Loading...
HomeMy WebLinkAboutCT 73-24; Carlsbad Lake Community; Soils Report; 1973-07-30SOIL INYESTIGATION FOR THE PROPOSED . .. ( CARLSBAD LAKE COMMUNUYA c CARLSBAD, CALVORNN for 2452 'E. Orangethorpe Covington Brothers Fullerton, California 92634 WOODWARD-GIZIENSKI & ASSOCIATES Consulting Soil and Foundation Engineers and Geologist .. (An Affiliate of Woodward-Clyde Consultants) 51010.15.22 TABLE OF CONTENTS PAGE TRANSMITTAL LETTER SCOPE - .- FIELD INVESTIGATION LABORATORY TESTS SITE AND SOIL CONDITIONS CONCLUSIONS AND RECOMMENDATIONS LIMITATIONS - - - FIGURE 1 - SITE PLAN FIGURE 2 - LOG OF TEST BORING 1 - FIGURE 3 - LOG OF TEST BORING 2 FIGURE 4 - LOG OF TEST BORING 3 FIGURE 5 - LOGS OF TEST BORINGS 4 & 5 FIGURE 6 - LOG OF TEST BORING 6 FIGURE 7 - LOG OF TEST BORING 7 FIGURE 8 - LOGS OF TEST BORINGS 8 & 9 FIGURE 9 - LOGS OF TEST BORINGS 10 & 11 FIGURE 10,- LOGS OF TEST BORINGS 12 & 13 FIGURE 11 - LOG OF CUT SLOPE FIGURE 12 - GRAIN SIZE DISTRIBUTION CURVES FIGURE 13 - RESULTS OF CONFINED COMPRESSION TESTS FIGURE 14 - FILL SUITABILITY TESTS ATTACHMENT I - SPECIFICATIONS FOR CONTROLLED FILL ATTACHMENT I1 - FILL SLOPES: STABILITY ANALYSIS ATTACHMENT 111 - CUT SLOPE: STABILITY ANALYSIS CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS An uffiliote of Woodttiard - Clyde Corwultants 3467 Kultz Street - California 92110 San Diego July 30, 1973 (714) 224-2911 Project No. 73-222 - Covington Brothers 2451 E. Orangethorpe - Ful lerton, California 92634 . Attention: Mr. Mike Ryan In accordance with your Purchase Order Number 15290 and our proposal dated June 4, 1973, we have conducted an investigation of the underlying soil conditions at the site of the proposed Carlsbad Lake Community subdivision in Carlsbad, California. Results of our studies indicate that the site is suitable for the proposed construction. There are however, existing fills, porous soils, and cultivated soils existing on the site that will require special treatment during grading. The accompanying report presents our conclusions and recomnendations, as well as the results of the subsurface exploration and the laboratory tests upon which these recomnendations are based. The engineer assigned to this project'was Joseph G. Kocherhans of our firm. WOODWARD-GIZIENSKI & ASSOCIATES SFG/JGK/ls (6) - Project No. 73-222 - SCOPE This report describes an investigation of the underlying soil and - geological conditions at the site of the proposed Carlsbad Lake Community to - be located east of Interstate 5 and south of Poinsettia Lane, in Carlsbad, California. The purpose of the investigation is to determine the general geology and subsurface conditions, including the presence and effect of existing fills, loose or porous soils, and potentially expansive soils; the embankment shrinkage factor; the relative stability of cut and fill slopes; the availability of select fill materia1s;'recommendations regarding allowable bearing pressures for design of foundations in natural undisturbed soil and in compacted fill; the most suitable type and required depth of foundations. for use at the site; and, the depth to water, if significant. It is our understanding the development will consist of approximately - 300 one to two-story wood-frame condominiums utilizing concrete slab-on-grade construction. We also understand that a shallow lake will be excavated at the central portion of the site. It is our further understanding that grading will be performed in general, in accordance with the Tentative Tract 73-24 plan dated May 1973, prepared by Lawrence R. Williams, Tustin, California, Consulting Civil Engineer. FIELD INVESTIGATION Thirteen test borings were made by a truck mounted, continuous flight, 6-in. diameter power auger and one existing cut slope was logged at the approximate locations shown on the Site Plan, Fig. 1. Field and sub- surface exploration was done on July 5 and 7, 1973, under the supervision of a staff engineer from our firm. Field logs were prepared by the engineer on the basis of an inspection of the samples secured, the materials excavated, and the soils exposed in the existing cut bank along Poinsettia Lane. ~- Project No. 73-222 Page 2 -. ~ The Logs of the Test Borings are shown on Figs. 2 through 10 and are " based on an inspection of the samples taken, the laboratory test results and field logs. Test Boring locations were plotted in the field on a Site .