HomeMy WebLinkAboutCT 13-03; ROBERTSON RANCH- RANCHO COSTERA; CONCRETE COMPRESSION TESTS; 2015-07-17Gee Ray Gee Inc. dba "G Force
LEA: 172, Exp:12/12/2017
4035 Pacific Highway
San Diego, CA 92110
Phone: (619) 583-6633
Fax: (866) 319-1366
. Compressive Strength of Concrete Report Date: 7/17/2015
Test Method: ASTM C 39 Sample: 4213
Client: Project:
LGC Valley Inc. GF150248L
28532 Constellation Road Robertson Ranch
Valencia, CA 91355 4980 El Camino Real
Carlsbad, CA 92054
Sample Details
Set #: 7 Contractor: Cass Construction Batched: 11:30 PDT
Specimen Size: 4" X 8" Cast By: Technician Sampled: 12:15 PDT
Specimens In Set: 5 Date Cast: 06/17/15 Cast: 12:25 PDT
Truck #: 36 Sampled From: Chute Truck Empty: 12:35 PDT
Ticket #: N/A Placement Method: Chute Placement Time: 65 (mm)
Location
Placement Location: Other, See Location Details
Location Details: Box Culvert Cut-Off Wall and Apron North side ECR Sta. #483+00
Batch Log Specifications
Supplier: Mar Con Mix Design: 600 CFW 4000P Strength: 4000 (psi)
On-Site Admixtures: None
Field Measurements
Weather: Clear Slump (in): 4.5 (ASTM C143) Plastic Unit Weight:
Air Temperature (F): 79 Concrete Temp (F): 91 (ASTM C1064) Air Content:
Load Volume: 9 (yd 3)
Lab Test Results
Testing Lab: G-Force, LEA: 172_Exp:12/12/2017, 4035 Pacific _Highway, Diego, CA, 92110 _San
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in')
Max Load
(Ibs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
7-1 7 06/24/15 7/0 4.00 12.57 46,090 3,670 2 P
7-2 28 07/15/15 7/21 4.00 12.57 61,330 4,880 2 Cl P
7-3 28 07/15/15 7/21 4.00 12.57 66,000 5,250 2 Cl P
7-4 56 08/12/15 7/49
7-5 14 07/01/15 1 7/7 4.00 12.57 1 50,340 1 4,010 5 P
Break Remarks Capping Methods
Cl: The Materials Were Sampled and Tested in Accordance with the Requirements of the Approved
Documents. The Materials Tested Met The Requirements of the Approved Documents.
P: Un-bonded Caps of Concrete
Cylinders (ASTM C1231)
XM9E[][]
TYPE I TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
07/17/2015
Joseph Bouknight
For All DSA Projects: Page 1 of 1 CC: Project Architect
Structural Engineer
Project Inspector
DSA Regional Office
Gee Ray Gee Inc. dba G" Force
LEA: 172, Exp:12/12/2017
4035 Pacific Highway
San Diego, CA 92110
Phone: (619) 563-6633
Fax: (866) 319-1366
Compressive Strength of Concrete Report Date: 7/13/2015
Test Method: ASTM C 39 Sample: 3986
Client: Project:
LGC Valley Inc. GF150248L
28532 Constellation Road Robertson Ranch
Valencia, CA 91355 4980 El Camino Real
Carlsbad, CA 92054
Sample Details
Set #: 6 Contractor: Cass Construction Batched: 13:43 POT
Specimen Size: 4' X 8" Cast By: Client Sampled: 14:50 PDT
Specimens In Set: 5 Date Cast: 06/09/15 Cast: 15:00 PDT
Truck #: 560 Sampled From: Truck Empty: 15:06 PDT
Ticket #: 586230 Placement Method: Chute Placement Time: 83 (mm)
Location
Placement Location: Other, See Location Details
Location Details: Box Culvert Wing Wall North side ECR Sta. #483+00
Batch Log Specifications
Supplier: Hanson Mix Design: 660 CFW4000P Strength: 4000 (psi)
On-Site Admixtures: None
Field Measurements
Weather: PT Cloudy Slump (in): 5 (ASTM C143) Plastic Unit Weight:
Air Temperature (F): 78 Concrete Temp (F): 90 (ASTM C1064) Air Content:
Load Volume: 9.5 (yd')
Lab Test Results
Testing Lab: G-Force, LEA: 172 Exp: 12/12/2017, 4035 Pacific Highway, SanDiego, CA, 92110
Specimen
Number
Test
Age Days
Test
Date
Field I Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in 2)
Max Load
(Ibs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
6-1 3 06/12/15 3/0 4.00 12.57 33,730 2,680 3 P
6-2 7 06/16/15 3/4 4.00 12.57 42,250 3,360 5 P
6-3 28 07/07/15 3/25 4.00 12.57 58,900 4,690 2 Cl P
6-4 28 07/07/15 3/25 4.00 12.57 63,050 5,020 3 Cl P
6-5 56 08/04/15 1 3/53
Break Remarks Capping Methods
Cl: The Materials Were Sampled and Tested in Accordance with the Requirements of the Approved
Documents. The Materials Tested Met The Requirements of the Approved Documents.
