Loading...
HomeMy WebLinkAboutCT 08-03; LA COSTA TOWN SQUARE RESIDENTIAL; INTERIM AS GRADED GEOTECHNICAL REPORT; 2013-06-12C1DF5 Diego 6280 Riverdale Street &San SOUTHERN CALIFORNIA 619.280.4321 San Diego, CA9ZIZQ SOIL & TESTING, INC. Indio 83-740 Citrus Avenue A California Certified Small Business Enterprise cs> 760.775.5983 Suite G Indio, CA 92201-3438 Riverside 1130 Patmyrita Avenue 951.965.8711 Suite 330-A Riverside, CA 92507 Toll Free 877.215.4321 www.scst.com INTERIM AS-GRADED GEOTECHNICAL REPORT LA COSTA TOWNE SQUARE RESIDENTIAL DEVELOPMENT PADS 2 THROUGH 23 AND 58 THROUGH 64 LA COSTA AVENUE CARLSBAD, CALIFORNIA PREPARED FOR: MR. JUAN ARRIAGA CONSTRUCTION MANAGER PROPERTY DEVELOPMENT CENTERS, LLC 5918 STONERIDGE MALL ROAD PLEASANTON, CALIFORNIA 94588 PREPARED BY: SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 RIVERDALE STREET SAN DIEGO, CALIFORNIA 92120 Providing Professional Engineering Services Since 1959 TABLE OF CONTENTS SECTION PAGE 1. PROJECT DESCRIPTION AND SUMMARY ......................................................................... 1 1.1. PRIMARY EQUIPMENT.................................................................................................2 1.2. CLEARING AND GRUBBING.........................................................................................2 1.3. SITE GRADING ............................................................................................................... 2 1.3.1. Cut/Fill Transition............................................................................................................2 1.3.2. Fill Slopes ....................................................................................................................... 1.3.3. Subdrains .......................................................................................................................3 3 1.4. ROADWAYS ....................................................................................................... . ........... 3 AS-BUILT GEOLOGY............................................................................................................4 SITE IMPROVEMENTS.........................................................................................................4 3.1. ANCHORS WALL BACKFILL..........................................................................................4 FIELD OBSERVATIONS AND LABORATORY TESTS.........................................................5 5 REMAINING WORK ..............................................................................................................6 CONCLUSIONS ....................................................................................................................6 LIMITATIONS ........................................................................................................................6 ATTACHMENTS FIGURES Figure 1 ................................................................................In Place Density Test Location Map Figures 2 through 11 ..............................Field Density and Laboratory Compaction Test Results Figure 12 .................................................................................Maximum Density Determinations I 1 I I I I & San Diego 6280 Riverdale Street 619.280.4321 San Diego, CA 92120 Indio 83-740 Citrus Avenue 760.775.5983 Suite G Indio, CA 92201-3438 Riverside 1130 Palmyrita Avenue 951.965.8711 Suite 330-A Riverside, CA 92507 Toll Free 877.216.4321 www.scst.com SCS&T No. 1211179 Report No. 24 i i I SOUTHERN CALIFORNIA SOIL & TESTING, INC. A California Certified Small Business Enterprise (S BE) June 12, 2013 Mr. Juan Arriaga Construction Manager Property Development Centers, LLC 5918 Stoneridge Mall Road Pleasanton, California 94588 Subject: INTERIM AS-GRADED GEOTECHNICAL REPORT LA COSTA TOWNE SQUARE - RESIDENTIAL DEVELOPMENT PADS 2 THROUGH 23 AND 58 THROUGH 64 LA COSTA AVENUE CARLSBAD, CALIFORNIA PROJECT NO. C.T. 08-03 Reference: "Geotechnical Investigation, La Costa Towne Square Residential East Development, Carlsbad, California"; prepared by Southern California Soil and Testing, Inc.; dated August 10, 2012 (SCS&T 1111196-1 R). Dear Mr. Arriaga: In accordance with your request, Southern California Soil and Testing, Inc. (SCS&T) prepared this report to present the results of field observations and tests performed during the grading for the planned subdivision. 1. PROJECT DESCRIPTION AND SUMMARY The project is located north of the intersection of La Costa Avenue and Camino De Las Coches in the city of Carlsbad, California. Mass grading for the project includes the construction of a residential subdivision, open space area, commercial retail space and office space. This report presents the earthwork observations and compaction tests performed for the partial grading of the residential subdivision. In general, the grading operations consisted of the over-excavation of undocumented fill, alluvium and weathered rock beneath and the replacement of this material to reach the planned final pad grade elevations. SCS&T performed our services between December 1, 2012 and June 3, 2013. Grading has not been completed at the site and SCS&T continues to provide grading observation services for the project. TNT Grading of San Marcos, California performed the grading. TNT Grading provided SCS&T with spot elevations, as requested, using their in-field GPS mapping system to assist in determining the locations and elevations of our field density tests. Property Development Centers, LLC June 12, 2013 La Costa Towne Square - Residential Development SCS& T No. 1211179-24 Carlsbad, California Page 2 1.1. PRIMARY EQUIPMENT The primary