- Plan entitled "Tentative Tract 73-24 Carlsbad Lake Community" dated May 1973, and prepared by Lawrence R. Williams of Tustin, California. LABORATORY TESTS - - The soils encountered were visually classified and evaluated with respecto to strength, swelling and compressibility characteristics, dry - density and moisture content. These classifications were substantiated by moisture content and dry density, plasticity, grain size analysis, direct shear and confined compression tests on representive samples of the soils. Results of the moisture content, dry density, plasticity and direct shear tests are shown at the corresponding sample location on the Log of Test Borings. Results of the grain size analyses and confined compression tests are shown on Figs. 12 and 13, respectively. Fill suitability tests, including compaction, grain size analysis, and direct shear tests have been performed on the probable fi 11 soils. Results of the fill suitability tests were utilized to arrive at the conclusions and recommendations contained herein and are presented on Fig. 14. SITE AND SOIL CONDITIONS The site is located south and east of the intersection of Interstate 5 and Poinsettia Lane and west of Bataquitos Lane in Carlsbad, California. The site consists of a relatively flat north-south trending ancient "beach ridge" sloping gently to the west with changes in elevation from approximately 150 ft in the east down to approximately 110 ft near 1-5. A relatively steep (approximately 2 to 1, horizontal to vertical) somewhat eroded slope exists near the eastern boundary. The Tentative Tract Plan indicates that construction WOODWARD GlZlENSKl & ASSOCIATES oDIY11.lo mn UD -nm U" -0 OIOLOOI." Project No. 73-222 Page 3 will be limited to the gently sloping western portion of the site. At the time of our investigation the major portion of the site was under cultivation. A row of large eucalyptus trees trending north-south exists in the north- western portion of the site. Results of the test borings made at the site indicate the presence of the following materials which are described in their general order of occurrence with depth and increasing geological age. - Fill. Damp to moist, brown silty sand with a trace of clay. The fill was encountered in the west-central portion of the site in Boring 7 extending to a depth of 13 ft. Piles of loose fill have been placed along the top of the ridge near the eastern boundary of the site. Some rubble and organic materials were observed in the scattered piles of fill in this area. Topsoil. Loose to medium dense, generally porous, damp to moist, dark brown silty sand. This material was encountered in borings located .in the western portion of the site, Borings 1, 2, and 8 to 13, ranges from one to six ft in thickness. These topsoils exhibit low potential expansibility characteristics. Terrace Materials. Medium to very dense, damp, red brown to grey brown silty to clayey sands. These materials were encountered in all borings and extend to the depths explored, a maximum of 30 ft. They comprise the basic formational soil at the site, and relatively competent foundation material and exhibit a low potential for expansion when wetted. Below the fill found in Boring 7 about 4 ft of porous clayey sand "old topsoil" was encountered. No hard rock or ground water was encountered in the test borings at the time of excavation. Project No. 73-222 Page 4 CONCLUSIONS AND RECOMMENDATIONS (1) It is our opinion no major soil conditions exist at the site which would preclude the development of the proposed one to two-story condominiums. The presence of existing fills, old porous topsoil, and loose piles of trashy