P: Un-bonded Caps of Concrete
Cylinders (ASTM C1231)
XM9E[1[1
TYPE I TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
/ /r,4- 5J
07/13/2015
Joseph Bouknight
For All DSA Projects:
CC: Project Architect
Structural Engineer
Project Inspector
DSA Regional Office
Page 1 of 1
S fl
Gee Ray Gee Inc. dba "G" Force
LEA: 172, Exp:12/12/2017
4035 Pacific Highway
San Diego, CA 92110
Phone: (619) 583-6633
Fax: (866) 319-1366
Compressive Strength of Concrete Report Date: 6/26/2015
Test Method: ASTM C 39 Sample: 3701
Client: Project:
LGC Valley Inc. GF1 50248L -
28532 Constellation Road Robertson Ranch
Valencia, CA 91355 4980 El Camino Real
Carlsbad, CA 92054 -
Sample Details
Set #: 4 Contractor: Cass Construction Batched: 12:14 PDT
Specimen Size: 4" X 8" Cast By: Technician Sampled: 13:10 PDT
Specimens In Set: 4 Date Cast: 05/29/15 Cast: 13:20 POT
Truck #: 573 Sampled From: Truck Empty: 13:25 POT
Ticket #: 557542 Placement Method: Chute Placement Time: 71 (mm)
Location
Placement Location: Other, See Location Details
Location Details: North Side El Camino Real, Storm drain Box / Culvert Floor, Approx. Sta 483+00
Batch Log Specifications
Supplier: Hanson Mix Design: 4033502 Strength: 4000 (psi)
On-Site Admixtures: None
Field Measurements
Weather: Clear Slump (in): 4.0 (ASTM C143) Plastic Unit Weight:
Air Temperature (F): 68 Concrete Temp (F): 87 (ASTM C1064) Air Content:
Load Volume: 10 (yd')
Lab Test Results
Testing Lab: G-Force, LEA: 172_Exp:12/12/2017, 4035 Pacific CA, 92110 _Highway, _San _Diego,
Specimen
Number
Test
Age Days
Test
Date
Field I Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in 2)
Max Load
(Ibs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
4-1 7 06/05/15 4/3 4.00 12.57 44,860 3,570 2 P
- 42 28 06/26/15 4/24 4.00 12.57 61,950 4,930 2 Cl P
4-3 28 06/26/15 4/24 4.00 12.57 62,700 4,990 2 Cl P
4-4 56 07/24/15 4/52
Break Remarks Capping Methods
Cl: The Materials Were Sampled and Tested in Accordance with the Requirements of the Approved
Documents. The Materials Tested Met The Requirements of the Approved Documents.
P: Un-bonded Caps of Concrete
Cylinders (ASTM C1231)
EMME[][]
TYPE I TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
ieAJi
For All DSA Projects: Page 1 of 1 CC: Project Architect
Structural Engineer
Project Inspector
DSA Regional Office
E
&R,C
Gee Ray Gee Inc. dba "G Force
LEA: 172, Exp:12/1212017
4035 Pacific Highway
San Diego, CA 92110
Phone: (619) 583-6633
Fax: (866) 319-1366
Compressive Strength of Concrete Report Date: 5/22/2015
Test Method: ASTM C 39 Sample: 3074
Client: Project:
LGC Valley Inc. GF150248L
28532 Constellation Road Robertson Ranch
Valencia, CA 91355 4980 El Camino Real
Carlsbad, CA 92054
Sample Details
Set #: 1 Contractor: Cass Batched: 10:00 POT
Specimen Size: 6" X 12" Cast By: Technician Sampled: 10:30 POT
Specimens In Set: 3 Date Cast: 04/16/15 Cast: 10:40 POT
Truck #: Sampled From: Truck Empty: 10:39 POT
Ticket #: 577935 Placement Method: Placement Time: 39 (mm)
Location
Placement Location: Other, See Location Details
Location Details: Box Culvert Floor Wing Wall Footings, North Side El Camino Real Sta 450+00
Batch Log Specifications
Supplier: Hanson Mix Design: 4033502 Strength: 4000 (psi)
On-Site Admixtures: None
Field Measurements
Weather: clear Slump (in): 4.25 (ASTM C143) Plastic Unit Weight:
Air Temperature (F): 76 Concrete Temp (F): 84 (ASTM C1064) Air Content:
Load Volume: 9.5 (yd')
Standard Cure F Field Cure
Min/ Max Temp (F): 68/79
Lab Test Results
Testing Lab: G-Force, LEA: 172 Exp:12/12/2017, 4035 Pacific Highway, San Diego, CA, 92110
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in 2)
Max Load
(Ibs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
1-1 28 05/14/15 7/21 f 6.00 28.27 112,940 4,000 3 Cl P
1-2 28 05/14/15 7/21 4 6.00 28.27 114,850 4,060 3 Cl P
Break Remarks Capping Methods
Cl: The Materials Were Sampled and Tested in Accordance with the Requirements of the Approved
Documents. The Materials Tested Met The Requirements of the Approved Documents.