equipment used for the site mass grading operations included: . John Deere 824 Loader Caterpillar D6 Dozer Caterpillar 08 Dozer Caterpillar D9 Dozer John Deere 800 Excavator Water truck Caterpillar 350 Excavator Caterpillar 651 Scraper Terex 24 Scraper 1.2. CLEARING AND GRUBBING Site preparation began with the demolition of the existing improvements and the clearing and I grubbing of the existing vegetation and organic matter at the proposed development area. The material generated from these operations was exported from the residential site. 1.3. SITE GRADING In general, the grading operations consisted of the over-excavation of undocumented fill, alluvium and weathered rock beneath and the replacement of this material to reach the planned final pad grade elevations. The bottoms of the excavated areas typically exposed Tertiary-age Del Mar Formation or metavolcanic rock. The grading contractor scarified, moisture conditioned, and compacted the surface exposed at the bottom of the excavations. Fill was placed in 6 to 8-inch lifts, moisture conditioned to near optimum moisture content and compacted until field density tests indicated a minimum of 90% relative compaction. Figure 1 presents the approximate locations of these tests. All references to optimum moisture and relative I compaction in this report are based on the ASTM D 1557 laboratory test method. Compaction was achieved by means of a John Deere 824 rubber tire loader and other heavy construction equipment. I This process continued until planned elevations were reached. 1.3.1. Cut/Fill Transition I Cut/fill transition differentials at the site ranged between about 5 and 20 feet. Where a cut/fill differential was less than 10 feet, the cut portion of the lot was over-excavated to a minimum ' depth of five feet below finished pad grade. Where a cut/fill differential exceeded 10 feet, the cut portion of the lot was over-excavated to a minimum depth of 10 feet below finished pad grade. The over-excavation was performed to create a uniform condition beneath the planned structures. When possible, the bottoms of the excavations were sloped away from the middles of the pads and toward the deeper fill areas. The excavation surfaces were prepared and fill I material was generally placed and compacted as previously described until planned elevations were reached. & Property Development Centers, LLC June 12, 2013 La Costa Towne Square - Residential Development SCS&T No. 1211179-24 I Carlsbad, California Page 3 1.3.2. Fill Slopes I Fill slopes were constructed along the southern perimeter of the site and north of Pads 19 through 23. To provide adequate support for the proposed fill slope, a keyway was cut into I formational soils along the toe of the slope. The keyways were generally 15 feet wide and sloped back into the existing sloping terrain at an approximate gradient of two percent. The keyway bottoms were scarified to a depth of 12 inches; moisture conditioned and compacted to I at least 90% relative compaction before additional fill was placed. Typically, the fill slopes were over-filled and wheel rolled with a rubber-tire dozer and other I heavy equipment. After planned elevations were reached, the slopes were cut back to expose the compacted surface. The faces of the slopes were track-walked with a crawler dozer to form I a uniform surface. 1.3.3. Subdrains Canyon subdrains were installed at the bottom of canyon removals wherever fill depths exceed 10 feet and where groundwater seepage was observed during grading. Canyon subdrains were constructed using perforated pipe (SDR 35 or equivalent), surrounded by at least 6 cubic feet per lineal foot of crushed rock wrapped in filter fabric (Mirafi 140N or equivalent). Figure 1 presents the locations of the installed canyon subdrains. The locations of the canyon subdrains were surveyed by others. A subdrain was placed at the heel of the fill slope keyway south of Pads 1, 9, and 10. SCS&T recommended that this subdrain be installed due to seepage observed in the keyway excavation. A chimney drain and a blanket drain were installed along the backcut behind Wall Number 5 between stations 2+40 and 3+00. SCS&T recommended these drains be installed due to seepage observed along the backcut. The chimney drain consisted of a 1 foot wide column of 34-inch crushed rock wrapped in filter fabric placed between the back cut and wall backfill. The blanket drain consisted of a 6-inch thick layer of %-inch crushed rock placed on native soil prior to wall backfill being placed. 1.4. ROADWAYS The construction work included rough grading for the streets. Site preparation essentially consisted of the same operations that were employed for the project lots. Fill material was placed in thin moisture conditioned lifts and compacted to at least 90% relative compaction until desired rough subgrade elevations were reached. Property Development Centers, LLC June 12, 2013 La Costa Towne Square - Residential Development SCS&T No. 1211179-24 Carlsbad, California Page 4 AS-BUILT GEOLOGY An SCS&T geologist observed the geologic conditions exposed during grading. The geologic conditions encountered during grading generally were as anticipated and as presented in the referenced project geotechnical report. In our professional opinion and to the best of our knowledge, no significantly adverse geologic conditions were observed and the site appears to be geologically suitable for the proposed construction. SITE IMPROVEMENTS 3.1. ANCHOR® WALL BACKFILL The approximate locations for the Anchor® wall backfill tests are listed on Figures 7 through 9. The Anchor® wall backfill in-place density tests have been labeled "WB". The contractor placed manufactured material produced by screening and crushing operations on-site for the wall backfill. The backfill material was compacted in thin lifts until field density tests indicated a minimum of 90% relative compaction. Compaction was achieved primarily by means of a four to six ton riding vibratory roller or hand tamper. The reinforcing grid placement was also observed. Backdrains were placed behind each Anchor® wall. The backdrains consisted of 4-inch diameter perforated pipe (SDR 35) surrounded by a minimum of one cubic feet per lineal foot of crushed rock, which was then wrapped in filter fabric material. As of the date of this report, these subdrains have not been connected to an approved outlet. It is recommended that the outlets for the subdrains be kept free of debris and be allowed to freely flow at all times. Special inspection requirements verified in accordance with ESR-21 13 or Section 4.3 of the California Building Code include: Soil conditions were substantially in conformance with those described in the referenced project geotechnical investigation report. The base of the Anchor® walls was founded in a layer of crushed rock that, in turn, was founded in compacted fill or formational materials. In our opinion, these soils are suitable for the support of the proposed wall. The Anchor® wall, including geogrid type, length and placement, was constructed substantially in accordance with the plans. The angle of the face of the wall was in substantial conformance with the wall section on the applicable plans. Property Development Centers, LLC June 12, 2013 La Costa Towne Square - Residential Development SCS&T No. 1211179-24 Carlsbad, California Page 5 5) All Anchor® walls were constructed with a backdrain at the base of the wall, I immediately behind the block. The backdrains were surrounded by a minimum of one cubic foot of %-inch crushed rock per linear foot. The rock was wrapped with filter fabric. The backdrain outlets should be connected to storm drains or outlets I onto paved areas, in a timely manner. These outlets should be kept free of debris and be allowed to freely flow at all times. We observed the construction of the Anchor® walls under our purview, and performed laboratory and field in-situ density /moisture content testing. The results of our tests and observations are the I basis for our opinion that the wall was constructed in substantial conformance with geotechnical recommendations, the City of Carlsbad Special Inspection Ordinances concerning Anchor® walls and the California Building Code. 4. FIELD OBSERVATIONS AND LABORATORY TESTS I A representative of SCS&T performed periodic field observations and density tests during the grading operations at the locations shown on Figure 1. The density tests were performed according to ASTM D 6938 (nuclear gauge) procedures. The results of these tests are shown on Figures 2 through 9. The accuracy of the in-situ density test locations and elevations is a function of the I accuracy of the survey control provided by others than SCS&T representatives. Unless otherwise noted, their locations and elevations were determined by pacing and hand level methods and I should be considered accurate only to the degree implied by the method used. As used herein, the term "observation" implies only that we observed the progress of work we were involved with, and performed field density tests which, in conjunction with our observations, were I the base for our opinion as to whether the work was performed in substantial conformance with the geotechnical recommendations and the requirements of the applicable agencies. I Maximum dry density determinations were performed on representative samples of the soils used in the compacted fills according to ASTM D 1557. The results of these tests, presented on Figure 10, I were used in conjunction with the field density tests to determine the degree of relative compaction of the compacted fill. Rock corrections were applied to the soil samples having not more than 40 percent by weight retained on the #4 sieve or not more than 30 percent by weight retained on the 3/4-inch sieve according to ASTM D 4718. The results of these tests, as presented on Figure 13, were used in conjunction with the field density tests to determine the degree of relative compaction of the compacted fill. & Property Development Centers, LLC June 12, 2013 La Costa Towne Square - Residential Development SCS&T No. 1211179-24 Carlsbad, California Page 6 5. REMAINING WORK I The following operations remain to be completed. It is recommended that field observations and relative compaction tests be performed during these operations to verify that these operations are I being performed in accordance with job requirements and local grading ordinances. Completion of bio-retention basins adjacent to Wall Numbers 4 and 5, including placement I of fill where required; Grading of Pads 24 through 57, and 66; I . Construction of fill and cut slope adjacent to and north of Pads 35 through 56 and 66; Completion of all underground utilities; I . Construction of and backfill behind site walls; Connection of all wall subdrains to approved outlets. 1 6. CONCLUSIONS Based on our field observations and the in-place density test results, it is the opinion of SCS&T that I the geotechnical engineering and engineering geology aspects of the grading are in compliance with the approved referenced geotechnical report, the City of Carlsbad Grading Ordinance, the Grading/Improvement Plan Drawing for Project Number C.T. 08-03, and the California Building I Code. Minimum recommendations for the design of the foundations, as presented in the referenced report(s), remain applicable. 