Loading...
HomeMy WebLinkAboutCT 13-03; ROBERTSON RANCH- RANCHO COSTERA; ROUGH GRADING CERTIFICATIONS; 2017-09-28-j·---..... ..:.?..._:' Civil Engineering • Surveying City of Carlsbad Public Works Inspector ATTN: Grant Clavier 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera September 28, 2017 J.N. 10-1307-1 Lots 88 through 91, Lot 100 and Lot 104 of Map CT 13-03, Map No. 16092 Dear Grant, Based upon topographic surveys performed by O'Day Consultants on March 30, 2016 for Lots 88 through 91 and Lot 100 and Lot 104 performed on September 28, 2017, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad DWG. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for Lots 88 through 91, Lot 100 and Lot 104. We request the release of pads for building permits for lots 88 through 91, Lot 100 and Lot 104. GO/tan O'Day Consultants Inc. 2710 Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 O'DAY CONSULTANTS, INC. Very truly yours, By: ~r:_d{)? George O'Day Project Manager E-mail: oday@odayconsultants.com Website: www.odayconsultants.com Tel: 760.931.7700 Fax: 760.931.8680 I 131 132 133 134 155 122 123 124 125 126 -~· 113 114 153 f§ ~r----~ ~ ~ ~ ~ WEST RANCH ST. ' t) ' I J' Civil Engineering • Surveying City of Carlsbad Public Works Inspector ATTN: Grant Clavier 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera September 14, 2017 J.N. 10-1307-1 Lots 172 through 176 of Map CT 13-03, Map No.16092 Dear Grant, Based upon topographic surveys performed by O'Day Consultants on March 25, 2016 for Lots 172 through 176, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad DWG. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 172 though 176. We request the release of pads for building permits for lots 172 through 176. GO/tan O'Day Consultants Inc. 271 O Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 O'DAY CONSULTANTS, INC. Very truly yours, r By: h.. I o v:J. George O'Day 7 Project Manager E-mail: oday@odayconsultants.com Website: www.odayconsultants.com Tel: 760.931.7700 Fax: 760.931.8680 ... Civil Engineering • Surveying City of Carlsbad Public Works Inspector ATTN: Grant Clavier 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera September 12, 2017 J.N. 10-1307-1 Lots 177 through 182 of Map CT 13-03, Map No.16092 Dear Grant, Based upon topographic surveys performed by O'Day Consuhants on March 25 and 28, 2016 for Lots 177 through 182, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad DWG. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 177 though 182. We request the release of pads for building permits for lots 177 through 182. GO/tan O'Day Consultants Inc. 2710 Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 O'DA Y CONSULTANTS, INC. Very truly yours, By: 4 1vz~dro/ ' \ I George: 'Day , Project Manager \ E-mail: oday@odayconsultants.com Website: www.odayconsultants.com Tel: 760.931.7700 Fax: 760.931.8680 \ ' Civil Engineering • Surveying City of Carlsbad Public Works Inspector ATTN: Grant Clavier 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera June 15,2017 J.N. 10-1307-1 Lots 111 through 114 and 122 though 126 of Map CT 13-03, Map No. 16092 Dear Grant, Based upon topographic surveys performed by O'Day Consultants on March 8, 2016 for Lot 111, March 28, 2016 for Lots 112 through 114, and 123 through 126 and June 15, 2017 for Lot 122, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad DWG. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 111 through 114 and 122 through 126. We request the release of pads for building permits for lots 111 through 114 and 122 through 126. GO/tan O'Day Consultants Inc. 2710 Loker Avenue lf\/est, Suite 100 Carlsbad. California 92010-6609 Very truly yours, O'DA Y CONSULTANTS, INC. ~~~ GeoriO'Day 7 Project Manager E-mail: oday@odayconsultanis.com Website: www.odayconsultanis.corn Tel: 760.931.7700 Fax: 760.931.8680 Civil Engineering • Surveying October 23, 2015 J.N. 10-1307-1 Grant Clavier City of Carlsbad Public Works Inspector 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera Lots 101-103 of MAP CT 13-03 PA 3 Dear Inspector: Based upon topographic surveys performed by O'Day Consultants on November 24, 2014, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approved plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 101 through 103. We request the release of pads for building permits for lots 101 through 103. Very truly yours, O'DA Y CONSULTANTS, INC. ~(/2 }L tY 71' George cf Day Project Manager O:\projectManagers\transmc\10 l 307\pCPA3 Lot 101-103.doc O'Day Consultants Inc. 2710 Lol<er Avenue West. Suite 100 Carlsbad, California 92010-6609 E-mail: oday@odayconsultants.com Website: www.odayconsultants.com Tel: 760.931 .7700 Fax: 760.931.8680 -------4 " I -_J 39 -11 I I tfil_ ___ _ 347 PA -23C --------- 347 ---------7 SUBDIVISION BOUNDARY I I I I I I 0:: I '~ I -z. I 3 I I I I I I / / SHEET INDEX SHEET NO. DESCRIPTION 1 TITLE SHEET 2 NOTARY SHEET J INDEX MAP 4-5 PROCEDURE OF SURV, 6 EASEMENTS 7-21 MAP SHEETS 22 MAP SHEET -LO TS , 23 DETAILS 24 MAP SHEET -LOTS, .. . Civil Engineering • Surveying October 23, 2015 J.N. 10-1307-1 Grant Clavier City of Carlsbad Public Works Inspector 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera Lots 206-208 of MAP CT 13-03 PA 6 Dear Inspector: Based upon topographic surveys performed by O'Day Consultants on November 24, 2014, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approved plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 206 through 208. We request the release of pads for building permits for lots 206 through 208. Very truly yours, O'DAY CONSULTANTS, INC. ~ 0~ George ~ 1/~ Project Manager (1' O:\ProjectManagers\transmc\101307\PCPA6 Lot 206-208.doc O'Day Consultants Inc. 271 0 Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 E-mail: oday@odayconsultants.com Website: www.odayconsultants.corn Tel: 760.931.7700 Fax: 760.931.8680 ~ ~ L i ~ ~ ~ ~ r-- -~ t....i ..;,.. 0 \J 131 :i 132 1 133 134 155 92 105 93 106 94 107 95 ~ 711 119 ~ SJ ~ 108 96 ~ffi'S 109 97 ~ 86 110 98 87 . _ 152 99 ~ 150 --i s:::::; ~ ~ f§ 122 123 124 125 1?~ 111 100 112 101 113 102 114 103 J.§}_104 ~ -~ ~r _J ~ ~ ~ ~ 88 89 90 9[ 151~ WEST RANCH sr ~ ~ Civil Engineering s Surveying City of Carlsbad Public Works Inspector ATTN: Grant Clavier 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera October 3, 2016 J.N. 10-1307 , Lots 82 through 87 and 92 though 99 of Map CT 13-03, Map No. 16092 Dear Grant, Based upon topographic surveys performed by O'Day Consultants on March 8, 2016, Lots 82 through 87 and 92 though 99, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad DWG. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 82 through 87 and 92 through 99. We request the release of pads for building ~€1111its for lots 82 through 87 and 92 through 99. PO/tan O'Day Consultants Inc. 2710 Loker Avenue West. Suite 100 Carlsbad, California 92010-6609 Very truly yours, O'DAY CONSULTANTS, INC. 1:;;~~o/ Project Engineer / E-mail: oday@odayconsultants.com Website: www.odayconsultants.com Tel: 760.931.7700 Fax: 760.931.8680 Civil Engineering • Surveying City of Carlsbad Public Works Inspector ATTN: Grant Clavier 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera August 11, 2016 J.N. 10-1307-1 Lots 212 through 216 and 226 through 234 of Map CT 13-03 PA6, Map No. 16092 Dear Grant, Based upon topographic surveys performed by O'Day Consultants on March 31, 2016, Lots 212 through 216, and 226 through 234, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad Dwg. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 212 through 216, and 226 through 234. We request the release of pads for building permits for lots 212 through 216, and 226 through 234. - PO/tan O'Day Consultants Inc. 2710 Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 Very truly yours, O'DAY CONSULTANTS, INC. ~ {/:U Goorgl:;.y 7 Project Manager E-mail: oday@odayconsultants.com Website: www.odayconsultants.com Tel: 760.931.7700 Fax: 760.931.8680 245 346 i2 Civil E11gi11eeri11g • Surveying Grant Clavier City of Carlsbad Public Works Inspector 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera June 9, 2016 J.N. 10-1307-1 Lots 25 Through 37, and 44 Through 56 of Map CT 13-03 PA 5, Map No. 16092 Dear Inspector: Based upon topographic surveys preformed by O'Day Consultants on Dec 3, 2015, March 8, 2016, and March 22, 2016, Lots 25 through 37, and 44 through 56, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 25 through 37, and through 56 .. We request the release of pads for building permits for lots 25 through 3 7, and 44 through 56 Very truly yours, O'DAY CONSULTANTS, INC. 1:;t;.~o/ Project Manager 00/na O:\ProjectManagers\transmc\l 01307\PCPAI 3 Lot25-37, 44-56.doc O'Dav Consultants Inc. E-mail: oday@odayconsultants.com Website: www.odayconsultants.com Tel: 760.931.7700 Fax: 760.931.8680 2710 Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 ; Civil Engineering • Surveying Grant Clavier City of Carlsbad Public Works Inspector 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera May 26, 2016 J.N. 10-1307-1 Lots 1, 2, 3, 4 of Map CT 13-03 PA 13, Map No. 16091 Dear Inspector: Based upon topographic surveys preformed by O'Day Consultants on May 24, 2016 and May 25, 2016, Lots 1, 2, 3, 4, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 1, 2, 3 and 4. We request the release of pads for building permits for lots 1, 2, 3 and 4. GO/na O:\ProjectManagers\transmc\l O 1307\PCPAI 3 Lot! ,2,3,4.doc O'Day Consultants Inc. 2710 Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 E-mail: oday@odayconsultants.com Website: www.odayconsultants.com Tel: 760.931.7700 Fax: 760.931.8680 I ; \ ! I ) \ I t I 1/ \. ! ! l a~ • I ~--I \ ... \ \ \ Civil Eng_ineering • Surveying April 8, 2016 J.N. 10-1307-1 Grant Clavier City of Carlsbad Public Works Inspector 1635 Faraday A venue Carlsbad, CA 92008 r RE: Rancho Costera Lots 116 through 121 of MAP CT 13-03 PA 3, Map No.16092 Dear Inspector: Based upon topographic surveys performed by O'Day Consultants on April 8th, 2016 Lots 116 through 121, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approved plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 116 through 121. We request the release of pads for building permits for lots 116 through 121. Very truly yours, O'DAY CONSULTANTS, INC. O:\ProjectManagers\transmc\101307\PCPA6 Lot 127-149.doc O'Day Consultants Inc. 2710 Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 E-rnail: oday@odayconsultants.corn Website: www.odayconsultants.corn Tel: 760.931.7700 Fax: 760.931.8680 ( \.~ ( I I \ I (~ / ) / ! I ) ~ / ) ,_.---,- ( ( ( / / I I \ ~ Civil Engi,neering • Surveying Grant Clavier City of Carlsbad Public Works Inspector 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera April 6, 2016 J.N. 10-1307-1 Lots 12, 13, 22, 23 of Map CT 13-03 PA 13, Map No. 16091 Dear Inspector: Based upon topographic surveys preformed by O'Day Consultants on April 6, 2016 Lots 12, 13, 22, 23, the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approval plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 12, 13, 22 and 23. We request the release of pads for building permits for lots 12, 13, 22 and 23. Very truly yours, O'DAY CONSULTANTS, INC. ~ (JJ(() . George;:; 7 Project Manager GO/as O:\ProjectManagers\transmc\101307\PCPA6 Lotl2,13,22,23.doc O'Day Consultants Inc. 2710 Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 E-mail: oday@odayconsultants.com Website: www.odayconsultants.com Tel: 760.931.7700 Fax: 760.931.8680 ·✓--t ) '(:'.