fill will require special treatment during grading. (2) The ground which will receive fill and/or one and two-story condominiums will have an adequate bearing value to safely support the proposed loads when treated as described in the following paragraphs and in the attached "Specifications for Controlled Fill". Footings for residential structures placed on nonexpansive, non-porous native soils or properly compacted nonexpansive fill soils may be designed for a soil bearing pressure of 2000 psf (total dead plus live load) at a depth of 12 inches below rough lot grade. Footings should have a minimum width of 12 inches. The above soil bearing pressure may be increased by one-third for loads that include wind or seismic forces. (3) Cut and fill slopes having an inclination of 2:l (horizontal to vertical) and maximum unsupported heights of less than 25 feet will in our opinion have adequate safety factors against deep seated slope failures if constructed in accordance with the plans and the attached "Specifications for Controlled Fill". Typical stability calculations for cut and fill slopes are attached for your information to support our conclusions. (4) Results of our field investigation indicate that soils expected to be used in fills are basically nonexpansive. Though no potential expansive soils were encountered, it has been our experience, that thin (1 to 2-ft) residual clayey soils could be encountered between the topsoils and formational soils in localized areas. Should any potentially expansive soils be encountered they should be excavated and spread and compacted in Project No. 73-222 Page 5 fills below a depth of 2 ft below rough lot grade, Potentially expansive soils, if encountered within 2 ft of finish grade in cut areas should be undercut and be replaced with properly compacted nonexpansive soils avai lab1 e on the site. (5) Results of our field exploration indicate that all materials encountered can be excavated with normal heavy grading equipment. No extensive cemented zones nor hard rock are expected. (6) In order to express a meaningful estimate of the embankment ’ shrinkage-swell factor, the results of laboratory compaction tests need to be compared to the density in the natural state in borrow. We wish to emphasize that variations in soil density in the natural state, as well as in the fill, make calculated values of shrinkage at best very approximate. A major factor is that relatively few tests are made of on-site materials as compared to the mass of material moved during grading plus the insuffi- cient knowledge regarding the actual densities in excess of minimum require- ments to which the contractor will compact the fill. Based on the 1 imited work done to date and considering the above factors the following shrinkage values for preliminary estimating may be used: Topsoil, approximately 8% 2 2%; the underlying formational soils approximately - 2%; existing loose fills, 10 to 20%. + (7) Our experience with soils similar to those encountered on the site indicates that they could have relatively high permeability rates. Therefore the water loss through seepage of the proposed lakes could be high, could cause marshy areas at lower elevations, or could show as slope seepage. It is therefore recomended that adequate steps be taken to seal the lake areas or to intercept the seepage so that no harmful effects result. Project No. 73-222 Page 6 (8) Soils similar to those encountered on this site are subject to extreme erosion by uncontrolled action of water. Therefore, it is recomended that all cut and fill slopes be planted and be provided with adequate surface drainage in accordance with the City of Carlsbad standards. (9) It is recomended that loose and/or porous soils as well as existing fill soils that are not removed by grading operations be excavated or scarified, as required, replaced and compacted before fill or structures are constructed. In general the loose and/or porous surface soils average approximately 3 ft in thickness where encountered. The