October 2, 1979
PHILIP HENKING BENTON PIEP,DINT 61YIL IUGINCEI
Frederick J. Meyer, A. I.A.
Architect 8, Associates
2348 liarcourt Drive
Son Diega, California 92123
TLLLP”0.I (71.1 *6s-t0ss
Gentlemen:
This is ta transmit ta yw seven copies of our report of Project No. 79-8-23A, entitled
“Limited Sails Investigation, Proposed Alta Verde Condominiums, Lots 6 and 7 of La Costa
Greens Subdivision, North of La Costa Avenue, Carl&ad, California,“dated
October 2, 1979.
If you should have any questions concerning any of the data presented in this report,
please contact us.
Very truly yours,
BENTON ENGINEERING, INC.
PHB/jr
-
SlOlO
.17.77
LIMITED SOILS INVESTIGATION
-.
-
PROPOSED ALTA VERDE CONDOMINIUMS
LOTS 6 AND 7 OF LA COSTA GREENS SUBDIVISION
NORTH OF LA COSTA AVENUE
CARLSBAD, CALIFORNIA
-
-
-
-
-
-
-
-
-
-
Prepared far
FREDERICK J. MEYER
A. I. A.
by
BENTON ENGINEERING, INC.
PROJECT NO. 79-8-23A
OCTOBER 2, 1979
TABLE OF CONTENTS
Page Nos.
LIMITED SOILS INVESTIGATION
-
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Field Investigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 and 2
Laboratory Tests . . . . . . . , . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 and 3
Conclusions and Recommendations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3, 4, 5, 6
and 7
-
APPENDICES
- Sampling, etc.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B
-
BENTON ENGINEERING. INC.
APPLIED SOIL YECHA.NlCS - FO”NO*TIONs
*s*o RUFFlN ROaD
**N DIEGO. CALIFORNIA 9*17.3
TELe.P”c.NL ,714, sss.less PHILIP “ENKING BENTON PllESIDEHI CIYIL INaIHclz”
Introduction
LIMITED SOILS INVESTIGATION
This is ta present the results of a limited sails investigation conducted at the proposed
Alta Verde Condominium site, which is legally known as Lots 6 and 7 of La Costa Greens Subdivision,
in Carl&ad, California.
At the site, a compacted fill ground, varying from 7 ta 20 feet in thickness, was placed
between 1969 and 1970. The canpacted fill ground was known to be placed aver variable
thicknesses of cmpressible natural sails in the north half of the property. In the south half of
the property, the compacted fill ground was placed m firm natural ground.
The objectives of this investigation were to determine the existing subsurface cmditims
at me location in the northern portion of the site, and certain physical properties of the sails,
so that appropriate foundation design recammendatims could be developed and presented.
In order ta accomplish these objectives, me boring was drilled at the site, and both
undisturbed and lacse soil samples were obtained for laboratory testing.
This investigation was based m the 1” = 10’ Site Plan prepared by the Project Architect,
Frederick J. Meyer, of San Diega, California.
Field Investigation
The baring was drilled, 5.5 inches in diameter, with a truck-mounted auger type drill
rig at approximately 62 feet southerly and 82 feet easterly of the northwest comer of the lot.
The baring was drilled ta a depth of 65 feet below the existing ground surface. A continuous
log of the soils encountered in the boring was recorded at the time of drilling and is
described m the fallowing p09e.
-2-
Baring 1: Approximately 62 feet southerly and 82 feet easterly of the northwest corner of the
lat. The approximate elevation of existing grwnd surface is Eiev. 21.5 feet.
Depth Bel aw
Existing Ground
Surface, in Feet Sail Description
0 to 5.5 Fill, Silty fine to medium sand with same asphaltic concrete fragments,
Tbme ta medium compact, dry, light brown ta light gray brawn.
5.5 ta 19.3 - Fill , Sandy clay and clayey fine ta medium sand, compact ta very - compact, moist, light brawn and gray brown, lenses of dark gray
sandy clay soils with scattered organic materials between 14.0 feet
and 16.0 feet.
