HomeMy WebLinkAboutCT 72-20; La Costa Vale Unit 3 & 4 Trac 72-20 & 76-3; La Costa Vale Unit 3 & 4 Trac 72-20 & 76-3; 1977-02-04BENTON ENGINEERING, INC.
APPLIED SOIL MECHANICS FOUNDATIONS
6717 CONVOY COURT
SAN DIEGO. CALIFORNIA 82111
February 4, 1977
PHILIP HENKINO BENTON
PRESIDENT - CIVIL ENGINEER
La Costa Land Company
2100 Cos fa Del Mar Road
Carlsbad, California 92008
TELEPHONE ( 714
Subject:Project No. 74-5-2D
Final Report on
Compacted Filled Ground
La Costa Vale Unit Nos. 3 and 4
Carlsbad Tract Nos. 72-20 and 76-3
Carlsbad, California
Gentlemen:
This is to report the results of tests and observations made in order to inspect the compocUnn of.
filledjground placed on certain areas of La Costa Vale Unit Nos. 3 and 4 in Carlsbad, California.
"The fills were placed during the period between June 10, 1974 and January 24, 1977. Also
included in this report are the results of tests taken in trench backfill placed over certain utility
lines.i
The approximate areas and depths of filled ground placed under our inspection in accordance
with the approved specifications are shown on the attached Drawing Nos. 1, 2, and 3, each
entitled "Location of Compacted Filled Ground." The grading plan used for the placement of
filled ground, dated April 18, 1974, was prepared by Rick Engineering Company. • v
The approximate locations at which the tests were taken and the final test results are presented
on pages T-l to T-53, inclusive, under the "Table of Test Results." The laboratory determinations
of the maximum dry densities and optimum moisture contents of the major fill materials are
presented on page L-l, under the "Laboratory Test Results." Some of the maximum dry densities
shown in the "Table of Test Results" wore combinations of these. The tests were taken during the
weekly periods indicated below:
Test Numbers
1 to
7 to
10 to
38 to
118 to
185 to
249 to
322 to
401 to
451 to
6,
9,
37,
117,
184,
248,
321,
400,
450,
473,
inclusive
inclusive
inclusive
inclusive
inclusive
inclusive
inclusive
inclusive
inclusive
inclusive
Week Ending
June 15, 1974
March 13, 1976
March 20, 1976
March 27, 1976
April 3, 1976
April 10, 1976
April 17, 1976
April 24, 1976
May 1, 1976
,,May8, 1976
Project No. 74-5-2D
La Costa Vale Unit Nos. 3 and 4
-2-February 4, 1977
Test Numbers
474 to 483, inclusive
484 to 496, inclusive
497 to 520, inclusive
521 to 545, inclusive
546 to 575, inclusive
576 to 608, inclusive
609 to 635, inclusive
636 to 675, inclusive
676 to 697, inclusive
698 to 743, inclusive
744 to 771, inclusive
772 to 811, inclusive
812 to 875, inclusive
876 to 925, inclusive
926 to 970, inclusive
971 to 1044, inclusive
1045 to 1095, inclusive
1096 to 1131, inclusive
1132 to 1186, inclusive
1187 to 1230, inclusive
1231 to 1287, inclusive
1288 to 1365, inclusive
1366 to 1440, inclusive
1441 to 1527, inclusive
1528 to 1581, inclusive
1582 to 1587, inclusive
1588 to 1595, inclusive
1596 to 1614, inclusive
1615 to 1624, inclusive
1625 to 1650, inclusive
1651 to 1660, inclusive
1661 to 1680, inclusive
1681 to 1688, inclusive
1689 to 1692, inclusive
1693 to 1699, inclusive
1700, 1701 and 1702
Week Ending
May 15, 1976
May 22, 1976
May 29, 1976
June 5, 1976
June 12, 1976
June 19, 1976
June 26, 1976
July 3, 1976
July 10, 1976
July 17, 1976
July 24, 1976
July 31, 1976
August 7, 1976
August 14, 1976
August 21, 1976
August 28, 1976
September 4, 1976
September 11, 1976
September 18, 1976
September 25, 1976
October 2, 1976
October 9, 1976
October 16, 1976
October 23, 1976
October 30, 1976
November 6, 1976
November 13, 1976
November 27, 1976
December 4, 1976
December 11, 1976
December 18, 1976
December 25, 1976
January 1, 1977
January 15, 1977
January 22, 1977
January 24, 1977 (Date of last test)
Certain lots on La Costa Vale Unit No. 3 were not graded during this period. Those lots not graded
v/ere Nos. 428 to 440, inclusive, 457 to 468, inclusive, 472 to 481, inclusive, 485 and 486.
