HomeMy WebLinkAboutCT 81-16; Vista Santa Fe; Soils Report; 1981-04-21,
REPORT OF GEOTECHNICAL INVESTIGATION
(PHASE I)
LA COSTA AREAS SE18 THRU SE21
FOR
THE MEISTER COMPANY
APRIL 21, 1981
PREPARED FOR:
THE MEISTER COMPANY
5100 Campus Drive
Newport Beach, California 92660
PREPARED BY:
SHEPARDSON ENGINEERING ASSOCIATES, INC.
1083 North Cuyamaca Street
El Cajon, California 92020
SSEA
OEOTECHNICAL ENOINEERB
EHEPARDBON ENOINEERINO ABBOCIATEB INC.
1083 N. CUYAMACA STREET
EL CAJON, CA. BOOR0
TILE 448-8830
April 21, 1981
The Meister Company
5100 Campus Drive
Newport Beach, California 92660
ATTENTION: Mr. Terry Teeple
Vice President
S.E.A. 110175
SUBJECT: Report of Geotechnical Investigation (Phase I), La Costa
Areas SE18 thru SE21, Olivenhain and Ranch0 Santa Fe
Roads, Carlsbad, California.
Gentlemen:
In accordance with your request and our proposal dated March 20, 1981,
we have completed the subject investigation and herewith submit our
findings, conclusions, and recommendations. We have combined data
obtained by previous geotechnical investigations with the results of
additional extensive subsurface investigations performed in accordance
with our proposal, to formulate the conclusions and recommendations
presented herein. It is our opinion that the geotechnical data available
will permit efficient preparation of proposed development plans in
accordance with the City of Carlsbad, Ordinance No. 8086, and accepted
engineering practices. It is our opinion that additional subsurface
investigations will be required prior to completion of final grading
plans for the subject project.
The subject site, consisting of approximately 176 acres, is located as
shown on attached Plate No. 1A. The proposed development will consist
of single and multi-family residential units, a proposed school site and a commercial area.
It is apparent, based on the geotechnical data presented herein, that
the subject site contains a significant number of existing landslides.
The landslides are founded in the De1 Mar Formation soils which are
present below approximately elevation 240 msl. The proposed site
grading; as shown in the “Concept Site Plan” presented herein as Plate
No. 1, will substantially improve the stability of certain landslide involved soils. In areas where the proposed grading does not result in
-
-
April 21, 1981 -2- S.E.A. 110175
an increase in the factor of safety in excess of 50 percent, ~recommended
mitigating measures have been incorporated in this report. The miti-
gating measures consist of the installation of stabilizing buttress fills
and subsurface drainage systems. The mitigating measures are designed
to produce a factor of safety of not less than 1.5 when the pfoposed
site grading has been completed.
In conclusion, it is our opinion that the subject site is suitable for
development in accordance with the above referenced “Concept Site Plan”,
providing the recommendations presented in the body of this report are
incorporated in the site development.
Please do not hesitate to contact the undersigned, if you have any
questions regarding the findings, conclusions, or recommendations pre-
sented herein.
Respectfully submitted,
SHEPARDSON ENGINEERING ASSOCIATES, INC.
Vice President
DES: jgr
cc: (41 Submitted
(4) Rick Engineering
Mr. Bob Ladwig
(21 The Planning Center
Attn: Mr. Peter Templeton
(21 Westec Services, Inc.
Attn: Fay Round
-
TABLE OF CONTENTS
-
-
-
-.
-
-
-
.
-
-
-
-.
-
-
-.
-
-~
-.
-.
INTENT . . . . . . . . . .
SCOPE . . . . . . . . . .
Site Description . . . . . . .
Site Geology . . . . . . . .
Geologic Units . . . . . . .
Geologic Hazards . . . . . .
FINDINGS & DISCUSSION . . . . . .
General Soil & Geologic Characteristics
Alluvial Deposits . . . . . .
Liquefaction Potential . . . . .
Analyses of Existing Landslides . .
Subsurface Drainage Systems . . .
CONCLUSIONS & RECOMMENDATIONS . . .
Site Preparation. . . . . . .
Alluvial Soils . . . . . .
Proposed Structural Fill Areas .
Preparation of Natural Ground .
Site Grading. . . . . . .
Transition Lots . . . .
Earthwork. . . . . .
Canyon Subdrains . . .
Mitigating Measures(Landslides1 .
Proposed Site Grading . .
Stabilizing . . . .
Mitigating Measures(Site Grading)
Landslide Debris Recompaction. .
Cut-Off Drains . . . . . .
Foundation Design Criteria. . .
Foundation Condition A . .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
.
. .
Page No.
1
1
. 2
. 3
. 3
. 4
. 5
. 5
. 7
. 7
. 8
. 9
10
10
10
11
. 11
12
12
12
12
12
13
13
. 14
15
. 16
. 16
. 16
-
_-
-.
-
-
.-
-
-
-~
TABLE OF CONTENTS (CONTINUED)
Foundation Condition B . .
Foundation Condition C . .
Foundation Condition D . .
Slope Stability . . . . . .
Slope Protection . . . . . .
Earth Retaining Structures. . .
Allowable Passive Pressure .
Active Soil Pressure . . .
FIELD EXPLORATIONS . . . . . .
LABORATORY TESTING . . . . . .
INVESTIGATION LIMITATIONS . . . .
.
ATTACHMENTS
VICINITY MAP .........
SITE PLAN ..........
BORING LOGS .........
LABORATORY TEST RESULTS .....
CROSS SECTIONS ........
Benton Engineering Boring Logs; GeoSoils, Inc.
.
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
Boring Logs,
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
Consolidation Data; Shepardson Engineering Associates, Inc.
Preliminary Calculations; Recommended Grading Specifications:
General Provisions, Special Provisions; Unified Soils
Classification Chart . . . . . . . . . . . . .
Page No.
17
19
. 20
. 22
. 22
. 22
22
23
. 23
. 24
24
Plate No.
1A
1
2-32
33-38
. 39-43
. Appendicies
-
-
-
.-
-
-.
-
-
-
-
-
REPORT OF GEOTECHNICAL INVESTIGATION
(PHASE I) .
LA COSTA AREAS SE18 THRU SE21
FOR
THE MEISTER COMPANY
APRIL 21, 1981
INTENT
The intent of this investigation- was to compile sufficient geotechnical
data pertaining to the subject site to permit proper analysis of the
proposed “Concept Site Plan” and to provide design criteria for prep-
aration of preliminary grading plans for the proposed development. It
was further our intent to incorporate in our recommendations, pertinent
sections of the City of Carlsbad Grading Ordinance 8086, in addition to
those recommendations intended to mitigate potentially adverse gec-
technical conditions.
SCOPE
The scope of our investigation, completed as of this date, has consisted
of the following:
1. The extension of 15 large diameter test borings at the locations
shown on the attached Plate No. 1. The soils encountered in these
borings were logged by “downhole” inspections by our Engineering
Geologist. Representative soil samples obtained from the borings
were returned to our laboratory for physical testing.
-
-
-
-
_-
-
-
-_
-
-
-
-
-
-
-.
-~
April 21, 1981 -2- S.E.A. 110175,
2. Laboratory tests were performed on representative samples of the
soils encountered in accordance with applicable A.S.T.M. -
procedures. Residual shear tests were performed on soils
encountered in the area of existing slide planes.
3. Additional geotechnical data was compiled from reports prepared
by:
Benton Engineering, Inc.
Project Nos.
72-82BC
73-3-1lBC
75-l-20BC
75-IO-9BC
GeoSoils, Inc.
Project W.O. 810-OC.
We have compiled the data obtained from the above described scope
within the body of this report, or the attached appendices.
Site Description
The subject property is an irregular shaped parcel of land located
immediately east of the intersection of Rancho Santa Fe Road andoliven-
hain Road in the southeast corner of the City of Carlsbad.
The site is characterized by grass covered, gently rolling hills with
prominent flat bottom drainages paralleling along the northwest and
southeast boundaries. Elevations on site range from a low of approxi-
mately 75 msl in the southwest corner to a high of approximately 282
msl at the top of the highest hill in the eastern central portion of the
site. Numerous subtle topographic benches are present along the hillsides
paralleling the major drainages within the project.
-
-
-
_
_.-
-_
-
__
-
.-
-
_.
-
-
April 21, 1981 -3- S.E.A. 110175
At present, the property is used solely for livestock grazing, however,
there is evidence that it was cultivated in the past. No prior grading
has taken place on the site, and there are no man-made structures other
than fences and livestock pens within the limits of the propert;. An
existing power line runs along the southern boundary of the property.
Site Geology
Geologic Units
The project site is underlain by four mappable geologic units. These
units consist of the De1 Mar Formation, Torrey Sandstone Formation,
landslide debris and alluvium.
The oldest of these units is the De1 Mar Formation of Eocene age. This
formation is characterized by greenish-gray and blueish-gray, mud-
stones, claystones and siltstones, which often contain considerable sand
grains. The bedding is nearly flat lying at this location. The upper
portions of the De1 Mar Formation are interfingered with the overlying
Torrey Sandstone resulting in a series of interbedded sandstones and
mudstones near the contact between the two units.
The Torrey Sandstone is also of Eocene age and conformably overlies,
and is interfingered with, the De1 Mar Formation. The Torrey Sandstone
is buff to tan in color with considerable red-brown iron staining. It
consists of partially cemented sandstone, which ranges from fine to
coarse grain in texture. Generally, the Torrey Sandstone is encountered
above elevation approximately 240 feet msl within this project. Character-
istically, the Torrey Sandstone exhibits considerable cross bedding.
Our investigation revealed the presence of numerous existing ancient
landslides occupying the . major portions of the steeper natural slopes
within this project. These landslides have originated along weak mud-
stone or claystone beds within the De1 Mar Formation and can best be
-
-
-
.~.
-
_.
-
-
-_
-.
-
April 21, 1981
:
i
-L- S.E.A. 110175,
described as a combination of bedding plane glide and rotational type
of landslides. The presence of these landslides is defined by subtle
topographic benches at various elevations along the slopes, and
generally hummocky topography downslope of these benches. O& test
borings have confirmed the presence of existing shear zones and slide
planes beneath these topographic features.
The last, and apparently most recent, geologic unit encountered within
the project is Quaternary age alluvial material deposited by waters
flowing along the major drainages. Test borings within this alluvium
indicate that it is generally clayey in nature and may be in excess of
28 feet in depth at some locations. At the time of our investigation,
these alluvial materials appeared to be at or near saturation. There
was evidence of a perched water table near, or just below, the ground
surface within the alluvial areas.
Geologic Hazards
As was discussed above, the claystones and mudstones of the De1 Mar
Formation are susceptible to landslide activity. Existing landslides
within the project will require detailed analyses to determine that the
proposed grading and/or appropriate mitigating measures will adequately
stabilize the existing slide materials. Additional analyses will be
required for the design of cut and fill slopes which involve De1 Mar
Formation materials.
Although no faults are evident within the project area, inactive faults
have been encountered within nearby projects and it is conceivable that
inactive faults may be encountered during the grading for this project.
It ia our opinion, based on existing geologic data. that the faults in
the general area do not pose a seismic threat and will not be a
significant factor in the development of this project.
It is our opinion that the nearest source for a major earthquake, which
would affect this area, would be the Elsinore or San Jacinto Fault Zones
-
-
,-,.
-.
-.
-
_-
_
-
.-
-
-
~.
-
-.
April 21, 1981 -5- S.E.A. 110175.
which Yie approximately 25 and 35 miles, respectively, to the northeast.
In our opinion, the Elsinore and San Jacinto Fault Zones are capable of
producing maximum probable earthquakes on the order of 7.0 and 7.8, .
respectively. Such events could result in bedrock accelerations of
approximately 0.16 g.
Due to the clayey dense nature of the existing alluvium within this
project, is does not appear that liquefaction, in the event of a major
earthquake, would be a potential hazard.
Expansive soils will be encountered in numerous areas of this project
where mudstones and claystones of the De1 Mar Formation are exposed.
Special grading techniques or structural designs will be required to
mitigate the potential expansion of these soils.
FlNDlNGS & DISCUSSION
General Soil & Geologic Characteristics
A review of the previous test borings and our recent test borings
indicate that the entire area of the project site contains a clayey
topsoil deposit ranging in thickness from 1 to approximately 5 feet.
Even the areas underlain by high quality sandstone have developed an
expansive, clayey topsoil profile which ranges in thickness from 1 to 3
feet. Areas underlain by mu~dstone generally contain 3 to 5 feet of
relatively soft topsoil materials.
A review of me limited number of borings placed within the slope areas
outside of existing landslides, indicates that there is a very limited
thickness of colluvial materials on these slopes. Compressible colluvial
materials which will require removal during keying procedures, as part
of the grading operation; can generally be considered not to exceed 5
feet in thickness. Based on topographic expression, it appears that the
extreme lower portions of the existing slopes, as they transition into
-
-
.-
-
.~
.-~
-
__
.~
-
-
.-
-
-
-
April 21, 1981 S.E.A. 110175
alluvial areas, may possess significant deposits of colluvial materials,
however, the scope of this phase of our investigation did not include
test borings in these transition areas. .
Highly disturbed, potentially compressible material within existing land-
slide areas appears to be limited to. the upper 10 to 15 feet of material
near the heads of the slides. In many cases, relatively little disturb-
ance was observed in the landslide materials immediately below the
overlying topsoil zone. No deep slide graben deposits were observed
although it should be noted that, the heads of these ancient landslides
have not, at this time, been thoroughly investigated for slide graben
deposits.
Excavations within the Torrey Sandstone Formation above approximately
elevation 240 to 245 should encounter fine to medium grained, silty to
cohesionless sand which is non-expansive and possesses excellent
strength characteristics. This, of course, does not include the thin
clayey topsoil cover which was previously described. Deposits of the
Torrey Sandstone can generally be recognized by their yellowish tan to
orange color as opposed to dark gray to gray, extremely fine dense
sandstones which are encountered in the underlying De1 Mar Formation.
In the transition zone between the Torrey Sandstone and the underlying
De1 Mar Formation around elevation 240, sandstone interbeds approxi-
mately 5 to 6 feet in thickness may be encountered within the mudstones
of the De1 Mar Formation. For purposes of estimating and preliminary
design, we recommend that these deposits of Torrey Sandstone within the
De1 Mar Formation be considered as lenses of limited area1 extent.
Sufficient data is not available, at this time, to adequately evaluate
the. continuity of these sandstone interbeds.
The mudstones and siltstones within the De1 Mar Formation can be
considered highly expansive and over-consolidated. Many of the beds
observed in the test borings exhibited considerable fracturing with
slickensided surfaces. Such features scan detrimentally affect cut slopes
constructed in these materials.
-
--
-
.-
-
_~
-
-.
.-
_..
-
-~
-
-.
April 21, 1981 -7- S.E:A. 110175,
Alluvial’ Deposits
The alluvial materials on-site have been investigated by Benton . Engineering and GeoSoils, Inc. Their findings indicate that these
materials are generally of a sandy clay to clayey sand composition with
scattered cobbles throughout. The results of consolidation tests performed
during the above referenced investigations do not indicate excessive
settlement, under the anticipated embankment loads.
It is our opinion, as discussed with your representatives, that Phase II
of this investigation will require the retrieval and analysis of
additional samples from the alluvial soils to permit a detailed analysis
of the anticipated magnitude and rate of consolidation. In the event the
detailed analysis indicates that the time required to produce adequate
consolidation of the alluvial soils does not coincide with the proposed
development schedule, the use of surcharge fills and/or vertical sand
drains can be utilized to accelerate the consolidation process.
We have included, hereinafter, recommendations for the preparation of
alluvial soils to receive. the proposed fills. The preparation, i.e.
removal and recompaction, of the alluvial soils will be required above
the existing groundwater elevation, which may vary from the surface to
approximately 10 feet below existing grade in the alluvial areas. The
preparation of alluvial soils for some heights above the groundwater
elevation will be required, regardless of the anticipated time rate
settlement.
Liquefaction Potential
Based on the results of investigations, completed as of this date, in the
alluvial soils, it appears that the clayey sands and sandy clays are
classified as medium dense and stiff, respectively. In consideration of
the additional densification, which will occur as the result of the
imposed embankment loads, and the characteristics of the soils
encountered in the previous investigations, it is our opinion that ~the
potential for liquefaction, resulting from dynamic, i.e; seismic loading,
-
-
-
-
..-
-
-
-
-
_-
-.
-
-.
-,
_ I
/
i
April 21, 1981 -8- S.E.A. 110175
is verq low. As indicated hereinabove, this condition will be analyzed
in more detail during completion of Phase 11 of our investigation.
Analyses of Existing Landslides
.
The method of analysis of the stability of the existing landslide areas
is, with specific intent, considered conservative. It is our standard
procedure to evaluate the stability of existing landslides, as well as
proposed mitigating measures to improve stability, based on two
generally accepted methods. The first method consists of analysing the
existing landslide configuration to determine the approximate shear
strength characteristics required to produce a factor of safety of 1.0.
The second procedure is to utilise the results of laboratory test data to
calculate the apparent factor of safety that exists within the landslide
mass under the current and proposed configuration.
In consideration of the limited time available to complete our analyses
and report, procedure #2, described above, was utilised as a check of
the shear strength characteristics which were determined by a mathe-
matical analysis of each slide mass. The mathematical analyses were
based on an assumed factor of safety of 1.0. Obviously, the existing
landslides currently possess a factor of safety greater than 1.0 or
reactivation of the landslide masses would have occurred during, or
subsequent to, the abnormally heavy rainfall of recent years. Therefore,
the calculated shear strength characteristics reflect a lower angle of
internal friction than that which currently exists.
This condition has been confirmed by comparison between the laboratory
test results presented on attached Plate No. 33 and the calculations
presented herein as Appendix C. The laboratory test results indicate
residual angles of internal friction of go to 13’ and the calculated
angles of internal friction’ are in the order of 7O to go.
Laboratory shear tests indicate varying degrees of cohesion within the
slide plane soils. Although we are aware that some cohesion is present
-
-
-
_..
. .
-.
-.
._
-.
-
-.
.~~.
-
-
-
-
..,..
_~
-
April 21, 1981 -9- S.E.A. 110175
in the ‘slide plane soils, it is. our opinion that the inclusion of this soil
characteristic in these preliminary calculations might give an indication
of false stability and would not serve your best interest. We do
anticipate that a value representing cohesion will be utilized in the
detailed analysis performed under Phase II of our investigation.
The above described analytical procedure also provides us with an
indication of the accuracy with which we have plotted the cross-section
configuration of each slide. The configuration of each slide area is
based, at this time, on the extension of one test boring along each
cross-section and the topographic features which are indicative of the
head and toe of the landslide. It is apparent that the assumed
cross-section of each landslide mass as shown on attached Plate Nos. 39
thru 42, inclusive, is relatively accurate as evidenced by the angle of
internal friction derived from procedure No. 1 described above. The only
exception is M-M shown on Plate No. 41. A review of the calculations
presented in Appendix C indicates that the cross-section M-M config-
uration resulted in a calculated angle of internal friction of 4.8’
indicating the assumed configuration is extremely stable. It is apparent
that additional subsurface investigations, to be performed under Phase
II of our investigation in the area of landslide No. 12, will be required
to more accurately delineate
Subsurface Drainage Systems
the slide plane configuration.
