PREPAREDFOR:
MadiscmSquarePartnership
4223 Ponderosa Avenue, Suite A
San Diego, California 92123
PREPARED BY:
southerncalifo~asO~and~ting,Incorporated
Post Office Box 20627
6280 Riverdale Street
San Diego, California 92120
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
EMPEERING DEPT. LIBRARY
City of Carlsbad 2075 Las Pa!mas e+te
CMmd, CA 82&x3-4859
SO”THERN CALIFORNIA SOIL AND TESTING, INC.
628a RIVERDALE sr. SAN DIEGO, CALIF. 9z1z(1 * TELE 2804121 * P.0. BOX 2062-I SAN DIEGO. CALIF. 92120
678 LNTEe7PRISE ST. ESCONDIOO. CALIF. 9zoz5 . TE‘E 746.4544 &pril 24, 1990
Madison Square Partnership
4223 Ponderosa Avenue, Suite A
San Diego, California 92123
SCS&T 8821047
Report No. 19
SUBJECT: Report of In-Place Density Tests, Site Improvements,
Lots 17, 18, and 19, Palomar oaks Business Park,
Carlsbad, California.
Gentlemen:
In accordance with your request, this report has been prepared
to present the results of the in-place density tests performed
in the sewer, water, storm drain, and retaining wall backfills
as well as in the prepared subgrade and base materials at the
subject site. These tests were performed by Southern California
Soil & Testing, Inc. between August 17, 1989 and February 21,
1990.
Field density tests were performed in accordance with ASTM Test
1556-74 at various locations in the compacted backfills and
prepared subgrade and base materials. Test locations were
chosen by our field representative. The results and locations
of the field tests are shown on the attached plates.
SOUTHERN CALIFORNIA s 0 I L AND TESTINO. INC
- SCS&T 8821047 April 24, 1PgO Page 2
Maximum dry density determinations were performed on -
representative samples of the soils used according to ASTM Test
1557-78, Methods A and C. The results of these tests were used - in conjunction with the field density tests to determine the
percent of relative compaction of the compacted backfill soils - and subgrade and base materials.
- If you should have any questions after reviewing this report,
please do not hesitate to contact this office. This opportunity
to be of professional service is sincerely appreciated. -
-
-
-
.-
Respectfully submitted,
SOUTHERN CAL,IFORNIA SOIL & TESTING, INC.
SCE&T Project SuperViSOr
-
-
-
-
-
-
Charles H. Christian, R.G.E. #00215
CHC/DH/MH/vp
cc: (4) Submitted
(1) SCS&T, Escondido
-
-.
JOB NAME: Palomar Oaks JOB NO:8821047 -. PLATE NO: 4
TEST DATE LOCATION ELEVATION MOISTURE DRY DEN. SOIL REL.COMP. -' NO. (percent) (p.c.f.1 TYPE (percent) ___________________-____________________-------------------------------------
SEWER
- Sl 9-14-89 Building 2, Interior s2 9-14-89 Building 2, Interior s3 9-14-89 Building 3, Interior - s4 9-14-89 Building Interior 3,
- WATER LINE
Wl 9-7-89 Southwest Corner of Building 2 - w2 9-7-89 Southwest Corner of Building 2
-
STORM DRAIN
- SD1 8-17-89 Lot 19, South SD2 8-17-89 Lot 19, South SD3 8-21-89 Lot 18, East SD4 8-22-89 Lot 17, East -- SD5 8-22-89 Lot 17, East SD6 9-5-89 Lot 17, East SD7 9-5-89 Lot 18, East (Inlet) - SD8 9-5-89 Lot 18, East (Inlet) SD9 9-5-89 Lot 18/19 SD10 9-5-89 Lot 19 _ SD11 9-5-89 Lot 19 SD12 9-5-89 Lot 19 SD13 10-28-89 Lot 17 SD14 10-28-89 Lot 17 - SD15 10-28-89 Lot 18