maximum thickness of existing fill encountered was approximately 13 ft at Boring 7. Since the fill soils on the site have the same general appearance as. the formational soils and the area is used for plant growth, it is difficult to define exact limits of existing fills for this report. The former erosional patterns are not known by us, nor is the extent of filling to make grade for the present farming operation. Because of these factors it is recommended that several inspection pits be made with grading equipment at the time of grading in proposed fill areas to ascertain the extent of existing fills. (10) It is recommended that all existing potentially compressible soils be excavated, as ,required, and compacted prior to placing fill soils or structures. This reconmendation includes the area of porous old topsoil in the vicinity of Boring 7. The excavation is expected to extend to approximately 16 ft in depth (the depth to the base of the porous soils in Boring 7). Since there has been some filling on the site in the past, the actual extent of porous soils that will require treatment should be controlled in the field by the soil engineer during grading upon visual examination of the exposed soil. Project No. 73-222 Page 7 - (11) It is recommended that all grading operations be observed - and compacted fills tested by Woodward-Gizienski & Associates. Organic material and debris should not be permitted in compacted fill. A set of "Specifications for Controlled Fill" is attached. The recomendations - made as a part of this report shall become a part of the "Specifications for Controlled Fill". LIMITATIONS The conclusions and recommendations made in this report are based on the assumption that the soil and geological conditions do not deviate appreciably from those disclosed by the test borings. If variations are encountered during construction, we should be notified so that we may make supplemental recommendations, if this should be required. Evaluation and utilization of soil materials and geological formations for support of structures includes investigation of the subsurface conditions, analysis, formulation of recommendations, and inspection during grading. The soil investigation is not completed until the soil engineer has been able to examine the soil in excavations or cut slopes so that he can make the necessary modifications, if needed. We emphasize the im- portance of the soil engineer continuing his services through the inspection of grading, including construction of fills, and foundation excavations. Boring I DD = 112 Medium dense to dense, danp, bravl Medium dense to dense, damp, red- DD = 120 BC = 32 brown clayey sand (SC) BC= 40 Bc= E= . Very dense, danp, red-brow si1 ty For Legend, see Fig. 3 LOG OF TEST BORING I CARLSBAD LAKE COMMUNITY WSULTIIIG SOIL S AND GEDLOGISTS I Boring 2 LEGEND WC = Water Content in percent of dry weight. DD = Dry Density in pcfo BC = Number of blows by 140-1 b. hammer falling 30 inches to drive sampler 12 incheso DS = Direct Shear Test Data: 6 = Angle of Apparent Friction in degrees. C = Apparent Cohesion in psf. (SH) = Group classification symbol in accordance with the Unified Soil Classification System. 0 5 4 m LL Q) m I 0 Y- cn L '0 a 0 L a 3 0 Q) m 10 m a c 15 - r 20 e m n a 25 30 Boring 3 For Legend, see Fig. 3 I LOG OF TEST BORING 3 CARLSBAD LAKE CCMMUNITY WSULTIWG SOIL WD FOUWOATION EllGlllEERS AND GEOLOGISTS WXlDWARD - GIZIENSKI & ASSOCIATES SUI Dl EO, CALI FORIIIA DR. BY: GS I APPROX. SCALE: 1" 5' I m& NO: 73-222 CK'D 8Y:)th I DATE: 7/19/73 F[GlI& NO: I) 0 IO 15 I 0 15 Boring 4 Boring 5 Dense, damp, red-brm clayey sand BC = 7.4 S1 ightly Porous DS: = 29 BC = BC = e, damp, red-brm clayey sand _- S1 ightly Porous WC= 6 2 ; .., DD = 117 -:: For Legend, see Fig. 3 I LOGS OF TEST BORINGS 4 & 5 CARLSBAD LAKE COMMUNITY Boring 6 0 5 IO 13 For Legend, see Fig. 3 I LOG OF TEST BORING 6 CARLSBAO LAKE COMMUNITY CollSULTlNG SOIL S AND GEOLOGISTS 0 5 IO 15 20 DD = 114 BC= 14 DD = 106 BC = 12 DD = 112 BC= 37 .: ... DD = IIU