The final results of tests and observations indicate that the compacted filled ground has been placed
at 90 percent of the maximum dry density or greater except in certain street areas which will be
recompacted at a future date. It has been determined that the fill materials, compacted to 90 percent
BENTON ENGINEERING, INC.
Project No. 74-5-2D -3- February 4, 1977
La Costa Vale Unit Nos. 3 and 4
of the maximum dry density, have a safe bearing value of 1800 pounds per square foot for one
foot wide continuous footings founded at the minimum required depth and placed five feet or
more inside the top of compacted filled ground slopes. If footings are placed closer to the exposed
slopes than 5 feet inside the top of compacted filled ground slopes, these should be deepened one
foot below a 1 1/2 horizontal to 1 vertical line projected outward and downward from a point
5 feet horizontally inside the top of compacted filled ground slopes in areas of no rock disposal.*
Footings founded at least one foot below the surface of the firm undisturbed natural soils may be
designed using an allowable bearing value of 2000 pounds per square foot.
"Expansive" soil conditions exist within the upper three feet below finished grade on certain lots.
The classification of each lot with regard to "expansive1' soil conditions is presented as follows:
Type "A" (Critically Expansive)
La Costa Vale Unit No. 3 - Lors 406 to 410, inclusive
412, 415
487 to 492, inclusive
La Costa Vale Unit No. 4 - None
lype "B'^J^harginally Expansive)
La Costa Vale Unit No. 3 - Lots 416, 417
_ 469, 470, 471
482, 483 and 484
La Costa Vale Unit No. 4 - Lors/47s, 48
73, 74
90 t-n TQ?f inclusive
1JJ8 to III, inclusive"
Type "C" (Nonexpansive)
La Costa Vale Unit Nc^S - Lots 296 to 405, inclusive
411, 413, 414
418 to 427, inclusive
441 to 456, inclusive
La Costa Vale Unit No. 4 - Lots 1 to 46, inclusive
49 to 71, inclusive
75 to 89, inclusive
103 to 107, inclusive
1 12 to 114, inclusive
* In areas where rock disposal was made at the rear of certain lots as shown on the attached
Drawing Nos. 1 T 2, and 3, no footings should be placed closei to the top of slopes than 5
feet horizontally inside of the approved compacted filled ground limits shown by dashed
lines.
BENTON ENGINEERING. INC.
Project No. 74-5-2D -4- February 4, 1977
La Costa Vale Unit Nos. 3 and 4
Lots Not Graded an
La Costa Vale Unit No. 3 - Lots 42ofTb 440, inclusive
457 to 468, inclusive
472 to 481, inclusive
485 and 486
La Costa Vale Unit No. 4 - None
These lots that have not been graded should be classified at the time of construction.
In order to minimize possible detrimental effects caused by the I;expansive" soil conditions on the
proposed residential lots, the following special design and precautions are recommended:
Type :|A" (Critically Expansive)
1 . Use continuous interconnected reinforced concrete footings, wherever
possible, and place these at a minimum depth of 2.0 feet below the
lowest adjacent exterior final ground surface. If isolated interior column
footings are required, these should be placed at a depth of 2.5 feet belov-
the lowest adjacent ground surface. If in-place rock conditions are encoun-
tered at depths of less than 2.0 feet, then lesser depths of excavation are
permissible to a minimum of 1 .0 foot.
2. Reinforce and interconnect continuously with steel bars all interior and
exterior footings with a minimum of one "5 bar at 3 inches above the bottom
of all footings and one ^5 bar placed 1 1/2 inches below the top of the stems
of the footings.
3. Reinforce all concrete slabs with a minimum of 6x6 - 1 0/1 0 welded wire fabric
and provide a base layer of at least 4 inches of 3/4 to 1 inch size crushed rock
beneath all concrete slabs. A moisture barrier should be provided above the
crushed rock and then 2 inches of sand should be placed over the moisture barrier
and below the bottom of the slab.
