HomeMy WebLinkAboutCT 07-05; LA COSTA GREENS NEIGHBORHOOD 1.03; COMPACTION TEST SUMMARIES 2009- 2010; 2010-01-07C--O7-
All
c'
GEOCON 0 INCORPORATED COMPACTION TEST SUMMARY
PROJECT NAME '— — /-03
PROJECT NO. 06Lim 3 2 A— CORRESPONDING FIELD REPORT NO.
TEST
NO.
TEST
DATE
.
LOCATION
ELEV.
(FEET)
RELATIVE
COMP.
1%) REMARKS
37ff
if
COMMENTS
. 44 , to.., SD- ................. Storm Drain
SM .................. Sewer Main
Lateral
WM........i:t: Main
WL..................Water Lateral
iT .................... Joint Trench
SG ................... Subgrade
SW.................Sidewalk
WB ................. Wall Backfill
AC..................Asphaltic Concrete
DISTRIBUTION YES NO
9VLa2_1 D
su R INTEDENT (CLIENT)
FOREMAN (CONTRACTOR)
S
JOB TRAILER GEOCON REPRESENTATIVE
OTHER
-
B......................Base
.
. mo. / date / year
CTS/ RSSI I.tXVIII
6960 FLANDERS DRIVE • SAN DIEGO, CALIFORNIA 92121-2974 • PHONE (858) 558-6900 • FAX (858) 558-6159
SHEET......... OF........................
-
-
kU3 0, GE000IN .
I N C 0 R P 0 R A T E D COMPACTION TEST SUMMARY
PROJECT NE
12 PROJECT NO. ' CORRESPONDING FIELD REPORT NO. ________
(low)
TEST
NO.-
TEST
DATE
.
LOCATION .
ELEV.
(FEET)
RELATIVE
..COMP.
(%) REMARKS
vp r
a COMMENTS C-
SD...................Storm Drain
SM
.....Ii:ii
WM ................ Water Main
...................ater Lateral
iT .................... Joint Trench
SG ................... Subgrade
SW ................. Sidewalk
WB ................. Wall Backli)) -
AC .................. Asphaltic Concrete
DISTRIBUTION . "ES NO
S&JPER)NTEDENT (CLIENT)SL .
l'VL_Q CWL FOREMAN (CONTRACTOR)
- -
JOB TRAILER
. GEOCON REPRESENTATIVE
- /as
OTHER
-
. mo. / ate / year
CISIRSSII.IXVIU
6960 FLANDERS DRIVE • SAN DIEGO, CALIFORNIA '92121-2974 U PHONE (858) 558-6900 U FAX (858) 558-6159
SHEET __ OF