HomeMy WebLinkAboutCT 06-13; TABATA 10; INTERIM AS-GRADED GEOTECHNICAL REPORT; 2015-05-21May 21, 2015
Lennar Homes
25 Enterprise, Suite 300
Aliso Viejo, California 92656
Attention: M-r. Brian Nestoroff
- -.----.
SUBJECT:. INTERIM AS-GRADED GEOTECHICAL REPORT
DeveIoprent\Cas'ero
Carlsbad, California
Mr. Nesteroff
In accordance with ybur request, we have prepared this second interim as-graded report
summarizing the results ''of the testing and observation services provided by Group Delta
Consultants to date at the Casero development in Carlsbad, California. The general contractor
/or this project was 1énnar Homes. The grading operations were conducted by James McMinn
Incorporated (JMI) and Clarke Grading Incorporated. Underground improvements were made
by Cass Constuctionand the Schilling Corporation. Paving operations were conducted by
4. Marathon General lncororated (MGI) Our geotechnical services for this phase of the project
were provided between September 4th of 2014 and May 15th, 2015
- N
/
1.0 PURPOSE AND SCOPE OF SERVICES
- .- - - -- .-.--- '4- -' -
This rert and the associated geotechnical services were provided in general accordance with
the provisions of the referenced agreement (Lennar, 2014) Our field personnel were provided
for this project in order to test and observe rem'diI earthbrk, fill placement and the
compaction operations. These observations and tests assisted-Us 'I'n developing professional
opinions regarding whether or not the geotechnical aspects of earthwork construction were
conducted in general accordance with our geotechnical recommendations and the geotechnical
requirements of the City of Carlsbad. Our services did not include supervision or direction of
the work of the contractor; his employees, or agents. Ourervices did include the following.
As-needed consultation during grading. Pertinent reports are referenced in Appendix A
Interim As-Graded Geotechnical Report GDC Project No. SD365
Casero Development May 21, 2015
Lennar Homes Page 2
Observation of the preparation of the existing ground in order to confirm that remedial
earthwork was conducted in accordance with our recommendations.
Performing field and laboratory tests on fill materials in order to support geotechnical
recommendations and conclusions. The laboratory test results are summarized in
Appendix B. The field density test results are shown in Appendix C.
Preparation of daily field reports summarizing the day's activity with regard to
earthwork, and documenting the hours spent in the field by our technicians.
Preparation of this interim report which summarizes site preparation to date, field and
laboratory test results, fill placement, and the compaction operations.
2.0 SITE DESCRIPTION
The subject site consists of the Casero residential development (formerly Tabata 10) located in
the City of Carlsbad, California. The site is located immediately southeast of the intersection
between El Camino Real and Camino Hills Drive, which form the northern and western property
boundaries, respectively. Existing single-family residential developments bound the southern,
eastern and western edges of the property. The approximate location of the site is shown on
the Site Location Map, Figure 1. The geotechnical conditions at the site were described in detail
in the referenced geotechnical investigation report (G DC, 2014a).
Site development included 26 two-story residential buildings supported by post-tension slab
foundations. Other site improvements included a new asphalt concrete paved residential
street, reconstruction of the northern terminus of Camino Hills Drive, new Portland cement
concrete sidewalks and driveways, several new retaining walls, and various subsurface utilities.
A blo-swale and detention basin were also constructed along the northern edge of the site. The
layout of the site and the lot numbers are shown on the Rough Grading Plan, Figure 2.
3.0 GEOLOGY
The site is located within the coastal plain section of the Peninsular Ranges geomorphic
province of California,. which consists of subdued landforms underlain by marine sedimentary
formations. Prior to the grading operations described herein, most of the site was covered with
alluvial flood plain deposits associated with Agua Hedionda Creek, undocumented fill, and
stockpiled fills. The Eocene-age Santiago Formation underlies'the entire site at depth.
DUP DELTA N:\Projects\SD\SD365 Lennar, Tabata Development\14-0178\14-0178R2.doc
Interim As-Graded Geotechnical Report GDC Project No. SD365
Casero Development May 21, 2015
Lennar Homes Page 3
The surficial soils used to cap the upper 3 or 4-feet of the building pad areas at the site
generally classify as silty or clayey sand (Unified Soil Classification System SM and SC).
Laboratory tests indicate that the fill soils typically have a low expansion potential (Ek50), and
a negligible soluble sulfate content based on commonly accepted criteria. Specific aspects of
the grading and improvement operations are described in more detail below.
4.0 GRADING AND IMPROVEMENT OPERATIONS
The geotechnical aspects of the grading and improvement operations to date included remedial
grading for the future building pad and improvement areas, and the placement and compaction
of fill soils to attain site grades. These operations are described in greater detail below.
4.1 Remedial Earthwork: Remedial grading was conducted within the planned building
pad areas in general accordance with the geotechnical recommendations presented in
the referenced report (GDC, 2014a). Remedial excavations were first conducted to
depths which typically varied from about 4 to 15 feet below the lowest existing grades
withinthe pad areas. The excavated soil was then placed as a uniformly compacted fill
to within 3 or 4 feet of finish pad grades. The upper 3 to 4 feet of fill soil placed within
: the building pads consisted of select, granular, imported, low expansion soil (EI<50). A
summary of the as-graded conditions beneath each building pad is presented in Table 1.
4.2 Fill Soils: The various materials used as fill are described in Figure B-i. The
maximum, densities and optimum moisture contents of the soils were determined in the
laboratory using ASTM D1557 as a guideline. The on-site fill soils generated from
excavations within the alluvium and formational materials generally consisted of lean to
fay clay with a variable amount of fine grained sand (CL or CH). For selected pavement
areas, the expansive clay subgrade was stabilized using 6 percent dry-hydrated lime in
general accordance with our recommendations (GDC, 2014g). The select granular
stockpiled fill material used to cap the building pad areas generally consisted of low
expansion (El<50) fine grained silty or clayey sand (SM or SC).
4.3 Fill Placement: Grading of the site was performed using typical grading techniques
with heavy earthmoving equipment. In-place moisture and density tests were
conducted during fill placement in general accordance with ASTM 06938. The results of•
these tests are presented in Appendix C. The approximate test locations are shown on
the Test Location Plan, Plate 1.
.
GROUP DELTLS N:\Projects\SD\SD365 Lennar, Tabata Development\14-0178\14-0178R2doc
Interim As-Graded Geotechnical Report GDC Project No. SD365
Casero Development May 21, 2015
Lennar Homes Page 4
The test locations and elevations were based on available field survey information
provided by the grading contractor, and should only be considered rough estimates.
The estimated locations and elevations should not be used for preparing cross sections,
or for the purpose of after-the-fact evaluating of the sequence of fill placement.
5.0 GEOTECHNICAL EVALUATION AND CONCLUSIONS
Based on the observations and tests we have conducted to date, it is our professional opinion
that remedial grading operations and improvement operations to date have been performed in
general accordance with the intent of our geotechnical recommendations, and with the
geotechnical requirements of the City of Carlsbad. Our conclusions are based on observations
and tests performed between September 4th of 2014 and May 15th, 2015. No representations
are made to the quality and extent of materials that we have not observed.
5.1 Compaction: In the areas we tested and observed, it is our professional opinion
that fill materials were placed in substantial accordance with the minimum compaction
criterion of 90 percent of the maximum dry density based on ASTM D1557. Our tests
indicate that pavement subgrade and aggregate base were placed in substantial
accordance with the minimum compaction criterion of 95 percent of the maximum dry
density based on ASTM D1557. Our tests also indicate that the asphalt concrete was
compacted to between 91 and 97 percent of the Rice density per ASTM D2041. The
density test results are presented in detail in Appendix C. The approximate density test
locations are shown on the Test Location Plan, Plate 1.
5.2 Building Pads: It is our professional opinion that remedial grading for the building
pads was conducted in general accordance with the intent of our geotechnical
recommendations. Laboratory tests were conducted on samples of the soils placed
within the foundation influence zone for the proposed residential structures. Testing
included expansion index and soluble sulfate content. The laboratory test results are
shown in Figures B-2.1 and B-2.2. The testing indicates that the new buildings will
generally be underlain by silty or clayey sand (SM or SC) with a low expansion potential
(Ek50) and a negligible soluble sulfate content. The as-graded conditions are
summarized in Table 1, and are also shown on the As-Graded Geotechnical Map, Plate 2.
RDUP DELTA. N:\Projects\SD\SD365 Lennar, Tabata Development\14-c178\14-0178R2.doc
Interim As-Graded Geotechnical Report GDC Project No. SD365
Casero Development . May 21, 2015
Lennar Hohes. Page 5
5.3 Foundations: All of the building pad areas were capped with 3 or 4-feet of low
expansion sand. The as-graded conditions beneath each lot are summarized in Table 1.
The 2013 CBC seismic design parameters are presented in Table 2. The updated post-
tension slab foundation design parameters are described in detail below.
Post-Tension Slabs (Category IA): The following post-tension slab foundation design
parameters are considered to be applicable to building pad areas that are underlain by
at least 4 feet of low expansion compacted fill. This condition applies to Lots 1, 2, 3, 14,
15, 16, 24, 25 and 26 only, as shown in Table 1.
Moisture Variation, em: Center Lift: 9.0 feet
- Edge Lift: 5.0 feet
Differential Swell, ym: Center Lift: 0.4 inches
Edge Lift: - 0.6inches
Allowable Bearing: 2,000 psf at slab sub grade
Post-Tension Slabs (Category IB): The following post-tension. slab foundation design
parameters may be used for building pad areas that are underlain by at least 3 feet of
low expansion compacted fill. This condition applies. to Lots 12, 13 and 17 to 23.
-.
Moisture Variation, em: Center Lift: 9.0 feet
' .. . . Edge Lift: 5.0 feet
Differential Swell, ym: Center Lift: . 0.5 inches
Edge Lift: 0.7 inches
Allowable Bearing: 2,000 psf at slab subgrade
Post-Tension Slabs (Category II): Lots 4 through 11 are underlain by highly expansive fat
clays derived from the Santiago Formation (Category II). These lots were all capped with
at least 4 feet of low expansion sand. The following post-tension slab design
parameters apply to Lots 4 through 11 only. I •
Moisture Variation, em: • Center Lift: 9.0 feet
Edge Lift: 4.8 feet .
Differential Swell, ym: Center Lift: 0.9 inches
Edge Lift: 1.4 inches
Allowable Bearing: 2,000 psf at slab subgrade
IN
DLJP DEL.TA, N:\Projects\SO\S0365 Lennar, Tabata Development\14•0178\14-0178R2.doc
Interim As-Graded Geotechnical Report GDC Project No. SD365
Casero Development May 21,2015
Lennar Homes Page 6
5.4 Pavements: R-Value tests were conducted on randomly selected samples of the
pavement subgrade soil collected from the site in general accordance with CTM 301.
The results were presented previously (GDC, 2014fhi). Recommendations for lime
stabilization were provided for areas with low the lowest R-Values (GDC, 2014g). The R-
Value testing is summarized in Figure B-3. The R-Values were used to develop
pavement section recommendations for the site, as shown in Figure B-3.
The pavement sections were constructed by first scarifying, moisture conditioning, and
compacting the surficial 12 inches of pavement subgrade. The recycled Class 2
Aggregate Base sections were then placed and compacted. A base course of Type Ill,
Class B2 asphalt concrete was placed directly over the compacted base. The equipment
used for construction of the pavement section included various loaders, water trucks,
vibratory rollers, and asphalt laydown machines.
Conformance testing was conducted on randomly selected samples of the aggregate
base placed at the site. Conformance tests for the base included particle size analysis,
R-Value, Sand Equivalent, and Durability, as shown in Figures B-4.1 through B-4.6. The
test results indicate that the base generally conformed to requirements for %-inch
Maximum Class 2 Aggregate Base from Section 26-1.02B of the 2010 Caltrans Standard
Specifications. However, it should be noted that the gradations for Samples AB-3 and
AB-4 did not meet the Caltrans requirements for Class 2 Aggregate Base in the No. 4 and
No. 30 sieve sizes. In addition, the Durability Index for Sample AB-1 and the Sand
Equivalent for Samples AB-3 did not meet Caltrans requirements. However, all of the
base samples had R-Values well above the minimum required of 78.
