HomeMy WebLinkAboutCT 10-01; Sea Breeze Villas; Geotechnical Engineering Investigation; 2010-04-20STRATA
B E a c a N s
- T E C H , I N C
U L T A N T S
7372 Walnut Avenue, Unit F.Buena Park. Califomla 90620
April 20,2010
RECORD COPY
Initial Date
714-521-5611
562-427-«)99
FAX 714-521-2552
W.0.262310
Tony Sfredo
21 Woodcrest
Irvine, California, 92603
Subject: Geotechnical Engineering Investigation of Proposed
Multi Family Residential Development, 391
Tamarack Avenue, Carlsba4 California.
Gentlemen:
Pursuant to your request, a geotechnical investigation has been performed at the subject site. The
purposes of the investigaticm were to determine the general engineering characteristics ofthe soils
on and underlying the site and to provide recommendations for tiie design of foundations,
pavements and underground improvements.
PROPOSED DEVELOPMENT
It is our understanding that tiie proposed develcq)ment will consist of ^proximately 12 attached
town homes of wood-framed construction with parking and landscaping.
PURPOSE AND SCOPE OF SERVICES
The scope of the study was to obtain subsurface information within the fm)ject site area and to
provide recommendations pertaining to the proposed development and included the following:
1. A cursory reconnaissance of the site and surrounding areas.
2. Excavation of exploratory geotechnical test pits to determine the subsurface soil and
groundwater conditions.
3. Collection of representative bulk and/or undisturbed soil samples for laboratory analysis.
4. LaboratCMy analyses of soil samples including determination of in-situ and maximum density,
in-situ and optimum moisture content shear strength and consolidation charact^stics,
expansion potential and liquefaction analysis.
5. Preparation of this report presenting results of our investigation and recommendations for the
proposed development
CQ
ZD
or
>-
STRATA-TECH, INC.
BEOCONSULTANTS
Tony Sfredo 2 W.0.262310
Geotechnical Engineering Investigation March 15.2010
SITE CONDITIONS
The 117 by 266 foot rectangular lot is located on the south side of Tamarack Avenue, adjacent to
the west side of the coastiine railroad tracks in Carlsbad, California. A small single story house is
currently in the front of the lot, witii a debris-covered lot in the rear. The site is shown on the
attached vicinity M^, Plate No. 1.
Site configuration is further illustrated on the Site Plan, Plate 2.
FIELD INVESTIGATION
The field mvestigation was performed on February 26,2010, consisting of excavating four backhoe
test pits and two hand dug percolation test holes. The locations are shown on the attached Site
Plan, Plate 2. As the excavation progressed, personnel fix)m this office visually classified the soils
encountered, and secured representative samples for laboratory testing.
Description of the soils encoimtered are presented on the attached Test Pit Logs. The data
presented on these logs is a simplification of actual subsur&ce conditions encountered and applies
only at tiie specific boring locaticm and the date excavated. It is not wananted to be representative
of subsurfece conditions at other locations and times.
EARTH MATERIALS
Earth materials raicountered withm the e}q)loratory test pits were visually logged by a
representative from STRATA-TECH, Inc. The materials were classified as artificial fill and native
soils.
Native soils consisted of a silty residual sandy soil to a maximimi depth explored of 7 feet
Groundwater was not encounters! in any of our geotechnical pits.
SEISMICITY
Southem California is located in an active seismic region. Moderate to sti"ong earthquakes can
occur on numeiY)us &ults. The United States Geological Survey, California Division of Mines and
Geology, private consultants, and universities have been studying earthquakes in
Southem California for several decades. The purpose ofthe code seismic design parameters is to
prevent collapse during strong ground shaking. Cosmetic damage should be expected.
The principal seismic hazard to tiie subject property and proposed project is strong ground shaking
fi^m earthquakes produced by local faults. Secondary effects such as surface rupture, lurching, or
flooding are not considered probable.
STRATA-TECH, INC.
