February 25, 2017
RE: Certification of Pad Grade for Pool Restroom Building of the City of Carlsbad Drawing No.
428-911, Project No. CT 15-08, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort
Site-Phase 3
To whom it my concern,
Excel Engineering performed a field survey on February 24, 2017 to confirm
finish pad grade for the referenced site. A minimum of 5 shots were taken and the
finished pad grade is as follows:
Pad Average Pad Elevation Design Pad Elevation
Pool Restroom Bldg. 212.21 21225
The maximum deviation from design to finish pad for said pad was found to be 0.08'. The pad is
in substantial conformance with the approved grading plan.
If you have any further questions or need any additional information do not hesitate to call.
Sincerely,
Win J. -Oxkwmm
athew J. Muckennan, PLS 49 No. 7603 -
Q:\1414100\STAKerts1pad certsPAD CERT Poo' E1dgdoc
EXCEL ENGINEERING LEV1N & DEN TINO INC. b.BA EXCEL EN(.INEElNG
ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118. Fax 745-8134
June 20, 2016
RE: Certification of Pad Grade for Villas 75, 76, 77 and Maintenance Building of the City of
Carlsbad Drawing No. 428-9H, Project No CT I 5-08 Grading Plans for Carlsbad Ranch,
Planning Area No. 5, Resort Site-Phase 3
To whom it my concern,
Excel Engineering performed a field survey on June 17, 2016 to confirm finish
pad grade for the referenced site. A minimum of 5 shots were taken and the finished pad
grade is as follows:
Pad Avernge Pad Elevation Design Pad Elevation
Villa 75 207.26 207.20
Villa 76 197.79 197.75
Villa 77 192.26 . 192.25
Maintenance Bldg. 211.04 211.05
The maximum deviation from design to finish pad for said pad was found tobe 0.10'. The pad is
in substantial conformance with the approved grading plan.
If you have any further questions or need any additional information do not hesitate to call.
Mathew
JMuckerman PLs
No. 603
ce1s\PAD CERT V1UAS 75-77 Majrit BIdg.doc
EXCEL ENGINEERING LEVIN & DENTINO INC. D.B.A. EXCEL ENGINEERING
ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118 .Fax 745-8134
May 25, 2016
RE: Certification of Pad Grade for Villa 61 of the City of Carlsbad Drawing No. 428-9H, Project
No. CT 15-08, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site-Phase 3
To whom it my concern,
Excel Engineering performed a field survey on May 24, 2016 to confirm finish
pad grade for the referenced site. A minimum of 7 shots were taken and the finished pad
grade is as follows:
Pad Average Pad Elevation Design Pad Elevation
Villa 61 189.62 189.61
The maximum deviation from design to finish pad for said pad was found to be 0.05'. The pad is
in substantial conformance with the approved grading plan.
If you have any further questions or need any additional information do not hesitate to call.
Sincerely,
Michael D. Levin, PLS l D. Levin
)4No. 6896..4
Q:\14114100\STAKE\certs\pad certsPAD CERT VILLA 61.doc
J. Muckerman, PLS
EXCEL ENGINEERING LEVIN & DENT/NO INC. D.S.A. EXCEL ENGINEERING
ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118.Fax 745-8134
March 20, 2017
RE: Certification of Pad Grade for Hotel 3 and Out Building of the City of Carlsbad Drawing
No. 428-9H, Project No. CT 15-08, Grading Plans for Carlsbad Ranch, Planning Area No. 5,
Resort Site-Phase 3
To whom it my concern,
Excel Engineering performed a field survey on March 17, 2017 to confirm finish
pad grade for the referenced sites. A minimum of 7 shots were taken on the Out
Building and a minimum of 35 shots were taken on Hotel 3, the finished pad grades are
as follows:
Pad Average Pad Elevation Design Pad Elevation
Hotel 3 223.53 223.55
Out Building 223.78 223.80
The maximum deviation from design to finish pad for said pad was found to be 0.10'. The pad is
in substantial conformance with the approved grading plan.
If you have any further questions or need any additional information do not hesitate to call.
Q:\14\14100STAKEcerts\pad certa\PAD CERT Hotel 3 and Out b/dg.doc