Conformance tests were also conducted on the Type Ill %-inch Maximum Class B2
asphalt concrete placed at the site. Conformance tests for the asphalt concrete
included asphalt oil extraction and gradation, Hveem and maximum theoretical (Rice)
densities, stabilometer, and air voids. The asphalt concrete conformance test results
are summarized in Figures B-5.1 through B-5.3. The conformance testing indicates that
the base course of the asphalt concrete generally met the gradation and quality
requirements from Section 400-4 of the 2012 SSPWC.
A~W'
GROUP DELTA. N:\Projects\SD\S0365 Lennar, Tabata Development\14-0178\14-0178R2.doc
InterimAs-Graded Geotechnical Report GDC Project No. SD365
Casero Development May 21, 2015
Lennar Homes 0 Page 7
6.0 LIMITATIONS
Our services were performed using the degree of care and skill ordinarily exercised, under
similar circumstances, by reputable soils engineers and geologists practicing in this or similar
localities. No warranty, express or implied, is made as to the conclusions and professional
advice included in this report.
We appreciate this opportunity to be of professional service. Feel free to contact the office
with any questions or comments, or if you need anything else.
GROUP DELTA CONSULTANTS
eqL 12L31-15 4,&4 •.1&
Matthew A. Fagan, G. . 2569 , James C. Sanders, C.E.G. 2258
Senior Geotechnical Engineer OF Senior Engineering Geologist
Distribution: (1) Addressee, Mr. Brian Nestoroff (Brian.Nestoroff@lennar.com)
0 (1) Addressee, Mr. Brett Hood (Brett.Hood@lennar.com) 0 SWDEM
f1m 2M (1) Addressee, Mr. Moses Kim (Moses.Kim@lennar.com) 0 00MFIED
GEOUXMW
13ROUP DELTA,_ N:\Projects\SO\S0365 Lennar, Tabata Development\14-0178\14-0178R2.doc
TABLES
TABLE I
LOT CONDITION SUMMARY
GDC PROJECT NO. SD365, Lennar Casero Development
Lot
Number
Building
Occupancy Type
Foundation
Category23
Reference
Elevation [FT]4
Finish Pad
Elevation [FT]
Remedial OX.
Bottom [fl11
Over-Excavation
Depth [El]1
Total Compacted
Fill Depth [FT]
Expansion
Index
Expansion
Potential
Sulfate
Content [%]
Sulfate
Exposure
1 Residential Category IA >90 103.2 -77 -13 -26 17 Low 0.02 Negligible
2 Residential Category IA > 97 108.2 -83 -14 -25 12 Low 0.02 Negligible
3 Residential Category IA > 105 113.3 -97 -8 -16 17 Low 0.04 Negligible
4 Residential Category II >112 114.2 -102 -10 -12 17 Low 0.08 Negligible
5 Residential Category II >117 115.3 -101 -14 -14 19 Low 0.09 Negligible
6 Residential Category II >115 114.4 -92 -22 -22 16 Low 0.02 Negligible
7 Residential Category II > 114 114.0 -108 -6 -6 23 Low 0.03 Negligible
8 Residential Category II >114 112.3 -106 -6 -6 15 Low 0.02 Negligible
9 Residential Category II > 113 110.5 -106 -5 -5 18 Low 0.04 Negligible
10 Residential Category II >113 109.6 -105 -5 -5 15 Low 0.03 Negligible
11 Residential Category II >112 108.9 -103 -6 -6 25 Low 0.03 Negligible
12 Residential Category lB >111 108.3 -99 -9 -9 19 Low 0.03 Negligible
13 Residential Category lB > 109 107.8 -99 -9 . -9 28 Low 0.04 Negligible
14 Residential Category IA >103 114.2 -92 -11 -22 10 Low 0.02 Negligible
15 Residential Category IA >102 112.7 -89 -13 -24 4 Low 0.02 Negligible
16 Residential Category IA >101 111.0 -90 -11 -21 13 Low 0.02 Negligible
17 Residential Category lB >101 109.7 -86 -15 -24 8 Low 0.02 Negligible
18 Residential Category lB > 102 109.1 -91 -11 -18 0 Low 0.02 Negligible
19 Residential Category lB > 102 108.4 -91 - 11 -17 1 Low 0.02 Negligible
20 Residential Category lB >102 107.8 -91 -11 -17 5 Low 0.01 Negligible
21 Residential Category lB >92 99.5 -76 - 16 -24 17 Low 0.04 Negligible
22 Residential Category lB >92 98.9 -77 -15 -22 5 Low 0.02 Negligible
23 Residential Category lB >91 99.7 -76 -15 -24 14 Low 0.02 Negligible
24 Residential Category IA >91 100.4 -76 -15 -24 10 Low 0.02 Negligible
25 Residential Category IA >92 101.1 -76 -16 -25 7 Low 0.02 Negligible
26 Residential Category IA >92 102.0 -76 -16 -26 24 Low 0.03 Negligible
NOTES: 1> As a minimum compressible soils were excavated and compacted throught the site as described in the Investigation report. Actual over-excavation bottom elevations are shown above.
For category IA lots, 401low expansion fill was used to cap the lots. For category lB lots, 3' of low expansion fill was used.
Category II foundations will be founded on 4of low expansion fill overlying highly expansive fill and daystone of the Santiago Formation.
The reference elevations for the recommended over-excavation depths were taken as the lowest natural grade on each lot.
Z
-J
cr
LU Q.
0.900 0.485 0.728 1 1.2
.2 1.0
4-
w
0.8 (2
(9
4- 0.6
a
Coll
0.4
1.000 0.437 0.655
1.100 0.397 0.595
1.200 0.364 0.546
1.300 0.336 0.504
1.400 0.312 0.468
1.500 0.291 0.437
1.600 0.273 0.409
1.700 0.257 0.385
1.800 0.243 0.364
1.900 0.230 0.345
2.000 0.218 0.328
2.100 0.208 0.312
2.200 0.198 0.298
2.300 0.190 0.285
2.400 0182 0.273
2.500 - 0.175 0.262
2.600 0.168 0.252
2.700 :o - 0.243
2.800 0.156 0.234
F=
TL
5=
SMI=
S=
S,=
To=
T5=
1.586 = Site Coefficient applied to S1 to account for soil type (CBC 2010 Table 1613.5.3(2)) Longitude:I -117.2865
sec = Long Period Transition Period (ASCE 7-05 Figure 22-16)
= site class modified short period (0.2 sec) MCE spectral response acceleration = F. x S, (CBC 2010 Eqn. 16-36)
= site class modified 1.0 sec period MCE spectral response acceleration = Fx S (CBC 2010 Eqn. 1647)
= site class modified short period (0.2 sac) Design spectral response acceleration = 213 x SMS (CBC 2007 Eqn. 1638)
= site class modified 1.0 sec period Design spectral response acceleration = 2/3x SMI (CBC 2007 Eqn. 1649)
sec = 0.2 S011S05 = Control Period (left end of peak) for ARS Curve (Section 11.4.5 ASCE 7-05)
sec = = Control Period (right end of peak) for ARS Curve (Section 11.4.5 ASCE 7-05)
8.00
1.147
0.655
0.765
0.437
0.114
0.571
T
conds)
Design MCE
1.4
Sa (g) Sa (g)
0.000 0.306 0.459
0.114 0.765 1.147
0.571 0.765 1.147
0.600 0.728 1.092
0.218
0.211
0.205
0.198
0.193
0.2
IIiio~ME
M
:::r 1u II(!JjIUU .....u.u.u-
MEN _ Im
ii!ENiU1!IIIUIIIIl1!1k
ME MEM
IUINIIU
TABLE 2
2013 CBC ACCELERATION RESPONSE SPECTRA
GDC PROJECT NO. 5D365, Lennar Casero Development
1.070 g = short period (0.2 sec) mapped spectral response acceleration MCE Site Class B (CBC 2010 Fig. 1613.5(3) or USGS Ground Motion Calculator)
S1= 0.413 g = 1.0 sec period mapped spectral response acceleration MCE Site Class B (CBC 2010 Fig. 1613.5(4) or USGS Ground Motion Calculator)
Site Class= 0 = Site Class definition based on CBC 2010 Table 1613.5.2
F= 1.072 = Site Coefficient applied to S to account for soil type (CBC 2010 Table 1613.5.3(1)) Latitude:I 331439
0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Period (seconds)
V 1 r
j ç, -# .1 '•
IV-
IC
JA
4
Acts
AA f\
si
LI(t V7 • -
BIORETENTION BASIN (TREATMENT, HMP AND PEAK )LOW ATTENUATION) SECTION 'A.A
- I -
CAMINO HILLS DRIVE (PER OWO, 475-701 SECTION
CAMINO HILLS DRIVE (PER DWC,472.70( SECTION tC WTX—
cr'
Bs
,.
- —
'
LOT I.S.6.1.O
SECTION '0-0'
PLATES
I I
r I I I
I I I
I
I
III! I I
Explanation
----a
aw
tfl
S0385
,.oflo
RADED GEOTECI-tNICAL MAP
APPENDIX A
REFERENCES
American Society for Testing and Materials (2006). Annual Book of ASTM Standards, Section 4,
Construction, Volume 04.08 Soil and Rock (I); Volume 04.09 Soil and Rock
Geosynthetics, ASTM, West Conshohocken, PA, Compact Disk.
APWA et al. (2006). Standard Specifications for Public Works Construction,. Untreated Base
Materials, Asphalt Concrete, BNI, Vista, CA.
Group Delta Consultants (2013). Geotechnical Review, Tabata 10 Subdivision, Carlsbad, CA,
Project 1R596, AUgust 30.
Group Delta Consultants (2014a). Geotechnical Investigation, Tabata Development, Carlsbad,
California, Project No. 5D365, Document No. 13-0339, March 4.
Group Delta Consultants (2014b). Supplemental Settlement Monument Details, Casero
Development (Formerly Tabata), Carlsbad, CA, Project No. 5D365, Document No. 14-
0105, June 18.
Group Delta Consultants (2014c). Updated Foundation Recommendations, Casero
Development, Carlsbad, California, Project No. SD365, Document No. 14-0117, July 16.
Group Delta Consultants (2014d). Grading Plan Review, Tabata 10 Development (a.k.a. Casero),
Chula Vista, California, Project No. SD365, Document No. 14-0158, August 13.
Group Delta Consultants (2014e). Seismic and Geologic Hazards, Casero Carlsbad, California,
Project No. SD365, Document No. 14-0165R, September 3. .
Group Delta Consultants. (2014f). . Testing of Pavement Subgrade Materials, Casero
Development (Reef Circle Street), Chula Vista, CA, Project No. SD365, Document No. 14-
0197, October 2.
Group Delta Consultants (2014g). Lime Stabilization Recommendations, Casero Development,
Carlsbad, CA, Project No. 5D365, Document 14-0203, October 30. .
Group Delta Consultants (2014h). Testing of Pavement Sub grade Materials, Casero
Development (Camino Hills Drive), Carlsbad, California, Project No. D365, Document 14-
0197R, dated November 13. . . .
'A GROUFMKILT-1 . .,
.
. N:\Projects\SD\SD365 Lennar, Tabata Development\14-0178\14-0178R2.doc
APPENDIX A
REFERENCES (Continued)
Group Delta Consultants (2014i). Testing of Pavement Subgrade Materials (Revised), Casero
Development (Camino Hills Drive), Carlsbad, California, Project No. D365, Document 14-
0197112, dated November 18.
Lennar Homes of California, Inc. (2014). General- Agreement for Consulting Services, Casero
(Tabata), Carlsbad, Contract No. 19545880, May 5.
Post-Tensioning Institute (2007). Standard Requirements for Analysis of Shallow Concrete
Foundations on Expansive Soils and Addendum No. 1 to the 3rd Edition of the Design of
Post-Tensioned Slabs-on-Ground, Phoenix Arizona, May, www.post-tensioning.0rg
DLJP DEL_TA, N:\Projects\SD\SD365 Lennar, Tabata oevelopment\14-0178\14-0178R2doc
APPENDIX B
LABORATORY TESTING
Selected samples were tested using generally accepted standards. Laboratory testing was
conducted in a manner consistent with the level of care and skill ordinarily exercised by
members of the profession currently practicing under similar conditions in the same locality.