BEaCONSULTANTS
Tony Sfredo 3 W.0.262310
Geotechnical Engineering Investiftation March 15.2010
20061.B.C. SEISMIC DESIGN VALUES
2003 NEHRP Seismic Design Provisions Site Class E - Fa = 1.0 ,Fv = 1.0
Spectral Response Accelerations Ss and SI = Mapped Spectral Acceleration Values
Data are based on a 0.01 deg grid spacing
Ss= 133 Si=0.5 Sa=.88
CONCLUSIONS AND RECOMMENDATIONS
Development ofthe site as proposed is considered feasible from a soils engineering standpoint,
provided that the recommenciations stated herein are incorporated in the design and are
implemented in the field. Recommendations are subject to change based on review of final
foundation and grading plans.
It is recommended that the proposed stmctures be entirely supported by compacted fill.
A minimum 1-foot thick compacted fill blanket below the bottom of the footings is
recommended.
For other minor stmctures such as property line walls or retauiing walls less than 4 feet high,
competent native soils or compacted fill may be used for stmctural support.
PROPOSED GRADING
Grading plans were not available at the time our work was performed. It is assumed that
proposed grades will not differ significantly from existing grades. The foUowmg
recommendations are subject to change based on review of final grading plans.
GRADING RECOMMENDATIONS
Removal and recompaction of existing fill and loose native soils will be required to provide
adequate support for foundations and slabs on grade. The depth of removal shall be 1 foot below
the bottom ofthe footings. The depth of removal is estimated to be at least 3 feet.
Earthwork for foundation support shall uiclude the entire building pad and shall extend a
minimum of 5 feet outside exterior footing lines where feasible or to property line. While no
stmctures are on adjacent properties care shall be exercised not to undermine adjacent hardscape,
walls, or pavements.
STRATA-TEC H,l N C
BEOCONSULTANTS
Tony Sfredo
Geotechnical Engineering InvestigatiMi
W.0.262310
March 15.2010
The exposed excavation bottom shall be observed and approved by STRATA-TECH, Inc. and
the City's grading inspector prior to processing. Dependent on field observations, removals may
be adjusted up or down. Subsequent to approval of the excavation bottom, the area shall be
scarified 6 inches, moisture conditioned as needed, and compacted to a mmimum of 90 percent
relative compaction.
Fill soils shall be placed in 6 to 8 inch loose lifts, moisture conditioned as needed, and
compacted to a minimum of 90 percent relative compaction. This process shall be utilized to
finish grade.
Grading for hardscape areas shall consist of removal and recompaction of soft surficial soils.
Removal depths are estimated at 1 to 2 feet Earthwork shaU be performed in accordance with
previously specified methods.
Grading and/or foundation plans shall be reviewed by the soil engineer. All recommendations are
subject to modification upon review of such plans.
FOUNDATIONS ON COMPACTED FILL
The proposed building may be supported by continuous spread and isolated footings placed a
minimum depth of 24 inches below lowest adjacent grade utilizing an allowable bearing value of
2,000 pounds per square foot. This value is for dead plus live load and may be increased 1/3 for
total including seismic and wind loads where allowed by code.
Type
Minimum
Deptfi
(inches)
Mlnimiun
Width
(inches)
Bearing
Value
(psf)
Increase Maximum
(psf) Type
Minimum
Deptfi
(inches)
Mlnimiun
Width
(inches)
Bearing
Value
(psf)
Widtii Depth Maximum
(psf) Type
Minimum
Deptfi
(inches)
Mlnimiun
Width
(inches)
Bearing
Value
(psf) (psfi'ft) (psfi'ft)
Maximum
(psf)
Continuous 24 12 2000 180 440 3500
Interior Pad 18 24 2000 180 440 3500
It is recommended that aU footings be reinforced with a minimum of two no. 4 bars (1 top and 1
bottom). The stmctural engineer's reinforcing requirements should be followed if more
stringent.
Footing excavations shall be observed by a representative of STRATA-TECH, Inc. prior to
placement of steel or concrete to verify competent soil conditions. If unacceptable soil
conditions are exposed mitigation will be recommended.
FOUNDATIONS ON COMPETENT NATIVE SOILS - for Minor Stmctures
Minor stmctures may be supported by continuous spread footings placed a minimum depth of
24 inches below lowest adjacent grade and 12-inches into natural soil utilizing an allowable
STRATA-TECH, INC
BEOCONSULTANTS
Tony Sfredo
Geotechnical Engineering Investigation
W. 0.262310
March 15.2010
bearing value of 1,500 poimds per square foot. This value is for dead plus live load and may be
increased 1/3 for total including seismic and wind loads where allowed by code.
