RECORD COPY
l0/11./,t
O'-A / "'"'~ TPi SJ,
Jnmal Date
Geotechnical • Geologic • Coastal • Environmental
5741 Palmer Way • Carlsbad. California 92010 • (760) 438-3155 • FAX (760) 931 -0915 • www.geosoilsinc.com
Beach Vi II age Life 1, LLC
c/o Karnak Planning and Design
381 Christiansen Way
Carlsbad, California 92008
October 11 , 2018
Attention: Mr. Robert Richardson
W.O. 6942-A 1-SC
RECEIVED
OCT 11 2018
LAND DEVELOPMENT
ENGINEERING
Subject: Geotechnical Review of Grading and Shoring Plans, Planned Mixed-Use
Hotel, Spa, and Condominiums, Christiansen Way, Carlsbad, San Diego
County, California, Assessor's Parcel Number (APN) 203-173-02-00, City of
Carlsbad Project No.: CT 16-03
Dear Mr. Richardson :
In accordance with your request and authorization, GeoSoils, Inc. (GSI) is providing this
summary letter of our geotechnical review of the grading and shoring plans respectively
prepared by Spear and Associates, Inc. ([S&A], 2018 [see Appendix]) and Sun Structural
Engineering, Inc. ([SSE], 2018) for the subject project. The purpose of our review was to
evaluate if S&A (2018) and SSE (2018) have properly incorporated the recommendations
contained herein and in the project geotechnical reports (GSI; 2015, 2016, 2017, 2018a,
2018b, and 2018c). The services GSI performed for this study included a review of the
documents referenced in the Appendix and the preparation of this summary letter. Unless
specifically superseded herein, the conclusions and recommendations contained in GSI
(2015, 2016, 2017, 2018a, 2018b, and 2018c) are still considered valid and applicable, and
should be appropriately implemented during project design and construction.
It is our understanding that the City of Carlsbad is requiring that the void space between
the face of the backcut and the backside of the shoring lagging boards be backfilled with
1 ½-sack sand-cement slurry rather than pea gravel. Th is backfill method is considered
suitable from a geotechnical perspective provided that two (2) Mirafi G100W composite
drain panels are installed back-to-back along the face of the backcut, near the center of
each lagging bay. The drain panels should be oriented such that the filter fabric is
exposed on the exteriors of the back-to-back panels. In addition, the drain panels' plastic
core should be covered byfilterfabric on all sides. The minimum width of the drain panels
should be 12 inches. The drain panels may be installed in 4-foot to 5-foot vertical lengths
provided that the laps between panels are not less than 6 inches with the underlying laps
positioned behind the overlying laps. The tops of the drain panels should be held down
6 inches below the finished exterior grade. The 1 ½-sack sand-cement slurry should be
placed between the drain panels and the backside of the lagging boards. Similar to the
drain panels, the slurry should also be held down 6 inches below the finished exterior
grade or to a depth deemed acceptable for planting by the Project Landscape Architect.
The vertical space between the exterior grade and the top of the slurry/top of the drain
panels should be backfilled with very low expansive soils (expansion index < 20 and
plasticity index < 14). Compaction efforts should be applied when backfilling the
aforementioned vertical space to provide a relatively firm and non-yielding surface.
Based on our review, S&A (2018) and SSE (2018) are in general accordance with the
geotechnical recommendations provided herein and those contained in GSI (2015, 2016,
2017, 2018a, 2018b, and 2018c); and therefore, are approved from a geotechnical
standpoint. Should any significant revisions be made to S&A (2018) and/or SSE (2018)
following the issuance of this letter, the conclusions contained herein shall be considered
invalid until the plan revisions have been reviewed and approved by this office.
LIMITATIONS
The conclusions and recommendations are professional opinions. These opinions have
been derived in accordance with current standards of practice, and no warranty, either
express or implied, is given. Standards of practice are subject to change with time. GSI
assumes no responsibility or liability for work or testing performed by others, or their
inaction; or work performed when GSI is not requested to be onsite, to evaluate if our
recommendations have been properly implemented. Use of this report constitutes an
agreement and consent by the user to all the limitations outlined above, notwithstanding
any other agreements that may be in place. In addition, this report may be subject to
review by the controlling authorities. Thus, this report brings to completion our scope of
services for this portion of the project.
Beach VIiiage Lile 1, LLC
APN 203-173-02-00, Carlsbad
File:e:\wp12\6900\6942a1 .gro GeoSoils, Inc.
W.O. 6942-A1-SC
October 11, 2018
Page 2
If you have any questions or comments regarding this letter, please do not hesitate to
contact the undersigned.
Ryan B. Boehmer
Project Geologist
RBB/JPF/ATG/jh
Attachment: Appendix -References
Distribution: (2) Addressee (wet signed, via US Mail and email)
(1) Spear and Associates, Inc., Attention: Mr. Nick Dampf (via email)
(1) Sun Structural Engineering, Inc., Attention: Mr. Changhua Sun (via email)
Beach VIiiage Life 1, LLC
APN 203-173-02-00, Carlsbad
File:e:\wp12\6900\6942a1 .gro GeoSoils, Inc.
W.O. 6942-A1-SC
October 11, 2018
Page 3
•
APPENDIX
REFERENCES
GeoSoils, Inc., 2018a, Geotechnical response to City of Carlsbad third-party plan check
and Engineering Department review comments, planned mixed-use hotel, spa, and
condominiums, Christiansen Way, Carlsbad, San Diego County, California,
Assessor's Parcel Number (APN) 203-173-02-00, City of Carlsbad Project No.:
CT 16-03, W.O. 6942-A1-SC, dated May 30.
__ , 2018b, Geotechnical update evaluation, planned mixed-use hotel, spa, and
condominiums, Christiansen Way, Carlsbad, San Diego County, California,
Assessor's Parcel Number (APN) 203-173-02-00, W.O. 6942-A1-SC, dated
February 15.
__ , 2018c, Revised cast-in-drilled-hole (CIDH) pile recommendations, planned
mixed-use hotel, spa, and condominiums, Christiansen Way, Carlsbad, San Diego
County, California, Assessor's Parcel Number (APN) 203-173-02-00,
W.O. 6942-A1-SC, dated February 5.
__ , 2017, Supplemental geotechnical recommendations, proposed mixed-use hotel,
spa, and condominiums, Christiansen Way, Carlsbad, San Diego County, California,
Assessor's Parcel Number (APN) 203-173-02-00, dated October 23.
__ , 2016, Geotechnical response to City of Carlsbad Engineering Department plan
check comments, Beach Village Life 1 Mixed Use, APN 203-173-02-00, Carlsbad,
San Diego County, California, CT 16-03/RP 16-09/CDP16-16, W.O. 6942-A1-SC,
dated June 20.
__ , 2015, Preliminary geotechnical evaluation, APN 203-173-02-00, Carlsbad,
San Diego County, California, W.O. 6942-A-SC, dated September 11.
Spear and Associates, Inc., 2018, Precise grading plan for: Beach Village Life,
300 Christiansen Ave, 12 sheets, various scales, City of Carlsbad Project No.:
CT 16-03, Drawing No.: 508-9A, plot dated October 11.
Sun Structural Engineering, Inc., 2018, Shoring plans for: Beach Village Life, Christiansen
Way, 6 sheets, various scales, plot dated September 26
GeoSoils, Inc.