Objectives
BENTON ENGINEERING, INC.
APPL.IED SOIL. MECHANICS -FOUNDATIONS . ~-...
'6741 EL. CAJON BOUL.EVARD
SAN DIEGO. CAL.IFORNIA 921115
SOILS INVESTIGATION
•
SAN DIEGO. 583·5654
L.A ME8A. 469·5654
. This is to present the findings and con~lusions of a soils, investigation completed at the
site of the proposed'La Costa Beach Motel, located on the west side of Highway 101 on the
north side of the',satiquitos Lagoon that is located north of Leucadia, in S<::,n Diego County,)
Cafifornia.
The objectives of the investigation were to determine the existing soil conditions and . "
to make foundation design recommendations. In order to accompl ish these ob jectives, seven
borings were drilled, undisturbed, samples were taken where feasible, field density, and
laboratory tests were condl,lcted to determine the physical properties of the soils. ,
It is understood that the motel is to be two an~ three stories in height arid is to be
'constructed of reinforced concrete ~ masonry. The foundation loads are not known at this
time, but it is assumed that wall loads will not exceed 7500 pounds per lineal foot, and that
column loads will not exceed 300 kips each.
, Field Investigation
Sev'en borings were drilled 'with a truck-mount.ed rotary ~~cket'!"tyPe drill rig at the
approximate locations shown on the attached Drawing No.1, entitled "Location of Test
'Borings". 'The borings were drilled to dept~s of 7 to 40 feet below·the existing ground sur-
,,face. A contin'uous log of the soils encoun.tered in the' borings was recorded at the tim~ of
drilling and is shown 1n detail on' Drawing Nos. 2 to 13, in~lusive, each entitled, "Summary , 'I
Sheet" ••.
---.
-2-
The soils were visually classified by field identification procedures in accordance with,
the Unified Soil Classification Chart ~ A simpl ified description of .this classification system is.
,.
presented in the attached Appendix A at the e~d of th is repor~. '
Undisturbed samples were obtained where possible in the gravel free soils ahead of the
drilling. The drop weight used for driving fhe sampling tube into the soils was the "Kelly" bar /
of the drill rig which weighs 1100 pounds, and the average drop was 1~ inches. The general
. . .
procedures used in .field sampling ,are described under "Sampling'" in Appendix B. Two sand-
displacement type field density tests were taken in the representative gravelly soils above the. , .
ground water level where undisturbed samples could not be taken.
Laboratory Tests
Laboratory tests were performed on all undisturbed samples of the soils in order to de-
termine the dry density and moisture content. Direct shear tests were also conducted on sam-
ples for shearing strength. The resul ts of these tests are presented on Drawing Nos. 2 to 13,
inclusive. Consol idation tests were perfonned on representative samples in order to determine
the load-settleme~t characteristics of the soils. The results of these tests ~re pr~sented on
Drawing Nos. 14 and 15, each entitled, "Consol idation Curves ....
In addition to the. above fe~tsl direct shear tests were perfamed on saturated and
drained samples to determine the minimum angle qf internal friction qnd apparent cohesion.
The results of these tests are shown below.
Angle of
\ Internal Apparent.
Boring Sample Depth Friction Cohesion
No. No. in Feet Soil Description Degrees Ib/sq ft
1 1 2.5 Fine to medium ~arid 40 0
4 2 7.0 Very fine to fine sand 40 50
6 l' 2.0 Fine to medium sand 40 0
The general procedures used for the laboratory tests are de~ribed briefly in'AppendixBo
BENTON ENGINEERING, INC.
_.,o-. ____ ~ ________ .~,.~ ___ ~_._._.~_ ___ __ . ____ ~ -.o. ___ ~---_~~_-.,. .... _ .... , ______ .,.~ ,'_
,v
I'
! .
i ; ,
j i , : , I
; 1
: I · I , I
I I
I I
I I I
! ; · I I r
• f 1 ;
I . I
. j'
: : . . , I : I
,i t
-! i'
• • -3-
DISCUSSION AND RECOMMENDATIONS
Soil Strata
Except for a trashy fill to 1.3 feet in depth at B~ring 3, all of the soils encountered,
were logged as natural deposits: Boring'l was drilled in an old dirt roadway. The upper " , '
• 'r. • ,
soils were slightly silty sand and fine to medium sand to 3.4 feet in, depth. Compact sandy
gravel, slightly clayey and slightly silty sandy grovel soils wer!3 enc'?Untered between 3~4
, ' ,
feet, and the depth of expl orati on .of 11.5 feet. .,
The very fine to fine sandy grovel found to the depth of exploration at Boring 2 varied·
, from loose in the upper one foot to medi um compact between one and 7 feet.i n depth.
The soils underlYing' the fill at Boring 3 were general! y compact and consisted of grave II y
fine to medium sand between 1.3 and 3. ° feet in depth, very fine to fine sandy gravel
" gra'vel between 3.0 and 4.2 feet in depth, and,slightly silty very fine to fine sandy gravel be-
" ':tw,e~n 4.2 an'd to the limit of,exploration at.lO.O feet in depth.
The soils encountered at Borings 4, 5, 6, and., were gravelly,sand, sand, and sandy
:' :: grave! to the depths of 18.5 feet at Boring 4, to 1~.0 feet at Boring 5, to 11.0 feet at Boring 6,
, and to the entire depth of exploration of 18.0 feet at Boring 7. The upper soils were observed
. , ,to be relatively loose to depths of ,0.5, 2.8, 2.0, ~md 3.0 feet, respectively, at Borings 4, 5,
6, and 7.' Below these depths they were medium compact. Below the depths of 14.0 and 11.0
feet, respectively, at Borings 5 and 6, geologically older soils vqrying in consistency from'firm
or compa'ct to very firm or very c'ompact were enc~ntered to the limits of exploration. These
, .
deeper soi.ls consist~d of clay, sand, and sl ightly ~il ty,sand at Boring 5, and c1ayey,sand ,at •
Boring 6.' ..::. ,. .. / • r ..
Ground water was, encountered 'below the depths 0(7.5, 6.0, 7.0, 7.0,,2.0, 3.5, and
4~5 feet, respectively, 'at Borings 1 to 7, inclusive.
, BENTON ENGINEERING. INC. "v
I , 1
I . !