Footing excavations shall be observed by a representative of STRATA-TECH, Inc. prior to
placement of steel or concrete to verify competent soil conditions. If unacceptable soil conditions
are exposed, mhigation will be recommended.
LATERAL DESIGN
Lateral restraint at flie base of footings and on slabs may be assumed to be tiie product ofthe dead
load and a coefficient of fiiction of .30. Passive pressure on tiie face of footings may also be used
to resist lateral forces. A passive pressure of zero at the surface of finished grade, increasing at the
rate of 300 pounds per square foot of deptii to a maximum value of 2,500 pounds per square foot,
may be usol for compacted fill or native soils at this site. If passive pressure and fiiction are
combined when evaluating the lateral resistance, the value of the passive pressure should be limited
to 2/3 ofthe values given above.
RETAINING WALLS
Unrestrained walls up to 5-feet in height retaining drained earth may be designed for the following:
Surface Slope of Retained Material
Horizontal to Vertical
Equivalait Fluid Pressure Pounds
Per Cubic Foot
Level 30
5tol 32
4tol 35
3tol 38
2tol 43
These values include seismic loading. BackfiU should consist of clean sand and gravel. While all
backfills should be compacted to the required degree, extra care should be taken wcwking close to
walls to prevent excessive pressure. Retaining walls should include subdrains consistmg of 4-inch,
SCH 40 or SDR 35 perforated pipe surrounded by 1 cubic foot per lineal foot of crushed rock. AU
waU backfiU should be compacted to a minimum of 90 percent relative compaction.
All retammg stmctures should include appropriate allowances for aiticipatod surcharge loading,
where applicable. In tiiis regard, a uniformly distributed horizontal load equal to one-half the
vertical surcharge shall be applied when the surcharge is within a horizontal distance equal to tiie
waU height
Retaining wall footing excavations shall be founded entirely in competent native soils or
compacted fill. Footing bottoms shall be observed by a representative of STRATA-TECH, Inc., to
verify competent conditions.
STRATA-TEC H,l N C.
BEOCONSULTANTS
Tony Sfi«do g W. 0.262310
Geotechnical Enginecrin)z Investigation March 15,2010
EXPANSIVE SOILS
Results of expansion tests indicate that the near surface soils have a low expansion potential.
SETTLEMENT
The maximum total post-constmcticm settl^ent is anticipated to be on tiie order of 1/2 inch.
Differential settlements are expected to be less than 1/2 inch, measured between adjacent stmctural
elements.
SUBSIDENCE & SHRINKAGE
Subsidence over tiie site during grading is anticipated to be on flie order of .5 feet Shrinkage of
reworked materials should be in the range of 10 to 15 percent
FLOOR SLABS
TTie surfece soils are non-plastic with low expansion potential.
Where concrete slabs on grade are utilized, the slab shall be supported on at least 1 foot of
engineered fiU compacted to a minimum of 90 percrait relative compaction. Slabs should be at
least 4 inches thick and reinforced with a minimum of no. 3 bars 24 inches on center both ways.
The soU should be kept moist prior to casting the slab. However, if the soils at grade become
disturbed during constiuction, they should be brought to approximately optimum moisture content
and rolled to a firm, unyielding condition prior to placing concrete.
In areas where a moisture sensitive floor covering will be used, a vapor barrier consisting of a
plastic film (6 ml polyvinyl chloride or equivalent) should be used. The vapor barrier should be
properly lapped and sealed. Since the vapor barrier wiU prevent moisture fiwm draining from fresh
concrete, a better concrete finish can usually be obtained if at least 2 inches of wet sand is spread
over the vapor barrier prior to placement of concrete.
UnUTY LINE BACKFILLS
AU utility line backfills, both interior and exterior, shall be compacted to a minimum of 90 percent
relative compaction and shall require testing at a maximum of 2-foot vertical intervals.
STRATA-TECH, INC.
BEOCONSULTANTS
Tony Sfredo 7 W. 0.262310
Geotechnical Engineering Investigation March 15.2010
HARDSCAPE AND SLABS
Hardsce^ and slab subgrade areas shall exhibit a minimum of 90 percent relative ccwnpaction to a
depth of at least 1 foot. Deeper removal and recompaction may be required if unacceptable
conditions are encountered. These areas require testing just prior to placing concrete.
