Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CT 81-46; Airport Business Center Unit 1; Soils Report; 1987-02-25
_- - - - - - - - .- - - - - - - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS 4530 EAST LA PALMA AVENUE. ANAHEIM, CALlFOFINlA 9EB07, (71-S) 779-2591 e,*rm O,,lCl BAKERSFIELD REPORT OF GEOTECHNICAL SERVICES Carlsbad Tract No. 81-46 Airport Business Center Unit No. 1 City of Carlsbad, California CLIENT Centre Development Company ENGINEERING DEPT. LIBRARY City of Carlsbad 2075 Las Palmas Drive CarlsbaQ CA 92009-4859 ENGINEERING DEPT. LIBRARY City of Carlsbad 2075 Las Palmas Drive CarkbaQ CA 92009-4859 February 25, 1987 Job No. 285-256 .-- - - - - - - - - - - - - - _- - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Table of Contents REPORT OF GEOTECHNICAL SERVICES Introduction ........... ...... Grading Procedures ........ ...... Testing ............. ...... CONCLUSIONS AND RECOMMENDATIONS .... ...... As-Built Geology ......... ...... Pre-Eocene Deposits ..... ...... Eocene Deposits ....... ...... Post-Eocene Deposits .... ...... Structure ............ ...... Mitigation of Geologic Conditions ...... Restricted Use Zone ....... ...... Maintenance ........... ...... Grading ............. ...... Slopes .............. ...... Expansive Soils ......... ...... Summary ............. ...... Foundation Support ........ ...... General Foundation Setbacks ... ...... Expansive Soil Considerations . . ...... Drainage Control ......... ...... General Conditions ........ ...... Page 2 2 3 4 4 4 4 4 5 5 7 9 9 9 9 10 10 11 12 12 14 ATTACHMENTS Table I ................... A-A - A-B Table II ................... A-l - A-77 Table III .................. B-l - B-3 Geologic Maps ................ Sheets 1 - 3 Plans - Location of Field Tests ....... Sheets 4 - 6 Job No. 285-256 - February 25, 1987 -i- - - .,- - - - - - .- MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS REPORT OF GEOTECHNICAL SERVICES Introduction This report presents the results of our field observations and tests performed during recent grading operations within Unit I of the Carlsbad Airport Business Center, (Tract No. 81-46). These soils engineering services were conducted in compliance with a request by Mr. Don Cook representing Centre Development Company. Grading recommendations and data pertaining to the site soils and geologic conditions were presented in H.V. Lawmaster and Company, Preliminary Geotechnical Investigation, Proposed Palomar Business Park, North San Diego, County, California, File No. 79-9394/654G, (dated January 15, 1980), and subsequent letters of recommendation by Moore & Taber. Gradinq Procedures The grading was performed by Templeton Construction between November, 1985 and November, 1986. Earthwork consisted primarily of filling incised drainage canyons from adjacent ridges. This fill placement, in association with other cut and fill operations, was performed in order to create essentially level commercial building lots. Site preparation prior to fill placement included the removal of heavy vegetation and unsuitable materials. The canyon bottoms were cleaned of alluvium to expose bedrock and subsequent to observation of canyon clean-outs by the project geologist, sub- drains conforming to project specifications were installed in the major drainage courses. After installation of subdrains the canyons were brought to proposed grades with compacted fill. As fills progressed upslope, alluvium, colluvial and slopewash materials were removed by benching to expose firm natural ground. Where fills were constructed on sloping terrain an equipment width bench was established at the toe of the fill slope. Soils used as fills were obtained on the site and were essentially free of organic matter or objectionable material. Fill materials were spread in thin lifts, watered to above optimum moisture content and compacted by sheepsfoot and pneumatic wheel rolling. The slopes were backrolled with a sheepsfoot roller as the fill was raised and were cut back to firm material or track walked upon completion. The maximum depth of compacted fill is in Job No. 285-256 - February 25, 1987 -2- - ,- - .- - - .~- - - .- MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS the area of Lot 25 and is about 64 feet. compacted fill slope is The maximum height of a about 78 feet and is located in the southwest corner of Lot 22. Two earthern storm water retention basins were construdted within green belt areas of the subject project. The embankment fill placed near Lot 1, adjacent to Palomar Airport Road and Camino Vida Roble was founded on firm natural ground. Due to the high moisture content of alluvial soils beneath the proposed embankment within a portion of Lot 16 it was recommended that removal be limited to five feet in depth. Subsequent to removal, the exposed wet granular soils were rolled with heavy equipment. Embankment fills consisted of on-site soils which were spread in thin lifts, moisture conditioned as required and compacted to at least 90 percent of maximum density were then placed on the cleaned prepared surfaces. Cut slopes were observed by an engineering geologist during excavations and subsequent to completion, in order to determine the potential stability of the geologic structure. Where adverse geologic conditions were observed. The slopes were stabilized with compacted fill buttresses or stabilization fills as described within the "As-Built Geology" section of this report. Buttress and stabilization toe keys were observed by project geotechnical representatives of Moore & Taber prior to fill placement. Subdrains consisting of filter gravel and perforated pipe were installed at the head of the toe keys. Where slopes were over 30 feet in height, subdrains were installed at vertical intervals within the slope. Laterals consisting of non-perforated pipe were installed at appropriate intervals to provide drainage outlets. After placement of the subdrains, the fills were brought to grade with compacted fill. The approximate location and elevation of the filled ground stabilization and buttress fills, subdrains, and the embankment fills are shown on the attached plans which are modifications of revised lWAs-Built Maps" prepared by The McIntire Group. Testing Maximum dry density and optimum moisture content of the representative soils used to construct the fills were determined in the laboratory by ASTM Test Method D1557-70. The results of the compaction curves are presented in Table I. A total of two thousand five hundred-three (2503) field moisture-density tests were taken on the site during fill place- ment operations to determine relative compaction. Fill soils were tested using the sand volume, drive cylinder and nuclear gauge methods, as described in ASTM publications. Results of the Job NO. 285-256 - February 25, 1987 - - .- - - - .- - - - MOORE & TABER GEOTECHNICAL ENGlNEERS AND GEOLOGISTS relative compaction tests are presented in Table II and the locations are shown on the attached drawing. operation The fill placement was performed with essentially continuous observations and testing by a qualified soils technician from this office. When a test indicated compaction below the required density, .the failing test area was removed, reworked, and/or recompacted and checked by additional testing. Expansion tests were performed on typical samples of repre- sentative soils in accordance with the standard procedure for the Expansion Index Test (UBC Standard 29-2). The results are as shown in Table III. CONCLUSIONS AND RECOMMENDATIONS As-Built Geolouv The following is a summary of geologic conditions encountered and recommendations provided, during grading within Unit I of the Carlsbad Airport Center, (Tract 81-46). The geotechnical condi- tions encountered during grading of Unit No. 1 were generally consistent with those anticipated and described in H.V. Lawmaster and Company, Preliminary Geotechnical Investigation of January 5, 1980. Sediments exposed during grading consisted of the following: Pre-Eocene DeDOSitS - Pre-Eocene bedrock within the project limits consists of The Jurassic Santiago Peak Volcanic6 which were encountered along the north westerly portion of the project site. The Santiago Peak Formation consists of metamorphosed volcanic breccia, agglomerate and volcanic conglomerate. Eocene Devosits - Overlying the Santiago Peak Volcanics within the project limits is the Eocene De1 Mar Formation which consists predominantly of fine to coarse grained gray-white or yellow-white poorly bedded sandstone, with interbedded gray-white or yellow silty sandstone and gray-green or brown clayey silt- stone. s-o e Deposits - The Eocene bedrock is overlain unconformably by Holocene alluvium/colluvium/topsoils. The Holocene soils were variable over the project site and varied from silty clays to clayey sands. Depths of the soils ranged from a few feet along the ridges to 20 - 30 feet deep in the larger canyons. Job No. 285-256 - February 25, 1907 -4- - - - - MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS Structure Structurally the bedrock was only slightly deformed with dips where observed typically less than 20 degrees. bedding on the project site is The general dip of 4-12 degrees to the south- southwest. One exception is in the northwest section of Unit 1 where bedding dips west-northwest. Mitisation of Geolosic Conditions Cut slopes were observed by an engineering geologist, during excavation and subsequent to completion, in order to evaluate the stability of the geologic structure. Where adverse geologic conditions were believed to create a potentially unstable condi- tion, the slope was stabilized with compacted fill buttresses or stabilization blankets. Slopes where stabilisation or buttress fills exist and the dimensions are tabulated below. The locations of stabilization fills are also shown on the inclosed geologic maps. Lot No. ------- Approximate Location and Dimensions of Remedial Earthwork -------------------------------------------------- 23 Southwest facinq slone between Lots 23 and 24 12-15 feet wide at top and bottom. Approximately 190 feet long. 20 Southerlv facincf slope between Lots 20 and 21 Approximately 15-18 feet wide at top and bottom. Approximately 540 feet long. Original 13-14 Southerlv facincr slone between oriainal Lots 13-14 and Palomar Airvort Road Buttress dimensions are about 12-15 feet wide, top and bottom of slope, from approximately 140 feet east of the southwest corner of original Lot 14 to the east end of Lot 13. The buttress was not extended the full length of the slope and native soil (colluvium/topsoil) was left in place at the southwest corner of original Lot 14. Buttress is approximately 460 feet long. 5 Southerlv facing slooe, west side of Lot 5. between Lot 5 and SDG & E tower Approximately 15 feet wide at bottom, approximately 6 feet wide at top of slope. Approximately 320 feet long. Job NO. 285-256 - February 25, 1987 -5- - - - 5 7-8 11 .