Loading...
HomeMy WebLinkAboutCT 79-27; GROVE APARTMENTS; UPDATE SOIL AND GEOLOGIC INVESTIGATION; 1979-12-06• • • • •• • '! • • • } C,7'-Z1 -UPDATE SOIL AND GEOLOGIC INVESTIGATION PUEBLO DEL ORO (GROVE APARTMENTS) CARLSBAD, CALIFORNIA For Broadmoor Homes, Inc. 3911 Sorrento Valley Boulevard Suite B San Diego, California 92111 .' • • • • • \ ~ ,I • • • " . 3467 Kurtz Street San Diego. California 92110 714·224·2911 Woodward·Clyde Consultants Telex 697·841 December 6, 1979 Project No. 5933lW-UDOl Revised: October 20, 1980, Broadmoor Homes, Inc. 3911 Sorrento Valley Boulevard Suite B San Diego, California 92111 Attention: Mr. Jim Henry UPDATE SOIL AND GEOLOGIC INVESTIGATION PUEBLO DEL ORO (GROVE APARTMENTS) CARLSBAD, CALIFORNIA Gentlemen: We are pleased to provide the accompanying report, which presents the results of our update soil and geologic study at the site of the proposed Pueblo del Oro subdivision (previously known as Grove Apartments) • The report presents our conclusions and recommendations pertaining to the project, as well as the results of our field explorations and laboratory tests. Our engineer and geologist assigned to this project are Messrs. rHchael R. Rahilly and Robert Dowlen respectively. If you have any questions, please give us a call. Very truly yours, WOODWARD-CLYDE CONSULTANTS ~..Jk~. Daryl Streiff ~ C.E.G. 1033 DS/RPW/MRR/RD/rs Attachment (6) Broadmoor Homes, Inc. (2) Roy L. Klema Consul ling Engineers. Geologists and Environmental SCientists Offices In Other Principal CIties Richard P. While R.E. 21992 .' • • • • • • • .. ~- project No. 5933lW-UDOl Woodward· Clyde Consultants TABLE OF CONTENTS PURPOSE AND SCOPE OF INVESTIGATION REVIEW OF PREVIOUS SOIL AND GEOLOGIC STUDIES PROJECT DESCRIPTION FIELD INVESTIGATION AND LABORATORY TESTING SUMMARY OF SITE, SOIL AND GEOLOGIC CONDITIONS Landslides Faulting Seismicity Ground Water DISCUSSION, CONCLUSIONS, AND RECOMMENDATIONS Faulting Ground Water Liquefaction Potential Landslides Slope Stability Landslide Areas Existing Cut Slopes Fill Slopes General ·1 2 3 4 4 5 5 7 7 8 8 8 9 10 10 10 12 13 13 '. I , • • • • .' • • project No. 59331W-UD01 Woodward· Clyde Consultants TABLE OF CONTENTS (continued) Surface Preparation and Earthwork Foundations Retaining Walls 'RISK AND OTHER CONSIDERATIONS FIGURE 1 SITE PLAN Appendix A -FIELD INVESTIGATION FIGURE A-1 -KEY TO LOGS FIGURES A-2 THROUGH A-22 -LOGS OF TEST BORINGS AND TEST PITS APPENDIX B -LABORATORY TESTS FIGURES B-1 AND B-2 -GRAIN SIZE DISTRIBUTION CURVES FIGURE B-3 -FILL SUITABILITY TESTS APPENDIX C -PROPOSED FILL AND SUBSURFACE DRAINS APPENDIX D -GUIDE SPECIFICATIONS FOR TYPICAL BUTTRESS APPENDIX E -SPECIFICATIONS FOR CONTROLLED FILL APPENDIX F -1972 REPORT APPENDIX G -1973 REPORT 14 16 17 18 A-1 B-1 C-1 D-1 E-1 F-1 G-1 • • • • • • • • • Project No. 59331W-UDOl Woodward· Clyde Consultants UPDATE SOIL AND GEOLOGIC INVESTIGATION PUEBLO DEL ORO (GROVE APARTMENTS) CARLSBAD, CALIFORNIA PURPOSE AND SCOPE OF INVESTIGATION This report presents the results of our soil and geological investigation at the site of the proposed Pueblo del Oro subdivision. The site is south of Marron Way and west' of El Camino Real, in the city of Carlsbad, California. The purpose of our update investigation is to assist Broadmoor Homes, Inc., and their consultants in evalu- ating the property and in project design. This report pre- sents our conclusions and/or recommendations regarding exist- ing surface and subsurface soil and geologic conditions, grading-and foundation design; specifically, buttressing of existing landslide areas, disposition and/or treatment of compressible and expansive soils, excavation characteristics of the on-site material, suitable types and depths of founda- tions, and allowable soil bearing pressures for foundations and retaining walls. We have also included conclusions regarding the presence of faulting and materials susceptible to liquefaction. • • • • • • • • • e, • Project No. 59331W-UD01 Woodward· Clyde Consultants REVIEW OF PREVIOUS SOIL AND GEOLOGIC STUDIES A soil investigation of the general area, including the site, was made by Woodward-Gizienski & Associates in 1972. The report of that study entitled IISoil and Geologic Investigation for the Proposed Hosp Grove Apartments, Carls- ~ bad, California, II is dated August 25, 1972 (Appendix F). That report indicates the site is underlain by the Eocene age La Jolla Group which includes the landslide-prone Delmar Formation. In some areas, the La Jolla Group is overlain by a draping terrace deposit of generally granular Pleistocene. age materials. Large di"ameter test borings performed for that investigation indicated several landslide zones or bedding plane faults on the site. The report recommended removing one active landslide and installing a subsurface drainage system. The entire site was graded into a series of large, flat pads in 1972. site preparation, compaction, and testing were done between May 17 and December 19, 1972 under the observation of representatives of Woodward-Gizienski & Assoc- iates. The results of that work are summarized in their report entitled "Final Report of Engineering Observation and Compaction Testing, Grove Apartments, Carlsbad, California," dated March 1, 1973 (Appendix G). During th'at grading, 2 • • • • • • • • • • fit Project No. 59331W-UDOI Woodward· Clyde Consultants highly expansive soil was undercut 2 feet in the level por- tion of some of the pads and replaced with properly com- pacted, nonexpansive soils. PROJECT DESCRIPTION The site is divided into two main areas. The southern portion of the site is south of Hosp Way and west of EI Camino Real. The northern portion of the site is north- west of the southern portion and lies between Marron Road and Hosp Way. The undated plans entitled "Grading Plan, Carlsbad Tract 79-27, II prepared by Roy L. Klema, Engineers Inc., indicate that the site will be regraded to form building pads for the construction of one-to three-story, multi-family apartment or condominium type structures. The building pad locations will be significantly different from those graded in 1972. The present plans also indicate that maximum cuts and fills will be on the order of 20 feet and 30 feet, re- specti vely and that cut and fill slopes wili have maximum heights on the order of 20 feet and 70 feet, respectively and maximum slope inclinations of 1-1/2 to 1 (horizontal to vertical) . 3 • • • • • • • • • • • Project No. 59331W-UDOl Woodward· Clyde Consultants FIELD INVESTIGATION AND LABORATORY TESTI~G To supplement the field work done for the 1972. soil investigation, ten large diameter test borings and 15 test pits were made at the approximate locations shown on Fig. 1. Samples were recovered from the excavations and transported to our laboratory for inspection and testing. A Key to Logs is presented in Appendix A as Fig. A-I. Simplified boring and test pit logs are presented on Figs. A-2 through A-22. The descriptions on the logs are based on sample inspection and laboratory test results. The results of the laboratory tests are shown in Appendix B. The field investigation and laboratory testing pr?grams are discussed in Appendixes A and B. SUMMARY OF SITE, SOIL AND GEOLOGIC CONDITIONS The subject site was graded in 1972. This grading has produced several large cut-fill pads and associated roadways in both parts of the site. These pads and roadways have been subjected to considerable erosion and contain numerous erosion gullies up to 10 feet in depth. Large cut slopes are present along the southern boundaries of both parts of the site. These cut slopes are up to 60 feet in height and are inclined at 1-1/2 to 1 with 8 . foot wide benches at 25 foot intervals. Our field recon- naissance indicates the presence of weak clay seams wi thin these existing cut slopes. 4 • • • • • • • • • • • Project No. 59331W-UDOl Woodward· Clyde Consultants Landslides The presence and location of existing ancient landslides on the site was noted in the 1972 soil investi- gation report. A review of that report indicates that slide planes were found in the large diameter test borings at depths up to 45 feet below original ground surface. Test borings made for the current investigation in the northwest part of the site were made to more fully evalu- ate the areal extent and depths of the slide planes in this area. These additional large diameter borings indicate that the landslides in this area are apparently a series of small- er landslides rather than one or two larger landslides as previously suspected. Figure 1 indicates the approximate locations of existing landslides, weak clay seams exposed in cut slopes, and faults noted during the 1972 field investi- gation and our recent field investigation. Faulting - A small fault has been identified in the high cut slope at the extreme southern end of the site. The faul t offsets the La Jolla Group sediments about 30 feet vertically. The fault strikes generally north-south to slightly northeast, and has a nearly vertical dip. The width of the fault varies from approximately 1/2 inch to 3 inches. Material in the fault is stiff to very stiff, brown to gray, silty clay. 5 • • • • • • • • • • • Project No. 59331W-UDOl Woodward· Clyde Consultants Aerial photographs and topographic maps of the general site area prior to the 1972 grading show no linea- tions, vegetation, or topographic features that would indi- cate faulting. In addition, the fault exppsure in the south- ern cut slopes does not shown any offset or displacement of the residual topsoil contact. Dating of the residual topsoil layer in the Carlsbad-Oceanside area suggests that such materials are on the order of several thousand years old. No apparent vertical offset was observed in expo- sures of the capping Pleistocene terrace deposit south of the site. The Pleistocene terrace is tentatively correlated to the early Pleistocene age Lindavista Formation (approximately 50,000 to 3,000,000 years old). Two to possibly four small breaks or fractures were noted subparallel and east of the fault. These features show relatively little or no vertical offset (0 to 4 feet), have a general north-south strike, and a near vertical dip. The seams are 1/16 inch to 1/2 inch wide, and are composed of light gray to white calcareous silt. These features appear to be a~justment ,planes formed after deposition and during consolidation of the sediments. Therefore in our opinion, these phenomenon are depositional features and probably not tectonic faults. 6 • • • • • • • • • • • Project No. 59331W-UDOl Woodward· Clyde Consultants The closest fault zone to the si te along which earthquakes greater than Richter Magnitude 4.0 have been recorded .is the Elsinore Fault zone, mapped approximately 23 ./ miles east-northeast of the site. The major faulting closest to the site is in an offshore inferred zone of deformation, located about 8 to 10 miles west of the site. Some geolo- gists have~pos~tila~ed this zone as the northern extension of the Rose Canyon Fault zone. Seismicity The Carlsbad-Oceanside area is considered to be tectonically stable because of its low historical seismicity; however, ground shaking is possible from earthquakes gener- ated on distant faults, such as the Elsinore Fault zone. Additionally, many geologists believe future earthquakes could occur along the local Rose Canyon Fault. It has been estimated that a Richter Magnitude 6.0 earthquake could have an average recurrence interval of 100 to 200 years. Ground Water During the 1972 investigation, perched ground water was observed in the La Jolla Group sediments at depths rang- ing from 21 to 46 feet. During our recent site inspection, water seeps and exotic hydrophytes were observed in and at the base of a cut slope at the extreme southwest corner of 7 •• I • • • • • • • • • • Project No. 5933lW-UDOl Woodward·Clyde Consultants the site. We also observed several areas of poor drainage on unfinished pads. These areas appear to collect and hold .... water as seasonal ponds. DISCUSSION, CONCLUSIONS, AND RECOMMENDATIONS Our current studies of the site indicate that, with the exception of massive erosion, site conditions have not changed significantly since the end of the grading in 1972. Existing ancient landslides and weak clay seams in cut slopes will require consideration when developing new plans for the site. Faulting Our investigation 'identified no significant or maj'or faults crossing the site. In our opinion, the small faul t on the east side of the site is a minor and ancient structural feature. It is our further opinion that, the probability of ground surface rupture (faulting) at the site~ is very low. Ground Water In our opinion, conditions in the proposed develop- ment indicate probable future ground water seepage. Seep v areas will probably occur where permeable sand lenses are 8 • • • • • • • • • • • Project No. 59331W-UDOl Woodward·Clyde Consultants interbedded with less permeable sediments. In our opinion, no shallow permanent ground water table exists on the site. We anticipate that the present water seepage in the extreme southwest end of the site will be collected in sub-v drains installed during recommended slope buttressing (see Slope stability). We recommend that positive measures be taken to properly finish· grade each lot after the residential struc- tures and other improvements are in place so that drainage waters from the lots and adjacent properties are directed off the lots and away from house foundations, floor slabs, and slope tops. Even with these provisions, experience has shown that a shallow ground water or surface water condition can and may develop in areas where no such ground water condition existed prior to site development; this is particularly true in years of heavy rainfall, and in residential subdivisions where a sUbstantial increase in surface water infiltration results from landscape irrigation. Liguefaction Potential The depth to the regional ground water table on the site is estimated to be greater than 50 feet. In our op1n- 10n, this depth, together with the dense nature of the natu- ral soil on the site, generally precludes the possipility of liquefaction. 9 • • • • • • • • • • • Project No. 59331W-UD01 Woodward-Clyde Consultants Landslides Two landslide areas are present in the northwestern ,. part of the site. These landslides were noted during the 1972 investigation and were further evaluated during the current field investigation. Additional borings placed within the landslide areas indicated that the larger western landslide area is apparently a series of shallow landslides rather than one or two more extensive landslide masses as expected as a result of the 1972 investigation. The upper portions of the eastern landslide mass were removed during. grading in 1972. Slope Stability Landslide Areas -Slope stability analyses of the larger landslide area were performed by computer· methods, using the Morgenstern-Price wedge failure approach. The records of analyses are not included in this report, but are available for review if requested. Based on our inspection of the existing slope conditions and our analyses of land- slide conditions on the site, it is our opinion that the existing landslides, 1n a gross sense, have a moderate proba- bility of failure, according to current state-of-the-art analyses and under current site conditions. Based on our 10 • • • • • • • • • • • Project No. 59331W-UDOI Woodward-Clyde Consultants recent experience with landslides and weak clay seams in similar materials, slide plane shear strengths used in our current analysis are as follows: Location Graben area Neutral block GRABEN AREA ~' (deg) 24 6 c' (psf) o o ___ --GROUND SURFACE SLIDE PLANE TYPICAL SLIDE CONFIGURATION (NO SCALE) y (pcf) 120 120 The 1972 report included slope stability analyses performed by . computer methods. Factors of safety given in that report were obtained using soil strength parameters higher than those ,presently considered representative of landslide plane strengths. In our opinion, the large fill proposed north of the existing large western landslide area and proposed sub- surface drains will effectively buttress this area. Our analyses indicate that this fill area will result in a calcu- lated factor of safety against deep-seated failure in excess of 1.5 under static conditions. 11 ' ... • • • • • • • • • • • Project No. 59331W-UDOI Woodward· Clyde Consultants We recommend that subsurface drains be installed on the original ground surface prior to placing the fill mater-- ial. A typical cross-section of the proposed fill and the subsurface drains is shown as Appendix c. We recommend that a minimum 5-foot thick compacted mat be constructed in the graben areas of the landslide " masses. Much of this mat is already in place, but additional grading will remove portions of it. The pads affected are r the proposed cut pads south of Hosp Way in the northwestern part of the site. In our "opinion, grading done in the area of the smaller landslide effectively stabilized the mass. The upper portions of the slide material were removed and fill was placed in the-canyon below' the slide i' this fill serves as a buttress. Existing cut Slopes -Weak clay seams are t>resent ln the existing cut slopes along the southern boundaries of both the northwestern and southeastern parts of the site. We recommend that drained buttress fills be placed in these slopes. The approximate location of the buttresses are shown on Fig. 1. A typical buttress scheme is shown on Appendix D •. Retaining walls may be required at the toe of the ~ buttress at the corner of Hosp Way and an unnamed access road between the northwest and southeast portions of the site in 12 • • • • • • • • • • • Project No. 59331W-UD01 Woodward· Clyde Consultants order to construct the 1-1/2 to 1 inclined slopes planned for this area. It is our understanding that this corner will be cut down and oversteepened locally to provide access for equipment during grading then rebuilt later. We estimate that the volume of material involved in buttress construction in these areas with present pad grades will range from 40,000 to 50,000 cubic yards. Fill Slopes -We expect that fill slopes, including buttress fill slopes, will be inclined at 1-1/2 to 1 or flatter and will have maximum heights on the order of 70 feet. We also expect that a-foot wide slope benches will be placed at 25-foot fill height intervals in accordance with local standards. Based on our analyses, the expected fill slopes will have indicated factors of safety of at least 1.5 under static conditions if constructed in accordance with specifications and the recommendations contained herein. General -Stability analyses require the use of parameters selected from a range of possible values; thus, there is a finite possibility that slopes having calculated factors of safety as indicated above could become unstable. In our opinion, the probability of deep-seated failure is low and it is our professional judgment the slopes can be con- structed as indicated above. 13 • • • • • • • • • • Project No. S9331W-UD01 Woodward.Clyde Consultants We recommend that all slopes be drained, planted,~' and maintained to help control erosion and surface sloughing. Special care should be taken by the grading contractor to properly compact fill to each slope face. We recommend that fill slope faces be backrolled at maximum 4-foot fill height intervals during construction and the 2 to 1 inclined fill slopes be trackwalked upon completion of the fill slope. In our experience, fill slopes constructed at inclinations steeper than 2 to 1 are partic'ularly susceptible to shallow slope sloughing during periods of rainfall, heavy irrigation or upslope surface runoff. Periodic maintenance may be required, including the rebuilding' of the outer 18' to 36 inches of the slope may be required. Sloughing of fill slopes can be reduced by overbuilding by at least 3 feet and cutting back to the desired slope inclination. Surface Preparation and Earthwork We recommend that all earthwork be done in accord- ance with the attached Specifications for, Controlled Fill (Appendix E). The grading should be observed and compacted fills tested by our firm. We recommend that a preconstruction conference be held at the site. Special soil handling can be discussed at that time. 14 • • • • • • • • • .' Project No. 59331W-UDOI Woodward-Clyde Consultants Test borings and pits made during the current investigation indicate that expansive soil may be wi thin 2 .... feet of pad grade in several of the proposed cut areas. We recommend that these expansive soils be excavated a minimum of 2 feet below pad grade in building pads and 1 foot in pavement areas and replaced with properly compacted nonexpan- sive soil available on the site. The building pads expected to have expansive soil within 2 feet of pad grade are shown on Fig. 1. We recommend that the actual areas requiring excavation and replacement be evaluated in the field at the time of grading. We estimate that approximately 500 ,,00.0 ..... cubic yards of expansive soils will require excavation and replacement. We recommend that the upper 2 feet of fill in building areas and the upper 1 foot in pavement· areas be composed of nonexpansive soil available at the site. The expansive clay soils can be placed in the deeper fill areas" and properly compacted. We recommend that all cut slopes and buttress cuts be inspected by an engineering geologist from our firm during grading to evaluate actual geologic conditions, and to pro- vide design modifications if needed. 15 • • • • • • • • • • Project No. 59331W-UDOI Woodward-Clyde Consultants Foundations We recommend that footings for two-to three-story, residential structures founded in natural or properly compac- ted, nonexpansive soil be designed for an allowable soil bearing pressure of 2,000 psf (total dead plus live loads). In our opinion, this pressure can be increased by no more than one-third for loads that include wind or seismic forces. We recommend that all footings be founded a minimum of 12- inches below lowest adjacent grade, have a minimum width of 12 inches, and at least one No. 4 rebar top and bottom. We- further recommend that flqor slabs-on-grade be a minimum of 4 inches thick and be reinforced at mid height with flat sheets of 6x6, 10/10 welded wire fabric. We recommend providing positive drainage around all structures, and no ponding of water be allowed adj acent to footings. We recommend that structures not able to tolerate differential settlements (such as foundations, concrete decks, walls, etc.) not be located within 8 feet of a slope top. We recommend that footings located within 8 feet from a slope top be extended in depth until the outer bottom edge of the footing is at least 8 feet horizontally from the outside slope face. 16 • • • • • • • • • • Project No. 59331W-UD01 Woodward· Clyde Co~sultants Retaining Walls We recommend that cantilevered retaining walls with 1-1/2 to 1 inclined backfill surfaces be designed to wi th- stand the pressure exerted by an equivalent fluid weight of 70 pcf. This value assumes that on-site granular soils will be utilized for backfill and that there will be no surcharge " load, such as adjacent footings or vehicle traffic acting on the wall. In order to provide resistance for design lateral loads we recommend using the pressure exerted by an equiv- alent fluid weight of 400 pcf. This value is for footings or shear keys poured neat against properly compacted granular fill soils or granular undisturbed soil. If friction alone is to be used to resist lateral loads, we recommend that a coefficient of friction· between soil and concrete of 0.45 be used for design in lateral resistance. If it is desired to combine frictional and passive resistance in design, we recommend that the friction coefficient be reduced to 0.35. RISK AND OTHER CONSIDERATIONS We have only observed a small portion of the pert- inent soil and ground water conditions. The recommendations made herein are based on the assumption that soil conditions 17 • • • • • • • • • • • Project No. 59331W-UDOl Woodward· Clyde Consultants do not deviate appreciably from those found during our field investigation. If the plans for site development are changed, .or if variations or undesirable geotechnical condi- tions are encountered during construction, the geotechnical consultant should be consulted for further recommendations. We recommend that the geotechnical consultant review the foundation and grading plans to verify that the intent of the recommendations presented herein has been properly interpreted and incorporated into the contract documents. We further recommend that the geotechnical con- sultant observe the site grading, subgrade preparation under concrete slabs and paved areas, and foundation excavations. It should also be understood that California, including San Diego, is an area of high seismic risk. It is generally considered economically unfeasible to build totally earth,quake-resistant structures i therefore, it is possible that a large or nearby earthquake could cause damage at the site. Professional judgments presented herein are based partly on our evaluations of the technical information gathered, partly on our understanding of 'the proposed con- struction, and partly on our general experience in the geo- technical field. Our engineering work and judgments rendered meet current professional standards. We do not guarantee they performance of the project in any respect. 18 .' • • • • • • • • • • Project No. 59331W-UD01 Woodward· Clyde Consultants This firm does not practice or consult in the field of safety engineering. We do not direct the contractor IS operations I and we cannot be responsible for the safety of other than our own personnel on the site; therefore I the safety· of· others is' the. responsibility. of' the· contractor. The contractor should notify the owner if he considers ·any of the recommended actions presented herein to be unsafe. 19 • • • Cut Off Trench Drain Buttl~ess Fill 1 ~. 1 Siope-......., 2· • • Property Line Topsoil Formational Soil • • Class II Filter State Specification • • •• Native Soil . 2-LJI TOPSOIL . . . .." ... . . .. . ····L /-, .:." 12" L ~-.r .l-1-.LJ 1/ 6" Perforated PiPe~ T (ADS Corrugated plastic) slope to drain TRENCH DETAIL No Scale CUT OFF TRENCH DRAIN SPECIFICATIONS PUEBLO DE ORO • DRAWN BY: mrk I CHECKED BY: >. PROJECT NO: 59331\V-FCOl I DATE: 5-27-82 FIGUR~NO: 1 WOOOWARO-Cl YDE CONSULTANTS :. • • • • • • • • • • • Project No. 59331W-UDOl Woodward· Clyde Consultants APPENDIX A FIELD INVESTIGATION Ten exploratory borings and 15 test pits were advanced at the approximate locations shown on Fig. 1. The field work was performed by personnel September 8 through September 12, 1980. from our firm on The test borings were advanced with a 30-inch bucket auger and the test pits were made with a 24-inch wide tractor mounted backhoe. Samples of the subsurface materials were obtained from the excavations, sealed to preserve the natural moisture content of the sample, and returned to the laboratory for examination and testing. The locations of each excavation and the elevations of the ground surface at each location were estimated from the grading plans. • • • • • • • • • • • Location Boring Number Elevation DEPTH L..-._T..,E_ST_D_ATT'A_~.OTHER SAMPLE IN r FEET -MC -00 -ac TESTS NUMBER SOIL DESCRIPTION -12 110 65 Very dense, damp, brown silty sand (SM) . - ~~ WATER LEVEL J At time of drilling or as indicated. SOIL CLASSIFICATION Soil Classifications are based on the Unified Soil Classification System and include color, moisture and consistency. Field descriptions have been modified to reflect results of laboratory analyses where appropriate. -DISTURBED SAMPLE LOCATION Obtained by collecting the auger cuttings in a plastic or cloth bag. L..-. __ DRIVE SAMPLE LOCATION MODIFIED CALIFORNIA SAMPLER Sample with recorded blows per foot was obtained with a Modified California drive sampler (2" inside diameter, 2.5" outside diameter) lined with sample tubes. The sampler was driven into the soil at the bottom of the hole with a 140 pound hammer falling 30 inches. L..-. _____ INDICATES SAMPLE TESTED FOR OTHER PROPERTIES GS -Grain Size Distribution CT -Consolidation Test LC -Laboratory Compaction UCS -Unconfined Compression Test' Test PI - A tterberg Limits Test OS - 0 irect Shear Test ST -Loaded Swell Test TX-Triaxial Compression Test CC -Confined Compression Test NOTE: In this column the results of these tests may be recorded where applicable. '----------BLOW COUNT Number of blows needed to advance sampler one foot or as Indicated. L..-. __________ DRY DENSITY Pounds per Cubic Foot "-------------MOISTURE CONTENT Percent of Dry Weight NOTES ON FIELD INVESTIGATION 1. REFUSAL indicates the inability to extend excavation. practically. with equipment being used in the Investigation. KEY TO LOGS GROVE APARTMENTS DRAWN BY: ch I CHECKED BY: MfZf4 PROJECT NO: 59331N-UDOl I DATE: 10-3-80 I FIGURE NO:A-l WOODWARD·CLYDE CONSULTANTS • • • • • • • • • • • DEPTH IN r---'---~--~ FEET 5 10 15 20 25 30 35 40 SAMPLE NUMBER 1-1 1-2 1-3 1-4 1-5 Boring 1 SOIL DESCRIPTION Moist, gray, clayey sand FILL Very dense, moist, gray, silty sand (SM) EOCENE SEDIMENTS Hard, moist, gray-brown, silty clay (CH) 'EOCENE SEDIMENTS ~" remoulded clay seam _ _ _ _ _ _ Grading to _ _ _ _ _ _ __ Very dense, moist, gray-brown, silty sand (SM) EOCENE SEDIMENTS Bottom of Hole • For description of symbols, see Figure A-1 DRAWN BY: ch LOG OF TEST BORING 1 GROVE APARTMENTS CHECKED BY: /V\IZ PROJECT NO: 5933Hv-UDOl DATE: 10-1-80 FIGURE NO: A-2 WOODWARD·CL YDE CONSULTANTS • • • • • • • • • • • DEPTH IN t---.----..----f FEET 5 10 15 20 25 30 35 41 SAMPLE NUMBER 2-1 2-2 2-3 2-4 2-5 2-6 Boring 2 Approximate El. 145' SOIL DESCRIPTION Damp, light gray-brown, silty sand (SM) F·ILL Hard, damp, brown, silty clay (CH) EOCENE SEDIMENTS _ _ _ _ _ _ _ _ Grading to ______ _ Very dense, damp, light gray-brown, silty sand (SM) EOCENE SEDIMENTS Hard, damp, dark brown, silty clay (CH) EOCENE SEDIMENTS ~" remoulded firra clay seam • For description of symbols, see Figure [\-1 Bottom of Hole LOG OF TEST BORING 2 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY: rM-<4 PROJECT NO: 59331W-UDOl I DATE: 10-1-80 I FIGURE NO: A-3 WOOOWARO·CL YOE CONSULTANTS • • • • • • • • • • • DEPTH IN i---r----r---i FEET 5 10 15 20 25 30 35 40 SAMPLE NUMBER 3-1 3-2 3-3 GS,PI 3-4 3-5 3-6 3-7 3-8 Boring 3 Approximate El. 161' SOIL DESCRIPTION Damp, light gray-brown, clayey sand FILL Moist, dark gray to dark brown, sandy to silty clay FILL Damp, 'dark brown to brown, silty sand FILL Irregular contact Very stiff, moist, dark gray, Silty clay (CH) with fractures EOCENE SEDIMENTS Very dense, damp, silty to clayey sand (SM-SC) with interbeds of silty clay EOCENE SEDIMENTS 'For description of symbols, see Figure A-I Continued on next page LOG OF TEST BORING 3 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY:JVICUZJ PROJECT No:5933itv-UDOl I DATE: 10-1-80 I FIGURE NO: A-4 WOODWARD·CL YDE CONSULTANTS • • • • • • • • • • • DEPTH .OTHER SAMPLE F~~T t---r----r-"""""i TESTS NUMBER 3-9 4 3-10 5 5 3-11 3-12 65~--~----~--~--~--~-- 70 75 8 "For description of symbols, see Figure A-I Boring 3 (Cont'd) SOIL DESCRIPTION (Continued) very dense, damp, silty to clayey sand (SM-SC) with interbeds of silty clay EOCENE SEDIMENTS Very dense, damp, gray-brown, clayey sand (SC) EOCENE SEDIMENTS Bottom of Hole LOG OF TEST BORING 3 (CONT'D) GROVE APARTMENTS DRAWN BY: ch I CHECKED BY: JWZi4-PROJECT No:5933IW-UDOl I DATE: 10-1-80 I FIGURE NO: A-5 WOODWARD·CL VDe CONSULTANTS • • • • • • • • • • • DEPTH .OTHER IN ~--~--~--~ FEET TESTS GS,PI 4-1 4-2 1 4-3 1 4-4 25 4-5 30 35 4-6 40 .... ---'------- *For description of symbols, see Figure A-I Boring 4 Approximate El. 123' SOIL DESCRIPTION Very dense, moist, light gray-brown, clayey sand (SC) EOCENE SEDIMENTS Hard, moist, brown, sandy clay to clayey sand (CL-SC) EOCENE SEDIMENTS - - --Grading to - - Very dense, damp, light gray-brown, silty sand (SM) EOCENE SEDIMENTS Hard, damp, brown, sandy to silty clay (CL-CH) ; feactured EOCENE SEDIMENTS Very dense, damp, light gray-brown, sHty sand (SM) with some fracture EOCENE SEDIMENTS Hard, damp, brown, silty clay (CH) ; fractured EOCENE SEDIMENTS Continued on next paoe LOG OF TEST BORING 4 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY: tJUU2I. PROJECT NO: 5933HI-SIOI I DATE: 10-1-80 I FIGURE NO: A-6 WOODWARD·CL YDE CONSULTANTS • • • • • • • 6 • 7 • 7 • 'For descrrption of symbols, see Figure A-l • DRAWN BY: ch CHECKED BY:jV\ SAMPLE NUMBER 4-8 Boring 4 (Cont'd) SOIL DESCRIPTION (Continued) hard, damp, brown, silty clay; fractured EOCENE SEDIMENTS Grading to Hard, sand brown, sandy clay to clayey EOCENE SEDIMENTS Very dense, damp, light gray-brown, silty sand (SM) EOCENE SEDIMENTS Bottom of Hole LOG OF TEST BORING 4 (CONT'O) GROVE APARTMENTS PROJECT NO: 5933Hv-SIOl DATE: 10-1-80 FIGURE NO: A-7 WOODWARD·CLYDE CONSULTANTS • • • • • • • • • .' • DEPTH IN ~--~--~--~ FEET 2 3 3 4 • For description of symbols, see Figure SAMPLE NUMBER 5-1 5-2 5-3 5-4 5-5 Boring 5 Approximate El. '141' SOIL DESCRIPTION Dry, light gray-brown, silty to clayey sand FILL Hard, damp, brown, silty to sandy clay (CH) EOCENE SEDIMENTS Fractured - - - - --Grading to - - - - - - - - Very dense, damp, light gray-brown, silty sand .(SM) EOCENE SEDIMENTS Hard, damp, brown, silty clay (CL-CH) with sand EOCENE SEDIMENTS Fracture plane from 20~'-23~' - - - - -Grading to - - - - - - - Very dense, moist, light gray-brown, silty sand (SM) EOCENE SEDIMENTS Hard, damp, brown, silty clay (CH) EOCENE SEDIMENTS Bottom of Hole LOG OF TEST BORING 6 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY:lV\tzlZl PROJECT NO: 5933UI-UDOl I DATE: 10-1-80 I FIGURE NO: A-8 WOODWARD·CLYDE CONSULTANTS • • • • • • • • • • DEPTH IN ~--~---T--~ FEET 5 10 15 20 25 30 35 40 SAMPLE NUMBER 6-1 6-2 6-3 6-4 6-5 6-6 Boring 6 Approximate El. 152' SOl L OeSeRI PTION Damp, light gray-brown, silty to clayey sand FILL Dense, moist, gray to gray-brown, silty to clayey sand (SM-SC) TERRACE DEPOSITS Irregular contact Very dense, moist, gray, silty to clayey sand (SM-SC) EOCENE DEPOSITS Hard, damp, gray-green, saridy to silty clay (CH) EOCENE SEDIHENTS ---_ Grading to ------ Very dense, moist, gray, silty fine sand (SM) EOCENE SEDIMENTS 'For description of symbols, see Figure A-I Continued on next page LOG OF TEST BORING 6 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY: IVI~ PROJECT NO: 59331W-UDOl I DATE: 10-1-80 I FIGURE NO:A-9 WOOOWARO·CL YOE CONSULTANTS • • • • • • • • • r-__ ,-__ ~ __ ~·OTHER TESTS 45 6-7 Boring 6 (Cont'd) SOIL DESCRIPTION (Continued) very dense, moist, silty fine sand (SM) EOCENE SEDIMENTS Hard, damp. gray-green, silty clay (CH) EOCENE SEDIMENTS . 50~--~----~--+-----~----~~---------------------------------------------Bottom of Hole 55 60 ·65 70 75 80 'For description of symbols, see Figure A-l LOG OF TEST BORING 6 (CONT'D) GROVE APARTMENTS DRAWN BY: ch I CHECKED BY: M~f2J PROJECT NO: 59331 W-UDOl I DATE: 10-1-80 I FIGURE NO: A-lO WOOOWARO·CL YOE CONSULTANTS • • .' • • • • • • • • SAMPLE NUMBER 7-1 5 7-2 10 7-3 7-4 15 20 7-5 25 7-6 30 7-7 35 40 Boring 7 Approximate El. SOIL DESCRIPTION Damp, light gray, silty clay FILL Damp, light gray-brown, clayey sand FILL Moist, gray-brown, sandy clay FILL Moist, dark brown, sandy clay FILL Bard, damp, brown, sandy clay (CL) EOCENE SEDIMENTS 128' yery dense, damp, , light gray, silty sand' (SM) EOCENE SEDIMENTS Hard, damp, brown, sandy clay (CL) EOCENE SEDIMENTS Bottom of Hole "For description of symbols, see Figure A-I LOG OF TEST BORING 7 GROVE APARTMENTS DRAWN By:ch I CHECKED BY: MIZ4 PROJECT NO:59331W-UDOl I DATE: 10-1-80 I FIGURE NO:A-ll WOODWARO·CLYDE CONSULTANTS • • '. • • • • • .' • f-_-r-_-.,._---l*OTHER SAMPLE TESTS NUMBER 8-1 5 8-2 10 8-3 15 GS,P 8-4 20 25 8-5 30 35 40 Boring 8 Approximate El. 126' SOil DESCRIPTION Damp, 1 gray-brown, silty sand FILL Damp, gray-brown to brown, sandy clay to clayey sand FILL Damp, gray-brown, sandy clay FILL Very dense, damp, light gray-brown, silty sand (SM) EOCENE SEDIMENTS Hard, damp, gray-brown, sandy clay (CL) EOCENE SEDIMENTS Bottom of Hole • For description of symbols, see Figure A-I LOG OF TEST BORING 8 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY:(V\R!ZJ PROJECT NO: 59331\.l7-UDOl I DATE: 10-1-80 I FIGURE NO: A-12 -WOODWARD·CLYDE CONSULTANTS • • '. • • .' • • • • • DEPTH IN ~--~--~--~ FEET 5 10 15 20 25 30 35 41 • For description of symbols, see Figure SAMPLE NUMBER 9-1 9-2 9-3 9-4 9-5 9-6 9-7 A-I Boring 9 Approximate El. 153' SOIL DESCRIPTION Dry to damp, light gray, silty to clayey sand FILL Damp, gray-brown, clayey sand FILL Medium dense, damp, brown, silty fine sand (SM) TOPSOIL Very dense, damp, red-brown and gray, clayey sand (SC) TERRACE DEPOSITS Very stiff, moist, gray-green, silty clay (CH) EOCENE SEDIMENTS Very dense, damp, gray, silty sand (SM) with interbeds of silty clay EOCENE SEDIMENTS Very dense, damp, light gray-brown, clayey sand (SC) EOCENE SEDIMENTS Bottom of Hole LOG OF TEST BORING 9 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY:N\fZ~ PROJECT NO: 59331W-UDOl I DATE: 10-1-80 I FIGURE NO:A-13 WOOOWARD·CLYDE CONSULTANTS • • • • • • • .' • • • DEPTH TEST DATA -OTHER IN TESTS FEET -MC -DD -BC 5- - 10 - is 20 _ - - - - - • For description of symbols. see Figure Test pit 10 SAMPLE SOIL DESCRIPTION NUMBER Damp, light gray to clayey sand 10-1[ 10-2[ ~ 10-3 r:::.::; 10-4~ 10-5 10-6~ 10-7 10-8r Moist, gray-brown, clay 1\ Bottom of Hole A-I LOG OF TEST PIT 10 GROVE APARTMENTS Approximate El u 15.7 I gray-brown, silty to FILL .. . clayey sand to sandy FILL DRAWN BY: ch I CHECKED BY: MelZ.1 PROJECT NO: 5933Hv-UDOl 1 DATE: 10-1-80 I FIGURE NO: A-14 WOODWARD-CLYDE CONSULTANTS •• • • • • • • • • • • • 10 1 DEPTH IN FEET S_ 10- 1S- ~ __ ~ __ ~ __ ~-OTHER SAMPLE TESTS NUMBER TEITDATA ·OTHER -Me -DD -ac TEITS .1 11-1 11-2 11-3 11-4 SAMPLE NUMBER 12-1 ~ 1= 12-2 1= 12-3 1= 12-4 "'- 12-5 r 12-6 c: 12-7 L ~ :;:;:::::::::::: ,\ \ Test pit 11 te El. 156' SOIL DESCRIPTION Dry to damp, light gray, silty sand FILL Dense, moist, gray-black, silty sand (SM) with some clay RESIDUAL SOIL Very dense, damp, gray-brown, clayey sand (SC) EOCENE SEDIMENTS Very dense, damp, light gray, silty sand (SM) EOCENE SEDIMENTS Very dense, moist, gray-brown, silty to clayey sand (SM-SC) EOCENE SEDIMENTS Bottom of Hole Test pit 12 ApproxiMate E1. 167' SOIL DESCRIPTION Damp to moist, gray-brown to light gray, silty to clayey sand FILL Hard, damp, gray-green, silty clay (CH) EOCENE SEDIMENTS Dense, moist, light gray, silty sand (SM) EOCENE SEDIMENTS Bottom of Hole - • For deSCription of symbols, see Figure A-1 DRAWN BY: ch LOG OF TEST PITS 11 AND 12 GROVE APARTMENTS CHECKED BY:lV\~ PROJECT NO:S933Hl-UDOl FIGURE NO: A-1S WOOOWARD·CLYDE CONSULTANTS • • • • • • • • • • • 1 5 10 15 SAMPLE NUMBER SAMPLE NUMBER 14-1 14-2 14-3 Test pit 13 Approximate E1. 167' SOIL DESCRIPTION Loose to medium dense, dry, light brown, silty sand (SM) RECENT SLOPEWASH Very dense, damp, light gray,' silty sand (SM) EOCENE SEDIMENTS Bottom of Hole Test pit 14 te E1. 168' SOIL DESCRIP"TION Dry, gray, silty sand FILL Very dense, damp, 1iqht gray, silty sand (SM) EOCENE SEDIMENTS Bottom of Hole' • For description of symbols, see Figure A-I LOG OF TEST PITS 13 AND 14 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY:M~PROJECT NO: 59331tv-UD01 I DATE: 10-2-80 I FIGURE NO: A-16 WOOOWARD·CL VDE CONSULTANTS • • • • • • • • • • • 1 DEPTH IN t--"""---r-~ FEET 5 10 15 "For description of symbols, see Figure SAMPLE NUMBER A-I Test pit 15 Approximate El. 191' SOIL DESCRIPTION Very dense, damp, light gray, silty sand (SM) EOCENE SEDIMENTS Bottom of Hole Test pit 16 Approxi~ate El. 188' SOIL DESCRIPTION Very dense, damp, gray-brown, clayey sand to sandy clay (SC-CL) EOCENE SEDIMENTS Very dense, damp, liqht gray, silty sand (SM) EOCENE SEDIMENTS Bottom of Hole LOG OF TEST PITS 15 AND 16 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY:/VlelZ-1 PROJECT NO: 593111-1-UD01 1 DATE: 10-2-80 I FIGURE NO: A-17 WOOOWARD·CLYDE CONSULTANTS • • • • • • • • • • • 1 DEPTH IN ~--~--~--~ fEET 15 'For description of symbols, see Figure SAMPLE NUMBER A-l Test pit 17 Approximate El. 187' SOIL DESCRI'PTION Loose, damp, gray-brown, silty sand (SM) RECENT SLOPEWASH Very dense, moist, red-brown to gray-brown, silty sand (SM) TERRACE DEPOSITS Hard, damp, green-brown, silty to sandy clay (CL-CH); fractures EOCENE SEDIMENTS Very dense, damp, light gray-brown, silty sand (SM) EOCENE SEDIMENTS Bottom of Hole Test Pit 18 ApproxiTIate El. 189' SOIL DESCRIPTION Loose to medium dense, dry, light gray, silty sand (SM) RECENT SLOPEWASH Very dense, damp, light gray-brown, silty sand (SM) EOCENE SEDIMENTS Hard, damp, green-brown, silty to sandy clay (CH) EOCENE SEDIMENTS Bottom of Hole LOG OF TEST PITS 17 AND 18 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY: 1'1\12£1 PROJECT NO: 59331W-UD01 I DATE: 10-2-80 I FIGURE NO: A-18 WOOOWARO·CL YOe CONSULTANTS • • • • • • • • • • • ·OTHER SAMPLE I---r----r---i TESTS NUMBER "For descript,on of symbols, see Figure 19-1 19-2 19-3 19-4 A-l Test pit 19 roximate El. 189' SOIL DESCRIPTION Loose to medium dense, dry, gray-brown, silty sand (SM) RECENT SLOPEWASH Very dense, damp, light gray, silty sand (SM) EOCENE SEDIMENTS Fracture plane at 5' Hard, damp, brown, silty clay (CRY with sand EOCENE SEDIMENTS , _______ Grading to _ _ _ _ _ _ Very dense, damp, light gray-brown, silty \ sand (SM) EOCENE SEDIMENTS --- - - --Grading to - - - Hard, damp, gray-brown, sandy clay to clayey sand (CL-SC) EOCENE SEDIMENTS Bottom of Hole Test pit 20 A~proximate El. 191) SOIL DESCRIPTION Loose to medium dense, dry, light gray-brown, silty sand (SM) RECENT SLOPEWASH Very dense, damp, light gray, silty sand (SM) EOCENE SEDIMENTS Hard, damp, brmvn, silty clay (CH) ; fractured EOCENE SEDHIENTS Very dense, damp, qray-brown, silty sand (SM) EOCENE SEDH1ENTS Fracture plane 8' Very dense, damp, light qray, silty sand (SN) EOCENE SEDINENTS Bottom of Hole LOG OF TEST PITS 19 AND 20 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY: M~ PROJECT NO: 59331W-lJDOl I DATE: 10-2-80 I FIGURE NO: A-19 WOOOWARO·CL YOE CONSULTANTS • • • • • • • • • • • DEPTH IN ~--'----T--~ FEET GS,PI 1 "For description of symbols, see Figure A-I Test pit 21 Approximate El. 135' SOIL DESCRIPTION Loose to medium dense, dry, lignt qray- brown, silty sand (SM) RECENT SLOPEWASH Dry, light gray-brown, clayey sand FILL I Very dense, dry, dark brown.to light brown, I clayey sand (SC) RESIDUAL SOIL L _ _ _ _ _ _ -Grading to _ ---_ _ -_ Hard, damp, brown, sandy clay to clayey sand (CL-SC); fractured EOCENE SEDIMENTS Fracture plane at S' Very dense, damp, light gray, silty sand (SH) EOCENE SEDIMENTS Very dense, damp, gray, silty sand and brown, sandy clay (SM-CL) Bottom of Hole LOG OF TEST PIT 21 GROVE APARTMENTS EOCENE SEDIMEN~S DRAWN BY: ch I CHECKED BY:~_PROJECT NO: 59331W-UDOl I DATE: 10-2-80 I FIGURE NO:A-20 WOODWARD·CL YDe CONSULTANTS • • • • • • • • •• • • DEPTH TEST DATA IN FEET -MC -DD -BC 5 10 15 -OTHER SAMPLE TESTS NUMBER 22-1 22-2 GS,PI 22-3 DEPTH TEIT DATA -OTHER SAMPLE IN ~--~--~--~ fEET -Me -DD -ac TEITS N ...... EIt 23-1 I 23-2 [ 5- 10- - "For description of symbols, see Figure A-l Test pit 22 Approximate El. 136' SOIL DESCRIPTION Hard, damp, brown, sandy to silty clay (CL-CH) EOCENE SEDIMENTS Bottom of Hole Test pit 23 :n.noroximate 1<'1 138' SOIL DESCRIPTION Very dense, dry, light gray, silty sand ~~I\~ ___ (_S_M_)_i __ f_r_a_c_tu_r_e_d ________ E_O_C_E_N_E __ S_E_D_I_M_E_N_T_S __ _ ~r' ;.: ;~ ~:.~ Hard, damp, brown, sandy clay to clayey sand (CL-SC); fractured EOCENE SEDIMENTS Very dense; damp, light gray-brown, silty sand (SM) EOCENE SEDIMENTS Bottom of Hole LOG OF TEST PITS 22 AND 23 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY: t"&1 PROJECT NO: 5933iw-UDOl I DATE: 10-2-80 I FIGURE NO:A-2l· WOODWARD·CL 'fOE CONSULTANTS • • • • • • • • • • • ~ __ ~ __ ~ __ ~·OTHER SAMPLE TESTS NUMBER 24-1 24-2 24-3 1 24-4 24-5 • For description of symbols, see Figure A-I Test pit 24 SOIL DESCRIPTION Dry, light gray, silty sand FILL l! Hard, dry, dark gray.to brown, sandy clay (CL-CH) RESIDUAL SOIL Very dense, damp, gray-brown, silty sand (SM); fractured EOCENE SEDIMENTS Fracture at lO!:!' Hard, damp, brown, sandy clay (CL) EOCENE SEDIMENTS Very dense, moist, gray, silty fine sand (SM) EOCENE SEDIMENTS Bottom of Hole LOG OF TEST PIT 24 GROVE APARTMENTS DRAWN BY: ch I CHECKED BY:lV\erz.t, PROJECT NO: 59331H-UDOl I DATE: 10-2-80 1 FIGURE NO:A-22 WOOOWARD·CL YDE CONSULTANTS • • • • • • • • • • • Project No. 5933lW-UDOl Woodward· Clyde Consultants APPENDIX B LABORATORY TESTS The materials observed in the excavations were visually classified and evaluated with respect to strength, swelling, and compressibility characteristics; dry density; and moisture content. The classifications were substantiated by performing grain size analyses and evaluating plasticity suitability tests, including compaction tests and grain size analyses, were performed on samples of the probable fill soils. The grain size distribution curves are shown on Fig. B-1. The results of fill suitability tests are reported on Fig. B-2. • • • • • • • • • • • WCC.GS-76 100 90 80 70 t;:}60 CI) CI) ....: a.. ~50 w (,,) Or:: W .. IlO ao 20 10 0 COBBLES GRAVEL SAND SILT and CLAY Coarse I Fine Coarsel Medi um I Fine , Mesh Opening -Ins Sieve Sizes Hydrometer Analysis 76 3 2 I! t 10 162030110 60 80 140200 ~~ ~ " " _'I. , " 13-1 \ . .10-4 l'\ '.\\ \\1 . 1\ \ 17h.l 1\ 1\ \ \ \ 12':'4 \ , 1\\ , • \\ ~ \ "- I"- \.\ \. "\:\ "' ::... ~ "'II "-,~ ~ ~ -""'-L ....... t'-. --t-. 1---~ ~ ....... . f--~ ....... .. /--. ~ f'...~ t-. ~ ....... "" . l-t---~ , l-t--"----. I-1--.... - -1-. . . 100 50 10.0 5.0 10 0 0.1 0.05 0.01 0.005 GRAIN SIZE IN MILLIMETERS SAMPLE CLASSIFICATION AND SYMBOL *LL *PI 10-4 Clayey sand (SC) 33 14 - 12-4 Clayey sand (SC) 36 20 13-1 Clayey sand (SC) 37 20 17-1 Clayey sand (SC) -- - *LL -Li qu i d Li mit ......... o 10 20 30 1lOt;:} z: ;: w 50 Or:: I-z: w (,,) Or:: 6O~ 70 80 90 I 00 0.001 *PI -Plasticity Index GRAIN SIZE DISTRIBUTION CURVES GROVE APARTMENTS DRAWN BY: ch CHECKED BY: PROJECT NO: 593 3 Hv-UD01 DATE: 10-14-80 FIGURE NO: 8-1 WOOOWARO·CL YOE CONSULTANTS • • • • • • • • • • 100 90 80 70 ffi60 en en < Q. ~50 w u 0: W Q.40 30 20 10 0 GRAVEL SAND COBBLES Coarse I Coarsel I Fi ne Medium Fi ne Mesh Opening -Ins Sieve Sizes 76 3 2 10 16203O1lO 6080 11lO2OO -......... "-" " \ "' :'I ~\ 17-4 \ _'\.\ -'t \ 1\ \ \ \ 1\ \ \ \ '\. 21-3 \I , :\. \. .... \ \ --f---- SILT and CLAY . Hydrom~ter Analysis 22-3 \. \. \. '\. " .... ........ \ r---.,.. \ to.... \. ........ \. ...... o 10 20 30 IIOffi z: < I-W so 0: I-z: W (.) 0: 60~ 70 \.\. ...... 80 ------- -f------~ --f-----1------I-- I 100 50 SAMPLE 17-4 21-3 22-3 --- 10.0 5.0 1.0 0.1 0.05 GRAIN SIZE IN MILLIMETERS CLASSIFICATION AND SYMBOL Sandy clay (CL) - Clayey sand (SC) Sandy clay (CL) / GRAIN SIZE DISTRIBUTION CURVES GROVE APARTMENTS ..... ,\. ..... "- 90 ..... ...... ~ .......::::---... ---:-... 0.01 0.005 *LL *PI 39 22 34 18 44 25 *LL -Li qu i d Li mit ~I 00 0.001 *PI -Plasticity Index DRAWNBy:ch I CHECKED BY:N\fZll..) PROJECT NO: 59331-UD01 I DATE: 10-14-80 I FIGURE NO: B-2 WOODWARD·CLYDE CONSULTANTS • • • • • • • • • • • 150 14 0 13 0 120 110 100 90 PLASTICITY CHARACTERISTICS r~:'=+-r~~f-l S I L T & CLAY Liquid Limit, % Plasticity Index, % 100 Classification by Unified Soil .. Classification System , 1\ ex: ~ 2 \ \ 1\ ZERO AIR VOIDS CURVES o \ i\ ' \ 2.80SG \ 1\ 2.70 SG 1\ \ f\ 2.60 SG \ ~ \ \ 2.50SG \ ~ , \ \ [\ \ ~ , \ \ 1\ \ \ 1\ \ 1\ \ \\/\ y ...... "-\\ \ /J \,\ [\' \ ~\ 1\ -\ \ r\\ Co) \\ \ 0. I 1-' \ !\ :I: (!) \\ 'W 3: \ I- Z :) >-a: 0 I : ~ I Maximum Dry 17-1 Density, pef 124.0 Optimum Moisture 9.5 Content, % [\ i\\ \ i\ 1\ i\\ \. \ \ i\ \ 1\ ,,\ r\ \ 1\ , \ 1\' !\ 1\' ~\ 1\.\ ,\ f\. \ \~ 1\' 1,\ 1\ !\. I o I I I 1 000 100 10 1.0 0.1 0.01 0.001 DIRECT SH Dry Density, Initial Water GRAIN SIZE, mm MECHANICAL ANALYSIS EAR TEST DATA pef Content, % ~------+----4----~--~ Final Water Content, % Apparent CO hesion, psf Apparent Fri etion Angle, degrees SWELL TES T DATA Initial Dry 0 ensity, pcf Initial Water Content, % Final Dry De nsity, pet Final Water Content, % I-.Load, psf Swell, percen t r\.\ \ t\. ,\ .'\ r\. '\ ~ ~I\. '\ l\ ~ 1,\ i'\.: ~ I MOISTURE CONTENT, % I'\: 1\.1 20 30 40 LABORATORY COMPACTION TEST METHOD: ASTM-D 1557-70 A 10 LABORATORY COMPACTION TEST FILL SUITABILITY TESTS GROVE APARTMENTS DRAWN BY: ch I CHECKED BY: I PROJECT NO: 5933Hv-UD01 T DATE: 10-14-80 I FIGURE NO:S-3 WOOOWARD·CLYDE CONSULTANTS • • • /ORIGINAL GRADE \" _ j ?,BORING 3 \ ____ ~ (72-105-20) (' • • • EXISTING GRADE BORING 1 (72-105-20) "" ------\----.... ------" . ----~-- • • • . ' ~ PROPOSED FII.L -~--~ ~~--=-------.sLIDE PLANES -'-..~l NOTES: 1. PROPOSED FILL TO BE CONSTRUCTED OF PROPERLY COMPACTED ON-SITE MATERIAL. 2. COLLECTOR PIPE TO BE 6-INCH DIAMETER THICK WALLED PERFORATED PVC OR ABS PIPE SLOPED TO DRAIN TO CONVENIENT OUTLET. 3. FILTER MATERIAL FOR CHIMNEY AND AROUND COLLECTOR PIPE TO BE CLASS II PERMEABLE MATERIAL IN ~ ---PROPOSED }---20' MAX.--j D-~ 24"x24" l-lINTMllM 4. ACCORDANCE WITH SECTION 68-1.025 OF STATE OF CALI,FORNIA STANDARD SPECIFICATIONS OR 3/4" TO 1~u DIAMETER CRUSHED ROCK ENCLOSED IN FILTER CLOTH. TOP OF DRAIN TO BE APPROXIMATELY 10 FEET BELOW ~ ~ 6" COI,T,EC'I'OR \---J L _ _ _~ PIPE --- PROPOSED FILL SURFACE. --------- ~~-~~~ ~---1 LATTICE LAYOUT OF DRAINS (NO SCALE) Proposed Pill and Subsurface Drains GROVE APARTMENTS DRAWN BY: ch CHECKED BY:~ PRDJECT NO: 59331\'1-UD01 ,DATE:] 0-1 b-m~ l\PPENlnx C- woonWARO-Cl VDE CONSUl. TANTS .. • • , .:\) , .') • • • • • • • • • Project No. 5933lW-UDOl APPENDIX D GUIDE SPECIFICATIONS FOR TYPICAL BUTTRESS I . DESCRIPTION Buttresses consisting of compacted, granular fill shall be installed as shown on the plans in accordance with these specifications, unless otherwise specified by the engineer. Typical cross sections are shown on the sketch. II. CONSTRUCTION The buttresses shall be composed of compacted, granular material as described in the report recommendations. Chimney drains consisting of perforated pipe and either . filter material or clean gravel enclosed in filter fabric shall be installed as shown on the sketch. III~ PERFORATED PIPE Collector pipe shall be 6-inch diameter, perforated, thick walled ABS or PVC pipe sloped to drain to outlet pipe. Outlet pipe from buttress shall be nonperforated and should slope at 1 percent minimum to drain to a convenient outlet. IV. FILTER MATERIAL Filter material for use in backfilling chimneys and around and over drain pipe shall consist of clean, coarse sand and gravel or crushed stone conforming to the following grading requirements. . . Sieve Size 1" 3/4" 3/8" 4 8 30 50 200 Percentage Passing Sieve 100 90 -100 40 -100 25 -40 18 -33 5 -15 0-7 0-3 This material generally conforms with Class II permeable material in accordance with Section 68-1.025 or combined aggregate section 90-3.04 of the Standard Specifications of the State of California, Department of Transportation. D-l • e' • • • • • • • • • Project No. 5933lW-UDOl V. FILTER FABRIC Filter fabric for use in drains shall consist of Mirafi l40S (Celanese), Typar (DuPont), or equivalent. The aggregate shall be 3/4-inch to 1-1/2inch maximum size, free draining aggregate. Filter fabric shall completely surround the aggregate. VI. LAYING Trenches for drains shall ~be excavated to a m~n~mum width equal to the outside diameter of the pipe plus 1 foot and to the depth shown on the plans or as directed by the engineer. The bottom of the trench shall then be covered full width by 4 inches of filter material or filter fabric and 4 ~nches of aggregate, and the drain pipe shall be laid with the perfora- 'tions at the bottom and sections shall be joined with couplers. The pipe shall be laid on a minimum slope of 0.2 percent. After the pipe has been placed, the trench shall be back- filled with filter material or 1-1/2-inch maximum size aggregate if filter fabric is used, to the elevation shown on the plans, or as directed by the engineer. D-2 • • • • • • • • • • Project No. 5933lW-UbOl Property Line", ,~Natural \J '''', Slope i H , , T " I ''''..... I " I " I , SKETCH DETF<_IL OF MAXHmr1 SECTIONS (No Scale) 1 2 ~ 1 .... : .: : .... ; '. ".' Collector Drain Perforated Pipe Pinish Grade 5 I --1 __ -'-__ Filter gravel chimney drain shown on plans ---f LATTICE LAYOUT OF BU'T'TRESS DRAINS (No Scale) 24" Minimum 24" .Minimum 20' t-MaximUI~ I 6" Minimum encasement Seepage collector pipe Minimum 6" diameter D-3 Collector-Drain . Pipe Bottom of Buttress Excavation • • • ~;.:.:. • • • • • • • • r. • I H Project No. 5933lW-UDOl , , 'v--Existing , , \ \ \ \ \ , .. '.'-', . -T 10' Haximum -L 24" Minimum Cuts lope SKETCH DETAIL OF HAXIHUM SECTION HOSP~'VAY AND ACCESS ROAD (No Scale) 1 Collector Drai Perforated Pipe Finish Grade 5 ' Filter gravel chimney drain ~ As shown on plan~s __ ~_~1 -LATTICE LAYOUT OF BUTTRESS DRAINS (No Scale) 24" 24" Minimum 20' r-MaximuZ;1 ",_o:,.~ Minimum ~ 6" Minimum encasement \Z:. 