The soil moisture conditions prevalent at the time of our investigation
did not indicate the presence of extensive subsurface seepage conditions.
Boring No. 8: extended in Landslide No. 9, was the only major exception
to this condition. The absence of significant subsurface seepage through-
out the major portion of the site is, in our opinion, the result of
relatively impermeable surface soils. Obviously, the proposed site
grading will remove the’ less permeable topsoil strata and produce a
condition which may be condusive to the infiltration of surface water.
We have, therefore, included in our recommendations, the installation of
extensive subsurface drainage systems in virtually all areas of the
-
- April 21, 1981 -IO- S.E.A. 110175
-
-
-
-
-.
existing landslides. In accordance with the Carlsbad Ordinance Section
11.06.100(3)(B), we have also included recommendations for the instal-
lation of subdrains in all canyon fill areas.
Reference is made to the installation of “cut-off drains” as shown on
attached Plate Nos. 39 thru 42. The utilization of a cut-off drain and
recompaction of native soils in those areas where existing slide scarps
encounter proposed finish grade are intended to mitigate two potentially
adverse conditions. The recommended removal and recompaction is, in
our opinion, potentially conservative due to the absence of apparent
slide graben areas as indicated by previous investigations of the
subject site. The installation of the proposed cutoff drains is, in our
opinion, necessary to reduce the potential for infiltration of surface
water into the slide plane areas.
CONCLUSIONS & RECOMMMENDATIONS --
Site Preparation
Alluvial Soils: In consideration of the existing density and related
settlement characteristics of the alluvial soils located above existing
groundwater elevation, we recommend that these soils be removed,
cleaned of all deleterious material, and recompacted in accordance with
the Recommended Grading Specifications as “structural fills”. The
alluvial soils should be removed to the depth required to comply with
one of the following three conditions:
1) Uniformily dense alluvial soils which possess a density equal to
or not less than 85 percent of maximum dry density.
2) To a depth which is not more than 3 feet feet above static
. groundwater elevation.
3) A depth of approximately 6 feet below existing grade. (Note: the
approximate maximum depth of alluvial removal is based, on the
- April 21, 1981 -ll- S.E.A. 110175
.-
,-
-.
-
-.
-.
-
-
-
-
-
data available at this time. This depth may be increased in
localized areas, based on additional test borings and/or test
trenches extended prior to and during site grading).
The limits of the alluvial removal and recompaction will apply to all
areas which are intended to receive structures and/or structural fills in
the major drainage courses and tributary canyons. The removal and
recompaction of alluvial soils in the major drainage course adjacent to
Ranch0 Santa Fe Road should extend a minimum distance of 10 feet
outside the proposed toe of the structural fills.
For purposes of preliminary construction cost estimates, we recommend
that an average depth of 4 feet of alluvial removal and recompaction
throughout all areas designated as “Qal”, as shown on attached Plate No
1, be utilized.
Proposed Structural Fill Areas: In consideration of the marginal density
encountered in the colluvial deposits, which overlie the majority of the
site, we recommend that the colluvial soils be removed to firm natural
ground and replaced as structural fills in accordance with the attached
Grading Specifications. Firm natural ground is defined as soil which
possesses an in situ density equal to, or greater than, 85 percent of its
maximum dry density. For preliminary construction cost estimates, we
recommend that an average depth of 2.5 feet of removal and recompaction
within the proposed structural fill areas be utilized. It must be noted
that localized areas of deeper removal may be required.
Preparation of Natural Ground: Subsequent to the removal of alluvial
and/or colluvial soils, as described above, we recommend that the
natural ground areas, intended to receive structural fills, be scarified
to a depth of not less than 12 inches and compacted to not less than 90
percent of maximum dry density at approximately optimum moisture
content.
-
-
-
_-
-
-~
..-
-
--
-
-
-.
April 21, 1981
Site Grading
-12- S.E.A. 110175
Transition Lots: Foundations supported partially on cut and partially on
fill are not recommended. The tendency of cut and fill soils to compress
differently will probably result in unequal structural support and
consequential cracking. Therefore, in transition areas, we recommend
that the entire area be undercut and be replaced with soils compacted
to a minimum of 90 percent. The undercutting should be carried to a
depth of two feet below the base of the deepest footing.
Earthwork: All earthwork and grading contemplated for site preparation
should be accomplished in accordance with the attached Recommended
Grading Specifications and Special Provisions. Utility trench backfill
within 5 feet of the proposed structure and beneath asphalt pavement
should be compacted to a minimum of 90 percent. The maximum dry
density of each soil type should be determined in accordance with
A.S.T.M. Test Method 1557-70T, Method A or C.
Canyon Subdrains: The approximate location of anticipated canyon sub-
drains is shown on attached Plate No. 1. The canyon subdrains should
be constructed in accordance with the detail shown on attached Plate
No. 42.
The location of the recommended canyon subdrains shown on attached
Plate No. 1 should be considered preliminary, to be utilized for
estimating purposes. Detailed recommendations will be submitted upon
completion of the proposed site grading plans.
Mitigating Measures (Landslides)
We have discussed hereinabove the two general concepts which will be
utilized in mitigation of the potential instability inherent in existing
landslide areas. These two concepts are briefly described as follows:
-.
-,
April 21, 1981 -13- S.E.A. 110175.
1. Proposed Site Grading
This concept consists of analyzing the stability of a particular landslide
mass, utilizing the available data to determine the relative increase in
the factor of safety against rejuvenated movement utilizing the topo-
graphy which will exist after grading of the proposed project. The
results of subsurface investigations, completed as of this date, indicate
that the density of the soils within the landslide mass is adequate to
support the proposed structures, providing measures are taken to reduce
the potential for future lateral movement. It is, therefore, our opinion
that this concept is in accordance with accepted standards of practice.
The recommendations entitled “Cut-Off Drain Installations” and “Landslide
Debris Recompaction”, described hereinafter, must be incorporated in the
preliminary grading plans to permit utilization of this concept.
2. Stabilizing Buttress Fills
This concept of mitigation is a well accepted procedure for improving
the stability of existing landslides. The approximate location, elevation,
and configuration of proposed stabilizing buttress fills are presented on
attached Plate Nos. 1, 39 thru 42, inclusive. It must be noted that the
plan area shown on Plate No. 1 is intended to indicate the approximate
location and elevation of the shear key only. Obviously, the proposed -
stabilizing buttress fills will encompass a significantly larger area.
Due to the location and configuration of the existing landslides and the
proposed grading, our recommendations have utilized either a “head
buttress” or “toe buttress” based on the conditions prevalent in a
specific landslide area. Although we are aware that the utilization of a
“head buttress” is generally considered less efficient, it is our opinion
that extinuating circumstances in the landslide areas where a “head
buttress” was utilized dictated a use of this type of stabilizing buttress
fill.
-
.-
-_
.._
.-
.-
_.
_~
_
_.
.-
_.
-
April 21, 1981 -14- S.E.A. 110175
A review of attached Plate No. 1 will indicate that stabilizing buttress
fills are recommended in Landslide Nos. 1, 3, 6, 8, 10, 12, 14, 15, and
17. Plate Nos. 39 thru 42 present our recommendations for the con-
figuration of each buttress fill. Plate No. 42 presents our recommen-
dation for the installation of subsurface drainage systems to be installed
in each of the stabilizing buttress fills. The discharge for these
subsurface drainage systems must connect to a suitable surface or storm
drain facility.
The stabilizing buttress fills must be constructed from soils derived from
the Torrey Sandstone Formation. For purposes of our stability analysis,
we have utilized shear strength characteristics representing 39’ angle of
internal friction and zero cohesion. A review of the buttress fill
cross-sections will indicate that we have utilized a temporary cut slope
inclined at one unit horizontal to one unit vertical. Although it is our
opinion that the majority of the temporary buttress cuts will possess
adequate short-term stability at this inclination, localized areas of
construction failures in the temporary cuts should be expected.
Mitigating Measures (Site Grading)
A review of the boring logs presented herein will indicate that the De1
Mar Formation does contain areas of randomly oriented fractured zones
and slickensided conditions in addition to a regional dip, generally
oriented in a northwesterly direction. The presence of these conditions
will require that detailed inspections of the cut slope areas be
performed by an engineering geologist during site grading. The recom-
mended mitigating measures, in the event adverse dipping bedding
planes or highly fractured soils are encountered in the proposed cut
slopes will be the construction of facial buttress fills. These buttress
fills will be approximately 20 feet in width and should contain the
buttress drain details presented on attached Plate No. 42.
For the purpose of preliminary cost estimates, we recommend that the
cost of installation of a “facial buttress fill” be included in the cut
. . .
-~
-
.-
-.
.-
.-.
.-
_~
-.
<-- t
c-
..~~
April 21, 1981 -15- S.E.A. 110175
portion ‘of the composite slope in the area of section G-G. In addition to
the potential for adverse dipping bedding planes in this area, the
provision of Carlsbad Ordinance 11.06.100(3)(F) will, in our opinion,
dictate the probable need for a facial buttress fill.
In consideration of the shear strength characteristics of the prevailing
De1 Mar Formation soils and the probability that this geologic formation
will be utilized to construct the majority of the proposed fill slopes, we
recommend that slope subdrains be installed in all fill slopes in
accordance with the details presented on attached Plate Nos. 42 and 43.
A review of these details will indicate that a slope drain is recom-
mended in all fill slopes which are 25 feet in height or greater. The
intent of the slope drain detail is to reduce the potential for the
accumulation of hydrostatic pressure in the near surface fill soils. It
has been our experience during the recent periods of abnormally heavy
rainfall that surface slough type failures do occur in fill slopes
constructed at an inclinataion of 2 units horizontal to 1 unit vertical
from soils similar to the De1 Mar Formation soils prevalent within the
subject site. The presence of expansive soils in the area of the fill
slopes will result in a future reduction in in-place density with a
corresponding increase in permeability. Therefore, the maintenance of
long-term surficial stability for the proposed fill slope will require the
installation of one of the three alternatives detailed on attached Plate
No. 43.
Landslide Debris Recompaction
Although the results of investigations, completed as of this date, do not
indicate the presence of significantly disturbed zones of slide debris, we
do recommend that provisions be incorporated in the preliminary grading
plans and cost estimates to provide recompaction of landslide debris at
the “head” and “toe” of the existing landslides. A review of the areas
recommended for removal and recompaction. as shown on Plate Nos. 39
thru 42, will show that the majority of these areas will be removed
April 21, 1981 -16- S.E.A. 110175. .-~
~~
-.
-
-
.-
_-
..-
.-
-
during ‘the installation of “stabilizing buttress fills” or the preparation
of alluvial or colluvial deposits to receive structural fills. For purposes
of construction cost estimates, we estimate that a volume of earthwork . representing the shaded sections designated on Plate Nos. 39 thru 42,
multiplied by the width of the appropriate landslide, will produce a
conservative estimate of the additional removal and recompaction
required by the recommendation.
Cut-Off Drains
Subsurface drainage systems which will intercept the flow of surface
water which infiltrates the recompacted zones at the head of each
landslide should be installed. The recommended location and con-
figuration of each subdrain system will be submitted after an additional
review of the proposed grading plans and the completion of Phase II of
the investigation.
For purposes of preliminary cost estimates, we recommend that the
subdrain configuration shown on Plate No. 42 for “canyon subdrains” be
utilized.
Foundation Desi,gn Criteria
In consideration of the expansive soils present within the subject site
and the potential variation in the quantity of suitable non-expansive
soils for capping the proposed structure areas, we recommend that
provisions be made to install one of the following four alternative
foundation recommendations. A detailed lot by lot survey will be
performed upon completion of the site grading with a report submitted
which will present the recommended foundation condition classification
for each lot.
Foundation Condition A: Each lot which receives this foundation classifi-
cation designation must possess native soils which are considered
non-expansive soils, i.e. expansion of less than 3% when te~sted from an
.-
_-.
“~
,-
,-
-
--
.-
-
^.
-
April 21, 1981 -17- S.E.A. 110175
air dried to saturated condition under a surcharge of 150 psf, for a
depth of not less than 4.0 feet below proposed finish grade. In the
event the structure area, i.e. the level lot pad extending from the front
property line to a line which is not more than 15 feet from the rear of
the level pad, contains soils which do not comply with the maximum 3%
expansion, these soils shall be removed and replaced with non-expansive
soils. The non-expansive materials shall not be less than 4.0 feet in
depth. This condition can also be applied to fill lots where expansive
materials are maintained at least 4.0 feet below a non-expansive cap.
Conventional spread footings may be used for foundation condition A and
should be founded a minimum of 12 and 18 inches below lowest adjacent
grade for 1 and 2 story structures, respectively, and have a minimum
width of 12 inches. Spread footings may be designed for an allowable
soil bearing pressure of 2,100 and 2,300 psf for 12 and 18 inch deep
footings, respectively.
Interior slab on-grade should be not less than 4 inches in thickness,
underlain by not less than 4 inches of clean sand or crushed rock and
completely surrounded by a continuous footing.
Foundation Condition B: All lots which receive this foundation classifi-
cation will possess expansive soils which exhibit an expansion of not
less than 3% nor more than 8% when tested from an air dried to
saturated condition under a surcharge load of 150 psf. These soils will
be examined for a depth of not less than 4 feet below finish grade.
1. All footings should be founded a minimum of 18 inches below
adjacent finish grade and may be designed for an allowable soil
bearing pressure of 2,200 psf. Footings should have a minimum
width or diameter of 12 inches.
2. Both exterior and interior continuous footings should be reinforced
with one #4 bar positioned 3 inches above the bottom of the
April 21, 1981 -18- S.E.A. 110175.
-~
-
-
-
~-.
-.
-
-
~_
-
footings and one #4 bar positioned one inch clear below finish
floor or the cold joint between thee foundation and slab pour. Pier -
footings need not be reinforced.
3. Interior slabs should be a minimum of 4 inches in thickness and
underlain by a 4 inch blanket of clean sand or crushed rock.
Further, interior slabs should be reinforced with 6”x6”-lO/lO
welded wire mesh and completely surrounded with a continuous
footing.
4. Exterior slabs should be a minimum of 4 inches in thickness and
constructed on native soils prepared in accordance with the
recommendations presented in item No. 6 shown below. Further,
exterior slabs should be provided with weakened plane joints as
recommended hereinafter.
5. Weakened plane joints for exterior slabs should be provided for
any slab greater than 5 feet in width. Any slabs between 5 and
10 feet should be provided with a longitudinal weakened plane
joint at its center line. Slabs exceeding 10 feet in width should
be provided with a weakened plane joint located 3 feet inside the
exterior perimeter, as indicated on the attached Figure A. Both
transverse and longitudinal weakened plane joints should be
constructed as detailed on Figure A.
6. Clayey soils should not be allowed to dry before placing concrete.
They should be sprinkled, if necessary, to insure that the soils
are kept in a very moist condition or at a moisture content
exceeding 2% above optimum moisture content.
7. Surface drainage should be directed away from the proposed
foundation.
8. Prior to pouring concrete, the foundation excavations should be
inspected by a representative of this office to insure that the
above recommendations have been followed.
-.
-
-~
-
-
April 21, 1981 -19- S.E.A. 110175.
Foundation Condition C: All lots which receive this foundation condition
classification will contain expansive soils which exhibit an expansion of
not less than 8%, nor more than 12%, when tested from an air dried to
saturated condition under a surcharge load of 150 psf. These soil’s will
be examined for a depth of 4 feet below finish grade.
1. All footings should be founded a minimum of 18 inches below
adjacent finish grade and may be designed for an allowable soil
bearing pressure of 2,000 psf. Footings should have a minimum
width or diameter of 12 inches.
2. Both exterior and interior continuous footings should be reinforced
with two #4 bars positioned 3 inches above the bottom of the
footings and two #4 bars positioned one inch clear below finish
floor or below the cold joint below the foundation and slab pour.
Pier footings need not be reinforced, although exterior piers
should extend not less than 3 feet below adjacent grade.
3. Interior slabs should be a minimum of 4 inches in thickness and
underlain by a 6 inch blanket of crushed rock. Further, interior
slabs should be reinforced with 6”x6”-lo/IO welded wire mesh and
completely surrounded with a continuous footing.
-
-
-
-~
-
4. Exterior slabs should be a minimum of 4 inches in thickness and
constructed on native soils prepared in accordance with the
recommendations presented in item No. 6 shown below. Further,
exterior slabs should be provided with weakened plane joints as
recommended hereinafter.
5. Weakened plane joints for exterior slabs should be provided for
any slab greater than 5 feet in width. Any slabs between 5 and
10 feet should be provided with a longitudinal weakened plane
joint at its center line. Slabs exceeding 10 feet in width should
be provided with a weakened plane joint located 3 feet inside the
-~
-
-.
-
-
-
.~.
-
-
-.
-.
,-
-
_-
-
-
April 21, 1981 -2o- S.E.A. 110175
exterior perimeter, as indicated on the attached Figure A. Both
transverse and longitudinal weakened plane joints should be
constructed as detailed on Figure A. .
6. Clayey soils should not be allowed to dry before placing concrete.
They should be sprinkled, if necessary, to insure that the soils
are kept in a very moist condition or at a moisture content
exceeding 2% above optimum moisture content.
7. Surface drainage should be directed away from the proposed
foundation.
a. Prior to pouring concrete, the foundation excavations should be
inspected by a representative of this office to insure that the
above recommendations have been followed.
Foundation Condition D (Alternative Design) : An alternate pre-stressed
concrete foundation and slab design for soil Condition “C” may be
utilized. This design should be prepared by a registered civil engineer
experienced in the design of pre-stressed concrete structures. The
preparation of the foundation soils and detailed recommendations
regarding foundation construction and pre-stressing requirements should
be prepared in cooperation with your structural design consultant.
Exterior slabs should be prepared as described in Foundation Condition
“C” above.
All lots which contain soils within 4 feet of finish grade that exhibit an
expansion greater than 12% should be regraded to remove the critically
expansive soils.
In consideration of the potential for lateral movement of foundations
construction parallel to, and within 10 feet of the top of any cut or fill
slope within, or constructed from the De1 Mar Formation, we recommend
that the following foundation design criteria be considered.
April 21, 1981 -21- S.E.A. 110175. -.
-.
._.
-
-
-
-
1. The depth of the foundation shall be sufficient to extend not less
than 12 inches below a line parallel to and 5 feet in from the
face of the slope.
2. All foundations within 10 feet from the top of a slope shall
contain not less than the reinforcement recommended in
“Foundation Condition B” and be designed to support a maximum
dead load of 1000 psf.
3. All foundations within 10 feet of the top of a slope, and parallel
to the slope, should be tied into other foundations within the
structure which are at least 20 feet from the top of slope. These
cross ties should be constructed perpendicular to the top of
slope, consist of at least 12”x12” concrete beam reinforced with
two #L bars, and be spaced at not greater than 15 feet intervals.
The above recommendations are intended to supplement the requirements
of Carlsbad Ordinance No. 8086, Section 11.06.110 for only those
structures which are supported by De1 Mar Formation soils.
Adjacent footings founded at different bearing levels should be so
located that the slope from bearing level to bearing level is flatter than
one unit horizontal to one unit vertical.
The allowable soil bearing pressures described above may be increased
by one-third for wind and/or seismic loading and should be decreased
by one-fourth for dead loads only.