- 11-12 - - 2 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Southerly facina slooe between Lot 5 and Lot 7-S prooertv line (east of tower) West half of buttress approximately 12 feet wide at bottom and approximately 6 feet wide at top of slope. East half of buttress approximately 15 feet wide at bottom. Buttress did not extend to top of slope, it was terminated at about elevation 229.0. Approximately 300 feet to the east. Southerlv facina slooe between Lot 7-0 and Wright Place West half of buttress approximately 40 feet wide at base and 20 wide on top. East half of buttress approximately 20 feet wide at base and 15 wide at top of slope. Approximately 560 feet long. Southerly facina slooe north of Lot 11 Access Road Approximately 20 feet wide at bottom and approxi- mately 8 feet wide at top of slope. Approximately 320 feet long. Southerly facina slooe below Lots 11-12 and Palomar Airoort Road Approximately 15 feet wide at top and bottom of slope. Approximately 740 feet long. Southerly facina slooe at south edae of Lot 4 Base width varies between 60 feet wide to 100 feet wide, top of slope approximately 20 feet wide. Southerly facina slowes between Lots 3 and 10 below SDCi & E tower West of tower base width is aooroximatelv 60 to 100 feet wide, top of slope is approximately-12-20 feet wide. Above power pole pad and access road, base width varies between 30-65 feet wide with an ap- proximately 20 foot top of slope width. South of tower pad and access road, base width varies from 12 to 60 feet with a top width of approximately 15 to 20 feet. South facina slooe between Lots 2 and 10 Base width approximately 45 feet wide, top of slope approximately 15 to 20 feet wide. - Job No. 285-256 - February 25, 1907 - -6- - ,- - - - - MOORE & TABER GEOTECHNICAL ENGlNEERS AND GEOLOGISTS Restricted Use Zone In some areas, it was decided to leave some areas of adverse geologic structure unsupported. At these locations a Restricted Use Zones (RUZ) has been established. A RUZ is defined as an area restricted for the construction of permanent structures, unless remedial work or further investigation is completed. A descrip- tion of these areas is listed below. During site grading a compacted fill buttress was required along the south facing slope along the south sides of original Lots 13 and 14 to support an adverse bedding condition. At the request of a representative of Centre Development, the buttress was not extended the full length of the cut and native soil (colluvium/ topsoil) was left in place near the southwest corner of original Lot 14. Because the soil zone was not removed and underlying bedding was left unsupported, a Restricted Use Zone was required. The approximate limits of the RUZ along original Lot 14 are depicted on page 8, and can be generally described as follows: The east-west limits are from the southwest corner of Lot 14 extending approximately 140 feet to the east. The north- south limits are from the toe of slope to approximately 45 feet north of the top of slope. During site grading of Lot 7 and 8, a southerly facing fill over cut slope was constructed, dividing Lot 7 and 8 into a north and a south section. Due to adverse geology in the cut portion of the fill over cut slope, the northern half, which is the upper pad of Lot 7 and 8 will be restricted. This RUZ is intended to limit construction of all buildings but surface parking will be accep- table. Two other cut slope areas of adverse geology exist within the project site. The adverse geology of both areas consist of out of slope components of dip. These adverse conditions should not affect the finished commercial sites and do not necessitate establishing a Restricted Use Zone. These areas will be mitigated during grading of Carlsbad Tract No. 81-46, Unit No. 2. These two areas are the southwest facing cut slope located on the northeast side of Palomar oaks Way northeast of Lot 19 and the southwest facing cut slope located on Camino Vida Roble, northeast of Lot 1. No other adverse geologic structures or conditions were noted within the project limits. Job No. 205-256 - February 25, 1987 -7- I I I I I I I I , I I I I / I I I I .‘-+ .‘-+ / / . . + + , , , , !b !b . . Airport Eusj.rless Center CT 31-46, Unit V?. 1, Lot 13 Carlsbad, California kr’t’roxT:.:Aw 1.1.117 CIF Pu:. MOORE 8 TABER - ~n9/“rrrr. Grolo9~sts 07, 2-25-67 JO~NQ 285-256 i - - - .- .- - - - MOORE & TABER GEOTECHNlCAL ENGINEERS AND GEOLOGISTS Maintenance AS with the fill slopes constructed in association with site grading, judicious landscaping and irrigation schemes will add significantly to the inherent stability of finished cut slopes. Some ravelling and dislodgment of small blocks are inevitable within the fresh exposed cuts, but this can be minimized through a well defined maintenance program. Gradinq Accepted construction practice and testing procedures were followed during the grading operations. It is our opinion that the fill was placed and compacted in conformance with the project plans and specifications, the City of Carlsbad Grading Ordinance, and the recommendations contained in our referenced reports. Based on our observation and tests, it is concluded that areas to receive fill were properly prepared as required. Representative field tests indicate the fill materials were compacted to a minimum of 90 percent relative compaction at the locations and elevations shown on the attached drawing. This report describes geotechnical services provided during rough grading of the subject project. Additional construction involving earthwork, such as utility trench or retaining wall backfill, pavement subgrade, etc., may require geotechnical observation and testing. Notification should be given to the soils engineer prior to commencement of this work in order to schedule these geotechnical services. SloDes Fill slopes were backrolled during construction and were either cut back to firm material or track-walked upon completion. Fill slopes are considered to be stable for the intended use and with adequate planting and proper maintenance should remain so. Expansive Soils During, and at the conclusion of grading, expansion tests were performed on samples of the typical soils within three feet of pad grade. Results of these tests are presented in Table III. Based on the results of these tests and our observations, we conclude that expansive soils will influence footing and slab design. The recommendations for foundations and slabs are covered in following portions of this report for site geotechnical conditions. Job No. 285-256 - February 25, 1907 -9- - - - - - - .- - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Summarv The fOllOwing recommendations are based on geotechnical data obtained during the previously referenced geotechnical investi- gation, and during site grading, interpretation of the physical data obtained during these periods, and previous experience with other developments. The subject lots expose undisturbed bedrock and compacted fill which will provide adequate support for future structures. The most suitable foundation system for individual buildings will be dependent upon the final structure location, the magnitude and variability of foundation loads, and the sensitivity of the structure to differential movement. Preliminary foundation recommendations are presented for what we anticipate to be the most prevalent structural conditions. As building locations, foundation plans, and loading conditions become available, they should be reviewed by the geotechnical engineer. Additional geotechnical investigations may be necessary to develop site- specific design parameters for some structures. The potential foundation soils range from non-expansive to highly expansive. Special design considerations and site prepara- tion may be necessary to mitigate these conditions. The geotechnical conditions and associated engineering characteristics vary considerably within the subject lots and consequently, some of the design values presented in subsequent sections may be conservative for some building locations. Additional investigation oriented toward a specific lot or project may result in more favorable design parameters. Foundation SUDDOrt Building sites are comprised of cut into bedrock and/or compacted fill. It is recognized that even properly engineered fill soils can experience some minor compression after placement in response to future moisture increases and imposed loads from overlying fill or structures. The potential magnitude of this compression is proportional to the thickness of the fill and structural loads. Therefore, to minimize potential differential movement, every attempt should be made in planning to locate structures in areas having the most uniform geotechnical condi- tions and foundation loadings. The use of conventional footing foundations will provide adequate support for most structures. For buildings with reason- ably uniform structural loads which do not exceed about 100 kips for column loads and about 7 kips/foot for wall loads, footing foundations may be designed using an allowable bearing pressure Of Job No. 285-256 - February 25, 1987 -lO- .- - MOORE & TABER GEOTECHNICAL ENGINEERSANOGEOLOGISTS - - .- - .- - - 3500 psf in bedrock (cut areas) and 2000 psf in compacted fill. The maximum estimated total settlement resulting from these column or wall loads is less than one inch. The anticipated differential settlement between similarly loaded footings should be less than one-quarter inch. A detailed foundation investigation is recommended for individual structures if any of the following conditions are applicable: . . . Designers desire site - specific design parameters. . . . Sensitivity of design requires detailed data on poten- tial differential settlement. . . . Design necessitates a significant range in structural loads. . . . Design loads exceed about 100 kips for columns or 7 kips/foot for walls. . . . Geotechnical review of site plans indicates significant fill thickness differentials beneath buildings. The detailed study would provide site-specific design parameters oriented toward the particular project. Based on structural considerations, it would include consideration of pile foundations or variable bearing pressures on spread footings to minimize potential differential foundation response and/or provide support for very heavy foundation loads. General Foundation Setbacks A moderate foundation setback should be maintained from the top of slopes. This setback should be equal to 0.33 H + 5 feet (where H = height of slope) with a maximum setback of 30 feet for fill slopes and 20 feet for cut slopes. Improvements within these setback areas may be subject to some lateral and vertical displacement resulting from long-term creep. Consequently, structures which encroach within the set- back may require special design (e.g. support by means of pile foundations). An additional investigative study will be required on a project where structural encroachment in the setback area is necessary. Job No. 285-256 - February 25, 1907 -ll- - - .