HomeMy WebLinkAboutCT 77-02; HOSP GROVE UNIT 3; GRADING AND TESTING; 1981-06-053467 Kurtz Street
San Diego. California 92110
714-224-2911
Woodward-Clyde Consultants
June 5, 1981
Project No. 592072-FC02
Broadmoor Homes, Inc.
3911 Sorrento Valley Boulevard
San Diego, California 92126
Attention: Mr. James Carter
FINAL REPORT OF ENGINEERING
OBSERVATION OF GRADING AND
TESTING OF COMPACTED FILL
WOODWRIDGE PHASE II
CARLSBAD TRACT 77-2, UNIT 3
LOTS 70 THROUGH 103
CARLSBAD, CALIFORNIA
Gentlemen:
In accordance with your reguest, and our proposal dated
January 22, 1981, we have provided engineering services in
conjunction with the grading of the subject site.
SCOPE OF WORK
Our services included:
° Providing engineering observation of the grading
operation,
° Providing engineering and geologic observation of
alluvial removal,
° Performing field density tests in the placed and
compacted fill,
° Performing laboratory tests on representative
samples of the material used for fill, and
° Providing professional opinions regarding the
contractor's general adherence to plans and
specifications. ^
RECEIVED
Consulting Engineers, Geologists
and Environmental Scientists
Offices in Otner Principal Cities
riTY OF CARLSBAD
Engineering Ueo^ •
Broadmoor Homes, Inc.
June 5, 1981
Project No. 592072-FC02
Page 2
Woodward'Clyde Consultants
SUMMARY OF GENERAL EARTHWORK AND TESTING
Site preparation, compaction, and testing were done between
December 22, 1980 and May 8, 1981. In our opinion, based on
our observation and testing, the work performed during that
period was in general conformance with the Specifications for
Controlled Fill attached to our report entitled "Soil and
Geologic Investigation for the Proposed Carlsbad Tract
No. CT 77-2," dated July 19, 1979.
During the grading period, fill was placed, compacted, and
tested on fill Lots 70 through 72 and cut-fill Lots 73, 81
through 84, 99 and 100. Lots 102 and 103 have been left in
their natural state. Lots 74 through 80, 85 through 98, and Lot
101 are cut lots. The grading operation generally consisted of
removing alluvial and loose surface soils, scarifying,
watering, and compacting areas to receive fill and making cuts
and fills to design grade.
During the grading operation, compaction procedures were
observed, and field density tests were made to help evaluate
the relative compaction of the placed fill. Field observations
and results of field density tests indicate that the fill has
been generally compacted to 90 percent or more of maximum
laboratory dry density as determined in accordance with ASTM
Test Method No. D1557-70. For reference, the approximate
locations of field density tests and the limits of compacted
fill have been recorded on a copy of the grading plan. The
results of field density tests, expressed as a percent of
laboratory dry density (relative compaction), are given on the
attached forms.
Laboratory tests were made on representative samples of the
materials used for fill. The tests were performed to evaluate
moisture density relationships, maximum dry density, optimum
moisture content, grain size distribution, plasticity and swell
characteristics. The results of laboratory tests are attached.
SUMMARY OF FINISH GRADE SOIL CONDITIONS
Fill Lots and Fill Portion of Cut-Fill Lots
Inifipection and laboratory tests indicate that nonexpansive fill
was 5^1 aced within two feet of rough grade on all fill lots noted
herein.
Broadmoor Homes, Inc.
June 5, 1981
Project No. 592072-FC02
Page 3
Woodward'Clyde Consultants
Cut Lots and Cut Portion of Cut-Fill Lots
Cut lots and cut-fill lots were inspected at the completion of
grading. The inspection indicated tJiat no expansive soil is
evident at rough grade surface. Nonexpansive soil is soil
which swells less than three percent when compacted to 90
percent of the maximum laboratory compaction density at optimun
water content under a surcharge of 160 psi.
RECOMMENDATIONS
Foundations for Structures on Nonexpansive Soils
We recommend that foundations for single- or two-story, multi-
dwelling, residential structures placed on nonexpansive,
undisturbed soil or on nonexpansive, properly compacted fill be
designed for a bearing pressure not exceeding 2,000 psf (dead
plH^.,.a4l^ loads). We rppommend that footihfs Bef founded at
•^SmlsiSi 1*!'^^®^ belbw fihished grade ahd havfe a minimum width
df 12' inaii&s. In our opinion, this bearing pressure can be
increased by no more than one-third for loads that include wind
or seismic forces.
Slopes
Fill slopes at the site have varying inclinations of
approximately 1-1/2:1 to 2:1 (horizontal to vertical), and are
approximately 10 feet high. Fill slopes were treated by over
filling, rolling with a sheepsfoot compactor and cutting back
to design grade.
