Loading...
HomeMy WebLinkAboutCT 15-08; CARLSBAD RANCH PA 5 PHASE 3; PAD CERTIFICATIONS; 2017-02-25cri -o;~- 1 Ail k ENGINEERING. LEVIN & DENT!NO INC. D.A. EXCEL ENGINEERING ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118 • Fax 745-8134 February 25, 2017 RE: Certification of Pad Grade for Pool Restroom Building of the City of Carlsbad Drawing No. 428-911, Project No. CT 15-08, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site-Phase 3 To whom it my concern, Excel Engineering performed a field survey on February 24, 2017 to confirm finish pad grade for the referenced site. A minimum of 5 shots were taken and the finished pad grade is as follows: Pad Average Pad Elevation Design Pad Elevation Pool Restroom Bldg. 212.21 21225 The maximum deviation from design to finish pad for said pad was found to be 0.08'. The pad is in substantial conformance with the approved grading plan. If you have any further questions or need any additional information do not hesitate to call. Sincerely, Win J. -Oxkwmm athew J. Muckennan, PLS 49 No. 7603 - Q:\1414100\STAKerts1pad certsPAD CERT Poo' E1dgdoc EXCEL ENGINEERING LEV1N & DEN TINO INC. b.BA EXCEL EN(.INEElNG ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118. Fax 745-8134 June 20, 2016 RE: Certification of Pad Grade for Villas 75, 76, 77 and Maintenance Building of the City of Carlsbad Drawing No. 428-9H, Project No CT I 5-08 Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site-Phase 3 To whom it my concern, Excel Engineering performed a field survey on June 17, 2016 to confirm finish pad grade for the referenced site. A minimum of 5 shots were taken and the finished pad grade is as follows: Pad Avernge Pad Elevation Design Pad Elevation Villa 75 207.26 207.20 Villa 76 197.79 197.75 Villa 77 192.26 . 192.25 Maintenance Bldg. 211.04 211.05 The maximum deviation from design to finish pad for said pad was found tobe 0.10'. The pad is in substantial conformance with the approved grading plan. If you have any further questions or need any additional information do not hesitate to call. Mathew JMuckerman PLs No. 603 ce1s\PAD CERT V1UAS 75-77 Majrit BIdg.doc EXCEL ENGINEERING LEVIN & DENTINO INC. D.B.A. EXCEL ENGINEERING ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118 .Fax 745-8134 May 25, 2016 RE: Certification of Pad Grade for Villa 61 of the City of Carlsbad Drawing No. 428-9H, Project No. CT 15-08, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site-Phase 3 To whom it my concern, Excel Engineering performed a field survey on May 24, 2016 to confirm finish pad grade for the referenced site. A minimum of 7 shots were taken and the finished pad grade is as follows: Pad Average Pad Elevation Design Pad Elevation Villa 61 189.62 189.61 The maximum deviation from design to finish pad for said pad was found to be 0.05'. The pad is in substantial conformance with the approved grading plan. If you have any further questions or need any additional information do not hesitate to call. Sincerely, Michael D. Levin, PLS l D. Levin )4No. 6896..4 Q:\14114100\STAKE\certs\pad certsPAD CERT VILLA 61.doc J. Muckerman, PLS EXCEL ENGINEERING LEVIN & DENT/NO INC. D.S.A. EXCEL ENGINEERING ESCONDIDO 440 State Place • Escondido, CA 92029 (760) 745-8118.Fax 745-8134 March 20, 2017 RE: Certification of Pad Grade for Hotel 3 and Out Building of the City of Carlsbad Drawing No. 428-9H, Project No. CT 15-08, Grading Plans for Carlsbad Ranch, Planning Area No. 5, Resort Site-Phase 3 To whom it my concern, Excel Engineering performed a field survey on March 17, 2017 to confirm finish pad grade for the referenced sites. A minimum of 7 shots were taken on the Out Building and a minimum of 35 shots were taken on Hotel 3, the finished pad grades are as follows: Pad Average Pad Elevation Design Pad Elevation Hotel 3 223.53 223.55 Out Building 223.78 223.80 The maximum deviation from design to finish pad for said pad was found to be 0.10'. The pad is in substantial conformance with the approved grading plan. If you have any further questions or need any additional information do not hesitate to call. Q:\14\14100STAKEcerts\pad certa\PAD CERT Hotel 3 and Out b/dg.doc