No warranty, express or implied, is made as to the correctness or serviceability of the test
results or the conclusions derived from these tests. Where a specific laboratory test method
has been referenced, such as ASTM, Caltrans, or AASHTO, the reference applies only to the
specified test method and not to associated test methods or practices, and the test method has
only been used as a guidance document for the performing the test, and not as a "Test
Standard." A brief description of the tests performed follows:
Classification: Soils were classified visually according to the Unified Soil Classification System as
established by the American Society of Civil Engineers in general accordance with the
procedures outlined in ASTM test method D2488.
Maximum Density/Optimum Moisture: The maximum density and optimum moisture of
selected fill soil samples were determined by using test method ASTM test method 01557. For
samples with more than 10 percent plus %-inch material, the maximum densities and optimum
moisture contents were corrected using ASTM D4718 as a guideline. The test results are
summarized in Figure B-i.
Expansion Index: The expansion potentials of selected samples of finish grade soils within the
building pad areas were estimated in general accordance with the laboratory procedures
outlined in ASTM test method D4829. The results are summarized on Figures B-2.1 and 8-2.2.
Sulfate Content: To assess the potential for reactivity with concrete, selected soil samples
were tested for water soluble sulfate. The sulfate was extracted from the soil under vacuum
using a 10:1 (water to dry soil) dilution ratio. The extracted solution was tested for water
soluble sulfate in using ASTM 0516. The results are also presented in Figures B-2.1 and B-2.2. •
DLJP DELTA N:\Projects\SD\SD365 Lennar, Tabata Development\14-0178\14-0178R2.doc
APPENDIX B
LABORATORY TESTING (Continued)
R-Value: R-Value tests were performed on selected pavement subgrade materials in general
accordance with California Test Method 301. The test results are summarized in Figure B-3.
Base Conformance Tests: Conformance testing was conducted on a selected sample of the
recycled Class 2 aggregate base used at the site. Individual laboratory tests included Sieve
Analysis (ASTM C136), Sand Equivalent (ASTM D2419), R-Value (ASTM 02844), and Durability
(ASTM D3744). The test results are presented in Figures B-4.1 through 8-4.6.
Asphalt Conformance Tests: Laboratory conformance testing was also conducted on selected
samples of the asphalt concrete used at the site. Individual laboratory tests included Extracted
Gradation (ASTM C136), Specific Asphalt Content (ASTM D6307), Hveem Density (ASTM D2726),
Maximum Theoretical Density (ASTM D2401), and Stabilometer (ASTM D1560). Air voids were
calculated using ASTM D3203. The results are shown in Figures B-5.1 through B-5.3.
I
DUP DELTA N:\Projects\SD\S0365 Lennar, Tabata Developrnent\14-0178\14-0178R2.doc
MAXIMUM DENSITY & OPTIMUM MOISTURE
- (ASTM D1557)
ID DESCRIPTION
MAXIMUM
DENSITY
[lb/ft3]
OPTIMUM
MOISTURE
[%]
1 Moderate yellow brown clayey sand (SC). 119 1134
2 Dark yellow brown clayey sand (SC). 123 10Y2
3 Light olive brown sandy lean clay (CL). 120 12
4 Yellow brown sandy lean clay (CL). 11934 12
5 Dark yellow brown silty sand (SM). 12134 111/2
6 Dark yellow brown lean clay with 6% lime (CL). 121 14
B Recycled %-inch Maximum Class 2 Aggregate Base. 119 1134
Document No. 14-0178
GROUP DELTA LABORATORY TEST RESULTS Project No SD365
FIGURE B-i
EXPANSION AND SULFATE TEST RESULTS
(ASTM 04829 & D516)
ID SAMPLE DESCRIPTION SOLUBLE
SULFATE
EXPANSION
INDEX
El-i Lot 1 - Moderate yellow brown clayey sand (SC) 0.02% 17
El-2 Lot 2 - Moderate yellow brown clayey sand (SC) 0.02% 12
EI-3 Lot 3 - Moderate yellow brown clayey sand (SC) 0.04% 17
El-4 Lot 4 - Moderate yellow brown clayey sand (SC) 0.08% 17
El-S Lot 5 - Moderate yellow brown clayey sand (SC) 0.09% 19
EI-6 Lot 6— Moderate yellow brown clayey sand (SC) 0.02% 16
El-7 Lot 7— Moderate yellow brown clayey sand (SC) 0.03% 23
EI-8 Lot 8 - Moderate yellow brown clayey sand (SC) 0.02% 15
El-9 Lot 9 - Moderate yellow brown clayey sand (SC) 0.04% 18
EI-10 Lot 10 - Moderate yellow brown clayey sand (SC) 0.03% 15
El-11 Lot 11 - Moderate yellow brown clayey sand (SC) 0.03% 25
EI-12 Lot 12 - Moderate yellow brown clayey sand (SC) 0.03% 19
El-13 Lot 13 - Moderate yellow brown clayey sand (SC) 0.04% 28
EXPANSION INDEX POTENTIAL EXPANSION
0t020 Very low
21to50 Low
51to90 Medium
91 to 130 High
Above 130 Very High
SULFATE CONTENT [%] SULFATE EXPOSURE CEMENT TYPE
0.00 to 0.10 Negligible -
0.10 to 0.20 Moderate II, IP(MS), IS(MS)
0.20 to 2.00 Severe V
Above 2.00 Very Severe V plus pozzolan
Document No. 14-0178
RDLJPDTZ LABORATORY TEST RESULTS Project No. 5D365
FIGURE B-2.1
EXPANSION AND SULFATE TEST RESULTS
(ASTMD4829 & D516)
ID SAMPLE DESCRIPTION SOLUBLE
SULFATE
EXPANSION
INDEX
El-14 Lot 14— Dark yellow brown silty sand (SM) 0.02% 10
El-15 Lot 15 - Dark yellow brown silty sand (SM) 0.02% 4
El-16 Lot 16 - Moderate yellow brown clayey sand (SC) 0.02% 13
EI-17 Lot 17— Dark yellow brown silty sand (SM) 0.02% 8
EI-18 Lot 18 - Dark yellow brown silty sand (SM) 0.02% 0
EI-19 Lot 19 - Dark yellow brown silty sand (SM) 0.02% 1
El-20 Lot 20— Dark yellow brown silty sand (SM) 0.01% 5
El-21 Lot 21 - Moderate yellow brown clayey sand (SC) 0.04% 17
El-22 Lot 22 - Dark yellow brown silty sand (SM) 0.02% 5
El-23 Lot 23 - Moderate yellow brown clayey sand (SC) 0.02% 14
El-24 Lot 24— Dark yellow brown silty sand (SM) ' 0.02% 10
EI-25 Lot 25 - Dark yellow brown silty sand (SM) 0.02% 7
El-26 Lot 26 - Moderate yellow brown clayey sand (SC) 0.03% , 24
EXPANSION INDEX POTENTIAL EXPANSION
.-0to20 Very low
21to50 Low
51 to 90 Medium
91 to 130 High
Above 130 Very High
SULFATE CONTENT [%] SULFATE EXPOSURE CEMENT TYPE
0.00to0.10 ,. . Negligible -
0.10 to 0.20 Moderate
, II, IP(MS), IS(MS)
0.20 to 2.00 • 'Severe V
Above 2.00 Very Severe V plus pozzolan
4 . GROUP DT1 , LABORATORY TEST RESULTS
Document No. 14-0178
Project No. 5D365
FIGURE B-2.2
R-VALUE TEST RESULTS
(CTM 301)
Sample
No. Sample Date Street Name Sample
Location Sample Represents R-Value
R-1 10/10/14 Reef Circle Station 17+00 Reef Circle Street, Station 16+00 to 19+00 5
R-2 10/14/14 Reef Circle Station 25+50 Reef Circle Street, Station 24+00 to 27+00 20
R-3 10/15/14 Reef Circle Station 22+00 Reef Circle Street, Station 21+00 to 24+00 24
R-4 10/15/14 Reef Circle Station 20+00 Reef Circle Street, Station 19+00 to 21+00 10
R-5 11/10/14 Camino Hills Station 14+00 Camino Hills Drive, Station 13+00 to 16+00 14
R-6 11/14/14 Camino Hills Station 11+00 Camino Hills Drive, Station 10+00 to 13+00 12
R1* 10/23/14 Reef Circle Station 17+00 Reef Circle Street, Station 16+00 to 19+00 67
R4* 10/23/14 Reef Circle Station 20+00 Reef Circle Street, Station 19+00 to 21+00 72
NOTE: Samples R1* and R4* were retested using 6.0% dry-hydrated lime slurry.
RECOMMENDED PAVEMENT SECTIONS
- Pavement Area
Design
R-Value
Traffic
Index
Asphalt
Section
Base Section / Lime
Treated Soil (LTS)
Camino Hills Drive, Stations 10+00 to 16+50 12 6.0 4 Inches 10 Inches
Reef Circle Street, Stations 16+50 to 21+00 5 5.0 4 Inches 4 Inches /8 Inches LTS
Reef Circle Street, Stations 21+00 to 27+00 5 5.0 4 Inches 8 Inches
NOTE: Lime stabilization was only conducted between Stations 16+50 and 21+00 of Reef Circle Street.
GROUP DE:LTA, LABORATORY TEST RESULTS
sQQ11
Document No. 14-0178
Project No. SD365
FIGURE B-3
GRADATION ANALYSIS
SIEVE
SIZE
_____
PERCENT
FINER AS
TESTED
SPECIFIED
OPERATING
RANGE
1" 100 100
3/4" 95 90 -100
3/8"
No. 4' 58 35-60
No.8 45
No. 16 33
No. 30 23 10-30
No. 50 16
No. 100 10
.No. 200 6.8 2- 9
I, of iiiuiu•_iuuuiui__._IIuiiuii_ iiuuiui•iiiiii••----iiiiiuu _iiuuuu•____ iiiii•wiiiii•i•_iiiiuii•_uuuiui•____
I iiiil•U•i%!iIiIIU••_iiiuiuu•_iiiuuiu•____ • iiiiiuu•uiiii ____iiiuiu• ____iiuuuu••____ • iiIiii••hIIUU ____uiuiui••_iiiiii••____ • _ iiuuui•• iiiiuu• • iuiuii••_iiuiu.._iiI11iLIEIU
____
0111111111111 • iiiiiu•____ iiiiu•_iiiiiu•va____ iuiuuu•____ • iiiiiiu• iiii•____ iiiu••a____ uuuiu•____ uuuiuui• IkiImob iiIiiU4• iiiiii • iiiiuuu• iiiuu•iuiii• iuiuuu••____ ____
iuuuui•• iiII!••!iiII!iU• iiiiii••____ • iiuuuuu• liii hII•--IIIIIUU iiiiuiu II!II _iiiia• iiiiiu••____ ____
• iiiuiiu• iuiu•. iiu iiiiuuu•____ uinuu•iiiiiu••iuiiiiiiuuuuu • uuuiiui•iiiuii ___i!!IIl!iIIIU••___ ill ___IIhiLIIU••___ • iiuuu... ___ iiuiuu. iiiiiuu•;:iiu•
I I •I
CLASS 2 AGGREGATE BASE, 3/4" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS QUALITY SPECIFICATIONS
2010 EDITION, SECTION 26-1.0213
SAMPLE ID: AB-1 (Recycled)
DATE SAMPLED: 11/14/2014
SAMPLE LOCATION: Reef Circle Street (@ 23 Tons)
MAXIMUM DENSITY (ASTM D1557)
MAXIMUM DENSITY: 1171/2 PCF
OPTIMUM MOISTURE: 12%
- RESULTS SPECIFIED
R-VALUE(CTM 301) 85 78 MIN
SAND EQUIVALENT (CTM 217) 40 22 MIN
DURABILITY (CTM 229) 28 35 MIN
LA ABRASION, 100 REV (CTM 131) -- 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52 MAX-
Document No. 14-0178 ISR OUP DELTA- CONFORMANCE TEST RESULTS Project No. SD365
FIGURE B-4.1.