0 • •• __ -Seepage collector pipe ~QOII \I \) \)0 --- Minimum 6" diameter D-4 Collector Drain Pipe Bottom of Buttress Excavation • • • • • • • • • .. Project No. 59331W-UDOI APPENDIX E SPECIFICATIONS FOR CONTROLLED FILL I. GENERAL These specifications cover preparation of existing surfaces to receive fills, the type of soil suitable for use in fills, the control of compaction, and the methods of testing compacted fills. It shall be the contractor's responsibility to place, spread, water, and compact the fill in strict accordance with these specifications. A soil engineer shall be the owner's representative to inspect the construction of fills. Excavation and the placing of fill shall be under the direct inspection of the soil engineer, and he shall give written notice of conformance with the specifications upon completion of grading. Deviations from these specifica- tions will be permitted only upon written authorization from the soil engineer. A soil investigation has been made for this project; any recommendations made in the report of the soil investigation or subsequent reports shall become an ·addendum to these specifications. II. SCOPE The placement of controlled fill by the contractor shall include all clearing and grubbing, removal of existing unsatisfactory material, preparation of the areas to be filled, spreading and compaction of fill in the areas to pe filled, and all other work necessary to complete the grading of the filled areas. III. MATERIALS 1. Materials for compacted fill shall consist of any material imported or excavated from the cut areas that, in the opinion of the soil engineer, is suitable for use in constructing fills. The material shall contain no rocks or hard lumps greater than 6 inches in size and shall contain at least 40% of material smaller than 1/4 inch in size. No material of a perishable, spongy, or otherwise improper nature shall be used in filling. 2. Material placed within 24 inches of rough grade shall be select material that contains no rocks or hard lumps greater than 6 inches in size and that swells less than 3% when compacted as hereinafter specified for compacted fill and soaked under an axial pressure of 160 psf. E-l • " .. • • • • • • • • • " oIP M Project No. 5933lW-UDOl 3. Representative samples of material to be used for fill shall be tested in the laboratory by the soil engineer in order to determine the maximum density, optimum moisture content, and classification of the soil. In addition, the soil engineer shall determine the approximate bearing value of a recompacted, saturated sample by direct shear tests or other tests applicable to the particular soil. 4. During grading operations, soil types other than those analyzed in the report of the soil investigation may be encountered by the contractor. The soil engineer shall be consulted to determine the suitability of these soils. IV. COMPACTED FILLS 1. General (a) Unless otherwise specified, fill material shall be compacted by the contractor while at a moisture content near . the optimum moisture content and to a density that is not less than 90% of the maximum dry density determined in accordance with ASTM Test No. DI557-70, or other density test methods that will obtain equivalent results. (b) Potentially expansive soils may be used in fills below a depth of 24 inches and shall be compacted at a moisture content greater than the optimum moisture content for the material. 2. Clearing and Preparing Areas to be Filled (a) All trees, brush, grass, and other objectionable material shall be collected, piled, and burned or otherwise disposed of by the contractor so as to leave the areas that have been cleared with a neat and finished appearance free from un- sightly debris. (b) All vegetable matter and objectionable material shall be removed by the contractor from the surface upon which the fill is to be placed, and any loose or porous soils shall be removed or compacted to the depth shown on the plans. The surface shall then be plowed or scarified to a minimum depth of 6 inches until the surface is free from uneven features that would tend to prevent uniform compaction by the equip- ment to be used. (c) Where fills are constructed on hillsides or slopes, the slope of the original ground on which the fill is to be placed shall be stepped or keyed by the contractor as shown on the figure on Page 4 of these specifications. The steps shall extend completely through the soil mantle and into the underlying formational materials. E-2 . , • -y ,\" ' y ~ ~ .~ ~ \ V) • • • • • • • • • Project No. 5933lW-UDOl (d) After the foundation for the fill has been cleared, plowed, or scarified, it shall be disced or bladed by the contractor until it is uniform and free from large clods, brought to· the proper moisture. content, and compacted' as specified for fill. 3. Placing, Spreading, and Compaction of Fill Material (a) The fill material shall be placed by the contractor in layers that, when compacted, shall not exceed 6 inches. Each layer shall be spread evenly and shall be thoroughly mixed during the spreading to obtain uniformity of material in each layer.' I:. (b) When the moisture coritent of the fill material is below that specified by the soil engineer, water shall be added by the contractor until the moisture content is as specified. (c) When the moisture content of the fill material is above that specified by the soil engineer, the fill material shall be aerated by the contractor by blading, mixing, or other satisfactory methods until the moisture content is as specified. (d) After each layer has been placed, mixed, and spread evenly, it shall be thoroughly compacted by the contractor . to the specified density. Compaction shall be accomplished by sheepsfoot rollers, vibratory rollers, multiple-wheel pneumatic-tired rollers, or other types of acceptable com- pacting equ~pment. Equipment shall be of such design that it will be able to compact the fill to the specified density. Compaction shall be continuous over the entire area, and the equipment shall make sufficient trips to insure that the desired density has been obtained throughout the entire fill. (e) The surface of fill slopes shall be compacted and there shall be no excess loose soil on the slopes. v. INSPECTION 1. Observation and compaction tests shall be made by .the soil engineer during the filling and compacting operations so that he can state his opinion that the fill was con- structed in accordance with the specifications. 2. The soii engineer shall make field density tests in accordance with ASTM Test No. D 1556-64. Density tests shall be made in the compacted materials below the surface where the surface is disturbed. When these tests indicate that the density of any layer of fill or portion thereof is below the specified density, the particular layer or portion shall be reworked until the specified density has been obtained. E-3 , , . e?" " ~\~ '~ "- ~ e' VI e e • • • • • • Project No. 5933lW-UDOl VI. PROTECTION OF WORK 1. During construction the contractor shall properly grade all excavated surfaces to provide posit~ve drainage and prevent ponding of water. He shall control surface water to avoid damage to adjoining properties or to finished work on the site. The contractor shall take remedial measures to prevent erosion of freshly graded areas and until such time as permanent drainage and erosion control features have been installed. 2. After completion of grading and when the soil engineer has finished his observation of the work" no further excava- tion or filling shall be done except under the observation of the soil engineer. Sprip as specified Original ground Slope ratio = N M Fill Remove all topsoil See note NOTES: The minimum width "B" of key shall be 2 feet wider than the compaction equipment, and not less than 10 feet. The outside edge of bottom key shall be below topsoil or loose surface material. Keys are required where the natural slope is steeper than 6 horizontal to 1 vertical, or where specified by the soil engineer. E-4 See note • • • • • • • • • • • . .. , .. . project No. 59331W-UD01 Woodward· Clyde Consultants APPENDIX F SOIL AND GEOLOGIC INVESTIGATION FOR THE PROPOSED HOSP GROVE APARTMENTS CARLSBAD, CALIFORNIA 1972 •• • • • • • • • • • . .' SOIL AND GEOLOGICAL INVESTIGATION FOR THE PROPOSED HOSP GROVE APARTMENTS CARLSBAD, CALIFORNIA for Grove Apa rtrr.ents Post Office Box 1155 Carlsbad, California by !'iOOD:-!t.RD-G I ZI EriSK I F1 tIS SOC I ATES Ccnsulting Soil and Foundati6n Engineers and Geologists (:,n llffiliate of \Jood~'/ard-Clyde Consultants) • . . • II • • TABLE OF CONTENTS Page LETTER OF TRANSMITTAL • SCOPE FIELD INVESTIGATION 2 LABORATORY TESTS 2 • SITE AND SOIL CONDITIONS 3 GEOLOGICAL STRUCTURE 5 GROUrW HJ\TER 6 • COilCLUS I OtIS 7 RECO~~ENDATIONS -EARTHWORK 8 RECor·1tlErIDJ.'.TIONS -FOUNO/\TIOfIS 11 • LH!ITATIOfIS 12 FIGURE 1 -SITE PLAN FIGURES 2 THROUGH 25 -LOGS OF TEST BO~INGS • FIGURE 26 -HYDROI';ETER J\NALYS IS FIGlJRE 27 -TYPICAL SECTIONS • • • • . . .. • • • • • • • • • • ~--' • I, Grove Apartments Augus t 25, 1972 Project No. 72-105-20 Post Office Box 1155 Carlsbad, California 92008 Attention: Mr. J. Rombotis In accordance with your request and our authorizated proposal dated July 19, 1972, we have made an investigation of the underlying geologic and soil con- ditions at the site of the proposed condominium development to be known as Hosp Grove Apartments in Carlsbad, California. Our subsurface investigation revealed that weak clay s·eams are present within . the formational soils at the site and that there is evidence of recent sliding Subsequent analysis, however, has shown that the proposed cut and fill slopes \·1111 generally have adequate factors of safety against deep-seated failure except in the area of an eXisting slide where special treatment will be required. The accompanying report presents the results that the subsurface exploration ar.d the laboratory tests as \'Jell as the conclusions and recommendations per- :aining to this site. The engineer and project geologist assigned to this project was Richard P. Hhile and Ernie Artim of our firm . LO:.Jis J. L R?Hj:"'JLj 1 In (4) 3rove Apartm2nts • . . . .. • • • • • • • • • Project No. 72-105-20 SCOPE This report describes an investigation of the underlying geo- logical and soil conditions at the site of a proposed subdivision to be known as Hosp Grove Apartments which will be located south of proposed ~1ar:-ron Road and the May Company Shopping Center adjacent to and west of E1 Camino Real along"the north limits of Carlsbad, California. o 0 The purpose of this inves~igation is to determine the underJying soil and geological conditions including the presence, depth and extent of existing landslides and weak soil layers; to study the effect of these conditions on the stability of proposed cut and fill slopes; and to present recommendations regarding gradi~g, including the construction of proposed cut and fill slopes, and special treatment of potentially unstable areas. Recommendations regarding the treatment of potentially expansive soils; the most suitable type and depth of foundation and allowable soil bearing pressures for use in design; and any construction problems that can be anticipated, are also presented. It is our understanding that the proposed construction will be limited to relatively light to moderate weight one and two-story, wood- frame and stucco structures with either raised, wooden floors or sl~b-on- grade floors. The available grading plan indicates that grading will essentially consist of reducing the site into a series of cut and fill pads stepping down east and north from the highest elevation and will include the filling of several canyons. Cut and fill slopes having maxi- mum heights of 57 and 75 feet, respectively, and maximum slope inclinations of 1-1/2 to 1 for cut slopes and 2 to 1 for fill slopes, are proposed. A previous geological investigation has been made of the site by F. Beach Leoighton, Geologist. This report is dated December 11, 1967, and is entitled "Geologic Report for Hosp Grove Planning Study, Phase II. "0 e. . . • • • • • • • • • • Project No. 72-105-20 Page 2 A preliminary soil investigation of the entire Hosp Grove development was prepared by Woodward-Clyde & Associates and is entitled, "Soil Investigation for the Proposed Hosp Grove Development, Carlsbad, California," dated April 13, 1968. FIELD INVESTIGATION A geological reconnaissance of the site was made by the project engineering geologist of our firm on May 22, 1972. Subsequent'to this 17 test borings were made with a large diameter (30 in.) bucket auger drill rig at the approximate locations shown on the Site Plan, Fig. 1. The drilling was done during the period of May 30, 1972 to June 22, 1972, under the supervision of the project engineering geologist. Natural stream cut exposures and man-made cut banks were also examined during this period. Field logs of the borings were prepared by the geologist on the basis of a visual inspection of the borings, the samples secured, arid of the exca- vated material. The Logs of Test Borings shown on Figs. 2 through 25 are based on an inspection of the samples and on the field logs. The test borings were located in the field with the aid of an undated plan entitled "Grading Plan -,Hosp Grove Apartments" prepared by Roy L. Klema Engineers, Inc. LABORATORY TESTS The soils encountered in the test borings were visually classi- fied and evaluated \·,ith respect to strength, swelling and compressibility characteristics, dry density and moisture content. Since grading of the site is undcr\'/ay, reference is also made to fill suitabi 1 ity tes ts per- formed on the fill materials including laboratory compaction tests, grain size analyses, plasticity characteristics, direct shear tests and s\·/ell tests. The strength and compressibility of the undisturbed soils, exclu- " WOODWARD· GIZIENSKf & ASSOCIATES COHSULTIN~ 50'~ ""0 rOUH04TIOH [HCIHUU "'''0 C[OLOC'5TS • • • • • • • • • • • . . Project No. 72-105-20 Page 3 sive of the clay seams, was evaluated by previous tests and by geologic characteristics. Specific laboratory tests were performed for this investigation on remolded clay seams encountered in the borings. These tests included complete hydrometer analysis (grain size distribution on the minus #200 sieve material) on representative samples and a slow repeated direct shear test. The purpose of these latter tests was to better evaluate the long term strength of the clay seams. The slow direct shear test is still in progress and the results will be issued in an addendum report. The results of the hydrometer tests are presented on Fig. 26. SITE AND SOIL CONDITIONS The site is located in the western half of Section 32, Township 11 South, Range 4 West, San Bernardino Base Meridian on the lower and middle north facing slopes of Buena Vista Creek Valley where it enters Buena Vista Lagoon. In gross aspect the topography is typified by northerly striki.ng ridges and valleys sloping to the lagoon in a north-northwest direction. The bottom of the valleys,have been severly eroded into vertical sided gulleys, some as much as 15 feet deep, and piping in some areas has created small caverns and holes. The'ground surface elevations within the site range from a low of approx'imately 40 ft in the northwest portion to a high of approximately 255 ft in the southeastern portion (USGS Datum). The area studied was being graded at the time of our inspection and cuts and fills in the order of 10 and 20 ft had been placed. Originally the native vegetation consisted of short grass and weeds with a"scattering of small trees and brush in the nat~ral drainage chann~ls. In the eastern most canyon along the north slope water loving plants were apparent and wet areas WOODWARD· GIZIENSKI & ASSOCIATES co"suu."Q 10.1. "ND IDUN04T.OH (NCI'N""S Ar.O G(OLOG'STS e. • • • • • • • • • • .. Project No. 72-105-20 Page 4 were noted in the west facing side slope .. This evidence and the presence of scarps and hummocky topography suggests a recent existing landslide on this slope. Previous investigators have also recognized this landslide. Some miscellaneous rusted farm equipment and other vehicles were present at the southeast corner of the site . Near Surface Soil Conditions The valley side slopes at the subject site are covered by a surface soil mantle composed of materials which are nonformationa1 in character, consisting of (1) residual soil (topsoil and clay); and (2) alluvium in the bottoms of the canyons. The portion of the soil mantle, which has formed in place and generally has not been transported, is considered residual in nature. These materials at the subject site consist essentially of topsoil and underlying clay collectively varying in thickness from 1 to perhaps 10 ft. On the middle and upper slopes this residual mantle is generally 2 ft to 10 ft in thickness and is composed primarily of clayey to silty sands with scattered gravels. On the lower slopes and on protected slopes the soil profile consists generally of 1 ~o 3 ft of sandy silt topsoil under- lain by 0 to 10 ft of potentially expansive silty and sandy clay. In some places deep erosion has stripped these materials and the underlying formational soils are exposed. The alluvial soils consist primarily of loose to mediulil dense silty sands with SOrile clayey sand interbeds. These soils are usually porous to depths of at least 7 to 10 ft and are located in the bottoms of the subcanyons and low drainage areas. Quaternary Terrace (Qt) Quaternary terrace soils exist at variable levels on the site. ftbove an east to west sloping terrace surfac~ at elevation 220 to 180 ft, WOODWARD· GIZIENSKI & ASSOCIATES CO"'ULTI"II SOIL "'"0 'OU"OATIOH ("C;'H"U "NO ",c)('OGISTI ., • • • • • • • • • • Project No. 72-105-20 Page 5 these materials consist of relatively horizontally bedded, dense, gravelly .silty sand. The so-called "drapingll terraces which occur below the sloping elevation of 220 to 180 ft consist of moderately to poorly consolidated gravelly silty to clayey sands and exist at various unrelated elevations. These latter terraces are highly irregular in occurrence and were not mapped in detail . . ·Eocene Sediments (La Jolla Group) (Et) ~ An undifferentiated member of the La Jolla Group of Eocene Age· underlies the entire site to significant depths. This member consists primarily of dense medium to coarse poorly indurated uncemented sandstone with interbedded siltstones and claystones occuring in irregular layers and lenses. Some of the claystones have been remolded into firm to stiff clay seams. GEOLOGICAL STRUCTURE In general, the Eocene sediments are the only materials on s~te, which exhibit geological features, such as bedding, joints and fractures, faults, and shear zones. Our studies on the site and surrounding areas, reveal bedding attitudes of the sandstones and claystones within the Eocene unit, ranging from a strike and dip of north 60° east and 4° to the north to approximately north 5° east and 20° to the west. In over all aspect the predominately regional structural attitude woyld be approximately north 30° east with a 10° dip to the northwest. Du~ to the relatively poor induration of the unit, joints and fractures are relatively few and spaced far apart and where observed did not appear to be generally adverse to the overall stability of slopes. Our investigation revealed the existence of weak clay seams or layers within the Eocene sediments. Our studies of the clay seams appear - WOODWARD· GIZIENSKI & ASSOCIATES CONSULTlNQ SOIL AND rOUHD4TIQH (HGIHUII, "NO CO[OLOGISrs ... " e. • co • • e • • • • • • • Project No. 72-105-20 ~ Page 6 to indicate that in some cases the seams constitute'bedding plane faults or shear zones, while in other cases they may constitute the base of relatively large ancient landslides. (The bedding plane faults are not faults in the classic sense in that movement occurs parallel to the bedding rather than across the bedding and no wide gouge zones in most cases are present. None of these latter faults were encountered nor are they suspected to exist across the site.) The clay seams range from a few inches to as much as 18 inches in thickness and occurred at all levels within the borings. The consistency of the clay ranged from firm to very stiff and slickensided surfaces were found in all the clay seams. A study of the clay seam material, the attitude of the seams and the location of the seams in cross section, indicates a degree of continuity from boring to boring of some of the seams and although classic topographic evidence is not generally present, it is our opinion that some of the seams form the base of large ancient landslides. In general the movement along the bedding plane faults is due to tectonic forces 9 while the movement in land- slides is due to gravity forces. As suspected at the subject site, land- slides very often occur along the weakened zones constituting bedding plane faults. GROUND WATER Ground water was encountered in Test Borings 7 through 11, 13, 14, 16 and 17 at depths ranging from 21 to 46 ft. The ground water surface appears to slope towards the northwest being modified by the clay seams. tlo ground \'/ater \'/as en.countered ; n the bor; ngs made in the extreme southern and western parts of the site. The previous test boring in the area of Boring 11, indicated a water table at a depth of 64 ft. The water level in several of the borings was allowed to stand during an overnight period and '0 WOODWARD· GIZIENSKI & ASSOCIATES CO"SULT'''Q SOIL ""0 'OU"04T10" [H~'HftAS 4"0 Co[04.00IlTS • . . • to • • • • • • • • • • Project No. 72-105-20 Page 7 then measured again, as is indicated on the particular Logs of Test Borings. CONCLUSIONS 1) The results of our investigation revealed the presence of rela- tively soft clay seams at depths within the formational soils. It is our opinion that these seams represent both bedding plane faults and adjacent landslide surfaces. Analyses, however, indicates that the stability of proposed cut'and fill slopes ;s not greatly adversely affected by the pre- sence of those seams', except in the eastern'most canyon along the north slope where an existing relatively recent slide ;s present. Special prepar- ation of key areas and installation of drains will be required prior to . ' placing fill in this canyon. No other major adverse sailor geological con- ditions are indicated on the site that would 'preclude fUrther development of plans for the subdivision. Current grading operations on the site indi- cate that low to moderately expansive soils may result at finished grade in fill areas and nominal special foundations may be required. Recommendations for the special treatment in the canyon fill area and for the foundations are presented in the paragraphs under earthwork. 2) The subsurface soils and formations on the site can be grouped into the following units: a. Minor amounts of existing uncompacted fill, trash and rubble. b. Overburden soils composed of residual sandy clay soil mantle and clay and gravel alluvial soils containing some sandy zones. c. Terrace deposits composed of reddish brm·m silty sand with some gravel and thin clay lenses. . d. Eocene sediments constitute the predominate soil on the site and are composed of silty to clayey sqndstones, poorly indurated in nature containing layers _of silty clGY some of which have been remolded due to bedding plane faulting and possible landsliding. WOODWARD· GIZIENSKI & ASSOCIATES CO"SULT."G lOlL A"O 'OUNOATION (NG"'([III ~NO G[OLOGISTS •• • • • • • • • • • • Project No. 72-105-20 Page 8 3) In general the soils to be used in fills range from nonex- pansive to low to moderately expansive in nature with the exception of the overburdened clays and silty clay lenses within the Eocene sediments \'/hich are considered highly expansive in nature. 4) The proposed fill slopes having maximum slope inclinations between benches of 2 to 1 and maximum overall heights in the order of 75 ft will, in our opinion, have adequate factors of safety against deep-seated failure, if constructed in accordance with specifications and the recommen- dations contained herein. Special preparation will be required for the fill placed in the eastern most canyon area along the north slope. Detailed analyses were made of both fill and cut slopes. The analyses included the use of a computer program on file which enables the analysis of many sli~e wedges with different soil parameters and ground water conditions. Our cal- culations are not attached but are available for review at our office upon request. 5) The proposed cut slopes having maximum heights in the order of 60 ft and inclinations between benches in the order of /-1(2 to 1 will ~ also have adequate factors of safety against deep-seated failure, if con- structed in accordance with plans and specifications. It should be anti- cipated, however, that water seeps may be encountered at the toe of the deeper cut slopes; recommendations for handling this situation and other water seeps which may occur in the deeper cut areas are presented in the following paragraphs. RECOi'1i~ENDATIorIS -EARTHHORK 1) Highly expansive clay soils may be encountered in areas of shallow cut or where clay seams are encountered at depths within the deeper cut areas. With slab-on-grade construction it is recommended that the WOODWARD· GIZIENSKI & ASSOCIATES CONSULTINO SOil AND fOUNDATION rNGINtUS AND OtOLOGISTS e. . " • • • • • • • • e • Project No. 72-105-20 Page 9 clays be removed to a minimum depth of 2 ft below all level graded pad areas and disposed of in deeper fills. The clay should b~ replaced with nonexpansive or low to moderately expansive soil available at the site. It is recommended that this type of treatment be extended to proposed roads and other traffic areas. In this case the depth of removal ~nd replacement should be 12 inches. If raised floor construction is used and the clay is not removed in the building areas, it is recommended that the footings extend through the clay or to maximum depth of 2.ft. In this case, the footings should be reinforced top and bo~tom with rlo. 4 reinforcing bars. 2) It is recommended that all existing fills, loose dry or porous alluvial soils, and desiccated residual clay soils be excavated, or benched into, as required, and recompacted before new fill is placed or building~ constructed. The maximum depth of these soils is anticipated to be in the order of 5 ft, however, the actual depth of removal should be determined in the field by Hoodward-Gizienski & Associates upon visual examination 'of the exposed soils. Special keys perhaps to depths of 10 ft or more will be required in the eastern canyon areas. All trash dumps, rubble and car bodies, etc. should be removed from the site. 3) It is recommended that the upper 2 ft of fill in the building areas be composed of nonexpansive or low to moderately expansive soils avail- able at the site. The highly expansive clay materials may be placed in the deeper fill areas. 4a) It is recommended that special key preparations be employed prior to placing fill in the eastern canyon area along the north slope. This area encompasses a "V" shaped fill I>lithin the confines of the canyon and is indicated on the site plan and geological map Fig. 1. It is recom- mended that the toe of the deepest part of the fill extend a minimum depth WOODWARD· GI1IENSKI & ASSOCIATES CO"SULTI"G SOIL A"O rou .. OATIO .. [ .. GI .. EUS A"O GEOlOGISn •• • . . • • • • e· . : i i i • , el I ! • • . Project No. 72-105-20 Page 10 of 5 ft into formational soils and be a minimum width of 20 ft. All fill placed from the toe up the 'sides should be benched a minimum depth of 2 ft into formational soils. In addition to the special key all surface residual ~oils and the existing slide at the east side of the canyon should be removed within the confines of the fill to natural undisturbed formational soils and a proper drain placed prior to constructing the fill. The actual depth and width of the special key and stripping should be determined in the field by Woodward-Gizienski & Associates at the time of grading. 4b) The drain to be placed below ~he fill should consist of a filter blanket with perforated collected pipe which will outlet at the toe of the fill in the natural drai~age. The blanket should cover all areas of seepage plus a minimum distance of 5 ft beyond seepage areas. A minimum 6-in. diameter perforated steel collected pipe (AASHO M 218-207 ASTM A 444- 446-AM) should be properly bedded in the fill area and placed along the lowest portion of the drainage. A typical sketch illustrating these recom- mendations is shown on Fig'. 27 . 5) Drains should be placed at the toe of cut slopes, wherever seepage is' evident. The sketch below illustrates the recommended procedures for placing drains in this case: Class I I Permeable --~ State of California Specifications or Equivalent TYPICAL SECTION No Scale Excavate and rebuild as indicated I ~Compacted Native Impermeable Cover (clayey sand or lean sandy clay to be approved by the Soil Engineer) 4 ino Perforated Transit Pipe Slope to drain outlet at curb or. into storm drain WOODWARD· GIZIENSKI & ASSOCIATE COf'rfSULTING 50'L AND rOUhDATION' [NCINlUlS ANO G[OlOCI~ · .. • • • • • • • • • • Project No. 72-105-20 Page 11 6) It is recommended that all cut slopes be inspected during grading by Woodward-Gizienski & Associates. Additional recommendations for unusual or unanticipated geological conditions can be presented in the interim report, if this should be required. RECOMMENDATIONS -FOUNDATIONS 1) It is our opinion that conventional spread or continuous footings founded in properly noncompacted nonexpansive or low to moderately expansive soil should provide a suitable foundation for the proposed struc- tures. 2) It is recommended that an allowable soil bearing pressure of 2,000 pounds per square foot (total load) be used in the design of footings founded a minimum depth of 12 in. in properly compacted nonexpansive or low to moderately expansive fill or nonexpansive or low to moderately expan- sive undisturbed natural ground. Footings should have a minimum width of 12 in. It is recommended that footings be reinforced top and bottom with '0 No.4 reinforcing bars, and that the concrete slabs-on-grade be reinforced with 6x6 10/10 wire mesh and underlain by a minimu~ of 4 in. of sand, crushed ro ck or gravel. 3) It is recommended that all building foundations be kept a minimum distance of 5 ft back from the top of a slope. 4) For retaining walls not restrained from movement at the top and having a level backfill surface, it is recommended that they be designed for equivalent fluid weight of 35 pounds per cubic foot. In the case of sloping backfill it is recoml11endoed that the equivalent fluid pres- sure for 1-1/2 to 1 and 2 to 1 slopes be increased to.60 pounds per cubic foot and 45 pounds per cubic foot respectively. In the case of basement type reta i ni ng wa 11 s, it is recommended that a uni form pressure of hundred . WOODWARD· CLYDE & ASSOCIATES r.o. "" . \ , ,.' .. '.,' . •• • • •• • • • • • • • • • • Project No. 72-105-20 P,age 12 pounds per foot be added to the equivalent fluid weight. LIMITATIONS The conclusions and recommendations made in this report are based on the assumption that the soil and geological conditions do not • deviate appreciably from those disclosed by the test borings. -If vari- ations are encountered during construction, we should be notified so that we may make supplemental recommendations, if this should be required. Evaluation and utilization of soil materials and rock formations for support of structures includes investigation of the subsurface conditions, analysis, formulation of recommendations, and inspection during grading. The soil investigation is not completed until the soil engineer has been able to examine the soil and rock in excavations or cut slopes so that he can make the necessary modifications, if needed. We emphasize the importance of the soil engineer continuing his services through the inspection of grading, including construction of fills, and foundation excavations. WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL ""0 fOUND"no~ [NGI~[[RS ANO G(OlOCISTS • • • • • I'.~ '~' ... > "~. "J ),.7 r .l.?,/r • : ___ '---t' __ .' &.,-_ o 0 ~ Qt 0 .,) / 0/ ". LEGEND: . ~r. ,:;. I ....... ':' ,.,,:_.,' .' 1r Indicates approximate location of tel l bor i ng~ Indicates approKimate dip and strike >' of bedd i ng. r --., : : Indicates major proposed fill and slopes. L. .... J ~ .... ? C i Indicates relative1, recent tand,lide .rel. c.~.J ,,-, "!Ii Indicates possible ancient landstide areal_ L~J r,i"'w Indicates QlJaternary terrace deposits t"'u.,°J (lower terraces not .hown) r-, , I Indicates Eocene sediments. L_.J Graphic Scale in Feet ,..... • ....,-___ . ~ --::; 1 200 100 0 200 ~oo 600 • • • I •• :. ..... ! j 1 t ~ ... , ...... . ) I Q-'''--., • C ._ .. _ ....... / .. ~_.~-.... \. ( \. [ --... .L". • .;;-...... ••.. . .... '., • ...-0 ..... 0 ". " , ~ ;-0 ••• Q! ••• '~ .... . ...... ; _............... ~ •• ~.J'>! '. . ' '. '. ... ~ ................. ,............... ..,.......... l.. II • • • .,. N •• • • • • • • • ..., ClJ ClJ u.. I ClJ () «S ..... L. • :::J en "0 c: :::J o L. (!' ~ o ClJ CO .c: +' 0- ClJ o o 5 10 15 20 25 30 3!f 40.2 Clay Searn N70E 15NW For Legend, see Fig. 6 Bor i ng I :-.:.::.: : :;-<. ;;::l;:;;' ~:;~:{': ::::?;'::~~;~ ';:"!~~. ~.:~: . Medium dense, damp, gray silty sand (SM) Porous Dense, damp, light reddish-brown cl ayey sand (SC) Dense, damp, reddish brcwh silty sand (SN) Very stiff, wet, light gray silty clay (CH) :Hard, moist, light gray sandy clay (el) Hc..rd, wet gray silty clay (CIi) moist, gray sandy clay (CL) ----T --------- Terrace Deposit Eocene Sediments i II II I I i __ --------------------------------)1 LOG OF TEST BORING I HaSP GROVE WOODWARD -GIZI8~SKI & ASSOCIATES CONSULTIHG SOIL AHD FOUNDATIOH ENGINEERS AHD GEOLOGISTS SAN DIEGO, CALIFORNIA DR. BY: GS APP~ '( • 72-105-20 CK'D BY: (~ DATE: 2 e. • 0 • 5 +-' • Q) /0 Q) I.L. I Q) 0 ~ \f- L.. ::;, I • en /S "'0 c: ::;, 0 L.. C!' ~ 0 • Q) 20 m ..c:: +-' 0.. cu C . ; !!O • l!5 • 50 For Legend see Fi g. 6 • .' Bori ng 2 ';::'" ;-..... ..... :-.. :: $'""""', ...... :. . " .... . ~. :~:' .. : ..... ~ .. : :: ..... -------1--------Dense, moist, reddish brown clayey sand (SC) Te rrace Deposit -------------- Dense, moist, I ight gray clayey silty sand (SC-s.1) Very stiff, moist, light gray silty clay (CH) (di sturbed) Hard, wet, 1 ight gray silty clay (CH) Very dense, danp, 1 ight gray si lty sand (SP-SW) with thin clay stringers Hard, wet, dark gray silty clay (CH) Very dense, moist, light'gray clayey sand (SC) LOG OF TEST BORING 2 liOSP GROVE Eocene Sediments WOODWARD -GIZI8~SKI & ASSOCIATES COHSULTIHG SOIL AHD FOUHDATION EHGINEERS AHD GEOLOGISTS SAN DIEGO, CALIFORHIA DR. BY: GS CK'D BY: I'fM DATE: '. . .' • . o -• • I 5- ..... Q) Q) LL I Q) 0 «S • 10 -.... I.- ::J en "0 c: ::J 0 l.-• e:: ~ 0 ..... Q) !Xl .c: ..... c.. Q) c • 30 _ Cla'l Seam 5 • lJ.5 - Cl ay Seam • 50 - • For Legend, see Fig. 6 • • P.ori ng 3 ~ ~ ~ ~ ~ ~ ~ W ~ Terrace Oepos i t Hard, moi st, (CH) 1 ight gray silty clay -----r-------- Eocene Sediments LOG OF TEST BORING 3 HaSP GROVE WOOD~ARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGIHEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA '. DR. BY: GS APPPOX. SCAlE: I" = 5' PPOJ NQ·72-I05-20 CK'D BY: {/ttcl DATE: 7/18/72 I I I •• • • 5- .' , 10- +' cu cu U. I cu • 0 , CO '+-L.. ::I en "C c: ::I 0 L.. <.!) ~ • 20- 0 -cu a:: ~ +' 0-cu • 0 30- • 35- • 4-0- Fer Legend, see Fig. 6 • • 80 ring 4- ~ ~.ard, dry, dark gray sandy cl ay (CIl) ~i\.Porous ~ Hard, damp, light gray sandy cl ay ~ (erl) " ',': Very dense, moist, I ight gray-brown sandy clay to clayey sand (CL-SC) Very dense, damp, 1 ight gray clayey sand (SC) i":".' ' :L:},~', Very dense, moi st, light gray-brown :;~~ silty sand (SM-SP) with thin clay !":',"-." str i ngers ;:; '\:.: .. ,:-:.:.' ~\:::-? : ..... . .. : ..... . ~.:: .... ~ :,':.. f,,:',';'; Very dense, rro i st, 1 i ght gray silty '.':':" sand (SM) L--. ..L-_______________ _ Continued on next page Eocene Sediments I I I i I I ~ ; II Ji i i f II --------" --~j LOG CF TEST BeRING L~ ~I HOSP GROVE 11 ~-----------------------------~' , WOODWARD -GIZI8~SKI & ASSOCIATES COHSULTIHG SOIL AHD FOUNDATION EHGINEERS AHD GEOLOGISTS • SAN DIEGO. CALIFORNIA DR. BY: GS APPROX. SCAlE: I" = C:f F'POJ. "0' 72-1(1:-70 CK'D BY: ,LW DATE: 7/18/72 • • • • • • • ..... Q) Q) IJ... I • Q) 0 <U '+-I- ::J (I) "0 c: ::J • 0 I-CI ~ 0 .- Q) CQ ..c: ..... • 0- Q) 0 • • • • • • qO- 1~5 _ Cl ay Seam 50 - H70W 16H Boring q, Continued ..,..-~r---------------:;·;':·:~.i' Same as Before ~.\-,K:~ ~. Very dense, "" i st, Ii gh t broWll I\gravelly coarse sand (sp-SW) ,~i\~ard, rroi st, dark gray si lty c1 ay , .... · .. 1 ~ CH) ~ v"-e-r-=-y-d-e-ns-e-,-mo-i-s-t,-l-i g-h-t-b-~-o-wn-S-i l-t-y- /:i: l'Foarse sand (SP-S~) ~;h:::\;'·\Finr., moist, dark gray silty clay (aJ) ,{;'>L Dense, moist, bro\',fJ clayey sand (SC) ~::.-.;-:. ~:~[~~ ~ Very sti ff to hard, ~ clay (CH) J ~~f ~ black si Jty Eocene Sediments LEGEND: (SM) = Group classification symbol in accordance with the Unified Soil Classification Systemo ~ = Water Level at time of drillingo ~* = Water Level as noted at bottom of logo LOG OF TEST BORING ij, COHTINUED H OSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUHDATION ENGINEERS AND GEOLOGISTS SAN 0.1 EGO. CALI FORH I A DR. BY: GS I APPROX,,-SCALE: I" = 5' CK'D BY: fl,r. .... ! DATE: 7/18/72 • •• • • • • • • • • • ~ Q) Q) u.. o 5 10 15 30 35 For Legend, see Fig. 6 Boring 5 Hard, dry, dark gray sandy clay (CH) ~orous) ~"iI-----------------------------Hard, da~p, light gray s~1dy clay (CH) damp, brm.." silty clay (CL-CH) LOG OF TEST BORING 5 HaSP GROVE Eocene Sediments .. WOODWARD -G1218~SKI & ASSOCIATES '. CONSULTING SOIL AND FOUHDATION ENGINEERS AND GEOLOGISTS I SAN DIEGO. CALIFORNIA J' DR. BY: GS .72-1~s..20 CK'D BY: R;.!W DATE: · ,\ • .- • • • • • • • • • .... C!) C!) u. -C!) co .s::; .... C- O) C 10 - 15 - 20 - 25 - 30 - 35 _ 50 j For Legend, see Fig. 6 Boring 6 t~edjum dense, damp, gray silty sand (Swf) Porous Dense, danp, reddi sh broV!T1 si.lty to clayey sand (SC) Dense, damp, light gray silty sand (S~) with dark gray silty clay (CH) layers Very dense, da"p, dark gray coarse si J ty sand (Sp-SW) ;:;~);:t: ~:~ (~)e, damp, light gray si J ty :;:?h .. ~.~ -----1--------- Terrace Depos j ts Eocene Sediments ~ ; f j t. ; ! , : '. Very dense, danp, coarse bra.,.", si 1 ty \! sand (g.1-SP) cross-bedded . n 7,_"·-:-.L-7 _--,-_____ --"---II HOSP GRO VE L CG 0 F TEST 80 R I N G 6 wooa~ARD -GIZI8~SKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAH DIEGO, CALIFORNIA DR. BY: GS T APPROX. SCAtt: I" = 15' 'PQI)J. N?j 7?-10C',..?Q· ~ I j ('yIn IlV. ~'''/{ul n.I.T~' 7/i8/72 I ~'I('J::l!: ~,... •• • i: •• • . \ " , Bori ng 7 • , 0-~ Hard. dry, gray si 1 ty cJ ay T 0-1) Porous . '. t:t,,:. ------1---------- .i:P::I.: Dense, moi st, gray-brown clayey sand ( SC) • ~ ~~~'.:~:::' Terrace :. ':".:.:~:: 5-:(:::\';: Oepos i ts ~<:-~~: . . ;:!i~'i;.' • • 7 7~;',~;,! +-' :' ::':~'.::. Q) < Q) ::C'-;' u.. 15 -.. ,. ~ . ----------------- I Very stiff, rroist, 1 ight gray si Ity Q) clay (CH) 0 I~}f~·;. tU Very dense, moi st, 1 i ght gray cl ayey 'I-L. .:.:.: .... <;. si It (ML) ::J i~;:.':::.'.~ en "0 20 - • • c ;;~~ ~~ dense, moist, 1 ight gray si 1ty ::J 0 ( a~) L. Eocene c:l , ~ Sediments 0 .... )::::',:: Q) co 30 _ .c ~ Hard, moist, braWl si 1 ty clay (CH) +-' 0-~ Q) c ~:.';'''::.:' Very dense, moi st, 1 ight gray si 1 ty I Jt~~ sand ( 3.1) . 35 -7 - 4r- 'i~::':';:'" , . ,-, :.;:'::' , ~:.::::.\~:. f-Water Seep :~.::~.:::: • • Clay Seam ":,' ~. ~ 4-5 -E-W ~ Very stiff, saturated, broWl si 1ty liN ~~Y (Oi) 1\ 'I: Hard, rroist, bro~ si lty clay ( Oi) ! ~ I , \7 I 50 -~ "'" * I'~ hours after dri 11 ing • For Legend, Fig. 6 HaSP GROVE see LOG OF TEST [30 RING 7 WOO [)l,.JAR 0 -GIZI8~SKI & ASSOCIATES COHSULTlHG SOIL AND FOUNDATION EHGINEERS AND GEOLOGISTS SAN DIEGO. CALI FORN JA DR. BY: GS APPROX SCAlE: I" = 5' PRI)J lin· 72-105-20 • CK'D BY: tau DATE: 7/19/72 FIr,U~E....~n· 9 e 11 • " \ • • • • • • • • • 0- 5- 10- 15- 20- 25- 30- Clay Seam H20N 20NE For Legend, see Fig. 6 Boring 8 ~ Hard, dry, gray, sandy clay (CH) ~ Porous ------r--------- ':'~'-_/~~. ~': ~ :. ;: ... ~~:' ".:.- Terrace Deposits Eocene Sediments ~'-'---------------- Continued on next page HaSP GROVE LOG OF TEST BORING 8 l.JOODl~ARD - G I Z 18~SK I & ASSOC I ATES CONSULTING SOIL AND FOUNDATION ENGINEERS ~NO GEOLOGISTS SAN DIEGO. CAtIFORNI~ ., DR, BY: GS I APPRm', SC~\..~: I" =~, f PQQ:),,-112.4..2?:.:2.9.2;::2.2.~t ~ ~ ## e .. , t . . . • . • • • • • • • • • ... Ol Q) LL. I Ol () «I -.- '-:::I CI) -0 C :::I 0 '-0 3: 0 -Ol Ql .s:::. ... C- Ol C 30- 35- !J.5- Boring 8, Continuej· :;('~T Sam~--;:f~------- ~ Hard, danp, broWl s; lty cl ay (aJ) :::i\:f: Very dense, roo; st, 1 i ght gray 5; lty ? ':':i': sand ($i) ::: J',: ~ Hard, rooi st, ~ broWl sil ty c1 ay (CH) ·;r2.::. Very dense, mo i st, 1 i ght gray silty .:,'::.)J sand (SvI) > .... ~ t·,:·' .::';::::-;.;. -Water Seep . i~~[': ~turated _Cl __ ay,---,-Se ___ a_m_-!=~;!:;;~~ ~ Very sti ff, satu rated, brC\lll si lty Eocene Sed iments N I 5W ~ cl ay (CH) I 50-I2NE ~'\ ___ -L... __ _ ~i H II J i I , ,.. ____________________________________ ~i ! For Legend, see Fig. 6 LOG OF TEST BORI NG 8, CONTI NU~D I HaSP GROVE ! ~---W-OO-D-WA-R-D----GI-Z-18-~~SK~I~&--A-SS~O-C-IA~T~ES----~~! CONSULTING SOIL AHD FOUHDATION EHGINEERS AHD GEOLOGISTS I SAX DIEGO. CALIF~HIA ~------~--~~~~~~~------------~i DR. BY: GS APPROX. SCALF: I" = 5' PROJ, 1/1).72-105-72 I CK'D BY: !1i()J DATE: 7/19/72 FII3UP~ Ifl)~ II_II •• • • • • • • • • • • • .s::: -+J C. (!) o 0- 5- 10- 15- 20- 25- 30- 35- 80ri ng 9 .\~:;'.::::\: :}! r,":::' ..: .. :r·:'~·· ,~:.:..': . . ~.,.:.:.;. ,'.~ .. ::" ~:,,;~.~'~\" ·;t,:.:·:· ::Y:-::.:':.: ··~~~t\ Terrace Deposit :~'~}=-(" ~~------------------------------------------\)'.:'.: .. Very dense, moi st, 1i ght gray si 1 ty C.:....I a...:..y~Se:...::a.:::.m_-t;=:i·:·'·:.::j·::' sand (s.1) N70W 7-~ 5N E :·1 .. \.~. Clay Seam H70w0/ I lINE {~}.: :':'::.:.: . ~:;:::' : ; ::::::::,-. : ',;;: .: ' ... ,'., ~:. ~.:.j~~ .... : ..... . . ': .. :.:~ ::::.:F·::. :~"~:::::" \l0.;if .>::-::;;=-.:' : '-'·n·"~. ~Hard, damp, brown silty clay (CH) ~~ Water Seep Very dense, saturated, {I gtlt gray . ~*Si Ity sand (s-.1) L--_L-____________ _ *16 hours after drilling Eocene Sediment It 0. For Legend, see Fig. 6 LOG OF TEST BORING 9 HOSP GROVE WOODWARD -GIZI8~SKI & ASSOCIATES CONSULTING SOIL AND FOUNDATIOH ENGINEERS AHD GEOLOGISTS . SAH DIEGO. CALIFORNIA OR. BY: GS APPROX SCALE: I" = C;" P90J 1/1)·72-10'.-20 CK'D BY: t(J(,() DATE: 7/19/72 FIC.uPf: .111'1' 12 • • • • 1 • • • • • • • • • • 35 4-0 4-5 50 For Legend, see Fi g. 6 Boring 9. Continued ----------.- Same as Before Eocene Sediments LOG OF TEST BORING 9, CONTINUED liOSP GROVE WOODWARD -GIZI8~SKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGIHEERS AHD GEOLOGISTS SAN DIEGO. CALIFORNIA DR, BY: GS CK I D BY: !:tt<,v '. e· • • • • • • • • • • .... Q) Q.) u... Q) o «I .... L. :::I CI) ..-Q) cc ..r:. .... Co Q) o o 5 10 15 20 25 30 35 Clay Seam Clay Seam "IlOE ll!iNW Clay Seam H25E 18NW CIa For Legend, see Fig. 6 Bori ng 10 ~\'.i;' Dense, moi st, reddi sh brown c lay~y ':m::\ sand (SC) ,=::',:, .. fIt:::: t Ter race Oepos its ~~~! "":;:~J~:-.i;~ i-V-e-ry-d-en-s-e-, -mo-i s-t-,-l j-g-h-t -g-r-a y-s-n-t-y------------------- ';::'{~. sand (SJ-i) ' ........ . ;~~:.~:;;~ '!';!"'::: }~f;~':i ~.~~~~ ~~~ Very stiff, moist, gray-bro~n clay (CH) Water Seep Continued on next page Eocene Sediment !I ~ ____________________________________ ~.ii LOG OF TEST BORING 10 HOSP GROVE WOODWARD -GIZI8~SKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA DR. BY: GS In = 5' CK'D BY: P.AAJ DATE: I • 50 - • • • • . . For Legend, see Fig. 6 • • So ri ng 10, Con ti nued ..,.,..--r----------------------- ·:<:i·· Very dense, mo i st, J i ght yray silty ;:·:;.i). sand (~N) : ... ~::-.. ' .... ~. ',::'': .t'::;',r: ," . ',':: .~r·:.:::··. ~"'::".:' .•.. o}.: .• . ::~.~::;\::~ ;/":'!' .f:?;,:: Sf- ~:~~:~.':'. '~';:.::<:: .... : ... : LOG OF TEST BORING 10, COtHIHUED HO SP GROVE WOODWARD -GIZI8~SKI & ASSOCIATES CONSULTIHG SOIL AND FOUNDATION ENGINEERS AHD GEOLOGISTS SAN DIEGO. CAll FORN 1 A . ._ DR. BY: GS APPROX SCAlE: I" = 5' PQOJ !l0' 72-105-20 CK'D BY:~ DATE: 7/1~/n FI(,1JRE NO' I Ii •• • • • • • • • • • • • • 0- 5- ..... 10 _ Q) Q) LL.. I Q) U ~ .... t... :;, en 15 - "0 c: :::l 0 t... (!:' 3: 7. 0 .... Q) 30 -co -c ..... Co Q) 0 35 ...., 7 5J Fo r Legend '. see Fi g. 6 Sori ng II ~ Hard, darp, brtW"l silty clay (ru) ~ ~ Hard, rroist, bl"CWl silty clay (01) ~~ Water Seep , LOG OF TEST BORING II HaSP GROVE Eocene Sediments WOODWARD -GIZI8JSKI & ASSOCIATES CONSULTIHG SOIL AND FOUHDATIOH ENGINEERS AND GEOLOGists SAH DIEGO. CAlIF~NIA , " DR. BY: GS APPROX SCALE: I" = 5' pj)OJ. WI' 72-105-20 CK'D BY: 1J:/f.)J DArF.: 7/Iq/7? F'~,U~E IIIl-16 •• • ,. : . Boring 12 • 0-~ Hard, damp, dark gray sandy cl ay ~ (el) Porous ----------------- • '::~:::: ::-r Very dense, damp, 1 ight s il ty '.::~:?: gray 5-.. \;~~;: sand (94) '.~:'}': . ..... ,-::.:. 7 ~~f~~ ..... -.:.-!,.:. '. (1) :~}~:·:;z· " (1) LL. 20 -,'0,: • I ~~;~;~:. • • (1) ~}f~r 0 cu . .... I- ::J ~ Hard, damp, brown si 1 ty clay (CH) en Eocene -c 25 -Sediments c: ::J ~ 0 I- C!:l I ~ ( 0 -(1) to ~ ..c: ItO -..... ~ c.. (1) 0 '.::.::~'~:; Very dense, danp, 1 i ght gray s il ty ',' ';".; .. ", ::~ .';: .. -sand (~) ':: "~: .. . -It5 -;i:;~~;~ . .. : .... . ~': ~~(~ ... .~:: .. ~~ :' " ,-,:',-.:: .... :,::-", : ..... '.- • ,: " I, I 50 -,' .. ,I '.1 : ,. ~ , I" • 2 ~ : j; t: : k: ! For Legend, see Fig. 6 LOG OF TEST BORING 12 i I I • • U OSP GROVE .j . WOODWARD -GIZIENSKI & ASSOCIATES I CONSULTING SOil AND FOUNDATION ENGINEERS AND GEOLOGISTS I SAN DIEGO, CALI FORN I A APPROX. SCAt E: P90J NI)' 72-1 05-20 ! DR. ay: GS I" = 5' : WW 7/19/72 F,r"fR~ i CK'D BY: . DATE: lin· 17 :J e . . . • • • • • • • • .-w m .s::; +' 0-W Q 0- 5- 25 - [f0 - 50 - 55 - For legend, see Fig. 6 Bari ng 13 ~ Hard, danp. bro.-Kl silty clay (an ::,;;F~ Very dense, damp, light gray si J ty !;~~;:~.. sand (SM-SP) :~:l:: : .. ~." ~~g? :.r~:'~".~' ~ Hard, damp, ~ I ~ broWl silty clay (CH) .'>L::.,: Very dense, \','et, light gray silty i: .. '··::·' .. sand (SH) ..... : ... : ':'::,J' .... ' .. " ~: . ..... : .. :.: ~Hard, wet, broWl sil ty clay (CH) ~ . Ivery dense, saturated, 1 i ght gray si J ty sand (~H) . _. ---------- Continued on next page Eocene Sediments lOG OF TEST BOR/IiG /3 1I0SP GROVE WOODWARD -GIZI8iSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAH DIEGO. CALIFORNIA OR. BY: GS APPRQ'( SCALE: I" = r:;' ~OJ, !l1)~ 7:'-10::'-20 CK'D BY: il.K,,» DATF.: 7/1f'/72 Flr,{JPE ~I}~ 1st • c I .. •• e) , • • • • • • • +' (!) (!) LL. 55 I (!) () ctS 't-'-::J CI') "'C c: 60 ::J 0 1- C!:J 3: 0 .-- (!) a:I ..t:: 65 +' C. C!J Q 70 For legend, see Fig. ~ Boring 13, Continued --------------- Same as Befo re Hard, saturated, gray-bra-,n silty c1 ay (CH) ~and rising Eocene Sed i ments lOG OF TEST BORftlG 13, COIITI1WED HOSP GRO VE WOODWARD -GIZI84SKI & ASSOCIATEs CONSULTING SOIL AND FOUNDATIOH ENGINEERS AHD GEOLOGISTS SAN DIEGO. CALIFORNIA '. DR. BY: GS APPR X II • 72-10'i-20 CK'D BY: ClloJ DATE: 13 e. ". ~ I. Bor i ng 1lJ. 0- I ';'::": Dense, damp, reddi sh brown c1 ayey f :;'~:;'i:; sand (SC) • .;":: .. ~ : :~. ~::;'~:.' Te r race '; .. ~:'"., -', 5_ .... ::.: ... Deposits .;":.:" ::::-:::':::,;-, .. +' · .?:~ '.:: .... (/) -::::. (/) '~:~'~:;~.: u.. I ·::::.r.~ (/) 10-.. ':.:':: () ~\.:.:~::;: ctI •• 'to-~. :~~".':.~~:. ----------------I-Dense-very dense, moist, 1 ight ::;, gray '" · ~: .... : ;: '-.~ ... : . si I ty sand (S4) "t:J :;;:;b; c ::l 0 ":'~':".':" : ....... :: I-15-::\~;~:::::: (!) :;: ~ ;: 'i .' 0 :~;:~.:f··;:: Qj .~] .: .. ~~-:: co ~}::.t· Eocene I -Sediments +' Co Clay Seam :.:':'.,-(/) 20-· . . . Q ~ Hard, roo i st, broWl c1 ay (CH) ~ • I Very dense, moi st, brown sil ty cl ay , to clayey si It (~fL) . 25-- " iI • .:~ .. : Very dense, IlD i st, light gray si lty :.-. ::" 30-sand ( S-i) II ..... ~" -',: :-".,-f ' .' • ~ : '" ~ i ~ : 35-, ~----------~; Continued next '-" on page ~ . q • -=+ for Legend, Fig. 6 . I see LOG OF TEST BO RI NG /lJ. ., HOSP GROVE ~i WOODWARD -G/ZI8~SKI & ASSOCIATES ~, CONSULTING SOIL AHD FOUHDATIOH ENGINEERS AND GEOLOGISTS l:1 SAM DIEGO. CALI FORH I A ;.! • DR. BY: CiS APPROX. SCAlE: I" = '" PPOJ. 110· 72-105-20 ~I 6l~ CK'D BY: DATE: 7/21+/72 F II:.U~E wn· 20 "1! i • •• • • • • • • +' Q.) W L.I.. 30- lJ.O- lJ.5- 50- 55 - 60 - Cl ay Sean HIOE IONW For Legend, see Fi g. 6 Boring /lJ., Continued ,."..,...,...._--------------:'(~.:.:. Same as Befo re :~ .. : .... : ' ... . . ;:~.:~:~.:.: ~ Hard, saturated, brown silty clay ~ (CH) ~ ~;!::r-Very dense, saturated, 1 ight gray t;.;:' s i I ty sand (SM) '. ':.:~:'. ': ',::":",';", < -.:.::: :;':': '::':i Eocene Sed iments LOG OF TEST BORING 1lJ., CWTIHUED HOSP GR eVE WOODWARD -GIZI8~SKI & ASSOCIATES CONSUL TI NG SO I L AHD FOUHDA TlOIf ENG I HEERS ANO GEOLOG I STS SAN DIE~. CALIF~HIA '. DR, BY: GS APPR(lX SCAlE: I" = 5' f'OOJ ,,~, 72-105-20 CK'D BY: lAP DATE; 7!2'4fn FfrJ)OE 1!!2' 21 ••• 0- • 5- -+oJ 10_ • Q) Q) LL.. I Q) 0 «I 'to- L. :;, • CI:l 15- "'0 c: :;, 0 L. C!:' l: 0 --• 20-Q) III .s:::. -+oJ e-el 0 • 25 - • 30- • For. Legend, see Fi g. 6 • • Bor i ng 15 :ti}' Dense, danp, brm'41 c!.ayey sand (SC) :i:: C ... ~·::· t Terrace Deposits .. :":', ~ ." ~:.:~:.: .. ;:::.~: ... :.:~::(.:~;~ . ~~ '~~":'. ::(~":;'. Very dense, damp, light gray silty sand (S~) Eocene Sediments ~ Hard, danp, bro~A1 silty clay (C~l) I ~ Continued on next page LOG OF TEST BORING 15 HOSP GROVE WOODWARD -GIZI8~SKI & ASSOCIATES CONSULTING SOIL AND FOUHDATION ENGINEERS AND GEOLOGISTS SAH DIEGO. CALIFORNIA " DR. AY: GS APPPO~. SCALE: I" = 5' ~0J Nt), 72-IO'i-20 C)('D BY: JlttfJJ oATF.: 7/2~/7? I=Ir.!l0..E. 111'\· ?7 ., . • • • • .' • • • • • -Q) CXl .J: +' 0-Q) C 60 - 70 _ For Legend, see Fig. 6 Eocene Sediments .: •• ::> ••• : ~.,.:~.\. '. ~ i __ ------------=.J/ '.j LOG OF TEST BORIIIG 15, COIITINUED i'j. HOSP GROVE d ~----~~~--------------~~~~----~~I WOODWARD - G I Z 18~SK I & ASSOC I ATES P,· CONSULTING SOIL AHD FOUNDATION EHGINEERS AND GEOLOGISTS LII SAN DIEGO, CALIFORNIA i OR, BY: GS APPRQX SCAlE: I" = 5' ponJ NO' 72-1 o~201i CK'D BY: M~ DATE: 717.~/7? FJC./JPC= lin· n -~J •• • : ~ Bari ng /6. • 0_ ::/~\~ Medi urn dense, damp, brown si 1 ty t .. :~.;.:.:{:. sand ( S/~) porous ;'~i~~ A II uvi urn , Dense, danp, brO'r'll clayey sand (SC) ~~'~;'l{" • 5_ ~~:};~.':~ ---------------. -~;;'" .'};):::. Very dense, fiX) i st, light gray ~~~ sil ty sand (~) 7 " ~'. • -f.J :::~.~':\: <!J 25 -:i;;~} (l) LL. • I k~ Q) 0 <U '+-'-"~:P") Eocene :::1 CI') 30 -~:.:., ...... Very dense, /OC) i st, I ;ght s'; I ty Sediments "t:l ~:'::;Y' gray c: sand (S4) :::1 Clay Seam 0 • • '-~ Hard, CD damp, brown sil ty clay ( CH) ~ 0 ~ -~ Q) 35 -co .J::. +' ~ 0.. <!J Q ~ .. " ~O -I .. , • .. ,,', dense, saturated, 1 ight 1::)\:\ Very gray silty sand ( 5\1) ~5 _ /:-,:::; .......... -;'.:. I-Water Seep : ~" ~'. : " ,:'.' ~ r ;"" .. ' S? I " • 50 - • For Legend, see Fig. E lOG OF TEST BO RIIIG 16 HOSP GROVE WOODWARD -GIZI8~SKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CAU FORN I A DR, BY: GS APPROX. SCALE: I" = 5' ppJlJ. NO' n-Ios-?o • CK'D BY:HW DATE: 7/2q/n Fltll~E.. lj/\. ?U ••• • • • • • • • • • .r:. +' c.. .0,) o 0- 30 - 4-0 - 4-5- CI ay Seam H60E 2!iNW For Legend, see Fig. 6 Sori ng 17 ::<'.:.::,~ Medi urn dense, derop, broW'l si lty .. :; :.:,.:'. sand ( SM) po rou 5 (....:.:;..~=.::-.>..;:;.;..;.'-.J...---'-.;;....;..._______ _ ___ _ _ _ ____________ _ >C'" . Very dense, danp, 1 ig,t gray si·l ty .;~~,\.; sand (SM) .. ' :.'. ,:t ::;~:~ .. ~I\. Very stiff, moi st, broVll clay (Oi) :::~~/ .. ; Very dense, rnoi st, 1 i ght gray si I ty \'.:;". sand (S·i) ~:~<.:':' ~t;'~ 't"';~' ':', ";"';':::' -:' .. ~:',,:-".: '~~/.~:.:/:: .. ! ...... ~:.~:. ~': ',: ,:':" :;. ~:. ':::;'.~ .. ::, ~. ,:,::,~.r·. -Water Seep .. " ::, Eocene Sediments LOG OF TEST BORING 17 -. ·1 I HOSP GROVE . WOODWARD - G I Z I 8~SK I & ASSOC I ATES I CONSULTING SOIL AHD FOUHDATION ENGIHEERS AHD GEOLOGISTS ~ SAH DIEGO. CALIFORHIA . OR. BY: GS APPRO'!; SCALE: I" = 5' PPOJ ~O· 72-105-20 CK'D BY: t!/¥(.u DATF: 7/24/72 FIr.IJRE lin· 25 e . I. • • • • • • • • • • C'I c: .-(/) (/) cd 0... +' c: (I) U I- (!) 0... Note: o O~~~~~~--~----~~~~~--~~----~IOO 0.1 ' .01 .001 Grain Size in Mill imeters ¢r Range According to Lambe and Whitman (1969) Sample "/. Passing ~ ~r Range 4-6 10-1 13-2 14-3 60 50 47 17 8 ,to 18 10 to 21 II to 22 17 to 3 " I ./ II .1 II ; 1 ~ l ~ : ~ ______________________________________ ~H r" . 11 ¢ = Residual angle of internal res i s tance~ HYDROl·1ETER ANAL YS I S II HOSP GROVE L ~--------------------------~--=!'f WOODWARD - G I Z 18~SK I & ASSOC I ATES r.J COHSULTIHG SOIL AHD FOUHDATIOH EHGIHEERS AHD GEOLOGISTS ;1 SAH 0 I EGO, CALI FORH I A ~ DR, BY: Wi APPRQX SCALE: na pqOJ. W)· 72-105-20 1/ ~~~:=:=======================~C=~=ID==By=:=e=H=·(=J~D=AT=F.~:~8=/=23=/=72====~~~F~1~w~RE~wn~.