HomeMy WebLinkAboutCT 76-02; Royal Homes No. 6; Compaction Tests; 1977-07-14DUCO Engineering, Inc. FOUNDATION & GEOLOGIC ~NVCSTIGATIONS FILL CONTROL - SOIL TESTING 1170 CENTRE DRIVE, SUITE F * WALNUT, CALIFORNIA 91709 (213) 964-3440 * 964-3449 July 14, 1977 Carlsbad Development Corp. P.O. Box "B" Carlsbad, California Subject: Report of Compaction Tests Carlsbad Tract 76-2 Royal Homes No. 6 Carlsbad, California Job No.: 6-20 Gentlemen: In accordance with your request this firm has inspected and tested the compacted fill placed on the subject site between May 11 and July 11, 1977. A plan of the site showing the test locations and other data pertinent to this report is attached as Figure No. 1 (3 sheets). Reference data used in the preparation of this report consisted of a Report of Soils Investigation prepared by this firm dated 3-26-76, Geologic Investigation dated 10-4-76 prepared by Bob Dickey and a Grading Plan of the site prepared by Brian Smith Engineers, Inc. Site preparation, grading and testing were conducted in the follow- ing manner: Site Preparation 1. Surface debris and vegetation was stripped and hauled offsite. 2. No surface structures were present on the site. 3. No subsurface structures were encountered during grading. 4. No trees were existing on the site when we arrived. 5; Existing fill soils were removed to natural ground and incor- porated into the compacted fill after removal of all deleter- ious material. 6. Existing loose natural soils were removed by benching as the compacted fill progressed upslope. Page Two July 14, 1977 Job No.: 6-20 Site Preparation (can't) 7. The exposed surface of the natural ground was prepared to re- ceive fill by scarifying to a depth of 8 inches, watering as necessary and compacting to minimum requirements. 8. A shear key excavated into bedrock or approved soil was pro- vided at the toe of the major fill slopes. Grading 1. Fill soils were spread in 6 inch loose lifts, watered as neces- sary and compacted to minimum requirements. 2. The method used for adding moisture and compacting was a water truck and rolling with a self-propelled iron wheeled compactor and a sheepsfoot roller. 3. Top soils were removed and an equipment width wide tilt-back bench was provided at the daylight point for proposed fill over cut slopes. Testing 1. Field density tests were performed in accordance with ASTM test method D1556. The results of these tests, taken during the course of grading are attached as a part of this report. 