1 7. LIMITATIONS This report covers only the services performed between December 1, 2012 and June 3, 2013. Our I opinions are based on our observations and the relative compaction test results and are limited by the scope of the work that we agreed to perform. Our work was performed in accordance with the I currently accepted standard of practice and in such a manner as to provide a reasonable measure of the compliance of the grading and backfill operations with the project requirements. No warranty, I express or implied, is made or intended with respect to the work that we have performed, and neither the performance of this work nor the submittal of this report should be construed as relieving I the contractor of its responsibility to conform with the project requirements. Our work was generally performed on an "on-call" basis. Therefore, the in-place density tests performed by our field representative can only be construed as representative of the areas tested as shown on the attached figures. & Douglas A, Ski Senior Engineering Geologist Property Development Centers, LLC June 12, 2013 La Costa Towne Square - Residential Development SCS& T No. 1211179-24 Carlsbad, California Page 7 If you have any questions regarding this document, please contact us at 619-280-4321. Respectfully Submitted, SOUTHERN CALIFORNIA SOIL AND TESTING, INC. NO. 2752 M EXP. 09-30-14 OF c IL-fl G eft . ountain, GE 2752 Vice President, Principal Geotechnical Engineer GBF:DAS:aw (2) Addressee JOB NAME: La Costa Town Square- Residential JOB NUMBER: 1211179-24 TEST NO. DATE LOCATION ELEVATION (feet,MSL) MOISTURE DRY DENSITY (percent) (p-c.f.) SOIL TYPE REL.COMP. (percent) GRADING 30 1/14/13 Residential via Tamarindo 284.0 18.0 108.2 3 90.8 31 1/14/13 Residential via Tamarindo 286.0 19.8 108.0 3 90.6 47 1/17/13 Res. Paseo Tamarindo 288.0 18.0 108.7 3 91.2 48 1/17/13 Res. Paseo Tamarindo 291.5 20.1 108.3 3 90.9 56 1/18/13 Res. Site South Retention Basin 257.5 14.2 110.4 3 92.6 57 1/18/13 Res. Site South Retention Basin 262.5 13.8 109.4 3 91.8 58 1/18/13 Res. Site Paseo Tamarindo 293.5 11.7 107.9 3 90.5 59 1/18/13 Res. Site East Retention Basin 278.0 19.3 109.4 3 91.8 60 1/18/13 Res. Site East Retention Basin 283.0 18.0 108.1 3 90.7 62 1/22/13 Residential South Building 274.5 19.3 97.2 2 91.4 63 1/22/13 Residential South Building Lot 1 277.0 18.2 97.8 2 92.0 64 1/22/13 Residential South Building Lot 10 263.5 12.9 111.2 3 93.3 65 1/22/13 Residential South Building Lot 270.5 11.9 113.0 3 94.8 66 1/22/13 Residential South Building Lot 274.0 13.4 113.9 3 95.6 67 1/22/13 Residential South Building 295.0 15.0 109.1 3 91.5 68 1/22/13 Residential Paseo Tamarindo 297.0 17.0 110.4 3 92.6 72 1/23/13 Residential Paseo Tamarindo 310.0 14.8 104.3 1 92.1 73 1/23/13 Residential Paseo Tamarindo 315.0 15.3 105.3 1 92.9 74 1/23/13 Residential Paseo Tamarindo 324.5 13.0 110.7 1 97.7 77 1/23/13 Residential Paseo Tamarindo 336.0 17.0 107.3 1 94.7 80 1/23/13 Residential South Lot 1 275.0 16.7 110.8 1 97.8 81 1/24/13 Residential South Lot 278.0 15.2 112.4 3 94.3 82 1/24/13 Residential South Lot 281.0 14.0 111.6 3 93.6 84 1/24/13 Residential South Lot #1 284.0 17.8 105.3 1 92.9 85 1/24/13 Residential South Lot #1 287.0 19.1 107.0 1 94.4 86 1/24/13 Residential South Lot #1 290.0 18.8 107.1 1 94.5 87 1/24/13 Residential South Lot 284.0 18.0 103.4 1 91.3 88 1/24/13 Residential South Lot 10 267.0 17.2 105.0 1 92.7 89 1/24/13 Residential Street B 313.5 11.4 114.5 7 93.9 90 1/24/13 Residential Lot #4 303.0 12.8 112.1 7 92.0 91 1/25/13 Residential Lot 10 270.0 17.8 105.5 6 92.8 93 1/28/13 Residential Lot 300.0 14.2 111.5 7 91.5 94 1/28/13 Residential Lot 308.0 13.8 102.3 7 83.9 95 1/28/13 RETEST OF94 308.0 14.9 113.5 7 93.1 96 1/28/13 Residential Lot 2 290.0 18.2 105.7 6 93.0 97 1/28/13 Residential Lot 3 302.0 19.1 107.0 6 94.1 98 1/28/13 Residential Lot 311.0 12.6 109.1 6 96.0 99 1/29/13 Residential Lot 24 350.0 10.8 110.6 3 92.8 100 1/29/13 Residential Lot 25 352.0 11.8 111.8 3 93.8 101 1/29/13 Residential Lot 26 354.0 7.7 122.5 SB 92.0 102 1/29/13 Residential Lot 25 357.0 10.0 118.3 S 91.1 103 1/29/13 Residential Lot 27 356.0 8.2 123.2 5B 92.6 106 1/29/13 Residential Lot 26 357.5 6.9 133.9 SE 96.8 107 1/30/13 Residential Lot 27 360.0 7.0 121.3 5C 90.0 108 1/30/13 Residential Lot 29 340.5 20.0 105.5 6 92.8 113 1/30/13 Residential Lot 30 342.5 18.0 97.8 2 92.0 114 1/30/13 Residential Lot 29 344.5 11.6 111.9 3 93.9 116 1/31/13 Lots 30Res 346.0 10.8 120.4 SB 90.5 117 1/31/13 Lots 29Res 348.0 12.6 121.3 5B 91.1 FIGURE 2 JOB NAME: La Costa Town Square- Residential JOB NUMBER: 1211179-24 TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) 118 1/31/13 Lots 28 Res 350.0 15.2 118.7 5 91.4 119 1/31/13 Lots 31 Res 352.0 10.4 124.6 5C 92.4 120 1/31/13 Lots 29Res 354.0 13.9 118.9 5 91.6 121 1/31/13 Lots 29Res 356.0 9.7 123.4 5C 91.5 122 1/31/13 Lots 31 Res 358.0 8.9 129.2 5F 92.2 123 1/31/13 Lots 29Res 360.0 10.6 121.7 5C 90.3 128 2/1/13 Residential lot #64 312.0 7.2 124.8 5d 91.4 129 2/1/13 Residential lot #64 315.0 8.0 125.6 5d 92.0 130 2/1/13 Residential lot #64 317.5 8.5 125.3 Sd 91.8 131 2/1/13 Residential lot #5 313.0 8.2 120.0 Sb 90.2 132 2/1/13 Residential lot #6 306.0 14.3 107.5 6 94.5 133 2/1/13 Residential lot #63 321.0 7.7 118.4 Sa 90.1 134 2/1/13 Residential lot #5 320.0 9.7 127.8 Se 92.4 135 2/1/13 Residential lot #63 325.0 7.8 121.0 Sa 92.1 136 2/4/13 Residential Lot#63 328.0 8.3 127.3 Sd 93.3 137 2/4/13 Residential Lot#62 330.0 7.8 125.5 Sd 91.9 138 2/4/13 PaseoTamarindo Sta 14+30 322.0 7.6 125.3 Sd 91.8 145 2/5/13 Residential Iot#31 365.5 12.6 111.7 7 91.6 146 2/5/13 