19.3 ta 23.0 Fine sandy clay, medium firm, saturated, dark gray
-
23.0 ta 26.0 Clayey fine sand with packets of fine sandy clay and scattered
raatlets, medium firm, saturated, light gray and light alive gmy.
-
26.0 to 57.0 Fine sandy clay, with packets and lenses of clayey fine sand,
medium firm to 43 feet; firm ta 49.0 feet and very firm below.
- Saturated, light gray, light alive gray, dark blue gray and
dark gray brawn.
- 57.0 to 64.3 Silty clay with small chunks of claystone and siltsbne, very firm,
saturated, alive gray and gray .
- 64.3 ta65.0 Gravelly fine to caarse sand, very firm, saturated, gray br>wn.
End of baring at 65.0 feet.
- Undisturbed samples were obtained at frequent intervals, where possible, in the sails
Q
=
ahead of the drilling. The drop weight used far driving the sampling tube into the sails was a
) steel rammer which weighs 140 pounds, and the average drop was 30 inches. ke general
K -. ! procedures used In field sampling are described under “Sampling” in Appendix B.
-Tj Laboratory Tests
-i
Laboratory tests were performed an all undisturbed samples of the sails in order ta determine
- the dry density, moisture content, and shearing strength. The results of these tests and the expended
energy ta drive the sampling tube far a vertical distance of 12 inches are presented an the following -
iwe.
llLNTON LNQINLL”ING. INC.
-3-
-
-
-
-
-
-
-
5
K
5
-
-
-
Baring Sample
* No.
1 1
2
3
4
5
6
7
8
9
10
11
12
13
14
Depth,
Feet
3.0
6.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
55.0
60.0
65.0
Drive Dry
Energy Density
Ft-kips/ft lb/cu ft
7.7 100.2
12.6 118.4
12.3 103.4
10.2 110.6
7.0 98.3
4.9 104.2
3.9 103.7
4.2 106.2
5.3 99.7
6.3 100.9
8.8 101.5
10.5 97.8
21.0 100.9
9. 1 98.9
Moisture searing
Content Resistance
% dry soil wt. kips/sq ft
4.5 0.61
12.3 4.28
18. 1 1. 16
17.6 2.32
24.8 1.56
19.5 1.32
17.6 1. 16
21.3 2.41
25. 1 1.11
23.9 0.37
22.9 I.77
27.0 2.23
24.7 3.23
24.8 3. 16
Consalidatim tests were performed on representative samples in order to determine the
Icad-settlement chamcteristiw of the sails and the results of these tests are presented below:
Cmsalidatim Under Surcharge Loads
(Percent of Original Sail Sample Height)
Surcharge Loads Baring: 1 Sample: 6
kips/sq ft. Depth: 25.0 Feet
0.2 and added water 0. 10
1.0 0. 98
2.0 1.45
4.0 2. 18
8.0 3. ii
0.2 2.23
Cmclusims and Recommendations
Surcharge Loads Baring: 1 Sample: 7
kips/sq ft. Depth: 30.0 Feet
0.2 0.72
1.0 1.60
2.0 2.69
Added Water 2.66
4.0 4.20
8.0 6.29
0.2 4.32
It is concluded from the results of field investigation and laboratory tests that:
1. The existing fill sails below 5.5 feet and the underlying medium firm ta very firm clayey natuml
soils have acceptable strength and load-settlement characteristics. It is recommended that all
existing upper fills, less than 90 percent of maximum dry density be removed and be recompacted
under continuous engineering inspection and testing ta at least 90 percent of maximum dry density.
rnLNTON LH(IWCLIINO. WC
-4-
The proposed building foundations may then be founded on the fill soils uniformly compacted to
at least 90 76 of maximum dry density if the bearing fill soils under all future buildings arc
similar to those found below 5.5 feet at Boring 1.
2. Due to placement of compacted fill ground ct~ both compressible ground and firm natural ground,
and in order to minimize possible adverse effects of Img-term settlement of saturated natural
clayey soils in the northern portion of the site on the performance of future building foundations, -
it is recommended that continuous interconnected reinforced concrete footings be used to
support each of the proposed buildings. The recommended bearing value for sizing footings
- is 1,000 pounds per square foot provided that the footings are, (a) at least 1.0 Foot in width,
(b) founded at least 2.0 feet below the undisturbed final ground surface, (c) Founded in the
uniformly compacted filled ground, and (d) I ocated at least 8 feet inside the undisturbed sloping
- ground surface.