STORMWATER INFILTRATION TEST RESULTS
Two 3 foot deep Hand Dug test pits were excavated in the central driveway portion ofthe site on
April 20,2010. The diameter of the test hole was 6-inches.
The lower dq>tii ofthe pit exposed a natural soil layer of loose medium grained brown Silty SAND
that is typical of the underlying soUs. The bottom of the test pit was saturated and tested the
foUowmg morning. The percolation test was performed by siphoning a 5-gallon water bottle into
the band-dug hole. The water level was kept at 5 to 6 inches in depth for a period of four hours. At
the end of four hours, the time for the water to drop fi^om the 6* to the 5* inch was measured. ITiis
value was 15 minutes for botii holes. This corresponds to a percolation rate of 15 gallcms per
square foot of sidewall soil per day.
The percolation rate can be expected to perform at the tested rate over a short period of time with
clean water flowing into undisturbed soil. A high factor of safety should be used for longer-term
use with unfiltered water. The percolation rate can be expected to increase at a power of 1.5 with
respect to head increase.
DRAINAGE
Positive drainage should be planned for the site. Minimum drainage should be 2 percent for
landscape areas and 1 percent for hardscape. Drainage should be directed away from stmctures via
non-erodible conduits to suitable disposal areas. The structure shouW utilize roof gutters and down
spouts tied directiy to yard drainage.
Unlmed flowerbeds, planters, and lawns should not be constmcted against the perimeter of the
stmcture. If such l^dscaping (against the perimeter of a stmcture) is planned, it should be
properly drained and lined or provided with an underground moisture barrier. Irrigation should be
kept to a minimum.
This report is issued witii tiie understanding tiiat it is tiie responsibility of the owner, or of his
representative, to ensure tiiat the information and recommendations contained herein are called to
the attention ofthe engineers for tiie project and incorporated into the plans and that tiie necessary
steps are taken to see that the Contractors and Subcontractors carry out such recommendations in
tiie field.
STRATA-TECH, INC.
BEOCONSULTANTS
Tony Sfredo g W.0.262310
Geotechnical Engineering Investigation _—— March 15,201p
ENGINEERING CONSULTATION, TESTING & OBSERVATION
We wiU be pleased to provide additional input with respect to foundation design once methods of
constmction and/or nature of imported soil has been determined.
Grading and foundation plans should be reviewed by tiiis office prior to commencement of grading
so tiiat ^propriate recommendations, if needed, can be made.
Areas to receive fill should be inspected when unsuitable materials have been removed and prior to
placement of fiU, and fill should be observed and tested for compaction as it is placed.
AGENCY REVIEW
AU soU, geologic and stmchiral aspects of tiie proposed development are subject to the review and
approval ofthe govemmg agency(s). It diould be recognized that the governing ^aicy (s) can
dictate the manner in which tiie project proceeds. They could approve or deny any aspect of tiie
proposed improvements and/or could dictate which foundation and grading options are acceptable.
Su{^lemental geotechnical consulting in response to agency requests for edditional information
could be required and wUl be charged on a time and materials basis.
LBVnTATIONS
This report presents recommendations pertaining to tiie subject site based on tiie assumption that
tiie subsurface conditions do not deviate appreciably from those disclosed by our exploratory
excavations. Our recommendations are based on the technical information, our understanding of
tiie proposed constmction, and our experience in tiie geotechnical field. We do not guarantee the
performance of tiie project, only that our enguieering work and judgments meet tiie standard of care
of our profession at this time.
In view ofthe general conditions in the area, the possibility of different local soil conditions may
exist. Any deviation or unexpected condition observed during constmction should be brought to
tiie attention ofthe Geotechnical Engineer. In tiiis way, any supplemental recommendaticms can be
made with a minimum of delay necessaiy to the project
If the proposed constmction wiU differ from our present understanding of the project, tiie existing
information and possibfy new factors may have to be evaluated. Any design changes and the
finished plans should be reviewed by tiie Geotechnical Consultant Of particular importance would
be extending development to new areas, changes in sfructural loading conditions, pos^ned
develc^ment for more than a year, or changes in ownership.