.- RETAINING WALL
RWl 8-22-89 Lot 19, Bottom of Footing - RW2 8-22-89 Lot 19, Bottom of Footing RW3 8-24-89 Lot 19, Bottom of - Footing
RW4 8-24-89 Retest of RW2 RW5 8-24-89 Retest of RW4, (RW2) - RW6 8-24-89 Retest RWl of RW7 9-6-89 Lot 18/19, Bottom of Footing
184.0 12.4 113.2 184.0 13.0 111.2 174.5 11.7 111.9 174.5 13.0 112.2
188.0 14.3 113.4
185.5 13.6 112.0
196.5 15.6 111.2 198.5 16.3 108.9 178.5 14.3 110.0 167.0 14.3 111.9 169.0 14.3 111.3 171.0 16.2 113.6 179.0 17.6 107.8 181.0 17.6 110.5 185.5 19.0 112.0 195.0 16.3 112.3 197.0 18.3 111.4 188.0 17.6 110.4
170.0 17.6 108.9 171.0 16.3 109.4 180.0 17.0 108.3
192.0 5.3 87.2
192.0 8.1 99.6
192.0 14.9 106.8
192.0 14.3 97.0 192.0 11.1 112.4 192.0 10.5 113.7 181.0 17.6 106.8
2 2 2 2
2
2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1
1
1
1 1 1 1
92.6 90.9 91.5 91.7
92.7
91.6
94.3 92.4 93.3 94.9 94.4 96.4 91.4 93.7 95.0 95.3 94.5 93.6 92.4 92.8 91.9
74.0
84.5
90.6
82.3 95.3 96.4 90.6
-
-
-.
JOB NAME: Palomar Oaks JOB NO:8821047 -. PLATE NO: 5
TEST DATE LOCATION ELEVATION MOISTURE DRY DEN. SOIL REL.COMP. -. NO. (percent) (p.c.f.) TYPE (percent) ________________________________________-------------------------------------
RW8 9-6-89 Lot 18/19, Bottom of 17.6 107.5 91.2
- Footing RW9 10-3-89 Lot 19, Retaining 14.9 110.0 93.3 wall RW10 10-3-89 Lot 19. Retaining
- Wall
RWll 10-3-89 Lot 19, Reta Wall
91.1
ining
181.0
204.0
203.5
202.0
203.0
205.5
205.5
204.0
205.0
207.0
203.0
205.0
202.0
203.0
186.0
187.5 189.0 188.0 191.0 190.0
11.7 107.4
13.6 109.4
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2 2 2 2 2
1 1 1 1 2 2 2 2 1 2
92.8
ining - RWl2 10-3-89 Lot 19, Reta wall RW13 10-4-89 Lot 19, Reta Wall -
12.4 111.8 94.8
,ining 11.7 111.6 94.7
RW14 12.4 107.2 90.9
RW15
10-4-89
10-4-89 11.7 108.6 92.1
RW16 10-4-89 13.0 107.5 91.2
- RW17
RW18
10-5-89 12.4 108.7 92.2
10-5-89 17.0 106.7 90.5
- RW19 10-5-89 16.3 107.1 90.8
RW20 -
RW21
10-6-89
Lot 19, Retaining Wall Lot 19, Retaining wall Lot 19, Retaining wall Lot 19, Retaining wall Lot 19, Retaining Wall Lot 19, Retaining Wall Lot 19, Retaining Wall Lot 19, Retaining Wall Lot 18/19, Retaining Wall Lot 18, West Lot 18, West Lot 18/19 Lot 18, West Lot 18/19
14.3 106.6 90.4
10-6-89 12.4 106.8 90.6
_ RW22 10-28-89 17.6 117.4 96.0
RW23 10-28-89 RW24 10-28-89 - RW25 10-28-89 RW26 10-30-89 RW27 10-30-89
17.0 116.6 17.6 115.3 14.9 112.8 14.3 113.1 14.9 114.8
95.13 94.3 92.2 92.5 93.9 -
SUBGRADE
- SGl SG2 SG3 - SG4 SG5
SG6 - SG7 SG8 SG9 _ SGl0
l-5-90 Parking, Lot 18 Subgrade 8.1 115.9 l-5-90 Parking, Lot 18 Subgrade 14.3 114.0 l-5-90 Parking, Lot 18 Subgrade 9.9 97.5 l-5-90 Parking, Lot 18 subgrade 14.3 117.1 l-8-90 Parking, Lot 17 Subgrade 10.5 120.7 l-8-90 Parking, Lot 17 Subgrade 9.3 120.2 l-8-90 Parking, Lot 17 Subgrade 11.7 119.7 l-8-90 Parking, Lot 17 subgrade 12.4 118.4 l-8-90 Retest of # SG3 Subgrade 11.1 114.9 l-29-90 Parking, Lot 19 Subgrade 12.4 119.4
98.3 96.7 82.7 99.3 98.7 98.3 97.9 96.8 97.5 97.6
-
-.
