ONSITE DRAINAGE STUDY
and
OFFSITE PUBLIC CURB INLET
INFLOW CAPACITY EVALUATION
for
Romeria Pointe
CT 06-221 CP 06-15
9-Units
Lots 392 & 393, Map 6600
APN 216-300-12 & 13
Prepared: January 14, 2005
Revision No.1: August 24, 2006
Update: October 22, 2007
RECEIVED
NOV 21 2007
ENGINEERING
DEPARTMENT
I
I
I
I
I
I'
I
I
I
I
I
I
I
I
I'
I
I:
I
I
Conway & Associates, Inc.
Civil EngineerslSurveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Ca:1sbad, CA 92008. Telephone (760) 753-1453. Fax (760) 434-5831
'REPORT INDEX
ThITRODUCTION ________________________________________ ~ _______ Pagel
1. PROJECT DESCRIPTION Page 1
1.1 Project Location Pa~e 1
1.2 Project Description Page 1
1.3 Physical Features Page 2
1.4 Land Use Page 2
2. PROJECT SITE RUNOFF Page 2
2.1 Watershed Contribution Page 2
2.2 Character of Storm Water Runoff Page 2
2.3 Proposed Storm Drain System Description Page 3
2.4 100-Year Return Event Peak Flow Computations Page 3
2.5 City of Carlsbad Master Plan of Drainage Reference Page 3
3. ONSITE DRAINAGE STUDY CONCLUSION Page 4
4. OFF SITE PUBLIC CURB INLET INFLOW CAP ACITY EVALUATION Page 4
4.1 Subject Off site Basin Land Use Page, 4
4.2 General Offsite Basin Descriptions and Flow Characteristics Page 4
4.3 Offsite Hydrology Study Methodology & Results Page 4
4.4 Existing Public Curb Inlet Inflow Capacity Evaluation & Results Page 4
5. OFF SITE DRAINAGE STUDY CONCLUSION Page 5
I
I
I
I
I
,I
I
I
I
I
I,
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil Engineers/Surveyors/General-Engineering Contractors AB412412
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
APPENDIX E
APPENDIX F
APPENDIX G
APPENDIX H
APPENDIX I
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453 • Fax (760) 434,5831
APPENDICES
Vicinity Map
Original Site Development Grading Plan -City Drawing 169-4A
Proposed Conditions Map
Proposed Site Grading Plan -'City Drawing 428-8A
Onsite Drainage Study 1 00-Year ,Return Event Peak Flow Computations
Proposed Onsite Storm Drain System Hydraulic Analysis
Existing Gibraltar Street Curb Inlets -City Drawing 169-4
Off site Drainage Study I 00-Year Return Event Peak Flow Computations
Existing Public Curb Inlet Inflow Capacity Evaluation
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I'
I
I
Conway & Associates, Inc.
Civil EngineerslSurveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453. Fax (760) 434-5831
January 14,2005 -Original
August 24, 2006 -Revision No. 1
October 22, 2007 -Update
ONSITE DRAINAGE STUDY
for
ROMERIA POINTE
CT 06-221 CP 06-15
Project: RomeriaPointe'Townhomes ~ 9 Units
Lots 392 & 393, Map 6600 ~ ,A,PN 216-300-12 & 13
INTRODUCTION
The purpose of this hydrology study is to present the 6-hour, 100-year frequency design storm flow rate
computations for the post-development condition of the Romeria Pointe Townhomes project site, to present a
hydraulic analysis of the proposed on-site private storm drain system and to evaluate the inflow capacity of
an existing pu.blic storm drain curb inlet located adjacent to the project site.
1. PRO.JECT DRSCRlJ>TTON
The scope of the proposed project is to construct three three-level, retained and on-grade base structures
consisting of residential living areas, garages, driveways and parking areas. The subject site is vacant land
originally mass-graded as part of the La Costa South Unit No.5 development in 1970 (approximate) and area
infrastructure improvement construction as part of the La Costa South Unit No.5 development in 1972.
There has been no further deVelopment of the site since that time.
1.1 Project Location: The subject property is located within the City of Carlsbad and is part of the La
Costa South Unit No.5 development. The subject property is also known as Lot 392 and Lot 393 of Map
6600, Assessor!s· Parcel N.umher.2l6.-3.o0-12arrd 13., :arutencompasses'O. 71 acres:, Existinglot-392_andLot
393 will be consolidated into a single lot with the recordatiop. of a subdivision map as part of the final '
engineering phase of the project. The project is bounded by Romeria Street to the east, fully-developed
residential condominium projects to the south and west, and Gibraltar Street to the north. Vehicular access
from the public right of way is from Romeria Street to the east. See Appendix A for a vicfuity map of the
project site.
1.2 Project Description: The project site is 0.71 acres in total area and is currently undeveloped
vacant land. Originally, tlle site was rough pad-graded in 1970 (approximate) as part of La Costa South -Unit
No.5 deve19pment phase (reference City Drawing 169-4A, sheet 3 of 5). See Appendix B for a reduced
copy of the original site development grading plan. '
The three new structures (Buildings A, B & C, south to north across the site) will step to generally follow the
original pad grades. The garage floor levels of Buildings A & B retain the finish grades on the south side of
these structures. Building C will be essentially constructed on grade.
p:\04-001 bnr-9\hydro\hydro\04-001_hydrpt.doc Page 1 of 6 Pages
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
. Conway & Associates, Inc.
Civil EngineerslSurveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453. Fax (760) 434-5831
The following tabulation presents the existing and proposed site uses broken down by use category.
Table 1: Site Use
Existing Use Proposed Use
Existing %of Change Proposed %of Change Condition Condition
(sf) Site (sf) (sf) Site (%ofsite)
Pavement 0 0% +18,223 18,223 10.3% +58.8%
Landscape 30,979 100.0% -27,775 3,204 58.9% -89.6%
Building 0 0% +9,552 9,552 30.8% +30.8%
Total: 30,979 100.0% -30,979 100.0% -
(0.71 ac.) (0.71 ac.)
See Appendix C for a proposed conditions map of the subject site.
1.3 Physical Features: The subject site is an irregular-shaped parcel, is approximately l80-feet deep
(in the general east-west direction, maximum) and approximately 240-feet wide (in the general north-south
direction, maximum) along the Romeria Street frontage. The topography of the site slopes downward along
the North axis of the site with a 40-foot overall vertical relief (SE comer: elevation 95; NW comer: elevation
55). The site consists of two generally level pads, the upper pad grade at elevation 90, the lower pad grade at
elevation 75.
A majority of the site runoff from the site's existing manufactured slopes and pads drain to Romeria Street
and Gibraltar Street gutters via surface flow. A minor amount of runoff form the northerly (upper) pad and
westerly slope face drains to a concrete-lined drain swale located at the West side of the site. Runofffrom
this swale and the frontage-street gutters are collected by an existing curb inlet located on Gibraltar Street,
near the northwest comer of the site.
1. 4 Land Use: The subject property is zoned residential, mediUin. density (RD-M) as part of the City's
General Plan, as are the surrounding developed sites.
2. PROJECT SITE RUNOFF
2.1 Watershed Contribution: The subject site is 0.71 ~cres in size and is located within the Batiquitos
Lagoon / San Marcos Creek watershed which is approximately 46 square miles in area. The subject site
represents less than 0.003% of the total Batiquitos Lagoon watershed area. The entire project site and
surrounding areas discharge to the San Marcos Creek, and ultimately to the Batiquitos Lagoon by way of an
existing .public storm drain system located offsite along the westerly site limits and crosses Gibraltar Street,
extending North to San Marcos Creek. The proj ect site and general area runoff is directed via street flow to
an existing curb inlet (part of the public storm drain system) located on Gibraltar Street near the northwest
comer of the site.
2.2 Character o[Storm Water Runoff: The site's main point of discharge for the post-development·
condition will differ from the pre-development condition. Presently, on site runoff generally sheet flows off
the site to the Romeria Street and Gibraltar Street gutters along the project frontage. A small portion of the
site drains to an existing PCC ditch located along the site'~ West slope face. The ditch is connected to the
area's existing public RCP storm drain system. All storm water runoff from the developed portion of the
p:\04-001 bnr -9\hydro\hydro\04-001_hydrpt.doc Page 2 of 6 Pages
1
1
1
I,
1
1
1
1
I
1
1
1
1
I
1
I
1
Conway & Associates, Inc.
Civil Enginee'rs/Surveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453-. Fax,(760) 434-5831
project site will be discharged to the Romeria Street gutter via a new sidewalk underdrain structures. Site
runoff from the westerly fill slope (draining to the existing PCC ditch) and the northerly fill slope (draining
, to the Gibraltar Street gutter) will continue. In both cases, th,e tributary areas will be reduced, by 'the proposed
grading design, thereby reducing ,the total runoff across the' slope areas.
2.3 Proposed Storm Drain System Description: All of the storm water runoff from the project site's
developed areas (driveways, landscaped areas, building roof areas and exterior deck surfaces) will be
conveyed by the proposed on-site private storm drain system to a new storm water separator unit located
North of the northerly driveway entrance, which in turn will be discharged to the Romeria Street gutter via ,a
new sidewalk underdrain structure. A Stormceptor model STC-900 storm water separator manufactured by
Rinker Materials was selected as the base-performance model for the project.
A reduced copy of the proposed site grading plan is included in Appendix D for reference.
2.4' 100-year Return Event Peak Flow Computations:
Estimated peak flows for 100-year, 6-hour storm events (pre-and post-development conditions) were
computed for the project site. The peak pre-development storm water runoff rate was computed at 1.4 cfs (Tc
= 8 minutes), the peak post-development storm water runoff rate was computed at 2. 7cfs (T c = 8 minutes),
an increase of 1.3 cfs. The incre~se in the peak discharge is the result of new impervious surfaces within the
subject site's tributary basin.
The following sections of this report contain the backup data and computations for the 1 OO-year 'frequency, 6-
hour storm peak runoff: .
On-Site Hydrology Computations: rational method hydrology computations quantifying the project's
pre-development and post-development peak runoff conditions;
Hydrology Map: A 1 n=40' -scale map (17"xll n) of the on-site and immediate areas showing the post-
development runoff conditions for the project site.
The calculations for the pre-development (existing conditions) and post-development (With proposed parking
expansion) peak runoff rates for the subject site are presented in Appendix E of this report.
A hydraulic capacity calculations for the proposed private on-site storm drain system were completed as part
,of this report and is-presented 'inAppendix F-ofth1s.rep:ort-;
2.5 City of Carlsbad Master Plan of Drainage Ret?rence:
The project site is located within the limits of Basin D of the San Marcos Creek / Batiquitos Lagoon
watershed as defmed by the City's Master Drainage and Storm Water Quality Management Plan dated March
1994. Basin D is depicted on the Plate 1 fold-out (sheet 4 of 4, City drawing 296-5 - a modified portion is
presented on page 4). Plate 1 of the drainage master plan shows an existing 42-inch and 48-inch diameter ,
RCP storm drain main line crossing Gibraltar Street and serving the general project area This storm drain
facility was constructed as part of La Costa South Unit No.5 project, City project 2694-5 TM, per City
drawing no. 169-4.
p:\04-001 bnr-9\hydro\hydro\04-001_hydrpt.doc Page 3 of 6 Pages
1
I
1
1
I--
1
1
1
I
1
1
I
1
I
-I
I
1
I
I
Conway & Associates, Inc.
Civil EngineerslSurveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453. Fax (760) 434-5831
3. ONSITE DRAINAGE STUDY CONCLUSION
The proposed private on-site storm drain system will convey the peak runoff from a 100-year frequency, 6-
hour design storm.
Estimated peak flows for a 100-year, 6-hour storm event were computed for the project site. The peak pre-
development storm water runoff rate was computed at 1.4 cfs, the peak post-development storm water runoff
rate was computed at 2.7 cfs, an increase of 1.3 cfs. The increase in the peak discharge is the result of new
impervious surfaces within the subject site's tributary basin.
4. OFFSITE PUBLIC CURB INLET INFLOW CAPACITY EVALUATION
The purpose of this report section is-to present the results-of-a--capacity-evaluatioll:studyJor the existing
Gibraltar Street curb inlets serving the proposed Romeria Pointe project site and surrounding area. This curb
inlet capacity evaluation was prepared in response to project review comments by City staff.
The existing Gibraltar Street curb inlets and associated public storm drain culverts, hereinafter "subject -storm
drain system", is located near the northwest property comer along Gibraltar Street. The subject storm drain
system discharges to San Marcos Creek via an existing 48" Rep culvert and overland flow through the La
Costa Resort golf course. -
The subject storm drain system is shown on City drawing 169-4, sheet 17: a sump-condition curb inlet with a
48-inch RCP outlet culvert. A reduced copy of City drawing 169-4, sheet 17, is included in Appendix G of
this report for reference.
4.1 Subject Offsite Basin Land Use:
The off site subject basin is zoned residential, medium density (RD-M), as part of the City's General Plan.
Approximately half of the lots contained in the subject offsite basin are developed. The undeveloped lots
were graded under City drawing 169-4A but are currently vacant land. For the purposes of this study, the
p:\04-00 1 bnr -9\hydro\hydro\04-001_hydrpt.doc Page 4 of 6 Pages
I
I·
I
I
I
I
I
I
I
I
I.
I'
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil Engineers/Surveyors/General-Engineering Contractors AB412412
2525 Pio Pieo Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453 • Fax (760) 434-5831
vacant parcels were assumed fully developed with condominium projects similar to the surrounding
neighborhood (C=0.70).
. 4.2 General OfJsite Basin Descriptions and Flow Characteristics:
The subject basin is a part of Hydrologic Unit 904.51, San Marcos Creek (west reach) and the Batiquitos
Lagoon.
The project site is located within the limits of Basin D of the Batiquitos Lagoon watershed as defined by the
City's Master Drainage and Sto:tm Water Quality Management Plan dated March 1994. Basin D is depicted
on the Plate 4 excerpt (sheet 4 of 4, City drawing 296-5) - a modified portion is presented in section 2.5 of
this report. The subject basin limits presented in this study are based on a review of record City plans and on
field observations from several field reconnaissance visits. Offsite hydrology maps are included in Appendix
H of this report.
The offsite subject basin is generally bounded by Gibraltar Street on the west and north limits, Romeria
Street and adjacent areas bounding the east side and La Costa Avenue on the south. The offsite subject basin
encompasses approximately 14.8 acres and drains to a pair of sump inlets located in the Gibraltar Street right
of way near the northwest comer of the project site.
4.3 Offsite Hydrology Study Methodology & Results:
The design QlOO flows used in this study are based on the June, 2003 County of San Diego' hydrology manual.
The peak flow calculation results for the offsite basin are included as Appendix H of this report.
A rational-method fo:tmat was used to evaluate design runoff quantities for the subject basins presented
herein in accordance with the County of San Diego hydrology manual (June, 2003 version). The project site
was evaluated by grouping site use into three general categories: landscape areas (C=0.40) and paved areas
(0=0:90), condominium site development (ranging from C=0.70 to C=0.80) and limited single-family
development (C=0.60).
A standard hydrology manual C-factor value of 0.70 is typically used for condominium developments, but
was modified in this study to include values of 0.75 and 0.80 were judged app~opriate for selected field
conditions.
A time of concentration, Te, of 12 minutes was developed for the subject offsite basin. A total QlOO peak
inflow of38 cfs was computed for the southerly curb inlet (nearest the project site) and a total QlOO peak
inflow of 8 cfs was computed for the northerly curb inlet.
4.4 Existing Public Curb Inlet Inflow Capacity Evaluation & Results:
City drawing 169-4 (see Appendix G) depicts the existing sto:tm drain. system and calls out A-2 curb inlets at
the Gibraltar Street sump. Our field reconnaissance con:fi:tmed type C inlets: two curb opening wings with an
inlet grate (per San Diego Regional Standard Drawing D-3, Type C-2) -L=20' for the south inlet, 10' for the
north inlet. The City of Carlsbad design standard' for curb inlets limits the headwater (HW) to no less than 1
inch from the top of curb at the inlet entrance.
The inflow capacity calculations for the southerly Gibraltar Street curb inlets are included as Appendix I of
this report.
The inflow capacity of the southerly curb inlet was computed at 37.4 cfs, practically matching the QlOO design
flow of 3 8 cfs, by assuming a ponded condition of 1" below the top of curb at the inlet. The total curb inlet
. \\fileserver\projects\04-001 bnr-9\hydro\hydro\04-001_hydrpt.doc Page 5 Of 6 Pages
I
I
I
I
I
I
I
I
I-
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil Engineers/Surveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453 • Fax (760)-434-5831
inflow capacity was computed using the sum of the capacities of the 19'-long sump inlet opening (32.4 cfs)
_ and the inlet grate (10 cfs). A 50% clogging factor was assumed for the inlet grate and the grate inflow
capacity was reduced accordingly. -
The inflow capacity of the northerly curb inlet was computed at 27.5 cfs .. The QlOO design flow for the north
side of the street was computed at 8 cfs. The north curb inlet has a significant capacity reserve.
