- PREZDUNARY SOILS INVESTIGATIONREPORT
,- i I_
-
of
Lot 431, Ia Costa Vale No. 3. &p 7950
Carlsbad. California
For
John Lemkey
BY
EN(JNEERlNG DEPT. LIBRARY
city of carlsbad
2075 Las Palmas Drive C&&Q CA 92009-4859
San Marco9 Engineering, Inc. 370 Mulberry Drive, Suite E
San brcos. Ca. 92069
-
September 3, 1987 Job Number 87118
j
i
,-
:
/-
-
,-
ii
Mr. John Lemkey 3230 venado Carlsbad, CA 92008
Re: Preliminary Soils Investigation of Lot 431, Map 7950 Carlsbad, California
I /-
! / ~- I
/
I-
4 I-
i
-
Dear Mr. Lemkey,
As YOU requested, we have conducted a preliminary soils
investigation of Lot 431, Map 7950, Carlsbad, California located
at the vicinity of Cadencia and Piragua Streets in Carlsbad,
California.
Purpose
Our investigation was conducted to assess the geologic and
geotechnical conditions at and near the site which may affect the
proposed development and to gather soils data on which to base
foundation recommendations. This report describes the
investigation of surface and near surface soil conditions,
provides conclusions regarding the resident soils, and makes
foundation recommendations for a proposed residential structure.
-
.-
-
Project Location and Description -
Lot 431 is located at the vicinity of the northeasterly corner of
intersection of Cadencia and Piragua Streets, in Carlsbad,
California. The lot is rectangular in shape and has been graded
sometime in July 1986 to accommodate the construction of a
- 1
! ,-
-
:-
:-
:- I
I
:-
j
i-
I
I-
/
:
-
c
residential house therein. It is proposed at this time to
regrade the entire pad for the construction of a residential
structure. Plate 1 show the Vicinity Map.
Regional Geology
Carlsbad, California lies on the coastal plain of northern San
Diego County and the adjoining low rolling foothills of the
Peninsular Range of Southern California. Marine conglomerates,
sandstones and shales of Eocene to Pleistocene age underlie the
coastal plain while metasediments and metavolcanics of the
Santiago Peak Formation intruded by Cretaceous batholithic rocks
make up the foothills. Lot 697 is underlain by a northwesterly
trending belt of the Juro-Triassic Peak Formation which consists
of metavolcanic and metasedimentary rock.
Although a number of small faults have been reported in the
surrounding area, none are known to be active. The nearest known
active faults are the Elsinore Fault Zone located 24 miles to the
northeast and the offshore extension of the Rose Canyon-
Newport/Indlewood Fault Zone which lies from 6-8 miles offshore
beneath the Pacific Ocean approximately 10 miles to the
southwest. Both faults have been active in recorded history and
are acknowledged of being capable of producing earthquakes up to
Richter Magnitude 7.0 (M7.0).
Soils Investigation
Four (41 test pits were excavated at site at the approximate
locations indicated in Plate 2. The test pits are indicated as
- 2
Lemkey Geotechnical Investigation, cont'd...
I-
i_
-
, :
i-,
i ! -.
‘_
-1
.d
.-
T-l to T-4, inclusive.
Log of the soil samples encountered are shown in Appendix b.
Findings
The fill material imported to form the existing graded pad
consist of brown to light brown silty sand. The native soils is
brown to reddish brown sandy clay with broken or fractured rock.
At test pit T-l, very hard, dense rock fracture was encountered
at bottom of test pit at -- 3.5 feet.
At T-2, native reddish brown clay was encountered at -- 4 feet
from existing surface, while at T-3, the reddish brown Sandy Clay
material was encountered at -- 7 feet below surface.
The fill material overlying the graded pad was compacted and 13
tests were taken at the locations indicated in Plate 1. The test
results are shown in Appendix B.
