CT
.GotecPüiicI, Inc.
October 15, 2014 Project No. 13200-01
Ms. April Tomillo
Taylor Morlison
8105 Irvine Center Drive, Suite .1450
Irvine, CA 92618,
Subject Geotechnical Recommendations for Proposed Deepened Caisson Footings Adjacent to the
Existing 66-inch Storm Drain Easement, State Street Toivnhomes, 2531 through 2589
State Street, .iEy of Carlsbad, California
Introduction
In accordance with your request; L3C Geotechnical, Inc has prepared this report to provide
recommendations for the proposed deepened caiss6ñ footings for building foundations adjacent to the
existing storm drain easement for the proposed State Street Townhomes between 2531 and 2589 State Street,
in the city of Carlsbad, California
'.BackRrOund .
An existing 66-inch storm drain transects the prdosed residential development sit at adepth of
approximately 9 feet below ground surface to top-of-pipe Following development, homes wilL. be located
approximately 7.5 feet horizontally from the edge of the buried storm drain As noted by the City Engineer,
building foundations adjacent to the storm drain easen1ent are not to induce horizontal or vertical loading of
any kind onto the existing storm drain line As a resultdeepened caisson footings are required to satisfy the
said requirements imposed by the City.
S
Deep Foundation Recommendations .
We recommend the proposed deepened footings be designed utilizing support from Cast-In-Drilled Hole
(CIDH) piles These piles may be designed to resist axial dead and live loads using an allowable skin friction
of 500 psf from the top of the existing storm drain elevation to the tip elevation of the proposed caisson Per
the City Engineer, the designed caissons must extend below the bottom elevation of the kisting storndra--
line An allowable end bearing of 3,500 psf niaybe utilized in the design of these piles Piles should-be
spaced at a minimum on-center spacing of three times the pile diameter For shrt d - ion seismic loadin
pile capacities may be increased by 1/3 The es pile capaciti are.based on soil resistance only and je •.i'_,
further limited by the pile-head connection details and structural material strength Total soil settlem6il
to structural foundation loads is estimated to be less than 1/2 of an inch or less Differential settlement may bL -
taken as V2 of the total (i.e., ¼ of an inch Over 40 horizontal feet).
S.,.
S.
The attributed loading applied to the proposed deepened caisson footings is to be taken as the structural loads
within a one to one projection from the bottom of the existing storm drain through to the adjacent building
slab-on-grade.
Pile borings should be plumb and free of loose or softened material. Extreme care in drilling, placement of
reinforcement steel and the pouring of concrete will be essential to avoid excessive disturbance of pile boring
walls. The pile reinforcing cage should be installed and the concrete pumped immediately after drilling is
completed. Concrete mix design should include provisions to minimize shrinkage which can reduce frictional
resistance of the pile shaft. A representative from LGC Geotechnical should be onsite full time during the
drilling of piles to verify the assumptions made during the design stages. Pile holes must not be left open
overnight.
Geotechnical Observation/Testing During Grading and Construction
The recommendations provided in this report are based on limited subsurface evaluation, field observations,
and geotechnical analysis. The interpolated subsurface conditions should be checked in the field during grading
and construction by a representative of LGC Geotechnical.
Geotechnical observation and/or testing should be performed by a field representative from our office at the
following stages:
During drilling and installation of Cast-In Drilled Hole (CIDH) foundations; and
When any unusual soil conditions are encountered during any construction operation
subsequent to issuance of this report.
Limitations
Our services were performed using the degree of care and skill ordinarily exercised, under similar
circumstances, by reputable soils engineers and geologists practicing in this or similar localities. No other
warranty, expressed or implied, is made as to the conclusions and professional advice included in this report.
Project No. 13200-01 Page 2 October 15, 2014
We appreciate this opportunity to be of service. Should you have any questions or concerns regarding this
letter, please do not hesitate to contact our office.
cechnical,Inc.
