HomeMy WebLinkAboutCT 75-04; La Costa Estates North Lot 1; Soils Report Preliminary; 1985-10-29SAN MARCOS ENGINEERING ClYlL LltOlNTC”,. SO,” d ce”N~*I,oM
PRELIMINARY SOILS INVESTIGATION . REPORT AND FOUNDATION RECOMMENDATIONS
PROJECT: PROPOSED RESIDENTIAL HOUSE
LOCATION: LOT #1 CARLSBAD TRACT 75-4 LA COSTA ESTATES NORTH
MAP 8302 CANDIL PLACE, CARLSBAD, CA,
R,E, HUGHES
RtE, HUGHES CONSTRUCTION CO,
P,O, Box 1146
'VISTA, CA. 92083
. .
380 MULsE*I” oawc S”,ll . SAN Y*mcOs. CA 9ZOSP lc3ls.l 704.0111
SAN MARCOS ENGINEERING
3.90 ImLBEBBY D!lIM, SUITE B
SAII HARUB, CA 92x9
(619) 744-0111
Civil EngIneera * Plannera * Land Developaent * Surveya l blla and Foundrtloa EngInewIng
October 29, 1985
Mr. R. E. Hughes
R. E. Hughes Construction Co.
P. 0. Box 1146
Vista, Ca. 92083
Re: Lot No. 1 La Costa Estates North
Hap 7637 Candil Place
Carlabad, California
Dear Mr. Hughes.
As per your request, we have performed a preliminary
soils investigation at the above referenced site and
this report is presented as regards our opinion of the
site soils engineering factors that may affect your
pro3ect.
Description of Site ------ ---- -- ----
The pro]ect site is located southwesterly of the cul de
sac of Candil Place in Cerlsbad, California. The site
is a graded pad uhich is vacant at the present time.
Some rock outcrops can be,found at the site. The site
la relatively clean of wild vegetation, being recently
cleared. Plate 1 ahowa the Vicinity Hap.
--
1
SAN MARCOS ENGINEERING civil. soils and foundations
Candil Place Pro)ect,Soils Report, Cont'd...
DppSrLption of Prolect ---_ -- --- ---
The pro]ect is for the construction of a single fainily
residential house structure of frame construction with
tile roof and stucco wall. No heavy loadings are
expected at the pro]ect site. The house will be two
stories. There will be minimum grading of the site to
for-s a house pad.
Puress Of &he Sell5 Inveeflsatinn
The purpose of this soils investigation is to determine
the physical characteristica of the existing site aoile
and to make .a report and foundation recommendation.
TEE Soils Inveatiqation Program ----- ----_-- ----- _-- --_
The soils investigation program consists of an ocular
observation of the site surface and near surface soils
and the conduction of a subsurface exploration
drilling.
The purpose of the observation of surface and near
surface soils is to detect any obvious surface soils
instability caused by erosion or tension cracking of
the exieting soils or landslides.
The subsurface soils exploration program aims to
2
SAN MARCOS ENGINEERING civil, soils and foundations
Candil Place Prolect, Soils Report, Cont'd...
determine the characteristics of the subsurface soils
especially at the founding elevations.
Finding= ---_--
The existing site soils appear to be stable. No
obvious signs of soils cracks or failures were
observed. No erosion problem was detected.
.
Subeurface Soila
Two (2)) test pit excavations were performed at site at
the approximate locations indicated in Plate 2. The
test pit excavations were done manually and marked as
T-l b T-2.
The soils encountered at site were visually identified
and classified in accordance with the Unified Soils
Classification System as shown in Appendix E of this
report. The soils encountered were described and the
identification logged. The log of the aoils are shown
in Platee 3 and 4. Bulk samples were brought to the
lab for further identification, classification and
testing.
The pro]ect site generalized soils profile which can be
inferred from the test pit excavation is described as
about 6" to 18" of medium compact to compact Sandy Clay
3
SAN HARCOS ENGINEERING civil, soils and foundations
Candil Place ProJect, Soils Report, Cont'd...
with some trace of shale rock fragments and overlying
deaintegreted to competent shale rock. The rock
sppears to be rippeble with machines in the upper
surfaces, and appeara to become harder with depth. If
deep excavations are required for construction of
structures planned at site, it may require rock
blasting.
The vertical and horizontal limits of rock could not be
ascertained at this tine. To get this information, it
will require a more detailed subsurface exploration.
The existing Sandy Clay aoile are expansive in our
estimation and experience of similar soils in the area.
Laboratory Sgile Testing --------- -_----
A maximum dry density test wae made of the Sandy Clay
soils and the result indicate the soil to have a
maximum dry density of 117 pcf at an optimum moisture
content of 12x
co~c1usIo!! an4 Foundc!Llon Eennm!!!es&&lnse
1. It is our opinion that the existing soila can
safely support the proposed structure planned for
the site, however, the following recommendations
should be observed during the design and
4
SAN HARCOS ENGINEERING civil, soils and foundations
Candil Place Prolect, Soils Report. Cont'd...
construction of the etructure.
2. The site should be cleared of all weeds, trash,
vegetation and other deleterious materiala within
the limits of construction prior to grading
operations. The Earthwork Specifications found in
Appendix A of this report forms part of this
recommendation.
