HomeMy WebLinkAboutCT 13-03; ROBERTSON RANCH- RANCHO COSTERA; ROUGH GRADING CERTIFICATIONS; 2017-09-28-j·---..... ..:.?..._:'
Civil Engineering • Surveying
City of Carlsbad Public Works Inspector
ATTN: Grant Clavier
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
September 28, 2017
J.N. 10-1307-1
Lots 88 through 91, Lot 100 and Lot 104 of Map CT 13-03, Map No. 16092
Dear Grant,
Based upon topographic surveys performed by O'Day Consultants on March 30, 2016 for Lots
88 through 91 and Lot 100 and Lot 104 performed on September 28, 2017, the rough grading for
land development has been completed within standard tolerance (0.10 feet) in accordance with
the approval plan, (City of Carlsbad DWG. 480-3A) and that all embankments, cut slopes and
pad sizing are as shown on the approved plans for Lots 88 through 91, Lot 100 and Lot 104.
We request the release of pads for building permits for lots 88 through 91, Lot 100 and Lot 104.
GO/tan
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
O'DAY CONSULTANTS, INC.
Very truly yours,
By:
~r:_d{)?
George O'Day
Project Manager
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tel: 760.931.7700 Fax: 760.931.8680
I
131
132
133
134
155
122
123
124
125
126
-~·
113
114
153
f§
~r----~
~
~ ~
~
WEST RANCH ST.
'
t)
' I J'
Civil Engineering • Surveying
City of Carlsbad Public Works Inspector
ATTN: Grant Clavier
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
September 14, 2017
J.N. 10-1307-1
Lots 172 through 176 of Map CT 13-03, Map No.16092
Dear Grant,
Based upon topographic surveys performed by O'Day Consultants on March 25, 2016 for Lots
172 through 176, the rough grading for land development has been completed within standard
tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad DWG. 480-3A) and
that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 172
though 176.
We request the release of pads for building permits for lots 172 through 176.
GO/tan
O'Day Consultants Inc.
271 O Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
O'DAY CONSULTANTS, INC.
Very truly yours, r
By:
h.. I o v:J.
George O'Day 7
Project Manager
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tel: 760.931.7700 Fax: 760.931.8680
...
Civil Engineering • Surveying
City of Carlsbad Public Works Inspector
ATTN: Grant Clavier
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
September 12, 2017
J.N. 10-1307-1
Lots 177 through 182 of Map CT 13-03, Map No.16092
Dear Grant,
Based upon topographic surveys performed by O'Day Consuhants on March 25 and 28, 2016 for
Lots 177 through 182, the rough grading for land development has been completed within
standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad DWG.
480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans
for lots 177 though 182.
We request the release of pads for building permits for lots 177 through 182.
GO/tan
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
O'DA Y CONSULTANTS, INC.
Very truly yours,
By:
4 1vz~dro/ ' \ I George: 'Day ,
Project Manager
\
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tel: 760.931.7700 Fax: 760.931.8680
\ ' Civil Engineering • Surveying
City of Carlsbad Public Works Inspector
ATTN: Grant Clavier
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
June 15,2017
J.N. 10-1307-1
Lots 111 through 114 and 122 though 126 of Map CT 13-03, Map No. 16092
Dear Grant,
Based upon topographic surveys performed by O'Day Consultants on March 8, 2016 for Lot
111, March 28, 2016 for Lots 112 through 114, and 123 through 126 and June 15, 2017 for Lot
122, the rough grading for land development has been completed within standard tolerance (0.10
feet) in accordance with the approval plan, (City of Carlsbad DWG. 480-3A) and that all
embankments, cut slopes and pad sizing are as shown on the approved plans for lots 111 through
114 and 122 through 126.
We request the release of pads for building permits for lots 111 through 114 and 122 through
126.
GO/tan
O'Day Consultants Inc.
2710 Loker Avenue lf\/est, Suite 100
Carlsbad. California 92010-6609
Very truly yours,
O'DA Y CONSULTANTS, INC.
~~~
GeoriO'Day 7
Project Manager
E-mail: oday@odayconsultanis.com
Website: www.odayconsultanis.corn
Tel: 760.931.7700 Fax: 760.931.8680
Civil Engineering • Surveying
October 23, 2015
J.N. 10-1307-1
Grant Clavier
City of Carlsbad Public Works Inspector
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
Lots 101-103 of MAP CT 13-03 PA 3
Dear Inspector:
Based upon topographic surveys performed by O'Day Consultants on November 24,
2014, the rough grading for land development has been completed within standard
tolerance (0.10 feet) in accordance with the approved plan, (City of Carlsbad Dwg. No.