STRATA
B E O C O N S
T E C H , I N C
U L T A N T S
Tony SScedo
Geotechnical Engineering Investigation
W. 0.262310
March 15.2010
This report is issued with tiie understanding tiiat it is the responsibUity of the owner, or of his
representative, to ensure that the information and recommendations containol herem are called to
the attention ofthe Architects and Engineers for tiie project and incorporated into the plans and that
the necessary steps are taken to see that the contractors and subcontractors carry out such
recommendations in tiie field.
This report is subject to review by the controlling autiiorities for tiiis project
We appreciate this opportunity to be of service to you.
Respectfully submitted:
STRATA-TECH, Inc.
Roland Acufla, PG
Principal
Larry Finlcy
RCE 46606
Enclosures:
Plate 1: Vicinity Map
Plate 2: Site Plan and Boring Location Map
Test Pit Logs
Appendfat A: Laboratory Results and Engineering Calculations
Appendbc B: Specifications for Grading
TRENCH LDCATinN PLAN 391 TAMARACK AVENUE. CARLSBAD. CA
VtffilLJS Site Plan
10.7
12-unit Townhome
Ave, Carlsbad, CA
Zcm«: KM
ainfitf AllowM: ^9 ur
(13-unrti)
[>«n»lt^ Pro(«t»d: 17.1 unlt»/«fi2i'i «f/unH
(1!-untti) (min)
Tutd ATM: 18.444 M.ft. '
30,74t »q.fl. (.7 oortfi)
PrttotB Potfo frm
R«»ilrad:
Prints PaUo ITN
i^^nunf Lot Covarog*
LtlhnClirag*
scoie: 1" = 20'-0"
Project: 391 Tamarack
60 •f/imll
3\7 WH. •
4,480 tq-ft.
Plan 2 (3-6«l rm)
5,SCe KVft. Pton 3 (3-b«d rm):
&^«*?3i^'b»d rni)
X9S0 •q.ft.
-unit* •1.S7S iq.ft, -
-unit! •1,42& •q.ri. -
-unlU 01,475 -•poeai/untt
TEST PIT LOCATION
PERCOLATION TEST PIT
LOCATION
STRATA-TECH, inc,
7372 WALNUT AVENUE #F
BUENA PARK, CA 90620
714-521-56U
3-10 PLATE a
RECORD OF SUBSURFACE EXPLORATION
w
m
^^ 'c
Date 2/25/2010 Geotechnical Engineering Investigation
Ji Q. E a ilsture ary \ a> 73 t 391 Tamarack Avenue
CO Q Carlsbad, California
U B Work Order 262310 Test Pit No. 1
Description of Eartti Materials
6 114
0 —
2 —
4
6 —
8 —
0- 2", TOPSOIL, MOIST, SMALL ROOTS
2- 6',: ORANGE-BROWN F-MED GR. SAND
DRY
6-8', SOIL, M-F GR. SILTY SAND , DAMP
DENSE
End of Test Pit at 8* Feet. No Ground Water. No Caving.
RECORD OF SUBSURFACE EXPLORATION
m Moisture % (% dry wt.) a-Date 212512010 Geotechnical Engineering Investigation ample Moisture % (% dry wt.) Dry Desf (pcf) ipth (F 391 Tamarack Avenue
OT Moisture % (% dry wt.) Dry Desf (pcf) 0 Carisbad, California
U B Wbric Order 262310 Test Pit No. 2
Description of Earth Materials
0 —
1 —
2 ]
3 —
4
SURFACE: WEED COVERED YARD
0-6" TOPSOIL, BROWN SILTY SAND WITH SMALL ROOTS
6-24": LIGHT BROWN NATURAL SOIL F-MED GR SAND
FAIRLY DENSE WITH SOME CLAY BINDER: MOIST
24-36" NATURAL SOIL.BROWN SILTY SAND WITH
SHARP GRAVELS, COHESIONLESS
End of Test Pit at 3 Feet. No Ground Water. No Caving.
STRATA - TECH, INC.
RECORD OF SUBSURFACE EXPLORATION
"cL c u.
Date 2/25/2010 Geotechnical Engineering Investigation
E to Moisti (%dn Q a. 391 Tamarack Avenue
tn Moisti (%dn Q.
o Carisbad, California
U B o Woric Order 262310 Test Pit No. 3
Description of Earth Materials
-6.1 114.1
0
2
6
0-1.5- TOPSOIL. MOIST DARK BROWN SILTY SAND WITH
SMALL ROOTS
1.5-'4': RESIDUAL (NATURAL) SOIL BROWN F-MED GR. SAND
MOIST
4-7 yellow, M-F GR. SILTY SAND damp
5.8
1
113.7
1
8
10
12
End of Test Pit at 9-Feet No Ground Water. No Caving.