A review of the “Concept Site Plan” indicates that the majority of the
fill soils will be obtained from the De1 Mar Formation soils. Although a
significant quantity of Torrey Sandstone Formation soils will be avail-
able, the majority of these soils will be required to construct the
stabilizing buttress fills. Additional non-expansive material may be
obtained by mining the Torrey Sandstone Formation soils within proposed
-
-.
-~
--
-
.-
-
-
-
-
-
-~
-
April 21, 1981 -22- S.E.A. 110175.
street tight-of-way areas. Based on the information available at this
time, it is our opinion that the potential for obtaining adequate -
quantities of non-expansive material to produce foundation Condition A
within all of the proposed building pad areas is extremely low.
Slope Stability
The cut and fill slopes constructed from the native on-site materials will
be stable with relation to deep-seated failures, if constructed at or
flatter than the following recommended slope ratios expressed in hori-
zontal to vertical units for the indicated heights:
Cut Slopes to 65 Feet in Height in De1 Mar Formation @ 2.0 to 1.0
to Over 80 Feet in Height in Torrey Sandstone @ 2.0 to 1.0
Fill Slopes to 25 Feet in Height in De1 Mar Formation @ 2.0 to 1.0
to Over 80 Feet in Height in Torrey Sandstone @ 2.0 to 1.0
The above maximum heights will result in a factor of safety of 1.5. Fill
slopes in the De1 Mar Formation, if required, may be constructed higher
than the above recommendations by selective grading.
Slope Protection
In the event that hydraulic studies indicate that flood flow conditions
in the major drainage courses within the subject site will result in a
water surface which is higher than the toe of the proposed fill slopes,
we recommend that adequate slope protection measures be included in the
grading plans. We anticipate that the projected velocities will require
the installation of rip-rap type slope protection measures.
Earth Retaining Structures
Allowable Passive Pressure: The allowable passive pressure for the
prevailing soil condition is 150 psf at the surface, increasing at a rate
April 21, 1981 -23- S.E.A. 110175’
of 125 ‘psf per foot of depth. This passive pressure has been computed -
using a factor of safety of 3 and may be increased by one-third for
wind and/or seismic loading. .
The coefficient of friction of concrete to soil may be assumed to be 0.4
for resistance to horizontal movement.
Active Soil Pressure: Active soil pressures for the design of earth
retaining structures may be assumed to be equivalent to the pressure of
fluid weighing 41 pcf and 60 pcf for unrestrained and restrained
retaining walls, respectively. These soil pressures are for no surcharge
and for a drained and level backfill condition. If the backfill will not
be level, or if a surcharge is anticipated, this office should be
contacted for the necessary increase in soil pressure.
-.
FIELD EXPLORATIONS
Fifteen subsurface explorations were made at the locations indicated on
the attached Plate No. 1 between March 24 thru 31, 1981. These
explorations consisted of borings drilled by means of a rotary bucket
type drill rig. The explorations were conducted under the observation of
our engineering geology personnel.
The explorations were carefully logged when made. These logs are
presented on the following Plate Nos. 2 thru 32. The soils are described
in accordance with the Unified Soils Classification System, as illustrated
on the attached simplified chart. In addition, a verbal textural
description, the wet color, the apparent moisture, and the density or
consistency are given on the logs. Soil densities for granular soils are
given as either very loose, loose, medium dense, dense, or very dense.
The consistency of silts or clays is given as either very soft, soft,
medium stiff, stiff, very stiff, or hard.
Representative core samples were obtained by means of a split tube
sampler driven into the soil by means of the “kelly bar” of the drill
-
-
-~
-
-~
-
-
.-.
-
-.
-
-
--~
April 21,~ 1981 -2& S.E.A. 110175
rig. The’ energy required to drive the split tube sampler is indicated on
the boring logs as the “penetration resistance”. The core samples were -
carefully removed, sealed, and returned to the laboratory for testing. .
Disturbed and undisturbed samples of typical and representative soils
were also obtained and returned to the laboratory for testing. The
results of these tests are presented on the attached logs.
LABORATORY TESTING
Laboratory tests were performed in accordance with generally accepted
American Society for Testing and Materials (A.S.T.M.) test methods or
suggested procedures. Representative samples were tested for their shear
strength characteristics, maximum dry density and optimum moisture
content, grain size and atterburg limits and expansive potential. The
results of these tests are presented on Plate.
The expansive potential of clayey soils was determined in accordance
with the following test procedure.
Allow the remolded sample to air dry to a constant moisture
content, at a temperature of 100’ F. Place the dried sample in the
consolidometer and allow to compress under a load of 166 psf. Allow
moisture to contact the sample and measure its expansion from an
air dried to saturated condition.
INVESTIGATION LIMITATIONS
The soil conditions encountered in our subsurface investigation of the
subject site are believed to be representative of the total area.
However, the conditions within landslide masses, similar to that present
within the subject site, are subject to variation.
Since our investigation is based on the conditions observed, selected
laboratory testing and engineering - analysis in accordance with the
-
- April 21, 1981 -25- S:E.A. 110175
-
-
-
.-
-
-
-
-
current “state-of-the-art”, the conclusions and recommendations presented
herein are preliminary and represent professional opinions. These
opinions have been derived in accordance with current standards of
practice and no warranty is expressed or implied.
If conditions are ,encountered in the field which differ from the
conditions and design criteria described herein, the project soils
engineer and engineering geologist should evaluate these conditions and
submit alternative recommendations. If any conditions within this report
are not fully understood as to the intent and purpose, the owner or his
design consultant should contact Shepardson Engineering Associates, Inc.
for clarification prior to commencing further design or construction.
.-
-
-
-
-
-
L Af?iw%. &b&f3 1*‘ctxGd
L -
L E LA wm am -Ma SHEPbFtDSON ENGINEEEUNG ASSOCUDES. Inc
wt4r~~ rw
“f&j. lwTE .4* zj*e(
I JmN0. Ilol7cj ,6&w &. IA
-
-
-
.-
.-.
--
.-
-
~~
.-
--
.-
-.
Greenish-tan to Buff, Wet, Medim Dense, Clayey, Silty,
Medium Stiff to Soft, Sandy Mudstone,(Disturbee
rder Below but Highly Fractured
Several NW Dipping Planes (slicked) with Iron Stains
R'emolded Clay Gouge with Gypsum crystals. Dips a Few
_--------------
ray & Buff, Moist, Medium Dense to Dense, Clayey Fine Sand-
-s------ ------ --
nge & Gray, Moist, Medium Dense to Dense, Silty Sandstone
edit Stiff, Mudstone
ight Olive Gray to Brown, Moist, Medium Stiff, Mudstone
2
;-
2’ CL
5: 2. 9
-
BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' par blow. L = 3" O.D. Sampler, 1401b. hammer, 30" drop S = Standard Penetrometer SAMPLE TYPE D = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
LA COSTA SE18 - SE21
KLS I 3/25/81
110175 PLATENO. 2~
-
-
-.
-
.-
-
-
-
-
-
^-
-
_.
-
-
--
-
-
LE
F isj
:c
iz
3% SC
94
ML
SM
BORING NO, B' Can't-
ELEVATION: BORING DIA,
DESCRIPTION
Dark Blue Grey, Moist, Very Stiff, Mudstone
Massive
Light Gray to Brown-Gray, Mottled Yellow-Brown, Red 6 Light Green, Humid to Moist, Very Dense, Partially Cemented
Sandstone
Gray, Humid to Moist, Very &nse, Fine, Slightly Cemented ' Sandstone
s.. ,--. .,.~,..
Light Gray, Humid to Moist, Very Stiff to Hard, Sandy Siltstone
Brown-Gray, Humid to Moist, Very Dense, Fine Sandstone
WI BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1’ per blow. L = 3" O.D. Sampler, 1401b. harmner, 30" drop S = Standard Penetrometer SAMPLE TYPE : Us= Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
LA COSTA SE18 - SE21
K1.R I 1135/Rl
110175 PLATE NO. 3
-
-
-.
-
-
-
-
-
-
-
-
-
. .
-
-
-
-
-
=I
!
:
u-l
12
16 4
L
SM
-
SU
BORING NO, B' Can't. BORING NO, B' Can't.
ELEVATION: ELEVATION: BORING DIA, BORING DIA,
DESCRIPTION DESCRIPTION ! ..I.
;$I B Brown-Gray, Humid to Moist, rown-Gray, Humid to Moist, Very Dense, Fine Sandstone Very Dense, Fine Sandstone
Very Massive Hard Sandstone
END OF BORING
nAaI BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1’ per blow. L = 3" O.D. Sampler, 1401b. hammer, 30" drop S = Standard Penetrometer SAMPLE TYPE U = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
LA COSTA SE18 - SE21
KLS I 3125181
I 110175 I PLATE NO. 4
-
2
6_
O-
2-
4-
IV 61
8-
O-
2-
&
6 -.
31 c
I-
2-
i
5-
!
CL/ CH '
\
ML/(
CL/ SC/: SM .'
ML/.
CL/' CH ,
I
I
I CL \
SM ;
CL '
\
,
,
,
7 \ b ‘.(.,.j 1’;; , :A’
F \ \ \ \
k +
Y \ \ \ \ )+ ,: Z.,’
BORING NO, B2
ELEVATION: ABORING DIA,
DESCRIPTION
Light Olive, Wet, Stiff to Medium Dense, Very Disturbed
Mudstone
Yellow-Brown, Wet to Moist, Medium Dense, Very Fine Sandy Silt-Claystone to Fine Sandstone
pame Shearing, $" remold, with gypsum, flat
Disturbed
Cl" of General gouge, no good planes, some caliche
Sheared Remolded &es" Sheard Below, Slicked Fractures
,Olive, Moist to Wet, Medium Stiff to Stiff, Clay
Fairly Massive
Mu-m Seepage CContact dips s few degrees NW
Blue-Gray, Moist, Stiff, Sandy Claystone
Yellow-Tan, Moist, Dense, Sandstone
Blue-Gray, Some Red & Yellow Mottling, Moist, Very Stiff to
Hard, Sandy Claystone, Massive
:A, =
;* >(i
:.
;”
-
2
3
_-_ BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. L = 3" O.D. Sampler, 1401b. hsmmer, 30" drop S = Standard Penetrometer SAMPLE TYPE u = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
-
I
, . VI 1% 16
biT
SC
CL
BORING DIA,
DESCRIPTION ‘
Ilue-Gray, Moist, Very Dense, Sandstone
Irown-Olive-Gray, Stiff, Mudstone
IND OF BORING
_-_ BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig I c a dror, 1' oer blow. I UDSON ENGNEENING ASSOClAlE!S. INC. L f 3" b.D. iampler, 1401b. hanrmer, 30" drop -4 S = Standard Penetrometer -A SAMPLE TYPE u = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
<,~ y, &A COSTA SE18 -.SEZl
KLS I 3125181
110175 PLATE NO. 6
-
-
-.
-
-
--
--
-_
-.
-
-
_-
.-
-
-
.-
-
4-
6-
a-
6-
a-
,o -
2-
,4 _
6s
a-
4-
6-
BORING NO, B3
ELEVATION: 235+ BORING DIA,
DESCRIPTION \ .y-' ,.,' i :
SC ‘(:), Brown, Moist to Wet, Medium Dense to Soft, Topsoil
;\;
,y< :\
\ -----m-m--
SC/ :< :?
CL (. .\~ .\‘. Buff, Moist to Wet, Very Fine Sand
1 . '\
Wet Sheared Clay, Some Undulating Planes
Highly Fractured
Olive, Wet, Medium Dense, Claystone
Sheared Zone & Slide Plane, Dips 10’ N, %" Remolded Clay
Less Fractured Mudstone
16" Thick, Flat, Possible Old Slide Zone
!
Fairly Sof,
SM : Olive to Gtay, Moist, Mediuj Dense to Hard, Mudstone
--_ BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1’ per blow. I
A =
:. > c
;’
ic
3
‘2
L = 3" O.D. Sampler. 1401b. hammer, 30" drop S = Standard Penetrometer SAMPLE TYPE U = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
-
-
-
-~~
-
-
..-
-
-.
~-
.~_
_-
-
-
-
-
.O-
,2-
,4
6-
a-
O-
2-
4-
6-
a-
D-
23 c
k-
5-
3-
O-
2-
-LQ!
SMf j
ML,
CL \
\
\
\
\ 3Ml
3C \
\
\
:H/ \ :L
\
SI
BORING NO. B3 Co"'t*
z BORING DIA.
2 DESCRIPTION
u 'Gray , Moist, Dense, Sandy Ssltstone
Olive, Moist, Hard, Massive, Sandy Mudstone with Orange
Sandstone Lenses
-Sharp Contact - *Dips 6O'NW
Buff to Orange, Moist, Vaxy Dense,
Slide Plane
Contact Dips 23O W. 6" ~sone of Varieated, Thin Mudstone - et Clay Beds, Possible Healed Slide Zone
Slide Plane, f" remolded, Highly Plastic Clay, Flat, very little color difference, Definite Plane
\ Blue-Green, Moist, Hard, Clay
\
END OF BORING
.-. BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. I L = 3" O.D. Sampler, 1401b. hansner, 30" drop S = Standard Penetrometer SAMPLE TYPE U = Undisturbed Drive S~ample C = Chunk Sample B = Bulk Sample
~_
22- Jl-
[24-
BORING NO, B4
ontact Dips, 15'S, Some Shearing 6 Gypsum
N Olive, Wet, Medium Stiff to Stiff, Clay
ractured Mudstone Minor Seepage olded Highly plastic Clay-Flat, very
A =
Ir 1 c
.I
,: I
Is:
-q BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig
J1
drop 1' per blow. g$E
L = 3" O.D. Sampler, 1401b. hammer, 30" drop '~~DSON~-I~ASSOC~Il%INC. S = Standard Penetrometer SAMPLE TYPE
1
U = Undisturbed Drive Sample IA COSTA SE18 - SE21
C = Chunk Sample KLS I 3125181
B = Bulk Sample L 110175 PLATE NO. 9
_.
-
-~
-
-.
.-
_-
-
-
-
--
-
-
-
-
.-
-
a-
O-
2-
4-
6-
a-
o-
2-
. m
2
%
L
CH
CL
s
!z :: z 2
i
\
\
\
\
\ !L
BORING NO, B4 Co"'t-
BORING DIA.
DESCRIPTION
Blue-Olive to Blue-Gray, Wet, Hard, Fractured Mudstone
ZND OF BORING
BLOW COUNT _-- -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. L = 3" O.D. Sampler, 1401b. harmner, 30" drop -ANDSON ENGINEER ING Assocrn~. INC. S = Standard Penetrometer SAMPLE TYPE lJ = Undisturbed Drive Sample LA COSTA SE18 -SE21
C = Chunk Sample IUS I 3I25lal B = Bulk Sample 110175 PLATE NO.~lD'
1
1
1
1
- 1
2
2
2
2
2
3
3
3'
31
2-
4-
6,
a-
O-
2
4-
6-
a-
O-
2-
4-
6-
a,
O-
2-
4-
6-
La
.z 3
L
L
Cl M
M
L
, L/ ( H
HI L
$
Y c . . ,*
.“l,t ,.I r\
.l’t
;.q
$
.: I ‘.
T
\
\
\
\
\
b
4
\
\
S1
ELEVATION:
DESCRIPTION
Brown, Moist, Medium Stiff Clay
Gray-Green, Wet, Medium Stiff, Clay
Gray with Orange, Wet, Moist, Clayey, Silty Sand
Tan, Moist, Medium Dense, Silty Sand
Olive to Dark Gray, Moist to Wet, Medium Stiff, Fractured Mudstone, (Some Slicked Fractures)
Tan to Light Brown, Wet, Medium Stiff to Very Stiff, Clay
+lighly Sheared, Well Developed Slide Plane ,%" to l",very
wet, sticky, remolded, plastic Clay. No Color Change - Zone is Flat
Olive, Moist, Hard, Massive Mudstone
Dark Green, Brown - Orange, Moist, Hard, Mudstone,(Orange
:A, = L-l!
;i ,
I f : .
I i
; i
BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. L = 3" O.D. Sampler, 1401b. hammer, 30" drop ~MDSON ENGINEERING ASSOCIATES. INC. S = Standard Penetrometer SAMPLE TYPE U = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
LA COSTA SE18 - SE21
KLS I 3127181
110175 PLATE NO. 11
-.
-
-
-.
-.
_-
-
_-
-
-.
--
-
-~
-
-
,2-
,4 -
.6 -
.8 -
0-
2-
CH CL
CL CH
ELEVATION: ELEVATION: BORING DIA, BORING DIA,
DESCRIPTION
Dark Green, Brown - Orange, Along Fracture) Moist, Hard, Mudstone,(Orange
Brown, Moist, Hard, Very Massive Mudstone
Blue-Olive, Moist, Hard, Mudstone
Blue-Gray, Mottled Red, Moist, Hard, Very Massive Mudstone
END OF BORING
BLOW CODNT .-* -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1’ per blow. L = 3" O.D. Sampler, 1401b. hammer, 30" drop StW?MDSON ENGIMENING .h.SSOCUTE.S. INC.
S = Standard Penetrometer SAMPLE TYPE u = Undisturbed Drive Sample LA COSTA SE :I8 - SE21
C = Chunk Sample B = Bulk Sample I
KLS I 1177lSl
110175 PLATE NO. 12
-.
-
.-
-.
-
-
~-.
-
_.
-
-~
-
-.
_~~
-
-.~
.
-
-
CL, CH
CL
SM
ML
SMI SW
CL
BORING NO, 6
LEVATION: 165+BORING DIA,
DESCRIPTION
Brown-Red Brown, Wet, Stiff, Clay
Orange-Brown & Buff, Wet, Stiff, Sandy Clay
Buff, Moist to Wet, Medium Dense, Sandstone
Light.Green & Tan Mottled Orange, Moist to Wet, Medium Dens Sandstone
$?'Contact Dip 15'S.- Xatural
Buff, Moist to Wet, Medium Dense Sandstone
Medium,Clean Sand
Flat, Contact, Some Possible Old Shearing
Olive with Orange Along Fractures to Gray, Moist, Wet,
Stiff, Mudstone
Remolded, Sheared, Sticky, Wet Clay f", Slide Plane,
-Dips Possibly 5'N., Nearly Flat -----------------
Green-Gray, Moist, Very Stiff, Clay
Sandy Mudstone
\ 1 Gradational+
KEY I
3
5
--- BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. L = 3" O.D. Sampler, 1401b. hanuser, 30" drop s)(DMDSON ENclNaxlNG A.%wclAlEs. IK.
S = Standard Penetrometer SAMPLE TYPE IJ = Undisturbed Drive Sample LA~COSTA SE18 - SE21
C = Chunk Sample KLS I 3f27/81 B = Bulk Sample 110175 Plate No. 13
!O -
.2 -
.4 -
,6 -
=!