==~26~~U • • • • • • • • • • • . . oj -_0 \" Fi Iter Class II permeab~ material State of Cal ifornia specifications or equivalent Visible Water Seep Fi I ter~2~'~-/ min" thickness TYP I CAL SECTION (normal to slope face (no scale) Collector pipe 6 in" perforated (Min) galvanized steel ® dense natural -7:'-=-T7T'~~ Out let pipe 6 i n" ~ i n" non perforated Outlet to Nat u ra~l,---... Drainage -.I20'min,,~ ~ ~ key 5' minimum into~ natural sandstone TYPICAL SECTION (parallel to slope face) (no scale) I 0' ° f ~mino into natural sandstone prior into dense natural sandstone TYP I CAL SECTIONS EAST CAIlYON FILL HOSP GROVE WCOD~~ARD - G I Z I 8~SK I & ASSDC I ATES COHSULTIHG SOIL AND FOUNDATIOH EHGIHEERS AHD GEOLOGISTS SAN DIEGO, CALIFORNIA DR. BY: (:) CK'O BY: '0 • • • • • • • • • • project No. 59331W-UDOl Woodward· Clyde Consultants APPENDIX G FINAL REPORT OF ENGINEERING OBSERVATION AND COMPACTION TESTING GROVE APARTMENTS CARLSBAD, CALIFORNIA 1973 ". •• · -', • • e' • • • • • • Ma rch 1, 1 9 7 3 Project No. 72-105-20 Grove Apartments Post Office Box 1155 Carlsbad, California 92008 Attention: Mr. Jerry Rombotis FINAL REPORT OF ENGINEERING OBSERVATION AND COMPACTION TESTING GROVE APARTr~ENTS CARLSBAD, CALIFORNIA In accordance with your request, and our. letter of agreement dated April 28, 1972, we have provided soil engineering services in conjunction with the grading of the subject site. These services included: (1) Engineering observation of the grading operation. (2) (3) Observation of the removal 'of highly expansive soil from the top of 2 feet of rough lot grade and replacing it with nonexpansive soil in the areas shown on the attached Fig. 1. Observation of the removal of an existing "old slide," installation of filter material and drain system'as directed by our office, and replacing with on-site fill material to proper grades with compacted fill. (4) Observation of the removal of loo~e surface soils from the bottom of canyons. (5) Taking field density tests in the fill placed and compacted. (6) Performing laboratory tests on representative samples of the material used for fi 11. Site preparation, compaction, and testing were done between May 17, 1972, and December 19,1972, in accol~dance with the "Specifications for Controlled Fill" in our report entitled "Soil and Geological Investigation for the Proposed Hosp Grove ,lI,partments, Carlsbad, California," dated August 25, 1972. The grading of the site essentially consisted of making cuts and fills of , moderate degree to reduce the site into large building pads and parking areas. Most of the deep cuts were in the southeast portion of the site and the deeper fills vlere placed in t\'IO canyons along the northern boundary, one major canyon and several minor dra\'Js along the eastern boundary. As the site gradi ng progres sed compaction procedures I'lere observed and fi e 1 d dens i ty •• • • • • • • • • • • Grove Apartments Project No. 72-105-20 March 1, 1973 Page 3 representative samples of the material used for fill. At the time of issuance of our preliminary soil investigation report, a slow direct shear test was underway on a sample from a clay seam encountered in the test borings in the area of the existing slide. The results of the test essentially verify assumed shear strength parameters used in our stability analysis. The results of laboratory tests are given on the attached forms. Laboratory tests and a visual inspection of the site by the project engineer and field technician on February 20, 1972, indicate that expansive materials are present at fini shed grade in some of the cut and day1 i ght areas; however, the upper 2 feet of all fill areas consist of a minimum 2 feet of nonexpansive soil. The following table presents the results of our inspection and indicates our estimate of the pads that will need special footings. TYPE OF PAD PAD FINISH CLAYSTONE SPECIAL GRADE Cut Fi 11 Cut-Fill DAYLIGHT PATCHES FOOTING ELEVATION UNDERCUT RE~1AINING REQUIRED 1 87 to 95 --x No Yes Yes 2 95 - - x Yes No No 3 103 to 105 --x Part. only No Yes 4 115 --x Yes No No 5 113 --x No Need No No 6 117 x --No Need No No . 7 121 --x No Need Yes Yes " 8 122 --x No Need No 'No 9 125 --x Yes No No 10 125-128 - -x Yes No No 11 130 --x No Need No No 112 133 x --No Need No No 13 136 --x No Yes Yes 114 145 --x Yes No No 15 153 --x No f~eed No No 16 155 --x No No Yes 17 161 --x No f~eed No No 18 165 --x r~o Need No No 19 180 -x -No Need No No 120 186-190 --x No Need fJo No 21 165-168 --x No Need No No WOODWARD, GIZIENSKI & ASSOCIATES COfrCSULTlHG sou. AND rOUNDATION ING'PffUIS AHO G(OLoc;JSTS e. • • • • • • • • e • Grove Apartments Project No. 72-105-20 March 1, 1973 Page 2 tests were made to determine the relative compaction of the fill in place. Field observation and field density test results indicate that the fill has been compacted to 90% or more of maximum laboratory density. The approximate locations of field density tests and the limits of compacted fill are sho'tln on the attached Fig. 1. The results of field density tests and of relative compaction expressed as a per~ent of maximum laboratory density are given on the attached forms. During the grading of the extreme northeast canyon area along the northern boundary, an existing slide was removed to dense undisturbed formational material before placing the canyon fill. An existing water seepage behind the slide was contained in a drain system, which was first established at the toe then extended up to the pad area as the fill progressed in height. The system, consisted of an approximate 3 feet wide trench into which was placed 6 inches of filter materials (1 in. max. combined aggregate State of California Specifications) then a 6 inch perforated corregated metal drain pipe and. finally an additional 2 feet of filter material above the pipe. Near the top of the canyon the filter material was spread out to cover seepage areas and off shoots of the trench and drain system extended above into the pad area and along a low slope where additional seepage was apparent. The drain line as installed is sho\'Jn on the attached Fig. 1. The drain system emptied into a natural drainage into which was later placed a 24 inch nonperforated pipe which extended to an existing storm drain inlet at the edge of the shopping center along the northern boundary. Periodic inspections of the drain have been made since installation .. The water issuing is clear and seeping at about the same volume as during construction of the system. Weak clay seams were recognized in the formational materials during one pre- 1 imi nary i nvesti gat; on ina northwest canyon area. Here the a 11 uvi a 1 materi'a 1 and overburden soils were removed in the key area to dense undisturbed for- mational soil which was inspected by a geologist before placing new fill material. The overburden soils were a~so removed and undisturbed formational 50ils benched into on either side of the canyon as the fill progressed in height. Along the e.astern boundary where fill \oJas placed in a major canyon and several minor draw areas, the alluvial material was excavated and recom- pacted and benches were made into the sides of the dravJs into hard clayey relatively competent overburden soils as the fill progressed. The lack of suspected slides along the eastern boundary and the generally favorable geologic conditions in this area did not dictate the complete removal of over~ burden soils to undisturbed formational materials. During grading, portions of several of the pads were undercut to remove potentially expansive soils and essentially nonexpansive materials were placed in the excavation and compacted. Upon request of Grove Apartments, Inc., undercutting was terminated on August 21, 1972, in accordance with a letter dated August 22, 1972. Hence, strips of expansive topsoil and patches of claystone remain in some areas on several of the pads. Laboratory tests to determine moisture density relationships, maximum dry density, optimum moisture content, grain size distribution, plasticity characteristics and strength and s\'/ell characteristics \'/ere performed on WOODWARD. GIZIENSKI & ASSOCIATES CON~UlT'NC SOIl ANO rOuNc,"'IOH CfrttCINrrllt\ "~D C(OlO~I~T'S • •• ". • • • • • • • • • • Grove Apartments Project No. 72-105-20 March 1, 1973 FOUNDATIONS Page 4 (1) Foundations for one to three-story woodframe and stucco structures founded in properly compacted fill or natural undisturbed soil may be designed for an allowable soil bearing pressure of 2,000 psf (total load) at a depth of 12 inches below lowest adjacent rough grade. This value may be increased 1/3 for loads that include wind or seismic forces. Footings should have a minimum width of 12 inches. (2) It is recommended that all footing excavations be inspected by our firm immediately upon completion of excavation. If potentially expansive soil is evident, one of the f&110wing footing designs will be recommended. (a) For footings founded on properly compacted low to moderately expansive soil, it is recommended that a 12 inch deep footing be reinforced top and bottom with No.4 reinforcing bars and that the concrete slab-an-grade be reinforced with 10 gauge 6x6 welded" wire mesh placed on chairs at the midpoint in the slab and that the slabs be underlain by a minimum of 4 inches of clean concrete sand, crushed rock or gravel. (b) In areas where moderately to highly expansive claystone soils or topsoils are encountered, it is recommended that the footing be extended a minimum depth of 24 inches, be reinforced top and bottom with No.4 rein- forcing bars and that the concrete slab-on-grade be reinforced with 6 gauge 6x6 welded wire mesh placed on chairs at the midpoint of the slab and that the slab be underlain be a minimum 6 inches of clean concrete sand, crushed rock or gravel. Dowels shOUld also be provided in the footing and bent down into the slab. The following sketch incorporates our recommendations in this regard. Rough or Compacted Grade 2Q"min o • L 12" I r-min;1 FOOTIHG DETAIL #3 Dowels, 2q" O.C. q" min" concrete slab with 6x6 66 mesh #q Bars, top and bottom (3) Structures that 'tli 11 not tolerate differenti al settlements, such as foundations, swimming pools, concrete deck walls, etc. should not be located within 5 feet of the top of a slope. Footings located closer than 5 feet from the top of a slope should be extended in depth until the outer bottom edge of the footing is 5 feet horizontally from the outside face of the slope. WOODWARD· GIZIENSKr & ASSOCIATES CONSUL Tt"'G sou. AHO 'OUNO ... l,ON (Ir'GtNf€ltS AND GtOlOGISTS •• • • • • • • • • • .. . • I. Grove Apartments Project No. 72-105-20 March 1, 1973 Page 5 The elevations of compaction tests, shown as finished grade (FG) tests, in Unit A, correspond to the elevations shown on the grading plans for "Carlsbad Tract No. 72-l2A Apartments-Unit A," dated October 6, 1972, prepared by Roy L. Klema Engineers, Inc., Escondido, California. For the remainder of the site, it is our understanding that as built plans are being prepared. Finish grade test elevations in other areas are essentially within + one foot of the elevations shown on "Grading Plans Hosp Grove Apartments ll dated May 26, 1972, and prepared by Roy L. Klema Engineers, Inc. Elevations and locations shown in this report are based on field surveys established by others. This report covers the fill placed under our observation during the dates specified herein. Additional fill placed after these dates, as well a's the backfill in utility trenches located within 5 feet of a building and greater than 12 inches deep, or any trench 5 feet or more from a building and in excess of 5 feet in depth, should be compacted under the observation of this office and tested to assure compliance with the earthwork specifications for the project. This office should be contacted at least 24 hours prior. to backfilling operations. Utility service trenches within 5 feet of a building that are perpendicular to the building footings and are less than 12 inches wide and less than 3 feet deep are not subject to this recommendation. The inspections and tests of compaction made during the period of our services on the subject site were in accordance with the local acceptable standards for this period. The conclusions or opinions drawn from the tests and site inspections apply only to our work with respect to grading and represent conditions at the date of our final inspection. We will accept no responsibility for any subsequent changes made to the site by others or by uncontrolled action of water or by failure of others to properly repair damages caused by uncontrolled action of water. L is J. Le1:YR.~ EHP /RPH/JLH/LJL (6) Kamar Construction Company (1) Roy L. Klema Engineers, Inc. Attachments ., WOODWARD· GIZIENSKI & ASSOCIATES CONSUl liNG SOIL AND FOUNOA"ON U'GIN££JtS .,,0 C;;(OLOGIS'. • • • • • • • Proper ty li ne ~f~--'ew of this ~ .. ' .. ", "'''!'' :~ .t b,tto •• -----/area see In se , -----• / MO' f'~ ..-----. ~'r <."7, :r:l~ •. ' / '" . .... ',,-l" II .J / .~~~_\ <V-;,;.: '::f~;l' {!...-:t~., ,.: ( (~:~tA:~··!~~~~r:·) ::$~:~~~.~ ';~:1::t \ --". 'I "I:v.. ;" "'"E. Ur n .. . ... <t .. , ''!r',~".. / .. ,. . ", ~ ~ •• . I ~l"" L ",'"'''!.. . ,,""-. \ _ . • \" /.i '\,........ <.. ">( .(."';., . /; ~ .. ~, I ; ,. • :~ .. /..' 'I ..... :." •• ~ ) ~, .• { \. ~~i'.i,i: ,I ~ •• ~ :. .... • ~ ~. • • lEGEHD: Indlcat .. appro.illate location of • Fi.ld Den,i t7 T.,t • r" Indicate. appro.lllate 1I.lto of L....i h,ted fill. rrllJ: Indicat., appro.l .. ate 11.1 h of filtj .ru undercut and rep lilced wi th CQmpilcted nonexpan$ivo fl II. . '.: ""~" ... ','. ~,~ \ -i~ r " .. ~ ,r. _.... " I ""',~ .''; J.".l'.j " iI'" ~ d'.:"'1 • • ".~ ~ t' ., L. .~ ~. '0' J" " .. ' . .,' "-"',7A .,,, ..•.• ~ . _. ~."'o ,,_ . .• .. . "". d I.' __ , -\ .,Jr,' _I • ,... ~' .. , . '-.~ .. -0 ·" (":.~: :. ~,f, I c..... ...;:'''' J' ~~ ."~' •... zz "_ " /''':::-r:~ '\ ' ........... ' • .' "-'-'---0 ." /C ..• _,~ I /., .J" W!-:::,., ffl{"" .,,' . ':-.~'l: ~ .. '~' ./ -'.. "' ~ .,10 'if I~f, "\ -/---' --, ,,,,, .. ,., ".. .. " . .~. -.. ~ ~o 0" ..... , <"c. ~ ,'" .... "" =~ ..... ' L '''''' "... , " _ w • .0."..., 0 , ." "" _ '" '<'h . ,,_ ."'.'~ -" . SI't.... ') v... .". ,....".. ~'-' ~ ..... --... ..... • -••• n .. ~ ~ ,n. . "'~~ ·,'s 't' ~'.;,.' "'1 ).~!. , ... ,:.; "".-. / ' I J' ."," -"'t. 'r _ ~ .~ ..... <.~ I ",: """ •. I ":..c' '" ],'1""~ 1J~'1z ... ~. C:\~~' -"V .. .< ,,,. ._. ::l: ~.."", '<., 1 ':"',. "'1" . £.r.. '-.... ...... • ." . ;;;:~'J.,.,.. (":.) ~f./~>o ''''-,d ~'r'~1 /'/'.I'::':·l'· '» """'7 .2t . . ..r •... , "'. ':' ~. "r j' ""''';;''1 'fJ d? ~ I . ~/.~:'~, "~"'''' ~,. " ~ ,., .j "'''''''', •• :.... . . . '.' or ,'" too ' ... " , ..... ,j ~. I .l EU I"~ .'It • '.: • • '" .)0. ... ~_ • 101 • ........ ~ • 'if f1 _. J,,,, 111 • , j' .'/. f.'ll' ttl., ... )~j;S-~,., ,.. " /' J .,.t. J . • Itt -r---' _ / •.• )t'~. • r4 • ) I" ';'77 J n " ". -~?-----~;---~~~~====~::::::::::::::::~~~==::::= C ~----IHSERT $cale ,. 100' .. ----.. -~-----.I • · . . . ' • • • • • • • • • • RESUlf () OF LOADED SWELL TESTS Initial Final Sample Dry Water Dry Water Pressure Expans ion ~aturatior &ituration Number Density Content Density Content pef % !J pef % % psf % of Initial fleiqht SA-I 105 23 100 10 I. 6 25 100 160 3. 12 Pad Ele 190ftg g *Based on a specific gravity of 2.65 1.9t! inches Diameter of Samples: -,--__ Height of Samples: O.63t! inches RESULTS OF LOADED SWELL TESTS HOSP GROVE APAR1NENTS WJOD~JARD - G I Z I ENSK I & ASSOC I ATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA OR. BY: LDS APffiOX SCALE' NA PP.OJ, HI)· 72-105-20 CK'D By:{(1V DATE: 3/1/73 FIGURE HO' 2 • •• . - • " v SA/04PLE DATA . , Sample Ho: 7 C.I assi fication: • . Height. inches .807 .... .... Diameter. inches I .911-.;. .., -.., c 0 .... . • en I 2 CI) Initial Conditions: LLJ a:: ~ CI) Dry Density. pcf /I q..2 I 111-.2 a:: oCI: LLJ Moisture Content. % 8.q. 8.q. :z: CI) After Soaking: • Dry Dens i ty. pef 116.lJ. 116.3 Moisture Content. ,.. 16 2 ;: 17 I Surcharge durir.g soaking and normal load: Fi rst run: 2040 psf Second n:n: l~080 psf, TEST DATA • Angle of Friction. degrees mo , Cohesion. psf IlOO SHEAR DISPLACEMEHT. inches -" • - " 2 ..; .... .;. '" -'" • • c: V 0 ~ .... V> tf' V> I ~ LLJ a:: / ~ CI) a:: / « ~-L ~ C. _Il00 -p'sf T I 2 3 II- HORMAL STRESS. tons/sQ. ft. DIRECT SHEAR TEST • HOSP GR eVE APARnJ.EHTS WOOD~ARD -GIZIENSKI & ASSOCIATES CONSUL TI HG so I L AHD FOUHDA TI OH EHG I HEERS AHD GEOLOG ISTS SAN DIEGO, CALIFORNIA • DR, BY:LDS GS APPROX. SCALE: ----PROJ. HO: 72-105-20 C!<'D BY:4~1 DUE: 2/':.3/73 -I GURE HO.: 3 -~ -- • , ~ • SAMPLE DATA Sample Ho: 10-1 Classification: • ...: He i ght. inches .807 .... Diameter. inches 1.9~ 0-'" -'" c 0 .... eI) • Initial Conditions: I 2 eI) ~ LU 0: I-eI) Dry Dens i ty. pcf 99.6 98.6 0: oc( lo4oisture Content. % u.J 22.2 23.9 :c eI) After Soalcing: • Dry Density. pef 9S.5 98.9 Moisture Content. -: 29.~ 29.~ ( -- Surcharge during soaking and normal load: First run: 20qo psf Second r~n: ~CSO psf TEST DATA Angle of Fri ction. degrees ISO I~ Cohesion. psf ~70 4-20" SHEAR DISPLACEMENT, inches *Hote: Indicates residual strengtho • . - 2 ...: , Peak-~ ~~ , .... ..;. ---'" --• • • { OIl -------r-I ~o= c: ~ r 0 .... (I) --~ ---~-~ (I) I u.J --~ ex r:::: I-~ (I) ~ '-Residual , 0: ~fT <'_:70 t II C'_420 II ~ -pst '-psf il II I 2 3 4-"' 'I NORt-IAL STRESS, tons/sq, ft. l' DIRECT SHEAR TEST HaSP GROVE AP ARTM ENTS WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAM DIEGO, CALIFORNIA • DR. BY: lOS GS APPROX. SCALE: ----PROJ. NO: 72-105-20 CK'DBY:~~V DATE: 2/78!73 FIGURE I/O: lj. •• 0 , COMPACTION TEST RESULTS oJ08 f'lAt.1E HOSP GROVE APARTMENTS OATe: REPORTEO 2/28/73 J08 NUMBER 72-105-20 . , May 22 through December 19, 1972 • CATES CC;>VERED PAG!: 1 OF 10 MOI.TURK P'IELO uaORATORY '''n .... TlvE TII.T RETEST LOCATION ELEVATION CONTENT DENSITY . OEN.ITT CO"'~ACTION DATI: OF TEST ~ DRT WT. I'(;P' 1'<:' -I. 0" LAS. DE.Na. NU,.a£1'I 01' NAY 22 1 SEE FIGURE ONE 66.0 I 16.3 107.4 117.5 91.5 • 2 76.0 I 17.6 106.7 117.5 90.7 j'1AY 23 3 70.5 I 14.5 107.7 117.5 91.6 4 75.0 I 16.3 109.1 117.5 93.0 5 78.0 I 14.5 108.8 117.5 92.6 6 86.0 I 15.0 107.4 117.5 91.4 • r~AY 26 77.0 I 12.2 7 104.6 115.5 90.6 8 84.0 I 8.3 108.2 117.5 92.3 9 104.0 I 16.2 111.2 115.5 96.3 r4AY 27 ·10 79.0 I 14.3 107.S 115.S 93.0 • 11 81.0 I . 12.3 106.0 115.5 91.8 12 84.0 I 12.3 105.8 117. S 90.1 13 108.0 I 13.6 106.5 115.5 . 92.3 14 86.0 I 12.3 107.2 115.5 92.7 15 88.0 I 13.0 108.5 115.5 94.0 • t4AY 30 16 91.0 I 11. 7 111.7 115.5 96.5 17 94.0 I 8.0 106.0 115.5 91.5 18 97.0 1 4.1 106.6 "'6.5 91. 5 19 1 00. 0 I 11. 5 107.0 116.5 92.0 . .' 1'1AY 31 20 102.0 I 8.5 10S.2 114. S 91. 7- 21 105.0 I 10.S 106.S 114.5 93.2 22 108.0 I 8.0 105.7 114.5 92.3 23 110.0 I 8.7 107.8 116.5 92.3 ,JU:·j 1 24 113.0 I 6.5 108.8 114.5 95.2 • 25 115.0 1 9.9 113.5 114.5 99.3 26 70.0 1 19.0 92.0 106.5 86.3 27 73.0 I· 19.0 96.0 106.5 90.0 28 26 70.0 I 18.3 97.7 10G.5 92.0 29 118.0 I 12.3 'i08.5 114.5 94.7 • JUil 2 30 76.0 I 20.5 97.7 106.5 91. 7 31 78.0 I 9.0 109.5 120.5 90.7 32 78.0 I 20.5 97.2 106.5 91.3 33 80.0 I 20.5 98.3 106.5 92.3 3.4 80.0 I 19.6 98.5 106.5 92:5 35 82.0 I 10.5. 109.2 120.5 90.7 .' 36 82.0 I 21. 5 99.5 106.5 93.5 37 120.0 1 12.3 11 O. 2 116.5 94.7 38 122.0 I 12.5 107.7 114.5 94.0 WOODWARD· GIZIENSKI & ASSOCIATES • CO~5.Ul"NG ,-OIL AI'9U 'OU~O""IO'" (ftrtC;.",.t't\ ."'0 CfOLOCIS'\ • • . . • COMPACTION TEST RESULTS JOII.NAI>I~ HOSP GROVE APARTMENTS DATE REPORTEO 2/28173 JOB NUMBER 72-105-20 • CATES COVERED Hay' 22 through December 19, 1972 PAGE 2 OF 10 , , MO,.TURI: ".ELD LAIIORATOIIY RELAT.VE DATE nllT RETEST LOCATION ELEVATION COHTItNT OItNS.TY OI:N •• TY CO"'''ACT'ON HU ... ER 0,. OF TEST "" OftYWT. reI' 1'<:1' 'I, 01' LAB. DENa .. -.-. '- JUN 5 39 SEE FIGURE ONE 84.0' 9.0 113.5 127.5 92.2 • 40 84.0' 11. 1 116.8 127.5 91.5 41 86.0' 13.0 106.3 117.5 90.6 42 86.0' 10.5 104.0 115.5 90.1 43 124.0' 13.0 109.0 114.5 95.2 44 124.0' 12.3 110.2 121.5 90.7 45 88.0' 15.3 92.0 106.5 86.5 • 46 90.0' 18.3 94.0 106.5 88.2 47 166.0' 8.3 106.5 117.5 90.1 JUN 6 48 . 126.0' 8.5 121.5 127.5 95.3 49 126.0 1 9.9 119.5 127.5 93.7 • JUi~ 7 50 128.0' 10.5 104.5 114.5 91.2 51 128. O' 9.3 110.0 127.5 90.5 JUN 8 52 45 88.0' 9.2 104.1 115.5 90.2 , 53 46 90.0' 10.5 104.0 115.5 90.0 54 131. 0 I 9.9 115.0 127.5 90.1 • 55 134.0 1 11. 1 115.5 127.5 90.5 56 136.0' 10.5 116.2 127.5 91. 2 57 138.0 1 9.3 111. 9 121. 5 91.9 JUN 9 58 140.0 1 9.3 101. 2 114.5 88.5 59 140.0 1 11. 1 105.8 127.5 83.0 • J.UN 12 60 58 140.0 1 5.8 114.9 122.5 90.1 61 59 140.0' 9.9 115.5 127.5 90.5 62 75.0 1 13.6 109.5 120.5 90.8 63 78.0' 8.7 102.9 129.5 79.4 64 78.0 1 5.9 129.5 129.5 83.4 • JUN 13 65 63 78.0 1 6.4 97.3 120.5 80.7 66 64 78.0 1 6.9 101.3 120 .. 5 84.1 67 90.0 1 13.6 109.8 121.0 90.6 68 91.0 I 10.5 112.3 120.5 93.3 69 94.0' 11.7 111 .9 121 .0 92.5 • JUN 14 70 65 78.0' 9.9 113.8 120.5 94.3 71 66 78.0' 10.5 107.0 117.5 90.9 JUil 15 72 80.0' 14.9 103.9 120.5 90.2 73 82.0' 17.6 108.1 117.5 92.1 • JU!~ 16 74 84.0' 13.6 109. 1 120.5 90.5 75 87.'0' 15.6 107.1 117.5 91.2 76 89.0' 14.9 108.7 120.5 90.1 77 96.0' 16.3 108.5 120.5 90.0 78 91. O' 14.9 109.5 120.5 90.9 • WOODWARD· GIZIENSKI & ASSOCIATES COPcSULt,PoIG, \OIL A"O fOUfifOa'IO" ''''C,N,''''' "''''0 GfOt.OG'\'" • . . . COMPACTION TEST RESULTS JOB NANE HOSP GROVE APARTNENTS DATE REPORTED 2/28/73 , JOB NUMBER 72-105-20 . I • OATES COVERED May 22 through'December 19, 1973 PAG& 3 OF 10 , MO'STUR~ P"ELD LAIIORATOIIY III!:LAT'VC !:lATE nST IICTCST LOCATION CLEVAT'ON CONTeNT !:IEN.'TY !:IEN.'TY COM~ACT'ON NUMB':II or Of'TEST '!Io !:IftYWT. P'(;f' P'(;' -I. 0' LAS. DENa. -- JUN 19 79 SEE FIGURE ONE 93.0' 13.6 109.9 120;5 91.2 • 80 91.0 ' 12.3 109.1 120.5 90.5 JULY 10 81 121 .0' 8.7 110.2 120.5 91.4 82 124.0' 8.7 110.6 120.5 91.7 83 127.0' 9.9 122.5 127.5 96.0· 84 127.0' 10.5 112.2 120'.5 93.1 • JULY 11 85 130.0 ' 9.9 113.9 120.5 94.5 86 133.0' 9.9 112.8 120.5 93.6 . 87 136.0' 9.9 112.0 120.5 92.9 88 139.0' 10.5 112.9 120.5 93.6 • JULY 12 89 141.0' 8.7 110.2 120.5 91.4 90 141.0 ' 9.9 114.8 120.5 95.2 91 144.0' 10.5 115.0 127.5 90.1 92 144.0' 9.3 109.2 120.5 90.6 JULY 13 93 147.0' 9.9 121 .9 127.5 95.6 • 94 147.0' 11.1 113.7 121 .5 93.5 95 150.0' 7.5 123.0 127.s-96.4 96 150.0' 11. 1 109.1 120.5 90.5 JULY 14 97 153.0' 8.7 114.7 125.0 91.7 98 153.0' 7.5 119.3 12-.0 93.2 • 99 153.0' 7.5 117.2 . 128.0 91'.5 100 155.0' 7.5 116.1 128.0 90."7 JULY 17 101 158.0' 11. 1 120.8 128.0 94.3 102 158.0' 9.9 118.9 127.5 93.2 103 158.0' 9.3 116.2 127.5 91 .·1 • 104 158.0' 9.3 116.2 127.5 92.0 JULY 18 105 163.0' 10.5 104.3 115.5 90'.3 106 160.0' 8.1 115.3 128.0 90.0 107 83.0' 11. 1 109.9 117.5 93.5 108 163.0' 9.1 11 0.1 120.5 91.3 • JULY 19 109 166.0' 11. 1 113.2 125.0 90.5 110 86.0' 11.1 113.0 117.5 96.1 111 89.0' 9.3 117.9 129.0 91.3 112 169.0' 8.7 108.0 117.5 91.9 113 92.0' 8.7 111.0 117.5 94.4 • JULY 20 114 95.0 1 11. 1 101.9 117.5 86.7 115 114 95.0' 10.5 107.0 117.5 91.0 116 98.0' 10.5 108.1 117.5 92.0 WOODWARD· GIZIENSKI & ASSOCIATES • CO .... §.Ut..T&NCt !tou ••• HU lou,",UA"ON ' ... C ..... lllt\ """0 'rOL.OCtI\l" •• . . . COMPACTION TEST RESULTS ';011 NAME HOSP GROVE APARTMENT CAT!'; R~PORTC:D 2/28/73 . JOB NUMBER 72-105-20 • . I CATES COVERED May 22 through December 19, 1973 PACt 4 OF 10 I MO,STUIt& ".ELO LABORATORY PrCLATIVE DATE naT RETEST LOCAT.ON ELEVATION CONUNT DENSITY DIEN.ITY CONI-ACTION HU .... l:i:ft 0 .. OF TEST '!It DIlY WT. ~" ~p 'I. 0" LAD. DEN •• JULY 20 lit CONT. 117 SEE FIGURE ONE . 101.0 1 11.1 107.2 117.5 91.2 118 99.0 1 12.3 109.0 117.5 . 92.7 JULY 21 119 100.0' 8.7 116.5 129.0 90.3 120 102.0' 8.7 116.9 129.0 90.6 121 99.0' 7.5 109.1 117.5 92.8 • 122 102.0' 7.5 116.9 129.0 90.6 JULY 24 123 100.0' 11.1 117.1 127.5 91.8 '124 103.0' 11.7 106.1 117.5 90.2 125 102.0' 10.5 115.1 127.5 90.2 '126 103.0' 9.3 117.7 129.0 91.2 • JULY 25 127 104.0' 8.7 118.5 129.0 91.8 128 106.0 10.5 104.3 120.5 86.5 129 128 106.0' 11.1 116.0 120.5 96.2 130 106.0' 10.5 111.4 120.5 92.4 131 104.0' 9.3 117.2 129.0 90.8 • JULY 26 132 109. 0' 11.1 109.0 120.5 90.4 133 110.0' 11 .1 116.3 120.5 96.5 134 97.0 11. 7 104.0 117.5 88.5 135 134 97.0' 10.5 109.1 117.5 92.8 • JULY 27 136 100.0' 11.7 112.0 117.5 95.3 137 103.0' 8.7 117.9 129.0 ·91.3 138 106.0' 6.4 106.2 126.0 84.9 139 138 106.0' 8.7 117.1 129.0 90.7 ·140 103.0' 11. 1 108.8 117.5 92.5 • JULY 28 141 107.0' 11. 1 109.1 117.5 92.8 142 113.0' 10.5 107.8 117.5 91. 7 143 163.0' 8.7 116.0' 125.0 92.8 144 116.0' 10.5 106.1 117.5 90.2 145 119.0' 11. 1 107.9 117.5 91.8 • JULY 31 146 109.0' 6.4 112.7 125.0 90.1 147 112.0 • 11.1 116.9 129.0 90.6 148 112.0 I 11. 1 112.9 125.0 90.3 149 114.0' 8.7 114.0 125.0 91.2 AUG 1 150 166.0' 9.3 119.2 132.0 90.3 • 151 166.0' 10.5 115.9 125.0 92.7 152 167.0' 8.7 114.0 125.0 91.2 153 167.0' 9.3 115.3 125.0 92.2 WOODWARD· GIZIENSKI & ASSOCIATES • • . . . . COMPACTION TEST RESULTS ..lOB NAME HOSP GROVE APARTr~ENTS DAn: REPORTEO 2/28/73 , JOB NUMBER 72-105-20 • OATES COVEREO May 22 through December 19, 1972 PAGt 5 OF10 I MOlaTUllC .. ,ELD I.AII0RA TORY REI.ATIYE DATE naT RETEST LOCATION ELEYATION CONTCNT DENSITY DENalTY CDMI'ACT'ON NUMII&:R Of' OF TEST 'lit DRY WT. /"Cf' P'CP -I. 0' LAB. OI:N •• AUG 2 154 SEE FIGURE ONE 115.0 I 11. 1 113.0 123.5 91.4 • 155 115.0' 14.9 105.1 11 0.0 95.9 156 113.0 ' 16.3 106.0 110.0 96.3 157 113.0' 11.7 109.2 117.5 92.9 AUG 3 158 116.0' 14.9 101.5 110.0 92.2 159 " '119.0' 16.3 103.0 110.0 93.6 ' • 160 117.0' 16.3 100.8 110.0 ' 91.6 161 117.0' 17.9 102.0 11 0.0 92.7 AUG 4 .162 120.0' 10.5 117. 1 127.0 92.2 163 120.0' 14.9 100.3 , 110.0 91.1 ,164 122.0' 9.3 115.2 . 127.0 90.7 • 165 123.0' 9.3 116.8 127.0 91.9 AUG 7 166 123.0' 11.7 105.4 125.0 84.3 167 126.0' 9.9 111.2 127.0 87.5 168 166 123.0' 17.5 102.9 110.0 93.5 169 167 126.0' 9.3 116.8 127.0 91. 9 • 170 126.0' 16.3 102.9 110.0 93.5 171 83.0' 10.5 114.9 127.0 90.4 AUG 8 172 124.0' 8.7 118.0 128.0 92.'1 173 127.0' 7.5 117.5 ' 128.0 91.7 174 142.0' 16.3 99.9 110.0 90.8 • AUG 9 175 142.0' 16.3 101.2 110.0 92.0 176 138.0' 9.3 113.8 123.5 92.1 177 53.0' 10.5 109.9 123.5 88.9 AUG 10 178 144.0' 11.1 11 0.1 120.5 91.3 • 179 177 53.0' 11 .7 111 .6 123.5 90.3 180 56.0' 10.5 114.0 123.5 92.3 181 144.0' 10.5 109.4 120.5 90.7 AUG 11 182 86.0' 17.5 101. 9 110.0 92.6 183 146.0' 11. 7 109.8 120.5 91. 1 • 184 146.0' 15.0 101. 1 110.0 91. 9 AUG 14 185 146.0' 20.2 100.0 110.0 90.9 186 89.0' 12.3 112. 1 123.5 90.7 '187 148.0' 11. 7 112.8 123.0 91. 7 • AUG 15 188 148.0' 15.0 111. 1 123.0 90.3 189 148.0' 9.9 111. 2 123.0 90.4 190 128.0' 12.2 105.7 110.0 96.0 • WOO DWAR 0 • G IZ lENS K', & ASS 0 C I A TES •• ~ . . COMPACTION TEST RESULTS ~Olt NAIIIE HaSP GROVE APARTMENT SITE DATE REPORTEO 2/28/73 . JOB NUMBER 72-105-20 • I OATESCOVEREO May 22 through December 19, 1972 PAGE: 6 OF 10 • I WOISTURI: ,.IELO UBORATORY RELATIVE DATE nST RETEST LOCATION ELEVATION CONTeNT DENSITY DIENa.TY CO"'''ACT'ON NU"B .. R 01' 01' TEST '!Io DRT WT. 1'<;1' 1'<;1' % 01' LAB. DENS. • AUG 16 191 SEE FIGURE ONE 12B.01 14.7 105.1 110.0 95.5 192 130.0' 19.0 104.9 110.0 95.3 193 . 130.0 1 17.5 102.0 110.0 92.7 194 133.0' 14.9 106.0 115.5 91.7 AUG 17 195 133.0 1 14.9 107.3 115.5 92.9 • 196 135.0' 13.6 104.2 115. S 90.2 197 92.0' 13.6 106.7 115.5 92.3 AUG 1B 198 136.0' 13.6 106.0 115.5 91.7 199 139.0' 17.6 104.4 110.0 94.9 200 142.0' 17.6 103.0 110.0 93.6 e 201 125.0' B.7 116.1 128.0 90.7 AUG 21 202 FG 127. A· 9.9 115.9 128.0 90.S 203 FG 12B.O' 7.5 116.9 12B.0 91.3 204 106.0' 7.5 109.1 120.5 90.5 205 144.0' 18.3 101.9 110.0 92.6 • 206 109.0' 7.5 110.0 120.5 91.2 AUG 22 207 111.0' 15.0 101.6 110.0 92.3 20B 113.0' 17.7 106.6 110.0 96.9 209 115.0' . 14.3 107.1 115.5 92.7 210 117.0 1 15.0 105.0 l1S. S 90.9 211 59.0' 16.3 102.1 110.0 9a.B • 212 120.0' 10.0 111.0 123.0 90;2 213 107.0' 9.3 117.8 127.0 92.7 214 FG 105.0' B.7 117.7 128.0 91.9 21S FG 103.0' 9.3 11B.1 128.0 92.2 AUG 24 216 120.0' 17.S 103.0 110.0 93.6 e. 217 110. O' 9.9 112.3 124.5 90.2 21B 147.0' lB.3 102.7 110.0 93.3 219 112.0' 9.3 113.7 124.5 91.3 AUG 2S 220 62.0' 17.6 103. l' 110.0 93.7 221 123.0' 7.5 117. 1 128.0 91.4 • 222 172.0 1 9.3 112.3 124.5 90.2 223 111.0' 6.4 116.1 12B.0 90.7 AUG 28 224 FG 113.0 1 B. 1 118.9. 128.0 92.8 '225 150. O' 10.5 112.0 123.0 91. 0 226 150.0 1 11. 1 112.9 123.0 91.7 • AUG 29 227 153.0 1 9.9 117. B 124.5 94.6 22B 65.0 1 1B.2 103. 1 110. a 93.7 • WOODWARD· GIZIENSKI & ASSOCIATES' COhsV\.r,h" ~Ol'" "HO lOU"lOA110H ("'C.IN'I.~ AND GeOlOGIST' •• 0 . 0 COMPACTION TEST RESULTS ..JOB NAME HOSP GROVE APARTMENT SITE OATE REPORTED 2/28/73 JOB NUMBER 72-105-20 • O~TES C~VERED May 22 through December 19, , . 1972 PAGE: 7 OF 10 IoCOU'TUlut ~'ELD LABORATORY RELATIVE DATE niT RETEST LOCAT.ON ELEVAT'ON CONTENT DENSITY . DENIITY COIoCI'ACT'ON HUIoCS':" D~ OF TEST "110 DIIYWT, I'C~ ~,. 'i. 0" LAB. DE.N •• AUG 29 229 SEE FI GURE ONE FG 95.0' 11. 1 116.1 128.5 90.3 • 230 FG 95.0' 11.7 117.0 128.5 91.0 AUG 30 231 FG 95.0' 8.7 111. 1 120.5 92. 1 232 FG 94.0' 6.4 115.0 115.0 95:4 233 150.0' 9.9 113.9 113.9 91.4 234 150.0' 5.3 114.1 114.1 91.6 • AUG 31 235 156.0' 8.7 113.1 113. 1 90.4 236 156.0' 9.3 113.9 113.9 91.1 237 68.0' 19.0 101.6 101. 6 92.3 238 68.0' 20.5 100. 1 110.0 91.0 .SEPT 1 239 159.0' 8.7 116.0 128.0 90.6 240 FG 92.0' 8.7 110.5 120.5 91.7 241 159.0' 7.5 116.9 128.0 91.3 SEPT 5 242 162.0' 11.7 116. 1 124.5 93.3 243 162.0' 9.3 117.0 128.0 91.3 • 244 71.0' 13.0 111.1' 123.0 90.4 SEP.T 7 245 165.0' 8.7 113.1 125.0 90.4 246 167.0' 7.5 113.2 125.0 90.5 247 122.0' 10.5 107.2 '117.5 91.2 . .SEPT 8 248 170.0' 9.3 113.3 125.0 90.6 249 170.0' 8.7 122.3 132.0 92.6 250 '·173.0' 7.5 115.8 127.0 91.1 251 173.0' 7.5 112.9 125.0 90.3 SEPT 11 252 176.0' 7.5 115.0 .125.0 92.0 • 253 176.0' 8.1 113.5 125.0 90.8 254 178.0' 7.5 114.0 125.0 91.2 255 178.0' 8.0 115.0 125.0 92.0 SEPT ;2 256 FG 180.0' 7.5 113.5 125.0 90.8 257 175.0' 8.7 115.9 127.0 91. 2 • 258 178.0' 9.3 114.8 127.0 90.3 . 259 181. O· 9.3 108.7 125.0 86.9 260 259 181. o· 10.5 114.3 125.0 91.4 SEPT 13 261 184.0' 10.5 114.9 125.0 91.9 262 FG 125.0' 6.9 114.0 125.0 91. 2 • 263 FG 125.0' 8. 1 113.3 125.0 90.6 264 FG 115.0' 7.5 115. 1 125.0 92.0 • WOODWARD· GIZtENSKI & ASSOCIATES e . , . · COMPACTION TEST RESULTS .JOB NAME HOSP GROVE APARTMENT SITE . . JOB NUMBER 72-105-20 • O',.TESC~VERED May 22 through December 19, 1972 . , • DATE SEPT 20 SEPT 21 SEPT 22 • SEPT 25 SEPT 26 SEPT 27 • OCT 2 OCT 3 • OCT 4 • OCT 6 OCT 12 • OCT 13 OCT 26 • eCT 24 eOCT 25 • TRaT RETEST NU,.8l:It 0' 265 266 267 268 269 270 271 272 273 274 275 273 276 274 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 LOCATION SEE FIGURE ONE DATE REPORTED 2/28/73 PAGE 8 OF 10 MOI.TURK .. IELD LABORATORY RELATIVE ELEVATION CONTENT DENSITY DENalTY COM,.ACTIOH OF TEST '!Io DRY WT. 1'(;1' I'CI' 'i, 01' LAD. DENa. 71.0 1 74.0' 77 .0' 150.0' 80.0' 83.0' 86.0' 86.0' 86.0' 86.0' 86.0' 89.0' 89.0' 92.0' 92.0 1 95.0' 95.0' 98.0' 98.0 1 101.0' 101.0 1 104.0' 104.0' 107.0 I 107.0 I 110. O' 110.0 I 86.0' 89.0 1 113.0 I 1l3.0 I 92.0 1 95.0' 11. 1 12.3 11.7 11. 1 9.9 11.7 12.3 11. 1 6.9 5.3 12.3 12.3 13.0 13.6 12.3 13.0 9.9 12.3 10.5 11.7 12.3 12.3 11.7 12.3 10.5 9.9 11. 1 11. 1 11 .7 11.7 11. 1 10.5 11 .1 17.0 117.3 111. 9 113.2 117.0 114.6 112. 1 114.1 113. 1 101.5 99.7 111.2 110.4 109.5 110.0 112.5 112.0 112.1' 111. 1 111. 1 112.5 116. 1 116.8 114.0 114.6 111.4 110.0 109.9 111.0 110.2 117.9 109.6 111.0 109.9 99.5 123.0 123.0 123.0 125.0 123.0 123.0 123.0 123.0 120.5 120.5 120.5 120.5 120.5 120.5 120.5 120.5 123.0 120.5 123.0 123.0 121. 5 121. 5 95.3 90.9 92.0 93.6 . 93.1 91.1 92.7 91.9 84.2 82.7 92.2 91.6 90.8 91. 2 93.3 92.9 91:] 92. 1 90.3 91. 4 95.5 96. 1 121.5 93.8 121.5 94.3 121.5 91.6 121.0 90.5 121.5 90.4 121.5 91.3 121.5 90.6 123.0 95.8 121 .5 90.2 121.5 91.3 121 .5 90.4 110.0 90.4 WOODWARD· GIZIENSKI & ASSOCIATES CONSU,,'I"''' .,OIL ''''U ,ou ... o."o" ''''G''''l'''' A""O cr""OCt'\'''t .0 0 . COMPACTION TEST RESULTS . JOB NAME HOSP GROVE APARTMENT SITE OATE REPORTEO 2/28/73 . . JOB NUMBER 72-105-20 • OATES COVEREO May 22, 1972 through December 19, 1972 PAGE: 9 OF 10 WO.STURE ".ELD LABORATOIIY ReLAT'VE DAll: niT RETEST LOCAT.ON ELEVATION CONTeNT DENS.TY DeNI'TV CO .... ACT.OH HUNBER O~ Of" TEST "JI, DIIY'ttT. rep' rc~ ./. 0' LA_. DEN •• • OCT 26 299 SEE FIGURE ONE 116.0' 10.5 111.4 121. 5 91.6 300 116.0' 9.9 110.0 121. 5 90.5 301 100.0' 11.7 111. 1 121. 5 9l. 4 302 105.0' 11.7 110.2 121.5 90.6 OCT 27 303 110.0' 11. 1 112. 1 121.5 92.2 • 304 115.0' 11. 1 109.8 121. 5 90.3 305 118.0' 10.5 111. 2 121.5 91.5 306 121.0' 10.5 11 O. 1 121. 5 90.6 307 116.0' 11. 1 111. 6 121.5 91.8 OCT 30 ·308 119.0' 11. 1 112.9 121. 5 92.9 • 309 119.0' 11.7 110.9 121.5 91. 2 310 119.0' 11.7 109.8 121.5 90.3 OCT 31 311 122.0' 11. 1 110.0 121.5 90.5 312 122.0' 11.7 114.0 123.0 92.6 • NOV 1 313 125.0' 12.3 99.0 110.0 90.0 314 135.0' 16.3 99.9 110.Q 90.8 315 131.0' 9.3 116.0 127.0 91.3 NOV 2 316 134.0' . 8. 1 117.1 127.0 92.2 317 128.0' 9.9 115. 1 127.0 90.6 • 318 137.0' 8.7 116.8 127.0 91.9. NOV 3 319 , 152.0' 10.5 108 .. 9 120.5 90.3 320 133.0' 9.9 116.2 127.0 91. 4 321 137.0' 8.7 115.9 127.0 91.2 • NOV 6 322 152.0' 16.3 102.6 110.0 93.2 323 F.G. 152.0' 10.5 114.2 125.0 91.3 NOV 7 324 F.G. 152.0' 11. 1 116.2 125.0 92.9 325 F.G. 153.0 ' 11. 1 115. 1 125.0 92.0 • NOV 8 ~26 125.0' 9.3 113.3 125.0 90.6 327 125.0' 11. 1 113.0 125.0 90.4 NOV 9 328 F.G. 130.0 9.9 113. 1 125.0 90.4 329 F.G. 186.0' 7.5 117.9 125.0 94·.3 • NOV 10 330 F.G. 173.0' 16.3 106.7 110.0 97.0 331 F.G. 168.0' 4.3 116.2 128.0 90.7 332 F.G. 165.0' 7.5 116.5 127.5 91.3 • WOODWARD· GIZIENSKI & ASSOCIATES •• " COMPACTION TEST RESULTS • , JOB NA~E HOSP GROVE APARTMENT SITE CAT~ REPORTEO 2/28/73 • JOB NUMBER 72-105-20 . May 22, 1972 through December 19, 1972 10 0,. 10 • CATES COVERED PAGE: MOlaTUIU: ""L.D LA.ORATORT RCLAT'YE DATE naT RCTEST L.OCAT,ON EL.EYATION CONTENT DI:Ne'TT OENS'Tv CO ... "ACT'ON HU .... .:1t or 01' TEST '!Io DATWT. P'C" I'C' -I. 0' LAB. D~H ... NOV 13 333 SEE FIGURE ONE 154.0' 8.7 105. 1 116.5 90.2 334 157.0' 8.3 116.9 128.0 91. 3 • 335 128.0" 10.5 115.9 12B.0 90.5 NOV 14 336 128.0' 9.9 117.9 128.0 92.0 337 128.0' 11.1 116.1 128.0 90.7 338 160.0' 8.7 .118.7 12B.O 92.7 339 163.0' 10.5 116.9 12B.0 .91.3 • NOV 20 340 166.0' 11.1 115.3 128.0 90.0 341 169.0' 11. 1 116.7 128.0 91.1 NOV 29 342 169.0' 11. 1 112. 1 124.5 90.0 343 131 .0' 11.7 113.0 124.5 90.7 • 344 134.0' 11. 1 114.0 124.5 91.5 NOV 30 345 137.0' 9.3 116.9 128.0 91.3 346 140.0' 10.5 116.1 128.0 90.7 347 124.0'. 9.3 115.6 128.0 90.3 • DEC 1 348 FG 172.0' 9.9 117. 1 128.0 91.4 349 127.0' 19. 1 101. 3 110.0 92.0 350 FG 171. 0' 9.9 117.0 128.0 91.4 351 FG 153.0' 9.9 113.9 125.0 91.1 352 130.0' 12.3 105.0 115.5 90.9 '. • DEC 4 353 133.0' 10.5 115.9 125.0 92.7 354 157.0' 9.9 114.0 125.0 91.2 DEC 13 355 160.0' 10.5 114.9 125.0 91.9 356 160.0' 11. 1 114.0 125.0 91'.2 357 FG 115.0 ' 9.9 115.3 125.0 92.2 • DEC 14 358 163.0' 11 . 1 117.8 125.0 94.2 359 163.0' 7.5 112.0 116.5 96.1 360 FG 130.0' 13.6 113.0 125.0 90.4 361 FG 155.0' 6.9 117. 1 128.0 91.4 362 FG 145.0' 8:7 116.0 128.0 90.6 • DEC 15 363 FG 133.0' 19.7 100.2 110.0 91. 0 364 FG 103.0' 9.9 117.5 127.5 92. 1 365 FG 104.0' 9.3 116.0 127.5 90,.9 DEC 1B 366 FG 125.0' B.7 115.3 128.0 90.0 • 367 165.0' 13.6 111. 9 120.5 92.8 368 FG 136.0' 10.5 117. 1 12B.5 91.1 DEC 19 369 FG 133.0' 10.5 116.2 128.5 ,90.4 WOODWARD· GIZIENSKI & ASSOCIATES . • (ON~UL'I"'G \.011. ""'u fOu""U.I.O'" ,,,,,GIN".' ""0 G1OLOCf\l\ • . I . ~ COMPACTION TEST RESULTS "08 NAr!I£ HOSP GROVE APARTMENT SITE (STREET TESTS) CATE REPORTEO 2/28/73 . JOB NUMBER 72-105-20 • CATES COVERED June 7 through December 13, 1972 PACE S-l OF' S-l . MOI.TUIUt I'II:LD LA.ORATORY RI:LATIVI: DATC TeaT RETI:ST LOCATION I:LI:VATION COHTI:NT DENSITY DEN.'TY CO"~ACTION Hu ... eR 0,. 0,. TEST "" OilY WT. r<:;t' I'CP ~. 0' L.A •• D~H •• • JUN 7 5-1 SEE FIGURE 1 135.0 ' 7.5 118.5 127.5 92.9 JUL Y 11 5-2 113.0' 9.1 109.3 120.5 91.6 5-3 116.0' 9.3 110.8 120.5 91.9 AUG 8 5-4 134.0 ' 19.7 100.0 . 110.0 90.9 • AUG 9 5-5 138.0' 20.5 102.8 110.0 93.4 AUG 10 5-6 142.0' 11. 7 109.0 120.5 90.4 I AUG 14 5-7 145.0' 13.0 110.9 120.5 92.0 • SEPT 22 S-8 148.0 ' 11.7 108.9 120.5 90.3 NOV 7 5-9 151.0 ' 11. 1 114.9 125.0 91.9 NOV 14 5-10 154.0 ' 10.5 113.4 125.0 90.7 • S-l1 154.0 ' 11. 1 114.9 . 125.0 9l.1 DEC 4 5-12 157.0 ' 9.9 116.9 128.0 91.3 5-13 157.0 ' 9.9 116.0 128.0 90.6 DEC 13 5-14 160.0 ' 10.5 115.3 125.0 92A 5-15 160.0 ' 8.7 117.9 125.0 . 94.1-• " • • • • WOODWARD· GIZIENSKI & ASSOCIATES •• . . " COMPACTION TEST RESULTS .loa NAME HOSP GROVE APARTMENT SITE (STORr~ DRAIN) cATE REPORTED 2/28/73 JOB NUMBER 72-105-20 I • CATES COVERED November 13 through December 19, 1972 PAGE. SO-l OF SD-1 I wo,aTU/llt "'ELD LABORATORY RCLAT,vE OA11: naT RETEST LOC:AT'ON ELEVATION C:ONUNT DCN.'T)' DEN.'TY C:O .. ,.AC:T,ON HU"'B~" 0' OF" TEST '110 OIlYWT. re, I'i:P % OrLAB. DI:H •• NOV 13 50-1 SEE FIGURE 70.0 ' 11. 1 108.9 120.5 90.3 • SO-2 86.0' 10.5 109.9 120.5 91.2 5D-3 FG 78.0" 10.5 110.5 120.5 91. 7 NOV 21 50-4 118.0 ' 11.7 112.1 121. 5 92.2 50-5 108.0' 10.5 109.1 120.5 90.5 • NOV 22 50-6 116.0' 11. 1 113.2 121. 5 93.1 50-7 FG 112.0' 9.3 111.0 121. 5 91.3 50-8 92.0' 12.3 111. 9 123.0 90.9 NOV 27 50-9 102.0' 12.3 112. 1 123.0 91.1 SO-10 FG '112.0' 11.7 113.9 123.0 92.6 • 50-11 FG 98.0' 12:3 114. 1 123.0 92.7 NOV 28 50-12 80.0' 11. 1 111.0 123.0 90.2 NOV 29 5D-12 FG 72.0' 10.5 111. 9 123.0 90.9 • NOV 30 50-14 140.0' 8.7 115.9 123.0 92.7 5D-15 138.0' 11. 1 116.9 128.5 90.9 SO-16 FG 112.0' 11. 1 108.9 120.5 90.3 5D-17 FG 88.0' 12.3 108. 1 117.5 92.0 OEC 19 50-18 FG 143.0' 11.1 116.2 128.5 90 .. 6 • , • • • • WOODWARD· GIZIENSKI & ASSOCIATES · . . .. .. -MECHANICAl ANALYSIS • a IJ 10 IJO 200 . 100 3 DIRECT SHEAR TEST DATA 1 2 3 "" 1 80 "'~ Dry Density. pef 99.9 94.6 102. 1 C> \\ z: • Initial Water Content. % 11.8 13.5 12.9 en ... -C~\ ~,., ~ 60 0... w \' , "- Final Water Content. 1-20.5 26.3 19.5 l-\. ',K."-... ffilJO Apparent Cohesion. psf 300 380 180 <..> , .......... r-... ..... .... 0:. UJ -0... Apparent Friction Angle. ~. 16 9 24 20 • I I I I I I , ,.',-. f--. 0 /110 1000 100 10 1.0 0.1 0.01 0.001 \ ~ GRAIN SIZE IH MILLIMETERS \-~ZERO AIR VOIDS CURVES !COBBLES!GRAVEL I SAND Is I L T & CLAY t ~"'" \ r c I f c I m I • \ \ 130 \ V2.70 S.G. PLASTICITY CHARACTERISTICS 1 2 \[\/2.60 S.G. 3 r\ V 2•50 S.G. Liquid LImit. % 38 28 -Iv • '\ \ l\ Plasticity Index. r. 24 10 I~P i \ \ Classification by Unified Soil 120 \ '\ \ Classification System CL CL sr·1 , \ \ I, /1\\ \ f\ -Iv ,.<)\ '\ u Q. • • ...: i'J, />" / '\ 1\ r\ SWELL TEST DATA 1 2 3 % '\ ~\ \ <.::> .J;~ ./ 110 "'" '-, l\ 104.8 104.7 ~ I~ r\ /ni t ial Dry Dens; ty. pcf -I--/' ;"" ,2 \ ~ \ Initial Water Content. ~ 12.3 13.0 :z: -:::> >-I\~ ,\ f\ Load. psf 160 160 c.: -Q \1\ 1\ Percen t Swe II 7.6 14.2 -\ \ 1\ - 100 l\ 1\ i\ . i\ \ SA~iP LE LOCAT ION \\ \ 1\ ~~ 1 Fi 11 No lot I~urnbers • 90 MAX II~UI-I DRY 1 2, 3 i\ 2 Drm" I DENSITY. pcf 117.5 115.5 114.5 ~~I\ 3 E. of rl.loJ. Fi 11 , OPTIMUM MOISTURE j CONTENT. 'f, 12.0 13.5 12.5 i\."~ f ,,' 1'\.1... f • MOISTURE CONTENT. ~ I'\. 'K '\ 80 0 10 20 30 lj.() LABORATORY COMPACTION TEST • I FILL SUITABILITY TESTS LABORATORY COMPACTIOII HOSP GROVE APART;·IErnS TEST J.4ETHOD:aSr;l-O FiL;Z"ZOT WOOOi,~ARD - G I Z I EiJSK I & ASSOC I ATES CONSULTING SOIL AND FOUNDATION EHGINEERS AHD GEOLOGISTS SAN DIEGO. CALIFORNIA DR. BY: LS SCALE: ----PROJ. HO: 72-105-2C CK' 0 BY:--;zzl DATE: 2/28/73 PAGE 1 of / • e . · . .. t.fECHAN I CAL ANAL YS I S • 100 3 a ~ 10 110 200 • "' t-,0. -DIRECT SHEAR TEST DATA 4 5 6 i\ 04.7 96. 1 109.0 80 \ Dry Density, pcf <!) \, \.,.. - 5 . ~ Initial Water Content. % 8.8 20.9 11.9 U) /' \ " , ~ 60 K\ 0.. Ik -Final Water Content. r. 16.6 30.6 18.9 I-.~ f-4 ffillO Apparent Cohesion. pst 0 ~ 20 ~20 (.,) \K\~ "" LU Apparent Friction Angle. e 28 22 20 Q,. 20 '~I--- r--... • -I I 1 il f f 'f -"-0 - IIW 1000 100 10 1.0 0.1 0.01 0.001 \ f\ ~ZERO AIR VOIDS CURVES GRAIN SIZE IN MILLIMETERS \-ICOBBLES!GRAVEL I SAND ISILT & CLAY I ~ \ t c I f c I m ! • \ 1\ ' 130 \ ~2.70 5.G. PLASTICITY CHARACTERISTICS 4 5 6 \~2.60 5.G. \ f\...--V" 2. 50 5. G. Liquid Limit, 'f. -45 50 , \ 1\ Plasticity Index. % NP 17 33 • 1\ Classification by Unified Soil sn CL SC "'\ i,\ " 120 !\., \ Classification System I III , .... I--! \ 1\" -I u I~ 0' i" 1\ \ ,\ Q. , • ..: II Ii \ I~· f\ SWELL TEST DATA 4 5 6 :z: f--t-t f\ ~ l\\ <.::I -I/O UJ 95.4 107.4 ~ I \ 1\ 1\ Initial Dry DenSity, pcf -I--% ::> , , c:: f\ \ Initial Water Cont~nt, ~ -22.0 13.0 · , ~ '\ 1\ >-, Load. pst 160 160 0:: -Q ty [\ f\ \ 7.5 6.7 \ \ i\ Percent Swell -/ 100 / \ \ \ , '\. \ SA~iPLE LOCAT ION \\. 1\ .~ ~b. 4 E. of N'\/' Fi 11 " • 90 MAXIMUM DRY 4 5 6 \ 5 nos t North Eas terly 30° Cut • DENSITY. pcf 116. !: 106.5 120.5 ~~ 6 Cut Eas t of North lies t Fi 11 I ~ OPTIHUM MOISTURE 8.5 21. 5 12.5 \J~ CONTENT. 'f, '\.t\.r--.. f : t i\." ~ I MOISTURE CONTrNT. % ~ "I I 80 0 10 20 30 40 LABORATORY COMPACTION TEST -I FilL SUITABILITY TESTS • I LABORATORY C~PA~.r~~ 11:57 -70T HOSP GROVE APARTNENTS TEST J.4ETHOD: S T I :) l~OOD'.-JARD - G I Z I Ei~SI( I & ASSOC I A TES COHSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA OR. BY: 1 S SCALE: ---PROJ. HO:' L-I U::>-'U CK'D BY: tL,A/ DATE: 2/28173 PlGE ? ,,+: 7 • -, .. t.fECHAH I CAL AHAl YS I S . • • 3 4 IJ 10 40 200 -100 '"-,, " DIRECT SHEAR TEST DATA 7 8 9 '\ . H1L..8. 80 Dry Density. pcf 114.8 109.6 co 'h z: • Initial Water Content. r. 8.8 10.9 12.3 u; \ ~--I--g ~ 60 Q.. 1\\ \ Final Water Content. 1-15. 1 17.2 18.8 t-~~ ffi40 Apparent Cohesion. pst 580 180 440 ' <..> 17 -~"r Q 0:. L&J ~ ..... ". 22 .:.. Apparent Frictiun Angle. 20 24 20 . ..-;:::: r-== ~ a I I L J I I I I • 140 1000 100 10 . 1.0 0.1 0.01 0.001 I \ 1\ ~ZERO AIR VOIDS CUR~ES GRAIN SIZE IN MILLIMETERS \-ICOBBLESI GRAVEL I SAND Is IL T ~ CLAY I V\ \ 1 c I f c I m I \ 1\ V2.70 S.G. 130 \ PLASTICITY CHARACTERISTICS 7 8 \ y2.60 S.G. g ~ 2.50 S.G. Liquid Limit, 1. 31 40 .-I\...-• 'J / \ \\ '\ Plasticity Inaex. % 14 21 NP , I \\ If I'>'; ~\ f\ Classificdtlon by Unified Soil SC-Sr·l ~C-SI1 Stlt 120 Classification System V I~ V ~~~ \ • I .'" .-\S ~\ 1\ -./ ,rio. u 1/ 8 ~\ ~ 0- .... ~ , \f\ SWELL TEST DATA 7 8 9 s .II 9 ,,\ \ 110 u..; \ 1\ r\ 114.8 108.7 107.6 3: Initial Dry DenSity, pcf .... • -1\ .. 8.3 11.7 13.3 % Initial Water Content. j' ::> >-\ '\ 1\ 160 160 160 . cr:: Load. psf Q f\r\ 3.2 4.1 0.7 \ 1\ Percen t Swe II ·100 , \ f\ t\ . 1\ \ SAMPLE LOCATION I \\ 1\ • \ r\~ 7 N. E. 30 Cut Area 90 MAXIMUM DRY 7 8 9 t\ 8 Cut E. of N. iL Fill DENSITY. pcf 127.5 121. : 1120,5 ~~ 9 Cut At N. E. Corner of Site ~ OPTIMUt~ MOISTURE 8.5 11. : 12.0 t\.~~ COl/TENT. t ~r'\.1\.. \ • t\-~~ 80 0 MOISTURE CONTrNT. ~ r--...~I 10 20 30 .j{) LABORATORY ca·PACTIOO TEST FILL SUITABILITY TESTS • LABORATORY COMPACTION TEST /,jETHOD: (,STi·!-D 1557-70T IIOSP GROVE APARTf-!EflTS WOODWARD -GIZI8~SKI & ASSOC I ATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAH DIEGO. CALIFORNIA DR. BY: LS SCALE: ---PROJ. Ho:72-105-20 • CK'D BY: L.//I DATE: ? /?P.l7'"J PAGE) of 7 -. · ... ,)0 MECHANICAL ANALYSIS • 100 3 a IJ 10 IJO 200 DIRECT SHEAR TEST DATA 10 11 12 ~\ • Dry Density. pcf 116.6 114.6 112.5 80 ~. • CI '\ :z: • Initial Water Content. % 8.8 8.4 9.5 c:;; '\ ~ 60 14.3 15.3 15.7 Q,. lLl -""~ ...-. 1-11 Final Water Content. 1-I-~\ [5 40 Apparent Cohesion. pst 820 300 540 c..:> \ "" • !.oJ I~ c 18 28 19 Q. Apparent Friction Angle. 20 11? -~':t- 0 i I I I , I , , ~- IIJO 1000 100 10 1.0 0.1 0.01 0.001 ~ZERO AIR VOIDS CURVES GRAIN SIZE IN MILLIMETERS \ ~ ICOBBLESI GRAVEL I SAND /SILT &: CLAY I ~ \ clfclmjf • 1\ ' \ \ V2.70 S.G. 130 PLASTICITY CHARACTERISTICS k\\y2.60 S.G. 10 11 12 , I , 1\\ V"'2.50 S.G. Liquid Limit • .,. 38 32 36 IY • / \.\ ~\ 1\ Plasticity Inoex. % 24 10 15 ~ II' l\\ \ Classification by Unified Soil I 1/ \\' \ f\ pr·l-SC bC-Sr·.1 Sr·1 120 i---'I \ \' \ Classification System , -.' '\ ~\ r\ u ~ r-12 r\\' \ Co • ...: "\ 1\ r\ SWELL TEST DATA 10 11 12 :z: ~ , \ 110 u.; 1116 •7 115.3 112.2 ~ \ \!\ Ini t la! Dry Dens; ty, pcf I- • -1\ \ ~ % Initial Water Cont~nt . 8.4 8.6 9.6 ::> . >-\ \ 1\ 0:: Load. psf 1)0 1 1 nO' 0 l\ 1\\ Percen t Swe I J \ -\ ,\ 4 0 2 2 1.8 100 \ f\ 1\ , 1\ SAMPLE LOCATION \\ I~ • 1\ r\~ 10 Center Canyon of Project 90 MAX II~UIol DRY 10 11 12 1\ 11 Central DENSITY. pet l?g.O 128.0 125.0 ~k 12 Central OPTIIolUIol MOISTURE 8.5 7.0 9.5 ~ CONTENT. 1, ~'\." • 1 i'.. ~\-. 80 0 1ol0ISTURE CONTENT. ~ ~~) 10 20 30 4Q LABORATORY C(WACTIOO TEST FILL SUITABILITY TESTS • LA80RATORY COMPACTION TEST METHOD: ASTj,r-D 1557-70T HOSP GROVE APARTr·1EmS WOOD~JARD - G I Z I EJ'~Sl< I. & ASSOC I ATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA DR. BY: LS SCALE: ---PROJ. HO:72-105-2( • CK'D BY: d# DATE: 2/28173 PAGE 4 of 7 · ." ~ MECHANICAL ANALYSIS • 100 3 a II 10 IJO 200 . DIRECT SHEAR TEST DATA 13 14. 11) ["\ .\~;.;,; ......... i\ \ ·'!r 119.4 80 ., Dry Density, pet 94.2 114.0 (lJ \. " z: • Initial Water Content. % 7.6 18.7 8. 1 u; \ . ~ 60 0.. \" , n-' ~, Final Water Content. 1-'3 3 29.0 15.5 I-1\ .~ I--\ ffilJO Apparent Cohesion. psf 560 340 200 (.) 1'2-~. To \ C<. 1..1.1 " '"'-. \ Il.. Apparent Friction Angle. e-n 16 20 20 '"'"--t--.....: ....... • 0 I I I I I I I I I 1'+0 1000 100 10 1.0 0.1 0.01 0.001 ~ GRAIN SIZE IN MILLIMETERS \-?,ZERO AIR VOIDS CURVES !COBBLESIGRAVEL I SA~~ ISILT & CLAY I ~ \ clf clm f • \ 1\' . 130 1 ,/~ \ ~2. 70 S. G. PLASTICITY CHARACTERISTICS ~ \[\/2.60 S. G. 13 14 1li , I ~ ~\ 2.50 S. G. Liquid Limi t, % 31 55 29 . 'l\...- • .I l~ f\ Plasticity Inaex. r. -4 32 14 / .' 1\ \ Classification by Unified Soil /..., I-\ \ ~ Classification System SI,1 CH CL 120 I :) 1\' \ \ \ ~ -f\. \ \ u Co • ,..: \ 1\ ~ SWELL TEST DATA 13 14 15 z <!> \ \ 110 ;::,:j 3: X ~r\ Initial Dry Density, pet -98.9 h14.4 .... • ~.\ -r\ Initial Water Cont~nt. r. -18.6 8.2 :z: , ::::> >-114 -~ \ \ r\ Load. psf -160 h60 0: Q f\ ~\ - \ \ 1\ Percen t Swe II -Be I) '4- 100 \ f\ . 1\ ",\ , \ SAMPLE LOCATION \\ 1"-13 Central \ r\\. • MAX I t~Uf.4 DRY 13 14 lS t\ 14 Mainstreet off El Caminio Real 90 DENSITY. pcf 111/ 0 110.0 127 0 ~~~ lS Cut Above Canyon S .1~. of Unit OPTIMUM MOISTURE 18. S 8.S , CONTENT. 'f, 7.0 \.t'\.t'. • 1\.' t'."\. I f MOISTURE CONTENT. ~ ~ "'1 II 80 0 10 20 30 ljQ LABORATORY oa),pACTION TEST -FILL SUITABILITY TESTS LA80RATORY 9fAf1-'~d 1557-70T TEST "'£THOD: S II HOSP GROVE APARHiElnS • WOODWARD - G I Z I Ei~SI( I & ASSOC I A TES COHSULTING SOIL AHD FOUHDATIOH ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA DR. BY: LS SCALE: ---PROJ. HO:IL-/U;)-LC CK'O BY: ~ DATE: ? I?P 171 PAGE " f'.& 7 • · ... MECHMICAL ANALYSIS • 100 3 4 IJ '10 40 200 . DIRECT SHEAR TEST DATA 16 17 18 ~""\J -I 80 ,,., Dry Density. pcf 110.9 103.4 112.2 ~ v ,\ z • • Initial Water Content. % 11.6 14.3 9.6 ;;;; .~\ ~ 60 • Q.. r~~ 0.-16 Final Water Content. % 20.9 20.5 17. 1 ~ 117-~\ i.'--.. mIlO Apparent Cohesion. psf 300 360 120 u \ '-....... r--.. a:. UJ 1', ....... " 0 83"''''' A.. " Apparent Friction Angle. 13 22 20 '--;..:....., .. -• -. L i L . i ~I I I . 0 1110 1000 100 10 1.0 0.1 0.01 0.001 \ ~ ~ZERO AIR VOIDS CURVES GRAIN SIZE IN MILLIMETERS \-ICOBBLESI GRAVEL I SA~~ ISILT & CLAY'. V' \ cit elm f • \ , 130 \ \ V2.70 S.G. PLASTICITY CHARACTERISTICS \~2.60 S.G. 16 17 18 i\ f\...-.......... 2.50 S.G. Liquid Limit, 1-'35 NP :~7 • 'k\ 1\ Plasticity Index. r. 125 Nn 1'i 11 A 1/ M.~ \ ./ / \ ~\ f\ Classification by Unified Soil 120 , Classification System CL SM CL Ie: -f-# \~ \ \ '\1\ -/1\,\ \ u Q. • 1 '\ 1\·1\ ~ SWELL TEST DATA '16 17 18 :::: <.:l K\ \ \ 110 u.: ~ '\ 1\ r\ I n It i a I Dry Den sit y , pcf 110.6 104.3 11 O. 8 ~ % 1\ -" Initial Water Cont~nt. ~ 11.8 14.0 10.4 :::> • >-\ \ r\ Load. psf 160 160 160 ~ Q 1\ !\ Percen t Swe I I . 8.5 0.3 2.3 . \\ 1\ 100 \ r\ \ \ , \. SAMPLE LOCATION \\ 1\ ~ \ f\" 16 SLIDE AREA • 90 HAX IMU'" DRY 16 17 18 1\ 17 WEST OF PAD FINISH ELEV. 1170 DENSITY. pet ?30 115 h 124 c; ~R:--~ 18 PAD 1170 OPTIMUM MOISTURE 11. 5 10.5 14.u COHTENT. 'f, f\.~~ / !\. ~'b, • MOISTURE CONTENT. % '~I 80 0 10 20 30 40 i LAOORATORY C(M>ACTIC*I TEST . FILL SUITABILITY TESTS t • ; LABORATORY COMPACTIOH f TEST I1ETHOD: AST['l D1557-70T HOSP GROVE APARTMENTS i f WOOD'.-JARD -GIZIEi'~SKI & ASSOC I ATES f COHSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS J SA~ DIEGO •. CALIFORNIA DR. BY: AI, SCALE: ---PROJ. HO: 72-105-2 CK'O BY:~ DATE: 2120173 PAGE 6 of 7 • -, · ... )0 MEQiAHICAL ANALYSIS • 3 a ~ '10 . 100 40 200 • • DIRECT SHEAR TEST DATA 19 ). \ , 80 Dry Density. pcf 115.9 CI \ ~ .. Initial Water Content. % ." 8.2 ~ 60 • Q. 1\ Final Water Content. J; 14.9 I-\ ~40 Apparent Cohesion. psf 380 (.,) \ 0<. I.U '---Apparent Friction Angle. c ~ 22 20 ~ • 0 I I , 1 JI , I 1110 1000 . 100 10 1.0 0.1 0.01 0.001 \ 1\ ~ZERO AIR VOIDS CURVES GRAIN SIZE IN MILLIMETERS \.-ICOBBLESIGRAVEL I ~AH[ ISILT & CLAY I ~ \ elf elm f • \ 1\ ~2.70 S.G.· \ 130 PLASTICITY CHARACTERISTICS ~\ LV2.60 S.G. 19 / \ V 2.50 S.G. Liquid Limit. 1-32 [\.., • I ~I\\ 1\ Plasticity Inoex. r. 9 !/ 1\\ \ Classification by Unified Soil 120 \ !\ r\ Classification System r.1L 1\ \ \ ... \ 1\ f\ u I\. ' \ Q. • ,..: \ 1\ I\. SWELL TEST DATA ::t: 1\ \ \ 19 Cl 110 UJ ~ \ \ f\ Initial Dry Density, pcf 115.4 I- • -1\ \ ~ % Initial Water Cont~nt. 8.6 ~ ,. >-\ \ f\ Load. psf 0:: 160 Q 1\1\ . . 3 2 . , \ 1\ Percen t Swe II . 100 \ r\ !\ " \. \ SAMPLE LOCATION \\ \ • I \ I\~ 19 PAD FINISH ELV. 1060 90 /-lAX I t~IJ'" DRY 19 \ DENSITY. pcf "R t; ~~ OPTIMUM MOISTURE ,,~ CONTENT. 1, 8.5 '\. r\. r--. , • I r\.'\ ,'\. I f 80 0 MOtSTURE CONTENT. ~ , ",) 10 20. 30 40 I LABORATORY C(WACTIOH TEST . • ~ FILL SUITABILITY TESTS r i LABO~ATORY COMPACTION I TEST METHOD: ASTf'l D 1 557 -70T HOSP GROVE APARH1ENTS I • h'OODt.JARD -GI ZI Ei~SK I & ASSOCIATES COHSULTING SOIL AN~ FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO •. CALlFQRNIA DR. BY: ALS I SCALE: ---PROJ. HO:72-105-20 I • I CK'D BY: d/'-' I DATE: 2/2~/Z'~ [PAGE .7 ot 7 ~ • • 't ). • , • • • • • • • • • APPENDIX D SPECIFICATIONS FOR CONTROLLED FILL I. GENERAL These specifications cover preparation of existing surfaces to receive fills, the type of soil suitable, for use in fills, the control of compaction, and the methods of testing compacted fills. It shall be the contractor's responsibility to place, spread, water, and compact the fill in strict accordance with these specifications. A soil engineer shall be the owner's representative to inspect the construction of fills. Excavation and the placing of fill shall be under the direct inspection of the soil engineer, and he shall give written notice of conformance with the specifications upon completion of grading. Deviations from these specifica-' tions will be permitted only upon written authorization from the soil engineer. A soil investigation has been made for this project; any recommendations made in the report of the soil investigation or subsequent reports shall become an addendum to these specificatio~s. II. SCOPE The placement of controlled fill by the contractor shall include all clearing and grubbing, removal of existing unsatisfactory material, preparation of the areas to be filled, spreading and compaction of fill in the areas to be filled, and all other work necessary to complete the grading of the filled areas. III. MATERIALS 1. Materials for compacted fill shall consist of any materiai imported or excavated from the cut areas that, in the opinion of the soil engineer, is suitable for use in constructing fills. The material shall contain no rocks or . hard lumps greater than 24 inches in size and shall contain at least 40% of material smaller than 1/4 inch in size. (Materials greater than 6 inches in size shall be placed by the contractor so that they are surrounded by compacted fines; no nesting of rocks shall be permitted.) No material of a perishable, spongy, or otherwise improper nature shall be used in filling. 2. Material placed within 24 inches of rough grade shall be select material that contains no rocks or hard lumps greater than 6 inches in size and that swells less than 3% when compacted as hereinafter specified for compacted fill and soaked under an axial pressure of 160 psf. ", • • t. • • • • • • • • • • ) . • 3. Representative samples of material. to be used for fill shall be tested in the laboratory by the soil engineer in order to determine the maximum density, optimum moisture content, and classification of the soil. In addition, the soil engineer shall determine the approximate bearing value of a recompacted, saturated sample by direct shear tests or other te~ts applicable to' the particular soil. 4. During grading ope~ations, soil types other than those analyzed in the report of the soil investigation may be encountered by the contractor. The soil engineer shall be consulted to determine the suitability of these soils. IV. COr-lPACTED FILLS 1. General (a) Unless otherwise specified, fill material shall be compacted by the contractor while at a moisture content near the optimum moisture content and to a density that is not less than 90% of the maximum dry density determined in accordance with ASTM Test No. 01557-70, or other density test methods that will obtain equivalent results. (b) Potentially expansive soils may be used in fills below a depth of 24 inches and shall be compacted at a moisture content greater than the optimum moisture content for the material. 2. Clearing and Preparing Areas to be Filled (a) All trees, brush, grass, and other objectionable material shall be collected, piled, and burned or otherwise disposed of by the contractor so as to leave the areas that have been cleared with a neat and finished appearance free from un- sightly debris. (b) All vegetable matter and objectionable material shall be removed by the contractor from the surface upon which the fill is to be placed, and any loose or porous soils shall be removed or compacted to the depth shown on the plans. The surface shall then be plowed or scarified to a minimum depth of 6 inches until the surface is free from uneven features that would tend to prevent uniform compaction by the equip- ment to be used . (c) Where fills are constructed on hillsides or slopes, the slope of the original ground on which the fill is to be . placed shall be stepped or keyed by the contractor as shown on the figure on Page 4 of these specifications. The steps shall extend completely through the soil mantle and into the underlying formational materials . · ' , • • • • • • • • • '. • • (d) After the foundation for the fill has been cleared, plowed, or scarified, it shall be disced or bladed by the contractor until it is uniform and free from large clods, brought to the proper moist~re content, and compacted as specified for fill. 3. Placing, Spreading,' and Compaction of Fill Material (a) The fill material shall be placed by the contractor in layers that, when compacted, shall not exceed 6 inches. Each layer shall be spread evenly and shall be thoroughly mixed during the spreading to obtain uniformity of material in each layer. ' (b) When the moisture content of the fill material {s below that specified by the soil engineer, water shall be added by the contractor until the moisture content is as specified. (c) When the moisture content of the fill material is above that specified by the soil engineer, the fill material shall be aerated by the contractor by blading, mixing, or other satisfactory methods until the moisture content is as specified. (d) After each layer has been placed, mixed, and spread evenly, it shall be thoroughly compacted by the contractor to the specified density. Compaction shall be accomplished by sheepsfoot rollers, vibratory rollers, multiple-wheel pneumatic-tired rollers, or other types of acceptable com- pacting equipment. Equipment shall be of such design that it will be able to compact the fill to the specified density. Compaction shall be continuous over the entire area, and the equipment shall make sufficient trips to insure that the desired density has been obtained throughout the entire fill. " (e) The surface of fill slopes shall be compacted and there shall be no excess loose soil on the slopes. v. INSPECTION 1. Observation and compaction tests shall be made by the soil engineer during the filling and compacting operations so that he can state his opinion that the fill was con- structed in accordance with the specifications. 