ENGINEERING co ta 260 M
H GEOLOGIST
Tim Lawson, CEO 1821, GE 2626 op
07'EC 65.
Geotechnical Engineer/Geologist CA OF C
TJL/ASR!kmb
- Attachments: References
Geotechnical Map and Cross Sections
Distribution: (3) Addressee (3 wet-signed copies; I via email)
(I) Adams Streeter Civil Engineers, Inc. (via email)
Attention: Mr. Mohammad Adabadi
(1) Amid Engineering Group, Inc. (via email)
Attention: Mr. Mansour Amid
(1) Mr. Marshal Mead (via email)
Project No. 13200-01 Page - October 15, 2014
References
Adams Streeter Civil Engineers, Inc., 2014, Precise, Grading Plan, State Street Townhomes, Carlsbad,
California, date plotted October 14, 2014.
Lew, et al, 2010, Seismic Earth Pressures on Deep Basements, Structural Engineers Association of California
(SEAOC) Convention Proceedings.
LGC Geotechnical, Inc., 2014a, Preliminary Geotechnical Evaluation for the Proposed State Street
Townhomes, 2531 through 2589 State Street, City of Carlsbad, California, Project No. 13200-01,
dated July 3, 2014.
2014b, Geotechnical Recommendations for Trench Excavation to Expose Existing 66-inch Storm
Drain after Construction of the Proposed Development, State Street Townhomes, 2531 through 2589
State Street, City of Carlsbad, California, Project No. 13200-01, dated October 9, 2014.
Project No. 13200-01 References October 15, 2014
...
LGC
Geotechnical, Inc.
State. 'Street
f ' '
@1 Approx1mqte Limits of Deepened
aisson Footings Actual Locations to be
Determined by Structural Engineer
'..1 ·-:,--=\:=-=....;;:~a
1--1
....._..----
--,I,
-_, --c:=--
~ -..-:--..-: ---= -'------.: ....... ?Et JP! WiC ~ ..... :we:--: _.. :Ml;
SCALE: 1 "=20'
20· 0 20' 40'
CLIENT:
Geotechnical Map of Caisson Taylor Morrison
Supported Footings 8105 Irvine Center Drive, Suite 1450
Irvine, CA 92618
Legend:
2 2'
"" ,._:.__ODesigesl;j· nn -::-r._--~,o I
Profile 't'..
~ I
UNIT9
FF"42.50
UNIT10
:::;
en "' ~ ,§ !e i ~
UI -i JC ~
Af
Qt
FF"42 . .c>
STO!lM OllAN EASDIENT~ I"" .,.._,,.FOOTING ='°-i ~---?
\j:_)/ a&.~m Ix;
20f1AV. BOTTOM Of CAJSSONI
~ ~
• -~ JC ~ ~
Horizontal Distance (Feet)
1 1'
~ ~
iif 401 c ~ ,g C ii
UI -l "'
UNIT31
FF"40.00
Af
Qt
Desig
Profi: 't_ ! UNIT 30 I FF"40.30 l ..
STMM DRAI~ tASEMENT~-
EXISTING~ ~ STORMORAIN
~~ ?
\,..-.-::,~I I JC ,1 ~
\I 11
_,"::'=~I ELEV.'2<.5
2Sll1RV. BOTTOM OF CAISSON
200 IC, 10 JO <IO '41.G
HonzontaJ Distance (Feet)
SCALE: 1"=20'
20· 0 20' 40'
• 2 2'
Approximate Limits of Deepened Caisson Footings.
Actual Caisson Locations to be
Determined by Structural Engineer
Approximate Location of Geotechnical Cross Section
I I -Approximate Report Limits
--Af Engineered Fill Material
® Quaternary Terrace Deposits, circled where buried
CIVIL ENGINEER: PROJECT NAME State Street -Carlsbad
Adams Streeter PROJECT NO. 13200-01
15 Corporate Park ENG./GEOL. TJL
Irvine, CA 92606 SCALE 1 inch = 20 feet
DATE October 2014