GRADATION ANALYSIS
SIEVE
SIZE
_____
PERCENT
FINER AS
TESTED
SPECIFIED
OPERATING
RANGE
1" 100 100
3/4" 98 90-100
3/8' 77
No.4 56 35-60
No.8 44
No. 16 32
No. 30 20 10-30
No. 50 12
No. 100 7
No. 200 4.4 2-9
iiiiiii1iiiii•i_•uuuii.ui •_Is_iiiu...___ iiiiuuuuuiiuu•• iiiiiu••_iiiiiiu•____ uuuuuuu•viiuiiuu• iiiiiii ____iiiuuui iiiuiu••iiiuiuu•• iuiuuiu•_iuiiuui____ ____
• iiiiii••uuiiu• ____uuiiiuu•_iiiiiiu•____ • iIiIi•l•hIiU• iiiiiu••_iuiiuiu•____ • iiiiiu••iiiuu•• iiiiuuu• uu•••u iuuuuuu• Iii ____
• iiiiii• ____uiiii•_IIIIIUUV1 uiuuuiu•____ • iuuiuuu• MIII ____iiuuuu ____iiiiui••____ iuiiiui•____ uiiiiuvi•_iiiuuuu•____ uiuuuuu•_iiuuuuuiiii•_uuuuuu••____ • iuuuuuu•_IIIU!•!IIII!4I•_iiiiii••____ • 1111100MMININIUMM,Ii!!I•• iiiiu.i ____ii!iU•____ iiiu ____iiiuuii • iiii• iiiiu• iiiu• iuuuiui____ ____
iiuui•••iiiii•••iiiuiiiiiiii • niiiu•miiiiiu•• ___
liii_
___
___IIIhUhIlIU•___ ___
• iiiiiu•• iiuiiuu• uiiiiiu;:tuuuu• MAXIMUM DENSITY (ASTM D1557)
MAXIMUM DENSITY: --
OPTIMUM MOISTURE: --J -
CLASS 2 AGGREGATE BASE, 314" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS QUALITY SPECIFICATIONS RESULTS SPECIFIED
2010 EDITION, SECTION 26-1.02B
SAMPLE ID: AB-2 (Recycled)
DATE SAMPLED: 11/20/2014
SAMPLE LOCATION: Reef Circle Street, Station 20+00
R-VALUE (CTM 301) 83 78 MIN
SAND EQUIVALENT (CTM 217) 60 22 MIN
DURABILITY (CTM 229) 54 35 MIN
LA ABRASION, 100 REV (CTM 13 1) -- 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52MAX
Document No. 14-0178 0~k GROUP DELTA CONFORMANCE TEST RESULTS Project No. 5D365
FIGURE B-4.2
uiiini1u1.uu• ii.i..i• iuiiuuu•____
I iiiiiu•iuuuiu•• iiuiui• iiiuuu••____ uiiui••iiiiiu•• iiiiiu• ____iiiiuui uuuuuuu•i;uuuuuu• iiuiuui ____iiuiuuu____ ____
• iiiiii••iiiu•• iiilllR• uuiiiu••____ • iuuiuu••iuiu• iiiiii• IIIIu.._____ • iuuuiuu•iiuiiuu• iuiiiuu• iiiiuu•• • uuiu...• iiiiu•_iii_ • iiiiiu••____ uiui ____iiiuii• 1_uuiuiu••____ • iiiiiu•• iiiiiu•a_iiiiuu••____ iiiiiu••_IkiiI•lIIIIiV4 ____iiiiuuu•____ iuuiuuu•_iiiuuu•iiiiuu•_nuuiu••____ • uIII!••'!IIIi!AU•_111111lU____ • iiiiiu••_iiiii•_Ii!AIU•_iiiuiui•____ iiiiiu••_Ii!iUI ____iiiiu•_iuuuii • iiiiiu•• IIIIul uiiiui••____ ____
• iiiiiu•iuiuii•• i!!IU•U!iIIIUI liii ___iiiii ___ILIUUU•___ ___
• ___ iuuuu..•::uu..• ,iiiuiu•• MAXIMUM DENSITY (ASTM D1557)
MAXIMUM DENSITY: I --
OPTIMUM MOISTURE: --
GRADATION ANALYSIS
SIEVE
SIZE
_____
PERCENT
FINER AS
TESTED
SPECIFIED
OPERATING
RANGE
1" 100 100
3/4" 99 90 -100
3/8" 83
No.4 65 35-60
No.8 52
No. 16 39
No. 30 28 10-30
No. 50 19
No. 100 12
No. 200 7.8 2- 9
CLASS 2 AGGREGATE BASE, 314" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS
2010 EDITION, SECTION 26-1.02B
SAMPLE ID: AB-3 (Recycled)
DATE SAMPLED: 12/1/2014
SAMPLE LOCATION: Reef Circle Street (@ 25 Tons)
QUALITY SPECIFICATIONS RESULTS SPECIFIED
R-VALUE (CTM 301) 84 78 MIN
SAND EQUIVALENT (CTM 217) 48 22 MIN
DURABILITY (CTM 229) 33 35 MIN
LA ABRASION, 100 REV (CTM 131) - 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52 MAX
, Document No. 14-0178 GROUP DELTA CONFORMANCE TEST RESULTS Project No. SD365
- FIGURE B-4.3
uuiiiuu•uiiuiiu• iiiiuuu• iiuuuum•____ lIiiIUU%iiiiIi•• iuuuui••_uiuuuui lIIIIil•I%IiIlii• uIIIu.R_ iiiii•____ ____
iiiuiuuiiiii•i ____iiiiiuu•_iiiiiuu • IIIUIU••iliUR ____iuiiii••_iiiuii• ____ • iiuIIUU•hhil• iiiiu• iiiiui••____ ____
• iiiiiu•niui• uiiiuu•• iiiiiu• iiiii..• uiiiU•L _III_1I_IEIUU ____ • 11111MEMM011190MMIIIIIIIVI_iiiiiii ____ • iiiuiuu•_iiuuiiiiuuuu uiuuu••____ uuiuuu••_lKiIUUIIIIIlV4•_iiiiii••____ ____
iuuiiu• ____iuiui•uuuuu•_iuuuuuu•____ iiuiii• ____illi!i!hW4U•_iuuuuui•____ • iiiiuu••_iiiiiiu•____ ____iiiiui•____ iiiuiii•_ii!IU ____iiiii ____iiuiiui•____ • iiiiiiu• uiiiu•. ulIIu. iiuiiu••____ iuiiiuu•iuuuiu•iuuiuuuuiiuiu••___ • iiiiiu•iiiiuii• 1!!I•U•!iIIIIU•___ iiiiiiriiu• IIIii5 _iiuui•____ • INEWMIIuIu.._ iiu.i..•::ui...
,In MAXIMUM DENSITY (ASTM 01557)
MAXIMUM DENSITY: --
OPTIMUM MOISTURE: --
GRADATION ANALYSIS
SIEVE
SIZE
_____
PERCENT
FINER AS
TESTED
SPECIFIED
OPERATING
RANGE
1" 100 100
3/4" 98 90 -100
3/8" 85
No.4 71 35-60
No.8 61
No. 16 48
No. 30 35 10-30
No. 50 22
No. 100 12
No. 200 6.7 2-9
CLASS 2 AGGREGATE BASE, 314" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS
2010 EDITION, SECTION 26-1.02B
SAMPLE ID: AB-4 (Recycled)
DATE SAMPLED: 12/1/2014
SAMPLE LOCATION: Reef Circle Street (@ 570Tons)
QUALITY SPECIFICATIONS RESULTS SPECIFIED
R-VALUE(CTM 301) 81 78 MIN
SAND EQUIVALENT (CTM 217) 55 22 MIN
DURABILITY (CTM 229) 50 35 MIN
LA ABRASION, IOO REV (CTM I3I) -- 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52 MAX
Document No. 14-0178 GROUP DELTA CONFORMANCE TEST RESULTS Project No. 5D365
FIGURE B-4.4
GRADATION ANALYSIS
SIEVE
SIZE
____
PERCENT
FINER AS
TESTED
SPECIFIED
OPERATING
RANGE
1" 100 100
3/4" 95 90 -100
3/8" 76
No.4 59 35-60
No.8 47
No. 16 36
No. 30 27 10-30
No. 50 17
No. 100 10
No. 200 6.0 2- 9
II
iuiiuu••iiiiuu• ____uiiiiu•• iiiuuuu•____ uiuiuu•uiiiii•_iiiiiii•_iiuuiii____ iiiiii•iiiiiiuu ____uuuuuuu•_uiiiiiu•____ • iuuuuuu•iuiuu•u_iiiui•••_iiuuuu••____ • IiIIiI•IhIIIU•_iuiiiuu ____uuuiiiu•____ • iiiii•••iiiuuu•_iiiiuuu• iiiuiuu• iiiiiui•_iiiiu.•_iii • iiiiiui•____ iiIIiR•_-IIIIIU•VA_iiiuuuu•____ ____ ____ • uuuiuuu•_kiIII1 ____uiiiii ____iiiuuu••____ iiiiiu• ____ikiiIRL IIIIUIYA ____uuiiiiu•____ uuuiuu••____ iiiuuiuiiuuia•_iiuuuuu•____ • iiiii.••_IIII!U!IIIU!iN•_iuuii.u•____ uiiiiu••_iiuiu ____iiiuuiu•____ iiiiiu••_II!IUhi ____ ____iuiu•_iiiuii••____ • iiiiiu•• !IIUI iuuii iiiuuu••____ uuuuuuu•iuuuuum•uuiuiuiiiuuuu•___ • iiiiiui•iiiiui•• i!il•!iIII•••___ liii ___iihi:!iuii•• • iiiiu•• ___ iiiiuu•• iuuiuu;:iuui•
I, I • I,
MAXIMUM DENSITY (ASTM D1557)
MAXIMUM DENSITY: --
OPTIMUM MOISTURE: --
RESULTS SPECIFIED
CLASS 2 AGGREGATE BASE, 3/4" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS
2010 EDITION, SECTION 26-1.02B
SAMPLE ID: AB-5 (Recycled)
DATE SAMPLED: 1/7/2015
SAMPLE LOCATION: Camino Hills Drive, Station 12+00
QUALITY SPECIFICATIONS
R-VALUE(CTM 301) 80 78 MIN
SAND EQUIVALENT (CTM 217) 58 22 MIN
DURABILITY (CTM 229) 46 35 MIN
LA ABRASION, 100 REV (CTM 131) -- 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52 MAX
Document No. 14-0178
'03V GROUP DELTA CONFORMANCE TEST RESULTS Project No SD365
iiiiiu••uiiuiuu•_iiiiiuu•_iiiiuiu•____ iiiuiuu•iiiiiui•_iiiiiii _IIIII______ uuuuuuu•aiiuuuua•_iuiuuuu•_iuuuuu••____ • iiiiii•uiiii• _iiiuuu••_iiiiiii•____ • iiIIiiliIIII••_uuuuuuu•_iiiuuiu•____ • lIiIiUi•IKIUU•_iiiui•••_iiiuuu•• IIIIu..__iiiiii ill SPECIFi6~Ti6N' EM • uiuuiuu iiuii• 1111111 VA iiiiii••____ • IIIIIl.__iiuiii ____ iiiiiu• uuuuui••____ uuuuiuu•_IIhUIIl IIiIIUV4• iiuiuui•____
, iiiiiii• uiiui••uuiuuu• iiuuuu••____ • iiiiiiu liii!!uIil!4•• iiuuiui•____ • iiii•••_iiiuiu•____ ____11111um uiiiiui ____II!IU ____iiiii•i ____
I iiiii••• ____ IuuuII iiiiiu•____ ____
• iiiiiu••iuiiii•• i!!IIU!iIIIII•___
IN _________•iiu•_iuu,i • i,uuuuu•• iiiiuuu• iuiiu..•:::ii... ___
____
all
MAXIMUM DENSITY (ASTM D1557)
MAXIMUM DENSITY: I --
OPTIMUM MOISTURE: --
GRADATION ANALYSIS
SIEVE
SIZE
____
PERCENT
FINER AS
TESTED
SPECIFIED
OPERATING
RANGE
1" 100 100
3/4" 94 90 -100
3/8" 74
No.4 57 35-60
No.8 46
No. 16 36
No. 30 26 10-30
No.50 17
No. 100 11
No. 200 7.0 2- 9
CLASS 2 AGGREGATE BASE, 314" MAXIMUM
CALTRANS STANDARD SPECIFICATIONS
2010 EDITION, SECTION 26-1.02B
SAMPLE ID: AB-6 (Recycled)
DATE SAMPLED: 1/9/2015
SAMPLE LOCATION: Camino Hills Drive, Station 14+00
QUALITY SPECIFICATIONS RESULTS SPECIFIED
R-VALUE(CTM 301) 81 78 MIN
SAND EQUIVALENT (CTM 217) 51 22 MIN
DURABILITY (CTM 229) 36 35 MIN
LA ABRASION, 100 REV (CTM 131) -- 15 MAX
LA ABRASION, 500 REV (CTM 131) -- 52 MAX
4 ,
. Document No. 14-0178 'GROUP DELTA CONFORMANCE TEST RESULTS , Project No. 5D365
FIGURE B-4.6
.1 •I •i, •• I,
S I
I
I mom
I
I
I
I
II I I SI
iiiii•iiiiiii• _iiuiuuu• iuiiii•• iiiii•iiiiiuu•_uuuuuuu•iiiiii iiiuimiiiiuii•_IiIiIl._IiIuIi.__ iiiiuiu•ii.iii•_iiiui•_—iuuiuii iiiiiuu•iiiuii• uiiiii•uiiui••- ___uiuuiu••oiiii•-. iiiiiui•niiii___ iiiIU•UiiI!lIiIiIIU•--lliKUE---- IIIIIUlriIClIII----IIIIIIU -iiiiiii• iiuiiii•___ iuiii•••_iIIUi ___ _flRPJ1flh1•• ___
iiiiiu• iiiiuu _uuuuuuu•____ iuiiiu••_iiiiu••iiiiiuri ____iiiiu•.
