Loading...
HomeMy WebLinkAboutCT 15-08; CARLSBAD RANCH PLANNING AREA 5; POOL SLIDE RECOMMENDATIONS; 2019-06-26CE f D Geo technical Engineering Construction Inspection NOV 2 5 2019 Materials Testing "Providing Value In Quanty Services~ LOCATION : LAND DE-VELOPM__,,...,--,N-=T----· Envire mental R~CORDCOPY ENGiNEERING SAN DIEGO 6295 Ferris Square Suite C San Diego. CA 9212 1 T: 858.537.3999 F: 858.537.3990 ANAHEIM 2992 E. La Palma Avenue Suite A Anaheim. CA 92806 T: 714.632.2999 F:714.632.297 4 EL SEGUNDO 222 N. Sepulveda Boulevard Suite 200 El Segundo, CA 90245 T: 310.364.5213 F: 310.364.520 l RIVERSIDE 14467 Meridian Parkway Building 2A Riverside. CA 92518 T: 9 51.653.4999 F:95 1.653.4666 SAN DIEGO DISPATCH 888.844.5060 ANAHEIM / RIVERSIDE DISPATCH 800.491.2990 www.mtglinc.com ( ' M/WBE I SBE I DBE I CBE DIR 1000006646 '--------- June 26, 2019 Grand Pacific Resorts , Inc. 5900 Pasteur Court, Suite 200 Carlsbad, California 92008 Attention: Mr. Houston Arnold ')t.r-/da, !'2.-c,-,4 Initial Date MTGL Project No. l 9 l 6C l 0 Log 19-1117 Subject: POOL SLIDE RECOMMENDATIONS Carlsbad Ranch PA 5 5500 Grand Pacific Drive Carlsbad, California 92008 Dear Mr. Arnold: As requested, this letter presents our recommendations for earthwork for the proposed pool slide (References). We understand the pool slide will be located on the Marbrisa Phase II pool deck, already constructed. The pool slide will be supported on a mound of fill, with decorative boulders and planting on the mound's surface. Compaction Recommendations , All fill materials should be compacted to at least 90 percent of maximum dry density as determined by ASTM Test Method Dl 557. Fill materials should be placed in loose lifts, no greater than 8 inches thickness, prior to applying compaction effort. All engineered fill materials should be moisture- conditioned and processed as necessary to achieve a uniform moisture content that is slightly above optimum moisture content and within moisture limits required to achieve adequate bonding between lifts. FIii Recommendations Fill material should have an expansion index of less than 50, be free or organic or deleterious materials and should not contain rocks or lumps of a greater dimension than 4 inches Carlsbad Ranch PA 5 Pool Slide Carlsbad, California MTGL Project. 1916C10 Log 19-1116 We trust this information meets your needs. If you have any questions, please contact us. • Carlsbad Ranch PA 5 Pool Slide Carlsbad, California REFERENCES MTGL Project. 1916C10 Log 19-1116 Excel Engineering (Undated), Carlsbad Ranch PA 5 (Pool Slide}, Sheets 1 -5, Drawing No. 428-9H. MTGL Inc. (2016) As-Graded Soils Report, Marbrisa Resort Phase II, 5500 Grand Pacific Drive, Carlsbad, California, November 4.