Residential lot#29 368.0 10.2 134.2 Se 97.0 147 2/5/13 Residential lot#30 368.0 10.0 122.5 Sb 92.0 148 2/5/13 Residential lot#28 369.5 11.0 120.4 Sb 90.5 149 2/5/13 Residential lot#26 372.0 10.5 118.5 9 92.6 150 2/6/13 South of Residential lot#10 265.5 16.2 104.7 1 92.4 160 2/7/13 South of Lot #9 Residential site 276.5 15.0 100.1 2 94.2 161 2/7/13 South of lot #l0 Residential site 268.5 13.8 98.9 2 93.0 174 2/12/13 S. of lot #10 Residential 276.5 13.0 100.8 12 92.2 179 2/12/13 S. of lot #9 Residential 269.5 14.8 107.2 12 98.1 182 2/13/13 S. of lot #9 Residential 280.0 12.5 104.0 12 95.2 183 2/13/13 S. of lot #10 Residential 284.0 14.0 101.4 12 92.8 184 2/13/13 S. of lot #10 Residential 286.0 13.8 102.4 12 93.7 185 2/13/13 S. of retention basin Residential 281.0 12.0 103.0 12 94.2 188 2/14/13 S of bio ret basin Res 283.0 15.9 106.1 6 93.3 189 2/14/13 West of lot 10 RES 278.0 6.5 124.8 Sd 91.4 190 2/14/13 West of lot 10 RES 281.0 7.0 123.9 Sd 90.8 191 2/14/13 South lot 10 RES 283.0 14.4 105.5 12 96.5 202 2/I5/13 S. of Lot Res 289.5 17.0 98.2 2 92.4 203 2/15/13 S. of Lot 10 Res 284.5 16.9 97.9 2 92.1 204 2/15/13 S. of Ret Basin Res 283.0 16.4 98.3 2 92.5 207 2/15/13 S. of Ret Basin Res 284.5 16.0 104.3 6 91.7 215 2/19/13 Lot 21 Res 326.0 12.8 111.9 7 91.8 216 2/19/13 S. of Lot 10 Res 285.0 14.0 97.9 2 92.1 218 2/19/13 Lot 21 Res 327.0 13.1 114.7 8 92.6 219 2/19/13 Lot 20 Res 327.5 13.6 112.4 8 90.8 220 2/19/13 Lot 22 Res 325.0 14.5 104.2 6 91.6 221 2/20/13 Lot 6 Res 323.0 10.9 130.3 5d 95.5 222 2/20/13 Lot 5 Res 325.5 9.0 127.2 Sd 93.2 225 2/20/13 Lot 7Res 311.5 9.0 126.7 5d 92.8 226 2/20/13 Lot 7 Res 313.5 10.6 125.8 5d 92.2 227 2/20/13 Lot 3Res 308.0 11.9 118.9 Sd 87.1 228 2/20/13 RETEST #227 308.0 11.4 127.8 Sd 93.6 233 2/21/13 Lot 23 Res 342.0 9.8 125.8 Sd 92.2 FIGURE 3 JOB NAME: La Costa Town Square- Residential JOB NUMBER: 1211179-24 TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p-c.f.) TYPE (percent) 234 2/21/13 Lot 61 Res 340.5 9.0 123.9 5d 90.8 235 2/21/13 Lot 61 Res 343.0 5.0 118.7 5d 87.0 238 2/21/13 Lot 29 Res 371.5 9.6 124.6 5c 92.4 239 2/21/13 Lot 31 Res 372.0 9.1 123.7 5c 91.8 240 2/22/13 RETEST #235 343.0 9.6 124.7 5d 91.4 243 2/22/13 Lot 22 Res 331.5 8.2 123.9 5d 90.8 244 2/22/13 Lot 63Res 330.5 11.4 116.0 11 91.2 245 2/22/13 Lot 62Res 339.5 10.8 118.0 11 92.8 248 2/23/13 Lot 22 Res 246.5 9.5 117.2 11 92.1 253 2/23/13 Lot 22Res 245.5 13.3 119.3 11 93.8 260 2/25/13 Lot 4Res 315.0 10.8 118.3 11 93.0 261 2/25/13 Lot 4Res 316.5 11.5 113.6 7 93.2 262 2/25/13 Lot 3Res 309.5 13.0 111.6 7 91.6 271 2/26/13 Lot2 Res 292.5 12.0 114.6 7 94.0 272 2/26/13 Lot 2Res 295.5 11.7 113.7 7 93.3 277 2/26/13 Lot 63 Res 313.5 9.4 108.3 11 85.1 278 2/26/13 RETEST #277 313.5 8.1 122.2 11 96.1 279 2/26/13 Lot 64Res 307.0 8.7 124.2 11 97.6 281 2/26/13 Street at Lot 59 Res 350.0 9.7 117.5 11 92.4 282 2/27/13 Lot 61 Res 345.0 10.8 126.5 5d 92.7 284 2/27/13 Street at Lot 60 Res 345.5 10.0 115.5 10 92.1 286 2/27/13 Lot 60Res 346.5 9.0 126.6 5d 92.7 289 2/27/13 Lot 61 Res 348.0 11.6 109.8 7 90.1 290 2/28/13 Slope N. of lot 21 Res 333.0 12.2 100.5 12 91.9 293 2/28/13 Slope N. of lot 22 Res 336.5 13.5 102.1 12 93.4 294 2/28/13 Slope W. of Lot Res 321.0 99.1 13.4 12 12.3 295 2/28/13 Slope W. of Lot Res 315.0 100.1 14.8 12 13.5 206 2/28/13 Slope N. of Lot 20 Res 339.0 100.1 12.6 12 11.5 297 2/28/13 Slope N. of Lot 22 Res 342.0 13.0 102.4 12 93.7 298 2/28/13 Lot 60Res 349.0 7.5 113.4 10 90.4 299 2/28/13 Slope W. of Lot Res 321.0 14.9 102.0 12 93.3 300 2/28/13 Slope W. of Lot Res 318.0 15.0 101.6 12 93.0 NOTE GRADING PLANS CHANGE AS OF 3-1-13 Lots numbers have moved. 304 3/1/13 Slope N. Lot 21 Res 358.0 14.9 99.2 12 90.8 305 3/1/13 Slope N. Lot 23 Res 349.0 13.6 103.4 12 94.6 306 3/1/13 Slope W. Lot 5Res . 328.0 15.4 101.4 12 92.8 307 3/1/13 Slope W. Lot 7 Res 310.5 14.8 103.1 12 94.3 308 3/1/13 Slope N. Lot 22Res 352.0 11.5 103.7 12 94.9 316 3/4/13 Lot 59Res 360.0 9.0 117.0 10 93.3 317 3/4/13 Lot 59Res 362.0 8.2 115.1 10 91.8 318 3/4/13 Lot 58 Res 362.0 7.9 115.5 10 92.1 319 3/4/13 Lot 58 Res 366.0 8.8 116.6 10 93.0 320 3/4/13 Lot 14 Comm 312.0 8.0 128.3 Sd 94.0 321 3/4/13 Lot 58 Res FG 371.0 12.3 103.7 12 94.9 322 3/4/13 Lot 59 Res FG 364.0 13.9 98.9 12 90.5 323 3/5/13 Lot 20 Res 328.5 8.2 120.1 9 93.8 324 3/5/13 Slope N of Lot 23 Res 357.0 13.8 98.9 12 90.5 325 3/5/13 Slope N of Lot 23 Res 359.0 14.6 101.6 12 93.0 326 3/5/13 Slope N of Lot 23 Res 361.0 16.3 104.3 12 95.4 328 3/5/13 Slope N of Lot 23 Res 365.0 18.7 104.8 12 95.9 329 3/5/13 Slope N of Lot 23 Res 369.0 17.4 103.6 12 94.8 FIGURE 4 JOB NAME: La Costa Town Square- Residential JOB NUMBER: 1211179-24 TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) 330 3/5/13 Slope above wall 4 Res 296.0 15.0 101.7 12 93.0 331 316/13 Lot 6Res 326.0 8.7 118.5 9 92.6 332 3/6/13 Lot Res 317.0 9.0 117.5 9 91.8 333 3/6/13 Lot 22Res 333.5 13.1 124.2 9 97.0 334 3/6/13 Slope N of Lot 21 Res 372.5 16.7 106.1 12 97.1 335 3/6/13 Slope N of Lot 20 Res 350.0 13.8 103.2 12 94.4 336 3/6/13 Lot 26 Res 374.0 8.6 132.7 5d 97.2 337 3/6/13 Lot 28 Res 373.5 8.2 132.1 Sd 96.8 338 3/6/13 Lot 25 Res 374.5 8.9 133.4 Sd 97.7 339 3/6/13 Lot Res 299.5 12.7 99.7 12 91.2 343 3/7/13 West of lot lORES 288.5 11.3 96.3 2 90.6 371 3/14/13 w of Lot 10 Res 292.0 19.8 92.0 16 83.9 375 3/14/13 Lot 9Res 289.0 19.0 101.8 16 92.8 376 3/14/13 Lot 10 Res 292.0 18.8 100.1 16 91.2 380 3/15/13 RETEST 371 292.0 18.8 99.5 16 90.7 384 3/15/13 Lot 9Res 294.0 21.5 100.4 16 91.5 385 3/15/13 Lot 10 Res 296.0 20.4 101.6 16 92.6 392 3/18/13 Street at Lot 17 Res 324.0 12.4 106.5 1 94.0 393 3/18/13 Slope W of Lot 16 Res 330.0 14.8 102.3 12 93.6 394 3/19/13 Slope W of Lot 17 Res 334.0 15.0 100.3 12 