Laboratory Soils Testing
Maximum dry density test of the prevailing fill material was made
and the test result is shown below:
SAMPLE
T-l @ -2.5': Brown Silty Sand
MAXIMUM DRY OPTIMUM MOISTURE DENSITY CONTENT
127.5 pcf 9.6%
Expansion Index Test per UBC Standard No. 29-l indicate the soils
to have an E.I. of 48 which is of low potential expansion.
-
I
- Lemkey Geotechnical Investigation, cont'd...
i-
;-
-
-
.-
-
-
-
: - I/
I-
Conclusions and Foundation Recommendations -
1. It is our opinion that the existing site soils can safely
support the project proposed to be constructed at site
provided the recommendations presented herein are observed
and followed during the design and construction of the
structure proposed to be built.
2. The Earthwork Specifications found in Appendix A forms part
of these recommendations. If there are conflicts in the
provisions between the Earthwork Specifications and these
specific recommendations, the latter provisions shall
prevail.
3. We recommend an allowable soil bearing pressure of 1500 psf
for standard spread footings. Bottom of footings should be
at least 24" below adjacent finish grade or natural grade.
4. All exterior and interior wall footings should be
continuously reinforced with 2 -#5 bars placed 3" above
bottom of footing and 2 -#5 bars placed 2" below top of
footing.
5. Concrete slabs on grade should be at least 4" thick and
reinforced with welded wire mesh placed at mid-thickness of
slab. The slab should be underlain by 4" sand and vapor
barrier. Prior to placing the sand and vapor barrier, the
subgrade soils should be wetted to at least 4% above
optimum moisture content.
4
,- Lemkey Geotechnical investigation, cont'd...
,
,-
1_
1.-
i 1
I-
-
! ’ -
1:
I i : -
1,
-
I.
.-.
I.
.-
I, .- -
I. - 1.
6.
7.
a.
9.
10.
11.
The following soil parameters are recommended for use in
the design of retaining walls:
Active equivalent fluid pressure = 36 pcf, No surcharge backfill
Active equivalent fluid pressure = 59 pcf, 2:l slope backfill
Passive Equivalent fluid pressure = 330 pcf, No surcharge
Passive Equivalent fluid pressure = 164 pcf 2:l Backfill slope
Coefficient of friction between soils and masonry = 0.33
To minimise differential settlement inherent in cut and
fill situation of graded pads, it is recommended that the
pad soils in the cut area should be undercut by 36 inches.
A soils engineer should inspect the foundation trench soils
prior to poring of concrete for the footings to see to it
that the recommendations presented herein are followed.
Recommend slope ratios for cut and fill not to exceed as
shown:
cut: 2 horizontal to 1 vertical
Fill: 2 horizontal to 1 vertical
All surface water runoff should be directed away from the
foundation system positively.
This firm should be contacted if soils different from the
soils presented in this report are found at site during the
grading and construction operations so that a proper
5
I /-
-
Lemkey Geotechnical investigation, cont'd...
evaluation and recommendations of the soils can be made.
Limitation of Report -
This report is based upon surficial and limited subsurface
observations and logical projections inferred from observed
conditions. Should conditions varying from those reported be
found during development, a qualified soils engineer should
inspect the site and evaluate the potential effect of our
recommendations. The report has been prepared in accordance with
generally accepted soils and foundation engineering practice. No
other warranties expressed or implied are made as to the
professional advice and recommendations contained. This report
is provided for the exclusive use of the client or his authorized
agents.
Should you have any questions regarding this report, please call
us at 744-0111 and mention Job #87118.
Very truly yours,
ENGINEER1
6
.- Lemkey Geotechnical Itivestigation, cont'd...
Enclosures:
-
i
Appendix A --Earthwork Specifications
Appendix B --Boring Logs & Laboratory Test Results
I
/_
Appendix C --Unified Soils Classification System
Plate 1 --Vicinity Map
1’ Plate 2 --Test Pit Location
i-
-
1; I-
1’ .- I :
I.
i
- 7
.I
/-
I
I
j-
-
I
!-
j-
I-
I-
i
i-
I
I-
i
/_
j-
I
r
I
>
I_
I
-
-
-
,
-
-
APPEUDIX A
RECONNENDED EARTHWORK SPECIFICATIONS
.-
-
/_
APPENDIX A RLCONHCNDLD EARTHWORK SPECIFICATIONS
I- I
l-
-.