. recoBttiend that structures that will not tolerate
^il itittr^ foundations, swiramihg pools,
concrete decks, walls, etc.) not be located within eight feet
of 1;he top of a slope. We recommend that footings that are
located within eight feet of the top of a slope be extended in
deptliL uhtil the outer bottom edge of the footing is eight feet
horiz6litally from -the outside face of the slope.
Additional Fill and Utility Trenches
This report discusses the fill placement observed by personnel
from our firm during the period specified. We recommend that
any additional fill placed, as well as backfill placed in
utility trenches located within five feet of a building and
deeper than 12 inches, or backfill placed in any trench located
Broadmoor Homes, Inc.
June 5, 1981
Project No. 592072-FC02
Page 4
Woodward'Clyde Consultants
five feet or more from a building and deeper than five feet, be
compacted under our observation and tested to verify compliance
with the eartJiwork specifications for the project. We should
be contacted at least 24 hours prior to backfilling operations.
Drainage
We recommend that positive measures be taken to properly finish
grade each lot after structures and other improvements are in
place, so that drainage waters from the lot and adjacent
properties are directed off the lot and away from foundations,
floor slabs, and slope tops. Even when these measures are
taken, a shallow ground water or surface water condition can
and may develop in areas where no such water condition existed
prior to site development; this is particularly true where a
substantial increase in surface water infiltration results from
landscape irrigation.
LIMITATIONS
The elevations of compaction tests shown as finished grade (FG)
tests on the attached forms correspond to tJie elevations shown
on the "Grading Plan for Carlsbad Tract #77-2, Unit 3," dated
February 14, 1980, prepared by Roy L. Klema Engineers, Inc.
Elevations and locations used in this report were based on
field surveys done by others.
The soil conditions described in this report are based on
observations and periodic testing. This office should be
notified of any indications that soil conditions are not as
described herein. We will inspect foundation excavations for
each lot if we are requested to do so.
For this report, rough lot grade is defined as that grade set in
the field by the grade checker from reference stakes
established by the surveyor, and represents rough grade at the
time we were inspecting the grading operation.
The conclusions and opinions drawn from the test results and
site inspections apply only to our work with respect to
grading, and represent conditions at the date of our final
inspection. We will accept no responsibility for any subse-
quent changes made to this site by others, or by uncontrolled
action of water, or by failure of others to properly repair
damages by uncontrolled action of water.
Broadmoor Homes, Inc.
June 5, 1981
Project No. 592072-FC02
Page 5
Woodward'Clyde Consultants
If you have any questions, please give us a call.
Very truly yours,
WOODWARD-CLYDE CONSULTANTS
Steven C. Haley
R.E. 18577
SCH/DT/rs
Attachments
(4)
COMPACTION TEST RESULTS
JOil NAME WOODRIDGE PHASE II, UNIT 3 DATE REPORTED 6/5/81
JOB NUMBER 592072-FCO2
DATES COVERED JANUARY 19, 1981 THROUGH MAY 8, 1981 PACE 2. or 1
DATl n •T nrrcsT LOCATION ELEVATION
OF TEST
HOimiMI
eOMTCPIT
% mmrwt.
PltLS
MMSITT
LA»0«ATOKV KKLATIVK
MMSITT COMPACTION
rcr % or LAB. DIM*.
JAN 19 1 LOT 71 180 13.0 111.5 121.0 92
2 II 70 184' 13.6 110.1 121.0 91
3 II 72 188 ' 13.0 117.8 128.C 92
JAN 20 4 LOT 71 186' 12.3 117.2 128.0 91
5 " 72 192' 13.0 114.0 123.0 92
6 It 73 194' 12.3 112.6 123.0 96
JAN 21 7 LOT 70 194' 11.1 114.0 123.0 92
8 II 84 190' 13.0 114.2 121.0 94