91.8 395 3/19/13 Slope W of Lot 16 Res 338.0 15.5 98.6 12 90.2 396 3/19/13 lot 16 Res 330.0 12.7 97.0 12 88.7 397 3/19/13 RETEST 396 330.0 14.2 99.2 12 90.8 398 3/19/13 Lot 15 Res 327.0 16.1 101.4 12 92.8 399 3/19/13 Lot 17 Res 331.5 15.3 100.3 12 91.8 400 3/19/13 Lot 14 Res 323.0 15.7 105.8 12 96.8 401 3/19/13 Lot 13 Res 318.0 16.3 102.1 12 93.4 402 3/19/13 Lot 12 Res 314.0 16.1 100.2 12 91.7 403 3/20/13 Slope N of Lot 17 Res 340.0 15.3 101.0 12 92.4 404 3/20/13 Slope N of Lot 17 Res 342.0 13.8 101.7 12 93.0 405 3/20/13 street at lot 15 Res 327.0 19.8 99.2 2 93.3 406 3/20/13 street at lot 13 Res 312.0 20.4 97.1 2 91.3 410 3/21/13 Lot 9Res 298.5 13.1 96.9 12 88.7 411 3/21/13 RETSET#410 298.5 14.9 98.8 12 90.4 412 3/21/13 Lot 8 Res 300.0 17.5 100.0 12 91.5 413 3/21/13 Lot 10 Res 300.0 15.5 98.9 12 90.5 414 3/21/13 Lot 11 Res 303.0 15.0 102.3 12 93.6 416 3/21/13 Lot 9 Res 304.0 15.6 100.9 12 92.3 417 3/21/13 Lot Res 306.0 17.4 103.3 12 94.5 418 3/22/13 Lot Res 308.0 15.2 101.2 12 92.6 419 3/22/13 Lot 8 Res 310.0 14.0 99.2 12 90.8 420 3/22/13 Lot 10 Res 304.0 15.1 102.1 12 93.4 421 3/22/13 Lot 11 Res 306.0 15.1 102.5 12 93.8 422 3/22/13 Lot 10 Res 308.0 14.9 103.1 12 94.3 423 3/22/13 Lot 9Res 306.5 15.3 101.4 12 92.8 427 3/25/13 Lot 8 Res 312.5 14.9 100.7 12 92.1 428 3/25/13 Lot 11 Res 309.0 15.3 103.6 12 94.8 436 3/26/13 Lot 11 Res 309.0 11.4 101.2 12 92.6 437 3/26/13 Lot Res 313.0 12.2 99.9 12 91.4 475 4/3/13 Lot 4 Slope Res 310.5 12.6 102.3 12 93.6 478 4/3/13 lot 58 Res 365.0 12.8 99.3 12 90.9 FIGURE 5 LI ~ I JOB NAME: La Costa Town Square- Residential JOB NUMBER: 1211179-24 ............................ TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) 479 4/3/13 Lot 7Res 315.0 15.2 101.1 12 92.5 480 4/3/13 Lot 5 Res 324.5 13.1 104.5 12 95.6 481 4/3/13 Lot 17 Slope Res 352.0 14.8 105.6 12 96.6 486 4/4/13 Slope west of Lot 17 Res 355.0 15.0 102.1 12 93.4 490 4/4/13 slope Between Wall 5 and 6 Res 305.0 15.2 98.8 12 90.4 491 4/4/13 Lot 64Res 322.0 14.9 101.6 12 93.0 492 4/4/13 Lot 62 Res 338.0 17.8 103.6 12 94.8 493 4/4/13 Lot 60Res 348.0 16.3 103.1 12 94.3 494 4/4/13 Lot 58Res 359.0 15.8 101.3 12 92.7 496 4/5/13 Lot 26 Slope test Res 367.0 10.7 104.4 12 95.5 498 4/5/13 Slope W of Lot 18 Res 358.0 13.2 101.3 12 92.7 501 4/8/13 Lot 29 Slope Res 365.0 13.6 106.4 12 97.3 502 4/8/13 Lot 30 Slope Res 370.0 13.2 105.2 12 96.2 506 4/8/13 West of Lot 17 Res 363.0 15.2 101.2 12 92.6 516 4/10/13 Lot 32 Res 365.0 8.6 129.6 5d 94.9 523 4/11/13 Lot 33Res 364.0 9.0 125.7 Sd 92.1 524 4/11/13 Lot 23Res 347.0 15.2 101.4 12 92.8 531 4/12/13 Lot 9 Res FG 308.5 7.9 106.6 21 91.7 532 4/12/13 Lot 8 Res FG 315.0 8.1 108.5 21 93.4 533 4/12/13 Lot 7 Res FG 321.5 11.5 106.2 21 91.4 534 4/12/13 Lot Res FG 328.2 8.6 106.5 21 91.7 535 4/12/13 Lot 5 Res FG 331.0 11.9 106.7 21 91.8 536 4/15/13 Lot 57 Res 375.0 8.4 123.1 10 98.2 537 4/15/13 Lot 55Res 377.0 8.7 118.9 10 94.8 538 4/15/13 Lot 19 Res 331.5 13.6 98.4 12 90.0 539 4/15/13 Lot 17 Res 332.0 9.4 95.5 12 87.4 540 4/15/13 RETEST #539 332.0 12.5 98.4 12 90.0 541 4/15/13 Lot 21 Res 327.0 13.4 99.3 12 90.9 542 4/15/13 Lot 22Res 333.0 12.8 100.7 12 92.1 543 4/15/13 Lot 54Res 380.0 8.1 117.0 10 93.3 544 4/15/13 Lot 53Res 375.0 8.3 116.5 10 92.9 545 4/15/13 Lot 18Res 333.0 15.0 101.6 12 93.0 546 4/16/13 Lot 56Res 376.0 8.7 115.6 10 92.2 547 4/16/13 Lot S3Res 378.0 9.0 113.5 10 90.5 553 4/17/13 Lot 56Res 378.5 8.3 115.5 10 92.1 554 4/17/13 Lot 54Res 380.0 8.7 115.1 10 91.8 557 4/18/13 Lot 64Res 321.0 12.5 98.8 12 90.4 558 4/18/13 Lot 63Res 310.5 11.8 98.8 12 90.4 559 4/18/13 Lot 61 Res 347.0 14.0 103.5 12 94.7 560 4/18/13 Lot 59Res 361.0 12.7 101.6 12 93.0 561 4/18/13 Lot 64Res 323.0 14.2 101.9 12 93.2 562 4/18/13 Lot 64 Res 326.0 13.9 103.6 12 94.8 564 4/19/13 Lot 58Res 370.0 13.2 101.0 12 92.4 565 4/19/13 Lot 29 Slope test Res 340.0 9.9 111.5 21 96.0 566 4/19/13 Lot 32 Slope test Res 350.0 9.0 110.6 21 95.2 567 4/19/13 Lot 57 Res 378.0 8.9 115.5 10 92.1 568 4/19/13 Lot 55 Res 380.0 8.5 116.6 10 93.0 570 4/22/13 Street Lot Res 297.0 12.9 106.6 12 97.5 573 4/23/13 Lot 23 slope test Res 341.0 16.0 107.1 16 97.6 577 4/24/13 Lot 37Res 370.0 7.2 131.9 Se 95.4 587 4/26/13 Lot 37 Res 372.5 4.4 100.7 22 75.7 FIGURE 6 I I JOB NAME: La Costa Town Square- Residential JOB NUMBER: 1211179-24 TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) 604 5/1/13 Lot 58 Slope test 367.0 12.8 99.9 12 91.4 605 5/1/13 Lot 6O Slope test 354.0 12.0 98.7 12 90.3 606 511/13 Lot 62 Slope test 339.0 13.2 102.4 12 93.7 607 5/1/13 Lot 64 Slope test 326.0 9.3 99.8 12 91.3 612 5/2/13 Lot 33Res 367.0 8.1 126.7 5d 92.8 613 5/2/13 Lot 32 Res 369.0 9.2 116.7 9 91.2 614 5/2/13 Lot 33Res 371.0 10.7 121.8 9 95.2 617 5/2/13 Lot 23 Res FG 349.0 8.8 107.8 12 98.6 618 5/2/13 Lot 22 Res FG 335.0 7.8 107.3 12 98.2 619 5/3/13 Lot 21 Res FG 329.0 11.0 114.6 21 98.6 620 5/3/13 Lot 20 Res FG 331.5 10.0 105.9 12 96.9 621 5/3/13 Lot 19 Res FG 334.0 9.8 103.0 12 94.2 622 5/3/13 Lot 18 Res FG 335.0 8.9 106.5 12 97.4 623 5/3/13 Lot 17 Res FG 334.0 8.8 104.7 12 95.8 624 5/3/13 Lot 16 Res FG 332.3 9.3 106.2 12 97.2 625 5/3/13 Lot 15 Res FG 330.0 7.9 105.4 12 96.4 626 5/3/13 Lot 14 Res FG 324.9 9.6 107.7 12 98.5 627 5/3/13 Lot 13 Res FG 320.5 9.5 101.8 12 93.1 628 5/3/13 Lot 2 Res FG 303.0 10.0 107.8 12 98.6 629 5/3/13 Lot 3 Res FG 312.0 10.1 103.9 12 95.1 630 5/3/13 Lot Res FG 318.0 8.7 107.1 12 98.0 631 5/8/13 Lot 64 Res FG 327.0 9.2 114.4 21 98.5 632 5/8/13 Lot 63 Res FG 335.0 8.7 112.9 21 97.2 633 5/8/13 Lot 62 Res FG 343.0 13.0 106.8 12 97.7 634 5/8/13 Lot 61 Res FG 350.0 12.5 105.8 12 96.8 635 5/8/13 Lot 60 Res FG 357.0 13.2 104.6 12 95.7 636 5/8/13 Lot 58 Res FG 371.0 12.6 107.2 12 98.1 652 5/14/13 Lot 