:-
-
1. WEEBb&, Qg$~fi~er~Q& The ob]ective ie to obtain uniformity & adequate internal strength in filled
ground by proven engineering procedures and teat.3 ao that the proposed atructurer may be safely aupported.
The procedures include the clearing and grubbing,
removal of existing atructuree, preparation of land to be filled, proceaaing the fill aoils, filling of the land, and the spreading and compaction of the filled
aream to conform with the linea, grades, and elopea aa ahown on the approved plans.
The owner shall retain a Civil Engineer qualified in Soil Mechanics (herein referred to a.s Engineer) to
inspect and teat the filled ground am placed to verify
the uniformity of compaction of filled ground to the specified 90 percent of maximum dry deneity. The
Engineer shall advise the owner and grading contractor immediately if any unaatiefactory conditions are obeerved to ericlt and shall have the authority to relect the compacted filled ground until such that aa corrective reaaurea are taken, neceaaary to comply with the apccificatione. It ehall be the sole reaponaibility of the grading contractor to achieve the specified degree of compaction.
2. ELfb!?Z!!4,. 48L!mxwL A!!D eeEPdK!G !mM TO BE E&LED,
(a) All brush, vegetation, and any biodegradable
refuse shall be removed, piled, and burned or
otherwise diapoaed of ae to leave the aread to be
filled free of vegetation and debria. Any unconpacted filled ground or loose conpreeaible natural ground, ehall be removed unleaa the report recommenda
otheruiee. Any unstable, -w-w, or otherwiee
uneuitable areaa ahall be corrected by draining or
removal, or both.
,
-
1'
SAN NARCOS ENGINEERING civil, foundationa L roilr
,
I
-
,
(b) Thr n.tur.1 ground which ir deterrined to be
satinfactory for the eupport of the filled ground rhall then be plowed or l cerified to . depth of et 1ea.t .1x
inchem (6") and until the aurfacr if free from rut.,
hueeock., Ar other uneven feeturer which would tend to
prevent uniform coepection by thr equipment to be med.
Cc) After thr n.tur.1 ground he. been prepered, it l h.11 then be brought to the proper 8oieture content
end compected to not leer than 90 percent of maximum
denelty in l ccordence with the A.S.T.M. Dl657-70 method which Il... 26 blowr of m 10 pound rammer felling 16
inche. on l ech of 5 lmyera in . 4-inch diemeter l/30
cubic foot cylindricml mold.
(d) Where fillr l re med. on hillmidem or exposed rlop. areaa, with gredirnt. greeter then 10 percent, horizontrl bmcher l h.11 be cut into fira undimturbed n.tur.1 ground in order to provide both later.1 and
verticel l tmbility. Thir la to provide . horizontal
bar. l o thet l ech lmyer i. plmced and compacted on l
horizontrl plane. The initi.1 bench at the toe of the fill l h.11 bo at learnt 10 feet in width on firm
undirturbed neturml ground at the elevation of the toe
l tak. plmced et the n.tur.1 engle of repose or design alope. The Engineer mh.11 deterrinr the width and
frequency of l ll succeeding benchem which will Vary
with the mail conditiona and the mteepnemm of elope.
3. "4~~~~~L",o~~S,t"egQX4~ ECQYXBLHEITPr The fill
l oilm of melect mmterielm ire0 from
vegetable matter, and other deleteriour rubmtance., and
mhall not contein rock. or luapr greater than 6 incher
in dimeter. Thim mmy be obtained from the excwation
of bmnkm, borrow pit. or any other approved sources and by mixing moilr from one or more l ourcea. If l xceaeive vegetation, rock., or l oilr with inadequete mtrength or other unmcceptmblr phyricel chmracterimticm are
encountered, theme mhmll be diepoaed of in uaate area
am mhoun on the plan. or aa directed by the Engineer.