2. The soil engineer shall make field density tests in accordance with ASTM Test No. D 1556-64. Density tests shall be made in the compacted materials below the surface where the surface is disturbed. When these tests indicate that the density of any layer of fill or portion thereof is below the specified density, the particular layer or portion shall be reworked until the specified density has been obtained. ", • • • • • • • • • • " 3467 Kurtz Street San Diego, California 92110 (619) 224·2~11 November 22, 1982 Project Numbers 'S9331W-FC01 and S9331W-UDOl 52106Y Mr. James Carter Broadmoor Homes, Inc. WOOdWard.CIYdJo~;ji~ 3911 Sorrento Valley Boulevard Suite B San Diego, California 92126 '" Dear Mr. Carter, As you requested, we are transmitting to you one copy of each of the reports captioned below prepared by our firm: UPDATE SOIL AND GEOLOGIC INVESTIGATION PUEBLO DEL ORO (GROVE APARTMENTS) CARLSBAD, CALIFORNIA Dated: December 6, 1979 Revised: October 20, 1980 HOSP GROVE APARTMENTS SAN DIEGO, CALIFORNIA Dated: December 12, 1980 GRADING PLAN REVIEW AND ADDITIONAL SLOPE STABILITY ANALYSIS PUEBLO DEL ORO (GROVE APARTMENTS) CARLSBAD, CALIFORNIA Dated: July 28, 1981 FINAL REPORT OF ENGINEERING AND GEOLOGIC OBSERVATION OF GRADING AND TESTING OF COMPACTED FILL PUEBLO DE ORO, LOTS 1 THROUGH 12 (PADS 1 THROUGH 76) CARLSBAD TRACT 79-27 CARLSBAD, CALIFORNIA Dated: September 18, 1981 Consulting Engineers GeOlogists and EnVIronmental SCientists • • • • • • • • • • , Broadmoor Homes, Inc. November 22, 1982 Project Numbers 59331W-FCOl and 59331W-UDOl Page 2 TEST RESULTS PUEBLO DE ORO CARLSBAD, CALIFORNIA Dated:· October 12, 1981 TEST RESULTS PUEBLO DE ORO C~LSBAD, CALIFORNIA Dated: October 20, 198~ COMPACTION TEST RESULTS STREET SUBGRADE, BASE, AND WALL BACKFILL PUEBLO DE ORO CARLSBAD, CALIFORNIA Dated: April 2, 1982 SLOPE SLOUGHING PUEBLO DE ORO (CARLSBAD TRACT 79-27) CARLSBAD, CALIFORNIA Dated: May 25, 1982 Woodward·Clyde Consultants If you have any questions, please give us a call. Very truly yours, WOODWARD-CLYDE CONSULTANTS Richard P While Vice President RPW/wt Enclosures • • • • • • • • • • • (:±) 3467 Kurtz Street San Diego, California 92110 (619) 224·2911 Woodward·Clyde Consultants November 24, 1982 Project No. 59331W-FC01 52106Y Ms. Tina Courtney CRC 1335 Hotel Circle South Suite 201 San Diego, California 92108 Dear Ms. Courtney, As you requested, we are transmitting to you one copy of the report captioned below prepared by our firm: FINAL REPORT OF ENGINEERING AND GEOLOGIC OBSERVATION OF GRADING AND TESTING OF COMPACTED FILL PUEBLO DE ORO, LOTS 1 THROUGH 12 (PADS 1 THROUGH 76) CARLSBAD TRACT 79-27 CARLSBAD, CALIFORNIA Dated: September 18, 1981 If you have any questions, please give us a call. Very truly yours, WOODWARD-CLYDE CONSULTANTS Richard P. While Vice President RPW/wt Enclosure Consulting Engineers Geologists and Environmental SClenltSIS ... . • • • • • • • • • • • 3467 Kurtz Street San Diego, California 92110 714·224·2911 Woodward·Clyde Consultants Telex 697·841 September 18, 1981 Project No. 59331W-FCOl Broadmoor Homes, Inc •. 3911 Sorrento Valley Boulevard San Diego, California 92126 Attention: Mr. James Carter FINAL REPORT OF ENGINEERING AND GEOLOGIC OBSERVATION OF GRADING AND TESTING OF COMPACTED FILL PUEBLO DE ORO, LOTS 1. THROUGH 12 (PADS 1 THROUGH 76) CARLSBAD TRACT 79-27 CARLSBAD, CALIFORNIA Gentlemen: In accordance with your request and our proposal dated November 10, 1980, we have provided engineering services in conjunction with the regrading of the subject site. SCOPE OF WORK Our services included: o o o o o o Providing engineering and geologic observation of the grading operation Performing field density tests in the placed and compacted fill Performing laboratory tests on representative samples of the material used for fill Providing engineering observation of the instal- lation of subdrains Providing geologic inspection of buttress cuts and cut slopes Providing professional op~n~ons regarding the con- tractor's general adherence to plans and specifica- tions. Consulting Engineers, Geologists and EnVifonmental SCientists Offices in Other PrinCipal Cities .. , . . .' • • • • • • • • • • Broadmoor Homes, Inc. September 18, 1981 Project No. 5933lW-FCOl Page 2 SUMMARY OF GENERAL EARTHWORK AND TESTING Woodward·Clyde Consultants Current site preparation, compaction, and testing were done between January 23 and June 25, 1981. In our opinion, based on our observation and testing, the work performed during that period was in general conformance with the Specifications for Controlled Fill attached to our report entitled "Update Soil and Geologic Investigation Pueblo Del Oro (Grove Apart- ments), Carlsbad, California," dated revised October 20, 1980. Previous grading of the subject site was completed between May 17 and December 19, 1972. That grading consisted of mass grading the site into a series of large approximately flat pads. That work is summarized in the report by Woodward- Gizienski & Associates entitled "Final Report of Engineering Observation and Compaction Testing, Grove Apartments, 'Carlsbad, California," dated March 1, 1973. During the current grading period, fill was placed, compacted, and tested, either as designed fill or undercut at finish grade, on Lot 1 (Pads I, 2, and 76), Lot 2 (Pads 8, 9, 10, and 13 through 17), Lot 5 (Pads 22, 25, and 28), Lot 6 (Pads 33, 34, 39, and 40), Lot 8 (Pads 45 through 51), Lot 9 (Pads 52 through 60, 71,72, and 74), Lot 10 (Pads 61 through 71),. and Lot 12. Lot 1 (Pad 1), Lot 5 (Pads 22 and 25), and Lot 6 (Pads 33, 34, and 40) are cut-fill pads. Lot 1 (Pads 3 through 7), Lot 2 (Pads II, 12, and 13), Lot 3 (Pad 73), Lot 4 (Pads 18 through 21), Lot 5 (Pads 23, 24, 26, 27, 29, and 30) and Lot 6 (Pads 31, 32, 35 through 38, and 41 through 44) and Lot 11 (Pad 75) are cut. The grading operation generally consisted of removing vegeta~ tion, excavating loose surficial soils, scarifying, wetting and compacting areas to receive fill, making cuts and fills to design grade and constructing buttress fills in perimeter cuts. Subdrains were installed in buttress slope fills and in design fills on and adjacent to Lots 6, 7, 8, 9, 10, and / 12. During the regrading operation, compaction procedures were observed, and field density tests were made to help evaluate the relative compaction of the placed fill. Field observa- tions and results of field density tests indicate that the fill has been generally compacted to .90 percent or more of maximum laboratory dry density as determined in accordance with ASTM Test Method No. 01557-70. For reference, the approximate locations of field density tests and the limits of compacted fill have been recorded on a copy of the grading -" • • • • • • • • • • • Broadmoor Homes, Inc. September 18, 1981 Project No. 5933lW-FCOl Page 3 Woodward·Clyde Consultants plan. The results of field density tests, expressed as a percent of laboratory dry density (relative compaction), are given on the attached forms. Laboratory tests were made on representative samples of the materials used for fill. The tests were performed to evaluate moisture density relationships, maximum dry density, optimum moisture content, grain size distribution, plasticity and swell characteristics. The results of laboratory tests are attached. SUMMARY OF FINISH GRADE SOIL CONDITIONS During the regrading operation, certain pads were specially treated to provide a specified depth of select soil at rough grade. Fill Pads and Fill Portion of Cut-Fill Pads Inspection and laboratory tests indicate that nonexpansive fill was placed within 2 feet of rough grade on all fill, cut-fill or undercut fill pads noted herein. Cut Pads and Cut Portion of Cut-Fill Pads On Lot 1 (Pads 1, 2, and 76), Lot 2 (Pads 8, -9, 10, and 13 through 17), Lot 5 (Pads 22, 25, and 28), Lot 6 (Pads 33, 39, and 40, Lot 8 (Pads 48 through 51), Lot 9 (Pads 57, 58, 59, and 72), and Lot 10 (Pads 65 through 69) expansive soil was excavated and replaced with nonexpansive fill to a depth of 2 feet below rough pad grade over the entire level pad. Cut Pads Not Undercut Cut Lot 1 (Pads 3 through 7), Lot 2 (Pads 11, and 12), Lot 3 (Pad 73), Lot 4 (Pads 18 through 21), Lot 5 (Pads 23, 24, 26, 27, 29 and 30), Lot 6 (Pads 31, 32, 35 through 38, and 41 through 44) were inspected at the completion of regrading. The inspection indicated that no expansive soil is evident at rough grade surface. Geologic Conditions The geologic conditions encountered during site grading were essentially as concluded in our report of October 20, 1980. Geologic observations of the recommended buttress keys were performed prior to the installation of subdrains and compacted fill. .. -e· e • e • e • • • • Broadmoor Homes, Inc. September 18, 1981 Project No. 59331W-FC01 Page 4 Woodward· Clyde Consultants Minor ground water seepage was observed in a cut slope below c Lot 11 (Pad 75) and is being monitored by our firm. Recom- mendations for seepage control, if needed, will be given at a later date. No additional areas of adverse geologic conditions were observed that required additional engineering analysis and recommendations. An as-graded soils and geologic map is being prepared and will be~issued under separate cover. RECOMMENDATIONS The recommendations presented herein are not intended for structures or appurtenances located beyond the limits of the undercut. Foundations for Structures C'n Nonexpansive Soils We recommend that foundations for single-story or two-story residential structures placed on nonexpansive, undisturbed soil or on nonexpansive, properly compacted fill be designed for a bearing pressure not exceeding 2,000 psf (dead plus live loads). We recommend that footings be founded at least 12 inches below finished grade and have a minimum width of 12 inches. In our opinion, this bearing pressure can be increased by no more than one-third for loads that include wind or seismic forces. Slopes Fill slopes at the site have inclinations ranging from approximately 1:1-1/2 to 2:1 (horizontal to vertical). Slope heights are approximately 8 to 75 feet. Fill slopes with inclinations of 1-1/2 to 1 were treated by overbuilding and cutting back to design slope. Fill slopes inclined at 2 to 1 were treated by periodically backrolling with a sheeps- foot compactor, and track compacting with a dozer upon completion. We recommend that structures that will not tolerate differ- ential settlements (such as foundations, swimming pools, concrete decks, walls, etc.) not be located within 8 feet of the top of a slope. We recommend that footings that are located within 8 feet of the top of a slope be extended in depth until the outer bottom edge of the footing i~ 8 feet horizontally from the outside face of the slope. ... • • • • • • • • • • • Broadmoor Homes, Inc. September 18, 1981 Project No. 5933lW-FCOl Page 5 Additional Fill and Uti1ity Trenches Woodward·Clyde Consultants This report discusses the fill placement observed by personnel from our firm during the periods specified. We recommend that any additional fill placed, as well as backfill placed in utility trenches located within 5 feet of a building and deeper than 12 inches, or backfill placed in any trench located 5 feet or more from a building and deeper than 5 feet be compacted under our observation and tested to verify compliance with the earthwork specifications for the project. We should be contacted at least 24 hours prior to backfilling operations. At the time of this report some of the utility trench backfill is completed. Test results are attached. 'Drainage We recommend that positive measures be taken to properly finish grade each pad after structures and other improve- ments are in place, so that drainage waters from the pad and adjacent properties are directed off the pad and away from foundations, floor slabs, and slope tops. Even when these measures are taken, a shallow ground water or surface water condition can and may develop in areas where no such water condition existed prior to site development; this is particu- larly true where a substantial increase in surface water infiltration results from landscape irrigation. LIMITATIONS The elevations of compaction tests shown as finished grade (FG) tests on the attached forms correspond to the-elevations shown on the "Grading Plan Carlsbad Tract 79-27," dated September 25, 1980, prepared by Roy L. Klema Engineers, Inc. Elevations and locations used in this repor.t were based on field surveys done by others. The soil conditions described in this report are based on observations and periodic testing. This office should be notified of any indications that soil conditions are not as described herein. We will inspect foundation excavations for each pad if we are requested to do so. For this report, rough pad grade is defined as that grade set in the field by the grade checker from reference stakes established by the surveyor, and represents rough grade at the time we were inspecting the grading operation. Likewise, the indicated depths of undercutting of expansive soil ... • J ., • • • • • • • • • Broadmoor Homes, Inc. September 18, 1981 project No. 5933lW-FCOl Page 6 Woodward-Clyde Consultants and/or depths of placement of nonexpansive soil were based on the measurements made by and grades set by the contractor's grade checker. The conclusions and opinions drawn from the test results and site inspections apply only to our work with respect to regrading, and represent conditions at the date of our final inspection. We will accept no responsibility for any subse- quent changes made to this site by others, or by uncontrolled action of water, or by failure of others to properly repair damages by uncontrolled action of water. If you have any questions, please give us a call. Very truly yours, WOODWARD-CLYDE CONSULTANTS Richard P. While R.E. 21992 RPW/DS/DT/rs Attachments (4) btd!!~ C.E.G. 1033 --.'-----~----------- • COMPACTION rEST RESULTS Jo. NANI PUEBLO DEL ORO OATE REI'O"TID 9/16/81 Joa NUN.It" 59331W-FC01 (STREET TESTS) • DATE. COYE"ED MAY 6, 1981 THROUGH JUNE 19, 1981 PAGE 5-1 0.. S-l IIOI.TUII& "11tU) l,AaOllA TOllY II&&.ATIV& DAT& ,..T IIItTIt8T LOCATION £LItVATION CONT&NT OIlN.ITY _alTY COIIMCTION NU .... .:II 01' Ol"TIt.T .. DAYWT. 1'(;1' I'C' ~ 0,. 1.A8. DIN .. • MAY 6 S-l AVENIDA MAGNIFICA, OPP. PAD 65 152' 12.3 114.3 123.5 92 S-2 AVENIDA MAGNIFICA, OPP. PAD 68 142' 12.3 115.0 123.5 93 MAY 14 S-3 AVENIDA MAGNIFICA, OPP. • PAD 72 137' 11. 7 119.8 126.0 95 S-4 AVENIDA MAGNIFICA, OPP. PAD 66 143' 13.6 117.3 126.0 93' JUN 8 5-5 CALLE CABALLERO, STA. 3+00 148' 13.0 119.4 126.0 94 • 5-6 CALLE CABALLERO, STA. 1+30 122' 12.3 119.2 126.0 94 JUN 9 S-7 CALLE ARROYO,STA.0+50 128' 13.6 116.3 126.0 92 S-8 " " STA. 0+80 132' 13.0 120.0 126.0 95 I • JUN 10 S-9 VIA FRANCISCA,STA.I0+00 190' 12.3 119.3 126.0 94 5-10 CIRCULO SANTIAGO, OPP. PAD 14 135' 11. 7 118.2 126.0 93 S-l1 CIRCULO SANTIAc;;o, OPP. PAD 17 137' 13.0 116.1 126.0 92 • JUN 16 S-12 CIRCULO SANTIAGO, OPP. PAD 10 128' 12.3 119.1 126.0 94 S-13 CALLE ARROYO,5TA. 1+50 138' 11. 7 117.2 126.0 93 JUN 17 S-14 CIRCULO SANTIAGO, N. OF STA. 1+90 100' 12.3 . 115.3 122.0 94 • 5-15 CIRCULO SANTIAGO, N. OF STA. 2+00 104' 13.6 112.9 122.0 92. JUN 18 S-16 CIRCULO SANTIAGO, N. OF STA. 3+00 108' 12.3 115.3 126.0 91 S-17 CIRCULO SANTIAGO, N. OF • STA. 1+50 112' 13.6 117.0 126.0 92 S-18 CIRCULO SANTIAGO, STA. 1+25 116' 13.0 119.5 126.0 94 JUN 19 S-19 CIRCULO SANTIAGO, STA. 2+00 120' 11.1 119.6 126.0 94 • S-20 CIRCULO SANTIAGO, STA. 1+50 124' 12.3 117.0 126.0 92 S-21 ELM AVENUE, STA. 95+00 258' 13.0 113.6 123.5 91 S-22 " " STA. 97+40 246' 12.3 115.3 126.0 91 S-23 ELM AVENUE, STA. 97+20' 248' 13.0 117.0 126.0 92 5-24 " " STA. 97+00 256' 11. 7 122.4 126.0 97 • Woodward-Clyde Consultants " wt 7/27/81 CONSUl. TI"'Q eNGINaa .. a, G.Of., •••• T. AND &HYIItOH".HTAL leICHT.STa '. COMPACTION TEST RESULTS Jo .. NAME PUEBLO DEL ORO Jo. NUM.ER 59331W-FC01 (BUTTRESS FILL) • DATE. COVERED FEBRUARY 6, 1981 THROUGH MAY 12, 1981 ' • FEB 6 FEB 12 • FEB 13 FEB 17 • FEB 20 • MAR 26 • MAR 30 MAR 31 • APR 1 • APR 2 • APR 7 • 5/18/81 B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B~9 B-10 B-ll B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-19 B-18 B-20 B-21 B-22 B-23 B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-32 B-33 B-34 LOCATION OPP. LOT 8, WEST SIDE OPP. LOT 8, EAST SIDE OPP. LOT 8, CENTER OPP. LOT 8, EAST SIDE OPP. LOT 8, EAST SIDE OPP. LOT 8, CENTER OPP. LOT 8, EAST SIDE OPP. LOT 8, WEST SIDE OPP. LOT 8, CENTER OPP. LOT 8, WEST SIDE OPP. LOT 8, EAST SIDE OPP. LOT 8, CENTER OPP. LOT 8, CENTER OPP. LOT 8, EAST SIDE LOT 12, SOUTH END " " " " LOT 6, S.W. CORNER LOT 12, SOUTH END LOT 12, SOUTH END LOT 6, S.W. CORNER 11 II .... " LOT 6, SOUTH SIDE LOT 6, S.W. CORNER LOT 12, SOUTH END LOT 6, SOUTH SIDE LOT 6, S.W. CORNER LOT 6, S.E. CORNER n II ff.. n n If .. II .. LOT 6, SOUTH SIDE LOT 6, S.E. CORNER LOT 6, S.W. CORNER LOT 6, SOUTH SIDE LOT 6, S.W. CORNER ELItVATION OI"TItST 158' 142' 152' 146' ISO' 156' 154' 160' 164' 168' 168' 172' 180' 176' 187' 191' 196' 200' 200' 196' 200' 196' 204' 204' 200' 208' 196' 200' 204' 210' 212' 214' 218' 222' MO'STUIIE CONTENT ~ DRY WT. 13.0 11.1 10.5 11.0 10.0 12.3 11. 7 12-.3 11. 7 12.3 13.6 13.6 11. 7 12.3 11. 7 11. 7 12.3 12.3 13.0 11. 7 12.3 11. 7 13.0 12.3 12.3 13.6 13.0 13.6 12.3 13.1 12.3 11. 7 13.0 12.3 DATE REPORTED 9/16/81 PAGE B-1 01' B-2 I"IItLO OItNSITY PC I" 116.7 ll4.0 115.9 121.8 123.0 118.2 117.4 117.2 119.8 ll1.1 llO.9 112.6 ll6.8 117.8 116.8 ll8.7 119.5 llO.6 117.2 114.6 117.8 115.8 115.5 119.6 ll7.8 119.2 122.9 120.5 119.8 124.2 ll6.6 116.2 118.1 123.1 LAaOIlATORY RELATIVE _alTY COM'ACT'ON K. 'lit 0" L.Aa. olENa. 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.0 126.0 119.5 114.5 119.5 126.5 126.5 126.5 126.5 . 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 1265. 126.5 126.5 126.5 126.5 126.0 126.0 126.0 126.0 92 90 91 96 97 93 92- 92 95' 92 92 94 93 93 92 93 94 87 92 90 93 91 91 94 93 94 97 95 94 98 92 9.2 93 97 Woodward·CIydeConsuItanta tI C:OHauL.TIHG eNGINEIU". GaOL.M'IT. ANO .NYUION .... HTAL aC'CHT.aTa • COMPACTION TEST RESUL. TS PUEBLO DEL ORO 59331W-FC01 (BUTTRESS FILL) • DATE. COYER ED FEBRUARY 6, 1981 THROUGH MAY 12, 1981 DATIl • APR 8 APR 9 • APR 10 APR 13 • APR 14 APR 15 • ~R 16 • APR 17 APR 27 • APR 28 • APR 29 MAY' 4 • r-1AY 12 • wt 5/18/81 ,..T RETE.T NUN.EIt 01' B-35 B-36 B-35 B-37 B-38 B-39 B-40 B-41 B-42 B-43 B-44 B-45 B-46 B-47 B-48 B-49 B-50 B-51 B-52 B-53 B-S4 B-55 B-52 B-56 B-57 B-58 B-59 B-60 B-61 8-62 8-63 8-64 8-65 8-66 B-67 8-68 8-69 LOCAT'ON LOT 6, S.E. CORNER .. .. II II .. LOT 6, S.W. CORNER LOT 6, S.E. CORNER LOT 6, SOUTH SIDE~ LOT 6, S.E. CORNER LOT 6, S.E. CORNER It II 11.. .. LOT 6, SOUTH SIDE LOT 6, S.E. CORNER LOT 6, S.E. CORNER II " n" If LOT 6, S.W. CORNER " " "" II LOT 12, SOUTH END LOT 6, SOUTH SIDE If .. " " LOT 6, SOUTH SIDE II .. " " LOT 12, SOUTH END LOT 6, SOUTH SIDE LOT 12 NORTH END II " Lot 7 LOT 12 LOT 7 LOT 12 LOT 7 LOT 12 It .. LOT 7 LOT 12 II II LOT 7 LOT 12 II II ELEVAT'ON OJ'TIE.T 218' 218' 226' 230' 222' 216' 220' 224' 228' 232' 236' 240' 218' 222' 208' 226' 230' 234' 238' 210' 234' 132' 136' 140' 144' 148' lS2' 156' 160' 164' 168' 172' 178' 182' 186' MOI.TUR& CONT&NT '110 DltYWT. 11. 7 13.6 11. 7 11. 7 11. 7 12.3 11. 7 12.3 12.3 13.6 11. 7 12.3 12.3 13.6 13.0 13.0 13.6 13.0 13.0 11. 7 13.6 12.3 12.6 12.3 14.3 13.6 13.0 12.3 13.0 12.3 13.0 13.6 12.3 11. 7 13 .1 DATE REI'ORTED 9/16/81 PAGE B-2 OF B-2 I'IELD DEN.,TY PCI' 111.7 117.6 115.9 117.7 115.9 114.6 114.5 118.5 118.6 117.3 115.9 114.6 110.3 117.7 111.4 111.0 112.7 108.3 111.6 115.9 113.7 115.0 111.4 l1S.1 109.S 110.S 113.4 113.0 118.2 105.2 113.3 112.3 117.0 119.8 118.9 LA.OIIATOltY It&LAT'Y& IMINIIITY CDMPACT'ON fJCII '" 01" LAIt. DIIN •• 126.5 88 126.5 92 126.5 91 126.5 126.5 123.5 126.5 126.0 126.0 126.5 122.0 122.0 119.5 122.0 122.0 122.0 ·122.0 122.0 122.0 122.0 122.0 119.5 119.S 126.5 114.5 114.5 122.0 122.0 126.0 114.5 122.0 122.0 122.0 126.0 126.0 93 91 92 90 94 94 92 95 93 92 96 91 90· 92 88 91 95 93 96 93 90 95 96 92 92 93 91 92 92 95 95 94 Woodward·C" Consultants " CON lUI-TING KHGIH •• 1t5. geOLOGIa". AND &HV"IOHM.HTA&.. IC1CHT'.TS • COMPACTION TEST RESUL.TS Jo. NAMa PUEBLO DE ORO DATE REPORTED 9/16/81 Jo. NUM •• " 59331W-FCOI (STORM DRAIN TRENCH BACKFILL) • DATES COVIU'ED JULy 15, 1981 THROUGH AUGUST 17, 1981 PAGE: SD-I 0 .. SD-3 STlRFACE .. OlaTUIlIl .. IIlLD !.AItOllA TOllY IIIlI.ATIYIl DAT. ftST ItItT •• T LOCATION CONTINT DIN.ITY DIlN.ITY CO .... ACTION NU ... 1t1t Of' '!It lillY WT. re .. PC, 'J(, 0 .. !.Alt. D ..... • JUL 15 SO:" 1 PAD 52 WEST SIDE -4 1 13.6 115.9 126.0 91 SD-2 PAD 52 -EAST SIDE -2' 12.3 114.7 126.0 91 SD-3 PAD 52 -CENTER SURFACE 11.1 115.3 126.0 91 JUL 16 SD-4 OPPOSITE PAD 55 STA. 3+40 -4' 13.0 114.2 126.5 90 • SD-5 OPPOSITE PAD 59 STA. 4+30 -4' 11. 7 117.0 126.5 92 SD-6 OPPOSITE PAD 49 STA. 5+70 -4' 13.0 117.6 126.5 92 JuL 17· SD .. 7 OPPOSITE PAD 57 • STA. 3+30 -2' 11. 7 117.2 126.5 93 SD-8 OPPOSITE PAD 49 STA. 5+30 -2' 12.3 123.5 126.0 98 JUL 20 SD-9 OPPOSITE PAD 55 SURFACE 12.3 123.1 126.0 97 SD-I0 OPPOSITE PAD 49 SURFACE 13.0 116.5 126.0 92 • SD-11 CALLE CABALLERO STA. 0+50 -2' 11. 7 117.0 126.0 92 SD-12 CALLE CABALLERO STA. 1+50 SURFACE 13.0 114.8 126.0 91. SD-13 PAD 76 -2' 13.0 114.3 123.5 92 SD-14 PAD 76 SURFACE 12.3 115.4 123.5 93 • JUL 23 SD-15 PAD 74 -EAST END -3' 13.0 112.4 123.5 91 SD-16 PAD 74 -WEST END -1' 11. 7 115.2 123.5 93 SD-17 PAD 74 -CENTER SURFACE 12.3 114.0 126.5 90 JUL 24 SD-18 PAD 64 CENTER -2' 11. 7 114.7 123.5 -92 SD-19 PAD 63 -WEST END -3' 13.0 113.3 123.5 91 • SD-20 PAD 61 -CENTER -2' 12.3 113.1 123.5 91 SD-21 PAD 62 -CENTER SURFACE 13.0 112.4 123.5 91 SD-22 PAD 64 -CENTER SURFACE 13.0 117.0 126.5 92 JUL 27 SD-23 BETWEEN PADS 63-64 CENTER -2' 13.0 108.8 123.5 88 • SD-24 BETWEEN PADS 62-63 CENTER -2 ' 12.3 114.6 123.5 92 SD-25 SD-23 BETWEEN PADS 63-64 CENTER -2' 13.0 122.2 123.5 98 SD-26 BE'IWEEN PADS 61-62 CENTER -2 ' 12.3 117.0 123.5 94 • SD-27 BETWEEN PADS 63-64 CENTER SURFACE 14.3 116.2 126.0 92 SD-28 BE'IWEEN PADS 61-62 CENTER SURFACE 11. 7 116.0 126.0 92 • Woodward-Clyde Consultants " CONa"'l..TIHQ .NG.H ••••• GIlOUN".". AND .NVU_OHM.NT.,-SC'CNT •• ". • COMPACTION TEST RESULTS Jo .. NAMa PUEBLO DE ORO Joa NUM.t:R 59331W-FC01 (STORM DRAIN TRENCH BACKFILL) • DATE. COVERED JULY ~5, 1981 THROUGH AUGUST 17,~ 1981 • JUL 27 SD-29 • • • JUL 29 SD-30 SO-31 SD-32 SO-33 SD-34 JUL 30 SO-36 SO-37 SO-38 SO-39 JUL 31 SO-40 SD-41 SO-42 • AUG 4 SO-43 SD-44 SO-45 AUG 10 • AUG 11 • SO-46 SO-47 SO-48 SO-49 SO-50 SO-51 SO-52 SO-53 SO-54 III:TI:ST 0 .. AUG 12 SO-55 SO-53 SO-56 • SO-57 SO-58 SO-59 SO-60 • wt 9/:14/81 LOCATION BETWEEN PADS 52-53 CENTER SURFACE -2' OPPOSITE PAD 52 CENTER SURFACE OPPOSITE PAD 52 SURFACE NORTHERLY END OF CALLE CABALLERO NORTHERLY END OF CALLE CABALLERO NORTHERLY END OF CALLE CABALLERO OPPOSITE PAD 18 OPPOSITE PAD 18 OPPOSITE PAD 73 OPPOSITE PAD 18 NORTHERLY END VIA CLEMROTE OPPOSITE TRANSFORMER EAST SIDE OF PAD 64 EAST SIDE OF PAD 64 EAST SIDE OF PAD 64 BETWEEN PADS 63 & 64 BETWEEN PADS 63"& 64 PAD 63 PAD 76 PAD 1 PAD 2 BETWEEN PADS 1 & 2 PAD 1, EAST SIDE PAD 2 PAD 8 PAD 9 PAD 10 PAD 9 PAD 10, SOUTH SIDE BETWEEN PADS 8 & 9 PAD 8, NORTH SIDE PAD 33 PAD 32 SURFACE SURFACE SURFACE -2' SURFACE -2' -2' SURFACE SURFACE -2' SURFACE SURFACE SURFACE -2' -2' -2' -2' SURFACE SURFACE SURFACE -2' -2' -2' -2' SURFACE SURFACE SURFACE -2' -2' MO'STUIIII CONTIINT .. D.YWT. 13.6 13.0 13.0 10.0 10.7 10.3 10.7 11.3 10.7 11.0 11.2 10.0 10.2 11. 2 10.4 11.8 11.3 12.3 13.0 11.1 12.3 11.1 10.5 11. 7 12.3 11. 7 13.6 11. 7 12.3 13.0 11.1 12.3 DATE R£fOORTED 9/16/81 PAGESO-2 OPSD-3 .. II:La DI:NaIT,. PC" 111.6 115.3 115.3 113.9 117.6 115.5 116.0 124.1 114.0 120.6 119.5 115.2 116.7 116.0 113.8 118.7 113.8 115.8 116.9 117.5 117.7 115.9 120.8 117.2 108.6 116.0 116.1 124.4 116.4 118.7 115.3 110.7 LAaa.ATO.,. IIaLATIVa _ITY COMPACTION PC, 'lIo 0" LAa. DUll. 119.5 126.5 126.5 126.5 122.0 122.0 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.0 126.0 126.0 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 93 91 91 90 96 94 91 98 90 95 94 91 92 92 90 93 90 91 92 93 93 91 95 92 85 91 91 98 92 93 91 87 CON.ULTIMO CHGIH •• "a, G.~.G'.T. AHD &N'IU'OH ... NTAL aC'.NT.STa • COMPACTION TEST RESULTS JOti NAMa PUEBLO DE ORO Jo. NUM.I:!I 59331W-FC01 (STORM DRAIN TRENCH • DATa. COVaftED JULY 15, 1981 THROUGH AUGUST 17, DATa ftaT IISTUT LOCATION HUNa.II 0" AUG 13 SO-61 50-60 PAD 32 • 50-,62 PAD 32, EAST SIDE SO-63 BETWEEN PADS 32 & 33 50-64 PAD 32, EAST SIDE AUG 14 50-65 PAD 24, EAST SIDE 50-66 BETWEEN PADS 23 & 24 • 50-67 PAD 23, WEST SIDE AUG 17 50-68 PAD 24 SO-69 PAD 23 50-70 BETWEEN PADS 23 & 24 • • • • • • • wt 9/14/81 BACKFILL) 1981 SURFACE -2' SURF. SURF. SURF. -2' -2' -2' SURF. SURF. SURF. CATI: RI:~OftTI:O 9/16/81 PAGE 50-3 01' 50-3 .. OI.TUlla .. IILD uaOIlATOltT CONTENT ClSH.ITT ClaH.ITT .. OIlTWT. rep' rep 11. 7 115.7 126.5 12.3 117.3 126.5 13.0 117.5 126.5 11. 7 116.7 126.5 13.0 115.7 126.5 .12.3 114.7 126.5 11. 7 115.4 126.5 11. 7 117.2 126.5 13.6 123.1 126.5 13.0 117.4 126.5 co .. aUL.TINO eNGIH.I" •• g.OL. •••• T. "ptD INVIIIOH ... HTAl.,aClaNTlaTa ltaUTI"a CO .... ACTION ~ o .. u.. ClIN •• 91 92 92 92 91 90 91 92 97 93 • COMPACTION TEST RESULTS PUEBLO DE ORO CATE REflORTED 9/16/81 59331W-FC01 (WATER TRENCH BACKFILL) • DATE. COVERED JULY 8, 1981 THROUGH AUGUST 17, 1981 PAGE W-1 O~ W-2 • • • • • • • • • JUL 8 JUL 17 JUL 20 naT NU .... tI, W-1 W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 W-IO W:"ll W-12 W-13 JUL 21 W-14 W-15 W-16 JUL 22 W-17 W-18 W-19 W-20 W-21 W-22 W-23 JUL 23 W-24 W-25 W-26 W-27 W-28 RItTltaT 0,. W-IO LOCATION ELNI AVE. STA. 92+00 ELNI AVE. STA. 94+00 ELNI AVE. STA. 96+75 ELNI AVE. STA. 93+00 ELNI AVE. STA. 96+00 CALLE ARROYO STA. 6+00 CALLE ARROYO STA. 3+50 CALLE ARROYO STA. 1+00 CALLE ARROYO STA. 1+50 CALLE ARROYO STA. 5+00 VIA CHEMENTE STA. 0+70 VIA CHEMENTE STA. 1+50 CALLE ARROYO STA. 5+00 VIA LOS SANTOS STA. 1+00 VIA LOS SANTOS STA. 3+00 VIA LOS SANTOS STA. 2+00 CIRCULO SANTIAGO STA. 1+50 CIRCULO SANTIAGO STA. 3+50 CIRCULO SANTIAGO LATERAL 2+67 CIRCULO SANTIAGO STA. 6+00 CIRCULO SANTIAGO STA. 4+25 CIRCULO SANTIAGO LATERAL 1 +4 3 CIRCULO SANTIAGO STA. 2+00 CIRCULO SANTIAGO STA. 1+95 CIRCULO SANTIAGO LATERAL 4+52 CIRCULO SANTIAGO LATERAL 6+21 CIRCULO SANTIAGO STA. 3+00 CIRCULO SANTIAGO STA. 1+75 SURFACE 1I01aTUR. .... La DItHalTY ~IIATO.Y R ...... Tly • -21 -21 -21 SURFACE SURFACE -11 -11 -11 SURFACE SURFACE -11 SURFACE -11 -11 SURFACE -11 -11 -11 -11 SURFACE SURFACE SURFACE -11 -11 SURFACE SURFACE -11 CONT.NT 'II> OIlY WT. 13.6 13.0 11. 7 11.1 11. 7 12.3 13.0 11.1 11. 7 12.3 13.6 12.3 11. 7 13.6 13.0 12.3 11. 7 11.1 14.3 13.0 12.3 13.0 13.0 12.3 12.3 11. 7 fie" 111.8 117.6 117.4 115.1 116.4 118.9 117.4 119.6 113.6 107.0 118.2 119.9 117.2 123.1 120.0 116.9 118.6 112.5 117.3 117.3 117.8 117.8 111.1 116.3 116.1 121. 7 DaCalTT COMPACTION PC" .. 0,. LAII. DDe. 123.5 123.5 123.5 123.5 123.5 126.0 126.0 126.0 126.5 126.5 126.5 126.0 126.5 126.5 126.0 126.0 126.0 123.5 123.5 126.0 126.0 123.5 123.5 126.0 126.0 126.0 90 95 95 93 92 94 93 94 90 85· 93 95 92 97 95 91 94 91 95 93 93 95 90 92 92 96 13.0 123.3 126.0 97 Woodward.CIyde Consultants fit COHauL.TtHO CHGfH.a"a, Gco&..oo.aT. AND aNvu,oHM.NT"&... IC,CHTlaT. • COMPACTION TEST RESULTS Jo. NAMIl PUEBID DE ORO Jo. NUM.ItR 59331W-FCOI (WATER TRENCH BACKFILL) • DATE. COVERED JULY 8, 1981 THROUGH AUGUST 17, 1981 STTRFACE DATa 'naT ItIlTII8T LOCATION NUM.lllt 0 .. JUL 24 W-29 CALLE CABALLERO • STA. 2+00 -I' W-30 CALLE CABALLERO STA. 4+50 -I' W-31 CALLE CABALLERO STA. 2+50 SURFACE W-32 ~ CALLE CABALLERO • STA. 5+25 SURFACE AUG 28 W-33 AVENIDA MAGNIFICA, OPPOSITE PAD 55 -I' W-34 AVENIDA MAGNIFICA, OPPOSITE PAD 56 SURFACE • W-35 AVENIDA MAGNIFICA, OPPOSITE PAD 72 -I' W-36 AVENIDA MAGNIFICA, OPPOSITE PAD 68 -I' W-37 AVENIDA MAGNIFICA, OPPOSITE PAD 65 SURFACE • W-38 AVENIDA MAGNIFICA, OPPOSITE PAD 70 SURFACE AUG 12· W-39 HOSP WAY STA. 11+00 -I' W-40 HaSP WAY STA. 13+45 -I' • AUG 13 W-41 HaSP WAY STA. 16+50 -I' W-42 HOSP WAY STA. 19+00 -I' W-43 W-40 HOSP WAY STA. 13+45 -I' AUG 17 W-44 HOSP WAY STA. 19+50 SURFACE W-45 Hasp WAY STA. 16+50 SURFACE • W-46 HaSP WAY STA. 12+00 SURFACE • • • DATE REPORTED 9/16/81 PAGE W-2 0.. W-2 MOI.TUlla .. I aLI) 1.A.0000TOIlY C:ONTaNT gaN.ITY DIIN.ITY .. DIlY WT. Pc:, ~. 12.3 114.7 126.5 13.0 116.8 126.5 13.6 117.0 126.5 11. 7 117.5 126.5 12.3 116.3 126.5 13.0 122.2 126.0 12.3 117.0 126.0 11. 7 116.0 12b.U 13.0 116.9 126.0 12.3 118.5 126.0 11. 7 113.9 123.5 13.0 108.6 123.5 13.6 117.0 123.5 12.3 117.0 126.0 13.0 119.5 123.5 12.3 115.3 126.0 13.0 116.1 126.0 12.3 1i9.2 126.0 CONaUI.TINO .NOINu.a. O.O"'OIiT. AND aNVU'OHM.NT .. ", .C •• NT,.". ltal.ATlya c:O .... Ac:TION .. 0' 1.A8. gllN .. 90 92 92 92 92 96 92 92 92 94 92 87 94 92 96 91 92 94 • COMPACTION TEST RESULTS JOII NAMI PUEBLO DEL ORO Jo. NUM.I:R 59331W-FC01 (MASS GRADING) • DATE. COVERED JANUARY 27, 1981 THROUGH JUNE 22, 1981 OATIt .JAN 27 FEB 4 -FEB 5 - FEB 6 • FEB 13 FEB 17 • FEB 18 • FEB 19 • FEB 23 - • wt 5/18/81 ""1' NUNa,;1I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 IIItTIt.T 01' 23 LOCATION LOT 8, PARKING E. SIDE " It II II II .. II II II II N.E. CANYON, LOT 9 If .. " " II N.E. CANYON, LOT 9 It It " .. " II fI " n .. " " II .. " LOT 8, PARKING W. SIDE II It II " " .. " II LOT 8, CENTER "" .. N.E. CANYON, LOT 9 " .. " II II .. II " " .. N.E. CANYON, LOT 9 N.E. CANYON, LOT 9 .. .. " .. .. " .1 " .. " " " " II .. LOT 9, N.E. CORNER .. " ".. II LOT 9, N.E. CORNER II II .. II 11 .. It .. II II LOT 9, EAST SIDE LOT 9, N.E. CORNER LOT 9, EAST SIDE II n " " " " LOT 9, EAST PARKING LOT, 142' 144' 148' 60' 64' 68' 72' 76' 80' 158' 160' 162' 152' 154' 84' 88' 92' 96' 100' 104' 108' 112' 116' 116' 120' 124' 126' 126' 128' 128' 130' EAST SIDE 130' LOT 9, EAST PARKING LOT, EAST SIDE 132' LOT 9, EAST PARKING LOT, WEST SIDE 134' LOT 9, EAST PARKING LOT, WEST SIDE 136' MOlaTUIIK CONTItNT .. OilY WT. 12.3 13.0 l3.6 13.0 11. 7 11.7 12.3 13.0 13.6 13.6 11. 7 12.3 13.0 11. 7 11.1 12.3 10.5 10.0 13.6 14.3 13.6 11.1 13.6 13.0 13.6 12.3 13.0 12.3 13.6 13.6 13.6 9.1 12.3 11. 7 12.3 DATE REI"ORTED 9/16/81 PAGE 1 I'IItL.O DItNalTY I'C' 109.0 109.4 109.5 113.4 108.5 111.0 117.8 114.2 112.2 115.1 114.4 117.1 117.3 117.8 115.6 120.6 117.2 113.0 111.7 112.6 112.6 115.3 103.5 109.3 115.9 114.7 116.6 118.3 111.6 109.9 115.4 112.1 120.2 114.3 114.4 IoAIIOIIATOIIY ,.K'-ATII/It aHalTY COMPACTION pe, 'Ii> 0 .. &,All. DUila • 119.5 119.5 119.5 123.5 119.5 119.5 126.0 119.5 119.5 126.0 126.0 126.0 126.0 126.0 126.5 126.5 126.5 119.5 119.5 123.5 119.5 123.5 119.5 119.5 126.0 126.0 126.0 126.0 119.5 119.5 126.0 123.5 126.0 126.0 126.5 91 91 91 92 90 92 93 95 93 91 90 92 93 93 91 95 92 94 93 91 94 93 86 91 91 91 92 93 93 91 91 90 95 90 90 CON.ULTIHO .NG.N ...... GaOL-oa •• T • .... , .. VIIIOHM.NTAL .C •• NT ...... • • • • • • • • • • • COMPACTION TEST RESULTS Jo .. NANE PUEBLO DEL ORO Jo. NUN.EIt 59331W-FC01 (MASS GRADING) DATIS COVEItED JANUARY 27, 1981 THROUGH JUNE 22, 1981 DAYIl TIlSY lIaTEST LOCATION ELEVATION Nu .. aalt 01' O"TEST FEB 24 36 LOT 9, EAST PARKING 'LOT, EAST SIDE 136' 37 LOT 9, EAST PARKING LOT, EAST SIDE 138' 38 LOT 8, WEST PARKING LOT, NORTH SIDE 156' 39 LOT 8, WEST PARKING LOT, NORTH SIDE 160' 40 LOT 8, CENTER 142' 41 " " ' .. 144' APR 1 42 LOT 10, N.E. CORNER 40' 43 " It It It " 44' APR 2 44 LOT la, N.E. CORNER 48' 45 " It .. .. " 52' APR 6 46 LOT 10, N.E. CORNER 56' 47 II It " " " 60' APR 7 48 LOT 6, S.E. CORNER 136' 49 II " " " It 140' 50 LOT la, N.E. CORNER 64' 51 LOT 9, N.W. CORNER 68' 52 LOT la, N.E. CORNER 72' APR 8 53 LOT la, N.E. CORNER 76' 54 53 II II II .. It 76' 55 LOT 10, N.E. CORNER 80' 56 LOT 10, NORTH SIDE 82' 57 LOT 10, N.E. CORNER 86' APR 10 58 LOT 9, N.W. CORNER 90' 59 LOT la, N.E. CORNER 94' 60 LOT 6, N.E. CORNER 144' APR 13 61 LOT 6, N.E. CORNER 148' 62 LOT la, NORTH SIDE 96' 63 LOT 11, S.E. CORNER 152' APR 14 64 LOT 9, N.W. CORNER 102' 65 LOT 10, NORTH SIDE 104' 66 LOT 6, N.E. CORNER 156' 67 LOT 6, N.E. CORNER 160' 68 65 LOT 10, NORTH SIDE 104' wt 5/18/81 OATE REPORTED 9/16/81 PAGE 2 0 .. 5 .. OISTUIIIl "laLD &.AaOltATOIlY RIlLA""1l CONTIlNT DENSITY DualTT CO ..... CTION 'lit DIt' WY. re" rep 'lit 0" LAe. Dua. 13.0 120.4 126.5 95 13.6 122.0 126.5 96 11.1 120.8 126.0 95 12.3 115.1 126.5 91 11. 7 118.3 126.5 93 13.0 111.0 123.5 90 11. 7 111.7 122.0 91 12.3 114.0 122.0 93 13.0 119.3 122.0 97 13.6 117.6 122.0 96 11. 7 105.9 126.0 91 13.0 114.6 126.0 90 12.3 115.5 122.0 94 13.0 111.2 122.0 91 11.1 114.7 126.0 91 12.3 116.7 126.0 92 11. 7 122.6 126.0 97 12.3 105.9 119.5 88 13.0 117.4 119.5 98 11.1 111.7 119.5 93 11.1 120.3 126.0 95 13.0 117.6 126.0 93 13.0 116.1 126.0 92 13.6 117.5 126.5 92 11. 7 114.2 122.0 93 11.1 115.8 126.5 91 13.6 117.6 126.5 92 10.5 111.9 122'• a 91 11. 7 116.5 126.5 92 12.3 108.5 126.5 85 11. 7 112.0 122.0 91 12.3 116.1 122.0 95 12.3 122.3 126.5 96 Woodward-ClydeConsuitants " CONSUL TING .NG.N ...... GIOL-OAI.T. AND INV.,'ONMIHTAL IC,CHTI.". • COMPACTION TEST RESULTS PUEBLO DEL ORO JO. NUW8ER 59331W-FC01 (MASS GRADING) • DAn. COVERED JANUARY 27, 1981 THROUGH JUNE 22, 1981 • APR 15 APR 16 • APR 20 APR 21 • APR 22 • APR 23 APR 24· • APR 27 APR 30 • MAY 1 • MAY 5 MAY 6 • TII.T NUM.EII 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 :-1AY 7 103 104 • wt 5/18/81 IIETC.T 01' LOCATION LOT 9, N.W. CORNER LOT 10, N.W. CORNER LOT 9, N.W. CORNER LOT 10, N.E. CORNER LOT 10, N.W. CORNER LOT 9, BLDG. PAD .54 FG LOT 10, BLDG. PAD 61 LOT 9, BLDG. PAD 74 LOT 10, BLDG. PAD 63 LOT 9, BLDG. PAD 52 LOT 10, BLDG. PAD 62 LOT 10, BLDG. PAD 61 LOT 10, BLDG. PAD 64 LOT 9, BLDG. PAD 52 LOT 10, BLDG. PAD 62 LOT 10, BLDG. PAD E1· LOT 10, BLDG. PAD 63 LOT 10, PARKING PAD 71 " " " " " " " " 72 65 LOT 10, PARKING PAD 65 "" " "70 LOT 5 PAD 22 If .. II It 11 II It II LOT 5 PAD 27 LOT 5 PAD 26 LOT 8 PAD 45 LOT 8 PAD 47 LOT 8 PAD 50 LOT 8 PAD 48 LOT 2 PAD 17 LOT 2 PAD 10 LOT 1 PAD 7 LOT 9 PAD 53 LOT 9 PAD 52 FG FG ELCVATION Ol'TC.T 106' 108' 112' 116' 118' 132.0' 120' 124' 126' 128' 128' 130' 130' 128' 132' 134' 133' 134' 138' 138' 142' 140' 162' 164' 170' 172' 174' 162' 154' 148' 142' 130 ' 132' 104' 130.5' 130.5' MOI.TUlia CONTIlNT .. DIll' WT. 13.0 12.3 13.6 13.0 13.6 12.3 12.3 14.3 13.0 12.3 12.3 14.3 13.6 14.9 15.3 14.3 14.9 12.3 13.0 13.6 13.6 13.0 12.3 13.6 13.0 13.0 11. 7 13.6 12.3 12.3 11.7 13.0 11. 7 12.3 DATe: REPORTED 9/16/81 PAGE 3 I'ICLI) oeN.ITT II'C" 112.8 119.5 113.0 112.3 113.7 117.1 118.2 111.6 ll5.8 115.6 115.2 104.5 104.7 110.3 113.4 110.0 109.6 116.2 116.0 118.9 114.9 112.0 117.2 121.9 121.3 118.7 115.2 114.0 113.2 118.4 116.5 112.6 112.3 111.5 0,. 5 LA.OIIA1'OIIT lIaLAT,va oaN.ITY .cOM'ACTION PC, 'lit 0' 1.A8. 0 ...... 119.5 126.5 122.0 122.0 122.0 126.0 122.0 122.0 122.0 122.0 122.0 ll4.5 114.5 114.5 114.5 114.5 114.5 126.0 126.5 126.0 122.0 114.5 126.0 126.0 126.0 126.0 126.0 123.5 123.5 126.0 '126.0 122.0 122.0 122.0 94 94 91 91 92 92 96 91 94 94 94 91 91 96 99 96 95 92 91 94 94 97 93 96 96 94 91 92 91 93 92 92 92 91 13.6 119.0 126.5 94 14.3 117.5 126.5 92 Woodward·CIyde Consultants " co,.,..u~ TING aNGIH ...... GaOLOGI.TS AHO CHYU'OHMCHTAL ICICNTIITI • COMPACTION TEST RESULTS PUEBLO DEL ORO Jo. NUM.EII 59331-FC01 (MASS GRADING) • DATE. COVERED JANUARY 27, 1981 THROUGH JUNE 22, 1981 MAY 11 MAY 14 • MAY 15 • MAY 18 • MAY 19 • MAY 20 • MAY 21 • ftaT NUMal1t 105 106 107 108 109 110 III 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 wt 5/27/81 .. ITEaT 01' 108 LOCATION LOT 9, PAD 74 LOT 9, PAD 64 LOT 10, PAD 63 LOT 10, PAD 62 LOT 10, PAD 61 LOT 10, PAD 62 LOT 10, PAD 65 LOT 10, PAD 66 LOT 10, PAD 67 LOT 10, PAD 68 LOT 10, PAD 69 LOT 10, PAD 70 LOT 9, PAD 71 LOT 9, PAD 72 LOT 9, PAD 59 LOT 9, PAD 60 LOT 11, PAD 75 LOT 6, PAD 34 LOT 11, PAD 75 LOT 6, PAD 34 LOT 6, PAD 34 LOT 6, PAD 44 LOT 6, PAD 44 LOT 9, PAD 58 LOT 9, PAD 57 LOT 9, PAD 56 LOT 9, PAD 55 ELEVATION O!'TEaT FG 134.5' FG 134.5' FG 135.3' FG 136.0 FG 137.5' FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG 136.0' 146.2' 145.5' 14'4.9' 143.6' 142.9' 142.3' 141.6' 141.0' 141.0' 141.0' 164' 168' 175' 176' 180' 186' 190 1 141.4 ' 140.9' 139.2' 138.4' LOT 10, PARKING OPP.L-69 138' LOT 10, PARKING OPP.L-66 143' LOT 8, PAD 48 144' LOT 8, PAD 49 LOT 8, PAD 45 LOT 8, PAD 46 LOT 8, PAD 47 LOT 8, PAD 48 LOT 8, PAD 49 LOT 8, PAD 50 LOT 8, PAD 51 FG FG FG FG FG FG FG 152' 163.1' 163.8' 155.0' 145.0' 153.9' 152.2' 150.8' MOlnu ... CONTENT .. DltYWT. 13.0 12.3 13.6 13.6 13.6 13.0 13.6 13.0 12.3 11. 7 12.3 13.0 12.3 13.6 12.3 13.6 12.3 13.6 13.0 11. 7 12.3 13.6 11. 7 13.0 12.3 11. 7 13.6 13.6 13.0 13.6 12.3 13.0 12.3 13.6 12.3 13.0 12.3 11. 7 cATE RE .. ORTli:D 9/16/81 PAGE 4 !'IIUI ClINalTY PCI' 117.2 119.0 117.5 112.4 118.9 117.1 118.8 115.6 116.4 116.1 120.1 114.0 118.1 116.4 115.0 -113.2 115.2 115.7 120.2 121.3 118.4 115.5 113.0 118.7 115.7 114.2 118.8 120.0 120.5 117.8 118.9 119.5 117.9 118.5 118.4 117.1 114.8 115.9 0 .. 5 &.AaOllATOItY ItUoAT'YE _alTY COMPACTION PC. 1ft O. ua. _ .. 126.0 12~.0 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.-0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 123.5 123.5 126.0 126.0 126.0 126.0 126.0 93 94 92 88 93 92 93 91 92 91 95 90 93 92 91 90 91 91 95 96 93 91 90 94 91 90 94 95 95 93 94 96 95 94 93 93 91 91 CONSUI.TINClIlNClINUU, Clllo .. _,na AHD KHVlltONMaNTAL aClaHT.aTa • COMPACTION TEST RESULTS JOII NAMa PUEBLO DEL ORO JO. NUM.IE" 59331W-FCOl (MASS GRADING) • DA TIES COYERED JANUARY 27, 1981 THROUGH JUNE 22, 1981 • MAY 22 • MAY 26 • MAY 27 • MAY 28 MAY 29 • JUN 1 • JUN 4 JUN 18 • JUN 19 JUN 22 • • ftaT NUM.KIt 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 wt 7/27/81 .. KTCIT 01' 158 LOCATION LOT 8, PARKING OPPOSITE PAD 46 LOT 8, PARKING OPPOSITE PAD 49 LOT 8, PARKING OPPOSITE PAD 51 ~ LOT 6, PAD 39 LOT 6, PAD 40 FG FG LOT 6, PARKING OPPOSITE PAD 44 FG LOT 6, PAD 33 FG LOT 5, PAD 28 FG LOT 5, PARKING OPPOSITE PAD 28 FG LOT 5, PARKING OPPOSITE PAD 26 FG LOT 5, PAD 25 LOT 5, PAD 22 LOT 2, PAD 13 LOT 2, PAD 14 LOT 2, PAD 15 LOT 2, PAD 16 LOT 2, PAD 17 LOT 2, PAD 9 LOT 2, PAD 10 LOT 2, PAD 8 LOT 2, PAD 16 FG FG FG FG FG FG FG FG FG FG FG LOT 1, PAD 76 FG LOT 1, PAD 1 FG LOT 1, PAD 2, E. SIDE LOT 1, PAD W, E. SIDE LOT 1, PAD 2, E. SIDE LOT 1, PAD 2 LOT 6, PAD 34 FG FG ELCVATION 0 .. TCIT 162' 152' 148' 192.0' 191.4' 191.5' 182.3' 174.8' 172.4' 173.4' 175.5' 166.0' 136.1' 136.7' 137.4' 138.0' 138.7' 128.0 1 129.0' 127.0' 138.0' 103.0' 103.0' 92' 96' 100' 103.0' 182.3' .. OlaTUIIC C:ONT.NT ~ IMIY WT. 13.6 11.7 12.3 13.0 11.1 13.6 13.0 11. 7 13.6 13.6 13.0 13.6 12.3 13.0 11. 7 13.6 11.7 13.0 13.6 13.0 12.3 13.0 13.0 11.1 12~3 13.0 13.6 13.6 DATE RIEJIORTIED 9/16/81 PAGE 5 .. ICLD OaNalTY PC" 118.9 114.6 117.8 119.3 119.0 123.6 117.3 118.7 121.6 114.0 113.3 112.3 113.0 117.3 118.7 108.3 119.3 120.0 118.9 121. 7 120.6 113.8 119.5 115.3 115.3 113.6 116.9 117.0 0,. 5 ""'.OIUTOIIY It&I.ATIY • IMIN.I" C:OMPACTIOM ~ '1100 ....... _ .. 126.0 126.0 121.0 126.0 126.0 126.0 126.0 126.0 126.0 123.5 123.5 123.5 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 119.5 122.0 122.0 126.0 126.0 94 90 93 94 94 98 93 94 96 92 91 90 90· 93 93 85 95 ·95 94 96 95 90 94 96 94 93 92 92 COHaUL.TIHO &NG.H ...... oaOL.OO'.Ta AND .Nva"OHM.NT"&.. SCICNTlaTa • COMPACTION TEST RESULTS PUEBLO DEL ORO 59331W-FCOI (SEWER BACKFILL) • DATE. COYlEftlE1) JUNE 24, 1981 THROUGH JULY 15, 1981 DAT& • JUN 24 ,.aT NUNalt1i SW-1 SW-2 LOCATION SURFACE AVENIDA MAGNIFICA,STA.4+40 -6' AVENIDA MAGNIFICA,STA.2+75 -6' SW-3 SW-1 AVENIDA MAGNIFICA,STA.4+40 • JUN 25 • • JUN 26 • JUN 29 • • JUN 30 • JUL 1 • SW-4 SW-5 SW-6 SW-7 SW-S SW-9 SW-10 SW-11 SW-12 SW-13 SW-14 SW-15 SW-16 SW-17 SW-18 SW-19 SW-20 SW-21 SW-22 SW-23 SW-24 SW-25 wt 7/27/81 -6' SW-2 AVENIDA MAGNIFICA,STA.2+75 -6' AVENIDA MAGNIFICA,STA.0+50 -6' AVENIDA MAGNIFICA, LATERAL, STA. 3+61 -4' AVENIDA MAGNIFICA, LATERAL, STA. 2+51 -2' AVENIDA MAGNIFICA, LATERAL, STA. 1+31 -4' AVENIDA MAGNIFICA, STA. 0+S7 AVENIDA MAGNIFICA, STA. 1+90 LATERAL, -21' LATERAL, AVENIDA MAGNIFICA, STA. 4+00 -4' LATERAL, -4' AVENIDA MAGNIFICA,STA.3+50 -2' AVENIDA MAGNIFICA,STA.1+50 -2' SW-12 AVENIDA MAGNIFICA,STA.3+S0 -2' AVENIDA MAGNIFICA,STA.1+00 SURF . AVENIDA MAGNIFICA,STA.3+00 SURF. AVENDIA MAGNIFCIA, LATERAL, STA. 1+31 SURF. AVENIDA MAGNIFICA,STA.3+61 HOSP. WAY, STA. 11+00 HOSP. WAY, STA. 13+50 HOSP. WAY, STA. 14+00 HOSP~ WAY, STA. 12+00 SW-21 HOSP. WAY, STA. 14+00 HOSP. WAY, STA. 11+50 HOSP. WAY, STA. 13+00 SURF. -6' -6' -4' -4' -4' -2' -2' MOIITUR& CONT&NT ... DII1'WT. 9.1 10.1 13.6 12.3 10.5 13.0 13.6 13.0 13.6 12.3 13.0 13.6 11. 7 13.0 11. 7 11.1 11.7 13.6 12.3 13.0 14.3 13.6 11.1 13.6 12.3 DATIE RlEl'OftTlEI) 9/16/S1 PAGE SW-1 OF SW-3 PlaLD o&NaiTY f'CP 91.8 100.1 112.9 115.3 10S.3 113.0 117.0 113.3 116.1 l1S.5 116.9 105.9 114.7 114.0 114.9 115.3 114.6 117.0 116.1 118.2 1l0.6 114.4 110.9 114.1 117.3 loA_TOllY R&&.ATIV& OIINalTY COMPACTIOIII f'CP .. OP u.. DIUC .. 119.5 119.5 119.5 119.5 119.5 122.0 122.0 122.0 122.0 122.0 122.0 123.5 123.5 123.5 126.5 126.5 126.0 126.0 123.5 123.5 123.5 123.5 123.5 123.5 126.0 76 83 94 96 90 92 95 92 95 97 95 85 92 92 91 91 90 92 94 95 S9 92 91 92 93 C:ONIU .. TINO aNO'H&III •• O&o .. oo'aTa AND IHV ... OH .. aHTAL .CIIINT.aT. • COMPACTION TEST RESULTS Jo .. NAMK PUEBLO DEL ORO CATE RE~RTED 9/16/81 Jo. NUM8ER 59331W-FCOI (SEWER BACKFILL) • DATE. COVERED JUNE 24, 1981 THROUGH JULY 15, 1981 PAGE SW-2 OF SW-3 .0leTU ... P"ELD "".ORATO'" IUl&.ATI". DAT. n.T 'UI;TE.T LOCAT'ON SURFACE COMT.MT O.M.ITY GaMalTY CO .... ACTION HU ... It" 01' ,OIlY WT. PCP' PC. '110 OF u.a. D&H .. • JUL 1 SW-26 HOSP. WAY, LATERAL, STA. 13+12 -21' 13.0 120.6 126.0 95 SW-27 HOSP. WAY, STA. 12+00 SURF. 11. 7 120.5 126.0 95 SW-28 HOSP. WAY, STA. 14+20 SURF. 11.1 119.7 126.0 95 SW-29 CALLE ARROYO, STA. 1+00 -6' 11. 7 115.2 123.5 93 SW-30 CALLE ARROYO, STA. 3+50 -6' 13.0 112.0 123.5 90 • SW-31 CALLE ARROYO, STA. 2+00 -4' 11.1 116.0 123.5 93 JUL 2 SW-32 CALLE ARROYO, STA. 4+50 -4' 13.6 119.7 126.0 95 SW-33 CALLE ARROYO, STA. 2+50 -2' 11.7 117.4 126.0 93 SW-34 VIA LOS SANTOS, STA. 1+00 -6' 12.3 119.6 126.0 94 SW-35 VIA LOS SANTOS, STA. 3+50 -6' 13.6 118.4 126.0 94 • SW-36 VIA LOS SANTOS, STA. 4+00 -4' 14.3 119.3 126.0 94 SW-37 VIA LOS SANTOS, STA. 1+50 -4' 13.0 119.5 126.0 94 SW-38 VIA CLEMENTE, STA. 1+25 -6' 12.3 122.6 126.0 97 SW-39 VIA CLEMENTE, LATERAL, STA. 2+35 -4' 13.0 118.8 126.0 94 • JUL 3 SW-40 CALLE ARROYO, LATERAL, STA. 1+63 -2' 13.0 113.0 123.5 91 SW-41 VIA CLEMENTE, STA. 0+30 -2' 11.1 119.6 126.0 94 SW-42 VIA CLEMENTE, STA. 2+00 -2' 11. 7 117.7 126.0 93 SW-43 VIA CLEMENTE, LATERAL, STA. 2+35 SURF. 12.3 115.3 126.0 91 • JUL 6 SW-44 VIA CLEMENTE, STA. 1+00 SURF. 13.6 116.6 126.0 92 SW-45 CALLE ARROYO, STA. 1+50 SURF. 12.3 116.1 126.0 92 SW-46 CALLE ARROYO, STA. 4+00 SURF. 13.0 121.1 126.0 96 SW-47 VIA LOS SANTOS, STA. 2+00 SURF. 13.0 117.5 126.0 93 SW-48 VIA LOS SANTOS, STA. 4+50 SURF. 11. 7 117.4 126.0 93 • JUL 7 SW-49 CIRCULO SANTIAGO, STA.3+00 -6' 13.6 121.0 126.5 95 ·SW-50 CIRCULO SANTIAGO, STA.4+75 -6' 12.3 122.8 126.5 97 SW-51 CIRCULO SANTIAGO, STA.6+60 -6' 13.0 118.7 126.0 94 JUL 8 SW-52 CIRCULO SANTIAGO, STA.3+50 -4' 11. 7 113.4 126.0 90 • SW-53 CIRCULO SANTIAGO, LATERAL, STA. 2+99 -4' 12.3 122.6 126.0 97 SW-54 CIRCULO SANTIAGO, LATERAL, STA. 4+74 -4' 13.0 114.9 126.0 91 SW-55 CIRCULO SANTIAGO,STA.5+75 -4' 13.6 119.0 126.0 94 SW-56 CIRCULO SANTIAGO, LATERAL, • STA. 6+75 -4' 12.3 117.3 126.0 93 JUL 9 SW-S7 CIRCULO SANTIAGO, STA. 4+00 -2' 11. 7 117.9 126.5 93 SW-58 CIRCULO SANTIAGO,STA.6+00 -2' 13.6 122.2 126.5 96 • wt 7/27/81 WoodwardeClyde~ " CONaUL TINQ .HGIH ...... a.OL.OOI.T. AND aNVlftON •• NTAL. Ie. aNTI a,. • • • • • • • • • • • COMPACTION TEST RESULTS Jo. NAMIt PUEBLO DEL ORO Jo. NUM.ER 59331W-FC01 (SEWER BACKFILL) DATE. COVERED JUNE 24, 1981 THROUGH JULY 15, 1981 DATil .... T IIIlTIl.T LOCATION SURFACE NU .... 1l1I 0' JUL 9 SW-59 CIRCULO SANTIAGO, LATERAL, STA. 4+32 -2 1 SW-60 CIRCULO SANTIAGO, LATERAL, STA. 3+20 -2 1 SW-61 CIRCULO SANTIAGO, LATERAL, STA. 5+92 -2' SW-62 SW-59 CIRCULO SANTIAGO, LATERAL, STA. 4+32 -2' JUL 10 SW-63 CALLE CABALLERO, STA.5+30 -6' SW-64 CALLE CABALLERO, LATERAL, STA. 5+67 -4' SW-65 CALLE CABALLERO, LATERAL, STA. 4+99 -2' SW-66 CALLE CABALLERO, STA.5+50 SURF. JUL 13 SW-67 LOT 9, PAD 54, N. E. CORNER -6' SW-68 LOT 9, PAD 54, N.W. CORNER -4' SW-69 AVENIDA MAGNIFICA, 20' E. OF M.O.#16 -6' JUL 14 SW-70 AVENIDA MAGNIFICA, SO'E. OF M.O.#6 -4' SW-71 AVENIDA MAGNIFICA, LATERAL, STA. 2+28 -2' SW-72 AVENIDA MAGNIFICA, LATERAL, STA. 3+10 -2' SW-73 LOT 9, PAD 54, CENTER -2' JUL 15 SW-74 LOT 9, PAD 54, CENTER SURF. SW-75 AVENIDA MAGNIFICA, 40' E. OF M.O.#16 SURF. wt 7/27/81 DATE REJI'ORTED 9/16/81 PAGE SW-3 OP SW-3 MOI.TUlla FIELD ~.OIIA TO"Y CONTaNT DIlN.ITY _.In .. lillY WT. pe, pe, 12.3 ll2.3 126.5 12.3 123.5 126.5 13.0 ll7.5 126.5 13.6 116.4 126.5 13.6 116.1 126.5 12.3 118.5 126.5 12.3 115.8 126.5 13.6 117.0 126.5 11. 7 118.6 126.5 13.6 120.1 126.5 11.1 ll8.7 126.5 12.3 118.0 126.5 13.0 116.8 136.5 13.0 115.3 126.5 13.6 11S.6 126.5 12.3 ll8.9 126.0 13.0 117.0 126.0 ,CONaUi..TIHQ .NG.H ...... aaOL ••• aT, AND .NVU'OHMaNTAL aC'.NT,aTa .~TIVa COMPACTION .. 0 .. LAa. DaN .. 87 97 92 92 91 93 91 92 93 94 93 93 92 91 91 94 92 • • • • • • • • • • • 150 14 0 130 120 110 100 90 PLASTICITY CHARACTERISTICS 1 Liquid Limit, % 27 Plasticity Index, % 6 Classification by Unified Soil ~M-SC Classification System , \ 1\ ~ \ 1\ ZERO AIR VOIDS CURVES \ 1\ \" 2.80 SG \ \ 2,70 SG \ 1\ 2.60 SG \ \ \ 2.50 SG \ 1\ ' , \ r\ 1\ 1\ \ \ 1\ 1\ \ [\ \ [\ \ 3 !I .\ \ t\ / [7 r\\ \' \ 1 '1/ \.\ ~\ ,....., ~~ \ \ -if \\ ~\ u \'~ \ \ \ 0.2 t-" / \\ 1\ \\ :z: ~ T ~\ \ \ w I == 1 \ \ ~\ ... Z \ \ i\ ::> \ \ 1\\ >-a: ! ~""' ~ i\ 0 I 2 33 15 SC 3 1~88LESI GRAVEL I SAND f I SILT & CLAY I •. clf.clml. • 28 10 SC 100 ~ 80 ~60 Q. ... f5 40 u a: ~ 2 o o r'\ 3 1 I ...... r-... [\ \ \\ \ 2 ~ \ I .\ \ \. '"'" '\.\. " " , I L 1 000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SHE AR TEST DATA 1 2 3 Dry Density, pet Initial Water Content, % Final Water C ontent, % Apparent Co hesion, psf Apparent Fri ctlon Angle, degrees SWELL TES T DATA 1 2 3 Initial Dry De nsity, pcf 10 114 Initial Water Content, % 12 10 Final Dry De nsity, pef 100 113 Final Water Content, % 23 14 \ \ 1\' I-.Load, pst 1\ 1\' ~\ 160 160 Swell, percent 6.9 0.3 r-,.,' .\ \. \ .~ :\. ' \. i\. ~\ " 1\,\ l\. SAMPLE LOCATION Maximum Dry 1 2 3 ~'\ ." \. Density, pet 123.5 119.5 126.0 '\ .'\ " Optimum Moisture '\ , ~ Content, % 10.0 11.5 9.5 I" , ~ 1 CUT SLOPE,S.W. COR. SITE 2 .S.w IRNRR 3 l,3UTTRESS CUT, S.W. COR. I MOISTURE CONTENT, % " ~1 10 20 30 LABORATORY COMPACTION TEST 40 LABORATORY COMPACTION TEST METHOD: ASTM D 1557 70 A FILL SUITABILITY TESTS PUEBLO DEL ORO DRAWN BY: ch I CHECKED BY~ PROJECT NO: 59331W-FCOI I DATE: 5/14/81 r FIGURE NO: 1 wt 5/13/81 WOOOWARD·CLYDE CONSULTANTS . ,. • • • 150 • 140 • 130 • 120 • 110 • 100 • 90 • PLASTICITY CHARACTERISTICS 4 5 6 f . SILT & CLAY ~~ " \ '. 1---6 \ \ 1\ liquid Limit, % 34 35 46 Plasticity Index, % 17 18 27 Classification by Unified Soil SC CL CL Classification System 100 5 ..l \ , \ 4 1\ \ \.. 'jc , ~ ~ ~ .......... "': t t I I o 000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANAL YSIS , \ 1\ a: ~ 2 ~ \ ~ ZERO AIR VOIDS CURVES \ i\ " 2.80 SG \ \ 2.70 SG 1 \ 1\ 2.60SG 'h \ ~ \ 2.50 SG o \~ , \ r\ \ ~ \ \ 1\' DIRECT SHE \ 1\ \ Dry Density, \ ~ \ Initial Water II , \ ~ 4 \ ~\ \ Final Water C Apparent Co / /~ "\ ~, I \' \ ~ Apparent Fri AR TEST DATA 4 pct 5 6 ontent, % Content, % hesion, pst ction Angle, degrees -I \ ~ ~, u f---o~/ I \.oJ \ ~ Co 5 I-.\ ~ ~\ :r (!) V \' '\ \ SWELL TES w T DATA 4 5 6 ~ 6 \ '\ \\ Initial Dry De I- Z / " \ t\ Initial Water :::> \ \ 1\' > Final Dry Den 11 111 102 10 111 nsity, pef sity, pef Content, % a: r\.~ ~, [\ 0 ; Final Water Content, % 17 21 29 \\ 1\' Load, pst 1\ If\.' '"\ I-160 160 160 Swell, percent 2.7 4.8 9.2 1\' ,\ If\. \ ,\. f\' !, If\. ,,\ 1\.' \ l\. SAMPLE LOCATION Maximum Dry 4 5 6 "~~ l" ~ Density, pet 126.5 122.0 114.5 '\ ,,\ ~"" 4 HOSP. WAY BUTTRESS Optimum Moisture '\ l\: r\' Content, % 10.0 12.5 15.0 '" ~ ~ .; NnRTH ~TDE. LOT 10 6 LOT 11 I MOISTURE CONTENT, % ~ ,., 10 20 30 40 LABORATORY COMPACTION LABORATORY COMPACTION TEST FILL SUITABILITY TESTS PUEBLO DEL ORO TEST METHOD: A5TM P 1557 70 A • DRAWN BY: ch I CHECKED BY:l~\iI PROJECT NO: 59331W-FCOI r DATE: 5/14/81 I FIGUR. NO: 2 wt 5/14/81 WOODWARD·CLYDE CONSULTANT$ • i • • • • • • • • • • • 3467 Kurtz Street San Diego, California 92110 714-224-2911 May 25, 1982 Project No. 59331W-FC01 Broadmoor Homes, Inc. 3911 Sorrento Valley Boulevard suite B San Diego, California 92111 Woodward·Clyde Consultants Attention: Mr. Ronald Van Daele SLOPE SLOUGHING PUEBLO DE ORO (CARLSBAD TRACT 79-27) CARLSBAD, CALIFORNIA Gentlemen: In accordance with your request, we have made observations regarding the recent slope sloughing at the Pueblo de Oro subdivision (Carlsbad Tract 79-27). The problem areas involve portions of the north facing and east fac~ng slopes adjacent to the site boundaries that extend from the southwest corner of Hosp Way and the newly constructed Calle Arroyo in the City of Carlsbad, California. The purpose of our work is to document the slope conditions, express an opinion as to the cause of the distress, and present recommendations toward possible mitiga- tion of the problems. The site was visited on March 19, 1982 by the undersigned in the company of Mr. Ron Van Daele of Broadmoor Homes, Inc. and Mr. Max Harrison of Interstate west. An additional visit was made on March 31, 1982 by a staff geologist from our firm in order to map the sloughing areas and examine the affected' soils. In addition, we have reviewed our files on the subject sub- division including our update soils report revised October 20, 1980 and our fill control report dated Septemb~r 8, 1981. Our observations and discussions with Mr. Ron Van Dae1e indi- cate that shallow-seated failures have occurred on the face of the 1~: 1 (horizontal to vertical) slopes in the study area during -recent months i four recent events occurred after the heavy rains of March 17, 1982. These recent sloughs, which -were deeper and involve more displaced material than previous events, are addressed specifically in our investigation. Consu!tlng Enqlneers, Geologists and EnVIronmental SCientists Offices Ir. Other PrinCipal Cities • • • • • • • • • • • Broadmoor Homes, Inc. May 27, 1982 Project No. 5933lW-FCOl Page 2 Woodward· Clyde Consultants Two of the sloughs occurred south of Hosp Way at the top of a north facing buttressed slope above the east parking area for Lot 8. They are centered approximately 40 feet and 50 feet east of the western edge of the parking pad. The sloughs are from 5 to 8 feet across and range from 1 to 2 feet in depth. The upper 2 to 4 feet of the slope in this area consists of a variable thickness of native topsoil which is faced with a thin layer of fill at the top of the buttress. A drainage basin lies beyond the property limits to the south of the slope. The drainage pattern in this watershed allows ponding of water during the wet season in the relatively flat areas adjacent to the slope top. The. natural topsoils in this area appear to be more permeable than the underlying formational materials; we suspect that water ponded in the basin south of the slope and percolated into the topsoil layer, piping beneath the brow di tch and into the buttress fill near the topsoil/formational soil contact. The seepage into the fill appears confined to the upper 2 to 6 feet of the buttress and is not controlled by the buttress drain system, which by design, is at least 10 feet below the slope surface. The resultant saturation of the soil in this zone reduces the strength of the materials and sloughing occurs. This particular watershed-topsoil-buttress fill rela- tionship exists along an approximately 100-foot section of the slope to the west of the described slough area. Future slough- ing is likely within this area during periods of saturation. An additional area of recent sloughing is located near the base of the aforementioned north facing slope. It is near the west end of the retaining wall extending from the southeast corner of the parking area of Lot 8. The slough is approximately 4 feet across and has affected soils to a depth o·f approxi- mately 12 inches. Recent sloughing has also occurred on the east facing cut slope along Calle Arroyo between the upper and the mid-slope drainage ditches, at a point approximately 160 feet south of the inter- section with Hosp Way. This slough was approximately 12 feet in width and up to approximately 4 feet in depth. Water pond- ing conditions were observed above the slope in the area, and some undermining of the slope top drainage ditch was noted. Based on an examination of grading plan topography, noticeable shallow channels existed on the previously cut slope (north and east facing) in the areas of these sloughs. Based on our field observations, we suspect that during fine slope trimming of the slopes, loose bladed soil may have fill~d the channels. The loose soil later sloughed after saturation. • • • • • • • • • • • Broadmoor Homes, Inc. May 27, 1982 Woodward· Clyde CC)nsultants Project No. 5933lW-FCOl Page 3 Another area of surficial slope distress was observed south of the slough described in the previous paragraph. starting at a point opposite Via Los Santos and angling up to the top of the slope, a scarp up to 1 foot high has developed where we believe the edge of a buttress fill lies. We suspect that the upper 'zone of the buttress fill has sloughed away from the natural slope face, thereby creating the observed scarp" in this area. Aside from the distress zones described above, several less recent sloughs less than 1 foot deep were observed in the same slopes. In addition, a 20-foot long surficial soil crack was noted originating slightly below the bench in the middle of the east facing cut slope along Calle Arroyo. The fissure extends south from a point approximately 180 feet south of the inter- section of Calle Arroyo with Hosp Way. Based on our observations and our experience, it is our opinion that all the observed sloughs are characteristic of shallow slope sloughing which can occur on a l~:l slope during periods of saturation. The sloughing appears to be confined to the outer 6 inches to 4 feet of the slope face. Our field investi- gation revealed no evidence of deep-seated failure . . As we discussed in our update report of October 20, 1980, slopes constructed at inclinations steeper than 2:1 are partic- ularly susceptible to shallow sloughing, especiallY during periods of heavy rainfall and/or when excessive irrigation has resulted in saturation of the near surface soils. We indicated also that periodic rebuilding of the outer 1 to 3 feet of the slope might be required. Two measures that could be employed to" mitigate future slough- age in certain areas are: o o The ponding area above Calle Arroyo may be graded to provide positive drainage away from the slope and to the north, paralleling the slope top. This area is actually offsite and permission for grading may present a problem. In the sloughage zone above Hosp Way where offsi te ponding of water has influenced the soil saturation, a cut-off trench drain may be placed across the top of the slope. The trench, which is illustrated on the attached Figure 1, should extend down below the topsoil horizon into the less permeable formational soils and should be filled with Class I I permeable material. A perforated pi2e placed in the bottom of the trench will collect water that should drain into the existing storm drain system. The trench" should be inspected to evaluate depth of embedment. • • • • • • .' • • • • Broadmoor Homes, Inc. May 27, 1982 Project No. 59331W-FC01 Page 4 Woodward· Clyde Consultants If you have any questions concerning this report, please give us a call. Very truly yours~ WOODWARD-CLYDE CONSULTANTS ~~ Richard P. While R.E. 21992 RPWjJBjeej Attachment • • • • • • •• • • • 3467 Kurtz Street San Diego. California 92110 714-224-2911 April 2, 1982 Project No. 5933lW-FCOl Broadmoor Homes, Inc. Woodward·Clyde Consultants 3911 Sorrento Valley Boulevard Suite' B San Diego, California 92111 Attention: Mr. Ron Van Daele COMPACTION TEST RESULTS STREET SUBGRADE, BASE, AND WALL BACKFILL PUEBLO DE ORO CARL~BAD, CALIFORNIA Gentlemen: Attached are the results of field density tests performed at the subejct site at your request and under your direction. These tests were performed on the dates and at the locations indicated; they were performed in accordance with ASTM Method No. 01556-64. Also attached are the results of laboratory compaction tests performed in accordance with ASTM Test Method No. 01557-78 on samples of the materials used for fill and backfill. To our knowledge., these tests represent the relative compac- tion and water contents at the locations tested. Our opinions as to the relative compaction, water content, or suitability of the fill in areas not tested will be expressed only where we have observed the placement of such fill, and we are satisfied that construction procedures followed in untested areas are represented by the areas tested. Very truly yours, WOODWARD-CLYDE CONSULTANTS Richard P. While R.E. 21992 RPW/EHP/rs Attachments (4) Broadmoor Homes, Inc. (1) City of Carlsbad Consulting Engineers. Geologists and EnVIronmental SCientists Offices In Other Principal Cities • COMPACTION TEST RESULTS JOII NAME PUEBLO DEL ORO OATe: REPORTED 4/2/82 Joa NUMBER 59331W-FCOI (SUBGRADE AND BASE) • OATES COVERED OCTOBER 29, 1981 THROUGH NOVEMBER 25, 1981 PAGE S-l 0,.. S-3 MOI.TUlla I'laLD IoA.OIIATOIIY "aloATlva OATil: T1IST III1:TII:ST LOCATION ELEVATION C:ONTll:NT DII:NSITY oaN.ITY CO .... ACTION NU ... EII 0,. 