I
I j
I I,
I ,;
\ '
"
-4-
Foundation Design Recommendations
It is concluded from the findings that the proposed building may be supported on con-, .,
t . I
ventional, continuous and spread footings, and that these foct ings should be designed to bear
at depths of at I~ast 3 feet bel'ow the existing ground surface and on, the compact or medium,
/ '
compact natural soils which were encountered below depths 'of 3.4, 1.0, 1.3, 0.5, 2.8, 2.0,
and 3.0 feet, respectively, at Borings 1 to 7, inclusive.
The calculated safe bearing capacity for continuous and spread footings one foot wide
and placed on the medium compact to compact soil is 3000 pounds per square, f~t'. This value
may be increased at t~e rate of 260 pounds per square foot for each additi onal foot of width
oyer one foot and at the rate of 770 pounds per square foot for each addition,?1 foot of depth
CNer 3.0 feet below adjacent grade to a maximum of 5000 pounds per square foot,. It is re-
commended that the footings in the vicinity of all Borings except Boring 5 be designed to bear
above the ground water level.
It should be noted that the ground water level was found at 2.0 feet below the surface
of the sand at Boring 5, that was, drilled nearest the ocean, and the recommended footing
, depth would be below this. This boring was started 40 minutes after. the highest tide for the
mor~ing of November 20, 1964 which was to plus 7.3 fe~t M.L.l.W. and it is likely the
water level will vary at this location with the tidal fluctuations. It is understood that the
onl y foundations in this area would be for a possible sea wall that would have to have extra
depth footings in addition to protection by riprap fro!Tl undercutting due to wove action.
The above bearing values are for dead plus live loads and may be increased one-third
for combined dead, live, and seismic loads.
.'
SENTON ENGINEERING, INC.
.: "
I I •
~'
"
. ,
I
. i
-5-•
It has been estimated from. the load-consol idation test data that the settlement of a con ....
tinuous footing uniformly load~d to 7500 pounds per I ineol foot, will be on the order of '1/4 ..
. I .
inch, and that th; settlements of a square footing supporting 0 300 kip c~lumn locid will be less'
'tha~ 1/2 inch.
Respec.tfu II y submitted I
BENTON ENGINEERING, INC.
BYfl~~e~ . Don L. Lead~ ~
.ReVieWedBY~ ~
.' ~on, ivi Engineer
DLL/gw
i i .
BENTON ENGINEERING. INC.
i
i
iNSPECTION'· TESTING • RESEARCH • DEVELOPMENT '. , I
6280 Riverdale' st. • San Di,ego, Californi,a 92120 • Phone 280·4321
'=--====" ===~==:===='===::;::::=::::=~=-====' ---. j
ALL RIEI'Ollt. AliI: IUIIMITTED A. THIt eONfrlnENTIAL ..... OplE"T" 01' CLIENTS. AUTHORIZATION 1'011 PUBLICATION 01' 00" RIEI'OllTS', CONCLUSIONS. 0" r;X,."ACT. 1
',""0M 0" IIItGAIIDING THEM •• , ItEU"VE!) PENDING, 'ouli W"'TTIEN AP""OYAL '"., " MUTUAL p"'()T~CTION TO CLIENTS. THI!: 1'0aUc "NO OUIIscLvtit. 1 'r"T"" 7' 'z' ':':"':':U," ,:':.,<: ~'."., ,'~'o:,'·:.,,·.,,::·:·,': ",'
'.,' ' ,; October 12,.' 1972,
, : . Pularro Contr.acting Co •.
, ·1485 N., Ma'gnolia Ave.'
EL Cajon~'califorhia92021'
", '
, 'J SCT .212421
Report No. 1
, SUBJECT: 'Report'.of In-Place 'bensity, Tes:t's, Proposed' Beach Colony
Apartments, U.S. Highway' 101,' South of Carlsbad State Park,
Caiifornia 9'20008 . , "
'Gentlemen; " ~
" In compl~ance' wi,tll your request, .this report has been prepared to es":, .,'
tablish 'the' 'd~gree' 'of compaction ,of: the 'native and imported materi'al'
placed on the', 'site 'as tested by' the' ''Southern California Testi~g, Lab ... ·
..
oratory, ,Inc from October ,4, 1972 through October 10.,,1972.
, ... :
Field density tests. ''lera per.formed in accordance withA.S.T.M. D-1556-
64~ Moisture content was determined for each density sample. The re-
", :i ,'suIts and location of the tests are g,iven on the attached f~gures. '. 'Representative, samples of the tested material were obtained for ,lab-
oratory tests.
Laboratory compaction. tests to determine maximum dry density and op-
timum moisture were performed in accordance with A.S.T.M. Test Method
1557-70 I Method A. The results 'of' the laboratory compaction tests
,
are given on the attached f~gure No~ 2;
. -"
, "
, . ~ .'
.. ,," . .\.
, " ;~'f'" '
" ..
'j .' ~ ,
, .' " .
. ') "," ',:
'~ .~ .
,-, .~ , -. . ~
:; .. ~' .; .) -. .'.
_ .: • ,)-'_l' '1" -. " .: ... ',,: :~:::" : ~ .' , ~ . -:..~ .:~,. '. ". \ ..... ~ "~ .
,<{,~', .' \ " ',' ". . f:, -,'. -..... , .' . :1 '{,
1 -I ,_ ,.t.\" .. ', ': -', . ~ " ./
.' ! ,~,
, '; ;:.;'
~ . ,
. ;.
" . " .. :
" '
1
I 1
i" !
i
.' ,
'SCT 212421 Page 2
" hes~tate 'to bontact'this office.
" ,
..
T,nis,o~poi~un,ity' to"F~' of ser\rice "is ~:incerely' appreciated.
, 'l _ "
'. • l • 'f', ,',. ',,' ,,:-
• ,} , , ' ! • ,", ~" ~,',', .': , ~
'.' " . ~' :'.
~ • '-'1 .. " , ~espec:tf1l11y subnii tted;
,. ',',"/ " ' ""
, .'. -, ' , . '.: ' SOUTHERN CALIFORNIA TESTING LAB., INC~
'_n' ,: .'.,_
DAP/mk '
ENC~' cc: (5'), Submitted,' "
(1) SCTL,: Esc.,'",
, "~. ' '
. . ~ .. :.: .. '.
""
, ,
'" : -.".. • t.'.