- ,- - - - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS As indicated by the Expansion Index Test results (Table 111) most of the on-site soils are considered to be expansive. Thie condition will influence foundation and slab design. Recomien- dations for the expansion potential based on the preliminary testing are on the following page. Site-specific recommendations can be prepared when final grading within building areas is complete. To promote greater uniformity of moisture below structures, a moisture barrier should be constructed around the exterior walls of buildings when the expansion index exceeds 60. Where concrete or asphalt paving will not abut the building, exterior footings should be continuous or exterior grade beams or wall panels should be extended to the minimum depth indicated for foundations. Use of gravel bedding beneath slabs is not recommended. However, to aid in moisture retention and to facilitate construction, a six- inch thick blanket of sand could be placed over the building area. Wh;heFisture may adversely affect interior fixtures, a vapor such as a polyethylene membrane, is recommended beneath build& slabs. Consideration should be given to the effect of expaneive soils on exterior fixtures when underlain by soils with an expansive index greater than 40. The subgrade beneath exterior concrete uflat-work" should have a moisture content well above optimum to a depth of approximately 12 inches. Consideration should be given to reinforcement of exterior concrete slabs similar to the building reinforcement and/or separate slabs with "cold Joints" at no more than ten foot intervals. Positive drainage of surface water away from structures and to the parking and drive areas is very important. No water should be allowed to pond at any location. Where slabs or pavement are not feasible adjacent to the buildings, the ground surface should be provided with a minimum gradient of about six percent to a distance of five feet away from the structures where expansive soils are at finished grade. A lower gradient (such as four percent) can be used when the expansion index of the surfaae soils is less than 40. Roof and surface water should be transported off the site in approved drainage devices or unobstructed swales. Unpaved drainage swales should have a gradient of at least one percent. Swalee or drainage paths through lawn areas should be provided with a gradient of at least two percent. Where neces- sary, drainage paths could be shortened by use of area drains and collector pipes. Job No. 285-256 - February 25, 1987 -12- I I I I 1 / I I I / I I I I I ! I I Pq EwxmmaaTIcNs FOR ExmNsm SXL =A= We Reinforcement ------ Intaior Rtterior WA3slalx34 ?@.&ura content (0 of optinm) GJxbe8) - o- 50 51 - 70 71 - 120 18 24 12 18 18 i0 l-t4 Bar T&B #3Bars@ 125-130 18 30" O.C. l-X4 Bar T&B 13Barse 130-140 24 24" O.C. l-15 Bar T&B #3Bars@ 140 30 18" O.C. ERTES: &plicahletointeriorf +=?glzY--* ~.Ifraisedfloorcon&mdionis proposal,interiorfootlngs be tlrrated as exterior. ?b. rsturerequiranentsimnedtately~iarto~~alaband.afterfootingshavebeenpoured. lb ktestedbya representat*;of tha project S0il.e Qlsine8r. 3Bars tobeplacedattop ad+tkYn (T&B) of f~'withadninun of three inch!s of aJnuete cover** e 4slab reiJlf0 x-canmttobeplae;d~~~yinboththapr~eslab- andmdtitheprprinciple~. &info3xmmntslm3ldbeattkmid-pointof~ Jbb kmere die t3Xp%Sion’indp exoeedo 40. B wwd’be tied to the &XriOr ~11~r,orfoot~~with:atleastt3bars~to~~~~~~~~inforceaent~ - -- .- - - - - - .- - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Planters adjacent to the building should be avoided insofar as possible. Planting areas at grade should be provided with good positive drainage. Wherever possible, exposed soil areas should be above adjacent paved grades unless provisions for drainage, such as catch basins and pipe drains are made. Adequate drainage gradients, devices and curbing should be provided to prevent run- off from adjacent pavement or walks into panting areas Considera- tion should be given to irrigation methods which will promote uniformity of moisture in planters and beneath adjacent conorete Hflat-work.W Over-watering and under-watering of landscape areas must be avoided. This report has been prepared in accordance with generally accepted geotechnical practices and makes no other warranties, either express or implied, as to the professional advice or data included in it. The report is based on the project as described and the data obtained in the field or from referenced documents. This report has not been prepared for use by parties or projects other than those named or described above. MOORE C TAEER, Ted M. Primas Staff Geologist CEG 1093 Rev&wed by Dugald R. Campbell RCE 18723, Expires 6-30-89 TMP/GLL/DRC/ta Attachments: Tables I, II, and III Plans - Location of Field Tests - 3 sheets Geology Maps - 3 sheets Distribution: (5) Client Job Wo. 285-256 - February 25, 1997 -14- .-. .- .- - -- - - .- - - - - - - APPENDIX soil - Type ---- ,- A B C .- E" F i-i I J X ii N 0 P Q R 8 T U .- V W X Y 8 AA MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS TABLB I Description ----------- Maximum Dry Density ----------- Dark red-brown SANDY CLAY Gray-brown SANDY CLAY Light brown SANDY CLAY Yellow and white SANDY SILT Tan-arav CLAYEY SILT Graylbr&n fine to medium CLAYEY SAND Red-brown SANDY CLAY Mottled tan CLAYEY SILT with SAND Yellow-brown CLAYEY SILT with SILTSTORB Yellow-brown SANDY SILT with CLAY Light tan Fine to medium SILTY SAND Brown SANDY SILT with CLAY Mottled gray-brown and orange CLAYEY SILT with SAND Tan-white SANDY SILT Tan-gray SIWY SAND Dark brown SILTY SAND Tan-white SILTY SAND Tan-gray fine SILTY SAND Light yellow-gray fine SILTY SAND Mottled orange-brown SANDY SILT with SILTSTONE Gray-brown SANDY SILT with SILTSTONB Light brown and gray CLAYEY SILT with SILTSTOWB Yellow-tan Fine to medium SILTY SAND Light ten tine SILTY SAND Mottled green-brown CLAYEY SILT with SILTSTONB Mottled yellow-brown SANDY CLAY Mottled red-yellow fine to medium SILTY SAND Job No. 285-256 - February 25, 1987 A-A - (pcf) 122.5 114.0 115.5 111.8 121.5 117.5 optimum - Moisture Content ---------------- (percent) 10.5 13.5 12.8 14.5 11.0 12.0 114.5 12.5 114.5 12.0 106.0 16.8 116.0 13.0 110.5 13.0 113.5 13.0 112.5 14.0 114.5 15.0 115.5 13.8 117.0 12.2 113.0 14.0 114.5 14.2 113.5 13.5 113.0 14.0 112.5 15.5 104.0 18.5 114.0 12.5 110.0 16.0 101.5 21.5 115.5 12.5 116.5 13.5 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS - - soil Type Description w--w ----------- TABLE I (cont'd) Maximum Optimum Dry Density Moisture Content -----m----m ---------------- (pcf) (percent) BB Mottled gray-green SANDY SILT with SILTSTONE cc Dark gray SANDY SILT with SILTSTONE DD Gray fine to medium SILTY SAND with SILTSTONE 106.0 17.0 113.0 15.0 119.0 12.5 - - - - - - - Job No. 285-256 - February 25, 1987 A-B - .- .- - -_ - Test Test Number Date ------- ---___ 1 11-15-85 2 11-15-85 3 11-15-85 4 11-15-85 5 11-15-85 6 11-15-85 7 11-15-85 8 11-15-85 9 11-20-85 10 11-20-85 11 11-20-85 12 11-20-85 13 11-20-85 14 11-21-85 15 11-21-85 16 s" 11-21-85 17 sv 11-21-85 - 18 sv 11-21-85 19 11-21-85 20 11-21-85 21 11-21-85 22 sv 11-21-85 23 11-21-85 .- 24 11-22-85 25 11-22-85 26 11-22-85 27 11-22-85 28 11-22-85 29 11-22-85 30 11-22-85 31 11-22-85 32 11-22-85 33 12-05-85 34 12-05-85 35 12-05-85 - -- - - M 0 0 R E & TA B E E+ABBO~HNICAL ENGINEERS AND GEOLOGISTS - - - Test Elev. (feet) ----- Maximum Moisture Density Content (pcf) (percent) ------- ------ Dry Relative Density Compaction (pcf) (percent) __----_ ---me___ 171.0 111.8 14.2 108.9 97 174.0 115.5 16.9 111.4 96 177.0 115.5 16.3 111.2 96 179.0 115.5 17.6 109.5 95 180.0 115.5 17.6 108.5 94 186.0 111.8 16.6 105.7 95 188.0 111.8 16.1 107.8 96 182.0 115.5 16.8 111.8 97 185.0 122.0 13.6 112.0 92 191.0 122.0 14.9 111.9 92 187.0 114.0 14.9 108.6 95 190.0 122.0 11.1 111.1 91 194.0 114.0 13.6 105.3 92 197.0 114.0 17.6 102.0 90 196.0 115.5 11.1 106.0 92 180.0 111.8 15.9 100.3 90 180.0 111.8 15.6 105.8 95 183.0 117.5 14.9 107.5 91 182.0 121.5 15.6 111.9 92 181.0 117.5 17.6 107.1 91 181.0 117.5 17.6 107.0 91 184.0 117.5 17.6 108.3 92 197.0 114.0 16.2 109.8 96 199.0 117.5 14.3 105.9 90 200.0 117.5 20.5 106.1 90 202.0 117.5 13.6 105.3 90 203.0 111.8 20.5 102.9 92 202.5 111.8 19.0 102.5 92 204.5 111.8 16.2 103.6 93 206.0 122.0 10.4 112.7 92 207.5 111.8 17.6 107.8 96 206.5 117.5 14.9 105.3 90 206.0 111.8 16.2 100.3 90 206.5 111.8 14.9 102.9 92 205.0 121.5 10.4 110.1 91 Job No. 285-256 - February 25, 1987 A-l M 0 0 R E & T&I&i sI @8@$~t&&Jd9NGlNEERS AND GEOLOGISTS - - - Test Test Number Date ------- ---_-- 36 12-05-85 37 12-05-85 38 12-06-85 39 12-06-85 40 12-06-85 41 12-06-85 42 sv 12-09-85 43 nu 12-09-85 44 nu 12-09-85 45 12-09-85 46 sv 12-09-85 47 nu 12-09-85 48 12-09-85 49 12-09-85 50 sv 12-09-85 51 12-10-85 52 sv 12-10-85 53 12-10-85 54 12-10-85 55 12-10-85 56 12-10-85 57 12-12-85 58 12-12-85 59 sv 12-12-85 60 12-12-85 61 12-12-85 62 sv 12-12-85 63 12-13-85 64 12-13-85 65 12-13-85 66 sv 12-13-85 67 12-13-85 - 68 12-13-85 69 12-13-85 70 12-13-85 - - Job No. 285-256 - Test Elev. (feet) ----- Maximum Moisture Density Content (pcf) (percent) Dry ------- ------ Density (PCf) _____-_ Relative Compaction (percent) --se____ 209.0 111.8 16.2 102.6 92 208.0 121.5 10.4 112.5 93 209.0 121.5 12.3 109.5 90 208.0 114.0 16.2 102.4 90 210.0 111.8 16.2 100.3 90 212.0 111.8 13.6 101.8 91 218.0 111.8 16.2 101.4 91 213.0 111.8 20.2 86.5 77 ck by 44 213.0 111.8 13.0 105.2 94 215.0 111.8 14.9 105.0 94 211.0 122.0 12.3 113.1 93 214.0 115.5 14.2 109.0 94 187.0 111.8 16.2 104.1 93 226.0 111.8 12.3 100.8 90 216.0 117.5 14.9 108.5 92 188.0 117.5 16.2 107.6 92 216.0 114.0 14.9 105.9 93 217.0 114.0 16.2 105.7 93 217.0 114.0 17.6 102.6 90 229.0 111.8 16.2 101.5 91 218.0 111.8 14.9 101.5 91 220.0 111.8 16.2 102.4 92 221.0 115.5 14.9 103.9 90 220.5 111.8 19.0 102.9 92 222.0 115.5 17.6 103.9 90 223.0 121.5 13.6 108.8 90 223.0 115.5 16.2 107.0 93 222.0 122.0 12.3 112.7 92 223.5 114.5 13.6 112.3 98 224.0 111.8 17.6 100.9 90 225.0 114.5 17.6 90.7 79 ck by 69 224.5 111.8 14.2 103.2 92 226.0 114.0 16.2 104.0 91 225.0 114.5 17.6 106.0 93 226.0 114.0 16.9 105.2 92 - February 25, 1987 A-2 - - .- - .- ,,- -,~ - - - - .- -~ ,- - - M 0 0 R E & M&g FI c,,,,,,fNG’NEE”S AND GEOLOGISTS Teat Test Number Date ---e--w ------ Test Elev. (feet) __--- Maximum Moisture Density Content (pcf) (percent) ------- ------ Dry Relative Density Compaction (PCf) (percent) ----me- ----m-e_ 71 12-13-85 72 sv 12-16-85 73 sv 12-16-85 74 12-16-85 75 sv 12-16-85 76 12-16-85 77 12-16-85 77 12-16-85 78 12-16-85 79 12-16-85 224.0 111.8 12.3 104.0 222.0 114.5 13.6 106.3 225.0 121.5 13.0 108.8 232.0 111.8 17.6 100.3 228.0 117.5 17.6 107.8 229.0 111.8 16.2 104.6 242.0 115.5 14.9 107.0 242.0 115.5 14.9 107.0 231.0 111.8 16.2 103.8 230.0 111.8 14.9 101.8 80 12-17-85 228.0 117.5 14.9 108.6 81 12-17-85 206.0 117.5 16.2 108.8 82 sv 12-17-85 225.0 122.0 13.6 109.3 83 sv 12-17-85 227.0 122.0 13.6 113.1 84 12-17-85 230.0 122.0 14.9 111.4 85 12-17-85 226.0 111.8 14.9 103.0 86 12-17-85 197.0 114.5 14.2 104.2 87 nu 12-18-85 190.0 114.5 14.0 107.0 88 nu 12-18-85 192.0 114.5 14.1 107.7 89 nu 12-18-85 230.5 114.5 15.7 106.7 90 nu 12-18-85 233.5 114.5 15.7 106.2 91 12-18-85 200.0 117.5 14.2 109.3 92 12-18-85 228.5 115.5 13.6 112.0 93 12-18-85 226.0 122.0 12.3 109.9 94 12-18-85 223.0 115.5 16.2 106.4 95 12-18-85 96 sv 12-18-85 97 sv 12-18-85 98 sv 12-19-85 99 nu 12-19-85 100 12-19-85 101 12-19-85 102 sv 12-19-85 103 12-19-85 104 12-20-85 234.0 111.8 12.3 102.2 237.0 114.5 14.2 106.6 235.0 114.5 16.2 107.4 234.0 115.5 16.2 104.6 224.0 114.5 15.1 107.2 239.0 111.8 14.9 102.7 234.5 114.5 16.2 104.1 231.0 117.5 14.9 106.5 243.0 111.8 16.2 103.3 246.0 111.8 19.0 101.8 Job No. 285-256 - February 25, 1987 A-3 93 93 90 90 92 94 93 93 93 91 92 93 90 93 91 92 91 93 94 93 93 93 97 90 92 91 93 94 91 94 92 91 91 92 91 - - - - .- - - M 0 0 R E & Tsf&&R~p ~~~~~~G,NEER~ANDGEOLOG,STS Test Test Number Date ------- ------ 105 12-20-85 260.0 115.5 17.6 106.0 92 106 12-20-85 243.0 115.5 16.2 106.7 92 107 12-20-85 236.0 111.8 10.4 101.1 90 108 12-20-85 240.0 115.5 14.2 104.7 91 109 12-20-85 235.0 117.5 12.3 107.4 91 110 12-20-85 244.5 111.8 13.6 104.8 94 111 12-20-85 262.0 122.0 14.2 110.3 90 112 sv 12-23-85 253.5 122.0 14.9 114.9 94 113 sv 12-23-85 241.0 106.0 19.0 103.2 97 114 sv 12-23-85 235.0 106.0 11.6 105.2 99 115 12-23-85 231.0 106.0 14.2 102.1 96 116 12-23-85 261.0 116.0 11.1 108.0 93 117 12-23-85 235.0 121.5 16.2 109.0 90 118 12-23-85 243.0 114.5 14.9 109.8 96 119 12-23-85 233.0 106.0 14.9 105.1 99 120 12-23-85 260.0 114.5 16.2 108.3 95 121 12-24-85 253.0 106.0 17.6 102.0 96 122 sv 12-24-85 233.5 111.8 14.9 102.0 91 123 12-24-85 237.0 111.8 16.2 102.2 91 124 12-24-85 242.0 114.5 9.8 103.1 90 125 12-24-85 236.0 110.5 14.9 104.4 95 126 12-24-85 241.0 110.5 14.9 105.1 95 127 12-26-85 263.0 111.8 14.9 101.0 90 128 nu 12-26-85 239.0 110.5 10.2 110.2 100 129 12-26-85 248.0 106.0 16.2 103.8 98 130 sv 12-26-85 243.0 106.0 13.6 101.5 96 131 nu 12-26-85 236.0 116.0 15.1 109.0 94 132 nu 12-26-85 238.0 116.0 14.9 108.7 94 133 12-26-85 148.0 110.5 11.7 102.2 93 134 12-26-85 150.0 110.5 17.0 106.0 96 135 12-26-85 152.0 110.5 17.6 107.2 97 136 nu 12-27-85 154.0 110.5 16.2 98.9 90 137 12-27-85 155.5 113.5 14.9 101.8 90 138 12-27-85 247.0 116.0 16.2 105.7 91 139 12-27-85 243.0 106.0 16.9 100.9 95 Job No. 285-256 - February 25, 1987 A-4 Test Elev. (feet) ----- Maximum Moisture Density Content (pcf) (percent) ------- ------ Dry Relative Density Compaction (PCf) (percent) --e---w ---m-m__ - - ,- .