CT
WATER SYSTEM ANALYSIS
FOR THE
BRESSI RANCH
COMMERCIAL SITE
November 2,2007
J(ECEIVE.f'"
NO\! 07 10Gl
ENG\NEER.\NC
~-?t DEPARTMEN1
Prepared By:
Dexter Wilson Engineering, Inc.
2234 Faraday Avenue
Carlsbad, CA 92008
Job No: 869-001
C' ~ ~1 ~ ~-;
~
.. ~
0 -= =~ .-== Ja
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
November 2, 2007
LNR Property Corporation
4275 Executive Square, Suite 210
La Jolla, CA 92037
Attention: Jeff Williams, Project Manager
Subject: Water System Analysis for the Bressi Ranch Commercial Site
869-001
This letter summarizes our analysis and recommendations for providing water service.
to the Bressi Ranch Commercial Site development. The proposed development consists
of 122,092 square feet of building space over 8 lots on 13.72 acres of the Bressi Ranch
project. The project is located within the Carlsbad Municipal Water District's .550
Water Pressure Zone. This area of the system is supplied by a 550 Zone Pressure
Reducing Station. Existing water service lines within the vicinity of the Bressi Ranch
Commercial Site include 12-inch 550 Zone water lines in Gateway Road, EI Fuerte
Street, Bressi Ranch Way, Finnila Place and Town Garden Road.
Purpose of Study
A water system analysis dated October 22, 2002 (revised November 5, 2003) was
prepared for the Bressi Ranch project which includes the Commercial Site. This study
identified the backbone water facilities necessary to serve the overall project, but did
not identify how onsite water service would be provided to the commercial area. The
purpose of this study is to identify the proposed water system layout necessary to
provide domestic and fire protection service to the Commercial Site.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Jeff Williams
November 2, 2007
Page 2
Water Demands
The two demands used to design the system are domestic demands from the building
and fire flow demands. The projected water fixture units for the buildings have not yet
been established. As a result, this water study shows the locations of proposed
building water services, but the sizes are to be determined at a later date.
Domestic water demands were approximated based on the City of Carlsbad's
Engineering Standards, Volume 2 for Potable Water Design Guidelines. Per this
document, a commercial average day demand factor of 2,300 gpd/10,000 ft2 was
utilized. Maximum day demand and peak hour demands were calculated based on the
peaking factors of 1.65 and 2.9, respectively, times the average day demand. A
summary of building square footage, associated demands, and hydraulic n;l.odel
reference (Node #) can be found in Appendix A.
A design fire flow rate of 4,000 gpm was used in the fire system analysis, based on the
2003 Carlsbad Municipal Water District Water Master Plan. Fire sprinkler pipe sizing
and design are not considered in this water system analysis and will be p.rovided by
others.
Proposed Domestic Water System
Based on finish floor elevations ranging from 402 to 410.5 feet, the maximum onsite
static pressure with service from the 550 Zone ranges from 60.4 to 64.1 psi. Proposed
water lines to serve the Bressi Ranch Commercial Site shall be 8-inch and 12-inch.
The proposed water lines shall connect to existing water lines within the Bressi Ranch
project in four locations. Figure 1 provides the recommended water facilities for the
project.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Jeff Williams
November 2, 2007
Page 3
Computer Model
The KYPIPE computer analysis developed by the UJ?iversity of Kentucky was utilized
to determine residual pressures throughout the distribution system. This computer
model utilizes the Hazen-Williams Equation to determine dynamic losses in the piping
system. A Hazen-Williams "C" Factor of 120 was used in our analysis. Although this
factor is conservative for PVC piping, we felt it appropriate to allow for pipe aging and
other minor losses in the backbone distribution system.
To determine the appropriate input hydraulic gradeline for the computer model, we
relied on the November 5, 2003 Potable and Reclaimed Water System Analysis for
Bressi Ranch. Table 1 summarizes the available hydraulic gradeline' at the
intersection of Bressi Ranch Way and El Fuerte Street (Node 502 from the 11103
Study),
TABLE 1
AVMLABLEHGLSUMMARY
Avera e Da Demand
Peak Hour Demand
Max Day + 4,000 GPM
Fire Flow
546
526
.-I ,
~ __ ....J '
--,
~
",,"",
"" "
\
J
" CONNECT TO •
" /EXISTING 12 ..... WATER UNE " ,
)', '-~
~~ N~
~ ~ I U) " t· -----Q: l:r ~ I· """ ~ bP
l/e1(7'e 87'1(;;,----7--
1
,,,_ ~ I
1 ~~/---
____ u 1""---
I
I
I
I
CONNECT TO
EXISTING 12"
WATER LINE
LEGE~D
...
