HomeMy WebLinkAboutCT 74-8; NEC Oak Ave and Valley St; Soils Report; 1975-02-21DUCO Engineering, Inc.
,,AF~‘3f* .oUNDlCfloN * GEOL GIG IN”EBT,GATIONL FILL CONTROL -SOIL TESTING 1170 CENTRE DRIVE. SUITE F WN,N”T, CALlFORNlA 91789 (213) 964-3440 . 964.3449
-
-
-.
-.
-
.-
.-
-
,.-
.-,
February 21, 1975
S. L b b Service Corp. P.O. Box B Carlsbad, California 92008
Subject: Report of Compaction Tests Tract No. 74-8 N.E.C. of Oak Ave. and Valley Street Carlsbad, California
Job No.: 4-123
RECE/,,,
JAN 24 1975
% PF c4R~s~~o Bul’d%? Depa&)@nt
Gentlemen:
In accordarle with your request this firm has inspected and tested
the compac :d fill placed on the subject site between February 18
and February 21, 1975. A plan of the site showing the test locat-
ions and other data pertinent to this report is attached as figure number 1.
Reference data used in the preparation was a Report of Soils Inves-
tigation, dated 11-5-74, prepared by this firm and a Grading Plan
of the site prepared by Brian Smith Engineers, Inc.
Ground preparation, grading and testing of the site were conducted
in the following manner:
SITE PREPARATION
1. No surface or subsurface structures were present on the site upon our arrival. 2. Surface debris and vegetation were stripped and hauled offsite.
2:
No trees were present on the site.
The exposed surface of the natural ground was prepared to rec- eive fill by scarifying to a depth of 8 inches, watering as
necessary and compacting to minimum requirements.
GRADING
1. Fill soils were spread in 6 to 8 inch loose lifts, watered as
necessary and compacted to minimum requirements.
2. The method used for adding moisture and compacting was a water truck and rolling with a dual 5X5 aheepsfoot roller.
-
Job No.: 4-123
TESTING
- 1. Maximum density and optimum moisture were determined for each
type of fill soil in accordance with ASTM test method D1557-70. 2. Field density tests were performed in accordance with ASTM
test method D1556.
3. Expansion tests using a 60 P.S.F. surcharge load were performed
on typical samples of the fill soils remolded to 90% compaction. 4. Results of the field density tests taken during the course of
grading are attached as a part of this report.
SUMMARY OF LABORATORY TESTS
-
Soil Type Max. Den. opt. Moist. X Expansion
A- Silty Sand 127.5 PCF 8.5% 0.0
-
-
-.
-
B- Clayey Silty Sand 127.7 PCF 10.2% 0.3
CONCLUSIONS AND RECOMMENDATIONS
The soils on the site are considered nonexpansive. No remedial construction measures are deemed necessary.
The allowable soil bearing value for continuous and square foot- ings imbedded a minimum of 12 and 18 inches below the lowest adj- acent finished grade shall be 1500 and 1750 P.S.F. respectively
The foregoing values are for dead and live loads and may safely be increased l/3 for temporary horizontal forces.
It is the opinion of this firm that the fill placed on the sub-
ject site, as reported herein, has been properly compacted and
placed on a suitably prepared subgrade and is suitable for the
purpose intended.
.-
Respectfully submitted,
Job No.: 4-123
-
Test
No.- Date - 1 2-18-75
2 ,I -
3 II
-4 11
5 2-20-75
- 6 "
7 II -
8 11
-9 2-21-75
10 "
- 11 "
12 " -
Lot _No.
10
1
9
2
3
3
8
2
9
8
7
4
SUMMARY OF FIELD DENSITY TESTS
Elevations I Moist. Dry Den. Soil Nat. Fin. Gr. Test Field PCF Field m
170.0 171.0 170.0 7.0 117.9 A
170.0 ; 171.0 171.0 8.3 117.9 A
172.5 176.0 174.5 8.4 118.4 A
172.0 176.0 174.0 7.9 119.4 A
176.0 180.0 178.0 10.1 115.5 B
177.0 180.0 179.5 10.7 120.6 B
176.3 180.0 178.5 8.8 118.8 A
173.0 .Cl76.0 176.0 8.5 115.8 A
172.0 176.0 176.0 7.9 119.0 A
178.0 180.0 180.0 8.9 119.0 B
180.5 182.0 182.0 8.5 117.1 B
181.0 182.0 182.0 10.2 118.1 B
a
Camp.
92.5
92.5
92.9
93.6
90.4
94.4
93.1
90.8
93.3
93.2
91.7
92.5
.
-
-
VALLEY s 7-e