I 1
i ” i:
:E 1
i
Cl
Cl
4 c c r: c: e i;
2
t
\
\
\ L
BORING NO, 6 Can't-
ELEVATION: BORING DIA,
DESCRIPTION
Same
3lue-Green, Moist, Hard, Clay (Slow Drilling)
:ND OF BORING
.-* 3LOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. I L = 3" O.D. Sampler, 1401b. hammer, 30" drop S = Standard Penetrometer SAMPLE TYPE lo = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
4-
6-
8-
14 _
16 _
!O -
!2 -
14
!6 _
18 -
IO -
12 -
I4 -
I6 -
BORING NO, B7
, Wet to Moist, Medlum Dense, Sand
reen-Gray & Orange, Wet, Medium Stiff, Sandy Silt Clay with
arigated, Sheared, Slicked, Clay
m Thick, Dips a Few Degrees Socth, Numerous Planes
Iive-Green-Gray, Moist to Wet, Hard, Mudstone to andy Mudstone with Concretions
o Sandy Siltstone
ractured,with Slick Concoidal Surfaces
lue-Gray, Moist, Hard, Sandy Mudstone (Massive)
A =
II , c
I’
1: I
nAbI BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. L = 3" O.D. Sampler, 1401b. hammer, 30" drop S = Standard Penetrometer SAMPLE TYPE u = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
LA COSTA SE18 - SE21
KLS I 111)7/111
110175 1 PLATE NO. 15
O-
2-
4-
6-
&-
O-
BORING NO, B7 Con't.
ELEVATION: -BORING DIA,
DESCRIPTION
Blue-Gray, Moist, Hard, Sandy Mudstone (Massive)
END OF BORING
g
;. ?’ 2’ 2: a
BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. L = 3" O.D. Sampler, 1401b. hannner, 30" drop S = Standard Penetrometer SAMPLE TYPE . IJ = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
LA COSTA SE18 - SE21~
KLS 1 3/27/81
110175 1 PLATE NO. 16
-.
~_~
-
_.~
-
~-
-.
-.
-
..~
-~
-.
-
-~
..-
4-
6-
Iv
B-
O-
2- 1B
4-
6-
B-
O-
2-
4-
6-
8,
O-
2-
4-
6s
Brown, Wet, Medium Stiff to Soft, Topsoil
uff to Orange, Moist, Medium Dense, Sand
u Molded, Remold, Some Planes, Could be Slide Planes not
Real Plastic
ML Light Green-Gray, Wet, Medim Dense, Clayey Siltstone
1 .A'
SM/ y&:“ .i ; Buff to Tan, Moist, Dense, Sandstone
sw ;li-r\
y$
y$ '<,.',.
CL Light Olive-Gray to Dark Gray, Moist, Stiff, Clay to
Sandy Mudstone.
\
BLOW COUNT z
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. I
!!
Ic I c
I’
1: I
;I
r !Z
:c i[ :: r
1.2
L = 3" O.D. Sampler, 1401b. hammer, 30" drop
-
-
-
.-
-~
-
.-
-
-
-~
-
-~
-
-
-
.-
-.
SM
-
ELEVATION: -BORING DIA,
DESCRIPTION
Blue-Green to Gray, Moist, Hard, Sandy Mudstone
Tan, Wet to Saturated, Denser, Hard Sandstone Lots of Seepage Medium - Coarse Sand
-6light West Dip, 1” - 2" Remold Clay, Not Real Sticky, Too
Much Seepage to See Well
Gray, Saturated, Soft, Fractured Clay
Blue-Green, Wet, Hard, Mudstone
Tan, Saturated, Dense, Sandstone
2
;. 31. :. 5: :’
-
6
ML BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1’ per blow. L = 3" O.D. Sampler, 1401b. harmner, 30" drop S = Standard Penetrmeter SAMPLE TIPE u = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample _ ..~.
-
--
.-
-
-
-
-
-
-~
-
-~
~..
.-~
-
.,-
,-
;c 15 > li
5’ t5
:2 If 2 :z
- -2
Ive Brown to Brown, Wet, Medium Stiff
(Sheared Slickensided) (Soil Creep Zone)
to Soft, Clay
Pale Olive, Moist, Medium Dense to Soft, Silt
Dark Olive, Moist, Medium Soft, Massive Mudstone
Massive Sandstone
Pinkish Tan to Tan to Dark Yellow Tan, Moist to Saturated, Medium to Coarse Sand
Dark Olive-Gray, Moist, Medium Stiff to Stiff, Very Frac- tured Mudstone with Slikensided Fracture Planes
\
(Minor Seepage)
Olive, Moist, Medium Stiff Clay
CL t%
CL -$fide Plane, t"'Remolded Clay, Dip 10's. Dark Blu&Gray, Moist, Stiff, Clay (Massive Mudstone)
3LOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow.
SE&- -
L = 3" O.D. Sampler, 1401b. hammer, 30" drop -ANDSON ENGJMERING ASSOClAlES. MC.
S = Standard Penetrometer SAMPLE TYPE IA COSTA SE18 - SE21
U = Undisturbed Drive Sample C = Chunk Sample s I 1I')AIRI B = Bulk Sample 110175 PLATE NO. 19
-
..-
-~
. .
-.
-
-
-
-
.-~
-
-
-
-
i
.o i
.2 -
,4 -
=I: I
I . 1’2
i2
i
CL
CL
BORING DIA,
DESCRIPTION
Blue-Gray, Moist, Very Stiff, Clay
.--M-Mm--- --
Very Dark Blue-Gray, Moist, Hard, Clay
END OF BORING
BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig droD 11 n-v hlnv
L = 3" b.D. &~pi&:'1401b. hammer, 30" drop SLIMDSON ENaNEEnING AssoclAlEs. INC. S = Standard Penetrometer SAMPLE TYPE LA COSTA SE18 - SE21 D = Undisturbed Drive Sample C = Chunk Sample KLS I 3/26/81 B = Bulk Sample 110175 PLATE NO. 20
-
--
-
-
-
_
-
-
.-
-.
-
-
-~
-
.-
-
2-
4-
6-
8-
O-
2
4-
6
a,
O-
2-
4-
6-
1:
DESCRIPTION -
SC
SP
i :.\: . k...' Brown to Red-Brown to Light Brown, Moist to Wet, Clayey .;.\. Sand b . . \ \ Contact Dips 20' S., Erosional
I i Yellow Tan, Moist, Medium Dense, Medium Fine Sand :I . . I
CL/ ta Pale Green to Olive Tan, Moist, Medium Stiff to Soft, Massive, Silty Mudstone with Minor Gypsum
ML
Gradational Change
SM
SP/ SM
I: Gray-Tan, Moist to Wet, Medium Dense, Very Fine Silty Sand Contact - Flat
31 Light Tan, Moist, Medium Dense, Medium, Slightly Silty Sand
;p.
,f$
SW SC
SM
ZL
SC/ :L
3M
:L
‘4 .+ $\I'
'Li:'
1
Light Tan, Moist, Medium Dense to Dense, Massive, Fine,
'1:): Silty, Clayey Sand
?,'I!
Tan, Wet, Medium Dense to Dense, Medium to Coarse Dense,
.i.!; Silty Sand Tan to Buff, Saturated, Medium Dense, Siltv Sand
\ Light Gray to Dark Brown, Wet to Saturated, Medium Stiff to Soft, Sheared, Very Plastic, Clay Zone Dips 15OS.E.
Tan, Saturated, Medium Dense, Silty Sand
KEY BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. L = 3" O.D. Sampler, 1401b. hammer, 30" drop SBEPMDSON ENGINEERING ASSOClAlES. IIIC.
S = Standard Penetr-eter SAMPLE TYPE LA COSTA SE18 - SE 21 D = Undisturbed Drive Sample C = Chunk Sample YT.C I ~3/7RIRl ~B = Bulk Sample 110175 PLATE NO. 21
Seepage
.~.
..~
.-.
-.
-
-
-
~-
.-.
-
-
-~
-
-
-
-
.-.
BLOW COUNT --_ -
K = 3" O.D. Sampler, Kelly bar of drill rig I
(-
droo 1' oer blow.
BORING NO, lo Con't*
BORING DIA,
DESCRIPTION
Dark Blue-Gray, Moist to Wet, Medium Dense, Massive Mudston
Blue-Gray, Moist, Medium Dense to Dense, Clay and Silt
[Water at 41', after 2 days)
END OF BORING
L = 3"~b.D. &mpler, 1401b. hammer, 30" drop S8E?MDSON RIWMERING ASSOCIATES. INC.
S = Standard Penetrometer SAMPLE TYPE IA COSTA SE18 - SE21
IJ = Undisturbed Drive Sample C = Chunk Sample KLS I- B =~ Bulky Sample 110175 PLATE NO. 22
-
-
-
-~
-
-
.~~.
-~
--
-
-
-~
-
4-
6,
a-
0
2-
4-
6,
B
3
2-
4-
6-
B-
D-
2-
i4 -
86
- SC
SM
!fLl CL
SC/ "L
SP
CL
-
SU SU
BORING NO. '1 BORING NO. '1
ELEVATION: lB1’ BORING DIA.
DESCRIPTION DESCRIPTION
Brown, Moist to Wet, Loose, Clayey Sand
Dark Yellow-Tan, Moist, Medium Dense to Loose, Silty Sand
Light Yellow Tan, Moist, Medium Dense to Dense, Massive
Erosional Contact, Undulating, Flat, no Shearing
Dark Green-Gray, Moist, Medium Dense to Dense, Very Uniform Massive Silty Mudstone
ery Fine Sand
Pale Green, Moist, Medium Stiff to Soft, Clay
.w. BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. I L = 3" O.D. Sampler, 1401b. hammer, 30" drop S = Standard Penetrometer SAMPLE TYPE u = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
-
‘1!
-
,-
i -
1
-
1
1 -
4
-
- c
5 -
5
5
- 6
-
-
-
-
-
--~
OWN
LO-
i2-
i4 -
i6 -
,a -
iO-
i2 -
i4 -
i6 -
;a -
O-
A
z 2
CI
CL
su
BORING NO, a't.
ELEVATION: BORING DIA.
DESCRIPTION
Blue-Dark Gray, Moist, Medium Stiff to Stiff, Clay
(Massive Mudstone with some Slikensides)
-Slide Plans, 1” Remolded, Wet, Sticky Clay, Well Developed Planes 104 SSW Planes
Blue-Dark Gray, Humid to Moist, Hard, Clay
(Very Hard Massive Mudstone)
Dark Blue Gray to Red, Humid to Moist, Very Hard, Clay
END OF BORING
-I
2; c.
:c :i
sr ‘i ,!
BLOW COUNT "
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1’ per blow. L = 3" O.D. Sampler, 1401b. hammer, 30" drop S = Standard Penetrometer SAMPLE TYPE D = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
LA COSTA SE18 - SE21
K1.S I 312RIRl
110175 1 PLATE NO. 24
-
-
-
-
-
-
-
-
,-
-
-
-
~.-
-
-
-
$lJ
E
E .
g
% -
-
2-
k-
j-
3-I
I-
!-
i-
i-
I-
)-
!-
i-
I-
1_1
l-
-
I-
,-
/-
-
sp ;.lir $1
$1 j i,J
BORING NO, l2
S(
LEVATION: 174t BORING DIA.
DESCRIPTION
Dark Gray-Brown, Wet, Medium Stiff to Stiff, Topsoil
Tan & Orange to Green-Gray, Wet, Medium Stiff, Very Fine Sandstone to Sandy Siltstone
.---P-BP-----
Orange d Buff, Moist to Wet, Medium Dense, Fine Sandstone (Cross Bedding)
Erosional u---m-----
Green-Gray, ,Wet,.Medium Dense, Silty Sand to Silt
SeeDane P 19’
Orange-Buff, Saturated, Medium Dense Silty Sand to Poorly
Graded Clean Sand
Bright Orange Dip 15ON
-1" Shear 6 Remold, Old Shearing Along Contact
Light Green-Gray, Wet, Medium Stiff to Soft, Clay
Green, Moist, Stiff, Clay (Mudstone)
Gray, Humid, Hard, Clay
Drier Below
Sandy Mudstone
(Massive)
ILOW COUNT _-- -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1’ per blow. I
:A =
;r 3[. b ;’
2: 9
-
-l
r !C
:c ii :: A
L = 3" O.D. Sampler, 1401b. hammer, 30" drop S = Standard Penetrometer SAMPLE TYPE IJ = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample m
-
-
--
-
-
-
-
-
-
-
-
-
-
-
-
I
I
I . m 1% Ie I
L
CL
\
SU
BORINGS NO, '*
ELEVATION: BORING DIA,
See Previous Page
1 --- BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1’ per blow. L = 3" O.D. Sampler, 1401b. hammer, 30" drop S = Standard Penetrometer SAMPLE TYPE U =~Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
I
wEmmmoN ENGWEERIWC AssoclAlEs. INC.
IA COSTA SE18 - SE21
KLS I 3/30/81
110175 PLATE NO. 26
-
-
-
-
-
-
,-
--
-
,-
I-
.-
-
SI
BORING NO, l3
Light Gray Green, Wet to Moist, Stiff to Dense, Sandy
Concretion ------- -- -- -,
Olive, Wet, Medium Stiff, Mudstone
Orange and Green Gray, Moist,
Olive to Light Gray Green to Green Gray Brown, Wet to Moist, Stiff to Hard, Claystone to Sandy Mudstone-Massive
(y' Gouge, Remold Clay, Maybe Old Slide Plane, Not Sticky
1 H Grz;ional Contact)
- BLOW COUNT K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. L = 3" O.D. Sampler, 1401b. hammer, 30"‘drop S = Standard Penetrometer SAMPLE TYPE U = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
yLIMD!SON EwlNEEmNG AssoculEs. INC.
LA COSTA ~~18 - SE21
~KLS 1~ 3/30/81
110175 PLATE NO. 27
_.
-
-
,-
,-
,-
-
-
L
SP
SM, SP
Sl Sl
BORING NO. l3 con'e BORING NO. l3 con'e
ELEVATION: ELEVATION: BORING DIA. BORING DIA.
DESCRI~PTION DESCRI~PTION
Orange to Buff, Wet, Dense, Medium Sand
42- II _
44 -
l- 46 -
1 48 -
1
50 -
&..
{!,f Buff, Moist to Wet, Dense, Sugary Sand
f-1;
IlY
\
(Gradational)
\
Blue Gray, Moist, Stiff to Hard, Mudstone (Shinny Coucoid, Fractures Very Hard)
\
1
END OF BORING
1 SLOW COUNT .-- -
K = Y'3t.lI; Sampler, Kelly bar of drill rig ..^W I.,,.... I LLL”Y I yrr “a”“. 1" mm ~~vler, 1401b. beer, 30" drop D - 0rablua?u rslletrometer 4PLE TYPE ,le Chunk Sample Bulk Sample
,stone
L=> -.-. I'-~ c - c..^--l^-> n^-
SAt U = Undisturbed Drive Sam{ c =' B=
YLCMDSON ENGIMENWG ASSOClNES. INC.
LA COSTA SE18 - SE21
KLS I 313
110175 PLATE NO.
0lSl
28
-
-
.~
-
-
-
-
-
.-
-
-
-
-
-
I
-
-
,-
2-
4-
b
6-
lo-
12-
14-
16-
18-
ZO-
22-
24-
26-
26-
30-
32-
34-
j6- c
SU
BORING NO, '4
DESCRIPTION
\
.
Gray Green, Wet, Medium Stiff to Stiff, Topsoil
Green Gray, Wet, Medium Stiff to Stiff, Clay
Orange and Green, Wet Medium Stiff Cla
I
Buff, Wet, Medium Stiff, Medium Sandstone
Buff, Wet, Hedium Stiff, Silty Fine Sand
Green Gray, Wet, Stiff, Sandy Silt-Claystone (Massive)
_-_ BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1' per blow. L = 3" O.D. Sampler, 1401b. hammer, 30" S = Standard Penetrometer SAMPLE TYPE D I Undisturbed Drive Sample C = Chunk Sample B =,Bulk Sample
LA COSTA SB%l? - SE21
KLS I 3/31181
110175 PLATE NO. 29
-
I I
,z
;;
0
i
:L/ :H
;P
:L
su su
BORING NO. l4 Can't BORING NO. l4 Can't
ELEVATION: ELEVATION: BORING DIA, BORING DIA,
DESCRIPTION DESCRIPTION
Yellow and Brown, Wet, Medium Stiff, Clay Flat
' Orange, Wet to Saturatei, Medium Stiff, Poorly Graded Clean Sand Dip 18 South
%" Remold Sticky Clay Dip 5' SSW, Good Plane
Dark Green Gray, Wet to Moist, Stiff to Very Hard, Clayston,
\
Very Soft Remold
END OF BORING
Slow Drilling
I KEY D&W COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig Arnn 1' r.ev hlnv
L= ---r . r-- ---I. 3" O.D. Sampler, 140lb. hammer, 30" drop ~MDSON ENGiNEENING ASSOCLAlES. tI1c. S = Standard Penetrometer
A =
Ir , L
;'
i:
SAMPLE TYPE U = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
LA COSTA SE18 - SE21
KLS I 3/31/81
110175 PLATE NO. 30
-.
-
-
-
-
-
.-
.-
-
-
-
-
-
-
-
2-
4-
6-
o-
2-
4-
6-
8-
10 -
:2-
!4-
16 -
!8 -
;o _
,2-
;4-
l6-
BORING NO, l5
LEVATION: *03+ BORING DIA,30”
DESCRIPTION
CH \ Green Gray, Wet, Stiff, Topsoil f \I
Light Green Gray, Wet, Medium Stiff to Stiff, Clq
CL Orange to Gray Green, Wet, Medium Stiff, Sandy Mud
(6" Brown-Streaked Orange Laminated Mudstone)
SM/ >..':I? Buff, Moist, Medium Dense, Silty Sand to Poorly Gr SP $9 Clean Sand
Light Green to Orange, Wet, Stiff, Clayey Silty Fi
SM, k, t::
sp -JX Buff, Wet, Medium Dense, Fine Sandstone
':I,k
!I. I!
:I?;
;I:~ ..I.$ !,:.I+ (Seepage) (Greenish Sand)
:n Buff, Saturated, Stiff, Clay
Olive, Wet, Stiff, Mudstone (Sheared Clay 1" to 2"
Cornflake Mudstone)
_-- BLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1’ per blow. L = 3" O.D. Sampler, 1401b. hannner, 30".~drop s)oIMDSON ENGIMENNG AssoclAlEs. INC.
S = Standard Penetrometer SAMPLE TYPE IJ = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
LA COSTA SE18 - SE21
KLS 1~ 3l3llal
110175 PLATE NO. 31
-
-
.-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
A
2 5 u
-
:L
:L,
:n
:L
&
:: PI ;
i3
;
\
\
\
A
\
\
\
Sl
BORING NO, " 'OnIt
BORING DIA.