,',
,
, "
-. ~ "
,1
:: ' . ,:-,
" .. : • t-'. : :,
" f "
, .'
.,. :': :,'
-",. I, . . ," . . . '. ~'. " -" ..
• ',' ~ .. ", f..-. • ":',
.' . '."" ~~'"
, : ,.-,,:, '-I .....
" '.' .. ,
t, ~
, ",' . ,'-;,
" .. '.'~. -
.' .' .-,,' .'
~,. ".
'~ : , . .'
, ,
"
! • .:,
'j .: :., ",
~ ,',' ,
,1 > ••
: ',: \',
< '., ~ ...
S , 'I ~~ , ," ~ J.
" . . , ..
" '".' .,.-
,', I " {,~' '.; ..... ,~' •
'," -, ,': ':':';~'<"'" " '.' ':'~'
• ~, <,.'
' ..... -
\.
....
, "
" -'
I' .. ~
" , . ~ . '.
'-. "",
~ '--"',.' ' ..
, • .' " : • ~ ~ -, • p
", ... -.
.-~~' . .'
" , .~..... .. . . 4',.' '.'
•• ; I .... ,.; , "
'-,' .
( , .
. ' :
':" ,..
...
l-.,
, . '
"
. , ,.
, ,\
'I
\1
f
I
,
I II ..
(,
ii
" II
, "
\,1
j.
! r
• <
,'" '.
'~ ... .. ,
' ... " ..
, .,
.',
...
., •• ;,' .', • I.
·'i.I,.
. ', I!' . ... '
o
'8 .. e
\': ,z ,\ ,,:.'
.. . I'.:
. ; .
• " •• t ,~ • . "
"
.: .
SOUTHERN CALIFORNIA
TESTING LABORATORY. INC.
6280 RIVERDALE STREET
SAN DIEGO. CALIFORNIA 92120
.1 .
,
.' 'I'
• i,1
~' ..
.1 " .
.,' ,'.:-: '::
, .... 1 ','
, -. ~: .' • I,
.. "
'-:,.., "
:. '< :". ;
~ ~ ", ; . .. , , .
Beach Colony Apartments
U. S. Highway 101
-.: '
. r'
: ...... !
~ ~' .. '
.•.. J,' ;r:.'
\ ., I '. ::"~~-, ; " '
., " "
.' .
• 1'
".J>
. ~ ::' ;:. '~
d ..
':-"
So. of Carlsbad st. Park, California
I ' , ", • -• j • ~.~.: .. ·,.:;.~;(:/};~C~~:~~:.~::~~~~~,i;i;;;;\;f~~:!i,~~·:':~,·:;~~:·L2'::~~~~~~:"~:~~;;:'~'~~::;<;~'~~~~A~~~L:;j,j~i:i;:i\;1;~.:,L{~:::;~~_~~.:~~:;_~~'·::~LL~1~~1S~;~k2}~~.~i0}r~::~~~_·~:·~:.: .. ·'
; ,
'1 I
'.: ':-: -.. ', '.: SOUTHERN CALIFORNIA TESTING LABORATORY ~ ~,
Field Density Tests Report seT 212421 ~ iII>;
"
I
i' ",.' ' .... : .. "
:' ".: ,. : .,,-.~:
. . ~ ~
--"1--_,_ ~ 2
; !: 1:', -: t;.' .:.:; .:~
.1 (;"i:~f
, .' . .
1?,<'
l' ' ...
1
1. '. ' •
r., ",:.',: =.-
Test
No. , . "
1 .
2
3
4
location :. . Depth of Fill " .. ' . ~. . ' , , , ~, .-'(Feet) . '. o,.' ," '. .
See Plot Plan +1 0
> See Plot Plan +1.0
'See Plot PIan +3'.0
-See Plot Plan +1. O·
Moisture Dry Unit Soil ' Relative Date Of
(Percent) "eight Compaction Test' Type (I bs • cu. ft. ) (Percent)
.
8al 121.6 ' 1 95 '5' 10/4/7'
11.7 122.3 1 96.1. 10/4/72
8.1 118.8 1 93.3 10/5/72
, 9.3 116.5 2 92.3 10/5/72
1
J · . ," ..
10/9/72 ~I . ' 5 See Plot Plan +1.0 9.3 113.8 2 90.2 r' .. · '.
,{ : ......' "!",,; ..
'j: '.: '.: ,
J. .' ".
~". ' .. '
;]1';" "".' r: •. :-
1~·:." ',:,-,;.
f • " ~ • ;. ' .... ..:.-
,';: :.
(, :;" .;:
\. . '. , .,', . ',' ,-' :: .. ~. :'
j
, . .
0' '. : : .. ~ . , . .' .. '" ,.,"~ .' .
~, ' ':
11' .. ; ... ,:. ,' •• ' ! • : ~><:;.: :~:,;
~f ~ . ,: ..... ,\
."j
" .
6 See Plot Plan
7 . See Plot Plan
. 8 See Plot Plan
. ,"
.
. . '
I
:.~ -
+4.5 8.7 114.7 2 90.9 10/9/72
+5.5 13.0 117.0 2 92.7 10/10/72'
..:
+7.2 F.G. 11.1 114.6 2 90.8 10/10/72
. . . , ..
" .
.
... .. r. -, .
'. LABORATORY STANDARD
t· : .:'. . ' . SoilTyps Optimum Moisture Maximum Dry Density
~~" ... , :'. (Percent) , (Ibs./cu. ft.)
1 .... ' . _., .
,
l ,··,~···,:· .. ' .;:'~ ;""', 1 7.5 127.3
: ~:~~,~;:~,~~\;~~~~~:;, .~\~ .. ~~ .. '~ ·~·~'-2~~~~~~~~~1-Q-.-S~~~~~~~~~1-2-6-.-2~~~~~~'\' .
, '. '. ' ... ,". " ,
" '. . . , .
!. ~, ,.:". ::.,' . ,'" '
j' ::.' .. :" .' ,.' '. ; . . .
t .; ,
Ii .. : ·,,:-·-'::.,·.~·L· '~\ :., .... :. "~'. ":"':. '. ,-~==~~,----. " . L'· ___ _
•
,I . -.