5. OFFSITE DRAINAGE STUDY CONCLUSION
Based on the off site drainage study methodology and the results contained in this report, the subject off site
public curb inlets have adequate capacity for the QlOO storm event. -
\\fileserver\projecls\04-001 bnr-9\hydro\hydro\04-001_hydrpt.doc Page 6 of 6 Pages
I
I
I
-I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil Engineers/Surveyors/Generai-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453. Fax (760) 434-5831
APPENDIX A
VICINITY MAP
---------------.----
VICINITY
CITY OF OCEANSIDE
PACIFIC
OCEAN
78
MAP
NOT TO
SCALE
LOCATION MAP
I
'I
I
I
I
'I,
'I
I
I
I
I
I
I
I
I'
I
I
I
I
Conway & Associates, Inc.
Civil EngineersiSurveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453 • Fax (760) 434-5831
APPENDIX B
ORIGINAL SITE DEVELOPMENT
GRADING PLAN
CITY DRAWING 169-4A
POOR
QUALITY
ORIGINAL S
-- -----------------
.-'~
:"'-" .-
c.. I ~ !H
I:"' (i) .... :::0 i' » 0 n z
0 (i) rn "tJ t3 r » 8 i' Z c: (/) z
r.JJ -l
2J -< 8 0 :::0 '11
~ Ul
= l> Z
0
~ ~ 0
~ III
~ ~ ~ ~ /'11 /'11 -l
~I Ul
I
I
I
'I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil Engineers/Surveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453. Fax (760) 434-5831
APPENDIX C
PROPOSED CONDITIONS MAP
- ----------- ----- --L
<Zo .. ------------------------------------------------~\~------------~~.------------------------------------------------------~ \. \ \ ~ \ \ \u\ ~ q
\
\
\
\
\
\
\
\
\ ;
\ \ ~ ~~.~J \t .................
\
<. \ ~~ \,\,\ ~ ':';~A ~,'}..\ \ \ \e.J ~ \~. \~\\ '\ \ ~ ./ \ )~ .. -\\ \\ n
f.-ii:" \\ \ \~\ ~ ~
\\ \\ t'J'.:I~ \ \ nf1:1 \ \. ~ \' ~!
;0.
SCALE: 1" = 40'
---------------
Conway & Associates, Inc. Cl.n Bqfnomo/SU1'ft1""'/Gonoral Bnc!nMri". Contr.otor. AlUJ2.Ite
25Zl1 PIG PlCD Drift' SullAo t02 • Corl.bold. Clolll'Dmla U2QOB folephDIUJ (780) 753-1i5S • l'AX (760) a:Jlj-083~
N q
o
(Xl q
I
I
I
I
I.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil EngineerslSurveyors/GeneraI-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453 • Fax (760) 434-5831
APPENDIX D
PROPOSED SITE GRADING PLAN
CITY DRAWING 42S-SA
'I
1
1
1
1
1
I
I
I
I
I
I
I
I
I
I
I
I
I J Nev De. 2007 -'~52:14 P:\D4-OO1 BNR-Sl\Dwg.\04OOIGPD.5.dwg PIDT 0 1_10
'\.. UJ WORK TO BE DONE: '\ 1 ___ Pee_Iim:H.,PATCH·rMh/PCC
\. 2, IErMM Ml. PO _ 0-3 M I'f III'MA'E PEIIIIT • \.! ' '\. P, 3 I'III'EIIY .. _ Ml. PBlIET 1, :lIlT .. "nPI:M. _ IRLIECIIIIIt' N lEE __ PINIS, SlEET !II '\../ " I 'II 11m 1I N I'f !EPNIAlE _ °
...
'~~ ~~~.
~V:.y .. -"-0
REVISION DESCRIPTION
t ~ If 1II!111D1Q1 WIN N lIE ,-I.-A, lIlT •
, MaCIlFMl.WJalIJIoII!IN:IlEIIllIICIIIrlo,IIIT.
! I'LIIID ~ -llllPE IUII1EII FS 1D MfA _ AT 211l1li, IDE I'UII1EIIS _,. __ SR' PIlI lET I.
!Ill: IlIEIIE MXSIT 1D _ PAIEIENT
4"-U Pi:c RA_ PIlI ..., ;-7 N ILII'£ ALL PCC RA_ AT A "1l1li
I 'III:IIIiH JIIIIoIN N 1.-111' N CIlIIIBT 10 aI liD , :111'-_ PCC .u: PIlI IIJ 1 larrz
;0 IIlBIW.IMI. oIIIUIJIUClURAI. P_ 0ElX N lEE lUll AID ~ 'tIIIU. U'I'CRI"PIII MCII'£IUIM. , ,PUNS N IT E'NlAlt _ '
_, MD -:JIll! "I1C Il1O I'IE-CAIT CCIICIIIE'J[ .-mil' III EQU.IL
.CUIII CU1W' l1£li,_ D-15 -NaI' " PM!' -lEE _ PUa
:w _ EII1iwIc£ PO _ o-W. II 11-12 N NaI' " PMI' -lEE _ PUlIS
r PCC CUIII PBI ,lIDRSD ;-1
9IEE1IIIIT PBI _ E-I N lICIT A PNIT -lEE _ PUNS
1MlSI:N'E PUIfEII SEMm L.o smBI -SEE UIIII£N'E lUllS
17 PCC AI:CElIIa£ _ -lEE MCIIImKIM. PINIS
I. Pee STAllS PIR DIII .... 2I, HNaIU PSI 11*14'11 2lI N lEE NDI1EImIIoIl. PINIS FIll ~ DETM.S 1~. 'Pee _y PA'IDIINT _ PIlI SIllS ~ N SLCPE l1li. Pee RA_ AT 11 .. _ 01IEII'MIE
" JICJIf,D -lEE PCC 'A~ N01'fiI. 11m 2
2l/ JIIDlED PAIII!M IWI. -lIEF sa:: D-D. lIlT ID N lEE MtIITfl:11MAL PIIIN5
zI n 1iET_ irIU. -lEE AIICIflICTUIW. P!MS -I'f !EPMAlt I'6IIT • I " . " . 22. ,!BIIEIITM.~-E,1III!E1S 2Z 11IU 21,N II'I'!EPMAlE.PEllllTo I ' , zr-1II'-cr Ml."WErf 1MB -!IE' IIAC1t1IllUIH. '['!AIlS
zt _1LCCK-~ wu.,-I£JGIIT < t .-1Ii I'6IIT IIIIIRIl °
21\ . ,QIj S!EM 'tIIIU. -lEE Mc:II1EClURAI. PIIIN5 '
IF LINE -CIITCH BASIN -lIACIC VMl. IRAIN TIE IN CIITCH BASIN
SlI CIITCH BASIN -lIACIC VMl. IRAIN TIE IN SlI CIITCH BASIN SlI CIITCH BASIN -lIACIC WMl. IRAIN TIE IN SlI CIITCH BASIN SlI CIITCH BASIN -lIACIC WM.L IRAIN TIE IN
SlI·.CIITCH BASIN -lIACIC WM.L IRAIN TIE IN SlI CIITCH BASIN -lIACIC WM.L IRAIN TIE IN SlI CIITCH BASIN -lIACIC WM.L IRAIN TIE IN 1110,18 Pee J.N:TIIli JIIX wI GlMTE
I> -2. aox 2.0 END IF LINE -CIITCH BASIN
6 -l!.1XIlC 2.6 SlI CIITCH BASIN
I> -I!. aax 2.6 SlI CIITCH BASIN 6 -l!.1XIlC 3.1 SlI CIITCH BASIN , -l!. aox 3.1 SlI CIITCH BASIN r; -l!. aox 3.4 SlI CIITCH BASIN I> -I!. 03lC 3.4 TIE INTI] MIIIN
12 -8.45X 4.8 STt:RM \/liTER SEPARATIlR UNIT
II! -II. 45lC 5.8 11-25 au WTLET STRUCTURE -2. aax 11-2:5 f'L II ROV
EXISTING CUll f'L
75.0073.00 I.m 6 -7. BOX 1.5 ENlI [J' LINE -CATCH BASIN
'" 2S 72. 90 44. 68 6 -2. aox 1.9 ClEAN IlJT IN IIRI¥E 74. 78 71!. DO 18. 19 I> -3. 4IllC 2.3 ClENI IlJT IN IlRI¥E
74. 40 71. 38 50 38 6 -l!.1XIlC 2.S 12Ic12 SlI CIITCH BASIN
74. 40 71. U I!I!. 75 I> -I!. aax 2.6 12xU! SlI CIITCH BASIN
74. 10 70. 82 3. 94 6 -l!. aax 2.8 12Ic12 SlI CIITCH BASIN
74. DO 7D. 74 4. 75 6 -10. 83X 2.8 TIE INTI] MIIIN
I> -2. aax 2.0 END IF LINE CIITCH BASIN 6 -12.114'1 2.3 12oc12 SlI CIITCH BASIN
6 -I. aox 2.0 ENlI [J' LINE CJ, USE !lET I, SlIT 18 6 -1. aax 2.2 12xU! SlI CIITCH BASIN, USE !lET I, SlIT 1B
Ii -1. aax 2.4 12xle SlI CIITCH BASIN. USE !lET I, SlIT 18 I> -I. aox 2.7 12x12 SlI CIITCH BASIN. USE !lET I, SlIT IB
6 -I. aox 3.0 12xle SlI CATCH BASIN. USE !lET I. SlIT 18 6 -1. aax 3.4 12x12 SlI CIITCH BASIN Ii -1. aax 3.6 12xle SlI CIITCH BASIN
8 -I. aox 3.8 12Ic12 SlI CIITCH BASIN 8 -I. aax 4.6 6" ClEAN IlJT
8 -1. aox 3.8 121c12 SlI CIITCH BASIN
8 -I. aox 6.0 6" ClEAN IlJT
8 -1.m 3.2 12Ic12 SlI CIITCH BASIN
:I' AllAY) RIM EL HIE TI£ SAME AS 2-7 AS SHINN.
STt:RM IRAIN lIATA FtlR PIP£: SEIiMENT IIlIINSlREAM [J' NDIE No. C' L'. • SIZE' .. ' SUPE' ) CIITCH JASINS ME NlIS IJI EllUAL PVC IH.ESS IITI£RVISE !IlTED CATCH JASINS ME 9' x9' IH.ESS !m£R\IISE !IlTED IH.ESS !m£R\IISE!IlTED. USE lET I. SlIT 18 F'IJI RI .... INVERT lIEPlIiS 3' IJI LESS \lSE DEl 2. SlIT 18 FtlR Ml. DTl£RS I SHEET II CITY OF CARLSBAD II SHEETS I 4 ,ENGINEERING DEPARTIIENT 30
IUDIIIG PLIIIII Nil;
ROMERIA POINTE
SITE GRADING PLAN
~
lSI = I?
@ID
2l
[2§
I?
(6)
~
lSI
@ID
[2§
.reJ
IYb
(l::::l
eJ
~
n
~
[2§
c:!C
~ = ~ = d
IY!!I
rlS
@b
eI ~ ~ ~ i ~
~ g i C
I ~ <> , :t ~ " ~ i 'i' li! .. ~ .. <> j~ 11 ! ;!
1 j
~
. ~ C) <> ~~ -tj
~i ""'lj ctl <> ......
C) .. o ~
tn .3 ~q
.:g~
~~ ell U r:=!: ~~ o !'.l U~
I
I
I'
I
I
I
I
I
I
I
'I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil EngineerslSurveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453. Fax (760) 434-5831
APPENDIX E
ON SITE DRAINAGE STUDY
. tOO-YEAR RETURN EVENT
PEAK FLOW COMPUTATIONS
-Peak Storm Water Runoff Calculations
• Pre-Development Condition (1 Page)
• Post-Development Condition (3 Pages)
-Onsite Tributary Basin Hydrology Map (1 "=40', 17"xll "), Pre-Development Condition
-Onsite Tributary Basin Hydrology Map (1 "=20', 17"xll "), Post-Development CQndition
-Reference Materials
• IDD Chart ~ 100-Y ear Return
• 100-Year, 6-Hour Storm Isopluvial Map
• 1 00-Year, 24-Hour Storm Isopluvial Map
• IDD Chart ~ 10-Year Return
• 10-Year, 6-Hour Storm Isopluvial Map
• 10-Year, 24-Hour Storm Isopluvial Map
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil Engineers/SurveyorsiGeneral-Engineering Contractors AB412412
2525 Pio Pico Drive· Suite 102.· Carlbad, CA 92008· Telephone (760) 753-1453 • Fax (760)434-5831
100-Year Return Event Peak Flow Computations
Romeria Pointe -CT 06-221 CP 06-15
APN 216-300-12 & 13
10/22/07
City of Carlsbad
--------------------------------------------------------------------------------------------------------------------------------------
ON-SITE TIME OF CONCENTRATION COMPUTATIONS: PRE-DEVELOPMENT
Computations based on Figure 3-4, County of San Diego Hydrology Manual, June 2003
~ b~ ~~
1
2 17.0
10.0
170
212
ON-SITE HYDROLOGY DATA
10 YEAR EVENT . . tc (min) 8 min.
P6 (10 YR Return) 1.8 in.
I, intensity (in/hr) 3.5 in.lhr.
PRE-DEVELOPMENT CONDITION
'A"
SUB AREA AREA "C"
BASIN (SF) (ACRES) FACTOR
A1 31,255 0.72 0.40
31,255 0.72
weIghted C value: 0.40
5.0 Initial basin saturation (est)
1.0
1.6
N'ly golf course slope, S'ly end of site
N'ly end of site
7.6 min
100 YEAR EVENT
"tc (min)
P6 (100 YR Return)
I, intensity (in/hr)
Q10
C*A (CFS)
0.29 1.01
0.29 1.01
Q100
8 min.
2.5 in.
4.9 in.lhr.
(CFS)
1.40
1.40
. Printed 11/15/2007 Page "I of 1 04001_hydro-3.xls Pre Dev
I
I
I
I·
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil EngineersiSurveyorsiGeneral-Engineering Contractors AB412412
2525 Pio Pico Drive· Suite 102· Carlbad, CA92008' Telephone (760) 753-1453. Fax (760) 434-5831
100-Year Return Event Peak Flow Computations
Romeria Pointe -CT 06-221 CP 06-15
APN 216-300-12 & 13
10/22107
City of Carlsbad
------------------------------------------------------------------------~-------------------------------------------------------------
ON-SITE TIME OF CONCENTRATION COMPUTATIONS: POST-DEVELOPMENT
Computations based on Figure 3-3, County of San Diego Hydrology Manual, June 2003
~ .b (ft) .b (m) § mfm Tc (min)
1 5.0 Initial basin saturation (est)
2 0.90 78 . 23.8 1.0% 1.8 Area C1 deck runoff
3 1.0 Rearyard swale flow (est)
4 1.0 North sideyard flow (est)
8.1 min
ON-SITE HYDROLOGY DATA
10 YEAR EVENT 100 YEAR EVENT
to (min) 8 min. to (min)
Ps (10 YR Return) 1.8 in. Ps (100 YR Return)
I, intensity (in/hr) 3.5 in.lhr. I, intensity (in/hr)
8 min.
2.7 in.
5.3 in.lhr.
POST-DEVELOPMENT CONDITION (DEVELOPED AREA)
"A" Q100
SUB ARE.A. AREA "e" 010 0100 Subtote!
BASIN (SF) (ACRES) FACTOR C*A (CFS) (CFS) (CFS)
A1.1 307 0.007 0.90 0.006 0.022 0.033
A1.2 77 0.002 0.40 0.001 0.002 0.004 0.04
A2.1 366 0.008 0.90 0.008 0.026 0.040
A2.2 75 0.002 0.40 0.001 0.002 0.004 0.04
A3.1 239 0.005 0.90 0.005 0.017 0.026
A3.2 67 0.00.2 0.40 0.00'1 u.uu~ U.UU::S 0.03
A4 1,627 0.037 0.90 0.034 0.118 0.177 0.18
-
81.1 327 0.008 0.90 0.007 0.024 0.035
81.2 37 0.001 0.40 0.000 0.001 0.002 0.04
82.1 478 0.011 0.90 0.010 0.035 0~052
B2.2 64-n nno1 nAn 0.001 0.002 O.OC~ 0.05 v.v,,", I V.-YV
83.1 475 0.011 0.90 0.010 0.034 0.052
83.2 64 0.001 0.40 0.001 0.002 0.003 0;05
84.1 437 0.010 0.90 0.009 0.032 0.047
84.2 61 0.001 0.40 0.001 0.002 0.003 0,05
85 363 0.008 0.40 0.003 0.012 0.018 0.02
Catch
8as~n
Ref.