BC= 29 ,. .. Be = 26 .. For Legend, see Fig. 3 Boring 7 Damp, dark brown silty sand Fill hp, red-brom silty sand Fill Damp to mist, yellow-brm to red-brm silty fine sand Fill Medium dznse, damp, red-brown clayey sand (SC) brous (Appears to be topsoil) Medium dense, damp to mist, gray- brown si 1 ty sand (34) LOG OF TEST BORING 7 CARLSBAD LAKE COMMUNITY 0 5 IO 15 18 0- 5- ' IO - 15 - Boring 8 Loose, damp, dark brow silty sand (SM) Boring 9 Loose, moist, dark brm silty sand urn dense, damp to moist, yellow- to red-brm clayey sand (SC) LOGS OF TEST BORINGS 8 & 9 CARLSBAD LAKE COMJN ITY I eOllSULTIWG SOIL WD FOUNDATION ENGINEERS AND GE0U)GISTS WXlDWARD - GIZIENSKI b ASSOCIATES 0 5 IO 15 0 5 IO 13 Boring IO Medium dense, damp, 1 ight brcm silty fine sand (a) : kdium dense,tovery dense, danp, red-brown clayey sand (SC) Dense, damp, gray-brown si 1 ty sand Bc= 37 Boring II For Legend, see Fig. 3 LOGS OF TEST WRINGS 10 h I I 0 IO i3 j 0 5 IO 15 Boring 12 , light brcwn silty wc = E... .. ..A kd i urn dense, damp, brown to red- Boring 13 ~= Bc= wc = DD = BC = dim dense, damp, red-brm clayey 1 ' '1 sand (34) Very dense, damp, red-brown si Ity BC= 70 For Legend, see Fig. 3 I LOGS OF TEST BORINGS 12 b 13 CARLSBAD LAKE COMMUNITY Cut Slope I4 For Legend, see Fig. 3 LOG OF CUT SLOPE CONSULTING SOIL &ID FOUNDATION ENGINEERS AND GEOLOGISTS COBBLES GRAVEL I SAND Coarse I Fine Ikrd Medium I Fine SILT and CLAY Mesh Opening - ins. Sieve Sizes Hvdruneter Analysis I I I 1 0 IO 20 30 n w 4 p: $- 0 p: Wf L 50E k! 60 70 80 90 loo 50 10.0 5.0 I .o 0.1 405 0.01 0.005 awl 100 GRAIN SIZE IN MILLIMETERS SAMPLE CLASSIFICATION AND SWL *LL *PI . 3-2 Clavev sand fSCl - - 3-4 Silty sand (SH) - - 3- 6 Silty sand ISM) - - 4- I Clayey sand (SC) - - *LL = Liquid Limit GRAIN SIZE DISTRIBUTION CURVES *PI = Plasticity Index CARLSBAD LAKE COMMUNITY WOODWARD - GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA OR. BY: GS IAPPROX. SCALE: - - - - IPROJ. NO: 73-222 CK'D BY: WIDATE: 7/23/73 IFIGURE NO: 12- RESULTS OF CONFINED COMPRESSION TESTS Initial II 65 Final :later mtent - - - % 15 IU I 3turation Pressure PRESSURE - psf * E of Initial kig U.8 3.3 RESULTS OF COHF I NED COI4PRESS I ON TESTS CARLSBAD LAKE CCMMUNITY I WOOCWARD - GlZlENSKl & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAM DIEGO. CALIFORNIA DR. BY: GS I APPROX. SCALE: - - - -1 PROJ. NO: 73-222 CK'D W:m 1 DATE: 7/23/73 1 FIGURE NO: 13 IUO I30 I 20 I IO 100 90 80 DIRECT SHEAR TEST DATA I 2 3 Dry Density, pcf 118 116 Initial Water Content. % 9 8 Final Water Content. % 13 15 Apparent Cohesion. psf 600 360 Apparent Friction Angle. 26 18 I00 0 v) 80 2 60 f b "ICAL AnALYSlS 3 t 410 w 200 3 t 410 w 200 Iwo I00 10 1.0 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS PLASTlClM CHARACTERISTICS I1 121 3 Liquid Limit, % - 22 Plasticity Index. % - 7 I Classification by Unified Soil Classificatim System SM SC I I %ELL TEST DATA I _I 2 3 2.60 SPECIFIC GRAVITY ZERO AIR VOIDS CURVES NOTE: Specimen I = I - 3 Specinm 2 = 3 - 3 Specimen 3 = IO 20 w Initial Dry Density. pcf ~. v - Initial Water Content, % - - Load. osf - - LABORATORY WACTIOW EST FILL SUITABILITY TESTS LABORATORY WACTION TEST METHOD: PSM 0-1 557-70T CARLSEAD LAKE COMMUNITY WOODWARD - GIZIENSKI h ASSOCIATES WSULTING SOIL ARD FWNDATIOH ENGINEERS AND GEOLOGISTS SIN DIEGO, CALIFORNIA O(L. ex: GS IAEPROX. SCALE: - - - - I PROJ. NO: 73-77') CI'D BY:,MDATE: 7/23/73 I FIGURE NO: 1'4 .. 1 Project NO. 73-222 ATTACHMENT I Page 1 of 4 " .II. - 111. SPECIFICATIONS FOR CONTROLLED FILL GENERAL These specifications cover preparation of existing surfaces to receive fills; the type of soil suitable for use in fills; the control of com- paction and the methods of testing compacted fills. It shall be the Contractor's responsibility to place, spread, water and compact the fill in strict accordance with these specifications. A Soil Engineer shall be the Owner's representative to inspect the construction of fills. Exca- vation and the placing of fill shall be under the direct inspection of the Soil Engineer