P: Un-bonded Caps of Concrete
lCylinders (ASTM C1231)
X09EED i
TYPE I TYPE 2 TYPE 3 TYPE 4 TYPES TYPE 6
Joe Bouknight
May 222015
For All DSA Projects: Page 1 of 1 CC: Project Architect
Structural Engineer
Project Inspector
DSA Regional Office
S C
AM'
Gee Ray Gee Inc. dba G" Force
LEA: 172, Exp:12/12/2017
4035 Pacific Highway
San Diego, CA 92110
Phone: (619) 583-6633
Fax- (RAA) 31q-1366
Compressive Strength of Concrete Report Date: 7/6/2015
Test Method: ASTM C 39 Sample: 3865
Client: Project:
LGC Valley Inc. GF150248L
28532 Constellation Road Robertson Ranch
Valencia, CA 91355 4980 El Camino Real
Carlsbad, CA 92054
Sample Details
Set #: 5 Contractor: Cass Construction Batched: 12:50 PDT
Specimen Size: 4" X 8" Cast By: Technician Sampled: 13:30 PDT
Specimens In Set: 5 Date Cast: 06/03/15 Cast: 13:40 PDT
Truck #: 539 Sampled From: Chute Truck Empty: 14:04 PDT
Ticket #: 585160 Placement Method: Chute Placement Time: 74 (mm)
Location
Placement Location: Other, See Location Details
Location Details: Double Box Culvert W/ Wing Walls, Nourth Side El Camino Real, Just East of Kelly Drive. Pour Encompassed Culvert
Walls, Lid and Footing Only
Batch Log Specifications
Supplier: Hanson Mix Design: 660 CFW-4000P Strength: 4000 (psi)
On-Site Admixtures: None
Field Measurements
Weather: C;ear Slump (in): 3.5 (ASTM C143) Plastic Unit Weight:
Air Temperature (F): 72 Concrete Temp (F): 80 (ASTM C1064) Air Content: I Load Volume: 9.5 (yd')
Lab Test Results
Testing Lab: G-Force, LEA: 172_Exp:12/12/201,_4035 Pacific _Highway, CA, 92110 _San _Diego,
Specimen
Number
Test
Age Days
Test
Date
Field I Lab
Cure Days
Average Cylinder
_Diameter (in)
Cylinder
Area (in 2)
Max Load
(Ibs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
5-1 7 06/10/15 6/1 4.00 12.57 45,690 3,640 2 P
5-2 14 06/17/15 6/8 - 4.00 12.57 54,100 4,300 2 P
5-3 28 07/01/15 - 6/22 - 4.00 12.57 62,910 5,010 5 Cl P
5-4 28 07/01/15 - 6/22 4.00 12.57 62,770 4,990 5 Cl P
5-5 56 07/29/15 - 6/50
Break Remarks Capping Methods
IP: Cl: The Materials Were Sampled and Tested in Accordance with the Requirements of the Approved
Documents. The Materials Tested Met The Requirements of the Approved Documents. Un-bonded Caps of Concrete
Cylinders (ASTM C1231) znn
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 8
For All DSA Projects: Page 1 of 1 CC: Project Architect
Structural Engineer
Project Inspector
DSA Regional Office
FORC
Gee Ray Gee Inc. dba "C" Force
LEA: 172, Exp:12/1212017
4035 Pacific Highway
San Diego, CA 92110
Phone: (619) 583-6633
Fax: (866) 319-1366
. . Compressive Strength of Concrete Report Date: 5/26/2015
Test Method: ASTM C 39 Sample: 3205
Client: Project:
LGC Valley Inc. GF150248L
28532 Constellation Road Robertson Ranch
Valencia, CA 91355 4980 El Camino Real
Carlsbad, CA 92054
Sample Details
Set #: 3 Contractor: Cass Const. Batched: 13:19 PDT
Specimen Size: 4" X 8" Cast By: Technician Sampled: 13:45 PDT
Specimens In Set: 4 Date Cast: 04/24/15 Cast: 13:55 PDT
Truck #: 584 Sampled From: Truck Empty: 13:55 PDT
Ticket #: 519941 Placement Method: Placement Time: 36 (mm)
Location
Placement Location: Other, See Location Details