PO:l
--®
PfOPOSE~ 550 ZONE WATER UNE
EIISTING 550 ZONE WATER LINE
PjOPOSE9 FIRE HYDRANT
EXISTING FftRE HYDRANT
PRbpOSEDI WATER SERVICE
BOYS
AND
GIRLS
CLUB
-,
_-J.. _ ___." " -"----It I
--r-oJ ~2._ _I '---..,... .....
\ \PACIFIC\DWG\869001\FIGURE-1.DWG 11-01-07 12:53: 37 LAYOUT: MODEL
/
I
PROPOSED
MAJOR "A"
FF=405.0
I
/
I
I
I
~ I ~I
~/ iJJ/
/
I
I
/
/'" ..... 1 / ,~.~ ~"). / /.p ~~"" " :'-----N eII ,.-" BRESS] _Y!_~-'
/
/
/
"" /
-~ -' n~ " \~ " t-.'/-. •
-----------
NOTESI
1. ALL WATER LINES ARE 550 ZONE.
2. BU I LD I NG PROPOSED MAJOR ' C' SERVED
BY EXISTING WATER LINE •
FIGURE 1
BRESSI RANCH
COMMERCIAL SITE
PROPOSED WATER
FACILITIES
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Jeff Williams
November 2, 2007
Page 5
Fire Flow Analysis
The proposed onsite water lines were sized based on the required fire flow for the
buildings within the project. The November 5, 2003 water study included hydraulic
modeling of the water system to ensure that fire flow requirements could be met
throughout the system, including a fire flow rate of 4,000 gpm for the industrial areas.
For the on site analysis in this study, the 4,000 gpm fire flow was split evenly between
two adjacent hydrants.
Appendix B provides a hydraulic model of the onsite system to ensure that the fire flow
requirements are met with the proposed onsite piping configuration. The results of the
hydraulic analysis indicate that the piping has been adequately sized to supply the
domestic and fire protection needs of the project. Exhibit A provides the node and pipe
diagram that corresponds with the hydraulic model.
Thank you for the opportunity to work on your project. If you have any questions or
require additional information, please let us know.
Dexter Wilson Engineering, Inc.
Stephen M. Nielsen
SMN:sbr
I
I
I APPENDIX A
I BUILDING REFERENCE DATA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BRESSI RANCH COMMERCIAL SITE BUILDING DEMAND
Proposed Major "A" 43,830 7.00 11.55 20.30
Proposed Major "B" 17,285 2.76 4.56 8.01
. Proposed Major "C" 12,007 1.92 3.16 5.56
Proposed Pad "A" 5,070 0.81 1.34 2.35
Proposed Pad "B" 4,500 0.72 1.19 2.08
Proposed Shop "A" 4,780 0.76 1.26 2.21.
Proposed Shop "B" 5,880 0.94 1.55 2.72 .
Proposed Shop "e" 4,960 0.79 1.31 2.30
Proposed Shop "D" 8,400 1.34 2.21 3.89
Proposed Shop "E" 4,880 0.78 1.29 2.26
Proposed Shop "F" 5,860 0.94 1.54 2.71
Proposed Shop "G" 4,640 0.74 1.22 2.15
ADD = Average Day Demand
MDD = Maximum Day Demand
PH = Peak Hour Demand
** Domestic demand served by existing 12-inch in Town Garden Road
20
8
110
2
12
12
12
12
8
26
14
16
I
I
I APPENDIXB
I COMPUTER MODELING OUTPUT
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The following conditions were modeled:
1. Average day demands
2. Peak hour demands
3. Maximum day demands plus 4,000 gpm fire flow at Nodes 2 and 104
4. Maximum day demands plus 4,000 gpm fire flow at Nodes 12 and 14
5. Maximum day demands plus 4,000 gpm fire flow at Nodes 14 and 16
6. Maximum day demands plus 4,000 gpm fire flow at Nodes 18 and 26
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE B-1
COMPUTER MODELING SUMMARY
Average Day Demands 60.4 64.1 60.4 64.1 40 Yes 0.03
Peak Hour Demands 60.4 64.1 58.7 62.4 t/ 40 Yes 0.09
Max. Day Demands Plus 4,000 ) J GPM Fire at Nodes 2 and 104 60.4 64.1 39.5 52.6 20 Yes 12.773
Max. Day Demands Plus 4,000 ,
GPM Fire at Nodes 12 and 14 60.4 64.1 34.9 50.8 20 Yes 12.803
Max. Day Demands Plus 4,000
GPM Fire at Nodes 14 and 16 60.4 64.1 46.6 50.9 J 20 Yes 6.45
Max. Day Demands Plus 4,000 I GPM Fire at Nodes 18 and 26 60.4 64.1 39.2 50.5 20 Yes 12.763
1 Based on 550 Foot Supply HGL
2 For onsite area only
3 Velocities of greater than 8.0 ft/s only occur in 8-inch dead end pipes during a fire flow scenario. Given that
pressure and flow requirements are met, we recommend leaving these lines as 8-inch due to water quality
concerns.
