HomeMy WebLinkAboutCT 76-15; Palisades Point Lots 128-130; Soils Report; 1983-12-12- ( ENGINEERING
-
,-
-
-
--
-
-
-
-
-
~OllX- C0NSLKTANl-S
December 12, 1983 W.O. 386905
Mola Development 808 Adams Avenue Huntington Beach, California 92648
Attn: Mr. Chris Christie Mr. John Millet
Gentlemen:
Subject: Proposed 1.5:1 Fill Slope
Lots 128, 129 and 130 Palisades Point Project Carlsbad, California
Pursuant to your request, we have investigated the subject area to
determine its suitability for accepting the proposed fill. This
additional study became necessary when it came to our attention
that an existing 1.5:1, thirty (30') foot high slope located at the
toe of the proposed slope was placed as a fill during grading of
adjacent property.
Two items of particular concern are the affects the proposed fill will
have on the existing fill slope and the height of the slope at a ratio
of 1.5 horizontal to 1 vertical.
The scope of this investigation consisted of review of grading records
for the adjacent subdivision; drilling, logging and sampling of an
exploratory boring; laboratory testing; stability aalculations;
consultation with the project geologist, Baseline Consultants; and
preparation of this report.
Three sources of information regarding placement of the existing fill
slope were investigated: public files at the City of Carlsbad; reports
by the project geotechnical consultant, Woodward-Clyde Consultants;
and records of the project engineer, Rick Engineering. In each
case, the information, while helpful, was incomplete. Compaction
testing by Woodward-Clyde Consultants show results of ninety (90%)
percent or more of the maximum density.
1630-G South Sunk&d St.. Anaheim, Ca. 92806 (213) 852-4710 (714) 634.2092
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
‘"*"La "r"rL"plellL Page 2 W.U. ~OOYU~
More detailed investigation required drilling of an exploratory boring
to a depth of forty (40') feet to examine the existing fill and under-
lying bedrock materials. In summary, the boring encountered ten (10')
feet of compacted fill underlain by thirty (30') feet of sandstone
bedrock. Densities of core samples in fill when compared to the
maximum dry density show a relative compaction of ninety (90%)
percent or more. Boring logs are attached and the boring location
is shown on Plates A and B.
Shear tests results are presented on Plate B and other pertinent data
is presented on the attached Boring Logs.
Consultation with Baseline Consultants, project geologists, indicates
bedrock structures are favorable.
Based on the generated parameters, stability calculations were
performed and are attached as Plates C through H. Calculations
were reviewed and accepted by Baseline Consultants.
GRADING RECOMMENDATIONS
It is recommended that grading of the subject slope be carried out
as depicted on Plates A and B and as described below.
A twenty-eight (28') foot wide bench should be established at the toe of
the proposed fill, with a tilt-back into the slope of not less than one
(1') foot. Bottom materials should be scarified and brought up to
approximately optimum moisture.
Fill should be composed of sandstone derived material mixed with two
(2%) percent cement by weight, and extend vertically from the proposed
toe of the slope to an elevation of twenty (20') feet below finish
pad grades. Within twenty (20') vertical feet of pad grades, fill
may be composed of compacted soil, with the outer slope face composed
of sandstone derived material.
As fill is placed, vertical benches not less than four (4') feet in
height should be cut into the bedrock material.
1630-G South Sunkist Street Anaheim, California 92606 (714) 634-2092 (213) 852-4710
Mola Development W.O. 386905 - Page 3
:-
-
-
-
-
-
-
-
During construction of lot 130, it will also be necessary to examine
the cut at the rear of the lot and at the rear of lot 131 to determine
if mudstone bedrock will provide adequate stability. Should adverse
conditions such as jointing or low strength materials be encountered,
a stabilization fill composed of soil derived from sandstone materials
may be necessary.
We trust this letter will meet your needs. If there are any questions,
please feel free to contact our office.
Respectfully submitted:
ACTION GEOTECHNICAL CONSULTANTS
&&flA/ BRUCE A. PACKARD RCE 13801 VICE PRESIDENT - ENGINEERING
GW:ss attachments: Plates A through H Summary Sheets - Boring #I
1630-G South Sunkist Street Anaheim,California 92806 (714)634-2092 (213) 852-4710
-
GRADING DETAILS - LAB RESULTS
-
-
,-
-
-
-
-
-
-
-
-
-
-
-
(‘0 76 dpe .’ -=
SHEAR TEST RESULTS
LJ-+h
B 9 orir,
AA. 2
i
3’
8’
/2’
aye Cemet7f
ra’”
35
34
35
35
35
35*
\-----L-L...-
,I&4 c
0
400
/OO
550
300 0 /loo *
pLa7-E 23
..~
-
-
-
-
-
-
-
-
,--
.~
i-
-.~
-
-
-
STABILITY ANALYSIS
py/a me ers : f
i-
%c e /?eq Ld w+ c&x) M0 ti cos Lx ul& # A? ’
A 4’8d 5.f 50
L3 4J9. 0 5/ .5 L/s/
c 620 .o 50.4 33
D 400.0 48.0 a
E 44.0 13.7 a3
f 387.5 46.5 w
G //a 0 13.2 7
3.7
37.0
e.3
Y3./
/2 .L
-%/
134
/%. 9
+J.Y /f
35.g 36
a7.v ay
al.0 aa
5.P’ 6
N.2 86
/.6 20
fc%G?