/ / ;·/~?3
f
:~/.~ .. ~r ~"d
• /"'" ~.l< ,.
i -:z:z.~~ pct.S a..-Pl4e5S /1 ;
I ,-; . ;:z:: -r t.J ;.rt ~~~ A?-£r' I a-<-S r ~ 1 ~ i
Mt?r.e. ;f1/I t)/ :J: tJA.AL~/.eT"--!
du¥e~t h<!;:r!~<~ ,f . .,u..~7s 7-0
5~rA.~ ~~f,<-~.,/·~e .
~~~. -~
67' i"
I
[
. I l--.f ,.
t t ,. ,
-y
DAVID JAY I~LOODe
A.LA.
Pia".
.and
I i907 San r ictntt lJoultvara
& ASSOCIATES
Arch iUcturt
'BEACH COLONY DEVELOPMENT
CARLSBAD, CALIFORNIA'
March 1 9, 1971
SUMMARY
A. Legal Description and Boundry Survey:
Los A ngtlu, California 90049
Tf/tphont-:
arta codt 213 4,76-6288
1. A portion of land, 3.014 acres lying the the southwest corner of
Lot 6, Section 33, in the County of San Diego, State of California.
2. . Ovvner -MMNS 4/6 Anderson, Robert C.
MMNS 1/6 Anderson, Arthur G.
MMNS 1/6 Harris, Grace A.
Legal Address -2101 Maginn Drive, Glendale, Califorriia 91202
D,ey.elqper -The Be.ach Col,q,I,;1..Y." a.~partner,shi.p.
Address -819 North Harbor Drive, Redondo Beach, C?lifornia 90277 .•
3. Residential condominium development.
B. Article 13.75:
Section 1379: .
2.1 Storm Drainage -The preliminary plan for storm drainage is
to direct it to the beach on the ocean side of the dev.elopment
and anow natural percolation to 9ccur. No large concentration
of water from any single source is planned.
2.2. Sewage Disposal -It is planned to direct sewage south to the
Leucadia County Water District's system at La Costa Road and
old Highway 101 •
2.3 Water Supply -Domestic water wHI be supplied by the. Carlsbad
M.mictpal Water District's system. A service line extension will
be made from existing facilities at the Ponto crossing of old
Highway 101, north of the proposed develOpment.
2.4 Utilities -Utilities will be provideq from the newest available
source (La Costa Road ~nd old Highway 101) by San Diego Gas
& Electric and the General Telephone Company of San Diego.
4. The project development program will consist of selling' fee title
condominium. All common areas are for the use of any owner
within the legal Association and all maintenance, including land-
scape maintenance, on or within those areas of common ownership.
:'
2/ •••
t
J
r f I
l I
I i
f r I f
I r
1
I t I f' I
I ~ :r
1
Ii ~ i
J
t l
I
f
• ';'
-2-
. " .
5.
will be the responsibility of the Condominiuh)~Association and
all owners are subject to the rules est~bli$·ti·ed· by that Association.'
The tentative time schedule of development can be found b).'·
referring to the preliminary schedule chart attached.
c. Areas:
Site -3.01 acres
. 1. BuHding coverage
2. Recreation area (including private swimming
pool)
3. Walkways, exterior parking, entrance.
4. Total open space (2 + 3)
D. Density:
81 units .;. 3.01 acres
E. Required Open Space:
1 • According to Chart (Ordinance 9060,
Page 25C), 1,000 sq. ft. of open space area
per unit
2. Project: 91,892';' 81
F. Number of [),.yen ing Units:
1'. Townhouses -27
2. Vinas 54
Total 81 Dvvel1ing Units
131 , 492 sq. ft. .
39, 600 sq. ft.
65,930 sq. ft.
25,962 sq. ft.
9,1 , 892 sq. ft"
27 units/acre.
81 , 000 sq. ft.
.,
1',136 sq. ft.
open space area
per unit •.
3/ .•.
!
'e, .. -·e
".
-3-
G. DweU.tng Unit Mix:
Q.,Iantity
21
14·
, -,<26
'13
7
One Bedrooms (in villas) ,
Two Bedrooms (in townhouses) ~ ,
-:t:w,o.Bed~r.os ""in vi.ll~$,.) _ J.
Three Bedrooms (in t:oNnhouses~
Three Bedr.ooms (\ n vi llas)j
H. Constructi.on R\a.si!]1:
.' ".
\ Total
21
,40
20
Phase A
Phase B
Phase C
6 townhouses
21 townhouses
54 vinas
(December, 1971 -April, 1'972)
(tv1arch, 1972 -October", 1972)
(June, 1972 -~rchl 1973)
1. Required -
21 x 1-1/4 spaces (per one bedroom unt t)
40 x 1-1/2 spaces (per two bedroom uni.t)
, '20 x 2 spaces (per three bedroom unit)
Total for 81 dwelling units
~est parking for viSitors (1/2 space per ' ,
dwe n t09 unit)
, Total Required
26 parking spaces '
, 60 ~rk'ing spaces
-40 parking spa~s
126 ~rk,i.ng spaces
": 4Oearki['9 spaces
, ,
168 parking spaces
2. Parking Plan'
For the present we have shown on the plan it total 'of 268
parking spaces avai labl,e to the-developmer:tt.·' We wish to
make it clear that we expect in later plannin'g: stages to ,:,
re-locate the mechanical areas and,use-s~ stalls now'
shown as parking for additional storage are~$, thus re-
ducing the ~tal nud>er of parking. In no ca$e, 'however,'
will we be less than required by the 'e~i$ting'.9rdinance;
. i '
I.
f I'
, .
-4-
J. Plans Submitted:
1. Site Plan A: 1 n = 32'-0"
2. Site Plan B: 1!' = 32'-o!'
.. ".,...,.3,o:.~ .. ",.st.te."glar::l .-C,: _1 n =_.~1.6' -::;!) It
4. Garage Plan: 1!' = 16'-0!'
5. Floor Plans & Sections:· 1ft = 16'-0"
6. Two (2) Elevations: 1" = 1 6' -0 n
7. One (1) Perspective
8. Time Schedule Plan
9. Summary
10. Application Forms.
• . .
Beach 'Co lony
Beach Colony plus Proposal
on County pr0perty •
To be submitted later.
To be submitted later.
!
'.
j~
; :6',>/
1>:\\'1 J) JAY FLOOD e
'A.I.A.
