HomeMy WebLinkAboutCT 76-12; Lake Calavera Hills; Soils Report; 1981-01-203467 Kurtz Street
San Diego. Cal1fornia92110 714-224-2911
Telex 697-841
Woodwarcklyde Consultants
January 20, 1981 Project No. 50216W-SI07
Pacific Scene, Inc. 3900 Harney Street San Diego, California 92110
Attention: Mr. Doug Nystrom
UPDATE GEOTECHNICAL INVESTIGATION FOR THE PROPOSED LAKE CALAVERA HILLS TRACT 76-12 CARLSBAD, ~CALIFORNIA
Gentlemen:
We are pleased to provide the accompanying report, which presents the results of our updated geotechnical investi- gation for the subject project. The report presents our conclusions and recommendations pertaining to the project, as well as the results of our field explorations and labo- ratory tests.
Our engineer and geologist assigned to this project are Messrs. Michael R. Rahilly and Robert J. Dowlen, respec- tively. If you have any questions, or if we can be of further service, please give us a call.
Very truly yours,
WOODWARD-CLYDE CONSULTANTS
Richard P. While R.E. 21992
RPW/DS/MRR/RJD/rs
Attachment
(4) Pacific Scene, Inc. (2) Rick Engineering Company
Consulting Engineers. Geologists
and Environmental Scientists
Daryl Streiff C.E.G. 1033
Project No. 50216W-SI07
. Woodward-Clyde Consultants
TABLE OF CONTENTS
PURPOSE OF INVESTIGATION
BACKGROUND INFORMATION
DESCRIPTION OF THE PROJECT
FIELD AND LABORATORY INVESTIGATIONS
SITE, SOIL, AND GEOLOGIC CONDITIONS
Geologic Setting
Topography and Surface Conditions
Subsurface Conditions
Fill Soils
Topsoil and Cultivated Topsoil
Alluvium
Santiago Formation
Santiago Peak Volcanics
Structure and Faulting
Ground Water
DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS
Potential Geologic Hazards
Faulting and Ground Breakage
Liquefaction
Landslides
Page
1
2
3
4
4
4
5
6
6
6
7
7
8
8
8
9
9
9
10
10
Project No. 50216W-SI07
TABLE OF CONTENTS (continued)
Woodward-Clyde Consultants
Ground Water
General Soil and Rock Conditions
Excavation Characteristics
Slope Stability
Grading
Foundations
RISK AND OTHER CONSIDERATIONS
FIGURE 1 - SITE PLAN AND GEOLOGIC MAP
Page
10
12
12
13
15
17
18
APPENDIX A - FIELD INVESTIGATION A-l
FIGURE A-l - KEY TO LOGS
FIGURES A-2 THROUGH A-6 - LOGS OF TEST BORINGS
FIGURES A-7 THROUGH A-12 - LOTS OF TEST PITS
APPENDIX B - LABORATORY TESTS B-l
FIGURE B-l - GRAIN SIZE DISTRIBUTION CURVES
FIGURE B-2 - FILL SUITABILITY TESTS
APPENDIX C - SPECIFICATIONS FOR CONTROLLED FILL C-l
APPENIDX D - GUIDE SPECIFICATIONS FOR SUBSURFACE DRAINS D-l
APPENDIX E - OVERSIZE ROCK PLACEMENT AREAS E-l
_ Project, No. 50216W-SI07
Woodward-Clyde Consultants
UPDATE GEOTECHNICAL INVESTIGATION
FOR THE PROPOSED
LAKE CALAVERA HILLS
TRACT 76-12
CARLSBAD, CALIFORNIA
This report presents the results of our update
geotechnical investigation at the site of the proposed
Lake Calavera Hills Tract 76-12 residential subdivision.
This report supercedes an earlier report by Soil, Geology,
& Testing Consultants, Inc. (SGT), dated January 28, 1977.
The site is approximately 2 miles southeast of the
intersection of Route 78 Freeway and El Camjno Real, in the
Calavera Hills area of Carlsbad, California.
PURPOSE OF INVESTIGATION
The purpose of our investigation was to assist
Pacific Scene, Inc., and their consultants in evaluating the
property and in project design. This report presents our
conclusions and/or recommendations regarding:
0 Potential geologic hazards,
0 Excavation characteristics of subsurface materials,
0 Site grading (including preparation of probable areas to receive fill),
Project No. 50216W-6107
Woodward-Clyde Consultants
0 Characteristics of probable fill materials,
0 Presence and effect of expansive soils,
0 Slopes, and
0 Foundations.
BACKGROUND INFORMATION
For our study, we have discussed the project with
Mr. Doug Nystrom of Pacific Scene, Inc., and we have been
provided with topographic maps prepared by Rick Engineering
Company, including:
0 "Grading Plans For Calavera Hills, Carlsbad Tract 76-12" (scale 1" = 30'), dated October 30, 1977,
0 "Lake Calavera Hills Unit 1, Tentative Map and PUD Plan No. 4 of Carlsbad Tract No. 76-12" (scale 1" = 200'), latest revision dated December 14, 1976.
In addition, we have reviewed applicable geologic
and geotechnical data, including the following:
0 "Report of Rough Grading Operations, Waste Water Treatment Facility, Calavera Hills, Carlsbad, Cali- fornia," dated June 9, 1980, prepared by B.R.G. & Associates, Inc.
0 "Soil and Geologic Investigation, Lake Calavera Hills, Unit No. 1, Tamarack Avenue, Carlsbad, California," dated January 28, 1977 prepared by SGT.
0 "Faulting in the Oceanside, Carlsbad, and Vista Areas, Northern San Diego County, California," dated 1975 by Dennis Hannan, in Studies on the Geology of Camp Pendleton, and Western San Diego County, California, San Diego Association of Geologists.
,Project No. 50216W-SI07
Woodward-Clyde Consultants
0 "Geologic Map of a Portion of the San Luis Rey Quadrangle, San Diego County, California," dated 1972, by Kenneth L. Wilson, MS Thesis, University of California, Riverside.
0 "Faults and Special Studies Zones - Quad 7, Ocean- side," dated March 3, 1976, by Mapping Section, San Diego County Department of Transportation.
0 Stereographic aerial photographs, AXN 4DD - 197, 198, Index Sheet No. 2, flown by Cartwright Aerial Surveys 1964 for USDA.
DESCRIPTION OF THE PROJECT
We understand that the proposed project will
subdivide approximately 53 acres into 138 single-family
residential lots. Ten additional acres on the site have
been reserved for open space areas and a proposed school
site, No specific investigations for these areas were made.
We understand that the proposed construction will
be limited to one- and/or two-story, wood-frame and stucco
residential structures, supported on continuous footings and
having slab-on-grade floors.
The available grading plans indicate cut and fill
slopes will have maximum heights of 30 feet and 60 feet, and
maximum slopes inclinations of 2 to 1 (horizontal to vertical).
The project also includes improving Tamarack Avenue
from El Camino Real to the subdivision, a distance of approxi-
mately one mile.
Project No. 502L6W-SI07
Woodward-Clyde Consultants .