· r. )0 \ (, t '---. \ \ I \ f I \_ r ' j WIND TRAIL WAY Civil Engineering ~ Surveying March 22, 2016 J.N. 10-1307-1 Grant Clavier City of Carlsbad Public Works Inspector 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera Lots 217 through 225 and Lots 235 through 244 of MAP CT 13-03-2, MAP NO.16092 Dear Inspector: Based upon topographic surveys performed by O'Day Consultants on March 18, 2016 lots 217 through 225 and Lots 235 through 244 the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approved plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 217 through 225 and lots 235 through 244. We request the release of pads for building permits for lots 217 through 225 and lots 23 5 through 244. Very truly yours, O'DAY CONSULTANTS, INC. /.:kvz Cl<LA7 George~ Project Manager O:\ProjectManagers\transmc\101307\PCPA6 Lot 60, PAS; Lots 320,321,322 PAlO.doc O'Day Consultants Inc. 2710 Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 E-rnail: oday@odayconsultants.com Website: www.odayconsultants.corn Tel: 760.931.7700 Fax: 760.931.8680 r 342 J~ 250 251 GAGE OR. JJ9 C T S Civil Engineering • Surveying February 24, 2016 · J.N. 10-1307-1 Grant Clavier City of Carlsbad Public Works Inspector 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera Lot 60, PAS; Lots 320,321,322 PAlO of MAP CT 13-03-2, MAP NO. 16092 Deat Inspector: Based upon topographic surveys performed by O'Day Consultants on March 27, 2015 Lot 60, May 12, 2015 Lots 320,321,322 the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approved plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 60,320,321,322. We request the release of pads for building pe1mits for lots 60,320,321,322. Very truly yours, O'DAYCONSULTANTS, INC. ~~-oij7 George O'ra; Project Manager O:\FrojectManagers\transmc\l 0 1307\FCP A6 Lot 60, PAS; Lots 320, 321, 322 P Al 0.doc O'Day Consultants Inc. 27·10 Loker Avenue West, Suite 100 Car,sbad. California 92010·6609 E-mail: orJay@odayconsultants.co:n VVebsile: vvww,och:iyconsuitonts.corn Tel: 760.931.7700 Fax; 760.931,fJGBO Civil Engineering • Surveying February 2, 2016 J.N. 10-1307-1 Grant Clavier City of Carlsbad Public Works Inspector 1635 Faraday Avenue Carlsbad, CA 92008 RE: Rancho Costera Lots 5-23 of MAP CT 13-03 PA 13 Dear Building Inspector: Based upon topographic surveys performed by O'Day Consultants on October 17, 2014 - Lots 5-11; November 4, 2014-Lots 12-23 the rough grading for land development has been completed within standard tolerance (0.10 feet) in accordance with the approved plan, (City of Carlsbad Dwg. No. 480-3A) and that all embankments, cut slopes and pad sizing are as shown on the approved plans for lots 5 through 23. We request the release of pads for building permits for lots 5 through 23. Very truly yours, O'DAY CONSULTANTS, INC. ~:t-c-tYo. George {5'Day /atj Project Manager / O:\ProjectManagers\transmc\101307\PCPA13 Lot 5-23.doc O'Day Consultants Inc. 2710 Loker Avenue West, Suite 100 Carlsbad, California 92010-6609 E-mail: oday@odayconsultants.com Website: www.odayconsultants.com Tel: 760.931.7700 Fax: 760.931.8680 "" ,/ I ...1' I-L-~I ,~- I I I I I I I . -J I J9 I I -11 I I I I I I I I ®- 347 PA-2.JC PA-1.3 CT 1J-OJ-1 SUBDIVISION BOUNDARY -- SHEET INDEX SHEET NQ DESCRIPTlON 1 2 3 4-5 6 7-21 22 23 24 TlTLE SHEET NOTARY SHEET INDEX MAP PROCEDURE Of SURVi EASEMENTS MAP SHEETS MAP SHEET -LO TS ~ DETAILS MAP SHEET -LOTS •