RECORD OF SUBSURFACE EXPLORATION Moisture % (% dry wt.) Date 2/25/2010 Geotechnical Engineering Investigation
oi a. E Moisture % (% dry wt.) Dry Desi (pcf) LL.
391 Tamarack Avenue
OT Moisture % (% dry wt.) Dry Desi (pcf) Carisbad, Califomla
U B Worit Order 262310 Test Pit No. 4
Description of Earth Materials
0 —
1 —
SURFACE: WEED COVERED LOT
0-6" TOPSOIL, MOIST DARK BROWN SILTY SAND
6-24": BROWN NATURAL SOIL F-MED GR SILTY SAND
AIRLY DENSE MOIST
2 1
3
2-3': RESIDUAL (NATURAL) SOIL BROWN F-MED GR. SAND
DENSE, MOIST
4
End of Test PK at 3Feet. No Ground Water. No Caving.
STRATA - TECH, INC.
NEAR SOURCE FAULT MAP
Geotechnical Engineering Investigation
391 Tamarack Avenue
Carlsbad, California
Woric Order 262310 Geotechnical Engineering Investigation
391 Tamarack Avenue
Carlsbad, California Plate No. 4
STRATA - TECH, INC.
STRATA-TECH, INC
BEOCONSULTANTS
APPENDIX A
This ^)pendbc conteuns a description of the field investigation, laboratory testing procedures and
results, site plan, and exploratory logs.
FIELD INVESTIGATION
The field investigation was performed on February 26, 2010, consistmg of the excavation of four
exploratory hunches at locations shown on tiie attached Site Plan, Plate 2. As excavation
progressed, persoimel fi"om this office visually classified the soils encountered, and secured
representative samples for laboratory testing.
Sample Retrieval- Backhoe
Undisturbed samples of earth materials were obtained at fi-equent intervals by driving a thin-
walled steel sampler by the hydraulic action ofthe backhoe bucket. The material was retamed in
brass rings of 2.41 inches inside diameter and 1.00 inch height. The central portion of the sample
was in close-fitting, watertight containers for transportation to the laboratory.
Descriptions of the soils encountered are presented on the attached boring Logs. The data
presented on these logs is a simplification of actual subsurfece conditions encountered and applies
only at the specific boring location and the date excavated. It is not warranted to be representative
of subsurface conditions at other locations and tunes.
Laboratory Testing
Field samples were examined in the laboratory and a testing program was then established to
develop data for preliminary evaluation of geotechnical conditions.
Moisture Density
Field moisture content and dry density were determined for each of the undisturbed soil samples.
The dry density was determined in pounds per cubic foot. The moisture content was determined as
a percentage of the dry soil weight. The results of the tests are shown ui the test results section of
this appendix.
Compaction Character
Compaction tests were performed cm bulk sample of the existing soil in accordance witii ASTM
D1557-07. The results of the tests are shown in tiie test results section of tiiis appendbc.
Shear Strength
The ultimate shear strengths of the soil, remolded soil, highly weathered bedrock and bedrock was
determined by perfcmning direct shear tests. The tests were performed in a strain-controlled
STRATA-TECH, INC
BEOCONSULTANTS
machine manufactured by GeoMatic. The rate of deformation was 0.005 inches per minute.
Samples were beared under varying confining pressure, as shown on the "Shear Test Diagrams".
The samples indicated as saturated were artificially saturated in the laboratory and were shear
under submorged conditions. Hie results of tests are b^ed on 80 percent peak strengtii or ultimate
strength, whichever is lower, and are attached. In addition, a shear was performed CMI an upper
layer sample remolded to 90-percent ofthe laboratory standard with low confining pressure.