480-3A) and that all embankments, cut slopes and pad sizing are as shown on the
approved plans for lots 101 through 103.
We request the release of pads for building permits for lots 101 through 103.
Very truly yours,
O'DA Y CONSULTANTS, INC.
~(/2 }L tY 71'
George cf Day
Project Manager
O:\projectManagers\transmc\10 l 307\pCPA3 Lot 101-103.doc
O'Day Consultants Inc.
2710 Lol<er Avenue West. Suite 100
Carlsbad, California 92010-6609
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tel: 760.931 .7700 Fax: 760.931.8680
-------4
" I
-_J
39
-11
I
I
tfil_ ___ _
347
PA -23C
---------
347
---------7
SUBDIVISION
BOUNDARY
I
I
I
I
I
I 0:: I
'~ I -z. I
3
I
I
I
I
I
I
/
/
SHEET INDEX
SHEET NO. DESCRIPTION
1 TITLE SHEET
2 NOTARY SHEET
J INDEX MAP
4-5 PROCEDURE OF SURV,
6 EASEMENTS
7-21 MAP SHEETS
22 MAP SHEET -LO TS ,
23 DETAILS
24 MAP SHEET -LOTS,
.. .
Civil Engineering • Surveying
October 23, 2015
J.N. 10-1307-1
Grant Clavier
City of Carlsbad Public Works Inspector
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
Lots 206-208 of MAP CT 13-03 PA 6
Dear Inspector:
Based upon topographic surveys performed by O'Day Consultants on November 24,
2014, the rough grading for land development has been completed within standard
tolerance (0.10 feet) in accordance with the approved plan, (City of Carlsbad Dwg. No.
480-3A) and that all embankments, cut slopes and pad sizing are as shown on the
approved plans for lots 206 through 208.
We request the release of pads for building permits for lots 206 through 208.
Very truly yours,
O'DAY CONSULTANTS, INC.
~ 0~
George ~ 1/~
Project Manager (1'
O:\ProjectManagers\transmc\101307\PCPA6 Lot 206-208.doc
O'Day Consultants Inc.
271 0 Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.corn
Tel: 760.931.7700 Fax: 760.931.8680
~
~
L i ~
~
~ ~ r--
-~
t....i ..;,..
0
\J 131
:i 132 1 133
134
155
92
105 93
106 94
107 95 ~
711
119 ~
SJ ~
108 96 ~ffi'S
109 97 ~ 86
110 98 87 . _
152 99 ~ 150 --i s:::::; ~ ~
f§ 122
123
124
125
1?~
111 100
112 101
113 102 114 103
J.§}_104
~ -~ ~r _J
~ ~ ~
~
88
89
90
9[
151~
WEST RANCH sr
~
~
Civil Engineering s Surveying
City of Carlsbad Public Works Inspector
ATTN: Grant Clavier
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
October 3, 2016
J.N. 10-1307 ,
Lots 82 through 87 and 92 though 99 of Map CT 13-03, Map No. 16092
Dear Grant,
Based upon topographic surveys performed by O'Day Consultants on March 8, 2016, Lots 82
through 87 and 92 though 99, the rough grading for land development has been completed within
standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad DWG.
480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans
for lots 82 through 87 and 92 through 99.
We request the release of pads for building ~€1111its for lots 82 through 87 and 92 through 99.
PO/tan
O'Day Consultants Inc.
2710 Loker Avenue West. Suite 100
Carlsbad, California 92010-6609
Very truly yours,
O'DAY CONSULTANTS, INC.
1:;;~~o/
Project Engineer /
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tel: 760.931.7700 Fax: 760.931.8680
Civil Engineering • Surveying
City of Carlsbad Public Works Inspector
ATTN: Grant Clavier
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
August 11, 2016
J.N. 10-1307-1
Lots 212 through 216 and 226 through 234 of Map CT 13-03 PA6, Map No. 16092
Dear Grant,
Based upon topographic surveys performed by O'Day Consultants on March 31, 2016, Lots 212
through 216, and 226 through 234, the rough grading for land development has been completed
within standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad
Dwg. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved
plans for lots 212 through 216, and 226 through 234.