- - - M 0 0 R E & TfiaE % (~~~NGINEERS AND GEOLOGISTS Test Test Number Date ------- ------ 140 sv 12-27-85 248.0 106.0 13.6 102.1 141 sv 12-27-85 240.0 116.0 16.2 106.3 142 12-27-85 228.0 116.0 14.9 104.6 143 12-27-85 230.0 106.0 13.6 103.5 144 12-30-85 262.5 111.8 13.6 106.5 96 92 90 98 95 145 sv 12-30-85 245.0 116.0 16.2 107.3 92 146 sv 12-30-85 245.5 116.0 14.9 111.4 96 147 12-30-85 155.5 113.5 17.6 106.1 93 148 12-30-85 157.5 110.5 16.9 99.7 90 149 12-30-85 248.0 116.0 14.2 107.2 92 150 12-30-85 159.0 112.5 17.6 101.7 90 151 12-30-85 161.0 112.5 17.6 100.9 90 152 12-30-85 158.0 110.5 11.1 101.2 92 153 12-30-85 815.0 110.5 12.3 102.8 93 154 12-30-85 163.0 110.5 13.6 102.5 93 155 12-30-85 165.0 110.5 16.2 103.3 93 156 12-31-85 161.0 110.5 19.0 103.2 93 157 12-31-85 164.0 110.5 17.6 103.9 94 158 12-31-85 166.0 110.5 17.6 103.2 93 159 12-31-85 243.0 116.0 14.9 107.2 92 160 12-31-85 250.0 116.0 16.2 109.5 94 161 12-31-85 166.5 113.5 17.6 105.8 93 162 12-31-85 168.5 112.5 17.6 104.1 93 163 12-31-85 172.0 112.5 16.2 103.4 92 164 12-31-85 170.0 112.5 17.6 103.1 92 165 01-02-86 171.0 110.5 12.3 108.3 98 166 01-02-86 152.0 112.5 16.2 105.0 93 167 sv 01-02-86 154.0 112.5 17.6 106.2 94 168 sv 01-02-86 156.5 112.5 16.2 107.3 95 169 01-02-86 254.0 116.0 16.9 105.0 91 170 01-02-86 249.0 116.0 14.9 107.9 93 171 01-02-86 265.5 116.0 16.2 107.2 92 172 sv 01-02-86 159.0 113.5 17.6 102.6 90 173 sv 01-02-86 164.0 113.5 16.9 105.2 93 174 01-02-86 172.0 110.5 13.6 107.0 97 Job No. 285-256 - February 25, 1987 A-5 Test Elev. (feet) ----- Maximum Moisture Density Content (PCf) (percent) ------- ------ Dry Density (PCf) -e--D-- Relative Compaction (percent) - -- - - - .- .- - M 0 0 R E & T$lfSmII ~~~&~GINEERS AND GEOLOGISTS Test Test Number Date ------- ------ 175 01-03-86 169.0 113.5 17.6 104.1 92 176 01-03-86 173.0 113.5 17.6 106.1 93 177 sv 01-03-86 175.0 110.5 14.2 106.9 97 178 sv 01-03-86 170.0 110.5 13.6 105.7 96 179 01-03-86 150.0 110.5 16.2 103.6 94 180 01-03-86 154.0 110.5 16.2 104.0 94 181 01-06-86 156.0 110.5 10.4 99.3 90 182 01-06-86 155.5 110.5 14.2 105.1 95 183 01-06-86 175.0 110.5 11.1 101.4 92 184 01-06-86 175.0 110.5 13.6 104.0 94 185 sv 01-06-86 252.5 106.0 16.2 102.8 97 186 sv 01-06-86 256.0 106.0 14.9 105.7 100 187 01-06-86 260.0 106.0 14.9 102.7 97 188 01-06-86 263.5 106.0 14.2 104.4 98 189 01-06-86 180.0 110.5 13.6 107.4 97 190 01-06-86 191 01-07-86 192 01-07-86 193 01-07-86 194 01-07-86 195 sv 01-07-86 196 sv 01-07-86 197 01-07-86 198 01-07-86 199 01-07-86 174.0 110.5 14.2 103.7 170.0 113.5 14.2 103.0 176.0 113.5 14.9 103.7 837.0 113.5 13.6 105.5 169.0 113.5 16.2 104.0 268.5 111.8 16.2 101.7 262.0 111.8 16.9 103.5 176.0 116.0 10.4 106.7 181.5 112.5 14.9 103.7 183.0 113.5 16.9 103.8 200 01-07-86 201 01-07-86 202 01-07-86 203 sv 01-08-86 204 sv 01-08-86 205 01-08-86 206 01-08-86 207 01-08-86 208 01-08-86 209 01-08-86 256.5 111.8 13.6 101.8 257.0 111.8 14.2 105.1 258.5 111.8 14.2 105.6 185.0 115.5 14.2 112.5 183.0 106.0 19.0 100.7 173.0 113.5 17.6 103.4 260.0 115.5 12.3 106.9 257.0 115.5 13.6 106.2 264.5 115.5 11.1 106.6 160.0 110.5 17.6 103.7 94 91 91 93 92 91 93 92 92 91 91 94 94 97 95 91 93 92 92 94 Job No. 285-256 - February 25, 1987 A-6 Test Elev. (feet) ----- Maximum Moisture Density Content (PCf) (percent) _----__ ------ DW Relative Density Compaction (pcf) (percent) ------- -------- - - M 0 0 R E & T&m 91 @&f,C~~l&&FjNGlNEERS AND GEOLOGISTS Test Test Number Date ------- ------ 210 211 212 213 - 214 215 .~- 216 217 218 - 219 220 221 - 222 223 224 - 225 226 227 01-08-86 186.5 110.5 16.9 106.6 96 01-08-86 271.5 115.5 13.6 105.1 91 01-09-86 243.0 114.5 10.4 106.9 93 01-09-86 245.5 114.5 12.3 106.5 93 01-09-86 249.5 117.5 13.6 110.9 94 01-09-86 245.0 114.5 19.0 103.9 91 01-09-86 246.5 112.5 20.5 101.6 90 01-09-86 189.0 112.5 19.0 102.5 91 01-09-86 250.5 114.5 12.3 109.9 96 01-10-86 184.0 114.5 13.6 110.0 96 01-10-86 192.0 114.5 14.9 112.1 98 01-10-86 147.0 113.5 16.2 107.4 95 01-10-86 140.0 113.5 14.9 108.3 95 01-10-86 145.0 113.5 14.9 106.2 94 01-10-86 128.0 112.5 17.6 104.9 93 01-10-86 01-13-86 01-13-86 136.5 113.5 13.6 106.2 139.0 112.5 17.6 102.0 147.5 112.5 16.2 112.2 150.5 114.5 13.6 106.7 153.5 114.5 19.0 104.0 94 91 100 93 91 91 91 94 91 93 91 90 90 97 93 90 90 90 92 93 - 228 sv 01-13-86 229 sv 01-13-86 - 230 01-13-86 231 01-13-86 232 01-13-86 233 01-13-86 234 01-13-86 235 01-13-86 .- 236 01-13-86 237 01-13-86 238 01-14-86 239 01-14-86 .- 240 01-14-86 241 sv 01-14-86 242 01-14-86 243 01-14-86 244 01-14-86 - .- Job No. 285-256 - February 25, 1987 A-7 Test Elev. (feet) ----- Maximum Moisture Density Content (pcf) (percent) Dry ------ Density (pcf) ------- 153.0 112.5 17.6 102.7 156.5 112.5 17.6 102.4 252.0 106.0 14.2 99.1 121.5 112.5 14.2 102.3 158.0 112.5 14.9 104.1 126.0 112.5 17.6 102.7 131.0 112.5 17.6 101.7 128.0 112.5 19.0 101.3 145.0 112.5 16.2 109.0 131.0 110.5 17.6 102.6 118.0 114.5 13.6 103.3 126.0 117.0 13.6 105.7 138.0 110.5 13.6 98.9 159.5 112.5 14.2 103.5 153.0 112.5 14.9 104.8 Relative Compaction (percent) ----____ .- - - - ,- ,-. .- - M 0 0 R E & Trf’&& bI f+~#C~~~@QNGlNEERS AND GEOLOGISTS Test Test Number Date ------- ------ 245 01-14-86 246 01-14-86 247 01-14-86 248 sv 01-15-86 249 sv 01-15-86 250 01-15-86 251 01-15-86 252 01-15-86 253 01-15-86 254 01-15-86 255 01-15-86 256 01-15-86 257 sv 01-15-86 258 sv 01-15-86 259 01-15-86 129.0 117.0 9.8 106.9 91 136.5 117.0 14.2 104.9 90 143.5 113.5 16.2 107.9 95 254.0 115.5 16.9 105.3 91 255.5 115.5 13.6 105.6 91 145.0 110.5 16.2 103.8 94 228.5 115.5 11.1 104.2 90 235.0 106.0 14.9 102.0 96 246.0 116.0 17.6 107.3 93 241.0 117.5 14.2 110.0 94 248.0 116.0 16.9 106.1 91 245.0 114.5 14.9 104.8 92 242.0 106.0 17.6 97.9 92 248.0 113.5 17.6 106.2 94 247.0 106.0 20.5 100.2 95 260 01-15-86 240.0 106.0 16.9 105.6 100 261 sv 01-16-86 238.0 106.0 17.6 106.4 100 262 01-16-86 231.0 106.0 14.9 99.7 94 263 01-16-86 234.0 113.5 16.2 105.7 93 264 01-16-86 245.0 113.5 17.6 106.5 94 265 01-16-86 239.0 106.0 19.0 97.8 92 266 01-16-86 243.0 106.0 17.6 99.7 94 267 01-16-86 234.0 106.0 17.6 100.9 95 268 sv 01-16-86 235.5 113.5 14.8 105.3 93 269 01-16-86 240.0 106.0 17.6 101.4 96 270 01-16-86 249.0 110.5 14.9 106.9 97 271 01-16-86 233.0 114.5 19.0 103.5 90 272 01-16-86 250.5 110.5 16.9 106.8 97 273 01-17-86 249.0 116.0 17.6 107.8 93 274 01-17-86 247.0 116.0 16.2 108.4 93 275 sv 01-17-86 232.5 115.5 13.6 107.4 276 sv 01-17-86 242.0 115.5 14.2 107.4 277 01-17-86 245.0 106.0 17.6 99.1 278 01-17-86 250.0 106.0 16.2 101.9 279 01-17-86 234.0 114.0 16.2 102.4 93 93 94 96 90 Job No. 285-256 - February 25, 1987 A-8 Test Elev. (feet) ----- Maximum Moisture Density Content (Pcf)- --w--e- (percent) ------ DrY Density (pcf) ------- Relative Compaction (percent) - M 0 0 R E & TA&E qI ,~@CJfj,j&~NGINEERS AND GEOLOGISTS - - -. - Test Test Number Date ------- --mm-- 280 01-17-86 242.0 115.5 16.2 104.1 90 281 01-17-86 246.0 115.5 14.9 106.1 92 282 sv 01-17-86 246.0 115.5 16.9 112.7 98 283 01-17-86 250.0 106.0 17.6 96.6 91 284 01-17-86 255.0 106.0 19.0 97.1 92 285 01-17-86 245.0 114.5 16.2 103.6 90 286 01-20-86 151.0 106.0 17.6 95.7 90 287 01-20-86 147.0 110.5 14.9 103.9 94 288 01-20-86 262.0 112.5 14.2 102.2 91 289 sv 01-20-86 267.0 106.0 17.6 104.2 98 290 01-20-86 291 01-20-86 292 01-20-86 293 01-20-86 294 01-20-86 160.0 110.5 13.6 105.6 96 167.0 115.5 14.2 104.0 90 173.0 106.0 14.2 99.3 94 175.0 106.0 14.9 99.9 94 266.0 116.0 16.9 105.7 91 295 sv 01-20-86 109.5 106.0 14.9 100.0 296 sv 01-20-86 191.5 106.0 14.2 102.5 297 01-21-86 151.5 112.5 14.9 104.6 298 sv 01-21-86 151.0 111.8 13.6 101.3 299 sv 01-21-86 158.5 111.8 14.2 104.3 300 01-21-86 170.0 106.0 14.9 96.4 301 01-21-86 266.5 115.5 13.6 107.5 302 01-21-86 255.5 112.5 16.9 101.1 303 01-21-86 262.0 113.5 14.9 105.1 304 01-21-86 259.0 106.0 10.4 98.9 305 01-21-86 306 01-21-86 307 01-21-86 308 01-22-86 309 sv 01-22-86 310 sv 01-22-86 311 01-22-86 312 sv 01-22-86 313 01-22-86 314 01-22-86 195.5 115.5 14.2 105.7 155.0 115.5 13.6 105.1 196.5 115.5 13.6 106.1 264.0 106.0 13.6 99.1 158.0 117.0 16.2 105.2 154.0 110.5 9.5 101.6 167.0 110.5 11.1 101.1 171.0 106.0 9.6 96.9 169.0 110.5 12.3 100.4 169.5 110.5 18.3 99.7 94 97 93 91 93 91 93 90 93 93 92 91 92 93 90 92 91 91 91 90 Test Elev. (feet) ----- Maximum Moisture Density Content (pcf) (percent) ------ Dry Relative Density Compaction (pcf) (percent) ------- -----w__ - Job No. 285-256 - February 25, 1987 A-9 - - ,- M 0 0 R E & T&m RI f@JJf,C~~~GlNEERS AND GEOLOGISTS Test Test Number Date ------- ------ 315 01-22-86 316 01-22-86 317 01-22-86 318 01-23-86 319 01-23-86 320 01-23-86 -- 321 322 si 01-23-86 01-23-86 323 01-23-86 324 01-23-86 - 325 sv 01-23-86 326 sv 01-23-86 327 01-23-86 328 sv 01-23-86 329 sv 01-23-86 - 330 01-23-86 331 01-23-86 332 01-23-86 333 01-23-86 334 01-23-86 Test Elev. (feet) ----- Maximum Moisture Density Content (pcf) (percent) Dry -_----- ------ Density (pcf) ------- Relative Compaction (percent) -------- 165.0 115.5 12.2 105.6 91 208.0 115.5 12.8 109.1 94 196.0 110.5 13.6 101.2 92 198.0 110.5 14.9 104.9 95 255.0 115.5 14.2 104.5 90 265.0 112.5 14.9 108.6 97 198.0 110.5 16.2 102.7 93 271.5 115.5 13.6 105.7 92 213.0 110.5 16.2 103.9 94 217.5 115.5 12.3 103.6 90 244.3 115.5 12.3 103.7 90 249.2 115.5 16.4 103.9 90 220.0 115.5 13.6 104.2 90 168.0 115.5 12.5 103.8 90 170.0 106.0 12.5 98.1 93 257.5 113.5 14.9 104.1 92 274.0 114.5 13.6 104.0 91 258.0 106.0 12.3 101.7 96 259.0 106.0 12.3 103.3 97 207.0 113.5 14.2 106.8 94 - 335 sv 01-23-86 336 sv 01-23-86 337 01-23-86 338 sv 01-23-86 - 339 01-23-86 170.0 106.0 13.0 97.4 92 169.0 106.0 13.5 97.8 92 208.5 110.5 19.0 100.5 91 171.0 115.5 13.7 108.3 94 220.5 110.5 12.6 101.3 92 340 01-23-86 211.0 110.5 14.2 105.7 96 341 sv 01-23-86 172.0 115.5 13.0 107.2 93 342 01-24-86 202.0 114.5 16.2 103.2 90 343 01-24-86 207.0 114.5 14.9 105.8 92 344 01-24-86 210.0 114.5 17.6 104.0 91 345 01-24-86 346 01-24-86 347 01-24-86 348 01-24-86 349 01-24-86 -. 212.0 114.5 17.6 103.9 254.0 114.5 16.9 103.0 249.0 114.5 16.2 106.3 246.0 112.5 14.9 108.4 256.0 112.5 16.2 105.3 9901 93 96 94 Job No. 285-256 - February 25, 1987 A-10 - M 0 0 R E & TAM s I (@$$i~~kJ~NGlNEERS AND GEOLOGISTS Test Test Number Date ------- ------ 350 01-24-86 351 01-24-86 352 01-24-86 353 01-24-86 - 354 nu 01-27-86 355 sv 01-27-86 - 356 sv 01-27-86 357 nu 01-27-86 358 nu 01-27-86 359 nu 01-27-86 360 nu 01-27-86 361 01-27-86 .~ 362 01-27-86 363 sv 01-27-86 364 sv 01-27-86 - 365 01-27-86 366 01-27-86 367 01-27-86 368 01-27-86 369 01-27-86 - 370 01-27-86 371 01-27-86 372 01-27-86 373 01-27-86 374 01-28-86 375 01-28-86 - 376 01-28-86 377 sv 01-28-86 378 sv 01-28-86 379 . . 