FIELD AND LABORATORY INVESTIGATIONS
Our field investigation, conducted between Novem-
ber 18 and 26, 1980, included making a visual geologic
reconnaissance of the existing surface conditions, making
two bucket auger borings and 16 backhoe test pits, and
obtaining representative soil samples. The borings were
advanced to depths of 32 feet and 80 feet, and the backhoe
pits were advanced to depths ranging from 3 feet to 12 feet.
The locations of the test explorations are shown on Fig. 1.
A Key to Logs is presented in Appendix A as Fig.
A-l. Simplified logs of the borings and test pits are
presented in Appendix A as Figs. A-2 through A-12. The
descriptions on the logs are based on field logs, sample
inspection, and laboratory test results. Results of labo-
ratory tests are shown at the corresponding sample locations
on the logs and in Appendix B. The field investigation and
laboratory testing programs are discussed in Appendixes A
and B.
SITE, SOIL, AND GEOLOGIC CONDITIONS
Geologic Setting
The site lies within a boundary zone between the
Tertiary and Quaternary age sediments of the coastal foot-
hills, and the Jurassic and Cretaceous age igneous and
metamorphic rocks that form the highlands to the east.
4
Project No. 50216W-SI07
Woodward-Clyde Consultants
Topography and Surface Conditions
The site is on a south-trending series of ridges
that have moderate to steeply sloping flanks. The site is
bounded on the east and west by major south-draining canyons;
two additional drainage ravines are present in the southern
portion of the site (Fig. 1). Elevations across the site
range from approximately 135 feet near the southeastern
boundary, to approximately 308 feet (MSL Datum) at the
northern boundary. Elevations for the proposed Tamarack
Avenue range from approximately 60 feet near the terminus
of Tamarack Avenue, to approximately 190 feet where the
roadway enters the subdivision.
Man-made features on the site include numerous
unimproved roads and scattered piles of agricultural debris,
such as plastic sheeting, stakes, and organic matter. We
understand that crops, such as tomatoes, were once raised on
the site. The vegetation on the ridge tops consists of a
heavy growth of native weeds and grasses; the hillsides
support a dense growth of chaparral. Vegetation along the
Tamarack Avenue alignment consists primarily of tomato fields
in the canyon bottoms, and heavy chaparral on the hillsides.
A water line for the Costa Real Municipal Water
District is present within the proposed Glasgow Drive ease-
ment, and a northwesterly-trending, 150-foot wide SDG&E
easement is present near the existing Tamarack Avenue
(Fig. 1).
5
Project No. 50216W-SI07
Woodward-Clyde Consultants
Offsite improvements that will be affected by the
proposed extension of Tamarack Avenue consist of two canyon
fills constructed as part of the Calavera Hills Waste Water
Treatment Plant, which is presently under construction at
the northwestern corner of the site.
Subsurface Conditions
The site, which includes Tamarack Avenue improve-
ments, is underlain by fill soils, cultivated topsoils,
Quaternary age alluvium, the Eocene age Santiago Formation,
and the Jurassic age Santiago Peak Volcanics. These units
are described below; their approximate area1 extents, with
the exception of the residual soils, are shown on Fig. 1.
The geologic map symbol for each unit is given after the
formal name for the unit, except for the topsoil.
Fill Soils (Qf) - Fill soils are present within the
Tamarack Avenue easement adjacent to the waste water treat-
ment plant. The B.R.G. & Associates, Inc., report dated
June 9, 1980 indicates that the natural ground was prepared
and fill was compacted to at least 90 percent relative com-
paction. The report also indicates that portions of the
Tamarack Avenue fill slope within the plant area have already
been constructed.
Topsoil and Cultivated Topsoil (unmapped) - A
loose and porous soil mantle, consisting of either natural sandy
6
Project No. 50216WSIO7
WoodwardXlyde Consultants
clays and/or cultivated silty sands and sandy clays, was
found to range from approximately 1 to 2-l/2 feet in thick-
ness across the site.
Alluvium (Qal), Alluvial deposits consisting of
porous and compressible silty to clayey sands are present in
the drainage bottoms. As indicated in Test Pits 12 and 16,
these soils appear to be less than 5 feet thick.
In the Tamarack Avenue easement, alluvial soils
consisting of loose to medium dense sandy clays and clayey
sands, such as those found in Test Pit 18, are present to
depths in excess of the 10-l/2 feet excavated. Similarly, a
review of Trenches 9 and 10 of the SGT report indicates
alluvial depths in excess of 7 and 10 feet, respectively.
Santiago Formation (Ts) - This unit is moderately
well indurated, dense, gray to greenish-gray, very fine to
coarse silty to clayey sand. Interbeds and clasts of sandy
to silty clay are present within the sand. Generally, the
sands are well sorted; definite layering by grain size and
clay content is often exhibited through a vertical section.
Lateral variations and gradations are also common, however,
and most of the beds appear to be lenticular across the
site. Cemented zones are known to be present in this unit;
zones up to 2 feet in maximum thickness have been observed
in other areas.
Project No. 50216W-SI07
Woodwarddytje Consultants
Santiago Peak Volcanics (Jsp) - Highly fractured,
irregularily weathered metavalcanic rock of the Santiago
Peak Volcanics is present in the vicinity of Lots 1 through
4 and 140.
Structure and Faulting
Our field investigation indicates that the Eocene
age sediments on the property generally dip on the order of
20 to 150 (average 9' ), primarily toward the northwest.
There are, however, numerous local undulations in bedding,
particularly near the contact with the adjacent hardrock
unit. Noticeable fractures and minor discontinuous faults
were encountered in several of the test pits, trending
north-northeast through much of the site. These faults,
which are common to the Carlsbad area, were not observed to
offset surface soils, and are considered inactive. Similar
fault traces were reported in the SGT report.
Joint and fracture patterns are noticeable in the
hardrock areas on and near the site. These features trend
between north-northeast and north-northwest, and exhibit
relatively steep dips.
Ground Water
A permanent ground water table was not reached
in any of our test borings. However, minor "perched" water
8
Project No. 50216W~SIO7
WoodwardXlyde ConsUltants
seepage and "wet" zones were found at various levels in the
borings. Generally the water was seeping from coarse sand
layers that overlie sands containing a large amount of
finer grained materials. The source of this water is un-
known, but may, in part, be associated with agricultural
irrigation and increased infiltration of rainwater during
the last three wet winter seasons.
DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS
The discussions, conclusions, and recommendations
presented in this report are based on the results of our
field and laboratory studies, analyses, and professional
judgment.
Potential Geologic Hazards
Faulting and Ground Breakage - Our reconnaissance,
literature review, and field explorations did not reveal the
presence of any significant faulting on the site. Based on
our test pits, it appears that the previously-mentioned fault
traces are not confined to a particular "zone," but rather
appear to be present randomly throughout the site. In our
opinion, these faults can be considered inactive and should
not pose a significant geologic hazard to site development.
The geologic literature we reviewed indicates that
the nearest known active fault zone along which seismic
9
Project No. 50216W-SI07
Woodward.Clyde Consultants
events of magnitude 4 or greater have occurred is the
Elsinore Fault zone, mapped some 21 miles northeast of the
site.