10
9
8
7
14
014') ,.,;
12
11
6
Printed 11/15/2007 page 1 of3 04001_hydro-3.xls Post Dev
·1
I
I.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil EngineerslSurveyorsiGeneral-Engineering Contractors AB412412
2525 Pio Pico Drive· Suite 102· Carlbad, CA 92008 • Telephone (760) 753-1453 • Fax (760)434-5831
100-Year Return Event Peak Flow Computations
Romeria Pointe -CT 06-22!-CP 06-15
APN 216-300-12 & 13
10/22107
City of Carlsbad
---------------------------------------------------------------------~----------------------------------------------------------------
POST-DEVELOPMENT CONDITION (DEVELOPED AREA) 0.33
"A" 0100 Catch
SUB AREA AREA lie" 010 . 0100 Subtotal Basin
BASIN (SF) (ACRES) FACTOR C*A (CFS) (CFS) (CFS) Ref.
C1 3,518 0.081 0.90 0.073 0.255 0.382 0.38 5
C2.1 328 0.008 0.90 0.007 0.024 0.036
C2.2 99 0.002 0.40 0.001 0.003 0.005 0.04 16
C3.1 545 0.013 0.90 0.011 0.039 0.059
C3.2 96 0.002 0.40 0.001 0.003 0.005 0.06 15
01.1 146 0.003 0.90 0.003 0.011 0.016
01.2 16 0.000 0.40 0.000 0.001 0.001 0.02 19
02.1 376 0.009 0.90 0.008 0.027 0.041
02.2 64 0.001 0.40 0.001 0.002 0.003 0.04 18
03.1 344 0.008 0.90 0.007 0.025 0.037
03.2 548 0.013 0.40 0.005 0.018 0.026 0.06 17
E1.1 5,375 0.123 0.90 0.111 0.389 0.583
E1.2 333 0.008 0.40 0.003 0.011 0.016 0.60 3
E2.1 1,081 0.025 0.90 0.022 0.078 0.117
E2.2 132 0.003 0.40 0.001 0.004 0.006 0.12 21
Printed 11/15/2007 Page 2 of.3 04001_hydro-3.xls Post Dev
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil ~ngineers/Surveyors/Genera1-Engineering Contractors AB412412
2525 Pio Pico Drive' Suite 102· Carlbad, CA92008' Telephone (760) 753-1453· Fax (760) 434-5831
100-Year Return Event Peak Flow Computations
Romeria Pointe -CT 06-221 CP 06-15
APN 216-300-12 & 13
10/22/07
City of Carlsbad
------------------------------------------------------------------------------------------------~-------------------------------------
POST ·DEVELOPMENT CONDITION (DEVELOPED AREA) 0.89
"A"
·SUB AREA AREA "C" Q10
BASIN (SF) (ACRES) FACTOR C*A (CFS)
. F1.1 508 0.012 0.90 0.010 0.037
F1.2 387 0.009 0.40 0.004 0.012
F2.1 602 0.014 0.90 0.012 0.044
F2.2 313 0.007 0.40 0.003 0.010
F3.1 833 0.019 0.90 0.017 0.060
F3.2 361 0.008 0.40 0.003 0.012
F4.1 836 0.019 0.90 0.017 0.060
F4.2 377 0.009 0.40 0.003 0.012
F5.1 1,280 0.029 0.90 0.026 0.093
F5.2 376 0.009 0.40 0.003 0.012
F6 542 0.012 0.90 0.011 0.039
24,480 0.56 0.46 2.84
Overall Weighted "C" Value: 0.82 (Study area only)
POST·DEVELOPMENT CONDITION (REMAINING SITE AREA)
"AU
SUB AREA AREA "C"
BASIN (SF) (ACRES·) FACTOR C * A-
G1 334 0.008 0.90 0.007
G2.1 392 0.009 0.90 0.008
G2.2 82 0.002 0.40 0.001
G3 5,967 0.137 0.40 0.055
6,775 0.16 0.45 0.07
TOTAL Q (Areas A -G):
Post·Development Area Use Summary:
Pavement
Landscape
Structures
Printed 11/15/2007
17,508 sf
3,992 sf
9.755 sf
31,255 sf
56.0%
12.8%
31.2%
68.8%
Page 3 of3
Q10
(CFS)
0.024
0.028
0.003
0.192
0.25
3.08
Q100 Catch
Q100 Subtotal Basin
(CFS) (CFS) Ref.
0.055
0.019. 0;07 29
0.065
0.015 0.08 28
0.090
0.017 0.11 27
0.091
0.018 0.11 ·26
0.139
0.018 .0.16 25
0.059 0.06 23
2.42 2.42
Q100
Q100 Subtotal
(CFS) (CFS) -. --
0.036
0.043
0.004 0.05
0.288 0.29
0.37
2.79 2.76
04001_hydro-3.xls Post Dev
1
1
I
I
I
1
1
I
1
1
-I
1
1
I
I
1
I
'\
1
IJ
40' 20' 0 40~ 80"
I I! -I , r
SCALE: 1-=40'
REDUCED SCALE EXHIBIT
, ",/ )./'
./~::: .. ././ ",f"',.r ~;;..-
./ ~.,//' -.
.j',;
.,"-'::';"--:':::';;-;;'-::~:;"~
-'~
Nov 06. 2007 -15:12'29 P:\04-001 BNR-9\H)I:Iro\HjI:!ro\04001-H)I:Iro.dwg PLOT: 11.17 FIT
fIIINOfF FIIf»I CffllIlE' 1ltJ{jf~ 0IAEC1ED 7D ElIIS7INr: D-75 WA \
ROOf" GIIl7FRS .. PVT Sll SlSmI\
\ ,
~p""«P'
"
I b '<1".
II '"$' ~ 1 ...J ' <C u
(/),
" \
J Ii
'! ~
1 i \I~
\
\
1 \
I·
SHBET 1 of 2 SHEBTS
PRE-DEVELOPMENT
CT06·22/CP06-15
LEGEND
A1 ~ SUB-BASIN DESIGNATOR
3064 --.......... SUB-BASIN AREA (5.F.) _ .. _---BASIN BOUNDARY
Hydrology Map
Pre-Development Condition
CT'06-22 / CP 06-15
Romeria Pointe
November 6. 2007
s
(§
= I:=J
~
§)
@5
I:=J
@R)
~
(§
~
@5
(§)
I!:!b
I?
(§)
~
[I
~
@5
~
~ = ~ = c::::!1
I!!:!!I
@5
@b
~ ~ os :8 -g ~ ., . S ~e .s \:i 8 ~
1:'l I :!: i~ '" ~ -;S
M !
~ ~
ri
1 j
~
~ ~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
IJ
\
01 ~ ~ ~:
~ m ~ ~ ~
LEGEND
'f ~'" \. \ \ -I
i' ~~ \', ~ \ i
l \ ' ~~.". "', \' \1 ' i, ~,'-\~. \ i, .... )!\, '\ ,\ '\ '. ,'\ . ',,) I , \ ~ i '. \, " ~.
, ~ /-_ . ..:. .~.~ ... < '\'" '-;--f v...t\ '..', \ '\
,:1"'. ... , "~ A1 J' "'1/ ' , "" ", , \ "" -.J. ~~ " ~ • "" " '. tJ;il064 '-SUB-BASIN AREA (S.F.) J ~)'-.'\. r '" ... '., "-I '\' , '''', "-f \. ", ~ .. ~ .. -~'.,I ',0,./ " ,," ...... ~ '\ f".(-...
, .... ', ... ~. "' .... ,"-~ ,---,
"', ,. ""-fIRECTION OF FLOW ~ ; /"'--" ~~~~~'. \ " \
.... I / >b '... ,\".
SHEET 2 of 2 SHEETS
POST-DEVELOPMENT
CT 06-22/CP 06-15
./" SUB,....BAS/N D£SfGNA TOR --
BASIN BOUNDARY
(
1 I fe5 I
-AV ..........
~
SUB-BA~N BOUNDARY
i' I B1
, I 364
A1~_
384 (
, A~ /'/
V F4
"r< .. ~"'" $TO~\PRAIN / '... ~
) , '., "'-
I :26'" 'Ot( H BA~fIv,,-.,.{/ ID No.
\ "~ /P.~.~-~:~~ ".~" .. ....~-) r-~
I
-~ B2
542 ~13 [l~ ___ -"" "
A21
441 r
~~ -B3
A3: 539
306J\-
/ I~
A41B4~
1627 I 498
~~ 19 ~1
56ltO
12
'" 1213
~ /, ~J ../
I F5
1656 I
i' .... , / \ .~ ' ..... , i I .... )( ......... ,.... '",,-'''''-, .... \ ! ">, ... ,...... . "-
'if., f.... "'~'..... '~" ..: '! '" .j. '" \ ~ -'."-_ ... _ .. , ". \ ')1/ ,~ ........ l. " ' \ " .... .. , < , \ ~, ' . ....
' .... 1 I j ~ f' .. -.-.. ~. ....... ./ '" / ! ............ ~<:---..... '...... \ ..... ~
•• -' •• , ", \ ./pP" / '-. /' \ ./
,/ '." / '-, \ ~.-:.. / ~.~, \
/ " ,
~
(§
= [;=
@
2J
@§
[;=
@'j)
~
(§
@
@§
(§
I!!b
[;=
(§)
~
[J
~
@§
~
~ = ~ = c:::!I
I!illJ
@§
@b
~ ~ e'l :!l ~ ~
.~ ~e ~ ~ Il :r .. l: g I :!: i~ '" ..... ii' {i ~ . ~. , ~. '///,/ oj /'/1 '\ ' , \, ,-' / " , ,. /.-" "X-\ , / -,~, 0'. _ , z%;! --/ ,.~, . , \. 6. , \ f' ',. ,-, p' 1 M rn i ~M -~-' ~¢#/ I \ \ A' \ \ /x /<'7~>Hvdro ogy ap i! ----~.:::--~, ---/. " , ", , I -/ --// --J -• B. s C) N
--.c::'J--"-r ----;--\\ \ ~ \ \ i"'/ \. ,'?~P~,,?';:./ Oln-Site Dramage aSln ~ ~
r!
i j
~
···········1 I i '\ ' \.._______' \ \ } /L 0,/' II 15"! ::[~U~~J~J~b~b~~~~~~~~~~.~_~~~~~._~~_\~ , \ ~ \ \ i /Y,~~_ cr~!~~ ~~
-\ '\ \ -..\ ~ \ \ \ (./ ...... :;7'--.~.(..-Ro, ..... .-.aPomte ~ g , '. ~ • -, -" \ -r ~~. ~,
\ \ '\; l\ \ 11 ,-;; \ _ --+--ill I /' I"~,"~ >'7~--,-"" / \ \ \ \ \ \, ----: \ \ i l' '" ,.", ~.:: ~\ " No ...... ~2')()7" ~ . \ , I • ,. '" \ -\ i , , , '/" \ -' "/ " , \ \ \ " , --i ! , J " /' --0 • \ -j \ -~:--+-"" IC \' ~ / \ . . I 'J l \ I ) cbT~ET) ! i _ J--! : I \ I I i j/\ _,,<' / I -' RO lf:iEdIA I 1 ~ \ I _~1 __ ~_ I i-r I 1 I j ; I J ,p, M ~ ; __ i __ .-+---';-!--T ----r I! i I j . f -If 1 i ~ i i : .
Nov 06, 2007 -15:12:29 P:\04-001 BNR-9\Hydro\Hydro\04001-Hydro.dwg PLOT: 11.17 AT
- ---.---- --- - - -- - ---
2.01 ! I l"'kl I ! 1 I j~! 1111"Nt
8 ~
g1.ol I ' I ~M 1111:
~o.s
.lll .s0.7
0.51 I I ! I I
0.41 I I , I
7 8 9 10 15 20 30 40 50
Minutes
Ouratiqn
EQUATION
I "" 7.44 P6 D-0.645
I = Intensity (in/nr)
P6 := 6-HourPrecipltation (in)
D = Duration (min)
2 3 4 5 6
'Hours
i
'Jt :g
6.0 '2:
5.5 ~
5.0 g
4.5 "§'
4.0 ~
3.5.!!!.
3.0
2.5
2.0
1.5
1.0
Intensity-Duration Design Chart -Template
Directions for Application:
(1) From precipitation maps determine 6 hr and 24 hr amounts
for the selected frequency. These maps are included in the
County Hydmlogy Manual (10. 50, and 100 yr maps included
in the Design and Procedure. Manual).
(2) Adjust 6 hr precipitation (if necessary) $0 that it is within
the range of 45% to 65% of the 24 hr precipitation (not
applicaple to D~sert).
{3} Plot 6 hr precipitation on the right side of the chart.
(4) Draw a line through the point parallel to the plotted lines.
(5) This line is the intensity-duration curve for the location
being analyzed.
App'ication Form:
{a} Selected frequency ~ year
(b) P6 ;: L2Jn., Pit = ~ '::4::: 5' z. %(2)
(c) Adjusted p6(2l;: Z. ~n.
(d) tx = ~ min.
(e) I ::: __ in.lhr.
Note: This chart replaces the Intenslty~Duration.Frequency
curves used since 1965.
FIGURE I .
3 .. 1
-~ --' -
"",,~l 1 .... 1
.,,1 ,
!-.,~ .. -.;
; .. __ ... ,t •• ; i
:" ,"'''32·10' . ..... ! I; ,I -r' rnJ.
"t.:.J:.:' i ..Jr=i"r;.::~!~": F:'~::d,,! .. ~.:·i·+ r::r:~ €
--- --
J .: .. t!·-f-:-'T"''''~'-'-' I'¥-• J •• i, .. , , I , ,
--- ---- --
..J I: i: i I' 'I !. I ' ! i ! !;J 1 1 I! ""'~-"'+""'I ... -l .. · .. j • ~-:--r~·-I ",1"" "t' " . ;. .., ... ~--....! I"T'''I' !e"( 1 "". "'1''''''''''1'' .,," i -+--1
.. .I.; 11 ;·I"·"I··,,""',,l-~~l· l
t .. t· .. ··-J 1 ' I" J i i 31 "j ".I:~L·;""':
""I'-o5'!' t·, -, I () I ··0·,,-
County of San Diego
Hydrology Manual
Rainfall Isopluvials
100 Year Rainfall Event - 6 Hours
Isopluvlal (Inches)
It Qu;):= 2:5 "
DP\V ~GIS GIS ~""N::II~ <Sot~~"MIJ.·~ w¢ Hu\.'.:: S:tn 1)11.'8C'1 <:O"'(.t..:d!
N TH1Sw.PISPROVIOEDwmtOUTWAARAKrYOFNttkJM).BnstEXPRESS ~ ORIMPUED,IHCllIDr«J.BUTNOTUMJEOTO. TtEII.I'lJB)WNUWffiES
S
OF NERCHAUTABIUTY AND FITNESS FORAPAATIClII..AR PURPOSE. CowIthI8InGIS,.MRlflj:uR .....
Th1sproob:tslNY~Wormat1D11rn.m#leSNiOAO~ E lnIomIIlIIcnSytlem'lltlIch=-tIlll~wIIIlcd"-...... permlillcnofSAl«lAO.
ThIII~IN1CCf'1l11r1ln1omwUcn~,,"be.n"~1'AIh pwmInb'Ipr'Qdby~~Maps.
3 o 3 Miles r-_
-- - - -- ---. - -
J
l! ... +.L,_.
--1", .
. t· .. ·· .. ,I
• 1 ..... "-~,, .. '~. "1
i ..... : ,'y.. !J' ....
33"00' '.,., , : i
- ---'. ---.-
County of San Diego
Hydrology Manual
Rainfall Isopluvials
100 Year Rainfall Event -24 Hours
Isopluvial (inches)
~(j~)"M'
DPW "GIS Ot,4~flI"NGtttrt:I
""" .... ,~M<>r',g.:..,m' .. w
lHlSNAPISPROVIOEOWITHOUTWNaWlrYOFNU1<IND,emERElCPRESS OR IMPUED.lHa.uDlNO, BUI' NOT UNITEOTD.llE IJ.F!JEDWAAFWITlES OFNERCHANTAGIUTY AMI mNESSFClRAPNmCUl..AAPtJRPOSE. Ccp)dgIjS.,olS.Al~ReMIWd.
,.w~ p-~~~~~~
ThIIIpnI6.Iclln8)'carUlnlnftlllTlMlan'flHch .... bM'I~'I\tii pelmlllfllllglWlledbyThclmNBd\eQM.,
3 o 3 Miles ,....-
--- -
2.01 I I 1''1<1 I I I I
i
11
.
oR :?;-O,9
·~O.8 I
~0.7
6 7 3 910 15
---
20 30 40 50'
Minutes D\Jral(~p
- ---
2 3 -4 5 6
Hours
-
~ !i:i
11 <il ~. e,o _.