59 Res FG 364.0 9.8 113.6 21 97.8 653 5/15/13 Lot 40 Res 272.5 9.3 124.0 We 92.6 654 5/15/13 Lot 42 Res 374.5 9.0 122.9 17e 91.8 655 5/15/13 Lot 27 Res 374.0 8.9 137.0 Se 99.1 656 5/15/13 Lot 25Res 376.0 8.2 137.2 Se 99.2 657 5/I5/13 Lot 29Res 373.0 8.5 138.0 Se 99.8 658 5/I5/13 Lot 31 Res 371.5 8.0 135.5 Se 98.0 659 5/15/13 RETEST #587 372.5 9.4 124.2 We 92.8 660 5/16/13 Lot 38 Res 372.5 10.0 109.3 13c 90.0 661 5/16/13 Lot 41 Res 374.0 8.0 128.1 17e 95.7 662 5/16/13 Lot 43 Res 376.0 9.5 122.1 17e 91.2 664 5/17/13 Lot 36 Res 373.0 7.8 126.9 17e 94.8 665 5/17/13 Lot 39 Res 374.0 9.8 129.1 17e 96.4 666 5/17/13 Lot 21 Res 327.0 10.3 99.2 12 90.8 667 5/20/13 Lot 9 Res 284.0 15.2 104.9 1 92.6 672 5/20/13 N of Lot Parkway Res 321.0 14.8 104.7 1 92.4 673 5/20/13 PL Lot S and 6 Parkway Res 330.0 18.7 102.3 1 90.3 674 5/20/13 PL Lot 7and 8 Parkway Res 315.0 16.4 103.8 1 91.6 675 5/20/13 E of Lot 23 parkway Res 357.5 14.6 102.5 1 90.5 676 5/21/13 Lot 58 slope test Res 365.0 13.8 101.3 12 92.7 677 5/21/13 Lot 37 back slope test Res 377.0 8.5 116.1 10 92.6 678 5/21/13 Lot 38 back slope test Res 379.0 7.4 116.9 10 93.2 679 5/21/13 Lot 6o slope test Res 352.0 13.5 101.5 12 92.9 680 5/21/13 Lot 62 slope test Res 337.0 13.3 99.7 12 91.2 'V.. FIGURE 7 JOB NAME: La Costa Town Square- Residential JOB NUMBER: 1211179-24 TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) 681 5/21/13 Lot 64 slope test Res 321.0 12.0 98.6 12 90.2 684 5/21/13 Lot 36 back slope Res 381.0 10.7 120.9 10 96.4 685 5/22/13 Lot 37 backslope Res 383.0 10.5 116.7 10 93.1 686 5/22/13 S of Lot 10 Res 297.0 14.5 103.8 12 95.0 687 5/22/13 Sof Lot 9Res 290.0 11.2 99.0 12 90.6 688 5/22/13 S of Lot 10 Res 294.0 15.3 104.2 12 95.3 699 5/28/13 S of Lot 10 Res 299.0 15.4 100.4 12 91.9 700 5/28/13 S of Lot 9 Res 294.0 12.2 96.4 12 88.2 701 5/28/13 RETEST #700 294.0 12.9 99.7 12 91.2 705 5/28/13 S of Lot 9 Res 297.0 14.6 101.3 12 92.7 706 5/28/13 Sof Lot lORes 302.0 14.0 102.0 12 93.3 709 5/29/13 Lot 10 Res 306.5 14.3 103.2 2 97.1 710 5/29/13 Lot 9 Res 305.0 16.0 99.5 2 93.6 711 5/29/13 1 t 1 slope RET Basin S of Lot 1 Res 290.0 16.1 99.6 2 93.7 712 5/29/13 1 t 1 slope RET Basin S of Lot 1 Res 291.0 15.9 100.1 2 94.2 713 5/29/13 1 t I slope RET Basin S of Lot 1 Res 291.5 17.2 101.1 2 95.1 714 5/30/13 Lot iORes 308.5 14.6 102.0 12 93.3 715 5/30/13 Lot 9Res 307.5 14.1 101.1 12 92.5 716 5/30/13 Street at Lot 52 Res 376.0 10.3 113.5 10 90.5 717 5/30/13 Basin Lot 1 Res 292.0 8.9 116.9 5 90.1 718 5/30/13 Basin Lot 1 Res 292.0 9.1 118.0 5 90.9 719 5/31/13 Lot 52 Slope Res 388.0 7.7 114.4 10 91.2 720 5/31/13 Street at Lot 52 Res 373.5 8.7 121.4 10 96.8 721 5/31/13 -Lot 52 Slope Res 391.0 10.1 114.7 10 91.5 722 5/31/13 Street at Lot 52 Res 364.0 7.7 119.2 10 95.1 723 5/31/13 Lot ii Res FG 312.5 13.1 103.3 12 94.5 724 5/31/13 Lot 10 Res FG 310.1 16.2 103.1 12 94.3 725 5/31/13 Lot 12 Res FG 315.9 9.3 100.4 12 91.9 726 5/31/13 Lot 9 Res FG 308.5 9.9 106.3 12 97.3 727 5/31/13 Lot 52 Slope Res 393.0 9.7 126.2 9 98.6 728 5/31/13 Lot 52 Slope Res 395.0 9.5 123.0 9 96.1 729 5/31/13 Lot 52 Slope Res 397.0 7.7 124.5 9 97.3 730 6/3/13 Lot 52 Slope Res 399.0 10.4 115.3 9 90.1 731 6/3/13 Lot 52 Slope Res 400.0 7.9 125.2 9 97.8 733 6/3/13 Street east of Lot 52 Res 358.0 9.6 120.1 9 93.8 734 6/3/13 Street east of Lot 52 Res 366.0 9.5 115.5 9 90.2 735 6/4/13 Lot 52 Slope Res 403.0 7.8 121.3 9 94.8 736 6/4/13 Lot 52 Slope Res 406.0 7.2 123.2 9 96.3 737 6/4/13 Lot 52 Slope Res 408.0 8.7 119.8 9 93.6 738 6/4/13 Lot 52 Slope Res 410.5 8.4 120.6 9 94.2 739 6/4/13 Lot 52 Slope Res 412.5 8.9 124.7 9 97.4 740 6/5/13 Lot 52 Slope Res 414.5 9.0 123.9 9 96.8 741 6/5/13 Lot 52 Slope Res 416.5 8.9 125.8 9 98.3 742 6/5/13 Street at Lot 40 Res 361.0 8.3 114.9 9 89.8 743 6/5/13 RETEST #742 361.0 8.5 116.9 9 91.3 744 6/5/13 Lot 37 slope test Res 383.0 5.7 121.7 9 95.1 745 6/5/13 Street at Lot 41 Res 363.0 10.4 117.8 9 92.0 750 6/6/13 Lot 25 Res 363.0 9.4 120.8 9 94.4 WALL BACKFILL WB24 3/1/13 wall 4 Sta 1+10 288.0 8.5 121.6 15 91.6 FIGURE 8 JOB NAME: La Costa Town Square- Residential JOB NUMBER: 1211179-24 TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) WB25 3/1/13 Wall 4 Sta 1+35 288.0 9.1 123.0 15 92.7 WB26 3/1/13 Wall 4 Sta 1+66 288.0 9.0 120.6 15 90.9 WB27 3/1/13 Wall 4 Sta 1+15 290.0 8.7 119.9 15 90.4 WB28 3/1/13 Wall 4 Sta 1+57 290.0 9.4 120.2 15 90.6 WB29 3/4/13 Wall 4 Res Sta 1+60 219.3 10.4 121.3 15 91.4 WB30 3/4/13 Wall 4 Res Sta 1+25 293.3 9.9 125.3 15 94.4 WB31 3/4/13 Wall 4 Res Sta 1+50 293.3 9.4 119.5 15 90.1 WB32 314/13 Wall 3 Res Sta 1+10 290.3 10.0 122.1 15 92.0 W833 3/4/13 Wall 3 Res Sta 1+25 292.3 10.3 120.8 15 91.0 W834 3/4/13 Wall 3 Res Sta 1+50 294.0 9.7 120.0 15 90.4 WB41 3/13/13 Anchor wall 5 Res Sta l+40 294.0 10.1 122 15 91.9 WB42 3/13/13 Anchor wall 5 Res Sta 1+90 294.0 11.0 114.5 15 86.3 WB43 3/13/13 RETEST WB42 294.0 10.9 119.6 15 90.1 WB44 3/13/13 Anchor wall 5 Res Sta 2+40 294.0 9.4 122.1 15 92.0 WB45 3/13/13 Anchor wall 5 Res Sta 2+75 295.3 8.9 120.9 15 91.1 WB46 3/13/13 Anchor wall 5 Res Sta 2+35 295.3 10.4 119.8 15 90.3 WB47 3/14/13 Anchor wall Res Sta 1+30 296.7 11.8 121.4 15 91.5 WB48 3/14/13 Anchor wall 5 Res Sta 1+80 2967 12.3 119.9 15 90.4 WB49 3/14/13 Anchor wall 5 Res Sta 2+25 296.7 10.9 119.5 15 90.1 WB50 3/14/13 Anchor wall 5 Res Sta 2+80 296.7 8.7 123.2 15 92.8 WB51 3/15/13 Anchor wall 8 Res Sta 1+90 373.0 12.5 124.2 15 93.6 WB52 3/15/13 Anchor wall 8 Res Sta 2+30 375.0 9.9 121.0 15 91.2 WB53 3/15/13 Anchor wall 8 Res Sta 2+80 375.7 9.6 122.6 15 92.4 WB54 3/18/13 Anchor wall 8 Res Sta 2+40 377.3 7.2 131.4 19f 92.2 WB55 3/18/13 Anchor wall 8 Res Sta 2+90 378.0 8.3 130.2 19f 91.4 WB56 3/18/13 Anchor wall 8 Res Sta 3+05 