Location Details: Box Culvert Wing Walls north side El Camino Real, Station 450+00
Batch Log Specifications
Supplier: Hanson Mix Design: 4033502 Strength: 4000 (psi)
Plant: 034
On-Site Admixtures: None
Field Measurements
Weather: Clear Slump (in): 4.0 (ASTM C143) Plastic Unit Weight:
Air Temperature (F): 59 Concrete Temp (F): 77 (ASTM C1064) Air Content:
Load Volume: 10 (yd')
Lab Test Results
Testing Lab: G-Force, LEA: 172_Exp:12/12/2017, 4035 Pacific _Highway, CA, 92110 _San _Diego,
Specimen
Number
Test
Age Days
Test
Date
Field I Lab
Cure Days
Average Cylinder
_Diameter (in)
Cylinder
Area (in 2)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
3-1 7 05/01/15 6/1 4.00 12.57 39,840 3,170 5 P
3-2 28 05/22/15 6/22 - 4.00 12.57 60,140 4,780 2 Cl P
3-3 28 05/22/15 6/22 - 4.00 12.57 66,340 5,280 3 Cl P
3-4 56 06/19/15 1 6/50
Break Remarks Capping Methods
Cl: The Materials Were Sampled and Tested in Accordance with the Requirements of the Approved
Documents. The Materials Tested Met The Requirem'nts of the Approved Documents.
P: Un-bonded Caps of Concrete
Cylinders (ASTM C1231)
XM9111111 I..
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPES TYPE 6
e 5ij4'
Joe Bouknight
May 262015
For All DSA Projects: Page 1 of 1 CC: Project Architect
Structural Engineer
Project Inspector
DSA Regional Office
Gee Ray Gee Inc. dba G Force
LEA: 172, Exp:12/12/2017
4035 Pacific Highway
San Diego, CA 92110
Phone: (619) 583-6633
Fax: (866) 319-1366
. S
Compressive Strength of Concrete Report Date: 5/19/2015
Test Method: ASTM C 39 Sample: 3204
Client: Project:
LGC Valley Inc. GF150248L
28532 Constellation Road Robertson Ranch
Valencia, CA 91355 4980 El Camino Real
Carlsbad, CA 92054
Sample Details
Set #: 2 Contractor: Cass Const. Batched: 12:28 PDT
Specimen Size: 4" X 8" Cast By: Technician Sampled: 13:15 PDT
Specimens In Set: 4 Date Cast: 04/21/15 Cast: 13:25 PDT
Truck #: 536 Sampled From: Truck Empty: 13:50 PDT
Ticket #: 578696 Placement Method: Placement Time: 82 (mm)
Location
Placement Location: Other, See Location Details
Location Details: Box Culvert Improvement, North side El Camino Real approx. 100 Yds East of Existing Retention S.D. Basin
Batch Log Specifications
Supplier: Hanson Mix Design: 660 CFW4000P Strength: 4000 (psi)
On-Site Admixtures: None
Field Measurements
Weather: Clear Slump (in): 4.0 (ASTM C143) Plastic Unit Weight:
Air Temperature (F): 72 Concrete Temp (F): 76 (ASTM C1064) Air Content:
Load Volume: 9.5 (yd')
Lab Test Results
Testing Lab: G-Force, LEA: 172_Exp:12/12/2017, 4035 Pacific _Highway, CA, 92110 _San _Diego,
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in 2)
Max Load
(Ibs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
2-1 9 04/30/15 9/0 4.00 12.57 42,070 3,350 2 P
2-2 28 05/19/15 9/19 4.00 12.57 52,660 4,190 2 Cl P
2-3 28 05/19/15 9/19 4.00 12.57 54,190 4,310 3 Cl P
2-4 10 05/01/15 9/1 4.00 12.57 42,690 3,400 3 P
Break Remarks Capping Methods
Cl: The Materials Were Sampled and Tested in Accordance with the Requirements of the Approved
Documents. The Materials Tested Met The Requirements of the Approved Documents.