01' TEST ,OilY WT. PC,. pcp % Ol'u.. OEH •• SUB GRADE • OCT 29 S-l HOSP. WAY, STA.18+50 SG 12.3 122.4 126.0 97 S-2 " " " 15+00 SG 13.0 117.3 126.0 93 S-3 " " " 13+00 SG 12.3 123.9 126.0 98 S-4 S-2 " " " 15+00 SG 13.0 122.1 126.0 96 • NOV 2 S-5 AVENIDA MAGNIFICA, OPP. PAD 65 SG 10.5 117.2 123.5 95 S-6 AVENIDA MAGNIFICA, OPP. PAD 70, PKG. AREA SG 11.1 119.1 123.5 96 S-7 AVENIDA MAGNIFICA, • OPP. PAD 57 SG 10.7 120.4 123.0 97 NOV 3 S-8 AVENIDA MAGNIFICA, OPP. PAD 58 SG 10.7 123.5 123.0 96 S-9 AVENIDA MAGNIFICA, OPP. PAD 55 SG 12.3 126.0 123.0 98 • TOP OF BASE NOV 4 S-10 HOSP. WAY, STA.19+00 T.O.B. 10.7 125.1 131.0 95 S-11 " " " 16+00 T.O.B. 12.3 128.1 131.0 97 S-12 " " " 14+50 T.O.B. 13.4 127.1 131.0 97. • NOV 5 S-13 AVENIDA MAGNIFICA, OPP. PAD 64 T.O.B. 12.4 125.5 131.0 95 S-14 AVENIDA MAGNIFICA, OPP. PAD 69 T.O.B. 1l.1 129.1' 131.0 98 • S-15 AVENIDA MAGNIFICA, OPP. PAD 58 T.O.B. 10.7 129.5 131.0 98 S-16 PRIVATE STREET, OPP. PAD 46 T.O.B. 13 .0 126.5 131.0 96 SUB GRADE • NOV 18 S-17 CALLE ARROYO, STA. 1+00 SG 11.5 130.2 126.0 100+ S-18 " " " 3+00 SG 10.5 124.0 126.5 98 S-19 " " " 6+00 SG 11.1 120.6 126.0 95 S-20 VIA FRANCISCA, OPP. PAD 36 SG 12.3 116.3 126.0 92 • S-21 VIA FRANCISCA, OPP. PAD 40 SG 1l. 7 121.6 126.0 96 S-22 VIA FRANCISCA, OPP. PAD 43 SG 9.9 121.0 126.0 96 • wt 12/1/81 Woodward· Clyde ConsuHants " CONSUt.,TING ENGINE.It., GEOL.OGISTS AND ENV,ft:ONMaHTAL. SCIENTISTS .,' COMPACTION TEST RESULTS Jail NAME PUEBLO DEL ORO JOB NUMBER 59331W-FC01 (SUBGRADE AND BASE) • DATES COVERED OCTOBER 29, 1981 THROUGH NOVEMBER 25, 1981 DATI: • NOV 18 • NOV 19 • • NOV 20 • • NOV 23 • .. S-22 S-23 5-24 S-25 S-26 S-27 S-i8 S-29 5-30 S-31 S-32 5-33 S-34 S-35 S-36 S-37 S-38 S-39 S-40 S-41 S-42 • wt 12/1/81 RETEST Or' S-21 S-30 S-36 LOCATION VIA FRANCISCA, OPP. PAD 43 VIA FRANCISCA, OPP. PAD 36 \', PRIVATE STREET, OPP. PAD 50 CALLE ARROYO, STA. 5+50 II II II II II II CALLE CABALLERO, STA. 1+00 CALLE CABALLERO, STA. 3+00 CALLE CABALLERO, STA. 6+2D CALLE CABALLERO, STA. 6+20 VIA LOS SANTOS, OPP. PAD 25 VIA LOS SANTOS, OPP. PAD 27 VIA LOS SANTOS, OPP. PAD 30 2+80 0+75 VIA CLEMENTE, OPP. PAD 20 CIRCULO SANTIAGO, OPP. PAD 11 CIRCULO SANTIAGO, OPP. PAD 11 CIRCULO SANTIAGO, OPP. PAD 3 CIRCULO SANTIAGO, OPP. PAD 6 CIRCULO SANTIAGO, OPP. PAD 8 CIRCULO SANTIAGO, OPP. PAD 16 CIRCULO SANTIAGO, OPP. PAD 12 ELEVATION Or'TEST SUB GRADE SG SG SG TOP OF BASE T.O.B. T.O.B. T.O.B. SUB GRADE -----SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG MOISTUlla CONTENT .. DaTWT. 9.9 12.8 11.1 13.0 11.8 10.5 12.4 13.0 12.8 12.3 21.5 12.4 11.8 12.3 11.1 12.3 11.8 10.4 11. 7 11.1 12.4 DATE REPORTED 4/2/82 PAGE S-2 0". S-3 121.0 122.4 120.2 129.9 127.3 125.2 124.4 122.1 115.5 124.0 113.1 121.3 122.8 122.4 117.9 122.9 124.0 122.9 117.6 122.8 121.4 ...... OIlATOIIT Ra ..... TIVI: DENslTT COMPACTION PC" '4 Or' ....... DIENS • 126.0 126.0 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.0 126.0 126.0 126.0 126.5 126.5 126.0 126.0 126.0 126.5 126.5 96 97 95 99 97 95 98 96 91 98 89. 96 97 97 93 97 98 97 93 97 96 Woodward·CIyde Consultants " C:ONSUI.TING ENGINEE .... GEOLOGISTS ~ND &NV.,.ON"'KNTAI. SCIENTISTS • COMPACTION TEST RESULTS JO&l NAME PUEBLO DEL ORO JOB NUMBER 59331W-FC01 (SUBGRADE AND BASE) • CATES COVERED OCTOBER 29, 1981 THROUGH NOVEMBER DATil ftaT "II:TIlST LOCATION NUM.EII 01' • NOV 23 S-43 CIRCULO SANTIAGO, OPP. PAD 8 NOV 24 S-44 S-40 CIRCULO SANTIAGO, OPP. PAD 8 • S-45 S-32 VIA LOS SANTOS, OPP. PAD 25 S-46 VIA FRANCISCA, OPP. PAD 37 S-47 VIA FRANCISCA, OPP. PAD 41 • S-48 VIA FRANCISCA, OPP. PAD 44 NOV 25 S-49 CIRCULO SANTIAGO, OPP. PAD 11 S-50 CIRCULO SANTIAGO, OPP. • PAD 14 S-51 CIRCULO SANTIAGO, OPP. PAD 17 S-52 CIRCULO SANTIAGO, OPP. PAD 7 S-53 CIRCULO SANTIAGO, OPP. • PAD 3 S-54 VIA CLEMENTE, OPP. PAD 19 S-55 VIA LOS SANTOS, OPP. PAD 28 S-56 S-46 VIA FRANCISCA, OPP. • PAD 37 • • wt 12/2/81 25, 1981 ELEVATION Ol'TEST SUBGRADE SG SG SG TOP OF BASE " " " " TOP OF BASE " " " " " " " " " " " " " " DATE REPORTED 4/2/82 PAGE S-3 0 .. S-3 Mo,aTUlla "'IELD &.A.ORATOR ... "1E&.AT'VIt CONTIENT DIENaIT" DaNalTY COMPACTION ~ DaTWT. PC, PCI' % 01' &.Aa. DltHa. 11.9 120.6 126.5 95 13.0 121.6 126.0 96 12.0 124.2 126.0 98 19.7 114.0 131.0 87 12.7 131. 3 131.0 100+ 11.7 129.2 131.0 98 12.3 132.1 131.0 100+ 11.7 131.4 131.0 100+ 12~3 127.0 131.0 96 12.4 128.2 131.0 97 11.5 128.1 131.0 97' 13.0 126.8 131.0 96 12.0 127.8 131.0 97 12.4 127.1 131.0 97 Woodward·CIyde Consultants " CONSUL.TINa ENGIHIEE"., CEOl,.OCISTS AND ENVIJIIIONNIENTAL SCIENTISTS • COMPACTION TEST RESULTS JOol NAME PUEBLO DEL ORO JOB NUMBER 59331W-FCOI (WALL BACKFILL) • OATES COVEREC OCTOBER 21, 1981 DATE ,..aT RETEST LOCATION NUMIEII 01' OCT 21 WE-I W. SIDE OF CALLE • OPP. STA. 1+50 WE-2 W. SIDE OF CALLE OPP. STA. 1+85 • • • • • • • • wt 12/2/81 ELEVATION OrrTI;ST ARROYO, 147.9' ARROYO, 147.9' DATE REPORTEC 4/2/82 PAGEWB-l OJl'WB-l MOI8TUII& I"IELD LA.OIIATOIIY IIELATIY& CONT&NT OENIITY O&NIITY COMPACTION '!It DIlYWT. fOCI' fOCI' % 01' LAS. 01EH •• 4.2 111.9 122.0 91 7.1 113.1 122.0 92 Woodward.CIyde Consultants " CONSUL,.TINe ENCINEERS. GEOl.OGISTS AND &NVlftONMaNTAL. SCIENTISTS e· COMPACTION TEST RESULTS • e Jail NAME PUEBLO DEL ORO JOB NUMBER 59331W-FC01 (UTILITY TRENCH BACKFILL) CATES COVERED SEPTEMBER 22, 1981 THROUGH OCTOBER 1, 1981 DATI: SEP 22 SEP 23 ,...T NU,.aEIt U-1 U-2 U-3 U-4 U-5 ItETI:ST O/' U-1 LOCATION HOSP. WAY, OPP. PAD 45 " " " "47 HOSP. WAY, OPP. PAD 45 " " " " " " " " 48 46 SURFACE -I' -I' -I' SURF. SURF. • SEP 24 U-6 U-7 U-8 U-9 U-10 HOSP. WAY, OPP. PAD 68 -1' • SEP 25 e • SEP 28 • • SEP 29 • • U-11 U-12 U-13 U-14 U-15 U-16 U-17 U-18 U-19 U-20 U-21 U-22 U-23 U-24 U-25 U-26 U-27 U-28 U-11 U-21 " " " " " " " " " " " " 72 59 67 AVENIDA MAGNIFICA, OPP. PAD 61 AVENIDA MAGNIFICA, OPP. PAD 63 AVENIDA MAGNIFICA, OPP. PAD 63 AVENIDA MAGNIFICA, OPP. PAD 52 AVENIDA MAGNIFICA, OPP. PAD 70 CALLE ARROYO,OPP. PAD 18 " " " " " " " " 31 22 VIA FRANCISCA,OPP. PAD 32 " " " " " " " " 34 33 VIA LOS SANTOS, OPP. PAD 22 VIA LOS SANTOS, OPP. PAD 24 VIA LOS SANTOS, OPP. PAD 23 VIA LOS SANTOS, OPP. PAD 24 VIA CLEMENTE, OPP. PAD 18 " " "" 18 " " " " 18 CALLE CABALLERO, OPP PAD 8 -I' SURF. SURF. -1' -I' -I' SURF. SURF. -I' -1' SURF. -I' -I' SURF. -I' -I' SURF. SURF. -I' SURF. SURF. -I' MOI8TUIt& C:OHTI:HT .. DltYWT. 10.0 11. 7 13.0 12.3 13.6 12.3 11. 7 10.5 12.3 13.6 14.3 12.3 13.0 13.6 12.3 11. 7 12.3 11. 7 10.5 12.3 11.1 12.3 12.3 13.0 10.5 11.1 10.5 11. 7 OATE REPORTED 4/2/82 PAGE U-l 0,. U-2 "'I:LO DIlNalTY rc;I' 111.0 115.0 114.1 116.6 116.1 119.3 118.5 114.8 114.8 117.2 106.3 115.8 114.9 116.4 119.1 118.3 114.3 116.6 115.8 115.3 115.8 111.9 115.9 116.~ ll7.2 113.7 ll5.1 113.6 LA.OItATOItY ItI:LATIYIl DI:NalTY COMPACTION PCI' .,. 0 .. LAa. DltHa. 126.0 126.0 126.0 126.5 126.5 126.0 126.0 126.0 126.5 126.5 126.5~ 126.5 126.0. 126.0 126.0 126.0 126.5 126.5 126.5 126.0 126.0 126.0 126.0 126.0 126.5 126.5 126.0 126.0 88 91 90 92 91 94 94 91 90 92 84 91 91 92 94 93 90 92 91 91 91 88 92 92 92 90 91 90 Woodward·CIyde Consultants (j CONSUL. TINa &HGIH&~" •• GEOL.OGISTS AND I:NVllitONMI.NTAL. SCIENTISTS • COMPACTION TEST RESULTS JO&l NAME PUEBLO DEL ORO JOB NUMBER 59331W-FC01 (UTILITY TRENCH BACKFILL) • CATES COVERED SEPTEMBER 22, 1981 THROUGH OCTOBER 1, 1981 DATE ,..aT RETEST LOCATION SURFACE HUNaEII 0' SEP 30 U-29 CIRCULO SANTIAGO, OPP. • PAD 1 -1' U-30 CIRCULO SANTIAGO, OPP. PAD 10 -1' U-31 CIRCULO SANTIAGO, OPP. PAD 8 -1' U-32 CIRCULO SANTIAGO, OPP. • PAD 76 SURF. U-33 CIRCULO SANTIAGO, OPP. PAD 9 SURF. OCT 1 U-34 EL CAMINO REAL, OPP. PAD 76 -1' • U-35 EL CAMINO REAL, OPP. PAD 2 -1' U-36 EL CAMINO REAL, OPP. PAD 1 SURF. • • • • • • wt 10/6/81 DATE REPORTED 4/2/82 PAGE U-2 0 .. U-2 1I0'aTUlI& l"ELa I.A.OIIATOIIY III:I.AT'YE CONT&NT OENalTY O&N.'TV COMPACTION ~ D"Y WT. PCI' PCP '10 Ol'~. DENa. 10.5 113.7 126.0 90 12.3 113.2 126.0 90 l3.0 115.0 126.0 91 10.5 117.7 126.5 93 8.1 115.2 126.5 91 10.5 114.2 126.0 90 11.1 116.7 126.0 92 11. 7 114.9 126.0 91 Woodward· Clyde ConsuHants {t CONSUL.TING ENGINIlERS, GKOL.OC,sTS AND I:NVI .. ONMI£HTAL. SCIENTISTS • • • • • • • • • • • 150 140 130 120 110 100 90 PLASTICITY CHARACTERISTICS 8 Liquid limit. % - Plasticity Index. % - Classification by Unified Soil Classification System - \ !\ \ \ !\ ZERO AIR VOIDS CURVES \ " \ 2.80 SG \ \~ 2.70 SG , \ \ 2.60 SG 1> -9-~ \ \ 2.50 SG i-\ \ \ I \ \ \ II \ \ '\ 10 .~ ~. " ~ \ 1\ r--8-1 ........ /' \ \ \ I \ 1\ ~\ 1 \ \ ' r\ \ \ -\ .'i ~\ !.J 1\' \ l\-e. I 1-' \ \ \\ J: (!) r\\ \ [\.. w 3 \ \ r\\ I- z \ ' \ i\ ::> \ 1\ ~\ >-: cr;. I \ \ !\ 0 , ; \ 9 - - - 10 t-="'f'-=:=+---r-::~--j S I L T & CL.4 Y -- - 100 ~ 80 ~ ~60 I-~ 40 t.) a: ~ 2 o o 1 , , I , 1 000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SHE AR TEST DATA 8 9 10 Dry Density, pet Initial Water Content, % Final Water C onten!, % Apparent Co hesion, pst Apparent Fri ction Angle, degrees SWELL TES T DATA 8 9 10 Initial Dry De nsity, pet .:. Initial Water Content, % Final Dry De nsity, pet Final Water Content, % \ 1\' Load. pst i\ f\\ ,\ t-" Swell, percen t ----------~~--------~--~ ~\ \ i\ \ .\. 1\\ I 1 I\, i\ ~ "\. \ LI\ SAMPLE LOCATION Maximum Dry 8 9 10 ,,'\ ~ ~ Density. pet 129.5 144.0 131.0 '\ .'\ ~~ 8 IMPORT (BASE MATERIAL) 9 IMPORT FROM SOUTH COAST Optimum Moisture , ~ ~ 10.5 .'\ ~ 10 IMPORT FROM SOUTH COAST Content, % 9.0 6.5 MOISTURE CONTENT, % 10 20 30 LABORATORY COMPACTION TEST ~ :" ~I 40 LABORATORY COMPACTION TEST METHOD: ASTM D 1557 70 A FILL SUITABILITY TESTS WOODRIDGE PHASE II, MONROE STREET EXTENSION DRAWN BY: mrk I CHECKED By:-qJDI PROJECT NO: 592073-FC03 I DATE: 4/2/82 1 FIGURE NO: wt 4/1/82 WOOOWARO·CL YOe CONSULTANTS •• • • • • • • • • • • 150 140 130 120 . 110 100 90 PLASTICITY CHARACTERISTICS 1 Liquid Limit, % 27 Plasticity Index, % 6 Classification by Unified Soil SM-SC Classification System , "-\ \ 1\ ZERO AIR VOIDS CURVES \ \ ' \ 2.80 SG \ 1\ 2.70 SG 1\ \ \ 1\ 2.60 SG \ \ ' \ 2.50 SG \ ~ , \ ~ \ \ \ \ 1\ \ \ 1\ \ 1\ \ 3 [r .\ \1\ / V \\ \\ \ 1 '/ \.\ r\' V -~\ \ 1\ .... 1 \\ \\ \\ u \\ \ \ 1\ 0.2 i r.: II \\ 1\ ~\ J: (!) \ :\,.\ \ ~ w / :: I \ I~ ~ I- Z \\ \ \ :::> \ \ ~\ >-a:: \ \ [\ 0 : i \ \ \' 2 33 15 SC 3 t SILT & CLAY 28 10 SC 100 ~ 80 ~ ~60 I- a:i 40 u a: ~ 2 o o " 3 1 I I 'I\. 1\ \ \\ 2 \' \ , ,\ .. ~ ~ I,\, \.\ '" .~ ~ I I I I 1 000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SH EAR TEST DATA 1 2 3 Dry Density, pcf Initial Water Content, % Final Water C ontent, % Apparent Co hesion, psf Apparent Fri ction Angle, degrees SWELL TES T DATA 1 2 3 Initial Dry De nsity, pet 107 114 Initial Water Content, % 12 10 Final Dry De nsity, pef 100 113 Final Water Content, % 23 14 Load, psf 160 160 \ \.' ~\ -- Swell, percen ,\ L\ \. 6.9 0.3 t ------------~--~~--.-~~ \ ,\ \.' 1,\ \. ,\ l\.. ~\ l\. SAMPLE LOCATION Maximum Dry 1 2 3 ,"\ l"'~ Density, pet 123.5 119.5 126.0 "\ .'\. '\\ .• 1 CUT SLOPE S.W. COR. SITE 2 S. W, 1.t<l'l..t:;K Optimum Moisture '\ :'\. ~ 11.5 " l\: ~ 3 I3UTTRESS CUT, S.W. COR. Content, % 1 10.0 9.5 MOISTURE CONTENT, % i'\ ~., 10 20 30 40 LABORATORY COMPACTION TEST METHOD: ASTM D 1557 70 A LABORATORY COMPACTION TEST FILL SUITABILITY TESTS PUEBLO DEL ORO DRAWN BY: ch I CHECKED BY~ PROJECT NO: 59331W-FC01 I DATE: 5/14/81 1 FIGURE NO: 1 wt 5/13/81 WOODWARD·CLYDE CONSULTANTS '. '. I. • • • • • • • • • • • 150 14 0 130 120 110 100 90 PLASTICITY CHARACTERISTICS 4 5 Liquid Limit, % 34 35 Plasticity Index, % 17 18 Classification by Unified Soil SC CL Classification System , \ \ \ \ ZERO AIR VOIDS CURVES \ 1\ \ 2.80 SG \ \ '\ 2.70 SG \ \ 1\ 2.60SG \ \ 2.50 SG \ 1\ , \ ~ \ 1\ \ \ 1\ 1\ \ 1\ \. ~ \ 4 1/ " \ I / \ ~ , \ 7 1/\ \. \\ II / i\~ \1\ -. I '\ \ \\ u r--'-/i W \ i\ Co 5 .... .~ \ \\ J: (!) / \' \ \. w ~ 6 \ \ ~\ .... Z / \' ~ i\ ::J \ \ 1\\ >-a: I f\ \ r\ Cl : \ \ ~' \ ~' ~ ,\ .\ i\ \ '\ 1\' 1,\ i\. ,,\ , i\. \ Maximum Dry 4 5 6 ~\ Density, pet 126.5 122.0 114.5 " Optimum Moisture Content, % 10.0 12.5 15.0 I I MOISTURE CONTENT, % 10 20 30 LABORATORY COMPACTION TEST 6 !-=~=+-'-::::':':';:"""-i SILT & CLAY _46 27 CL 100 ~ 80 ~ ~60 .... ~ \ \ 5 4 " " '. -. 6 \ \ \ t_\ \\ a:i 40 C,) a: '\.. \ ....... ~ 2 ~ -. ~ ~~ o o I I 1 000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SH EAR TEST DATA 4 5 6 Dry Density, pet Initial Water Content, % Final Water Content, % Apparent Co hesion, pst Apparent Fri ction Angle, degrees SWELL TES T DATA 4 5 6 Initial Dry De nsity, pct 114 111 102 Initial Water Content, % 10 Final Dry De nsity. pet III Final Water Content, % 17 21 Load, pst 160 160 160 Swell, percen t 2.7 4.8 9.2 l\. SAMPLE LOC ATION ,,\ r\. .~ "'~ '\ '\. 1\." " " ~ P. WAY BUTTRESS "'T'H C::TDE LOT 10 11 6 4 HOS ~ ~1 40 LABORATO RY COMPACTION TEST METH 00: AS:rM 0 1552 2Q ~ FILL SUITABILITY TESTS PUEBLO DEL ORO DRAWN BV: ch CHECKED BV:~t.\(. PROJECT NO: 59331W-FC01 DATE: 5/14 /81 I FIGURE NO: 2 wt 5/14/81 WOODWA RD·CLYDE CONSULTANTS • • • • • • • • • • • 3467 Kurtz Street San Diego, California 92110 714-224-2911 October 20, 1981 project No. 59331W-FC01 Broadmoor Homes, Inc. 3911 Sorrento Valley Boulevard Suite B San Diego, California 92121 Attention: Mr. Ron Van Dae1e TEST RESULTS PUEBLO DE ORO CARLSBAD, CALIFORNIA Gentlemen: Woodward·Clyde Consultants Attached are results of R-value tests performed by Testing Engineers -San Diego on samples taken from the subject project. Very truly yours, WOODWARD-CLYDE CONSULTANTS Richard P. While R. E. 21992 RPW/rs Attachments (3) Broadmoor Homes, Inc. (1) City of Carlsbad Consulting Engineers Geologists and Environmental SCientists Offices In Other Principal Cities • • i 1/ Testing Engineers-San Diego ';'!" 4· . ..P. 3467KurtzSt., P.O. Box80985,SanDiego, Ca. 92138 (714)225-9641 ." .. ,,-7j~"1 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 FORM 6 LABORATORY NUMBER SD36-4000 REPORT OF SOIL TESTS DATE Oc tober 21, 1981 JOB DATA: File fF507~ Job 1I59331HFCOl SAMPLE DATA: Submitted to the laboratory on October 14, 1981, PROJECT: Pueblo De Oro, Carlsbad • CLIENT: Woodward-Clyde Consultants 3467 Kurtz Street San Diego, California R-VALUE DATA A A B c:; -.,- COMPACTOR PRESS -P'S.I. ----<" 130 85 :55 MOIST 0 COMPAC~ION • '" 17.1 18.5 19.8 • DENSITY' IIICu. FT. 109.0 106.7 104.3 R,VALUE • STABILOMETER 17 12 9 - EXUD. PRESSURE· P'S./. 460 330 '210 • STAB. THICK -FEET 1.19 1.26 1.31 EXPAN. PRESS. THICK-FEET 0.37 0.27 0.13 T. I. (ASSUMED) • .. --• 11 z 1&1 By STAB. 0 300 P.S.I. EXUD. " U 3 ~~ By EXPANSION PRESSURE ali " -- AT EQUILIBRIUM . 11 • SAND EQUIVALENT = • REPORTED To: (1) Woodward-Clyde Consultants • • JCB:cd 0 identified as S/'& 116, Calle Arroyo, opposite pad 18. BEARING VALUE (CALIFORNIA HIGHWAY METHOD) COMPACT!1;Q AND SOAKED FOUR DAYS PENETRATION STANDARD " OF INCHES P.S.I. P.S.1. STANDARD 0.1 1000 0.2 1!!00 0.3 tSloo 0.4 2300 O.!! 2600 MOISTURE AFTER SOAKING _ ••••••••••••••••••• EXPANSION ••.•••••••••••••••••••••••••••• .. COMPACTION TEST: METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE ••••••••••••••••••••••••• OPTIMUM DRY DENSITY, LBS./CU. FT •••••••••••• , •• PLASTIC CHARACTERISTICS: LIQUID LIMIT - PLASTIC L.IMIT . PLASTICITY INDEX . TESTING ENGINEERS' SAN DIEGO REVIEWED BY C. Burns~ R.E. fF28752 " " '" • • Testing Engineers-San Diego 3467KurtzSt., P.O. aox80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, Unit a, Vista, California 92083 (714) 758-3730 FORM 8 LABORATORY NUMBER SD36-4001 REPORT OF SOIL TESTS DATE October 21, 1981 JOB DATA: File Job 1159331WFC01 SAMPL.E DATA: Submitted to the 11507, laboratory on October 14, 19S1 PROJECT: Pueblo De Oro', Carlsbad • CLIENT: Wood~-1ard-Clyde Consultants 3467 Kurtz Street San Diego, California R-VALUE DATA • A B C COMPACTOR PRESS -P.S.I. 350 270 115 MOIST ~ COMPACTION -% 10.4 11.7 13.0 • DENSITY -./Cu. FT. 123.2 119.8 117.2 R-VALUE -STABILOMETER 40 21 14 EXUD. PRESSURE -P'S.I. 700 510 220 • STAB. THICK -FEET 0.86 1.13 1.23 EXPAN. PRESS. THICK-FEET 1.50 0.83 0.40 T. I. (ASSUMED) = 4.5 · ... By STAB. CP 300 P.S.I. EXUD. 2 15 Z :l CI ...I ~~ By EXPANSION PRESSURE = 27 o . a: AT EQUILIBRIUM a 15 • SAND EQUIVALENT = • REPORTED To: (1) Woodward-Clyde Consultants • • JCB:cd " 0 identified as SIN If] , Via Clemente, opposite pad 21. BEARING VALUE (CALIFORNIA HIGHWAY METHOD) COMPACTED AND SOAKED FOUR DAYS PENETRATION STANDARD INCHES P.S.I. P.S.I. 0.1 1000 0.2 I!SOO 0.3 1900 0.4 2300 O.!! 2600 MOISTURE AFTER SOAKING. ' .•••• __ • _ • _________ EXPANSION ••• __ • __ ••. _ . _ •• _ •• __ •• _ • _ • __ •• COMPACTION TEST: METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE. _ • __ .• __ •• __ • __ •••••••• _ OPTIMUM DRY DENSITY. LBS./CU. FT. _ •• _ •• _____ • _ • , PLASTIC CHARACTERISTICS: LIQUID LIMIT - PLASTIC LIMIT - PLASTICITY INDEX - TESTING ENGINEERS -SAN DIEGO REVIEWED BY %OF STANDARD ,. % % FORM 6 JF • , -Testing Engineers-San Diego (I , i !~{ 52> .:i : 3467KurtzSt., P.O. Box 80985, San Diego, Ca. 92138 (714)225-9641 ., ; •• ~. ~4' •• >!' ~~~ J 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 ~ • LABORA70RY NUMBER SD36-4002 REPORT OF SOIL TESTS DATE October 21~ 1981 JOB DATA' File 1I507~ Job f!5933lWFCOl SAM?LE DATA: Submitted to the laboratory on October 14~, 1981~ PROJECT: Pueblo De Oro~ Carlsbad identified as SiN 118, Via Los • Santos, opposite pad 29. CL.IENT: \ioodward-C1yde Consultants 3467 Kurtz Street San Diego~ California R-VAL.UE DATA BEARING VALUE (CALIFORNIA HIGHWAY METHOD) • COMPACTED AND SOAKSD FOUR DAYS A B C D COMPACTOR PRESS -P.S.I. 200 120 80 PENETRATION STANO'ARD %0 .. INCHES P.S.I. P.S.I. STANDARD 0.1 tOOO MOIST @ COMPAC~ION -" 13.1 14.5 15.8 0,2 1!l00 -DENSITY -.. /Cu. FT. 0.3 IgOO 119.7 115.8 112.8 0.4 2300 O.!! 2eoo R:VALUE -STABILOMETER 22 16 10 MOISTURE AFTER SOAKING •••••••••••••••••••• % EXUD. PRESSURE -P.S.I. 490 270 210 EXPANSION ••.•••.••.••••••••••••••••• _ ••• % • STAB. THICK -FEET 1.12 1.20 1.29 COMPACTION TEST: EXPAN. PRESS. THICK·FEET 0.23 0.20 0.13 METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE ••••••••••••••••••••••••• % T. I. (ASSUMED) " --OPTIMUM DRY DENSITY. LBS.lCU. FT. •••••• _ ••• ' •••• • . z w By STAB. ~ 300 P.S.I. ExuD. " 18 CI :3 PLASTIC CHARACTERISTICS: ~~ By EX?ANSION PRESSURE = --Cl • LIQUID LIMIT a: -I I AT EOUILIBRIUM . 18 PLASTIC LIMIT -• PLASTICITY INDEX -I SAND EQUIV ... LENT = • REPOR,ED To: (1) Woodward-Clyde Consultants • TESTING ENGINEERS -SAN DIEGO REVIEWED BY • JCB:cd ~a_~ nt:Burns, R.E. 28752 • • • -.. -- .. I ./ .'. 1/ 1. /I """k)"~ ~'.' I ,-,' .. I Testing Engineers-San Diego 3467Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-4003 REPORT OF SOIL TESTS DATE October 21, 1981 JOB DATA' File 11507, Job fl59331WFCOI SAM?:..::: DATA: Submitted to the laboratory on October 14, 1981 PROJECT: Pueblo De Oro, Carlsbad and identified as SiN /19 via Francisca opposite pad 37. CLIENT: Woodward-Clyde Consultants 3467 Kurtz Street San Diego, California R-VALUE DATA BEARING VALU::: (CALIFORNIA HIGHWAY METHOD) COMPACTED AND SOAKED FOUR CAYS A B C D COMPACTOR PRESS -P.S.I. PENETRATION STANDARD " OF 260 180' 100 INCHES P.S.J. fI.S.1. STANDARD MOIST II COMPACTION'" 11.8 12.7 13.5 • DENSITY' ,.ICu. FT. 122.2 118.7 117.9 R-VALUE • STABILOMETER 26 18 14 EXUD. PRESSURE' P.S.I. 590 310 220 • STAB. THICK -FEET 1.06 1.18 1.23 Ex PAN. PRESS. THICK' FEET 0.87 0.70 0.57 T. I. (ASSUMED) ,. 4.5 • 18 z IaI By STAB. @ 300 P.S.1. EXUD. ,. CJ :l -m~ By EXPANSION PRESSURE ,. 33 Cl • a:: AT EOUILIBRIUM ,. 18 • SAND EQUIVALENT = •. REPORTED To: (1) ~-lood\vard-Clyde Consultants • • JCB:lh 0.1 1000 0.2 ISOO 0.3 1900 0:4 2300 O.S 2600 MOISTURE AFTER SOAKING •••••••••••••••••••• EXPANSION •••••••••••.•••••••.•.••••••••• COMPACTION TEST: METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE .••••.••••••••••••••••••• OPTIMUM CRY DENSITY. LBS./CU. FT •••••••••.••••• PLASTIC CHARACTERISTICS: L.loUID L.IMIT - PLASTIC L.IMIT - PLASTICITY INDEX - TESTING ENGINEERS, SAN DIEGO REVIEWED BY rC/.L~4' John C. Burns, R.E. 1128752 % % " I I I • " {i " Testing Engineers-San Diego ,_II"~ 1 • .:J.! 3467 Kurtz St., P. O. Box 80985, San Diego, Ca. 92138 (714) 225-9641 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 • LABORATORY NUMBER SD36-4004 REPORT OF SOIL TESTS DATE October 21, 1981 JOB DATA: File 11507, Job 115933Ul FC01 PROJECT: Pueblo De Oro,'Carlsbad • -- CLIENT: ~.,roodward-Clyde Consultants 3~67 Kurtz Street San Diego? California 92110 R-VALUE DATA A B C COMPACTOR PRESS -P.S.J. 255 145 85 MOIST 0 COMPACTION' % 12.5 13.8 15.1 eDENSITY -,/Cu. Fr. 120.8 117.4 114.0 R-VALUE -STABILOMETER 22 15 12 EXUD. PRESSURE -P.S.I • 800 370 280 • STAB. THICK -FE£T 1.12 1.21 1.26 EXi"AN. PRESS. THICK·FEET 0.50 0.30 0.13 T. I. (ASSUMED) = • 13 o z w By STAB. @I 300 P.S.I. EXUD. = ~ 3'~ ________________________________________________ ~1 0.~ Ci . By EXPANSION PRE:SSURE = Cl: AT EQUILIBRIUM = 13 e SAND EQUIVALENT = e REPORTED To: (1) Woodward-Clyde Consultants • • JCB:fh SAMPLE DATA: Soil sample submitt( to the laboratory on October 14 1981 and identified as SiN RV#l( via Francisca opposite pad 43 • BEARING VALUE (CALIFORNIA HIGHWAY METHOD) COMPACTED AND SOAKED FOUR DAYS PENETRATION STANDARD %OF INCHES P.S.J. P.S.I. STANDARD 0.1 1000 0.2 1500 0.3 1900 0.4 2300 0.5 2600 MOISTURE AFTER SOAKING. • • • . • • • • . • • • • • • • • • • % EXPANSION .•••••••••••••••••••••••••••••• COMPACTION TEST: METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE. • • • • • • • • • . • • • • . • . • • • • • • • ,. OPTIMUM DRY DENSITY. LBS.lCU. FT .•••.••.••••••. PLASTIC CHARACTERISTICS: LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX TESTING ENGINEERS -SAN DIEGO REVIEWED BY ~C~ ohn C. Burns, R.E. #28752 FORM 6 J • • ; ., .J Testing Engineers-San Diego 3467 Kurtz St., P. O. Box 80985, San Diego, Ca. 92138 (714) 225-9641 1903 West Vista Way, Unit a, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-400S REPORT OF SOIL TESTS DME October 21, 1981 JOB DATA: File IIS07, Job IIS933Ul FCOI SAMPLE DATA: Soil sample submitt( PROJECT: Pueblo De Oro, Carlsbad • CLIENT: t-loodward-Clyde Consultants 3467 Kurtz Street San Diego, California 92110 R-VALUE DATA • A B C COMPACTOR PRESS -P.S.I. 165 110 80 MOIST ~ COMPACT'ON -% 20.3 21.6 23.0 • DENSITY -./Cu. FT. 106.9 104.1 101.3 R-VALUE -STABILOMETER 21 13 11 EXUD. PRESSURE -P'S.I. 580 470 260 • STAB. THICK -FEET 1.13 1.25 1.28 EXPAN. PRESS. THICK·FEET 1.07 0.83 0.67 T. I. (ASSUMEO) .. 4.S • Z III By STAB. @ 300 P'S.I. EXUD. = 11 CJ 3 ~~ By EXPANSION PRESSURE = 23 o . a: AT EQUILIBRIUM .. 11 • SAND EQUIVALENT = • REPORTED To: (1) Hoodward-C1yde Consultants • • JCB:fh D to the laboratory on October 14 1981 and identified as SiN tEl: Calle Caballero opposite pad 11 BEARING VALUE (CALIFORNIA HIGHWAY METHOO) COMPACTE:D ANO SOAKED FOUR DAYS PENETRATION STANDARD " OF INCHES P.S.I. P.S.!. STANDARC 0.1 1000 0.2 1500 0.3 1900 0.4 2300 0.5 2800 MOISTURE AFTER SOAKING ..•••••••••••••• _ ••• EXPANSION ..••••••••••••• __ • _ •• _ •••• _ •••• COMPACTION TEST: METHOC -CALIFORNIA BEARING OPTIMUM MOISTURE .•••••••••••••••••••••••• OPTIMUM DRY DENSITY. LBS.lCU. FT ••••••••••••••• PLASTIC CHARACTERISTICS: LIQUIO LIMIT - PLASTIC LIMIT - PLASTICITY INDEX - TESTING ENGINEERS -SAN DIEGO REVIEWED BY Burns, R.E. #287S2 % % % - • Testing Engineers-San Diego i. ;. . ~. '\ . ';,: •. ' .. ' .,/il ./ 3467 Kurtz St., P. O. Box 80985, San Diego, Ca. 92138 (714) 225-9641 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 • BORATORY U -N MBER SD36 4006 REPORT OF SOIL TESTS DATE October 21 1981 JOB DATA: File 11507, Job #5933lH FC01 SAM?LE DATA: Soil sample submitte to the laboratory 10/14/81 and PROJECT: Pueblo De Oro, Carlsbad identified as SIN 1112, Calle • Caballero opposite pad 75. CLIENT: Woodward-Clyde Consultants 3467 Kurtz Street San Diego, California 92110 R-VALUE DATA ~ BEARING VALUE (CALIFORNIA H,GHWAY METHOD) -COMPACTED AND SOAKED FOUR DAYS -A B C 0 COMPACTOR PRESS -P'S.I. 350 350 230 PENETRATION STANDARD %OF INCHES P.S.I. P.S.I. STANDARD 0.1 1000 MOIST ~ COMPACTION -% 10.2 11.0 12.3 0.2 1500 • DENSITY -ill/CU. FT. 0.3 1900 123.1 122.9 120.2 0.4 2300 I 0.5 2600 R-VALUE -STABILOMETER 75 56 20 MOISTURE AFTER SOAKING ..•• _ • _____ • __ • ____ • % I EXUD. PRESSURE -P'S.I. 600 380 290 EXPANSION. _ ••••••••.••• _ •.•••••••.• _ •••• % • STAB. THICK -FEET 0.36 0.63 1.15 COMPACtION TEST: EXPAN. PRESS. THICK-FEET 1. 70 0.83 0.60 METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE •••..••••••.•• _ •• _ ••• _ ••• % T. I. (ASSUMED) .. 4.5 OPTIMUM DRY DENSITY. LBS.lCU. FT .•••••••.•• _ ••. • . . Z !II By STAB. ~ :3 00 P.S.1. EXUD. " 28 ~ 3 PLASTIC CHARACTERISTICS: ~~ By EXPANSION PRESSURE = 48 00: LIQUID LIMIT - AT EQUILIBRIUM 28 PLASTIC LIMIT -z • PLASTICITY IND;;;X - SAND EQUIVALENT = • REPORTED To: (1) \.Joodward-Clyde Consultants • TESTING ENGINEERS -SAN DIEGO REVIEWED BY ~~ c.A ~ """- -;;: John C • Burns~ R.E. 1128752 JCB:fh • FORM ei Jj • • - • -f f.' ,-~.!. , ~.::;·l: Testing Engineers-San Diego 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, Unit a, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-4007 REPORT OF SOIL TESTS D~E October 21, 1981 JOB DATA: File fl507, Job 1159331HFCOl SAMPL.E DATA: Submitted to the laboratory on October 14, 1981 PROJECT: Pueblo De Oro, Carlsbad and identified as SiN /113, Circulo Santiago opposite CLIENT: l-loodward-Clyde Consultants pad 8. 3467 Kurtz Street San Diego, California R-VAL.UE DATA BEARING VAL.UE (CAL.IFORNIA HIGHWAY METHOO) COMPACTED AND SOAKED FOUR DAYS A B C 0 COMPACTOR PRESS -P.S.I. 85 60 PENETRATION STANDARD %OF INCHES P.S.I. P.S.I. STANDARD MOIST ~ COMPAC~ION -% 17.9 19.7 0.1 1000 0.2 I!SOO -DENSITY -IICu. FT. 109.0 104.9 0.3 1900 0.4 2300 R-VALUE -STABILOMETER 10 6 O.!S 2600 MOISTURE AFTER SOAKING .•••••••••.••••••••• % EXUD. PRESSURE -P.S.I. 460 300 EXPANSION .•••••••.••••••••••••••.••••••• % -STAB. THICK -FEET 1.29 1.35 EXPAN. PRESS. THICK·FEET 0.47 0 COMPACTION TEST: METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE •••••••••••••.••••••••••• % T. I. (ASSUMED) = --OPTIMUM DRY DENSITY. LBS.lCU. FT ••••••••••••••• -. 6 z III By STAB. ~ 300 P.S.I. ExuD. = ~ 3 PLASTIC CHARACTERISTICS: ~~ By EXPANSION PRESSURE = --a . a:: LIQUID LIMIT - AT EQUILIBRIUM 6 PLASTIC LIMIT -" -PLASTICITY INDEX - SAND EQUIVAL.ENT = • REPORTED To: (1) Wood'vard-Clyde Consultants , • TESTING ENGINEERS -SAN DIEGO REVIEWED BY ~c; C ~ JCB:lh Burns, R.E. 28752 • • • .. { r· .I~' 'i LABOR .... ,ORY NUMBER Testing Engineers-San Diego 3467 Kurtz St., PO. Box 80985, San Diego, Ca, 92138 (714) 225-9641 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 FOP,", 6 SD36-4008 REPORT OF SOIL TESTS DATE October 21, 1981 JOB DATA File #507, Job 115933HTCF01 SAMPLE DATA: Submitted to the laboratory on October 14,. 1981. PROJECT: Pueblo De Oro, Carlsbad • CLIENT: t-loodward-Clyde Consultants 3467 Kurtz Street San Diego, California R-VALUE DATA ~ -A B C COMPACTOR PRESS -RS.I. 220 125. 85 MOIST ~ COMPACTION -" 15.0 16.3 17.6 • DENSITY • ~/Cu. FT. 115.7 112.2 109.3 R-VALUE -STABILOMETER 21 16 10 EXUD, PRESSURE -RS.I. 760 450 230 • STAB. THICK -FEET 1.13 1.20 1.29 EXPAN. PRESS. THICK' FEET 1.10 0.60 0.37 T. I. (ASSUMED) .. 4.5 • Z IIJ By S7AB. ~ 300 RS.I. EXUD. = 12 II 3 ~~ By EXPANSION PRESSURE = 22 o . a: AT EQUILIBRIUM = 12 • SAND EQUIVALENT = • REPO?7EO To: (1) ~.Jood~vard-Clyde Consultants • • JCB:lh 0 and identified as SiN 1114 Circulo Santiago opposite pad 7. BEARING VALUE (CALIFORNIA HIGHWAY METHOD) COI:!PACTED AND SOAKED FOUR DAYS PENETRATION STANDARD " OF INCHES P.S.I. P.S.I. STANDARD 0.1 1000 0.2 1!S00 0.3 1900 0.4 2300 O.!S 2600 MOISTURE AFTER SOAKING .••••••• , ••••••••••. E~PANSION .. -. , •••••.••••••••••••••••••••• COMPACTION TEST: METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE ••••••••••••••••••••••••• OPTIMUM DRY DENSITY. LBS.lCU. FT ••••••••••••••• PLASTIC CHARACTERISTICS: LIQUID LIMIT - PLASTIC LIMIT - PLASTICITY INDEX - TESTING ENGINEERS -SAN DIEGO REVIEWED BY . John C. Burns, R.E. #28752 " % '" FORM e JI • • • • ., t. • \ ,: " 1:. : . ""},' , . ~ ',' .' .... I'I:~ I Testing Engineers-San Diego 3467KurtzSt., p.o. 8ox80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, Unit 8, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-4009 REPORT OF SOIL TESTS DATE October 21, 1981 JOB DATA: File #507, Job fF5933lHFCOI SAMPLE DATA: Submitted to the laboratory on October 14, 1981 PROJECT: Pueblo De Oro, Carlsbad and identified as SiN 1115 Circulo Santiago opposite pad CLIENT: Woodward-Clyde Consultants 15. 3467 Kurtz Street San Diego, California R-VALUE DATA BEARING VALUE (CALIFORNIA HIGHWAY METHOO) COMPACTEO ANO SOAKE!2 FOUR DAYS A B C 0 COMPACTOR PRESS -P.S.1. PENETRATION STANOARO " OF 140 110 65 INCHES P.S.I. P.S.I. STANOARO MOIST liP COMPACTION -" 14.6 16.0 17.3 • DE:NSITY -IIICu. FT. 116.3 113.7 110.2 R-VALUE • STABILOMETER 16 l3 7 Exuo. PRESSURE' P'S.I. 390 220 120 • STAB. THICK' FEET 1. 20 1.25 1. 33 Ex PAN. PRESS. THICK-FEET 0.80 0.70 0.40 T. I. (ASSUMED) = --• I:J By STAB. @ 300 P.S.I. Exuo. = 15 Z :l CI oJ ~~ By EXPANSION PRESSURE = --CO! AT EQUILIBRIUM : 15 • SAND EOUIVALENT = • REPORT~D To: (1) \vood~.,ard-Clyde Consultants • • JCB:lh 0.1 1000 0.2 1500 0.3 1900 0.4 2300 0.5 2600 MOISTURE AFTER SOAKING .••.••••.••••••••• _ • EXPANSION .••..•.•• , ••••••••••••••••••••• COMPACTION TEST: METHOO -CALIFORNIA BEARING OPTIMUM MOISTURE ..•••••••••••••.••••••••. OPTIMUM DRY DENSITY. LBS.lCU. FT ••••••••••• _ ••• PLASTIC CHARACTERISTICS: LIQUID LIMIT · PLASTIC LIMIT · PLASTICITY INDEX · TESTING ENGINEERS -SAN DIEGO REVIEWED BY " " " e· • • • • • • • • • 3467 Kurtz Street San Diego. California 92110 714-224-2911 October 12, 1981 Project No. 59331W-FC01 Broadmoor Homes, Inc. 3911 Sorrento Valley Boulevard Suite B San Diego, California 92111 Attention: Mr. Ron Van Daele TEST RESULTS PUEBLO DE ORO CARLSBAD, CALIFORNIA Gentlemen: Woodward·Clyde Consultants Attached are results of R-value tests performed by Testing Engineers San Diego on samples taken from the subject. project. Very truly yours, WOODWARD-CLYDE CONSULTANTS Richard P. While R.E. 21992 RPE/EHP / ee j Attachments (2) Broadmoor Homes, Inc. (2) City of Carlsbad Consulting Engineers. Geologists and EnVIronmental SCientists Offices In Other Principal Cities FORM fS j? • • Testing Engineers-San Diego 3467KurtzSt., p.o. Box 80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, "Unit 8, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-380S REPORT OF SOIL TESTS DATE October 8, 1981 JOB DATA: File 1!507, Job 1!59331HFC01 SAMPLE DATA: Submitted to the laboratory on October 2, 1981 PROJECT: Pueblo De Oro and identified as SiN RV 111, • Hospway station 19+00. CLIENT: Woodward-Clyde Consultants 3467 Kurtz Street San Diego, California '" R-VALUE DATA BEARING VALUE (CALIFORNIA HIGHWAY METHOD) • COMPACTED AND SOAKED FOUR DAYS A B C D COMPACTOR PRESS -P.S.I. 350 225 150 PENETRATION STANDARD " OF INCHES P.S.I. P.S.I. STANDARD MOIST @ COMPACT!ON • " 11.1 12.0 12.9 0.1 1000 0.2 1500 -DENSITY' IIICu. FT. 125.5 122.3 120.1 0.3 1900 0.4 2300 R-VALUE -STABILOMETER 35 20 13 0.5 2600 MOISTURE AFTER SOAKING •••••••••••••••••••• " EXUD. PRESSURE -P.S.I. 440 380 260 EXPANSION •••.•••••.•.•.••••••••••••••••• " --STAB. THICK -FEET 0.93 1.15 1.25 COMPACTION TEST: EXPAN. PRESS. THICK' FEET 0.20 0 0 METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE •...•....••.• -•••••••••••• " T. I. (ASSUMED) '" OPTIMUM DRY DENSITY. LBS.lCU. FT. ••••••••.••••• • Z III By STAB. @ 300 P.S.!. EXUD. = 14 " :3 PLASTIC CHARACTERISTICS: ~~ By EXPANSION PRESSURE = o . -O! LIQUID LIMIT - AT EQUILIBRIUM = PLASTIC LIMIT -• 14 PLASTICITY INDEX . SAND EQUIVALENT = • REPORTED To: (1) Woodward-Clyde Consultants • • THC:fh fORM 6 JP • :; • Testing Engineers-San Diego 3467KurtzSt., P.O. Box 80985, San Diego, Ca. 92138 (714)225.:.9641 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-3809 REPORT OF SOIL TESTS DATE October 8, 1981 - JOB DATA: File #507, Job 1159331WFC01 SAMPLE DATA; Submitted to the laboratory on October 2, 1981 PROJECT: Pueblo De Oro and identified as SiN RV ilZ , • Hospway station 13+50. CLIENT: Woodward-Clyde Consultants 3467 Kurtz Street San Diego, California R-VALUE DATA BEARING VALUE (CALIFORNIA HIGHWAY METHOD) • COMPACTED AND SOAKED FOUR DAYS A B C 0 COMPACTOR PRESS -P.S.I. 175 70 115 PENETRATION STANDARD " OF INCHES P.S.I. P.S.I. STANDARD 0.1 1000 MOIST ~ COMPACTION -% 15.4 18.1 16.7 0.2 1500 • DENSITY -"/Cu. FT. 0.3 1900 115.3 109.9 112.9 0.4 2300 R-VALUE -STABILOMETER 17 10 16 0.5 21500 MOISTURE AFTER SOAKING ••••••.••••••••••••. " EXUD. PRESSURE -P.S.I. 780 220 390 EXPANSION .•••••••••••••••••••••••••••••• " • STAB. THICK -FEET 1.19 1.29 1.20 COMPACTION TEST: EXPAN. PRESS. THICK-FEET 0.63 0.23 0.60 METHOD -CALIFORNIA 8e:ARING OPTIMUM MOISTURE ••••••••••••••••••••••••• " T. I. (ASSUMED) ,. OPTIMUM DRY DENSITY. LBS./CU. FT. •••••••••••••• • . Z III By STAB. ~ 300 P.S.I. ExuD. = 13 Cl :3 PLASTIC CHARACTERISTICS: ~~ By EXPANSION PRESSURE = -On: L.IQUID LIMIT - AT EOUILIBRIUM ,. PLASTIC LIMIT -13 • PLASTICITY INDEX - - SAND EQUIYALENT = • Re:PORTe:D To: (1) Hoodward-C1yde Consultants • TESTING ENGINEERS -SA IEGO REVIEWED BY • THC:fh - • " -j 1f " J' t· . '.i. _>.,1,'; . .!;J; ~ Testing Engineers-San Diego 3467 Kurtz St., P. O. Box 80985, San Diego, Ca. 92138 (714) 225-9641 1903 West Vista Way, Unit 8, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-3810 REPORT OF SOIL TESTS D~E October 8, 1981 JOB DATA: File 11507, Job 1159331WFC01 SAMPLE DATA: Submitted to the laboratory on October 2, 1981 PROJECT: Pueblo De Oro and identified as SiN RV 113, • Avenida Magnifica opp. Pad 64. CLIENT: lvoodward-C1yde Consultants 3467 Kurtz Street San Diego, California R-VALUE DATA BEARING VALUE (CALIFORNIA HIGHWAY METHOO) • COMPACTED AND SOAKED FOUR DAYS A 8 C D . COMPACTOR PRESS -p.S.J. 160 95 55 PENETRATION STANDARD "OF INCHES P.S.I. P.S.!' STANDARD 0.1 1000 MOIST @ COMPACTION' % 15.6 17.3 19.1 0.2 1500 -DENSITY' "/Cu. FT. 0.3 1900 114.7 111.0 107.0 0.4 2300 0.5 2600 R-VALUE -STABILOMETER 17 11 6 MOISTURE AFTER SOAKING •..••••••••••••••••• % EXUD. PRESSURE -p.s.!. 640 380 250 EXPANSION .•••••••••••.•••••••••.•••••••• % • STAB. THICK' FEET 1.19 1.28 1.35 COMPACTION TEST: EXPAN. PRESS. THICK' FEET 0.47 0.23 0 METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE ••••.•••.•••••.•••••••••• % T. I. (ASSUMED) " OPTIMUM DRY DENSITY. LBS.lCU. FT •••••.••••••••• . -8 z III By STAB. @ 300 P.S.!. EXUD. z l!) :3 PLASTIC CHARACTERISTICS: ~~ By EXPANSION PRESSURE = -00: LIQUID LIMIT . -PLASTIC LIMIT AT EQUILIBRIUM " . 8 -PLASTICITY INDEX - SAND EQUIVALENT = • REPORTED To: (1) Woodward-Clyde Consultants -TESTING ENGINE~N DIEGO REVIEWED BY / G7I/~~ • T.7. chapma/, R.E. 1112882 THC:fh FORM 6 J? • .... Testing Engineers-San Diego I· .1.1 ~; " 3467 Kurtz St., P. O. Box 80985, San Diego, Ca. f!.2138 (714) 225-9641 .... !.-::'Lij 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 'l" " • LABORATORY NUMBER SD36-3811 REPORT OF SOIL TESTS D~E October 8, 1981 JOB DATA: File #S07, Job #S9331HFC01 SAM?LE DATA: Submitted to the laboratory on October 2, 1981 PROJECT: Pueblo De Oro and identified as SiN RV #4, • Avenida Magnif~ca opp. Pad 69. CLIENT: Woodward-Clyde Consultants 3467 Kurtz Street San Diego, California R-VALUE DATA BEARING VALUE (CALIFORNIA HIGHWAY METHOD) • COMPACTED AND SOAKED FOUR DAYS A 8 C D COMPACTOR PRESS -P.S.I. 22S 160 100 PENETRATION STANDARD "OF INCHES P.S.I. P.S.1. STANDARD 13.4 14.3 0.\ 1000 MOIST 0 COMPACTION -% lS.2 0.2 1500 -DENSITY -#/CU. FT. 119.2 116.2 114.6 0.3 1900 0.4 2300 R-VALUE -STABILOMETER 21 15 12 0.5 2600 MOISTURE AFTER SOAKING .•••••..•••••••••••• % EXUD. PRESSURE -p.S.1. 610 sao 290 EXPANSION .••••••••••••••• _ •.••.•••.••••• " -STAB. THICK -FEET 1.13 1.21 1.26 COMPACTION TEST: EXPAN. PRESS. THICK' FEET O.SO 0.33 0.30 METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE ..••..••••••.••••..•••••• % T. I. (ASSUMED) = OPTIMUM DRY DENSITY. LBS.lCU. FT .•.•••.•••••••• • By STAB. 0 300 P.S.1. EXUD. = z III 12 o :3 PLASTIC CHARACTERISTICS: ~~ By EXPANSION PRESSURE , Cl • = -n:: LIQUID LIMIT -, AT EOUILIBRIUM = PLASTIC LIMIT . 12 PLASTICITY INDEX . - SAND EQUIVALENT = , -REPORTED To: (1) Wood~"ard-Clyde Consultants -TESTING ENGINEER~CIEGC REVIEWED BY . /' , 6/1!r.U THC:fh T. H. Chapman/R.E. 1112882-• FOF-"-i 6 JF • ; . Testing Engineers-San Diego • . '{ i. r ./. jf " .=c-f. ' .. ~~~:~:t 3467KurtzSt., P.O. Box 80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 • LABORATORY NUMBER SD36-3812 REPORT OF SOIL TESTS DATE October 8 1981 , JOB DATA: File 11507, Job 1159331WFCOI SAMPLE DATA: Submitted to the laboratory on October 2, 1981 PROJECT: Pueblo De Oro and identified as SiN RV 115, • Avenida Magnifica Opp. Pad 56. CLIENT: '·loodward-C1yde Consultants 3467 Kurtz Street San Diego.~ California R'VALUE DATA BEARING VALUE (CALIFORNIA HIGHWAY METHOO) • COMPACTED AND SOAKED FOUR DAYS -I A B C 0 COMPACTOR PRESS' P.S.I. 350 280 145 125 PENETRATION STANDARD " OF INCHES P.S.I. P.S.I. STANDARD MOIST 0 COMPACTION' " 0.1 1000 11.6 12.5 13.3 14.2 0.2 ISOO -DENSITY' "ICu. FT. 0.3 1900 124.5 121.3 118.5 116.2 0.4 2300 R,VAlUE • STABILOMETER 35 23 15 12 0.5 2600 MOISTURE AFTER SOAKING .••••••••••••••••••• " EXUD. PRESSURE' P.S.I. 650 460 270 250 EXPANSION .•• : ••••••.•••••••.•••••••••••• " • STAB. THICK' FEET 0.93 1.10 1.21 1.26 COMPACTION TEST: EXPAN. PRESS. THICK·FEET 1.47 0.97 0.87 0.67 METHOD -CALIFORNIA BEARING OPTIMUM MOISTURE ..••.•••••••••••••••••••• " T. I. (ASSUMED) ~ 4.5 OPTIMUM DRY DENSITY. LBS.lCU. FT. •••••••••••••. • By STAB. ~ 300 P.S.I. ExuD. z W = 16 " 3 PLASTIC CHARACTERISTICS: ~~ By EXPANSION PRESSURE = 25 a . 0::: LIQUID LIMIT · AT EQUILIBRIUM = 16 PLASTIC LIMIT · • PLASTICITY INDEX · SAND EQUIVALENT = • REPORTED To: (1) Hoodward-C1yde Consultants • -THC:fh T. H. Chapman,fR.E. 1112882 " • <I' I ~. • • • • • • • • • • 3467 Kurtz Street San Diego. Call forma 92110 714-224-2911 Woodward·Clyde Consultants Telex 697-841 September 18, 1981 Project No. 5933lW-FCOl Broadmoor Homes, Inc. 3911 Sorrento Valley Boulevard San Diego, California 92126 Attention: Mr. James Carter FINAL REPORT OF ENGINEERING AND GEOLOGIC OBSERVATION OF GRADING AND TESTING OF COMPACTED FILL PUEBLO DE ORO, LOTS 1. THROUGH 12 (PADS 1 THROUGH 76) . CARLSBAD TRACT 79-27 CARLSBAD, CALIFORNIA Gentlemen: In accordance with your request and our proposal dated November 10, 1980, we have provided engineering services in conjunction with the regrading of the subject site. SCOPE OF WORK Our services included: o o o o o o Providing engineering and geologic observation of the grading operation Performing field density tests in the placed and' compacted fill Performing laboratory tests on representative samples of the material used for fill Providing engineering observation of the instal- lation of subdrains Providing geologic inspection of buttress cuts and cut slopes Providing professional op1n1ons regarding the con- tractor's general adherence to plans and specifica- tions. Consulting Engineers. Geologists and Environmental SCientists Offices in Other Principal Cities . , • • • • • • • • • • • Broadmoor Homes, Inc. September 18, 1981 Project No. 59331W-FCOI Page 2 SUMMARY OF GENERAL EARTHWORK AND TESTING Woodward· Clyde Consultants Current site preparation, compaction, and testing were done between January 23 and June 25, 1981. In our opinion, based on our observation and testing, the work performed during that period was in general conformance with the Specifications for Controlled Fill attached to our report entitled "Update Soil and Geologic Investigation Pueblo Del Oro (Grove Apart- ments), Carlsbad, California," dated revised October 20, 1980. Previous grading of the subject site was completed between May 17 and December 19, 1972. That grading consisted of mass grading the site into a series of large approximately flat pads. That work is summarized in the report by Woodward- Gizienski & Associates entitled "Final Report of Engineering Observation and Compaction Testing, Grove Apartments, ·Carlsbad, California," dated March 1, 1973. During the current grading period, fill was placed, compacted, and tested, either as designed fill or undercut at finish grade, on Lot 1 (Pads 1, 2, and 76), Lot 2 (Pads 8, 9, 10, and 13 through 17), Lot 5 (Pads 22, 25, and 28), Lot 6 (Pads 33, 34, 39, and 40), Lot 8 (Pads 45 through 51), Lot 9 (Pads 52 through 60, 71,72, and 74), Lot 10 (Pads 61 through 71), and Lot 12. Lot 1 (Pad 1), Lot 5 (Pads 22 and 25), and Lot. 6 (Pads 33, 34, and 40) are cut-fill pads. Lot 1 (Pads 3 through 7), Lot 2 (Pads II, 12, and 13), Lot 3 (Pad 73), Lot 4 (Pads 18 through 21), Lot 5 (Pads 23, 24, 26,27, 29, and 30) and Lot 6 (Pads 31, 32, 35 through 38, and 41 through 44) and Lot 11 (Pad 75) are cut. The grading operation generally consisted of removing vegeta- tion, excavating loose surficial soils, scarifying, wetting and compacting areas to receive fill, making cuts and fills to design grade and constructing buttress fills in perimeter cuts. Subdrains were installed in buttress slope fills and in design fills on and adjacent to Lots'6, 7, 8, 9, 10, and 12. During the regrading operation, compaction procedures were observed, and field density tests were made to help evaluate the relative compaction of the placed fill. Field observa- tions and results of field density tests indicate that the fill has been generally compacted to 90 percent or more of maximum laboratory dry density as determined in accordance with ASTM Test Method No. D1557-70. For reference, the approximate locations of field density tests and the limits of compacted fill have been recorded on a copy of the grading • • • • • • • • • • • Broadmoor Homes, Inc. , September 18, 1981 Project No. 5933lW-FCOl Page 3 Woodward· Clyde Consultants plan. The results of field density tests, expressed as a percent of laboratory dry density (relative compaction), are given on the attached forms. Laboratory tests were made on representative samples of the materials used for fill. The tests were performed to evaluate moisture density relationships, maximum dry density, optimum moisture content, grain size distribution, plasticity and swell characteristics. The results of laboratory tests '" are attached. SUMMARY OF FINISH GRADE SOIL CONDITIONS During the regrading operation, certain pads were specially treated to provide a specified depth of select soil at rough -grade. Fill Pads and Fill Portion of Cut-Fill Pads Inspection and laboratory tests indicate that nonexpansive fill was placed within 2 feet of rough grade on all fill, cut-fill or undercut fill pads noted herein. Cut Pads and Cut Portion of Cut-Fill Pads On Lot 1 (Pads 1, 2, and 76), Lot 2 (Pads 8,9,10, and 13 through 17), Lot 5 (Pads 22, 25, and 28), Lot 6 {Pads 33, 39, and 40, Lot 8 (Pads 48 through 51), Lot 9 (Pads 57, 58, 59, and 72), and Lot 10 (Pads 65 through 69) expansive soil was excavated and replaced with,nonexpansive fill to a depth of 2 feet below rough pad grade over the entire level pad. Cut Pads Not Undercut Cut Lot 1 (Pads 3 through 7), Lot 2 (Pads 11, and 12), Lot 3 (Pad 73), Lot 4 (Pads 18 through-21), Lot 5 (Pads 23, 24, 26, 27, 29 and 30), Lot 6 (Pads 31, 32, 35 through 38, and 41 through 44) were inspected at the completion of regrading. The inspection indicated that no expansive soil is evident at rough grade surface. Geologic Conditions The geol~gic conditions encountered during site grading were essentially as concluded in our report of October 20, 1980. Geologic observations of the recommended buttress keys were performed prior to the installation of subdrains and compacted fill. " • • • • • • • • • • • Broadmoor Homes, Inc. September 18, 1981 project No. 59331W-FCOl Page 4 Woodward-Clyde Consultants Minor ground water seepage was observed in a cut slope below Lot 11 {Pad 75} and is being monitored by our firm. Recom- mendations for seepage control, if needed, will be given at a later date. No additional areas of adverse geologic conditions were observed that required additional erigineering analysis and recommendations. An as-graded soils and geologic map is being prepared and will be issued under separate cover. RECOMMENDATIONS The recommendations presented herein are not intended for structures or appurtenances located beyond the limits of the undercut. Foundations for S·tructures on Nonexpansive Soils We recommend that foundations for single-story or two-story residential structures placed on nonexpansive, undisturbed soil or on nonexpansive, properly compacted fill be designed for a bearing pressure not exceeding 2,000 psf (dead plus live loads). We recommend that footings be founded at least 12 inches below fini.shed grade and have a minimum width of 12 inches. In our opinion, this bearing pressure can be increased by no more than one-third for loads. that include wind or seismic forces. Slopes Fill slopes at the site have inclinations ranging from approximately 1:1-1/2 to 2:1 (horizontal to vertical). Slope heights are approximately 8 to 75 feet. Fill slopes with inclinations of 1-1/2 to 1 were treated by overbuilding and cutting back to design slope. Fill slopes inclined at 2 to 1 were treated by periodically backrolling with a sheeps- foot compactor, and track compacting with a dozer upon completion. We recommend that structures that will not tolerate differ- ential settlements (such as foundations, swimming pools, concrete decks, walls, etc.) not be located .within 8 feet of the top of a slope. We recommend that footings that are located within 8 feet of the top of a slope be extended in -depth until the outer bottom edge of the footing is 8 feet horizontally from the outside face of the slope. .' . " • • • • • • • • • • • Broadmoor Homes, Inc. September 18, 1981 Project No. 59331W-FCOl Page 5 Additional Fill and Ubility 'Trenches Woodward· Clyde Consultants This report discusses the fill placement observed by personnel from our firm during the periods specified. We recommend that any additional fill placed, as well as backfill placed in utility trenches located within 5 feet of a building and deeper than 12 inches, or backfill placed in any trench located 5 feet or more from a building and deeper than 5 feet be compacted under our observation and tested to verify compliance with the earthwork specifications for the project. We should be contacted at least 24 hours prior to backfilling operations. At the time of this report some of the utility trench backfill is completed. Test results are attached . . Drainage We recommend that positive measures be taken to properly finish grade each pad after structures and other improve- ments are in place, so that drainage waters from the pad and , adjacent properties are directed off the pad and away from foundations, floor slabs, and slope tops. Even when these measures are taken, a shallow ground water or surface water condition can and may develop in areas where no such water condition existed prior to site development; this is particu- larly true where a substantial increase in surface water infiltration results from landscape irrigation. LIMITATIONS The elevations of compaction tests shown as finished grade (FG) tests on the attached forms correspond to the elevations shown on the "Grading Plan Carlsbad Tract 79-27," dated September 25, 1980, prepared by Roy 'L. Klema Engineers, Inc. Elevations and locations used in this report were based on field surveys done by others. The soil conditions described in this report are based on observations and periodic testing. This office should be notified of any indications that soil conditions are not as described herein. We will inspect foundation excavations for each pad if we are requested to do so. For this report, rough pad grade is defined as that grade set in the field by the grade checker from reference stakes established by the surveyor, and represents rough grade at the time we were inspecting the grading operation. Likewise, the indicated depths of undercutting of expansive soil • • • • • • • • • • • ., . , " Broadmoor Homes, Inc. September 18, 1981 project No. 5933lW-FCOl Page 6 Woodward·Clyde Consultants and/or depths of placement of nonexpansive soil were based on the measurements made by and grades set by the contractor's gra~e checker. The conclusions and opinions drawn from the test results and site inspections apply only to our work with respect to regrading, and represent conditions at the date of our final inspection. We will accept no responsibility for 'any subse- quent changes made to this site by others, or by uncontrolled action of water, or by failure of others to properly repair damages by uncontrolled action of water. If you have any questions, please give us a call. Very truly yours, WOODWARD-CLYDE CONSULTANTS ~~. Richard P. While R.E. 21992 RPW/DS/DT/rs Attachments (4 ) G::r!!~ C.E.G. 1033 • COMPACTION TEST RESULTS JOII NAME PUEBLO DEL ORO DATE REPORTED 9/16/81 JOB NUMBER 59331W-FC01 (STREET TESTS) • OATES COVERED MAY 6, 1981 THROUGH JUNE 19, 1981 PAGE S-1 01" S-1 MOISTUR& "IELO LA.ORATORY R&LATIV& DATI: 'MIST RETEST LOCATION ELEVATION CONT&NT DENSITY OIl:N.ITY COMPACTION NUMSER 0,. OF TEST '!It DRVWT. PCI' PC .. '4 0 .. LAII. DUf •• , MAY 6 S-l AVENIDA MAGNIFICA, OPP. • PAD 65 152' 12.3 114.3 123.5 92 S-2 AVENIDA MAGNIFICA, OPP. PAD 68 142' 12.3 115.0 123.5 93 MAY 14 S-3 AVENIDA MAGNIFICA, OPP. • PAD 72 137' 11. 