5.5 ~
5.0 g
4.5 "§'
4.0 ~
3.5~
3.0
2.5
2.0
1.5
1.0
Intensity-Duration Design Chart -Template
- -----
Directions for Application:
(1) From precipitation maps detennine 6 hr and 24 hr amounts
for the selected frequency. These maps are included in the
County Hydrology Manual (10,50, and 100 yr maps included
in the Design and Procedure Manual).
(2) Adjust 6 hr precipitation (if necessary) $0 that it is within
the range of 45% to 65% of the 24 hr precipitation (not
applicaple to Desert).
(3) Plot 6 hr precipitation on the right side of the chart.
(4) Draw a line through the point parallel to the plotted lines.
(5) This line is the Intensity..cJuration curve for the location
being analyzed.
Application Form:
{a) Selected frequency It) year
(b) P6:::: ..J..dL in., P24;:: U '::4;:: S-f> %(2)
(c) Adjusted Pe(2) = M.. in.
(d) tx ;:: h min.
(e) I ;:: __ in.lhr.
Note: This chart replaces the Intenslty-Duration-Frequency
curves used since 1965.
3-1
-
----- --------
I'" ! ~~..r.. ",
l~~l~~'·~! !···:·:····r~::·:l+~i. i~,,:·~:·:·
.,.
------
County of San Diego
Hydrology Manual
Rainfall Isopluvials
10 Year Rainfall Event - 6 Hours
Isopluvial (inches)
I? (tt»: ItS'
DPW --GIS
N
~~fO.Mf;~ ~.~~~fm\\'t'J
nus NAP IS PROVIDED Wl1HOUT WARlWnYOf Nl'fKIND. ElTHER EXPR£5S ORINPLlEO,lNct..UOINO.BUTNOTtJt.UTa)TO.1HE IM'LIEDWAAAANTlES OfNERCtWfTABIU1YNIOFlTNESSFORAP~PI.IRPOSE. Cow\ibISIrlO/S AII~RMrNd.
,,*prododsmayCO!llllnW1ll'fl\lllleflfrgmIllllSNlOAQ~ ldorrnmlcnSl'lltm""khQllnlllbe~~tn.
ThlsprDolx:l:lNYtorIIaInll'lrOl1'Mlb1I11Ncbl.-bttrIlllptDdladMh ~*"pUdby'fluNl.~MIpt.
S
3 0
~
3 Miles
---_. --- -- --- -- -- -- -
" J-".l ~~fi~f+l~rFr~Y County of San Diego
Hydrology Manual
j. "..' ... 'i' -" .. .;.' ~'~ *."j ";'.' '1; i '{ F.t;' 1.: l---' ,. , T '\Ji" rf k~ b I "t ), ~'1' ! 1 'I ' , ' : ,1-""'='73, ~,,' t.. (_''''_o'.,! , .. • ~ ,33't5' . ,\'-:.1;' yo :=-::::-" ",t, ", \'''~~, ! • "" : "'r "'"
Rairifall Isopluvials
-~-t .. 1 •
... ; .. 1.
I. i .... ""l! 1 !.~~.;. '''I
I "_,,L"I.. , ,
-l
10 Year Rainfall Event ... 24 Hours
Isopluvlal Onches)
1:4 (rlJ ) .. ? r
STA 'rJ,'" .h .!l'" f.."~:::C" T y. . 1,"' . .. . .. . DP~ WI:
O
,1">/'''''' " ' I:! . " ...... , ..... " ' j' I' . d7i;!'i V ; / . ...-:-. _. ! :-" -.+/'. r-'--+C',! L~ .; .
': ,,0, __ .,tn,,",,,d-'lP,I, .~: ' . .:±J ... ,I''''!''' =~:;J"Y ~I " ,. ' ['''I ~j111 'f,+':""f ,if xr~,i ~~ .:::r=Ilm-c-ti:-ilL:. N -~.=;--. I. , . , ., '. ," ,; I L' : I ... , .. '. , 1 ... ".,. • ••• 1 ,t .,-'-'-+ OFueR~=G,eurNoT~OFAHVKlN1).ElTHER
.I rf~l-: ±.:.j+ ' •. 1 ii' !!' .! nTti"''''''Fr!:j~:-:!i: E ;;.;;;;;;;..::::: ......... ..".,.,....
,"'.1 .... _ ..... ' i I .... ,,-J.
1o
"-"1 ,: ........ , .. + ... ~.;b. " ." I ,.!, ii, ..... _"...= ........... '='.-
'j I, i I ...... -"!"L'" ,. ,.' 'r" ,,' ,. " " --' ,; ! I'~"l",''' .+-, " ! .... I .. j .... i"f<:s" """!" ! ..... ; '" i '! i ih ! II i 32'30',t--" S ~~a:'"n!!..~~h.beentap"Dlb:ed , .. , 1'f' 1'1' i' ; 'r-,,-~"+·+:·i:+;:: '.-d 3 MRos ---
I
I
I-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil Engineers/Surveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453 • FaX (.760)434-5831
APPENDIX F
PROPOSED ON-SITE STORM DRAIN SYSTEM
HYDRAULIC ANALYSIS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~ e:::: o z
o I")
"
W ..J « ()
(f)
8F2
915
F1
895
G3
5967
7F3
1194
Cl
3518
Bl
364
A1
384
B2
542
10
E2
1213
El
5640
19 18
Dl D2
162 440
C2
427
16
B3
539
A2
441 9
Storm Drain
Analysis Data
CT 06-22 / CP 06-15
Romeria Pointe
November 6, 2007
17 4
D3
892
I-
C3 w w_ -641 a:::
15 I-(f)
B4 «
498 0:::
W
~
7 Gl 0
0:::
334
30
Nov 06, 2007 -15: 12: 29 P: \04-001 BNR-9\Hydro\Hydro\04001-Hydro.dwg PLOT: 11x17 FIT PLOT 1=30 (MFC85 HALF)
I
I
I-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
Conway & Associates, Inc.
Civil Engineers/SurveyorslGenera1-Engineering Contractors AB412412
2525 Pio Pico Drive' Suite 102· Carlbad, CA92008· Telephone (760) 753-1453· Fmr(760) 635-0839
04-001 -BNR-9: Site SD Analysis Entry Data 12117/04
liNE ID DEFL'N LENGTH Q I.E. dn I.E. up Dia June FG PLAN ANGLE n Loss
1 63.9 12.78 0.00 68.00 68.69 12 0.009 0.3 73.0 21
2 35.7 12.06 0.00 68.69 69.34 12 0.009 0.2 74.2 20
3 0.0 6.32 0.45 69.34 69.68 8 0.009 1.0 72.8 12
4 0.0 27.81 0.00 69.68 70.73 8 0.009 1.0 73.9 11 ..
5 -9.6 40.58 0.43 70.73 78.34 8 0.009 1.0 82.5 10
6 0.0 26.50 0.01 78.34 78.87 8 0.009 1.0 83.1 9
7 0.0 38.40 0.13 78.87 81.41 8 0.009 1.0 91.5 8
8 -90.0 17.34 0.04 81.41 81.75 6 0.009 0.5 91.6 7
9 0.0 26.34 0.05 81.75 82.28 6 0.009 0.5 91.8 5
10 0.0 28.10 0.04 82.28 82.84 6 0.009 0.5 92.1 3
11 -90.0 8.65 0.06 78.87 79.05 6 0.009 0.5 82.9 19
12 0.0 27.68 0.05 79.05 79.60 6 0.009 0.5 83.2 17
13 0.0 28.24 0.05 79.60 80.17 6 0.009 0.5 83.3 15
14 0.0 36.72 0.04 80.17 80.90 6 0.009 0.5 83.4· 13
15 -90.0 11.65 0.07 78.34 78.57 6 0.009 0.5 82.8 23
16 0.0 27.30 0.06 78.59 79.12 6 0.009 0.5 83.1 21
17 0.0 4.75 0.06 70.23 70:73 6 0.009 0.5 74.0 30
18 0.0 26.68 0.04 70.73 71.27 6 0.009 0.5 75.4 28
1-9-0·.0 27.30 0:03 71.27 11-.82 6_ --.0.009-.0:5 14.6· 26
20 222.9 7.88 0.00 69.68 69.81 8 0.009 1.0 73.5 44
21 -312.9 24.53 0.12 69.81 72.63 8 0.009 0.5 75.4 32
22 270.0 3.99 0.00 69.81 69.85 8 0.009 0.3 75.8 43
23 -25.9 11.42 0.06 69.85 69.96 8 0.009 1.0 14.3 42
24 51.1 58.81 0.00 69.96 70.54 8 0.009 0.3 75.1 41
25 29.2 8.59 0.14 70.54 70.63 8 0.009 1.0 74.9 40
26 -292.8 42.14 0.10 70.63 71.05 6 0.009 0.5 74.9 38 ..
27 0.0 32.91 0.10 71.05 71.38 6 0.009 0.5 74.9 37
28 0.0 32.83 0.07 71.38 71.71 6 0.009 0.5 74.9 36
29 0.0 18.92 0.07 71.71 71.90 6 0.00.9 1.0 74.8 35
2.27
Printed 2/1/2005 Page 1 of 1 J.N. 04-001: Q4001_SD.xIs
1
1
1
1--
1
I·
1
1
1
1
1
1
1
1
I
1
1
Storm Sewer Summary Report
Line LinelD Flow Line Line Invert Invert Line HGL
No. rate size length ELDn ELUp slope down
(cfs) (In) (tt) (tt) (tt) (%) (tt)
1 1 2.27 12 c 12.8 68.00 68.69 5.399 68.30
2 2 2.27 12 c 12.1 68.69 69.34 5.390 71.11*
3 3 2.27 8 c 6.3 69.34 69.68 5.380 71.19*
4 4 1.16 8 c 27.8 69.68 70.73 3.776 71.96* ':'
5 5 1.03 8 c 40.6 70.73 78.34 18.753 72.25
-,
6 6 0.47 8 c 26.5 78.34 78.87 2.000 79.05
7 7 0.26 8 c • 38.4 78.87 81.41 6.615 79.32
8 8 0.13 6 c 17.3 81.41 81.75 1.961 81.73
9 9 0.09 6 c 26.3 81.75 82.28 2.012 81.96
10 10 0.04 6 c 28.1 82.28 82.84 1.993 82.46
11 11 0.20 6 c 8.6 78.87 79.05 2.081 79.32
12 12 0.14 6 c 27.7 79.05 79.60 1.987 79.32
13 13 0.09 6 c 28.2 79.60 80.17 2.018 79.82
14 14 0.04 6 c 36.7 80.17 80.90 1.988 80.35
15 15 0.13 6 c 11.6 78.34 78.57 1.974 79.05
16 16 0.06 6 c 27.3 78.57 79.12 2.015 79.05
17 17 0.13 6 c 4.8 70.73 70.73 0.000 72;25*
18 18 0.07 6 c 26.7 70.73 71.27 2.024 72.26*
19 19 0.03 6 c 27.3 71.27 71.82 2.015 72.26
20 20 0.66 8 c 7.9 69.68 69.81 1.650 _ 71.96"
21 21 0.12 8 c 24.5 69.81 72.63 11.496 72.02
22 22 0.54 8 c 4.0 69.81 69.85 1.003 72.02*
230 23_ 0.54-8e 1":1.4 69.85 69.96 -0.963 72.0'J!'
24 24 0.48 8 c 58.8 69.96 70.54 0.986 72.11*
25 25 0.48 8 c 8.6 70.54 70.63 1.048 72.17*
26 26 0.34 6 c 42.1 70.63 71.05 0.997 72.21"
27 27 0.24 6 c 32.9 71.05 71.38 1.003 72.31"
28 28 0.14 6 c 32.8 71.38 71.71 1.005 72.35*
29 29 0.07 6 c 18.9 71.71 71.90 1.004 72.36
PROJECT FILE: 04-001.STM I-D-F FILE: SAMPLE.lDF TOTAL NO. LINES: 29
NOTES: C =-Circular; e = elliptical; b = boX; Return period = 5 Yrs.; "Indicates surcharge condition.
Page 1
HGL Minor Dns
~p loss line
(ft) (tt) No.
68.99 -2.12 End
71.13* 0.06 1
71.30* 0.66 2 ---I
72.08* 0.17 3
78.82 0.23 4
79.19 0.12 5
81.65 0.08 6
81.93 9·03 7 .
82.43 0.02 8 .'
82.94 0.02 -9
79.28 0.04 6
79.79 0.03 11
80.32 0.02 12
81.00 0.02 13
79.05 0.00 5 .
79.24 0.02 15
72.25* 0.00 4
j
72.26* 0.00 17 I j-
72.26 0.00 18 I
71.9'7* 0.06
-.-I
3 l
72.79 0.05 20 I
72.03* 0;04 20 I
72;08~ 0.04 22-I
72.16* -0.01 23 I
72.18* 0.03 24
72.28" 0,02 25
72.34" 0;01 26 I I
72,36* 0.00 27
72.36 0-.00 28
I
I
I
RUN DATE: 01-05-2005 I
--
I
I'r----------------=---
I
I'
I
'I '
I
I
'I
I
I
I
I I
I
I
I,
I,
I,
I
Storm Sewer Design & Analysis
I I '
!
I
Proj. file: 04-001.STM IDF file: SAMPLE.IDF No. Lines: 29 01-05-2005, I
Line 1 Q=2.27 Size = 12 x 0 (Cir)
1 I Outfall
I.
I
I Invert Depth HGL EGL
·1
·1
.1
I
'1
I
I
Dnstrm 68.00 4
Upstrm 68.69 4
Drainage area (ac)
RUnoff coefficient (C)
Time of conc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
. Cumulative C x A
Q = CA x I (cfs)
Q Catchment (cfs)
Q Carryover (cfs)
Q Captured (cfs)
Q Bypassed to offsite
Line 2 Q=2.27
I . 2 I Downstream line = 1
I
I
·1
I
'1.
I
Invert
Dnstrm 68.69
IJpstnn-69:34
Depth
12
12
Drainage area (ac)
Runoff coefficient (C)
Time ofconc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q = CA x I (cfs)
Q Catchment (cfs)
Q Carryover ( cfs)
Q Captured (cfs)
Q Bypassed to 1 (cfs)
68.30 70.42
68.99 71.11
-0.00
-0.00
-1.31
-0.00
= 0.00
= 0.00
= 0.00'
-0.00
-0.00
-0.00
-0.00
Size = 12 x 0 (Cir)
HGL
71.11
71.13
-0.00
-0.00
-1.24
-0.00
-0.00
= 0.00
= 0.00
-0.00
= 0.00
= 0.00
= 0.00
EGL
71.24
11.26
Nv = 0.009 Len = 12.8 JLC= 1.00
Area Vel T-Wid Cover·
0.19 11.68 0.91
0.19 11.68 0.91
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
Nv=O.009 Len = 12.1
Area Vel T-Wid
0.79
0.19
2.89
.2:89-
0.00
0.00
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
N/A
3.31
-5.399
-5.399
-8
-73.00
-0.00
-0.00
-11.95
= MH
-0.00
= 0.00
= 0.00
JLC = 0.50
Cover
3.31
3.:86
-5390
-0.195
- 8
-74.20
-0.79
-:-0.00.
= 11.94
-----------------------------------------------~----
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
== WI
-0.00
= 0.00
= 0.00 I
I
-------------------------------------------------------------------------------------------------------~--------
I.
Line 3 Q=2.27 Size = 8 x 0 (Cir) Nv=0.009 Len =6.3 JLC= 1.00 1 . 3 / Downstream line = 2
I·
1
I
1
I·
1
I
1
1
.1:
.1
Invert Depth.
Dnstrm 69.34 8
Upstrm 69.68 8
Drainage area (ac)
. Runoff coefficient (C)
Tim,e of conc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q = CA x I (cfs)
Q Catchment (cfs)
Q Carryover (cfs)
Q Captured ( cfs)
Q Bypassed to 2 (cfs)
HGL
71.19
71.30
-0.00
-0.00
-1.21
-0.00
= 0.00
= 0.00
=' O~OO
-0.00
-0.00
-0.00
-0.00
EGL
71.85
71.96
Area Vel T-Wid Cover
0.35 6.50 0.00 4.19
0.35 6.50 0.00 2.45
Slope of invert (%) = 5.380
Slope energy w;ade line (%) -1.694
Critical depth (in) = 8
Natural ground elev. (ft) -72.80
Upstream surcharge (ft) = 0.95
Additional Q (cfs) = 0.45
Full-flow capacity (cfs) . = 4~O5
----------------------------------------------------
Inlet Type
Gutter slope (ftlft) .