The closest significant faulting is the northern
extension of the Rose Canyon Fault zone, which is mapped
approximately 10 miles southwest of the site. No magnitude
4 or larger earthquakes have been recorded on the Rose
Canyon Fault zone.
Liquefaction - The formational sediments on the
site are very dense. These sediments contain thin perched
water seepages at various levels; however, there is no
apparent permanent ground water table within probable grad-
ing depths. Due to the dense nature of the soils and the
general absence of a permanent, shallow ground water table,
in our opinion, these soils are not susceptible to liquef-
action.
Landslides - Our review and field investigations
did not reveal the presence of any landslides on the site.
Likewise, no remolded clay seams or near-horizontal bedding
plane faults, were encountered in the test borings or pits.
Ground Water
Based on our experience, we believe that a seasonal,
shallow perched ground water table may be present in the alluvial
10
Project No. 50216W-SIO7 .
Woodward-Clyde Consultants
soils, as well as in near-surface fractures in the metavolcanic
rocks in the general site area.
In our opinion, the conditions within the proposed
development area indicate a low to moderate probability for
ground water seepage problems developing in the future. In
our opinion, these conditions and resulting problems can be
reduced by installing subsurface drains. Recommendations
for the need, extent, and locations of such drains are best
made in the field during grading. General guidelines for
subsurface drains in canyons and draws are presented under
"Grading."
We recommend that positive measures be taken to
properly finish grade each lot after the residential struc-
tures and other improvements are in place, so that drainage
waters from the lots and adjacent properties are directed
off the lots and away from house foundations, floor slabs,
and slopes. Even with these provisions, experience has
shown that a shallow ground water or surface water condition
can and may develop in areas where no such water condition
existed prior to site development; this is particularly true
in years of heavy rainfall and in residential subdivisions
where a substantial increase in surface water infiltration
results from landscape irrigation.
11
Project.No. 50216W-SI07
Woodward-Clyde Consultants
General Soil a'nd Rock Conditions
The surficial soil and geologic units on the site
are grouped into three classes: soils that are moderately
to highly expansive (~topsoils, the clayey materials of the
Santiago Formation, and the weathered clayey upper zone of
the Santiago Peak Volcanics) compressible soils (topsoils
and alluvium in the drainage areas), and soils suitable for
use at finish grade (sandy materials of the Santiago Forma-
tion). These latter materials may be slightly to moderately
expansive, but have been used at finish grade in other areas.
Nominal reinforcement of foundations and slabs-on-grade is
typically used with these soils.
Based on preliminary earth package studies, in our
opinion, sufficient quantities of finish grade soils will be
generated during the proposed grading to provide each pad
with at least a 2-foot cover.
Excavation Characteristics
In our opinion, the topsoil, residual soil, and
formational sediments can be excavated with light to mod-
erate effort by heavy-duty grading equipment. It should be
noted that well cemented layers could be encountered during
grading. Excavation of these and similar materials may
require heavy ripping, and may result in oversized rock
(larger than 24 inches).
12
.Project No. 50216W-SI07
Woodward-Clyde Consultants
Excavation of the Santiago Peak Volcanics hard-
rock unit generally depends on the type of material, the
degree of weathering and decomposition, and the spacing and
orientation of the fractures. Due to the limited presence
of these materials on site and the fact that proposed cuts
are less than 5 feet in depth, we expect that design grades
can be achieved with heavy ripping. Excavation for utility
trenches in these materials may require pre-blasting.
Slope Stability
Our selection of soil parameters for analysis of
the slopes is based on the results of laboratory tests
performed on selected samples and on our experience with the
Santiago Formation in the Carlsbad area.
We have performed stability analyses for the
proposed slopes by the Janbu method using the following
parameters, which we consider conservative:
8 = 330, C' = 500 psf and y = 125 pcf, for undisturbed materials; and @ = 25', C' = 400 psf and y = 125 pcf, for compacted soils.
The results of those analyses indicate that the proposed 2 to
1 inclined slopes have calculated factors of safety against
deep-seated slope failure in excess of 1.5 for static condi-
tions. Stability analyses require using parameters selected
from a range of possible values. There is a finite possibility
13
Project No. 50216W-SI07
Woodward.Clyde Consultants
that slopes having calculated factors of safety, as indi-
cated, could become unstable. In our opinion, the proba-
bility of slopes becoming unstable is low, and it is our
professional judgment that the slopes can be constructed.
We recommend that the outer zone of fill slopes, a
horizontal distance equal to the height of the slope, be
composed of properly compacted, granular soil.
We recommend that the face of each fill slope be
compacted at maximum 4-foot intervals during construction
and trackwalked upon completion. All slopes should be
properly drained and maintained to help control erosion.
We recommend that an engineering geologist from our
firm inspect all cut slopes during grading to verify actual
geologic conditions and to provide design modifications, if
needed. If adverse conditions are encountered during inspec-
tion, slope buttressing may be required. Buttress recommenda-
tions will be given during grading, if necessary.
The fill soils within the zone of influence of the
Tamarack Avenue extension in the waste water treatment plant are
reported to be compacted to at least 90 percent relative com-
paction. Based upon our analysis, the lots within the subject
site will be supported on a prism of fill which does not bear
on the existing waste water treatment plant fill.
14
Project No, 50216W-SI07
Woodward-Clyde Consultants
Grading
We recommend that all earthwork be done in accor-
dance with the attached Specifications for Controlled Fill
(Appendix C). Woodward-Clyde Consultants should observe
the grading and test compacted fills.
We recommend that a pre-construction conference be
held at the site with the developer, civil engineer, con-
tractor, and geotechnical engineer in attendance. Special
soil handling or the grading plans can be discussed at that
time.
We recommend that all loose, porous topsoils,
alluvium, and other loose soils not removed by planned
grading be excavated or scarified as required, watered, and
then recompacted prior to placing any additional fill. We
recommend that the soil engineer evaluate the actual depth and
extent of excavation in the field at the time of grading.
We recommend installing subsurface drains beneath
the fills placed in the major subdrainages on the site in
accordance with the attached Guide Specifications for Sub-
surface Drains (Appendix D). We recommend that each sub-
surface drain be extended "upstream" in the drainage to the
point where it is covered by a minimum of 10 feet of fill.
We recommend that oversize rock fragments, that is
fragments between 2 and 4 feet in maximum dimension, be
15
Project No. 50216W-SI07
placed in accordance with the attached Oversize Rock Place-
ment Areas (~Appendix E). We recommend that rock fragments
larger than 4 feet in size not be used in fills.
Highly expansive clayey soils may be encountered
at grade in areas of shallow cuts and fills Cdaylight areas),
or where claystone is encountered in deeper cuts. We
recommend that these clayey soils be excavated, where encoun-
tered over the entire level lot areas to a minimum of 2 feet
below finish grade, and then be replaced with properly
compacted, nonexpansive soils or slightly to moderately
expansive soils available on the site. The more clayey
soils can be placed and properly compacted in the deeper
fill areas.
We recommend that the upper 2 feet of materials in
the fill areas be composed of finish grade, granular soils.
