HomeMy WebLinkAboutCT 13-03; ROBERTSON RANCH- RANCHO COSTERA; SEWER SURVEY; 2015-12-210
Morr-Is Tested, Inc
19469 Via Del Caballo
Yorba Linda, Ca 92886 M'F
orr-ic
Tested
CARLSBAD-ROBERSON RANCH WEST VILLAGE-EL CAMINO REAL WIDENING SEWER
122115-A 12/21/2015 WEST RANCH STREET 463+50 ONSITE MH SDR-35 171.2 171.2
122115-B 12/21/2015 EL CAMINO REAL 463+50 EXISTING MANHOLE SDR-35 3943 3943
Number of inspections: 2 Subtotal 565.5 ft 5655 ft
Total 565.5 ft 565.5 ft
Project Summary Monday, December 21, 20159:44 AM Page 1 of 1 . I I
. Morr-Is Tested, Inc
19469 Via Del Caballo
Yorba Linda, Ca 92886
SITE DATA
Mainline ID: City: Address:
122115-A CARLSBAD WEST RANCH STREET I
Upstream node: Downstream node: Pipe type: Pipe shape: Pipe height: Pipe width:
ONSITE MH J 463+50 SDR-35 I Circular 8 18 1
INSPECTION DATA
Scheduled date: Start date/time: End date/time:
12/21/2015 9:17:49 AM 1 12/21/2015 9:19:01 AM 112/21/2015 9:24:33 AM ------------ Surveyed footage: Status: Operator: Work order no.:
171.2 Stopped MIKE LUZZI I
Reason: Weather: Condition:
Pre-Acceptance Fair Satisfactory
Comments
ROBERSON RANCH WEST VILLAGE
EL CAMINO REAL WIDENING
NEW SEWER
OBSERVATIONS
0 Observations By Inspections Monday, December 21, 2015 9:44 AM Page 1 of 1
. MOrr-Is Tested, Inc
19469 Via Del Caballo
Yorba Linda, Ca 92886 Mf
Tested
SITE DATA
Mainline ID: City: Address:
122115-B CARLSBAD EL CAMINO REAL I
Upstream node: Downstream node: Pipe type: Pipe shape: Pipe height: Pipe width:
463+50 EXISTING MANHOLE I SDR-35 Circular 8 8
INSPECTION DATA
Scheduled date: Start date/time: End date/time:
12/21/2015 9:25:25 AM 1 12/21/2015 9:30:35 AM 112/21/2015 9:44:07 AM
Surveyed footage: Status: Operator: Work order no.: -
394.3 Stopped MIKE LUZZI I
Reason: Weather: Condition:
Pre-Acceptance I Fair Satisfactory
Comments
ROBERSON RANCH WEST VILLAGE
EL CAMINO REAL WIDENING
NEW SEWER
OBSERVATIONS
0 Observations By Inspections Monday, December 21, 2015 9:44 AM Page 1 of 1