7 119.8 126.0 95 S-4 AVENIDA MAGNIFICA, OPP. PAD 66 143' 13.6 117.3 126.0 93 JUN 8 S-5 CALLE CABALLERO, STA. 3+00 148' 13.0 119.4 126.0 94 • S-6 CALLE CABALLERO, STA. 1+30 122' 12.3 ll9.2 126.0 94 JUN 9 S-7 CALLE ARROYO,STA.0+50 128' 13.6 116.3 126.0 92 S-8 11 11 STA. 0+80 132' 13.0 120.0 126.0 95 • JUN 10 S-9 VIA FRANCISCA,STA.I0+00 190' 12.3 119.3 126.0 94 S-10 CIRCULO SANTIAGO, OPP. PAD 14 135' 11. 7 118.2 126. O' 93 S-l1 CIRCULO SANTIAGO, OPP. PAD 17 137' 13.0 116.1 126.0 92 • JUN 16 S-12 CIRCULO SANTIAGO, OPP. PAD 10 128' 12.3 119.1 126.0 94 S-13 CALLE ARROYO,STA. 1+50 138' 11. 7 117.2 126.0 93 JUN 17 S-14 CIRCULO SANTIAGO, N. OF STA. 1+90 100' 12.3 115.3 122.0 94 • S-15 CIRCULO SANTIAGO, N. OF STA. 2+00 104' 13.6 112.9 122.0 92 JUN 18 S-16 CIRCULO SANTIAGO, N. OF STA. 3+00 108' 12.3 ll5.3 126.0 91 S-17 CIRCULO SANTIAGO, N. OF • STA. 1+50 112' 13.6 117.0 126.0 92 S-18 CIRCULO SANTIAGO, STA. 1+25 116' 13.0 119.5 126.0 94 JUN 19 S-19 CIRCULO SANTIAGO, STA. 2+00 120' 11.1 119.6 126.0 94 • 8-20 CIRCULO SANTIAGO, STA. 1+50 124' 12.3 ll7.0 126.0 92 S-21 ELM AVENUE, STA. 95+00 258' 13.0 113.6 123.5 91 S-22 11 II STA. 97+40 246' 12.3 115.3 126.0 91 S-23 ELM AVENUE, STA. 97+20 248' 13.0 117.0 126.0 92 S-24 II II STA. 97+00 256' 11. 7 122.4 126.0 97 • Woodward·CIyde Consultants " wt 7/27/81 CONSUL. Tllte ENGINEERS, GaOLOClaT. ANG ENVI"OHMI:NTAI. SCIENTIST. • COMPACTION TEST RESULTS JO .. NAME PUEBLO DEL ORO JOB NUMBER 59331W-FCOI (BUTTRESS FILL) • DATESCOVERED FEBRUARY 6, 1981 THROUGH MAY 12, 1981 DATE FEB 6 • FEB 12 FEB 1,3 • FEB 17 • FEB 20 • MAR 26 • MAR 30 MAR 31 • APR 1 • APR 2 • APR 7 • 5/18/81 ,..ST NUMBER B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-I0 B-ll B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-19 B-20 B-21 B-22 B-23 B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-32 B-33 B-34 RETEST 0,. B-18 LOCATION OPP. LOT 8, WEST SIDE OPP. LOT 8, EAST SIDE OPP. LOT 8, CENTER OPP. LOT 8, EAST SIDE OPP. LOT 8, EAST SIDE OPP. LOT 8, CENTER OPP. LOT 8, EAST SIDE OPP. LOT 8, WEST SIDE OPP. LOT 8, CENTER OPP. LOT 8, WEST SIDE OPP. LOT 8, EAST SIDE OPP. LOT 8, CENTER OPP. LOT 8, CENTER OPP. LOT 8, EAST SIDE LOT 12, SOUTH END " " " " LOT 6, S.W. CORNER LOT 12, SOUTH END LOT 12, SOUTH END LOT 6, S.W. CORNER II II n 11 II LOT 6, SOUTH SIDE LOT 6, S.W. CORNER LOT 12, SOUTH END LOT 6, SOUTH SIDE LOT 6, S.W. CORNER LOT 6, S.E. CORNER II II ".. It II If If If 11 LOT 6, SOUTH SIDE LOT 6, S.E. CORNER LOT 6, S.W. CORNER LOT 6, SOUTH SIDE LOT 6, S.W. CORNER ELEVATION OP'TEST 158' 142' 152' 146' 150' 156' 154' 160' 164' 168' 168' 172' 180' 176' 187' 191' 196' 200' 200' 196' 200' 196' 204' 204' 200' 208' 196' 200' 204' 210' 212' 214' 218' 222' MOISTURa CONTaNT , DIIY WT. 13.0 11.1 10.5 11.0 10.0 12.3 11. 7 12.3 11. 7 12.3 13.6 13.6 11. 7 12.3 11. 7 11. 7 12.3 12.3 13.0 11. 7 12.3 11. 7 13.0 12.3 12.3 13.6 13.0 13.6 12.3 13.1 12.3 11. 7 13.0- 12.3 DATE REPORTED 9/16/81 PAGE B-1 0,.. B-2 'IELD DENSITT PC" 116.7 114.0 115.9 121.8 123.0 118.2 117.4 117.2 119.8 111.1 110.9 112.6 116.8 117.8 116.8 118.7 119.5 110.6 117.2 114.6 117.8 115.8 115.5 119.6 117.8 119.2 122.9 120.5 119.8 124.2 116.6 116.2 118.1 123.1 LABORATORY RaLATIYIE DENBITY COM,.ACTION PC" ,,,. 0" LAB. DEN •• 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.0 126.0 119.5 114.5 119.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 1265. 126.5 126.5 126.5 126.5 126.0 126.0 126.0 126.0 92 90 91 96 97 93 92 92 95 92 92 94 93 93 92 93 94 - 87 92· 90 93 91 91 94 93 94 97 95 94 98 92 92 93 97 Woodward.Clyde Consultants " CONSUL TlNG ENGiNEERS. GEOLOGISTS ANa ENVIRON,..EHTAl. SCIE;NTISTS • COMPACTION TEST RESULTS JOII NAME PUEBLO DEL ORO JOB NUMBER 59331W-FCOI (BUTTRESS FILL) • DATES COVERED FEBRUARY 6, 1981 THROUGH MAY 12, 1981 DATil APR 8 • APR 9 • APR 10 APR 13 • APR 14 APR 15 • APR 16 APR 17 • APR 27 • APR 28 • APR 29 i'11\Y 4 • :>lAY 12 • wt 5/18/81 B-35 B-36 B-37 B-38 B-39 B-40 B-41 B-42 B-43 B-44 B-45 B-46 B-47 B-48 B-49 B-50 B-51 B-52 B-53 B-54 B-55 B-56 B-57 B-58 B-59 8-60 8-61 8-62 8-63 8-64 8-65 8-66 8-67 8-68 8-69 RETEST 0,. B-35 B-52 LOCATION LOT 6, S.E. CORNER .. II "" " LOT 6, S.W. CORNER LOT 6, S.E. CORNER LOT 6, SOUTH SIDE LOT 6, S.E. CORNER LOT 6, S.E. CORNER " " "n II LOT 6, SOUTH SIDE LOT 6, S.E. CORNER LOT 6, S.E. CORNER II .. "n n LOT 6, S.W. CORNER " 11 11 n " LOT 12, SOUTH END LOT 6, SOUTH SIDE " II " " LOT 6, SOUTH SIDE If II " " LOT 12, SOUTH END LOT 6, SOUTH SIDE LOT 12 NORTH END " " Lot 7 LOT 12 LOT 7 LOT 12 LOT 7 LOT 12 II 11 LOT 7 LOT 12 II If LOT 7 LOT 12 " " ELEVATION Ofl'TEST 218' 218' 226' 230' 222' 216' 220' 224' 228' 232' 236' 240' 218' 222' 208' 226' 230' 234' 238' 210' 234' 132' 136' 140' 144' 148 1 152' 156' 160' 164' 168' 172' 178' 182' 186' MO'aTURIl CONTIlNT ... DIIY WT. 11. 7 13.6 11. 7 11. 7 11. 7 12.3 11. 7 12.3 12.3 13.6 11. 7 12.3 12.3 13.6 13.0 13.0 13.6 13.0 13.0 11. 7 13.6 12.3 12.6 12.3 14.3 13.6 13.0 12.3 13.0 12.3 13.0 13.6 12.3 11. 7 13 .1 DATE REPORTED 9/16/81 PAGE B-2 ·o~ B-2 111. 7 117.6 115.9 117.7 115.9 114.6 114.5 118.5 118.6 117.3 115.9 114.6 110.3 117.7 111.4 111.0 112.7 108.3 111.6 115.9 113.7 115.0 111.4 115.1 109.5 1l0.5 113.4 113.0 118.2 105.2 113.3 112.3 117.0 119.8 118.9 ~aORATORY "1l~T'VIl DIlN.'TY COMPACTION pel' % 01' ~a. DENa. 126.5 126.5 126.5 126.5 126.5 123.5 126.5 126.0 126.0 126.5 122.0 122.0 119.5 122.0 122.0 122.0 122.0 122.0 122.0 122.0 122.0 119.5 119.5 126.5 114.5 114.5 122.0 122.0 126.0 114.5 122.0 122.0 122.0 126.0 126.0 88 92 91 93 91 92 90 94 94 92 95 93 92 96 91 90 92 88· 91 95 93 96 93 90 95 96 92 92 93 91 92 92. 95 95 94 . IDt. Woodward· Clyde ConsuHants ~ CONSUL.TlNG ENGINEEtftS. GEOLOGISTS AND !lENV.tftONMENTAL SCIENTISTS • COMPACTION TEST RESULTS JOai NAME PUEBLO DE ORO DATE REPORTED 9/16/81 JOB NUMBER 59331W-FC01 (STORM DRAIN TRENCH BACKFILL) • DATES COVERED JULY IS, 1981 THROUGH AUGUST 17, 1981 PAGE 80-1 0 1" SD-3 STTRFACE MOI.TUIIIl '1IlLC LA.OIIATOIIY RIlLATIYIl OATil TII.T _ lIaTEST LOCATION CONTIlNT CIlH.ITY CIIH.ITT COMPACTION Hu .... all C!" 'II. OilY WT. PC" PC" -I. 01" LAa. DEHS. • JUL 15 SD-1 PAD 52 -WEST SIDE , -4' 13.6 115.9 126.0 91 80-2 PAD 52 -EAST SIDE -2' 12.3 114.7 126.0 9], SD-3 PAD 52 -CENTER SURFACE 11.1 115.3 126.0 91 JUL 16 80-4 OPPOSITE PAD 55 8TA. 3+40 -4' 13.0 114.2 126.5 90 • 80-5 OPPOSITE PAD 59 STA. 4+30 -4' 11. 7 117.0 126.5 92 SD-6 OPPOSI,;[,E PAD 49 STA. 5+70 -4' 13.0 117.6 126.5 92 JUL 17" SD-7 OPPOSITE PAD 57 • STA. 3+30 -2' 11. 7 117.2 126.5 93 80-8 OPPOSITE PAD 49 STA. 5+30 -2' 12.3 123.5 126.0 98 JUL 20 80-9 OPPOSITE PAD 55 SURFACE 12.3 123.1 126.0 97 SD-I0 OPPOSITE PAD 49 SURFACE 13.0 "116.5 126.0 92 • 80-11 CALLE CABALLERO STA. 0+50 -2' 11. 7 117.0 126.0 92 80-12 CALLE CABALLERO STA. 1+50 SURFACE 13.0 114.8 126.0 91 80-13 PAD 76 -2 ' 13.0 114.3 123.5 92 SD~14 PAD 76 SURFACE 12.3 115.4 123.5 93 • JUL 23-80-15 PAD 74 -EAST END -3' 13.0 112.4 123.5 91 80-16 PAD 74 -WEST END -1' 11. 7 115.2 123.5 93 80-17 PAD 74 -CENTER SURFACE 12.3 114.0 126.5 90 JUL 24 SD-18 PAD 64 -CENTER -2 ' 11. 7 114.7 123.5 92 80-19 PAD 63 -WEST END -3' 13.0 1l3.3 123.5 91 • SD-20 PAD 61 -CENTER -2' 12.3 113.1 123.5 91 8D-2l PAD 62 -CENTER SURFACE l3.0 112.4 123.5 91 80-22 PAD 64 -CENTER SURFACE 13.0 117.0 126.5 92 JUL 27 SD-23 BETWEEN PADS 63-64 CENTER -2' 13.0 108.8 123.5 88 • SD-24 BETWEEN PADS 62-63 CENTER "-2 ' 12.3 114.6 123.5 92 SD-25 SD-23 BETWEEN PADS 63-64 CENTER -2' 13.0 122.2 123.5 98 SD-26 BE'IWEEN PADS 61-62 CENTER -2 ' 12.3 117.0 123.5 94 • SD-27 BETWEEN PADS 63-64 CENTER SURFACE 14.3 116.2 126.0 92 SD-28 BETWEEN PADS 61-62 CENTER SURFACE 11. 7 116.0 126.0 92 • Woodward· Clyde Consultants " CONSUL.. TINe ENGINEIE"S, GEOL.OGISTS "NO ENVI"ONMENTAL SCIENTISTS • COMPACTION TEST RESUL.TS JOII NAME PUEBLO OE ORO JOB NUMBER 59331W-FC01 (STORM ORAIN TRENCH BACKFILL) • DATES COVERED JULY 15, 1981 THROUGH AUGUST 17, 1981 DATIl: ,..ST NUMSER • JUL 27 SO-29 • • • JUL 29 SO-30 SO-31 SO-32 SO-33 SO-34 SO-35 JUL 30 SO-36 SO-37 SO-38 SO-39 JUL 31. SO-40 SD-41 SO-42 • ~UG 4 SO-43 SO-44 SO-45 AUG 10 SO-46 SO-47 • SO-48 AUG 11 SO-49 SO-50 SO-51 SO-52 • SO-53 SO-54 "'TEST 01' AUG 12 SO-55 SO-53 SO-56 SO-57 • SO-58 SO-59 SO-60 LOCATION BETWEEN PAOS 52-53 SURFACE 1I0lSTUlt& CONT.NT .. DIIYWT. CENTER -2' 13.6 13.0 13.0 OPPOSITE PAO 52 CENTER SURFACE OPPOSITE PAO 52 SURFACE NORTHERLY ENO OF CALLE CABALLERO NORTHERLY ENO OF CALLE CABALLERO NORTHERLY ENO OF CALLE CABALLERO OPPOSITE PAO 18 OPPOSITE PAO 18 OPPOSITE PAO 73 OPPOSITE PAO 18 NORTHERLY ENO VIA CLEMROTE OPPOSITE SURFACE 10.0 SURFACE 10.7 SURFACE 10.3 -2' 10.7 SURFACE -2' -2' 11.3 10.7 11.0 TRANSFORMER SURFACE 11.2 EAST SlOE OF PAD 64 EAST SlOE OF PAO 64 EAST SlOE OF PAO 64 BETWEEN PADS 63 & 64 BETWEEN PADS 63 & 64 PAD 63 PAD 76 PAD 1 PAD 2 BETWEEN PADS 1 & 2 PAO 1, EAST SIDE PAD 2 PAO 8 PAO 9 PAO 10 PAO 9 PAO 10, SOUTH SIDE BETWEEN PADS 8 & 9 PAO 8, NORTH SlOE PAD 33 PAD 32 SURFACE -2' SURFACE SURFACE SURFACE -2' -2' -2' -2' SURFACE SURFACE SURFACE -2' -2' -2' 10.0 10.2 11.2 10.4 11.8 11.3 12.3 13.0 11.1 12.3 11.1 10.5 11. 7 12.3 11. 7 -2' 13.6 SURFACE 11.7 SURFACE 12.3 SURFACE 13.0 -2' 11.1 -2' 12.3 DATE REPORTED 9/16/81 PAGESO-2 o~SO-3 ""LD D'NSITY PC, 111.6 115.3 115.3 ll3.9 117.6 ll5.5 116.0 124.1 114.0 120.6 ll9.5 115.2 116.7 116.0 113.8 118.7 113.8 ll5.8 ll6.9 117.5 ll7.7 115.9 120.8 117.2 108.6 116.0 116.1 124.4 ll6.4 118.7 115.3 110.7 LA.ORATORY . RELATiVe DENSITY CO .... ACT'ON PC" <;I, 0" LAS. Da:NS • 119.5 126.5 126.5 126.5 122.0 122.0 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.0 126.0 126.0 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 93 91 91 90 96 94 91 98 90 95 94 91 92 92 90 93 90 91 92 93 93 91 95 92 85 91 91 98 92 93 91 87 • wt 9/14/81 Woodward·CIyde ConsuHants " eONSUL. TINC ENCINE.: .... GI:OL.OCISTI AHD &NYU'ONMaNTAL. SCieNTISTS • COMPACTION TEST RESULTS JOII NAME PUEBLO DE ORO JOB NUMBER 59331W-FC01 (STORM DRAIN TRENCH • OATES COVERED JULY 15, 1981 THROUGH AUGUST 17, DATa nST RETEST LOCATION NuwaEII 01' AUG 13 SD-61 SD-60 PAD 32 • SO-62 PAD 32, EAST SIDE SD-63 BETWEEN PADS 32 & 33 SO-64 PAD 32, EAST SIDE AUG 14 SO-65 PAO 24, EAST SIOE SO-66 BETWEEN PADS 23 & 24 • SO-67 PAD 23, WEST SIDE AUG 17 SO-68 PAD 24 SO-69 PAD 23 SO-70 BETWEEN PAOS 23 & 24 • • • • • • • wt 9/14/81 BACKFILL) 1981 SURFACE -2' SURF. SURF. SURF. -2' -2' -2' SURF. SURF. SURF. DATE REPORTED 9/16/81 PAGE SD-3 01" SD-3 MOleTUlla "laLD LA.OIIATOIIY IIELATIVa CONTENT DaNSITY DaNalTV CO .... ACTION , DIlY WT. PC .. PCP % 0 .. LAS. DltHa. 11. 7 115.7 126.5 91 12.3 117.3 126.5 92 13.0 117.5 126.5 92 11. 7 116.7 126.5 92 13.0 115.7 126.5 91 12.3 114.7 126.5 90 11. 7 115.4 126.5 91 11. 7 117.2 126.5 92 13.6 123.1 126.5 97 13.0 117.4 126.5 93 Woodward·CIyde Consultants " CONSUL.TING IENGINKIE"S, GEOLOCISTS AND &NYIItONMKNTAL SCICN!IST. •• • • • • • • • • • • 3467 Kurtz Street Woodward·Clyde Consultants San Diego. California 92110 714-224-2911 Telex 697-841 December 12, 1980 Project No. 593311'1-UDOI Mr'. James Carter Broadmoor Homes, Inc. 3911 Sorrento Valley Road Suite B San Diego, California 92111 HOSP GROVE APARTMENTS SAN DIEGO, CALIFORNIA Dear Hr. Carter: 'As a part of our continuing geologic consultation on the subject project, we discussed the project with Mr. William Harley of the Los Angeles HUD office on November 24, 1980. This discussion followed Mr. Harley's inspection of the site and his review of the engineering and geologic reports that we sent him. Mr. Harley outlined the following items of concern that he feels may restrict the participation of HUD in this project. l. 2. 3. 4. On-Site Fault -The fault is one of Mr. Harley's minor concerns; however, based on our reports and his site visit, he is of the opinion that set-backs should' be established on cut pads. Such set-backs could allow for structures within "5 feet" of the fault. Landslides -Mr. Harley has concerns regarding the landslides and development on top of such slides. He indicated that HUD would need a positive statement regarding slope stability. (We believe that we can provide such a statement that would satisfy Mr. Harley and HUD.) Regrading -Severe erosion has taken place because the materials at the site are highly erodible. Mr. Harley said, "excellent and thorough erosion mitigation measures" would be required and that such mitigation measures might require continuous maintenance. Cut/fill Situation -Because the site is in an existing cut/fill situation, Mr. Harley said that approval is needed at the "regional level." Mr. Harley's verbal communications with the regional staff indicate the site possibly has a low probability of approval, even with our clarification. COnsulting Engineers. Geologists and EnVironmental SCientists Offices in Other Principal Cities • • • • • • • • • • • Mr. James Carter December 12, 1980 project No. 5933lW-UDOl Page 2 Woodward-Clyde Consultants In summary, Mr. Harley thinks the fault on site is only a minor problem; however, due to the other items the proba- bility of obtaining HOD funding for this site is low. If you have any questions or if we can be of further assistance, please give us a call. Very truly yours, WOODWARD-CLYDE CONSULTANTS . Richard P. While R.E. 21992 RPW/DE/rs (3) • • • • • • • • .. • • COMPACTION TEST RESULTS JOII NAME PUEBLO DE ORO JOB NUMBER 59331W-FCOI (WATER TRENCH BACKFILL) DATES COVERED JULY 8, 1981 THROUGH AUGUST 17, 1981 DATil JUL 8 JUL 17 JUL 20 JUL 21 JUL 22 W-l W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 W-10 W-ll W-12 W-13 W-14 W-15 W-16 W-17 W-18 W-19 W-20 W-21 -W-22 W-23 JUL 23 -W-24 W-25 W-26 W-27 W-28 RETEST 0" W-I0 L.OCATION ELNI AVE. STA. 92+00 ELNI AVE. STA. 94+00 ELNI AVE. STA. 96+75 ELNI AVE. STA. 93+00 ELNI AVE. STA. 96+00 SURFACE -2' -2' -2' SURFACE SURFACE CALLE ARROYO STA. 6+00 -1' CALLE ARROYO STA. 3+50 -1' CALLE ARROYO STA. 1+00 -1' CALLE ARROYO STA. 1+50 CALLE ARROYO STA. 5+00 VIA CHEMENTE STA. 0+70 VIA CHEMENTE STA. 1+50 CALLE ARROYO STA. 5+00 VIA LOS SANTOS STA. 1+00 VIA LOS SANTOS STA. 3+00 VIA LOS SANTOS STA. 2+00 CIRCULO SANTIAGO STA. 1+50 CIRCULO SANTIAGO STA. 3+50 CIRCULO SANTIAGO LATERAL 2+67 CIRCULO SANTIAGO STA. 6+00 CIRCULO SANTIAGO STA. 4+25 CIRCULO SANTIAGO LATERAL 1+43 CIRCULO SANTIAGO STA. 2+00 CIRCULO SANTIAGO STA. 1+95 CIRCULO SANTIAGO LATERAL 4+52 CIRCULO SANTIAGO LATERAL 6+21 CIRCULO SANTIAGO STA. 3+00 CIRCULO SANTIAGO STA. 1+75 SURFACE SURFACE -1' SURFACE -1' -1' SURFACE -1' -1' -1 ' -1' SURFACE SURFACE SURFACE -1' -1 ' SURFACE SURFACE -1' MOlaTUlla CONTIINT .. DIIT WT. 13.6 13.0 11. 7 11.1 11. 7 12.3 13.0 11.1 11. 7 12.3 13.6 12.3 11. 7 13.6 13.0 12.3 11. 7 11.1 14.3 13.0 12.3 13.0 13.0 12.3 12.3 11. 7 DATE REPORTED ~/16/81 PAGE W-1 0 .. W-2 Jl'11IL.D DIINalTT pel' 111.8 117.6 117.4 115.1 116.4 118.9 117.4 119.6 113.6 107.0 118.2 119.9 117.2 123.1 120.0 116.9 118.6 112.5 117.3 117.3 117.8 117.8 111.1 116.3 116.1 121.7 W\aOIlATOllT IICw\Tlva DIINalTT CO"~ACTION PC' 'It 0' ....... Dba. 123.5 123.5 123.5 123.5 123.5 126.0 126.0 126.0 126.5 126.5 126.5 126.0 126.5 126.5 126.0 126.0 126.0 123.5 123.5 126.0 126-.0 123.5 123.5 126.0 126.0 126.0 90 95 95 93 92 94 93 94 90 85 93 95 92 97 95 91 94 91 95 93 93 95 90 92 92 96 13.0 123.3 126.0 97 Woodward·CIyde Consultants " CONSULTING ENGINIIUIS, Ga01.0CIST. AND &NVI"ONMKNTAL. .CIIENTIITS .' • • • • • • • • • • COMPACTION TEST RESULTS JOai NAME PUEBLO DE ORO Joa NUMaER 59331W-FCOI (WATER TRENCH BACKFILL) DATES COVERED JULY 8, 1981 THROUGH AUGUST 17, 1981 STTRFACE OATC nST RETEST LOCATION NUN.ER 0 .. JUL 24 W-29 CALLE CABALLERO STA. 2+00 -11 W-30 CALLE CABALLERO STA. 4+50 -I' W-31 CALLE CABALLERO STA. 2+50 SURFACE W-32 CALLE CABALLERO STA. 5+25 SURFACE A:tJG 28 W-33 AVENIDA MAGNIFICA, OPPOSITE PAD 55 -11 W-34 AVENIDA MAGNIFICA, OPPOSITE PAD 56 SURFACE W-35 AVENIDA MAGNIFICA, OPPOSITE PAD 72 -I' W-36 AVENIDA MAGNIFICA, OPPOSITE PAD 68 -I' W-37 AVENIDA MAGNIFICA, OPPOSITE PAD 65 SURFACE W-38 AVENIDA MAGNIFICA, OPPOSITE PAD 70 SURFACE AUG 12 W-39 HOSP WAY STA. 11+00 -11 W-40 HOSP WAY STA. 13+45 -I' AUG 13 W-41 HOSP WAY STA. 16+50 -I' W-42 HOSP WAY STA. 19+00 -I' W-43 W-40 HOSP vlAY STA. 13+45 -I' AUG 17 W-44 HOSP WAY STA. 19+50 SURFACE W-45 HOSP WAY STA. 16+50 SURFACE W-46 'HOSP WAY STA. 12+00 SURFACE DATE REPORTED 9/16/81 PAGE W-2 0.. W-2 MOISTUIIC "ICLI) LA.OIIATOIIY IIII:LATIYC C:ONTCNT DENSITY OCNSITY c:O .... ACTION ... OilY WT. PC" PC" ';' 0 .. LA •• OUIS • 12.3 114.7 126.5 90 13.0 116.-8 126.5 92 13.6 117.0 126.5 92 11. 7 117.5 126.5 92 12.3 116.3 126.5 92 13.0 122.2 126.0 96 12.3 117.0 126.0 92 11. 7 116.0 12b.U 92 13.0 116.9 126.0 92 12.3 118.5 126.0 94 11. 7 113.9 123.5 92 13.0 108.6 123.5 -87 13.6 117.0 123.5 94 12.3 117.0 126.0 92 13.0 119.5 123.5 96 12.3 115.3 126.0 91 13.0 116.1 126.0 92 12.3 119.2 126.0 94 Woodward .• Clyde ConsuHants Cit CONSUL. TING ENGIN&II"., GEOL.OGtSTS AND IENV'ftONMIENTAL. SCIENTISTS • COMPACTION TEST RESULTS Jail NAME PUEBLO DEL ORO JOB NUMBER 59331W-FC01 (MASS GRADING) • DATES COVERED JANUARY 27, 1981 THROUGH JUNE 22, 1981 OATE JAN 27 • FEB 4 • FEB 5 • FEB 6 • FEB 13 FEB 17 • FEB 18 • FEB 19 • FEB 23 • • wt 5/18/81 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 RETEST 0' 23 LOCATION LOT 8, PARKING E. SIDE .. " " " " " " " " " N.E. CANYON, LOT 9 11 " " .. " N.E. CANYON, LOT 9 " " " " II II " " " II " If " II n LOT 8, PARKING W. SIDE .. " " " If" II " LOT 8, CENTER II II 11 N.E. CANYON, LOT 9 It II " " " II If " " II N.E. CANYON, LOT 9 N.E. CANYON, LOT 9 " II " tt II II " " " " " " " " " LOT 9, N.E. CORNER .. II "" II LOT 9, N.E. CORNER " " .. II " II 11 "It II LOT 9, EAST SIDE LOT 9, N.E. CORNER LOT 9, EAST SIDE II If " " " " LOT 9, EAST PARKING LOT, ELEVATION 0' TEST 1421 144' 148' 60' 64' 68' 72' 76' 80' 158' 160' 162' 152' 154' 84' 88' 92' 96' 100' 104' 108' 112' 116' 116' 120' 124' 126' 126' 128' 128' 130' EAST SIDE 130' LOT 9, EAST PARKING LOT, EAST SIDE 132' LOT 9, EAST PARKING LOT, WEST SIDE 134' LOT 9, EAST PARKING LOT, WEST SIDE 136' MO'.TUlla CONTENT , O"IlT WT. 12.3 13.0 13.6 13.0 11. 7 11. 7 12.3 13.0 13.6 13.6 11. 7 12.3 13.0 11. 7 11.1 12.3 10.5 10.0 13.6 14.3 13.6 11.1 13.6 13.0 13.6 12.3 13.0 12.3 13 .6 13.6 13.6 9.1 12.3 11. 7 12.3 DATE REPORTED 9/16/81 PAGE: 1 "IELD DEN.ITY pe, 109.0 109.4 109.5 113.4 108.5 111.0 117.8 114.2 112.2 115.1 114.4 117.1 117.3 117.8 115.6 120.6 117.2 113.0 111.7 112.6 112.6 115.3 103.5 109.3 115.9 114.7 116.6 118.3 111.6 109.9 115.4 112.1 120.2 114.3 114.4 01" 5 LA.OIIATOIlY IlIlLATIVE aaN.ITT COMPACTION pe, '.-0" LA •• OlIN •• 119.5 119.5 119.5 123.5 119.5 119.5 126.0 119.5 119.5 126.0 126.0 126.0 126.0 126.0 126.5 126.5 126.5 119.5 119.5 123.5 119.5 123.5 119.5 119.5 126.0 126.0 126.0 126.0 119.5 119.5 126.0 123.5 126.0 126.0 126.5 91 91 91 92 90 92 93 95 93 91 90 92 93 93 91 95 92 94 93 91· 94 93 86 91 91 91 92 93 93 91 91 9.0 95 90 90 Woodward· Clyde Consultants " CONSUL TING EHCINEEftS. GEOLOGISTS A.ND EHYlftONII4ENTAL SCljENTISTS • COMPACTION TEST RESULTS JO&l NAME PUEBLO DEL ORO J08 NUMBER 59331W-FC01 (MASS GRADING) • CATES COVERED JANUARY 27, 1981 THROUGH JUNE 22, 1981 DATil FEB 24 • • APR 1 • APR 2 APR 6 • APR 7 • APR 8 • APR 10 APR 13 • APR 14 • • wt 5/18/81 36 37 38 39 40 41 42 . 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 RIlTIlST 0" 53 65 LOCATION LOT 9, EAST PARKING LOT, ELEVATION OI'TEST EAST SIDE 136' LOT 9, EAST PARKING LOT, EAST SIDE 138' LOT 8, WEST PARKING LOT, NORTH SIDE ., LOT 8, WEST PARKING LOT, NORTH SIDE LOT 8, CENTER It 11 It LOT 10, N.E. CORNER " " "" " LOT 10, N.E. CORNER " " II n " LOT 10, N.E. CORNER " " "rr " LOT 6, S.E. CORNER II " n.. II LOT 10, N.E. CORNER LOT 9, N.W. CORNER LOT 10, N.E. CORNER LOT 10, N.E. CORNER " If " .. II LOT 10, N.E. CORNER LOT 10, NORTH SIDE LOT 10, N.E. CORNER LOT 9, N.W. CORNER LOT 10, N.E. CORNER LOT 6, N.E. CORNER LOT 6, N.E. CORNER LOT 10, NORTH SIDE LOT 11, S.E. CORNER LOT 9, N.W. CORNER LOT 10, NORTH SIDE LOT 6, N.E. CORNER LOT 6, N.E. CORNER LOT 10, NORTH SIDE 156' 160' 142' 144' 40' 44' 48' 52' 56' 60' 136' 140' 64' 68' 72' 76' 76' 80' 82' 86 1 90' 94' 144' 148' 96' 152' 102 1 104' 156' 160' 104 1 MOlnuR& CONTIlNT '110 DIIYWT. 13.0 13.6 11.1 12.3 11. 7 13.0 11. 7 12.3 13.0 13.6 11. 7 13.0 12.3 13.0 11.1 12.3 11. 7 12.3 13.0 11.1 11.1 13.0 13.0 13.6 11. 7 11.1 13.6 10.5 11. 7 12.3 11. 7 12.3 12.3 DATE REPORTED 9/16/81 PAGE 2 120.4 122.0 120.8 115.1 118.3 111.0 111.7 114.0 119.3 117.6 105.9 114.6 115.5 111.2 114.7 116.7 122.6 105.9 117.4 111. 7 120.3 117.6 116.1 117.5 114.2 115.8 117.6 111.9 116.5 108.5 112.0 116.1 122.3 0.. 5 LoAaOIlATORY IIIlLoATIYIE DIENalTY COMPACTION PCI' '10 01' LoA •• DIEH •• 126.5 126.5 126.0 126.5 126.5 123.5 122.0 122.0 122.0 122.0 126.0 126.0 122.0 122.0 126.0 126.0 126.0 119.5 119.5 119.5 126.0 126.0 126.0 126.5 122.0 126.5 126.5 122.0 126.5 126.5 122.0 122.0 126.5 95 96 95 91 93 90 91 93 97 96 91 90 94 91 91 92 9~ 88 98 93 95 93 92 92 93 91 92 91 92 85 91 95 96 Woodward· Clyde Consultants Cit CONSUL. TlNG ENGIN~E." •• CEO~OCISTS AND .NVIRONMENTAL SCIENTISTS • COMPACTION TEST RESULTS JOII NAME PUEBLO DEL ORO JOB NUMBER 59331W-FC01 (MASS GRADING) • CATES COVERED JANUARY 27, 1981 THROUGH JUNE 22, 1981 DATE APR 15 • APR 16 • APR 20 APR 21 • APR 22 • APR 23 APR 24 • APR 27 APR 30 • MAY 1 • ~1AY 5 MAY 6 • naT NUMBEII 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 :·IAY 7 103 104 • wt 5/18/81 RETEST 01' LOCATION LOT 9, N.W. CORNER LOT 10, N.W. CORNER LOT 9, N.W. CORNER LOT 10, N.E. CORNER LOT 10, N.W. CORNER LOT 9, BLDG. PAD 54 FG LOT 10, BLDG. PAD 61 LOT 9, BLDG. PAD 74 LOT 10, BLDG. PAD 63 LOT 9, BLDG. PAD 52 LOT 10, BLDG. PAD 62 LOT 10, BLDG. PAD 61 LOT 10, BLDG. PAD 64 LOT 9, BLDG. PAD 52 LOT 10, BLDG. PAD 62 LOT 10, BLDG. PAD E1 LOT 10, BLDG. PAD 63 LOT 10, PARKING PAD 71 " " " " " " " " 72 65 LOT 10, PARKING PAD 65 " " " LOT 5 PAD 22 " If It II II If II If LOT 5 PAD 27 LOT 5 PAD 26 LOT 8 PAD 45 LOT 8 PAD 47 LOT 8 PAD 50 LOT 8 PAD 48 LOT 2 PAD 17 LOT 2 PAD 10 LOT 1 PAD 7 " 70 ELEVATION 01' TEST 106' 108' 112' 116' 118' 132.0' 120' 124' 126' 128' 128' 130' 130' 128' 132' 134' 133' 134' 138' 138' 142' 140' 162' 164' 170' 172' 174' 162' 154' 148' 142' 130' 132' 104' LOT 9 PAD 53 LOT 9 PAD 52 FG 130.5 i FG 130.5' MOIBTUlla CONTENT , gIlYWT. 13.0 12.3 13.6 13.0 13.6 12.3 12.3 14.3 13.0 12.3 12.3 14.3 13.6 14.9 15.3 14.3 14.9 12.3 13.0 13.6 13 .6 13.0 12.3 13.6 13.0 13.0 11. 7 13 .6 12.3 12.3 11. 7 13.0 11. 7 12.3 13.6 DATE REPORTED 9/16/81 PAGE 3 .. IIELD DENSITY PC" 112.8 119.5 113.0 112.3 113.7 117.1 118.2 111.6 ll5.8 115.6 115.2 104.5 104.7 110.3 ll3.4 llO.O 109.6 116.2 116.0 118.9 114.9 112.0 117.2 121.9 121.3 118.7 115.2 114.0 113.2 118.4 116.5 112.6 112.3 111.5 119.0 '01" 5 LABOIIATOItY IIELATIVIE OENBITT COMPACTION PCI' ',. O~ LAB, O~., 119.5 126.5 122.0 122.0 122.0 126.0 122.0 122.0 122.0 122.0 122.0 114.5 114.5 114.5 114.5 114.5 114.5 126.0 126.5 126.0 122.0 114.5 126.{) 126.0 126.0 126.0 126.0 123.5 123.5 126.0 126.0 122.0 122 .. 0 122.0 126.5 94 94 91 91 92 92 96 91 94 94 94 91 91 96 99 96 95 92 91 94' 94 97 93 96 96 94 91 92 91 93 92 92 92 91 94 14.3 117.5 126.5 92 Woodward· Clyde Consultants " CONSUl-TING ENGINEERS. GEOL.OGISTS AND ENVIRONMENTAL SCIENTISTS • COMPACTION TEST RESULTS Jail NAME PUEBLO DEL ORO 59331-FC01 (MASS GRADING) • DATE. COVERED JANUARY 27, 1981 THROUGH JUNE 22, 1981 OATIE MAY 7 • MAY 11 • MAY 12 MAY 13 • MAY 14 • MAY 15 • MAY 18 • MAY 19 • . MAY 20 • ~Y 21 ftST NUMSEII 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 . 131 l32 133 134 135 136 137 138 139 140 141 142 • wt 5/27/81 IIIETIEST 01' 108 LOCATION LOT 9, PAD 74 LOT 9, PAD 64 LOT 10, PAD 63 LOT 10, PAD 62 LOT 10, PAD 61 LOT 10, PAD 62 LOT 10, PAD 65 LOT 10, PAD 66 LOT 10, PAD 67 LOT 10, PAD 68 LOT 10, PAD 69 LOT 10, PAD 70 LOT 9, PAD 71 LOT 9, PAD 72 LOT 9, PAD 59 LOT 9, PAD 60 LOT 11, PAD 75 LOT 6, PAD 34 LOT 11, PAD 75 LOT 6, PAD 34 LOT 6, PAD 34 LOT 6, PAD 44 LOT 6, PAD 44 LOT 9, PAD 58 LOT 9, PAD 57 LOT 9, PAD 56 LOT 9, PAD 55 LOT 10, PARKING LOT 10, PARKING LOT 8, PAD 48 LOT 8, PAD 49 LOT 8, PAD 45 LOT 8, PAD 46 LOT 8, PAD 47 LOT 8, PAD 48 LOT 8, PAD 49 LOT 8, PAD 50 LOT 8, PAD 51 FG FG FG FG FG FG FG FG FG ELEVATION Ol'TEST 134.5' 134.5' 135.3' 136.0 137.5' 136.0' 146.2' 145.5' 144.9' FG 143.6' FG 142.9' FG 142.3' FG 141.6' FG 141.0' FG 141.0' FG 141.0' FG FG FG FG 164' 168' 175' 176' 180' 186' 190' 141.4 ' 140.9' 139.2' 138.4' OPP.L-69 138' OPP.L-66 143' 144' 152' FG 163.1' FG 163.8' FG 155.0' FG 145.0' FG 153.9' FG 152.2' FG 150.8' IIOISTUII& CONTl:NT .. OilY WT. 13.0 12.3 13.6 13.6 13.6 13.0 13.6 13.0 12.3 11. 7 12.3 13.0 12.3 13.6 12.3 13.6 12.3 13.6 13.0 11. 7 12.3 13.6 11. 7 13.0 12.3 11. 7 13.6 13.6 13.0 l3.6 12.3 l3.0 12.3 l3.6 12.3 l3.0 12.3 11. 7 DATE RE .. ORTEC 9/16/81 PAGE 4 plELD OIENalTY poeI' 117.2 119.0 117.5 112.4 118.9 117.1 118.8 115.6 116.4 116.1 120.1 114.0 118.1 116.4 115.0 113.2 115.2 115.7 120.2 121.3 118.4 115.5 113.0 118.7 115.7 114.2 118.8 120.0 120.5 117.8 118.9 119.5 117.9 118.5 118.4 117.1 114.8 115.9 0,. 5 &.A.OIIATOIIY lIa&.AT,va ClaNalTY COM,.ACT'ON pcp % 01' I.A&. Clue •• 126.0 126.0 126.5 126.5 126.5· 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 123.5 123.5 126.0 126.0 126.0 126.0 126.0 93 94 92 88 93 92 93 91 92 91 95 90 93 92 91 90 91 91 95 96· 93 91 90 94 91 90 94 95 95 93 94 96 95 94 93 93 91 91 Woodward-Clyde Consultants " CONSUL. TING ENGINE&."., GEOLOGISTS AND ENVlftONMKHTAL SCIENTISTS • COMPACTION TEST RESULTS JOII NAME PUEBLO DEL ORO Joe NUMBER 59331W-FCOI (MASS GRADING) • DATES COVERED JANUARY 27, 1981 THROUGH JUNE 22, 1981 OATil: • MAY 22 • MAY 26 MAY 27 • • MAY 28 MAY 29 • JUN 1 • JUN 4 JUN 18 • JUN 19 JUN 22 ftST NUMSER 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 wt 7/27/81 RETEST Or' 158 LOCATION LOT 8, PARKING OPPOSITE PAD 46 LOT 8, PARKING OPPOSITE PAD 49 LOT 8, PARKING OPPOSITE PAD 51 LOT 6, PAD 39 FG LOT 6, PAD 40 FG LOT 6, PARKING OPPOSITE PAD 44 FG LOT 6, PAD 33 FG LOT 5, PAD 28 FG LOT 5, PARKING OPPOSITE PAD 28 FG LOT 5, PARKING OPPOSITE PAD 26 FG LOT 5, PAD 25 LOT 5, PAD 22 LOT 2, PAD 13 LOT 2, PAD 14 LOT 2, PAD 15 LOT 2, PAD 16 LOT 2, PAD 17 LOT 2, PAD 9 LOT 2, PAD 10 LOT 2, PAD 8 LOT 2, PAD 16 LOT 1, PAD 76 FG FG FG FG FG FG FG FG FG FG FG FG LOT 1, PAD 1 FG LOT 1, PAD 2, E. SIDE LOT 1, PAD W, E. SIDE LOT 1, PAD 2, E. SIDE LOT 1, PAD 2 FG LOT 6, PAD 34 FG ELEVATION Or'TEST 162' 152' 148' 192.0' 191.4' 191.5' 182.3' 174.8' 172.4' 173.4' 175.5' 166.0' 136.1' 136.7' 137.4' 138.0' 138.7' 128.0' 129.0' 127.0' 138.0' 103.0' 103.0' 92' 96' 100' 103.0' 182.3' MOUITUII& CONTENT ,ORTWT. 13.6 11. 7 12.3 13.0 11.1 13.6 13.0 11. 7 13.6 13.6 13.0 13.6 12.3 13.0 11. 7 13.6 11. 7 13.0 13.6 13.0 12.3 13.0 13.0 11.1 12.3 13.0 13.6, 13.6 DATE REJI'ORTEC 9/16/81 PAGE 5 .. IELD DENSITY PC .. 118.9 114.6 117.8 119.3 119.0 123.6 117.3 118.7 121.6 114.0 113.3 112.3 113.0 117.3 118.7 108.3 119.3 120.0 118.9 121. 7 120.6 113.8 119.5 115.3 115.3 113.6 116.9 117.0 0... 5 LA.ORATORY IIELATIV& e&N •• TT CO ..... ACTION pcp '4 0 .. LAS. DEN •• 126.0 126.0 121.0 126.0 126.0 126.0 126.0 126.0 126.0 123.5 123.5 123.5 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 126.0 119.5 122.0 122.0 126.0 126.0 94 90 93 94 94 98 93 94 96 92 91 90 90 93 93 85 95 95 94 96 95 90 94 96 94 93 92 92 Woodward·CIyde ConsuHants " .' • • • • • • • COMPACTION TEST RESULTS JOII NAMa PUEBLO DEL ORO 59331W-FC01 (SEWER BACKFILL) DATES COVERED JUNE 24, 19S1 THROUGH JULY 15, 19S1 DATE JUN 24 "'ST NUM.IEIt SW-1 SW-2 ItETEST Of' LOCATION SURFACE AVENIDA MAGNIFICA,STA.4+40 -6' AVENIDA MAGNIFICA,STA.2+75 -6' SW-3 SW-1 AVENIDA MAGNIFICA,STA.4+40 SW-4 JUN 25 SW-5 $W-6 SW-7 SW-S JUN 26 SW-9 JUN 29 JON 30 SW-10 SW-11 SW-12 SW-13 SW-14 SW-15 SW-16 SW-17 SW-18 SW-19 SW-20' SW-21 SW-22 -6' SW-2 AVENIDA MAGNIFICA,STA.2+75 -6' AVENIDA MAGNIFICA,STA.0+50 -6' AVENIDA MAGNIFICA, LATERAL, STA. 3+61 -4' AVENIDA MAGNIFICA, LATERAL, STA. 2+51 -2' AVENIDA MAGNIFICA, LATERAL, STA. 1+31 -4' AVENIDA MAGNIFICA, LATERAL, STA. 0+S7 -21' AVENIDA MAGNIFICA, LATERAL, STA. 1+90 -4' AVENIDA MAGNIFICA, LATERAL, STA. 4+00 -4' AVENIDA MAGNIFICA,STA.3+50 -2' AVENIDA MAGNIFICA,STA.1+50 -2' SW-12 AVENIDA MAGNIFICA,STA.3+50 -2' AVENIDA MAGNIFICA,STA.1+00 SURF. AVENIDA MAGNIFICA,STA.3+00 SURF. AVENDIA MAGNIFCIA, LATERAL, STA. 1+31 SURF. AVENIDA MAGNIFICA,STA.3+61 SURF. -6' -6' -4' -4' SW-23 SW-21 HOSP. WAY, STA. 11+00 HOSP. WAY, STA. 13+50 HOSP. WAY, STA. 14+00 HOSP. WAY, STA. 12+00 HOSP. WAY, STA. 14+00 -4' JUL 1 SW-24 SW-25 wt 7/27/81 HOSP. WAY, STA. 11+50 HOSP. WAY, STA. 13+00 -2' -2' MDISTUIt. CONTKNT .... DIlY WT. 9.1 10.1 13.6 12.3 10.5 13.0 13.6 13.0 13.6 12.3 l3.0 13.6 11. 7 13.0 11. 7 11.1 11. 7 13.6 12.3 l3.0 14.3 13.6 11.1 13.6 12.3 DATE REPORTED 9/16/S1 PAGE SW-1 O~ SW-3 "'EL.I) DENSITY PC .. 91.8 100.1 112.9 115.3 10S.3 113.0 117.0 113.3 116.1 llS.5 116.9 105.9 114.7 114.0 114.9 115.3 114.6 117.0 116.1 118.2 110.6 114.4 110.9 114.1 117.3 IoA.OIlATOltY ItEIoAT'YE OEN.,TY COMPACTION PC.. % 0 .. 1.A8. D&H •• 119.5 119.5 119.5 119.5 119.5 122.0 122.0 122.0 122.0 122.0 122.0 123.5 123.5 123.5 126.5 126.5 126.0 126.0 123.5 123.5 123.5 123.5 123.5 123.5 126.0 76 S3 94 96 90 92 95 92 95 97 95 85 92 92 91 91 90 92 94 95 89 92 91 92 93 Woodward·CIyde Consultants fI CONSUL-TINC ENGIHaC"., GCOL.OGISTS AND ~NVIRONM.NTA'" SCII;NTISTS • COMPACTION TEST RESULTS JOII NAME PUEBLO DEL ORO DATE REPORTED 9/16/81 JOB NUMBER 59331W-FC01 (SEWER BACKFILL) • OATES COVERED JUNE 24, 1981 THROUGH JULY 15, 1981 PAGE SW-2 O~ SW-3 /IIOlnull. 1'111:1.0 ......O .. ATOIIY 1t ...... TIV. DATI: Tan .. ETII:ST LOCATION SURFACE CONTII:NT DII:NSITY DII:NSITY COMPACTION NUM.EII O/' ~ DIlYWT. PCI' PCI' 'lIo 01' J.Aa. OUt •• • . JUL 1 SW-26 HOSP. WAY, LATERAL, STA . 13+12 -21' 13.0 120.6 126.0 95 SW-27 HOSP. WAY, STA. 12+00 SURF. 11. 7 120.5 126.0 95 SW-28 HOSP. WAY, STA. 14+20 SURF. 11.1 119.7 126.0 95 SW-29 CALLE ARROYO, STA. 1+00 -6' 11. 7 115.2 123.5 93 SW-30 CALLE ARROYO, STA.~ 3+50 -6' 13.0 . 112.0 123.5 90 • SW-31 CALLE ARROYO, STA. 2+00 -4' 11.1 116.0 123.5 93 JUL 2 SW-32 CALLE ARROYO, STA. 4+50 -4' 13.6 119.7 126.0 95 SW-33 CALLE ARROYO, STA. 2+50 -2' 11. 7 117.4 126.0 93 SW-34 VIA LOS SANTOS, STA. 1+00 -6' 12.3 119.6 126.0 94 ~W-35 VIA LOS SANTOS, STA. 3+50 -6' 13.6 118.4 126.0 94 SW-36 VIA LOS SANTOS, STA. 4+00 -4' 14.3 119.3 126.0 94 • SW-37 VIA LOS SANTOS, STA. 1+50 -4' 13.0 119.5 126.0 94 SW-38 VIA CLEMENTE, STA. 1+25 -6' 12.3 122.6 126.0 97 SW-39 VIA CLEMENTE, LATERAL, STA. 2+35 -4' 13.0 118.8 126.0 94 • JUL 3 SW-40 CALLE ARROYO, LATERAL, STA. 1+63 -2' 13.0 113.0 123.5 91 SW-41 VIA CLEMENTE, STA. 0+30 -2' 11.1 119.6 126.0 94 SW-42 VIA CLEMENTE, STA. 2+00 -2' 11. 7 117.7 126.0 93· SW-43 VIA CLEMENTE, LATERAL, STA. 2+35 SURF. 12.3 115.3 126.0 91 • JUL 6 SW-44 VIA CLEMENTE, STA. 1+00 SURF. 13.6 116.6 126.0 92 SW-45 CALLE ARROYO, STA. 1+50 SURF. 12.3 116.1 126.0 92 SW-46 CALLE ARROYO, STA. 4+00 SURF. 13.0 121.1 126.0 96 SW-47 VIA LOS SANTOS, STA. 2+00 SURF. 13.0 117.5 126.0 93 SW-48 VIA LOS SANTOS, STA. 4+50 SURF. 11. 7 117.4 126.0 93 • JUL 7 SW-49 CIRCULO SANTIAGO, STA.3+00 -6' 13.6 121.0 126.5 95 SW-50 CIRCULO SANTIAGO, STA.4+75 -6' 12.3 122.8 126.5 97 SW-51 CIRCULO SANTIAGO, STA.6+60 -6' 13.0 118.7 126.0 94 JUL 8 SW-52 CIRCULO SANTIAGO, STA.3+50 -4' 11. 7 "113.4 126.0 90 • SW-53 CIRCULO SANTIAGO, LATERAL, STA. 2+99 -4' 12.3 122.6 126.0 97 SW-54 CIRCULO SANTIAGO, LATERAL, STA. 4+74 -4' 13.0 114.9 126.0 91 SW-55 CIRCULO SANTIAGO,STA.5+75 -4' 13.6 119.0 126.0 94 SW-56 CIRCULO SANTIAGO, LATERAL, • STA. 6+75 -4' 12.3 117.3 126.0 93 JUL 9 SW-57 CIRCULO SANTIAGO,STA.4+00 -2' 11. 7 117.9 126.5 93 --SW-58 CIRCULO SANTIAGO,STA.6+00 -2' 13.6 122.2 126.5 96 • wt 7/27/81 Woodward-Clyde Consultants " CONSUL TINe ENCINIIE"., GEOLOCISTS AND !l:NVI"ON .... NTAL. SCIENTIITS • COMPACTION TEST RESULTS • • • • • • • • • JOII NAMIt PUEBLO DEL ORO JOB NUMBER 59331W-FCOI (SEWER BACKFILL) DATES COVERED JUNE 24, 1981 THROUGH JULY IS, 1981 DATE JUL 9 JUL 10 JUL 13 JUL 14 JUL 15 TIIST NUM.ER SW-59 SW-60 SW-61 RETEST 0" LOCATION SURFACE CIRCULO SANTIAGO, LATERAL, STA. 4+32 -2' CIRCULO SANTIAGO, LATERAL, STA. 3+20 -2' CIRCULO SANTIAGO, LATERAL, STA. 5+92 -2' SW-62 SW-59 CIRCULO SANTIAGO, LATERAL, SW-63 SW-64 SW-65 SW-66 SW-67 SW-68 SW-69 SW-70 SW-71 SW-72 SW-73 SW-74 SW-75 STA. 4+32 -2' CALLE CABALLERO, STA.5+30 CALLE CABALLERO, LATERAL, STA. 5+67 CALLE CABALLERO, LATERAL, STA. 4+99 CALLE CABALLERO, STA.5+50 -6' -4' -2' SURF. LOT 9, PAD 54, N.E. CORNER -6' LOT 9, PAD 54, N.W. CORNER -4' AVENIDA MAGNIFICA, 20' E. OF M.O.#16 -6' AVENIDA MAGNIFICA, 50'E. OF M.O.#6 AVENIDA MAGNIFICA, LATERAL, -4' STA. 2+28 -2' AVENIDA MAGNIFICA, LATERAL, STA. 3+10 -2' LOT 9, PAD 54, CENTER -2' LOT 9, PAD 54, CENTER AVENIDA MAGNIFICA, 40' E. OF M.O.#16 SURF. SURF. • wt 7/27/81 IIOISTURE CONTENT , DRYWT. 12.3 12.3 13.0 13.6 13.6 12.3 12.3 13.6 11. 7 13.6 11.1 12.3 13.0 13.0 13.6 12.3 13 .. 0 DATE REJIORTED 9/16/81 PAGE SW-3 O~ SW-3 .. IIELD DENSITY PCI' 112.3 123.5 117.5 116.4 116.1 118.5 115.8 117.0 118.6 120.1 118.7 118.0 116.8 115.3 115.6 118.9 117.0 LoA.OIIATORY RIELoATIVIE DIENSITl' COMPACTION PC.. '10 0 .. LAa. DIEN •• 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 126.5 136.5 126.5 126.5 126.0 126.0 87 97 92 92 91 93 91 92 93 94 93 93 92 91 91 94 92 Woodward.CIyde Consultants " CONSUL.TINC ENGINCE ... , CEOt..OGIITS AND £NVI"ONM&NTAL. SCIENTISTS • • • • • • • • 150 14 0 13 0 120 110 100 90 PLASTICITY CHARACTERISTICS 1 Liquid Limit, % 27 Plasticity Index, % 6 Classification by Unified Soil ~M-SC Classification System , \ \ \ \ \ ZERO AIR VOIDS CURVES \ \ \ 2.80 SG \ \ 2.70 SG \ \ 1\ 2.60 SG \ \1 \ 2.50 SG \ 1\ ' , \ 1\ !\ 1\ \ \ 1\ ' \ \ r\ \ 1\ \ 3 II \~ . / V \\ 1\' \ 1 !// ...,.. \:\ \' 1'-" r"\'\ \ 1\ -1/ \\ ~ \\ (.) \'\ \ \ !\ 0. 2 -,1 ..... II ~\ \ \\ ::t (.!) \' '\ \ w / ~ I \ \ ,\ .... z \ \ '\ t\ ::> \ \ 1\\ >-a: I r\' 1\..\ ~ Cl , 2 33 15 SC 3 r:!:j.!.!::'=+-r-l~~-I SILT & 'CLAY 28 10 SC 100 ~80 ~ «60 ~ .... ~ 40 u a: ~ 2 o o 1'\ 3 1 I , I f\. r\ \ \\ \ 2 \1 \ , ',\ \ \ ~ ,\ ' .. . '-... " I I I 1000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECTSH EAR TEST DATA 1 2 3 Dry Density, pct Initial Water Content, % Final Water Content, % Apparent Co hesion, psf Apparent Fri ction Angle, degrees SWELL TES T DATA 1 2 3 Initial Dry D ensity, pct 107 114 Initial Water Content, % ;.. 12 10 Final Dry De nsity, pet 100 113 Final Water Content, % 23 14 \ \ 1\' f-.Load, psf 1\ l\ :\ 160 160 Swell, percen t 6.9 0.3 i\.\ .\ 1\ \ '\ 1\.' " I\. ~\ , \.. r\\ l\. SAMPLE LOCA TION Maximum Dry 1 2 3 ,\ :'\. ~ Density, pef 123.5 119.5 126.0 '\ .'\ ~~ Optimum Moisture "\ ~ ~ Content, % 10.0 11.5 9.5 ~ r\.' " OPE S.W. COR. SITE I'RNl<!R SS CUT, S.W. COR. I I MOISTURE CONTENT, % 1,,\ ,., 10 20 30 LABORATORY COMPACTION TEST 40 LABORATORY COMPACTION : ASTM D 1557 70 A TEST METHOD FILL SUITABILITY TESTS PUEBLO DEL ORO DRAWN BY: ch CHECKED BY' PROJECT NO: 59331W-FCOl I FIGURE NO: 1 wt 5/13/81 WOODWARD ·CLYDE CONSULTANTS • • • • • • • • • 150 14 0 130 120 110 100 90 PLASTICITY CHARACTERISTICS 4 Liquid Limit, % 34 Plasticity Index, % 17 Classification by Unified Soil SC Classification System , \ 1\ 1\ \ 1\ ZERO AIR VOIDS CURVES \ 1\ '\ 2.80 SG , \ 1\ 2.70 SG , \ 1\ 2.60 SG \ \ \ 2.50 SG \ \ , \ r\ \ \ \ \ \ \ 1\ \ \ \. ~ \ 4 / ~ \ 1\ ~\ \ / /\ \ \' / r\' \ \ -I \ \ \\ t.l -~/I ~ \ \ a. 5' .... " . \1\ \\ J: (.!) / r\' \ \ w 3 6 \ \ \\ .... z II r\' \ f\ :::> \ \ 1\ >-a; 1\' ,\ 1\ 0 '\ \ 1\' 1\ 1\' ,,\ 1\' .\ \ ,\ I'" Maximum Dry 4 5 6 Density, pet 126.5 122.0 114.5 Optimum Moisture Content, % 10.0 12.5 15.0 1 MOISTURE CONTENT, % 10 20 5 35 18 CL 6 r~~--'--:~~-i SILT & . CLAY 46 27 ~ ~ 100 CL ~ 80 \ I" "'.' f---6 ~ ~60 .... a5 40 () a; ~ 2 o o \ 5 4 I I \ _\ \ \ " 1\ \ "-" ~ ~ l'.. l'--..~ I 1000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SH EAR TEST DATA 4 . 5 6 Dry Density, pet Initial Water Content, % Final Water Content, % Apparent Co hesion, pst Apparent Fri etion Angle, degrees SWELL TES T DATA 4 5 6 Initial Dry D ensity, pet 114 111 102 Initial Water Content, % 10 13 Final Dry De nsity, pet 111 106 94 Final Water Content, % 17 21 29 r-Load, pst 160 160 160 Swell, percen t 2.7 4.8 9.2 1\ 1\' i\: "'\ r\. ",\ l\ SAMPLE LOCATION 1\.\ l" t\. '\ ~ r\\ .. "" l\ f\: ." ~ ~ 4 HOSP. WAY BUTTRESS r:; NORTH ~TDE LOT 10 6 LOT 11 I" K1 30 40 LABORATORY COMPACTION LABORATORY COMPACTION TEST TEST METHOD: ASTM D 1557 70 A FILL SUITABILITY TESTS PUEBLO DEL ORO DRAWN BV: ch I CHECKED Bv:\'e\f.1 PROJECT NO: 59331W-FC01 I DATE: 5/14/81 I FIGURE NO: 2 wt 5/14/81 WOODWARD·CL YDE CONSULTANTS • " • • • • • • • 3467 Kurtz Street San Diego, California 92110 714·224·2911 Telex 697·841 July 28, 1981 Project No. 5933lW-FCOl Broadmoor Homes, Inc. Woodward·Clyde Consultants 3911 Sorrento Valley Boulevard Suite B San Diego, California 92111 Attention: Mr. Ron Van Daele GRADING PLAN REVIEW AND ADDITIONAL SLOPE STABILITY ANALYSIS PUEBLO DEL ORO (GROVE APARTMENTS) CARLSBAD, CALIFORNIA) Gentlemen: In accordance with your request and the recommendations of our report entitled "Update Soil and Geologic Investigation, Pueblo Del Oro (Grove Apartments), Carlsbad, California," dated December 6, 1979, revised October 20, 1980, we have reviewed the grading plans for the subject site in prepa- ration for signing the plans. The plans entitled "Carlsbad Tract 79-27," prepared by Roy L. Klema, Engineers, Inc., and dated September 25, 1980, indicate approximately 2:1 and 1.7:1 inclined cut slopes with maximum heights of approximately 30 feet and 54 feet, respectively, and a 2.3:1 fill slope with a maximum height of approximately 91 feet. All other fill slopes are 2:1 with a maximum height of approximately 75 feet. In our opinion, the plans provided are in general conformance with the conclusions and recommendations of our soil investi- gation with the following exceptions: o o o A 30 foot high 2:1 cut slope located in the south- easterly portion of the site An existing 54 foot high 1.7:1 cut slope located in the central portion of the site A 91 foot high 2.3:1 fill slope located in the northwesterly portion of the site. Consuiling Engineers, Geologists and Environmental Scientists Offices in Other Principal Cities • • • • •• Broadmoor Homes, Inc. July 28, 1981 Project No. 5933IW-FCOI Page 2 Woodward·Clyde Consultants Consequently, we have performed additional slope stability analyses, utilizing the Janbu method of analysis and soil parameters developed from consideration of previous labo- ratory tests performed on selected samples, and our pro- fessional judgment. Calculations are attached for refer- ence. These analyses indicate that the aforementioned slopes have calculated factors of safety against deep-seated. slope instability in excess of 1.5 for static conditions. Due to natural variations of soil strength parameters, however, there is a finite probability that the slopes could become unstable. In our opinion, the probability of the slopes becoming unstable is low. If you have any questions, please give us a call. Very truly yours, WOODWARD-CLYDE CONSULTANTS Richard P. While R.E. 21992 RPW/SAW/rs Attachments (4) • , " • • • • • • • • • • Project No. 4933lW-FCOl SLOPE STABILITY ANALYSIS CUT SLOPE Assumptions: (1) Maximum height of slopes (2) Maximum slope inclination (3) Unit weight of soil H ' = 30' 2:1 y =t20 pcf (4) Apparent angle of internal friction (5) Apparent cohesion <P c = 30° = 300 psf (6) No seepage forces. References: (1) Janbu,. N., "Stability Analysis of Slopes with Dimensionless Parameters," Harvard Soil Mechanics Series No. 46, 1954. (2) Janbu, N., "Dimensionless Parameters for Homogeneous Earth Slopes," JSMFD, No. SM6, November 1967. Anulyses: Sufety Factor, F.S. = ). cf = '( II tun <b = 6.9 c From Fig. 10 of Reference F.S. = 2.1 c yH (2) N cf' = Where Ncf is the stability number for slopes with both c and .p. 25 • • • • • • • • • Project No. 59331W-FCOl SLOPE STABILITY ANALYSIS CUT SLOPE Assumptions: (1) Maximum height of slopes (2) Naximum slope inclination (3) Unit weight of soil H . = 54' 1.67:1 (4) Apparent angle of internal friction (5) Apparent cohesion y <P c = 120 pcf = 30° = 300 psf (6) No seepage forces. References: (1) Janbu,. N., "Stability Analysis of Slopes with Dimensionless Parameters," Harvard Soil Mechanics Series No. 46, 1954. (2) Janbu, N., "Dimensionless Parameters for Homogeneous Earth Slopes," JSMFD, No. SM6, November 1967. Analyses: Safety Factor, F.S. = )·cf = yIf tan :2 = 12.5 c From Fig. 10 of Reference ( 2) F.S. = 1.53 c yH N cf· = 33 Where Ncf is the stability number for slopes with both c and .p. . tJ • • • " • t Project No. 59331W-FCOI ATTACHMENT SLOPE STABILITY ANALYSIS FILL SLOPE Assumptions: (1) Maximum height of slopes (2) Naximum slope inclination (3) Unit weight of soil (4) Apparent angle of internal friction (5) Apparent cohesion (6) No seepage forces. References: H . = 91' 2.27:1 y = 120 ~ = 30° c = 300 (1) Janbu,. N., "Stability Analysis of Slopes with Dimensionless Parameters," Harvard Soil Mechanics Series No. 46, 1954. pcf psf (2) Janbu, N., "Dimensionless Par~meters for Homogeneous Earth Slopes," JSMFD, No. SM6, November 1967. Analyses: Safety Factor, F.S. = l'cf = '(II tan ~ = 21. 0 c From Fig. 10 of Reference F.S. = 1.8 c yH (2) N cf" = Where Ncf is the stability number for slopes with both c and .p. 66 o o o o o o o o o o o .,} ,J, ~ •• ' ,., -_l' ,~. 1, , .. -'~-.. " f- ~ -'j --~ '--' , " -" ;:; «"' :::~ ·0-, , ~ •• '" '"-..1- " ' I ~ -"{ .. ' ~",", -4,.~. , - ,',. '~ ., " ~-.' \ • • • • • • • • .' • UPDATE SOIL AND GEOLOGIC INVESTIGATION GROVE APARTr.1ENTS CARLSBAD, CALIFORNIA for Broadmoor Homes, Inc. 3911 Sorrento Valley Road Suite B San Diego, California 92111 3467 Kurtz Street San Diego, California 92110 714-224-2911 . C"f1'1 --~1 Woodward·Clyde Consultants Telex 697-841 November 4, 1980 project No. 59331W-UD01 50106Y City of Carlsbad Engineering Department 1200 Elm Avenue Carlsbad, California 92008 Gentlemen: RECEIVED NOV 0 6198.0 . . tlTY OF CARLSBAD Engineering Department As you requested, we are transmitting to you one copy of the . report captioned below, which was prepared by our firm. UPDATE SOIL AND GEOLOGIC INVESTIGATION PUEBLO DEL ORO (GROVE APARTMENTS) CARLSBAD, CALIFORNIA Dated: December 6, 1979 Revised: October 20, 1980 If you have any questions, please give us a call. Very truly yours, WOODWARD-CLYDE CONSULTANTS Richard P. Whi1e- Vice President RPW/MRR/1km Enclosure Consulting Engineers, Geologists and Environmental Scientists Offices in Other Principal Cities ROY L KLEMA, ENGINEERS, INC. Telephone: 745·3222 TO: etif6/l /)e;pr . C'Jr~ ,-r:wus4~ ATTN: C" 't.//J t:r GENTLEMEN: We are sending you a.ttached C2r .' '-:::.:;,~~CJ . Origin~ls "'!-:..,~. . ~,t';.:.\;.\,......:::J Caples ;', ." .. ~ . ':CJ . Check Prints .c:J Prints ,'f I I Es timn tea ~l Report , THESE ARE TRANSl>IITTED AS CRECKED BELOH: I i For Approval Cl Approved ~r your Use t=J Approved ~l ~?-~ -~ ~,~£~""",,J'U .... ~ - l~i{O rlA/lllllie MIJI"~IPAl IMPROV(M(IIIS SURV(TIfIC 431 HALE AVENUE ESCONDIDO, CALIFORNIA 92025 DATE: JOB NO .. : nE: D Under Separate Cover Yia ___ ;...;... c==J Improvement Plans o Grading Plan D Plot. Plan t==l Map Sheets r==J Title Sheets ~ /ZeV/ S£J:;:J-' [-] begal Description As Submitted I :I Return Ao Noted Corrected: Pl-1ntll CJ As Requested' . \ c==J Roturned for Corrections I j He turned Aftor Loa.n CJ For Review &: Commont t=J Copies for Approval 'r6 Ua. .L..J Signatures c==J Copies for Distribution d COMMENTS: NOTE: If encloBur.ea are not as noted, kindly notify U$ at once. SIGIIED: q~ , I , // • -, • • • • • • • • • • , 3467 Kurtz Street San Diego, California 92110 714-224-2911 Telex 697-841 December 6, 1979 Project No. 59331W-UD01 Broadmoor Homes, Inc. Woodward·Clyde Consultants 3911 Sorrento Valley Boulevard Suite B San Diego, California 92111 Attention: r.1r. William Snow UPDATE SOIL AND GEOLOGIC INVESTIGATION GROVE APARTMENTS CARLSBAD, CALIFORNIA Gentlemen: In ,accordance with your request, we have made an update soil and geologic study at the site of the proposed Grove Apartments subdivision, located south of Harron Way and west of EI Camino Real, in the City of Carlsbad, California. The purpose of this update study is to provide prelimi- nary conclusions regarding existing surface and subsurface soil and geologic conditions, and to present recommendations for grading and foundation design; specifically, buttressing of existing landslide areas, disposition and/or treatment of potentially compressible and expansive soils, excavation characteristics of the on-site material, suitable types and depths of foundations, and allowable soil bearing pressures for foundations and retaining walls. 'He have also included conclusions regarding the presence of faulting and materials susceptible to liquefaction. We understand that we will have an opportunity to provide more detailed recommendations once tentative current grading plans have been developed. Consulting Engineers, Geologists and Environmental Scientists Offices in Other Principal Cities e., e • • • • • • • • e Broadmoor Homes, Inc. December 6, 1979 Project No. 59331W-UD01 Page 2 Woodward· Clyde Consultants REVIEW OF PREVIOUS SOIL AND GEOLOGIC STUDIES A soil investigation of the general area, including the site, was made by Woodward-Gizienski & Associates in 1972. The report of that study entitled "Soil and Geologic Investi- gation for the Proposed Hosp Grove Apartments, Carlsbad, California," is dated August 25, 1972 (Appendix A). That report indicates the site is underlain by the Eocene age La Jolla Group which includes the landslide-prone Delmar Forma- tion. In some areas, the La Jolla Group is overlain by a draping terrace deposit of generally granular Pleistocene age materials. Large diameter test borings performed for that investigation indicated several landslide zones or bedding plane faults on the site. The report recommends removing one active landslide and installing a subsurface drainage system. The entire site was graded into a series of large, flat pads in 1972. Site preparation, compaction, and testing were done between May 17 and December 19, 1972 under the observation of representatives of Woodward-Gizienski & Associates. The results of that work are summarized in their report entitled "Final Report of Engineering Observa- tion and Compaction Testing, Grove Apartments, Carlsbad, California," dated Harch 1, 1973 (Appendix B). During that grading, highly expansive soil was undercut 2 feet in the level portion of some of the pads and replaced with properly compacted, nonexpansive soils. PROJECT DESCRIPTION The entire site has been divided into three phases. Phase A is the northeastern portion of the site, north of Hosp Hay, and is not included in this report. Apartments were constructed during Phase A. Phase B is the southern portion of the site, south of Hosp Way. Phase C is west of eo e e • • • • • • • • Broadmoor Homes, Inc. December 6, 1979 Project No. 59331W-UDOl Page 3 Woodward.Clyde Consultants Phase A, between ~1arron Road and Hosp Way. The Site Plan (Figs. i-A through i-C) indicates the approximate locations of the three phases. The Site Plan was prepared from copies of the grading plan used during the 1972 grading. No regrading plans have been prepared to date. We understand, however, that additional grading may take place in the building pad areas. The main road alignment through the site will not change except for vertical grade. Build- ing pads for the construction of one-and/or two-story, wood frame and stucco, apartment or condominium-type structures are proposed. Cut and fill slopes having inclinations of 1-1/2 to 1 and 2 to 1 are expected. FIELD RECONNAISSANCE A site reconnaissance was made by a project geologist from our firm on November 26, 1979 to evaluate current surface geologic conditions. The reconnaissance included inspecting existing cut slopes. SUMMARY OF SITE, SOIL, AND GEOLOGIC CONDITIONS The Site Plan (Figs. I-A through I-C) indicates the approximate locations of existing landslides, ''leak clay seams and faults noted during the 1972 field investiga.tion and our recent site reconnaissance. Landslides The presence and location of existing ancient land- slides on the site was noted in the 1972 soil investigation report. A review of the soil investigation report indicates that slide planes were found in the large diameter test borings at depths up to 45 feet· below original ground sur- face. In the northwestern part of the site (Phase C), grading has produced several large cut-fill pads. Heak clay seams e. • • • • • e • • • • Broadmoor Homes, Inc. December 6, 1979 Project No. 59331W-UDOl Page 4 Woodward· Clyde Consultants are present in the existing 1-1/2 to 1 inclined cut slopes at the southern site boundary of this phase. Existing graded pads and roadways in both phases have been subjected to considerable erosion and contain· numerous .deep (up to approximately 10 feet) erosional gullies. Faulting A small fault has been identified in the high cut slope at the extreme south end of the site. The fault offsets the La Jolla Group sediments about 30 feet vertically. The fault strikes generally north-south to slightly northeast, and has a nearly vertical dip. The width of the fault varies from approximately 1/2 inch to 3 inches. Material in the fault is stiff to very stiff, brown to gray, silty clay. Aerial photographs and topographic maps of the general site area prior to the 1972 grading show no lineations, vegetation, or topographic features that indicate faulting. In addition, the fault exposure in the southern cut slope does not show any offset or displacement of the residual topsoil contact. Dating of the residual topsoil layer in the Carlsbad-Oceanside area suggests that such materials are on the order of several thousand years old. No apparent vertical offset was observed in exposures of the capping Pleistocene terrace deposit south of the site. The Pleistocene terrace is tentatively correlated to the early Pleistocene age Lindavista Formation (approximately 50,000 to 3,000,000 years old). Two to possibly four small breaks or fractures were noted subparallel to the fault. These features show rela- tively little or no vertical offset (0 to 4 feet)~ have a general north-south strike, and a near vertical dip. The seams are 1/16-inch to 1/2-inch wide, and are composed of· light gray to white calcareous silt. These features appear to be adjustment planes formed after deposition and during • • • • • • • • • • Broadmoor Homes, Inc. December 6, 1979 Project No. 59331W-UDOl Page 5 Woodward· Clyde Consultants consolidation of the sediments. Therefore, these phenomenon are depositional features and probably not tectonic faults. The closest fault zone to the site along which earth- quakes greater than Richter Magnitude 4.0 have been recorded is the Elsinore Fault Zone. The Elsinore Fault Zone is located approximately 23 miles east-northeast of the site. The major faulting closest to the site is in the offshore inferred zone of deformation, located about 8 to 10 miles west of the site. Some geologists have postulated these features as the northern extension of the Rose Canyon Fault Zone. Seismicity The Carlsbad-Oceanside area is considered to be tecton- ically stable because of its low historical seismicity; however, ground shaking is possible from earthquakes gener- ated on distant faults, such as the Elsinore Fault Zone. Additionally, many geologists believe future earthquakes could occur along the local Rose Canyon Fault. It has been estimated that a Richter Magnitude 6.0 earthquake could have an average recurrence interval of 100 to 200 years. Ground Water During the 1972 investigation, perched ground water was observed in the La Jolla Group sediments at depths ranging from 21 to 46 feet. During our recent site inspection, water seeps and exotic hydrophytes were observed in and at the base of a cut slope at the extreme southwest corner of the site. vve also observed several areas of poor drainage on unfinished pads. These areas appear to collect and hold water as seasonal ponds. DISCUSSION, CONCLUSIONS, AND RECOMMENDATIONS Our current studies of the site indicate that, with the exception of massive erosion, site conditions have not • . .' • • • • • • • • • Broadmoor Homes, Inc. December 6, 1979 Project No. 59331W-UD01 Page 6 Woodward· Clyde Consultants changed significantly since the end of the grading in 1972. Existing ancient landslides and \'leak clay seams in cut slopes will require consideration when developing new plans for the site. Faulting Our investigation identified no significant or major faults crossing the site. In our opinion, the small fault on the east side of the site is a minor and ancient struc- tural feature. In our opinion, the probability of ground surface rupture (faulting) at the site is very low. Ground Hater In our opinion, conditions in the prop0ged development indicate probable future ground water seepage. Seep ,areas will probably occur where permeable sand lenses are inter- bedded with less permeable sediments. In our opinion, no shallow permanent ground water table exists on the site. The present water seepage in the extreme southwest end of the site should be corrected during recommended slope buttressing (see Slope Stability). We recommend that positive measures be taken to properly finish grade each lot after the 'residential structures and other improvements are in place so that drainage waters from the lots and adjacent properties are directed off the lots and away from house foundations, floor slabs, and sI'ope tops. Even with these provisions, e~perience has shown that a shallow' ground vvater or surface water condition can and may develop in areas where no such ground \vater condition existed prior to site development; this is particularly true in years of heavy