Finish grade soils are defined as granular soils that have a
potential swell of less than 6 percent when recompacted to
90 percent of maximum laboratory density at optimum moisture
content, placed under an axial load of 160 psf, and soaked
in water.
We recommend that soils swelling between 3 and 6
percent be compacted at moisture contents of 3 to 5 percent
over optimum water content when they are used within 2 feet
of finish grade.
16
Project No, 50216W-SI07
Woodward-Clyde Consultants
We recommend that an engineering geologist inspect
all cut banks and slopes during grading to evaluate possible
seepage and geologic problems. Final recommendations for
controlling seepage problems can be presented at that time.
The attached Guide Specifications for Subsurface Drains
(Appendix D) shows several recommended methods for col-
lecting cut slope seepage.
Foundations
We recommend that foundations for structures
founded in natural or properly compacted, nonexpansive soil
be designed for an allowable soil bearing pressure of 2,000
psf (dead plus live load). In our opinion, this bearing
pressure can be increased by up to one-third for transient
loads caused by wind or seismic forces. For these bearing
pressures, we recommend that all footings be founded a
minimum of 12 inches below compacted fill or undisturbed cut
lot grade, be a minimum of 12 inches wide, and be founded a
minimum horizontal distance of 8 feet from slope faces.
We recommend that foundations founded in slightly
to moderately expansive material be reinforced top and
bottom with at least one No.4 steel bar, and that the con-
crete slabs-on-grade be a minimum 4 inches thick and be
17
Project No. 50216W-SI07
Woodward-Clyde Consultants
undeslain by 4 inches of coarse, clean sand and reinforced
by 6x6, lO/lO welded wire mesh. A plastic membrane should
also be provided under slabs.
RISK AND OTHER CONSIDERATIONS
We have observed only a small portion of the
pertinent soil, rock, and ground water conditions. The
recommendations made herein are based on the assumption that
rock and soil conditions do not deviate appreciably from
those found during our field investigation. If the plans
for site development are changed, or if variations or
undesirable qeotechnical conditions are encountered during
construction, the geotechnical consultant should be con-
sulted for further recommendations.
We recommend that the geotechnical consultant '~-, /
review all final foundation and grading plans to verify tha c.
the intent of the recommendations presented herein has been !
properly interpreted and incorporated into the contract J
documents. We further recommend that the geotechnical
consultant observe the site grading, subgrade preparation
under concrete slabs and paved areas, and foundation excava-
tions.
It should also be understood that California
is an area of high seismic risk. It is generally considered
18
Project No. 50216W-SI07
Woodward4Zlyde Consultants
economically unfeasible to build totally earthquake-
resistant structures: therefore, it is possible that a large
or nearby earthquake could cause damage at the site.
Professsional judgments presented herein are based
partly on our evaluations of the technical information
gathered, partly on our understanding of the proposed con-
struction, and partly on our general experience in the
geotechnical field. Our engineering work and judgments
rendered meet current professional standards. We do not
guarantee the performance of the project in any respect.
This firm does not practice or consult in the
field of safety engineering. We do not direct the con-
tractor's operations, and we cannot be responsible for the
safety of other than our own personnel on the site; there-
fore, the safety of others is the responsibility of the
contractor. The contractor should notify the owner if he
considers any of the recommended actions presented herein to
be unsafe.
19
Project No. 50216W-SI07
APPENDIX A
FIELD INVESTIGATION
Woodward-Clyde Consuyants
Two exploratory test borings and 16 test pits were
made at the approximate.locations shown on Fig. 1. Our
field work was performed from November 20 to 26, 1980.
The test borings were made with a truck-mounted
30-inch diameter bucket auger. The test pits were excavated
by a John Deere Model 310-A backhoe. Representative samples
of the subsurface materials were obtained from the test
explorations and returned to our laboratory for testing.
The locations of the test excavations and the
elevation of the ground surface at each location were
estimated from the plan prepared by Rick Engineering
Company.
A-l
-
Location
I
‘SC -
65
Boring Number Elevation
I iAMPLE
IUMBER SOIL DESCRIPTION
r Very dense, damp, brown silty sand (34) $
-I 5
WATER LEVEL A, time Of drilling or as indicated.
SOIL CLASSIFICATION ---I soil Clarrificationr ate based on the ““ifkd sot, Clarrlflcatlon svrtem and inchde cob‘. n!oi*l”re and conli$lency. Field dercriollonr Ilaw been modified fO rettect reT”lt6 0‘ laboratory answer where app,0p,,ate.
- DISTURBED SAMPLE LOCATION Obtained b” collecting the auger C”ltingl in a plaltlc or Cloth bag.
- DRIVE SAMPLE LOCATION MODIFIED CALIFORNIA SAMPLER sample with recorded tdowr per ‘0.x *as obtained with B Modi‘led California drive rampIer 12” inside diameter. 2.5- O”tllde dlsmeteri lined With sample tuber. The *mp,er war driven I”,0 the sot, at the bottom Of the hole with a 140 pound hammer falling 30 mcher.
INDICATESSAMPLE TESTED FOR OTHER PROPERTIES GS- Grain si*e Dirtributlon c-r - Conrolldallon Tcr, LC - Laborator” Compactlo” ucs - ““confined cnm~rerrlon Ter, Test PI - Atterberg l.,mitr Test lx- Direct Shear Tes, ST - Loaded Swell Test TX- Triaxial cmwrerr,on Tert cc - Confined Comprerrion Test NOTE: I” this COl”nl” rtle result. Of there tests ma” be recorded where applicable.
BLOW COUNT Number of blows needed to advance sampler 0°C loot or 81 I”dcafed.