DESCRIPTION
Blue Gray, Moist, Stiff, Clay (Fracture)
(1” Soft Remolded Clay Sticky, Well Developed Planes)
(No Color Change) (Flat Massvie Slide Plane)
Light Brown, Moist, Hard, Mudstone
Blue Green, Moist, Hard, Sandy Mudstone
RND OF BORING
SLOW COUNT -
K = 3" O.D. Sampler, Kelly bar of drill rig drop 1’ per blow. L = 3" O.D. Sampler, 1401b. hemmer, 30" drop S = Standard Penetrometer SAMPLE TYPE . U = Undisturbed Drive Sample C = Chunk Sample B = Bulk Sample
1.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DIRECT SHEAR TEST RESULTS
,
SAMPLE DESCRIPTION Angle of Cohesion
intrrnal frictiod ') mtcrcc t fDSf I B2 @ -4' I Light Olive Clay (Undisturbed) I l1mJl 31
B2 @ -7'to -8 Yellow Brown Clayey Silty Sand (Remold) I 35 - 250
I I
B2 @-IS'to-16' Olive Gray Clay (Remold) 22 350
B2 @ -15' Olive Gray Clay (Residual) 10 150
I B3 (a -12' I Olive Clav (Undisturbed) I 26 I 550 I
I B4 @ -34' I Olive Clay (Residual) I 9 I 180 I
B6 @ -5' Buff Sand (Remold) 41 125
B8 @ -13' Buff to Orange Sand (Remold) 40 250
B9 @ -15' Tan to Yellow Tan Sand (Remold) 40 250
B9 @ -33' Tan Clay (Residual) 12 250
Bll @ -10' Light Yellow Tan Silty Sand (Remold) 39 125
B12 @ -8' Green Gray Sandy Siltstone (Remold) 31 350 ,
B13 @ -5' Clayey Silty Sand (Undisturbed) 37 780
1
I SEA LA COSTA SE18 - SE21
-L SHEPARDSON ENIlINEERING AssocIATEs, Inc.
1 I* DES DATE 4/21/81
JM No* 110175 I PLATB NO. 33
-.I
-.
-
-
MAXIM1
ASTF
1 B2 e-7 to-8
1 B2 @-15 to-16
I B6 @ - 5
I B8 P - 13
B13 -9
E
EDENSITY & OPTIMUM MOISTURE CONTENTS
Ii . . . . . .._..__ Method: .__._.....,,,.__
DESCRIPTION
SEA
SHEpARDSONEiNGINEERINoASSOCIATES.Inc. IA COSTA SE18 - SE21
Et KLS DATE 4/9/81
JOBNO. 110175 PLATE NO. 34
-
.-
-
-
-
_-
_-
-~.
-
-
-
-
-
-
-
-
EXPANSION TEST RESULTS
I SAMPL,E 1. B2 f-7 to-8 I B6 @ - 5 I BlO e-17 I I CONDITION I Remold I Remold 1 Remold 1
INITIAL M.C.(*/.l 1.0 3.1 2.1
INITIAL DENSlTYtPCF) 107.5 109.1 112.1
FINAL M.C.W.) 19.4 18.3 14.7
NORMAL STRESS(PSF) 166 166 166
I EXPANSION (*/.I I 4.0 I 3.1 I 1.0 I
SAMPLE
CONDITION
I INITIAL MC.(%) I I
INITIAL DENSITY{ PCF)
FINAL MC. W.)
NORMAL STRESSWSFI
EXPANSION t.1.)
SAMPLE
I CONDITION
INITIAL MC.(%)
INITIAL DENSITY(PCF)
FINAL M.C. W.)
NORMAL STRESf tPSi=)
EXPANSION (V.) I I I I I
L
SHEPARDSON ENGINEERING ASSOCIATES. Inc. LA COSTA SE18 - SE21
II KLS DATE /+,,‘,R,
I JOB No. 110175 ~T~A’FF un -5
GRAIN SIZE ANALYSIS AND ATTERBURG LIMITS
-
LIOUID LIMIT
PLASTIC LIMIT
PLASTICITY INDEX
63 60
27 35
36 25
I UNIFIED
CLASSIFICATION CH MH/CH 1
SHEPARDSON ENGINEERIN HHOCI
-
-
-
.-
--,
-
DIRECT SHEAR TEST RESULTS
DESCRIPTION
lded 90% Cla
MAXIMUM DENSITY 6 OPTIMUM MOISTURE CONTENT
ASTM METHOD
SAMPLE DESCRIPTION Maxtmum Optmum Demty @co MOlStUPe content P/*i
EXPANSION TEST RESULTS
SE& w Benton Engin.,Inc. DATE 2/2s/75
SHEPARD&DN EMiINEERINo AStWCfATE$ &ii 7 ~0’ MY
110175 PLATE NO. ~37
i
CJ BENTON ENGINEERING November 11. IS
SAMPLE , Anglo of Cohesmn DESCRIPTION Internal mtercept
friction ( ’ ) (PSI)
62 @ -10’ Clay 20 390
36 @ -30' Clay to Claystone 40 840
86 @ -4' -5' Silty Fine Sand (Remolded) '26 390
MAXIMUM DENSITY 8 OPTIMUM MOISTURE CONTENT
_ ASTM ~1557-70 METHOD A
SAMPLE Mammum DESCRIPTION of-Jtmlum Cmsity @cl) MoaSture ccntmt w.i
B2 @ -3' -4' Clayey Fine to Medium Sand 119.6 12.2 ,-
B5@-7' -8' Clayey Fine Sand 112.9 14.8
.-~ B6 @ -4' -5' Silty Fine Sand 112.1 14.6
- EXPANSION TEST RESULTS
\
ii- 1’ INITIAL DENSITY~C~
'i-
1' SE& SV BENTON ENG. LMTE 11111175
I-~HEPARDSON ENOINEERIM) AssocxATEsInd. , Joe w. 110175 PLATE NO. 38
.-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
--
-
-
LA COSTA APPENDICES
-
-
-
-
Appendix Description
A-l Boring Logs-Benton Engineering,
Inc. (B.E.I.) Project No. 75-lo-9BC
A-2
INDEX OF APPENDICIES
Plan Symbol -
Boring Logs (B.E.1.) Project No. 0 V 75-lo-9BC Boring Nos. 11 thru 21
I-
-
i-
-
-
-
-
-
-
A-3
A-4
B-l
B-2
C-l
Boring Logs (B.E.1.) Project
No. 75-l-20BC
Consolidation Data (B.E.1.) Project
No. 75-lo-9BC & 75-l-20BC
Boring Logs-GeoSoils, Inc. (G.S.1.)
W.O. 810-OC, April 3, 1981
Trench Logs (G.S.I.) W.O. 8100C
Consolidation Data (G.S.1.)
W.O. 810-OC
Preliminary Calculations RE:
Apparent Shear Strength Parameters
and Landslide Mitigation Measures,
Shepardson Engineering Associates,
Inc. (S.E.A.) 110175
.
:,I.: ,: ,
-
-
_-
-
-
-
.-
-
-
-
-
-
.-
-
.
APPENDIX
A-l
BORING LOGS
BENTON ENGINEERING
PROJECT NO. 75-lo-9BC
-.
-
i.
.~
.~-
.-
-
-
-
-
-
- I - I i - 1 - 1
-
-
SUMMARY SHEET
mNlNQN0. 1 --
ELEVANOW 14l.V l
* Gw, bt Lo-, H&H roatumd, hw Scatbud
imvalbl Inch
Itghtly Molct kg.8
kht, M&urn Finn
o!umhd
by, Sahmhd, Medium Finn
/Nh Lonma of Chy~y Fina to bdlum Sand
hy, Saturatad, Compact,
3’0~0160% to 3 inch Dianete
&ble ta 5 Inch Dlamatar
FINE SANDY
CLAY
CLAYEY
FINE SAND
CLAYEY FINE TO MEDIUk
SANDY GRAVEL
>
i?‘;’
a :z ;t
a -
3' .A
3' .d
1 .t
3’ .d
-
-
3 %, clr:
‘Pa
IS.1
17.1
!l .I
!3.!
-
-
-
-
lndlcahr Loos. Bq Sample
IndkahI Ltndwurbod hlva Smplo
l The Ekvatians won obtalmd from the contou llnos shown on
Rawlng No. 1.
‘G:i-,l,.
I I ORAWINQ NO. SENTON ENGINEERING, INC. 2
.~
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SUMMARY SHEET
Rown, Dry, Loon, Topcoil
l-
CLAYEY
FINE SAND
Gmy 81 &own, Slightly Mole,
Vuy Firm, Wfth Lama of
Cleysy Fina Smd
‘I I
ho&r Dip Approxlmakly
150-5700 E, Light Ollvo,
Molrt, Firm, Frochmd
16-
17-
18-
‘9I@
10 -
SILTY
:INE TO MEDIUM
SAND
Light Olfvo, Moist, Vay Firm,
Magar, No BaddIng F’lam
Ltght Ollva, Moist, Very Fin
CLAY
SILTSTON E
LIME CEMENTEO
SILTSTONE
-
16.:
-
6.;
-
39.
39. -
6.9
EC: -Y &
63 -
-
15.
-
22.E
cp 31 !I :; -
-
-
-
-
9s.
-
19.
13, -
-
15.e
16.: - -
II I Contlmod on Dmwlng No. 4
I:.~. ~_ ., ,,i,~ ~~>,
-
FNOJECT No.
I I
DNAWINQ Na.
75-10-9K BENTON ENGINEERING, INC. 3 I
-
-
-
-
-
-
-
-
-
-
7
SUMMARY SHEET
WNINQND. 2cont.
PNDJECT No. I DNAWINQ ND.
75-1&9x BENTON ENGINEERING, INC. I
4
.~
.-
-
-
-
-
-
.~
-
-
-j
-1
.- ]
-i
B
1’
2,
3.
4,
5
6
7
8
9
IO
I1
I2
13
I4
15
17
I8
I9
J .- I
-
SUMMARY SHEET
WnlNQw. 3
ELEVATION 189.0’
*lo Apparent BaddIng Planas,
But Mnny Slickansldad Surfaces
Trw~Ilng 10’ to 150 Down
Cirmmlly S 26 E
FINE SANDY
ClqY
CLAYSTONE
-
16.;
IL!
17.1
16.:
I I Contfnuad on C~mving’No. 6
3# ‘-: ‘?I
-
14.;
15.;
23.:
24.1
-
-
?Non!cT No. I I DNAWINQ NO.
75-10-9K BENTON ENGINEERING, INC. 5
-
.-
-
-
-
-.
-.
-
-
-
-
-
-
-
-
-
-
-
L SUMMARY SHEET
BORINO No. 3 cont.
8 0 0
No Appont Bedding Phnos,
But Moray Sllckensidod Surfoca
CLAYSTONE .
PROJECTNO.
75-lo-9BC I
BENTON ENGINEERING,’ INC.
I
OnAwlNo No.
6
.-
.--
-
.-
-
-
-.
-
-
-
-
-
-
-
-
- f -a
Sllckuuidad Slopeu 150S700E
- -
- 3, - -
PaoJEcT No. 7%10-9x
FINE SANDY
CLAY
CLAYSTONE
18.1
-
I I
0oAwlNo no. BENTON ENGINEERING, INC. 7
-
-
-
-
-_
-
-
-
-
-
-
-
-
f
- 4’
iz
SUMMARY SHEET
PaoJE4xwo. ORAWINO M. BENTON ENGINEERING, INC.
-
! -i 8
; WN Cd t AY da
z aa 4
SUMMARY SHEET
BORING NO. 5 cO,,t,
2
g: 25,
z It- 5 J 0 -
- Ohm, Moist, Very Firm,
0ccxdnol Cwnonhd Luru
md Lenses With Flna Sand, No .
ckk Ollva, Highly Fractured,
Many Glossy Fmchtms
. j:...
,PROJECT NO. 75-lo-9Bc I BENTON ENGINEERING, INC. I
.
-
-
.- I
4
.l f -4
_I: I
SUMMARY SHEET
BORINO NO.
ELEVATION u
Light Gmy, Moist, Very FM
Continued on Drowl~ No. 11
--
.~-
~-.
.-
_-
-
-
-~~
-
-
-
-
-
i i #l
21 .
13.
2s
24.
25,
26.
27,
28:
29
30
31:
32,
33:
34:
35
36,
37:
38:
39
40
mow-r w.
75.m-9pt
SUMMARY SHEET
eoa1110 NO. 6 Cwt.
k!d Bnmn
ilight Clay 8ind.r and Few klfum Grmlns, Pcesibly
kosiorml
wagule Contact Dips Aqprox-
mtely 15” IO East, Light 0th
md Rod 8rown,Moirt,Vory Fira
:hin l/4 Inch Platic Clay%~
Nps W 5 2U' E, Oliva
:ew Limo Gmontod LonW
SliTY
FINE SAND
CLAY TO
CLAYSTONE
> 0;
f$ :3 >,c’ e -
41.7
16.7
50.0
28.3
Contlnud on Drawing No. 12
1.8
I z .-
7.1
3.1
35.:
11.:
BENTON ENGINEERING, INC. I DRAWING NO.
11‘ I
SUMMARY SHEET
OORINO NO. 6 cent*
.
l
. ::,.,.
1
PROJECT IYO. I I DRAWlNO NO.
75-10-5x BENTON ENGINEERING, INC. 12
--
~-
-~
--
..-
-
-
-.
-
--
f’ yo; $3 0
-
-
I ,...~
-
SUMMARY SHEET
BORING NO. ‘7
ELEVATION 150.0’
hk N, SlightIy MOW,
.oae
F&E
SANDY CLAY 1 Vuy Firm
x Gmy Brown, Moist, Vwy Flm,
Fmcture# :I
I
CLAYEY
FINE SAND
ClAYSTONE
8.1
I41 -
9’ .1
Ild
-
14.4
14.4 -
I
14,:
4.9 -
2.2
5.1
-
!0.1
!3 .c -
99.
W.1 -
31 .I
w.:
-
36.1
v9.i -
I I I
PROJECT NO. ORAWING No.
75-lG9aC BENTON ENGINEERING, INC. I 13 :
5
6
7
8
9
0
1
2
3
-
-.~
~.
-~
-~.
-
-
-
-
-
-
-
-.
-~
-
-
-
-
SUMMARY SHEET
BORINa NO.
ELEVATION 125.0'
l rises of Fh Sand
PRWECT NO. I I ORAWINO NO.
7%lo-9K BENTON ENGINEERING, INC. 14
-.
-
--
-
-
-
-
-
-
-
-
-
-
-.
-~
-
-
SUMMARY SHEET
SORING NO.
ELEVATION
-
-
-
..-
-
-
-
-.
-
-
-
-
-
-
-
SUMMARY SHEET
WRINO NO. 10.
ELEVATION
BENTON ENGINEERING. INC.
-
-,
-
-
-
-
-
-
-
.-.
-.
-
APPENDIX
A-2
BORING LOG NOS. 11 THRU 21
BENTON ENGINEERING
PROJECT NO. 75-lo-9BC
.,s.. ..>. , ;
5
6
7
8
9
C
1
Ii
II
SUMMARY SHEET
BORING NO.. 11
ELEVATlON 133.0* -- .-
Brown, Moist, Loose
I
. 3 _ @ ,. y.- /h G
In
., SC
_ @ ‘..yC.. 0 . .
I
ray, Very Moist, Soft,
terbedded with Clayey Fine
md Mottled Lenses,
ccosional Small Grovel
SILTY
FINE SAND
29.5
30.9
BE.
89. 1.6
=I cter
@I IL 28.4' 94. -I “< [ 3.2 lturoted
iown FINE SANDY
CLAY
I E -
-
- 1
I
1
~’ 1
- 1
-~
--
_.
-
-
19.31
I !
!
1.6 !4.8 l-
!--
l-
1
/ I ‘I I :, :’ i !; fi :I 1 I
i s
I
I I
I
!
-223.2 99.91 i
3 Indicates Undisturbed Drive Somplc
23 Indicates Loose Bag Sample
‘Elevations were obtoined from 1”=200’ Scale Drawing No. 1
of this report
.G ~-.
.
-
moitcr NO ~NENGlNEERtNti. INC. OHAWNG NO, 1 18 75-lo-9BC I
--
I El G .G
L’
L:
14
l5
1:
l8
I9 10
1 11
1
1;
II
114
1 It
1:;
1 ‘1
1 l! 2t
1
z 0 ‘-
YE SUMMARY SHEET
gg
& 0;g
*z “5% BORING NO. 12
4, ELEVAT(ON 27o.o* ’ __-
0 d
Brown, Moist, Loose, Topsoil SILTY
FINE SAND
Brown, Moist, Soft FINE SANDY ’
CLAY
CLAYEY
_- FINE SAND 1 I I
( 34.1’ 10.3!109.3i
I
/ j j
1 , I
-I I
/ 1 I
I 1
-1 39.1: 10.7~110.51
j i f
I ! I
I I ,- SILTY t I FINE SAND I !- I I ! I t-
i
i-
7
Dips 16 North 35.71 10.9bl3.0
1 I I I
I
I
I I
3~ i
?- i
3: I
I II
Light Gray to Light Yellow
Brown, M&t, Very Firm, CLAYEY
Thin Lense :INE TO MEDIUM
SAND
I I’
! j
1/ 35.7 13. 16 .,2 rx;, ::~,I
DRAKlNG NON BENTON ENGINEERING. INC. 19
a-
I
2
:3-
!4-
15
16
11
i2
3
;4
!5
i6
17
8
9
,O
-
SUMMARY SHEET
BORING NO. 12 cont.
6
2
2
2
2
2 1
2
-1 2
I 2
2
2
3
3
3
3
3
3
3
3
3
3
4
.ight Gray to Light Yellow
3rown, Moist, Very firm
SILTY.
FINE SAND
0 SILTY
:INE TO MEDIUM
SAND
bown, Moist, Very Finn
®ular Gosional Contact)
Cllive, Very Moist to Moist,
Very Firm, Slight Dip to North,
Neathered From Exposure,
Fmcture Filled With Silty Fine
to Medium Sand
16.1
-
!8.:
‘4.1
i4.!
CLAY
Dark Olive, Moist, Very Firm
Dips 45’ - N 60°W Thin
Fmcture
CLAYSTONE
i i i-
PROJECT NO, ORAWNC NO.
75-l o-9Bc BENTON ENGINEERING, INC. 20
-
/ ,’ if
J
L’
I::
14:
ss:
1;;
la/
1,:;
111:
1;:;
114:
_I”’
16.
-II
1
1
i
1
-.
-
7.
8’
:9,
!O.
-
OEZ 4 ‘.:
6z i!Ez
0 i ”
SdMMARY SHEET
BORING NO. 15
ELEVATION 192.0 ’ -
- >ark Grey, hid, Soit
.ight Gray and Light Olive,
Moist, Very Firm, With Some
Fine Sand
Micoceous Silt Lenses
FINE SANDY
CLAY
(Merges) .
SILrf CLAY
3.2 -
6.2
7.9
‘7.9
19.5 i 1.
Continued on Drawing No. 25
2.8 1122.1
5.6jIl2$
PROJECT NO I I DRAWING NO.
75-lo-9EC BENTON ENGINEERING, INC. 24
-
.-
‘-
I-
-
-
-
-
-
-
J
.
PRO,ECT NO.
7%lo-9BC
More Fine Sand
SILTY CLAY
6.6
0.2 -
14.4 116.5
18.4 ill2.8 - -
DRAWING NO BENTON ENGINEERING, INC. 25
2
3
4.
5
6
7.
8
9
IO
I1
12
13
14
15
!6
‘7
I8
9-
!O
-
SUMMARY SHEET
BORING NO. 16
ELEVATION 170.0”
- ~,Brown, Moist, Loose, Topsoil
ed Bran, Moist, Soft
Interbedded Layers of Claystuu
Silty Claystone and Cemented
Lenses
Olive, Moist, Very Firm CIAYSTON E
CLAYEY
FINE SAND
FINE SANDY
CLAY
SlLrf
CLAY
(Memes)
SILTY
VERY FINE
SAND
SLIGHTLY
SILTY
‘INE TO MEDIUM
SAND
-
8.1
2.5 14.1
- -
2.5 7.6
9.5 9.8
6.6 -
-
!7.7
$
a5
YdY
>a
S’
-
-
,3 .:
-
!O.(
-
il.!