If, during grmding opermtionm, l oilm are found which
were not encountered and teated in the preliminary
invertigmtion, tertr on theme roil* rhall be performed
to determine their physic.1 cheracterimtic.. Any
special treatment recommended in the preliminary or
aubaequent moil reporta not covered herein ah811 become
an addendur to these ap~cificatiOnm~
2'
SAN RARCOS ENGINEERING civil, foundations k aoilm
-
!- I
!
:-
-
;;,ELAQZML ~EEEAPIMQr CMP EQMOKIIMP L&L MbIEEIbLP+ When the roiature content of the fill material ia belou that rpecifird by the Engineer, water mhall be
8dd.d in the borrow pit until the roirturo content im
near optimur to l mmuro uniform mixing and effective compwtion.
(b> Whrn the moisture content of the fill material ir
above that l pecified by the Engineer. rcwlting in inrdequate compaction or unstable fill, the fill
material ahall be aerated by blading and scarifying or
other l atirfrctory methodm until the moisture content
im near optimum am specified.
(c> After proceraing, the auitabl. fill material rhall
be placed in lryerr which, when compacted, ahall not exceed dX inchem (6" ) . Each layer ahall be spread
evenly and rhall be thtoughly mixed during the
apremding to ensure uniformity of material and moisture in each layer.
(d) After each layer haa been placed, mixed and spread evenly, it l hmll be throughly compacted to not lemm
that the deneity art forth in paragraph 2(C) above.
Compaction -hell be accomplished with aheepafoot
roller*, multiple-wheel pneumatic-tired roller*, or
other 8pproved type. of comp8ction equipment, much . .
vibrmtory equipment that im l pecially designed for
certain mail typm. Rollerm ahall be of much design
and maintained to much a level that they will be able
to compact the fill materiml to the specified density. Tamping feet of l heepmfoot follere ahall be maintained
8uch th8t the SOil will be compacted rather than
aheared by the roller. Rolling ahall be accomplished while the fill #aterid im at the specified moisture
content.
Rolling of l rch layer l hmll be continuour over itr entire area and the roller *hall mmk. mufficiint tripm
to inmure thmt the specified density haa been obtained.
Rolling ahall be l ccorplimhed in l planned procedure much that the entire aream to be filled ahall receive
uniform comprctive effort.
(e) The rurfmcer of the fill l 1op.a rho11 be compacted
by *e*nm of mhaepmfoot roller8 or other suitable
equipment. Compacting operationr ahall be continured
,
-
- 3'
SAN RARCOS PNCINEERINC civil, foundation. I moilm
-
!‘-
i-
appreciable l mount of loore aoil on the dopea. Compacting of the rlopem rhall be l ccompliahed by
backrolling the l lopem in increments of 3 to 5 feet in
elevation gmin or by other rethodr producing
l 8timfactory rerultm.
(f) Field denmity temt. mhall be taken for
approximately each foot in elevation gain after
compaction, but not to exceed two feet in vertical
height between teetm. Field density tertm l my be taken at interval8 of 6 inchem in elevation gain if required
by the Engineer. The location of the teatm in plan
l hall be M apaced to give the bemt pommible coverage
l nd ehall be taken no fmrther apart than 100 feet. Temtm rhall be trken on corner and terrace lotr for
l rch two feet in elevation gain. The Engineer may take additional tertr am considered neceamary to check on
the uniformity of compaction. Where aheepmfoot rollera
are wed, the temtr ahall be taken in the corpected
material below the disturbed surface. No additional
layer- of fill rhall be l premd until the field density temta indicmt. that the rpecified density haa been
obtained.
(cl) The fill operation ahall be continured in mix inch
(6-j comp8ct.d leyerm am rpeciffed above, until the
fill ham been brought to the finished slopem and gradem me mhoun on the mccepted plmnm.
Sufficient inspection by the Engine+r
be l aintmined during the filling mnd compacting
operationm mo thmt he can verify that the fill V..
constructed in accordance with the accepted
mpecificrtionm.