4. Separate garage slabs from perimeter footings by a 1/2 inch thickness of construc-
tion felt or equivalent, to allow independent movement of garage slabs relative
to perimeter footings. Assure complete separation by extending the felt over the
full depth of the front thickened edge of the garage slab. Also, cut off the
garage door stops at least 1/2 inch above the slab.
5. Provide positive drainage away from all perimeter footings with a vertical tall
of at least 5 inches in a horizontal distance of 5 feet outside the perimeter of
the house.
6. Exercise every effort to assure that the soil under the foundations and slabs has
a uniform moisture content 1 percent to 3 percent greater than optirr jr through-
* The required design for commercial buildings may differ from the recommendations presented
herein.
BENTON ENGINEERING, INC.
Project No. 74-5-2D
La Costa Vale Unit Nos. 3 and 4
-5-February 4, 1977
6. Cont.
out the top 3 feet below finished grade at the time of placing foundations and
slabs. The moistened soil conditions need not extend to a depth of 3,0 feet in
those areas where rock or very firm nonexpansive soil conditions are encountered
at depths of less than 3.0 feet.
Type ''B" (Marginally Expansive)
Use the same design as recommended for Type "A" lots except items 1 and 2 should be modified as
follows:
1. The continuous footings may be placed at a minimum depth of 1.5 feet below
the lowest adjacent exterior final ground surface.
2. Single ^4 bars, placed as directed above, may be substituted for the ^5 bars
recommended for the Type "A" lots.
Type "C " (Nonexpansive)
Special design for expansive soil conditions will not be required for lots classified in this category.
Oversized rock v/ere buried in certain designated areas in accordance with the project specifications,
The approximate locations of these rock disposal areas are shown on the attached Drawing Nos. 1,
2 and 3.
It is possible that natural in-place rock formations or large rock fragments may be encountered
in excavating to depths of greater than 1 .5 feet below finished grade in certain areas.
All buried exterior utility lines should be City of Carlsbad approved plastic lines due to the
corrosive characteristics of the soils, unless sufficient field tests are taken to establish that
noncorrosive soils exist in the utility trench areas.
Two tests taken in street subgrade and areas of trench backfill that have been placed at less than
the required degree of compaction will be recompacted at a future date. These tests are noted
':To be Reworked" in the remarks column of the "Table of Test Results."
Respectfully submitted,
BENTON ENGINEERING, INC
By
,~ r,
(2)
(1) Attention: Mr. Burton C. Kramer
(2) City of Carlsbad, Eng. Depart.
(1) Rick Engineering Company, Carlsbad
(l,i YVarmington Development, Inc.
Attention: Mr. Bart Pitts
_
Philip H. §enton, Civil Engineer
R.C.E. No. 10332
BENTON ENGINEERING, INC.
|A AliuMC.3^
8£NTON ENGINEERING MECHANICAL ANALYSIS CF SOILS
Project ',/ <"•*-> £-r A /x*^ ' cT '»«'
* J -i*"*f *•> >«*** ,_». >.. .""»No. / ^ - o - *., ,o --
Hole No. Sample No. /?/*
, , -f . \"
/. /
t? r- "h"
Depth
Date 5*' Z.S'- "7 7
Testwd Bv -' . '' ( - •
Checked By
ANALYSIS of MATERIAL
Retained On Sieve (W|)
ANALYSIS of MATERIAL
From Hydrometer Analysis
Sleva
No.
['<-
i
**~
'>
1U7&
Pcsn
Total
Wgt.
Retained
iii
. \&
<66itf
^9
tsot'o
13 t; -7
/?J 5
|
Cum. Wgt.
Passing
t
|
^Tb!r>
s?3,; ^-«
I*.?
*
i
i
!
i
Cum. % of
Total Passing
>^
/
/oa-6> >;
3 3 . <1- *
*7 . ^ ^
Sieve
No.
Pan
Total
Wgt.
Retai ned
Cum. Wgt.
Pass ing
Cum. % of
Total Passing
Hydrometer Analysis Wgt. Mate
Clock
Time
Time
Min.
1
2
5
10
15
30
120
250
1440
Temp.Hydro.
