Loading...
HomeMy WebLinkAboutCT 08-03; LA COSTA TOWN SQUARE; GEOTECHNICAL INVESTIGATION; 2012-08-10I 'I I I I I I I I ·1 I I I, I I I I I I SOUTHERN CALIFORNIA SOIL & TESTING, INC. A CaUfornla Cer~illed :;maU Bllsines. Et\te 'p,ise [S6E) San Diego 6280 Riverdale Street 619.281l.4321 San Oiego,CA 92120 Indio 83.14\1 Citrus Avenue 760.775.5983 Suite G Indio, CA: '92201.3438 RiversIde 1130 palmytlta Avenue 951.965.8711 Suite 3300A Riverside. CA 9250'1 Toll Free S17.215.4321 www.scst.com GEOTECHNICAL INVESTIGATION LA COSTA TOWN SQUARE RESIDENTIAL EAST DEVELOPMENT CARLSBAD, CALIFORNIA PREPARED FOR: MR. RICK HENDERSON PROPERTY DEVELOPMENT CENTERS 5918 STONERIDGE MALL ROAD PLEASANTON, CALIFORNIA 94588 PREPARED BY: SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 RIVERDALE STREET SAN DIEGO, CALIFORNIA 92120 Providing Professional Engineering Services Since 1959 I I I I I I I I I I I I I I I I I I I SOUTHERN CALIFORNIA SOIL &TESTINGTINC. A Californi. Certified Small Business Enterprise (SSE) March 23, 2012 Revised August 10,2012 . Mr. Rick Henderson Property Development Centers 5918 Stoneridge Mall Road Pleasanton, California 94588 Subject: GEOTECHNICAL INVESTIGATION LA COSTA TOWN SQUARE RESIDENTIAL EAST DEVELOPMENT CARLSBAD, CALIFORNIA Dear Mr. Henderson: San Diego 628(fRiverdale Street 619.280.4321 San Diego, CA 92120 Indio 83-740 Citrus Avenue 760.775.5983 Suite G Indio, CA 92201-3438 Riverside 1130 Palmyrita Avenue 951.965.8711 -Suite 330.A Riverside, CA 92507 Toll Free 877 .215.4321 www.scst.com SCS&T No. 1111196 Report No.1 R This letter transmits Southern California Soil & Testing Inco's (SCS&T) report describing the updated geotechnical investigation performed for the planned east residential subdivision. The subdivision will be located at the northeast corner of Rancho Santa Fe Road and La Costa Avenue in the City of Carlsbad, California. This investigation was conducted in general conformance with the scope of work -presented in SCS& T's proposal dated November 16, 2011. If you have any questions concerning this repor:t. or need additional information, please call us at (619) 280-4321. Respectfully Submitted, SOUTHERN CALIFORNIA SOIL AN~~.).:. • Shih-Hsun Liang (Eddie Staff Engineer G8F:AKN:aw (8) Mark Langan (1) Mr. Mark Langan via e-mail atmarkl@sca-sd.com (1) Mr. Rick Henderson via e-mail atrick.henderson@pdcenters.com I I I I I I I I I I I I I I I I I I I TABLE OF CONTENTS SECTION PAGE EXECUTIVE SUMMARY ........................................................................................................................ I 1. INTRODUCTION ............................................................................................................................... 1 1.1 GENERAL ......................................................................................•...•........................•..•................ 1 1.2 SCOPE OF WORK. .............................•.............................................................................................. , 1 1.2.1 Field Exploration .................................................................................................................. 1 1.2.2 Laboratory Testing ................................................................................................................ 1 1.2.3 Analysis and Report .............................................................................................................. 1 2. SITE AND SUBSURFACE CONDITIONS ..................................................................................... 2 2.1 SITE DESCRIPTION .......................................................................•••..•................•.•....•..................... 2 2.2 STOCKPILE .............................................................................................•.............•...•..................... 2 2.3 SUBSURFACE CONDITIONS ...................................•...................•.....•..................•............................ 2 2.4 GROUNDWATER ............................................................................................................................. 3 2.5 POTENTIAL GEOLOGIC HAZARDS ................................•................................................••.•.•.•..... , .... 3 2.6 SEISMIC DESIGN PARAMETERS .........................................................•.............................•...•.......... 3 3. CONCLUSIONS ................................................................................................................................. 4 4. RECOMMENDATIONS ..................................................................................................................... 4 4.1 SITE PREPARATION AND GRADING ..............................................•............................•..•.................• 4 4.1.1 Site Preparation ............................... '" .................. '" ............................................................. 4 4.1.2 Compressible Soil Removal .................................................................................................. 4 4.1.3 Excavation Characteristics ................................................................................................... 5 4.1.4 Expansive Soil ....................................................................................................................... 5 4.1.5 Rock Fill Placement .............................................................................................................. 5 4.1.6 Lot Over'-Excavation Requirements ...................................................................................... 6 4.1.7 Earthwork ............................................................................................................................. 6 4.1.8 Keyway .................................................................................................................................. 6 4.1.9 Subdrains .............................................................................................................................. 6 4.1.10 Fill Slopes ............................................................................................................................. 7 4.1.11 Permanent Cut Slopes ........................................................................................................... 7 4.1.12 Temporary Excavation Slopes .............................................................................................. 7 4.1.13 Shrinkage and Bulkage Estimates ......................................................................................... 7 4.1.14 Imported Soil ......................................................................................................................... 8 4.1.15 Surface Drainage .................................................................................................................. 8 4.1.16 Grading Plan Review ............................................................................................................ 8 4.2 FOUNDATIONS ............................................................................................................................... 8 4.2.1 Conventional Footings .......................................................................................................... 8 4.2.2 Post-Tension Footings .......................................................................................................... 9 4. 2.3 Foundation Excavation Observations ................................................................................. 10 4.2.4 Static Settlement Characteristics ........................................................................................ 10 4.2.5 Resistance to Lateral Loads ................................................................................................ 1 0 4.2. 6 Foundation Plan Review ..................................................................................................... 10 4.3 SLABS-ON-GRADE ........................................................................................................................ 10 4.3.1 Interior Concrete Slabs-on-Grade ...................................................................................... 10 4.3.2 Exterior Concrete Slabs-on-Grade ..................................................................................... 11 4.4 EARTH RETAINING WALLS ................................................................ , .......................................... 12 4. 4.1 Foundations ........................................................................................................................ 12 I I I I I I I I I I I I I I I I I I I TABLE OF CONTENTS (Continued) SECTION PAGE 4.4.2 Passive Pressure ................................................................................................................. 12 4.4.3 Active Pressure ................................................................................................................... 12 4.4.4 At-Rest Pressure .................................................................................................................. 12 4.4.5 Seismic Earth Pressure ....................................................................................................... 12 4.4.6 Waterproofing and Backdrain Observation ........................................................................ 13 4.4. 7 Backfill ................................................................................................................................ 13 4.4.8 Factor of Safety ................................................................................................................... 13 4.5 MSE WALL DESIGN PARAMETERS ................................................................................................ 13 TABLE 4 ..........................................................••..•...............•......•..................••..•..........•.......•.................... 13 4.6 PAVEMENT SECTION RECOMMENDATIONS .................................................................................. 13 TABLE 5 .................................................................................................................................................... 14 5. GEOTECHNICAL ENGINEERING DURING CONSTRUCTION ............................................ 