The allowable bearing value is for dead plus live lmdr only and may be increased one
-
third for combined dead, live and seismic loodings.
- The anticipated total settlements of a cmtinuous footing lmded to a unit foundation pressure
of 1,000 pounds per sqwre Foot may vary From 0. 1 to 5.8 inches if the footing is less than 2.0
-
Feet in width and is Founded at the recommended minimum depth of 2.0 feet below the undisturbed
4
3 final ground surface. ,
r; The settlements ore expected to be attributed mainly to the long-term ccnsolidatia, of the
i I various thicknesses of the compressible soil layers existing beneath the compacted filled ground.
,.g
T Since the thickness of the compressible soil layers increases northwardly, it is anticipated that the
settlements of comprcted filled ground will also increase northwardly. The rate of settlement -
increase was estimated to be approximately one inch vertical in 15 feet horizontal distance, or
-
,-
1 to 180 ratio over a 30 year period during our soils investigation for Lot 8 of La Costa Greens
Subdivision. Elevation readings taken on Lot 8 show that as much OS 5 3/4 inches of total
mENION l!NOINLLRINQ. INC.
-
-
-
-
-
-
-5-
settlement has occurred since construction. Therefore, it would be best to construct the walls
on the north portion of this site on a batter of approximately l/2 inch horizontal to 8 feet vertical
to the south, so that when the walls deflect northward at a ratio of 1 to 180, the movement
will not be apparent. Likewise, if interconnected reinforced cmcrete Footings and concrete
slabs are poured m an upward slope of l/2 inch vertical per 15 feet horizontal distance during
cmstructicn toward the north, it is unlikely that the tilting will be visually detected. Also,
this procedure will allow the slab to rotate downward toward the north with the same beneficial
effects. As an alternative, considerations may also be given to the possibility of separating
the units structurally and designing the units with interconnected reinforced concrete Footings
with raised wocd floors bolted with extra long anchor bolts at the northerly ends. The initial
footings could be poured in an upward slope toward the north. As the long term downward
settlement toward the north occurs, the anchor bolt nuts could be released and wood wedges
or shims driven beneath the floor beams and the mud sill to relevel each unit. The adjustments
could be accomplished whenever needed.
Special consideration should also be given to buildings spanning the line of demarcation
between Fill placed over Firm natural ground and fill placed over soft compessible soils. It
wwld be best to provide complete structural separation and a horizcmtal separation of a few
Feet between buildings supported on the two different soil conditions in order to reduce potential
adverse differential settlements within any one building. The demarcation line can be located
by connecting the two points across the property in an east-west direction.
The first point lies a, the west lot line and is located approximately 125 Feet north of
thesouthwest corner point of the property. The second point is located on the east lot line and
is measured approximately 140 Feet north of the southeast corner of the lot. North of this line,
compressible natural soils exist, and south of this line, Firm natural soils exist.
The special foundation design that was used successfully cn Lot 8 oF La Costa Greens
-
.ENTON LNOma!l!“INO. INC
-
-
-
-
-
-
.
with a similar soil condition is recommended for this development or some such similar design.
It is also anticipated that potentially expansive soils may be exposed after Fwndation
trench excavation or exist beneath the bottom of the concrete slab m grade unless all building
areas are Filled with 3 feet of non-expansive soils under cmtinuous engineering inspection
during site grading. In wder to minimize possible adverse effects of these expansive scilr on
the performance of Future building Fwndatims and concrete slabs m gmde, special design and
precautimary measures should also be taken to design the Footings and the cmcrete slabs m
grade. The suggested minimum measures to accomplish this goal are as follows:
1. Isolated interior piers should not be used. Continuous Footings should be used
throughout, and these should be placed at a minimum depth of two feet below the
lowest odjocent exterior final ground surface.
2. Reinforce and intercmnect continuously with steel bars all interior and exterior
Footings with at least me #5 bar at 3 inches above the bottom of all Footings and
at least me #5 bar placed 1 l/2 inches below the top of the stems of the Footings.