Pla;lIIe
(md
11907 San riunu Bou/a'ard
Architalurt
& :\SSOCfATES
BEACH COLONY
CARLSBAD, CALIFORNIA
March 19, 1 971
ASPECTS OF PLANNING:
,oJ"' '~'-'-."."" ., "~7" t\ -".--, • ~~"~" •
Los A ItgdfS; C{lltjorni(1 9'004,9
Tdepho,u: ,'". . ,
nua COdl' 213 476-628~
The Beach Colony is a simple, but very clear, linear development along
and parallel to u. S. Highway 101. The guest parking area with trees (green
belt) serves as a shield betvveen townhouses or villa$ and the highway.
Tenants have easy and direct access by car to their garage anc;:i a direct
stairway connects each townhouse .. to it. The villa tenants have their elevators
r,eaching' the parking'.
The private pool and recreation area is concentrated and wen designed as '
a perfect linking element betvveen beach, townhouses and vnlas. The use of
slight grade differentials towards the beach provides changing yiews and
·'::'i'S:,;a$errns\t~tiV'e·-<.W'a$l·'~t.cj"lJbhttl~~:!'f.rtii'ffi~bew.l"t'!a~"e'~:S""':to>~e' ~rtalh!I'r.·qJ",si:te:~
A public beach access at the northern end of ' the develop'ment opens the beach
to everybody and beach visitors have the c3.dvantage of undisturbed u~e of the
beach all along the shor.e line as the development is tied close backt9 U io S.
Highway 101 •
',DESIGN INTENT:
Townhouses -On a modular grid, each unit is desfgned to use the greatest
number of standardized elements, thus having a clear constructive expression.
Gre~t attention has been paid to the flow of movement: the unit can be r~ached
from the garage directly by a connecting stairway or from the,: visitor parking
through a small recreative patio. Vertical, tvvo-story space's ,and the"d6Uble
orientation of the one complete floor living room to the beach and, the hi.gl:iway
provide a maximum flexibility in thei.r, use.' ,Several decks on different flbors
and on either side of the unit extend living and pr~vacy··to the open air.
Townhouse tenants have all direct beach access.
Villas -It was obvious to carry through the same structural. grid as in the
, townhouses, generated by parking and the desi.re to standardize. The i.ntention . . -.
was to design a multi-story building in the same spirit as the, townhouses,
'which means double orientation of each villa to the beach and the highway, '
and rich spacial adventure of tvvo.-story spaces.,
! 2/' ... ,
-2-
In doing so, it was possible to limit access-corrid9rs to the villas to every
second floor and reach a great efficiency C?f the building.
Quiet to the highway side, yet structured by its cylindrical private staircases,
the buHding opens totany to the beach and 'surprisingly gets the· character of
a multitude of well organized decks. .
USE OF MATERIALS:
As an buildings are mainly oriented towards two sides -the beach and the
highway -it is intended to emphasize and express this design concept in a
\ .
clear, nonconformist but subtle way by a· careful choice of bliUding materials.
The highway side, quiet, austere and reflective o{ "town character'!, would
be very formal and rich in appearance by the use of somber bric.ks and
glass, yet judiciously contrasted by trees and hedges. .
All the delight of beach life is reflected in the informal, active and playful
··"ch'Err-·~C:tet":·Yc;'F'tMts''rIjt!if'1itft<t'fg~1"i:'&e ·~"'1f"'~i~~P1~ter·;,.;)t'~tr0'"d··Ja:nd ··gla·s~; ·toge ther wi: th
the use of some color graphics, stand in good harmony to a "beach spirit'.'
and are the· welcome contrast to daily rU$h and stres$ •.
Thus, townhouses and vinas are elements of transition, ? place where
man finds his compensation to hi.s hectic way of life.
Ie
"
e -
BENTON ENGINEER.ING. INC. CT'? 2 ~-o 1./
APPLIED SOIL MECHANICS -FOUNDATIONS
6741 EL CAJON BOULEVARD
SAN DIEGO. CALIFORNIA 92115
PHILIP HENKING SENTON
PRESIDENT. CIVIl. ENGINEER APPENDIX A SAN DIEGO. 563·5654
LA MESAl !469.5654
Unified Soil Classification Chart*
,SOIL DESCRIPTION
I. COARSE GRAINED, More than half of
material is larger than No. 200 sieve
size.**
GRAVELS
More than hal f of
coarse fraction is
larger than No.4
CLEAN GRAVELS
sieve size but smaller GRAVELS WITH FINES
than 3 inches (Appreciable amount
of fines)
SANDS
More than half of
coarse fraction is
smaller than No.
4 sieve size
CLEAN SANDS
SANDS WITH FINES
(Appreciable amount
of fines)
II. FINE GRAINED, More than half of
material is smaller than No. 200
sieve size .,** SILTS. AND CLAYS
Liquid Limit
Less than 50
SIL TS AND CLAYS
Liquid Limit
Greater than 50
Ill. HIGHLY ORGANIC SOILS
GROUP
SYMBOL
GW
GP:
GM
GC
SW
SP
SM
SC
ML
CL
OL
MH
CH
OH
PT
TYPICAL
NAMES
Well graded gravels, gravel-sand mixtures,
I ittle or no fines.
Poorly graded gravels, gravel-sand
mixtures, little or no fines. '
Silty gravels, poorly graded gravel,-
'sand-silt mixtures.
COlayey gravels, poorly graded gravel-
sand-clay mixtures.
Well graded sand, gravelly sands, little
or no fi nes. ' ,
Poorly graded sands, gravelly sands,
I ittl e or no fines.
Silty sands, poorly graded sand-silt
mixtur~s.
Clayey sands, poorly graded sand-clay
mixtures.
Inorganic silts and very fine sands, rock
. flour, sandy silt or c I ayey-sil-t-sand
mixtures with slight plasticity.
Inorganic clays of low to medium plas-
ticity., gravelly clays, sandy clays,
silty clays, lean clays.
Organic silts and organic silty-clays of
low plasticity. '
Inorgcmic silts, micaceous or diatoma-
ceous fine sandy or silty soils, elastic'
s i I ts.
Inorganic clays of high plasticity, fat
clays.
Organic clays of medium to high
plasticity. '
Peat and other highly organic s<:?ils.
* ,Adopted by the Corps of Engineers and Bureau of Reclamation in January, 1952.
** All sieve sizes on this chart are U.S. Standard. '
, "
!! II
I !I
"
PHILIP HENKING BENTON
PRESIDENT -'CIVIL ENGINEER
Sampl ing
BENTON ENGINEERING, INC.