3. We recommend the proposed structure to be founded
with atandard s0il bearing footings with an
allowable soil bearing pressure of 1800 paf. The
bottom of the footings should be founded to at
least 24" below existing aground surface or
ad JaCent finish grade. Perimeter wall footings
should be at least 18" wihe and continuously
reinforced with at least l-#S bar placed 3" above
the bottom of the footing and l-#5 bar placed 2"
below the stem of the footing or floor slab.
Isolated footinge should be at least 24" square
and reinforced with 2-#5 bars placed each way.
4. Slabs on grade should have a minimum thickness of
4" I and reinforced with welded wire mesh placed at
midheight of ths slab. The slab should be
underlain by at least 4" of sand placed over the
5
SAN MARCOS ENGINEERING civil, soils and foundations
Candil Place Project, Soil8 Report, Cont'd... .-
prepared subgrade. The subgrade should be vetted
to at leaet 4X above the optimum moieture
content of the soils prior to placing the sand over
it.
5. In areas where rock are found to be at ehallow
depth, it ia recommended that the diaintegrated
rock be removed. Footings ehould be at least 12"
into good competent rock.
6. Footinga placed in fill areae should be positioned
aa indicated below:
!I
Fill I-/< Slope) L
/fLL 5' 'n: in.
7. Cut and fill elopes should be no greater that 2:l
horizontal to vertical ratio.
8. The San Diego county Standard Drawings and
Specifications for design of retaining walls maybe
used in the construction of retaining walls for
this pro]ect.
6
SAN MARCOS ENGkNEERING civil, soils and foundations
Cendil Place Project, Soil8 Report, Cont'd...
9. Blasting of near surface rocks maybe necessary to
achieve the designed pad. The limits of the rock
are unknown at thie time.
10. Recommend that this firm be informed when the
footing trenches are excavated so a soils engineer
can inspect the founding soils to make sure that
they are adequate for the purpose intended.
11. All eurface water runoff should be directed away
from the foundation system positively.
SAN MARCOS ENGINEERING civil, soils and foundations
Cendil Place ProIect, Soils Report, Cont'd...
Limitation of Report ---------- -- -- ---
The soils engineer hae prepared this report for the
exclusive use of the client and his authorfzed agents.
This report has been prepared in accordance with
generally accepted soil and foundation engineering
practices. No other warranties either expreaeed or
implied are made aa to the profeaaional advice
provided under the terms of this agreement, and
included in the report.
If you have any queatione about thie report, please
call.
Very truly yours,
SAN MARCOS ENGINEERING
Distribution: (4) Addressee
8
.’
.
SAN MARCOS ENGINEERING
,-- N
NO SC
1 ‘.--, I / ‘c. ~,‘=-. .I
!., t
PLATE 1, VICINITY MAP
PROJECT: HUGHES RESIDENCE
CANDIL PLACE
CARLSBAD, CA. TH
E
..- .---L- ,I-h-----L--r -.---
REFERENCE: THOMAS BROS, MAP
PAGE 20 C-5
3eo HUC.L-m” OIIVC ,“,I*. SAM Y_--^- -. _..~.
.,-- ” - ..-. -_.
, ,
___---. -_ TV&“IJ’~~~W PLATE 2, SITE 8 BORING LOCATION PLAN _--. OW 00’ --: PROJECT: HUGHES RESIDENCE
I LOT 1 MAP 7637 /-
?EL ,VT 70 SAN L’!E6D GAS 8 Ef EC,?RC CO CANDI L PLACE, CARLSBAD, CA,
‘WSES REC 4-22-5-4, AS DK’52G29, SK 52/2, =C 5-/Z-P, RS aX”62394, 5K 5235, 23 /39, OR ,“” ' LEGEND:
?/@fT TO 7ii?!M CR Z-5 ANY L?EES WiTHM ; ” a INDICATES APPROXIMATE LOCATIOC
F/Of OF MS3fE’fT RIGHT OF WAY liM/T5Ts, I,’ OF TEST PIT EXCAVATION
l-hi. I. no, . l “rx\cI ,,I ,hc l,?d. bUl i.
iO”,>~l..d Ial, inrurm~tion ““I\. n.ar i5 it .
p,,, ,A ,hr ru,wrt nr p.,,,r\ ,u r!,kb
;I m.\ h+ ttt!*,hrd.
PLATE 3, BORING LOG
SAN MARCOS ENGINEERING ClllL L*O1.a*... SOIC. . roIlr.o.l~all
Wing No. 7=/ 360 “UL,I.n-. o-l”*. ,r,.. . ..” “r.CD.. c* .a=.. idlO> 7...0111 Skeet No.e+Of&
Ua!srial h Remarks
PLATE 4, BORING LOG
SAN MARCOS ENGINEERING Cl”% L*al.a‘.*. 30%. . ,OU?.D.I\O.a
,a0 -4”L.r-m O.,“C. v*,-e. Boring No.=
,.* “LICO,. c. .a.=.. IalP, 74.-o,,, Skeet No.+Ot&
WdrJrial h Renarkr
SAN MARCOS ENGINEERING
C,“lL L*o,rms.s. 101L. . rourro.7loP4
_-
Project:
PLATE 5. f”l&fm TlRY IlFNSlTY
;Lloisture vs. Dry Density Curve
Soil Type: I /) .
/* f%J cr/a!&f.c
J&~~~~~
@ . LOCa&ll ~ 2
6?p z37 I
140
130
120
110
100
90
MOISTURE CONTENT, %
Remarks: