Loading...
HomeMy WebLinkAboutCT 13-03; ROBERTSON RANCH- RANCHO COSTERA; SEWER SURVEY; 2015-12-210 Morr-Is Tested, Inc 19469 Via Del Caballo Yorba Linda, Ca 92886 M'F orr-ic Tested CARLSBAD-ROBERSON RANCH WEST VILLAGE-EL CAMINO REAL WIDENING SEWER 122115-A 12/21/2015 WEST RANCH STREET 463+50 ONSITE MH SDR-35 171.2 171.2 122115-B 12/21/2015 EL CAMINO REAL 463+50 EXISTING MANHOLE SDR-35 3943 3943 Number of inspections: 2 Subtotal 565.5 ft 5655 ft Total 565.5 ft 565.5 ft Project Summary Monday, December 21, 20159:44 AM Page 1 of 1 . I I . Morr-Is Tested, Inc 19469 Via Del Caballo Yorba Linda, Ca 92886 SITE DATA Mainline ID: City: Address: 122115-A CARLSBAD WEST RANCH STREET I Upstream node: Downstream node: Pipe type: Pipe shape: Pipe height: Pipe width: ONSITE MH J 463+50 SDR-35 I Circular 8 18 1 INSPECTION DATA Scheduled date: Start date/time: End date/time: 12/21/2015 9:17:49 AM 1 12/21/2015 9:19:01 AM 112/21/2015 9:24:33 AM ------------ Surveyed footage: Status: Operator: Work order no.: 171.2 Stopped MIKE LUZZI I Reason: Weather: Condition: Pre-Acceptance Fair Satisfactory Comments ROBERSON RANCH WEST VILLAGE EL CAMINO REAL WIDENING NEW SEWER OBSERVATIONS 0 Observations By Inspections Monday, December 21, 2015 9:44 AM Page 1 of 1 . MOrr-Is Tested, Inc 19469 Via Del Caballo Yorba Linda, Ca 92886 Mf Tested SITE DATA Mainline ID: City: Address: 122115-B CARLSBAD EL CAMINO REAL I Upstream node: Downstream node: Pipe type: Pipe shape: Pipe height: Pipe width: 463+50 EXISTING MANHOLE I SDR-35 Circular 8 8 INSPECTION DATA Scheduled date: Start date/time: End date/time: 12/21/2015 9:25:25 AM 1 12/21/2015 9:30:35 AM 112/21/2015 9:44:07 AM Surveyed footage: Status: Operator: Work order no.: - 394.3 Stopped MIKE LUZZI I Reason: Weather: Condition: Pre-Acceptance I Fair Satisfactory Comments ROBERSON RANCH WEST VILLAGE EL CAMINO REAL WIDENING NEW SEWER OBSERVATIONS 0 Observations By Inspections Monday, December 21, 2015 9:44 AM Page 1 of 1