6. a,a,~nrl L&RILr No fill material ahall be placwiL
spread, or rolled if weather conditionr increase moisture content above permirrible limitr. When the
work im interrupted by rain, fill operationm mhall not
be remumed until field teatm by the l 0ilm engineer
indicate that the moisture content and density of fill
are am previously apecificd.
,
-
I !-
SAN UARCOS ENGINEERING civil, foundation. k aoile
/-
.-
7 8;il~&B&~hl !!&NM Qg !!Q!!,NQ~ndY# PQihr Thorn.
that expand 3.0 percent or leea from 8ir dry to
axturmtion under l unit load of 150 pounda per rqu8re
foot are con8idered to be nonexp8neive.
8. All recommendation. prexented in the attached report
are e pert of there rpecificetione.
I-
1 1 !
i-
,
I-
I
-
,
-
5 ’
-
-
I-
i-
I
I-
i
-
-
APPENDIX B
LABORATORY TEST RESULTS
.
-
-
!
a_-
j-
i ,~
! .
f a-
j-
/-
,-
.-
,
-
SAN MARCOS ENGINEERING
ClWL C*01”1..*. ,QIL. . ro”~D-.lo”
,a0 UUL.,.l o..r*. .“... . Boring ?40.7=
..l “..55.. 5. .a<.. x.*eu 7...0111 Sheat NO.- of-
CCNTRACT NO. PGRPCSE
5T,&a?s7H
Ma!arial
/
i-
-
SAN MARCOS ENGINEERING
j-
‘, ~~
I (.- , \
/
i- 1
I-
I-
CWlL ChO.W‘I... set&.. . c*“..o.llo”
so0 “UC...-- o-r*. .r.-. . *r-d “..CS.. c- .a<.. ..,s, ,...o,,, Peal No./ofL
CONTRACT NO, PURPCSE
Ua!arial 6 RenarkI
-
SAN MARCOS ENGINEERING
-
:/I
:!
.f /-- . 1’ ;I-
/ ‘-
I -
i
I :-
j !
i
-
,
-
i
Cl”lC C*Oi..sl... SQIL. . ,OcI..O..10~
3ao UVL.E.I o.,r*. ..d-. . &ring No. F3
..” -..cc.. 5. .a.?.. s.,e, ,...011, Seat No.+of~
LEMKEY ,4E5.0@~,%=q.%RSt, Lt h7a
CCrUTRACT NO. PL’RPCSE J
Ua!erirl 6 Remarks
j- i-
s-
!I-
II-~
jl- I IL i .
ii
jt i
jj .i
i 1 ;i
iNi // jl
ip
j i
:l
-
,
i
I
SAN MARCOS ENGINEERING
CWlL c-a,-**... SOIL. . roY..o.~\o~
,a0 ““L.E.I O.,“.. .I,.. . Boring NO. H
..s. “..CG.. 5. *a=.. ,.,v, ,r..o*,, She! N../Of~
CChtTRACt NO. PGRPCSE d
Uararial 6 Renarkr
I
jl
!
: :
1
-
I-
I,
,. i i ,~I>
SAN MARCOS ENGINEERING, INC.
Job No. 87/F 370 MULBERRY DRIVE. SUITE E
Lc%zkey
SAN MARCOS. CA 92069
Project: (6191 744-0111
, ~heMf2J '
Sample ID; Dry Density vs. Water Content
Curve. Test Per ASTM D1557-78
&lculated_: Maximum Dry Density: /*5pc1
Optimum Moisture Content:?k 1
I
150
100
, .- 9 12 16 20 24
Water Content, Percen.t
Page
I l-
Sumlnarr og T.cC :-
i-
i
i-
lr
I
i
TEST ----
N!c!!!ER
1 2399
2 +_401
3 502
4 +405
5 +_410
6 2412
7 2408
a +408
9 2416
10 t419
11 2413
12 2387
13 2400
APPROX ------z L?EY -------- RELATIVE l??n&lUES
ELEVA- DENSITY COMPACTION ------ ___-___ ---------- TION(FT) (PCF) (%> -------- ----- ---
121.07 93.1 DriVeWay
120.82 92.9 Pad
122.42 94.2 Slope
127.17 97.8 Pad
109.20 92.5 pad
120.00 92.3 Pad
118.65 91.3 Pad
120.64 92.8 Pad
115.12 91.6 Pad
120.91 93.0 Pad
124.21 95.6 Driveway
110.32 85.0 Slope
111.77 86.0 Slope
,-
I
I- ,
I
-
I !-
I_
i I- 1 1
; ,-
-
I-
j -
I
/-
I
I-
/-
/ i ;_ I
-
-
-
, -
APPENDIX C UNIFIED SOILS CLASSIFICATION
-
. \
A*DcLln*Y I- -
i ~~
!