We request the release of pads for building permits for lots 212 through 216, and 226 through
234.
-
PO/tan
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
Very truly yours,
O'DAY CONSULTANTS, INC.
~ {/:U
Goorgl:;.y 7
Project Manager
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tel: 760.931.7700 Fax: 760.931.8680
245
346
i2
Civil E11gi11eeri11g • Surveying
Grant Clavier
City of Carlsbad Public Works Inspector
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
June 9, 2016
J.N. 10-1307-1
Lots 25 Through 37, and 44 Through 56 of Map CT 13-03 PA 5, Map No. 16092
Dear Inspector:
Based upon topographic surveys preformed by O'Day Consultants on Dec 3, 2015, March 8,
2016, and March 22, 2016, Lots 25 through 37, and 44 through 56, the rough grading for land
development has been completed within standard tolerance (0.10 feet) in accordance with the
approval plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and
pad sizing are as shown on the approved plans for lots 25 through 37, and through 56 ..
We request the release of pads for building permits for lots 25 through 3 7, and 44 through 56
Very truly yours,
O'DAY CONSULTANTS, INC.
1:;t;.~o/
Project Manager
00/na
O:\ProjectManagers\transmc\l 01307\PCPAI 3 Lot25-37, 44-56.doc
O'Dav Consultants Inc. E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tel: 760.931.7700 Fax: 760.931.8680
2710 Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
;
Civil Engineering • Surveying
Grant Clavier
City of Carlsbad Public Works Inspector
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
May 26, 2016
J.N. 10-1307-1
Lots 1, 2, 3, 4 of Map CT 13-03 PA 13, Map No. 16091
Dear Inspector:
Based upon topographic surveys preformed by O'Day Consultants on May 24, 2016 and May 25,
2016, Lots 1, 2, 3, 4, the rough grading for land development has been completed within
standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad Dwg. No.
480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans
for lots 1, 2, 3 and 4.
We request the release of pads for building permits for lots 1, 2, 3 and 4.
GO/na
O:\ProjectManagers\transmc\l O 1307\PCPAI 3 Lot! ,2,3,4.doc
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tel: 760.931.7700 Fax: 760.931.8680
I ; \ !
I
)
\
I
t
I
1/
\.
! !
l
a~ • I ~--I
\
...
\
\
\
Civil Eng_ineering • Surveying
April 8, 2016
J.N. 10-1307-1
Grant Clavier
City of Carlsbad Public Works Inspector
1635 Faraday A venue
Carlsbad, CA 92008 r
RE: Rancho Costera
Lots 116 through 121 of MAP CT 13-03 PA 3, Map No.16092
Dear Inspector:
Based upon topographic surveys performed by O'Day Consultants on April 8th, 2016
Lots 116 through 121, the rough grading for land development has been completed within
standard tolerance (0.10 feet) in accordance with the approved plan, (City of Carlsbad
Dwg. No. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on
the approved plans for lots 116 through 121.
We request the release of pads for building permits for lots 116 through 121.
Very truly yours,
O'DAY CONSULTANTS, INC.
O:\ProjectManagers\transmc\101307\PCPA6 Lot 127-149.doc
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
E-rnail: oday@odayconsultants.corn
Website: www.odayconsultants.corn
Tel: 760.931.7700 Fax: 760.931.8680
( \.~
(
I
I \ I
(~
/ )
/ !
I )
~
/
)
,_.---,-
(
( ( / / I
I
\
~
Civil Engi,neering • Surveying
Grant Clavier
City of Carlsbad Public Works Inspector
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
April 6, 2016
J.N. 10-1307-1
Lots 12, 13, 22, 23 of Map CT 13-03 PA 13, Map No. 16091
Dear Inspector:
Based upon topographic surveys preformed by O'Day Consultants on April 6, 2016 Lots 12, 13,
22, 23, the rough grading for land development has been completed within standard tolerance
(0.10 feet) in accordance with the approval plan, (City of Carlsbad Dwg. No. 480-3A) and that all
embankments, cut slopes and pad sizing are as shown on the approved plans for lots 12, 13, 22
and 23.
We request the release of pads for building permits for lots 12, 13, 22 and 23.
Very truly yours,
O'DAY CONSULTANTS, INC.
~ (JJ(() .
