ENGINEER'S CERTIFICATE OF COMPLIANCE
FOR COMPACTED EARTH FILLS
Lots l-26
Lots 1-11
Lots 12-29, 36.46,
416 Tamarack Avenue
Carlsbad, California
,/ Soil Testing Agency
'-----~
Owner:
Grading Plan by:
FOLINDATION ENGINEERING CO., INC.
18344 Oxnard Street
996-1600
Tarzana, California
GOLDRICH & KEST
4255 Fairfax Avenue Los Angeles, California
91356
PACE ENGINEERING, INC. 12517 Chandler Blvd. North Hollywood, California
Grading Contractor: L. R. PAGE COMPANY, INC. 345-1523
4335 Marina City Drive Marina de1 Rey, California 90291
Date work started 617777
Date fill completed: 7111177 , 8/11/77
Note: See attached report for description of the grading, classification of the soil and tabulation of the test results. A Foundation Report
describing the conditions at the site was prepared by Foundation En-
gineering Company on October 25, 1973.
Date of Certificate: August 1, 1977, September 1, 1977
I hereby certify that I have personally supervised the testing and inspection during placement and compaction
of the fill described in this report, and on the basis
of these inspections and tests it is my opinion that the work was done in full compliance with the Carlsbad City Building Code, the foundation engineer's report, and in
general conformity with the approved grading plan. This
certification does not include loca
or dimensions of fills.
FOUNDATION E N G I N E E R I N
416 Tamarack Menuc Carlsbad , Cal i l~or‘nia
Phase I-Lots 1-26 Tract 231 Phase II-Lots l-11, 28-37 & 47-54, Tract CT 76-11
Phases III-Lotsl2-29. 36-46 Tract CT 76-11
General
-acted fill was placed to providelevelbuildingsites, yardanzas and to provide proper drainage of the site.
After remval of a septic tanknear JefferscmStreet, the excavationwas back- filled with axqxcted fill. The m depth of conpacted fill is about five feet, except in the septic tankbackfill area.
Description of Fill
Prior to placen-ent of the fill, the area was cleared of waads and debris. The loose natural soil was processed as reammended in the Foundation FQxxt. The natuml ground was scarified to a depth of six inches, mistened and compacted. After the ground surface was prepareditwas inspected and found take firm and suitable for support of the fill. Therraterial used for the fill was obtained fmm the site and inport and amsistedof silty sand, som ofwhichcontained rock fragn-ents.
Fill was placed inlevellaxelayers ahout six inches in thickness,mistened tonear optimmmisture, and ampacted. Waterwas placedonthe corrpletedpr- t&m of the fill before placemnt of additicmal fill. All fill was placed in this-er and the topofthe fillwas sloped to drain towardthe street.
The approximate extentofthe grading is shownan the attached drawing, "Lma- tion of Density Tests". The drawingwas prepared from a plan supplied to us.
Testing
Field density tests ware taken at freqmnt intervals near the fill surface. Representative samples of the soil ware taken to the la?mraizxy for WC- tion and classification tests. The relative density of the fill was deter- mined franthe compaction tests.
Wheredensity tests~relow,additional rollingwas requastedand the area was retested.
l%elccations of the density tests are given an the attached drawing showing the extent of the fill. lke results of the tests are shownon the table "Sumnary of Tests" , and a descripticm of the test nethods used is attached.
FOUNDATION ENGINEERING c o., I N C;
raeporton mtmlledmctedFil1
Phase I, II, III: 416 Tankxack Avenue Carlsbad, California
2
Conclusions and=- dations
It is amcluded that the fill was placed in an orderly and efficient -er, that the field density tests are representative of the density of the fill placed, and that allporticols of the fill are compacted td at &east 90 percent ofthehdensity, detelmined in the laboratory in accordancewith the re- quirenents of the City of Carlsbad.
It is vdsd that the provisions given in the Foundation RqxtdatedCcto- her 25, 1973, be used as abasis for design. Conditicr~s atthe sitewere similar to those anticipated in the original fomdation report.
Ths soil is considered tobenczx%pansive. Ebctings on aqxcted fillshxldbe designed in accordance with the follming recomdations. Spread faAjngs should he desiqed for the allowable fou&ki~pressure set forth in the Foundation F+
Poe.
In accordance with theFomdati~Fqort,avalueof2000 poundsper square foot rmybe used for acontinuous footing having awidth of12 inches andadepthof 12 inches.
kinfor~trequirerrents, if any, for the floor slake skuldbe as determined bythe structural engineer.
Continmus spread footings shouldbs reinforcedwith atleastone no. 4 bar of steel.
'Ibe topofthe flcor slab shouldbe above finished grade and the groundsurface shouldke sloped todrain away fromthe slab.
FOUNDATION E N G I N E E f? I N G c 0.. I N C.
LOCiTION OF DENSITY TESTS
cc LL 0 - .
Pl-/A’GE It
Pi-l/XX T
=a 45 . II -.
4 l 44 ,. -.