01-28-86 - 380 01-28-86 381 nu 01-28-86 382 nu 01-28-86 383 nu 01-28-86 384 nu 01-28-86 Test Elev. (feet) ----- Maximum Moisture Densitv Content (Pcf)- ------- (percent) ------ Dry Density (pcf) ------- Relative Compaction (percent) -------- 215.0 114.5 14.9 108.6 95 218.0 114.5 16.2 106.0 93 218.5 113.5 14.9 103.5 91 184.0 113.5 16.2 103.6 91 190.5 114.5 14.9 106.8 93 250.0 116.0 16.2 105.9 91 256.0 115.5 16.9 105.5 91 168.0 114.5 6.4 113.6 99 168.0 115.5 10.1 115.3 100 170.0 114.5 14.0 111.8 98 171.0 114.5 7.7 113.3 99 173.5 114.5 12.3 110.7 97 176.0 114.5 14.9 106.1 93 174.0 113.0 16.9 109.9 97 190.0 114.5 13.6 104.4 91 152.0 115.5 13.6 104.5 90 154.0 115.5 14.2 104.7 91 172.0 115.5 13.6 105.9 92 145.0 115.5 14.2 105.7 92 209.5 110.5 11.7 100.9 91 221.0 115.5 13.6 104.2 90 276.0 110.5 16.9 99.7 90 277.5 113.0 14.9 104.6 93 270.5 113.0 13.6 104.5 92 190.5 117.5 12.3 107.3 91 188.0 110.5 14.9 103.4 94 189.0 110.5 16.9 102.6 93 188.0 113.0 11.1 111.2 98 177.0 113.0 12.3 110.9 98 174.0 114.5 12.3 104.1 91 191.5 136.0 14.9 100.9 95 193.3 106.0 16.2 101.2 95 148.5 115.5 13.6 106.1 92 220.0 116.0 14.9 106.5 92 149.0 110.5 14.2 100.3 91 Job No. 285-256 - February 25, 1987 A-11 M 0 0 R E & TM&E s I (~K@#&&~qNGINEERS AND GEOLOGISTS - - - ,- - - Test Test Number Date ------- ------ 385 01-28-86 151.5 106.0 12.3 102.9 97 386 01-28-86 192.0 106.0 17.6 99.4 94 387 01-28-86 187.0 106.0 16.2 101.3 96 388 01-28-86 150.5 113.5 14.9 107.2 94 389 sv 01-28-86 157.5 115.5 12.3 111.6 97 390 sv 01-29-86 154.0 115.5 11.1 110.3 96 391 01-29-86 182.5 114.5 16.9 103.8 91 392 01-29-86 176.5 114.5 14.9 103.2 90 393 01-29-86 184.0 114.5 13.6 105.9 92 394 01-29-86 179.0 114.5 14.9 104.4 91 395 01-29-86 396 01-29-86 397 01-29-86 398 01-29-86 399 01-29-86 400 01-29-86 401 01-29-86 402 01-29-86 403 01-29-86 404 01-29-86 405 406 S; 01-29-86 02-03-86 407 sv 02-03-86 408 sv 02-03-86 409 sv 02-03-86 154.0 113.0 11.1 106.5 158.0 113.0 12.3 106.5 196.0 115.5 16.2 104.4 200.0 115.5 17.6 105.9 226.5 106.0 19.0 95.4 221.0 156.5 160.0 179.0 179.0 216.5 184.0 180.0 176.0 158.5 410 sv 02-03-86 160.0 411 sv 02-03-86 161.5 412 02-03-86 228.0 413 02-03-86 230.0 414 02-03-86 223.5 415 02-03-86 214.5 416 02-03-86 185.0 417 02-03-86 181.5 418 02-03-86 178.0 419 02-03-86 185.0 115.5 110.5 113.0 114.5 121.5 114.5 115.5 115.5 115.5 115.5 115.5 115.5 113.5 113.5 113.5 113.5 115.5 114.5 114.5 113.0 14.9 104.9 16.9 100.6 17.6 102.2 14.2 104.9 12.3 109.3 13.6 103.7 17.6 107.1 16.9 106.1 16.2 107.1 14.9 106.3 16.2 105.6 17.6 105.2 10.4 103.6 11.1 106.3 11.1 107.1 12.3 105.2 14.2 105.1 17.6 105.1 16.9 106.5 12.3 103.6 94 94 90 92 90 91 91 90 92 90 91 93 92 93 92 91 91 91 94 94 93 91 92 93 92 Job No. 285-256 - February 25, 1987 A-12 Test Elev. (feet) ----- Maximum Moisture Density Content (pcf) (percent) ------ DV Relative Density Compaction (pcf) (percent) ------- -----___ - M 0 0 R E & Tea&RI I ‘f@J#f#$f&&fJGlNEERS AND GEOLOGISTS - .- -- Test Test Number Date ------- ----__ Test Maximum Moisture Dry Relative Elev. Density Content Density Compaction (feet) (Pcf) [percent) (pcf) (percent) ----- ------- ------ -_--_-_ -------- 420 02-03-86 421 02-03-86 422 02-04-86 423 02-04-86 424 02-04-86 225.0 113.0 11.1 106.0 94 229.0 115.5 13.6 106.5 92 231.0 115.5 13.6 105.6 91 236.0 115.5 14.2 102.2 88 ck by 424 226.0 115.5 12.3 105.0 91 425 02-04-86 230.0 115.5 12.3 106.3 92 426 sv 02-04-86 180.0 122.0 14.9 110.3 90 427 02-04-86 185.0 113.0 13.6 105.9 94 428 02-04-86 172.0 115.5 14.2 105.7 92 429 02-04-86 160.0 113.0 11.1 105.1 93 430 02-04-86 187.5 122.0 14.9 110.3 90 431 02-04-86 231.5 115.5 16.2 104.3 90 432 02-04-86 216.5 113.5 14.2 103.6 91 433 02-04-86 222.0 113.5 14.9 104.4 92 434 02-04-86 230.0 113.0 17.6 103.4 92 435 02-04-86 236.0 115.5 13.6 107.7 93 436 02-04-86 234.5 115.5 14.2 105.0 91 437 02-04-86 225.0 113.5 11.1 108.2 95 438 02-04-86 228.0 113.5 13.6 106.5 94 439 02-04-86 198.0 112.5 14.9 106.8 95 440 02-04-86 202.0 112.5 17.6 105.6 94 441 02-04-86 224.0 110.5 16.2 100.3 91 442 02-04-86 233.5 115.5 13.6 105.2 91 443 02-05-86 183.0 115.5 13.6 104.2 90 444 02-05-86 190.0 106.0 16.2 99.3 94 445 02-05-86 224.0 446 02-05-86 229.0 447 02-05-86 231.0 448 sv 02-05-86 185.0 449 sv 02-05-86 188.0 113.0 113.0 115.5 115.5 115.5 113.0 115.5 113.5 113.5 113.5 13.6 107.2 95 14.9 106.3 94 14.2 105.7 92 13.6 108.0 93 14.2 107.5 93 450 sv 02-05-86 184.0 451 02-05-86 187.5 452 02-05-86 236.0 453 02-05-86 230.5 454 02-05-86 233.0 13.6 110.9 98 16.2 104.8 91 14.9 108.4 96 14.9 109.6 97 13.6 108.2 95 Job No. 285-256 - February 25, 1987 A-13 - M 0 0 R E 81 T&J&E 3 I ,~fCJ#,f&~NGINEERS AND GEOLOGISTS Test Test Number Date -----mm ------ - 455 02-05-86 456 02-05-86 457 02-05-86 458 02-05-86 - 459 02-05-86 460 02-05-86 177.0 122.0 12.3 113.9 93 - 461 02-06-86 236.0 115.5 16.2 108.2 94 462 02-06-86 242.0 115.5 14.9 107.9 93 463 sv 02-06-86 227.5 115.5 13.6 108.6 94 464 sv 02-06-86 233.5 113.0 14.9 109.6 97 465 02-06-86 233.0 115.5 7.5 102.7 89 ck by 466 466 02-06-86 233.0 113.0 12.3 102.7 91 .~. 467 02-06-86 267.5 115.5 14.9 106.1 92 468 02-06-86 270.5 115.5 14.2 107.5 93 469 02-06-86 160.5 115.5 13.6 107.5 93 - 470 471 472 - 473 474 02-06-86 188.5 115.5 13.6 109.5 95 02-06-86 238.0 106.0 9.8 100.3 95 02-06-86 235.0 115.5 13.6 107.0 93 02-06-86 232.0 113.5 13.6 104.2 92 02-06-86 163.0 113.0 12.3 104.5 92 - 475 476 477 478 ..- 479 02-06-86 170.0 02-06-86 234.5 02-06-86 238.0 02-06-86 235.0 02-06-86 164.5 166.0 189.0 213.0 202.0 236.0 113.0 113.5 114.5 110.5 113.5 113.5 115.5 122.0 122.0 114.5 115.5 115.5 113.5 113.5 113.5 12.3 108.9 96 7.5 101.7 90 11.1 102.7 90 11.7 100.6 91 10.4 105.4 93 480 02-06-86 - 481 02-07-86 482 02-07-86 483 02-07-86 484 sv 02-07-86 11.7 104.9 92 16.2 103.9 90 10.4 111.0 91 11.1 113.4 93 16.2 107.6 94 485 sv 02-07-86 486 RV 02-07-86 487 02-07-86 488 02-07-86 489 02-07-86 - Test Elev. (feet) ----- Maximum Moisture Density Content (pcf) (percent) Dry ------ Density (pcf) ------- Relative Compaction (percent) -_--____ 282.0 112.5 16.2 103.4 92 232.0 113.5 14.9 106.8 94 238.0 113.5 13.6 107.5 95 237.0 115.5 13.6 107.5 93 235.0 115.5 13.6 109.5 95 228.0 233.0 239.0 189.0 186.0 16.9 113.4 98 17.6 106.1 92 13.6 104.2 92 14.2 103.5 91 14.2 105.0 93 Job No. 285-256 - February 25, 1987 A-14 - - - - MOORE & TABER GEOTECHNICAL ENGINEERSANDGEOLOGISTS 501 02-10-86 502 02-10-86 503 02-10-86 504 02-10-86 - 505 02-10-86 506 02-10-86 507 02-10-86 508 02-10-86 509 sv 02-10-86 510 sv 02-10-86 ..- - - Test Test Number Date ------ ------ Test Maximum Moisture Dry Elev. Density Content Density (ft) (pcf) (%) (pcf) ----- ------- -------- ------- - 490 02-07-86 491 02-07-86 492 02-07-86 493 02-07-86 494 02-07-86 495 02-07-86 - 496 02-07-86 497 02-07-86 498 02-07-86 499 02-07-86 500 02-07-86 168.0 170.0 173.0 192.0 195.0 204.5 202.0 197.0 205.0 180.0 184.0 208.0 199.0 196.0 187.0 189.0 185.0 166.0 180.0 200.0 210.0 511 02-10-86 213.0 512 02-10-86 211.0 513 02-10-86 176.0 514 02-10-86 183.5 515 sv 02-10-86 185.5 516 sv 02-10-86 187.5 517 02-10-86 210.0 518 02-10-86 205.5 519 02-10-86 213.5 520 02-10-86 206.0 Table II (Continued) 110.5 110.5 110.5 113.5 113.5 113.5 113.5 114.5 114.5 113.5 113.5 113.0 113.0 113.0 113.5 114.5 114.5 115.5 115.5 113.0 113.0 113.0 113.0 114.5 113.0 113.0 117.0 113.5 113.0 113.0 115.5 12.3 101.8 13.6 103.5 12.3 103.4 14.9 104.1 13.6 105.9 11.1 106.7 13.6 105.4 14.2 103.6 17.6 102.7 16.9 103.3 13.6 105.3 17.6 101.7 17.6 102.5 19.0 101.5 14.9 107.5 16.9 106.4 17.6 106.1 17.6 103.7 17.6 105.1 16.9 104.1 14.9 103.9 12.9 102.7 13.6 103.3 16.2 103.2 13.6 109.6 14.2 109.1 14.2 108.5 17.6 102.3 19.0 103.2 14.9 104.9 14.9 106.8 Reldtive Compaction (%I ---------- 92 94 94 92 93 94 93 90 90 91 93 90 91 90 95 93 93 90 91 92 92 91 91 90 97 97 93 90 91 93 92 Job No. 285-256 - February 25, 1987 A-15 MOORE & TABER GEOTECHNlCAL ENGINEERS AND GEOLOGISTS - Table II (Continued) Test Test Number Date 521 02-10-86 190.0 115.5 13.6 103.7 522 02-11-86 186.0 114.5 17.6 103.5 523 02-11-86 192.0 114.5 14.2 103.5 524 02-11-86 211.0 113.0 10.4 101.8 525 02-11-86 214.0 113.0 14.9 102.3 526 sv 02-11-86 207.5 113.0 16.2 101.8 527 sv 02-11-86 209.0 113.0 14.9 102.3 528 02-11-86 192.0 112.5 16.2 107.0 529 02-11-86 195.0 112.5 14.9 109.4 530 02-11-86 187.0 115.5 16.2 108.6 531 02-11-86 216.5 110.5 13.6 99.8 532 02-11-86 209.5 110.5 15.6 99.3 533 02-11-86 210.5 110.5 13.6 100.1 534 sv 02-11-86 214.0 113.0 17.6 106.7 535 sv 02-11-86 215.5 113.0 16.9 106.7 536 02-11-86 273.5 115.5 16.2 104.3 537 02-11-86 213.0 113.0 14.9 103.2 538 02-11-86 212.0 113.0 14.9 103.5 539 02-11-86 187.0 112.5 17.6 103.0 540 02-11-86 190.0 115.5 17.6 103.7 541 02-11-86 177.0 113.5 13.6 105.8 542 02-11-86 179.0 113.5 16.2 104.1 543 02-11-86 188.0 115.5 17.6 104.0 544 02-11-86 214.5 112.5 13.6 101.0 545 02-12-86 194.0 110.5 13.6 99.8 546 02-12-86 191.0 113.0 14.2 104.7 547 02-12-86 211.5 112.5 10.4 100.9 548 02-12-86 218.0 112.5 13.6 101.0 549 02-12-86 217.5 112.5 14.9 101.1 550 02-12-86 206.5 112.5 14.9 101.8 551 02-12-86 192.5 113.0 12.3 105.0 552 sv 02-12-86 195.0 113.0 16.2 103.8 553 02-12-86 198.5 115.5 14.5 104.6 554 02-12-86 199.5 114.5 14.9 108.2 555 sv 02-12-86 176.0 116.0 16.9 107.4 --_--_ Test Elev. (ft) ----- Maximum Density (pcf) ------- Job No. 285-256 - February 25, 1987 Moisture Content (%) -------- DW Reldtive Density Compaction (pcf) (0) ------- ---------- 90 90 90 90 91 90 91 95 97 94 90 90 91 94 94 90 91 92 92 90 93 92 90 90 90 93 90 90 90 90 93 92 91 94 93 A-16 MOORE & TABER GEOTECHNlCAL ENGINEERS AND GEOLOGISTS - Table II (Continued) .- Test Test Number Date ------ --____ - Test Elev. (ft) ----_ Maximum Density (pcf) ------- Moisture DW Content Density (%) (PCf) -------- ------- 556 sv 02-12-86 557 02-12-86 - 558 02-12-86 559 02-12-86 560 02-12-86 - 561 02-12-86 562 02-12-86 563 02-12-86 564 02-12-86 565 02-18-86 180.0 114.5 16.2 104.8 190.0 110.5 13.6 101.5 186.0 114.5 13.6 105.2 191.5 114.5 14.2 105.7 192.0 114.5 14.2 105.4 198.5 116.0 16.2 103.9 200.0 112.5 13.6 100.9 202.0 112.5 14.9 101.2 199.0 112.5 13.6 100.8 201.5 113.5 14.9 102.3 566 02-18-86 203.5 114.5 14.9 103.4 567 02-18-86 198.5 114.5 16.9 103.1 568 02-18-86 200.0 112.5 14.2 100.7 569 02-18-86 195.0 112.5 16.2 101.2 570 02-18-86 199.0 116.0 14.9 106.1 571 02-18-86 201.0 116.0 17.6 104.4 572 02-18-86 200.0 116.0 17.6 104.1 573 02-18-86 201.0 116.0 16.2 104.3 574 sv 02-18-86 199.0 113.0 16.9 105.4 575 sv 02-18-86 198.5 113.0 17.6 102.0 576 sv 02-19-86 205.0 106.0 17.6 100.4 577 02-19-86 206.0 112.5 16.2 102.2 578 02-19-86 203.0 112.5 16.2 101.2 579 02-19-86 193.0 114.5 16.2 103.4 580 02-19-86 195.0 114.5 14.9 106.8 581 02-19-86 205.0 113.0 11.1 102.4 582 02-19-86 207.0 113.0 11.7 104.3 583 02-20-86 200.0 113.0 12.3 105.4 584 02-20-86 210.0 113.0 12.3 101.8 585 sv 02-20-86 213.0 113.0 13.6 104.2 Reldtive Compaction (8) ---------- 92 92 92 92 92 90 90 90 90 90 90 90 90 90 91 90 90 90 93 90 95 91 90 90 93 91 92 93 90 92 - Job No. 285-256 - February 25, 1987 - A-17 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS .- .- - Test Test Number Date ------ ----__ 586 sv 02-20-86 587 02-20-86 588 02-20-86 589 02-20-86 590 02-20-86 591 02-20-86 592 02-20-86 593 02-20-86 594 02-20-86 595 02-20-86 596 02-20-86 597 02-20-86 598 sv 02-20-86 599 sv 02-20-86 600 02-20-86 601 02-20-86 602 02-20-86 603 02-20-86 604 02-20-86 605 02-20-86 606 02-21-86 607 02-21-86 608 02-21-86 609 02-21-86 610 sv 02-21-86 611 02-21-86 612 02-21-86 613 02-21-86 614 02-21-86 615 02-21-86 616 02-21-86 617 02-21-86 618 .si 02-21-86 619 02-21-86 620 02-21-86 192.5 193.5 191.0 190.5 201.0 202.0 212.0 211.0 194.0 193.0 113.0 13.6 102.9 112.5 13.6 101.4 112.5 14.9 106.0 114.5 11.1 106.5 114.5 11.7 107.0 Job No. 285-256 - February 25, 1987 - Test Elev. (ft) ----- Maximum Moisture DW Reldtive Density Content Density Compaction (pcf) (%I (pcf) (%) ------- ----___- ------- ---------- 210.0 116.0 14.9 106.5 92 191.5 113.0 16.9 102.8 91 193.0 113.0 16.2 103.7 92 203.5 113.0 13.6 105.2 93 198.5 112.5 14.2 106.4 95 190.5 110.5 14.9 106.3 96 195.0 115.5 16.2 104.4 90 193.5 115.5 14.9 104.4 90 192.0 114.5 14.2 104.2 91 192.0 112.5 13.6 103.3 92 200.0 112.5 12.3 102.2 91 201.5 112.5 14.2 101.5 90 203.0 112.5 12.3 101.8 90 203.5 112.5 17.6 107.9 96 211.0 113.0 13.6 102.4 91 196.0 113.0 19.0 101.8 197.0 113.0 17.6 101.8 198.0 113.0 13.6 103.1 193.0 115.5 14.9 104.1 194.0 115.5 14.2 104.5 218.0 113.0 14.2 106.1 207.0 113.0 13.6 107.0 212.0 113.0 14.9 106.5 204.5 113.5 13.6 103.8 200.5 113.5 14.9 107.3 110.5 12.3 100.8 110.5 16.2 101.8 112.5 16.2 100.1 112.5 16.9 100.9 113.0 12.3 102.6 90 90 91 90 90 94 95 94 91 95 91 92 89 ckby614 90 91 91 90 94 93 93 A-18 - - - ..