iiiuiu• ilhI!IIII!4I ____iiiiiu••____
iiiiiU•HIii ii'iuu•_uuuiuiu ____iiiiuu••____
uiiiii••_IIIIll._____ ____
iiiii•iu iiIIUU•i!IUI. iiiii•••____
IIIIIIllhIII Ihi!UhIIIU iiiiiuu• iiiiii• ____
- - -
- .
-4 ..-- -..--. ---.-.-. ---.-.-4 -- - -- -
4 -
SIEVE
SIZE
PERCENT
FINER AS
SPECIFICATION
INDIVIDUAL MOVING
TESTED TEST RESULT AVERAGE
1" 100 100 - 100
3/4" - 99 87 -100 90 -100
1/2" 84
3/8" 63 50 -80 60 -75
No.4 35 30-60 40-55
No. 8. 26 22-44 27-40
,No. 16 20
N6.30 16 8-26 12-22
No.50 11 -;
No'. 100 6
No. 200 3.5 * 1 -8 3 - 6
-
TEST
RESULTS . RESULTS SPECIFIED
.4
- - - _.4•4 .. - _ - - *._._-_,-__.-."-____ - u.- - _-,p;
•
q - ,_. - .,.. -. -.- . - ,.'_. -
QUALITY SPECIFICATIONS
IIiIiIU!1IUU
GROUP
TYPE III CLASS B2 ASPHALT CONCRETE
"STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION", 2012 EDITION, SECTION 400-4
SAMPLE ID: AC-1 (Escondido Asphalt, Inc.)
DATE SAMPLED: . 11/24/2014 .
- SAMPLE LOCATION: Reef Circle Street (@ 21 Tons)
SAND EQUIVALENT (ASTM D2419) - -- 45 MIN.
STABILOMETER VALUE (ASTM D1560) .. 46 35 MIN
SPECIFIC ASPHALT CONTENT (ASTM D6307) 5.0% 4.6%-6.0%
HVEEM DENSITY (ASTM 1562) - - 152.8 -- N/A
MAXIMUM THEORITICAL DENSITY (ASTM D2041) -160.5 N/A
PERCENT AIR VOIDS (ASTM D2041) 4.8% 2.0%-6.0%
- - ', -. •
- '•.
4 . - .
. Document No. 14-0178
9.!FLT :: ..
ASPHALT CONCRETE CONFORMANCE Project No SD365
SIEVE
SIZE
PERCENT
FINER AS
SPECIFICATION
INDIVIDUAL MOVING
TESTED TEST RESULT AVERAGE
1" 100 100 100
3/4" 99 87 -100 90 -100
1/2" 77
3/8" 57 50 -80 60 -75
No.4 35 30-60 40-55
No.8 26 22-44 27-40
No. 16 20
No.30 15 8-26 12-22
No.50 10
No. 100 6
No.200 3.2 1-8 3-6
TEST
RESULTS SPECIFIED
iiiiiUU•RIIiiiU••_iuiuiiu ____uiiiii••____ uiiuiuu•iuiiuiuu• uiiiii•• uuuiiu••____ iiiiiu••iuiiiiuu• uiuuuus• iiiuuuu•____ uuiiuiu•itiiiiiu•• iiiiii•• uiuiuu••___ • uiiiu•miiuuuuu•• iiiiiuu• uiiiiui•____ uiuuiii•muuiiii iuuiuuu• uuiiiui•____ iiiiiU••liiIkiU• ____iiuuiiu• iiiiiu••____ • iiiuuu••_iiiii••_iiiiuu•• iiuiiu•____
I iiiuiuu• IUiiUhi iiiiiuu•___ ____ .- ____
• , uuuuuii•_iiii••. ___ uiuuiiw ___ ____uuiuiuu•____ ___
uuiiuuu• iii iu••iuiiiuri• uuuuuuu____ • IllilliR_HhI•!IUUI!4U•_iuiiiiu uuuuuui ____uiuuhi iiuu ____uuuuuu• ____ uuuiumu•_ ____uuuiui• ____ iiiiiii iIIU••ilh!IU• uiiiii• ____ ___!iIh•IIIlIlI ____ Ihi!UhIIU••____ ___ uuuiuuu• iuuuuuu uuiiii•iuu•
I, I I II
QUALITY SPECIFICATIONS
SAND EQUIVALENT (ASTM D2419) -- 45 MIN
STABILOMETER VALUE (ASTM D1560) 46 35 MIN
SPECIFIC ASPHALT CONTENT (ASTM D6307) 5.0% 4.6%-6.0%
HVEEM DENSITY (ASTM 1562) 153.3 N/A
MAXIMUM THEORITICAL DENSITY (ASTM D2041) 1601 N/A
PERCENT AIR VOIDS (ASTM D2041) 4.2% 2.0% - 6.0%
TYPE III CLASS B2 ASPHALT CONCRETE
STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION", 2012 EDITION, SECTION 400-4
SAMPLE ID: AC-2 (Escondido Asphalt, Inc.)
DATE SAMPLED: 11/24/2014
SAMPLE LOCATION: Reef Circle Street (@ 442 Tons)
Document No. 14-0178 RDUP DELTA ASPHALT CONCRETE CONFORMANCE Project No. 5D365
FIGURE B-5.2
iiiiiia•nuuiuu• iuiuui•• uuuiuu• iiiiuuaiuuuuu•• uiiiuuu• uuiui• ____ uuiuuu•i'iii•• uiiiiuu ____iiiuu•w_ ____ • uiiuiui•iiiiiu•• uuiiii•• liii.... • iiuuiuu.iuiuu•_iuiii••_iiiuuuu•____ iuiiiii•uuiuu••_uiiuuu• ____iiiiuui•____ • iiuuuuu•iiuuiiu••_uuiiiiu•_iiiiiu••____ • uuiiiu• iuiui• _iiiuuiu•_iiiiui••____
I iiuiiuu• 'iii,i.. ___iimiramn••___ uiiiuuu• iIIII ___
I iiiuiuu• Iiuu. iiiii•u llhiil••____ • uiiiii• ____uuiuuuuiiiuri•_uuiiuuu•____ iiuiiu• ____llhI!•!IIII!4•_iiiiiui•____ uuiiiii•_iiiiii••____
I iuuiiuu•_IiiPdU• ____uiiiiu••____ uuiiiiu !iiiU•iiiliN uiiiiuu•
I -LOWER LIMIT OF SPECIFICATION IIIIIIIIIIIII ____Ihi!U•IiIIU•____ • iuiiiuu uiiuiu•• IIIIIUI!!III••
I, I I II
TYPE III CLASS B2 ASPHALT CONCRETE QUALITY SPECIFICATIONS
"STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION", 2012 EDITION, SECTION 400-4
SAMPLE ID: AC-3 (Escondido Asphalt, Inc.)
DATE SAMPLED: 1/13/2015
SAMPLE LOCATION: Camino Hills Drive (@ 358 Tons)
SIEVE
SIZE
PERCENT
FINER AS
SPECIFICATION
INDIVIDUAL MOVING
TESTED TEST RESULT AVERAGE
1" 100 100 100
3/4" 99 87-100 90-100
1/2" 88
3/8" 71 50 -80 60 -75
No. *4 46 30-60 40-55
No.8 35 22-44 27-40
No.16 27
No.30 21 8-26 12-22
No. 50 14
No.100 8
No.200 4.3 1-8 3-6
TEST
RESULTS SPECIFIED
SAND EQUIVALENT (ASTM D2419) -- 45 MIN
STABILOMETER VALUE (ASTM D1560) 42 35 MIN
SPECIFIC ASPHALT CONTENT (ASTM D6307) 5.2% 4.6%-6.0%
HVEEM DENSITY (ASTM 1562) 151.5 N/A
MAXIMUM THEORITICAL DENSITY (ASTM D2041) 155.8 N/A
PERCENT AIR VOIDS(ASTMD2041) 2.8% 2.0%- 6.0%
- . . Document No. 14-0178
RDUP DELTL\ ASPHALT CONCRETE CONFORMANCE Project No 5D365
APPENDIX C
FIELD TEST RESULTS
The results of the field density tests taken during the grading operations at the subject site are
presented in the following Figures c-i through C-9. Note that the elevations and locations of
the field tests were determined by hand level and pacing relative to survey data provided by
the grading contractor.
The following abbreviations were used to describe tests reported in this appendix.
AB = Aggregate Base
AC = Asphalt Concrete
CG = Curb & Gutter
FG = Finish Grade
FBG = Finish Base Grade
FSG = Firi'ish SubGrade
iT = Joint Trench
ITS = Lime Treated Soil
NU = Nuclear Density Test . .