. LEGEND
9* LOC. c NO. OF DEN5\’
LIMIT OF FILL
0s
LA h I 4 L . . . - c
‘XPJIC TAhlK REHOWD
-FROM -Ill15 ARER.
TY -BT
JEFFERSON ST: WASEL , TRAc‘T 231
4lLo TAUAlZPCIC AUE.
c!a2LSc3AD , CAUE
FOUNDATION ENGINEERINQ c o., I N C.
LOCATION OF ENSITY TESTS
l “3
PHA5E5 P C m lI?WT CT-7b- 11
411r, TRMARAOC AVE.
CAEtL5SbAD, CALIF.
EERINQ c o., I N C.
Test NO.
1 . 2
. i
5
11
*12
;i
15
21
22
23
;:
;; 28
29
30
. 31
iz
34
35
36
3";
Date ----
617177
6/7/77
6/7/77
6/7/77
6/7/77
Lot no ------'-
3
i
12
2
6/7/77 6/7/77
6/7/77
6/7/77
6/9/77
23
:; 14
32
(i/10/77 4 6110177 2 6124177 2 6/24/77 32
6/24/77 35
6124177 29 6/24/77 26
6/27/77 25
6/27/77 24 6127177 1
6/27/77
6128177
6128177 7/5/77 7/5/77
3
6
2: 16
715177 7/7/77 7/7/77
7/7/77
7/7/77
7/7/77 7/7/77 7/7/77
7/7/77
7/8/77
7/D/77
J/8/77 7/B/77 7/u/77
7/G/77
::
11
2 1
2
i
6"
SIJMI~ARY OF TFSTS .----------------
416 Tamarack,Avenuc Carlsbad, California
FIELD DENSITY TESTS _____-_________-_--
Percent
Elevation Moisture --------
O.G.
O.G.
O.G.
0":::
FE
0:G:
O.G.
O.G.
2
FE
0:G:
0.6.
O.G. O.G.
: 2
1 F.G. F.G.
FE:
F.G. F.G.
fi
F:G .
F.G.
2:
F.G. F.G
FOUNDATION E N G I N E E R I N G c o., I N C.
9
1;.
1:
10 5
1:
9
10 9
10
1;)
11
6
Maximum Density __--- -
129
129
129
129
129
129 129
129
129
129
129 No. 13
129 129
129
129 129
144
144 144
144
129
129
129 129
129 129 129
129
144
144 129 129
129
129
129
129
12 , 129 9 129 9 129
Degree of Field Phase
Compaction HO ~_ ------- Density ----- - ---'--
91 117 I
91 117 I
91 117 I
go 116 I
91 117 II
94 121
93 120 93 120
90 116
91 117
96 81
91
%
124
105 117
118
116
31
90
92
90 93
iii
92
91 91
;: 91
91
95
;: 92
;:
94 92
;; 91
117
116
133 130
134
134
127
118
117
117
118
it;
117
137
133 117
118 121 124
121 118
123
118 117
I
I
I
II
I
I
I
II II
II
I
I
:
I I
I
i
I
I
I
I
I I I I I
I
I I I
Summary of Tests
416 Tamarack Avenue
Carlsbad. California
Test
No. Date
4";
4%
49
50
::
*53 54
55
56
:;
65:
61
::
*64
65
66
67
ifi
70
. ::
:i
75
76
:i
79 80
7111177
7/11/77
7/ll/77
::g::
::; i:::
7/ll/77
7111177 7/ll/77
7111177
7/ll/77 7/ll/77
::'11:::
7112177
::; y::
7/12/77
7/12/77
7/15/77
7115177 7115177
7126177
7/26/77
7126177
7/27/77 7127177
:::::::
7130177 7130177
7130177 7130177 7130177
:::i:::
a/ l/77
af 1177 a/ l/77
Lot No. Elevation
F.G.
K:
2:
E:
:t F:G:
:*:* F:G:
2:
2:
:;
31
O.G.
x*
0:G:
1
1
:
E:
i
;:
11
7
E:
K
1
::::
:-ii- 0:G:
:i
9
::
O.G. F.G.
1
;
FOUNDATION E N G I N E E R I N G c 0.. I N C.
Percent Ilaximum DerJree of Field Phase
Moisture Densitv Compaction Density J&
129
129
131
131
131
120
117 122
123 124
11 129
7 129
8 144
6 144 5 144
120 116
133
130 130
11 10
ii 9
129
129 No. 55
129 129
118
121 112
117 116
7
1;
10 9
129
E
129
129
118
121 117
121
120
129
129 129
No. 112
129
117
117
83 107
91 117
117
125 128
127
118
1:
10
1;
9 7
1'1
11
129 129
131
131
129
129
129
129 129 129
131 129
131
, 131 131
91
9':
9":
;i
;: 91
z:
91
;:
120
121
123 117 117
119 118
119 124 119
: I
:
: I I I
I
:
:
1:: III III II
:i
:I II
II III III II II
:I
if II
III II
1:; III
2
Sumnary of Tests
416 Tamarack Avenue
Carlsbad, California
Test
No. Date Lot No.