DRY DENSITY Pounds per Cubic Fcmf
MOISTURE CONTENT Percent Of Dry Weight
NOTESON FIELD INVESTIGATION
1. REFVSAL indiuter ,tl* inability 10 exrend .Icd”lli.“. PracticalI”. with equipmnt being “ted in the invartigatian.
KEY TO LOGS
TRACT 76-12
ORAWNW: ch MECKED BY: ;:‘:j PROJECT NO: 50216W-SI07 DATE: I-5-81 FICVRE NO: A-l
WOOOWARO-CLYOE CONSULTANTS
20-
25-
Boring 1
Approximate El, 232'
iAMPLE WMBER SOIL DESCRIPTION 1
Hard, dry to damp, dark brown, sandy clay
(CL) CULTIVATED TOPSOIL
Dense, damp to moist, pale brown, silty
sand (SM) SANTIAGC FORMATION
Irregular contact attitude N32'E 6'N
Becomes pale olive, very fine sand with
olive sandy clay seams
Very dense, moist, very pale brown, silty
sand (SM) with scattered coarse sands
SANTIAGO FORMATION
Normal fault from 12'-20'-up to 'a" qouqe
zone;
Attitude N9'E 70'N at 11%'
Attitude N14'E 80'N at 19%'
Coarse sand
l- Coarse sand
Dense moist, liqht qray, fine sand (SM)
SANTIAGO FORMATION
Medium sand layer
*PO, description of rymtm~r. ree ~igure A-1 Continued on next page
LOG OF TEST BORING 1
TRACT 76-12
DRAWN BY: ch CHECKED w: 1.:3 PROJECTNO: lI,W-SI07 DATE: l-5-81 PlOURE Not A-2
WOOOWARO-CLYDE CONSULTANTS
Boring 1 (Cont'd)
DEPT
c: 2,
45
50
55
60
65
70
75
80
- 1 - ‘MC -
-
- T 01 - ‘DO -
- 6 - ‘BC -
-
-f- */ R s h
1
1
I
iAMPLE IUMBER SOIL DESCRIPTION
:$a.:.>Tq Z~E. (Continued) dense, moist, light gray, , -6 fine sand (34) SANTIAGO FORMATION
t
Cemented zones
Cemented zones
Becomes dark gray
i-v.- Cemented zones
Cemented zones
Dense, moist, light gjray, medium sand (SP)
SANTIAGO FORMATION
Minor water seeps at 71'
?$< Dense, moist, light gray, silty very fine
sand (SM) SANTIAGO FORMATION
*For description Of rymbolr. see Figure A-1 Bottom of Hole
LOG OF TEST BORING 1 (CONT'D)
TRACT 76-12
DRAWN By: ch CHECKED BY: LJC PROJECT NO: 5"216W-ST"7 D*TE:1-5-81- FIGURE wo: p.- 3
WOOOWARO-CLYDE CONSULTANTS
IN -
5-
10 -
15-
7
YiG - ‘DO -
- ,
GF -
-
-
DTHE rEsrS
-
SOIL DESCRIPTION
1 Loose, dry, brown, clayey sand to silty
sand (SC-SM) TOPSOIL
Medium dense, damp, reddish-brown, silty
sand (SM) CULTIVATED TOPSOIL
Dense, moist, light gray, silty sand (SM)
SANTIAGO FORMATION
Boring 2
Approximate El. 221'
- Estimated bedding attitude N14OE 9'N at 8'
t-
Wet sand
- Bedding attitude N51°W 9's at 24$'
::-9:::.
"
Bottom of Hole
A-l 'Far description Of rymbolr, see Figure
LOG OF TEST BORING 2
TRACT 76-12
DRAWN BY: ch CHECKEDBY:~~~ PROJECTNO:50216W-ST07 DATEl-5-81 FlO"RENO: A-4
WOOOWARO-CLYDE CONSULTANTS
;S 3-2 [
Test Pit 3
Approximate El. 273'
SOIL DESCRIPTION
Loose, dry, dark qray-brown, silty sand
(SW TOPSOIL
Medium dense, dry to damp, dark gray-brown
to light red, silty sand (SM)
RESIDUAL SOIL
Dense, damp to moist, light yellow-brown,
silty sand (SM) SANTIAGOFORMATION
Occasional $" thick clay interbeds from
11-5'
Bedding attitude N13OE 9ON at 5'
Bedding attitude N2'E 15'N at 7'
4 fractures-attitude N22'W 85'S at 8'
Bottom of Hole
Test Pit 4
Approximate El. 262'
DEPTH TEST DATA
PPA
*OTHER SAMPLE
*MC ‘LID WC TESTS NVMBER SOIL DESCRIPTION
I / 1 t:c:::<*::a LOOSt?, dry, gray-brown, silty sand (SM)
TOPSOIL
Medium dense, damp, dark Tray-brown, clayey
sand (SC) RESIDUAL SOIL
Dense, moist, light gray, silty fine to
medium sand (SM) SANTIAGO FORMATION
Wet sand
Bedding attitude N54OE 4ON at 8%
Becomes darker gray and finer qrained
Bottom of Hole
‘For ck%cription Of rymbolr. see Figure A-l
LOG OF TEST BORINGS 3 AND 4
TRACT 76-12
DRAWN BY: ch C”ECKED BY: $22 PRO,ECT NO: 50216W-SIOI DATE: l-1-81 PlOURE no: A-i
WOOOWARO-CLYDE CONSULTANTS
Test Pit 5
Avxoximate El. 256'
SOIL DESCRIPTION
Stiff, damp, olive-brown, sandy clay (CL)
\ \ CULTIVATED TOPSOIL
Stiff, damp to moist, dark olive, sandy
clay to silty clay (CL-CHl;(occasional clay
parting surfaces) SANTIAGO FORMATION 5
10
15
Contact attitude N30'E 5’N at 8'
Very dense, moist, liqht gray, silty sand
\ (91) SANTIAGO FORMATION - - - Hard, damp, dark olive, silty clay (CH)
(many clay parting surfaces)
SANTIAGO FORMATION
Bottom of Hole
Test Pit 6
Approximate El. 222'
1 - T OP - ‘DO -
-
-
L ‘BC -
-
SOIL DESCRIPTION
Medium dense, dry, gray-brown, silty sand
(SM) TOPSOIL
Medium dense, damp, dark brown, clayey sand
(SC) RESIDUAL SOIL
-2 C Very dense, damp, pale brown, silty sand
(SM); (poor bedding)
SANTIAGO FORMATION
Bottom of iiole
LOG OF TEST BORINGS 5 AND 6
TRACT 76-12
DRAWNBY: ch CHEC~EOBY:j~h~ PRO,ECTNO:5021hW-SI07 DATE: I-5-81 FIOURE wo: A-6
WOODWARD-CLYDE CONSULTANTS
Test Pit 7
Approximate El. 215'
SOIL DESCRIPTION
Loose, dry, brown, silty sand (SM)
\ TOPSOIL
L Medium dense, damp, gray-brown, clayey
\ sand (SC) RESIDUAL SOIL \ L - - - - - _ _ Grading to - - _ - - - - -
\
Dense, damp, light olive to grav, silty
sand (SM) SANTIAGO FORMATION
Dense, moist, olive-gray, thinly bedded,
fine to medium sand (SM)
SANTIAGO FORMATION
Bedding attitude N18OE 12'N at 8'
Bottom of Hole
i
I
i
i
i
i
Test Pit 8
Approximate El. 207'
SOIL DESCRIPTION DEPTH 1
LIE IN FEET *MC
5
I
3 !