SID = Storm Drain
SG=SubGrade
SS = Sanitary Sewer
W = Water
WB = Wall Backfill
ESIROUP DELTA. N:\Projects\SD\SD365 Lennar, Tabata Development\14 0178\14 0178R2 doc
Document No. 14-0178
GROUP. DELTA DENSITY TEST RESULTS Project No. SD365 CIA FIGURE C-I
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction Compaction Number Method
[ft] [pcf] [%] [pcf] [%) 1%]
1 09/11/14 81 4 119.5 11.5 110.0 92 90 NU
2 09/11/14 82 4 119.5 14.6 112.2 94 90 NU
3 09/11/14 82 4 119.5 14.5 108.5 91 90 NU
4 09/11/14 83 4 119.5 13.8 107.9 90 90 NU
5 09/12/14 86 2 123.0 9.4 106.6 87 90 6 NU
6 09/12/14 87 2 123.0 9.2 104.9 85 90 7 NU
7 09/12/14 88 2 123.0 10.5 110.5 90 90 NU
8 09/12/14 89 2 123.0 12.5 111.4 91 90 NU
9 09/12/14 86 4 119.5 13.5 110.0 92 90 NU
10 09/12/14 87 4 119.5 12.8 108.8 91 90 NU
11 09/12/14 86 4 119.5 14.0 108.0 90 90 NU
12 09/12/14 87 4 119.5 15.2 107.5 90 90 NU
13 09/12/14 93 4 119.5 14.5. 107.3 90 90 NU
14 09/12/14 91 2 123.0 12.3 110.5 90 90 NU
15 09/12/14 92 2 123.0 12.3 111.5 91 90 NU
16 09/12/14 86 2 123.0 12.2 108.0 88 90 18 NU
17 09/12/14 87 2 123.0 11.5 107.6 87 90 19 NU
18 09/12/14 86 2 123.0 12.5 111.9 91 90 NU
19 09/12/14 87 2 123.0 12.9 112.1 91 90 NU
20 09/15/14 92 2 123.0 19.3 106.5 87 90 21 NU
21 09/15/14 92 2 123.0 14.6 111.1 90 90 NU
22 09/15/14 93 2 123.0 16.9 106.1 86 90 23 NU
23 09/15/14 93 2 123.0 12.8 113.5 92 90 NU
24 09/15/14 94 2 123.0 10.5 114.9 93 90 NU
25 09/15/14 95 2 123.0 10.8 115.6 94 90 NO
26 09/15/14 89 2 123.0 13.3 110.5 90 90 NU
27 09/15/14 90 2 123.0 10.4 110.2 90 90 NU
28 09/16/14 88 2 123.0 12.8 111.4 91 90 NU
29 09/16/14 91 2 123.0 20.8 100.1 81 90 30 NU
30 09/16/14 91 2 123.0 12.3 113.0 92 90 NU
31 09/16/14 99 4 119.5 10.3 108.3 91 90 NU
32 09/16/14 103 4 - 119.5 12.2 107.0 90 90 NU
33 09/16/14 104 4 119.5 12.0 108.6 91 90 NU
34 09/16/14 82 2 123.0 10.7 114.5 93 90 NU
35 09/16/14 84 2 123.0 11.4 110.3 90 90 NU
36 09/16/14 89 2 123.0 9.5 110.8 90 90 NU
37 09/16/14 88 2 123.0 10.7 110.1 90 90 NU
38 09/16/14 87 2 123.0 10.4 110.4 90 90 NU
39 09/16/14 92 2 123.0 16.3 113.4 92 90 NU
40 09/16/14 93 2 123.0 14.9 112.1 91 90 NU
41 09/16/14 92 2 123.0 11.5 110.8 90 90 NU
42 09/16/14 93 2 123.0 10.2 115.3 94 90 NU
43 09/17/14 95 2 123.0 15.5 111.2 90 90 NU
44 09/17/14 96 2 123.0 16.0 110.7 90 90 NU
45 09/17/14 95 4 119.5 16.0 109.0 91 90 NU
46 09/17/14 96 4 119.5 15.9 108.5 91 90 NU
47 09/17/14 95 2 123.0 13.8 112.1 91 90 NU
48 09/17/14 96 4 119.5 15.5 107.9 90 90 NU
49 09/17/14 97 4- 119.5 16.0 107.4 90 90 NU
50 09/17/14 101 4 119.5 12.0 107.4 90 90 NU
Document No. 14-0178
GROUP DELTA DENSITY TEST RESULTS Project No. 5D365
FIGURE C-2
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. I Date I Location Type I Density Content I Density I Compaction I Compaction Number I Method
51 09/17/14 102 2 123.0 14.0 110.8 90 90 NU
52 09/18/14 94 4 119.5 12.0 107.9 90 90 NU
53 09/18/14 95 4 119.5 12.4 107.4 90 90 NU
54 09/18/14 96 2 123.0 13.2 113.1 92 90 NU
55 09/18/14 97 2 123.0 14.4 112.1 91 90 NU
56 09/18/14 94 2 123.0 13.9 111.9 91 90 NU
57 09/18/14 96 2 123.0 13.3 111.5 91 90 NU
58 09/18/14 102 2 123.0 14.4 112.0 91 90 NU
59 09/18/14 104 4 119.5 17.6 109.1 91 90 NU
60 09/18/14 96 2 123.0 11.9 112.5 91 90 NU
61 09/18/14 98 2 123.0 10.0 111.4 91 90 NU
62 09/19/14 108 4 119.5 9.2 105.0 88 90 64 NU
63 09/19/14 109 4 119.5 9.0 104.8 88 90 65 NU
64 09/19/14 108 4 119.5 11.4 107.6 90 . 90 NU
65 09/19/14 109 4 119.5 13.2 109.8 92 90 NU
66 09/19/14 111 1 119.0 11.6 109.8 92 90 NU
67 09/19/14 112 1 119.0 11.4 107.8 91 90 NU
68 09/22/14 100 2 123.0 10.5 110.7 90 90 NU
69 09/22/14 102 2 123.0 10.0 111.0 90 90 NU
70 09/22/14 103 2 123.0 11.5 112.2 91 90 NU
71 09/22/14 104 2 123.0 10.9 110.9 90 90 NU
72 09/22/14 105 2 123.0 10.2 111.4 91 90 NU
73 09/22/14 104 2 123.0 9.9 110.4 90 90 NU
74 09/22/14 105 2 123.0 11.0 111.2 90 90 NU
75 09/22/14 106 2 123.0 15.5 107.6 87 90 76 NU
76 09/22/14 106 2 123.0 10.4 110.9 90 90 NU
77 09/22/14 107 2 123.0 13.8 113.3 92 90 NU
78 09/22/14 104 2 123.0 11.3 111.1 90 90 NU
79 09/22/14 105 2 123.0 10.5 110.6 90 90 NU
80 09/23/14 85 2 123.0 10.3 103.6 84 90 80 NU
81 09/23/14 86 2 123.0 9.7 106.8 87 90 81 NU
82 09/23/14 85 2. 123.0 10.6 110.8 90 90 NU
83 09/23/14 85 2 123.0 12.0 110.9 90 90 NU
84 09/23/14 88 2 123.0 11.1 114.5 . 93 90 NU
85 09/23/14 88 2 123.0 11.4 110.8 90 90 NU
86 09/23/14 112 1 119.0 10.2 107.8 91 90 NU
87 09/23/14 113 1 119.0 10.8 107.0 90 90 NU
88 09/24/14 94 2 123.0 10.3 112.6 92 90 NU
89 09/24/14 95 2 123.0 11.1 111.1 90 . 90 NU
90 09/24/14 97 2 123.0 11.7 110.1 90 90 NU
91 09/24/14 98 2 123.0 11.3 111.8 91 90 NU
92 09/24/14 100 4 119.5 14.8 107.1 90 90 NU
93 09/24/14 102 2 123.0 9.7 114.6 93 90 NU
94 09/24/14 94 4 119.5 12.5 109.4 92 90 NU
95 09/24/14 95 4 119.5 12.8 107.2 90 90 NU
96 09/24/14 97 2 123.0 12.8 111.3 90 90 NU
97 09/24/14 99 2 123.0 11.9 110.9 90 90 NU
98 09/24/14 104 2 123.0 11.5 112.0 91 90 NU
99 09/26/14 86 2 123.0 10.0 112.4 91 90 NU
100 09/26/14 88 . 2 123.0 10.5 113.6 92 90 . NU
GROUP DELTtt DENSITY TEST RESULTS
Document No. 14-0178
Project No. 5D365
FIGURE C-3
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type Density
I
Content Density Compaction Compaction Number Method
[ft] I [pcf) [%] [pcf] [%J 1%)
101 09/26/14' 100 3 120.0 12.2 108.5 90 90 NU
102 09/26/14 102 3 120.0 . 12.1 109.9 92 90 NU
103 09/26/14 103 3 129.0 15.6 100.3 84 90 105 NU
104 09/26/14 104 3 120.0 13.7 106.0 88 90 106 NU
105 09/26/14 103 3 120.0 13.5 109.0 91 90 NU
106 09/26/14 104 3 120.0 14.2 108.6 91 90 NU
107 09/26/14 82 2 123.0 10.7 110.4 90 90 NU
108 09/26/14 83 2 123:0 12.4 110.7 90 90 NU
109 09/26/14 85 2 123.0 10.7 112.4 91 90 NU
110 09/26/14 86 2 123.0 12.5 111.3 90 90 NU
111 09/26/14 88 2 ' 123.0. 14.2 102.2 83 90 112 NU
112 09/26/14 88 ' 2 123.0 12.3 111.0 90 90 NU
113 09/29/14' 92 2 123.0 13.0 106.9 87 90 114 NU
114 09/29/14 92 2 123.0 11.3 113.3 92 90 NU
uS 09/29/14 89 2 123.0 14.5 110.6 90 90 NU'
116 09/29/14 90 2 123.0 13.3 111.0 90 90 NU
117 09/29/14 80 2 123.0 10.3 107.6 87 90 119 NU
118 09/29/14 81 2 123.0 8.7 105.9 86 90 120 NU
119 09/29/14 80 2 123.0 10.1 110.6 90 90 NU
120 09/29/14 81 2 123.0 10.5 111.8 91 90 NU
121 '09/29/14 83 4 119.5 14.7 110.9 93 90 NU
122 09/29/14 84 4 119.5 ' 12.7 109.6 92 90 NU
123 09/30/14 87 4 119.5 15.1 . 110.5 92 90 NU
124 09/30/14 89 . 4 119.5 14.4 107.9 90 90 NU
125 09/30/14 79 4 119.5 12.6 107.7 90 90 NU
126 09/30/14 81 4 119.5 12.5 108.2 91 90 NU
127 09/30/14 83 4 119.5 13.8 108.9 91 ' 90 NU
128 09/30/14 85 4 119.5 14.1 108.7 91 90 NU
129 09/30/14 87 4 119.5 13.9 109.3 91 . 90 NU
130 09/30/14 79 4 ' 119.5 12.9 108.2 91 90 NU.
131 09/30/14 81 4 119.5 12.5 108.4 91 90 NU
132 10/01/14 83 4 119.5 11.9 110.5 92 90 NU
133 10/01/14 85 5 121.5 11.3 111.2 92 90 NU
134 10/01/14 86 5 121.5 11.5 110.3 91 90 NU
135 10/01/14 80 5 121.5 11.5 110.7 91 90 NU
136 10/01/14 82 5 121.5 10.8 108.9 90 90 NU
137 10/01/14 85 5 121.5 . 11.1 113.9 94 90 NU
138 10/01/14 87 5 121.5 11.9 108.8 90 90 NU
139 10/02/14 96 5 121,5 11.5 112.8 93 90 NU
140 10/02/14 98 5 121.5 11.4 114.6 94 90 ' NU
141 10/02/14 82 4 119.5 11.5 109.7 92 90 NU
142 10/02/14 89 ' ' 4 119.5 12.0 110.5 92 90 . NU
143 10/02/14 90 2 123.0 9.7 116.5 95 90 NU
144 10/02/14 88 2 123.0 9.9 110.5' 90 • 90 NU
145 10/02/14 90 4 119.5 13.8 108.8 91 90 • NU
146 10/02/14 92 4 119.5 11.6 109.0 91 90 NU
147 10/02/14 . 94 4. 119.5 11.8 112.1 94 90 NU
148 10/02/14 96 4 .' 119.5 12.5 • 111.5 93 90 NU
149 10/02/14 98 4 119.5 11.2 • 111.5 93 90 NU
150 10/03/14 94 3 120.0 12.4 '108.8 91 ' 90 NU
Document No. 14-0178
GROUP DELTA DENSITY TEST RESULTS Project No. SD365
FIGURE C-4
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type I Density Content I Density Compaction I Compaction I Number I Method
151 10/03/14 . 95 5 121.5 11.6 110.1 91 90 NU
152 10/03/14 95 5 121.5 14.3 110.8 91 90 NU
153 10/03/14 96 5 121.5 14.5 P111.3 92 90 NU
154 10/03/14 98 5 121.5 15.6 110.2 91 90 NU
155 10/03/14 99 5 121.5 14.8 109.1 90 90 NU
156 10/03/14 101 3 120.0 12.3 104.3 87 90 157 NU
157 10/03/14 101 3 120.0 12.6 108.9 91 90 NU
158 10/03/14 102 3 120.0 13.0 109.2 91 90 NU
159 10/06/14 105 4 119.5 14.0 108.6 91 90 NU
160 10/06/14 106 4 119.5 11.3 109.0 91 90 NU
161 10/06/14 106 5 121.5 12.3 111.0 91 90 NU
162 10/06/14 107 5 121.5 11.9 112.7 93 90 NU
163 10/06/14 108 5 121.5 13.0 110.1 91 90 NU
164 10/06/14 112 5 121.5 11.9 111.5 92 90 NU
165 10/06/14 112 5 121.5 7.2 103.5 85 90 166 NU
166 10/06/14 113 5 121.5 11.2 108.9 90 90 NU
167 10/06/14 113 5 121.5 11.4 111.7 92 90 NU
168 10/06/14 113 5 121.5 8.7 106.0 87 90 169 NU
169 10/06/14 108 5 121.5 11.2 110.0 91 90 NU
170 10/06/14 108 5 121.5 10.3 110.5 91 90 NU
171 10/06/14 108 5 121.5 10.0 111.7 92 90 . .NU
172 10/06/14 103 1 119.0 9.3 113.2 95 90 . NU
173 10/07/14 103 1 119.0 8.0 111.6 94 90 1 NU
174 10/07/14 109 5 121.5 9.4 . 111.4 92 90 NU
175 10/07/14 109 5 121.5 9.1 118.3 97 90 NU
176 10/07/14 108 5 121.5 9.7 110.7 91 90 NU
177 10/07/14 108 5 121.5 8.9 .109.5 90 90 NU
178 10/07/14 108 5 121.5 9.3 112.8 93 90 NU
179 10/07/14 108 5 121.5 10.0 110.9 91 90 NU
180 10/09/14 94 3 120.0 . 17.0 103.9 87 90 . :181 NU
181 10/09/14 94 3 120.0 14.6 110.2 92 90 NU
182 10/09/14 96 3 120.0 17.6 103.7 86 90 183 NU
183 10/09/14 96 3 120.0 13.9 109.0 91 90 . NU
184 10/09/14 98 2 123.0 8.7 108.9 89 . 90 185 NU
185 10/09/14 98 2 123.0 11.0 112.1 91 90 NU
186 10/09/14 100 2 123.0 9.9 111.2 90 90 NU
187 10/10/14 103 2 123.0 . 12.1 114.1 93 90 NU
188 10/10/14 106 2 123.0 10.3 116.8 . 95 90 NU
189 10/10/14 109 2 123.0 11.5 115,5 94 90 MU
190 10/10/14 108 1 119.0 10.3 112.3 94 90 . NU.