i:
83
84 85
a/ i/77
ij ::::
81 2/77 81 2/77
81 2177
8/ 2/77
8/ 2/77
a/ 3177
af 3177
91
;: 94
95
81 3177
!$ :::: 8/ 3177
a/ 3/77
9967
;i
100
a/ 3177
a/ 3177
a/ 3/77
af 3177
af 3177
101
102
103 104 105
a/ 3177
a/ 4177
af 4/77
i$ i:::
106 a/ 5/77 107 a/ 5177
108 a/ 5/77 109 81 5/77
110 a/ 5177
*111 112
.*113
114 115
81 a/77
af a/77
8/ 8177
af a/77 af 9177
116 a/ 9/77
*117 af 9/77 118 af 9177
119 81 9177
120 8/11/77
iz
:i
34
:65 37 38
39
17
30
3:
19
Elevation Percent Maximum Degree of Field Phase Moisture Density Compaction Density No.
2
:
::GG:
::GG:
::::
F.G.
F:GG:
:-Es F:G:
F.G.
3
5
2:
12
;:
1':
:*t*
F:G:
E:
11
1:
2
K FIG:
::GG:
:2 F:G: : 8
E: 1:
131 131 131
131
131
131
131
131
129
129
129
129 129 129
129
131
131 131
131 131
131
131
131 131 131
131 129
131 129
129
No. 115
129
No. 116 129 129
129
No. 121 129
129
4 129
z:
;; 94
zi
z:
95
91
z: 93
93
ii66
iizi
92
95
ii:
i:
ii:
;:
94
i:
9": 90
91
9":
E
3
122
122 120
128 123
122
122
121
121
123
117
117 118 120
120
126
126
120
123 121
124
120
121 120
119
122 120
122 117
121
110
117 110
116 116
117
106 117
118 124
III III III
:I
III III
:t II
1:; III III III
III III III III III
III II
:: III
III
:I II
II
:I
::
1:; III III III
FOUNDATION E N G I N E E R I N G C 0.. I N C.
Summary of Tests
416 Tamarack Avenue
Carlsbad, California 4
Test Percent Maximum Degree of Field Phase
No. Date Lot No. Elevation Moisture Density Compaction Density No.
121 iii:;;::: ;: 129 124 III 122 E 1:
129
z;
118 III
123 B/11/77 27 F:G: 9 129 91 117 III
*Test failed. Additional compaction was requested. See test number in Max. Den. column for number of satisfactory retest.
FOUNDATION E N G I N E E R I N G c o., I N C.
SUMMARY OF TESTS ---------I
416 Tamarack Avenue Carlsbad, California
COMPACTION TESTS -----II I II Maximum dry density, pcf: 129 131
Maximum size tested: #4 x4
Optimum moisture, percent: 9 10
CLASSIFICATION TESTS I II
Soil type: Silty Sand Silty Sand Silty Sand
% passing no. 314 sieve: 100 % passing no. 4 sieve: 100 % passing no. 200 sieve: 42
% passing no. 270 sieve: .33
Plastic Index: Slghty. Pls.
EXPANSION TESTS - -------- I
Surcharge Load, p.s.f. 60
Expansion, percent: 1%
;: 45
36
95
si
32
Slghty.Pl' Ron-Plastic
ii III
60
1% 1
2
III
144
314"
8
III
FOUNDATION ENGINEERING c o., I N C.
TEST METHODS
FIELD DENSITY TESTS
Field density tests were made by the sand volume method in accordance with the American Society for Testing Materials (ASTM) Test Method
D 1556. The density was determined by obtaining the dry weight of the
soil from a hole approximately eight inches deep and determining the
volume of the hole with calibrated sand.
COMPACTION TEST
The maximum density and optimum moisture content were determined in the
laboratory in accordance with the American Society for Testing Materials
(ASTM) Test Method D 1557. The compaction test was made in a four-inch
diameter mold having a l/30 cubic foot volume, with 25 blows of a ten- pound hammer falling 18 inches on each of five layers. A new batch of
soil was used for each point on the compaction curve.
CLASSIFICATION TESTS
Classification tests were made in accordance with American Society for
testing materials (ASTM) Test Method 2488. The No. 4 sieve has 3116 inch
openings. The largest particle that will pass a No. 200 sieve is about
the smallest that can be seen with the unaided eye. Gravel is that frac-
tion larger than the No. 4 sieve; sand is the fraction that passes a No. 4 sieve and is retained on a No. 200 sieve. The fraction passing the No. 200
sieve is a silt if non-plastic and a clay if plastic.
EXPANSION TEST
The expansion index test is in accordance with the Uniform Building Code Standard No. 29-2. A moistened sample was compacted in a four inch dia- meter ring with 15 blows of a 5.5 pound hammer having a fall of 12 inches
per inch of compacted sample. If the degree of saturation ranged between 49 and 51 percent for an assumed specific gravity of 2.7, the specimen was loaded with 144 pounds per square foot and flooded. After 24 hours the expansion was noted and the expansion indices calculated.
FOUNDATION ENGINEERING COMPANY