14 6. CLOSURE ......................................................................................................................................... 14 TABLES Table 1 ................................................... : ...................................... Expansion :Index Requirements Table 2 .................................................................... Estimated Shrinkage and Bulkage Estimates Table 3 ................................................... Pr~liminary Post -Tensioned Design Recommendation Table 4 ..................................................... Mechanically Stabilized Earth Wall D~sign Parameters Table 5 .............................................................................. Flexible Pavement Recommendations ATTACHMENTS FIGURES Figure 1 ............................................................................................................... Site Vicinity Map Figure 2 .......................................................................................... Subsurface Investigation Map Figure 3 .............................................................................................. Grading Consideration Map Figures 4 and 5 .......................................................................... Oversize Rock Placement Detail Figure 6 ................................................................................................................ Subdrain Detail Figure 7 ...................................................................................................... Wall Backdrain Details APPENDICES Appendix 1 ............................................................................... Logs of Exploratory Test Trenches Appendix II ....................................................................................................... Laboratory Testing Appendix III ........................................................................................... Seismic Traverse Results I I I I I I I I I I I I I I I I I I I EXECUTIVE SUMMARY This report presents the results of the geotechnical investigation Southern California Soil and Testing, Inc. (SCS& T), performed for the planned subdivision to be located on the northeast corner of Rancho Santa Fe Road and La Costa Avenue in the City of Carlsbad, California. The purpose of our work is to provide conclusions and recommendations regarding the geotechnical aspects of the project. An SCS& T geologist observed the excavation of 4 exploratory test trenches to depths of between 5 feet and 13 feet below the existing grade with a rubber tire backhoe equipped with an 18-inch bucket. The backhoe encountered refusal in test trenches, T-1 and T-2. SCS&T tested selected samples from the trenches to evaluate pertinent classification and engineering properties and assist in the development of geotechnical conclusions and recommendations. Additionally, 9 seismic traverses where performed to determine rippability characteristics of the underlying materials. Materials encountered in the test trenches consist of alluvium, Delmar Formation, and metavolcanic rock. The alluvium is comprised of loose, clayey sand and soft, sandy clay. The Delmar Formation is comprised of very stiff to hard, sandy claystone. The metavolcanic ,rock is comprised of metamorphosed and un-metamorphosed volcanic and sedimentary rock commonly identified as. the Santiago Peak Volcanics. SCS&T's geologist observed groundwater seepage and wet soil in test trench T-3. The main geotechnical considerations affecting the planned development are: • The presence of compressible alluvial materials; • Expansive soils; • Difficult excavation conditions; • Cut/fill transitions below the building pads; • Oversize materials. Test trenches, T-1 and T-2 encountered refusal with a rubber-tire backhoe. The seismic traverses indicate that the rock on-site will require blasting and specialized rock breaking equipment during excavation. The on-site soil tested has a high expansion potential. We expect that the excavated rock will need to be processed with expansive soil to produce a . suitable fill material. Processing of the rock is expected to consist of crushing and/or screening. Other alternatives to produce a suitable fill material can also be considered. Shallow spread footings with bottom levels in compacted fill can be used for the support of the planned structures. I I I I I I I I I I I I I I I I I I I 1. INTRODUCTION 1.1 GENERAL This report presents the results of the geotechnical inv~stigation Southern California Soil and Testing, Inc. (SCS&T), performed for the planned subdivision to be located on the northeast corner of Rancho Santa Fe Road and La Costa Avenue in the City of Carlsbad, California. We understand the structures will be of wood frame construction. The purpose of our work is to provide conclusions and recommendations regarding the geotechnical aspects of the project. Figure 1 presents a site vicinity map. 1.2 SCOPE OF WORK 1.2.1 Field Exploration Subsurface conditions were explored by excavating a total of 4 exploratory tesUrenches to depths of between 5 feet and 13 feet below the existing grade with a rubber tire backhoe equipped with an 18-inch bucket. Additionally, 9 seismic traverses where performed to determine the rippability characteristics of the underlying materials. Figure 2 shows the locations of the test trenches and seismic traverses. An SCS& T geologist logged the test trenches and obtained samples for examination and laboratory testing. The logs of the test trenches are in Appendix I. Soils are classified according to the Unified Soil Classification System illustrated on Figure 1-1. The seismic traverse results are in Appendix III. 1.2.2 Laboratory Testing The laboratory program consisted of tests for: • Atterberg limits; • Grain size distribution; • Expansion Index. The results of the laboratory tests, and brief explanations of test procedures, are in Appendix II. 1.2.3 Analysis and Report SCS& T evaluated the results of the field and laboratory tests to develop conclusions and recommendations regarding: 1. Subsurface conditions beneath the site; 2. Site preparation; 3. Excavation characteristics; 4. Potential geologic hazards that may affect the site; I I I I I I I I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California August 10,2012 SCS& T Proposal No. 1111196-01 R Page 2 5. Criteria for seismic design in accordance with California Building Code procedures; 6. Appropriate alternatives for foundation support along with geotechnical engineering criteria for design of the foundations; 7. Resistance to lateral loads; 8. Estimated foundation settlements; 9. Support for concrete slabs-on-grade floors; 10. Lateral pressures for the design of retaining walls; 11. Pavement sections. 2. SITE AND SUBSURFACE CONDITIONS 2.1 SITE DESCRIPTION The subject site is an irregular shaped lot located on the northeast corner of Rancho Santa Fe Road and La Costa Avenue in the City of Carlsbad, California: The site is bounded by vacant land on the west, Rancho Santa Fe Road on the north, an SDG&E power line easement on the northeast, and La Costa Avenue and a residential subdivision on the southeast side. A stockpile of rocks is located at the northwestern portion of the project area. The site is located along a south-facing slope that is characterized by four north-south trending, natural drainage swales that flow to the south. The total elevation difference of the site is about 170 feet over a span of 2,000 feet. Vegetation consists of native grasses and shrubs. 2.2 STOCKPILE A stockpile is located at the northwest corner of the site. The material observed in the stockpile consists of clayey soils and rocks that range up to about 4 feet in maximum dimension. This material was most likely derived from excavations performed as part -of the construction of Rancho Santa Fe Road and nearby developments. The stockpile appears to be about 20 feet thick at it deepest section and is most likely underlain by metavolcanic rock. 2.3 SUBSURFACE CONDITIONS Alluvium, Delmar Formation, and metavolcanic rock underlie the subject site. Figure 2 shows the approximate limits of the geologic materials. Alluvium: SCS& T's geologist observed alluvium comprised of loose clayey sand and soft sandy clay with gravel in test trenches T-1 through T-3. In general, this material is located within the drainage swales at the site. This alluvium encountered in our test trenches extended to depths of between about 2 feet and 7 feet below the ground surface and overlies the Delmar Formation or metavolcanic rock. I I I I I I I I I I I I I I I I I Properly Development Centers La Costa Town Square Residential East Development Carlsbad, California August 10, 2012 SCS& T Proposal No. 1111196-01 R Page 3 Delmar Formation: SCS&T's geologist observed the Delmar Formation comprised of very stiff to hard, sandy claystone at the surface in test trench T-4 and below the alluvium in test trench T-3. This material extended to the maximum depth explored of 13 feet in test trench T-3. Metavolcanic Rock: SCS& T's geologist observed Metavolcanic rock below the alluvium in test trenches T-1 and T-2. The metavolcanic rock is typically comprised of metamorphosed and un-metamorphosed volcanic and sedimentary rock commonly identified as the Santiago Peak Volcanics. This material extended to the maximum depth explored of 6 feet in test trench T-1. 2.4 GROUNDWATER SCS&T's geologist observed groundwater seepage in test trench T-3. Water cmd wet soil should be expected at the bottoms of the existing alluvial channels. Groundwater levels can fluctuate seasonally, and can rise significantly following periods of precipitation. In addition, -groundwater can be perched on impermeable layers of the claystone and/or rock as a result of rainfall and irrigation. 