191 10/10/14 109 1 119.0 10.2 112.1 94 90 NU
192 10/10/14 110 1 119.0 11.0 112.0 94 90 NU
193 10/10/14 111 1 119.0 10.9 107.1 90 90 NU
194 10/10/14 FG 5 . 121.5 7.6 119.1 98 90 NU
195 10/10/14 FG 5 121.5 8.2 . 112.1 92 90 NU
196 10/10/14 FG 5 121.5 6.9 120.0 99 90 NU
197 10/10/14 FG 5 121.5 6.2 119.2 98 90 NU
198 10/10/14 FG 5 121.5 6.8 113.2 93 90 NU
199 10/10/14 FG 1 119.0 7.8 111.4 94 90 NU
200 10/10/14 FG 1 119.0 8.4 113.4 95 90 NU
II
Document No. 14-0178 A-1 GROUP DELTA DENSITY TEST RESULTS Project No. 5D365
FIGURE C-5
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest 'Test
No. Date Location Type Density Content Density Compaction Compaction Number 'Method,.
[ft] [pcf] (%] [pcf] ' [%] 1%]
201 10/14/14 FG 1 119.0 9.1 113.5 95 90 NU
202 10/14/14 FG 1' 119.0 10.8 ' 107.7 91 90 NU
203 10/14/14 FG 1 119.0 9.2 110.7 ' 93 90 NU
204 10/15/14 FG 1 . 119.0 7.5 108.4 91 90 NU
205 10/15/14 FG 5 121.5 9.4 119.1 98 90 . NU
206 10/15/14 FG 5 121.5 9.4 112.7 93 90 NU
207 10/15/14 FG 5 121.5 11.4 110.1 91 90 NU
208 10/15/14 FG 5 121.5 7.8 110.5 91 90 NU
209 10/16/14 FG 5 121.5 9.9 113.5 93 90 NO
210 10/16/14 FG 5 121.5 11.1 120.4 99 90 , NU
211 10/16/14 FG 5 121.5 10.1 118.1 97 , 90 NU
212 10/16/14 FG 5 121.5 10.6 112.7 93 ' 90 NU
213 10/16/14 FG 5 121.5 11.1 111.1 ' 91 90 NU
214 10/16/14 ' FG 5 121.5 10.3 109.9 90 90 NU
215 10/16/14, FG 5 121.5 11.6 111.6 92 90 NU
216 10/16/14 FG 5 121.5 12.3 110.4 91 90 ' NU
217 10/16/14 FG , 5 121.5 10.5 113.2 93 90 NU
218 10/16/14 FG 5 121.5 ' 11.6 109.2 90 90 NU
219 10/16/14 FG 5 121.5 10.3 ' 115.3 95 90 NU
220 10/16/14 FG 5 121.5 10.5 110.1 91 90 NU
221 10/16/14 FG 5 121.5 11.0 114.4 94 90 NU
222 10/16/14 FG 5 121.5 , 10.8 111.9 92 90 ' NU
223 10/16/14 FG 5 121.5 10.3 111.9 92 90 NU
224 10/16/14 FG 5 121.5 11.1 110.8 91 ' 90 NU
225 10/16/14 FG 5 121.5 11.0 111.7 92 90 , NU
226 10/16/14 FG 5 121.5 12.0 112.0 92 90 NU
227 10/16/14 FG 5 121.5 12.2 112.3 92 90 NU
228 .10/16/14 FG 5 121.5 11.9 111.4 92 ' 90 NU
229 10/16/14 FG 5 121.5 11.5 110.7 91 90 . NU
230 10/16/14 FG 5 121.5 12.1 112.2 92 90 NU
231 10/16/14 FG 5 121.5 11.9 111.7 92 . 90 NU
, 232 10/16/14 FG 5 121.5 10.5 110.9 91 90 NU
233 10/16/14 102 5 121.5 12.5 110.9 91 90 NU
234 10/16/14 103 2 123.0 , 11.9 112.8 92 90 NU
235 10/16/14 99 ' 2 123.0 13.5 110.6 90 90 ' NU
236 10/16/14 100 2 123.0 12.9 111.4 91 90 NU
237 11/18/14 FG 1 119.0 9.5 114.5 96 90 NU
238 02/23/15 104 2 123.0 9.6 117.2 95 ' 90 NU
239 02/23/15 105 2 123.0 10.2 ' 117.5 96 90 NU
240 , 02/25/15 106 1 119.0 8.3 113.2 95 90 NU
241 02/25/15 FG 1 119.0 9.4 113.9 96 90 NU
242 02/26/15 105 1 119.0 8.7 114.2 96 90 NU
AB-1 11/20/14 FBG , B-i 119.0 11.1 113.6 95 95 ' NU
AB-2 11/20/14 FBG , B-i 119.0 12.7 116.6 98 95 NU
AB-3 11/20/14 FBG B-i' 119.0 11.8 115.3 97 95 ' NU
AB-4 . 11/20/14 FBG B-i 119.0 12.3 116.2 98 95- NU
AB-5 11/20/14 FBG B-i 119.0 11.4 115.8 97 95 NU
AB-6 11/20/14 - FBG B-i 119.0 , 12.0 116.3 98 95 NU
AB-7 01/16/15 ' FBG B-i , 119.0 11.9 118.0 99 95 NU
Document No. 14-0178
GROUP DELTA DENSITY TEST RESULTS Project No. 5D365
FIGURE C-6
Test Test Elevation! Soil Max. Dry Moisture . Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction Compaction Number Method
[ft] [pci] [%] [pci] [%] [%]
AB-8 01/16/15 FBG B-i 119.0 11.7 117.6 . 99 95 NU
AB-9 01/16/15 FBG B-i 119.0 12.0 118.1 99 95 NU
AB-10 01/16/15 FBG B-i 119.0 u.s ' 117.3 99 95 NU
AB-11 01/16/15 FBG B-i 119.0 11.6 117.9 99 95 NU
AB-12 01/17/15 FBG B-i 119.0 10.7 118.0 99 95 NU
AB-13 01/17/15 FBG B-i 119.0 11.0 118.3 99 95 NU
AB-14 01/20/15 FBG B-i 119.0 9.0 118.0 99 95 NU
CG-1 11/13/14 STA 23+00 2 123.0 11.7 118.8 97 95 NU
CG-2 11/13/14 STA 25+00 2 123.0 10.9 . 119.0 9.7 95 NU
CG-3 11/13/14 STA 24+00 2 123.0 u.s 117.7 96 95 NU
CG-4 11/13/14 STA 22+50 2 123.0 11.3 118.1 96 95 NU
CG-5 11/14/14 STA 25+50 B-i 119.0 15.8 118.3 99 95 NU
CG-6 11/14/14 STA 24+00 B-i 119.0 11.6 117.9 99 95 NU
CG-7 11/14/14 STA 22+50 B-i 119.0 12.3 117.6 99 95 NU
CG-8 11/14/14 STA 21+00 B-i 119.0 12.0 118.5 100 95 NU
CG-9 11/14/14 STA 19+50 B-i 119.0 11.9 117.2 98 95 NU
CG-10 11/14/14. STA 18+00 B-i 119.0 14.3 116.9 98 95 ' NU
CG-11 11/14/14 STA 16+50 B-i 119.0 12.2 116.5 98 95 . NU
CG-12 11/14/14 STA 16+00 B-i 119.0 11.7 117.0 . 98 . 95 . NU
CG-13 12/01/14 STA 14+50 B-i 119.0 11.3 113.7 96 95 ' . . NU
CG-14 12/01/14 STA 13+50 B-i 119.0 11.5 115.5 . 97 95 . . NU
CG-15 12/01/14 STA 12+50 'B-i 119.0 11.0 115.0 97 95 . . NU
CG-16 12/01/14 STA 11+50 . B-i 119.0 11.8 117.7 99 . 95 NU
CG-17 01/06/15 STA 10+10 B-i 119.0 11.4 117.3 99 95 NU
iT-i 11/05/14 FSG 1 119.0 11.1 114.1 96 95 NU
JT-2 11/05/14 FSG 1 119.0 10.5 113.7 96 95 ' NU
JT-3 11/06/14 FSG 1 119.0 9.7 113.9 96 95 ' NU
JT-4 11/07/14 , FSG 1 119.0 10.3 114.4 96 95 NU
iT-S 11/07/14 FSG 1 119.0 0.4 113.5 95 95 NU
JT-6 . 11/07/14 FSG 1 119.0 9.6 114.0 . 96 95 NU
JT-7 11/24/14 FSG 1 119.0 9.6 113.8 96 95 . NU
JT-8 11/24/14 FSG 1 119.0 10.9 115.0 97 95 NU
JT-9 11/24/14 FSG 1 119.0 11.0 114.3 96 95 NU
SD-1 11/10/14 90 1 119.0 10.6 109.8 92 90 NU
SD2 11/10/14 92 1 119.0 11.0 108.8 91 90 NU
SD-3 11/10/14 94 1 119.0 11.3 109.7 92 90 NU
SD-4 11/10/14 92 1 119.0 12.4 113.9 96 95 ' NU
SD-5 11/10/14 96 1 119.0 11.8 114.3 96 90. NU
SD-6 11/10/14 98 1 119.0 12.1 114.6 96 95 NU
SG-1 11/13/14 FSG 6 121.0 17.0 109.0 90 90 LTS NU
SG-2 11/13/14 FSG 6 121.0 22.6 108.6 90 90 LTS NU
SG-3 11/13/14 FSG 6 121.0 17.6 110.1 91 90 LTS NU
SG-4 11/13/14 FSG 6 121.0 17.2 109.5 90 90 LTS NU
SG-5 11/13/14 FSG 6 121.0 17.3 110.3 91 90 LTS NU
SG-6 11/13/14 FSG 2 123.0 12.9 118.6 96 95 NU
SG-7 11/13/14 FSG' 2 123.0 10.3 120.0 98 95 ' NU
Document No. 14-0178
D1JP DELTA DENSITY TEST RESULTS Project No. 5D365
I Ad~ FIGURE C-7
Test Test
-
Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
NO. Date Location' Type Density ' Content Density Compaction Compaction Number Method
[ft] . [pcfj [%j [pcf] 1%] [%]
SG-8 11/13/14 FSG 2 123.0 11.0 117.7 96 ' .95 NU
SG-9 11/13/14 FSG 2 123.0 12.6 117.9 96 95 NU
SG-10 11/13/14 ' FSG 2 123.0 11.9 118.4 96 95 NU
SG-11 11/13/14 FSG 2 123.0 10.1 117.2 95 95 NU
SG-12 12/19115 FSG 5 121.5 . 10.5 115.4 95 95 NU
SG-13 12/19/15 FSG 5 121.5 9.2 115.9 95 95 NU
SG-14 12/19/15 ' FSG 5 121.5 9.8 ' 116.1 96 95 NU
SG-is 12/19/15 FSG 5 121.5 10.3 115.0 95 95 NU
SG-16 01/06/15 FSG 6 121.0 15.3 114.8 95 ' .95 , NU
SG-17 04/21/15 FSG B-i 119.0 6.4 116.2 . 98 95 NU
SG-18 04/21/15 FSG B-i 119.0 6.9 ' 115.3 97 95 , NU