I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07
I
I FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG
I A SUMMARY OF THE ORIGINAL DATA FOLLOWS
I
I PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS K FIXED GRADE
(FEET) (INCHES)
3 2 4 120.0 8.0 120.0 .00
5 108 4 180.0 8.0 120.0 .00
I 7 110 6 250.0 12.0 120.0 .00
9 6 8 120.0 12.0 120.0 .00
11 6 10 120.0 12.0 120.0 .00
I 13 10 12 340.0 8.0 120.0 .00
15 10 14 50.0 12.0 120.0 .00
17 14 16 280.0 12.0 120.0 .00
19 16 18 300.0 12.0 120.0 .00
I 21 18 20 25.0 12.0 120.0 .00
23 116 20 200.0 12.0 120.0 .00
25 20 22 275.0 12.0 120.0 .00
27 22 24 50.0 12.0 120.0 .00
I 29 24 6 225.0 12.0 120.0 .00
31 22 26 340.0 8.0 120.0 .00
101 0 102 120.0 12.0 120.0 .00 550.00
I 103 102 104 120.0 12.0 120.0 .00
105 104 106 80.0 12.0 120.0 .00
107 106 108 180.0 12.0 120.0 .00
109 108 110 230.0 12.0 120.0 .00
I 111 110 112 100.0 12.0 120.0 .00
113 106 114 475.0 12.0 120.0 .00
115 114 116 440.0 12.0 120.0 .00
I 117 116 118 80.0 12.0 120.0 .00
119 118 120 375.0 12.0 120.0 .00
121 120 122 1400.0 12.0 120.0 .00
123 122 112 400.0 12.0 120.0 .00
I 125 0 120 100.0 12.0 120.0 .00 550.00
JUNCTION NUMBER DEMAND ELEVATION CONNECTING PIPES
I 2 .81 408.00 3
4 .00 406.00 3 5
6 .00 407.00 7 9 11 29
I 8 4.10 407.00 9
10 .00 408.00 11 13 15
12 3.21 410.00 13
14 .94 408.00 15 17
I 16 .74 407.00 17 19
18 .00 404.00 19 21
20 7.00 404.00 21 23 25
I 22 .00 405.00 25 27 31
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07
24 .00 406.00 27 29
26 .78 402.00 31
102 .00 405.00 101 103
104 .00 410.50 103 105
106 .00 410.00 105 107 113
108 .00 406.00 5 107 109
110 1. 92 408.00 7 109 111
112 .00 408.00 111 123
114 .00 405.00 113 115
116 .00 385.00 23 115 117
118 .00 380.00 117 119
120 .00 350.00 119 121 125
122 .00 390.00 121 123
OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD
3 VALUES ARE OUTPUT FOR MAXIMUM AND MINIMUM PRESSURES
THIS SYSTEM HAS 28 PIPES WITH 24 JUNCTIONS , 3 LOOPS AND 2 FGNS
I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07
I THE RESULTS ARE OBTAINED AFTER 12 TRIALS WITH AN ACCURACY .00006
BRESSI RANCH
I COMMERCIAL SITE
WATER SYSTEM ANALYSIS -AVERAGE DAY DEMANDS
I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
3 2 4 -.81 .00 .00 .00 -.01 .00
5 108 4 .81 .00 .00 .00 .01 .00
I 7 110 6 7.07 .00 .00 .00 .02 .00
9 6 8 4.10 .00 .00 .00 .01 .00
11 6 10 3.12 .00 .00 .00 .01 .00
I 13 10 12 3.21 .00 .00 .00 .02 .00
15 10 14 -.09 .00 .00 .00 .00 .0.0
17 14 16 -1. 03 .00 .00 .00 .00 .00
19 16 18 -1.77 .00 .00 .00 -.01 .00
I 21 18 20 -1.77 .00 .00 .00 -.01 .00
23 116 20 9.70 .00 .00 .00 .03 .00
25 20 22 .93 .00 .00 .00 .00 .,00
I 27 22 24 .15 .00 .00 .00 .00 .00
29 24 6 .15 .00 .00 .00 .00 .00
31 22 26 .78 .00 .00 .00 .00 .00
101 0 102 8.91 .00 .00 .00 .03 .00
I 103 102 104 8.91 .00 .00 .00 .03 .00
105 104 106 8.91 .00 .00 .00 .03 .00
107 106 108 6.15 .00 .00 .00 .02 .00
109 108 110 5.34 .00 .00 .00 .02 .00
I 111 110 112 -3.64 .00 .00 .00 -.01 .00
113 106 114 2.76 .00 .00 .00 .01 .00
115 114 116 2.76 .00 .00 .00 .01 .00
I 117 116 118 -6.94 .00 .00 .00 -.02 .00
119 118 120 -6.94 .00 .00 .00 -.02 .00
121 120 122 3.64 .00 .00 .00 .01 .00
123 122 112 3.64 .00 .00 .00 .01 .00
I 125 0 120 10.59 .00 .00 .00 .03 .00
I JUNCTION NUMBER DEMAND GRADE LI'NE ELEVATION PRESSURE