I I ,THEC ‘ESTS SAMPLE UMBER
3-1 [
3-2 [
3-3 I:
Dry to damp, brown, clayey sand
FILL
Medium dense, damp, brown, clayey sand
(SC) RESIDUAL SOIL S
Dense, damp, dark olive-gray, silty
fine sand (SM): thinly bedded
SANTIAGO FORMATION
Dense, damp, light gray, silty sand (SM)
SANTIAGO FORMATION
Reverse fault, 10" displacement, shear zone
hairline to 5" thick at 4?I'
Bottom of Hole
LOG OF TCST PITS 7 AND 8
TRACT 76-12
DRAWN BY: ch CWXKEO Elv:1^3!, PROJECT ~0: 50216W-S107 1 DATE: 1-5-81 F,G”RE wo: A-7
WOODWARD-CLYDE CONSULTANTS
OEPT
c
IN FEE
5
10
- i
G- -
-
El - 00 -
5
10
15
-
-
BC -
-
-
4 -
VC -
-
-
,THEI ‘EFJS -
:S
OWEF TESTS I I
SAMPLE #UMBER
3-l [
SAMPLE ‘UMBER
LO-1 [
LO-1 [
Test Pit 9
Arxxoximate El. 212'
SOIL DESCRIPTION
I
Loose, dry, brown, silty to clayey sand
(SM-SC) CULTIVATED TOPSOIL
Dense, damp, light gray, silty sand (SM)
SANTIAGO FORMATION
At 4'-fracture zone (%" wide)-unable to
determine any offset
Attitude N15'E 78OS
Bedding attitude N82'E 5ON at 4'3"
Refusal on cemented sand
Test Pit 10
Approximate El. 223'
SOIL DESCRIPTION
1
Loose, dry, brown, silty sand (SM)
TOPSOIL
Medium dense, moist, dark brown, clayey
sand to sandy clay (SC-CL)
CULTIVATED TOPSOIL
Dense, moist, light qray, silty sand (SM)
SANTIAGO FORMATION
Bottom of Hole
A-l 'For description 0‘ r"mboll, see FilJ"c? I 1
LOG OF TEST PITS 9 AND 10 LOG OF TEST PITS 9 AND 10
TRACT 76-12 TRACT 76-12
DRAWNBY: ch DRAWNBY: ch C"ECKE0 BY: Dr C"ECKE0 BY: Dr PROJECTNO: 50216W-ST07 PROJECTNO: 50216W-ST07 DATE l-5-81 DATE l-5-81 FIGURE NO: A-8 FIGURE NO: A-8
WOODWARD-CLYOE CONSULTANTS
I OEPTW OEPTW TEST DATA TEST DATA IN IN FEET G-r *MC * ‘00
T
‘BC
5 5 i
10
15
i
0EP-f L IN FEE,
5
10
15
Test Pit 11
Approximate El, 145'
WMPLE IUMBER I SOIL DESCRIPTION
Ll-l[
Ll-2[
Ll-3
C
.l-4[
AMPLE IUMBER
.2-11
.2-3[
‘For dercriptian Of rymbalr. see Figure A-l
Hard, dry to damp, olive-brown, sandy
clay (CL) RESIDUAL SOIL \ Dense, damp to moist, gray, silty sand (SM)
SANTIAGO FORMATION
Hard, moist, dark gray, silty clay (CH)
SANTIAGC FORMATION
Contact attitude N65OE 3ON at 9'
Hard, moist, dusky red, silty clay (CL-CH)
SANTIAGO FORMATION
Becomes gray-brown
Bottom of Hole
Test Pit 12
Approximate El. 136'
SOIL DESCRIPTION
Loose, damp, pale brown, silty sand (SM)
ALLUVIUM
Stiff, moist, olive-brown, silty clay (CH)
SANTIAGO FORMATION
1
Becomes very stiff and olive-gray
Bottom of Hole
LOG OF TEST PITS 11 AND 12
TRACT 76-12
DRAWN BY: ch CHECKEDBY: l?Jp PROJECT NO: 50216W-SI07 D*TE:l-5-81 F,O"RE NO: A-9
WOOOWARD-CLYDE CONSULTANTS
OEPT c IN FEE,
5
‘BC
9
i.
DTHEl rEsTS R I
I k
1
1
i
1
L3-2
Test Pit 13
Approximate El. 261'
.4-l C
~4-2 C
.4-3 [
SOIL DESCRIPTION
Loose, dry to damp, brown, silty sand
(SM) CULTIVATED TOPSOIL
Dense, moist, pale brown, silty sand (SM)
SANTIAGO FORMATION
Bedding attitude N56'E 1l'N at 6'
Bottom of Hole
Test Pit 14
Approximate El. 247'
SOIL DESCRIPTION
Loose, dry to damp, brown, silty sand (SM)
CULTIVATED TOPSOIL
Medium dense, damp to moist, dark brown,
clayey sand (SC) RESIDUAL SOIL
------ Grading to - - - - --
Dense, damp, liqht olive-qray, silty sand
(SW SANTIAGO FORMATION
2 sub parallel fractures at 7'
Attitude N22'W 89ON
Beddinq attitude N30'W 12ON at 8'
Bottom of Hole
LOG OF TEST PITS 13 AND 14
TRACT 76-12
DRAWNBY: ch CHECKED BY: c\i- PROJECT NO:50216W-ST07 DATE: I-5-81 FlOURE No: A-]”
WOODWARD-CLYOE CONSULTANTS
Test Pit 15
DTHER TESTS
l-
Approximate El. 254'
SAMPLE l”MBER SOIL DESCRIPTION 1
Loose, dry, brown, silty sand (SM)
CULTIVATED TOPSOIL
Medium dense, moist, dark qray-brown, clayey
sand (SC) RESIDUAL SOIL
Dense, moist, light gray-brown, silty sand
(SW SANTIAGO FORMATION
Fault trace, undetermined displacement at
3'-attitude Nl'W 72OS
Bedding attitude N87OW 5'N at 4%'
Bottom of Hole
Test Pit 16
Approximate El. 154'
WLE NVUER SOIL DESCRIPTION
I Loose, moist, light brown to brown, mixed
silty to clayey sand and sandy clay
(SM-SC-CL) ALLUVIUM I Hard, moist, liqht olive, silty clay and
rock fragments (CII-GC)
SANTIAGO PEAK
VOLCANICS
Dominant fracture attitude approximately
N53OE 81°S
Bottom of Hole
LOG OF TEST PITS 15 AND 16
TRACT 76-12
DRAWN BY: ch 1 c”ECKED BY: %’ ’ 1 l’, PR~JECTNO:~O~~~W-S~C~ DATE: I-5-81 FGURE NO: il-1~ 1
WOOOWARO-CLYDE CONSULTANTS
Test Pit 17
Amxoximate El. 290'
SOIL DESCRIPTION
Loose, dry, brown, silty sand (SM)
RESIDUAL SOIL I
Very dense, damp, brown, fractured
metavolcanic rock
SANTIAGO PEAK VOLCANICS
Dominant fracture attitudes: N43OW 77OS,
N47OE 76'S
Bottom of Hole (Refusal)
Test Pit 18
Annm~imat~ Pl 1 AA’ . ._= - -. . -...- - - I ^ . _ - -
DEPTH TEST DATA IN *OTHER WLE TEtTE NUMBER SOIL DESCRIPTION FEET l = l DD WC ~~-~.
I I I;#/,~
Loose to medium dense, moist, dark gray-
brown, clayey sand to sandy clay (SC-CL)
ALLUVIUM
‘For deYripti0” 0‘ l”nlboll, see Figure A-l
LOG OF TEST PITS 17 AND 18
TRACT 76-12
DRAWN BY: ch 1 CHECKED BY: KY: 1 PROJECTNO:50216W-S107 DATE: 1-5-81 FIGURE wo: A-12
WOOOWARO-CLYDE CONSULTANTS
Project No. 50216W-SI07
APPENDIX B
LABORATORY TESTS
Woodward&lyde Consultants
The materials observed in our test explorations
were visually classified and evaluated with respect to
strength, swelling, and compressibility characteristics.
The classifications were substantiated by performing grain
size analyses on representative samples of the soils. A
laboratory compaction test was performed on a sample of
probable fill soil.