George;:; 7
Project Manager
GO/as
O:\ProjectManagers\transmc\101307\PCPA6 Lotl2,13,22,23.doc
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tel: 760.931.7700 Fax: 760.931.8680
·✓--t
)
'(:'.· r.
)0
\ (,
t
'---.
\
\
I
\
f I
\_ r
' j
WIND TRAIL WAY
Civil Engineering ~ Surveying
March 22, 2016
J.N. 10-1307-1
Grant Clavier
City of Carlsbad Public Works Inspector
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
Lots 217 through 225 and Lots 235 through 244 of MAP CT 13-03-2, MAP
NO.16092
Dear Inspector:
Based upon topographic surveys performed by O'Day Consultants on March 18, 2016
lots 217 through 225 and Lots 235 through 244 the rough grading for land development
has been completed within standard tolerance (0.10 feet) in accordance with the approved
plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad
sizing are as shown on the approved plans for lots 217 through 225 and lots 235 through
244.
We request the release of pads for building permits for lots 217 through 225 and lots 23 5
through 244.
Very truly yours,
O'DAY CONSULTANTS, INC.
/.:kvz Cl<LA7 George~
Project Manager
O:\ProjectManagers\transmc\101307\PCPA6 Lot 60, PAS; Lots 320,321,322 PAlO.doc
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
E-rnail: oday@odayconsultants.com
Website: www.odayconsultants.corn
Tel: 760.931.7700 Fax: 760.931.8680
r
342 J~
250 251
GAGE OR.
JJ9
C T S
Civil Engineering • Surveying
February 24, 2016 ·
J.N. 10-1307-1
Grant Clavier
City of Carlsbad Public Works Inspector
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
Lot 60, PAS; Lots 320,321,322 PAlO of MAP CT 13-03-2, MAP NO. 16092
Deat Inspector:
Based upon topographic surveys performed by O'Day Consultants on March 27, 2015
Lot 60, May 12, 2015 Lots 320,321,322 the rough grading for land development has
been completed within standard tolerance (0.10 feet) in accordance with the approved
plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad
sizing are as shown on the approved plans for lots 60,320,321,322.
We request the release of pads for building pe1mits for lots 60,320,321,322.
Very truly yours,
O'DAYCONSULTANTS, INC.
~~-oij7
George O'ra;
Project Manager
O:\FrojectManagers\transmc\l 0 1307\FCP A6 Lot 60, PAS; Lots 320, 321, 322 P Al 0.doc
O'Day Consultants Inc.
27·10 Loker Avenue West, Suite 100
Car,sbad. California 92010·6609
E-mail: orJay@odayconsultants.co:n
VVebsile: vvww,och:iyconsuitonts.corn
Tel: 760.931.7700 Fax; 760.931,fJGBO
Civil Engineering • Surveying
February 2, 2016
J.N. 10-1307-1
Grant Clavier
City of Carlsbad Public Works Inspector
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Rancho Costera
Lots 5-23 of MAP CT 13-03 PA 13
Dear Building Inspector:
Based upon topographic surveys performed by O'Day Consultants on October 17, 2014 -
Lots 5-11; November 4, 2014-Lots 12-23 the rough grading for land development has
been completed within standard tolerance (0.10 feet) in accordance with the approved
plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad
sizing are as shown on the approved plans for lots 5 through 23.
We request the release of pads for building permits for lots 5 through 23.
Very truly yours,
O'DAY CONSULTANTS, INC.
~:t-c-tYo.
George {5'Day /atj
Project Manager /
O:\ProjectManagers\transmc\101307\PCPA13 Lot 5-23.doc
O'Day Consultants Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, California 92010-6609
E-mail: oday@odayconsultants.com
Website: www.odayconsultants.com
Tel: 760.931.7700 Fax: 760.931.8680
""
,/
I ...1' I-L-~I ,~-
I I
I I
I I I .
-J I
J9 I I -11 I
I
I
I
I
I
I
I
®-
347
PA-2.JC
PA-1.3
CT 1J-OJ-1
SUBDIVISION
BOUNDARY
--
SHEET INDEX
SHEET NQ DESCRIPTlON
1
2
3
4-5
6
7-21
22
23
24
TlTLE SHEET
NOTARY SHEET
INDEX MAP
PROCEDURE Of SURVi
EASEMENTS
MAP SHEETS
MAP SHEET -LO TS ~
DETAILS
MAP SHEET -LOTS •