2 .81 550.00 408.00 61. 53
4 .00 550.00 406.00 62.40
6 .00 550.00 407.00 61.97
I 8 4.10 550.00 407.00 61. 97
10 .00 550.00 408.00 61. 53
12 3.21 550.00 410.00 60.67
I
14 .94 550.00 408.00 61.53
16 .74 550.00 407.00 61.97
18 .00 550.00 404.00 63.27
20 7.00 550.00 404.00 63.27
I 22 .00 550.00 405.00 62.83
24 .00 550.00 406 .. 00 62.40
26 .78 550.00 402.00 64.13
102 .00 550.00 405.00 62.83
I 104 .00 550.00 410.50 60.45
106 .00 550.00 410.00 60.67
108 .00 550.00 406.00 62.40
I 110 1. 92 550.00 408.00 61.53
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS
112 .00 550.00 408.00 61.53
114 .00 550.00 405.00 62.83
116 .00 550.00 385.00 71.50
118 .00 550.00 380.00 73.67
120 .00 550.00 350.00 86.67
122 .00 550.00 390.00 69.33
MAXIMUM PRESSURES
120 .00 550.00 350.00 86.67
118 .00 550.00 380.00 73.67
116 .00 550.00 385.00 71. 50
MINIMUM PRESSURES
104 .00 550.00 410.50 60.45
12 3.21 550.00 410.00 60.67
106 .00 550.00 410.00 60.67
THE NET SYSTEM DEMAND = 19.50
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
101 8.91
125 10.59
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES =
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES =
19.50
.00
11-01-07
I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07
I A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
I THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR 2.90
THE FOLLOWING CHANGES IN PIPE DATA ARE SPECIFIED
I FOR PIPE NUMBER 101 THE VALUE OF THE FIXED GRADE IS CHANGED TO 546.0
FOR PIPE NUMBER 125 THE VALUE OF THE FIXED GRADE IS CHANGED TO 546.0
I
THE RESULTS ARE OBTAINED AFTER 2 TRIALS WITH AN ACCURACY .00000
I BRESSI RANCH COMMCERCIAL SITE
PEAK HOUR DEMANDS
I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/I000
I 3 2 4 -2.35 .00 .00 .00 -.01 .00
5 108 4 2.35 .00 .00 .00 .01 .00
7 110 6 20.50 .00 .00 .00 .06 .00
9 6 8 11. 89 .00 .00 .00 .03 .00
I 11 6 10 9.04 .00 .00 .00 .03 .00
13 10 12 9.31 .00 .00 .00 .06 .00
15 10 14 -.27 .00 .00 .00 .00 .00
17 14 16 -2.99 .00 .00 .00 -.01 .00 I 19 16 18 -5.14 .00 .00 .00 -.01 .00
21 18 20 -5.14 .00 .00 .00 -.01 .00
23 116 20 28.14 .00 .00 .00 .08 .00
I 25 20 22 2.70 .00 .00 .00 .01 .00
27 22 24 .44 .00 .00 .00 .00 .00
29 24 6 .44 .00 .00 .00 .00 .00
31 22 26 2.26 .00 .00 .00 . Cll .00
I 101 0 102 25.85 .00 .00 .00 .07 .00
103 102 104 25.85 .00 .00 .00 .07 .00
105 104 106 25.85 .00 .00 .00 .07 .00
I 107 106 108 17.85 .00 .00 .00 .05 .00
109 108 110 15.50 .00 .00 .00 .04 .00
111 110 112 -10.56 .00 .00 .00 -.03 .00
113 106 114 8.00 .00 .00 .00 .02 .00
I 115 114 116 8.00 .00 .00 .00 .0·2 .00
117 116 118 -20.14 .00 .00 .00 -.06 .00
119 118 120 -20.14 .00 .00 .00 -.06 .00
121 120 122 10.56 .00 .00 .00 .03 .00 I 123 122 112 10.56 .00 .00 .00 .03 .00
125 0 120 30.70 .00 .00 .00 .09 .00
I JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
2 2.35 546.00 408.00 59.80
4 .00 546.00 406.00 60.67 I 6 .00 546.00 407.00 60.23
8 11. 89 546.00 407.00 60.23
10 .00 546.00 408.00 59.80
I 12 9.31 546.00 410.00 58.93
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS
14
16
18
20
22
24
26
102
104
106
108
110
112
114
116
118
120
122
120
118
116
104
12
106
2.73
2.15
.00
20.30
.00
.00
2.26
.00
.00
.00
.00
5.57
.00
.00
.00
.00
.00
.00
MAXIMUM
.00
.00
.00
MINIMUM
.00
9.31
.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