rainfall, and in residential subdivisions where a substantial increase in surface water infiltration results from landscape irrigation. • . ., • • • • • • • • •• • Broadmoor Homes, Inc. December 6, 1979 Project No. 59331W-UD01 Page 7 Liquefaction Potential Woodward· Clyde Consultants The depth to the regional ground water table on the sit~ is estimated to be greater than 50 feet. ·In our opinion, this depth, together with the dense nature of the natural soil on the site, generally precludes the possibil- ity of liquefaction. Landslides Landslides were noted during the 1972 investigation. Their treatQent is discussed under Slope Stability -Land- slide Areas. Slope Stability Landslide Areas -Slope stability analyses of landslide areas were performed by co~puter m~thods. The records of analyses are not included, but are available 'for review if requested. Based on our inspection of the exist- ing slope conditions and our analyses of landslide conditions on the site, it is our opinion that the existing landslides, in a gross sense, have a moderate probability of failure, according to current state-of-the-a~t analyses. Based on our recent experience with landslides and weak clay seans in similar materials, slide plane shear strengths used in our current analysis are as follows~ Location Graben area Neutral block GRABEN AREA 24 6 c' (psf) o o SURFACE ----- SLIDE PLANE ----- Y (pcf) 120 120 TYPICAL SLIDE CONFIGURATION (NO SCALE) • • • • • • • • • • • " Broadmoor Homes, Inc. December 6, 1979 Project No. 59331W-UD01 Page 8 Woodward· Clyde Consultants The 1972 report included slope stability analyses performed by computer methods. Factors of safety given in that report were obtained using soil strength parameters higher than those presently considered representativ~ of landslide plane strengths. tie recommend that buttresses and subsurface drains be constructed at the approximate locations shm'ln on Fig. 1-B. The results of our computer analyses indicate that the buttress configurations shown will have calculated factors of safety of at least 1.5 under static conditions. Two generalized buttress schemes are shown on the cross sections (Figs. 2 and 3). We estimate that the volume of material in each buttress scheme will range from 80,000 to 90,000 cubic yards. We recommend that a minimum 5-foot thick compacted mat be constructed in the graben areas of the landslide masses. Much of this mat is already in place, but additional grading may remove it. In our opinion, grading done in the area of the small landslide in the eastern part of Phase C effectively stabil- ized the mass. The upper portions of the slide material were removed and fill was placed in the canyon below the slide; this fill serves as a buttress. He recommend buttressing the weak clay seams in the existing cut slopes on the southern boundaries of Phases B and C. Approximate locations of buttresses are shm'ln on the figures. A typical buttress design is shown as Appendix C. We estimate that the volume of material involved in buttress construction in these areas with present pad grades will range from 40,000 to 50,000 cubic yards. Fill Slopes -~~ expect that fill slopes, including buttress fill slopes, will be inclined at 2 to 1 and will • • • • • • • • • • Broadmoor Homes, Inc. December 6, 1979 Project No. 59331W-UD01 Page 9 Woodward-Clyde Consultants have maximum heights on the order of 70 feet. We also expect that 8-foot wide slope benches will be placed at 25-foot fill height intervals in-accordance with local standards. Based on our analyses, th~ expected fill .slopes will have indicated factors of safety of at least 1.5 under static conditions if constructed in accordance with specifi- cations and the recommendations contained herein. Stability analyses require the use of parameters selee-ted from a range of possible values; thus, there is a finite possibility that slopes having calculated factors of safety as indicated above could become unstable. In our opinion, the probability of the slopes becoming unstable is low, and it is our professional judgment that slopes ~an be constructed as indicated above. iVe recommend that all slopes be drained, planted, and maintained to help control erosion and surface sloughing. Special care should be taken by the grading contractor to properly compact fill to each slope face. We recommend that fill' slope faces be backrolled at maximum 4-foot fill height intervals during construction and trackwalked upon completion of the fill slope. Surface Preparation and Earthwork We recommend that all earthwork be done in accordance with the attached Specifications for Controlled Fill (Appen- dix D). The grading should be observed and compacted fills tested by our firm. We recommend that a preconstruction conference be held at the site. Special soil handling can be discussed at that time. We recommend that any expansive soils exposed during grading, or within 2 feet of pad grade, be excavated to 2 feet below pad grade and be replaced with properly compacted, nonexpansive soil. • • • • • • • • • • • " Broadmoor Homes, Inc. December 6, 1979 Project No. 59331W-UDOI Page 10 Woodward· Clyde Consultants We recommend that the upper 2 feet of fill in building areas be composed of nonexpansive soils available at the site. Then properly compacted, expansive clay soils can be placed in the deeper fill areas. We recommend preparing an earthpackage investigation for the site. In that report, buttress and sUbdrain details and estimates of quantities of soil requiring special hand- ling, such as clay undercut, materials to be used in buttres- ses, and material for use at finish grade, will be presented. The investigation should be done when grading plans are available. We recommend that all cut slopes and buttress cuts be inspected by an engineering geologist from our firm during grading to evaluate actual geologic conditions, and to provide design modifications if needed. Foundations We recommend that footings for two-story, residential 'structures founded in natural or properly compacted, nonexpansive soil be designed for an allowable soil bearing pressure of 2,000 psf (total dead plus live loads). In our opinion, this pressure can be increased by no more than one-third for loads that include wind or seismic forGes. We recommend that all footings be founded a minimum of 12 inches below lowest adjacent grade, and have a minimum width of 12 inches. We recommend providing positive drainage around all structures, and no ponding of water be allowed ~djacent to footings. We recommend that structures not able to tolerate differential settlements (such as foundations, concrete decks, walls, etc.) not be located within 8 feet of a slope top. We recommend that footings located within 8 feet from a slope top be extended in depth until the outer bottom edge • • • • • • • • • • • Broadmoor Homes, Inc. December 6, 1979 Project No. 59331W-UD01 Page 11 Woodward.Clyde Consultants of the footing is at least 8 feet horizontally from the outside slope face. GENERAL The conclusions and recommendations made in this report are based on the assumption that the soil conditions do not deviate appreciably from those fo.und in the borings and excavations made for previous studies; they are made for specific site development. If changes are expected or if any variations or undesirable conditions are encountered during construction, the geotechnical consultant should be consulted for further recommendations. We recommend that the geotechnical consultant review the foundation and grading plans to verify that t~e intent of the recommendations presented herein has been properly interpreted and incorporated into the contract documents. The geotechnical consultant should also observe the site grading and subgrade preparation under concrete slabs and paved areas and the foundation excavation to verify that the soil and rock conditions used as a basis for design are appropriate. This firm does not practice or consult in the field of safety engineering. We do not direct the contractor's operation, and cannot be responsible for safety of other than our own personnel on the site; therefore, the safety of others is the responsibility of the contractor. The con- tractor should notify the owner if he considers any of the recommended actions presented in this report to be unsafe. Professional judgments presented in this report are based partly on our evaluations of the technical information gathered, partly on our understanding of the proposed con- struction, and partly on our general experience in the geotechnical field. Our engineering work and judgments • • • • • • • • • • • Broadmoor Homes, Inc. December 6, 1979 Project No. 5933Hv-UD01 Page 12 Woodward· Clyde Consultants rendered meet or exceed the standard of care of our profes- sion at this time. 'lve do not guarantee the performance of the project in any respect. If you have any questions, please give us a call. Very truly yours, vl00DHARD-CLYDE CONSULTANTS Richard P. While R.E. 21992 RPv.7 /RS /t-1RR/ERA/vm Attachments (4) Broadmoor Homes, Inc. (3) Roy Klema Engineers Robert Smillie C.E.G. 207 • " • • • APPENDIX A • AUGUST 25, 1972 REPORT • • • • • • • ./ • • • • • • • • • • SOIL AND GEOLOGICAL INVESTIGATION FOR THE PROPOSED HOSP GROVE APARTMENTS CARLSBAD, CALIFORNIA for Grove Apartrr:ents Post Office Box 1155 Carlsbad,.Ca1ifornia by t~OODVJ,L\.RD-GIZIENSKI & ASSOCIATES Consulting Soil and Foundation Engineers and Geologists (An Affil; ate of vJoodwa rd-Clyde Consultants) • • • TABLE OF CONTENTS Page LETTER OF TRANSfvlITTAL • SCOPE 1 FIELD INVESTIGATION 2 LABORATORY TESTS 2 • SITE AND SOIL CONDITIONS 3 GEOLOGICAL STRUCTURE 5 GROUrW HATER 6 • COilCLUSIONS 7 RECor'i~lENDJl.TIONS -EARTHWORK 8 RECOMMENDATIONS -FOUNDATIONS 11 • L H1IT ATI ONS 12 FIGURE 1 -SITE PLAN FIGURES 2 THROUGH 25 -LOGS OF TEST BORINGS • FIGURE 26 -HYDROMETER ANALYSIS FIGURE 27 -TYPICAL SECTIONS • • • ..... ~~.... ...... ...·h, ........ _'" .....' . . ~...... -.. • • • • • • • • • • Grove Apartments August· 25, 1972 Project No. 72-105-20 Post Office Box 1155 Carlsbad, California 92008 Attention: Mr. J. Rombotis In accordance with your request and our authorizated proposal dated July 19, 1972, we have made an investigation of the underlying geologic and soil con- ditions at the site of the proposed condominium development· to be known as Hosp Grove Apartments in Carlsbad, California. Our subsurface investigation revealed that weak clay seams are present within the formational soils at the site and that there is evidence of recent sliding Subsequent analysis, however, has shown that the proposed cut and fill slopes \·lill generally have adequate factors of safety against-deep-seated failure ~xcept in the area of an existing slide where special treatment will be required. The accompanying report presents th~ results that the subsurface exploration and the laboratory tests as well as the conclusions and recommendations per- ~aining to this site. The engineer and project geologist assigned to this project was. Richard P. 11hile and Ernie Artim of our firm. RP\·l/LJL/lm (4) Srove Apartments ___ ", •••••••• .-1>" ... '.' .... ---~ .... -. • ... ~"" • •• • • • • • • • • Project No. 72-105-20 SCOPE This report describes an investigation of the underlying geo- logical and soil conditions at the site of a proposed subdivision to be known as Hasp Grove Apartments which will be located south of proposed Marron Road and the May Company Shopping Center adjacent to and west of El Camino Real along the north limits of Carlsbad, California. The purpose of this investigation is to determine the underlying soil and geol.ogical conditions including the presence, d.epth and extent of existing landslides and weak soil layers; to study the effect of these conditions on the stability of proposed cut and fill slopes; and to present recommendations regarding grading, including the construction of proposed cut and fill slopes, and special treatment of potentially unstable areas. Recommendations regarding the treatment of potentially expansive soils; the most sui tab 1 e type and .depth of foundati on and all owab 1 e soil beari ng pressures for use in design; and any construction problems that can be anticipated, are also presented. It is our understanding that the proposed construction will be limited to relatively light to moderate weight one and two-story, wood- frame and stucco structures with either raised, wooden floors or slab-on- grade floors. The available grading plan indicates that grading will essentially consist of reducing the site into a'series of cut and fill pads stepping down east and north from the highest elevation and will include the filling of several canyons. Cut and fill slopes having maxi- mum heights of 57 and 75 feet, respectively, and maximum slope inclinations of 1-1/2 to 1 for cut slopes and 2 to 1 for fill slopes, are proposed. A previous geological investigation has been made of the site by F. Beach Leighton, Geologist. This report is dated December 11, 1967, and is entitled "Geologic Report for Hosp Grove Planning Study, Phase II. • • • • • • • • • • • Project No. 72-105-20 " Page 2" A preliminary soil investigation of the entire Hasp Grove development was prepared by Woodward-Clyde & Associ ates and is entitl ed, IISoil Investi gati on for the Proposed Hosp Grove Development, Carlsbad, California,1I dated April 13, 1968. FIELD INVESTIGATION A geological reconnaissance of "the site was made by the project engineering geologist of our firm on May 22, 1972. Subsequent"to this 17 test borings were made with a large diameter (30 in.) bucket auger drill rig at the approximate locations shown on the Site Plan, Fig. 1. The drilling was done during the period of May 30, 1972 to June 22, 1972, under the supervision of the project engineering geologist. Natural stream cut exposures and man-made cut bariks were also exami~ed during this period. Field logs of the borings were prepared by the geologist on the basis of a visual inspection of the borings, the samples secured, and of the exca- vated material. The Logs of Test Borings shown on Figs. 2 through 25 are based on an inspection of the samples and on the field logs. The test borings were located in the field with the aid of an undated plan entitled "Grading Plan -. Hosp Grove Apartments" prepared by Roy L. Klema Engineers, Inc. LABORATORY TESTS The soils encountered in the test borings were visually classi- fied and evaluated with respect to strength, swelling and compressibility characteristics, dry density and moisture content. Since grading of the site is underway, reference is also made to fill suitability tests per- formed on the fill materials including laboratory compaction tests, grain size analyses, plasticity characteristics, direct shear tests and swell tests. The strength and compressibility of the undisturbed soils, exclu- WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL AND fOUNDATION ENGIN££RS AND GEOLOGISTS .. ~, .......... '"-.. -~ .. -.............. -.. ~ ......... -. • • • • • • • • • • • Project No. 72-105-20 Page 3 sive of the clay seams, was evaluated by previous tests and by geologic characteristics. Specific laboratory tests were performed for this investigation on remolded clay seams encountered in the borings. These tests included complete hydrometer analysis (grain size distribution on the minus #200 sieve material) on representative samples and a slow repeated direct shear test. The purpose of these latter tests was to better evaluate the long term strength of the clay seams. The slow direct shear test is still in progress and the results will be issued in an addendum report. The results of the hydrometer tests are presented on Fig. 26 .. SITE AND SOIL CONDITIONS The site is located in the western half of Section 32, Township 11 South, Range 4 West, San Bernardino Base Meridian on the lower and middle north facing slopes of Buena Vista Creek Valley where it enters Buena Vista Lagoon. In gross aspect the topography is typified by northerly striking ridges and valleys sloping to the lagoon in a north-northwest direction. The bottom of the valleys have been severly eroded into vertical sided gull eys, some as much as 15 feet deep, and pi pi.ng in some areas has created small caverns and holes. The ground surface elevations within the site range from a low of approximately 40 ft in the northwest portion to a high of approximately 255 ft in the southeastern portion (USGS Datum). The area studied was being graded at the time of our inspection and cuts and fills in the order of 10 and 20 ft had been placed. Originally the native vegetation consisted of short grasi and weeds with a scattering of small trees and brush in the natural drainage channels. In the eastern most canyon along the north slope water loving plants were apparent and wet areas WOODWARD ·GIZIENSKI & ASSOCIATES CONSULTINQ SOIL AND· fOUNDATION ENQINEERS AND GEOLOOISTS • • • • • • • • • . ' Project No. 72-105-20 Page 4 were noted in the west facing side slope. This evidenc~ and the 'presence of scarps and hummocky topography suggests a recent existing landslide on this slope. Previous investigators have also recognized this landslide. Some miscellaneous rusted farm equipment and other vehicles were,pre~ent at the southeast corner of the site. Near Surface Soil Conditions The valley side slopes at the subject site are covered by a surface soil mantle composed of materials which are nonformatisnal in character, consisting of (1) residual soil (topsoil and clay); and (2) alluvium in the bottoms of the canyons. The portion of the soil mantle, which has formed in place and generally has not been transported, is considered residual in nature. These materials at the subject site consist essentially of topsoil and underlying clay collectively 'varying in thickness from T to perhaps 10 ft. On the middle and upper slopes this residual mantle is generally 2 ft to 10 ft in thickness and is composed primarily of clayey to silty sands with scattered gravels. On the lower slopes and on protected slopes the soil profile consists generally of 1 to 3 ft of sandy silt topsoil under- lain by 0 to 10 ft of potentially expansive silty and sandy clay. In some places deep erosion has stripped these materials and the underlying formational soils are exposed. The alluvial soils consist primarily of loose to medium dense silty sands with some clayey sand interbeds. These soils are usually porous to depths of at least 7 to 10 ft and are located in the bottoms of the subcanyons and low drainage areas. QuaternarY"Terrace (Qt) Quaternary terrace soils exist at variable levels on the site . Above an east to west sloping terrace surfac~ at elevation 220 to 180 ft, WOODWARD· GIZIENSKI & ASSOCIATES • CONSULTING SOIL, AND FOUNDATION [NIIINEEJIS AND GEOLOGISTS .. ~-..... ~ ~. ~" ~--.. ~ .... ~ -_... . .. " .... ~ , • • • • • • • • • • • Project No. 72-105-20 Page 5 these materials consist of relatively horizontally bedded, dense, gravelly silty sand. The so-called "drapingll terraces which occur below the sloping elevation of 220 to 180 ft consist of moderately fo poorly consolidated gravelly silty to clayey sands and exist at various unrelated elevations. These latter terraces are highly irregular in occurrence and were not mapped in detail . . Eocene "Sediments (La Jolla Group) (Et) An undifferentiated member of the La Jolla Group of Eocene Age underlies the entire site to significant depths. This member consists primarily of dense medium to coarse poorly indurated un cemented sandstone with interbedded siltstones and claystones occuring in irregular layers and lenses. Some of the claystones have been remolded into firm to stiff clay seams. GEOLOGICAL STRUCTURE In general, the Eocene sediments are the only materials on site, which exhibit geological features, such as bedding, joints and fractures, faults, and shear zones. Our studies on the site and surrounding areas, reveal bedding attitudes of the sandstones and claystones within the Eocene unit, ranging from a strike and dip of north 60° east and 4° to the north to approximately north 5° east and 20° to the west. In over all aspect the predominately regional structural attitude would be approximately north 30° east with a 10° dip to the northwest. Due to the relatively poor induration of the unit, joints and fractures are relatively few and spaced far apart and where observed did not appear to be generally adverse to the overall stability of slopes. Our investigation revealed the existence of weak clay seams or layers within the Eocene sediments. Our studies of the clay seams appear WOODWARD· GIZIENSKI & ASSOCIATES C:ONSULTING SOIL AND FOUNDJITION ENGIN££IIS AND GEOLOGISTS • • • • • • • • • • • Project No. 72-105-20 . Page 6 to indicate that in some cases the seams constitute bedding plane faults or shear zones, while in other cases they may constitute the base of relatively large ancient landslides. (The bedding plane faults are not faults in the classic sense in that movement occurs parallel to the .: bedding rather than across the bedding and no wide gouge zones in most cases are present. None of these latter faults were encountered nor are they suspected to exist across the site.) The clay seams range from a· few inches to as much as 18 inches in thickness and occurred at all levels within the borings. The consistency of the clay ranged from firm to very stiff and slickensided surfaces were found in all the clay seams. A study of the clay seam material, the attitude of the seams and the location of the seams in cross section, indicates a degree. of continuity from boring to boring of some of the seams and although classic topographic evidence is not generally present, it is our opinion that some of the seams form the base of large ancient landslides. In general the movement along the bedding plane faults is due to tectonic forces~ while the movement in land- slides is due to gravity forces. As suspected at the subject site, land- slides very often occur along the weakened zones constituting bedding plane faults. GROUND WATER Ground water was encountered in Test Borings 7 through 11, 13, 14, 16 and 17 at depths ranging from 21 to 46 ft. The ground water surface appears to slope towards the northwest being modified by the clay seams. No ground water was encountered in the borings made in the extreme southern and western parts of the site. Th~ previous test boring in the area of Boring 11, indicated a water table at a depth of 64 ft. The water level in several of the borings was allowed to stand during an overnight period and WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION [NGIN[[JIS AND GEOLOGISTS • • • • • • • • • • • --'_ ... > -~ __ • Jo ~ ... _ .......... '" Project No. 72-105-20 Page 7 then measured again, as is indicated on the particular Logs .of Test Borings. CONCLUSIONS 1) The results of our investigation revealed the presence of rela- tively soft clay seams at depths within the formational soils. It is our opinion that these seams represent both bedding plane faults and adjacent landslide surfaces. Analyses, however, indicates that the stability of proposed cut·and fill slopes is not greatly adversely affected by the pre- sence of those seams·, except in ~he eastern· most canyon alo.ng the north slope where an existing relatively recent slide is present. Special prepar- atio~ of key areas and installation of drains will be required prior to placing fill in this canyon. No other major adverse soil or geological con- ditions are indicated on the site that would ·preclude further development of plans for the subdivision. Current grading operations on the site indi- cate that low to moderately expansive soils ·may result at finished grade in fill areas and nominal special foundations may be r~quired. Recommendations for the special treatment in the canyon fill ·area and for the foundations are presented in the paragraphs under earthwork. 2) The subsurface soils and formations on the site can be grouped into the following units: a. Minor amounts of existing uncompacted fill, trash and rubble. b. Overburden soils composed of residual· sandy clay soil mantle and clay and gravel alluvial soils containing some sandy lones. c. Terrace deposits composed of reddish brown silty sand with some gravel and thin clay lenses . . d. Eocene sediments constitute the predominate soil on the site and are composed of silty to clayey sandstones, poorly indurated in nature containing layers of silty clay some of which have been remolded due to bedding plane faulting and possible landsliding. WOODWARD· GIZIENSKI & ASSO'dIATES CONSULTING SOIL AND· FOUNDATION ENGINE[JIS AND GEOLOGISTS 1 • • • • e· • • • • • • Project No. 72-105-20 Page 8 3) In general the soils to be used in fills range from nonex- pansive to low to moderately expansive in nature with the exception of the. overburdened clays and silty clay lenses within the Eocene sediments which are considered highly expansive in nature. 4) The proposed fill slopes having maximum. slope inclinations between benches of 2· to 1 and maximum overall heights in the order of 75 ft will, in our opinion, have adequate factors of safety against deep-seated failure, if constructed in accordance with specificati~ns and the recommen- dations contained herein. Special preparation will be required for the fill placed in the eastern most canyon area along the north slope. Detailed analyses were made of both fill and cut slopes. The analyses included the use of a computer program on file which enables the analysis of many slide wedges with different soil parameters and ground water conditions. Our cal- culations are not attached but are available for review at our office upon request. 5) The proposed cut slopes having maximum heights in the order of 60 ft and inclinations between benches in the order of 1-1/2 to 1 will also have adequate factors of safety against deep-seated failure, if con- structed in accordance with plans and specifications. It should be anti- cipated, however, that water seeps may be encountered at the toe of the deeper cut slopes; recommendations for handling this situation and other water seeps which may occur in the deeper cut areas are presented in the following paragraphs. RECOMMENDATIONS -EARTHWORK 1) Highly expansive clay soils may be encountered in areas of shallow cut or where clay seams are encountered at depths within the deeper. cut areas. With slab-on-grade construction it is recommended that the WOODWARD· GIZIENSKI & ASSOCIATES CONSUlTING SOil AND FOUNDATION ENG:INEERS AND GEOlOGISTS • • • • • • • • • • • Project No. 72-105-20 Page 9 clays be removed to a minimum depth of 2 ft below all level graded pad areas and disposed of in deeper fills. The clay should be replaced with nonexpansive or low to moderately expansive soil available at the site. It is recommended that this type of treatment be extended to proposed roads and other traffic areas. In this case the depth of removal and replacement should be 12 inches. If raised floor construction is used and the clay is not removed in the building areas, it is recommend~d that the footings, extend through the clay or to maximum depth of 2 ft. In this case, the footings should be reinforced top and bottom with rio. 4 reinforcing bars. 2) It is recommended that all existing fills, loose dry or porous alluvial soil s, and desiccated residual clay soils be excavated, or benched into, as required, and recompacted before new fill is placed or buildings constructed. The maximum depth of these soils is anticipated to be in the order of 5 ft, however, the actual depth of removal should be determined in the field by Woodward-Gizienski & Associates upon visual examination of the exposed soils. Special keys perhaps to depths of 10 ft or more will be required in the eastern canyon areas. All trash dumps, rubble and car bodies, etc. should be removed from the site. 3) It is recommended that the upper 2 ft of fi 11 in the bui 1 ding areas be composed of nonexpansive or low to moderately expansive soils avail- able at the site. The highly expansive clay materials may be placed in the deeper fill areas. 4a} It is recommended that specia'l key preparations be employed prior to placing fill in the eastern canyon area along the north slope. Thi s area encompasses a IIV II shaped' fi 11 withi n the confi nes of the canyon and is indicated on the site plan and geological map Fig. 1. It is recom- mended that the toe of the deepest part of the fill extend a minimum depth WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND, GEOLOGISTS • • • •• • • , •• I • I I .1 Project No. 72-105-20 Page 10 of 5 ft into formational soils and be a minimum width of 20 ft. All fill placed from the toe up the 'sides should be benched a minimum depth of 2 ft into formational soils. In addition to the special key all surface residual soils and the existing slide at the east side of the canyon should be removed withi n' the confi nes of the fi 11 to natural undi s turbed formati ana 1 . soi 1 sand' a proper drain placed prior to constructing the fill. The actual depth and width of the special key and stripping should be determined in the field by Woodward-Gizienski & Associates at the time of grading. . 4b) The drain to be placed below the fill sh~u1d consist of a filter blanket with perforated collected pipe which will outlet at the toe of the fill in the natural drainage. The blanket should cover all areas 6f $eepage plus a minimum distance of 5 ft beyond seepage areas. Aminimum 6-io. diameter perforated steel collected pipe (AASHO M 218-207 ASTM A 444- 446-AM) should be properly bedded in the fill area and placed along the ·lowest portion of the drainage. A typical sketch illustrating these recom- mendations is shown on Fig~ 27. 5) Drains should be placed at the toe of cut slopes, wherever seepage is' evident. The sketch below illustrates the recommended procedures for placing drains in this case: Class I I Permeable -----state of California Specifications or Equ ivalent TYPICAL SECTION No Seal e ..----Excavate and rebuild as indicated Impenneable Cover (clayey sand or lean sandy clay to be approved by the Soi I Engineer) ~ ino Perforated Transit Pipe Slope to drain outlet at curb or into storm drain WOODWARD· GIZIENSKI & ASSOCIATE CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGIS' •• • • • • • • • • • • Project No. 72-105-20 Page 11 6) It is recommended that all cut slopes be inspected during grading by Woodward-Gizienski & Associates. Additional recommendations for unusual or unanticipated geological conditions can be presented in the interim report, if this should be requir~d. RECor'lMENDATIONS -FOUNDATIONS 1) It is our opinion that conventional spread or continuous· footings founded in properly noncompacted nonexpansive or low to moderately expansive soil should provide a suitable foundation for the proposed struc- tures. 2) It is recommended that an allowable soil bearing pressure of 2,000 pounds per square foot (total load) be used in the design of footings founded a minimum depth of 12 in. in properly compacted nonexpansive or low to moderately expansive fill or nonexpansive or low to moderately expan- sive undisturbed natural ground. Footings should have a minimum width of 12 in. It is recommended that footings be reinforced top and bottom with No.4 reinforcing bars, and that the concrete slabs-on~grade be reinforced with 6x6 10/10 wire mesh and underlain by a minimum of 4 in. of sand, crushed rock or gravel. 3) It is recommended that all building foundations be kept a minimum distance of 5 ft back from the top of a slope. 4) For retaining walls not restrained from movement at the top and having a level backfill surface, it is recommended that they be designed for equivalent fluid weight of 35 pounds per cubic foot. In the case of sloping backfill it is recommended that the equivalent fluid pres- sure for 1-1/2 to 1 and 2 to 1 slopes be increased to 60 pounds per cubic foot and 45 pounds per cubic foot respectively. In the case of basement type retaining walls, it is recommended that a uniform pressure of hundred WOODWARD· CLYDE· & ASSOCIATES {1nn.1I'tlll;ntt ~n" n .... ,1 k'n"Olrlnf:"," 7:' ...... : .................... ...r ,... ..... l,._:~~-. • • .' • • • • • • • • Project No. 72-105-20 P,age 12 pounds per foot be added to the equivalent fluid weight. ' LH1ITATIONS The conclusions and recommendations macte in this report are based on the assumption that the soil and geological conditions do not , deviate appreciably from those disclosed by the test borings. If vari- ations ,are encountered during construction, we should be notified so that we may make supplemental recommendations, if this should be required. ' Evaluation and utilization of soil materials and rock formations for support of structures includes investigation of the subsurface conditions, analysis, formulation of recommendations, and inspection duri~g grading. The soil investigation is not completed until the soil engineer has been able to examine the soil and rock in excavations dr cut slopes so that he Can make the necessary modifications, if needed. We emphasize the importance of the soil engineer continuing his services through the inspection of grading, including construction of fills, and foundation excavations. WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL AND fOUNDATION ENGINEERS AND GEOLOGISTS • • • '. • ... ' .. . " o 0 ~ Qt 0 '" ./ 0/ ~ .. " '!' .. ///(7:~)~~;;~~/ t~: / ". " '. I'~ LEGEND: +-Indicates approximate location of tes t bod ng..- Indicates approximate dip and strike >' of bedd i ngo r-·'l • I .. L.~_ ... I'''T~ t i ti ... \l v-' LU: rO'Ol I,;, 0 I Lo. J r--, I I L._~ Indicates major proposed fill and alopes. Indicates relatively recent landslide area. Indicates possible ancient landsl ide areas. Indicates Quaternary terrace deposits {lower terraces not shown 1 Ind i cates Eocene sed imen ts. Graphic Scale in Feet rsr~ i 200 10,0 0 200 ~oo 600 • 2jtC~ •••• 'I ( I 1 • • l,/ _c~-~~~~/---·-,--.. :_:~~: .[:. /O-...~-;--::-", \ .... ,.,\ .. ~.,... .---~~~,~ J\ ~ ;;-0 0 Vo Q; 0 0 o.~ \. ........ ; --'::=. --""'/-"--,----"~.. -·it. • ......... \ //. .•..... _., ~ .. , ! i .. \ ,;. • • N ..., • • • • • • • • • • • ..... Cl> Cl> u... -Cl> co ..c: ..... Co Cl> C o 5 10 15 20 25 30 Cl ay Seam N70E .15NW For legend, see Fig. 6 Bori ng 1 , Medium dense, damp, gray silty sand (8M) Porous Dense, damp, light reddish-brown cl ayey sand (SC) Very stiff, wet, light gray silty clay (CH) Hard, moist, light gray sandy clay (CL) Hard, wet gray silty clay (CH) gray sandy clay (Cl) LOG OF TEST BORING HaSP GROVE Terrace Deposit Eocene Sed i men ts WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND· GEOLOGISTS SAN DIEGO CALIFORNIA • 72-105-20 I CK'D BY: , 2 • • • • • • • • • • • .s:::. ~ C- O) o o 10 15 20 40 45 50 Bori ng 2 :}\~~ Dense, moist, reddish brown clayey -------1-------- ;::-;;::';;' sand (Sc) t;:'::::; Te rrace ~~~=-C=::J Oepos i t ~~~~:-----:--:-:-:-:-:----=----::-:---------------Dense, moist, 1 ight gray clayey silty .:'::.-:.' sand (SG-s-i) Very stiff, moist, light gray silty clay (CH), (di sturbed) Hard, wet, 1 i ght gray si lty c1 ay (CH) Hard, wet, dark gray silty clay (CH) Eocene Sediments For Legend see Fi g. 6 LOG OF TEST BORING 2' HOSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO CALIFORNIA ·72-I05-Z 3 •• • o • 5 +' Q) Q) LI.. • Q) 0 10 ro '+-~ ;:, (I) '"t:l 7 c: ;:, 0 • ~ 25 (!] :;:: 0 Q) co .c: +' Co • Q) 30 0 5 • 4-5 Clay Seam • 50 • For Legend, see Fig. 6 • • Flori ng 3 Medium dense, dry,~l ight gray silty sand (s-i) Po rous 'j Dense, lID i st, redd i sh brol>ll c1 oyey ------T--------- ;,," sand (SC) gravel from 13 to 16 feet f' Hard, mo i st, (CH) Terrace Oepos i t / , -----r--------light gray silty clay Eocene Sediments LOG OF TEST BORING 3 HOSP GROVr: WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO CALIFORNIA CK'D BY: • • • 5- • 10- +' <lJ <lJ u... • <lJ 15_ 0 <U '+-I- ::l en "0 c ::l a l-• C.!J 20- ~ a -<lJ a:: .s::. +' c.. <lJ • C 30- • 35- • LtO- For Legend, see Fi g. 6 • • 80 ring Lt ~ Hard, dry, dark gray sandy clay (CH) ~ \Porous ~ Hard, damp, 1 ight gray sandy clay ~ (CH) ~::·:t~ :}:. Very dense, moi st, 1 ight gray-broW1 >1 sandy clay to clayey sand (CL-SC) t .<;<; Very dense, damp, 1 ight gray clayey :;:r~'*· sand (SC ) ~~ ~~ : '~'-:.): ; .. ;.; ..... : .::-:.: ..... .i'/,:\:' Very dense, moi st, light gray,;"broW1 ~:~{:!:;::; si lty sand (::M-SP) with thin clay :;:;::;.,: ... /, stringers ~~·:;·~t:\ . Cont i nued on next page LOG CF TEST BOR 1 t~G lj. HaSP GROVE Eocene Sediments WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA DR. BY: GS· APPROX SCAlE: I" = 1':' PROJ HO' 72-105-20 CK'D BY: ~ DATE' 7/18/72 FIGURE NO-5 e. .' • • • • • e • • e 3: o .c +' Co <I> o L~5 _ Cl ay Seam 50 - 55 - H70W 16H Boring ~, Continued ...,...,"'.---------------------;:~K\: Same as Before ;:;·:·~.(~·i ·~I~~~~e1~S~~~~S!~~if~-~~wn ~!\~ard, moist, dark gray silty clay ~llt..-.CH-!..)-------- ';:;1';' Very dense, mo i st, 1 i ght brown silty ):!:}~ \'t:oarse sand (SP-S4) ~::f,j \Fi nn, moist, dark gray si lty clay (CH) 'i·{; Dense, moist, bro\lm clayey sand (SC) ~:~<ir': '11tV~ q~~~; ~ Very stiff to hard, black si1ty ~ clay (CH) I ~ Eocen'e Sediments LEGEND: (SM) = Group classification symbol in accordance with the Unified Soil Classification Systemo ~ = Water Level at time of drillingo ~* = Water Level as noted at bottom of logo LOG OF TEST BORI NG It, CONTI NUED H asp GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA DR. BY: GS APPROX SCALE: I" = 5' PROJ, NO· 72-105-20 CK' 0 BY: t!,:/tAJ DATE: 7/18/72 FIGURE HO~ 6 .' • • • • • • • • • • ...... Q) Q) u. Q) o ctI '+-I- :::l en .s= ...... Co Q) o o 5 10 15 30 35 50 J7 For Legend, see Fi g. 6 Boring 5 Hard, dry, dark gray sandy clay (CH) (porous) ~'<l----------------------------- Hard, damp, 1 ight gray sandy clay (CH) damp, light gray clayey brown si 1 ty -cl ay (CL-CH) LOG OF TEST BORING 5 HOSP GROVE Eocene Sediments WOODWARD - G I Z I ENSK I & ASSOC I ArES . CONSULTING SOIL AND FOUNDATION EHGIHEERS AHD GEOLOGISTS SAN DIEGO CALIFORNIA DR. BY: .72-105-20 CK'D BY: 7 • • Boring 6 Medium dense, damp, gray silty sand (SM) Porous Dense, damp, reddish brown silty to clayey sand (SC) . Very dense, damp, dark gray coarse si lty sand (SP-SW) Very dense, damp, light gray silty sand (SM) HaSP GROVE -----1--------- Terrace Deposits Eocene Sed iments L 00 OF TEST BORI NG 6 WOODWARD - G I Z I8'JSK I & ASSOC.I ArES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS . SAM DIEGO, CALI FORK I A DR. BY: as I APPROX. SCALE: lit = 5' I PROJ. 1'(0· 72-105-20 tic"!) RY' ~A !)AT~' 7/19/72 Il=lr .. III~S:: lin· 8 . -. ~ • • • • • • • • • • • ..... Q) Q) u.. I ,Q) () Cd ..... L. ::J C/) "0 c: ::J o L. C!:l ~ o ..c: ..... a. Q) Cl o 5 15 20 30 45 50 Clay Seam E-W IIH For Legend, see Fig. 6 Sari ng 7 :;,;}<::: .;. i·!:~.::~ ~t~ c1 a CH) Porous .------'t----------gray-brow~ clayey sand I Terrace O'epos i ts fott-d---------------, -----------------Very stiff, moist, 1 ight gray silty ;:";:'~'.' c 1 a CH) «.~::-.... i1;"%/ Very dense, moi st, 1 i ght gray c1 ayey ':'.}::t si 1t (ML) r~:'!·t: Hard, moist, brown silty clay (CH) light gray silty Very stiff, saturated, brown silty c1a . (CH) * 1lJ. hours after dri 11 ing HOSP GROVE Eocene Sed iments LOG OF TEST BOR ING 7 WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN 0 I EGO CALI FORM I A . DR. BY: PR • 72-105-20 I CK'D BY: F 9 •• • • • • • • • • • • ..... <I.) Il:l ..c +' 0- o 5 10 15 ~ 20 25 30 Clay Seam N20N 20NE For Legend, see Fig. 6 Boring 8 Hard, dry, gray, sandy clay (CH) Porous reddish brown clayey ------r--------- Terrace Depos i ts ~----------------------------------------,Very dense, flX)ist, I ight gray si1ty "sand (~) flX)i st brown si 1 t c1 a: 1 ight gray silty Continued on next page HOSP GROVE , Eocene Sediments LOG OF TEST BORING 8 WOODWARD -GIZIENSKI '&' ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN 0 I EGO CAli FORN Ii ' ' DR. BY: • 72-105-20 • • • • • • • • • • • +' a> <l) LI.. I a> u C1:I '+-.... ~ CI) "l:J C ~ a .... (!:' ~ 0 -a> aJ ..t:: +' C. a> 0 3D- 35- ~O- ~5- Boring 8, Continuej, .,...........---------------------i~},~~:\, >./.[::?-Same as Befo re ~ Hard, danp, broM"l s i 1 ty cl ay (CH) ~.:;. .. ;::" flf:I·. Very dense, 100 i st, 1 i ght gray si 1 ty :.;.~:.;;~ sand (~) ~ Hard, lOOist, broM"l silty clay (CH) ~ >(~;:. Very dense, mo i st, 1 i ght gray silty /~:' ., .. ' sand (etA) .;:~. '~"'.:. '-'lVI ~':.:':" .-~:~~~' . ~~~~::= ..:..:Cl:..::a!-y --=-S.::..:ea:.:::m_~~~~~ -¥= Very st iff, satu rated, broW'! silty NI5W ~. clay (CH) 50-I2NE ~~ Eocene Sed iments For Legend, see Fig. 6 LOG OF TEST BORI NG 8, CONTI NUED HaSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATiON· ENGINEERS AND GEOLoGISTS SAN DIEGO CALIFORNIA . DR. BY: GS APPROX. SCALE: In = 5' PROJHO' 72-105-72 CK'D BY: fjII()J DATE' 7/19/72 FIGURE NO' II • • • • • • • • • • • ..... ClJ ClJ u.. I ClJ 0 «' '+- "-~ (/) '"0 c ~ 0 "-c:!:J ::: 0 ClJ a:l ~ ..... c.. ClJ 0 0- 5- 10- 15- 20- 25- 30- 35- Clay Seam N70W It5NE Clay Seam N70r'l lItHE For Legend, see Fi g. 6 80ri ng 9 ~Hard, danp, brown silty clay (CH) ~f-Water Seep ,.--, Very 'dense, saturated, 1 I ght gray ,;"'< SZ*si lty sand (SM) " ~ -::;- ~:..'-~-------------- *16 hours after drilling Terr'ace Deposit Eocene Sediment LOG OF TEST BORING 9 HOSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONsuLTING SOIL AND FOUNDATION ENGINEERS-AND GEOLOGISTS SAN DIEGO, CALIFORNIA DR. BY: GS APPROX SCALE: I" = 5" PROJ, NO~ 72-105-20 CK'D BY: tiM DATE· 7/19/72 FIGURE NO~ 12 • • • • • • • • • • • 35 4-0 4-5 so For Legend, see Fig. 6 Boring 9. Continued Same as Befo re Eocene Sed i ments LOG OF TEST BORING 9, CONTINUED HOSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SO I LAND FOUNDATION ENGI NEERS AND GEOLOG I STS SAN DIEGO CALIFORNIA ' CK'D BY: F • • o • 5 +-' • OJ OJ u.. 10 OJ u CIS '+-I- :::I • en "0 15 c: :::I 0 I- c:!J Clay Seam ~ 0 • OJ co .t::. 20 +-' 0- OJ 0 Clay Seam N'tOE • 25 rt.5HW Clay Seam N25E 18NW Cla • 30 • 35 For Legend, see Fig. 6 • • Sori ng 10 t 'i..';: :f.f,i· Dense, moi st, reddi sh brown clayey r:F:~:, sand (SC) :.~;{;.:; !fr\ Terrace Deposits :r::i:~'­:.; ·f-·f :·t:;::·~: ~±!-~------------------------------- 1 ight gray silty Eocene Sed i ment Very sti ff, moist, gray-brown clay (CH) -Water Seep ------------ Cont i nued on next page LOG OF TEST BORING 10 HOSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO CALIFORNIA I" = 5' • 72-1 - • • • • • • • • • • • "0 c: :;, o L. C!' ~ o Q) CO 35 - 40 _ 45 _ 50 - For Legend, see Fig. 6 Bo ri ng 10, Con ti nued r:"7:::"'..-'-----------' :'Ui~:):,.; Very dense, mo i st, 1 i ~ht gray s i 1 ty ,;'.;.:'). sand UN) ~)~ ~.~:: .: :':i/' :;\;:t ;i':'" :i;\'},~:'" ~X~(,\ ~~)~ ::l:~~~t:~~:, .~~~,:;\ '~~:;:~(f ;~::~:~'~.::' LOG OF TEST 80 RI NG 10, CONTI HUED HOSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO, CALIFORNIA . DR, BY: GS APPROX SCALE: I" = 5' _PlIDJ NO-.72-105-20 CK'D BY:#tU DATE' 7/19/72 FIGURE NO-15 • • • • • • • • • • • 0- 5- +oJ 10 _ Q) Q) u... Q) (.) <U '+-I... ~ CI) 15 - "'0 c: ~ 0 I... (!:' :;: 7 0 ~ Q) 30 -co ..c: +oJ Co Q) 0 35 .... 7 sJ For Legend, see Fig. 6 Bori ng II ~ Hartl, darp, brov.n s i1 ty c1 ay (a;) ~ ~ Hard, rroist, brov.n si 1 ty clay (01) ~c-Water Seep . LOG OF TEST BORI NG II HOSP GROVE Eocene Sediments WOODWARD - G I Z I ENSK I & ASSOCI ATES CONSULTING SOIL AHD FOUNDATION ENGINEERS AND GEOLoGISTS SAN 0 I EGO. CAUFORH I A OR. BY: GS APPROX SCAlE: I" = 5'. PROJ. NO' 72-105-20 CK'D BY: IJI<» DATE: 7/1~/7? FIGURE NO' 16 • • o • 5 • 20 •• 25 5 • 4-0 • 4-5 • 50 • For legend, see Fig. 6 • • Boring 12 Hard, da~p, dark gray sandy clay (Cl) Porous ~*------------------------------- :r- 'y ~;~~l Very dense, damp, light gray silty sand (34) Hard, damp, brown silty clay (CH) LOG OF TEST BORING 12 HaSp GRO VE Eocene Sediments WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO CALIFORNIA DR. BY: AP R X ·72-105-20 CK'D BY: 17 • . ' • o • 5 • 20 • 25 -(!) • m 4-0 • 4-5 • 50 - • 55 For Legend, see Fig. 6 • • Bori ng 13 brOtKl silt cla ~~~~~~~~~~~~~~------------------ '( ".: Very dense, damp, 1 i ght gray si 1 ty . sand (SM-SP) Hard, damp, brown silty clay (CH) Very dense, wet, light gray silty sand (sr.~) ._ Water Seep wet, brown silty cl ay (CH) Very dense, saturated, 1 ight gray silty ~.~s_and{~) ______________ _ Continued on next page Eocene' Sediments LOG OF TEST BORING 13 HOSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO CALIFORNIA DR. BY: GS A PR X CK'D BY: f;!fJu) DATE' F • +' (!) • (!) L.L. 55 (!) u <1:1 '+-L. :J CI) • 60 "0 c: :J 0 L. <!:I 3: 0 (!) • !Xl 65 .I:; +' c.. (!) 0 • 70 • • • • For Legend, see Fig. 6 • • Bo ri ng 13, Cont i nued ---------------Same as Befo re Hard, saturated, gray-brawn-silty clay (CH) Eocene Sediments '5Z d .. "'f an r I sing LOG OF TEST BORING 13, CONTINUED HOSP GRO VE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AHD GEOLOGISTS SAN DIEGO CALIFORNIA • 72-105-20 CK'D BY: 19 • • o • 5 +' Q) Q) W- • Q) 10 () ro ~ I- ::J en "0 c: ::J • 0 I-15 <!:l ::: 0 (jj co -+' a. • Q) 20-0 • 25 • 30 • 35 For Legend, se·e Fig. 6 • • Bor i ng 14- .;.': .. ; .. Dense, damp, reddi sh broW'l c1 ayey ;::';r;:·· sand (SC) f Terrace Deposits ~")~~:'~::'--------------------------------------------- :.:';:.;::: Dense-very dense, moi st, light gray >F~:: si 1 ty sand (3~) Hard, moist, brown clay (CH) Very dense, moist, brown silty clay to clayey silt (ML) Continued on next page LOG OF TEST BORING 14- HOSP GROVE Eocene Sediments WOODWARD -GIZIENSKI & ASSOCIATES ·72-105-20 CK'D BY: 20 • • • • • • • • • • • ..c: ...... c.. Q.) o 30- If 0- 1f5 - 50 - 55 - 60 - 65 - 70 - Clay Sean HIOE 10NW For Legend, see Fi g. 6 Boring I If, Continued r.'"::!'':''r---------------- ,!:,}< Same as ~fo re li Eocene . Sed iments ~ Hard, saturated, brown silty clay (CH) )!~ ~~r{/:~~' (;:iurated, 1 ight gray ~j;/!~;~ i.t~:::~ ::.f..:\'J ~iiI~ }:~~i.:·:f '~~'~~:(~:'.~ ~ ·:·~~~:"t 11~ SZ ~d rising ;.;~;::} ~ T~~:·~~ I~~ I.(:}} LOG OF TEST BORING 11f, COOTINUED HOSP GR eVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS 4ND GEOLOGISTS SAN DIEGO, CALIFORNIA DR. BY: GS APPROX. SCAtE: I" = 5' PROJ NO· 72-105-20 CK'D BY: 1M DATE: 7/2'4/72 FIGURE NO· 21 • • 0- • 5- • +' Q) 10_ Q) u.. Q) 0 «l '+-• ~ ~ en 15- '"0 c: :::1 0 ~ c;J 3: • 0 Q) 20-a:l ..s::: +' Q.. (I) 0 • 25- • 30- • For Legend, see Fi g. 6 • • Bor i ng 15 ~~1 Dense, danp, brm'll cl ayey sand (SC) !; .•.•••. t Terrace Deposits .:.···.if:::j· 1'"1 i";";-,:,~:"""-l::: -V-e-r-y -d-en-s-e-, -d-am-p-,-j i-g-ht-g-ra-y-s i-l-ty-- - - - - !~ s~d (S4) I .~:.\.,:.-: Eocene Sed i ments damp, brown silty clay (CH) ~ Hard, I] f:·.:"··· -":' ...• ~' ... :.:::: O:mtinued on next page LOG OF TEST BORING 15 HOSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA - DR. BY: GS APPROX SCAl E: I" = 5' _ ?ROJ MO' 72-105-20 CK'D BY:1!/If.A; DATE: 7/211/72 FIGURE HO~ 22 .. • • • • • • • • • • • -+-' <l> <l> u... 35 l - I <l> 0 «l 7 "4-L :;, CI.) -0 60 -c: :;, 0 L CJ 3: 0 -<l> a:! 65 _ .s:: -+-' a.. <l> 0 70 - For Legend, see Fig. 6 Eocene Sediments LOG OF TEST BORING 15, CONTINUED HOSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN D I EGO. CALI FORM IA . DR. BY: GS APPROX. SCALE: I" = 5' PROJ NO· 72-105-20 CK'D BY:~ DATE: 7/2U,/72 FIGUREKO· 23 • • • • • • • • • • • 5- 7 +' <!) 25 -<!) u.. <!) () ro '+-"-::J en 30 - "'0 - Bori ng 16 I'Y\ Medi urn dense, damp, brown si 1 ty :(~;~,; sand (SI~) po rou s htl~ Dense, danp, brann clayey sand (SC) ':i~ji;; .:;.',::.' t All uv i um Eocene Sediments c: ::J 0 '::~}C Very den se, roo i st, 1 i ght gray silty Clay Seam f~':;'x: sand (~) "-t!) ~ 0 ~ 35 -<!) co ..c:: +' Co <!) 0 4-0 - 4-5 -, 50 - For Legend, see Fig. 6 ~ Hard, d""P , br""" s i1 ty clay (CH) I ~ I ::):;i:: Very dense, saturated, 1 ight gray ,~·t~'i silty sand (~) !~~~ Water Seep ~f S? :';',!'r·",:· • LOG OF TEST BORING 16 HOSP GROVE WOODWARD -G1Z1ENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO, CALIJORNIA . DR. BY: GS APPROX. 'SCALE: .1" = 5' PROJ Ho· 72-105-20 CK'D BY:1fIuJ DATE' 7/2~/72 FIGURE NO' 2~ • • • • • • • • • • • +' 0) 0) LL. ..c +' c.. .0) o 0- 30- 4-0- 4-5- Clay Seam N60E 25HW For Legend, see Fig. 6 Bori ng 17 '::';~~~;~ :~ U(S~r~~~o~:mP' bro~ si lty f:-:.:"" .. ,..j-~.::-1"':":"';''-'-_~________ _ __ _ _ _ ____________ _ ",:'::,::(:' Very dense, danp, lig,t gray silty :'::'1,::r sand (SM) .... : .. Eocene Sediments ~I\ Very stiff, rroist" bro~ clay (Oi) ,j,:,:~';i Very dense, moi st, 1 i ght gray si lty ::"':",:', sand (SM) :/l·:E~~~:.: LO G 0 F TEST BO R 1 N G 17 HOSP GROVE WOODWARD -GIZIENSKI & ASSOCrATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA DR. BY: GS APPROX' SCALE: I" ';"5' PROJ. NO-72-1050-20 CK'D BY: ~ DATE: 7/21'ti72 FIGURE NO-25 • • • • • • • • • • • ~ 100 0 ~v-10 1-1 90 10 ..... "" ....... .... I-t-t-~ ~ 80 .. , 20 '\, .~ 1\ " ~~ ~ . ~ 70 30 \, " r--... 1"-, i'.... k 1-4--6 .. \ i\ " .\.. 60 '-A, ., ~ 110 1lJ-3 K' "0 01 a> c .~, c .-50 \ 50 ..... en \ 2J 1\' '\ ro en 13-+' ro .\ a> a.. \ \\ e:;: +' 110 \.\ 60 +' C \~ c a> 1\ a> 0 ~.