Cross slope (ftlft)
Width of Flow (ft)
= MH
0.00
= 0.00
= 0.00
---------------------------------------------------------------------------------------------------------~------
Q= 1.16 Size = 8 x 0 (Cir)
. 4 / pownstream line = 3
Invert Depth HGL
Dnstrm 69.68
Upstrm.. 70.73
8
··-8
Drainage area (ac)
Runoff coefficient (C)
Time of conc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q = CA x I (cfs)
71.96
72.08
= 0.00
-0.00
= 0.98
= 0.00
= 0.00
= 0.00
= 0.00
EGL
72.13
72.25
Nv=0.009 Len =27.8 JLC= 1.00
Area Vel T-Wid Cover
0.35 3.32 0.00 2.45
'0.35 3.32" 0:00 250
Slope of invert (%) -3.176
Slope energy grade line (%) -0.442
Critical depth (in) -6
Natural ground elev. (ft) -73.90
Upstream surcharge (ft) -0.68
Additional Q (cfs) -0.00
Full-flow capacity (cfs) -3.39
-----------------------------------------------~-----
1 .Q Catchment (cfs) = 0.00 Inlet Type = MH
Q Carryover (cfs) = 0.00 Gutter slope (ftlft) = 0.00
Q Captured (cfs) = 0.00 Cross slope (ftlft) =' 0'.00
I. . ~-~~~~-~~-~~--~--~~~~!----------~~~~-----------------~~~:~-~~-~!~~-~~!---------------~-----~:~~----
I
I
I' LineS Q=1.03
5 / Downstream line = 4
Size = 8 x 0 (Cir) Nv = 0.009 Len = 40.6 JLC=1.00
I Invert Depth HGL EGL· Area Vel T-Wid Cover
Dnstrm 70.73 8
Upstrm 78.34 . 6 I
I . Drainage area (ac)
Ru,noff coefficient (C)
Time ofconc. (min) I. Inlr et ~im@e (romS· )(inIhr ntenslty yr )
Cumulative C x A
Q = CA.x I (cfs) I
72.25
78.82
-0.00
-0.00
-0.76
= 0.00
= 0.00
= 0.00
. = 0.00
~-------------------------------------------
1 Q Catchm~nt (cfs)
Q Carryover (cfs)
Q Captured (cfs) I. Q Bypassed to 4 (cfs)
= 0.00
-0.00
= 0.00
= 0.00
72.39
79.05
0.35 2.95 0.00
0.27 3.84 0.60
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural grQund elev. (ft)
Upstream surcharge (ft)
Additio~al Q (cfs)
Fuil-flow capacity (cfs)
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
2.50
3.49
-18.753
-16.412
-6
-82.50'
-0.00 ;
-0.43·.
-7.55
=MI-I
-0.00
= 0.00
= 0.00
-------------------------------------------------------------------------------------------------~-------------.
I Line 6 Q=0.47 Size = 8 x 0 (Cir)
I 6 / Downstream line = 5
I
I
Invert
Dnstrm 78.34
UpstIm.. 18.87
Depth
8
4
HGL
79.05
79.;-19
. Drainage area (ac) = 0.00 I Runoff coefficient (C) = 0.00
Time ofconc. (min) -0.61
Inlet Time (min) = 0.00 I Intensity @ 5 yr (in/hr) = 0.00
Cumulative C x A = 0.00
II' ~ ___ ~~~!_~~~~ __________________ ~~~~_
Q Catchment (cfs)
Q Carryover (cfs)
Q Captured ( cfs)
Q Bypassed to 5 (cfs)
= 0.00
= 0.00
= 0.00
= 0.00
EGL
79.08
79.32
Nv = 0.009 Len = 26.S
Area Vel T-Wid
0.35 1.35 0.00
"0:17-2.80' 0;;6':t
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity ( cfs)
JLC=.1.00
Cover
3.49
3.56
= 2.000
= 0.903
- 4
-83.10
-0.00
-0.01
= 2.47
-----------------------------------------------------
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
=l\ffi
= 0.00
::::: 0.00
= 0.00
I
I
I
----------------------------------------------------------------------------------------------------------------
I
I
I,
I'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Line 7 Q=0.26 Size = 8 x 0 (Cir) Nv = 0.009 Len = 38.4 JLC=1.00
,7 / Downstream line = 6
Invert Depth HGL EGL Area Vel' T-Wid Cover
Dnstrm 78.87 5 79.32 79.33 0.25 1.05 0.54 3.56,
Upstrm 81.41 3 81.65 81.73 0.11 2.30 0.64 9.42
Drainage area (ac) -0.00 Slope of invert (%) -6.615
, Runoff coefficient (C) -0.00 Slope energy grade line (%) -6.250
time of c~nc. (min) -0.40 Critical depth (in) -3
Inlet Time (min) -0.00 Natural ground eleva (ft) -9.1.50
Intensity @ 5 yr (in/hr) = 0.00 Upstream surcharge (ft) -0.00' ,
Cumulative C x A -0.00 Additional Q (cfs) -0.13
, Q" CA x I (cfs) -0.00 Full-flow capacity (cfs) ,"= 4.49
" , '
. ------------------------------------------------------------------------------------------------
,Q Catchment ( cfs) -0.00 Inlet Type =MH
Q Carryover (cfs) = 0.00 Gutter slope (ftlft) -0.00
Q Captured ( cfs) -0.00 Cross slope (ftlft) -0.00
Q Bypassed to 6 (cfs) -0.00 Width of Flow (ft) -0.00
-----------------------------------------------------------------------------------------------~----------------
Line 8 Q=0.13 Size = 6 x 0 (Cir) Nv=0.009 Len = 17.3 JLC = 0.50
8 / DoWnstream line = 7
Invert Depth HGL EGL Area Vel T-Wid Cover
Dnstrm 81.41 4 81.73 81.75 0.13 0.97 0.40 9.59
-Upstrnl-81.75 ,2 _81..93 81.99, 0.07 2~00' -0.48 -9..35-
Drainage' area (ac) = 0.00 Slope of invert (%) -1.961
Runoff coefficient (C) = 0.00 Slope energy grade line (%) -1.432
Time of conca (min) = 0.30 Critical depth (in) -2
Inlet Time (min) = 0.00 Natural ground eleva (ft) = 91.60
Intensity @ 5 yr (inIbr) = 0.00 Upstream surcharge (ft) -0.00
Cumulative C x A = 0.00 Additional Q (cfs) = 0.04
Q = CA x I (cfs) ,= 0.00 Full-flow capacity (cfs) -1.13
------------------------------------------------------------------------------------------------
, Q Catchment (cfs) = 0.00 Inlet Type =:rv.tH
Q Carryover (cfs) = 0.00 Gutter slope (ftlft) =' 0.00
Q Captured (cfs) = 0.00 Cross slope (ftlft) = 0.00'
Q Bypassed to 7 (cfs) = 0.00 Width of Flow (ft) == 0.00
----------------------------------------------------------------------------------------------------------------
I
I' Line 9 Q=0.09
9 I Downstream line = 8
I Invert Depth
I Dnstrm 81.75 3
, Upstrm 82.28 2
I Drainage area (ac)
Runoff coefficient (C)
T~e of conc. (min)
I Inlet Time (min)
Intensity @ 5 yr (in/hr) I ' Cumulative C x A
: , 'Q = CAxI (cfs)
Q Catchment (cfs)
Q Carryover (cfs)
Q Captured (cfs)
Q -Bypassed to 8 (cfs)
Size = 6 x 0 (Cir)
HGL
81.96
82.43
-0.00
-0.00
-0.16
-0.00
= 0.00
= 0.00
= 0.00
-0.00
-0.00
-0.00
-0.00
EGL
81.98
82.48
Nv=0.009 Len =26.3 JLC=O.50
Area Vel T-Wid' Cover
0.08 1.12 0.33 9.35
0.05 1.78 0.46 9.02
Slope of invert (%) = 2.012
Slope energy grade line (%) = 1.890,
Critical depth (in) - 2 -,
Natural ground elev. (ft) -91.80
Upstream surcharge (ft) -0.00'
Additional Q (cfs) -0.05
Full-flow capacity (cfs) -L1S
-----------------------------~----------------------.
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
= MH
-0.00
= 0.00
= 0.00
I
I
I
I
I
-----------------------------------------------------.----------------------------------------------------------, ' ,
I
Line 10 Q=0.04
10 I Downstream line = 9
Dnstrm
UpstniJ.
Invert Depth
82.28
82.84
2
1
Drainage area (ac) I Runoff coefficient (C)
_ Time of conc. (min)
I
I
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q ~ CA x I (cfs)
Q Catchment (cfs)
Q Carryover ( cfs)
Q Captured (cfs)
Q Bypassed to 9 (cfs)
Size = 6 x 0 (Cir)
HGL
82.46
82.94
= 0.00
= 0.00
= 0.00
= 0.00
-0.00
= 0.00
= 0.00
-0.00
= 0.00
= 0.00
= 0.00
EGL
82.46
82.97
Nv = 0.009 Len =28.1
Area Vel T-Wid
0.06
-0.03
0.64 0.30
1.40~--0040
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
JLC=O.50
Cover
9.02
8:.76
-1.993
-1.810,
- 1
-92.10
-0.00
= 0.04
= 1.14
----------------------------------------------------
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
= MH
-0.00'
= 0.00
= 0.00
I
I
I
----------------------------------------------------------------------------------------------------------------
1
1 Line 11 Q=O.20 Size = 6 x 0 (Cir) Nv=O.009 Len = 8.6 JLC=O.50
" II/Downstream line = 6
1 Invert Depth HGL
I Dnstrm. 78.87 5 79.32
Upstrm. 79.05 3 79.28
I" Drainage area (ac) -0.00
Runoff coefficient (C) -0.00
Time of conca (min) -0.51
1 Inlet Time (min) -0.00
IntenSity @ 5 yr (in/hr) = 0.00
I Cumulative C x A = 0.00
Q = CA x I (cfs) = 0.00
--------------------------------------------
I Q Catchment ( cfs) = 0.00
Q Carryover (cfs) = 0.00
I Q Captured (cfs) = 0.00
" Q Bypassed to 6 (cfs) = 0.00
EGL Area Vel T -Wid Cover
79.33 0.18 1.08 0.47 3.73
79.36 0.09 2.27 0.50 3.35
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground eleva (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
= 2.081
= 0.307
= 3
= 82.90
-0.00
= 0.06
== 1.17
----------------------------------------------------
Inlet Type"
Gutter slope (ftlft)
Cross slope (ftlft)"
Width of Flow (ft)
=l\1H
= 0.00
= 0.00
= 0.00
----------------------------------------------------------------------------------------------------------------
I
I
I
I"
Line 12 Q=O.14
12 / Downstream line = 11
Invert Depth
Dnstrm. 79.05
Upstrm." 79.60
3
2
" Drainage area (ac) 1 Runoff coefficient (C)
Time of conca (min)
1 Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
I Q = CA x I (cfs)
Size = 6 x 0 (Cir)
HGL
79.32
79.79
-0.00
-0.00
-0.36
= 0.00
= 0.00"
= 0.00
"= 0.00
--------------------------------------------" "
I " Q Catchment (cfs)
Q Carryover (cfs)
Q Captured (cfs)
Q Bypassed to 11 ( cfs)
-0.00
= 0.00
= 0.00
= 0.00
EGL
79.35
79.85
Nv=O.009 Len =27.7
Area
0.11
0.0.7
Vel
1.30
2;05
Slope of invert (%)
T-Wid
0.37
OA9
Slope energy grade line (%)
Critical depth (in)
Natural ground eleva (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity"(cfs) "
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
JLC=O.50"
Cover
3.35
-3.10
= 1.987
= 1.839
= 2
= 83.20
= 0.00
:-0.05
= 1.14
_" lI.fl..T -lYlll
= 0.00
== 0.00
= 0.00 I ----------------------------------------------------------------------------------------------------------------.
1
I
Len =28.2 Line 13 Q = 0.09 Size = 6 x 0 (Cir)
I· . 13 / Downstream line = 12
Nv=0.009 JLC=O.50
I
I
I
I
1
I
.1
1
I
I
I
I
·1
I
1
I
I'
Invert Depth HGL EGL Area Vel T-Wid Cover
Dnstrm 79.60 3 79.82 79.84 0.08 1.07 0.33 3.10
Upstrm 80.17 2 80.32 80.37 0.05 1.78 0.46 2.63
. Drainage area (ac) -0.00 Slope of invert (%) = 2.018.
Runoff coefficient (C) -0.00 Slope energy grade line (%) -1.881 .
Time of conc. (min) . -0.20 Critical depth (in) = 2.
Inlet Time (min) -0.00 Natural ground elev. (ft) . -83.30
.. Intensity @ 5 yr (in/hr) -0.00 Upstream surcharge (ft) -0.00
Cumulative C x A -0.00 Additional Q (cfs) -0.05'
Q = CA xl (cfs) -0.00 Full-flow capacity (cfs) -1.15
-------------------------------------~----------------------------------------~-----------------
Q Catchment (cfs) -0.00 Inlet Type =MH
Q Carryover (cfs) -0.00 Gutter slope (ftlft) = 0.00
Q Captured (cfs) -0.00 Cross slope (ftlft) =.0.00.
Q Bypassed to 12 (cfs) -0.00 Width of Flow (ft) = 0.00
----------------------------------------------------------------------------------------------------------------
Line 14 Q=0.04
14 / Downstream line = 13
Invert Depth
Dnstrm 80.17 2
Upsmn 80.90 1
Drainage area (ac)
Runoff coefficient (C)
Time ofconc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q = CAxI (cfs)
. Q Catchment (cfs)
. Q Carryover (cfs)
Q Captured (cfs)
Q Bypassed to 13 (cfs)
Size = 6 x 0 (Cir)
HGL
80.35
81..00
= 0.00
= 0.00
-0.00
= 0.00
-0.00
= 0.00
= 0.00
-0.00
= 0.00
= 0.00
= 0.00
EGL
80.35
-8.1.03.
Nv = 0.009 Len =36.7
Area Vel T-Wid
0.06 0.64 0.30
.0.03 1.4.0_ OAO
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
JLC=O.50
Cover
2.63·
2 . .00.
-1.988
-1.848
- 1
= 83.40
= 0.00
= 0.04 .
=' 1.14
= :MIl .
= 0.00
= 0.00 .
= 0.00
---------------------------------------------------------------------------~------~----------------------------. '
I
Line 15 Q=O.13 Size = 6 x 0 (Cir) I-Nv=O.009 Len = 11.6 JLC=O.50
15 I Downstream line = 5
I Invert Depth HGL
I-
I
Dnstrm 78.34 6
Upstrm 78.57 6
Drainage area (ac)
Runoff coefficient (C)
Time ofconc. (min) I Inlet Time (min)
-Intensity @ 5 yr (in/hr)
I--
I
I
I-
I
Cumulative C x A
Q _-CAxI (cfs)
Q Catchment (cfs)
-Q Carryover ( cfs)
Q Captured (cfs)
Q Bypassed to 5 (cfs)
Lme16 Q=O.06
161 Downstream line = 15
Invert
Dnstrm 78.57
JJpstmt 79.12
Depth
6
1
Drainage area (ac)
Runoff coefficient (C)
Time ofconc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q = CA x_I (cfs)
Q Catchment (cfs)
Q Carryover (cfs)
Q Captured ( cfs)
Q Bypassed to 15 (cfs)
79.05
79.05
-0.00
= 0.00
= 0.15
-0.00
= 0.00
= 0.00
= 0.00
-0.00
-= 0.00
= 0.00
= 0.00
Size = 6 x 0 (Cir)
HGL
79.05
79.24
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
-0.00
= 0.00
= 0.00
= 0.00
EGL Area Vel T -Wid Cover
79.05 _ 0.20 0.66 0.00 -3.66
79.06 0.19 0.67 0.19 3.73
EGL
79.06
79.28
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in) -.