546.00
PRESSURES
546.00
546.00
546.00
PRESSURES
546.00
546.00
546.00
THE NET SYSTEM DEMAND = 56.55
408.00
407.00
404.00
404.00
405.00
406.00
402.00
405.00
410.50
410.00
406.00
408.00
408.00
405.00
385.00
380.00
350.00
390.00
350.00
380.00
385.00
410.50
410.00
410.00
59.80
60.23
61. 53
61. 53
61.10
60.67
62.40
61.10
58.72
58.93
60.67
59.80
59.80
61.10
69.77
71. 93
84.93
67.60
84.93
71.93
69.77
58.72
58.93
58.93
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER
101
125
FLOWRATE
25.85
30.70
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES =
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES
56.55
.00
11-01-07
I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS . 11-01-07
I A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
I THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR :L.65
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE :
I JUNCTION NUMBER DEMAND
2 2001.39
104 2000.00
I THE FOLLOWING CHANGES IN PIPE DATA ARE SPECIFIED
FOR PIPE NUMBER 101 THE VALUE OF THE FIXED GRADE IS CHANGED TO 526.0
I FOR PIPE NUMBER 125 THE VALUE OF THE FIXED GRADE IS CHANGED TO 526.0
I THE RESULTS ARE OBTAINED AFTER 4 TRIALS WITH AN ACCURACY .00085
BRESSI RANCH COMMERICAL SITE
MAXIMUM DAY DEMANDS PLUS 4000 GPM FIRE FLOW I SPLIT BETWEEN NODES 2 AND 104
I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HLjl000
3 2 4 -2001.39 -9.19 .00 .00 -12.77 -76.58
5 108 4 2001. 39 13.79 .00 .00 12.77 76.58
7 110 6 -511. 68 -.21 .00 .00 -1. 45 -.85
I 9 6 8 6.76 .00 .00 .00 .02 .00
11 6 10 -232.19 -.02 .00 .00 -.66 -.20
13 10 12 5.30 .00 .00 .00 .03 .00
I 15 10 14 -237.49 -.01 .00 .00 -.67 -.21
17 14 16 -239.04 -.06 .00 .00 -.68 -.21
19 16 18 -240.26 -.06 .00 .00 -.68 -.21
21 18 20 -240.26 -.01 .00 .00 -.68 -.21
I 23 116 20 539.35 .19 .00 .00 1. 53 .94
25 20 22 287.54 .08 .00 .00 .82 .29
27 22 24 286.26 .01 .00 .00 .81 .29
29 24 6 286.26 .07 .00 .00 .81 .29
I 31 22 26 1.29 .00 .00 .00 .01 .00
101 0 102 2318.69 1. 68 .00 .00 6.58 13.96
103 102 104 2318.69 1. 68 .00 .00 6.58 13.96
I 105 104 106 318.69 .03 .00 .00 .90 .35
107 106 108 890.36 .43 .00 .00 2.53 2.37
109 108 110 -1111.03 -.82 .00 .00 -3.15 -3.57
111 110 112 -602.51 -.12 .00 .00 -1. 71 -1.15
I 113 106 114 -571. 68 -.50 .00 .00 -1. 62 -1:04
115 114 116 -571. 68 -.46 .00 .00 -1. 62 -1.04
117 116 118 -1111.03 -.29 .00 .00 "'3.15 -3.57
I 119 118 120 -1111.03 -1. 34 .00 .00 -3.15 -3.57
121 120 122 602.51 1. 61 .00 .00 1. 71 1.15
123 122 112 602.51 .46 .00 .00 1. 71 1.15
125 0 120 1713.54 .80 .00 .00 4.86 7.97
I
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
I 2 2001.39 499.22 408.00 39.53
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07
4 .00 50B.41 406.00 44.3B
6 .00 523.23 407.00 50.37
B 6.76 523.23 407.00 50.37
10 .00 523.25 40B.00 49.94
12 5.30 523.25 410.00 49.0B
14 1. 55 523.26 40B.00 49.95
16 1. 22 523.32 407.00 50.41
18 .00 523.38 404.00 51. 73
20 11. 55 523.39 404.00 51. 74
22 .00 523.31 405.00 51.27
24 .00 523.29 406.00 50.B3
26 1. 29 523.31 402.00 52.57
102 .00 524.32 405.00 51.71
104 2000.00 522.65 410.50 48.60
106 .00 522.62 410.00 4B.80
lOB .00 522.19 406.00 50.35
110 3.17 523.02 40B.00 49.B4
112 .00 523.13 408.00 49.89
114 .00 523.12 405.00 51.1B
116 .00 523.58 3B5.00 60.05
lIB .00 523.B6 380.00 62.34