APPLIED SOIL MECHANICS -FOUNDATIONS
6741 EL CAJON BOULEVARD
SAN OIEGO-.~·CALIFORNIA 9211S
APPENDIX B
•
SAN DIEGO. 563-5654 LA MESA. 469-5654
The undisturbed soil samples are obtained by forcing a special sampling tube into the
undisturbed soils at the 'bottom of the boring, at frequent intervals below the ground surface.
The sampling tube consists of a steel barrel 3.0 inches outside diameter, with a special cut-
ting tip on ,one end and a double ball valve on the other, and with a lining of twelve thin
brass rings, each one inch long by 2.42 inches inside diameter. The sampler, connected to a
twelve inch long waste barrel, is either pushed or driven approximately 18 inches into the soil
and a six inch section of the center portion of the sample is taken for laboratory tests, the soil
being still confined in the brass rings, after extraction from the sampler tube. The samples are'
taken to the laboratory in close fitting waterproof container~ in order to retain the field mois-
.ture until compl(3tion of the tests. The driving ,energy is calculated as the average energy in
{f~!lit"';l~JF$ Ir~lUliiil:ad! It([l) {f.mr<C:l if.bs ~rqp>1lam,w ltwihe itl1iiraauI£,l1n Itiliile ifw't <Glf ~ljl <ritlt itibs ailflp:f.1n m wJ.hi~1n if.~
sornpi'e is ohl'o ined'.
Shear Tests
The shear tests are run using a direct shear machine of the strain control type in which
'the rate' of deformation is approximately 0.05 inch per minute. The machine is so designed that
the tests are made without removing the samples from the brass I iner rings in which they are se-
cured. Each sample is sheared'under a normal load equivalent to the weight of the soil above'the
point of sampl ing. In 'some instances, samples are sheared under various normal loads in order to
obtain the internal angle of friction and cohesion. Where co!,)sidered necessary, samples are
saturated and drained before shearing in order to simulate extreme field moisture conditions.
Consolidation Tests
. The apparatus used for the consol idation tests is designed to receive one of the one inch
high rings of soil as it comes from the field. Loads are appl ied in several increments to the .upper
surface of the test specimen and the resulting deformations are recorded at selected time intervals
for each increment·. Generally, each increment of load is maintained on, the sample untn the
rate of deformation is equal to or less than 1/10000 inch per hour. Porous storIes are placed in
contact with the top and bottom of each spec imen to permit the ready additi on or release of water.
Expansion Tests
One inch high samples confined in the brass rings are permitted to air dry at 105°F for
at least 48 hours prior to placing into the 'expansion apparatus. A unit load of 500 pounds per
-' square foot is then appl ied to the upper porous stone in contact with the top of each sample.
Water is permitted to contact both the top and bottom of-each sample through porous stones.
Continuous observations are made until downward movement stops. The didl reading is recorded
and expansion is'recorded until the rate of upward moveme'nt is ,less than 1/10000 inch per hour. . '
i ~ , !
I
i 'j
i i
I
',1
'I
II
. ' I , : t'
I Ii
I: Ii I' I
'i
l' I
,.,
.... -
.
c·
W .:E
~ ' .. -z
co o ..,
.'l'!< • ,
~'1\')
Z
:z::t\i I-IJJ
Q. "" W
Q
W~ ...IW
0....0 ~:E <t::;) .
11'1.;0::
SUMMARY SHE~T
BORING NO. __ _
ELEVATION 11 ..• 5' .
.Brown, Dry, Compact ----l SLIGHTLY SIL TY .
Very Compact, Partfally FINE SAND
Cemented.
Brown, Dry, Medium Comp?ct
FINE TO MEDIUM
SAND
Brown, Slightly Moist, Compact FlNE'TOMEDIUM
60% Grovel and Cobbles to 5" SANDY GRAVEL
Gray Brown, Moist, Compact,.'
60% Grovel and Cobbles to 5"
Gray Brown, Saturated,
Compact, 60% Gravel to3";
Occasional'Shelis
SLIGHTL Y CLA YE
FINE TO.MEDIUM
SANDY GRAVEL'
SLIGHTLY SILTY
FINE TO MEDIUM
SAN'DY GRAVEL
* The elevations presented herein were determined by interpolation of the,
contours shown on the liT opography fv'\ap" prepared by Land Survey Service,
dated November 7, 1964.
.' O-Indicates undisturbed drive sample .
** Sample not suitable for 'shear testing du'e to grovel.
PROJECT NO.
64-11-12A BENTON ENGINEERING, INC.
DRAWING NO.
2,
l I· I.
I
I
I I',
I I
, . t
.j .• , '
! I I i i 1 i
j' . , ,
.,
,
!
j
" ,I,
J'; , :1
~l
..
, , ~' w~ ,. ....IW :I:l:i:i o..ca
I-w :E~ o..u.. <=> W IIlZ Q
!. ,
MMARY St-filEET
BORiNG NO.--=2=--_
t'I, l' ELEVATION _~r~--.;;._
.. Gray, Slightly Moist, Loose
Moist, Medium Compact I 50%-
60% Gravel and Cobbles to 6"
-----------
.D-Indicates field density test
VERY FINE TO
FINE SANDY
GRAVEL·
7 • .1 110.
. '. ,.
2 o .~
al. o ..,
'. ~ w~ .... w ::d;:; Il..CO
I-w :E~ Il.. ..... <:::> w cnz Q
SUMMARY S~~!EIET
BORING NO._3 __
ELEVATION 9-,71
,·Gray Brown, Dry, Loose, 30%
Gravel and Cobbles to 4",
Conc'rete I Trash
GRAVELLY SIL TY
FINE TO MEDIUM
SAND
Brown, Dry I Compact, 40%
~~~QflO~~~..Q.;.l-I_1 ---IGRAVELLY FINE
PROJECT NO.
64-11-12A
ct,
Occasional Shells
Gray, Moi·st I Compact
Gray Brown, Moist, Compact,
70%-80% Gravel and Cobbles
\
TO MEDIUM SAND
ERY FINE TO
INE SANDY
GRAVEL
GRAVEL
SLIGHTL Y SILTY
ERY FINE TO
INE SANDY
GRAVEL
BENTON ENGINEER!NG, .' INC. DRAWING NO.