9 II 82 192 ' 11.7 111.0 121.0 91
JAN 22 10 LOT 99 196' 11.7 110.8 121.0 91
11 II 100 198' 12. 3 117.8 128.0 92
FEB 4 12 LOT 81 UPPER FG 193.5' 13.0 112.6 123.0 91
13 II 82 FG 193.2' 11.7 112.3 123.0 91
14 tl 83 FG 193.2' 13.0 112.9 123.0 91
15 II 84 FG 192.8 12. 3 111.5 123.0 90
FEB 5 16 LOT 73 FG 195.3' 13.6 118.4 128.0 92
17 II 7-: FG 195.3' 10.5 116.4 128.0 90
FEB 6 18 LOT 71 LOWER FG 187.0' 11.7 116.1 128.0 90
19 11 70 FG 187.0' 11.7 116.5 128.0 91
FEB 24 20 LOT •70 UPPER FG 196.0' 12.3 118.4 128.0 92
21 II 71 FG 196.0 12. 3 118.1 128.0 92
MAY 8 22 LOT 99 FG 199.6-12.3 117.0 128.0 91
23 II 100 FG 199.e 13.0 118.2 128.0 92
Wpodward'CtydeCon«ultaiits ^
PLASTICITY CHARACTERISTICS 1 2 3
Liquid Limit, % 32 22 24
Plasticity Index, % 16 3 12
Classification by Unified Soil
Classification System SC SM SC
150
ZERO AIR VOIDS CURVES
-2.80 SG
2.70 SG
2.60 SG
2.50 SG
110
COBBLES GRAVEL SAND
c 1 f c| m 1 f SILT 4 CLAY
100
100
80
60
40
20
0
V
\
Y 3
V \\
1
• 2
V
_J— 1 J 1 1 11 -i 1
1000 100 10 1.0 0.1 0.01 0.001
GRAIN SIZE, mm
MECHANICAL ANALYSIS
DIRECT SHEAR TEST DATA 1 2 3
Dry Density, pcf
Initial Water Content, % ---
Final Water Content, % ---
Apparent Cohesion, psf — — —
Apparent Friction Angle, degrees --
SWELL TEST DATA 1 2 3
Initial Dry Density, pcf --118
Initial Water Content, % — _ 11
Final Dry Density, pcf --116
Final Water Content, % --15
Load, psf --160
Swell, percent --1.5
SAMPLE LOCATION
1 LOT 130, CANYON BOTTOM
2 CUT LOTS 123-128
3 CUT LOTS 90-98
10 20 30
LABORATORY COMPACTION TEST
LABORATORY COMPACTION
TEST METHOD: ^S™ ^ " ^57 70 A
FILL SUITABILITY TESTS
WOODRIDGE PHASE II, UNIT 2
DRAWN BY: ch 1 CHECKED By:JV\(aft.PROJECT NO: 592072-FCO2 | DATE: 4/13/81 1 FIGURE NO: 1
WT 3/30/81 WOODWARD-CLYDE CONSULTANTS
PLASTICITY CHARACTERISTICS 4 5 6
Liquid Limit, % -44 34
Plasticity Index, % NP 27 18
Classification by Unified Soil
Classification System SM SC SC
150
ZERO AIR VOIDS CURVES
-2.80 SG
2.70 SG
2.60 SG
2.50 SG
COBBLES GRAVEL SAND SILT t CLAY COBBLES c 1 f c m 1 f SILT t CLAY
100
1000 100 10 1.0 0.1 0.01 0.001
GRAIN SIZE, mm
MECHANICAL ANALYSIS
DIRECT SHEAR TEST DATA 4 5 6
Dry Density, pcf --
Initial Water Content, % ---
Final Water Content, % ---
Apparent Cohesion, psf ---
Apparent Friction Angle, degrees --Mfc 1
SWELL TEST DATA 4 5 6
Initial Dry Density, pcf 109 111 114
Initial Water Content, % 11 11 10
Final Dry Density, pcf 109 108 112
Final Water Content, % 15 18 16
Load, psf 160 160 160
Swell, percent .01 3.1 1.5
SAMPLE LOCATION
4 CUT LOTS 36-39
5 LOTS 42 & 43
6 BUTTRESS CUT W. OF
10 20 30
LABORATORY COMPACTION TEST
LOTS 130-139
40 LABORATORY COMPACTION ,
TESTMFTHOn- ^STM b^lSl 70 A
FILL SUITABILITY TESTS
WOODRIDGE PHASE II, UNIT 2
ch I CHECKED BY: iVWH PROJECT NO: 592072-FCO2 | DATE: 4/13/81 | FIGURE NO; 2 DRAWN BY:
WT 3/30/81 WOODWARD-CLYDE CONSULTANTS
PLASTICITY CHARACTERISTICS 7
Liquid Limit, % -
Plasticity Index, % NP
Classification by Unified Soil
Classification System SM
150
140
130
120
110
100
ZERO AIR VOIDS CURVES
-2.80 SG
2.70 SG
2.60 SG
2.50 SG
COBBLES GRAVEL SAND
c f c| m 1 f SILT 4 CLAY
1000 100 10 1.0 0.1 0.01 0.001
GRAIN SIZE, mm
MECHANICAL ANALYSIS
DIRECT SHEAR TEST DATA 7
Dry Density, pcf -
Initial Water Content, % -
Final Water Content, % -
Apparent Cohesion, psf -
Apparent Friction Angle, degrees -
SWELL TEST DATA 7
Initial Dry Density, pcf 115
Initial Water Content, % 9
Final Dry Density, pcf 115
Final Water Content, % 14
Load, psf 160
Swell, percent 0.4
SAMPLE LOCATION
7 BUTTRESS LOTS 130-139
10 20 30
LABORATORY COMPACTION TEST
LABORATORY COMPACTION
TEST METHOD: ASTM D 1557 70 A
FILL SUITABILITY TESTS
WOODRIDGE PHASE II, UNIT 2
DRAWN BY: 1 CHECKED BY: ,(y|C4l|-PROJECT NO: 592072-FCO2 | DATE: 4/13/81 1 FIGURE NO: 3
WT 3/30/81 WOODWARD-CLYDE CONSULTANTS