and he shall give written notice of conformance with the specifications upon completion of grading. Deviations from these specifications will be permitted only upon written authorization fron the Soil Engineer. A soil investigation has been made for this project; any recommendations made in the report of the soil investigation or subsequent reports shall become an addendum to these specifications. SCOPE The placement of controlled fill by the Contractor shall include all clearing and grubbing, removal of existing unsatisfactory material, fill in the areas to be filled, and all other work necessary to complete preparation of the areas to be filled, spreading and compaction.of the grading of the filled areas. MATERIALS 1. Materials for compacted fill shall consist of any material imported or excavated from the cut areas that, i.n the opinion of the Soil Engineer, is suitable for use in constructing fills. The material shall contain no rocks or hard lumps greater than 6 inches in size and shall contain at least 40% of material smaller than 1/4 inch in size. No material of a' perishable, spongy, or otherwise improper nature shall be used in filling. 2. Material placed within 24 inches of rough lot grade shall be select material that contains no rocks or hard lumps greater than 6 inches in size and that swells less than 3% when compacted as hereinafter specified for compacted fill and when subjected to an axial pressure of 160 psf. 3. Representative samples of material to be used for fill shall be tested in the laboratory by the Soil Engineer in order to determine the maximum density;optimum moisture content and classification of the soil. In addition, the Soil Engineer shall determine the approximate bearing value of a recom- pacted, saturated sample by direct shear tests or other tests applicable to the particular soil. 4. During grading operations, soil types other than those analyzed in the report of the soil investigation may be encountered by the Contractor. The Soil Engineer shall be consulted to determine the suitability of these soils. ". . .. " WOODWARD - GlZlENSWl 6 ASSOCIATES -- W M MU"IIO* uucrp UO UMOOISIl Project No. 13-222 ATTACHMENT I Page 2 of 4 COMPACTED FILLS 1. General (a) Unless otherwise specified, fill material shall be compacted by the Contractor while at a moisture content near the optimum moisture content and to a density that is not less than 90% of 01557-70T, or other density methods that will obtain equivalent the maximum density determined in accordance with ASTM Test No. resul ts. (b) Potentially expansive soils may be used in fills below a depth of 24 inches and shall be compacted at a moisture content greater than the optimum moisture content for the material. 2. Clearing and Preparing Areas to be Filled be collected, piled and burned or otherwise disposed of by the Con- (a) All trees, brush, grass and other objectionable material shall tractor so as to leave the areas that have been cleared with .a neat finished appearance free from unsightly debris. (b) All vegetable matter and objectionable material shall be removed by the Contractor from the surface upon’which the fill is to be placed and any loose and porous soils shall be removed or compacted to the depth shown on the plans. The surface shall then be plowed or scarified to a minimum depth of 6 inches until the surface is free from uneven features that would tend to prevent uniform compaction by the equipment to be used. (c) Where fills are constructed on hillsides or slopes, the slope of the original ground on which the fill is to be placed shall be stepped: or keyed by the Contractor as shown on the attached figure. The steps shall extend completely through the soil mantle and into the underlying formation materials. scarified, it shall be disced or bladed by the Contractor until it is (d) After the foundation for the fill has been cleared, plowed or uniform and free from clods, brought to the proper moisture content and compacted as specified for fill. 3. Placing, Spreadinq, and