4
. I
! ,
. J
w ::
I < ' .... z -
!Xl o ...,
" ~
:J:!Li I-w ll.u. w
Q
BORING NO. ___ . __ 4.:..-
8.9' ELEVATION _~~_
Gray, SI ightl y Moist, Nledium
Compact, Occasional Gravel VERY FINE TO
FINE SAND
1.8 101.8
7-.. G:Lf----___________ ..cJ!oter -1.:...2 J..Q.:;.2 ~2~ __ -
Xi:(;)( Brown, Saturated
8]';4£ Brown, Saturated, Medi urn
Continued on Drawing No.6
PROJECT NO.
GRAVELLY VERY
FINE TO FIN~
SAND
..
I
64-11-12A BENTON' ENGiNEERING, iNC.
"
ORA WING NO. I
5 ~
!-
-0) .... 0 :E
c 0
'" I-(!)
"'0 C <:
w :E r:(. -z
I:Q o -.
. ,
.. .... -"-... -. _····_·S!MMARY SHE~T
BORING NO. 4 (Cont).
Gray, Saturated, Medium
Compact I 20% Gravel to 2 II
'40% Gravel and Cobbled to 5 11
Gray, Saturated, Medium
Compact, 60% Gravel and
Cobbles to 5 11
,
GRAVELLY VERY
FINE TO FINE
SAND
(CONT)
VERY FINE TO
FINE SANDY
GRAVEL
,PROJECT NO.
64-:11-12A BENTON ENGiNEERING, INC.
'f
,ORA WfNG NO.
~
: J
II II
II
• 11
i II I'
II . \ !'
, I,
I'
,
"
I I
! I , • I
, f
j
1.
f,
l II
"
. i
h
,
~.
"
i r
w :E <C
..
---Z '
to o ....
,
~ '\
.----_. -----_._--.. ----------'. ------,-. ---.-:--_.--.-. ~'"-' . .-.,~~.-----
w O!-SUMMARY SHEIET -. .... w .
0..£0 :E:E «::l InZ
BOR~NG NO._· ....... 51.--.._
ELEVATION 4.0 -> .....
9ray, Very Moist, Loose,
-----_ ..c:...Water 0.6 19.6 96.5 0.24
Saturated
Medi~m Compact
Gray, Saturated, Medi um
Compact, 15% Gravel to 2"
30% Gravel and Cobbles to 4"
FINE SAND
GRAVELLY FINE
SAND
Gray, Yellow Brown, and Red
~=~ -Brown, Saturated, Firm·, Clayey
Fine to Medium Sand Layers CLAY
Continued on Drawing No.8
PROJECT NO.
64-11-12A BENTON ENGINEERiNG, INC.
2.2 1.6 99.6 0.31
DRAWING NO.'
7
1\
1
I
I-
i ,
1
t -I
;-
. , ,
,
•
).. I . " SUMMARY SHEET. C> ,..: >-,..: ~'ti 1.1.1"': t-
o ~ .1.1.10:: 0:: u.. v; u..
..... 1.1.1 1.1.1 "-0::3:
:du Q.c:I 5 (c'ont) . z Vl 0:) Z :) o::Z
~:E BORING NO. I.LJ Il. ~ ... >-LU U <~g
t-1.1.1 52 ~o:: 0 "-WI-
e.."" ~:) 1.1.1 0 0 vi :J:~Vl w >' . >-
0 VlZ -~. -... ~ 0 ~ al VlVlIl. ,-
Continued from Drawing No.
0:: u.. ;,::: 0 ..... w_
7 0 o::~
i-f"_ I';'; .
'Gray,. 'Yellow Brown, and .Red . ' , i --:{ 3)::.
16-Brown, Saturated, Firm, , 3.3 21.1 106.2 1. 31
-W Alternating Clayey Fine ,to 3.3 33.8 89.8 1.66
Medium Sand Layers .. . '
17-, .,
.'
18
"
19-
?n.. E5E 1 5.5 22.9 104.3 1.84 -. ,
2"1-, . .
-CLAY
2" (CONT) ,
'-
, .'
-
?A ' . ',~ :" ....
: " -~): 91.4 " ·3.0 32.3 1. J 3
25-, .. ' ~,
" -
26 ..
l 1
27
-
1"1" ~O' t !;::~':.;: -:'~':. .,'. Gray, Saturated, Compact; F.INE TO COARSE.
. 29-r·:~~);:·· Occasional Gravel to 111 SAND
I:,: ':':-'(~": I·' .. ~:<:;: -...... :. :.9:j ..
Jl7 .;.:.: .... ?:' . .': Gray and Yellow Brown, -[~:;~;{j FINE SAND
31-
I': 7 Saturated, Compact 6.0 28.9 94. 1 1.73
f";:'
Continued on Drawin'g No. 9
PROJECT NO. DRAWING NO.
64-11-12A BENTON ENGINEERING, INC. 8
Q) .... o :E
c o
~ Q) v c «
w . :E
"
'--' < Z -
al ·0 ..,
.. ~-. --= ....
~
:I:ti:i
SUMMARY SHEET
t-w c..LI.
W
BORING NO. 5 (~ont)
Q
Continued from Drawin~ No.8 ~31 ....
-{<X·\J: ,. Gray and Yellow Brown,
32-).:·:.::\:·.:·i! Saturated,' Compqct, Occasional
:>.:::-:::::.:~:.::;:. Fine to Coarse Sand Zones,
3~ iJ{·/)/ Occasional Thin Clay Layers
:'::;:'~:'\~:'f':
-{~\}/;:;.: 34-.......... . -:!(fJ 35-.......... .
. -:,'X)!P;
. ,
Light Gray, Saturated, Very .
Compact I Slight Clay Binder I
Occasional Thin Very Fine
Sandy Clay Layers
FINE SAND
. (CONT.)
SLIGHTLY SIL TV .
FINE SAND
PROJECT NO.
64-11-12A BENTON : ENGIN~ER;NG, iNC.
10.8 26.0 98.9 2. 80
44.9 17. 7 111. 4 6.54
DRAWING NO.
9
. !
. -.
w :: < z
Itl o ....
. ~,
:d:U t-w Q.u. w
Q
S MMARY S~-HEET
BO~:UNG NO._6:...-_
ELEVATION -Z.O·
Gray, Moist, Loose, 'Occasional
Fine Sand Layers
FINE TO MEDIUM
Very Moist I Medium Compact
Gray, Saturated, Medium
Compact, 20% Gravel and
Cobbles to 4"
~
30% Gravel and Cobbles to 6"
,
· ..