Il.1
VHOJECT NO.
75-IO-9BC I BENTON ENGINEERING. INC. I DRAWING NO
26
..~
SUMMARY SHEET
BORING NO. 17
ELEVATION 178.0’ .
I - >aark Olive Gmyc Moist,
Soft
Firm
(Meraes)
Dlive, Very Firm
>
2k
;ij
57
& 0 -
9‘ .I
12.;
.
1.4 :I( lo.1
3 CLAY
- 9: 16.8 is 15.:
I
1 7
6-
1 7:
1 8:
111.
12.
1 . 13.
14..
1%
16-
17-
18-
- IMerges) - -
= Ilive, Moist, Very Firm
Z - t
3.3 6.4 11’ 13.5
I
19-
‘20:
.Ime Cemented Lenses - Xive, Moist, Very Firm
r CLAY
2.7 6.8 I
-
1 14.1 Ii;:;
Continued on Draw 3 No. 28
1 75-IO-9BC
*
r NO. I I
I
-- q RAWNG NO. q RAWNG NO. BENTON ENGINEERING, INC. BENTON ENGINEERING, INC. 27 27
F 21
c
1 24
1
25
8 8
c-8 c-8
!ZFJ !ZFJ SUMMARY SHEET SUMMARY SHEET
irr irr BORING NO. BORING NO.
$2 $2
17 (t&t.) 17 (t&t.)
d d
= &ive, Moist, Very Firm, = &ive, Moist, Very Firm,
= Gradually changed into Silty = Gradually changed into Silty CLAY CLAY
= Fine to Mediun Sand = Fine to Mediun Sand
Merges) * Merges) *
Light Light Brown and Light Yellow Brown and Light Yellow SILTY SILTY
FINE TO MEDIUM FINE TO MEDIUM
SAND SAND
1 1
.
-
_ ..- ,, : ~.,~ ..~
r NO. I I ORAWING NO. PRO BENTON ENGINEERING, INC.
,
28
SUMMARY SHEET
BORlNG NO. 18 .
ELEVATION 7% a
Slightly Moist, Loose,
R
Red Brown, Moist, Mediun . . . . . . . . . Firm . . . . . .
SILTY
FINE SAND
CLAYEY
FINE SAND Yellcw Brmvn and Red Brown,
6.
7,
8.
i’
1 -
~ Light Olive, Moist, Very
Firm CLAYEY
:INE TO MEDIUM
SAND
9
10
11
12
13
14
15
16
17
I I 3 Glossy Fractures CLAYSTONE 4.6 I’ 8.i
7.6 8.4
18 i 1 Dark Olive
19
20 c9
w.
Continued on &awing No. 30
PROkCT NO.
I I.
ORAWNG NO.
75-lo-9BC BENTON ENGINEERING, INC. 29
SUMMARY SHEET
BORING NO. 18 (Cwt.)
Olive, Moist, Very Firm,
Fractured
6
32- L -
35 - 1 -
36-
B /
CLAYSTONE
Continued on Drawing No. 3 1
15.0
‘4.6
j0.C
i
: e
II
1’
‘a , _,:
PROJECT NO. I I ORAWNG NO. - 7%lo-98C BENTON ENGINEERING, INC. 30
d ,a;
42 -
1,:
l4-
15
16.
17
18.
19
50
Puojrcr NO.
7%lo-98C
SUMMARY SHEET
BORING NO. 18 (Cont.)
hk Olive, Moist, Very Firm,
‘roctured CLAYSTONE
fellow Brown, Moist, Very
:irm, Few Coorse Grains SLIGHTLY
SILTY
FINE TO MEDIUM
SAND
Werges)
Xive Groy, Moist, Very Firm SlLl-Y I FINE SAND
(Irreaulor Contact)
>ark Olive, Moist, Very Firm
Wewes)
ClAYSTONE
6.6
-
-
8.2 15.8 116.:
BENTON ENGINEERING. INC. I
DRAWING NO.
31
5,
6,
8.
9
16
18 G 3
PROJECT NO.
75-lo-98C
SUMMARY SHEET
BORING NO. 19
ELEVATION 256.0’ ’
Brown, Slightly Moist, Loose,
\Tcpsoil
Moist
ted Brown, Moist, Very Firm
Light Groy ond Light Yellow
Brown, Moist, Very Firm
(Slightly lnegulor Contact)
Olive, Moist, Very Firm
Continued on bw
SILN
FINE SAND
CLAYEY
FINE SAND
SILTY
FINE SAND
CLAYSTONE
lg No. 33
-
i3.0
c i i
~ I.1
I
I I
i 1
-
8.7
5.8
8.7
15.8
-
?9.C
DRAWING NO BENTON ENGINEERING, INC. 32
SUMMARY SHEET
BORING NO. 19 (COllt
live, Moist, Very Fim
PROJECT NO.
75-lo-98C
,.) .
I ClAYSTONE ’
CUafF)
CLAYSTONE
CLAYSTON E
r 2
1 3
6.6
#5.0
‘1.7
It.!
19.8 pO9.l
18.:
,
I
,
2..
3
3
-
- -
I DRAWING NO. BENTON ENGINEERING, INC. 33
-
c
2
Y, z
k
$
I 1: L . 2
1.
il
1:
1:
1 8
l9
j:p
12
-! 13
_ 1
I
-
1
- i
:
14
I5
I6
I7
I8
I9
ta
SUMMARY SHEET
BORING NO. 20
ELEVATION 276.0’ ’
&mm, Moist, Loose, Topsoil
,&awn, Moist, Soft
Red &own, Moist, Firm
Light Groy and Light Yeiiw
Brown, Moist, Very Finn
SILN
FINE SAND
:INE SANDY
CIAY /
CLAYEY
FINE SAND
SILTY
FINE SAND
Continued on bowing No. 35
!7.6
7.6
2.6
‘1.8
PROJECT NO.
I
DRAWING NO.
75-IO-98C BENTON ENGINEERING, INC. 34
i I7
I’ I !-
! 4 ;-
-
-~
30 -
31- _
32 -
SUMMARY SHEET
BORING NO. 20 (hit .)
Light Groy and Light Yellow
&awn, Moist, Very Firm
SILTY
FINE SAND
CLAYSTONE
> 06 Et
is Iv* ;i
0 -
io.2
17.:
10.2
-
11.7
,g
:c,: ;s,r
II
0.i
7.i
3.c
-
7.5
PROJECT NO.
I
75-IO-98C _. I
DRAWING NO. EENTON ENGINEERING, INC. 35
-.
-
-.
-
-
-
-
--
I
-
-
-
-
-
-
-
APPENDIX
A-3
BORING LOGS
BENTON ENGINEERING
PROJECT NO. 75-l-20BC
-
-
-
-
-
_
. ..~
-
-
-.
,-.
--
-
-
.-~
-
-
E z t : 0
1,
2
3
4
5
6
7
8
9
a
1
;i
:3
14
u
I4
,.: ;!a *
I-
t
c
I-
P
‘I ‘:. ::
El 0
0
q
0
0
-
SUMMARY SHEET
BORING NO. 1 ’
El EVATION lm.0’ l
Groon-bolwn QldBrown,
Sli#htly Mow, Loca,
CIUY Lmua
Evbdium Ftrm
FINE SANDY
CLAY
Grmn-bmwn md Blown,
Slightly Moirt, Madium Firm,
20 perc8nt Graval to 2 Inchar
Olren-twwm end Brown,
Slightly Moist, Medium Fin,
OcccOional Lensn of Cluyey
Fine k Akdlum Sand end
~RBcket8 of Clay
Gmm-brown ad Brown,
Slightly MOW, Medium Firm, 20 Purcent GTad and
Cobbla to 4 ~nchu
Light Groon-lxwn k Li&t
Gmy, Moist, VVy Firm,
Contact Dlp 2(P ot S s E
GRAVeLY
FINE SANDY 1
CLAY
FINE SANDY
CLAY
aNeLY
FINE SANDY
CLAY
CLAY
Contlnuod on Dmwlng No. 3
8
- lndicata LOOM BqJ SanplL
- lndlcohs Undir~ Rfvo Sanplo
4.9
6.5
2.7
17.1
I1 .I
8.1
6.8
-
t - Elovatlm ahown wuu cbtuhd by tntwpolation ktwen aontwr lirw
QI Rick W-b Dmwfw No. J=, dahd cC7),,..,,, ~~‘~?xj;/:,,:., ..>:. ,
I I
ORAWNG NO. BENTON ENGINEERING, INC. 2
-
-~
_-
_.
.-
-
-~
-.
C~
-
-
-
f
$i SUMMARY SHEET
BORING NO.
,y
1 (c0lbt.j
0
Lieht ban-brwm b ueh,
Gw, M8b v-v nm
CLAY
5. =:= yg g? %” -
21 .l
1o.c
29.2 -
Il.!
IS.!
IS. -
.
16.’
12.7
,
a’:’
s; !szy 44 8 -ITI fjiE :ci
-.
I DR*;vING NO. BENTON ENGINEERING, INC. 3
.
-
- )
t
._
-~
__
-
-~
~-
-~
.-
-
_-
-
-.
-
-~
f
-a
-I;
SUMMARY SHEET
GORING NO. 5 ’
I ELEVATION 15J*(y
ch oudsown, Slightly Moist, filn, Gypl
+!EGa
um -
ii
s!z
ma
Ital -
rf
IS
nlm
GrGGnh, bowncmd
Yoll~, Moist, vwy
Fhl
With Fine b Odium Sod
1
Light Brown, Moist, Vwy
Firm, Slight Clay Bindor
1
hk Bmwn ald GrGGnh, Abirt, Vay Finn
I SANDCLAY -. _ . Contifnmd m Drawi* No. 10
CLAY
SILTY CLAY
SILTY CLAY
NTERBEDDED
WITH CLAY
:NE TO MEDIUEU
SAND
Wgu)
INTERBEDDED
JLTY CLAY, CLA
AND FINE
-
16.2
PNOJCCT NO.
I
DWNVING NO.
.3S442f$ BENTON ENGINEERING, INC. 9
-
-
__
-
-
-.
..-
-
-,
-
-
-~
-
- ‘.
iid
SUMMARY SHEET , BORING NO. 5 (C-t*)
DakBlwmmdGrGG~, Moist, vay Fhl -7 S
lM@BEDDED
‘ILTY CLAY, CLR
Light Ydlow-bmvn, Moist,
vary Finn
Light Ydlowdmwn, Moist,
rFin I
SILTY FINE
MD (-1
SILTY CLAY
SILTY FINE
SAND
(MGrgGs)
SILTY FINE TO
MEDIUM SAND
&d ICY 2
I; > . 0 -
39.1
50.1
16.2
-
-
17.
-
-
-
-
-
-
?RO.iECl NO. 75-l-2= I I DRAWING 110. EENTON ENGINEERING, INC. 10
- - - _-. - - -_ .- - -~ -1
J
I J
-
-
-
-
-
-
-
J, . SUMMARY SHEET
BORING NO. 6 ’
ELEVATION 1 12*@
m h+% ba+, Slightly Rwou
M&urn Firm
SILTY FINE
SAND ,
-
9.7
1.6
Dmk Gmy, M&t, Firm,
Contact k Shrink- Cracks
Filled with Silv Fine Send i9.e
22.1 SILTY CLAY ----.. -. --.- I
BrownandG
,,m 1.6 !O .i CLAYEY FINE
SAND
Brown and Grcpbrown, kh~rad, j&d{m Fin,
Occoiond Grmd to 1 Inch FINE SANDY
CLAY
INTERBEDDED
WITH CLAYN
FINE SAND 3.2 •~.~,, ..,.. I3 ‘.’ ‘.” . . . . ._,_ . . . . . . . . . . . J . . . . . . . ~ El Contlnuod on Drawing No. 12 mOdEEl NO. DRAWING NO. ;Ic1-2.2ogc BENTON ENGINEERING, INC. 11 a
-
-
-
-
-
-
.-
-
-
ci
- !
.-I
1
-
-
-
-
-
-1
n
i
;
;
I
I
I
I
I
I
I
SUMMARY SHEET
GORING NO. 6 (CO&
- u m,
sohrdrd, ~lull Rtm,
OcwkmdGmdkllnd~
I
.
-
. I
FINE SANDY
CLAY
INTERBEDDED
WITH CLAYEV
PINE SAND
I -
CM*IECI NO.
I
“Fl.li~!NG lu”.
I ‘7544au BENTON ENGINEERING, INC. 12
-
-
-
i
'L
'1
L
1
L
1
1
b
i
1
1 I
i
1
;,
I:
2.
9.
t
5
b
7
SUMMARY SHEET GORING NO; 7 PLEVATION 161.0
CLAY
0
a
0
. . ,...._.. zzzl . .;.
?i. dc
3 gY 2lc a -
4.5
4.5
1.t
6.4
flNE SANDY
CLAY
GRAVELLY
:LAYEY FINE TO
MEDIUM SAND
1 i
1 1
1 1
52
z
la.1
-
Yt 23 +I 6a iI rii -
9.8
‘1 .a m.
16.:
@;W a ‘.~.. /.., ~. .., . ..~.... ,q . . . . ~.. ,
FlNE SANDY
CLAY
LNTERBEDDED
WITH CLAY AND
CLAYEY FINE
SAND
4.5 8.4
I I .
I,
!
ConHnwdoll Drawtng No. 14 I
,: C~ ~,a ,.:,
,
1
$tt DRAWING NO. BENTON ENGINEERING, INC. 13 e
I
-
i
4 I
-
-
-
-
.-
.-
.-
-
-
-
-
-
-
-
SUMMARY SHEET
BORING NO. 7 (cord;)
NGINEERING, INC.
L 3!
[
0
1.
0
3
4
5
6
7
8
,?
0
1
2
3
4
5
6
7
8
9
I8
a
E 2
3
8 3
E
0
8 $f SUMMARY SHEET
GORING NO. 8 *
E‘E”;TION p1.p
i I
1 berm, Sllgbdy MOR), baa
Yollow4mwl, MalEt, vay pm
Light Brewu, Slightly Abis?,
vary Rfm, FmhrGd
SILTY FINE
SAND
CLAYW FINE
SAND
SILTY FINE
SAND
CLAYEY FINE
SAND
cmtinwd on w No, 16
-
8 .!
16.
21.
6.7
1o.t 3.2
F.8
MOJECTNO. ~.
I
LmAWNG No.
;. 75444Bc BENTON ENGINEERING, INC. 15 e
-
-
-
-
-
>
SUMMARY SHUT *i 2%
BONING NO. 8 (CGNt.) a ft
gt
Li@hrGra)r,M&r,vmymln
. . . . . 27.6 13.7 112:s
. . . . .
2 . . . . . . . . . . . . . . . . . . . .
I 8
!
4
I
i . ;_.._ .
i .
:: ;:i '., 5, ;
3ENTON ENGINEERING, II&.
DRAWING NO.
16
-
-
-
-
-
-
-
-
-
-
-
-
-
,-
APPENDIX
A-L
CONSOLIDATION DATA
BENTON ENGINEERING
PROJECT NOS. 75lo-9BC 8. 75l-20BC
Y...
.,
.y:;;:- ~;
~.~ ,i,
-
-
L
L
L
L
1
L
L
1
1 * = J e 2 ei r- 51 $
Y
1
3 P
0,
CONSOLIDATION, CURVES
LOAD IN EWE IER SOUARE FOOT
2 02 04 G6 OS IO 2 4 6 I) to
j Boring 1
Sample 4
* .---- . - . _ _ -~ . . - -- -.,. --_~__- ---.- -
--- - - -- . -. -~.- .-. - . --_. .-... _&.~ -
I _-_.. .____~ -. -- ----- -_
I : 7--
I I I / / ; !
1 \
j ! ( : ---
~
: 1
I i Iii;
-:--- : ; T ! i_d ! i ’ , 1 -A- -.__ ---L-- - __
1 ; i +z;:
o Indicates percent consolidation at field rr.oisture ‘<
l Indicates percent consolidation after saturation
PROJECT “0. oRAwlmo NO.
7%lo-9BC BENTON ENGINEEAING, INC. 38
-
-
-
-
-
-
-
-
-
-
-
-
-
CONSOLIDATION CURVES LOAO IW IWS ?ER MUARE COOT
O"i' 0.4 0.6 0.0 1.0 2 4 6 s IO I I I I1111
I smPl.3
IbrIng 1
1
2
3
4
3 z5 0
E
i6 37
%
i”
ijl
I
F2
33
u
4
5
o Indicates percent consolidation ot field moisture
l indicates percent consolidation after soturotion
l ROJKCT no. ORAWIWS il0.
75-r&@c I BENTON ENGINEERING, INC. I 17
CON~OLlOATlON CURVES
, LOAD IN KIPS PCK BOUARL COOT
+I” 0.4 0.6 0.6 I.0 2 4 6
I
6 I p&a’!
I !
-r . ! I I
P Q
+1 L
&&!3
k&l;*
0 . 1 ’
!
. / I
2
:
g3 r: z
%
?i J5
8 6
E :: !+1
I
go
11
0
2
3
4 ---I, f
I YB
5:
I
?KOJLCT NO.
7Sl-203c
o Indicates percent consolidation ot field moisture ’
l lndicotrs percent consolidation after soturotion
GENTON ENGINEERING, INC. I
onAwl*o no.
23
CONSOLlDATlOl’4 CURVES
LOAD IK KIPS PKK SWIRL fOOT
I I
. .
o Indicates percent consol idotion at field moisture
l Indicates percent consolidation after saturation
COOJECT NO. ORAWIIIO NO. 6 75-l-203c GENTON ENGINEERING, INC. 29
APPENDIX
B-l
GEOSOILS, INC.
BORING LOGS
W.O. 810-OC, APRIL 3, 1981
TRENCH LOGS
W.O. 81OOC
-
-
.-
,-
-
-
-
-
-
-
-
-
-
-
-
.-
-
-
-
C. 0 BORING LOG SEB-13
^. .-..- - __- -- _- ,-- ,^_ GLltNTuaOn W.O.81o-oc DATE DRILLED l~/~~J/“u LOGGED BY&T.
PROJECT’l.aCosta. SURFACE ELEV. DRIVING WT. J&lb. 30”drop
Clay, blackish brown, some medium grained Sand, moist, soft at surface, grading firm to stiff.
Sandy Clay, dark brown, moist to wet, stiff. Groundwater.
Clayey Sand, light brown, medium grained, wet and medium dense.
Clayey Sand, light brown, coarse grained, locally gravelly, wet and dense.
Sandy Claystone, olive green, weathered, wet, very stiff.
Total Depth 31 feet.
$
$ 0. 7 !:
‘rr
2:
3;
2:
2:
E ii
5 3
i
3E
ot
Df
11
I.0
1.3 _
L-0 -
5.3
-.
