Final Soils Summary Letter
Lot 1 (Units 1 through 4) and Lot 2, Golden Surf Residential Development, 1000
Camino De Las Ondas, City of Carlsbad, California
1) Advanced Geotechnical Solutions, Inc., (AGS), "Prelimina,y Geotechnical
Investigation, Proposed Golden Swf Residential Development, 1000 Camino De Las
Ondas, City of Carlsbad, San Diego County, California" dated March 6, 2017, Report
No. 1701-13-B-2.
2) Advanced Geotechnical Solutions, Inc., (AGS), "Project Grading Report, Lot 1 (Units
1 through 4) and Lot 2, Golden Swf Residential Development, 1000 Camino De Las
Ondas, City of Carlsbad, San Diego County, California" dated October 24, 2017,
Report No. 1701-13-C-5.
Advanced Geotechnical Solutions, Inc. (AGS) observed the soil and geologic conditions at the subject
project during site grading and improvement construction, and found them to be substantially in
conformance with those assumed in the approved geotechnical rep01t (Reference 1) and described in the
project grading repo1t (Reference 2). Unsuitable soils in the subject building pad areas were removed and
replaced with compacted fill soils to approximate design finish grades. Soil backfill of utility lines was
compacted to at least 90 percent of maximum dry density as determined by ASTM: D-1557. Footing
excavations for the proposed single-family residences were observed to extend to a suitable bearing strata
and meet minimum embedment requirements. The soil has been tested for expansive characteristics and
determined to possess "very low to medium" potential for expansion. The upper soils were tested for
soluble sulfate concentrations and found to have "negligible" sulfate concentrations. Based on AGS's
testing and observations and review of the referenced repo1ts, the soil engineering and engineering
geologic aspects of the grading are in compliance with the approved geotechnical report and the grading
and improvement plans. The subject building pads are considered suitable for suppo1t of the proposed
Respectfully Submitted,
Advanced Geotechni Solutions, Inc
JE F . CHAN , resident
RCE 46544, RGE 2314, Reg. Exp. 6-30-19
Distribution: (3) Addressee
ORANGE AND L.A. COUNTIES
(714) 786-5661
INLAND EMPIRE
(619) 708-1649
SAN DIEGO AND IMPERIAL COUNTIES
(619) 850-3980
NEW POINTE COMMUNITIES, INC.
16880 West Bernardo Drive, Suite 230
San Diego, CA 92127
Attention: Mr. Tyler Sandstrom
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
485 Corporate Drive, Suite B
Escondido, California 92029
Telephone: (619) 867-0487 Fax: (714) 409-3287
August 20, 2018
P/W 1701-13
Report No. 1701-13-C-8
Subject: Supplemental Compaction Report, Masonry Retaining Walls, Golden Surf
Residential Development, 1000 Camino De Las Ondas, City of Carlsbad, San Diego
County, California
References: See Appendix
In accordance with your request, Advanced Geotechnical Solutions, Inc. (AGS) has prepared this repoti
summarizing our observation and test results collected during the construction of the Masonry Retaining
walls at the Golden Surf Residential Development, 1000 Camino De Las Ondas in the City of Carlsbad,
California. The specific locations of these walls are shown on Plates I through 3 (utilizing the most
current Retaining Wall Addition Exhibit as a base).
The subject walls were constructed as part of the ongoing development of the Golden Surf project. The
subject walls were constructed under the periodic observation and testing of AGS. Specifically, AGS
personnel conducted the following services during the construction of the subject wall:
• Observed footing excavations to verify that the footings were founded in firm competent
materials;
• Conducted periodic observations to verify Masonry retaining walls were constructed in general
conformance to the plans and recommendations presented in the referenced repo1ts and the San
Diego Regional Standard Drawings.
• Observed wall backdrains.
• Provided periodic compaction testing of the backfill to verify the minimum compaction criteria
(minimum of 90% of the laboratory maximum density per ASTM D-1557) was meet;
During the placement of the masonry wall backfill, representatives of AGS observed and conducted
periodic compaction testing. In general, the majority of the wall backfill consisted of crushed rock
(314inch) capped with approximately 12 to 18 inches of locally derived soils. During the backfill
operations the wall backfill was moisture conditioned to or slightly above optimum moisture content,
placed in thin, loose lifts (approximately 12 inches), and compacted to a minimum of 90 percent of the
laboratory maximum dry density in accordance with ASTM Test Method D-1557. Compaction was
achieved utilizing a vibratory and hand operated tampers.