120 .00 525.20 350.00 75.92
122 .00 523.59 390.00 57.89
MAXIMUM PRESSURES
120 .00 525.20 350.00 75.92
lIB .00 523.B6 3BO.00 62.34
116 .00 523.5B 385.00 60.05
MINIMUM PRESSURES
2 2001.39 499.22 40B.00 39.53
4 .00 50B.41 406.00 44.3B
104 2000.00 522.65 410.50 4B.60
THE NET SYSTEM DEMAND = 4032.23
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
101 231B.69
125 1713.54
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 4032.23
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES .00
I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07
I A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
I THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR 1. 65
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE :
I JUNCTION NUMBER DEMAND
12 2005.33
14 2001.55
I THE RESULTS ARE OBTAINED AFTER 3 TRIALS WITH AN ACCURACY .00065
I BRESSI RANCH COMMERCIAL SITE
MAXIMUM DAY DEMANDS PLUS 4000 GPM FIRE FLOW
SPLIT EVENLY BETWEEN NODES 12 AND 14
I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
3 2 4 -1. 34 .00 .00 .00 -.01 .00
I 5 108 4 1. 34 .00 .00 .00 .01 .00
7 110 6 1952.64 2.54 .00 .00 5.54 10.16
9 6 8 6.76 .00 .00 .00 .02 .00
11 6 10 2659.43 2.16 .00 .00 7.54 18.00
I 13 10 12 2005.33 26.13 .00 .00 12.80 76.86
15 10 14 654.10 .07 .00 .00 1. 86 1. 34
17 14 16 -1347.45 -1. 43 .00 .00 -3.82 -5.11
19 16 18 -1348.67 -1. 54 .00 .00 -3.83 -5.12 I 21 18 20 -1348.67 -.13 .00 .00 -3.83 -5.12
23 116 20 2075.06 2.27 .00 .00 5.89 11. 37
25 20 22 714.84 .43 .00 .00 2.03 1.58
I 27 22 24 713.55 .08 .00 .00 2.02 1. 57
29 24 6 713.55 .35 .00 .00 2.02 1. 57
31 22 26 1.29 .00 .00 .00 .01 .00
101 0 102 1823.38 1. 07 .00 .00 5.17 8 .. 95
I 103 102 104 1823.38 1. 07 .00 .00 5.17 8.95
105 104 106 1823.38 .72 .00 .00 5.17 8.95
107 106 108 1205.87 .75 .00 .00 3.42 4.16
I 109 108 110 1204.54 .95 .00 .00 3.42 4.15
111 110 112 -751.27 -.17 .00 .00 -2.13 -1.73
113 106 114 617.50 .57 .00 .00 1. 75 1. 20
115 114 116 617.50 .53 .00 .00 1. 75 1.20
I 117 116 118 -1457.56 -.47 .00 .00 -4.13 -5.91
119 118 120 -1457.56 -2.22 .00 .00 -4.13 -5.91
121 120 122 751.27 2.42 .00 .00 2.13 1. 73
I 123 122 112 751.27 .69 .00 .00 2.13 1. 73
125 0 120 2208.83 1. 28 .00 .00 6 .. 27 12.76
I JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
2 1. 34 522.39 408.00 49.57
4 .00 522.39 406.00 50.43
6 .00 518.89 407.00 48.49
I 8 6.76 518.89 407.00 48.49
10 .00 516.73 408.00 47.12
12 2005.33 490.60 410.00 34.93
I 14 2001. 55 516.67 408.00 47.09
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS
16
18
20
22
24
26
102
104
106
108
110
112
114
116
118
120
122
120
118
116
12
14
10
1. 22
.00
11. 55
.00
.00
1.29
.00
.00
.00
.00
3.17
.00
.00
.00
.00
.00
.00
MAXIMUM
.00
.00
.00
MINIMUM
2005.33
2001.55
.00
518.10
519.63
519.76
519.33
519.25
519.33
524.93
523.85
523.14
522.39
521. 43
521.61
522.57
522.04
522.51
524.72
522.30
PRESSURES
524.72
522.51
522.04
PRESSURES
490.60
516.67
516.73
THE NET SYSTEM DEMAND = 4032.21
407.00
404.00
404.00
405.00
406.00
402.00
405.00
410.50
410.00
406.00
408.00
408.00
·405.00
385.00
380.00
350.00
390.00
350.00
380.00
385.00
410.00
408.00
408.00
48.14
50.11
50.16
49.54
49.07
50.84
51. 97
49.12
49.03
50.43
49.15
49.23
50.94
59.38
61. 75
75.71
57.33
75.71
61.75
59.38
34.93
47.09
47.12
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER
101
125
FLOWRATE
1823.38
2208.83
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES =
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES
4032.21
.00
11-01-07
I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07
I A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
I THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR 1. 65
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE :
I JUNCTION NUMBER DEMAND
14 2001. 55
16 2001.21
I THE RESULTS ARE OBTAINED AFTER 3 TRIALS WITH AN ACCURACY .00221
I BRESSI RANCH COMMERCIAL SITE
MAXIMUM DAY DEMANDS PLUS 4000 GPM FIRE FLOW
SPLIT EVENLY BETWEEN NODES 14 AND 16
I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
3 2 4 -1. 34 .00 .00 .00 -.01 .00
I 5 108 4 1.34 .00 .00 .00 .01 .00
7 110 6 1882.84 2.37 .00 .00 5.34 9.49
9 6 8 6.76 .00 .00 .00 .02 .00
11 6 10 2273.54 1. 62 .00 .00 6.45 13.46
I 13 10 12 5.30 .00 .00 .00 .03 .00
15 10 14 2268.24 .67 .00 .00 6.43 13.40
17 14 16 266.69 .07 .00 .00 .76 .25
19 16 18 -1734.52 -2.45 .00 .00 -4.92 -8.16
I 21 18 20 -1734.52 -.20 .00 .00 -4.92 -8.16
23 116 20 2144.82 2.42 .00 .00 6.08 12.08
25 20 22 398.76 .15 .00 .00 1.13 .54
I 27 22 24 397.47 .03 .00 .00 1.13 .53
29 24 6 397.47 .12 .00 .00 1.13 .53
31 22 26 1.29 .00 .00 .00 .01 .00
101 0 102 1814.31 1. 06 .00 .00 5.15 8.86
I 103 102 104 1814.31 1. 06 .00 .00 5.15 8.86
105 104 106 1814.31 .71 .00 .00 5.15 8.86
107 106 108 1156.42 .69 .00 .00 3.28 3.85
I 109 108 110 1155.08 .88 .00 .00 3.28 3.84
111 110 112 -730.92 -.16 .00 .00 -2.07 -1. 65
113 106 114 657.89 .64 .00 .00 1. 87 1.35
115 114 116 657.89 .60 .00 .00 1. 87 1. 35
I 117 116 118 -1486.93 -.49 .00 .00 -4.22 -6.13
119 118 120 -1486.93 -2.30 .00 .00 -4.22 -6.13
121 120 122 730.92 2.30 .00 .00 2.07 1. 65
123 122 112 730.92 .66 .00 .00 2.07 1. 65
I 125 0 120 2217.85 1. 29 .00 .00 6.29 12.86
I JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
2 1. 34 522.47 408.00 49.60
4 .00 522.47 406.00 50.47
6 .00 519.21 407.00 48.63
I 8 6.76 519.21 407.00 48.63
10 .00 517.60 408.00 47.49
12 5.30 517.60 410.00 46.63
I 14 2001.55 516.93 408.00 47.20
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS
16
18
20
22
24
26
102
104
106
108
110
112
114
116
118
120
122
120
118
116
12
14
10
2001.21
.00
11. 55
.00
.00
1.29
.00
.00
.00
.00
3.17
.00
.00
.00
.00
.00
.00
MAXIMUM
.00
.00
.00
MINIMUM
5.30
2001.55
.00
516.86
519.30
519.51
519.36
519.33
519.36
524.94
523.87
523.16
522.47
521. 59
521.75
522.52
521.92
522.41
524.71
522.41
PRESSURES
524.71
522.41
521. 92
PRESSURES
517.60
516.93
517.60
THE NET SYSTEM DEMAND = 4032.16
407.00
404.00
404.00
405.00
406.00
402.00
405.00
410.50
410.00
406.00
408.00
408.00
405.00
385.00
380.00
350.00
390.00
350.00
380.00
385.00
410.00
408.00
408.00
47.60
49.96
50.05
49.56
49.11
50.86
51. 97
49.13
49.04
50.47
49.22
49.29
50.93
59.33
61. 71
75.71
57.38
75.71
61. 71
59.33
46.63
47.20
47.49
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER
101
125
FLOWRATE
1814.31
2217.85
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES =
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES
4032.16
.00
11-01-07
I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07
I A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
I THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR 1. 65