1--•. -'-1 Light Gray, Saturated, Very
· . .. Firm
1,,.. ....
r L. ••• · .. . · .. . -... . · .. . · .
• 1;;-:.:
-t7~:": 14-~ ..
--.. . . -.. -; .
1 S. .:' . . .
Continued on Drawinl=! No. 11
PROJECT NO.
SAND
y-Water
.
" .
GRAVELLY FI NE
TO MEDIUM SAND
CLAYEY VERY
FINE TO FINE
SAND
64-1l-12A BENTON ENGINEERU\JG, _ INC.
1.1 6~4 91. 6 o. 12
. '
"
~
15.8 18.0 11.9 3.9~
[)RA WING NO.
10
f""
1 II ,
I
,I , ,
1
l
'. ,
I
Q) .. -o ~
§
~ Q) -0,
'C: <J:
W ~ < z
~ o ..,
•
~.'~~
-. .,
~ willi: .... w -I-n.co "I.,W :E:E I-W n.u. <::l W II'IZ 0
-~ , , ....
· · · · --;-;;-;-
16-· .. · .. · ... -· · · ...
17 · . · · .
· .. · . · · · . 18-· . ·
11'\ R3}
I
,
.
·
PROJECT NO.
, 64-11-12A
• SUMMARY SHErET
BORING ~O. 6 {cont),
."" Continued fr,om Drawing No. 10
L'ight Gray~ Saturated, Very :
Firm
CLAYEY VERY
FINE TO FINE
, SAND
(CONT)
,-' ,
"
"
BENTON ENGINEERING, INC.
"r-"·--"
1-, w'': u. ~:: ...... Z 11'1 19~>-"' n. ~ wll'l~ w U::(5o > ...: :E~ ~ u.
0
i
17.6 18.7
"
,
" ..
"
~ .
I-...: w' Vi u. uti: Z :) ~Z~ UJ U «« 0 ...... WI-
vi :C!!!II'I >-,11'111'10.-~ ~ ..... w_
0 ~~
111. 3 3,,63
"
DRAWING NO.
11
.
,
"
. ,
I 1
r
I ' i
-',
I
(1)'
0I-0 ~
c 0 III ...
~ c «
•• . ~
:dLi I-w o..u. w Q
SUMMARY SHEET
BORING NO.,--=-7 __
ELEVATION 5-;8'
Gray and Black, Slightly
Moist, Loose
Gray and Black, Very Moist,
Medium Compact, Occasional
Gravel to 211 -------
Saturated
Gray and Block, Saturated, -
Medium Compact I 15% Grovel'
to 311
Gray and Block, Saturated,
Medfum Compact, 60% Grqvel
and Cobbies to 4.5"
FINE SAND
FINE TO MEDIUM
SAND
--~a~
GRAVELLY FINE
TO MEDIUM SAN
FINE TO MED,IUM
SA NDY GRAVEL
Continued on Draw; No. 13
PROJECT NO.
64-11-12A BENTON ENGINEERING, 'INC.
1. 1 4. 5 09. 1 o. 13-
1.7
-
20.2
-
DRAWING NO.
12 '
! ; .
!
, .
I
i : :
• (1).
~
w :€ < z
co o ...,
S'UMMARY SHElET
BORING NO. 7 (Cont)
Continued from Drawin No. 12 .
. Gray and Black, Saturated,
Medium Compact, 60% Gravel
and Cobbles to 4.5" FINE TO MEDIUM
SANDY GRAVEL
, (CONT)
PROJECT NO.
64-11-12A BENTON' ENGINEERING, INC. DRAWING NO.
13
" . . I
I I
I I,
I i,
.',
Sl o .,
'-'!I
0°·2
1
2
3
A .
4.
(/) en· vJ :<.'! 5 :s: (.)
::l: ....
t.1I 6
...J Il. (.'
~ .~ 7 (J)
u. 0
~ :0:
W (,)
IX \AI Q.
I
z ,0 Q .... <4 0 ,:j
0 1 (J)
? 0 (,)
2
\
..
.
PROJECT NO.
64-11-12A
,
0.4
0 -
CONSOLIDATION CURVES .. .
" -
LOAD IN -r~IPS PER SQUARE: FOOT
0.6 O.B 1.0 2 4 6 8 to 16
I:$Onn~ I ,
. Samp e 2
~ ~ Depth 3.3'
.. · .. 0
,
,
.
I .. , .
~.~
I'--..
"""
j
"'-i'
,
" ,,' j. -I ,
~
Borin~ 4
i"'\. ~~ Samp e 1
I).... De~ th 7.0'
--<;)
! (r>---r-'. -;,
"
. I· I
.
, . :
INDICATES WATER • PERMITTED TO CONTACT SAMPL.E .. ,
DRAWING NO.
BENTON ENGINEERiNG, INC. 14
<D
"'0 ~
c '0
I/) I-<D -0 C «
(l) o .,
~
2
<-~
3
4
(fJ
(f) us :2 5 ~ ,
()
:t:
~
ll.I .... ,,-:is
<$. O. (J) ,.
u. q, I~
t-1
:z.'!
W
()
'" 2 IIJ 0..
I
~ 3 52 I-Cl: '9 ....
0 4 (fJ :u: 0 Col
5
o
2
PROJECT NO.
64 .. 11 .. 12A
04
r---t---
-
r---1---
e
CONSOLIDATiON • CURVES
LOAD IN ~fi'ps' PE~ SQUARIZ FOOT
06 08 10 2 4
,
I--l-
-I-h ~
~ ~
~ r--r-~ -i---------r--
.
i--
~
'" r-... r-. r---. ... i'.-. ------... ' ~ '" , --~
~ -........
t--~h
~
--< ~
6
" r-....
~ I-
"-'" ""-r-..-r-
r--I--.
o -lNDI~ATES WATER PERMITTED TO CONTACT SAMPL£
BENTON ENGINEERiNG , ~NC.
!
16 ! a 10
Boring 5
Sample 4
De!: th 16. 1
)
~)
, Boring 5
Sample 4, J
Depth 1.6~'51
' '
~
I
Boring 7
Sample 2
Depth 4. O'
,
O~AWING NO. I