ORANGE AND L.A. COUNTIES
(714) 786-5661
INLAND EMPIRE
(619) 867-0487
SAN DIEGO AND IMPERIAL COUNTIES
(619) 867-0487
August 20, 2018
P/W 1701-03
APPENDIX,REFERENCES
Page 3
Repo1iNo. 1701-13-C-8
Advanced Geotechnical Solutions, Inc., (AGS), "Preliminary Geotechnical Investigation, Proposed
Golden Surf Residential Development, 1000 Camino De Las Ondas, City of Carlsbad, San Diego
County, California" dated March 6, 2017, Report No. 1701-13-B-2
Advanced Geotechnical Solutions, Inc., (AGS), "Foundation Plan Review for Golden Surf Residential
Development, 1000 Camino De Las Ondas, City of Carlsbad, San Diego County, California" dated
August 29, 2017, Repo1tNo. 1701-13-B-D-4
Advanced Geotechnical Solutions, Inc., (AGS), "Project Grading Repo1t, Lot 1 (Units 1 through 4) and
Lot 2, Golden Surf Residential Development, 1000 Camino De Las Ondas, City of Carlsbad, San
Diego County, California" dated October 24 , 2017, Repo1t No. 1701-13-C-5
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
August 20, 2018
P/W 1701-13
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
TEST NUMBER/LOCATION/ELEVATION KEY
Page 2 of Table 1
Report No. 1701-13-C-8
S -Sewer Trench I -Irrigation Trench SD -Storm Drain Trench E -Electrical Trench JT -Joint Utility Trench W -Water Trench RTW -Retaining Wall FTG -Footing FG -Finish Grade
SG -Subgrade CG -Curb and Gutter Subgrade B -Base AC -Asphalt Concrete Fi_nish Grade BC -Asphalt Concrete Base Course CC -Asphalt Concrete Cap Course -R,Rl,R2 -Indicates Retest
* Rock Correction-Estimated Percent Retained on #4 Sieve (Method A) or 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Depth Moisture Dry Density Rel. Proj. Test Pass
Test or Soil Rock (%} (pcf} Comp. Spec. Type or
Date Number Location Elev. Type Corr.* Opt. Field Max. Field (%} {%} {S/N} Fail
10/13/17 140RTW Lot 2 168 A 9.0 11.8 128.S 117.0 91 90 N Pass
10/13/17 141RTW Lot 2 169 A 9.0 11.6 128.S 119.4 92 90 N Pass
10/16/17 144RTW Lot 2 167 E 7.5 9.7 132.5 119.8 90 90 N Pass
10/16/17 145RTW Lot 2 169 E 7.5 11.2 132.5 120.6 91 90 N Pass
10/16/17 147RTW Lot 2 170 E 7.5 10.6 132.5 122.4 92 90 N Pass
10/17/17 150RTW Lot 2 171 E 7.5 9.6 132.5 123.4 93 90 N Pass
10/17/17 151RTW Lot 1 -Unit 1 166 B 8.5 8.9 133.0 121.7 91 90 N Pass
10/17/17 152RTW Lot 1-Unit 2 165 B 8.5 9.4 133.0 122.S 92 90 N Pass
10/18/17 156RTW Lot 2 170 E 7.5 11.2 132.S 121.0 91 90 N Pass
10/18/17 157RTW Lot 1-Unit 1 167 B 8.5 9.1 133.0 125.7 94 90 N Pass
10/18/17 159RTW Lot 1-Unit 2 167 B 8.5 10.7 133.0 121.7 91 90 N Pass
10/19/17 160RTW Lot 1-Unit 1 169 B 8.5 11.2 133.0 123.9 93 90 N Pass
10/19/17 161RTW Lot 1-Unit 2 168 B 8.5 9.6 133.0 121.2 91 90 N Pass
08/13/18 166RTW Lot 2 164 B 8.5 11.2 133.0 109.2 82 90 N Fail
08/13/18 167RTW Lot 2 164 B 8.5 6.2 133.0 111.2 83 90 N Fail
08/13/18 168RTW Lot 2 164 B 8.5 7.0 133.0 110.4 83 90 N Fail
08/13/18 169RTW Lot 1 166 B 8.5 7.2 133.0 115.1 86 90 N Fail
08/13/18 170RTW Lot 1 166 B 8.5 7.1 133.0 109.S 82 90 N Fail
08/20/18 166RTW-R Lot 2 164 B 8.5 9.1 133.0 121.7 91 90 N Pass
08/20/18 167RTW-R Lot 2 164 B 8.5 9.4 133.0 121.2 91 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
I
I I
I
l
I '~
I I I i
I
I
\
5 0
b-11--1-U
W1
SCALE: 7" = 5'
□□ BB□·t', ,f ?;I, I' ,~fc(, ~
□□□1 11 1 1 1 1 1 I I\ 7 J I I I I
RETAINING WALL ADDmON EXHIBIT FOR:
GOLDEN SURF GP496-4A
LOT 1 ~ UNIT2
'?L-1\"TE 3 SHEET2