HomeMy WebLinkAboutCT 76-17; Canon Park Unit 1 Lots 5-6; Soils Report; 1977-03-11RECEIVED :?:,R 1 4 1977
..-
-
-
.-
-
-
-
-
-
-
PH(ILIP HENKINO BENTON
P”C.10~NT ClYlL r*(il*lr.”
La Costa Land Company
2100 Costa Del Mar Road
Corlsbad, Caliiornio 92003
BENTON ENGINEERING, INC.
APPLIED SOIL LIECHANICS ~- FOUNDATIDNS
6717 CONVO” COURT SAN DIEGO CALIFORNIA OZlll
Aiorch 1 1, 1977
Su!bject: Project No. 77-i -5D
Report on Compacted Filled Ground
Lots 5 and 6
Canon Park Unit bjo. 1
Carlsbad, California
CT- -m--n--
Gentlemen:
This is to report the results of tests and observations made in order to inspect the compaction of
Filled ground placed on certain areas of Lots 5 and 6 of Canon Pork Unit I,!o. 1 in Cal-lsbad,
CaliFornia. The fills were placed dul.i”g tile period between Frb~-ua~y 28 ond March 11, 1977.
The filled ground v/as placed under our inspection in accordance with the approved specifications.
The grading plan used For the placement of filled ground was p~wpared bv Rick Engineering Cornpow:.
The approximate locations at which the tests WC~E take” and the Final test results are present&
on page 3, under the “Table of Test Results. ” The laborutorv deternlinutio”s of the maximum Iii-x,,
densities and optimum moist!~;rc contents oi the major fill motel~ials al-e presented on page 3, under
the “Laboratory Test Results. ” Some of the moximurm dt~\, densities shown i” the ‘,ioble of Test
Results’; wcl-e com!>inotio”s of these. The tests VJ~I-E taken on tlx dates indicated belov,:
Test t\lumbel- Date
1 Febi-uarv 28, 1977
2 Murch 1, 1977
3 hlol~ch 4, 1977
4, 5 and 6 ~,‘klrch 10, 1977
7, 3, 9 and 10 Mai-ch 11, 1977
The fincl results of tests and observations indicate that the compacted filled ground has been
placed at 90 percent oi il1e r:iaximum Jr,;, densit\, ,>I~ gl-eu~er. It /has been determined that the iill
material;, compacted to 90 percent of the maximum Jrv densit,i, have a safe bcaz~ing value OF
ct least 1000 pounds per sc;uare foot for one foot wide continuous iootings founded at o depth OF
G inches below the lowest adjacent iinol compacted ground suriace and placed Ifive feet or mol~e
inside the top OF compacted Filled ground slopes. Ii footings ore placed closer to the exposed
SlOlO
.17.68
c.3
L
-
-
-
-
-
-
-
-
-
-
-
Project No. 77-l-50
Canon Park Unit No. 1
-2- March 11, 1977
slopes than 5 feet inside the top of compacted filled ground slopes, these should be deepened
one foot below a 1 l/2 horizontal to 1 vertical 1 ine projected outward and downward from a
point 5 feet horizontally inside ths top of compacted filled ground slopes. Tests indicate that
the compacted filled ground is adequate to satisfactorily support the proposed one and two
story wood frame dwellings without detrimental settlements.
Expansive soil conditions exist in the upper three feet below finished grade. It is understood
that the post-tension slab system, to be used for supp,ort of these houses, has been designed to
minimize possible detrimental effects caused by the potentially expansive soil conditions.
A plan showing the approximate areas and depths of Filled ground placed under our inspection
in accordance with the approved specifications will be submitted with our final report on this
project.
Respectfully submitted,
BENTON ENGINEERING, 1~.
BY -&%?A
R. C. Remer
Reviewed by
S. H. Shu, Civil Engineer
R.C.E. No. 19913
Distr: (2) Addressee
( 1) Addressee - Attn: Mr. Burton C. /Cramer City af Co&bad (2)
(1) (1)
Building Department
Rick Engineering Ca
Woodward Companie;
t
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Project NO. 77-l-5D
Can& Pork Unit No. 1
-3-
TABLE OF TEST RESULTS
Test
Ph.
Approx-
imate
Location
Lot No.
Depth
of Fill
at Test
in Feet
1 5 2.0 14.8 108.5 114.7 94.6
2 5 6.0 13.3 117.7 124.8 94.3
3 5 8.0 13.8 109.2 114.7 95.2
4 6 2.0 12.4 117.9 128.0 92.1
5 5 12.0 13.2 116.4 128.0 90.9
6 6 6.0 13.0 102.1 114.7 89.0
7 6 6.0 12.9 106.9 118.2 90.4
6 6 8.0 14.0 120.1 124.8 96.2
9 6 10.0* 11.0 111.1 121.6 91.3
10 5 13.0” 14.5 114.9 124.8 92.1
Fie Id
Moisture
% dry wt
Drv
Density
Ib/cu ft
Maximum
b
Density
Ib/cu ft
March 11, 1977
Percent
Compaction Remarks
Reworked
Ck on ii6
* Indicates finished grade.
LABORATORY TEST RESULTS
The maximum dry densities and optimum moisture contents of the major fill materials os deter-
mined by the A.S.T.M. D 1557-70 method, that uses 25 blows of o 10 pound rammer falling
from a height of I8 inches on each of 5 layers in o 4 inch diameter l/30 cubic foot compaction
cylinder, are presented os follows:
Soil Description
Groy with red brown and white silty clay
Light yellow brown fine sandy cloy
Brown clayey fine to medium sand
Maximum Optimum Mois-
Dry Density ture Content
Ib/cu ft 96 dry wt
114.7 15.3
121.6 11.5
128.0 9.2
BENTON ENGINEERING. INC.