SG-19 04/21/15 FSG B-i 119.0 7.7 115.8 97 95 ' NU
SG-20 , 05/01/15 FSG B-i 119.0 10.6 114.6 96 90 ' NU
SG-21 05/01/15 FSG B-i 119.0 10.9 108.3 91 90 NU
SG-22 05/01/15 FSG B-i 119.0 10.7 112.5 95 90 NU
SS-1 10/23/14 103 3 120.0 . 11.9 ' 108.4 90 90 NU
SS-2 10/23/14 109 3 120.0 12.0 109.5 91 90 NU
SS-3 10/23/14 '108 3 120.0 12.1 110.1 92 90 NU
SS-4 10/23/14 104 ' 2 123.0 12.6 115.1 94 90 NU
SS-5 10/23/14 108 3 '120.0 12.3 103.5 ' 86 90 SS-6 NU
55-6 10/23/14 108 3 120.0 , 12.5 111.6 93 90 NU
SS-7 10/23/14 105 2 123.0 11.3 .112.2 . 91 ' 90 NU
55-8 10/23/14 109 3 120.0 14.3 ' 108.9 91 90 ' NU
SS-9 10/23/14 108 3 120.0 12.1 108.2 90 . 90 . NU
SS-10 10/23/14 110 2 123.0 11.4 114.5 93 90 . NU
SS-11 10/23/14 110 3 120.0 11.9 109.7 91 90 NU
SS-12 10/23/14 109 3 , 120.0 11.6 108.3 90 90 NU
SS-13 10/23/14 102 2 123.0 12.2 , 112.5 91 90 , . NU
SS-14 10/23/14 98 2 123.0 11.0 112.1 . 91 90
,
NU
SS-15 10/24/14 96 2 123.0 12.0 113.0 92 90 NU
55-16 10/24/14 95 2 ' 123.0 12.4 114.2 93 90 . NU
SS-17 10/24/14 96 ' 2 . 123.0 12.1 112.1 91 90 NU
SS-18 .10/24/14 95 2 123.0 12.9 111.9 91 90 ' NU
SS-19 10/24/14 93 2 ' 123.0 ' 11.7 110.6 90 90 NU
SS-20 10/24/14 92 2 123.0 , 12.3 111.9 91 90 NU
SS-21 10/24/14 93 2 123.0 12.2 114.6 93 90 ' NU
55-22 10/24/14 , 94 2 123.0 13.0 111.8 91 90 , NU
SS-23 11/04/14 ' 105 ,. 1 119.0 9.6 110.6 93 90 NU
SS-24 11/04/14 FG 1 119.0 9.4 114.1 96 95 NU
SS-25 11/04/14 , FG 1 119.0 10.2 113.8 96 95 NU
SS-26 11/04/14 FG 1 119.0 9.7 114.4 96 95 NU
SS-27 ' 11/05/14 FG 1 119.0 13.6 113.6 95 95 NU
SS-28 11/10/14 ' 93 1 119.0 10.5 111.5 94 ' 90 NU
SS-29 11/10/14 95 , 1 119.0 ' 10.9 ' , 113.5 ' 95 95 NU
SS-30 11/14/14 93 1 119.0, 11.4 113.8 96 95 , NU
SS-31 11/14/14 95 1 119.0 11.9 114.2 96 95 NU
SS-32 11/14/14 103 1 119.0 12.2 114.0 96 95 . NU
SS-33 11/14/14 105 ' 1 . 119.0 11.3 113.5 95 95 . NU.
Document No. 14-0178
I A GROUP DO-TA.. DENSITY TEST RESULTS Project No. 5D365
a~FIGURE C-8
Test Test Elevation! Soil Max. Dry Moisture Dry Relative Required Retest Test
No. Date Location Type Density Content Density Compaction Compaction Number Method
SW-1 01/30/15 FSG 2 123.0 10.1 119.0 97 90 . NU
SW-2 01/30/15 FSG 2 123.0 9.7 118.3 96 90 NU
SW-3 01/30/15 FSG 2 123.0 10.3 119.1 97 90 NU
SW-4 01/30/15 FSG 2 123.0 10.6 118.0 96 90 NU
SW-5 01/30/15 FSG 2 123.0 9.6 117.5 96 90 - NU
SW-6 01/30/15 FSG 2 123.0 10.0 117:9 96 90 NU
SW-7 02/13/15 FSG 2 123.0 10.2 114.9 93 90 NU
TEST NUMBER NOT
-
USED
SW-9 04/17/15 FSG 2 123.0 9.6 117.2 95 90 NU
SW-10 04/17/15 FSG 2 123.0 9.2 118.0 96 90 NU
SW-11 04/17/15 FSG 2 123.0 10.4 117.6 96 90 NU
SW-12 04/17/15 FSG 2 123.0 8.9 118.5 96 90 1 NU
w-i 10/30/14 FG 1 119.0 8.9 113.7 96 95 NU
W-2 10/30/14 FG 1 119.0 9.2 114.0 96 95 NU
W-3 10/30/14 FG 1 119.0 10.0 113.3 95 95 NU
W-4 10/30/14 FG 1 119.0 10.8 112.5 95 95 NU
W-5 10/30/14 FG 2 123.0 9.6 117.0 95 95 NU
W-6 10/30/14 93 2 123.0 10.3 118.3 96 95 . NU
W-7 10/30/14 FG 2 123.0 9.9 118.8 97 95 NU
W-8 10/30/14 FG 2 123.0 10.5 117.9 96 95 - NU
W-9 10/30/14 FG 2 123.0 10.7 118.6 96 95 NU
w-10 11/04/14 FG 1 119.0 10.3 113.9 96 95 NU
W-il 11/04/14 FG 1 119.0 9.4 113.6 95 95 NU
W-12 11/18/14 FG 2 123.0 11.4 119.2 97 95 NU
W713 11/18/14 FG 2 123.0 10.9 118.8 97 95 NU
W-14 11/18/14 FG 2 123.0 11.6 1195 97 95 - t NU
WB-1 11/24/14 116 1 119.0 11.4 114.5 96 95 . NU
WB-2 11/24/14 117 1 119.0 10.6 116.8 98 95 NU
WB-3 11/24/14 115 1 119.0 10.7 115.2 97 95 NU
WB-4 11/24/14 114 1 119.0 10.3 114.3 96 95 NU
WB-5 12/19/14 118 1 119.0 10.2 114.9 97 95 NU
WB-6. 12/19/14 120 1 119.0 9.9 113.7 96 95 NU
E3RC3UF= DELTA DENSITY TEST RESULTS
Document No. 14-0178
Project No. SD365
FIGURE C-9
Test Test Elevation! AC Hveem Rice Field Air Relative Relative Required
No. Date Station Type Density Density Density Voids Compaction Compaction Compaction
[ft] [ppfj [pcfi [pcf] [%] (Hveem) [%] (Rice) [%] Rice [%]
AC-1 11/24/14 FG AC-1 152.8 160.5 149.8 6.7 98 93 91 -97
AC-2 11/24/14 FG AC-1 152.8 160.5 149.5 6.9 98 93 91-97
AC-3 11/24/14 FG AC-1 152.8 160.5 153.1 4.6 100+ 95 91-97
AC-4 11/24/14 FG AC-1 152.8 160.5 154.1 4.0 100+ 96 . 91 -97
AC-5 11124/14 FG AC-1 152.8 160.5 149.8 6.7 98 93 .' 91 -'97
AC-6 11/24/14 FG AC-1 152.8 160.5 150.2 6.4 98 . 94 91 -97
AC-7 11/24/14 FG AC-i 152.8 160.5 151.9 5.4 99 95 91-97
AC-8 11/24/14 FG AC-1 152.8 160.5 147.3 8.2 96 92 91 -97
AC-9 11/24/14 FG AC-1 . 152.8 160.5 149.8 6.7 98 93 91-97
AC-10 11/24/14 . FG AC-1 152.8 160.5 153.2 4.5 100+ 95 91 -97
AC-li 11/24/14 FG AC-1 152.8 160.5 151.9 5.4 99 '95 91-97
AC-12 11/24/14 FG AC-1 152.8 160.5 149.0 7.2 .98 93 91-97
AC-13 11124/14 FG AC-1 152.8 160.5 147.4 8.2 96 92 91 -97
AC-14 11/24/14 FG AC-1 152.8 160.5 148.2 7.7 97 92 91-97
AC-15 11/24/14 FG AC-1 152.8 160.5 147.5 8.1 97 92 91-97
AC-16 11/24/14 FG AC-1 152.8 160.5 148.3 7.6 97 92 91-97
AC-17 11/24/14 FG AC-2 153.3 160.1 148.0 7.6 97 92 91-97
AC-18 11/24/14 FG . AC-2 153.3 160.1 155.3 3.0 100+ 97 91 -'97
'.AC-19 11/24/14 FG AC-2 153.3 160.1 149:1 6.9 97 93 91 -97
AC-20 11/24/14 FG AC-2 153.3 160.1 149.0 6.9 97 93 , 91-97
AC-21 11/24/14 FG AC-2 153.3 160.1 153.8 3.9 100+ 96 91 -97
AC-22 11/24/14 FG AC-2 153.3 160.1 150.9 5.7 98 ' 94 91-97
AC-23 11/24/14 FG AC-2 153.3 , 160.1 149.8 6.4 98 94 91-97
AC-24 11/24/14 FG AC-2 153.3 160.1 155.4 2.9 100+ 97 91-97
AC-25 11/24/14 FG AC-2 153.3 160.1 150.1 6.2 '98 94 91-97
AC-26 11/24/14 FG AC-2 153.3 160.1 , 151.2 5.6 99 94 91 -97
AC-27 11/24/14 FG AC-2 153.3 160.1 155.8 2.7 100+' 97 91 -97
AC-28 11/24/14 FG AC-2 153.3 160.1 , 148.4 7.3 97 ' 93 91 -97
AC-29 11/24/14 FG AC-2 153.3 160.1 154.1 3.7 100+ 96 91 -97
AC-30 11/24/14 FG AC-2 153.3 160.1 146.7 8.4 96 . 92 91 -97
AC-31 11/24/14 FG AC-2 153.3 160.1 148.0 7.6 97 92. 91 -97
AC-32 11/24/14 FG AC-2 153.3 160.1 152.8 4.6 100 95 91 -97
AC-33 01/13/15 FG AC-3 151.5 155.8 150.3 3.5 99 96 .91-97
AC-34 01/13/15 FG AC-3 151.5 155.8 150.5 3.4 99 97 , 91-97
AC-35 01/13/15 FG AC-3 151.5 ' 155.8 151.5 2.8 100 97 91-97
AC-36 01/13/15 FG AC-3 151.5 155.8 150.2 3.6 99 96 91-97
AC-37 01/13/15 FG AC-3 151.5 155.8 150.4 3.5 99 97 91 -97
AC-38 01/13/15 FG AC-3 151.5 1,55.8 149.8 3.9 99 ' 96 91-97
AC-39 01/13/15 ' FG AC-3 151.5 155.8 150.1 3.7 99 96 91-97
AC-40 01/13/1,5 FG AC-3 151.5 155.8 150.6 3.3 99 97 91-97
AC-41 01/13/15 FG AC-3 151.5 155.8 149.6 4.0 99 96 91-97
AC-42 01/13/15 FG AC-3, 151.5 155.8 150.3 3.5 99 96 91-97
AC-43 01/13/15 FG AC-3 151.5 155.8 150.9 3.1 100 97 91-97
AC-44 01/13/15 FG AC-3 151.5 155.8 149.4 4.1 99 96 91-97