- (3) Performing laboratory tests on representative samples of the material
used for fill.
Site preparation, compaction and testing were done between January,14 and
21, 1972 in accordance with the ISpecifications for the Construction of
Controlled Fills" presented in the January 6, 1966 addendum to the "Founda-
tion Soils Investigation for Ranch0 Agua Hedionda Subdivision" dated July
29, 1965, prepared by Dresselhaus Engineering of Oceanside, California.
WOODWARD - GIZIENSKI & ASSOCIATES CONS”LT,NG SOIL AND FO”NDAT,ON ENGlNEERS ANO OEOLOGlSTs
An affiliate of Wooduxrd - Clyde Consultants
3,67 KYlll street San Diego April 5, 1972
fali‘arnh 92110 Project No. 72-102-4
(71,) 224-2911
Kamar Construction Company
P.O. Box 71
Carlsbad, California 92008
Attention: Mr. Jerry Rombotis
LAGUNA RIVIERA UNIT 9
WATER MAIN
CARLSBAD, CALIFORNIA
ENGINEERING DEPT. LIBRARY
Cily of Carl&ad 2075 Las Palmas Drive Carl&ad CA 92009-4859
In accordance with your request and your letter of authorization dated
January 18, 1972, we have provided soil engineering services in conjunction
with the grading of the subject site. These services included:
(1) Engineering observation of the grading operation in that portion of the
easement of the water main passing through this unit.
(2) Taking field density tests in the fill as placed and compacted.
Fill was placed, compacted and tested on Lots 276, 277, 278, 279, 281 and
that portion of Avila Avenue fronting on these lots during the grading of
the future water main easement located in this unit.
- As the site grading progressed, the compaction procedures were observed and
field density tests were made to determine the relative compaction of the
fill in place. Field observations and field density test results indicate
that the fill has been compacted to 90 percent or more of maximum laboratory
density. The approximate locations of field density tests and the limits of
compacted fill are shown on the attached Figure 1. The results of field
density tests and of relative compaction, expressed as a percent of maximum
laboratory density, are given on the attached forms.
Laboratory tests to determine moisture-density relationships, maximum dry
density, optimum moisture content, and grain size distribution were per-
formed on representative samples of the material used for fill. The results
of laboratory tests are given on the attached form.
-.
-
-
-
Kamar Construction Company
Project No. 72-102-4
April 5, 1972
Page 2
Laboratory tests indicate that nonexpansive fill was placed within 2 feet
of rough grade on all fill lots noted above.
It is our understanding that additional grading will be done on this unit
at a future date. Foundation recommendations will be made in our final
report at the completion of all grading.
The elevations of compaction tests correspond approximately to the elevations
shown on the grading plans for "Laguna Riviera Unit No. 9", undated, pre-
pared by Raymond R. Ribal, Civil Engineer, Dt-ea, California.
This report covers the fill placed under our observation during the dates
specified above. Additional fill placed after these dates should be com-
pacted under the observation of this office and tested to assure compliance
with the earthwork specifications of the project. This office should be
contacted at least 24 hours prior to backfilling operations.
The inspections and tests of compaction made during the period of our ser-
vices on the subject site were in accordance with the local acceptable
standards for this period. The conclusions or opinions drawn from the
tests and site inspections apply only to our work with respect to grading
and represent conditions at the date of our final inspection.
We will accept no responsibility for any subsequent changes made to the
site by others or by uncontrolled action of water or by failure of others
to properly repair damages caused by uncontrolled action of water.
EHP/JLH/SFG/jm
Attachments
(7)
-
WDODYIAQD. CIZIEI:SKI & ASSOClhT;S co*I"LIINT IDlL 1.m ,o"*oAT,"N .aC,YECI1S .?I0 cL"LoL:~.r~
~-.
COMPACTION TEST RESULTS
--JoL1 NArnE LAGUNA RIVIERA UNIT 9 (Water Main) DATEREPORTEO 4-5-72
JOB NUMBER 72-102-4
- ~~~~~~~~~~~~~ January 15 through 21, 1972 PAGE 1 OF 1
"0I.T""‘ .,LL!d LL.OIATOL" "CLAIIYI - D*,z n.r mr:., LOCATIOY lLL"ATlOH COWT‘YT DINBITI Dml.lri cO*,*CTION ""YBI" OFTTST c 0"" WT. PC, K. % 0, L&s. DLNS.