= 1.974
= 0.031-
= 2
-82.80
-0.00
Natural ground eleva (ft)
Upstream surcharge (ft)
A4ditional Q "( cfs)
Full-flow capacity (cfs)
-= 0.07 _
-1.14
---------------------------------------~------------
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
Nv=O.009 Len = 27.3
-Area Vel T-Wid
0.19 0.31 0.49
0.04 1..57 0.43
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground eleva (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
=:MH
= 0.00
= 0.00
= 0.00
JLC=O.50
Cover
3.73
3.48
-2.015
-0.831-
-1
-83.10
-0.00
-0.06
-1.15
------------------------------------~---------------
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
-
-
-
-
Iv1H
0.00
0.00
0.00
I
I
I
I
I
I
I-
----------------------------------------------------------------------------------------------~-----------------
I
I, '
1
I
1
I
1
1
I
I
Line 17 Q=0.13 Size = 6 x 0 (Cir)
17 I Downstream line = 4
Invert Depth HGL
Dnstrm 70.73 6 72.25
Upstrm 70.73 6 72.25
Drainage area (ac) -0.00
Rutioff'coefficient (C) -0.00
Time ofconc. (min) -0.30
Inlet Time (min) -0.00
Intensity @ 5 yr (in/hr) -0.00
Cumulative C x A -0.00
Q = CA x I (cfs) = 0.00
--------------------------------------------
Q Catchment (cfs) -0.00
Q Carryover (cfs) -0.00
Q Captured (cfs) -0.00
Q Bypassed to 4 (cfs) -0.00
EGL
72.26
72.26
Nv = 0.009 Len = 4.8 JLC = 0.50 '
Area Vel T':'Wid Cover
0.20
0.20
0.66
0.66
Slope of ll;1vert (%)
0.00
0.00
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
2.67
2.71 ,
= 0.000
= 0.026
- 2
-74.00
-1.02
-0.06
= 0.00
=MH
-0.00
= 0.00
= 0.00
----------------------------------------------------------------------------------------------------------------
1
I
I
Line 18 Q=0.07
18 I Downstream line = 17
Invert Depth
j)nstrm 70.73 1 '-lJ-pstrm-7-t21
6
6
I
I
I
I
I' '
I
Drainage area (ac)
Runoff coefficient (C)
Time of conc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q = CAxI (cfs)
Q Catchment (cfs)
Q Carryover ( cfs)
Q Captured (cfs)
Q Bypassed to 17 (cfs)
Size = 6 x 0 (Cir)
HGL
72.26
72.26
= 0.00
-0.00
-0.15
-0.00
-0.00
= 0.00
= 0.00
-0.00
= 0.00
= 0.00
= 0.00
EGL
72.26
72.26
Nv=O.009 Len = 26.7
Area Vel T-Wid
0.20
0.20
0.36, 0.00
0..3-6-O~OD_
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity ( cfs)
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
JLC=O.50 ' :'
Cover
2.77
3.63
= 2.024
= 0.007
- 2
= 75.40
= 0.49·
= ,0.04
= 1.15
-MH
= 0.00
= 0.00
== O~OO
Line 19 Q=0.03 Size = 6 x 0 (Cir)
19 / Downstream line = 18
1
I
I' Invert Depth HGL EGL
'1 Dnstrm 71.27 6
Upstrm 71.82 5
I Drainage area (ac)
.. Runoff coefficient (C)
. : Time of conc. (min) I . . Inlet Time (min)
. Intensity @ 5 yr (in/hr)
I Cumulative C x A
Q =CAxI (cfs)
I·
I
I·
I.
I
Q Catchment (cfs)
Q Carryover ( cfs)
Q Captured (cfs)
. Q Bypassed to 18 (cfs)
Line 20 Q=0.66
20 / Downstream line = 3
Invert
Dnstrm 69.68
. U:pstrm--·69~8·1
Depth
8
8
Drainage area (ac)
Runoff coefficient (C)
Tiine of conc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q = CAxI (cfs)
Q Catchment (cfs)
Q Carryover (cfs)
Q Captured (cfs)
Q Bypassed to 3 (cfs)
72.26
72.26
= 0.00
= 0.00
= 0.00
-0.00
= 0.00
= 0.00
= 0.00
-0.00
= 0.00
= 0.00
= 0.00
Size = 8 x 0 (Cir)
HGL
71.96
71.91
-0.00
-0.00
-1.16
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
72.26
72.26
EGL
72.01
72:02
Nv = 0.009 Len =27.3 JLC=O.SO .
Area Vel T-Wid Cover
0.20 0.15 0.00 ·3.63
0.18 0.16 0.32 2.28
Slope of invert (%) = 2.015.
Slope energy grade line (%) -0.001
Critical depth (in) -1
Natural ground elev. (ft) -74.60
Upstream surcharge (ft) -0.00
Additional Q (cfs) = 0.03
Full-flow capacity (cfs) = 1.15
----------------------------------------------------
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
Nv=0.009 Len = 7.9
Area Vel T-Wid
0.35
0.35
1.89
1.89-
0.00
0.00.
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity ( cfs)
= :MH
= 0.00
= 0.00
=. 0.00
JLC= 1.00
Cover
-1.650
-0.143
5
-73.50
-1.49
-0:00
== 2.24
---------------------------------------------~------
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
-:MIl
= 0.00
= 0.00
= 0.00
I
I
I
I
I
I
I
----------------------------------------------------------------------------------------------------------------
1
I ,Line 21
21 / Downstream line = 20
Q=0.12
I
1
1
I"
Dnstrm
Upstrm
Invert
69.81
72.63
Depth
8
2
Drainage area (ac)
Runoff coefficient (C)
Time of conc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A I' , Q 'CAxI (cfs)
I Q Catchment (cfs)
Q Carryover ( cfs)
Q Captured (cfs)
Q Bypassed to 20 (cfs)
Size = 8 x 0 (Cir)
HGL
72.02
72.79
= 0.00
= 0.00
-0.00
-0.00
-0.00
-0.00
= 0.00
-0.00
= 0.00
= 0.00
= 0.00
EGL
72.03
72.84
Nv=0.009 Len = 24.5
Area Vel T-Wid
0.35
0.07
0.34
1.81
0.00
0.57
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in.)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
JLC=l.OO
Cov~r
3.02
2.10
= 1'1.496
= 3.333"
= 2'
-75.40
= 0.00
= 0.12
= 5.91
=:M:H
= 0.00
= 0.00
= 0.00
----------------------------------------------------------------------------------------------------------------
1
I,
Line 22 Q=0.54
221 Downstream line = 20
Invert Depth
Dnstrm 1_ IIpstrm
69.81
69~85-
8
8
1
1
I'
Drainage area (ac)
Runoff coefficient (C)
Time of conc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q = CA xl (cfs)
Q Catchment (cfs)
Q Carryover (cfs)
Q Captured (cfs)
Q Bypassed to 20 (cfs)
Size = 8 x 0 (Cir)
HGL
72.02
72.03'
-0.00
-0.00
-1.14
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
EGL
72.06
72~O1--
Nv = 0.009 Len = 4.0
Area Vel T-Wid
0.35
-0.35
1.55
1.55
0.00
0.00
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
JLC=1.00
Cover
3.02
5.28'
= 1.003
= 0.096
= 4
= 75.80
-1.51
= 0.00
= 1.75
-------------------------~-------------------~------Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
= :MH
-0.00
= 0.00
= 0.00
I
1
I
----------------------------------------------------------------------------------------~-----------------------
I
I Line 23 Q=O.54 Size = 8 x 0 (Cir)
23 1 Downstream line = 22
I Invert Depth HGL
I Dnstrm 69.85 8
Upstrm 69.96 8
I . Drainage area (ac)
Runoff coefficient (C)
'. Time of conc. (min) 1 Inlet Time (min)
. Intensity @ 5 yr (in/hr)
I . Cumulative C x A
.. ' Q = CA x I (cfs)
72.07
72.08
-0.00
= 0.00
= 1.08
-0.00
-0.00
-0.00
-0.00
--------------------------------~-----------I'
I
I.
Q Catchment (cfs)
Q Carryover (cfs)
Q Captured (cfs)
Q Bypassed to 22 (cfs)
Line 24 Q=O.48
I' 241 Downstream line = 23
I·
I
I
I
Invert Depth
Dnstrm 69.96 8
-Upsttm. 10;54 8·
Prainage area (ac)
Runoff coefficient (C)
Time of conc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q = CAxI (cfs)
-0.00
= 0.00
= 0.00
= 0.00
Size = 8 x 0 (Cir)
HGL
72.11
72~16-
= 0.00
= 0.00
-0.75
-0.00
-0.00
-0.00
= 0.00 I·
I
--------------------------------------------
Q Catchment (cfs)
Q Carryover ( cfs)
. Q Captured (cfs)
= 0.00
= 0.00
= 0.00
= 0.00
EGL
72.10
72.11
EGL
72.14
72.1-9
Nv=O.009 Len = 11.4 JLC = 1.00
Area Vel T-Wid Cover'
0.35 1.55 0.00 5.28
0.35 1.55 0.00 5.17
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
Inlet Type
Gutter slope (ft/ft)
Cross slope (ftlft)
,Width of Flow (ft)
Nv=O.009 Len = 58.8
= 0.963
= 0.096
= 4
-75.80
-1.45
-0~06'
-1.71
= :MH
= 0.00
= 0.00
-:-0.00
JLC=O.50
Area Vel T-Wid Cover
0.35 1.38 0.00 5.17
. O:3~--1.38· 0:00 3'.89
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
= 0.9~6
= 0.076
= 4
= 75.10
-0.95
== 0.00
= 1.73
-l\.1H
= 0.00
= 0.00
= 0.00 I . Q Bypassed to 23 (cfs)
----------------------------------------------------------------------------------------------------------------
I
I
Line2S I Q=O.48 Size = 8 x 0 (Cir)
25 1 Downstream line = 24
I Invert Depth HGL EGL
I Dnstrm. 70.54 8
Upstrm. 70.63 8
I Drainage area (ac)
-Runoff coefficient (C)
-Time of conc. (min) I Inlet Time (min)
Intensity @ 5 yr (in/hr)
CUmulative.c x A I_ Q = CAxI (cfs)
I
I
I
I-
I-
Q Catchment (cfs)
Q Carryover (cfs) --Q Captured (cfs)
Q Bypassed to 24 (cfs)
Line 26 Q=O.34
261 Downstream. line = 25
Invert Depth
Dnstrm. I-Upstrnl-
70.63
71.05-
I
I
I
I
I
I-
Drainage area (ac)
Runoff coefficient (C)
Time ofconc. (min)
Inlet Time (min)
Intensity @ 5 yr (in/hr)
Cumulative C x A
Q __ CA x I (cfs)
Q Catchment (cfs)
Q Carryover (cfs)
Q Captured (cfs)
Q Bypassed to 25 (cfs)
72.17
72.18
= 0.00
= 0.00
= 0.70
-0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
Size = 6 x 0 (Cir)
HGL
72.21
72~28
= 0.00
-0.00
= 0.47
= 0.00
= 0.00
= 0.00
= 0.00
= 0.00
-= 0.00
= 0.00
= 0.00
72.20
72.21
EGL
72.26
72.33
Nv=O.009 Len = 8.6 JLC= 1.00
Area Vel T-Wid Cover
0.35 1.38 0.00
0.35 1.38 0.00
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs) -_
Full-flow cap~9ity ( cfs)
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
Nv=O.009 Len = 42.1
Area Vel T-Wid
0.20
-0.20-
1.73
1.73
0.00
-<t.O.o-
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
3.89 -
3.60
= 1.048
= 0.076
= 4
= 74.90
-0.88
::;:-0.14
-1.79
= :ME:
= 0.00
= 0;00
= 0.00
JLC = 0.50
Cover
3.77
_3.15
= 0.997
= 0.176
= 4
= 74.90
-0.73
== 0.10
= 0.81
-------------------------------------~---------~----
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
= MH
= 0.00
= -0.00
= 0.00
I
Line 27 Q = 0.24 Size = 6 x 0 (Cir) Nv = 0.009 Len =32.9 JLC=O.50
I 27 I Downstream line = 26
I Invert
Dnstrin 71.05 I Upstrm 71.38
Depth HGL
6 72.31
6 72.34
I·
I·
I:
·1
I
I
I
I
Drainage area-(ac) -0.00
. Runoff coefficient (C) -0.00
Time ofconc. (min) -0.29
Inlet Time (min) -0.00
Intensity @ 5 yr (in/hr) -0.00
Cumulative C x A -0.00
Q = CAxI (cfs) = 0.00
--------------------------------------------
Q Catchment (cfs) -0.00
Q Carryover (cfs) -0.00
Q .Captured (cfs) -0.00
Q Bypassed to 26 (cfs) -0.00
Line2S Q=0.14 Size = 6 x 0 (Cir)
281 Downstream line = 27
Invert Depth HGL
. Dnstrm 71.38 6 72.35
·1
I
I
Upstrm 71.71 6 72.36
Drainage area (ac) . = 0.00
Runoff coefficient (C) -0.00
Time of conc. (min) = 0.11
Inlet Time (min) :::; 0.00
Intensity @ 5 yr (in/hr) -0.00
Cumulative C x A = 0.00
I .. Q = CAxI (cfs) = 0.00
._-------------------------------------------
Q Catchment (cfs) = 0.00 I Q Carryover ( cfs) = 0.00
Q Captured (cfs) = 0.00
Q Bypassed to 27 (cfs) = 0.00
EGL
72.33
72.36
Area Vel T-Wid Cover
0.20 1.22 0.00 3.35
0.20 1.22 0.00 3.02
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in) .
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
Inlet Type
Gutter slope (ftlft)
Cross slope (ft/ft)
Width of Flow (ft)
Nv=0.009 Len =32.8
= 1.003
= 0.088
- 3
= 74.90
=0.46
=. 0.10
~ 0.81
= MH
= 0.00
= 0.00
= 0.00
JLC·= 0.50
EGL Area Vel T -Wid Cover
72.35 0.20 0.71 0.00 3.02
72.36 0.20 -0.71 -0.00_ 2;.69-
Slope of invert (%)
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
Inlet Type
Gutter slope (ftlft)
Cross slope (ft/ft)
Width of Flow (ft)
= 1.005
=.0.030
--2
-74.90
= 0.15
= 0.07
= 0.81
=MH
-0.00
= 0.00
= 0.00 I
I
-----------------------------------------------------------------------------------------------------~----------
I
Q=O.07 I Line 29
29 / Downstream line = 28
·1
Dnstrm I Upstrm
Invert
71.71
71.90
Drainage area (ac)
Depth
6
6
I .' Runoff coefficient (C)
.' Time of conc. (min) I . Inlet Time (min) .
. Intensity @ 5 yr (in/hr)
Cumulative C x A
Q = CA x I (cfs) I
Size = 6 x 0 (Cir)
HGL
72.36
72.36
-0.00
-0.00
-0.00
-0.00
= 0.00
= 0.00
= .0.00
--------------------------------------------
Q Catchment (cfs)
Q Carryover (cfs)
Q Captured ( cfs)
Q Bypassed to 28 (cfs)
-0.00
-0.00
-0.00
-0.00
EGL
72.36
72.36
Nv=O.009 Len = 18.9 . JLC=1.00
Area Vel T-Wid Cover
'0.20
0.19
0.36
0.37
Slope of invert (%)
0.00
0.27
Slope energy grade line (%)
Critical depth (in)
Natural ground elev. (ft)
Upstream surcharge (ft)
Additional Q (cfs)
Full-flow capacity (cfs)
2.69 '.'
2.40
= 1.004
= 0.005
- 2
= 74 .. 80
= 0.00
= 0.07
= 0.81
----------------------------------------------------
Inlet Type
Gutter slope (ftlft)
Cross slope (ftlft)
Width of Flow (ft)
= MH
= ·0.00
= 0.00
= 0.00
I
I
I
----------------------------------------------------------------------------------------------~----------------~ .
I··
I
I
I
I
I·
I·
I
I
- - --- - - - - - - - - - - -------Storm Sewer Profile Proj. file: 04M001.STM
Eisv. (ft)
80.0
2
77.0 Rim: 74.2 ft
1 Up Invert: 9.34ft
Rim: 73.00 ft On Invert: 8.69ft Rim: 73 . Oft
Up Invert: 68.69 ft length: 12 06ft3 Uplnve : 70.73ft
On Invert: 68.00 ft Size: 12 In Rim: 72.80 ft On Inve : 69.68ft
length: 12.78 ft Up Invert: 69.68 ft length: 7.81 ft
Size: 121n On Invert: 69.34 ft Size:8i
74.0
71.0
68.0
65.0
b 25 5q 75 100
Reach (tl)
--'-------------
-.-----.-.-~---~.-.~----
Storm Sewer Profile Proj. file: 04-001.STM
I
Elev. (ft)
100.0
7
Rim: 91.50 ft
Uplnvert:8V 1ft
On Invert: 78.E ~ft Length: 38.40
92.0 Size: 8in
5 6 ~
Ri In: 82.50 ft Rim: 83.10 ft L-----~I Invert: 78.34 ft Up Invert: 78.87 ft
01 Invert: 70.73 ft On Invert: 78.34 ft ~ 84.0 LEingth: 40.58 ft Length: 26.50 ft
~IFe; 0 II
~i7';' 8 in ,;...
4 ~ Rim: 73.90 ft
-
Up Invert: 70.j ~: -
pn Invert: 69.E -------~ ~--
76.0 I .. nnth· ?7Ai ~
Size:·8 in ~~ ~
I I
II .--!lIB
68.0
..
60.0
0 25 50 75 100 125
. Reach (ft) ..
---.:. .. ----.
.-.-.--"--~----'----"----
Storm Sewer Profile
Elev. (ft)
90.0
87.0
84.0
81.0
78.0.