Read i ng
Corrected
Read ing
Partial
0 1 am . mm
-i al q .
Percent of ^2
F iner than D
' W2
Percent of Total
Sample Wj W2
...
i
ZZ33708
BENTON ENGINEERING MECHANICAL ANALYSIS OF SOILS
Project JL.A ^/^c7 //u/TTT I? .T- 4-Data
Hole No.Sample No.
Tested By .F) [?
Depth Checked By
ANALYSIS of MATERIAL
Retained On Sieve (W|)
ANALYSIS of MATERIAL
From Hydrometer Analysis
Sieve
No.
/ ^• -%^
\
A-
r'^-
"~.t>'€>
Pan
Total
Wgt.
Retaji ned
i
,o
.t>
5^ 1
i o *j -7
1 3 L * ^
4o T
C^o. fc>
I7- -7. ^
^2. £ ^
\
Cum. Wgt.
Passing
t?rojo
n .^, 3
&3 \O
1^, C
Cum. % of
Total Passing
i v
1 00.10 x
TS14- V
7^J?iZ x-
^ ; <5 x
Sieve
No.
Pan
Total
Wgt.
Retained
Cum. Wgt.
Passing
Cum. % of
Total Passing
Hydrometer Analysis Wgt. Material 9 -
Clock
Time
Time
Min.
1
2
5
10
15
30
120
250
1440
Temp.Hydro.
Read i ng
Corrected
Read i ng
Partial
0 i am . mm
Percent of W2
F iner than D
Percent of Total
Sample Wj W2
ZZ33708
BENTON ENGINEERING MECHANICAL ANALYSIS OF SOILS
Project ,/,A c-o 5~~X,
No. 7^-- S - ^ 0 F
:? r—4-Date
Tested By
Hole No.Sample No./s I/ ^Depth Checked By
ANALYSIS of MATERIAL
Retained On Sieve (W|)
ANALYSIS of MATERIAL
From Hydrometer Analysis
S ieve
No.
/^
/
<4-
-fr?
2^0
Pan
Total
Wgt.
Retd i ned
i
j
.&
m.iS-
s°& 11 1
13 4{ (?*
ii
i
Cum. Wgt.
Passing
2150.
10.
-c?
r
1 £~J 4-
1i
i
i
i
Cum. % of
Total Passing
K
<
-J ^ ^r/ O€> O K
7 o ! 7 X.u> ** , C» v
^JL A
t
i
Sieve
No.
Pan
Total
Wgt.
Retai ned
! 2.STo.^> lo^'^J OifcJ *--' '*
i Hydrometer Analysis ; Wgt. Mate
Clock
Time
Time
Min. ;
1
2
5
10
15
30
120
250
1440
Temp.Hydro.
Read i ng
Corrected
Read i ng
Part i a 1
Dlam. mm
Cum. Wgt.
Passing
-ial q «
Percent of W2
F iner than D
Cum. % of
Total Passing
w2
Percent of Total
Sample Wj W2
ZZ33788
BENTON ENGINEERING MECHANICAL ANALYSIS OF SOILS
Project jLA. co-r^A
No. -74-- 5" -•*, OF
of- -T-Date
Hole No.Sample No. j5 S4-Depth
Tested By _
Checked By_
ANALYSIS of MATERIAL
Retained On Sieve (W|)
ANALYSIS of MATERIAL
From Hydrometer Analysis
S leva
No.
t^
I
~J~
_"C?
~Z>rSO
Pesn
Total
Wgt.
Retained
i
I
\0
/6/ii?
si'--!*.
•z. s^o.S o
i n j o
3 *\&
!
Cum. Wgt.
Passing
;
1 D O/O
p V/- t--
.t?/. D
Cum. ^ of
Total Passing
I K
1 x
mo- O x:
15*1 4- K
]2;4 x
s
t
1
ii
Sieve
No.
Pan
Total
Wgt.
Retained
Cum. Wgt.
Passing
Cum. % of
Total Passing
; Hydrometer Analysis Wgt. Mate
Clock
Time
Time
Min.
1
2
5
10
15
30
120
250
1440
Temp.Hydro.
Reading
Corrected
Read i ng
Partial
0 i am . mm
-ial q .
Percent of W2
Finer than D
W2
Percent of Total
Sample Wj W2
ZZ33708