\ 0 L-[\. L- a> ~ \ OJ a.. 30 a.. 1', , 70 I" 20 ~ 80 " '" 90 10 '\ 0 100 0.1 .01 .001 Grain Size in Mi 11 imeters ~r Range According to Lambe and Wh i tman (1969) Sample 1l-6 10-1 13-2 11l-3 Note: ~ = Residual angle of internal res i stance" % Passing ~ 60 50 117 17 ~r Range 8 ·to 18 10 to 21 II to 22 17 to 3 HYDROMETER ANAL YS IS HOSP GROVE WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AHD FOUNDATION ENGINEERS AND GEOLOGISTS SAH DIEGO, CALIFORNIA DR. BY: LIB APPROX SCALE: na PROJL.NQ· 72-105-20 .. CK'D BY: e,aw DATE' 8/23/72 FIGURE MO' 26 • • • • • • • • • • • seep 2' \ Fi Iter Class II permeab~ material State of Cal ifornia specifications or equivaJent Visible Water Seep Fi 1 ter~2~'_oJ mino thickness TYPICAL SECTION (normal to slope face) (no scale) Collector pipe 6 ina perforated (Min) galvanized steel TYPICAL SECTION (parallel to slope face) (no scale) ® Excavate to dense natu raJ Sandstone Out let pipe 6 i no m i no non perforated OutJet to Natu ra·J D ra i na=.!g'-e~-' .120'mino~ --__ --, key 5' minimum into natural sandstone Final Surface prior to refi I I inso into dense natural sandstone TYPICAL SECTIONS EAST CANYON FILL HOSP GROVE ® WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO CALIFORNIA DR. BY: S PR CK'D BY: F • • • • APPENDIX B • MARCH I, 1973 REPORT -. • • • • • • • • • • • • • • • • Ma rch 1, 1973 Project No. 72-105-20 Grove Apartments Post Office Box 1155 Carlsbad, California 92008 Attention: Mr. Jerry Rombotis FINAL REPORT OF ENGINEERING OBSERVATION AND COMPACTION TESTING GROVE APARTr~ENTS CARLSBAD, CALIFORNIA In accordance with your request, and our letter of agreement dated April 28, 1972, we have provided soil engineering services in conjunction with the gruding of the subject site. These services included: (1) Engineering observation of the grading operation. (2) (3) Observation of the removal of highly expansive soil from the top of ,2 feet of rough lot grade and replacing it with nonexpansive soil in the areas shown on the attached Fig. 1. Observation of the removal of an existing "old slide," installation of filter material and drain system'as directed by our office, and replacing with on-site fill material to proper grades with compacted fill. (4) Observation of the removal of loose surface soils from the bottom of canyons. (5) Taking field density tests in the fill placed and compacted. (6) Performing laboratory tests on representative samples of the material used for fill. Site preparation, compaction, and testing were done between May 17, 1972, and December 19, 1972, in accordance with the "Specifications for Controlled Fill" in our report entitled "Soil and Geological Investigation for the Proposed Hosp Grove Apartments, Carlsbad, California," dated August 25, 1972. The grading of the site essentially consisted of making cuts and fills of moderate degree to reduce the site into large building pads and parking areas. Most of the deep cuts were in the southeast portion of the site and the deeper fills were placed in two canyons along the northern boundary, one maj or canyon and several mi nor draws along the eas tern boundary. As the site grading progressed compaction procedures were observed and field density • • • • • • • • • • Grove Apartments Project No. 72-105-20 March 1, 1973 Page 3 representative samples of the material used for fill. At the time of issuance of our preliminary soil investigation report, a slow direct shear test was underway on a sample from 'a clay seam encountered in the test borings in the area of the existing slide. The results of the test essentially verify assumed shear strength parameters used in our stability analysis. The, results of laboratory tests are given on the attached forms. Laboratory tests and a visual inspection of the site by the project engineer and field technician on February 20, 1972, indicate that expansive materials are present at fi ni shed grade in some of the cut and dayl i ght areas; however, the upper 2 feet of all fill areas consist of a minimum 2 feet of nonexpansive soil. The following table presents the results of our inspection and indicates our estimate of the pads that will need special footings. TYPE OF PAD PAD FINISH CLAYSTONE SPECIAL GRADE Cut Fi 11 Cut-Fill DAYLIGHT . PATCHES FOOTING ELEVATION UNDERCUT REMAINING REQUIRED 1 87 to 95 --x No Yes Yes 2 95 --x Yes No No 3 103 to 105 --x Part. on Iy No Yes 14 115 --x Yes No No 15 113 --x No Need No No 6 117 x --No Need No No 7 121 --x No Need Yes Yes 8 122 --x No Need No No 9 125 --x Yes No No 10 125-128 --x Yes No No 11 130 ' --x No Need No No 112 133 x --No Need No No 13 136 --x No Yes Yes 14 145 --x Yes No No 15 153 --x No Need No No 16 155 - -x No No Yes 17 161 --x No Need No No 118 165 --x No Need No No 19 180 -x -No Need No No ~O 186-190 --x No Need No No 21 165-168 --x No Need No No WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEE"S AND GEOLOGISTS • • • • • • • • • . , • Grove Apartments Project No. 72-105-20 March 1, 1973 Page 2 tests were made to determine the relative compaction of the fill in place. Field observation and field density test results indicate that the fill has been compacted to 90% or more of maximum laboratory density. The approximate locations of field density tests and the limits of compacted fill are shown on the attached Fig. 1. The results of field density tests and of relativ~ compaction expressed as a percent of maximum laboratory density are given on the attached forms. During the grading of the extreme northeast canyon area along the northern boundary, an existing slide was removed to dense undisturbed formational material before placing the canyon fill. An existing water seepage behind the slide was contained in a drain system, which was first established at the toe then extended up to the pad area as the fill progressed in height. The ' system, consisted of an approximate 3 feet wide trench into which was placed 6 inches of filter mate~ials (1 in. max. combined aggregate State of California Specifications) then a 6 inch perforated corregated metal drain pipe and finally an additional 2 feet of filter material above the pipe. Near the top of the canyon the filter material was spread out to cover seepage areas and off shoots of the trench and drain' system extended above into the pad area and along a low slope where additional ,seepage was apparent. The drain line as installed is shown on the attached Fig. 1. The drain system emptied into a natural drainage into which was later placed a 24 inch nonperforated pipe which extended to an existing storm drain inlet at the edge of the shopping center along the northern boundary. Periodic inspections of the drain have been made since installation. The water issuing is clear and seeping at about the same volume as during construction of the system. Weak clay seams were recognized in the formational materials during one pre- 1 imi nary investi gati on ina northwest canyon area. Here the a 11 uvi a 1 materi'a 1 and overburden soils were removed in the key area to dense undisturbed for- mational soil which was inspected by a geologist before placing new fill material. The overburden soils were also removed and undisturbed formational soils benched into on either side of the canyon as the fill progressed in height. Along the eastern boundary where fill was placed in a major canyon and several minor draw areas, the alluvial material was excavated and recom- pacted and benches were made into the sides of the draws into hard clayey relatively competent overburden soils as the fill progressed.' The lack of suspected slides along the eastern,boundary and the g'enerally favorable geologic conditions in this area did not dictate the complete removal of over- burden soils to undisturbed formational materials. During grading, portions of several of the pads were undercut to remove potentially expansive soils and essentially nonexpansive materials were placed in the excavation and compacted. Upon request of Grove Apartments, Inc., undercutting was terminated on August 21, 1972, in accordance with a letter dated August 22, 1972. Hence, strips of expansive topsoil and patches of claystone remain in some areas on several of the pads . Laboratory tests to determine moisture density relationships, maximum dry density, optimum moisture content, grain size distribution, plasticity characteristics and strength and swell charac4eristics were performed on WOODWARD· GiZlENSKI & ASSOCIATES CONSULTING SOIL AND FOI .. JNOATION ENGINEERS ANO GEOLOGISTS • • • • • • • • • • • Grove Apartments Project No. 72-105-20 March 1, 1973 FOUNDATIONS Page 4 (1) Foundations for one to three-story wood frame and stucco structures founded in properly compacted fill or natural undisturbed soil may be designed for an allowable soil bearing pressure of 2,000 psf (total load) at a depth of 12 inches below lowest adjacent rough grade. This value may be increased 1/3 for loads that include wind or seismic forces. Footings should have a minimum width of 12 inches. (2) It is recommended that all footing excavations be inspected by our firm immediately upon completion of excavation. If potentially expansive soil is evident, one of the following footing designs will be recommended~ (a) For footings founded on properly compacted low to moderately expansive soil, it is recommended that a 12 inch deep footing be reinforced top and bottom with No. 4 reinforcing bars and th~t the concrete slab-on-grade be reinforced with 10 gauge 6x6 welded, wire mesh placed on chairs at the midpoint in the slab and that the slabs be underlain by a minimum of 4 inches of clean concrete sand, crushed rock or gravel. ," (b) In areas where moderately to highly expansive claystone soils or topsoils are encountered, it is recommended that the footing be extended a minimum depth of 24 inches, be reinforced top and bottom with No.4 rein- forcing bars and that the concrete slab-an-grade be reinforced with 6 gauge 6x6 welded wire mesh placed on chairs at the midpoint of the slab and that the"slab be underlain be a minimum 6 inches of clean concrete sand, crushed rock or gravel. Dowels should also be provided in the footing and bent down into the slab. The following s,ketch incorporates our recommendations in thi s regard. Rough or Compacted Grade 2Q"mino L 12""' r min71 FOOTING DETAIL ~3 Dowels, Zq" O.C. q" mino concrete slab with 6x6 6 6 mesh Hq Bars, top and bottom (3) Structures that will not tolerate differential settlements, such as foundations, swimming pools, concrete deck walls, etc. should not be located within 5 feet of the top of a slope. Footings located closer than 5 feet from the top of a slope should be extended in depth until the outer bottom edge of the footing is 5 feet horizontally from the outside face of the slope. WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL ANO FOUNDATION [NGIN[[IIS AND G[OLOGISTS • • • • • • • • • • Grove Apartments Project No. 72-105-20 March 1, 1973 Page 5 The elevations of compaction tests, shown as finished grade (FG) tests, in Unit A, correspond to the elevations shown on the grading plans for "Carlsbad Tract No. 72-12A Apartments-Unit A," dated October 6, 1972, prepared by Roy L. Klema Engineers, Inc., Escondido, California. For the remainder of the site, it is our understanding that as built plans are being prepared. Finish grade test elevations in other areas are essentially within + one. foot of th~ e·levations shown on "Grading Plans Hosp Grove Apartmentsll dated May 26, 1972, and prepared by Roy L. Klema Engineers, Inc. Elevations and locations shown in this report are based on field surveys established by others. This report covers the fill placed under our observation during the dates specified herein. Additional fill placed after these dates, as well as the backfill in utility trenches located within 5 feet of a building and greater than 12 inches deep, or any trench 5 feet or more from a building and.in excess of 5 feet in depth, should be compacted under the observation of this office and tested to assure compliance with the earthwork specifications for the project. This office should be contacted at least 24 hours prior. to backfilling operations. Utility service trenches within 5 feet of a building that are perpendicular to the building footings and are less than 12 inches wide and less than 3 feet deep are not subject to this recommendation. The inspections and tests of. compaction made during the period of our services on the subject site were in accordance with the local acceptable standards for this period. The conclusions or opinions drawn from the tests and site inspections apply only to our work with res'pect to grading and represent conditions at the date of our final inspection. We will accept no responsibility for any subsequent changes made to the site by others or by uncontrolled action of water or by failure of others to properly repair damages caused by uncontrolled action 'of water. Henry, P oject super~ w~~C/ WOODWARD· GIZIENSKI . & ASSOCIATES CONSULTING SOIL AND FOUNDATION £NGIH[US AHD GEOLOGISTS • ~ I • • • • • • Property li ne • • • LEGEHD: Indicates approximate location 01 • Field Oensi ty Test. r'l Indicates approximate Ilmlla of L . ...i Tested Fi II. '" \ A'~~ . "~;." \, '\ / '3:~~~;:',:0 _____ _ fJ7f}, I nd i cates approx I mate liml to of !lIb area undercut and rep laced wi th compacted nonexpans i ve fi t 10 . I~ t! 'i ~ ~,~ -14' l '. -H-1:':1" J9S -1M .' sJ,,.o •• ~ V JF'· .. 1I\Z;~.~1 .• ,~I. r-.~/"f . :_:":, '. "1 "'.~. j ~ "I \ ) ..• :.:,.,:;~.".* ~ ~ J' ._. • .;~ -/~-.---of Perforate ~---. Selle I" = 100' I I .J I -----~--~'r--:-:----....o----~ I FI ELD DFN!l1 TV Tr~' .72-105-20 --I • • • • • • • • • • • • RESUlf S OF LOADED SWELL TESTS Initial Final Sample Dry Water Dry Water Pressure Expans ion Number Density Content rsaturation Dens i ty Content Saturation pef % .. 10. pef % % psf % of Initial Height SA-I 105 23 100 10 I. 6 25 100 160 3. 12 Pad Ele 190ft" " *Based on a specific gravity of 2.65 Diameter of Samples: 1.9~ inches Height of Samples: 0.63~ inches RESULTS OF LOADED SWELL TESTS HOSP GROVE APARTMENTS WOODWARD -GltI8~SKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO, CALIFORNIA . DR. BY: LOS APFROX SCALE· NA PROJ, NO~ 72-105-20 CK'D BY: A1ttJ DATE: 3/1/73 FIGURE NO~ 2 ; . • • SAMPLE DATA Sample No: 7 Classification: • Height. inches .807 ...; .... Di ameter. inches J .911-0-I/) -I/) c 0 ...- • ~ . I 2 CI) Initial Conditions: w 0:: I-CI)' Dry Density, pcf 1111-.2 I 111-.2 0:: -< LIJ Moisture Content. % 8.11-8.11-:x: CI) After Soaking: • Dry Dens i ty. pef 116.11-116.3 Moisture Content. ,., 16.2. 11 17 I Surcharge durir.g soaking and normal load: First run: 2040 psf Second non: lf080 psf • TEST DATA Angle of Friction. degrees 29°. Cohesion. psf lj()() SHEAR DISPLACEMENT. inches • 2 ...; .... 0-• I/) -I/) c V . 0 ~ ...-q,' • CI) ./' CI) I w 0:: V I-CI) V 0:: -< ~~ ~ C' -lj()() -p'sf T I 2 3 lj. NORMAL STRESS, tons/sq, ft. • DIRECT SHEAR TEST HOSP GReVE AP ARTh1ErnS hOO[l.JARD -G I Z I ENSK I & ASSOCIATES CONSULTING SOIL A~~Fg~~~~;lg~L~~~~ffRS ~~D GEOLOGISTS • DR. BY:LDS GS APPROX. SCALE: ----PROJ. NO: 72-105-20 CK'D BY;-~ DATE: 2/28/73 FIGURE NO: 3 • I SAMPLE DATA • Sample 14o: 10-1 Classification: He i ght. inches .807 ..; .... Di ameter. inches 1.9lJ. ~ • '" -'" c 0 .... (I) Initial Conditions: I 2 (I) UJ 0:: fo-(I) Dry Density. pcf 99.6 98.6 • 0:: -< Moisture Content. % UJ 22.2 23.9 :t: (I) After Soaking: Dry Dens i ty. pef 98.5 98.9 Moisture Content. ." 29.!J. 29. !J. 1< • Surcharge during soaking and normal load: Fi rst run: 20lJ.O psf Second run: !J.C-aO psf TEST DATA • Angle of Friction. degrees 18° 1Lt* Cohesion. psf !J.70 !J.20* SHEAR DISPLACEMENT. inches *Note: I nd i cates residual strengtho • 2 ..; Peak-11--~4' .... ~ ----'" ..... -~' '" V-----I.--I !J.0 = c V--I' 0 ~ .... V--l----(I) -------(I) I UJ I-"" ~ co: r::: fo-l----(I) ~ '-Residual 0:: ~fT Cl=~q r C' _lJ.20 r-psf • • I 2 3 !J. NORMAL STRESS, tons/sq.ft. DIRECT SHEAR TEST • HOSP GRO V E AP ARTM ENTS WOODWARD -GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO, CALIFORNIA DR. BY: LDS GS APPROX. SCALE: ----PROJ. NO:' 72-105-20 • CK'D BY: ~ DATE: 2/28 73 FIGURE NO: lJ. • COMPACTION TEST ,RESULTS JOB NAME HaSP GROVE APARTMENTS DATE REPORTED 2/28/73 JOB NUMBER 72-105-20 • May 22 through December 19, 1972 PAGE; 1 OF 10 DATES COVERED MOlaTURE P'IELO ..... SORATORY ItELATIVE DATE naT RETEST LOCATION ELEVATION CONTENT DENSITY OEN.iTY COMPACTION NUMBER OF OF TEST '110 OltYWT. PCP' PCf -I. 0,. LAB. DENS. r~AY 22 1 SEE FIGURE ONE 66. a I ' 16.3 107.4 117.5 91. 5 • 2 76.0 I 17.6 106.7 117.5 90.7 iA.AY 23 3 70.5 I 14.5 107.7 117.5 91.6 4 75.0 I 16.3 109.1 117.5 93.0 5 78.0 I 14.5 108.8 117.5 92.6 • 6 86.0 I 15.0 107.4 117.5 91.4 ~~AY 26 7 77.0 I 12.2 104.6 115.5 90.6 8 84.0 I ,8.3 108.2 117.5 92.3 9 104.0 I 16.2 111.2 115.5 96.3 t~AY 27 10 79.0 I 14.3 107.5 115.5 93.0 • 11 81.0 I 12.3 106.0 l1S.5 9,1.8 12 84.0 I 12.3 105.8 117.5 90.1 13 108.0 I 13.6 106.5 11S.5 92.3 14 86. ci I 12.3 107.2 115, S 92.7 15 88.0 I 13.0 108.5 115.5 94.0 • r~AY 30 16 91. a I 11.7 111. 7 115.5 96.5 17 94.0 I 8.0 106'.0 115.5 91.5 18 97.0 I 4.1 106.6 116.5 91. 5 19 100.0 I 11. 5 107.0 116.5 92.0 • !'1AY 31 20 102.0 I 8.5 105.2 114.5 91.7 21 105.0 I 10.5 106.5 114.5 93.2 22 108.0 I 8.0 10S.7 114. S 92.3 23 1'10.0 I 8.7 107.8 116. S 92.3 ,JUN 1 24 113.0 I 6.5 108.8 114.5 95.2 • 25 l1S.0 I 9.9 113.,5 114.5 99.3 26 70.0 I 19.0 92.0 106.5 86.3 27 73.0 I 19.0 96.0 106.5 90.0 28 26 70.0 I 18.3 97.7 106.5 92.0 29 118.0 I 12.3 108.5 114.S 94.7 • JUN 2 30 76.0 I 20.5 97.7 106.S 91. 7 31 78.0 I 9.0 109.S 120.5 90.7 32 78.0 I 20.S 97.2 106: 5 91.3 33 80.0 I 20.5 98.3 106.5 92.3 34 80.0 I 19.6 98.5 106.5 92.5 35 82.0 I 10.5 109.2 120.5 90.7 • 36 82.0 I 21. 5 99.5 106.5 93.5 37 120. a I 12.3 110.2 116.5 94.7 38 122.0 I 12.5 107.7 114.5 94.0 • WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL ANO rOuNOAlION ENGINEERS AkD GEOLOGiSts • COMPACTION TEST RESULTS JOB NAME HaSP GROVE APARTMENTS DATE REPORTED 2/28/73 JOB NUMBER 72-105-20 • DATES COVERED t~ay' 22 through December 19, 1972 PAGE 2 OF 10 MOlaTURIt I'IE1.0 LABORATORY ftELAT'VE DATE naT RETEST LOCAT'ON ELEVATION CONTItNT DENSITY DItNalTY COMI'ACT'ON NUMBER Of' OF TEST '!Io DIIYWT, PCI' PC~ % 01' LAB. DENS. ---... - JUN 5 39 SEE FIGURE ONE 84.0' , 9.0 113.5 127.5 92.2 • 40 84.0' 11.1 116.8 127.5 91.5 41 86.0' 13.0 106.3 117.5, 90.6 42 86.0' 10.5 104.0 115.5 90.1 43 124.0' 13.0 109.0 1,14.5 95.2 44 124. 0' 12.3 110.2 121. 5 90.7 45 88.0' 15.3 92.0 ,106.5 86.5 • 46 90.0' 18.3 94.0 106.5 88.2 47 166.0' 8.3 106.5 117.5 90.1 JUN 6 48 126.0' 8.5 121.5 127.5 95,.3 49 126.0' 9.9 119.5 127.5 93.7 • JUN 7 50 128.0' 10.5 104.5 114.5 91.2 51 128.0' 9.3 110.0 127.5 90.5 JUN 8 52 45 88.0' 9.2 104.1 1"5.5 90.2 53 46 90.0' 10.5 104.Q 115.5 90.0 54 131.0' 9.9 115.0 127.5 90 .1 • 55 134.0' 11. 1 115.5 127.5 90.5 56 136.0' 10.5 116.2 127.5 91.2 57 138.0' 9.3 111.9 121. 5 91.9 JUN 9 58 140.0' 9.3 101. 2 114 .. 5 88.5 59 140.0' 11 . 1 105.8 127.5 83.0 • J,UN 12 60 58 140.0' 5.8 114.9 122.5 90.1 61 59 140.0' 9.9 115.5 127.5 90.5 62 '75.0' 13.6 109.5 120.5 90.8 63 78.0' 8.7 102.9 129.5 79.4 64 78.0' 5.9 129.5 129.5 83.4 • JUN 13 65 63 78.0' 6.4 97.3 120.5 80.7 66 64 78.0' ,6.9 101.3 120.5 84.1 67 90.0' 13.6 109.8 121.0 90.6 68 91.0 ' 10.5 112.3 120.5 93.3 69 94.0' 11.7 111 .9 121.0 92.5 • JUN 14 70 65 78.0' 9.9 113.8 120.5 94.3 71 66 78.0' 10.5 107.0 117.5 90.9 JUN 15 72 80.0' 14.9 103.9 120.5 90.2 73 82.0' 17.6 108.1 117.5 92.1 • JUN 16 74 84.0" 13.6 109.1 120.5 90.5 75 87.0' 15.6 107.1 117.5 91. 2' 76 89.0' 14.9 108.7 ·120.5 90.1 77 96.0' 16.3 108.5 120.5 90.0 78 91.0' 14.9 109.5 120.5 90.9 • WOODWARD· GIZIENSKI & ASSOCIATES CONSULtiNG SOIL AND fOUNDATION ENGINEERS AND GEOlOCISts • COMPACTION TEST RESULTS JOB NAME HOSP GROVE APARTMENTS DATE REPORTED 2/28/7'3 JOB NUMBER 72-105-20 • DATES COVERED May 22 through'December 19, 1973 PAGE 3 OF 10 MOI_TURE P'IELO LASORATORY fU!:LATI vr.: DATE TIIaT Re:TEST LOCATION ELEVATION CONTIENT DIENSITY DIENSITY COMPACTION NUMBER OF OF TEST '4 OilY WT, pcP' I'C~ 'I. 0,. LAB. DENS. ---- JUN 19 79 SEE FI GURE ONE 93.0 1 13.6 109.9 120.5 91.2 • 80 91.0 ' 12.3 109.1 . 120.5 90.5 JULY 10 81 121 .0' 8.7 1l0.2 120.5 91.4 82 124.0 1 8.7 11 0.6 120.5 91. 7 83 127.0' 9.9 122.5 127.5 96.0 84 127.0 1 10. ~ 112.2 120.5 93.1 • JULY 11 85 130.0 I 9.9 113.9 120.5 94.5 86 133.0' 9.9 112.8 120.5 93.6 . 87 136.0 1 9.9 112.0 120.5 92.9 88 139.0' 10.5 112.9 120.5 93.6 • JULY 12 89 141.0' 8.7 110.2 120.5 91.4 90 141.0' 9.9 114.8 120.5 95.2 91 144.0' 10.5 115.0 127.5 90.1 92 144.0' 9.3 109.2 120.5 90.6 JULY 13 93 147.0' 9.9 121.9 127.5 95.6 • 94 147.0' 11.1 113.7 121 .5 93.5 95 150.0' 7.5 123.0 127.5 96.4 96 150.0' 11. 1 109.1 120.5 90.5 JULY 14 97 153.0' 8.7 114.7 125.0 91.7 98 153.0' 7.5 119.3 12-.0 93.2 • 99 153.0' 7.5 117.2 128.0 9l.5 100 155.0' 7.5 116.1 128.0 90.7 JULY 17 101 158.0' 11. 1 120.8 128.0 94.3 102 158.0' 9.9 118.9 127.5 93.2 10.3 158.0' 9.3 116.2 127.5 91.1 • 104 158.0' 9.3 116.2 127.5 92.0 JULY 18 105 163.0' 10.5 104.3 115.5 90.3 106 160.0' 8.1 115.3 128.0 90.0 107 83.0' 11 .1 109.9 117.5 93.5 108 163.0' 9.1 11 0.1 120.5 91.3 • JULY 19 109 166.0' 11.1 113.2 125.0 90.5 110 86.0' 11.1 113.0 117.5 96.1 111 89.0' 9.3 117.9 129.0 91.3 112 169.0' 8.7 108.0 117.5 91 .9 . 113 92.0' 8.7 111 .0 117.5 94.4 • JULY 20 114 95.0' 11.1 101.9 117.5 .86.7 115 114 95.0' 10.5 107.0 117.5 . 91 .0 116 98.0' 10.5 108.1 117.5 92.0 • WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOil. AND fOUNDAtiON ENGINEERS ANO GCOLOGISTS .-.. ,-.. -"",.-..... , . .,...,.... • COMPACTION TEST RESULTS JOB NAME HOSP GROVE APARTMENT DATE REPORTED 2/28/73 JOB NUMBER 72-105-20 • May 22 through December 19, PAGE: 4 OF 10 DATES COVERED 1973 MOISTURE ,.IELD LASORATORY 'U!:L.ATIVE DATE TltaT RETEST LOCATION ELEVATION CONTENT DENS'TY DENa'TY COMPACT'ON NUMBER 0'-OF TEST % OilY WT. PCI' PCP 'I. OF ~B; DENS. • JULY 20 CONT. 117 SEE FIGURE ONE 101 .0' 11.1 107.2 117.5 91.2 118 99.0' 12.3 109.0 117.5 92.7 JUL Y 21 119 100.0' 8.7 116.5 129.0 9"0.3 120 102.0' 8.7 116.9 1'29.0 90.6 • 121 99.0' 7.5 109.1 117.5 n.8 122 102.0' 7.5 116.9 129.0 90.6 JULY 24 . 123 100.0' 11.1 117.1 127.5 91.8 . ·124 103.0' 11.7 106.1 117.5 90.2 125 102.0' 10.5 115.1 127.5' 90.2 • 126 103.0· 9.3 117.7 129.0 91.2 JULY 25 127 104.0· 8.7 118.5 129.0 91.8 128 106.0 10.5 104.3 120.5 86.5 129 128 106.0· 11.1 116.0 120.5 96.2 130 106.0' 10.5 111.4 120.5 92.4 • 131 104.0' 9.3 117.2 129.0 90.8 JULY 26 132 109.0· 11 .1 109.0 120.5 90.4 133 110.0' 11.1 116.3 120.5 96.5 134 97.0 11. 7 104.0 117.5 88.5 135 134 97.0· 10.5 109.1 117.5 92.8 • JULY 27 136 100.0' 11.7 112.0 117.5 95.3 137 103.0· 8.7 117.9 129.0 91.3 138 106.0· 6.4 106.2 126.0 84.9 139 138 106.0' 8.7 117.1 129.0 90.7 140 103.0 1 11.1 108.8 117.5 92.5 • ,JULY 28 141 107.0' 11 .1 109.1 117.5 92.8 . 142 113.0 • 10.5 107.8 117.5 91 .7. 143 163.0· 8.7 116.0 125.0 92.8 144 116.0 ' 10.5 106.1 117.5 90.2 145 119.0· 11.1 107.9 117.5 91.8 • JULY 31 146 109.0.' 6.4 112.7 125.0 90.1 147 112.0 1 11.1 116.9 129.0 90.6 148 112.0' 11.1 112.9 125.0 90.3 149 114.0 ' 8.7 114.0 125.0 91.2 AUG 1 150 166.0' 9.3 119.2 132.0 90.3 • 151 166.0· 10.5 115.9 125.8 92.7 152 167.0 ' 8.7 114.0 125.0 91.2 153 167.0· 9.3 115.3 125.0 92.2 • WOODWARD· GllIEN'SKI & ASSOCIATES CONSULTING ~Olt. AND FOuNOATlON ENGINEERS AP-fO G£OlOGIS1S • . COMPACTION TEST RESULTS JOB NAME HOSP GROVE APARTMENTS DATE REPORTED 2/28/73 JOB NUMBER 72-.105-20 • May 22 through December 19, 1972 5 OF10 DATES COVERED PAGE MOISTURE I'IELD LABORATORY ItI!:LATIVE DATE naT RETEST LOCATION ELEVATION CONTENT DENSITY DENSITY COMPACTION NUMBeR 01' OF TEST % DIIYWT. pe,. pe, '1. Opr LAs. D.EHS. • AUG 2 154 SEE FIGURE ONE 115.0 I 11. 1 113.0 123.5 91.4 155 115.0 I 14.9 105.1 110.0 95.9 156 113.0 ' 16.3 106.0 11 0.0 96.3 157 113.0' 11 .7 109.2 117.5 92.9 AUG 3 158 116.0 ' 14.9 101 .. 5 110.0 92.2 • 159 119.0' 16.3 103.0 110.0 93.6 160 117.0 I 16.3 100.8 110.0 91.6 161 117.0 ' 17.9 102.0 no.o 92.7 AUG 4 .162 120.0' 10.5 117.1 . 127.0 92.2 163 120.0' 14.9 100.3 . 11 Q.O 91.1 • 164 122.0' 9.3 115.2 . 127.0 90.7 165 123.0' 9·.3 116.8 127.0 91.9 AUG 7 166 123.0' 11. 7 105.4 125.0 84.3 167 126.0 I 9.9 111.2 127.0 87.5 168 166 123.0' 17.5 102.9 110.0 93.5 • 169 167 126.0' 9.3 116.8 127.0 91.9 170 126.0' 16.3 102.9 11 0.0 93.5 171 83.0' 10.5 114.9 127.0 90.4 AUG 8 172 124.0' 8.7 118.0 128.0 92.1 173 127.0' 7.5 117.5 128.0 91.7 174 • 142.0' 16.3 99.9 11 0.0 90.8 AUG 9 175 142.0' 16.3 101 .2 11 0.0 92.0 176 138.0' 9.3 113.8 123.5 92.1 177 53.0' 10.5 109.9 123.5 88.9 AUG 10 178 144.0' 11.1 11 0.1 120.5 91.3 • 179 177 53.0' 11.7 111 .6 123.5 90.3 180 56.0' 10.5 114.0 123.5 92.3 181 144.0' 10.5 109.4 120.5 90.7 AUG 11 182 86.0' 17.5 101. 9 110.0 92.6 183 146.0' 11.7 109.8 120.5 91.1 • 184 146.0' 15.0 101 . 1 110.0 91. 9 AUG 14 185 146.0~ 20.2 100.0 110.0 90.9 186 89.0' 12.3 112. 1 123.5 90.7 187 148.0 1 11.7 112.8 123.0 91. 7 • AUG 15 188 148.0 1 15.0 111.1 123.0 90.3 189 148.0' 9.9 111.2 123.0 90.4 190 128.0' 12.2 105.7 11 O. 0 96.0 • WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING ~OIL ANO rOUN04110N [NGIN[[RS AND GrOLOCIS1S • . COMPACTION TEST RESULTS JOB NAME HOSP GROVE APARTMENT SITE DATE REPORTED 2/28/73 JOB NUMBER 72-105-20 • DATES COVERED May 22 through December 19, 1972 PAGE 6 OF 10 MOISTURE "IELD LABORATORY RELATIVE DATE T1UT RETEST LOCATION ELEVATION CONTENT DENSITY DEN.ITY COMI'ACTION NUMa~" OF OFTEST '110 DIIYWT. r>el' r>eP -I. 0" LAB. DENS. .AUG 16 191 SEE FIGURE ONE 128.0 1 14.7 105.1 110.0 95.5 192 130.0 1 19.0 104.9 110.0 95.3 193 . 130.0 1 17.5 102.0 110.0 92.7 194 133.0 1 1,4.9 106.0 115.5 91. 7 AUG 17 195 133.0 1 14.9 107.3 115.5 92.9 • 196 135.01 13.6 104.2 115.5 90.2 197 92.0 1 13.6 106.7 115.5 92.3 AUG 18 198 136.01 13.6 106.0 115.5 91.7 199 139.0 1 17.6 104.4 110.0 94.9 200 142.01 17.6 103.0 110.0 93.6 • 201 125.0 1 8.7 116.1 128.0 90.7 AUG 21 202 FG 127.0 1 9.9 115.9 128.0 90.5 203 FG 128.0 1 7.5 116.9 128.0 91-.3 204 106.0 1 7.5 109.1 120.5 90.5 205 144.0 1 18.3 101. 9 110.0 92.6 • 206 109.0 1 7.5 110.0 120.5 91. 2 AUG 22 207 111.0 I 15.0 101. 6 110.0 92.3 208 113.0 ' 17.7 106.6 11 0.0 96.9 209 115.0' 14.3 107.1 115.5 92.7 210 117.0' 15.0 105.0 115.5 90.9 • 211 59.0' 16.3 102.1 110.0 92.8 212 120.0' 10.0 111.0 123.0 90.2 213 107.0' 9.3 117.8 127.0 92.7 214 FG ·105.0' 8.7 117.7 128.0 91.9 215 FG 103.0' 9.3 118. 1 128.0 92.2 .AUG 24 216 120.0 1 17.5 103.0 110.0 93.6 217 110.0' 9.9 112.3 124.5 90.2 218 147.0 1 18.3 102.7 110.0 93.3 219 112.0' 9.3 113.7 124.5. 91.3 AUG 25 220 62.0' 17.6 103. 1. 110.0 93.7 • 221 123.0' 7.5 117. 1 128.0 91.4 222 172.0 1 9.3 112.3 124.5 90.2 223 111.0' 6.4 116.1 128.0 90.7 AUG 28 224 FG 113.0' 8. 1 118.9 128.0 92.8 225 150.0' 10.5 112.0 123.0 91.0 • 226 150:0' 11.1 112.9 123.0 91.7 AUG 29 227 153.0' 9.9 117.8 124.5 94.6 228 65.0 1 18.2 103. 1 HO.O 93.7 • WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING ~OIL ANO rO\Jlflt,DATlOH [NGINEERS AND GEOLOGISTS • COMPACTION TEST RESULTS JOB NAME HOSP GROVE APARTMENT SITE DATE REPORTED 2/28/73 JOB NUMBER 72-105-20 • DATES COVERED May 22 through December 19, 1972 PAGE 7 OF 10 MOISTURE I'IELD LABORATORY RELATIVE DATE naT RETEST LOCATION EL.EVATION CONTENT DENSITY DEN.ITY COMI'ACTION NUMBER OF OF TEST '" DIlYWT. PCI' 1'<:' % OF LAB. DEN •• -.UG 29 229 SEE FIGURE ONE FG 95.0 1 11. 1 116. 1 128.5 90.3 230 FG 95.0 1 11.7 117.0 128.5 91.0 AUG 30 231 FG 95.0 1 8.7 111. 1 120.5 92.1 232 FG 94.0 1 6.4 115.0 115.0 95.4 233 150.0 1 9.9 113.9 113.9 91.4 • 234 150.0 1 5.3 114. 1 114.1 91.6 AUG 31 235 156.0 1 8.7 113.1 113.1 90.4 236 156.0 1 9.3 113.9 113.9 91.1 237 68.0 1 19.0 101. 6 101. 6 92.3 238 68.0 1 20.5 100.1 110.0 91.0 • SEPT 1 239 159.0 1 8.7 116.0 128.0 90.6 240 FG 92.01 8.7 110.5 120.5 91.7 241 159.0 1 7.5 116.9 128.0 91.3 SEPT 5 242 162.0' 11.7 116.1 124.5 93.3 • 243 162.0' 9.3 117.0 128.0 91.3 244 71.0' 13.0 111.1' 123.0 90.4 SEPT 7 245 165.0' 8.7 113.1 125.0 90.4 246 167.0' 7.5 113.2 125.0 90.5 247 122.0' 10.5 107.2 117.5 91.2 • SEPT 8 248 170.0' 9.3 113.3 125.0 90.6 249 170.0' 8.7 122.3 132.0 92.6 250 -173.0' 7.5 115.8 127.0 91.1 251 173.0' 7.5 112.9 125.0 9"0.3 .EPT 11 252 176.0' 7.5 115.0 125.0 92.0 253 176.0' 8.7 113.5 125.0 90.8 254 178.0' 7.5 114.0 125.0 91.2 255 178.0' 8.0 115.0 125.0 92.0 SEPT 12 256 FG 180.0' 7.5 113.5 125.0 90.8 • 257 175.0' 8.7 115.9 127.0 91. 2 258 178.0' 9.3 114.8 127.0 90.3 259 181.0' 9.3 108.7 125.0 86.9 260 259 181.0' 10.5 114.3 -125.0 91.4 SEPT 13 261 184.0' 10.5 114.9 125.0 91.9 • 262 FG 125.0' 6.9 114.0 125.0 91. 2 263 FG 125.0' 8 .. 1 113.3 125.0 90.6 264 FG 115. A' 7.5 115. 1 125.0 92.0 • WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL ANO rOUNOA.1I0N [NGIN([RS AND GEOLOGiSts • . COMPACTION TEST RESULTS JOB NAME HOSP GROVE APARTMENT SITE DATI; REPORTED 2/28/73 JOB NUMBER 72-105-20 • DATES COVERED May 22 through December 19, 1972 PAGE 8 OF 10 MOISTURE ' .. ,ItLD LAIIORATORY ft!:LATIVIt DATE nST RItTItST LOCATION ELEVATION CONTENT DENSITY DENSITY COMPACTION NUMBER 01' OF TEST 'lIo DftYWT. I'C" I'CI' % 0" LAB. D.ItNS. • SEPT 20 265 SEE FIGURE ONE 71. 0' ' 11. 1 117.3 123.0 95.3 SEPT 21 266 74.0 ' 12.3 111. 9 123.0 90.9 267 77 .0' 11.7 113.2 123.0 92.0 SEPT 22 268 150.0' 11 .1 117.0 125.0 93.6 • SEPT 25 269 80.0' 9.9 114.6 123.0 93.1 SEPT 26 270 83.0' 11.7 112. 1 123.0 91.1 SEPT 27 271 86.0' 12.3 114.1 123.0 92.7 • OCT 2 272 83.0' 11. 1 113.1 123.0 91.9 OCT 3 273 86.0' 6.9 101.5 120.5 84.2 274 86.0' 5.3 99.7 120.5 82.7 275 273 86.0' 12.3 111.2 120.5 92.2 • 276 27.4 86.0' 12.3 110.4 120.5 91.6 OCT 4 277 89.0' 13.0 109.5 120.5 90.8 278 89.0' 13.6 110.0 120.5 91. 2 279 92.0' 12.3 112.5 120.5 93.3 280 92.0' 13.0 112.0 120.5 92.9 • OCT 6 281 95.0' 9.9 112.1 123.0 91.1 282 95.0' , 12.3 111. 1 120.5 92.1 OCT 12 283 98.0' 10.5 111. 1 123.0 90.3 284 98.0' 11.7 112.5 123.0 91. 4 • 285 101.0' 12.3 116.1 121. 5 95.5 286 101.0 ' '12.3 116.8 121.5 96. 1 OCT 13 287 104.0' 11.7 114.0 121. 5 9J.8 288 104.0' 12.3 114.6 121.5 94.3 .OCT 26 289 107.0 ' 10.5 111.4 121.5 91.6 290 107.0 I 9.9 110.0 121.0 90.5 OCT 24 291 110.0' 11 .1 109.9 121.5 90.4 292 110.0 I 11 .1 111.0 121 .5 91.3 293 86.0 ' 11 .7 110.2 121.5 90.6 • OCT 25 294 89.0 ' 11. 7 117.9 123.0 95.8 295 113.0 I 11. 1 109.6 121 .5 90.2 296 113.0' 10.5 111.0 121.5 91.3 297 92.0' 11 .1 109.9 121.5 90.4 298 95.0' 17.0 99,.5 110.0 90.4 '. WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL AND rOUNOATION ENGINEERS AND GrO\.OGIS1~ • h COMPACTION TEST RESULTS JOB NAME HOSP GROVE APARTMENT SITE DATE REPORTEO 2/28173 JOB NUMBER 72-105-20 • DATES C:;OVEREO . May 22, 1972 through December 19, 1972 PAGE: 9 OF 10 MO'STURI!: f"ELD LABORATORY IOELAT.VE DATE naT RETEST LOCATION ELEVAT.ON CONTItNT DENS.TY DItNa.TY COMI'ACT'ON NUMBER OF OF TEST '" DRY WT. f'CF 1'(;1'. 'I. Of' LAB. DENa. • OCT 26 299 SEE FIGURE ONE 116.0' 10.5 111.4 121. 5 91. 6 300 116.0 • 9.9 110.0 121. 5 90.5 301 100.0' 11.7 111. 1 121.5 91.4 302 105.0' 11.7 110.2 .121. 5 90.6 • OCT 27 303 110.0 • 11 .1 112.1 121.5 92.2 304 115.0' 11. 1 109.8 121. 5 90.3 305 118.0" 10.5 111.2 121.5 91.5 306 121.0' 10.5 110.1 121.5 90.6 307 116.0' 11. 1 111.6 121.5 91.8 • OCT 30 308 119.0 • 11. 1 112.9 121 .5 92.9 309 119.0' 11.7 110.9 121. 5 91. 2 310 119.0' 11. 7 109.8 121.5 90.3 OCT 31 311 122.0' 11. 1 110.0 121.5 90.5 312 122.0' 11.7 114.0 123.0 92.6 • NOV 1 313 125.0' 12.3' 99.0 110.0 90.9 314 135.0' 16.3 99;9 110.0 90.8 315 131. O' 9.3 116.0 127.0 91. 3 NOV 2 316 134.0' 8.1 117.1 127.0 92.2 • 317 128.0' 9.9 115.1 127.0 . 90.6 318 137.0' 8.7 116.8 127.0 91.9 NOV 3 319 152.0' 10.5 108.9 120.5 90.3 320 133.0' 9.9 116-.'2 127.0 91. 4 321 137.0' 8.7 115.9 127.0 91. 2 • NOV 6 322 152.0' 16.3 102.6 110.0 93.2 323 F.G. 152.0' 10.5 114.2 125.0 91. 3 NOV 7 324 F.G. 152.0' 11.1 116.2 125.0 92.9 325 F.G. 153.0' 11. 1 115. 1 125.0 92.0 • NOV 8 ~26 125.0' 9.3 113.3 125.0 90.6 327 125.0' 11. 1 113.0 125.0 90.4 NOV 9 328 F.G. 130.0 9.9 113. 1 125.0 90.4 329 F.G. 186.0 • 7.5 117.9 125.0 94.3 • NOV 10 330 F.G. 173.0' 16.3 106.7 110.0 97.0 331 F.G. 168.0' 4.3 11'6.2 128.0 90.7 332 F.G. 165.0' 7.5 116.5 127.5 91.3 • WOODWARD· GIZIENSKI & ASSOCIATES CONSULTINC !loOIL AND fOUNDAtiON tPfGtHE£RS Ato.O G(OlOGI'51S • COMPACTION TEST RESULTS JOB NAME HOSP GROVE APARTMENT SITE DATE REPORTED 2/28/73 JOB NUMBER 72-105-20 • DATES COVERED t1ay 22, 1972 through December 19, 1972 PAGE 10 OF 10 Mo,aTURJt Y'ELD LABORATORY "ELAT,VE DAt'i! naT RETEST LOCAT'ON ELEVAT'ON CONTENT DENS'TY DEN.'TY COWI'ACTION NUMBER OF OF" TEST 'lit DRY WT. !'err !'el' 'I. 01' LAB. DJ:H •• NOV 13 333 SEE FIGURE ONE 154.0' 8.7 105. 1 116.5 90.2 • 334 157.0' 8.3 116.9 128.0 91. 3 335 128.0\' . 10.5 115.9 128.0 -90.5 NOV 14 336 128.0' 9.9 117.9 128.0 92.0 337 128.0' 11. 1 116. 1 128.0 90.7 338 160.0' 8.7 118.7 128.0 92.7 • 339 163.0' 10.5 116.9 128.0-91. 3 NOV 20 340 166.0' 11 .1 115.3 128.0 90.0 341 169.0 ' 11.1 116.7 128.0 91.1 NOV 29 342 169.0' 11. 1 112.1-124.5 90.0 • 343 131.0' n.7-113.0 124.5. 90.7 344 134.0' 11. 1 114.0 124.5 91. 5 NOV 30 345 137.0' 9.3 116.9 128.0 91.3 346 140.0' 10.5 115. 1 128.0 90.7 347 124.0'-9.3 115.6 -128.0 90.3 • DEC 1 348 FG 172.0' 9.9 117. 1 128.0 91.4 349 127.0' 19. 1 101. 3 110.0 92.0 350 FG 171.0' 9.9 117.0 128.0 91.4 351 FG 153.0' 9.9 113; 9 125.0 91. 1 352 130.0' 12.3 105.0 115.5 90.9 • DEC 4 353 133.0' 10.5 115.9 125.0 92.7 354 157.0' 9.9 114.0 125.0 91.2 DEC 13 355 160.0' 10.5 114.9 125.0 91.9 356 160.0' 11. 1 114.0 125.0 91.2 • 357 FG 115.0' 9.9 115.3 125.0 92.2 DEC 14 358 163.0' 11 . 1 117.8 125.0 94.2 359 163.0' 7.5 112.0 116.5 96.1 360 FG 130.0' 13.6 113.0 125.0 90.4 361 FG 155.0' 6.9 117.1 128.0 91.4 • 362 FG 145.0' 8:7 116.0 128.0 90.6 DEC 15 363 -FG 133.0' 19.7 100.2 110.0 91. 0 364 FG 103.0' 9.9 117.5 127.5 92. 1 365 FG 104.0' 9.3 116.0 127.5 90.9 • DEC 18 366 FG 125.0' 8.7 115.3 128.0 90.0 367 165.0' 13.6 111.9 -120.5 92.8 368 FG 136.0' 10.5 117. 1 128.5 91.1 DEC 19 369 FG 133.0' 10.5 116.2 128.5 ·90.4 • WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING ~OIL ANIJ rOUNOAlION [NGIN££RS ANO G£OLocrS1S • COMPACTION TEST RESULTS JOB NAME HOSP GROVE APARTMENT SITE {STREET TESTS) DATE REPORTED 2/28/73 JOB NUMBER 72-1 05-20 • DATES COVERED June 7 through December 13, 1972 PAGE S-l OF S-l IoCOI.TUlllt "IELD LABORATORY IIItLATIVE DATE ,...T RETEST LOCATION ELEVATION CONTENT DltN91TY DItNan", COMI"ACTION NUMBER OF OF TEST '" D,U WT. I'CI' I'CP fl. 01' LAB. _D£H •• • JUN 7 S-l SEE FIGURE 1 135.0 1 7.5 118.5 127.5 92.9 JUL Y 11 S-2 113.0 1 9.1 109.3 120.5 91. 6 S-3 116.0 1 9.3 110.8 120.5 91. 9 AUG 8 S-4 134.0 1 19.7 100.0 110.0 90.9 • AUG 9 S-5 138.0 1 20.5 102.8 110.0 93.4 AUG 10 S-6 142.0 1 11. 7 109.0 120.5 90.4 I AUG 14 S-7 145.0' 13.0 110.9 120.5 92.0 • SEPT 22 S-8 148.0' 11.7 108.9 120.5 90.3 NOV "7 S-9 151.01 11. 1 114.9 125.0 91.9 NOV 14 S-10 154.0 I. 10.5 113.4 125.0 90.7 • S-l1 154.01 11. 1 114.9 125.0 91.1 DEC 4 $-12 157.01 9.9 116.9 128.0 91.3' S-13 157.0 1 9.9 116.0 128.0 90.6 DEC 13 5-14 160.0' 10.5 115.3 125.0 92.4 • S-15 160.0 1 8.7 117.9 125.0 94.1 • • • • WOODWARD· ,Gill ENSKI & ASSOCIATES CONSUL liNG ~Otl.. ANO FOUNDATION [tfGINt:£RS AkO G£OI.O~IS1S • COMPACTION TEST RESULTS JOB NAME HOSP GROVE APARTMENT SITE (STORr~ ORAl N) DATE REPORTED 2/28173 JOB NUMBER 72-105-20 • DATES COVERED November 13 through Oecember 19, 1972 PAGE. SO-1 OF SO-l MOlaTURK "IELD &.AaORATORY RE&.ATIVE DATE TEST RETEST LOCATION ELEVATION CONTENT DENSITY DENSITY CONI'ACTION NUMBI::R OF OF TEST '!'o OilY WT. /'C,. I'C~ % 0" &.AD. DENa. NOV 13 SO-1 SEE FIGURE 1 70.0 1 " 11.1 108.9 120.5 90.3 • SO-2 86.0 1 10.5 109.9 120.5 91.2 SO-3 FG 78.0'1 10.5 110.5 120.5 91. 7 NOV 21 SO-4 118.0 1 11.7 112. 1 121. 5 92.2 SO-5 108.0 1 10.5 109.1 120.5 90.5 • NOV 22 SO-6 116.0' 11 ."1 113.2 121.5 93.1 SO-7 FG" 112.0 1 9.3 111.0 121. 5 91.3 SO-8 92.0 1 12.3 111.9 123.0 90.9 NOV 27 SO-9 102.0' 12.3 112. 1 123.0 91.1 SO-10 FG . 112.0 1 11.7 113.9" 123.0 92.6 • SO-11 FG 98.0' 12:3 114. 1 123.0 92.7 NOV 28 SO-12 80.0' 11. 1 111.0 123.0 90.2 NOV 29 SO-13 FG 72.0' "10.5 111. 9 123.0 90.9 • NOV 30 SO-14 140.0' 8.7 115.9 123.0 92.7 SO-15 138.0' 11. 1 116.9 128.5 90.9 SO-16 FG 112.0' 11. 1 108.9 120.5 90.3 SO-17 FG 88.0 1 12.3 108. 1 117.5 92.0 DEC 19 SO-18 FG 143.0 1 11. 1 116.2 128.5 90.6 • • • • • WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING. SOIL AND rOUNOA.1I0114 [ .... CIN[[RS AND erOLOGISTS • , MECHAH I CAl· ANAl YS I S 100 3 4 4 10 IW 200 DIRECT SHEAR TEST DATA 4 5 6 "" " r\ 04.7 96.1 h09.0 80 \ Dry Density, pcf <!l '. ~ '-5 :z: Initial Water Content. % 8.8 20.9 11.9 en / \" ~ 60 "-Ih -~\ Final Water Content. % 16.6 30.6 18.9 I-.:-t 1-4 ff:i1W Apparent Cohesion. psf 0 n 20 ~20 <.> K,,-""-lI.J .; r--"-Apparent Friction Angle. c 28 22 20 20 r-.... I I I I I I I I ....... 1- 0 ,-- • • 140 1000 100 10 1.0 O. I 0.01 0.001 \ ~ ~ZERO AIR VOIDS CURVES GRAfN SIZE IN MILLIMETERS \ \-ICOBBLESl GRAVEL l SAND ISILT &. CLAY I \/I \ f e I f c I m I \ 1\ V2.70 S.G. 130 \ PLASTICITY CHARACTERISTICS 4 5 6 \ [\/2.60 S.G. \ 2.50 S.G. LiqUId Limit, % -45 50 '\..,--. • '\ \ 1\ Plasticity Index. % NP ·17 33 \ \ Classification by Unified Soil "\ r\ [\ St·1 CL SC 120 Classification System- 1\' \ I III " .... r--! \ I\;~ ... I u [) .. ' '" f\ \ l\\ a. • ..: II Ii \ I'\'f\ SWELL TEST DATA 4 5 6 :::r: r--t-f \~\ <!l 110 u::i 3: I \ \ l'\ Indial Dry Density, pef -95.4 107.4 I--1\ ) 22.0 13.0 ::z:: , I I: Initial Water Cont~nt. II. -=> >-" [S ~ Load. psf 160 160 0::: -C> ~/ r\f\ 7.5 6.7 ''\ r\ Percent Swell -/ 100 \ ~ t\ / • • t\ SA~iPLE LOCAT ION \\ \. \ i\'h 4 E. of N. ~J. Fi 11 MAXIMUM DRY 4 5 6 [\ 5 ~·1os t North Eas terly 30° Cut 90 DENSI TY. pcf 116. : 106.5 120.5 ~~ 6 Cut Eas t of North Wes t Fi 11 ~ OPTIMUM MOISTURE 8.5 21. 5 12.5 ~r'\ ~ ~ CONTENT. % r\.!\.t\. • !\. ~~ MOISTURE CONTENT % r--.. '" 80 0 10 20 30 \j{) • LABORATORY COMPACTION TEST FILL SUITABILITY TESTS • LABORATORY C(~t+l,T~~H 1557 -70T TEST METHOD: S HaSP GROVE APARTMENTS WOODWARD - G I Z I 8~SI( I & ASSOC I ATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNJA DR. BY: lS SCALE: ---PROJ. "0;77-1 Uo-iU • CK'D BY:~ DATE: 2/28/73 PAGE 2 nf 7 • - MECHANICAL ANALYSIS • 100 3 4 ~ 10 ~ 200 ...... " DIRECT SHEAR TEST DATA 7 8 9 r\\ '\ 1\ lQ-L..8. 80 Dry Density, pet 114.8 109.6 <!:I ~.I\ z: Initial Water Content. % 8.8 10.9 12.3 (;; \--1-9 ~ 60 1\\ \ 0.. Final Water Content. % 15. 1 17.2 lKB I-~ ffi~ Apparent Cohesion. psf 580 180 440 <..> f7 -~ t-Q IX. W ~'-Apparent Friction Angle. {", 20 24 22 0... 20 '.;;:::::: ~ ""-"-. • 0 I I I I I I I I I I~ 1000 100 10 1.0 0.1 0'.01 0.001, \ 1\ ~ZERO AIR VOIDS CURVES GRAIN SIZE IN MILLIMETERS , \ ~ ICOBBLESIGRAVEL I SAND I S I L T& CLAY I ~ \ clfclmlf • \ "\ 130 \ ~2.70 S.G. PLASTICITY CHARACTERISTICS 7 8 9 \ ~2.60 S.G. Y\ /\.>.-/2.50 S. G. Liquid Limit, % 31 40 .- 7 / :\ 1\ Plasticity Index. % 14 21 NP , V ~ \ Classification by Unif-ied Soil ~c-sr~ W ~ ~ i\ SC-S~'l SM 120 Classification System I~ / ~~ \ • i." / ~ t\\i\ '+-,,- (J 1/ 8 ~\\ \ 0-• ...: ~ , \~ SWELL TEST DATA 7 8 9 :x: 1\' \ <!:I I 9 ;:u 110 ~ '\ I\r\ In i t i a I Dry Den s i ty , pef 114.8 108.7 107.6 I--r\ \ Initial Water Content. % 8.3 11.7 13.3 :z: :::> >-\ \ [\ Load. psf 160 160 160 0:: Q f\f\ Percent Swell 3.2 4.1 0.7 \ \ 1\ 100 \ f\ r\ • r\ SAMPLE LOCATION \\ 1\ !\ r\'t-, 7 N. E. 30 Cut Area • 90 MAXIMUM DRY 7 8 9 1\ 8 Cut E. of N. vJ. Fi 11 DENSITY. pcf 127.5 121. 5 120.5 ~~~ 9 Cut At N. E. Corner of Site ~ OPTIMUM MOISTURE 8.5 11.5 I CONTENT. % 12.0 i\.1\.t\. ~ 1 f\..' t\.~ • MOISTURE CONTENT, % t--.TI 80 0 10 20 30 lj{) LABORATORY COMPACTION TEST FILL SUITABILITY TESTS LABORATORY cOMPACTION HaSP GROVE APARTf.1ENTS TEST METHOD: ASTf··1-D 1557-70T • WOODWARD -GIZI8~SKI & ASSOC I ATES CONSULTING SOIL AND FOUNDATION ENGINEERS AHD GEOLOGISTS -SAN DIEGO. CALIFORNIA OR. BY: LS SCALE: ---PROJ. Ho:72-105-20 CK'D BY:~ DATE: ? 1?P.171 PAGE3 of 7 • • MECHANICAL ANALYSIS 100 3 4 ~ 10 ~ 200 DIRECT SHEAR TEST DATA 10 11 12 i\\ • Dry Density, pcf 116.6 114.6 112.5 80 \ C!:> \ z: Initial Water Content. % 8.8 8.4 9.5 en ' ,\ ~ 60 14.3 15.3 15.7 0.. n -~'.-!-ll Final Water Content. % r-''\\ E5~ Apparent Cohesion. psf 820 300 540 u " 0:. UJ '~ Apparent Friction Angle. c 18 28 19 0-20 1? -~': -• 0 I I I I I I I I ~-Ooo.- I~ 1000 100 10 1.0 0.1 0.01 0.001 \ ~ZERO AIR VOIDS CURVES GRAIN SIZE IN MILLIMETERS \ \-ICOBBLESI GRAVEL I SAND Is I L T & CLAY I V'I \ CiT c I m I f \ • \ \ ~2.70 S.G. 130 h y2.60 S.G. PLASTICITY CHARACTERISTICS 10 11 12 1 / \ \\ ....----2.50 S.G. Liquid Limit, "/0 38 32 36 ~ / '" ,\ l~ Plasticity Index. % 24 10 15 / II' ,~< \ ~ Classification by Unified Soil / '\ \ r\ )~1-SC ;:,C-St·l St·1 120 Classification System ,"' 1---4 \ \' \ • II. I / '\ ~\ \ -u J.+. I-12 ' .\ \ 0-\\ .-: ~ \r\ SWELL TEST DATA 10 11 12 ::t: C!:> \ \ -110 UJ 16.7 115.3 112.2 3: \ \ \ Initial Dry Density. pcf r- • -\ z !\ Initial Water Content. ~ 8.4 8.6 9.6 ~ >-\ \ \ 0:: Load. psf nO 1 160 C\ \ \\ Percent Swell \ \ \ 4 0 2 2 1.8 100 \ r\ 1\ • \ SAMPLE LOCATION \\. \. • \. \~ 10 Center Canyon of Project 90 MAXIMUM DRY 10 11 12 !\ 11 Central DENSITY. pcf l?g.O 128.0 125 0 ~~~12 Central OPTIMUM MOISTURE 7.0 9.5 COHTENT. % 8.5 '\.r\.~ • I r\. ~~ 80 0 MOISTURE CONTENT, 1-,~) 10 20 30 q() LABORATORY COMPACTION TEST FILL SUITABILITY TESTS • LABORATORY COMPACTIOH TEST Io!ETHOD: ASTM-D 1557 -70T HaSP GROVE APARTMENTS WOODWARD - G I Z I 8~SI( I & ASSOC I ATES COHSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO, CALIFORNIA DR. BY: LS SCALE: ---PROJ. NO:72-105-2C • CK'D BY: ~ DATE: 2/28/73 PAGE 4 of 7 • MECHAN J CAl AHAL YS J S 3 ! q 10 Ij() 200 100 '" DIRECT SHEAR TEST DATA 13 14 15 \ -\\ 119.4 94.2 114.0 80 " Dry Density, pcf ~ \' "-:z: Initial Water Content. % 7 6 18.7 8. 1 en \ ' ~ 60 ~ \ ,r p; Final Water Content. % 133 29.0 15.5 .... i\ ',\"" I-1\ ffilj() Apparent Cohesion. psf 560 340 200 u I ~-,-~, I::> '\ "" w ~ '.-. \ c 20 ~ 20 Apparent Friction Angle. n 16 ----f-;.....~" 0 I I I I I I I I ." • IIW 1000 100 10 1.0 0.1 0.01 0.001 \ ~ GRAIN SIZE IN MILLIMETERS \ ~ ~ZERO AIR VOIDS CURVES ICOBBLESI GRAVEL I SAH[ Is I L T & CLAY I ~ \ f c I f c I m \ \ 130 1 II' \ V2.70 S.G. PLASTICITY CHARACTERISTICS , / ~\ ~2.60 S.G. 13 14 1!1 ~ ! n~ ~v2.50 S.G. Liquid Limit, % 31 55 29 • .I [\\ [\ Plasticity Index. % -4 32 14 / f\ \ Classification by Unified Soil 120 /~ I-'\ '\ \ Classification System S~1 CH CL I:) \, \ • \ \ ~ .... 1\\ \ u 0. r: \ i\ 1\ SWELL TEST"DATA 13 14 15 ::r:: \ \ <!) 110 ;;:j 3: X ~r\ Initial Dry Density, pcf -98.9 14.4 .... • -~ ~ Initial Water Content,. % -18.6 8.2 :z: '" ::> >-4 -~ \ ~ f\ Load. psf -160 60 c:r: Q r\ ~\ Percent Swell " 8.0 5.4 " \ 1\ - 100 \ r\ 1\ • r\ SAMPLE LOCATION \\. I\. 13 Central \. \~ 90 MAXIMUM DRY 13 14 15 . 1\ 14 Mainstreet off E1 Caminio Real DENSITY. pcf ;13? .0 110.0 127 0 ~~t\. 15 Cut Above Canyon S.W. of Unit OPTIMUM MOISTURE CONTENT. % " 7.0 18.5 t-8.5 i\.t\.t\. • I t"\.' t\.~ MOISTURE CONTENT, % ~~I 80 0 10 20 30 40 • LABORATORY COMPACTION TEST FILL SUITABILITY TESTS • LABORATORY ~tfMI~~ 1557-70T TEST IoIETHOD: HOSP GROVE APARTMENTS WOODWARD -GIZIENSKI & ASSOC I ATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO, CALIFORNIA DR. BY: LS SCALE: ---PROJ~ HO: 72-1 OO-Ll CK'D BY: dh' • DATE: ? I? P, /7'), PAGE t:; "",+ 7 • MECHANICAL ANALYSIS 100 3 4 ~ '10 110 200 DIRECT SHEAR TEST DATA 16 ' 17 18 ~ -" 80 ,,, Dry Density, pcf 110.9 103.4 112.2 CI v ,\ :z:: Initial Water Content, % 11.6 14.3 9.6 ~ 60 '~\ <t ~,':.: ~16 Q.. Final Water Content. % 20.9 20.5 17. 1 f-in-~, ~ ffillO Apparent Cohesion. psf 300 360 120 u \ "-...... r-..... 0::. • w 1', "-'" Apparent Friction Angle. " f 22 Q.. 20 ...... 13 .83""" '--.~" ." ... "'~ I I 1 ~ 11 .1 1 0 • 140 1000 100 10 1.0 0.1 0.01 0.001 \ ~ ~ZERO AIR VOIDS CURVES GRAIN SIZE IN MILLIMETERS \ \, ICOBBLESI GRAVEL I SAH[ /SILT & CLAY I ~ \ t c I f c I m \ . , f\ V2.70 S.G.· 130 \ PLASTICITY CHARACTERISTICS \ [\/2.60 S.G. 16 17 18 \ 2.50 S.G. Liquid Limit. % l35 NP i :l7 I'v- • \,,\ 1\ Plasticity Index. % l25 Nn 1~ 1/ M .~ \ IlA ClassificatIon by Unified Soil / I \ 1\\ [\ 120 Classification System. CL SM CL Ih -f-:;> V f\ \~ \ • .... \ 1\ ~ u /' f\, \ \ c. 1 .~ \' 1\ f\ I-SWELL TEST DATA '16 17 18 :t: CI K\ \ liD W 3: \ \ ('\. Initial Dry Density, pcf 110.6 104.3 110.8 I- • -f\ \ 11.8 14.0 10.4 % Initial Water Content. % :::> >-\ ~ t-Load. psf 160 160 160 0::: Q 1\1\ Percent Swell 8.5 0.3 2.3 \ \ 1\ 100 1\ r\ 1\ • 1\ \ SAMPLE LOCATION \\ \ \ '\'l\ 16 SLIDE AREA I 90 '~AX I MUM DRY 16 17 18 1\ 17 WEST OF PAD FINISH ELEV. 1170 • DENSI TV. pcf 23 0 115 ~ 124 5 ~~ 18 PAD 1170 OPTIMUM MOISTURE 11. 5 10.5 14. u \J~ CONTENT. % \'1'\., I'\. ,,,,,- MOISTURE CONTENT, % "\..l"\.J : 80 0 10 20 30 LIO • LABORATORY COMPACTION TEST J FILL SUITABILITY TESTS LABORATORY COMPACTION t TEST METHOD: ASTM D1557-70T HOSP GROVE APARTMENTS ~ f WOODWARD -GIZIENSKI & ASSOC I ATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS ,I SAN DIEGO •. CALIFORNIA' . DR. BY: ALS SCALE: ---PROJ. NO: 72-105-2 CK'D BY:~ DATE: 2128j?3 PAGE 6 of 7 • • • -- MEOiAHICAL ANALYSIS 100 -3 a II--ro 40 200 DIRECT SHEAR TEST DATA 19 ~. l 80 Dry Densi ty. pcf 115.9 ~ \ z: Initial Water Content. % 8.2 (I') ~ 60 \ "-Final Water Content. % 14.9 ..... \ [f:ill{) Apparent Cohesion. psf 380 u \. 0:. • w '--h Apparent Friction Angle. c 22 "-20 ~ • 0 J I 1 I I I I I I Ill{) 1000 100 10 1.0 0.1 0.01 0.001 \ ~ ~ZERO AIR VOIDS CURVES GRAIN SIZE IN MILLIMETERS \ \, ICOBBLESI GRAVEL I~AH~ ISILT & CLAY I VI \ clf clm f \ r\ \ \ V2.70 S.G.- 130 PLASTICITY CHARACTERISTICS \~2.60 S.G. 19 I \ \ 2.50 S.G. Liquid Limit. % 32 [\.--- • I '1\\ 1\ Plasticity Index. % 9 II \ 1\' Classification by Unified Soi~ 120 \ \ r\ Classification System -~,lL \ \ • .... \ 1\ 1\ u 1\ \ \ Co ~ \ 1\ f\ SWELL TEST DATA :t: \ \ 19 <!) 110 -lLJ 3: \ \[\ Initial Dry Density, pcf 115.4 I- • -r\ z: Initial Water Content. ~ 8.6 ::> >-\ \ r\ Load. psf 0:: 160 Q Ii l'" Percent Swe 11 3.2 , \ 1\ 100 \ f\ r\ • [\ SAMPLE LOCATION \\ \ \ \.'1\ 19 PAD FINISH ELV. 1060 90 MAXIMUM DRY 19 i\ • DENSITY. pcf , ~R' 5 ~~ OPTIMUM MOISTURE 8.5 \.~~ CONTENT. % \. r\.1\. ~ 1'\." ~~ I 80 0 MOISTURE CONTENT, 1-~~) 10 20 30 40 LABORATORY C(M> ACT I OI~ TEST ~ • FILL SUITABILITY TESTS I LABORATORY COMPACTION TEST METHOD: ASTM D1557-70T HOSP GROVE APARTMENTS • WOODWARD -GIZIENSKI & ASSOC I-ATES CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO •. CALIFORNIA DR. BY: ALS SCALE: ---PROJ. "0.:72-105-20 • CK' 0 BY: d"A' DATE: 2/28/7?' pAGE 7 of 7 ------------" • • • • • • • • • • • APPENDIX C SKETCH DETAIL OF MAXIMUM SECTION (No Scale) CHIMNEY DRAIN DETAIL / (No Scale) FJ.:Ii.h . Cr.1:!e L--20'.--.1 H I 10' ~Iu£== rl ~LJl'!a"£='"".;;-tL ' . , • .: 24" Mini=~~ · : I ........... Co·::nec:~o~ Dr"i~ .J' I / ! • • I ~ . I j' Finish Grade . . NOTES: . (1) Safe construction slopes to be determined by the con- tractor. (2) 6-inch diameter perforated thick walled PVC, asbestos concrete, or ABS pipe. Outlet from buttress should be nonperforated and should slope to drain at convenient outlet. Outlet end shall be. protected against. damage and readily accessible for observation and maintenance. (3) Class II permeable California State Specification, Section 68-1.025, or combined aggregate State Specifi- cation, Section 90-3.04, i-inch maximum, 6-inch minimum encasement of drain pipe. (4) Compacted granular material. • • • • • • • • • • • APPENDIX D SPECIFICATIONS FOR CONTROLLED FILL , I. GENERAL These specifications cover preparation of existing surfaces to receive fills, the type of soil suitable fo~ use in fills, the control of compaction, and the methods of testing compacted fills. It shall be the contractor's responsibility to place, spread, water, and compact the fill in strict accordance with these specifications. A soil engineer shall be the owner's representative to inspect the construction of fills. Excavation and the placing of fill shall be under the direct inspection of the soil engineer, and he shall give written notice of conformance with the specifications upon completion of grading. Deviations from these specifica- tions will be permitted only upon written authorization from the soil engineer. A soil investigation has been made for this project; any recommendations made in the report of the soil investigation or subsequent reports shall become an addendum to these specifications. II. SCOPE The placement of controlled fill by -the contractor shall include all clearing and grubbing, removal of existing unsatisfactory material, preparation of the areas to be filled, spreading and compaction of fill in the areas to be filled, and all other work necessary to complete the grading of the filled area~. III. MATERIALS 1. Materials for compacted fill shall consist of any material imported or excavated from the cut areas that, in the opinion of the soil enginee~, is suitable for use in constructing fills. The material shall contain no rocks or hard lumps greater than 24 inches in size and shall contain at least 40% of material smaller than 1/4 inch in size. (Materials greater than 6 inches in size shall be placed by the contractor so that they are surrounded by compacted fines; no nesting of rocks shall be permitted.) No material of a perishable, spongy, or otherwise improper nature shall be used in filling. 2. Material placed within 24 inches of rough grade shall be select material that contains no rocks or hard lumps greater than 6 inches in size and that swells less than 3% when compacted as hereinafter specified for compacted fill and soaked under an axial-pressure of 160 psf. • • • • • • • • • • • 3. Representative samples of material to be used for fill shall be tested in the laboratory by the soil engineer in order to determine the maximum density, ,optimum moisture content, and classification of the soil. In addition, the soil engineer shall determine the approximate bearing value of a recompacted, saturated sampLe by direct shear tests or other tests applicable to the particular soil. 4. During grading operations, soil types other than those analyzed in the report of the soil investigation may be encountered by the contractor. The soil engineer shall be consulted to determine the suitability of these soils. IV. COMPACTED FILLS 1. General (a) Unless otherwise specified, fill material shall be compacted by the contractor while at a moisture content. near, the optimum moisture content and to a density that is not less than 90% of the maximum dry density determined in accordance with ASTM Test No. DI557-70, or other density test methods that will obtain equivalent results. (b) Potentially expansive soils may be used in fills below a depth of 24 inches and shall be compacted at a moisture content greater than the optimum moisture content for the material. 2. Clearing and Preparing Areas to be Filled (a) All trees, brush, grass, and other objectionable material shall be collected, piled, and burned or otherwise disposed of by the contractor so as to leave the areas that have been cleared with a neat and finished appearance free from un- sightly debris. (b) All vegetable matter and objectionable material shall be removed by the contractor from the surface upon which the fill is to be placed, and any loose or porous soils shall be removed or compacted to the depth shown on the plans. The surface shall then be plowed or scarified to a minimum depth of 6 inches until the surface is free from uneven features that would tend to prevent uniform compaction by the equip-' ment'to be used. (c) Where fills 'are constructed on hillsides or slopes, the slope of the original ground on which the fill is to be placed shall be stepped or keyed by the contractor as shown on the figure on Page 4 of these specifications. The steps shall extend completely through the soil mantle and into the underlying formational materials • • • • • • • • • • • • (d) After the foundation for the fill has been cleared, plowed, or scarified, it shall be disced or bladed by the contractor until it is uniform and free from large clods, brought to the proper moisture content, and compacted as specified for fill. 3. Placing, Spreading, 'and Compact'ion 'of Fill Material (a) The fill material shall be placed by the contractor in layers that, when compacted, shall not exceed 6 inches. Each layer shall be spread evenly and shall be thoroughly mixed during the spreading to obtain uniformity of material in each layer. (b) When the moisture content of the fill material is below that specified by the soil engineer, water shall be added by the contractor until the moisture content is as specified. (c) When the moisture content of the fill material is above that specified by the soil engineer, the fill material shall be aerated by the contractor by blading, mixing, or other satisfactory methods until the moisture con~ent is as specified. (d) After each layer has been placed, mixed, and spread evenly, it shall be thoroughly compacted by the contractor to the specified density. Compaction shall be accomplished by sheepsfoot rollers, vibratory rollers, multiple-wheel pneumatic-tired rollers, or other types of acceptable com- pacting equipment. Equipment shall be of such "design that it will be able to compact the fill to the specified density. Compaction shall be continuous over the entire area, and the equipment shall make sufficient trips to insure that the desired density has been obtained throughout the entire fill. (e) The surface of fill slopes shall be compacted and there shall be no excess loose soil on the slopes. v. INSPECTION 1. Observation and compaction tests shall be made by the soil engineer during the filling and compacting operations so that he can state his opinion that the fill was con- structed in accordance with the specifications. 2. The soil engineer shall make field density tests in accordance with ASTM Test No. D 1556-64. Density tests shall be made in the compacted materials below the surface where the surface is disturbed. When these tests indicate that the density of any layer of fill or portion thereof is below the specified density, the particular layer or portion shall be reworked until the specified density has been obtained. • •• • • • • • • • • • VI. PROTECTION OF WORK 1. During construction the contractor shall properly grade all excavated surfaces to provide positive drainage and prevent ponding of water. He shall control surface water to avoid damage to adjoining properties or to finished work on the site. The contractor shall take remedial measures to prevent erosion of freshly graded areas and until such time as permanent drainage and erosion control features have been installed. 2. After completion of grading and when the soil engineer has finished his observation of the work, no further excava- tion or filling shall be done except under the observation of the soil engineer. Strip as specified Original ground "Slope ratio = N M Remove all topsoil J ... :.... ' ...... :::~. . ~ /-<var:es' I ~ ... ~ .See note"i t-JOTES: The minimum width of liB" key shall be 2 feet wider than the compaction equipment, and not less than 10 feet. The outside edge of bottom key shall be below topsoil or loose surface material. Keys are required where the natural slope is steeper than 6 horizontal to 1 vertical, or where specified by the soil engineer. See.note , .. , , J , r , , , I I .' \ \ \ \ ( J>-I ) I , , \ I I I I' I f > -- I f--I i I~­, '- I t ~ , 'II ' I r 0 -i I 11'11;7 i}/ I f ~ i 1 ~J 1(( (~ I ' \:- ~ I I \ -\ -" \ / \ , ' ---' ~ -- 1 " ~ -_,0 il " ./ ~ / /_-/---/ l -I I -',,.-- /' .--_. -- , , ~ I I , 1; ~---"'-- '" , \ ) / / I / '. . :?:i?~ '/ .I /, / , ] I , , \. , I \ } , \ , \ ( , , , ' , , , \ , f '. DH"!"r~ BY \ k'Oy L kL£MJi. DJGfNf;E!25, IA/.C: 43/ I-IALE AVEIJUffiiJIA ' ESCONDIDO C,{)Lf2{:O (714) 745,322 , , CHECKED BY I PROJECT NO '/ ,. ,~., . ,,~~'\ .. ~',. .... ... l .\ L· \ J I \ o '\ \ \ \ , \ \ • \ \ , \ ;i 'r " \ \ T " , \ \ • \ I \ , I . -.-."--.'" '. ~---..~ -. -. ~" '. "" / " ! \ , \ , \ I \ \ \ \ "-... \ \ , ~ I " .. ~ I , \ 2 .. \ , ~ .\ J . ! \ A { -. ------- '. , ( \ I J \ .\ , ~. --- ---.--------.. -, ~ ------ . '. , " . , -~-------, ------·fi-·--------~~~~--~---", ./ A ,. t. -' ',~ / /( . -"r . r ::;-~ • >...' r ! , .. / \ \ \, I 75 \ \'/ \ r---EX \ \ ' I 15.' WATERUtv£ ~ '1 ' ''-E4!if , t, (/# I. ,~. -.\-rflYfl/' I'~~;/ ---- ----~--- ( \ ---'-- .... .-------'" / " . J r . .' I __ Jc' ____ --...-------~-- ------.-~ ,~=-::-~-::-~~---­"\j//-~ ~ I ! ' . I , I I /' I \ I -__ I \ ~--+---\- '\-'Y .. 0, • " AY kDYL , ,-' r I -. , . ~o " <c / . \ \ \ / i I --= ,,-,eo \ \ : I -.n! -I-~' t ~C;';?J} \ d l,-- co; I , I -jl ' : " , r . , ,~ -~ --. lliG.t_----r .~- \ , h r I I ,1'- T 'i _ t--, _J I " t __ ._.l.=-:~~==~~5 / / / / /' r/ / ./ 90 '. / / / / r I SLQP£, . \ ';- ! WOODWARD·Cl VOE I TYPICAL ,y-,-.;) cC TiON xx NO SC .... , E' ~~ ,. "A" .\ ( " . : ......... • .' ,. i, . , -, t I / i ) /: I I j .I j ---, -- / I //// ITE Pl."''' FIGURE N(, III S AnT'llo',TS 9 9 331\';-lDOl QATE' DE CONSU . PROJECT No.5 WOOOWARD.Cl Y -~;cc;"",,,,,~![,,,~G'~R~OV~E~AiP~~j~~'~~::;;;1;2;_;6;i_::7:;;;!!;;;;iTi~i~ii'S .u au • • r--------------------------------------------------------------------------- • • • A Boring 3 • 180 140 • 100 • 60 • 20 SLIDE • SLIDE PLANE} • Existing Grade FILL HOSP WAY 2 l min. t-Lt Boring 1 Drain '--dr---~--~-- COMPACTED FILL SEE NOTE 2 Proposed Buttress Fill ~ 2 :7 Notes: TYPICAL DRAIN CONFIGURATION (NO SCALE) 10 six inch diameter, perforated thick walled PVC, asbestos concrete or ABS pipe designed to withstand load of backfillo OUtlet should be nonperforated and sloped to draino OUtlet should be protected from damage and should be readily accessibleo B 180 140 100 60 20 GRAPHIC SCALE (FEET) LLJ 0, 20 40 ALTERNATE BUTTRESS DESIGN I' GROVE APARTMENTS 20 Class 2 permeable material in accordance with state of California nS~dard Specifications" (1978) Section 1.025 or combined aggregate •• ____ ~--~---------------------------------------------------------S-ec--t-1~on---9-0--3--.0_4 __ l_-_in __ C_h~m_ax __ im_um __ ' __ ._6_-_i_n_c_h __ m_i_n_imum ____ e_n_c_a_s_em __ e_n_t __ o_f~P_ipe~_. __ ~~D~R~A~W=N~B~Y::~S~h~~====][!!~~~~~~~~~f~I~G~UR~E~NO~:~2::::l DATE: 12-5-79 PROJECT NO: 59331W-UD01 WOOOWARO-CLYOE CONSULTANTS • • • A B • 180 3 EXISTING GRADE Boring 1 • FILL HOSP WAY-SLOT PLEtSTOCENE TERRACE .140 ~------------------------140 £-W?_7° DEL MAR FORMATION E-t M M - -~~LIriE -PLID~ lit • - 100 PLANE 100 -N z 0 H E-t ~ M 60 60 H • M 20 20 • • GRAPHIC SCALE (FEET) ILl o 20 40 • ALTERNATE BUTTRESS DESIGN II GROVE APARTMENTS DAAWNBY: sh FIGURE NO: 3 • DATE: 12-5-79 PROJECT NO: 59331W-UD01 WOODWARD-CLYDE CONSULTANTS