I -i ,’
!
I :
I--
j
1
i-
!
5
i-
-~
.-
4
-
nrrrl.“rn ”
UNIFIED SOIL CLASSIFICATION SYSTEM
MAJCR UVISIONS LETTER sw3a MscAIPT0NS
GRAVEL 1 GW ~LCU,~ 6- 5-"-m.- Hue
COARSE AND CLEAU QQAVEL~ bwNLU, LITTTU bu Lp ruea.
GRAINED GAAVELLV GP -LY.u*?w cuvnr. -vrL-yY?
SOILS SOILS %=fY - WC’CW, Inn* oa ta ~~.
cwtmusaf: YLTY l MVC.S oum-SW8
a ctiam -PAZ. m-r rrl*nard
cum *-ma, cum-mrl SILT n-. L SAND
sA3SlU
QEAH SAmS SW uu-ChAme wu7s,o&wsuv
w*iTwdm 2 $lll
pro, crr-fu on 10 rlb4m
b-M& on bm
,y*GFG$*
1 ’ ‘SF+ ~~;‘~~~y&..~:a~’
b-afLIIw8ao)j~
- ;p!s8+z w%%Es , su a&TV na#m, *;LI*-*ILT MRlvCd
tw~~YL+*H8 Anu~T Y ma%) SC cuI1* uwm, yo-urn UKri-f
Dwk LLW, 44 rer* w8
FINE SLls Y
CR&NED Am LIaJo LIMIT
sots am LESS THAN so hG+2NucLM w w -8 raw
CL X~i;*S!%fYfi Yt
a OICY ,I* w arc SILT' we m rumrGT
YH LIGUO LYIT iz?cxs-~ zs;;c,“,J,“,,
GREATER CH Uo~rY rLms --uww l ee- 3 wmt
THAN so -’
I OM : ~&K,,~&M~~L~ *
HIGHLY’ ORGANIC SOiLS l f M,tu*sw~Km# MM a-k cwmrl
b@lv: ALY oIMc5 Wmz4TC -IYI asn. CLAanln3CAr c3)
FEV TO SAMPLE MTA
DEPTH QI ELtVATlUt(FEET) . l ‘.
tt INMCATES PUSED)
SArnE REccHERl SAMPLER rVPE 6RARilC LOO
m - S INCH SPLIT LETTER SYMBa FOR
TUBE SAMPLER SOL. TYPE
Tw - 3 INQl THIN WALL OlSTlNCT CONTACT ‘_
SAMPLER BETWEEN SOIL STRm
ST - 2 INCH WIT
lL6E SAMPLE8 Gd?AOJK .CHANGE
c -ROCK CORE- BETWEEN S’3L STRATA.
b . - R&~KKR~STURBED ’ KJTTCM ff BORINO
~~..~___ __~~ I _- -.-. -.-~-.. - -~~ - - _ _ _ _ _ _ _ _ . ,,..lL,e- I-. -
.-
- SAN MARCOS ENGINEERING
Civil Engineers 380 Mulberry Dr. Suite E SAN MARCOS. CALIFORNIA 92069 ~ (619) 744.0111
L- J ---_---i-*-------e
I\
1, -
-.. j I I r
I I -..;-: 1 , 1 I / f-Y’