75.0 o
6
Rim: 83.10 ft
Up Invert: 78.871ft
On Invert: 78.34 ft
Length: 26.50 ft ....... ~rr
11
Rim: 82.90 ft
Up Invert: 79.05 ft
On Invert: 78:87 ft
I <>nnlh' A AI; ~ , ~'" Size: 6 in
-I-t----
25'
im: 83.20ft i p Invert: 79.60 ft
n Invert: 79.05 ft
ngth: 27.68 ft
F6irr
--
.50
Reach (it)
75
--.----.-----.--------~ .. -.. -. -.~--~-----------.-
13
Rim: 83.30 ft
Up Invert: 80.17 ft
On Invert: 79.60 ft
Length: 28.24 ft • ".t>. .v
I---
100
Proj. file: 04-001.STM
14
Rim: 83.40 ft
Up Invert: 80.90 ft
On Invert: 80.17 ft
Length: 36.72 ft
~i"A'Rin
-
125
----------~----~---
Storm Sewer'Profile
Elev. (ft)
90.0
85.0
80.0
65.0 o
5
Rim: 8~.50 ft
Up Inv rt: 78.34 ft
On Inv rt: 70.73 ft
Lfm-gt~:40:58 ft
Size: 8 in
25
15 Rim.~82.80 ft
Up I vert: 78.57 ft
On I vert: 78.34 ft
50
Reach (ft)
16
Rim: 83.10
Up Invert: 7Q.12 ft
On Invert: 7~.57 ft •
Size: 6 in
75
Proj. file: 04-001.STM
100
------- - -.-- - --. '-_.--... Storm Sewer Profile . Proj. file: 04-001.STM
Elev. (ft)
85.0
81.
18
Rim: 7 .40ft 19 4 17 Uplnv rt: 71.27 ft Rin ~~~!!07~ R~ ft Rim: 73.90 ft Rlm~ 7,tOO ft Dnlnv rt: 70.73 ft lin I Up Invert: 70.73 ft Up Invert 70.73 ft Lengtr I ~IJ.IJIJ R On nvert 71.27 ft
On Invert: 69.68 ft On Invert: 70.73 ft Size: 6 in lei ~th: 27.30 ft length: 27.81 ft Length: 4.75 ft -Siz :6in
Size: 8 in Size: 6in
77.
73 I . .-, ' --~
69 --
65.0 ------------
o 25 50 75 100
Reacli (it) .
-----------------.-....... ~-
.-. -.. _. - - - - - --.' -. - - - - - - - -
Storm Sewer Profile
Elev. (ft)
85.0
81.0
77.0
73.0
69.0
65.0 o
Proj. file: 04-001.STM
25 50 75 100
Reach (ft)
.--------.~-~-
--'. _. - - - - - ----- - -.. - --Storm Sewer Profile Proj. file: 04-001.STM
Elev. (tt)
85.0
81.0
22 2
Rim: 75.80 ft R m: 75.80 ft , 24 25
Up Invert: 69.1Il Dflnvert: 69,1~6 ft Rim: 75.10 ft Rim: 74.90 fl
On Invert: 69.8l ~flnvert: 6~MJ5 It Up Invert: 70.54 It Up Invert: 7C
20 Length: 3.99 fl ngth: 11.42 ft On Invert: 69.96 ft n .. I ... _ ... "It 77. 3 ""11; , ".<J~.!iZ~:. ~ In e: 8 In I Length: 58.81 ft Length: 8.591
Rim: 72.80 ttUP Invert: p9.81 ft Size: 8 in Size: 8 In
,63ft
54ft
ft
73.
69
65
Up Invert: 6~lftvert: ~~o I
On Invert: 6~.h: 7. ~ ft
r-i"': Length: 6.32~Z:: 2' ~ize: 8 in ( I~--
~L~-~-+~~~--------+---~------~----j-II~ _ V
J.. f-I-_ _ ----
e!P
,0 o 25 50 75
L __________ ~. __ .. ____ .. _. ____ . Reach (ft)
100
-~-----'----~'----'---
'Storm Sewer Profile , Proj. file: 04-001.STM
Elev. (ft)
85.0
81.0
25 26 27 ~8 29 Rim: 74.90 ft Rim: 74.90 ft Rim: 74.9 ft Rim: 74.90 ft Rim: 74.80 ft Up Invert: 70.63 ft Up Invert: 71.05 ft Up Invert: 71.38 ft Up Invert: 71.71 ft Up Invert: 71.90 ft 77.0 no ,rf"--7nJ;A1J r~d~~~1~:921 ft n L~lngth~'42: 14"ft .. ,",II III ...... • 9tft .. ""11' .... "' ... , ......... Length: 8.59 ft Length: 3 /:ength: 32.83 ft Size: 81n Size: 6 in Size: 6 in Size:6in Size:6in
73.0 --t-t--• ,. -.~
69.0
'65.0
0 25 50 75 100 125 1
Reach (ft)
--------
I
I
I
I.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
. Conway & Associates, Inc.
Civil Engineers/Surveyors/GeneraI-Engineering Contractors AB412412
2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453. Fax (760) 434-5831 .
APPENDIX G
EXISTING GffiRALTAR STREET
CURB INLETS
CITY DRAWING 169-4
I -
" j.
I ;-._b. --'--r:;--~:'-"'-''':''-;', .,!.. " -;.,--'J ", : '."!·;'-:::r'T:-.... ~r~ _ •• ,;, .~ .. :. -.-~ ... --
. :c:,;".\: : . ::-..
f' ., •. ":-' ..
.' " ..
, .' ' :.,.;:,,1' :'-u ",-----'.~' ..
• i-~E;--~,~~~~~~-=-=_~
II ' ". '. i ' ... ,:.._ ......... . ' . .".'... -:f:~~~i~1;~iiil!!.e.~_~ __ .,-:.--:~-
I
.I:;if:-:\',; :'~ ;:.,~~," _;;j i,-'
,; ,-o~_ ::I:i --:'_:;, ,ie"
. ', .. ::.j::.
.! 'I .. I . -.... i'-'
I· '.:.::~~: .... ~: .:.' ..
:':.' :;.'
;' '!-
... :-"'t· .-, ::.: ~ .. ! ~ :-.. ::' .... __ . . :.~ :", .-.~.: "~".: _, ri
~. "
" _:.:. ,I": ' ... ~~. . --:' '-'--:'i--'; 1 f-" '-~. _"'~::-"-I ::-~~·t€O: .
i., ::-:.~~ ~~ '.=J. ::. -'. .':" :.': ;, ... ~. .,. ,
I f."'" :\: ....
t .' . r~·'
.. ~~ '.~:-:: ~',:'::.-::; . :~~ :.~.' -'~.~
· ~. ~ .;. '; I~'.-. -, ;" :.: . -,_.
~ '. I ~· .;::".
~ ." J I . 'i'"
" i~ ,:
'., " "I '_~ :,: ••
· ~. :; .. .:. .:':: . '.
· :: -r' ',"':
:i ; ~ ','
.. ~ . ". ... . . .". ~ . C:\ .. '.: '7tORi'A "QRbIU ProFilE". .
; .. , . ~ I-lO~Z.I".ao' \leu. r·e; .... . ..~, " . _. ' --_.., , . .' .
I .....
'; " J
~. I , ''1'0-._' ..... " ... , ..
" __ I., , .
" :', ~ 1'1~ :-::' ... ' .. ..:~ •.. ~
. .n,. ~I:j ~~
.. 6i;;3'4~"
'J '
r-.t-"... ~~~'--'---'-f~·:-... Y:-. _.,,:.~._: .. '~':
" ..... ~ ,:. ~~.~~~:.~,... .
.' ::'.:'" • F7~ ~-':~::-'7. . : .. :' ·.::;';·~i; .. ·a_:"-;'r _ ••• -
!' , ; ... ( .. ~;. - : '''-:_:-~'1 :,' :.J-:'
• • !..P1:".',r. • • :-' ..... ,t.·.·".
,.N' -: ••• t. J.' ,{. I:' "
• ".'I.~('1\ l.' LI~ ., " /t'
•.• k:7:-r!."'·,--:::-': '-:::;:---= T .. :' ";: ... :. ~ :--._--... 7.-' ':' " "" '_. ,.: ':00 • '._. "',_" _ :_00' •. _"_' . '; _. • ":: ..... , .... ';~'~:-_V'
....
, . :.-. T-:' ..... -.. ~.:,.--: .. -... ~.~~--:.:(;: .. ; ... -",
I"' •• : •• :~""' •• :~.~-•••• ..:j' :":,-.'-,;-~"-!':;
• .. -... 1..< .. . i
:: ..... ~ -',' . ·<'LTF}:~·~~~::·::~·L~~.;~::-:~> ,-: . ..::-:,i' .....:.. !..:: ." :~,.._ • .,'.'
: \';, ,. " .: . j.~., • I I " •• _. ,_ :
,-,,-::l" -~" ~:--='-, ~ .1: ~-:',\2~-::: ~;~
" .. :, ... ~:i"'.:~,:::~): .: ...
.! .• : .. , .• :_ •. _---...••••• :. , .. ,'.
" . .1 ., .
. -.. --~'.
.:i ...
, . ',' ",.,"::,},-"l"
.. ' ',1., , :1-
~I. -_.'
'.-.::: ~--... : -i. oj
"
'''' ,;;',,;,-,';,I-t,:t ,-);' E-:::~
:-; ... , -_ ... -' -:-:· .. ::~::~~~~t~t~:~," ',':::':"' _.
: .....
........... -.~ ... ~. _.;. ".' ~ . ;', '. -. ,('" . .. , :.
; _;:0',:.;1.-::'
.. .-.. .: ',: -~ ... .... :-: ;';'...!.':' -,:: ~.-: --,;' , •. !-
.. .; .. _: .. /,~::,":_l:·.:, .. : i,:
.; .0' .-, 1',:.'_'':'
:" .
.. ! :.':-'::' .... =-
_ ... .; ',,,,":':1 " .:~: :. _.~ .' .~'O ., ~~~ ~~~go~p' ~:'=--: :::~~::'-: 7'-' ~, ' _ ' --" ,Le __ ZI -' '\1:-' $"J(C' 1'! .. _'----. '. ,.'
I' . /.ILL --;e c.-p'.~C~4SS·~;J?!'_~!f50. LJ
:i
.. ,
,;[1 '
H . ,j
. ~
'l ·t '. ~
~ ~
'')
./"
I ~ ,
ft' ~
, .. 'h ..
::. ... w' •••• 477./5' , .... ::-!.
"'.;, " ~ "-~" ,~~:~~
IGoG..IO' .. · .. ·-·f-:·· 'fj~fl:fCfECTlON: : .-;.-' ";'k":, ~<. :::_: .. :",: ~": .. ~:.: '~':':/" . ,. ·l... 170/97' :, ., ... '" p I
.. 1--:,;,,:: ,!~: .. :.£.~:~'~~~ ' ...... ~'.;' " .. :~ ~:-: : .... , fl3.CAL· qo ~~ \!'" '.-J'O'. "'~ i . ' I ~ ~
1
I'
1\
I
I
1
I
.. ,tt, ',,;,
~r,. -;~
--.-
/
I.
-/ \ -:::.. ----I " -"
'SEes/,/&i-".y!! 6
! ' '. ". ttere5'35'1fo
• '. 4 ~~# · .eOCK S.ttlJ"5 _ PA'VT4'C'T/O/Y. PIP •
);"'&WT)' d£.toW.tl,! ".', I~TLJ~ti'/""///?/-I 'f
· OFFS/TE" EdSEM~ 7""0 COt/NT>' OF
5,4/V .o/GaO. I poe. 2117. 4 .0,4 Te.II'/~v' I .
: IFILL 4ND 6'&lpA
i -'0 PR/JIN/fi}. /' ~",\ ~
. ~
<1 ...l
~Z.
~,,~
t :':'1'.
l' :;,,~ MA~ ... ,.6.'1,~7~' ~\ 10' 6-" l.eo. II!LE:f
:'.; :'" ~ l::i~.;?;.~jl" f RI::,qSiO!'ol
';.
:! I;; .i. 't !~~7?
.\':1lC..'<:JFif..Mr;f;)" .
t
595 //r·0/.50
~
, .. :"
518
~.5'i£"€ SNGG7 #8 . FO,€' SToe/V 0-<:'4.//'1
ii
.;.
H:. I D.lCrl,th •
LOWSZEO IllL tlR/l/JES Zto· IlEYl5EO SlOlZM O/?/lIN
lIS BU/lTS 7-1-71 1lT.
'1 .
\ .'
.', ' t'
: t"
"" ~ .l'
Description' CHI8E"LELJ SQt//JRE 0/'1 'CONCRETE COR.!! SOt/Tn 5/0E OF BR,/OliE /.JBC)V#" Wff.J.. N4EK.
Lontion ,ON LA COS7/.} ,eo'I3!$'W.E'ST OF EL.. a/.JM//vO ;e~L
Record From' COt//vTY B.ElIJcI4LEVELS /Ve DC-k>2
EI ... : 17. 770 D.t.m, u.s.a? as.
\siilli'I LE'-J
PRIVATE CONTRACT ,l
COIlNTY OF SAN DIEGO
ENGINEEJ:1NO DEI' ... tTMfNT
I"Llll./~ ~ 1lIe. V"~"E.l/T OF:
710VA ~{)I~
I~ Ih (OltTb ~Ol!j1.l £1qlT llO~
fI7l ~
FILE NO. afgS
9 ~
'.
./ 'i :(
, \, )
'" ........... ~O'\ ~'f
16'9-4 FtfJ8
.!.:> ~~ '1"~ ~ .;.~ , .... , , .r.... >:_:~
.. : -....... _.:~~,.-, .. ~~:J:_: .. ,-. ___ :....!.~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil Engineers/Surveyors/General-Engineering Contractors AB412412
. 2525 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453. Fax (760) 434.;.5831
APPENDIX H
OFF SITE DRAINAGE STUDY
tOO-YEAR RETURN EVENT
PEAK FLOW COMPUTATIONS
-Peak Storm Water Runoff Calculations
-Time of Concentration Calculations
Offsite Tributary Basin Hydrology Map (1 "=80', 17"x11")
Off site Tributary Basin Hydrology Map (1 "=80', 17"x11") with City topo
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil Engineers/Surveyors/GeneraI-Engineering Contractors AB412412
2525 Pio Pico Drive· Suite 102· Carlsbad, CA 92008' Telephone (760) 753-1453· Fax (760) 434-5im
100-Year Return Event Peak Flow Computations
Romeria Pointe --CT 06-221 CP 06-15 -10/22/07
City of Carlsbad APN 216-300-12 & 13
OFF-SITE HYDROLOGY DATA
10 YEAR EVENT
~~~~~~J See Tc computations, following page
tc (min) _ 12 min. tc (min)
P6 (10 YR Return) 1.8 in. P6 (100 YR Return)
I, intensity (in/hr) 2.7 in.!hr. I, intensity (in/hr)
12 min.
2.7 in.
4.0 in.lhr.
POST-DEVELOPMENT CONDITION (Estimated Original Design Values)
SUB
BASIN
A1
A2
A3
A4
A5
B1
B2
C1
C2
C3
C4
C5
C6
D1
D2
Printed 11/16/2007
"A"
AREA AREA "en Q10 Q100
(SF) (ACRES) FACTOR C*A (CFS) (CFS)
103,998 -2.39 0.83 1.98 5.34 8.01
20,017 0.46 0.50 0.23 0.62 0.93
92,692 2.13 0.75 1.60 4.30 6.45
79086 1.82 0.75 1.36 3.67 5.51
29,134 0.67 0.80 0.54 1.44 2.16
9,839 0.23 0.75 0.17 0.46 0.69
20,721 0.48 0.83 0.39 1.06 1.60
29,069 0.67 0.70 0.47 1.26 1.89
,
19,528 0.45 0.83 0.37 1.00 1.50
46,976 1.08 0;70-0.75 2.04 3.05-
12,213 0.28 0.83 0.23 0.63 0.94
94,343 2.17 0.70 1.52 4.09 6.13
18,082 0.42 0.83 0.34 0.93 -1.39
51,156 1.17 0.75 0.88 2.37 3.56
19,313 0.44 0.83 0.37 0.99 1.49
14.81
Post-Development Design Q100: I
SOUTHERLY TYPE A-2 INLET (L=20') -BASINS A & C:
SOUTHERLY TYPE A-2 INLET (L=10') -BASINS B & D:
Q100 CUMM
Subtotal -, Q100
(CFS) (CFS)
23.1 23.1 Node 4 -----_ ...