The grain size distribution curves are shown on
Fig. B-l. The results of the compaction test are reported
on Fig. B-2.
B-l
GRAVEL COBBLES I SAND SILT and CLAY Coarse Fine Coarse Hed i urn Fine 1
Mesh Opening - Ins Sieve Sizes Hydrometer Analysis I I I I
76 32 lOOI, , Ii? 4 tlr IO 16rn3030 6080 IWml !I ! I! I , 0
90 IO
80 m
70 30
60 WE f
“=
50 “g
E
40 60:
30 70
m 80
IO 90
I III III I I I -t YIOO
IM) VI IO,0 5.0 I,0 0. I 0.05 0.01 0.005 0.001
GRAIN SIZE IN MILLIMETERS
1 SAMPLE 1 CLASSIFICATION AND SYMBOL 1~~ ~; LL I *PI ~1
*LL - Liquid Limit
*PI - Plasticity Index
I GRAIN SIZE DISTRIBUTION CURVES I TWCT 76-12
DRAWN BY: i CHECKED BY: ;:;,p PROJECT NO: 502 16cJ-SIO7 DATE: l-5-*0 FIGURE NO: p,- ,
WOOOWARO-CLYDE CONSULTANTS
-t
’ -&y-j S,LT b CLAY t I
iooo ~100 10 1.0 0.1 0.01 0.001
GRAIN SIZE, mm
MECHANICAL ANALYSIS
I
PLASTICITY CHARACTERISTICS
Liquid Limit, %
Plasticity Index, %
Classification by Unified Soil
ZERO AIR VOIDSCURVES
Dry Density, pcf
initial Water Content, %
Final Water Content, %
Apparent Cohesion, psf
Apparent Friction Angle, degrees
I SWELL TEST DATA
Initial Dry Density. pcf
Initial Water Content. %
Final Dry Density, pcf
Final Water Content, %
Load, psf
Swell, percent
I I I I
Optimum Moisture
MOISTURE CONTENT, 96
LABORATORY COMPACTION
LABORATORY COMPACTION TEST TEST METHOD: J%Z,?-O 1557-70 A
I FILL SUITABILITY TESTS
TRACT 76-12
DRAWN BY: sh CHECKEOLtY:j”” PRo,ECT~o:50316W-SI07 -4 OATS: l-5-80 F,O”RE NO: B-2
W”““WlD” ,.I “nc *n”C,*. %...,I”
Project No. 50216W-SI07
APPENDIX C
SPECIFICATIONS FOR CONTROLLED FILL
I. GENEPAL
These specifications cover preparation of existing surfaces to receive fills, the type of soil suitable for use in fills, the control of compaction, and the methods of testing compac- ted fills. It shall be the contractor's responsibility to place, spread, water! and compact the fill in strict accord- ance with these specifications. A soil engineer shall be the owner's representative to inspect the construction of fills. Excavation and the placing of fill shall be under the direct inspection of the soil engineer, and he shall give written notice of conformance with the specifications upon completion of grading. Deviations from these specifications will be permitted only upon written authorization from the soil engineer. A soil investigation has been made for this pro- ject; any recommendations made in the report of the soil investigation or subsequent reports shall become an addendum to these specifications.
II. SCOPE
The placement of controlled fill by the contractor shall include all clearing and grubbing, removal of existing unsat- isfactory material, preparation of the areas to be filled, spreading and compaction of fill in the areas to be filled, and all other work necessary to complete the grading of the filled areas.
III. MATERIALS
1. Materials for compacted fill shall consist of any mater- ial imported or excavated from the cut areas that, in the opinion of the soil engineer, is suitable for use in con- structing fills. The material shall contain no rocks or hard lumps greater than 24 inches in size and shall contain at least 40% of material smaller than l/4 inch in size. (Mater- ials greater than 6 inches in size shall be placed by the contractor so that they are surrounded by compacted fines; no nesting of rocks shall be permitted.) No material of a perishable, spongy, or otherwise improper nature shall be used in filling.
2. Material placed within 24 inches of rough grade shall be select material that contains no rocks or hard lumps greater than 6 inches in size and that swells less than 6% when compacted as hereinafter specified for compacted fill and soaked under an axial pressure of 160 psf.
C-l
‘\ / Project No. 50216W-SI07
3. Representative samples of material to be used for fill shall be tested in the laboratory by the soil engineer in order to determine the maximum density, optimum moisture content, and classification of the soil. In addition, the soil engineer shall determine the approximate bearing value of a recompacted, saturated sample by direct shear tests or other tests applicable to the particular soil. _
4. During grading operations, soil types other than those analysed in the report of the soil investigation may be encountered by the contractor. The soil engineer shall be consulted to determine the suitability of these soils.
IV.
1.
(a)
(b)
2.
(a)
(b)
Cc)
COMPACTED FILLS
General
Unless otherwise specified, fill material shall be compacted by the contractor while at a moisture content near the optimum moisture content and to a density that is not less than 90% of the maximum dry density deter- mined in accordance with ASTM Test No. D1557-70, or other density test methods that will obtain equivalent results.
Potentially expansive soils may be used in fills below a depth of 24 inches and shall be compacted at a moisture content greater than the optimum moisture content for the material.
Clearing and Preparing Areas to be Filled
All trees, brush, grass, and other objectionable mater- ial shall be collected, piled, and burned or otherwise disposed of by the con.tractor so as to leave the areas that have been cleared with a neat and finished appear- ance free from unsightly debris.
All vegetable matter and objectionable material shall be removed by the contractor from the surface upon which the fill is to be placed, and any loose or porous soils shall be removed or compacted to the depth shown on the plans. The surface shall then be plowed or scarified to a minimum depth of 6 inches until the surface is free from uneven features that would tend to prevent uniform compaction by the equipment to be used.
Where fills are constructed on hillsides or slopes, the slope of the original ground on which the fill is to be placed shall be stepped or keyed by the contractor as shown on the figure on Page 4 of these specifications. The steps shall extend completely through the soil mantle and into the underlying formational materials.
c-2
I~, , Project No. 50216N-S107
Cd)
3.
(a)
lb)
(cl
(d)
(e)
V.
1. _
After the foundation for the fill has been cleared, plowed, or scarified, it shall be disced or bladed by the contractor until it is uniform and free from large clods, brought to the proper moisture content, and compacted as specified for fill.
Placing, Spreading, and Compaction of Fill Material
The fill material shall be placed by the contractor in layers that, when compacted, shall not exceed 6 inches. Each layer shall be spread evenly and shall be thorough- ly mixed during the spreading to obtain uniformity of material in each layer.
When the moisture content of the fill material is below that specified by the soil engineer, water shall be added by the contractor until the moisture content is as specified.
When the moisture content of the fill material is above that specified by the soil engineer, the fill material shall be aerated by the contractor by blading, mixing, or other satisfactory methods until the moisture content is as specified.
After each layer has been placed, mixed, and spread evenly, it shall be thoroughly compacted by the contrac- tor to the specified density. Compaction shall be accomplished by sheepsfoot rollers, vibratory rollers, multiple-wheel pneumatic-tired rollers, or other types of acceptable compacting equipment. Equipment shall be of such design that it will be able to compact the fill to the specified density. Compaction shall be continu- ous over the entire area, and the equipment shall make sufficient trips to insure that the desired density has been obtained throughout the entire fill.