2. Maximum density and optimum moisture were determined for each type of fill soil in accordance with ASTM test method D1557-70. The results of these determinations along with the expansion accordance with-U.B.C. potential of the soils, determined in test standard 29-2, are as follows: Soil Type Max. Den. A - Clayey sand 125.3 PCF B - Clayey fine sand 118.1 " c - Sandy clay 111.3 " D- Clayey silty sand 112.2 " E - Clayey sand 121.9 " F - Claystone 110.2 " G - Sandy clay 116.3 " H - Clayey silty sand 122.2 " I - Sandy clay (blend) 116.7 " J - Gravelly clayey sand 125.0 " K- Clayey sand w/gravel 120.3 " Opt. Moist. 8.2X 48 - 11.5x 77 14.8X 88 14.0% 27 9.8% 53 14.2% 103 12.6% 90 10.1% 25 12.3% 81 9.8% 21 9.5% 55 Expan. Index Page Three July 14, 1977 Job No.: 6-20 Conclusions and Recommendations The expansion potential of the onsite soils that will directly affect shallow foundations and slabs I-E considered moderate for lots 1, 7-9, 11-16, 19-24, 26-38; 46-54, 57 and 69. Remedial construction measures to minimize this condition are recommended as follows: Faoting shall be continuous under all exterior and interior bearing walls and shall be imbedded a minimum depth of 18 inches below the lowest adjacent finished grade. Reinforce the continuous footings with a minimum of one f4 rebar placed top and bottom. Concrete floor slabs shall be reinforced with 6X6 - 10X10 welded wire mesh placed at midpoint in the slab. Floor slabs shall be cast on a 4 Inch thick layer of graded aggregate base course or washed conc'rete sand. Garage floor slabs need not be reinforced If poured entirely inde- pendent of the stem walls using a positive expansion joint of felt or similar approved material. The recommended soil bearing value for continuous and square footings a minimum of 12 inches in width and imbedded a minimum depth of 12 Inches below the lowest adjacent finished grade shall be 1500 P.S.F. Tlie foregoing values are for dead and live loads and may be increased l/3 for temporary horizontal forces. It is the opinion of this firm that the fill soils placed on the subject site, as reported herein, have been properly compacted for their intended use. Respectfully submitted, Approved by: Test Lot Elevations X Moist. Dry Den. Soil X No. Date Ho. Nat. Pin. Gr. Test Field PCF Field Type Comp. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 , 5-11-77 2 . , " 4 5-12-77 3 VI 5 18 51 I? 68 5-13-77 2 18 30 II 68 10 57 I# 56 5-16-77 63 :I 57 8) -54 ‘ 1’ 58 II 51 I’ Clara 'I 55 II 5 IV 3 5-17-77 58 0 . 57 w 58 N 52 n 58 SUMMARY OF FIELD DENSITY TESTS JOB NO.: 6-20 278.0 282.0 283.0 285.5 277.0 284.6 275.5 286.0 182.0 216.2 196.0 218.0 277.0 282.0 277.0 '285.5 220.0 167.0 205.0 218.0 160.0 181.0 175.0 189.5 183.0' 204.0 157.0 165.0 165.0 175.0 152.0 162.0. 