~ - - 631 632 633 634 635 - - 641 642 643 - 644 645 MOORE & TABER GEDTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date ---mm- ------ 621 02-21-86 198.0 114.5 12.3 107.0 93 622 02-24-86 197.0 113.0 12.3 104.0 92 623 02-24-86 200.0 113.0 12.3 105.0 93 624 02-24-86 201.0 113.0 11.7 103.1 91 625 02-24-86 191.0 113.0 13.6 103.8 92 626 02-24-86 215.0 114.0 16.9 102.1 90 627 02-24-86 223.0 112.5 17.6 102.5 91 628 02-24-86 227.0 112.5 16.2 104.1 93 629 sv 02-24-86 224.5 116.0 17.6 106.4 92 630 sv 02-24-86 196.0 113.0 11.1 103.5 92 sv 02-24-86 196.5 113.0 12.3 101.9 90 02-24-86 195.0 113.0 10.4 101.8 90 02-24-86 198.5 113.0 12.3 101.3 90 02-24-86 218.0 110.5 13.6 101.7 92 02-24-86 214.0 106.0 14.2 100.5 95 636 02-24-86 220.6 114.5 14.9 106.5 93 637 02-24-86 196.0 113.0 9.8 102.0 90 638 02-24-86 194.0 113.0 12.3 101.6 90 639 02-24-86 195.0 110.5 9.8 100.9 91 640 02-24-86 195.5 113.0 11.7 103.6 92 02-24-86 200.5 114.5 14.9 105.3 92 02-24-86 221.0 114.5 14.2 105.2 92 02-25-86 204.5 104.0 17.6 100.6 97 02-25-86 203.5 113.0 12.3 105.7 94 02-25-86 193.0 113.0 8.7 101.9 90 646 - 647 648 649 650 02-25-86 202.0 113.0 11.7 103.1 91 02-25-86 225.5 122.5 13.0 111.5 91 02-25-86 226.0 122.5 14.9 110.0 90 02-25-86 224.5 113.0 12.3 103.6 92 02-25-86 223.0 104.0 17.6 101.0 97 651 652 653 654 655 - 02-25-86 203.5 114.5 16.2 106.3 93 02-25-86 208.0 114.5 14.9 107.0 93 02-25-86 194.5 114.5 16.2 107.4 94 02-25-86 196.0 114.5 16.2 108.6 95 02-25-86 226.5 112.5 16.9 101.9 91 Job No. 285-256 - February 25, 1987 - A-19 Test Maximum Moisture Elev. Density Dry Content (ft) Density (pcf) (%) (pcf) ----- ------- -----___ --e--w- Table II (Continued) Reldtive Compaction (%) ---------- MOORE & TABER GEOTECHNICAL ENGlNEERS AND GEOLOGISTS - 656 02-25-86 657 02-25-86 658 02-25-86 -. 659 02-25-86 660 02-25-86 Test Test Number Date ------ --____ Test Maximum Elev. Density (ft) (pcf) ---a- -----mm Moisture Dry Content Density ($1 (PCf) -----v-w ----m-m Reldtive Compaction (%) ------D-v- 228.0 104.0 17.6 102.0 98 229.0 104.0 14.9 101.6 98 205.5 113.0 13.6 105.4 93 205.0 113.0 7.5 103.0 91 201.0 113.0 10.4 101.6 90 661 02-26-86 192.0 113.0 13.6 105.8 94 662 02-26-86 195.0 113.0 11.1 104.9 93 663 02-26-86 200.0 113.0 11.1 104.4 92 664 02-26-86 201.0 113.0 12.3 106.5 94 665 02-26-86 190.0 113.0 12.3 104.5 92 666 02-26-86 667 02-26-86 668 669 sd 02-26-86 02-26-86 670 sv 02-26-86 231.5 112.5 16.2 105.3 94 233.5 104.0 14.2 100.5 97 232.5 104.0 14.9 102.6 99 190.5 110.5 8.2 109.0 99 197.0 113.0 12.9 108.0 96 671 sv 02-26-86 195.0 113.0 8.6 109.6 97 672 sv 02-26-86 210.0 104.0 25.0 99.6 96 673 sv 02-26-86 197.0 113.0 14.3 108.0 96 674 02-26-86 174.0 113.0 10.4 109.2 97 675 sv 02-26-86 177.0 113.0 9.3 109.0 96 676 sv 02-26-86 197.0 113.0 12.3 106.7 94 677 02-26-86 231.0 104.0 13.6 100.5 97 678 02-26-86 234.5 104.0 14.2 101.9 98 679 02-26-86 235.0 104.0 14.9 102.3 98 680 02-27-86 233.5 110.5 14.9 101.1 91 681 02-27-86 220.5 106.0 14.9 100.0 94 682 02-27-86 230.0 106.0 14.9 101.3 96 683 02-27-86 232.0 113.0 16.2 102.2 90 684 02-27-86 229.0 113.0 14.9 105.1 93 685 02-27-86 233.0 116.0 14.2 107.1 92 686 02-27-86 234.0 116.0 14.2 105.9 91 687 02-27-86 234.5 113.0 13.6 104.2 92 688 sv 02-27-86 194.0 113.0 13.6 108.3 96 689 sv 02-27-86 197.0 113.0 12.4 110.9 98 690 sv 02-27-86 211.0 113.0 11.0 91.1 81 &by691 Job No. 285-256 - February 25, 1987 - A-20 Table II (Continued) - - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date ------ ------ Test Maximum Moisture Dry Elev. Density Content Density (ft) (pcf) ('PI (pcf) ----- ------- -------- ------- Reldtive Compaction (%I ---------- 691 sv 02-27-86 211.0 113.0 11.0 105.3 93 692 sv 02-27-86 214.0 112.5 17.6 102.5 91 693 sv 02-27-86 214.0 112.5 17.6 102.5 91 694 02-27-86 232.5 104.0 16.2 99.3 95 695 02-27-86 235.5 104.0 16.2 100.3 96 696 02-27-86 236.5 104.0 14.9 101.6 98 697 02-27-86 237.0 104.0 16.2 99.8 96 698 sv 02-27-86 210.0 114.5 12.4 107.9 94 699 sv 02-27-86 210.0 114.5 12.4 102.5 90 700 sv 02-27-86 197.0 114.5 11.1 104.9 92 701 sv 02-27-86 702 sv 02-27-86 703 sv 02-27-86 704 sv 02-28-86 705 sv 02-28-86 706 sv 02-28-86 707 sv 02-28-86 708 02-28-86 709 02-28-86 710 02-28-86 197.0 114.5 11.1 104.7 92 210.0 112.5 19.0 101.2 90 210.0 112.5 19.0 103.1 92 197.0 113.0 9.9 102.1 90 200.0 113.0 12.4 108.8 96 200.0 113.0 12.4 102.9 91 204.0 113.0 11.1 110.8 98 237.0 115.5 16.2 103.6 90 233.5 115.5 16.2 105.6 91 235.0 115.5 14.9 106.1 92 711 02-28-86 180.0 114.5 16.2 103.4 90 712 02-28-86 182.5 110.5 11.1 101.1 91 713 02-28-86 184.0 110.5 10.4 100.0 90 714 02-28-86 186.0 110.5 13.6 102.9 93 715 02-28-86 187.5 106.0 14.9 99.0 93 716 02-28-86 717 sv 02-28-86 718 sv 02-28-86 719 sv 02-28-86 720 sv 02-28-86 721 sv 02-28-86 722 sv 02-28-86 723 sv 02-28-86 724 02-28-86 725 sv 02-28-86 .- 190.0 106.0 16.2 98.8 93 204.0 113.0 11.1 102.3 91 215.0 113.0 17.0 102.4 91 215.0 113.0 17.0 108.8 96 215.0 110.5 14.3 105.7 96 215.0 110.5 14.3 105.0 95 185.0 122.5 16.3 112.0 91 172.0 114.5 12.4 106.9 93 209.0 110.5 10.4 105.3 95 209.0 110.5 10.4 103.4 94 Job No. 285-256 - February 25, 1987 - A-21 Table II (Continued) - 726 02-28-86 727 02-28-86 728 02-28-86 ,- 729 02-28-86 730 02-28-86 731 03-03-86 190.0 112.5 13.6 104.5 93 732 03-03-86 190.0 116.0 14.9 105.1 91 733 03-03-86 189.0 116.0 14.2 105.6 91 734 03-03-86 199.0 116.0 14.2 106.6 92 735 03-03-86 196.0 116.0 16.2 107.2 92 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Table II (Continued) 736 03-03-86 737 03-03-86 738 sv 03-03-86 739 sv 03-03-86 740 sv 03-03-86 - 741 sv 03-03-86 742 sv 03-03-86 .-. 743 sv 03-03-86 744 sv 03-03-86 745 sv 03-03-86 .- 746 03-03-86 747 03-03-86 748 03-03-86 749 03-03-86 750 03-03-86 Test Test Number Date ------ ------ Test Maximum Moisture Dry Reldtive Elev. Density Content Density Compaction (ft) (pcf) (%) (pcf) (8) ---em ------- ---_--__ -----mm ---------- 186.5 112.5 14.2 104.9 93 191.0 112.5 16.2 104.9 93 191.5 116.0 16.2 107.5 93 194.0 116.0 14.2 108.9 94 195.0 113.5 13.6 107.7 95 190.0 122.5 16.3 116.9 95 180.0 114.5 14.9 109.8 96 208.0 113.0 8.1 103.8 92 208.0 114.0 5.3 102.7 90 210.0 110.5 11.7 99.9 90 210.0 113.0 11.7 103.8 92 210.0 110.0 11.1 100.6 91 210.0 110.0 11.1 104.8 95 212.0 106.0 12.4 98.2 93 212.0 106.0 12.4 98.8 93 193.0 116.0 14.2 105.9 91 188.0 116.0 14.2 108.2 93 238.0 114.5 13.6 103.6 90 232.5 114.5 14.2 104.0 91 236.0 113.0 14.2 104.5 92 751 03-03-86 .- 752 03-03-86 753 03-03-86 754 03-03-86 755 03-03-86 235.0 112.5 16.2 104.8 93 237.0 112.5 14.2 106.8 95 238.0 113.0 13.6 104.2 92 185.0 112.5 14.9 107.6 96 190.0 106.0 14.9 103.3 97 756 03-03-86 182.0 117.5 12.9 106.6 91 757 03-03-86 188.0 114.5 17.6 106.5 93 758 sv 03-03-86 226.0 113.0 16.2 99.1 88 ckby759 759 sv 03-03-86 226.0 113.0 16.2 102.4 91 760 03-04-86 239.0 113.0 14.2 104.3 92 Job No. 285-256 - February 25, 1987 A-22 - - - .- MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS - 766 03-04-86 .- 767 sv 03-04-86 768 03-04-86 769 sv 03-04-86 770 03-04-86 Test Test Number Date ----e- ---we- Test Maximum Moisture DW Reldtive Elev. Density Content Density Compaction (ft) (pcf) (8) (pcf) (2) ----- ----e-v ------me ------_ ---------- 761 03-04-86 242.0 113.0 12.3 107.2 95 762 03-04-86 241.5 113.0 11.7 106.3 94 763 03-04-86 293.0 114.5 14.9 106.0 93 764 03-04-86 291.5 114.5 16.2 105.8 92 765 sv 03-04-86 217.0 110.5 12.4 101.5 92 217.0 110.5 12.4 107.1 97 219.0 114.5 16.3 103.2 90 219.0 114.5 16.3 104.6 91 219.0 113.5 11.7 108.9 96 219.0 113.5 11.7 102.3 90 771 sv 03-04-86 214.0 113.5 11.1 102.9 91 772 03-04-86 214.0 113.5 11.1 106.4 94 773 sv 03-04-86 208.0 113.5 15.6 110.4 97 774 03-04-86 208.0 113.5 15.6 104.7 92 775 03-04-86 181.0 113.0 11.7 105.1 93 776 03-04-86 175.0 113.0 7.5 105.6 93 777 03-04-86 220.0 113.0 5.2 97.7 86 ckby778 778 03-04-86 220.0 113.0 13.6 103.1 91 779 03-04-86 214.0 110.5 12.4 95.6 87 &by786 780 sv 03-04-86 223.0 106.0 11.1 100.7 95 781 03-04-86 782 03-04-86 783 03-04-86 784 03-04-86 785 sv 03-04-86 229.0 113.0 10.4 101.7 90 219.5 113.0 14.2 105.6 93 192.0 116.0 14.9 106.8 92 225.0 110.5 13.6 101.4 92 225.0 110.5 13.6 108.4 98 186 sv 03-04-86 - 787 03-05-86 788 03-05-86 789 03-05-86 790 03-05-86 214.0 110.5 12.4 108.2 98 234.0 110.5 13.6 99.6 90 240.0 113.0 14.2 101.5 90 160.0 114.5 16.9 103.3 90 162.0 116.0 14.9 106.1 91 791 03-05-86 792 03-05-86 793 03-05-86 794 03-05-86 795 03-05-86 197.0 122.5 13.6 110.7 90 194.0 122.5 12.3 113.0 92 196.0 114.0 14.2 111.5 98 175.0 113.5 12.3 99.5 88 &by795 175.5 113.5 12.3 103.3 91 Job No. 285-256 - February 25, 1987 - A-23 Table II (Continued) - .- - - -. Test Test Number Date MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Table II (Continued) 796 03-05-86 180.0 116.0 14.2 105.4 91 797 03-05-86 185.0 114.0 16.2 107.5 94 798 03-05-86 183.0 114.0 16.2 109.6 96 799 03-05-86 165.0 121.5 14.2 112.0 92 800 03-05-86 163.0 121.5 14.9 112.1 92 801 sv 03-05-86 219.0 110.5 13.0 102.9 93 802 sv 03-05-86 218.0 113.5 13.0 103.9 92 803 sv 03-05-86 223.0 114.5 16.3 109.8 96 804 sv 03-05-86 222.0 110.0 12.4 105.6 96 805 sv 03-05-86 219.0 110.5 11.9 103.5 94 806 03-05-86 219.0 110.5 13.0 100.6 91 807 03-05-86 218.0 113.5 13.0 104.2 92 808 03-05-86 223.0 114.5 16.3 102.8 90 809 03-05-86 222.0 110.0 12.4 101.4 92 810 03-05-86 170.0 114.5 14.9 105.1 92 811 03-05-86 161.0 113.5 13.0 113.4 100 812 03-05-86 219.0 110.5 11.9 104.6 95 813 03-05-86 173.0 117.0 11.1 113.9 97 814 03-05-86 165.0 113.5 12.4 113.0 100 815 03-05-86 215.0 112.5 13.0 99.5 88 CkbY816 816 sv 03-05-86 215.0 112.5 13.0 103.5 92 817 03-06-86 214.0 110.5 12.4 99.6 90 818 03-06-86 218.0 110.5 13.0 102.3 93 819 03-06-86 223.0 114.5 17.7 104.8 92 820 03-06-86 220.0 110.5 14.3 98.1 89 ckby844 .- 821 03-06-86 162.0 822 03-06-86 159.0 823 03-06-86 176.0 824 03-06-86 172.0 825 03-06-86 180.0 826 - 827 828 829 830 03-06-86 03-06-86 03-06-86 03-06-86 03-06-86 169.0 182.0 184.0 190.0 192.0 113.5 114.0 114.0 114.0 117.0 113.5 113.5 113.5 113.5 113.5 Job No. 285-256 - February 25, 1987 - Test Elev. (ft) ---we Maximum Moisture Density Content (PCf) (2) ------- ----__-- 13.6 107.2 94 16.2 103.9 91 14.9 103.4 91 14.9 107.5 94 12.3 106.8 91 13.6 105.9 93 13.6 105.6 93 12.3 102.4 90 12.3 104.5 92 13.6 102.9 91 Dry Density (pcf) ------- Reldtive Compaction (%I ------me-- A-24 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Number 831 832 833 834 835 836 837 838 839 840 841 sv 842 sv Test Date Test Maximum Elev. Density (ft) (pcf) --we- ----e-w Moisture Dry Relgtive Content Density Compaction (%I (pcf) (%I ---_---_ ------- ---------- 03-06-86 187.5 113.5 14.2 103.6 91 03-06-86 185.0 113.5 13.6 104.9 92 03-06-86 191.5 112.5 19.0 101.5 90 03-06-86 190.0 112.5 19.0 102.1 91 03-07-86 239.0 115.5 11.7 107.7 93 03-07-86 240.0 115.5 11.7 108.8 94 03-07-86 187.0 117.5 14.9 107.9 92 03-07-86 192.0 117.5 15.6 107.7 92 03-07-86 182.5 117.5 16.9 108.8 93 03-07-86 168.0 121.5 16.2 109.9 90 03-07-86 03-07-86 214.0 110.5 12.4 101.7 92 218.0 110.5 13.0 105.8 96 223.0 114.5 17.7 104.0 91 220.0 110.5 14.3 100.5 91 215.0 112.5 17.6 109.3 97 843 sv 03-07-86 844 sv 03-07-86 845 sv 03-07-86 846 sv 03-07-86 222.0 112.5 13.6 104.8 93 847 03-07-86 200.0 113.0 13.6 104.4 92 848 03-07-86 200.0 113.0 14.3 105.7 94 849 03-07-86 215.0 112.5 17.6 102.6 91 850 03-07-86 215.0 112.5 13.6 102.3 91 851 03-07-86 170.0 113.5 16.3 103.2 91 852 03-07-86 165.0 113.5 14.9 102.1 90 853 03-07-86 203.0 114.5 13.6 105.2 92 854 03-07-86 197.0 112.5 20.5 102.5 91 855 03-07-86 197.0 112.5 17.6 104.3 93 856 03-07-86 - 857 03-07-86 858 03-07-86 859 03-07-86 860 03-07-86 208.0 112.5 25.0 96.6 86 &by258 208.0 112.5 19.8 99.8 89 &by259 208.0 112.5 20.5 103.3 92 208.0 112.5 19.8 101.0 90 171.0 115.5 17.6 105.7 92 861 03-07-86 175.0 115.5 862 03-07-86 174.0 113.5 ,~,- 863 03-07-86 178.0 113.5 864 03-07-86 185.0 115.5 865 03-07-86 191.0 115.5 16.2 106.5 92 14.2 109.4 96 14.9 108.0 95 17.6 107.4 93 16.2 108.0 94 Table II (Continued) Job NO. 285:256 - February 25, 1987 - A-25 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS .- c-L,- -- ,^--1 ~~ . . range II (conrlnueal .- 883 884 885 Test Test Number Date ------ --m--m Test Maximum Moisture Dry Elev. Density Content Density (ft) (pcf) (%) (PCf) ----- ------- ---_---_ ---e--m Releitive Compaction (%I -------__- 866 03-07-86 189.0 115.5 19.0 107.5 93 867 03-07-86 194.0 112.5 16.2 104.9 93 868 03-07-86 197.5 112.5 14.9 107.0 95 869 03-07-86 195.0 112.5 14.2 108.4 96 870 03-19-86 184.0 115.5 16.9 107.6 93 871 03-19-86 188.0 872 03-20-86 194.0 873 03-20-86 177.0 874 03-20-86 183.0 875 03-20-86 178.5 14.9 107.5 93 17.6 107.1 93 14.9 111.0 96 16.2 107.7 93 16.9 106.4 92 876 03-20-86 188.0 877 03-20-86 203.0 878 03-20-86 195.0 879 03-20-86 205.0 880 03-20-86 190.5 16.9 107.1 93 13.6 111.9 98 12.3 110.2 100 12.3 109.7 100 20.5 97.9 97 881 882 03-20-86 193.0 03-20-86 193.5 03-20-86 195.0 03-20-86 202.5 03-20-86 210.0 16.9 106.4 92 12.3 108.2 98 11.7 109.2 99 12.3 107.9 98 13.6 103.5 94 886 03-20-86 194.0 887 03-20-86 192.0 888 03-20-86 186.0 889 03-20-86 185.0 890 03-20-86 202.0 19.0 106.5 92 17.6 106.8 92 16.9 106.0 92 17.6 106.4 92 21.5 99.9 99 891 - 892 893 894 895 03-20-86 204.0 03-20-86 195.0 03-20-86 191.0 03-20-86 190.0 03-21-86 206.0 - 897 898 899 900 115.5 115.5 115.5 115.5 115.5 115.5 114.0 110.0 110.0 101.0 115.5 110.0 110.0 110.0 110.0 115.5 115.5 115.5 115.5 101.0 101.0 110.5 115.5 104.0 113.0 113.0 113.0 113.5 113.5 115.5 23.0 98.3 97 14.9 102.6 93 17.6 106.2 92 17.6 102.0 98 16.2 104.6 93 896 03-21-86 208.0 03-21-86 205.0 03-21-86 200.0 03-21-86 192.5 03-21-86 191.0 16.2 104.1 92 14.2 105.6 93 14.2 106.1 93 13.6 108.1 95 17.6 105.1 91 Job No. 285-256 - February 25, 1987 A-26 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS 901 03-21-86 194.0 902 03-21-86 198.0 903 03-21-86 199.0 904 03-21-86 203.0 905 03-21-86 204.0 906 - 907 908 909 - 910 911 .- 912 913 914 915 - 916 917 - 918 919 920 Test Test Number Date --m--m Test Maximum Moisture DV Relgtive Elev. Density Content Density (ft) Compaction (PCf) (8) (PC0 (0) -w-e- -----mm -----_-- a---_-- --------__ 03-21-86 179.0 03-21-86 177.0 03-21-86 208.0 03-21-86 209.0 03-21-86 212.0 03-21-86 210.5 03-21-86 211.0 03-21-86 170.0 03-21-86 164.0 03-21-86 181.0 03-21-86 179.0 03-24-86 213.0 03-24-86 211.5 03-24-86 270.5 03-24-86 276.5 921 03-24-86 213.0 922 03-24-86 210.0 923 03-24-86 206.0 924 03-24-86 203.0 925 03-24-86 186.0 926 03-24-86 181.0 927 03-24-86 179.0 928 03-24-86 188.5 929 03-24-86 208.0 930 03-24-86 212.0 931 03-24-86 209.0 - 932 03-24-86 211.5 933 03-24-86 215.5 934 03-24-86 213.5 935 03-24-86 184.0 Table II (Continued) 113.5 113.0 113.0 113.0 113.0 114.5 113.5 110.0 110.0 110.0 110.0 110.0 115.5 115.5 115.5 115.5 113.0 113.0 113.5 113.5 113.0 113.0 113.5 113.5 117.0 117.0 115.5 115.5 113.0 113.0 113.0 113.0 113.0 113.0 110.5 Job No. 285-256 - February 25, 1987 A-27 .- 14.2 107.8 95 13.6 109.5 97 14.9 108.9 96 13.6 104.2 92 13.6 105.6 93 16.9 105.0 92 14.9 108.2 95 13.6 100.8 92 12.3 103.4 94 14.2 108.9 99 14.2 108.4 99 16.2 108.2 98 14.9 111.4 96 19.0 106.2 92 17.6 106.8 92 17.6 107.1 93 12.3 102.7 91 13.6 102.6 91 12.3 104.5 92 14.2 104.5 92 17.6 103.7 92 14.2 105.9 94 11.7 108.8 96 12.3 108.8 96 16.9 105.4 90 16.2 106.7 91 16.2 107.7 93 14.9 109.6 95 12.8 105.5 93 13.6 105.4 93 13.6 106.3 94 13.6 105.6 93 13.6 106.1 94 13.6 106.7 94 12.3 99.7 90 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS -- 936 937 936 - 939 940 941 - 942 943 944 945 946 947 948 949 950 -- 951 952 953 954 955 Test Test Number Date Test Maximum Elev. Density (ft) (PCf) --em- ------_ Moisture DW Content Density (%I (pcf) -------- ------- Relgtive Compaction (%) ------ --m-m- -----e-m__ 03-24-86 185.0 113.5 13.6 105.6 93 03-24-86 214.5 113.0 12.3 110.4 98 03-24-86 215.0 113.0 12.3 108.8 96 03-24-86 210.0 113.5 12.3 109.1 96 03-24-86 211.5 113.5 11.7 108.8 96 03-24-86 210.5 113.5 13.6 108.4 96 03-25-86 217.0 112.5 13.6 104.7 93 03-25-86 219.0 113.5 14.2 105.2 93 03-25-86 213.5 113.5 14.2 106.3 94 03-25-86 189.0 117.0 18.3 107.3 92 03-25-86 186.0 117.0 14.2 108.4 93 03-25-86 189.5 117.0 16.2 105.8 90 03-25-86 192.0 114.0 12.3 106.1 93 03-25-86 196.0 110.5 14.2 104.0 94 03-25-86 217.0 113.0 10.4 102.9 91 03-25-86 219.0 113.0 11.7 105.6 93 03-25-86 220.0 113.0 12.3 105.7 94 03-25-86 221.0 113.0 13.6 106.7 94 03-25-86 195.0 117.0 10.4 97.8 84 &by955 03-25-86 195.0 117.0 16.9 106.9 91 956 03-25-86 196.0 117.0 16.9 106.9 91 957 03-25-86 216.5 115.5 16.2 108.7 94 958 03-25-86 218.0 113.5 14.9 109.3 96 959 03-25-86 222.0 113.0 13.6 107.4 95 960 03-25-86 223.0 113.0 12.3 110.0 97 961 - 962 963 964 965 03-25-86 221.0 113.0 13.6 109.3 97 03-25-86 221.5 113.0 11.7 109.2 97 03-25-86 223.0 113.5 14.2 108.7 96 03-26-86 217.0 112.5 12.3 103.8 92 03-26-86 215.0 112.5 12.3 105.2 94 966 967 - 968 969 970 03-26-86 223.0 113.0 11.7 107.9 95 03-26-86 220.5 113.0 13.6 107.0 95 03-26-86 219.0 112.5 14.2 104.3 93 03-26-86 218.5 112.5 16.2 102.9 91 03-26-86 219.0 113.0 13.6 106.6 94 Table II (Continued) Sob No. 285-256 - February 25, 1987 A-28 - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGBTS 981 982 983 984 985 .- 986 987 ..- 988 989 990 - 991 992 993 994 995 971 03-26-86 220.0 112.5 14.9 106.1 94 972 03-26-86 195.0 115.5 17.6 103.4 90 973 03-26-86 194.5 113.5 14.9 107.2 94 974 03-26-86 192.5 113.5 16.9 103.6 91 975 03-26-86 221.0 112.5 16.2 106.7 95 976 - 977 978 979 980 Test Test Number Date --__-- ---_-- Test Maximum Moisture DW Elev. Density Content Density (ft) (pcf) (%I (Pcf) ---_- ------- ---_---_ -----mm Reldtive Compaction (%) -------__- 03-26-86 223.5 03-26-86 190.0 03-26-86 188.0 03-26-86 188.0 03-26-86 194.0 03-26-86 193.5 03-26-86 196.0 03-26-86 195.5 03-26-86 169.0 03-26-86 173.0 03-27-86 190.0 03-27-86 194.0 03-27-86 192.5 03-27-86 193.0 03-27-86 195.0 03-27-86 195.0 03-27-86 196.5 03-27-86 178.0 03-27-86 171.0 03-27-86 182.0 996 - 997 998 999 1000 03-27-86 179.5 03-27-86 189.0 03-27-86 194.0 03-27-86 196.0 03-27-86 191.0 1001 03-28-86 196.5 1002 03-28-86 198.0 1003 03-28-86 203.0 1004 03-28-86 208.0 1005 03-28-86 194.0 113.0 117.0 117.0 117.0 117.0 117.0 115.5 115.5 113.5 115.5 110.5 115.5 110.5 115.5 115.5 110.0 110.0 110.5 117.0 117.0 117.0 113.0 113.0 113.0 113.0 113.0 113.0 113.0 113.0 113.0 12.3 105.6 93 16.9 106.7 91 17.6 104.7 89 ckby979 16.2 106.5 91 14.9 105.8 90 16.2 106.2 91 14.9 110.0 95 14.9 111.4 96 17.6 102.5 90 16.6 105.3 91 14.9 100.9 91 16.2 106.2 92 14.9 103.0 93 17.6 106.4 92 16.9 108.8 94 11.1 102.4 93 11.7 103.1 94 12.3 103.4 94 12.3 106.1 91 11.1 106.2 91 13.6 105.2 90 17.6 104.4 92 16.9 105.5 93 14.9 107.9 95 14.2 104.9 93 16.2 105.6 93 15.6 105.5 93 14.9 107.7 95 15.6 109.5 97 14.2 103.8 92 Job No. 285-256 - February 25, 1987 A-29 m-L,- -7 ,F.--La-._-a. sawer II ~uxmanuea~ MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date ------ ------ - 1006 1007 1008 .- 1009 1010 03-28-86 192.0 113.0 16.2 103.2 91 03-28-86 196.0 113.0 14.2 105.7 94 03-28-86 193.0 113.0 16.2 104.6 93 03-28-86 181.0 117.0 12.3 105.4 90 03-28-86 182.0 117.0 14.2 105.2 90 1011 - 1012 1013 1014 .~ 1015 1016 03-28-86 180.0 113.5 14.9 107.2 94 03-28-86 202.0 113.0 13.6 109.1 97 03-28-86 197.0 113.0 14.2 105.7 94 03-28-86 195.0 113.0 17.6 101.5 90 03-28-86 196.0 113.0 16.9 106.2 94 - 1017 1018 1019 1020 .- 03-28-86 186.0 114.0 17.6 106.6 94 03-28-86 184.0 114.0 14.9 109.6 96 03-28-86 185.0 114.0 16.9 106.0 93 03-29-86 187.0 117.0 12.3 107.2 92 03-29-86 184.0 117.0 16.9 106.4 91 1021 1022 - 1023 1024 1025 03-29-86 1190.0 117.0 16.2 107.9 92 03-29-86 193.0 117.0 13.6 106.7 91 03-29-86 197.0 117.0 13.6 107.5 92 03-29-86 197.5 113.0 14.2 108.5 96 03-29-86 199.5 113.0 12.3 108.8 96 - 1026 1027 1028 1029 1030 03-29-86 191.0 117.0 12.3 106.8 91 03-31-86 197.5 117.0 9.8 101.2 86 ckby1031 03-31-86 199.9 117.0 11.7 106.1 91 03-31-86 104.0 117.0 11.1 93.9 80 &by1030 03-31-86 104.0 117.0 14.9 106.5 91 1031 - 1032 1033 1034 1035 03-31-86 197.5 117.0 14.2 106.3 91 03-31-86 107.0 110.0 11.7 104.7 95 03-31-86 198.0 110.5 13.6 108.6 98 03-31-86 108.5 117.0 14.9 107.9 92 03-31-86 112.0 117.0 14.9 107.9 92 1036 - 1037 1038 1039 1040 - 03-31-86 116.0 117.0 13.6 107.9 92 03-31-86 106.5 110.5 15.6 104.5 95 03-31-86 100.5 110.5 14.9 106.0 96 03-31-86 190.5 121.5 13.6 111.4 92 03-31-86 193.0 121.5 9.8 112.7 93 Job No. 285-256 - February 25, 1987 Test Maximum Moisture Dry Elev. Density Content Density (ft) (PCf) (%) (pcf) --mm- ----m-e -------- ------- Table II (Continued) Relhtive Compaction ($1 ----_--___ A-30 .- - - .- - - .~- - - - - - - - - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Table II (Continued) Test Test Number Date ---me- ---_-- Test Elev. (ft) --w-v Maximum Density (pcf) ---m--m Moisture DW Content Density (%I (pcf) -------_ ---m--m Reldtive Compaction (%I ------____ 1041 03-31-86 198.0 106.0 17.6 104.8 99 1042 03-31-86 200.0 106.0 18.6 105.0 99 1043 03-31-86 200.5 113.5 14.3 103.3 91 1044 03-31-86 207.0 112.5 17.6 105.8 94 1045 03-31-86 197.0 112.5 19.8 107.2 95 1046 03-31-86 200.0 112.5 18.3 107.2 95 1047 03-31-86 204.0 111.8 13.0 100.3 90 1048 03-31-86 200.0 113.0 16.3 108.0 96 1049 03-31-86 200.0 114.0 18.3 108.5 95 1050 03-31-86 204.0 114.5 14.9 111.4 97 1051 03-31-86 182.0 115.5 13.0 108.9 94 1052 03-31-86 205.0 114.5 15.6 111.2 97 1053 03-31-86 180.0 113.5 18.3 108.7 96 1054 03-31-86 185.0 114.5 14.3 110.9 97 1055 04-01-86 200.0 113.0 14.3 106.6 94 1056 SV 04-01-86 203.0 113.0 11.7 102.8 91 1057 sv 04-01-86 200.0 113.0 11.1 103.8 92 1058 04-01-86 200.0 113.0 11.1 102.3 91 1059 sv 04-01-86 200.0 113.0 14.3 108.9 96 1060 04-01-86 200.0 113.0 14.3 106.7 94 1061 04-01-86 196.5 121.5 14.2 109.1 90 1062 04-01-86 100.0 110.5 14.2 101.5 92 1063 04-01-86 198.5 114.0 16.2 103.6 91 1064 04-01-86 199.5 114.0 14.9 105.6 93 1065 04-01-86 106.5 110.5 11.1 97.3 88 CkbY1066 1066 04-01-86 106.5 1067 04-01-86 196.0 1068 04-01-86 188.0 1069 04-01-86 191.0 1070 04-02-86 101.0 1071 04-02-86 103.0 1072 04-02-86 101.5 1073 04-02-86 114.5 1074 04-02-86 106.0 1075 04-02-86 104.0 110.5 115.5 113.0 114.0 117.0 117.0 117.0 113.5 113.0 113.0 12.3 101.3 92 14.9 112.6 97 13.6 102.2 90 14.2 106.1 93 11.7 110.1 94 12.3 110.2 94 11.7 112.0 96 14.9 105.8 93 12.3 105.6 93 11.7 107.9 95 Job No. 285-256 - February 25, 1987 A-31 .~ .- - - .- - ,- - - - 1086 SV 04-02-86 208.0 113.0 16.3 105.3 93 1087 SV 04-02-86 206.0 110.5 16.3 96.7 1088 88 Ckby1088 04-02-86 206.0 110.5 16.3 99.5 90 1089 04-02-86 206.0 113.0 9.9 104.5 92 1090 SV 04-02-86 206.0 113.0 9.9 107.9 95 1091 04-02-86 203.0 113.0 13.0 100.4 89 ckby1092 1092 sv 04-02-86 203.0 113.0 13.0 104.3 92 1093 04-02-86 203.0 113.0 13.0 105.0 93 1094 sv 04-02-86 203.0 113.0 13.0 103.7 92 1095 BV 04-02-86 206.0 113.0 13.6 101.4 90 1096 04-02-86 207.0 113.0 12.4 100.9 89 &by1092 1097 sv 04-02-86 113.0 113.0 12.4 101.4 90 1098 04-03-86 189.0 113.0 14.9 105.1 93 1099 04-03-86 203.0 111.8 9.9 101.5 91 1100 04-03-86 209.0 113.0 12.4 105.5 93 1101 04-03-86 115.5 1102 04-03-86 110.0 1103 04-03-86 112.0 1104 04-03-86 113.0 1105 04-03-86 112.5 1106 04-03-86 1107 04-03-86 1108 04-03-86 1109 04-03-86 1110 . 