-JAN 15
-
JAN 20 -
--
JAN 21
-
-
_-
-
-
-
-
6
7
a
9
1: K
14
15
LOT: 277
277
277
278
278
277
276
278
277
278
279
279
281
278
279
202.0' 11.1 120.0
204.0' 10.5 118.7
206.0' llil 117.8
208.0'
210.0'
208.0'
210.0'
212.0'
212.0'
214.0'
216.0'
218.0'
220.0'
220.0'
i 221.0'
10.5 118.8
11.7 116.7
10.0 120.5
10.5 119.0
9.9 116.5
10.5 120.0
9.9 115.5
9.5 117.5
1K
116.0
10:5
115.0
118.3
11.1 119.0
127.0 94.5
127.0 93.4
127.0 92.6
127.0 93.5
127.0 91.7
126.5 95.5
126.5 94.2
126.5 93.0
126.5 95.0 127.0 91.0
126.5 93.0
126.5 92.0
125.0 92.0
125.0 95.0
126.0 '94.0
WOODWARD. CIZIENSKI & RSSOClnTES
-
COMPACTION TEST RESULTS
-JOB NAME LAGUNA RIVIERA UNIT 9 (Streets) DATE r+EPORTED 44-72
Jo8 NUMEZER 72-102-4
-
DATESCOVERED January 20 and 21, 1972 PAGE 1 OF 1
“O”TYII* ,,rLD U~ORATOI” (ILUIIYI
TI.7 IlzTL*T LOUTlO” r.Ltz”ITIOH COYTmn DIN.IT” DS”.ITI COUCACTIOH
HYYDLI1 OF OPTESI l DIIWT. cc, KC v. or LAB. DEliS.
-JAN 20
-
-JAN 21
-
-
-
-
-
s-1
s-2
s-3
S-4
s-5
AVILA AVENUE
OPP LOT: 277
278
276
281
276
216.0'
216.0'
218.0'
218.0'
220.0'
S-6 277 G 221.5'
s-7 277 G 222.0'
S-8 276 G 222.5'
G = Grade attained at end of current operation
10.5 118.6 126.5 93.7
10.0 115.8 125.0 92.3
9.9 118.5 126.5 93.5
10.5 118.8 126.5 93.9
8.7 114.2 125.0 91.5
9.3 114.8 126.5 90.5
10.0 118.0 126.5 93.0
10.5 115.5 126.5 97.2
WOODWARD. GIZIENSKI & ASSOCIATES
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
MWNICAL ANALYSIS
I
ERO AIR VOIDS CURVES
PLASTICIM CHARACTERISTICS 12
Liquid Limit. % - -
Plasticity Index. 5 - -
Classification by Unified Soi[
Classification System; SM-SW SC-SM
SWELL TEST DATA 12
Initial Dry Density, pcf - -
Initial Water Content. .Z - -
- -
Percent Swel I - -
I I I I 8o 0 I I MOISTURE CONTENT, 6 I I IhhJ
IO
L~RATORY &ACTION TEST
30 KJ
FILL SUITABILITY TESTS
LABORATORY COMPACTlOll
TESTHETHOO: ASTM D1557-70T LAGUNA RIVIEP,A UNIT 9
WO(jCJdARD - GIZIEbdSKI b ASSOCIATES
CONSULTING SOIL 4ND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA
DR. By: ‘F.? , ScbLE: -- i%OJ. Hg: 7’/-:;:? I i r 7-l i LK’D 3: AC/# 1 DATE: ‘+-3-/L +:i;; 1 nf : -1
- _-.-p -. _ z! Y ..s.ew~‘wxc,m~.,
,-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
i:
I
0 I ?::CT ‘i!Z/ I: TEST b’;i. 112 a --
Dry tknsity. Pcf - - 111.1
Initial Water Content. X _ _
Final tlatcr G-intent. $ _ -
Apparent Ch’iesion. psf - -
Apparent Friction Angle. D _ _ ( 23
14’0
130
120
110
I @I
90
eo
Ic%T
80 <? r ;r; 2 60 CL
t ij 43
z
a 20
"
PLASTICIlY C!:hRACTEf:ISTICS I -LLLl~--~
- -
Plasticitv Inaex. $ - - ( I,!? i I Ctsssification by Unified Soil
Classification Systm
NP = Ilon Plastic
MILL TEST DATA 1 2 3 I I t
‘lG00 IO0 IO I.0 0.1 0.01 O.b3I
ZERO AIR VOIOS CURVES GRAIN SIZE I# I-‘ILLII:ETEKS
IO
l&XATORY C&ACTICil TEST
30
FILL SUITABILIN TESTS
LAEO?:TORV CC’:J.!CTt 0:: TEST hgti3D: iST)l D1557-70T LAWA RI'IIERA WIT 5 ,I /, j j
.._', /
W23C:!?RD - GlZICdSI:I & ASSXIATES ii
C!l:iSL’LTlliC SOIL b,!:? FOlY9:si ICY EI:GI!:‘;RS 43 ~EOLO;IST: 1:
s,::: PIC’3. c:LtiT:::I,? :
-I__-_-_ ~.lll_---“. .--.. I. .,,
.-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
.-
-~
LEGEI( 0
1 l Indicates approximate location of Field Density Test.
l indicates approximate location of Street Field Density Test.
s-'o Indicates approximate limits of Tested Fill.
FIELD DENSITY TEST LOCATIOI;S
LAGUHA RIVIERA UNIT KO. 9 ( WATER MAlii )
WCWdARD - GIZIEMKI b ASSOCIATES
COWJLTIHG SOIL AH3 FO~HDATl04 EHGIYEERS AHD GEGLOCISTS S,Afi DIElb. CALIFKHiA