184.0 216.2 199.5 215.0 161.0 173.0 281.0 286.9 281.5 284.6 155.0 168.0 160.0 181.0 159.0 170.0 170.0 179.0 158.0 180.0 - 280.0 14.5 283.5 8.6 279.0 9.9 279.5 9.2 184.0 14.1 199.0 11.2 281.0 8.4 281.5 8.5 222.0 7.1 209.0 16.4 162.0 . 14.3 178.0 14.7 188.0 21.9 159.0 15.0 169.0 15.8 157.0 17.7 187.0 13.2 205.5 15.9 167.0 '17.3 283.0 8.6 283.0 15.4 161.6 19.1 166.0 ' 15.9 165.0 13.8 176.0 11.9 185.0 13.8 q5.1 122.6 114.6 116.2 105.6 110.3 113.7 112.7 117.1 107.3 108.4 107.2 105.0 113.4 105.2 102.8 109.8 106.9 103.4 113.8 107.6 103.7 100.8 117.2 117.6 111.0 A A B B C B‘ B B. B C G G C A F' F G G F B . .- B C C A A B 91.9 - 97.8 97.0 98.4 94.9 93.4 96.3 95.4 99.2 96.4 93.2 92.2 94.3 90.5 95.5 93.2 94.4 91.9 93.8 96.4 . 91.1 93.2 * 90.5 93.5 93.9 94.0 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 5-17-77 58 \ 11 59 II 57 5-18-77 57 I' 53 II 51 II 58 I' 57 11 58 11 55 11 53 5-19-77 58 11 56 I' 57 II . '58 II ' 58 I' 59 II 59 S-20-77 59 II 60 II 60 II 60 I' 63 , n 63 5-23-77 56 II 56 Test Lot Elevations % Moist. Dry Den. Soil x No. Date No. Nat. Fin. Gr. Test Field PCF Field Type Comp. SUMMARY OF FIELD DENSITY TESTS JOB NO.: 6-20 163.0 170.0 157.0 160.0 167.0 172.0 161.0 163.0 165.0 167.0 175.0 165.0 169.0 164.0 168.5 172.0 177.0 175.0 175.0 176.0 181.0 183.0 193.0 19O'tO 175.0 173.0 175.0 . 167.0 177.0 171.0 178.0 168.0 175.0 170.0 180.0 175.0 180.0 176.0 181.0 170.0 .181.0 170.0 181.0 172.0 185.0 171.0 190.0 177.0 177.0 174.0 184.0 175.0 181.0 177.0 181.0 176.0 181.0. 178.0 185.0 179.0 185.0 182.0 185.0 183.0 185.0 180.0 189.0 185.0 189.0 187.0 204.0 197.0 204.0 199.0 184.0 179.0 184.0 18'2.0 13.5 15.9 13.0 13.1 13.6 17.0 18.9 13.3 12.2 12.4 . 15.4 9.5 11.6 15.7 18.8 18.3 18.5 14.1 17.1 10.3 12.3 12.0 16.5 14.9 10.8 11.6 112.0 . 110.9 111.5 107.0 109.2 107.8 101.1 110.8 111.0 105.7 104.5 116.0 110.0 107 .o 102.5 102.1 105.2' 110.3 105.6 105.9 106.5 106.5 104,9 102.8 103.2 104.3 .- H 91.7 H 40.8 H 91.2 F 97.1 G 93.9 G. 92.7 F 91.7 G 95.3 B 94.0 C 95.0 C 9.3 .9 H' 94.9 G‘ 94.6 P 97.1 F 93.0 F 92.7 F 95.5 B 93.4 G 90.8 G 91.1 . B 90.2 B 90.2 G I 90.2 F 93.3 F 93.7 P 94.7 Test Lot No. Date & 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 , 5-23-77 55 . 1' 53 I' 52 II 62 II 63 11 51 11 56 II 57 II 54 5-25-77 56 II 50 'I 52 I’ 54 11 50 I’ - 51 c ‘I 50 'I 53 II 55 '1 53 5-26-77 49 ID 52 I' 66 II 53 II 50 'I 52 11 56 SUMMARY OF FIELD DENSITY TESTS JOB NO.: 6-20 Elevations X Moist. Dry Den. Soil I Nat. Fin. Gr. Test Field PCF Field Type Camp. 174.0 193.0 175.0 189.0 178.0 190.0 195.0 198.0 195.0 204.0 183.0 216.2 175.0 195.0 1.70 .o l90.0 176.0 192.0 180.0 197.0 177.0 186.0 168.0 193.0 182.0. 