2.5 POTENTIAL GEOLOGIC HAZARDS No known geologic hazards are mapped at the site. A geologic hazard likely to affect the project is groundshaking as a result of movement along an active fault zone in the vicinity of the subject site. 2.6 SEISMIC DESIGN PARAMETERS The site coefficients and adjusted maximum considered earthquake spectral response acceleration parameters in accordance with the 2010 California Building Code based on the 2009 International Building Code are presented below: Site Coordinates: Latitude 33.083° Longitude -117.229° Site Class: D Site Coefficient Fa = 1.056 Site Coefficient Fv = 1.583 Spectral Response Acceleration at Short Periods Ss = 1.1 Spectral Response Acceleration at 1-Second Period S1 = 0.4 SMs=FaSs SM1=FvS1 SDs=2/3* SMS SD1=2/3* SM1 I I I I I I I I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California 3. CONCLUSIONS August 10,2012 SCS&T Proposal No. 1111196-01R Page 4 The main geotechnical considerations affecting the planned development are: • The presence of compressible materials; • Expansive soils; • Difficult excavation conditions; • Cut/fill transitions below the building pads; • Oversize materials. Test trenches, T-1 and T-2 encountered refusal with a rubber-tire backhoe. The seismic traverses indicate that the rock on-site will require blasting and specialized rock breaking equipment during excavation. The on-site soil tested has a high expansion potential. We expect that the excavated rock will need to be processed with the expansive soil to produce a suitable fill material. Processing of the rock is expected to include crushing and/or screening. Other alternatives to produce a suitable fill material can also be considered. Shallow spread footings with bottom levels in compacted fill can be used for the support of the planned structures. 4. RECOMMENDATIONS 4.1 SITE PREPARATION AND GRADING 4.1.1 Site Preparation Site preparation should begin with the removal of the existing vegetation and debris. It is expected that the upper 6 inches of the exposed surface will need to be brushed and exported from the site. The stockpile of soil and existing fill, if any, should be excavated in their entirety. 4.1.2 Compressible Soil Removal It is recommended that existing compressible soils (fill, alluvium and highly weathered formational deposits) underlying areas of the site to be graded be excavated in their entirety. SCS& T expects the compressible soil excavation to be about 3 feet within the alluvial drainage channels. No excavation for remedial grading is expected outside of the channels where rock is exposed on the surface. Figure 3 presents the approximate limits of the compressible soil removal. An SCS& T representative should observe conditions exposed in the bottom of the excavation to determine if additional excavation is required. I I I I I I I I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California 4.1.3 Excavation Characteristics August 10,2012 SCS& T Proposal No. 1111196-01 R PageS Conventional heavy equipment in good working order is expected to be able to excavate the alluvial materials on-site. However, non-rippable rock exists on-site, and these areas will require rock-breaking equipment. In addition, oversized, buried hard rock requiring special handling should be anticipated. Contract documents should specify that the contractor mobilize equipment capable of excavating and breaking the bedrock. Additionally, it should be noted that gravel, cobbles, and boulders up to 48 inches in diameter could be encountered within the stockpile. Contract documents should specify that the contractor mobilize equipment capable of compacting materials with gravel and cobbles. 4.1.4 Expansive Soil The existing materials on-site that were tested have a high expansion potential in accordance with ASTM D4829. Table 1 presents expansion index recommendations for the placement of the soil. Table 1 E Id R xpanslon n ex eqUiremen ts Depth Below Planned Final Grade Expansion Index of Material to be Placed Elevation Cut lots Expansion Index Less than 50 o to 10 feet Expansion Index Less than 90 Greater than 10 feet Expansion Index Greater Than 90 Allowed' 4.1.5 Rock Fill Placement The quantity of rock generated during grading operations will depend on the grading scheme. The rock will most likely consist of cobbles and boulders' of varying size. The rock should be mixed with sufficient quantities of soil such that nesting does not occur during placement and the rock is completely surrounded by a soil matrix material. The rock/soil mixture should be placed in lifts of approximately 12 inches in thickness and compacted with a rubber-tire loader. Oversized rock between 6 inches and 2 feet may be placed in structural fills in accordance with the details illustrated in the attached Figures 4 and 5. Larger rock may only be utilized for landscaping purposes. Rocks greater than 3 inches in diameter should not be used within 18 inches of final grade or where foundation or utility trenches will be located. I .1 I I I I I I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California 4.1.6 Lot Over-Excavation Requirements August 10, 2012 SCS& T Proposal No. 1111196-0fR' Page 6 Hard rock is expected to be encountered at the planned final grade elevation for the lots located along the north side of the site. The remainder of the lots will span a cut/fill transition with fill differential ranging between about 5 and 20 feet. Figure 3 presents the expected over-excavation requirements for each lot. The depths shown may have to be increased depending on the final grading. The bottoms of the excavation and subgrades beneath fill areas should be sloped toward the street or fill portion of the lot, and .away from its center. 4.1.7 Earthwork The material exposed in the bottom of the excavation should be scarified to a depth of 12 inches, moisture conditioned and compacted to at least 90% relative compaction. Excavated materials, except for soil containing roots and organic debris, can be used as compacted fill. Fill should be placed in 6-to 8-inch thick loose lifts, moisture conditioned to near optimum moisture content, and compacted to at least 90% relative compaction. The maximum dry density and optimum moisture content for the evaluation of relative compaction should be determined in accordance with ASTM D 1557. Utility trench backfill within 3 feet of the structure and beneath pavements and hardscape should be compacted to a minimum of 90% relative compaction. The upper 12 inches of subgrade beneath slabs and paved areas should be compacted to at least 95% relative compaction. 4.1.8 Keyway A keyway shall be established at the base of sloped areas. The keyway should be at least 15 feet wide at the bottom, extend at least 3 feet into competent material·and be sloped back at an inclination of about 2%. The keyway may need to be wider to accommodate compaction equipment. Final keyway recommendations will depend on the final grading plans. 4.1.9 Subdrains Canyon subdrains shall be installed at the bottom of canyon removals wherever fill depths exceed 10 feet. Canyon subdrains should consist of a perforated pipe (SDR 35 or equivalent), surrounded by at least 6 cubic feet per lineal foot of crushed rock wrapped in filter fabric (Mirafi 140N or equivalent). A canyon subdrain is presented on Figure 6. As- graded canyon subdrain locations should be surveyed. I I I I I I I I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California August 10, 2012 SCS& T Proposal No. 1111196-01 R Page 7 Subdrains may be required at the heel of keyways for buttress slopes and/or fill-over-cut slopes, Figure 6. Subdrains may also be required for some transition undercut areas if warranted by soil conditions or the presence of groundwater. Figure 3 shows the approximate locations of the planned subdrains. 4.1.10 Fill Slopes Fill slopes can be constructed at an inclination of 2:1 (horizontal:vertical). Compaction of slopes should be performed by back-rolling with a sheepsfoot compactor at vertical intervals of 2 feet or less as the fill is being placed, and by track-walking the face of the slope when the fill is completed. Alt~rnatively, slopes can be overfilled and cut back to expose dense material at the design line and grade. Fills should be benched into temporary slopes and . into the rock when the natural slope is steeper than 5:1 (horizontal:vertical). 4.1.11 Permanent Cut Slopes It is our opinion that cut slopes, constructed at an inclination of 2:1 or flatter, ratio will possess an adequate factor of safety. The engineering geologist should observe all cut slopes during grading to ascertain that no unforeseen adverse conditions requiring revised recommendations are encountered. 4.1.12 Temporary Excavation Slopes It is recommended that temporary cut slopes, greater than 3 feet in depth, be cut at an inclination no steeper that 1: 1. Cuts less than or equal to 3 feet in depth can be made vertical. Temporary cut slopes should be observed by an SCS&T Engineering Geologist during grading to ascertain that no unforeseen adverse conditions are observed. The temporary slopes should be inspected daily by the contractor's Competent Person before personnel are allowed to enter the excavation. Zones of potential instability, sloughing or raveling should be brought to the attention of the Engineer and corrective action implemented before personnel begin working in the trench. No surcharge loads should be placed within a distance from the top of temporary cut slopes equal to half the slope height. 4.1.13 Shrinkage and Bulkage Estimates The estimate shrinkage and bulkage estimates are presented below. Table 2 Sh . k rm age an dB Ik Eft u age sima es Soil Type Shrinkage Bulkage. Topsoil and alluvium 15% to 20% Del Mar Formation 5% to 10% Metavolcanic Rock 10% to 20% Rock Stockpile 15% to 20% I I I I I I I I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California 4.1.14 Imported Soil August 10, 2012 SCS& T Proposal No. 1111196-01 R Page 8 Imported fill should meet the specifications for Caltrans structure backfill and, if appropriate, be tested by SCS& T prior to transport to the site. 4.1.15 Surface Drainage Final surface grades around the buildings should be designed to collect and di~~ct surface water away from the structure and toward appropriate drainage facilities. The ground around the structures should be graded so that surface water flows rapidly away from the structure without ponding. In general, we recommend that the ground adjacent to the structure slope away at a gradient of at least 2%. Densely vegetated areas where runoff can be impaired should have a minimum gradient of at least 5% within the first 5 feet from the structure. Roof gutters with downspouts that discharge directly into a closed drainage system are recommended on structures. Drainage patterns established at the time of fine grading should be maintained throughout the life of the proposed structures. Site irrigation should be limited to the minimum necessary to sustain landscape growth. Should excessive irrigation, imp~ired drainage, or unusually high rainfall occur, saturated zones of perched groundwater can develop. 