-.
-
-
-
-
-
--
-
-
-
-
-
-
-
JOB NAME: Palomar Oaks JOB NO:8821047 PLATE NO: 6
TEST DATE NO. -------------
SGll l-29-90 SG12 l-29-90 SG13 l-29-90 SG14 2-2-90
SG15 2-2-90
BASE
Bl 1-31-90 B2 1-31-90 83 1-31-90 B4 1-31-90 B5 1-31-90 B6 1-31-90 B7 1-31-90 88 1-31-90 B9 1-31-90 B10 2-l-90 Bll 2-l-90 B12 2-l-90 B13 2-l-90 B14 2-l-90 815 2-l-90 816 2-2-90 B17 2-2-90 B18 2-3-90 B19 2-3-90 B20 2-6-90 B21 2-14-90
B22 2-21-90
LOCATION ELEVATION MOISTURE DRY DEN. (percent) (p.c.f.) ._-________-____-___-------------------------------
Parking, Lot 19 Subgrade 13.0 119.6 Parking, Lot 19 Subgrade 14.3 110.7 Parking, Lot 19 Subgrade 11.7 116.4 Lot 17, Entrance Subgrade 13.0 112.7 Apron Retest of # SG12 Subgrade 8.7 137.7
SOIL REL.COMP. TYPE (percent) .-_____-__-____
2 97.8 2 90.5 2 95.2 1 95.6
3 98.1
Parking, Lot 17 Parking, Lot 17 Parking, Lot 17 Parking, Lot 17 Parking, Lot 18 Parking, Lot 18 Parking, Lot 18 Parking, Lot 18 Retest of #Bl Parking, Lot 19 Parking, Lot 19 Parking, Lot 19 Parking, Lot 19 Parking, Lot 19 Parking, Lot 19 Parking, Lot 19 Parking, Lot 19 Parking, Lot 19 Lot 17, Entry Lot 18, Entry Lot 19, Northwest Entry Lot 19, Northeast Entry
Base Base Base Base Base Base Base Base Base Base Base Base Base Base Base Base Base Base Base Base Base
7.0 129.3 3 92.2 7.5 136.2 3 97.1 7.0 138.3 3 98.6 7.5 137.9 3 98.3 7.0 136.9 3 97.6 7.0 138.2 3 98.5 7.5 139.4 3 99.4 6.4 137.4 3 97.9 6.4 136.3 3 97.1 7.0 139.9 3 99.7 7.0 139.4 3 99.4 7.0 138.0 3 98.4 6.4 135.2 3 96.4 6.4 138.3 3 98.6 7.5 134.9 3 96.2 5.8 139.0 3 99.1 7.0 137.2 3 97.8 7.5 136.5 3 97.3 6.4 134.8 3 96.1 6.4 135.7 3 96.7 7.0 135.5 3 96.6
Base 5.3 133.8 3 95.4
-
-
.-
-
-
-
-
-
-
-
-
-
-
-
JOB NAME: Palomar Oaks JOB NO:8821047 PLATE NO: 7
MAXIMUM DENSITY AND OPTIMUM MOISTURE DETERMINATIONS, ASTM 1557-78 --_-____________________________________-------------------------
SOIL METHOD DESCRIPTON OPTIMUM MAXIMUM TYPE MOISTURE DENSITY (percent) (pcfl
1 A Brown Fine Grained 15.6 117.9 Silty Sand
2 A Reddish Brown, Fine 13.7 122.3 to Medium Grained Silty Sand
3 C Imported Base Material (GW) 4.8 140.3