-
,-
-
-
-
-
-
-
-
-
- j I -
-
I -
j - -
-
BORING LOG=+14
CLIENT Daon W.O.-C DATE DRILLED 12/k/ 0” LOGGED BY --.‘l‘-
PROJECTLaCostn SURFACE ELEV. DRIVING ~~,1401b. 3O"zp
-
F
ii !5
z
k 0
0
-
-
-
-
5’ -
-
-
-
40,
-
-
-
45
-
-
-
'2( -
-2:
-
-
-
-
-7,
Sandy Clay, mottled dark gray brown and greenish brown, caliche - stringers, medium grained sand,
plastic, very moist, soft to firm.
Grades to Clayey Sand, gray brown, moist, medium dense.
Grade back to Sandy Clay, gray brown, moist, firm to stiff.
Groundwater.
Clay with thin lenses of Sand, light brown, medium grained Sand,
wet, stiff.
Sandy Clay and Clayey Sand, green- i ch “F-Z,“. fi nn to medium Sand. wet - 1!
96. 6.9
9.8
14.1
Daon Corporation
.-
-
22
Test Pit # Depth (ft.)
21 0.0 - 2.5
Description
TOPSOIL: Sandy Clay, dark brown, fine grained Sand, deep desiccation cracks present on surface, dry to slightly damp, hard.
2.5 - 16.0 BEDROCK: Interbedded Sandstone and Siltstone, Sandstone predominates light greenish-brown, very fine grained, friable, damp. Bedding indistinct, irregular lower contact. Siltstone brownish-green, fractured, moist, hard. Lense of coarse sand and pea gravel within a Silty Clay matrix.
0.0 - 255 TOPSOIL: Sandy Clay, dark brown fine grained Sand, deep desiccation
cracks present on surface, dry to slightly damp, hard.
W.O. SlO-oc
TEST PIT LOGS
23
24
-
2.5 - 6.0 BEDROCK: Siitstone; brownishigreen, hard; moist, fractured.
0.0 - 1.5 TOPSOIL: Clayey Sand, dark yellow- brown, fine grained Sand, dry to damp loose to medium dense.
1.5 - 4.0 BEDROCK: Sandstone, mottled pale yellow-brown and reddish-yellow- brown, friable, damp, dense.
0.0 - 2.0 TOPSOIL: Silty Clay: dark gray- brown, deep desiccation cracks, dry, blocky.
2.0 - 4.0 BEDROCK: Claystone, brownish-green, fractured with some infilling of iron oxide and gypsum, weathered at upper contact, damp, stiff tohard.
- ‘I
CcaSailr. tnr.
-
-
-
Daon Corporation
Test Pit #
25 .
26 0.0 - 0.5
W-0. ElO-OC
TEST PIT LOGS (continued)
Depth (feet)
0.0 - 1.0
Description
TOPSOIL: Silty Sand, medium yellow- brown, fine grained, dry to damp, loose to medium dense.
1.0 - 6.5 BEDROCK: Sandstone, light yellow brown, damp to moist, lower contact very gentle, irregular.
@ 2.5' Claystone, brownish-green, some very fine grained sand, stiff to hard, wet at upper contact, becoming moist with depth, in- fillings of gypsum, Mn02 staining, fractured.
0.5 - 6.0
@ 2.5'
TOPSOIL/COLLWIUM: Silty Sand, medium yellow-brown, fine grained, dry to damp, loose to medium dense.
BEDROCK: Sandstone, yellow-brown, dry to damp, irregular lower contact,
Claystone, brownish-green, slightly silty at upper contact, becoming drier (moist), wet with depth, firmto hard, infillings of gypsum along fractures,
:
GcoSoiIs. Inc.
_..
-
7
-
-
-
-
-
-
-.
-
-
_-
-
-
-
-~
APPENDIX
B-2
CONSOLIDATION DATA
GEOSOILS, INC.
W.O. 810-oc
.
I
I
-
-
GeoSoiL, Inc.
CLIENT &w W.O. No. SIO-OC
Date: g-3-81
Boring/Trench No. st3
Depth 5 Fi
CONSOLIDATION - PRESSURE CURVE
NORMAL PRESSURE KIPS per Sq. Ft.
PLATE 5
-
GeoSods, Inc.
CLIENT- W.O. No. 910~oc
Date: J-3- 01
Boring/Trench No. a-13
Depth IO Ft
CONSOLIDATIO# - PRESSURE CURVE
NORMAL PRESSURE KIPS per Sq. Ft.
PLATE 6
-
--
GeoSoiL Inc.
CLIENT-U W.Q. No. Q’lO-Cc
Date: Y-3-81
Boring/Trench No. a-13
Depth IS Ft.
CONSOLfDATIO# - PRESSURE CURVE
NORMAL PRESSURE KIPS per Sq. Ft.
PLATE 7
-.
-
-
- - CONSOLIDATION - PRESSURE CURVE
GeoSoiL, Inc.
CLIENT ti W.O. No. 810
Date: +G
Boring/Trench No.
MPth Ft.
NORMAL PRESSURE KIPS per So Ft.
PLATE *
-
-.
.~
-~.
.-
-
-
.~
.~_
-
-..
_~
.-
-
GeoSoiIs, Inc.
CLIENT-J&,., W.O. No. 810
Date: Y-3-9r
Boring/Trench No. &Pf
Depth ;I0 Ft
CONSOLIDATIO# - PRESSURE CURVE
NORMAL PRESSURE KIPS per Sq. Ft.
PLATE g
-.
-~~
.,-
.~
-
-.
.
-_
l TIME CONSOLIDATION CURVE
W.O. *lo CLIENT m PROJECT Lh- BORINS NO. s “3
PRESSURE INCREMENT FROM ai- KSF TO 2,’ KSF DEPTH s
100.00 IO.0
121.00 I I .o
144 .oo 12.0
VTIME IN MINUTES
f
-
t
I
.-
l TIME CONSOLIDATION CURVE
w. 0.8’0 CLIENT bW PROJECT-BORING NO. s-‘3
PRESSURE INCREMENT FROM x KSF TO L KSF DEPTH lo
121 .oo I I .o
144.00 12.0
4
r I I I I I I I I I I I I
VTIME IN MINUTES
-~
~.
..~
..-
_.
-
-
--
.-
-
--
.-
-
.~.
-
_~
I~
-.
-
&ig$@gc. l TIME CONSOLIDATION CURVE
w. 0. ‘3’0 CLIENT- PROJECThh BORING NO. B-j3
PRESSURE INCREMENT FROM 1+3 KSF TO L KSF DEPTH Is
I a>- w
I I I h
I UJ I I m IYI I
VTIME IN MINUTES
_~
.-.
_.
-.
-.
_ ~.
.-.
.-
-
,.~
-
-~
-~
-~
-
l TIME CONSOLIDATION CURVE
I
W. 0. 9’0 CLIENT- PROJECT-BORING ND. B-w
PRESSURE INCREMENT FROM a KSF TO d KSF DEPTH 5
VTIME IN MINUTES
-_
I .-
I _
I -.
I in.
I - I -
I
I
I -~
I -.
I .- I
I .,- I _.~ I -~ I
I - I -. I
. TIME CONSOLIDATION CURVE
W.O. Q’O CLIENT- PROJECT-BORING NO. 3-!u .
PRESSURE INCREMENT FROM &!& KSF TO & KSF DEPTH ao
COMPRESSION
VTIME IN MINUTES
r-~- .-. ,- .- -.. .- I I- ..,. I -- - I - I I -
-.. I -. -~ -~ I -.
G@s’&. l ilME CONSOLIDATION CURVE
W.O. 8’0 CLI ENTAU PROJECT- GORING NO. s-Iv
PRESSURE INCREMENT FROM I KSF TO 1 KSF DEPTH 30
VTIME IN MINUTES
-..
-
-~
-
-.
-
_-
-
-
-
-.
-
-~
-~
.
APPENDIX
C-l
PRELIMINARY CALCULATIONS
RE: APPARENT SHEAR STRENGTH PARAMETERS
AND LANDSLIDE MITIGATION MEASURES
SHEPARDSON ENGINEERING ASSOCIATES, INC.
S.E.A. 110175
I ( I 1 I 1 I I I / I ) I I I I I
, I I I I I I I I I I I I I
I I 2 9 4
tb. AXi No. Ad A5 Au B
I I7 “~~. I I - , I ; ,., b! ‘%A, \ _ ,_
. j/p,, _~ .+;,~>;J~.~~ :
SHEPARDSON ENGINEERING ASSOCIATES. Inc. w t: DATE _ -, ~ 1 l”, * :! ‘,
JcerKl &‘:-: il, :/--, 1~‘~ .
I / 1 1 I I 1 ] I I / I 1 I ! / I /
I 2 3 4’
No. AK; A5 Au B
-
-y_!(- -ce. : I’: q, __ .__.. -_-_-- .---.- ----- - -
Lf 3 c 14 ..a .._._____ 2, ___.. !_Y .___.._.__ -- in - _-----.
c ,oo lJ’ I ( ic; :~ / i,: I .--
G ,..
“i ‘E -~ , :., j’ ,
rr,c - 3, !
-- .-______. ..- - .-.,
- ___. ~_~_. .__~.. ._ ..- - -.----- --.-----------.-- --
t E f
&&fl~ )(o. l&y.,, .2/z i (~+i/../i, L. &l,ff\ON &b. {~:: ,’ tLt;,/i,&J$ &%dm Mb.
a?Je No.
_, -,.’ el.Au~ No. +lAt4ls blo.
.i- . (-4 /’ c I I .,T,,.& <t’, j’T-J* - Q‘..iL \
SHEPARD6ON ENGINEERING ASIXXXATER Im.
.” id -l DATE -7’ . j ~.,I 2?,
J0eN0 I/!>,/ 2 ,i- &.!>’ r- ).,J 1% [;- 1
I I / I I / I I I 1 I ! I I I
I
lb. Axi
I
lb. Axi Lk” A: g lb. AL l i i
L- ___-__ qd --
__ A?! _____.__ _ ______ ____ x!.~~L?L .-_ _ --Ai - lb
__... go b L-- 7 ---LL---- _.--. i ;J c’c 7 --.--
__----
4% ,23 7#7 ;, .7 -_
/oLf IO 0 u
Y? // --I/
-..-
____ _.______. -__
-
L f
4tfmd tie. Lc.”
4tAtw No.
. .
I
b
-
-
-
-_
-
-
-
--
-
-
-
I l 2 2 3 3 4 4
Arc; A5 Au B Arc; A5 Au B
- -
--- --- --w
3iEPARDSON ENGINJiXIUNf3 A88ocImE8. Inc. )
4of% 4!@.&w3&wv BY PL DATE I. : /’ liu *Cl
33BNo. ii . ,~ 1
I ) I I j I I I I I I ! ! I I I
I I ~2 ‘3 4 I 2 9 4
No. A%i MO. A%i de drc 1 lb. AKi A5, du B
’ 33 JO iq I 2 ..,’ u’ 2 <.i
_ -.7_2 1-5 _.___ JL _____ ‘2 J’c 2 I! _ ___ L : - __
L 131 I5 1, i .I /;, - -.. ~._-------. --.
q -$_- :ci i,! ,:’ ..’ iJ ,: ~, - __---
/
‘1 <Lb ./G-J t; ;I ‘;
J 1
I.? 2 (I (/ ;,, ’
z :;, ‘1,
d\: \,~&-, _____.__ ~_~.~._....~ _------_-_----.-.-- -
t L f
4?iAlol4 t-lo. l,:, 1.; i,~ &CaON MO. I,. c .;’ lJ/! l&g. ii.2 @dtoN Nb.
md?s No. !,i,;, >..‘,,~,,.. 7, .’ -fl.AN& No. +?Atw ?b.
. . ~EIW ;-. /.j ,’ ,. id& pi:,- .. (,; _‘, ,
SHEPARDSON ENGINEERINt3 ASSOCIATES, Inc.
By b.) ._. DATE -: o \ f& . ct., 1 %~I,
JOBNO. / 8 J/i-\ ,‘.~ ;
lj , I !’ ! I / , 1 , L.- ! I
If a 4 A I $2 9 4 I 2 3 4
I Axi A4 dtj f N0.Mi~~rk & / No. AKi A5 ALI /
I
_-_-- ..~~.__ _.___. ---- _-
t s f
%dk=t’i fib.
+Lmw tb.
SI-IEPARDGON JZNGII’JEiERING A8BocLATEB. Inc.
I I I I I I , I I 1 I I
I I 2 9 4 I
lb A%i NC. Ad de h4 / Na. Ah
I 62 ‘Z~ C’ 2. y _ i:*, ;? lb .3..~ I in (:
2 /I> i ‘7 L.1 ,’ Y J I %> /(I 2 / ‘.
I I z-i: I I I I I ‘E I -_ I
. BEAK L/ /” &j$‘~~J / s<; :; i,
SHEPARDSON ENC+INEXRI~ -ATE& I~.
By :, ~‘i ~.., DATE q I i(!;’ ;;,I
mE3N0 /! /‘:..’ ; ;. L i
I I I I i I I I I / I I “L-
1 1 I-$, 9 I-$, 9 A ‘I’., A ‘I’.,
lb. iUi &’ dq lb. iUi &’ dq i lb. $i. & i lb. $i. & z: ; No. Li AZ du .,i, z: ; No. Li AZ du .,i,
. .
\ \ 62 62 23. ,~ 23. ,~ I,0 I,0
2 :J -j * l/g 2 :J -j * l/g IO IO
La La - - 416 416
; 32 3:, (’ 2. ; 32 3:, (’ 2.
i, yc, 3.t i, yc, 3.t 0, 5 0, 5
b 5% 23 6,\’ b 5% 23 6,\’ ,’ I ,’ I
2. 23. i? 2. 23. i? -6 -6 a, a,
I I I I ,. ,. : : 1 1 ’ ’
, ,
’ i’ ’ i’ L L f f ( (
1 1 ‘flkwcADh-
r.br ?@/J Litdh mow .?b mslwN us. .
aAN+ Mb. a.Atwdb.
E
SHEPARD6ON ENGINEXRING ABBOCIATEB, Inc.
I I I I ‘I
d;l”
---
I / , I I
- n n
t
1 ! 1
. /,A itl;STh 4jzlftA521 I
~EPARDSON~JZNGINl3ERINC) As8ocImEB. Ipc. I - 1
i, I. I , ‘I’~;’ / I I I I I I I I I I / I ! ;c/ ..J
I G. 9 -
‘ibA$i 444 4 ,“...&i (k” i i N&L;+. B” k-k I I I I I I I I I I I Y I .-I \
I I I I I r/. I 1 27,(@ II 1 ;<A/‘1 25 1 ” 1 ;1~,lid
I 3d LA.7 lzl u:.l I 25 I , V.-l , I -.I, I I * I I Lq --I= ----. ,_,,. ,I I f
3
1, P
3
ft-
i. (,\. t q -----_ L/ ZLI 2\ .
: I I I I L I I I I I I I
4adok4 uo. $X O&li,//LJ/3L RIMS No. LF fh~0r’l 6w-4wr4 t40. z-6 4?b+M. +l!h?w No. To PO +3.+&N& No. &h?l b&a L’
E L/h’ csbs ,~ BEIJWUDSONEIW-AsB0cLILTEB.h * . 5W@ &#=&W$$W’ w N-1. JmN0. Ili)dS
:
I Q 9’4 4,
k&i k 4 ‘J, cb.$i~ a” 2 d H0.A ‘4: d”u, B,
c
I 301 23 4q t sj 20 $fL/
Z' g(# .3 1 -, 2!5- ?- J(# .zi _ '. 2,s
3 I57 2v .I 3 s7 2-7 )
4 8s 7 OL q 6-L ts- 6, c
c 23 23 -IT
&, 5 7/&o L 21 /d -I 3
,.
. ,. . . f
.
'i ;E; L f
CJwlod ,Mob. tt-I-'. . O&&hiJDL m&j No. H 14 'k-D6 &xz4uw t&o.
-wo. 6% aAN& No. IdAtw ib. ,'
, ',
. ~ E LA CUS7A & 16. d %-21
SHEPAXLBON ENGINEERING - Ina
BY N-l. DATE 4, Idle\
mONQ. liOl7$- M?mlw c-l
I 1 i; ’ I I 1 I I I / I I ‘I I I I I //i( y’ ,
-~-~I ‘I : T3
I a
fb AS rk
,’
I 2 9. 4
No. AK; &J du ,J
L. E f
Icrsr/rlors uo. K/L OhlL,rrJnL 7da 4tmfloN blo. Ic P 4wdwM No.
a?w?b. flAtI& No. lb &lLAU& mtw ?&9.
cg)qgJ LA c*J~*mi+~zl
SfIER’4RDkON ENI3INEERING ASfSXX- b.
By ILL W4TE 46 lb431 No Ilc‘l7C fyq%QlA L-l
-.\,,
,
I I I L I
:, ‘.! .1
I
A&
,.
~. ;!,,,’ ” :+ 5
; : ,~.~?<,;,.- : !. ,.,;~,‘,‘c ,“
: :~*..
,.C.‘.,., ,;,
,..
.:, ,’ ,’
,: I ,~’
‘, TV
,j&,;; .~,,, ,.,,. in
(’
I’m’, ~: : .I..F*w. .~:
I I I
8.88
8. ee
585. ee
9926. ee
.e.ee
1199.52 462 3.16 f.be
G.12
I.de
8.12 e. ee 8.88 I. 88 75.58
3. ee
e :,;:
1’ ,,,: ‘:,‘:, 2: :y
3
i
;
6 -:,:,;i 7 :;,~’
8
9 1~
A
e ./:i 1‘.
; 1,
E . ‘<,
I
‘.,I,
in ‘3 ._ m:~j.. ,* F;
_. ,,,~,,F..
.~ ; I.,;‘,
I I ! I I
i!J!; ‘;
,” ,.~ :‘ ..’
:.:;
I..
~,. ‘:
.‘~
0.88 e : -35.87 1 457.b8 2 1t392.88 3 : ~, e.88. 4 gee.66 5 !i161.iT 6 1.. -: ?’ h.;.. b I.53
0.12 : if.80 .B
L1.Oe c
-J.00 D
14.80 E ,.,
tl.ee I
.,,Y$ i
_..: I J
I I -1. /,~~I I
.
.
I I,__, I I I I I / I I I I I I I .I I, I I
I I I I
I
lb. Axi ;.: *;,, ;
1
I 50 2-L 3r-
--. 33 - 38 17 _ ---- 1 98 1 q6 ! 19,
($= Cfk
I---- & \w
I I I $2 1 9 I 4 I I I. I ‘2 :I ?5 I 4 I
lb. AKi d9 & ,B lb. .A4 ds. ‘du i?’
I Sd I4 _ ‘3C :,$J 1 \q + ‘35+
v /‘oq 37 2 I9 93 TIC I
f y3- I 31 0, Ud I [lf v3 0
u f&J 27 d,dO / 25 3q, 0
333 -g -2-T 2, ‘; ,q -23
-t--t--t--l--t-t--e
htma4 do. &tI6f+WdlL
4cAts No. 75po
SHEPARIBON ENGINEXRINCt ASSOCIATEB. Inc.
lxTE 4. lb, ti,I
Ar~hlQx C,l A
I , I 1. ~1 I I I I I I I. I ‘I., I 1 ‘.L, -- ~,
4mot4 l&L &21Lu/lwL &trl@N *. LL- 1ZC’&~ADl? &%4wN t&q.
lww t&b.’