TEST RESULTS
Majdmum DeBSitv/Qptimum Moisture (ASTM:D-1557-07>
Trench Depth in Feet Maximum Density
fDCf)
Optimum Moistiire
(%)
3 1-3 124 12.0
In-Situ Drv Density/ Moisture
Trench Depth in Feet Dry Density
fDCf)
Moisture
(%)
1 3.5 114.0 6.1
3 4 114.1 6.0
3 9 113.7 5.8
Direct Shear
Trench Deptii in Feet Cohesion
(psf)
Angle of Intemal
Friction
(degrees)
3 4 200 30
ALLOWABLE BEARING CAPACITY
Reference: "Soil Mechanics in Engineering Practice", Terzaghi and Peck, 1967
pages 222 and 223.
Bearing Material: compacted fill
Properties:
Wet Density (y) = 130 pcf
Cohesion (C) * 200 psf
Angle of Friction (^) = 30 degrees
Footing Depth (D) = 2 feet
Footing Width (8) 1.0 foot
Factor of Safety = 3.0
Calculations - Ultimate Bearing Capacity
from figure 33.4 on page 222
Nc= 30.14 Nq= 18.4 Ny = 22.4
Qu = 1.2 C Nc + y D Nq + 0.4 y B Ny (Square Footing)
= 1.2 •200* 30.14+ 130*2* 18.4+ 0.4* ISC 1 *22.4
= 7233 + 4784 + 1164 = 13181 psf
Allowable Bearing Capacity for Square Footing
Qaii= Qu/F.S. = 4393 psf
Use 1500 psf (Settlement Control)
Qu = 1.0 C Nc + y D Nq + 0.5 y B Ny (Continuous Footing)
= 1.0 * 200 * 30.14 + 130 * 2 * 18.4 + 0.5 * 130 * 1 * 22.4
= 6028 + 4784 + 1456 = 12268 psf
Allowable Bearing Capacity for Continuous Footing
CU= Qu/F.S. = 4089 psf
Use 1500 psf (Settlement Control)
Increases: 440 psf / ft In depth over 2 feet
0 psf / ft in depth over 1 foot
Geotecrfinical Engineering Investigation
391 Tamarack Avenue
Carlsbad, California
Wbric Order 262310
STRATA - TECH, INC.
ACTIVE RETAINING WALL PRESSURE
Proposed
Pool
WALL
Free Body Diagram
PA
H =
Hc =
5 ft
2 ft
a = 53.1 °
F.S. = 2.00
ym = 130 pcf
C = 200 psf
tp = 30°
0.13 kef
0.2 ksf
•mtm
CA.
W = a + b a = 45° + 0^ / 2
Cm = C/F.S. - 0.1 ksf
^n, - tan"^ (tan ^ / F.S.) = 16.1 degrees
D = ( H - Ho) tan ( 90° - a) = 2.26 ft
L = {{H-Hc)^ + D^)"^ = 3.76ft
W=:Ay„ = 0.5D(H + Hc)y^= 1.03kips/LF
a = Cm L sin (90° + ^n,) / Sin ( a - 0„) = 0.6 kips/LF
b = W-a= 0.43 kips/LF
PA = b tan («- ^n,) = 0.32 kips/LF
Design EFP = 2 PA / H ^ = 25.6 pcf Use 26 pcf (30 min.)
Geotechnical Engineering Investigation
391 Tamarack Avenue
Carisbad, California
Wbric Order 262310 Geotechnical Engineering Investigation
391 Tamarack Avenue
Carisbad, California
STRATA' TECH, INC.
STRATA-TECH, INC
BEOCONSULTANTS
APPENDIX B
SPECIFICATIONS FOR GRADING
SITE CLEARING
AU existing vegetation shaU be stripped and hauled fi^om the site.
PREPARATION
AftCT the foundation for tiie fill has been cleared, plowed or scarified, it shall be disced or bladed
until h is uniform and fi-ee from large clcxls, brought to a proper moisture content and compacted to
not less than 90 percent of the maximum dry density in accordance with ASTM:D-1557-02 (5
layers - 25 blows per layer; 10 lb. hammer droj^d 18"; 4" diameter mold).
MATERIALS
On-site materials may t)e used for fill, or fill materials shall consist of materials qjproved by the
Soils Engineer and may be obtained fixjm the excavation of banks, borrow pits or any other
approved source. The materials used should be fi-ee of vegetable matter and other deleterious
substances and ^U not contain rocks or lumps greater tiian 8 inches in maximum dimension.