Compaction Fill Material (a) The fill material shall be placed by the Contractor in layers that when compacted shall not exceed 6 inches. Each layer shall be spread evenly and shall be thoroughly mixed during the spreading to obtain uniformity of material in each layer. (b) When the moisture content of the fill material is above that . specified by the Soil Engineer, the fill material shallbeerated by the Contractor by blading, mixing or other satisfactory methods until the moisture content is as specified. -. . Project No. 73-222. ATTACHMENT I Page 3 of 4 specified by tilc Scil Engineer, water shall be added by the Con- (c) When ;\- moisture content of the fill material is & that tractor until the moisturp content is as specified. (d) After each layer has been ;lzced, mixed and spread evenly, it shall be thoroughli. compacted by L4p Contractor to the specified density. Compaction shall be accomplisnc+ hy sheepsfoot rollers, vibratory roller, multiple-wheel pneumatic-i:rnd rollers or other design that it will be able to compact the fill to the specified density. types of acceptable compacting equipment. Equipmen: shall be of such Compaction shall be continuous over the entire area and the equipment obtained throughout the entire fill. shall make sufficient trips to insure that the desired density has been (e). Surface of fill slopes shall be compacted and there shall be no loose soil on the slopes. - V. INSPECTION - 1. Observations and compaction tests shall be made by 'the Soil Engineer during the filling and compaction operations so that he can state his opinion that the fill was constructed in accordance with the specifications. - '2. The Soil Engineer shall make field density tests in accordance with ASTM Test No. D-1556-70.. Density tests shall be made in the compacted materials below the surface where the surface is disturbed. When these tests indicate that the density of any layer of fill or portion thereof is below the specified density, the particular layer or portions shall be reworked until the specified density has been obtained. - - VI. PROTECTION OF WORK 1. During construction the contractor shall properly grade all excavated surfaces to provide positive drainage and prevent ponding of water. or to finished work on the site. The Contractor shall take remedial . He shall control surface water to avoid damage to adjoining properties. measures to prevent erosion of freshly graded areas and until such time as permanent drainage and erosion con,trol measures have been installed. 2. After completion of grading and the Soil Engineer has finished his observations of the work, no further excavation or filling shall be done except under the observation of the Soil Engineer. c Project NO. 73-222 ATTACHMENT I Page 4 of 4 cm sr mo mu mm D c c U m r I Project N3. 73-222 ATTACHMENT r I FILL SLOPES: STABILITY ANALYSIS Assumptions : (I) Maximum height of slopes, H =I 25 feet 2 :1 (3) Unit weight of soil, (4) Apparent angle of internal friction, + = 26O y = 118 pcf (5) Apparent cohesion, c = 600 psf . (2) Maximum slope inciination, ~ (6) No seepage forces. Reference: ~- (1) Janbu, N., "Stability Analysis of 'Slopes with Dimensionless Parameters", Harvard Soil Mechanics Series No. 46, 1954. Analysis: Safety Factor, F.S. = Ncf yH - C Where Ncf is the stability No. for slopes with both c and 4. ~~ y H tan 4 - 118 X 25 X 0.487 = lcf = C 600 2.4 - From Figure 3-1 of Reference: Ncf = 14 - F.S. = 14 x 600 l"Z% = 2.85 OK for seismic Project No. 73-222 ATTACHMENT I I I CUT SLOPE: STABILITY ANALYSIS . Assumptions : - (1) Maximum height of slopes, H =. 25 feet (2) Maximum slope inclination, 2 :1- ~ (3) Unit weight of soil, y .=113 pcf (4) Apparent angle of internal friction, 9 = 290 (5) Apparent cohesion, c =320 psf (6) No seepage forces. - Analysis: .. Safety Factor, F.S. = NCf Where Ncf is the stability NO. for slopes with both c and +. C - - YH "cf = 113 x 25 x 0.554 - 320 - From Figure 3-1 of Reference: Ncf = 19.5 - 19.5 x 320. 25 x 113 F.S. = = 2.2 - ..- OK for seismic 4.9