PLATE c
STABILITY ANALYSIS
-
-
-. t7.y. = (BL/ 9.vf- 35) f kdf. 55) = , ho
46.0 OK
-
.-
,_
S/de &ea zd L%J~(k/jlJ~. d" ddco3ff LaL&& -4'
. A 39.0 9.7 95 3.3 3.3 20
- d3 /to. 0 /9.2 3 /5./ j/.-J’ 26
c 2m.o 29.0 33 la./ 134 aq
D 69.0 8.3 28 7.3 3-9 7
E d62,5 31.5 8/ a.9 /I.3 87
- F BU .o /o./ /5 1.7~ 2.6 a/
8’tt 9 46,O -
-
-
-
-
-
--
-
-
.--
-
-
-
-
STABILITY ANALYSIS
~‘Lc @A 2) f& 35) f 30 (* 5s) , ,= 15.2 = 2*38
0-c \ l\ \ \
c= 550 p-f B,c,D- gff-35” c= op,sP
/“Z 20’
d%CQ Area d M/d&3) c=ie L4k?&lu c%!!H -9’
R 3v.5 4.1 39 3.3 a.5 30
& 35.0 3.6 32 3.1 /.a 7
c k53.0 /B Y . w /d.Z 8.6 29
0 50.0 6,~ a/ 5d a.2 d4
2f. 2 /5.2
&A?-& E
-
STABILITY ANALYSIS
-
-
-
-
-
-
-
-
AL
-
-
GD Is! =
\\
A. ,,l;Yo 35) f (45wJ)fi 55) /n9 d”J-.- r
w7 -= /*‘iz
OK,
@
&c e Afu2 13 at (2l)nS) cd6 Nt)Cb;ld &!,Jo(
A 5Y 6.5 50 Y.d 5-o
-p/
15
d $80 33.6 39 ah/ a/./ 27
c J50 3f.8 c?y 3l.f /s/.2 Pm35
0 /5J Ab.0 13 17.5 4.0 /5
f &s q.3 5 Y.3 P.t’ /2
83.9 44.7
STABILITY ANALYSIS
-
-
-
-
~-
-
-
Fs I .= & Plko 35) f 09) 6 5501 = / Bti
dY../ ,
d,X.
Para m&A=-r5
A,&- Jzf=35O
c= 0 --- _
c, 0 - la’= 3s.O
c = 5sops~
/“= 20’
J&e a.. * &L &0.5) &Jo timo( d&A4 J2’
/? 90 /o. B 44 7. e 7-5 31
6 /PO d/.6 3/ &x5 j/J w
c /OS Id.6 d/ 17, B q-5 /6
0 32,5 3.9 15 3.8 j.0 13
4-z 9 La/
-
STABILITY ANALYSIS
,-
Fill
Sandstone -5edrock
-
-
-
-
I /-
-
-
-
-
-
Mola Development
- -
117 92 0.0
124 97 5.6
94
121
7
295 7
2
S”RF &GE ELEY. Bucket f DUIP. Auger "Dif Dhr, 24”
-
: d; 8: “ci g:
3; -
LOttED~Y Gary Wallace
-
lE3C-G Scjrh S;%is! S::eel Ar.a:e;m~ Cal:‘j,r..i 51836 (7:4; 634~3092 (213:8:?-4710
8
0
2
4
6
8
0
2
4
~6 - -
-T- fWCt)lEERw:
cLrSS~~IC~lIoh’tt*:9,.,,D~
HITE, slightly clayey SAND
ill
DTTLED WHITE AND REDDISH ROWN, slightly clayey SAND ith BLACK SAND CLAY
HITE, slightly clayey ANDSTONE
emented Layers @ 18' to 20'
,IGHT BUFF. silty SANDSTONE ith cemenfed lasers, very
lense
MITE, slightly clayey, ledium to coarse SANDSTONE
JGHT BUFF, silty SANDSTONE, lith cemented layers, very iense -
P’OJECT
LLDLOGICAL oEs:RIFTIO~~
-
-
-
-
-
-
-
-
--
Mola Development -I-
-
t rl . L E 22
kg
-
-
36.
38,
40.
-
-
i I.
2 0
1.
0:
Zf
se JO
--
T
BOR!M,t Na. 1
SLarrtE ELCY. Bucket
foutp. Auger wD;E DII 24”
LOGCED2v Gary Wallace
a08 wo. DA7-l SdECT
3869 1114183 P 2
-
153D.G Swttr S-%;s: S::eel Ar.~>~;rn~ Cal”>r,;a 9i~B36 (714: 634-3092 (513: 1352-C71D
-
-
JXITE SANDSTONE
Znd @ 40'
Jo Groundwater Encountered
lo Caving Occurred