209 .o lRO.O 190.0 182.0 216.2 179.0 193.0. 182.0 214.0 180.0 206.0 195.0 214.0 190.0 198.0 182.0 215.5 208.0 212.0 178.0 214.0 18i.O 213.0 187.0 21.5,.5 177.0 201.0 - 181.0 180.0 177.0 197.0 202.0 187.0 186.0 183.0 186.0 188.0 180,O 181.0 189.0 184.0 189.0 187.0 189.0 188.0 197 .o 195.0 192.0 21o;o : 193.0 191.0 194.0 1'91.0 11.7 11.0 10.9 10.5 10.7 16.6 15.4 13.1 .. 11.8 15.8 11.6 12.8 9.6 14.2 10.3 12.3 14.8 9.2 10.0 8.9 10.4 12.6 10.3 12.6 9.6 13.9 106.6 . 105.5 106.9 105.0 103.6 106.8 107.1 109.7 104.7 106.7 113.4 111.8 122.2 106.4 111;2 110.5 107.3 113.4 102.1 114.6 112.5 110.9 114.1 113.3 111.5 111.5 I I I I F F. G G F I I I A G H H G H F- H I I A I I I - 91.3 g-O.4 91.6 90.3 94 .o 96.9 92.1 94.3 95.0 91.4 97.2 95.8 97,s 95.6 91.0 90.4 96.4 92.8 42.7 i3.8 96.4 95.0 91.1 97.1 95.5 95.5 Test Lot No. Date No. 79 5-26-77 48 80 !' 57 81 'I 51 82 II 53 83 5-27-77 55 84 II 49 85 'I 54 86 I' 49 87 II 55 88 'I 53 89 II 51 ‘90 II 68 91 5-28-77 52 92 II 54 . 93 .I? 50 94 I’ ' 51 95 lt 55 96 I’ 50 97 'I 48 98 5-31-77 Clara 99 I' 53 SUMMARY OF FIELD DENSITY TESTS Elevations X Moist. Nat. Fin. Gr. Test Field 199.0 167.0 181.0 188.0 185.0 190 176.0 193.0 182.0 194.0 $90.0 187.0 193.0. 195.0 191.0 192.0 193.0 192.0 200.0 191.0 177.0 100 II 51 '185.0 101 I' 54 193.0 . 102 II 68 2oi.o 103 II 55 186.0 104 6-l-77 53 185.0 I 205.0 201.0 17.4 i96.0 194.0 20.6 210.0 193.0 9.7 214.0 196.0 8.4 206.0 195.0 7.8 203.0 197.0 9.2 200.0 198.0 11;7 .208.0 200.0 10.0 206.0 197.0 11.3 214.0 198.0 9.4 216.2 195.0 7.7 218.0 190.0 16.7 215.5 197.0 18.1 212.0 200.0 12.2 217.0 198.0 7.9 216.2 199.0 7.0 206.0 200.0 12.1 217.0 201.0 7.6 215.0 TO5.0 10.4 214.0 199.0 9.7 211.0 212.0 8.1 216.2 203;O 8.4 212.0 202.0 17.3 218.0 204.0 9.3 206.0 203.0 1136 214.0 204.0 10.8 JOB NO.: 6-20 Dry Den. Soil PfZF Field Type % Comp. 112.9 \ 118.5 121.2 118:6 117.5 119.2 115.4 113.8 114.4 119.5 120.8 113.5 117.4 112.8 125.1 118.8 118.6 116.4 115.8 119.1 117.3 118.8 114.1 116.8 115.0 113.2 .:- A 90.1 A $4.6 ' H 99.2 H 97.1 H 96.2 A- 97.6 H 94.4 H 93.1 H 93.6 H 97.8 H 98.9 A 90.6 A' 93.7 H 92.3 A 99.8 H 97.2 H 97.1 H 95.3 H 44.8 ' H 97.5 H 96.0 A 97.2 A 91.1 H 95.6 H 94.1 H 92.6 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 '129 130 Test Lot Elevations % Moist. Dry Den. Soil % NO. Date No. Nat. Pin. Cr. Test Field PCF Field Type Comp. 6-l-77 5. w . 45' I1 47 81 43 @I 44 It 46 M 48 ?I 55 II 52 V# 56 n 47 t* 45 6-2-77 46 #I 44 t1 - 51 w “ 42 45 43 46 49 42 44 48 49 43 49 187.0 222.0 216.0 236.0 229.0 ,221.o 206.0 189.0 187.0 179.0 210.0 226.0 220.0 229.0 186.0 242.0 230.0 239.0 230.0 201.0 243.0 ;235.0 , 211.0 . 