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE :
I JUNCTION NUMBER DEMAND
18 2000.00
26 2000.00
I THE RESULTS ARE OBTAINED AFTER 4 TRIALS WITH AN ACCURACY .00053
I BRESSI RANCH COMMERCIAL SITE
MAXIMUM DAY DEMANDS PLUS 4000 GPM FIRE FLOW
SPLIT EVENLY BETWEEN NODES 18 AND 26
I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/I000
3 2 4 -1. 34 .00 .00 .00 -.01 .00
5 108 4 1. 34 .00 .00 .00 .01 .00
I 7 110 6 1772.85 2.12 .00 .00 5.03 8.49
9 6 8 6.76 .00 .00 .00 .02 .00
11 6 10 564.30 .12 .00 .00 1. 60 1. 02
I 13 10 12 5.30 .00 .00 .00 .03 .00
15 10 14 559.00 .05 .00 .00 1.59 1.00
17 14 16 557.45 .28 .00 .00 1. 58 1. 00
19 16 18 556.23 .30 .00 .00 1.58 .99
I 21 18 20 -1443.77 -.15 .00 .00 -4.10 -5.81
23 116 20 2253.53 2.65 .00 .00 6.39 13.24
25 20 22 798.21 .53 .00 .00 2.26 1. 94
I 27 22 24 -1201. 79 -.21 .00 .00 -3.41 -4.13
29 24 6 -1201.79 -.93 .00 .00 -3.41 -4.13
31 22 26 2000.00 26.01 .00 .00 12.76 76.49
101 0 102 1798.66 1. 05 .00 .00 5.10 8.72
I 103 102 104 1798.66 1. 05 .00 .00 5.10 8.72
105 104 106 1798.66 .70 .00 .00 5.10 8.72
107 106 108 1078.75 .61 .00 .00 3.06 3.38
109 108 110 1077.41 .78 .00 .00 3.06 3.38 I 111 110 112 -698.61 -.15 .00 .00 -1. 98 -1.51
113 106 114 719.91 .76 .00 .00 2.04 1. 60
115 114 116 719.91 .70 .00 .00 2.04 1. 60
I 117 116 118 -1533.62 -.52 .00 .00 -4.35· -6.4.9
119 118 120 -1533.62 -2.43 .00 .00 -4.35 -6.49
121 120 122 698.61 2.12 .00 .00 1. 98 1. 51
123 122 112 698.61 .61 .00 .00 1.98 1. 51
I 125 0 120 2232.22 1. 30 .00 .00 6.33 13.01
I JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
2 1. 34 522.60 408.00 49.66
4 .00 522.60 406.00 50.53
6 .00 519.70 407.00 48.84
I 8 6.76 519.70 407.00 48.84
10 .00 519.58 408.00 48.3-5
12 5.30 519.58 410.00 47.48
I 14 1. 55 519.53 408.00 48.33
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS
16
18
20
22
24
26
102
104
106
108
110
112
114
116
118
120
122
120
118
116
26
12
14
1. 22
2000.00
11. 55
.00
.00
2000.00
.00
.00
.00
.00
3.17
.00
.00
.00
.00
.00
.00
MAXIMUM
.00
.00
.00
MINIMUM
2000.00
5.30
1. 55
519.25
518.95
519.10
518.56
518.77
492.56
524.95
523.91
523.21
522.60
521. 82
521.97
522.45
521.74
522.26
524.70
522.58
PRESSURES
524.70
522.26
521.74
PRESSURES
492.56
519.58
519.53
THE NET SYSTEM DEMAND 4030.89
407.00
404.00
404.00
405.00
406.00
402.00
405.00
410.50
410.00
406.00
408.00
408.00
405.00
385.00
380.00
350.00
390.00
350.00
380.00
385.00
402.00
410.00
408.00
48.64
49.81
49.87
49.21
48.87
39.24
51. 98
49.14
49.06
50.53
49.32
49.39
50.89
59.26
61. 65
75.70
57.45
75.70
61.65
59.26
39.24
47.48
48.33
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
101 1798.66
125 2232.22
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES =
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES
4030.89
.00
11-01-07
~---
----I
~~
LEGEND
P~OPOSE(j) 550 ZONE WATER LINE
---EJISTING b50 ZONE WATER LINE
... pJopos~ FIRE HYDRANT
I>O<l EX\STING fflRE HYDRANT ~ CO~PUTERI MODEL NODE NUMBER
[AJ COMPUTER \ MODEL PIPE NUMBER
, ----
\ \PACIFIC\DWG\869001\EXHIBIT-A.DWG 11-01-07 12: 54: 21 LAYOUT: MODEL
PROPOSED
MAJOR "B"
PROPOSED ',I
MAJOR "A" .
NOTES:
1 • ALL WATER LINES ARE 550 ZONE.
2. BUILDING PROPOSED MAJOR "C" SERVED
BY EXISTING WATER LINE.
.~ .. ~
N~
I .. ,~, . «
(.,) en,
EXHIBIT A
BRESSI RANCH
COMMERCIAL SITE
NODE AND PIPE
DIAGRAM .'~