4.1.16 Grading Plan Review The grading plans should be submitted to SCS& T for review to ascertain whether the intent of the recommendations contained in this report have been implemented, and that no revised recommendations are necessary due to changes in the development scheme. 4.2 FOUNDATIONS 4.2.1 Conventional Footings Residential structures and retaining walls can be supported on shallow spread footings with bottom levels in compacted fill. A minimum width of 12 inches is recommended for continuous footings for single story structures and 15 inches for 2 story structures. Isolated footings should be at least 24 inches wide. All footings should extend a minimum of 18 inches below lowest adjacent grade for pads with an expansion index less than 50. All footings should extend a minimum of 24 inches below lowest adjacent grade for pads with an expansion index less than 90. A bearing capacity of 2,500 pounds per square foot (psf) can be used. These values can be increased by % when considering the total of all loads, including wind or seismic forces. Footings adjacent to slopes should be extended to a depth such that a minimum distance of 7 feet exists between the bottom of the footing and the face of the slope. For conventional retaining walls, a minimum 10-foot distance is ,recommended. 1(1' I I I I I. I I I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California 4.2.2 Post-Tension Footings August 10, 2012 SCS&T Proposal No. 1111196-01R Page 9 Shallow spread footings with bottom levels in compacted fill can be ·used to support the planned structures. The slab should be designed by a structural engineer familiar with the design criteria presented in the Post-Tensioning Institutes (PTI), Third Edition, as required by the 2010 CSC, Section 1805.8. The post-tensioned design should incorporate the geotechnical parameters presented below. Table 3 Preliminary Post -Tensioned Design Recommendations Post-Tensioning Institute (PTI), Third Recommended Design Parameters Edition Design Parameters Thornwaite Index -20 Equilibrium Suction 3.9 Edge Lift Moisture Variation Distance, em (feet) 4.7 Edge Lift, Ym (inches) 1.10 Center Lift Moisture Variation Distance, em (feet) 9.0 Center Lift, Ym (inches) 0.47 Pre-saturation, as needed, to obtain the minimum 1.3 times optimum down to 18 inches moisture down to minimum depth Subgrade Modulus, k (pounds per cubic inch) 50 A minimum width of 12 inches is recommended for continuous footings for single story structures and 15 inches for two story structures. Isolated footings should be at least 24 inches wide. All footings should extend a minimum of 24 inches below lowest adjacent grade. All footings should extend a minimum of 18 inches below lowest adjacent grade for pads with an expansion index less than 50. All footings should extend 'a minimum of 24 inches below lowest adjacent grade for pads with an expansion index less than 90. A bearing capacity of 2,500 pounds per square foot (psf) can be used. These values can be increased by % when considering the total of all loads, including wind or seismic forces. Footings adjacent to slopes should be extended to a depth such that a minimum distance of 7 feet exists between the bottom of the footing and the face of the slope. Experience indicates post-tensioned slabs are susceptible to excessive edge lift, regardless of the underlying soil conditions. Placing reinforcement at the bottom of the perimeter footings and the interior stiffener beams may mitigate this potential. The structural engineer should design the foundation system to reduce the potential edge lift occurring for the planned structures. I I I I I I I I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California August 10, 2012 SCS& T Proposal No. 1111196-01 R . Page 10 SCS& T should be contacted to provide final post-tension recommendations after grading is complete. 4.2.3 Foundation Excavation Observations It is recommended that all foundation excavations be approved by a representative from SCS& T prior to forming or placing reinforcing steel. 4.2.4 Static Settlement Characteristics Total footing settlements are estimated to be less than 1 inch. Differential settlements between adjacent footings are estimated to be less than % inch. Settlements should occur rapidly, and should be completed shortly after structural loads are applied. 4.2.5 Resistance to Lateral Loads Lateral loads will be resisted by friction between the bottoms of the footings and passive pressure on the faces of footings and other structural elements below grade. A friction factor of 0.3 can be used. Passive pressure can be computed using a lateral pressure value of 300 psf per foot of depth below the ground surface. The upper foot of soil should not be relied on for passive support unless the ground is covered with pavements or slabs. 4.2.6 Foundation Plan Review The foundation plans should be submitted to SCS& T for review to ascertain that the inteht of the recommendations in this report has been implemented and that revised recommendations are not necessary due to the layout. 4.3 SLABS-ON-GRADE 4.3.1 Interior Concrete Siabs-on-Grade Concrete slabs-on-grade should be designed by the project structural engineer. Siabs-on- grade should be underlain by a 4-inch thick blanket of clean, poorly graded, coarse sand (sand equivalent = 30 or greater) or %-inch crushed rock. Where moisture sensitive floor coverings are planned, a vapor retardant should be placed over the s.and layer. An additional 2 inches of sand can be placed over the vapor retardant to provide a degree of protection during construction. Typically, visqueen is used as a vapor retardant. If visqueen' is used, a minimum 10-mil is recommended. Moisture emissions can vary widely, depending upon such factors as concrete type and subgrade moisture conditions. If these moisture emission values are not within the manufacturer's specifications for the type of flooring to be installed, SCS& T should be contacted to develop appropriate additional damp-proofing recommendations. It is I I I I I I I I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California August 10, 2012 SCS& T Proposal No. 1111196-01 R Page 11 recommended that moisture emission tests be performed prior to the placement of floor coverings. In addition, over-watering should be avoided, and good site drainage should be established and maintained to reduce the potential for the build-up of excess sub-slab moisture. 4.3.2 Exterior Concrete Siabs-on-Grade Exterior slabs should have a minimum thickness of 4 inches and should be reinforced with at least No.3 bars at 18 inches on center each way. Additionally slabs should be underlain by at least 6 inches of aggregate base. Slabs should be provided with weakened plane joints. Joints should be placed in accordance with the American Concrete Institute (ACI) Guidelines Section 3.13. Joints should be placed where cracks are anticipated to develop naturally. Alternative patterns consistent with ACI guidelines also can be used. The landscape architect can be consulted in selecting the final joint patterns. A 1-inch maximum size aggregate mix is recommended for concrete for exterior slabs. A water/cement ratio of less than 0.6 is recommended, in order to decrease the potential for shrinkage cracks. It is strongly suggested that the driveway concrete mix have a minimum compressive strength of 3,000 pounds per square inch (psi). Coarse and fine aggregate in concrete should conform to the "Greenbook" Standard Specifications for Public Works Construction. Special attention should be paid to the method of curing the concrete to reduce the potential for excessive shrinkage and resultant random cracking. Minor cracks occur normally in concrete slabs and foundations due to shrinkage during curing and redistribution of stresses. Some shrinkage cracks can be expected. These cracks are not necessarily an indication of vertical movements or structural distress. Factors that contribute to the amount of shrinkage that takes place in a slab-on-grade include joint spacing, depth, and design; concrete mix components; water/cement ratio and surface finishing techniques. According to the undated 'Technical Bulletin" published by the Southern California Rock Products Association and Southern California Ready Mixed Concrete Association, flatwork formed of high-slump concrete (high water/cement ratio) utilizing 3/8-inch maximum size aggregate ("Pea Gravel Grout" mix) is likely to exhibit extensive shrinkage and cracking. Cracks most often occur in random patterns between construction joints. I I I I I I I I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California 4.4 EARTH RETAINING WALLS 4.4.1 Foundations August 10,2012 SCS&T Proposal No. 1111196-01R Page 12 The recommendations provided in the foundation section of this report are also applicable to . earth retaining structures. 4.4.2 Passive Pressure The passive pressure for the retaining walls can be considered to be 300 psf per foot of depth up to a maximum of 1 ,500 psf. This pressure may be increased by % for seismic loading. The coefficient of friction for concrete to soil may be taken as 0.3 for resistance to lateral movement. When combining friction and passive resistance, the friction should be reduced by %. The upper 12 inches of soil in front of retaining wall footings should not be included in passive pressure calculations unless pavement extends adjacent to the footing. 4.4.3 Active Pressure The active soil pressure for the design of unrestrained earth retaining structures with level backfills can be taken as equivalent to the pressure of a fluid weighing 40 pounds per cubic foot (pcf). An additional 20 pcf should be added for walls with sloping backfills of 2:1 (horizontal:vertical) or flatter. A granular and drained backfill condition has been assumed. Surcharge loads from vehicles can be taken into account by assuming an additional 2 feet of soil is supported by the wall. If any. other surcharge loads are anticipated, SCS& T should be contacted for the necessary increase in soil pressure. The project architect should provide. waterproofing specifications and' details. A typical wall backdrain detail is shown on Figure 7. 