200.0 238.0 207.0 SUMMARY OF FIELD DENSITY TESTS JOB NO.: 6-20 217.0 . 204.0 9.7 228.0 224.0 8.2 223.0 219 .o 11.4 246.0 238.0 10.0 240.0 233.0 17.2 231.0 227.0 16.3 215.0 208.0 12.5. 206.0 .204.0 9.7 215.5 205.0 8.4 194.0 183.0 13.5 222:o 216.0 11.7 243.0 234.0 12.6 232.0 230.0 15.8 243.0 236.0 12.5 216.2 207.0 7.7 257.0 245.0 8.3 238.0 238.0 7.8 258.0 242.0 9.6 240.0 235.0 8.4 213.0 211.0 10.6 259.0 248.0 6.9 241.0 240..0 7.4 220.0 214.0 11;3 218.9 211.0 10.4 25&o 246.0 9.1 218.5 2.15.0 8.8 116.2 \ 114.3 111.9 117.2 119.3 112.9 113.7 116.8 114.5 112.8 110.9 115.2 118.4 120.2 115.5 121.1 111.6 117.4 113.2 114.9 li2.8 110.7 -119i4 117.6 113.5 116.8 H ‘H H H A A. H H Ei A H H A' H H H H H H A -a H H H H H .- 95.1 9-3 .5 91.6 95.9 95.2 90.1 93.0 95.6 93;7 90.0 90.8 94.3 94.5 98.4 94.5 .99.1 91.3 9.6.1 92.6 91.T 3 92.3 90.6 97.7 95.2 92.9 95.6 Test Lot No. Date No. 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 2-3-77 41 . 11 II 11 tt II II *I 1) II II 1) IV II 1) - II II 81 ?I 47 45 42 44 46 48 41 43 45 42 47 43 46 41 ' 44 45 43 44 2-6-77 42 )I 44 I? 42 11 45 .' II 55 f? 52 11 55 SUMMARY OF FIELD DENSITY TESTS JOB NO.: h-20 Elevations % Moist. Soil Nat. Dry Den. Fin. Cr. Test Field PCF Field Type 253.0 223.0 238.0 248.0 242.0 234.0 215.0 255.0 247.0 235.0 255.0 231.0 253.0 239.0 258.0 250.0 245.0 254.0 240.0 252.0 247.0 ' 250.0 235.0 , 194 .o 179.0 196.0 260.0 258.0 11.8 233.5 228.0 9.5 250.5 244.0 7.4 264.5 249.0 8.9 259.5 247.0 -13.6 242.5 238.0 11.9 225.0 220.0 7.7 265.0 261.0 9.1 263.0 248.0 12.2 254.0 247.0 14.8 264.0 258.0 10.4 239 .o 238.0 9.6 263.0 251.0 7.4 248.0 241.0 8.5 265.0 263.0 12.2 259.0 252.0 15.6 257.0 256.0 13.9 263.0 254.0 11.7 259.5 256.0 10.2 264.5 258.0 11.1 260.0 258.0 10.7 264.5 261..0 13.4 250.5 248.0 103 206.0 205.5 7.4 211.0 204.0 7.6 209.0 208.0 9.5 113.7 . 116.4 118.5 113.1 105.3 107.2 115.7 114.0 116.8 104.6 114.3 116.2. 119.7 110.6 110.2 105.6 103.9 118.4 121.8 107.8 iO6.2 108.5 110.1 114.6 114.8 116.7 E 93.0 H 9-5.3 H 97.0 H 92.6 C 94.6 C. 95.3 H 94.7 H 93.3 H 95.6 C 94.0 H 93.5 H 95.1 H‘ 98.0 H 90.5 C 99.0 C '94.9 c 93.4 H 96.9 H 99.7 C 95.9 ; C 95.4 C 97.5 C 98.9 H 93.8 H 93.9 H 95.5 . I Comp. SU)?MARY OF FIELD DENSITY TESTS JOB NO.: 6-20 Test No. Date 157 6-6-77 158 II . 159 6-7-77 160 " 161 11 162 II 163 11 164 11 165 11 166 II 167 11 168 6-8-77 169 11 170 II 171 11 - 172 11 173 'I 174 11 175 11 176 II L77 II 178 6-9-77 179 11 . 180 II 181 II Lot Elevations x Moist. Dry Den. Soil x No. Nat. Fin. Cr. Test Field PCF Field Type Comp. 53 '54 C,lara 50 51 53 50 52 51 49 53 67 Clara 67 68 sr 67 69 67 68 69 67 68 57. 