I Ii. I I I I I I 1, I , I 1 1
I ‘I
d;"
I
So. hti d4 me. ad
7, I -I z--LI~--- I I 0 *H I 7- I 1-. / I 7 I, I 1 c, I 3 I ‘C I
I I I I I 1 I I I I I I
23 1 6 1 I .sv ! ’ ! 52 ! zz- ! ! 39 I ’ I -TV 1
‘dmtn4 uo. MK\ i)hbe 7& &oflMs No.
4#46 No. a.hw& lb. * \ 9uIw ,. ,. I
‘:: . g$E&?J
SHEPARD3ON ENGINEERINO ASSOCIATEa Inc.
‘b4 C~zs”fp\
e ~~tiv$NV BY N.-i, '.
.loBNo \I0\15
I I’ I I ; I I ~1 pi I I I \ 4’
~t~g.j$+-~~-..-~ . . ~++.~~+2~- __ .-{ 2.~
1439 1% 1 ! / 1 / 1 !,3ur ! $3 !
Be- ,r 3” /Q’ = 8 19 ------ -_-.~ ~:~~~-~------:I::: - z ______.__._.__ ~_ _ .-._ ..~ . :Et+= -- ___-__ -._.--
I f- -
I I I ‘I. ;
I
f f
I ‘, 1 SHEi%RDSON ENOlNEERING ASSOCIATEB. Inc. 1
,’ ,si?$ bJ#J I:. : !_
dko ,fl.~*..,~‘+ ,tA& ,.;‘, :_ :.-,-~, I : 2 ; i._,,.~;,~::T; QG% ,,:.
: i. :
; f ), “‘”
i.~ _~ . . . ^?- .
., ,, ,~~~
* ., + ,,q*$q ,.., ,,>! i.”
: ...:;~?:
_. ,’ ;q a$
: i ~. +~q&~~ : ,,
! ‘.:.; AL s,
i.
1, ,;,
., ids ,*, >,.f.
““‘~,“<i^‘~- M.yz~. ~,
- ,.
* 8.8% %,~ b~ %,%% 1 ,S$T,~i
3&$,%@ 2 ‘~~I,::’ ;
11848.8% 3
%.6d 4
1597.26 5 ,:,'
18243.63 '6 < ,;.~
1.8% 7 .', in!
8.16 8 “‘,“i,:
1.60 9 ,~; '~ :
8.12 A
8.8% a ,~.I.
%.%@ c:;::'
1.08 a ; :,'
,19.50 E I 'ff:
.
f :
.
,.,~ .I.,;:
I ‘~
~. r:.--.;~;:..J, )~’
:,.& .,~*:“~?~i? .’
,“‘& :~ y’ : ii,~
.“*, J
.~l,j ,~x ,.* ,.. 1, ,;~ I, .
I I I I I
1. .~,+.,I_~, ,.,
,.: ,.
,,,
‘: .:. ;;;J$~yFii~ ‘~?,,: ~~,
,‘. .,;:i” ~.._ hw”
1 “.) c+.:, I_-
I ,:~ $.(j@ %
-14’ 0: 1
: 39;:ee 2
: 9968.8% 3
11.80 4
1851.64 5
9385.88 6
~;;~I ~G., J.,54 ,. 7
8.16 8
1, ~~,, ‘\: in’ ,.,,+;,~ “.. J.54 9 :: ,:
8.12 9 :, : ,.,! ~( ,. ; 0.m 6 I,~~~ ~'
6.00 :
-2fi.08 D
., 17.50 E .~$,i;, .y ~_ ‘/*,*>,'+ J0.@ j ~.' it or .,,_ ~“ ~,, ,.b f
,q!;* ,, &
~.~. .: -1,;. '*! ‘>, ,,~~~)~,,~ I i ~: ., ,g "&' <; ::~"~.'
* r,..,
:.* ~;‘~.&?**; ,“,” . ‘L.T’.y k: ,r ,‘,‘.
rr[oj: ” ,G&>
~1 ~1 I 1, I ,’
PREG
47.68 8
-171.93 :
se.80 2
1845.8% 3
529.14. 4
6.6% 8 ., i.r:v
1.48 9 &*&+ &..,$+7
a.00 8 @. 2&;r&--“‘@-
-18.8% D ,,.*% E ,., ~'j.,_,
9.80 I
> ,'.,i
..,
-.,
! lL~ 1 1, ; I I , i 1 I I I I 1 I I
,I ‘52 :
lb. A$i d4
I 2 3 4
No. AK; h du b
I (4 33,
?t 46 Ltq - -.-.-
3 IW co
$3 36
5-73 23
@ 26 I<
49v 7
&CL c
CS~L3
?5\7.c
3g 47 (7- 2B (L’Lf r3 a8
- (< I !c l/b 1 -3 -- 4G zl-.-m;
I’ II0 .‘) tci S-i?
3 83~ r-5 - 3.
3 7-3 Ta 3
44: 2-b 2 by L/, 3’
Y’. ’ .\ I SLl 2Q 4,;
!&&o ? .-h. 3 ---_--
---------
L L t
‘4tlr(lolq I&* 0 0 Lwl(*l/yL3k hwlm4 Ho. do t-tS6b~~W MelwN ?ao. 00 12c CImir3rC
at46 lb. 7iPQ a.ANt+ lb. QL 1 TlAl4ls MO. @ 2
~~.~
L /A 1..OWA ysf% -9221
SHEPARLWON EiNGINEERINo ASWCIATE8. Inc.
eY t&L DATE J /cJ Bl
mNo. j/9/75- tw%WlX f,- 1
1~ I I / I I I / I I I I I x-a
I ,I. I ,“i. 9 .A II,. I I e 9 I
d+ 1 5
.
L f f
1, i I’ : I
2.’ 3 4
d3 du B
(/a c. 0~7% 5t38 -5Et!-\
I SHWARDf3ONF+NGINEXRING Assoamm.. I
. I I \,_a I I 1 I I ! ~‘1 \ ; / ! I i I. I / I
.
1 a 9 G,Axi & 4 p” lb., AL a” ; ; ’ Ne. i-&i d: d”u ;
a.
92 1 )‘L 52 /o lC
II’ 21 ., 1-b
Yl 24 I I ii :i -
f /b 6
l/s 6
73 z-6 -I+2 9% I8 //I 6
‘23 23 s %o /q 4x7,
,(Js 6 q 26 zo 9.7
r,(= 7,65 26 9 74 5
is f’ -3cl
,
.
s f f
4mot4 MO. 1T17 &ofloN t40. P p BROAD 4%&lm la;.
arw No. .jt IJO 2, ahw No. &do.2 +llu46 w&b
E I/A &&7A %ie> de21
SHEF!4FUSON EXWINJ8EFtING A8BocLATEB Inc.
By NJ. MTE +,(&g-
JCWNO m.rqDI% Cl I
1~ I I / I I I / I I, / I b \~~ i. / I I . . .
1, a “‘9 A
A l
9 4 ,*
b-Au; d4 4 / ib. du ,4 No. Aii d: du 8’ ‘. ‘I’ 72 1s 22 72 15 22 IIL /o ?
2 zq. JLf 7 23 /c/ 7 16 fo 2 - 5, II6 2: 3 /G 3 -2-l 6 b - 1 .d I
d /to /9. 2
( 100 .9 2
E LA I.,5 c,-$A %I@ -f?‘f%/
8IiEI?4RDsoN ENGINlGEWNG -1~. BY &l DvE q / l,‘l(E I Jc0No. \w-l< A~~QIK [,I
-.
: 1,
II
I I I’ I’/ I / I .i / 1 / I I 1. /
%\_..
‘.. I a 9 rd.A%i ,& 4’ p” lb. ALi’ a’ 2 ; Nb. A d: d”u s’ ;
. 4 1. 64 2q. 26 l (bLI/ ZT 26 z 4< 3g, : * s;b 1 sci 36 _ ‘5% 55f~‘. / 3 sg 33 / 4 ((j, 3; / VG;7 /j -22 4 Y31 // ! I ,
&= 51-J s * ,’ I ,,’
F L f &fa p *.. @& ,< .4?aLJfdaL 4eialm tb. 4tM4mlc. L 6;Po 4wfi*m&~. kx ‘il&.@m7f . ., ,a*‘&. ;, ‘,. .,. ,., * : ,,I ,* , ‘.Vl E ,,’ I .,., ,L LA & S;T& ‘$f%& --%‘i ,.A_ ~’ ,~‘,f,~? ,~ sEI~EN(IINEwINQ-~ L..;;, -pj&/. waTE + pf!ll ,. ! 4iqt5 4mew Pw >,, ,‘: ‘~~vl% VklA JmPJa 11617 i A@&#%. $.‘I ’
I I \‘~ ’ I I I I I 1 I I I I I I -.
I ~: ; ;ijf@&~ ‘, ” : ! z-do /I, 5: -llY qJ&%&.a .d?=,&,
~.$2 $ /., I9 8 1 L-7 yg
.’ .’
- -
[,Q: &&$“~- I;.,- { ,,# ,I~ ‘- ,I
4mm
i ‘..
j;$ {t +,,
j ,: ;,I.$
<:
:
:.‘,
../&f p+.‘L c*w 211=/24
- /c/s
- I I I I I I84 I
77
.~,
s=A. &A bS7A
;,,\,.<~ ..I, . ..’ I.. .,. ,r:
! A@#$ SU~M)d?/ a>” --I ’ j/P /I ;%Y- 41 ’
I I / I I / i : 5 I I I I I I I I
#lusM(aliraj--1. k 1s
!_. ,I,, 1 , I ~~qjg@q 72: .I I I I
i- ,. ,. :,y
‘..
. . .
I ,{sE& I
1 -/,A .-S7A
b
-F:
L,
bb,
,
-
0
,
347
\-
-
‘23t
Zdl 4” 6, 7’ c= u &/2,,
25, 4’--&., (.u j/c/+/“:
p&7&: &g&+ &+L
&~.,.&&....&r ‘.A-9
J-?a
4; ‘3; a;,~~zaO
=‘I LJ i27
SEA. &A LOI. j-A>
jc:,.,7i ,\. _:,: ..;z, ,,I //
1 At&&f3 ‘Zt.Wlw f%. hiA, 4, lb.
&& /,‘d/ 7 <- ‘
‘, 00~ hi *s ,,,,;’ kto d
3% &&,# 2107
: ‘,,,
g ,.~~ $&
,,.: ,,:,
- I I I I
f1
-2.03
I
,
E Sl
?,I,
itI :3u qj’L&J
ie2
p= L3.9
rr- 1
k 7,
@=cpy Lcu ti’i,lW
=5.J-iic-
,LA bs7pr -/
” T- ‘-
~:‘I.
:L
#~,,
_ _I ,..,A
,~.,.”
< :“. .~,. j ,;I’ .++h&,
. v j , ,. ‘, .~ A-.- !:. . .
.~,J, ‘.’ ‘. ,~~
r.
~A, .)_ i, ,.. _.+
~.~
,.~~.~ ;:’
1019.34
: 8362.73
,7. 1.70
0.58
2.87
0.12
‘, ,.: 0.00
1.28
a,,_, -20. d0
:;,_ ‘l~i, 3B. (30
9.8B
541.8d *** :‘:;.~. ,,~_.
2938149.80 Wt I _
“” ,,
Y
qJn 96 No. lRbatwMAw.c(rw
uy..*&yy llc(l
‘lo 1’ \.sq
0:; ‘. 3
i&,:, 21 lb%
il c II .~ t : : yj 3Y7 552 / f\...
.\
‘SE& I I !‘.LA &JATA *LIIBm”,ll* L*,IYmxI~ &sax-PImfs.,. ! ~~
I //I a U,7= 39’. C,T+=~~ da//20 1
I
..42 A? 187 q+ y7 q9,=34 c=u ~.zalzc.
_, ..>, q, 1 ‘il
.~,
17 %.if.i loo: 7wo ’ Y - 4&77d 333: 226 IY’C
(),+& /b &,~yu c*ca IsI~a-rj
da7 117 b5 5-d /($.&k ‘&&I %9/F-F
pfi : I ?c .j* ” - A/d d y7 a 7/ .*.
I fsE& / l..i GS7A
,’
,,’
: t :
I
34 II> ', -
0/2r~%P0 ' - - ~bP~~' l/of 39,~ /&y
g$4,/43 * . ~, 7Q 70 g ~22o&L 97 I
em.
.'
'~ ;s'& '. '1 &L&
.r ', : ~,,l"u* L*G,ICUI~. -mA.r\TB.II
-
-
-
-
-
-
-
- /-
TYP. SAW CUT
FILL WITH FLEXIBLE CRACK FILLING COMPOUND
;; it+=-
(AS RECOMMENL~ED /IV REPORT -TYP.)
,-
~’
LA COSTA SE18 - SE21
SHEPAFDSGN ENGINEERING w Inc. - BY DES DATE L/21/81 WEAKEND PLANE JOINT DETAIL JostKl. - 110175 FIGURE “A”
JOB NO. 110175 DATE b/21/81
-.
-
-
-
-
-
-
-.
--
-
-
RECOMMENDED GRADING SPECIFICATIONS
GENERAL PROVISIONS
GENERAL INTENT
The intent of these specifications is to establish procedures for clearing and compacting fill soil to the lines and grades shown on the accepted plans. The recommendations contained in the preliminary soil investi- gation report and/or the attached Special Provisions are a part of the Recommended Grading Specifications and shall supersede the provisions
contained hereinafter in the case of conflict.
INSPECTION AND TESTING
A qualified soil engineer shall be employed to inspect and test the
earthwork in accordance with these specifications. It will be necessary
that the soil engineer or his representative provide adequate inspection
so that he may state his opinion that the work was or was not
accomplished as specified. It shall be the responsibility of the con- tractor to assist the engineer and to keep him appraised of work schedules, chances and new information and data document the ba&s for his opinion. so that he may
If, in the opinion of the soil engineer, substandard conditions are encountered (such as questionable soil, poor moisture content, inadequate compaction, adverse weather, etc.), he will recommend that it be
corrected or recommend rejection of the work.
Soil tests used to determine the degree of compaction will be performed in accordance with the following American Society for Testing and Materials test methods:
Maximum Density & Optimum Moisture Content: A.S.T.M.D-1557-70 Density of Soil In-Place: A.S.T.U.D-1556-6L
PREPARATION OF AREAS TO RECEIVE FILL
All vegetation, brush and debris shall be removed, piled and burned ‘or otherwise disposed of. After clearing, the natural ground shall be
scarified to a depth of six inches, brought to the proper moisture content, compacted and tested for the minimum density specified in the Special Provisions of the recommendations contained in the preliminary soil investigation report.
When ‘the slope of the natural ground receiving fill exceeds 20 percent (5 horizontal units to 1 vertical unit), the original ground shall be stepped or benched. Benches shall be cut to a firm competent soil condition.
-.
-.
-~.
,-~
-.
The lower bench shall be at at least six feet wide. The compacted prior to receiving
JOB NO. 11’3175 DATE .4/21/81
least ten feet wide and all other benches horizontal portion of each bench shall be fill as specified hereinbefore for compacted
natural ground. Ground slopes flatter than 20 percent shall be benched
when considered necessary by the soil engineer.
FILL MATERIAL
Material placed in the fill shall be approved by the soil engineer and
shall be free of vegetable matter and other deleterious substances. Granular soil shall contain sufficient fine materials to fill the voids. The definition and disposition of oversized rocks, expansive and/or detrimental soils are covered in the Special Provisions. Expansive soils, soils of poor gradation or strength characteristics, may be thoroughly mixed with other soils to provide satisfactory fill materials but only
with the explicit consent of the soil engineer.
PLACING AND COMPACTION OF FILL
Approved fill material shall be placed in areas prepared to receive fill
in layers not to exceed six inches in compacted thickness. Each layer
shall have a uniform moisture content in the range that will allow the
compaction effort to be efficiently applied to achieve the specified
degree of compaction. Each layer shall be uniformly compacted to a
minimum specified density with adequately sized equipment, either specifically designed for soil compaction or of proven reliability. The
minimum degree of compaction to be achieved is specified in either the Special Provisions or the recommendations contained in the preliminary soil investigation report.
SEASON LIMITS
Fill shall not be placed during unfavorable weather conditions. When work is interupted by heavy rains, filling operations shall not be resumed until the proper moisture content and density of the fill has been achieved. Damage resulting from weather shall be repaired before acceptance of work.
UNFORESEEN CONDlTIONS
In the event that conditions are encountered during the site preparation and construction that were not encountered during the preliminary soil investigation, SHEPARDSON ENGlNEERlNG ASSOCIATES, INC. should be notified immediately to permit evaluation and submittal of alternative recommendations as required. We should also be notified of any signifi- cant changes in the proposed site grading.
:
,-
r- ‘I
-
-
-
JOB NO. 110175 DATE .!,/21/81
RECOMMENDED GRADING SPECIFICATIONS
SPECIAL PROVISIONS
The minimum degree of corn action to be obtained in comp,acting natural ground, inThe compacted fib in the compacted backfill, shall be 90
percent.
Detrimentally expansive soil is defined as soil which will swell more
than 3 percent against a pressure of 150 pounds per square foot from a condition of 90 percent of maximum dry density and optimum moisture content to saturation.
Oversize fill material is defined as rocks or lumps over six inches in
diameter. At lem percent of the fill soil shall pass through a #L
U.S. Standard Sieve.
r
j
-
‘,
UNIFIED SOILS CLASSIFICATION CHART
SOIL DESCRIPTION GROUP SYMBOL
I. COARSE GRAINED - More than half of material is e than No. 200 sieve size.
-
IL
GRAVELS - More than half of coarse fraction is larger than No. 4 sieve size but smaller than 3”.
CLEAN GRAVELS GW
GRAVELS WITH FINES (Appreciable amount of fines)
SANDS - More than half of coarse fraction is z than No. 4 sieve size.
CLEAN SANDS
SANDS WITH FINES
(Appreciable amount of fines)
FINE GRAINED - More than half of material is smaller than No. 200 sieve size.
SILTS AND CLAYS (Liquid Limit less than 50)
SILTS & CLAYS (Liquid Limit greater than 50) ,
c
Lo. HIGHLY ORGANIC SOILS
GP
GM
GC
SW
SP
SM
SC
ML
CL
OL
MH
CH
,OH
PT
TYPICAL NAMES
Well graded gravels, gravel-sand mixtures, little or no fines.
Poorly graded gravels, gravel sand mixtures, little or no fines.
Silty gravefs, poorly graded gravel- sand-silt mixtures.
Clayey gravels, poorly graded gravel- sand, clay mixtures.
Well graded sand, gravelly sands, little or no fines.
Poorly graded sands, gravelly sands,
little or no fines.
Silty sands, poorly graded sand and silt mixtures.
Clayey sands, poorly graded sand and
clay mixtures.
Inorganic sifts and very fine sands, rock flour, sandy silt or clayey-silt- sand mixtures with slight plasticity.
Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, Jean clays.
Organic silts and organic silty clays of low plasticity.
Inorganic silts, micaceous
diatomaceous fine sandy or silty soi:,
elastic silts.
Inorganic clays of high plasticity, fat clays.
Organic clays of medium to high plasticity.
Peat and other highly organic soils.