4.4.4 At-Rest Pressure The at-rest soil pressure for the design of restrained earth retainin~ structures with level backfills can be taken as equivalent to the pressure of a fluid weighing 60 pet. An additional 20 pet should be added for walls with sloping backfills of 2:1 (horizontal:vertical) or flatter. A granular and drained backfill condition has been assumed. If any surchar!;le loads are anticipated, SCS& T should be contacted for the necessary increase in soil pressure. 4.4.5 Seismic Earth Pressure The seismic earth pressures can be taken as an inverted triangular distribution with a maximum pressure at the top equal to 16H pounds per square foot (with H being the height of the retained earth in feet). This pressure is in addition to the un-factored static design wall load. The allowable passive pressure and bearing capacity can be increased by % in determining the stability of the wall. I I I I I I I ,I I I I I I I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California August 10,2012 SCS& T Proposal No. 1111196-01 R Page 13 4.4.6 Waterproofing and Backdrain Observation The geotechnical engineer should be requested to verify that waterproofing has been applied and that the backdrain has been properly installed. However, unless specifically asked to do so, we will not verify proper application of the waterproofing. SCS& T does have a waterproofing division that can provide this service if requested. 4.4.7 Backfill All backfill soils should be compacted to at least 90 percent relative compaction. Expansive or clayey soils should not be used for backfill material. The wall should not be backfilled until the grout has reached an adequate strength. 4.4.8 Factor of Safety The above values, with the exception of the allowable soil bearing pressure, do not include a factor of safety. Appropriate factors of safety should be incorporated into the design. 4.5 MSE WALL DESIGN PARAMETERS The following soil parameters can be used for the design of Mechanically Stabilized Earth (MSE) walls. Table 4 Mechanically Stabilized Earth Wall Design Parameters Reinforced Soil .Retained Soil Foundation Soil Internal Friction Angle 30° 30° 30° (degrees) Cohesion 0 0 0 (pounds' per square foot) Moist Unit Weight (pounds 130 130 130 per cubic foot) 4.6 PAVEMENT SECTION RECOMMENDATIONS The pavement support characteristics of the soils encountered during our investigation range from poor to good. It is anticipated that these deposits will be mixed and the resulting blend will have moderately good pavement support characteristics. An "R" value of 25 was assumed for this blend. The actual "R" value of the subgrade soils will be determined after grading. Based on an "R" value of 25, the following structural sections are recommended for the assumed Traffic Indices. I I I I I I I I I I, I I I I I I I, I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California Table 5 August 10, 2012 SCS& T Proposal No. 1111196-01 R . Page 14 Flexible Pavement Recommendations Traffic Index Asphalt Concrete Aggregate Base 1 (inches) (inches) 6.0 4 9 7.5 5 12 .. Note 1: AB shall conform to Class 2 Aggregate Base m Section 26·1.02 of the Standard Specifications of The State of California Department of Transportation or Crushed Miscellaneous Base in accordance with the Standard Specifications for Public Works and City of Carlsbad Standards. Bus turnouts should be constructed in accordance with the San Diego Regional Standard Drawings SDG-109, 9 inches of concrete underlain by at least 12 inches of aggregate base. The concrete should have a compressive strength of at least 3250 pounds per square inch. SDG&E concrete maintenance areas should have a concrete thickness of at least 7~ inches underlain by at least 12 inches of aggregate base. Trash enclosures should have a thickness of at least 7~ and be underlain by at least 12 inches of aggregate base. The upper 12 inches of subgrade should be scarified, moisture conditioned to above optimum moisture requirements, and compacted to at least 95% of the maximum dry density. All soft or spongy areas should be excavated and replaced with compacted fill. The base material should be compacted to at least 95% of its maximum dry density. All materials and methods of construction should conform to good engineering practices and the minimum standards set forth by the City of Carlsbad. 5. GEOTECHNICAL ENGINEERING DURING CONSTRUCTION The geotechnical engineer should review project plans and specifications prior to bidding and construction to check that the intent of the recommendations in this report has been incorporated. Observations and tests should be performed during construction. If the conditions encountered during construction differ from those anticipated based on the subsurface exploration program, the presence of the geotechnical engineer during construction will enable an evaluation of the exposed conditions and modifications of the recommendations in this report or development of additional recommendations in a timely manner. 6. CLOSURE SCS& T should be advised of any changes in the project scope so that the recommendations contained in this\ report can be evaluated with respect to the revised plans. Changes in recommendations will be verified in writing. The findings in this report are valid as of the date of this report. Changes in the condition of the site can, however, occur with the passage of time, I I I I I I I I I I I I I' I I I I I I Property Development Centers La Costa Town Square Residential East Development Carlsbad, California August 10,2012 SCS& T Proposal No. 1111196-01 R Page 15 whether they are due to natural processes or work on this or adjacent areas. In addition, changes in the standards of practice and government regulations can occur. Thus, the findings in this report may be invalidated wholly or in part by changes beyond our control. This report should not be relied upon after a period of two years without a review by us verifying the suitability of the conclusions and recommendations to site conditions at that time. In the performance of our professional services, we comply with that level of care and skill ordinarily exercised by members of our profession currently practicing under similar conditions and in the same locality. The client recognizes that subsurface conditions may vary from those encountered at the boring locations, and that our data, interpretations, and recommendations are based solely on the information obtained by us. We will be responsible for those data, interpretations, and recommendations, but shall not be responsible for interpretations by others of the information developed. Our services consist of professional consultation and observation only, and no warranty of any kind whatsoever, express or implied, is made or intended in connection with the work performed or to be performed by us, or by our proposal for consulting or other services, or by our furnishing of oral or written reports or findings. I I I I I I I I I I I I I I I I I I I SOUTHERN CALIFORNIA SOIL & TESTING, INC. SITE VICINITY MAP LA COSTA TOWN SQUARE - RESIDENTIAL EAST Scale: 1111196-1 Not To Scale 1 I I ~--------------------------------------~~~ OVERSIZE ROCK FILL PLACEMENT ZONED ZONE A: Compacted soil fill. No rock fragments over 3 inches in any dimension. ZONE B: Compacted soil fill. No rock fragments over 6 inches in any dimension. ZONE C: No rock fragments over 2 feet in any dimension. Uniformly distributed and well spaced in compacted soil fill. ZONE D: No rock fragments over 4 feet in any dimension. Uniformly distributed and well spaced in compacted soil fill. Note 1: Compacted soil fill should contain at least 40% soil finer than ~ inch sieve (by Weight) and be compacted to at least 90% relative compaction. Note 2: Rocks over 4 feet in maximum dimension are not permitted in fill. Date: 8/9/2012 Figure: By: EL 4 Job No.: 1111196-1 R Scale: Not To Scale Revised OVERSIZE ROCK DISPOSAL C_ SOUTHERN CALIFORNIA ~SOIL & TESTING, INC. LA COSTA TOWN SQUARE - RESIDENTIAL EAST ------------------- :0 NOTES: Typical Windrow Detail (End View) Typical Windrow Q€)tail (Profile View) OVERSIZE ROCK DISPOSAL (Structral Soil -Rock Fill) '---P/L .1 ~~~~~~~~~~~~~ "~i~~~Z;;~,:S~2~t~~ii;t.;.yr .:::~ ~~~:;,I:j;~~;;:··t~.f~: .:;.<t.,:-t -.... --~ .....-..,.,. r-"\~ ~~ ~~ . '>.y" 3 5' MIN ~~ .. " ZO~~B\~QCr..qcr~QQ'QO( 1 I /J~ 11 0 ° 01 0 0 0 n ~-=OOOO=a~o=S o~ , .. .:-..:">-';/0 (1'.=' ° 0 0 5)f~tG»1~ 0 0 0 0 ZONECO 0 0 0 0 0 0 0 0 0 < . ~'~'~"'YZONE 0 r-..c:.. ~-Ci.:. .b =--0...:. Q.=-O _0-= 0 -:-...S) -=-~ c-0 ( 4'M1N l .~.~ Q/ 0 0 ZONED 0 O~ :::I.... . / 0 0 ~!L J!~ -LEGEND ZONEE ZONE A: Compacted soil fill. No rock fragments over 3 inches in any dimension. ZONE B: Compacted soil fill. No rock fragments over 6 inches in any dimension. ZONE C: No rock fragments over 2 feet in any dimension. . I.. ..I 12' MIN 3'MIN Uniformly distributed and well spaced in compacted soil fill. 1. Compacted soil fill shall contain at least 40% soil size passing ~ inch sieve, (by weight), and be compacted at least 90% relative compaction. 2. Rocks over 4 feet in maximum dimension not permitted in fill. ZONE D: No rock fragments over 4 feet in any dimension. Uniformly distributed and well spaced in compacted soil fill. ZONE E: Required for all existing slopes 5:1 and steeper, At least 90% comapction Zone A or B material can be used. 11 cO' Date: 8/9/2012 ~. 01 (J) e ...... (j) .C_ SOUTHERN CALIFORNIA ~SOIL & TESTING, INC. OVERSIZE ROCK DISPOSAL LA COSTA TOWN SQUARE - RESIDENTIAL EAST By: Job No.: EL 1111196-1 R Not To Scale (j) Q. Scale: L I I I I Natural Ground CANYON SUBDRAIN DETAIL Remove Unsuitable Material Ir-------------------------------~- I I- I I I I I I I D ET AI L A Perforated Pipe Surrounded with Filter Material Detail A-1 Filter Material 6 cubic feet/foot Perforated Pipe* Detail A-2 DETAIL B ! inch open-graded gravel wrapped in filter fabric (Mirafi 140N or equivalent) Detail B-1 Filter Material -(Mirafi 140N or approved equivalent) Perforated Pipe* i inch open graded gravel or equivalent 6 cubic feet/foot I I Detail B-2 (for fills over 35' deep) Filter Material Shall be Class 2 permeable material per Section 68 of CAL TRANS standard specifications, or approved alternate. DETAIL of Canyon Subdrain Outlet Filter Fabric ======:;:=== 11-201 MIN" b: MI~ I r Non-perforated Pipe* -I" Perforated PiPe*-I I r-----------------~----~--------­SUBDRAIN INSTALLATION I Subdrain pipe shall be installed with perforation down. * MINIMUM DIAMETER SUBDRAIN PIPE 4" min = 0 -500' Drain. Subdrain pipe shall be PVC or ABS, type SDR35 for fills up 6" min = 500 -1,000' Drain 1r-__ to_3_5_f_e_et_d_e_e_p_,o_r_t_yp_e_S_D_R,2_1_f_o_r_fil_ls_u_P_t_o_1_00 __ fe_e_t_de_e_p_. __ -r ________ B_"m __ in_= __ 1_,0_O~O~+~D_r_ai_n __ ~ I -SUBDRAIN DETAIL C_ SOUTHERN CALIFORNIA ~SOIL & TESTING, INC. LA COSTA TOWN SQUARE- RESIDENTIAL EAST I~----~------~----~~ Date: 1/1/2012 Figure: By: El Job No.: 1111196-1 6 Scale: Not To Scale I I I I I. I I I I I I I I I I I . min. / / / / / / / / ,r:;I-----+---Miradrain 6000 or Equivalent 1 -Filter fabric between rock and soil. 2 -Backcut as recommended in accordance with CALOSHA 3 -Waterproof back of wall. . 4 - A 4-inch minmum diameter perforated pipe, SDR35 or equivalent, holes 1 % fall to outlet, encased in 3/4" crushed rock. Provide 3 cubic feet per lineal foot of crushed rock minimum. Crushed rock to be surrounded by filter fabric (Mirafi 140N or equivalent), with a 6-inch minumum overlap. Provide solid outlet pipe at suitable location. 5 -3/4-inch crushed rock I~----~----~------~~ I ,, __ SOUTHERN CALIFORNIA <li-SOIL & TESTING, INC. WALL BACKDRAIN Date: By: LA COSTA TOWN SQUARE -Job No.: RESIDENTIAL EAST 8/10/2012 GBF/EL 1111l96-1R Figure: 7 Scale: NOTIOSCALE I ~ L-.---___ --L----__ -----'-___ ----,.--'--------' I I I I I I I I I I I I I I I I I I I APPENDIX I FIELD INVESTIGATION APPENDIX I Four exploratory test trenches were excavated at the locations shown on Figure 2. The fieldwork was performed under the observation of our geology personnel, who also logged the trenches and obtained samples of the materials encountered. The test trench logs are presented on Figures 1-2 through 1-5. Soils are classified in accordance with the Unified Soil Classification System illustrated on Figure 1-1. I SUBSURFACE EXPLORATION LEGEND I UNIFIED SOIL CLASSIFICATION CHART SOIL DESCRIPTION GROUP TYPICAL NAMES SYMBOL I. COARSE GRAINED, more than 50% of material is larger than No. 200 sieve size. I GRAVELS CLEAN GRAVELS GW Well graded gravels, gravel-sand mixtures, little or no fines More than half of coarse fraction is GP Poorly graded gravels, gravel sand mixtures" little or no fines. larger than No.4 I sieve size but GRAVELS WITH FINES GM Silty gravels, poorly graded gravel-sand-silt mixtures. smaller than 3". (Appreciable amount of I· fines) GC Clayey gravels, poorly graded gravel-sand-clay mixtures. SANDS CLEAN SANDS SW Well graded sand, gravelly sands, little or no fines. More than half of I coarse fraction is SP Poorly graded sands, gravelly sands, little or no fines. smaller than No. 4 sieve size. SANDS WITH FINES SM Silty sands, poorly graded sand and silty mixtures. I (Appreciable amount of I fines) SC Clayey sands, poorly graded sand and clay mixtures. II. FINE GRAINED, more than 50% of material is smaller than No. 200 sieve size. SILTS AND CLAYS ML Inorganic silts and very fine sands, rock flour, sandy silt Of clayey-silt- (Liquid Limit less sand mixtures with slight plasticity. I than 50) CL Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays. OL Organic silts and organic silty clays of low plasticity. I SILTS AND CLAYS MH Inorganic silts, micaceous or diatomaceous fine sandy or silty soils, (Liquid Limit elastic silts. greater than 50) CH Inorganic clays of high plasticity, fat clays. I I OH Organic clays of medium to high plasticity. . III. HIGHLY ORGANIC SOILS PT Peat and other highly organic soils. I FIELD SAMPLE SYMBOLS LABORATORY TEST SYMBOLS IZ/-Bulk Sample AL -Atterberg Limits CAL -Modified California penetration test sampler CON -Consolidation CK -Undisturbed chunk sample COR -Corrosivity Test MS -Maximum Size of Particle -Sulfate I 6~ -Chloride -Water seepage at time of excavation or as indicated -pH and Resistivity SPT -Standard penetration test sampler DS -Direct Shear I ST -Shelby Tube EI -Expansion Index V -Water level at time of excavation or as indicated MAX -Maximum Density RV -RValue SA -Sieve Analysis I UC -Unconfined Compression ~ SOUTHERN CALIFORNIA LA COSTA TOWN SQUARE RESIDENTIAL EAST {.s~ SOIL & TESTING, INC. By: DAS I Date: 1/3/2012 ~~ Job Number: 1111196-1 I Figure: 1-1 I I I I I I I I I I I I I I I I I I. I I I I Date Excavated: Equipment: LOG OF TEST PIT NUMBER T-1 12/8/2011 Logged by: AKN Project Manager: GBF Surface Elevation (ft): Case 580L with 18-inch bucket 377 Depth to Water (ft): not observed g :c Cf) I-0 0... Cf) W ::l o SUMMARY OF SUBSURFACE CONDITIONS· ALLUVIUM (Qal) -Medium brown, moist, loose, CLAYEY "-cC-", SAND. '" sc '-2 '-------------------------------------------------------------------Mottled medium and dark brown, moist, soft, SANDY CLAY. I-4 (contact at 4 % feet) METAMORPHOSED AND UNMETAMORPHOSED '-6 ~ VOLCANIC AND SEDIMENTARY ROCKS, UNDIVIDED \ (Mzu) -Light brown and medium reddish brown, moderately weathered, very hard, and intensely fractured. I-8 BOTTOM OF TEST TRENCH AT 6 FEET. NO I-10 GROUNDWATER OR SEEPAGE ENCOUNTERED. -12 I-14 -16 -18 SAMPLES C 0 ..-. CJ :::R 0.. >-W ~ ---a::: co W ~ OCf) a::: ~ a::: ~I-::l ...J I-::l ::l I-a:::Cf) Cf) co I-Z OW £5 Cf) ::l col- Z 0 >-« ::l 2 a::: ...J 0 r--- ~ '-20~~----------------------------------------------------------------------------~----~~----~----~----~ ~C.., SOUTHERN CALIFORNIA (S~! SOIL & TESTING, INC. ~-~ LA COSTA TOWN SQUARE RESIDENTIAL EAST By: AKN Date: 8/10/2012 Job Number: 1111196-1 Figure: 1-2 I I I I I I I I I I I I I I I I I I I LOG OF TEST PIT NUMBER T-2 Date Excavated: 12/8/2011 logged by: AKN Equipment: Case 580l with 18-inch bucket Project Manager: GBF Surface Elevation (ft): 372 Depth to Water (ft): not observed SAMPLES c 0 ~ u -0.. >-~ W ~ '-" 0:: 00 c:o W ~ ~oo :c () 0:: ~ I-00 SUMMARY OF SUBSURFACE CONDITIONS ::J ....J 0:: «I- a. ::J I-::J ::J I-0::00 W 00 c:o I-Z OW 0 Ci 00 c:o I-. (5 ::J Z >-« ::J :2: 0:: ....J 0 CL ALLUVIUM (Qal) -Medium brown, moist, soft, SANDY CLAY. - 2 I-4 METAMORPHOSED AND UNMETAMORPHOSED -VOLCANIC AND SEDIMENTARY ROCKS1 UNDIVIDED - 6 \ jMzu) -Light brown and medium reddish brown, moderately weathered, very hard, and intensely fractured. I-8 BOTTOM OF TEST TRENCH AT 5 FEET. NO GROUNDWATER OR SEEPAGE ENCOUNTERED. i-10 -12 I-14 -16 -18 -20 & SOUTHERN CALIFORNIA lA COSTA TOWN SQUARE RESIDENTIAL EAST SOIL & TESTING, INC. By: AKN Date: 1/3/2012 Job Number: 1111196-1 Figure: 1-3 I I I I I I I I I I I I I I I I I LOG OF TEST PIT NUMBER T-3 Date Excavated: 12/8/2011 logged by: AKN Equipment: Project Manager: GBF Surface Elevation (ft): Case 580l with 18-inch bucket 288 Depth to Water (ft): seepage at 5 feet g I C/) I-() 0... C/) W ::::> o SUMMARY OF SUBSURFACE CONDITIONS CL ALLUVIUM (Qal) -Dark brown, very moist, soft, SANDY CLAY. r-2 I---+--------------------------------------~ DELMAR FORMATION (Td) -Light gray and light orange - 4 - 6 r-8 -10 r-12 -16 r-18 brown, very moist, medium stiff to stiff, SANDYClAYSTONE. .................................. 3 a Seepage encountered below 5 feet. Becomes saturated below 5 feet. Becomes very stiff to hard below 8 feet. BOTTOM OF TEST TRENCH AT 13 FEET. SAMPLES o W co 0:: ~ ::::> -J I-::::> C/) co Ci z ::::> ~ r-- \/ II \ '-- c-.-.. () ~ 0->--0:: W g 0 'I-C/) 0:: «l-::::> t: 0::C/) 1-. Z OW C/) col-O ::::> >-« :E 0:: -J 0 EI ~20~~--------------------------------------~--~~--~--~--~ ~ SOUTHERN CALIFORNIA (~~ SOIL & TESTING, INC. By: lA COSTA TOWN SQUARE RESIDENTIAL EAST 1111196-1 Figure: Job Number: AKN Date: 1/3/2012 1-4 I I I I I I' I I I I I I I I I I I I I LOG OF TEST PIT NUMBER T-4 Date Excavated: 12/8/2011 logged by: AKN Equipment: Project Manager: GBF Surface Elevation (ft): Case 580l with 18-inch bucket 300 Depth to Water (ft): not observed .g :c 00 I-() a.. 00 UJ ::>. o - 2 - 4 - - 6 '-8 -10 -12 -14 -16 -18 SUMMARY OF SUBSURFACE CONDITIONS DELMAR FORMATION (Td) -Light gray and light orange brown, moist, very stiff to hard, SANDY CLAYSTONE. BOTTOM OF TEST TRENCH AT 5 FEET. NO GROUNDWATER OR SEEPAGE ENCOUNTERED. SAMPLES o UJ cc cr: :::s::: ::> ..J I-::> 00 cc 0 z ::> ~I 1/\ f-- c-........ u ~ a. ~ 0 '-' '-' ~ 0 00 UJ cr: 1-1-« 00' ::> I-I-Z cr:UJ 00 01- (5 ::> cc >-« :2 cr: ..J 0 Al, SA _20L-~ ______________________________________ ~ __ ~J-__ ~ __ ~ __ -...l SOUTHERN CALIFORNIA SOIL & TESTING, INC. lA COSTA TOWN SQUARE RESIDENTIAL EAST By: AKN Date: 1/3/2012 Job Number: 1111196-1 Figure: 1-5 I I I I I I I I I I I I I I I I I I I APPENDIX II LABORATORY TESTING SUMMARY APPENDIX II Laboratory tests were performed to provide geotechnical parameters for engineering analyses. The following tests were conducted: • CLASSIFICATION: Field classifications were verified in the laboratory by visual examination. The final soil classifications are in accordance with the Unified Soil Classification System. • GRAIN SIZE DISTRIBUTION: A grain size distribution was determined for one sample in accordance with ASTM D 422. The result of this test is presented on Figure /1-1. • ATTERBERG LIMITS: The Atterberg limits were determined for one sample in accordance with ASTM D 4318. The result of this test is presented on Figure /1-1. • EXPANSION INDEX TESTS: One expansion index test was performed in accordance with ASTM D 4289. The result of this test is presented on Figure 11-2. Soil samples not tested are now stored in our laboratory for future reference and analysis, if needed. Unless notified to the contrary, all samples will be disposed of 30 days from the date of this report. ------------------- u.s. Standard Sieve Sizes I 6" 3" 1-'!h:" 3/4" 3/8'" #4 #8#10 #16 #30 #40#50 #100 #200 100 "- 90 ~ ....... ~ 80 ~ .... -r--., ..c .~70 -----~ ~ ~60 ~ ... Q) ......... .: 50 u. .... t: B 40 ... Q) a. 30 20 10 ! 