69 22 197.0 202.0 201.0 197.0 178.0 195.0 191.0 189.0 184.0 197.0 183.0 192.0 198.0, 200.0 204.0 196.0 208.0 207.0 203.0 209.0 197.0 i202.0 202.0 , 212.0 206.0 214.0 212.0 213.0 217.0 216.3 214.0 217.0 -215.5 216.2 218.5 214.0 221.0 213.0 221.0 218.0 221.0 219.7 221.0 220.0 219.7 221.6 218.0 224.0 225.0 229 :5 234.0 _ 207.0 14.6 210.0 10.8 208.0 11.7 209.0 13.2 210.0 12.4 212.0 15.2 211.0 11.6 213.0 12.8 214.0 14.3 213.0 13.0 213.5 15.6 195.0 14.0 200.0 12.7 198.0 13.1 6 205.0 6 11.9 203.0 13.8 209 .o 14.6 210.0 13.0 213.0 10.8 216.0 12.8 218.0 9.9 105.8 . 1'07.5 108.3 106.1 104.8 110.7 113.6 109.1 108.7 110.7 104.2 101.5 109.2 108.9 111.4 113.2 110.5 109.6 112.7 114.3 li1.6 116.8 113;2 115.0 101.8 104.3 217.0. 10.1 219.0 11.3' 221.0 9.6 221.0 18.2 224.0 15.1 . C ‘C C C C G . G G 1’ I .D D I. I I I I I 1 I H H H H D D 95.1 96.1 97.3 95.3 94.2 95.2 97.7 93.8 93.1 94.9 92.9 90‘. 5 93.6 93.3 95.5 97.0 94.7 9369 9'6.6 97.9, i 91.3 95.6 92.6 94.1 90.7 93.0 L82 11 68 201.0 SLMMARY OF FIELD DENSITY TESTS JOB NO.: 6-20 Test Lot Elevatione X Moist. Dry Den. Soil I No. Date lj& Nat. Pin. Gr. Test Field PCF Field Type Comp. 11 22 II 23 11 68 11 69 II 23 II 22 II 69 11 23 II 24 6-10-77 22 II 23 11 43 183 6-9-77 69 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 II 20 11 44 11 * 45 II '< 68 - II 21 II 46 11 30 6-13-77 2i 11 23 11 46 6-15-77 21. . II 31 11 21 215.0 229.0 207.0 229.5 218.0 231.0 210.0 225.0 212.0 263.0 227.0 234.0 210.0 229.5 217.0 243.0 226.0 229.0 232.0 239 .o 221.0 235.0 231.0 247.0 252.0. 263.0 246.0 259.5 242.0 250.5 212.0 236.0 216.0 239.0 237.0 242.5 225.0 267.0 227.0 239.0 226.0 260.6 ; 234.0 442.5 225.0 246.0 2k.o 267.0 229.0 2?9:0 232.0 249.0 - 228.0 14.1 224.0 12.6 223.0 13.8 227.0 20.1 236.0 15.6 230.0 12.4 226.0 13.0. ,234.O 10.6 228.0 11.8 235.0 14.3 232.0 17.0 233.0 20.9 262.5 18.6 259.0 14.1 ' 250.0 ‘ 15.9 235.0 12.7 228.0 13.8 241.0 19.6 230.0 11.6 233.0 13.2 235.0 15.1 242.0 16.6 236.0 12.i 234.0 10.8 239 .o 9.4 108.4 . 106.1 99.8 101.6 110.4 114.3 112.5 112.9 109.6 111.6 109.7 100.6. 106.1 105F9 108.3 101.5 114.3 109.7 113.6 115.2 1.02.8 108.1 112.4 * ' 110.5 109.3 I ‘I F F I I. I I I H .I F D' D D D I D 1 I 236.0 12.1 b ,F D I I I 1 113.6 A 92.9 90.9 90.6 92.2 94.6 97.9 95.4 96.7 93.9 91.3 94.0 9i.3 94.6 94.4 96.5 30.5 97.9 97..8 97.3 98.7. 93;3 .r 96.4 96.3 94.7 93.7 97.3 SUHMARY OF FIELD DENSITY TESTS JOB NO.: 6-20 Test Lot Elevations x Moist. Dry Den. Soil No. Date No. Nat. Fin. Gr. Test Field PCF Field Type 209 210 211 212 213 214 II 31 215 II 23 216 217 218 219 220 221 222 223 226 225 226 227 228 229 230 231 232 233 6-22-77 31 234 II 34 6-15-77 69 11 - 21 11 24 11 . 