Additional reinforcing steel may be required to reduce the adverse effects of
pcesible differential settlements similar to that used m Lot 8.
3. Use raised wood floors that span between continuous Footings, or reinforce all
concrete slabs with at least 6 x 6 = lO/lO woven wire Fabric and provide o minimum
of 4 inches of 3/4 gravel, then a moisture vapor barrier covered with 2 inches of
sand below slabs under living area.
4. Separate garage slabs From perimeter footings by l/2 inch thickness of constructim
felt or equivalent, to allow independent movement of garage slabs relative
to perimeter Footings.
-
-
mv4TON CNOINLLIINQ. INC.
-
5. Provide positive drainage oway From all perimeter Footings to a horizontal distance
of at least 6 Feet outside the footing walls.
It is recommended that the bearing soils exposed at the bottom of foundotion trench
excavations be inspected by a soils engineer before placing steel reinforcement and pouring concrete.
Respectfully submitted,
BENTON ENGINEERING, INC.
By &#A~-~ ~_
&E ‘No.
Uf Civil Engineer
19913 -
-
Reviewed by WGe
, Civil Engineer 4
RCE No. 10332 -
- Distributiiwl: (7) Frederick J. Meyer, A. I.A.
- SHS/PHB/c
-
-
m?JKnd LNOINIL”INO. INC
-
-
.-
-
-
-
-
-
-
-
-
_.
--
BENTON ENGINEERING. INC.
APPLIED *o,L MEC”ANICS - FO”NDATION.
SB.0 RU,FIN ROID s*r4 D,eGo. CIL,CORNII **I23
PHILIP HENKING BENTON C”s*ID.N,. ClYlL ‘I1aIWes” Tl!LIC”OYI ,7,., SaLless
APPENDIX B
Sampling
The undisturbed soil samples are obtained by forcing a special sampling tube into the
undisturbed soils at the bottom of the boring, at frequent intervals below the ground surface.
The sampling tube consists of a steel barrel 3.0 inches outside diameter, with a special cutting
tip on one end and o double ball valve on the other, and with a lining of twelve thin brass
rings, each one inch long by 2.42 inches inside diameter. The sampler, connected to a twelve
inch long waste barrel, is either pushed or dl-iven approximately 18 inches into the soil and a
six inch section of the center portion of the sample is taken. for labratory tests, the soil being
still confined in the brass rings, after extraction from the sampler tube. The samples are taken
to the laboratory in close Fitting waterproof containers in order to retain the field moisture until
completion of the tests. The driving energy is calculated as the average energy in Foot-kips
required to force the sampling tube through one Foot of soil at the depth at which the sample is
obtained.
Shear Tests
The shear tests are run using a direct shear machine of the strain control type in which
the rate of deformation is approximately 0.05 inch per minute. The machine is so designed that
the tests are made without removing the samples from the brass liner rings in which they are
secured. Each sample is sheared under a normal load equivalent to the weight of the soil above
the point of sampling. In some instances, samples are sheared under various normal loads in
order to obtain the internal angle of friction and cohesion. Where considered necessary, samples
are saturated and drained before shearing in order to simulate extreme field moisture conditions.
Consolidation Tests
The apparatus used For the consolidation tests is designed to receive one of the one inch
high rings of soil as it comes From the Field. Loads are applied in several increments to the upper
surface of the test specimen and the resulting deformations are recorded at selected time intervals
for each increment. Generally, each increment of load is maintained on the sample until the rate
of deformation is equal to or less than l/l0000 inch per hour. Porous stones are placed in contact
with the top and bottom of each specimen to permit the ready addition or release of water.
Expansion Tests
One inch high samples confined In the brass rings are permitted to air dry at 105’ F for
at least 48 hours prior to placing into the expansion apparatus. A unit load of 500 pounds par
sqquare Foot is then applied to the upper porous stone in contact with the top of each sample. Water
is permitted to contact both the top and bottom of each somple through porous stoner. Continuous
observations are made until downword movement stops. The dial reading is recorded and expansion
is recorded until the rate of upward movement is less than l/10000 inch par hour.