The surface of fill slopes shall be compacted and there shall be no excess loose soil on the slopes.
INSPECTION
Observation and compaction tests shall be made by the . sol1 engineer dursng the frilling and compacting operations so that he can state his opinion that .the fill was constructed in accordance with the specifications.
2. The soil engineer shall make field density tests in accordance width ASTM Test No. D1556-64. Density tes.ts shall be made in the compacted materials below the surface where the surface is disturbed. When these tests indicate that the density of any layer of fill or portion thereof is below the specified density, the particular layer or portion shall be reworked until the specified density has been obtained.
c-3
?I, & Project No. 50216W-SIO7
VI. PROTECTION OF WORK
1. During construction the contractor shall properly grade all excavated surfaces to provide positive drainage and prevent ponding of water. He shall control surface water to avoid damage to adjoining properties or to finished work on the site. The contractor shall take remedial measures to prevent erosion of freshly graded areas and until such time as permanent drainage and erosion control features have been installed.
2. After completion of grading and when the soil engineer has finished his observation of the work, no further excava- tion or filling shall be done except under the observation of the soil engineer.
a/-- Strip as specified
Original ground
;, ,,.. ‘,‘L ,‘, :.~/ ~<?~.. ,., ,,
sl.i.di.ng does not occw I?cmx7c a11 topsoil
NOTES :
The minimum width of "B" key shall be 2 feet wider than the
compaction equipme&, and not less than 10 fee.t.
The outside edge of bo.ttom key shall be below topsoil or loose surface material.
Keys are required where the natural slope is steeper than 61 horizontal to 1 vertical, or where specified by the soil engineer.
c-4
Project No. 50216W-SI07
APPENDIX D
GUIDE SPECIFICATIONS FOR SUBSURFACE DRAINS
I. DESCRIPTION
Subsurface drains consisting of filter gravel or clean gravel enclosed in filter fabric with perforated pipe shall be installed as shown on the plans in accordance with these specifications, unless otherwise specified by the engineer.
II. MANUFACTURE
Subsurface drain pipe shall be manufactured in accordance with the following requirements.
Perforated corrugated ADS pipe shall conform to ASTM Designa- tion F405. Transite underdrain pipe shall conform to ASTM Designation C-508 (Type II). Perforated ABS and PVC pipe shall conform to ASTM Desginations 2751 and 3033, respective-
lYt for SDR35; and to ASTM Designations 2661 and 1785, re- spectively, for SDR21. The type pipe shall conform to the following table.
Pipe Material Maximum Height of Fill (feet)
ADS 8 (Corrugated Polyethylene)
Transite "underdrain"
PVC or ABS: SDR35 SDR21
III. FILTER MATERIAL
20
35 100
Filter material for use in backfilling trenches around and over drains shall consist of clean, coarse sand and gravel or crushed stone conforming to the following grading require- ments.
Sieve Size Percenta e Passin g Sieve
1" 100 3/4" 90 - 100 3/U" 40 - 100 4 25 - 40 8 18 - 33 30 5- 15 50 o- 7 200 o- 3
D-l
Project No. 50216W-SI07
This material generally conforms with Class II permeable material in accordance with Section 68-1.025 of the Standard Specifications of the State of California, Department of Transportation.
IV. FILTER FABRIC AND AGGREGATE
Filter fabric for use in drains shall consist of Mirafi 1405 (Celanese), Typar (DuPont), or equivalent. The aggregate shall be 3/4-inch minimum to 1-l/2-inch maximum size, free draining aggregate. Filter fabric shall completely surround the aggregate.
V. LAYING
Trenches for drains shall be excavated to a minimum width of 2 feet and to a depth shown on the plans, or as directed by the engineer. The bottom of the trench shall then be covered full width by 4 inches of filter material or with filter fabric and 4 inches of aggregate, and the drain pipe shall be laid with the perforations at the bottom and sections shall be joined with couplers. The pipe shall be laid on a minimum slope of 0.2 percent and drained to curb outlet or storm drain.
After the pipe has been placed, the trench shall be back- filled with filter material, or 3/4-inch minimum to 1-1/2- inch maximum size free-draining aggregate if filter fabric is used, to the elevation shown on the plans, or as directed by the engineer.
D-2
Project No. 50216W-SI07
TYPICAL SUBSURFACE DRAINS
FOR LOCAL SEEPAGE
Compacted
FTypical Seepage Line V
lter Material or
Filter Fabric
6" Perforated Pipe
Drain to Curb Outlet
or Storm Drain
,-Compacted Native Soil
c’;t”/J ‘or seepage
6" ?erforated Pipe
Drain to Curb Outlet
or Storm Drain
cut Slope --A,/
CGlllp;:Ct~d Seepage Line
Ilativc Soil -1:
Fil t(?r I;l;ltcrial or Fil tcr Fabric
-..,-- 6" I'(!t.:nr<l l.~d I'i ,I?
Drain lo Curb Out:1 it
or !;lo~~x Ilrxir~
D-3
Line
Project No. 50216X-SIO7
TYPiCr L SI:CTION ,
SUBSURFACE DRAINS IN DMWS
/
ORIGIIIAL GROUND
FILTER FABRIC
ALL AROUiJD
-,
DJtAIN PIPE: 6 IllCH DIAMCTER
D-4
Project No. 50216WSIO7
TYPICAL SECTION
SURSURFACC DRnINS IN DRAWS
/
ORIGINAL GROUND \ $, 71 #
“-\
CC:IPACTZD FILL EXCAVATION
\ /
\
z&
&+
\
t
$5
\ \--
7ILTCR MATERIAL:
7 cf/ft OF LENGTH,
i.1 I N .
'I
,
1 Cl’ :,liil ,‘I
aimIN PIPE:
DIXETER
Mi\X'IXlN Il\~:IGilT OF FILL
Af,OV,: ii')',",'Oil $!y AI,I.I~IVT,',T, CI.I:A::nLl'l (I-T. )
ii
:!(i
3 ‘5
I Oil
6 1:X,,
D-5
Project No. 50216W-SI07
APPENDIX E
I. .-
varl*! 1s::
..$I” ---
&&y
, I
frcm -f- to ~;/ 1
>+._,.,.--:.. Fill plxcd in aCCO:dlncn wit!3
spec :i.sic?.tion* For Cor.trolled Fill /
fl” Lorisi
OVERSIZE ROCK PLACEMENT AREAS (No Scale)
LEGEND
0 Place no oversize rocks in this area.
m Oversize rock can be placed in this area.
NOTES
(1) Oversize rocks are those rock fragments between 2 feet and 4 feet in maximum dimension.
(2) Rocks between 2 feet and 4 feet in size should be pro- perly isolated and completely surrounded by properly compacted soil.
(3) No rocks greater than 4 feet in maximum dimension can be used in fills.
(4) The oversize rock should be surrounded by sufficient fines to obtain proper compaction.
(5) No oversize rock can be placed within 4 feet of finish lot grade or within expected depth of utilities, which- ever is deeper.
E-l