30 11 29 6-17-77 20 II 29 11 31 II Sonora' 11 30 II 20 6-20-77 29 II - 31 II ‘t 30 - II 41 11 47 II 48 11 48 11 Sonora 11 32 11 29. . 11 33 212.0 235.0 241.0 226.0 237.0 232.0 234.0 242.0 245.0 237.0 242.0 234.0 244.0 245.0 241.0 234.0 259 .o 227.0 215.0 220.0 2 4 8 '; 0 250.0 247.0 . 246.0 221.0 252.0 250.0 . 233.0 11.7 246.0 239.0 8.9 260.0 242.0 13.4 267.0 235.0 12.6 266.5 239.0 9.6 267.0 241.0 10.1 260.0 245.0 12.8 259.0 .244.0 10.3 266.5 243.0 11.6 267.0 245.0 13.4 265.0 247.0 14.2 267.0 446.0 12.9 249.0 24.8.0 10.1 266.5 249.0 11.7 267.0 250.0 1 15.0 267.0 252.0 11.9 265.0 265.0 12.7 233.5 222.0 10.8 225.0 223.0 12.5 230.0 227.0 13.4 265.0 255.0 10.6 267.0 253.0 12.1 266.5 257.0 13:7 267.0 249.0 12.2 267'.0 256.0 11.6 267.0 555.0 14.2 112.4 . 110.1 109.1 111.6 113.6 110.9 111.6 114.7 109.7 112.3 110.4 113.7. 114.7 108.6 107.3 114.1 112.6 116.5 112.0 110.7 113.6 111.5 109.2 110.1 112.6 108.7 I 'I I I I I I I I. I H H H- I I H H H I I -1 I I I I I % Comp. 96.3 9-4 .3 93.5 95.6 97.3 95.0 95.6 98.3 94.0 96.2 90.3 93.0 93.9 93.1 92.0 93.4 92.1 95.3 96.0 94.8 97.3 .* 95.5 93.6 94.4 95.5 93.1 Test Lot No. Date No. 235 6-22-77 67 236 .I' 22 237 II 30 238 6-23-77 239 11 240 11 241 6-24-77 242 II 243 II 244 II 245 II 246 II 247 6-27-77 248 249 250 251 252 253 254 255 256 257 258 259 260 261 34 31 29 30 33 29 32 47 . 68 30 11 31 11 - 34 . . &28-77 7 - II 7 6-30-77 35 II 32 Ii 29 7-11-77 40 II 38 II 37 11 ' 36 II 28 II 30 11 32 SUMMARY OF FIELD DENSITY TESTS JOB NO.: 6-20 Elevations X Moist. Dry Den. Soil x Nat. Fin. Cr. Test Field PCF Field Type Comp. 212.0 215.0 227.0 255.0 232.0 252.0 233.0 258.0 257.0 259.0 229.0 202.0 230.0 255.0 262.0 278.0 279.5 266.0 263.0 259.0 264.0 ; 266.0 266.5 # 265.8 266.5 236.0 265.5 228.0 - 227.0 12.4 229.5 229.0 10.5 267.0 256.0 13.9 267.0 257.0 16.5 267.0 259.0 18.4 266.5 260.0 11.5 267.0 262.0 6.2 267.0 ..260.0 14.7 266.5 264.0 10.0 267.0 261.0 13.7 233.5 233.5 15.5 218.0 218.0 14.1 267.0 264.0 12.7 267.0 265.0 11.3 267.0 265.0 3.5 284.0 280.0 12.4 284.0 282.0 9.1 267.5 267.0 7.4 268.5 268.0 11.4 268.5 268.0 7.1 264.; 264.8 8.6 267.3 267.3 7.1 268.5 268.5 7.3 269.0 269.0 9.4 269;O 269.0 10.8 269.0 269.0 9.1 269.0 269.0 8.8 113.9 . 111.6 101.6 100.8 103.6 111.6 124.0 110.5 114.8 111.8 111.1 108.8. 113.0 105,.4 106.8 113.6 108.1 111.1 108.6 105.1 i15.6 112.6 .107.8 107.2 118.1 109.5 108.0 I I F F F B. J I I I I I I' I B B B B B. I B B B B B B B 97.6 i5.6 92.2 91.5 94.0 94.5 99.2 94.7 98.2 95.8 95.2 9i.2 96.8 90.3 90.4 '96.2 91.5 94.1 92.0 90.1 i. 97.9 95.3 91.3 90.8 100.0 92.7 91.4