0 1000 100 10 1 0.1 0.01 Grain Size in Millimeters I Cobbles I Gravel I Sand I Silt or Clay I I Coarse I Fine I Coarse Medium I Fine I I SAMPLE LOCATION I UNIFIED SOIL CLASSIFICATION: CL I ATTERBERG LIMITS I T -4 between 0' and ~' I DESCRIPTION SANDY CLAY with Gravel I LIQUID LIMIT 50 pLASTIC LIMIT 22 PLASTICITY INDEX 28 C) SOUTHERN CALIFORNIA LA COSTA TOWN SQUARE RESIDENTIAL EAST ~ SOIL & TESTING, INC . . S~ By DAS I Date 1/3/12 Job Number 1111196 I Figure 11-1 I I I I I I I I I I I I I I I I I I I EXPANSION INDEX ASTM -04829 I SAMPLE 1/ DESCRIPTION " EXPANSION INDEX I T-3 at 0' to 2' I Medium brown, CLAYEY SAND· I 123 CLASSIFICATION OF EXPANSIVE SOIL EXPANSION INDEX POTENTIAL EXPANSION ~~~~~~,~,~-~-~-~-~-~-~-~-~-~-~-~-~-~--o -20 Very Low 21 -50 Low 51 -90 Medium 91 -130 High Above 130 Very High By: DAS/GBF Date: 1/3/2012 n ;5 C SOUTHERN CALIFORNIA ~ s:.::il SOIL & TESTING, INC. ~ LA COSTA TOWN SQUARE RESIDENTIAL EAST Job Number: 1111196-1 Figure: 11-2 I APPENDIX III I APPENDIX III I SEISMIC TRAVERSE RESULTS I I I· I I I I I I I I I I I rr1 I I I I I I I I I I I I I I I I I I I I I SEIS:MIC REFRACTION SURVEY LA COSTA TO'WlS" CENl'ER CARLSBAD, CALIFORNJA PRE'P ARE» VOR: Southern California S9i1 &,'l'esting- ·6280 River4~Y ~treet. San Diego, CA 92120 PREPARED "BY,: Southwest Geophysics~ .Inc. 8057 Raytheon Road, Suite 9 San Diego, .CA .92111 Dec.ember 29 ~ 2011. Projecd:~:o. flT:3:9.9 I I I I I I I I I I I I I I I I I I 4t~~~E;~:- YOUR SU8SURFACE SOLUTION Mr. Doug. Skinner Southel11 California Soil & Testing 6280 Riverdale Street San Diego, CA 92120 Subject: Seismic Refraction Survey La Costa Town Center Carlsbad, California Dear Mr. Skinner: 7"?tr'n%z~ titr December 29,2'011 . Project No. i11399 In accordance with your authorization, we have performed a seismic refraction survey p.ertainmg to the proposed La Costa Town Center project located along Rap.cho Santa.Fe RQiil-4 in Gar1spad, California. Specifically, our survey consisted of performing 10 seismic refraction lines at the subject site. The purpose of the study was to develop sl,ibsuiface velocity profUes·ofthe project. area and to evaluate the apparent rippabiliw of the shallow subsurface materials. This report pre., sents our survey methodology'\. equipment used, analysis, and results from our survey. We appreciate the opportunity to be of service. on this project. Should you have arty.quesfions related to this report, please contact the undersigned 'l:t your convt,(nience. . Sincerely, SOUTHWEST GEOPHYSICS, INC. ~~ 'Patrick Lehrmann, P.G., R.Gp. Principal Geologist/Geophysicist HVIPFLlhv Distribution: Addressee (electronic) Hans van ·de Vmgt, C.RO.; :B..Gp. PrinCipal GeolQgistiGeophysicist 8057 Raytheon Road, Suite 9 • San Diego' California 92111 • Telephone 858-527-0849 • Fax 858-225,0114. I I I I I I I I I I I I I I I I I I I La Costa Town Center Carlsbad, California TABLE OF CONTENTS December 29; ;2011 Proj~ct NQ. 111399 Page 1. INTRODUCTION ............................................................. , ........................ , ... , ............................ 1 2. SCOPE OF SERVICES .................... · .............................. " .............................................. " ............ 1 3, SITE AND PROJECT DESCRiPTION ......................... ,., .. , ...... ".".,." .. " .......................... , ........ i 4. SURVEY METHODOLOGY ......................................... , ............................... : ..... , .................. ~ ... 1 5. RESULTS ........................................................................... , ....................................... : ................. 3 6. CONCLUSIONS AND RECOl\1MENDATIONS ........... , ........................ ~ ... ; ............... , ......... "A 7. LIMITATIONS ........................................................................ ' ........... " ...................................... 5 8. SELECTED REFERENCES .................................................................... ' ..................... , ... " ... ,.6 Tables Tabie 1-Rippability Classification ............................................. ' ................................................. < ••.••• , • .3. Table 2 -Seismic Traverse Results ....................... _._ .. " .. " .. ~ ...................... ~ .... ~~ .............................. "., .. .3 -Site Location Map Line Location Map Figures 'Figure 1 Figure 2 Figure 3a - 'Figtrre 3b - Figure 3c - Figure4a - Figure4b - Figute4c - Figure4d - Figure 4e - Site Photographs (SL-l to SL-4) Site Photographs (SL-5 to SL-7) Site Photographs (SL-8 to SL-IO) Seismic Profiles, SL-l and SL-2 Seismic Profiles, SL-3 and SL-4 Seismic Profiles, SL-5 and SL-6 Seismic Profiles~ SL-7 and SL-g Seismic Profiles, SL-9 and SL-IO I I I I I I I I I I I I I I I I I I I La Costa Town Center Carlsbad, California 1. INTRODUCTION Decemb.er·29., 2011 Prqject.No.l1l399 In accordance with your authoiization~ we have performed a 'seismic refraction survey pert1rining to the proposed La Costa Town Center project located .along Rancho Santa Fe Road ill Carlsbad" California (Figur.e 1). Specifically, our survey 'consisted of performing 10 seismic refraction lines· at the subject site. The purpose of the study was to develop subsurface velocity profiles of the project area and to evaluate the apparent rippability of the shallow subsurface materials. This Ie;. port presents our survey methodology, equipment used, analysis. and results. from our survey. 2. SCOPE OF SERVICES .our scope of services for this study included: • Performance of 10 seismic refraction lines at the project site. • Compilation and analysis of the data collected. • Preparation of this report presenting ourre~;ults, conclusions, mid recQi1WJ.end$tiulls. 3. SITE AND PROJECT DESCRIPTION The study area is located along the south side of Rancho Santa Fe Road" near its intersection with Paseo Lupino in the Carlsbad area of San Diego (Figure 1). The site is generally undeveloped with the exception of a few dirt roads which transect the site. Topography cQnsists of relatively gentle slopes. Vegetation consists of annual grass and bnlsh. Figures 2 arid 3a thrOl.tg,b 3;g depict the general site conditions in the area of the refraction lines., It is our t}nderstanding that. r~si­ dences. may be constructed at the site and thl:J.t cuts up to 45 feet inliY be. petfbtJ:i1edd~g grading. 4. SURVEY METHODOLOGY A seismic P-wave (compression wave) refraction survey-was Gondu'Cted at the site to e\Taluate thl:; rippahility characteristics of the subsurface materials and to develop a subsurface. velocity profile, of the site. The seismic refraction method uses first-arrival times of .refracted seismic waves to estimate the thicknesses and seismic velocities of subsurface layers .. Seismic P-wavesgenerated at the surface, using a hammer and plate~ ar~ refracted 'at boundaries s~paraiing matedals of con- trasting velocities. These refracted seismic waves are. then detected by a.s.eries. ofsuifac~ vertical I I I I I I I I I I I I I I I I I I La Costa Town Center Carlsbad, California December 29, 2011 ·Project.No. 1 i 1399 component geophones, and recorded with a 24-channel Geometrics Strata Vie:'N" -s:eismograph. The travel times of the seismic P-waves are used in conjunction with the 5hot-to.,g~ophone dis- tances to obtain thickness and velocity information on the subsurface materials.T en seismic. lines/profiles (SL-l through SL-10) were coriducted .at the site as part of this study. Theap- proximate locations of the lines are depicted on Figure 2,· Shot points (signal .generation locations) were conducted at each end of the lin~ and at the midpoint. The Hiles. were 150 feet long ~d the general locations were selected by your office. The refraction method requires that subsurface velocities increase with depth. A layer having a velocity lower than that of the layer above will generally not be· detectable by the· seismic rerrae,. tion method and, therefore, could lead to errors in the depth calculations ofsubsequent layers, In addition, lateral variations in velocity) such as those caused by core stones/outcrops, can . also re...; suIt in the misinterpretation of the subsurface conditions. In general, seismic wave velocities can be correlated to tnaterjaldenslo/ .and/6r tock har.dness, The relationship between rippability ·and seismIC velocity is empjrica1 and 'assumes 'l;r 11Omgge- neus mass. Localized areas of differing composition, texture, ~mdfor structure may affe'ct both the measured data and the actual rippability of the mass .. The rippahility of a IUa~s js also dep;endeht on the excavation equipment used and the skill and.experience of the equipmentep:erator. The rippability values presented in Table 1 are based on .our experience with -similar materials' and assumes that a Caterpillar D-9 dozer ripping with a 'sfugle shank is used. We empluis'ize that the cU.toffs in this classification. scheJjle are approximate apd that tock thara;cteristics, :sl1ch 'as' fracture spacing and OflentatioI}, p.lay a 'significant role in 4~teni:rihing r9,ck tippaOiiity. These' 'characteristics may also vary with location and depth. For trenching operations, the rippability values shou14 pe scaled. downward. Bor example, veloci- ties as low as 3,500 feet/second may indicate difficult ripping during trepching' operations.! Ih . . addition, the presence of boulders, which can be troublesome in a narrow trench; :shQuld bea!}.- ticipated. 2 I I I I I I I I I I I I I I I I I I I La Costa Town Center Carlsbad, California December 29~ 2011 Project No.: 111399 Table 1-Rippability Classification SeismicP-wave Velocity Rippability· o to 2,000 feet/second Easy 2,000 to 4,000 feet/second Moderate 4,000 to 5,500 feet/second Difficult"Possible Blastiiig 5,500 to 7,000 feet/second Very Difficult, Probable Blasting Greater than 7,000 feet/second Blasting Genern;lly R{;lqtiir:ed It should be noted that the rippab'ility cutoffs presented in Table 1 are slightly mOreC(:lIiservative than those published in the Caterpillar Performance Handbook (Caterpillar, 2004). AccordingLy, the above classification scheme should be used with discretion; and contractors should not be relieved of making their own independent evaluation of therippabilityof the -on.,site materials prior to submitting their bids. 5. RESULTS Table 2 lists the average P-wave velocities and depths' calc;uhlted from the seismic ,fyfraction traverses conducted dUri1lg our evaluation. Tbe approximate 10oatio11s-of the ,seis1l11G' refra,ction traverses are shown on the Line Location Map (Figure 2). Layer velocity profiles .ate· also ip- eluded in Figures 4a through 4e. Please note the vertical se'ale changes for the profiles. rt should also be noted that, as a general rule, the. effective depth of evaluation for ,a seismic refraction traverse is approximately one-third to one-fifth the length of the refraction 'line .. The lengths of the seismic refraction lines are listed with their interpretations in Table 2. Table .2 -Seismic Tr.averse Results Traver~e No. P-wave Velocity Approximate Depth to Rippability* And Length feet/second Bottom ·ofLayer in feet SL-l VI = 1,615 1-,5. Easy 150 feet V2=3,475 7-16 Moderate V3:::: 6,795 ---VelY Difficult, .. Probable Blasting: .. .. SL-2 VI = 1,355 12-19 Easy 150 feet V2 = 7,050 ---Blasting Generally'Required SL-3 VI = 1,820 8-17 Easy 150 feet V2= 7,640 ---Bla,sting Generally Required 3 I I I I I I I I I I I I I I I I I I I La Costa Town Center Carlsbad, California December '29,2011 ProjectNo. 