P: Un-bonded Caps of Concrete
Cylinders (ASTM C1231)
XMOEII[I
TYPE I TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Je /5OJfL
Joe Bouknight
May 192015
For All DSA Projects: Page 1 of 1 CC: Project Architect
Structural Engineer
Project Inspector
DSA Regional Office
HANSAGGREGATES PACIFIC SOUTH VILEST, INC. 515402 I. . " P.cX639069 • SAN DIEGO, CALIFORNIA 921 069 "h son DISPATCH: 1-890-500-7465 Ext. 1 DIRECT 858-5 -2777 Time Due
HEIDELBERGCEM ENT Group SALES: 858-715-5600 on Job
Date Order No. 1 jorder WEIGHMASTER CERTIFICATE Arrive Job* 0.S'' J tt 0 1 3 THIS IS TO CERTIFY that the following described commodity was weighed, measured, or counted by a
Ticket No. ICum. 'v4rds/Meters weighmaster, whose signature is on this certificate, who is a recognized authority of accuracy, as prescribed by
I Chapter 7 (commencing with Section 12700) of Division 5 of the California Business and Professions Code, 535160 J 23. j tZiC ' administered by the Division of Measurement Standards of the California Department of Food and Agriculture.
Truck
[Spotted / g
J •/ ?
T Seller makes no warranty of any kind, express or implied, regarding the material; and all warranties, including Begin Time Loaded li 2., w any implied warranty of merchantability or of fitness for a particular purpose, are hereby excluded. Pour
The Material is sold by the cubic yard, cubic meter, ton or load. Customer acknowledges that the amount of
.-Material ordered has been 64termined by the Customer, and CustbTher assues full responsibility, and shall
held Seller harmless, regarqjng the adequacy of the amount of Mrial ordered. r' Finish
Pour*
Plit'034 Plant 154 Plant 204 - Plant 23
9255 Camino Santa Fe 10322 Channel Rd. 1050 Airport Road 12560'Highway 67
San Diego Lakeside ceanside Lkese
Plant 074 PI 174 Pliant 214 . -..
9229 Harris Plant Rd. 601 W. 12th St. A50 N. Tulip Sree. .' " '
San Diego National City Escondido
. I. Leave .c
Job
In Yard
Customer Name Customer No. Plant No.
0c439 CONSTRUCTION INC 332 204 3 INCH MAX SLLll1P
Job Address Map Ref.
EL Cc.tflXNo REAL AND CANNON Rf). CA .. 1107B6
Customer P.O. Customer Job A. Project NO. Load No. Yards/Meters Ordered
ij3Ø( y . Loaded Counter 61 Arrive Job 7 7 Unload
Lt3Ith bbUJ'LnJiLLJl' f. 0'k. I-'U bLfJrt'llP 0 9. 75CY 29. SIZiCY
3091 ENVIRONMtNiAL SURCHARGE
'309i ENERGY SURCF'IPRGE 1. 0@ea -.
li Truck No. Driver's Name
,._. Gallons ___ Water Added _____________________________
539 ~-,FHSANSON,CFIRI S At Plant TBegin Job . !ie Job TEnd Job Subtotal
Slump El Slump El siumpc:J
HANSON AGGREGATES I / Cyl1 . ' CyiE Cyl
Sales Tax PACIFIC SOUTHWEST, INC. Wafer added at customer's request above wsfe'r/cemenfitious ratio and/or slump will be customer's responsibility.
Weighmsst CAUTION Contains Portland Cement. May irritate eyes and skin. In case of contact, flush thoroughly with water. Get prompt medical attention. DO NOT take internally. Keep out of reach of children. Buyer/Contractor is
responsible for providing a contained area to wash Out mixer truck. Concrete is a perishable commodity and Total
becomes the property of the purchaser upon leaving the plant. Any chanoes or cancellation of orioinal
rSta~dmg
______
x
Deputyinstructions must be telephoned to the office before loadinb starts. NOT1ESPONSIBLE FOR RACTtVEAGGREGATE OR COLOR QUALITY. No claim allowed uhleas made at time material is delivered, Time *Note. Unloading time four (4) minutes per yard. Excess time charged at current hourly truck rate.
I No one available'to sign, customer waives receipt Received By Driver ',,,
--
-
signature. (First delivery ticket Buyer/Contractor
Signature release must be signed.) U 1 X /
CY= Cubic Yard
3 , JOB H2O:
See Back for Terms and Condit
CUSTOMER Total S All Loads