PLACING, SPREADING, AND COMPACTING HLL MATERL4LS
Where natural slopes exceed five horizontal to one vertical, the exposed bedrock shall be benched
prior to placing fiU.
The selected fill material shall be placed in layers which, when compacted, shall not exceed 6
inches in thickness. Each layer shall be spread evenly and shall be thoroughly mixed during the
spreading to ensure uniformity of material and moisture of each layer.
Where moisture of the fill material is below the limits specified by the Soils Engin^r, water shall
be added until the moisture content is as required to ensure tiiorough bonding and thorough
compaction.
Where moisture content of the fill material is above the limits specified by the Soils Engineer, the
fill materials shall be aerated by blading or other satisfactory methods until the moisture content is
as specified.
After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not
less than 90 percent ofthe maximum dry density in accordance with ASTM:D-1557-02 (5 layers -
25 blows per layer; 10 lbs. hammer dropped 18 inches; 4" diameter mold) or other density tests
which will attain equivalent results.
STRATA-TECH, INC
BEOCONSULTANTS
Compaction shaU be by sheepsfcx)t roller, multi-wheel pneumatic tire roller or other types of
acceptable rollers.
Rollers shall be of such design that they will be able to compact the fiU to the specified density.
RoUing shall be accompUshed while the fill material is at the specified moisture content Rolling of
each layer shall he continuous over the entu-e area and the roller shall make sufficient trips to
ensure that the desired density has been obtained. ITie final surface of the lot areas to receive slabs
on grade should be rolled to a dense, ^ooth surface.
The outside of all fill slopes shall be compacted by means of sheepsfoot rollers or other suitable
equipment Compaction operations shall be continued until the outer 9 inches of the slope is at
least 90 percent compacted. Compacting ofthe slopes may be progressively in increments of 3 feet
to 5 feet of fill height as the fill is brought to grade, or after the fill is brought to its total height.
Field density tests shall be made by the Soils Engineer of the compaction of each layer of fill.
Density tests shaU be made at intervals not to exceed 2 feet of fiU height provided aU layers are
tested. Where the sheepsfoot rollers are used, the soil may be disturbed to a deptii of several inches
and density readings shall be taken in the compacted material betow the disturbed surface. When
tiiese readings indicate that the density of any layer of fill or portion there is below the required 90
percent density, the particular layer or portion shaU be reworked until the required density has been
obtained.
The grading specifications should be a part of the project specifications.
The Soil Engineer shall review the grading plans prior to grading.
INSPECTION
The Soil Engineer shaU provide continuous supervision of the site clearing and grading operation
so tiiat he can verify the grading was done in accordance with the accepted plans and
specifications.
SEASONAL LIMITATIONS
No fill material shall be placed, spread or rolled during unfavorable weather conditions. When
work is interrupted by heavy rains, fiU operations shaU not be resumed until the field tests by the
SoUs Engineer indicate tiie moisture content and density of the fill are as previously specified.
EXPANSIVE SOIL CONDHIONS
Whenever expansive soil conditions are encountered, the moisture content of the fill or
recompacted soil shall be as recommended in the expansive soU recommendations included
herewith.
STRATA
B e a c o N s
•TECH
U L T A N •
, I N C
r 8
714-521-5611
562-427-8099
FAX 714-521-2552
7372 Walnut Avenue, Unit F.Buena Park, California 90620
May 24,2011
W.0.262310
TcHiy Sfi«do
21 Woodcrest
Irvine, California, 92603
Subject: Grading Plan Review and Groundwater
Statement 391 Tamarack Avenue, Carlsbad,
California.
Gentlemen:
Pursuant to your request, STRATATECH, Inc. has reviewed tiie grading plan for tiie site tiiat has
been prepared by DMS consultants Drawing No 471 3a. .
These plans are in conformance with the recommendations of the Geotechnical report for this site.
The stormwater infiltration will consist of permeable pavements. The pavements wiU be located at
finish grade approximately 1 foot above the existing grade. An exploratory boring drilled on
August 3,2010 to 12-feet below existing grade revealed dry sand, and a lack of groundwater and
confirms that the proposed groundwater infilti-ation system will be located at least 10-feet above the
groundwater table.
We appreciate this opportunity to be of service to you.
Respectfully submitted:
STRATA-TECH, Inc.
Roland Acufla, PG
Principal
Larry Finlcy
RCK 46606