380.0 8.8 129.9 19f 91.2 WB57 3/18/13 Anchor wall 8 Res Sta 3+55 380.0 9.4 129.1 19f 90.6 WB58 3/19/13 Anchor wall 8 Res Sta 2+75 381.7 6.4 133.7 19f 93.8 W1357a 3/19/13 Anchor wall 8 Res Sta 3+20 381.7 7.4 129.6 19f 90.9 WB58a 3/19/13 Anchor wall 8 Res Sta 2+55 383.0 7.3 130.2 19f 91.4 WB59 3/19/13 Anchor wall 8 Res Sta 3+25 383.0 8.4 132.0 19f 92.6 WB60 3/20/13 Anchor wall 5 Res Sta 2+80 298.0 12.3 123.3 15 92.9 WB61 3/20/13 Anchor wall 5 Res Sta 2+30 298.0 12.5 119.8 15 90.3 WB62 3/20/13 Anchor wall Res Sta 1+80 298.0 11.6 124.1 15 93.5 WB63 3/20/13 Anchor wall 5 Res Sta 1+30 298.0 11.9 120.7 15 91.0 WB64 3/20/13 Anchor wall 5 Res Sta 1+75 299.3 10.4 122.9 15 92.6 WB65 3/22/13 Anchor wall 5 Res Sta 2+25 299.3 9.7 124.3 15 93.7 WB66 3/22/13 Anchor wall 5 Res Sta 2+75 299.3 8.6 122.2 15 92.1 WB67 3/25/13 Anchor wall 5 Res Sta 1+50 300.7 8.6 119.9 15 90.4 WB68 3/25/13 Anchor wall 5 Res Sta 2+00 300.7 9.0 123.5 15 93.1 WB69 3/25/13 Anchor wall 5 Res Sta 2+50 300.7 9.6 121.6 15 91.6 WB70 3/25/13 Anchor wall 5 Res Sta 1+65 302.0 8.1 122.1 15 92.0 WB71 3/25/13 Anchor wall 5 Res Sta 2+15 302.0 7.9 124.4 15 93.7 WB72 3/25/13 Anchor wall 5 Res Sta 2+65 302.0 10.3 119.8 15 90.3 WB77 3/26/13 Anchor wall 7 Res Sta 1+08 364.7 7.2 114.8 15 86.5 WB78 3/26/13 RETEST #WB77 364.7 8.6 122.4 15 92.2 WB79 3/26/13 Anchor wall 7 Res Sta 1+15 366.7 8.2 121.6 15 91.6 WB80 3/26/13 Anchor wall 7 Res Sta 1+25 368.7 8.0 120.4 15 90.7 WB8I 3/26/13 Anchor wall 7 Res Sta 1+42 372.7 7.0 122.7 15 92.5 WB82 3/26/13 Fill Above wall Res below wall 6 Res 304.5 10.3 119.5 15 90.1 WB83 3/26/13 Fill Above wall 5 Res below wall 6 Res 306.0 8.5 121.0 15 91.2 FIGURE 9 JOB NAME: La Costa Town Square- Residential JOB NUMBER: 1211179-24 TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p-c.f.) TYPE (percent) WB84 3/26/13 Anchor wall 5 Res Sta 3i-10 306.0 7.9 120.2 15 90.6 WB85 3/26/13 Anchor wall 5 Res Sta 3+25 308.0 9.6 124.7 15 94.0 WB86 3/26/13 Anchor wall 5 Res Sta 3+35 310.0 10.1 123.1 15 92.8 WB88 3/27/13 Anchor Wall 7 Res Sta 1+60 371.3 7.6 122.7 15 92.5 WB89 3127/13 Anchor Wall 7 Res Sta 1+52 373.3 9.3 125.2 15 94.3 WB90 3127/13 Anchor Wall 5 Res Sta 3+50 313.0 7.7 123.1 15 92.8 WB91 3127/13 Anchor Wall 7 Res Sta 1+60 374.3 8.5 119.8 15 90.3 WB92 3127/13 Anchor Wall 5 Res Sta 3+70 314.0 8.9 126.3 15 95.2 WB93 3/27/13 Anchor Wall 5 Res Sta 3+90 316.0 9.4 122.7 15 92.5 WB94 3/27/13 Anchor Wall 5 Res Sta 4+05 318.0 10.3 120.4 15 90.7 WB95 3/28/13 Anchor Wall 5 Res Sta 4+30 320.0 11.0 118.7 20 90.0 WB96 3/28/13 Anchor Wall 5 Res Sta 4+55 322.0 9.7 119.2 20 90.4 WB97 3/28/13 Anchor Wall 5 Res Sta 4+60 324.0 9.9 120.4 20 91.3 WB98 3/28/13 Anchor Wall 5 Res Sta 4+75 326.0 10.4 118.9 20 90.1 WB99 3/28/13 Anchor Wall 5 Res Sta 5+00 328.0 8.8 120.0 20 91.0 WB100 3/28/13 Anchor Wall 5 Res Sta 5+25 330.0 8.5 119.5 20 90.6 WB101 3/29/13 Anchor Wall 5 Res Sta 5+30 332.0 8.7 121.6 20 92.2 WB102 3/29/13 Anchor Wall 5 Res Sta 5+55 334.0 9.9 120.7 20 91.5 WB103 3/29/13 Anchor Wall 5 Res Sta 5+75 336.0 9.4 124.3 20 94.2 WB104 3/29/13 Anchor Wall 5 Res Sta 3+10 306.0 9.6 119.2 20 90.4 WB105 3/29/13 Anchor Wall 5 Res Sta 3+15 307.3 8.2 119.4 20 90.5 WB106 3/29/13 Anchor Wall 5 Res Sta 5+95 338.0 8.0 125.3 20 95.0 WB107 4/1/13 Anchor Wall 5 Res Sta 6+30 340.0 9.4 120.3 20 91.2 WBI08 4/1/13 Anchor Wall 5 Res Sta 6+50 342.0 9.7 119.0 20 90.2 WB109 4/1/13 Anchor Wall 5 Res Sta 6+75 344.0 11.1 123.6 20 93.7 WB110 4/1/13 Anchor Wall 5 Res Sta 7+00 346.0 10.8 122.8 20 93.1 WB111 4/2/13 Anchor Wall Res Sta 7+05 348.0 10.3 123.8 20 93.9 W131 12 4/2/13 Anchor Wall 6 Res Sta 1+20 303.3 9.7 120.4 20 91.3 WBI 13 4/2/13 Anchor Wall 6 Res Sta 1+35 305.3 9.0 119.5 20 90.6 W131 14 4/2/13 Anchor Wall 6 Res Sta 1+30 306.7 11.4 122.9 20 93.2 WB115 4/2/13 Anchor Wall 6 Res Sta 2+05 308.0 10.5 122.3 20 92.7 W131 16 4/2/13 Anchor Wall 6 Res Sta 1+75 309.3 8.9 120.7 20 91.5 W131 17 4/3/13 Anchor Wall Res Sta 1+25 307.8 12.2 123.8 20 93.9 W131 18 4/3/13 Anchor Wall 6 Res Sta 1+70 311.3 10.7 120.5 20 91.4 WBI19 4/3/13 Anchor Wall 6 Res Sta 2+25 311.3 11.8 122.6 20 92.9 WBI20 4/4/13 Anchor Wall 6 Res Sta 1+80 313.3 11.5 119.4 20 90.5 WB121 4/4/13 Anchor Wall 6 Res Sta 2+30 313.3 10.6 122.8 20 93.1 WB125 4/5/13 Anchor Wall 6 Res Sta 1+80 315.0 9.5 125.3 20 95.0 WB126 4/5/13 Anchor Wall 6 Res Sta 2+20 315.0 10.3 120.8 20 91.6 WB295 5/16/13 Anchor Wall 2 Res Sta 3+15 279.7 13.2 115.7 18 91.1 WB296 5/16/13 Anchor Wall 2 Res Sta 2+85 280.3 11.6 114.3 18 90.0 WB297 5/17/13 Anchor Wall 2 Res Sta 2+70 282.0 11.4 115.8 18 91.2 WB298 5/17/13 Anchor Wall 2 Res Sta 2+35 283.7 10.6 116.4 18 91.7 WB299 5/17/13 Anchor Wall 2 Res Sta 2+60 283.7 11.2 114.9 18 90.5 WB300 5/17/13 Anchor Wall 2 Res Sta 2+15 285.7 12.6 116.3 18 91.6 WB301 5/17/13 Anchor Wall 2 Res Sta 2+45 285.7 11.0 115.6 18 91.0 WB302 5/20/13 Anchor Wall 2 Res Sta 2+00 287.7 12.7 115.7 18 91.1 WB303 5/20/13 Anchor Wall 2 Res Sta 2+30 287.7 11.0 114.9 18 90.5 WB304 5/20/13 Anchor Wall 2 Res Sta 1+80 289.7 11.4 117.4 18 92.4 WB305 5/20/13 Anchor Wall 2 Res Sta 2+20 289.7 10.5 115.6 18 91.0 WB309 5/21/13 Anchor Wall 2 Res Sta 1+15 291.7 10.0 117.4 18 92.4 FIGURE 10 JOB NAME: La Costa Town Square- Residential JOB NUMBER: 1211179-24 ........ I IN-PAC DNITY TESTS I TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) WB3I0 5/21/13 Anchor Wall 2 Res Sta 1+65 291.7 11.5 115.2 18 90.7 WB3II 5/21/13 Anchor Wall 2 Res Sta 2+00 291.7 9.8 116.1 18 91.4 WB312 5/21/13 Anchor Wall 2 Res Sta 1+50 293.7 9.3 119.5 18 94.1 WB313 5/21/13 Anchor Wall 2 Res Sta 1+90 293.7 11.4 120.4 18 94.8 WB314 5/21/13 Anchor Wall Res Sta 1+25 295.7 12.6 117.7 18 92.7 WB315 5/21/13 Anchor Wall 2 Res Sta 1+70 295.7 11.3 119.3 18 93.9 FIGURE 11