2.3 2.3 Node 4
3.4 Node 2
7.4 Node 3
14.9 14.9 Node 4
5: 1 5.1 Node 4
45.31 cfs
38.0 cfs
7.3 cfs
Page 1 of 1 04001_0S_hydro-1.xls Post Dev-12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil EngineerslSurveyors/Generai-Engineering Contractors AB412412
2525 Pio Pico Drive· Suite 102· Carlsbad, CA 92008· Telephone (760) 753-1453 • Fax (760) 434-5831
100-Year Return Event Peak Flow Computations
Romeria POinte -CT 06-221 CP 06-15
APN 216-300-12 & 13
10/22/07
City of Carlsbad
OFF-SITE HYDROLOGY DATA See Tc computations, following page
10 YEAR EVENT
tc (min) 12 min. tc (min)
Ps (10 YR Return) 1.8 in. Ps (100 YR Return)
I, intensity (in/hr) 2.7 in.lhr. I, intensity (in/hr)
POST-DEVELOPMENT CONDITION (Estimated Original Design Values)
12 min.
2.7 in.
4.0 in.lhr.
"A" 0100 CUMM
SUB AREA AREA "C" 010 0100 Subtotal 0·100
BASIN (SF) (ACRES) FACTOR C*A (CFS) (CFS) (CFS) (CFS)
A1 103,998 2.39 0.83 1.98 5.34 8.01
A2 20,017 0.46 0.50 0.23 0.62 0.93
A3 92,692 2.13 0.75 1.60 4.30 6.45
A4 79,086 1.82 0.75 1.36 3.67 5.51
A5 29,134 0.67 0.80 0.54 1.44 2.16 23.1 23.1
B1 9,839 0.23 0.75 0.17 0.46 0.69
82 20,721' 0.48 0.83 0.39 1.06 1.60 2.3 2.3
C1 29,069 0.67 0.70 0.47 1.26 1.89
C2 19,528 0.45 0.83 0.37 1.00 1.50 3.4
C3 46,976 1.08 0.70 0.75 2-;04--3.05
C4 12,213 0.28 0.83 0.23 0.63 0.94 7.4
C5 94,343 2.17 0.70 1.52 4.09 6.13
C6 . 1'8,082 0.42 0.83 0.34 0.93 1.39 14.9 14.9
D1 51,156 1.17 0.75 0.88 2.37 . 3.56
D2 19,313 0.44 0.83 0.37 0.99 1.49 5.1 5.1
14.8/
Post-Development Design Q100: / 45.3/ cfs
SOUTHERLY TYPE A-2 INLET (L=20') -BASINS A & C: 38.0 cfs
SOUTHERLY TYPE A-2 INLET (L=10') -BASINS B & D: 7.3 cfs
Node 4
Node 4
Node 2
Node 3
Node 4
Node 4
Printed 11/16/2007 Page 1 of 1 04001_0S_hydro-1.xls Post bev-12
I -.-- - - - - - - - - - - - - - - - ---.....
~ ~ / 'QmelX
\... Soil Type D ~ 0.5% ( 1% J 2% 3% 5% 10%
Element UU/Acre C L T 'I;... ...:;r' L T L T, L l' L T
Natural -0.35 50 12.0 70 11.3 85 9.9 100 9.4 100 7.9 100 6.3
LDR 1 0.41 50 11.1 70 10.4 85 9.1 100 8.6 100 7.3 100 5.8
LDR 2 0.46 50 10.3 70 9.6 85 8.4 100 8.0 100 ,6.7 100 5.3
LDR 2.9 0.49 50 9.8 70 9.2 85 8.0 95 7.4 100 6.4 100 5.1
MDR 4.3 0.52 j,Q"" _ 9.3 70 .K.1.. 80 7.4 95 7.1 100 6.1 100 4.8
&aoMDR 7.3 0.57 { 50 J 8.5 65 7.7 J 80 6.8 95 6.4 100 5.6 100 4.4
-:'MDR 10.9 0.6 -srr 8.0 65 7.3 80 6.4 90 5.9 100 5.3 100 4.2
MDR 14.5 0.63 50 7.5 65 6.8 80 6.0 90 5.6 100 4.9 100 3.9
HDR 24 0.71 50 6.3 65 5.7 75 4.8 90 4.6 95 4.0 100 3.3 ! ,
HDR 43 0.79 50 5.0 65 4.5 75 3.8 85 3.6 95 3.2 100 2.6
N.Com -0.79 50 5.0 60 4.3 75 3.8 85 3.6 95 3.2' 100 2.6
G.Com -0.82 50 4.5 60 3.9 75 3.5 85 3.2 90 2.8 100 2.3
O.P.lCom -0.85 50 4.0 60 3.5 70 3.0 80 2.8 90 2.5 100 2.1
Ltd. I -0.85 50 4.0 60 3.5 70 3.0 80 2.8 90 2.5 100 2.1
Gen. I -0.87 50 3.7 60 3.2 70 2.7 80 2.6 90 2.3 100 1.9
Soil Type C 0.5% 1% 2% 3% 5% 10%
Element DU/Acre C L T L T L T L T L T' ,L T
Natural -0.3 50 12.8 70 12.0 85 10.5 100 10.0 100 8.4 100 6.7
LDR 1 0.36 50 11.9 70 11.1 85 9.7 100 9.2 100 7.8 100 6.2
LDR 2 0.42 50 10.9 70 10.2 85 9.0 100 8.5 100 7.2 100 5.7
LDR 2.9 0.45 50 10.4 70 9.8 85 8.6 95 7.9 100 6.8 100 5.4
MDR 4.3 0.48 50 9.9 ' 70 9.3 80 7.9 95 7.5 100 6.5 100 5.2
MDR 7.3 0.54 50 9.0 65 8.1 80 7.2 95 6.8 100 5.9 100 4.7
MDR 10.9 0.57 50 8.5 65 7.7 80" 6.8 90 6.3 100 5.6 100 4.4
MDR 14.5 0~6 -50 8.0 65 7.3 80 6.4 90 5.9 100 5.3 100 4.2
HDR 24 0.69 50 6.6 65 5.9 75 5.i 90 4.9 95 4.2 100 3.4
HDR 43 0.78 50 5..1, " 65 4.6 4.0 85 3.7 95 3.3 100 2.7 75
; N.Com -0.78 50 5.1 60 4.:; 75 4.0 85 3.7 95 3.3 100 2.7
G.Com -0.81 50 4.7 60 4.0 75 3.6 85 3.3 90 2.9 100 2.4
O.P.lCom ,-0.84 50 4.2 60 3.6 70 3.1 80 2.9 90 2.6 100 2.2
Ltd. I .. ,0.84 50, 4.2 60 3.6 70 3.1 80 2.9 90 2.6 100 2.2
Gen. I -0.87 50 3.7 60 3.2 70 2.7 80 2.6 90 2.3 100 1.9 ---------
14
I
1-..
I'.
I
I
I
I
I
I
I
I
I
I
I
I
I
1 .. _ ..
I
I
20
10
9
6
7
l2
LO
0.9
0.8
0.7
0.6
0.4
r-1.5'·-f
2 % I . -...w.-----n: .01'7!5 ----~~-L-----~~I=r==~hl=-~2~~~?~::::~ ~ 0.13 RESIDENTIAL STREET t ONE" SIDE. ONI.Y
2 4 5 7 a 9 10
DISCHARGE (C.F. S.)
• I ~ N Givens 0.= fO S = 2.5 % .
Chart .~: Depth = 0.4 J Velocity = -t.4 t p.s.
SAN DIEGO COtJN"I'Y' .. .
30 40 50·
DEPARTMENT OF SPECIAL DISTRICT SERVICES
~UTTER AND ROADWAY
OIS.~HARGE -VELOCITY CHART
O.E S I!N_ .. 1I~~~ •
I APPROVE!) "'t81j.~· .. ." ," DATE 12..!~(J49· . I APPENorx x-O'
()4..-dtjf BNe-'1
. _____ ._ .. _._. _~ ... __ . __ . _-.--:~'--:""-;"'--r."-'----_ .. ____ . __ M ___ ~_M ---.':'-.............. -
I
1
I
I
I
I
I
I
I
I
I
I
I'
1
I
I
I
I
I~·J
......... 1",
" I " ( ",
\ " \ ,
" L---... " \ \,
\ ')..-.(',
\ f \ , \--, II " \ il I " \ ') tl I 'I ~--i:\ i-i
\ N 1.9h.s9o + I \ ---I\L----, ---\ ---I I I
\ I I I I
'---I ~\ 1 __ --I \ I \ 1 I \ I: I I
\ ---\ \ -\ \ \ \ \ \
\ ~ \ '. ~
\ ..--
V
\
\
\(
t-/1 ---I I-I
I r \ \
II ---_\_-j~_\---""'----....... _ w
-----------
+
+ CJ CJ It) .. It) '" lD w
+ 0 <> <> III It) '" .,;
w
.
I
I
I
I
I /
.,.,./ / ~ -// .... /' .,.,. -
I/~~~ 4-\1.91 __ ---
\ \ \ \~ \ \ \
\
+ N 1.976.500
CJ <> ::l ~ .,;
w
I
..... -~
~
~ ~
Z ~
BO' 40' 0 fI(f laO' ! ;. . I
SCALE: '"=lIO'
REDUCED SCALE EXHIBIT
LEGEND
~. . SJf1-lJASIN DES/GNAltft
30M .SJf1-lJASIN AREA (S.r.)
"C"FACmR ....... -
---.. ------
CD
1.-»0'
IMSIN IIOIJHa.4RY
SIJ8-BAS/N BO/JNDARY
Ga/DW. flOW IlIIiBlllON
HOD£ f'CIHT -FOIl ·ra DETFlWIHA7IOH
PIPE / t;UmR I~ flO, W«llH
~
(§) = C=
@ID
§)
@§
C=
@R)
~
(§)
@ID
@§
(§)
I!!b
~
(§)
~
D
~
@§
~
~ = ~ = dI
!!!!!l
@§
@b
~ ~ ~ ill
-I ~ ~ . ~ ~! i ~ ... " ':1 .., 1l :l i~ ~, !:
,'a g I: ... ,,-.l! ~ 11 r'il Jl'"
l j
~
l!l iii
0] .s~
ul] Q) •
. Off-Sire ?ydrology M;;p 11
"'-IF""""""'" . Exj'tiDgeumInJet 0 ~ ~ aT'( OF CN!t.S8A!i Inflow Ca.nacity E ._1 .... 44 ~. ~
,_ "" =, _ ,."." '\"-~""" . .... M'" ""'~ ~ ... _on <' • :::::::::::::::~::~:::\:H~:ro:\:h~:~:~:~:'~:\:OO:O:5~::QP:~w:g::p~:T~a~I:~:B~~::::::::::::::::::::::~::~::~~~~Q~W~~~~::-~~:~:::1:~:' __ .. __ j" ______________________________________________ -, __ -. ____ --. ~'--------------~CT::~::~::/:CP~05:.1:5~.--~----------------J~ i
. . RomeriaPo.inte ;!i
Novcm&cr6;2007 . ~ g i= ;;:
>=l ;!! o ~ Q~
2
"
+
ElCISTING ·,.,-t CURB INLET . stJt.lP-CONlIl1ONr L--10"
REE_mr.nWln!lf-4. -
+ o o '" ..,
~
W
r
,~
t '
1 1 .-
J \ I,
'1\ I I
+ c o o .; ill ozj
w
.
I
I
I
I
I
\
/----
\
\
\
-
2
j5 . -~ T i
10' -10' 0 10' 1eO' ! :. : I
~
(§)
= [}=:l
(§
21
@§
[}=:l
@i)
~
(§)
(§
~'1·=eol .@§
REDUCED SCALE EXHIBIT l (§)
I!!b
I}=
(§)
~
o
~
@§
~
~ = ~ -~~.~
+ N 1.976.500
c o U1 .; ~ ozj
'"
LEGEND
~ SU8-BASIN IlESIGHAlM
SUB-BASIN AREA (S.r.) • C" fAC7llR
...-.. -
---.. ------
CD
L..-"
BASIN /JOIJHtMRy
SUfl-BASIN SOIINDARY
GENeRAL. FLOW DlR£CllOH
HOOE POINT -FOR r" Df:1elIIWA7!ON
PIPE / CUTlER / CfWIN£l. fLOW LENCTH
= d
l!:!ID
@§
@b
~ ~ ;s 1i! i!
i ~ i ~ u • ~ ;; i~ .. ~ 01 :il ~ e
.l! ~ li P!
1
~
~
m
o i .s~
Off-S
o ~j
""""" '" -lie Hvdrol M ...., .=
,_ ... ~W-'H,.,' __ . J' ogy ap .~
:. P:\04--OO1 BNR-9\H)<Iro\hydro\offilite\09 05-," d Pf/O'-."" ..... -.=.~....... lJJdsting Curl> Inlet 'C) :. ~q ~'N' .. "E____ InfJ -0 , "" '"' -. """ ,. OW Cap;u;lty Evahulti01l ~ ~ cr 06-22/CP 06·15 '< ":
Romeria PointI: ~ ~ Novembor~ 2fJ07 "--" , ~g It 0:: ;::: ~ o ~ U~
------..-.---
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, I~c.
Civil Engineers/Surveyors/General-Engineering Contractors AB412412
25~5 Pio Pico Drive. Suite 102. Carlsbad, CA 92008. Telephone (760) 753-1453. Fax (760) 434-5831
APPENDIX I
EXISTING PUBLIC CURB INLET
INFLOW CAPACITY EVALUATION
I Conway & Associates, Inc.
Civil EngineerslSurveyors/Generai-Engineering Contractors AB412412
I 2525 Pio Pico Drive· Suite 102· Carlsbad, CA 92008· Telephone (760) 753-1453 • ,Fax (760) 434-5831
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Job No. e;1-clJ I 8AJR .. ' Desc. _a-,,-0_'S_;L.~'~f--4c_~ _a_rJlt_,l_$ _-_C--,B:::...-~_-_v_et-_/ Date _~~,~_Z._1/t._~&. __
Sht-'-of ~,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Conway & Associates, Inc.
Civil EngineerslSurveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive· Suite 102· Carlsbad, CA 92008· Telephone (760) 753-1453· Fax (760) 434~5831
Date __ r-!..!:_Z,,-·. ')_/1;_&_
Sht~of~
I Conway & Associates, Inc.
Civil Engineers/Surveyors/General-Engineering Contractors AB412412
2525 Pio Pico Drive· Suite 102 • Carlsbad, CA 92008· Telephone (760) 753-1453 • Fax (760) 434-5831
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Job No. tJfaJl tJAI~-1 Desc. _e;.t-:.4::::....-::1-.-~-/l-rohw __ CA-,-k_( __ t_/3_Et_v~_(
Sht.3 of 1-
Date ----ji' Ir-V_~_'_(<<-__
I
I
.~
I .~
..... '.::. ~ I '·' .. ~-' .. ~ . . .
.' ~ '. ....
.~ I ·:' . . .:
...
I=;M !!:" ,
.~
GRATE
P-I-718-4
P-l-718
• P-I-I/S
Reticuline
• Curved vane
30° Hit-bar
• Tested
0.9····
0:6
0.8
0.35
0.34
c 1\ I ~--------~+-----~-----r----~r-~----;--------------r--------~~~;-~----+--i .... i \\ 0.8·~---+---+-+--ft-+--t---I--~~~~~~+--+--+--+-"""'"
Me
I L : 0.6~.------+---;-----+--t--+~~~~~~~~----~--~~-~~---i
1--
--/ . e; 0.51-------..!.------+-----!;.--~¥~~¥~."....... a
I
'1' .. :' •• #" .. . . ' ", .'
I · . ". , ........... : 0,., or
" ... ,,.-\ . .
I
I
I'
I
1·'-/
I
0.41--------
0.3
t--L --I
A = LEAR OPENING AREA it:;.," t;.&..R-
P = jW + L (W~TH CURB.)
.p ~1(W+L} (WITH0I:JT CURB) q ~.
O.l~~~--~--~--~--~~~~~----~--~----~--~~~~~~
2 4 8. 10 30 40 50 60'· 80 100
1 '. &,,==-i4cIJ @ d ~ Ie... ~/&,J')
DlSCHAliaE 11 (FT 3/S) J
3 5 6
~ t(r It> ds (? d~7~-t" (d.»)')
CHART 11, Grate inlet capacity in s:ump' co-ndhions.
71
I
1-,·
I'
I
I
I
I
I
I
I
I
I
I
I
I
I
1 .. ,--
i,
I
I
2%
0.4
2 3
EXAMPLE:
~ 1.5'.-i ~' n:f.01'15 ::? -~Ir:---t--2%
0.13 t
"'r' -:.-
4 5676910 .
DISCHARGE (Co F.' s.)
RESIDENTIAL STREET
ONE' SIDE. ONI.Y
GUTTER' AND ROAOWAY
OISpHARGE,.. VELOCITY CHART
50·
DATE I'z/~(Jy,? . I APPENorx x-o
o4-CRJ! /3NL-1
.,. __ .'-t_. _-.--:~--'--:---r.-",.".----_ ... ____ . __ M.., __ ._r ___ .............. ro_ ••