11139.9, Table 2 -Seismic Traverse Results Traverse No. P-wave Velocity Approximate Depth to Rippability* And Lengtb feet/second Bottom of Layer in feet SL-4 VI = 1,325 12-17 Basy' ,. 150 feet V2 =6,115 ---Very Difficult, Probahle B18.&(mg SL-5 VI ='1,310 16-19 Ba.sy- 150 feet V2 = 7,.190 ---Blasting Generally: Req uired SL-o VI = 1,250 17...,21 Easy 150 feet V2=9,370 ---BlasnntrGeii.etally Required SL-7 VI = 1,365 2i -28 Easy 150 feet V2 = 8,080 ---Blasting Generafly ReqlJired SL-8 VI =1,395 '18 -27 Eaiy 150 feet V2 = 7,535 ---Blasting Generally Required SL-9 VI = 1,215 1-$ "Ea1W 150 feet V2=3,500 12-22 Moderate V3 = 8,770 ---Blasting Generally Required SL-lO VI = 1,340 15-22 Ea$Y 150 feet V2= 10,960 ---BlastlngGenerallv Required .. Rippability criteria based on the usc of a Caterpillar D-9 dozer ripping with a single shank 6. CONCLUSIONS A.1'W RECOMMENDATIONS The results from this seismic survey revealed two to three distinct geolQgiclayers at the locations surveyed. Based on our site observations and discussions with you, the study area isgeneraUy underlain by surficial soils (i.~., topsoil, colluvium, andlor fiU) and crystalline bedrock with vary- ing degrees of weathering. The layer velocities measured for the surfiyiai layers are· generally consistent; however, the bedrock velocities vary across ihe site. Significant scatter was noted in the first-arrivals indicating the, presence of inhomogen.eities ~ the subsurface materials. These inhomo.geneities may·be due to buried core stonesltemnant boul." ders, dikes, and/or differential weathering of the bedrock. Therefore., significant variability in the excavatability (including excavation depth) of 'the subsurface materials should be expe,cted across the project area. A contractor with excavation experience in simllar conditions ,should be c<?nsulted for expert advice on excavation methodology, equipment,. production rate, 'and (>.\'er- sized materials. 4 I I I I I I I I I I I I I I I I I I I La Costa Town Center Carlsba,d~ California 7. LIMITATIONS December 29, 2011 .Proje.ct No. 111399 The field ,evaluation and geophysical analyses presented in this report have b~ep' co.n9ucted in ,general accordance with current practice and the standard ·of care exerdse9,'by con,s\lltant$ p:er- forming similar tasks in the project area. No warranty~ expressed or implied, is lIlade regarding, the condusion~ recommendations, and opinions presented in this report. There is noeyah;t~1i9n detailed enough to reveal every subsurface condition. Variations may' exist and conditions not observed or described in this report may be present. Uncertainties relative' to subsurface condi .. tions can be reduced through additional subsurface exploration. Additional subsurface surVeying will be performed upon request. This, document is intended to be used only in its entiretY. No PQrtion of the docuinettt; by itseJf, is' designed to completely represent any aspect of the proje'ct described herejn. SQuthwes:t Ge9phys;- 1cs, Inc. should be contacted if the reader requires additional information or has, q'!le~tions regarding the content, interpretations presented, or completeness of this document. This report is intended exclusively for use by the client. Any use or reuse of the findings, conclusions, andior recommendations of this report by parties other than the client is undertakeri a'tsaid parties~' sole risk. 5 I I I I I I I I I I I I I I I I I I I La Costa Town Center Carlsbad, California 8. SELECTED REFERENCES December 29" 2011 ProjecfNo, 11 U99 Caterpillar" Inc., 2004, Caterpillar Performance Handbook.; Edition 3'5, Caterpillar, Inc~, Peoria, Illinois. Mooney, H.M., 1976, Handbook ofEngine.ering Geophysics, rlatE!d February. Rimrock Geophysics, 2003, Seismic Refraction Interpretation Pwgrams (SIPwin), V.,,2.76. Telford, W.M., Geldart, L.P., Sheriff, R.E., and Keys, D.A., 1976, Applied Oeophysics,Cam,- bridge University Press. 6 I I I I I I I I I I I I I I I I I I I SITE LOeA TION MAP La Costa Town Center Carlsbad, California Project No.: 111399 Date.: 1.211.1 rVlfuO Golf·: EmE;r: at SOUTHWEST -G;EOPHVSICS INC. Pigure 1 I I I I I I I <> <> ... ~ -.l! .E oS! .. I u <> co <> ''" .. m E x ~ Q, '" I .. '0 I I I I § ;,; ~ I s: I g (5 z: g '/S' It I Q.. ~ I == Z 0 j:: ~ I g ..oJ W z ::::i I - -- - - - SITE PHOTOGRAPHS (SL-1 to Sl.:-4) - - - - La Costa Town center Carlsbad, California - Pr oject No.: 1~1399 Dale: 12111, - - - - -- - - • II,; SOuTHWeST ............. ..-.--..,::UC!iIt-!c" Figure3a -------------- SITE PHOTOGRAPHS, (SL-5, to SL-7) La Costa'ToWn Genter Carlsbad, California Pro)ectNo.: 111399 p"le: 12Wl 'f' sourHWEST~, rGaoP"'YS'C~'lNC, Figure3b - ---- --- --- SITE PHOTOGRAPHS ($L-8 toSL-1 0) - - - - La CO!lt~. Town.Center Carlsbad) Caiifornia - Projecll'lo.~ 1 :113~9· Qa\e: 1·2(1·1 -- -- - -- - ·K'SOUTHWEST _ 9E::Qr··t-tV~I,,-,~.'NV< FigtJre·3c I I I SL-1 Ii i I i i 1 i i i i i iii iii, f i-I I I I' I I i i I I 1.0 I 0 I ::: 0 :;:: -1.0 III > ell WE" I eIl-> :;:: III -20 Q) c::: I -'30 I -"10 0 20 40 60 80 1.00 1.20 1.40 I Distance (ft) SL-2 I i i • I i i i i 1 j i i ii' i i j i I j i I I J i I I i i I, I I 20 C I B I ::: 0 :;:: 0 III > ell w'iE' I eIl-> :;:: III -1.0 Q) c::: I -20 I -30 0 20 40 60 80 1.0Q 1.20 1.<10, Distance I (ft) SEISMIC PROFILES La Costa Town Center ' SOUTHWEST I SL-1 AND SL-2 Carlsbad, California' ~ GEOPHYSICS INC Project No,: 111399 Date: 12/11 Figure 4a I I I I I I I I I I I I I I I I I I I I I o 20 o 20 SEISMIC PROFILES SL-3 AND SL-4 40 40 60 60 SL-3 80 Distance (ft) SL-4 80 Distance (ft) 1:00 100 La Costa Town Center Carlsbad, California 12.0 120 Project No.: 111399 Date: 12/11 140 SOUTHWEST 'GEOPHyslcs INC. Figure 4b I I I I I I I I I I I I I I I I I I I o 20 o 20 SEISMIC PROFILES SL-5 AND SL-6 40 40 60 60 SL-5 80 Distance (tt) SL-6 80 Distance (tt) 100 100 La Costa Town Center Carlsbad, California Project No.: 111399 O"te: 12/11 120 140 . ·e o "'10 120 140 'SOUTHWEST Fi~ure 4c I I I I I I I I I I I I I I I I I I I o 20 o 20 SEISMIC PROFILES SL-7 AND SL-8 40 40 60 60 SL-7 '8.0 Distance (ft) SL-8 80 Distance (ft) 100 100 La Costa Town Center Carlsbad, Califomia Project No.: 111399' Date: 12/1 i 120 140 120 140 SOUTHWEst :aEOPHy,S1CS iNC. Figure 4d I I I I I I I I I I I I I I I I I I I 0 20 I' i i 1 'I i I i i o 20 SEISMIC PROFILES SL-9 AND SL-10 40 i i 40 60 i i I' 60 SL-9 80 Distance (tt) SL-10 i it j I II , 80 Distance (tt) 100 j i i' Ii 100 La Costa Town,Center Carlsbad, California 120 I' i,1 120 Project No.: 111399 D"te: 12/11 140 ii-I I' i' 140 S(YUTHWeST., , ~eOf?HVSIC$ lNC,~ Figu're 4'e \ , \ \ \. "~'I / /i " I U t , \ \ f ! / /, f t' ," .! " I, , , " ., \ , '\ -, , " '-~ '... __ l".. ...... "\-:' -'-~ " , I -. \ \ -..... ' ( ........... " - . ,;~ \ ... k \ .. ' / r S ~--. .::-. I ,._'. ~.?;~~-< -.....",. -~ -- " , --'-----=, -~ ---=---.. . , ------~ " '~-,'i/ 'I , ~ , -I : \' , " / (\ '. ( '", " . , \ \. / ) ./ .. ,. r , J .. I , .' , I ... . "" \ r' , , .. , I ' , 1 I .. v 'c ..... \ , \' \ " , ~--- ---,~ :./ \/-r-+----""oc I ,.@ .</ 1, -. ,~-.= .. --------.- - -. , '::....=-. ----------- --- II ,"'@ I' 1 ·ll?iiJ -I I ,--- ®I @7j] I, 'I ,. ---- / , / / "'<: I'~ .. ", -r , • " " . , . ' ., I I .......J_. @1 ' \ ~-.. .\-\ ~/-... , ... -- \~~~, 0' j J71.P, ,. , / , ~ " '·r··,o , ", .. ' _'-C-____ 0' 15' 60' IM- 30' SCALE: 1" = 60' .~ .. .' / / /' '~. ... '.,.. ;;. '~,; I)'fL ~ T-4 Qaf Qal Td Mzu (SCS&T 2011) I I I SL-8 (SCS& T 201 1 ) H TP-30 (Geosoils 1990) • • T-6 (Geosoils 1982) ~ 8-4 (Geosoils 19~ SCS& T LEGEND ~rtific;ial fill ' ~lluvium (potentially c;ompressible soil) Delmar Formation Metasedim~ntary and metavolc;anic; roc;ks, undivided Geologic; Contac;t ~pproximate test trenc;h loc;ation (reported by SCS&T, 2011) ~pproximate Seismic; Refrac;tion Traverse loc;ation (reported by SCS& T, 2011) ~pproximatf3 test trenc;h loc;ation (reported by Geosoils, 1990) Approximate test trenc;h loc;ation (reported by Geosoils, 1982) Approximate test boring loc;ation (reported by Geosoils, 1982) 120' C\J ,.- o C\J I ""'" I ,.- Q) 10 o 0... « ~ Zw O-lI i=« « I-::Jif) C) a « i= if) W if) Z -1 W :> « > >- Z O~ W U « LL a: ::J if) en ::J if) « I-W «0 1-- if) if) OW Ua: ::s z . a:U Oz LL - ::Jcj «z U-Z~ a:W WI- I06 1--1 ::J_ 00 if) if) Figure: 2 / \ -'-.... , -' \ '- ~, \ \ \ :; \ .. \ i I \ \,-\" \ \ '\ \ . \. \ " \ , , \ \" , \, "., '. \ . - \ \"-, ',"-. \ , " " 'x., / I , , , ' , , ' , " , , ---------;- --'. .::..,-:- .' ", \ , \ -- $ -. - '" "' ( -" ...... '. \ , (' '-, "~' \ ,":'--~ ;,-h '" .........:. , ,'-.,,' t,-~ ~ I' !' - ;! / '-,. \ " If , , \ \ ! , , \ \ ' , I " I ;1 , \ \ ,. \ .. , \ \ \ ", \ \ \ " \ ' , , '- " -"', "-., __ ----r::. " , i i ! /' / , A ! LA " " , , f" ,_/.f.,:~. 1 • ' . I I , I j-, ;." jf I " ! .--- , ."-"-. ,-.\- , ' \ I , ----, ----~'-~-+ \ -,:i ® &3E ~' , ,@3E<1 "-1 ,/" - -4 --.-. .. -~ ~ I " ~~=+-:.=:--/-J. .----- ~-" ", -. -'--~-' \ \ . , , I I I I I @t 'I ' @ ~ 1,-· @o,D ' .... -- I ...... -"~r:-,, ~!Lr--' , I / -, I I' ~/ ~'---.----- ! ---,1---' \ __ "",,"c., \ I - I I (~r l If1??'IJ I I > / / , I \ ,7';", if/'" 11 .,d;" / ,'--- ,.@ ---RANCHO : ,'r"" _ 1 .-- " .-"--',-}-- Qaf Qal Td Mzu '\ --- --, -' .~-- 0' 15' --30' 60' SCALE: I" = 60' ...... .-\:- -,~" '~ ,- / " SCS& T LEGEND Artificial fi II Alluvium (potentially compressible soil) . Delmar Formation Metasedimentary and metavolcanic rocks, undivided Geologic contact Cut/Fill transition line (approximate) Subdrain alignment (approximate) Lot number 120' GRADING Location Lot Number 2 -12, 19 -23, 29, 30, and 60-64 Lot Numbers 14 -17, 34, 35, and 39 -51 Lot Numbers 13, 18, 24 -28, 31, 33, 52, 53, 55-59 Lot Numbers 32, 36, 37, 38, and 54 Requirement Fill Lots, excavate unsuitable soils prior to placing fill, estimate 2 feet of unsuitable soil excavation 5-foot overexcavation (Cut Lots) 5-foot overexcavation (CuVFili Transition Lots) 10-foot overexcavation (CuVFili Transition Lots) Note: Horizontally, the excavation should extend at least 5 feet outside perimeter footing lines or equal to the depth of overexcavation, whichever is more. C\J .,-o C\J I (V) C\J I (V) ill a5 o Cf) Z o -~ 0: W o Cf) z o o G z o « 0: G « -z +-' o:~ .,-'+- I 0 ~<.O .,-II W ~ o c 0: «I- ::JCf) 0« Cf)W Z---l $« 01-I-d] «0 1--Cf)Cf) OW 00: ::5 cr::o Oz LL - ::Jc9 «z 0-Zr--cr::fB Wr-- I06 r----.J ~-00 WW Figure: 3 Revised