04-03-86 114.0 116.0 120.5 118.0 117.0 114.5 115.5 115.5 114.5 114.5 114.5 110.5 114.0 113.0 114.0 Job NO. 285-256 - February 25, 1987 - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date ----mm ----mm 1076 04-02-86 110.0 117.0 11.7 111.2 1077 04-02-86 112.0 117.0 13.6 110.7 1078 04-02-86 105.5 110.5 11.7 100.4 1079 04-02-86 111.0 117.0 12.3 110.0 1080 04-02-86 110.5 101.0 13.6 101.7 1081 04-02-86 205.0 113.0 14.9 106.4 1082 sv 04-02-86 205.0 113.0 14.9 107.3 1083 04-02-86 200.0 113.0 9.9 107.8 1084 SV 04-02-86 200.0 113.0 9.9 103.9 1085 04-02-86 208.0 113.0 16.3 103.5 17.6 109.5 96 16.9 109.6 95 15.6 109.3 95 16.2 108.2 94 16.2 109.4 96 Test Elev. (ft) --e-w Table II (Continued) Maximum Moisture D?=Y Relative Density Content Density Compaction (PCf) (%) (PCf) (%) --e---m -----_-_ ------- -------___ 95 95 91 94 101 94 95 95 92 92 15.6 110.5 97 12.3 103.6 94 14.2 106.8 94 14.9 105.4 93 13.6 110.5 97 A-32 - ~- .- .- Table II (Continued) Test Test Number Date Test Maximum Moisture Dry Elev. Density Content Density (ft) (pcf) (%) (PCf) --mm- ------- -------_ ------- - 1111 1112 1113 - 1114 1115 04-04-86 116.5 113.0 14.2 103.1 91 04-04-86 121.0 115.5 16.9 103.8 90 04-04-86 123.0 113.0 16.2 103.7 92 04-04-86 124.0 115.5 17.6 104.0 90 04-04-86 122.0 115.5 17.6 104.9 91 1116 - 1117 1118 1119 1120 04-04-86 123.0 115.5 16.2 109.4 95 04-04-86 124.5 115.5 14.9 111.4 96 04-04-86 126.0 115.5 11.1 114.3 99 04-04-86 130.0 115.5 16.2 106.5 92 04-04-86 132.0 113.0 16.9 101.9 90 1121 - 1122 1123 1124 1125 04-04-86 208.0 113.0 12.4 107.1 95 04-04-86 208.0 113.0 13.6 104.4 92 04-04-86 208.0 113.0 16.3 104.4 92 04-04-86 208.0 113.0 13.6 104.8 93 04-04-86 210.0 113.0 14.3 103.1 91 1126 1127 .~- 1128 1129 1130 04-04-86 208.0 113.0 12.4 104.8 93 04-04-86 203.0 113.0 19.0 101.2 90 04-04-86 200.0 112.5 18.3 105.8 94 04-04-86 193.0 112.5 19.0 105.5 94 04-04-86 208.0 113.0 17.6 103.2 91 - 1131 1132 1133 1134 1135 04-04-86 207.0 113.0 16.3 105.6 93 04-04-86 220.0 106.0 17.0 94.7 89 ckbyll40 04-04-86 203.0 113.0 16.3 105.6 93 04-04-86 211.0 112.5 17.6 101.7 90 04-04-86 208.0 113.0 14.3 102.2 90 1136 - 1137 1138 1139 1140 04-04-86 220.0 113.0 17.6 95.9 85 04-04-86 211.0 112.5 19.0 100.3 89 &by1140 04-04-86 203.0 113.0 16.3 104.6 93 04-04-86 211.0 101.0 16.3 99.0 98 04-04-86 220.0 112.5 17.6 106.7 95 1141 04-04-86 141.0 117.0 13.6 108.8 93 1142 04-07-86 127.5 104.0 19.0 99.1 95 1143 04-07-86 123.0 117.0 16.2 106.0 91 1144 04-07-86 120.0 104.0 20.5 97.4 94 1145 04-07-86 118.0 117.0 14.9 106.1 91 MOORE & TABER GEOTECHNICAL ENGINEERSANDGEOLOGISTS ---_-- Job No. 285-256 - February 25, 1987 A-33 Releitive Compaction (%I - - .- Table II (Continued) Test Test Number Date ------ ---m-v Test Maximum Elev. Density (ft) (pcf) --v-c ------- Moisture Content (%I ----e--v Dry Reldtive Density Compaction (pcf) (2) ------- ------____ - 1146 1147 1148 -~ 1149 1150 04-07-86 119.0 117.0 16.2 116.2 98 04-07-86 120.0 117.0 16.2 106.0 91 04-07-86 126.0 113.0 14.9 103.7 92 04-07-86 120.0 113.0 11.7 104.7 93 04-07-86 117.5 113.0 11.1 104.9 93 1151 04-07-86 200.0 113.0 14.2 108.4 96 1152 04-07-86 205.0 115.5 17.6 108.1 94 1153 04-07-86 203.5 113.0 13.6 105.6 93 1154 04-07-86 210.0 113.0 14.9 112.1 99 1155 04-07-86 203.0 116.0 16.9 108.1 93 1156 1157 .- 1158 1159 1160 04-07-86 198.5 116.0 17.6 106.6 92 04-08-86 122.0 116.0 14.9 108.4 93 04-08-86 119.0 117.0 16.2 108.4 93 04-08-86 202.5 116.0 19.0 107.2 92 04-08-86 201.0 116.0 19.0 107.9 93 1161 1162 1163 1164 1165 04-08-86 200.5 114.5 17.6 108.8 95 04-08-86 121.0 117.0 14.9 109.3 93 04-08-86 123.0 117.0 13.6 109.1 93 04-08-86 128.0 113.0 12.3 108.6 96 04-08-86 197.0 116.0 16.9 108.1 93 - 1166 1167 1168 1169 1170 04-08-86 200.0 116.0 17.6 106.8 92 04-08-86 133.0 114.5 19.0 102.6 90 04-08-86 205.0 114.5 17.6 105.6 92 04-08-86 207.0 114.5 17.6 105.1 92 04-08-86 125.0 115.5 19.0 106.3 92 1171 - 1172 1173 1174 1175 04-08-86 176.0 113.0 12.3 107.2 95 04-08-86 178.0 113.0 13.6 107.5 95 04-08-86 121.0 113.0 11.7 107.4 95 04-08-86 123.0 113.0 13.6 106.8 95 04-09-86 127.0 113.0 11.7 106.9 95 1176 - 1177 1178 1179 1180 - 04-09-86 126.5 113.0 11.1 105.3 93 04-09-86 130.0 113.0 13.6 106.5 94 04-09-86 122.5 113.0 14.2 106.4 94 04-09-86 123.0 113.0 13.6 107.5 95 04-09-86 135.0 116.0 16.2 108.2 93 Job No. 285-256 - February 25, 1987 - A-34 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS MOORE St TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS Table II (Continued) Test Test Number Date ------ --m--w Test Maximum Elev. Density (ft) (pcf) --s-c ---me-- Moisture DW Reldtive Content Density Compaction (%I (pcf) (%I ----e--w ------- ----m--m_- .- 1181 1182 1183 1184 1185 04-09-86 140.0 116.0 16.9 108.8 94 04-09-86 147.0 116.0 16.2 110.3 95 04-09-86 129.5 113.0 13.6 107.2 95 04-09-86 117.0 112.5 14.2 104.9 93 04-09-86 135.0 117.0 15.6 105.5 90 1186 04-09-86 162.5 101.0 23.0 95.9 95 1187 04-09-86 169.0 116.0 17.6 104.7 90 1188 04-09-86 147.0 113.0 10.4 108.8 96 1189 04-09-86 144.0 113.0 11.1 108.7 96 - 1190 04-09-86 139.0 101.0 25.0 95.3 94 1191 - 1192 1193 1194 1195 ,- 04-09-86 146.0 116.0 16.2 106.3 92 04-09-86 150.0 101.0 23.0 97.4 96 04-09-86 147.0 101.0 20.5 98.4 97 04-09-86 159.0 115.5 14.2 103.5 90 04-09-86 159.0 115.5 14.9 104.2 90 1196 04-09-86 137.0 115.5 17.6 103.7 90 1197 04-09-86 138.0 110.0 13.6 105.8 96 1198 04-09-86 142.0 113.0 11.7 109.4 97 1199 04-09-86 150.0 110.0 13.6 104.7 95 1200 04-09-86 131.0 110.0 13.6 101.4 92 ,- 1201 1202 1203 - 1204 1205 04-09-86 202.0 114.5 19.0 106.5 93 04-09-86 185.0 114.5 17.6 105.9 92 04-09-86 180.0 112.5 17.6 102.6 91 04-09-86 208.0 112.5 14.9 108.2 96 04-09-86 188.0 110.5 15.6 99.7 90 04-09-86 - 1206 1207 04-09-86 1208 04-09-86 1209 04-09-86 1210 04-09-86 188.0 110.5 11.1 102.2 92 209.0 113.0 15.6 104.3 92 210.0 116.0 17.6 107.4 93 207.0 111.8 14.3 103.8 93 201.0 114.5 19.0 104.5 91 1211 04-09-86 - 1212 04-09-86 1213 04-09-86 199.0 114.5 15.6 106.4 93 209.0 111.8 13.0 102.0 91 208.0 112.5 17.6 105.7 94 209.0 111.8 13.6 105.0 94 212.0 113.0 12.4 106.9 95 1214 04-09-86 1215 . 04-09-86 Job No. 285-256 - February 25, 1987 - A-35 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date --w--w ---mm- Test Maximum Moisture DW Elev. Density Content Density (f+-1 (pcf) (%I (pcf) --m-e --m-_-m -------_ ---_--_ Reldtive Compaction (8) -------__- - 1216 1217 1218 1219 1220 04-09-86 204.0 113.0 14.9 106.0 94 04-10-86 212.0 113.0 18.3 101.6 90 04-10-86 212.0 113.0 19.0 102.0 90 04-10-86 198.0 101.0 19.0 99.2 98 04-10-86 212.0 101.0 20.5 96.0 95 1221 - 1222 1223 1224 1225 04-10-86 164.0 115.5 14.9 104.4 90 04-10-86 159.0 113.0 13.6 106.6 94 04-10-86 139.5 113.0 11.7 103.8 92 04-10-86 140.0 106.0 12.3 104.7 99 04-10-86 144.0 104.0 17.6 100.3 96 1226 - 1227 1228 1229 1230 04-10-86 142.0 113.0 17.2 107.1 95 04-10-86 145.5 113.0 12.3 108.2 96 04-10-86 147.5 116.0 17.6 104.7 90 04-10-86 143.0 116.0 16.2 107.2 92 04-10-86 133.5 106.0 13.6 104.0 98 1231 1232 - 1233 1234 1235 04-10-86 135.5 116.5 14.2 104.5 90 04-10-86 134.5 116.5 11.7 106.7 92 04-10-86 152.5 112.5 19.0 101.1 90 04-10-86 147.0 104.0 20.5 98.7 95 04-10-86 139.0 106.0 14.9 104.4 98 - 1236 1237 1238 1239 1240 04-10-86 135.5 106.0 14.2 104.3 98 04-10-86 133.0 106.0 16.9 104.2 98 04-10-86 135.0 113.0 11.7 109.7 97 04-10-86 136.0 106.0 14.2 104.5 99 04-10-86 153.0 116.5 11.7 107.2 92 1241 - 1242 1243 1244 1245 04-10-86 212.0 112.5 16.3 105.7 94 04-10-86 198.0 112.5 15.6 105.9 94 04-10-86 209.0 104.0 21.2 99.8 96 04-10-86 210.0 116.0 17.6 104.9 90 04-10-86 197.0 113.0 14.9 104.5 92 1246 04-10-86 214.0 106.6 19.0 104.5 98 1247 04-10-86 197.0 114.0 22.7 103.1 90 1248 04-10-86 200.0 106.0 19.0 104.5 99 1249 04-10-86 214.0 101.0 22.7 97.8 97 1250 04-10-86 216.0 114.5 18.3 105.3 92 Job No. 285-256 - February 25, 1987 A-36 Test Number - 1251 1252 1253 1254 1255 1256 - 1257 1258 1259 ,- 1260 1261 1262 1263 1264 1265 1266 04-11-86 1267 04-11-86 1268 04-11-86 1269 04-11-86 1270 04-11-86 1271 04-11-86 1272 04-11-86 1273 04-11-86 1274 04-11-86 1275 04-11-86 1276 - 1277 1278 1279 1280 04-11-86 04-11-86 04-11-86 04-11-86 04-11-86 1281 1282 - 1283 1284 1285 04-11-86 04-11-86 04-11-86 04-14-86 04-14-86 Job No. 285-256 - February 25, 1987 A-37 MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS Table II (Continued) Test Date ------ 04-10-86 04-10-86 04-10-86 04-10-86 04-11-86 04-11-86 04-11-86 04-11-86 04-11-86 04-11-86 04-11-86 04-11-86 04-11-86 04-11-86 04-11-86 Test Maximum Moisture DW Reldtive Elev. Density Content Density Compaction (ft) (pcf) (%) (pcf) (%) ---we ------- ----e-e- ------- ---------- 215.0 113.0 16.3 103.4 92 216.0 106.0 19.0 104.7 99 215.0 113.0 15.6 103.8 92 216.0 101.0 22.7 98.5 98 102.0 114.0 25.0 96.6 85 ckby1258 108.0 114.0 20.5 104.8 92 103.0 114.0 22.7 99.6 87 &by1260 101.0 114.5 21.2 104.3 91 203.0 111.8 13.0 102.5 92 98.0 106.0 21.9 101.6 96 132.5 113.0 12.3 107.9 102 134.0 113.0 11.7 109.0 103 131.5 113.0 13.6 105.2 99 135.0 115.5 16.2 104.9 91 154.0 110.0 11.1 108.0 98 136.0 113.0 11.7 107.7 102 140.0 113.0 12.3 107.4 101 150.0 113.0 10.4 108.5 96 153.0 113.0 12.3 106.1 100 157.0 113.0 11.1 106.0 100 202.0 104.0 20.5 97.2 93 202.5 101.0 19.0 97.1 96 207.0 104.0 23.0 94.3 91 217.0 101.0 21.9 96.3 95 216.0 101.0 22.7 96.1 95 206.0 104.0 18.3 100.0 96 208.0 104.0 19.0 97.9 94 209.0 104.0 20.5 98.9 95 238.5 121.5 14.2 112.0 92 229.0 114.5 14.9 104.1 91 208.0 112.5 14.2 104.3 93 209.0 101.0 20.5 100.4 99 199.0 112.5 13.6 105.3 94 198.0 101.0 23.0 98.7 98 200.0 112.5 12.3 108.8 97 - Test Test Number Date MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGlSTS Table II (Continued) Test Maximum Moisture Dry Elev. Density Content Density (ft) (PW (%%) (pcf) --e-w ------_ ----___- ------_ Reldtive Compaction (%) ----______ 1286 sv 04-14-86 216.0 101.0 25.0 97.8 97 1287 04-14-86 210.0 113.0 11.7 105.9 94 1288 04-14-86 203.0 113.0 13.0 106.9 95 1289 04-14-86 191.0 112.5 11.1 108.3 96 1290 04-14-86 203.0 113.0 11.2 109.5 97 - 1291 04-14-86 202.0 112.5 14.2 104.3 93 1292 04-14-86 199.0 101.0 23.0 99.2 98 1293 04-14-86 211.0 113.0 13.0 107.1 95 1294 sv 04-14-86 216.0 101.0 24.2 96.1 95 1295 sv 04-14-86 214.0 101.0 24.2 93.4 92 1296 - 1297 1298 1299 1300 04-14-86 224.0 112.5 14.9 105.6 94 04-14-86 212.0 113.0 11.1 110.9 98 04-14-86 196.0 112.5 14.2 107.0 95 04-14-86 196.5 113.0 13.6 105.4 93 04-14-86 208.0 113.0 14.2 105.4 93 1301 04-14-86 231.0 116.0 16.2 110.8 96 1302 04-14-86 232.0 114.5 14.9 108.8 95 1303 04-14-86 233.5 116.0 13.6 108.8 94 1304 04-14-86 307.5 117.0 16.2 111.0 95 1305 04-14-86 310.5 115.5 16.2 104.6 91 -- 1306 1307 1308 - 1309 1310 04-14-86 313.5 117.0 15.6 106.7 91 04-14-86 315.0 117.0 12.3 110.0 94 04-14-86 316.0 111.8 13.6 105.2 94 04-14-86 233.0 116.0 14.2 107.0 92 04-14-86 234.0 116.0 13.6 108.4 93 .- 1311 04-14-86 235.5 116.0 14.2 108.4 93 1312 04-15-86 238.0 116.0 15.6 105.5 91 1313 04-15-86 239.5 116.0 14.9 105.6 91 1314 04-15-86 241.5 116.0 5.6 107.1 10 1315 04-15-86 242.0 114.5 13.6 110.7 97 1316 - 1317 1318 1319 1320 04-15-86 04-15-86 04-15-86 04-15-86 04-15-86 242.0 114.5 14.2 110.8 97 244.0 116.0 16.2 107.9 93 242.5 114.5 13.6 112.8 99 246.0 112.5 16.9 100.7 90 250.5 112.5 14.9 103.7 92 Job NO. 285-256 - February 25, 1987 - A-38 Test Test Number Date Maximum Density (pcf) ------ ------ Test Elev. (ft) ----- Moisture D?=Y Reldtive Content Density Compaction (%I (PCf) (%) -e---m-- ----m-w --------__ - 1321 1322 1323 1324 1325 04-15-86 220.0 104.0 20.5 97.9 94 04-15-86 221.0 101.0 23.5 91.9 91 04-15-86 222.0 101.0 22.0 94.4 93 04-15-86 220.0 101.0 20.5 96.4 95 04-15-86 222.0 101.0 25.0 96.4 95 1326 - 1327 1328 1329 1330 04-15-86 222.0 101.0 25.0 91.7 91 04-15-86 218.0 101.0 25.8 94.0 93 04-15-86 220.0 101.0 25.0 94.2 93 04-15-86 213.0 104.0 17.0 98.3 95 04-15-86 227.0 101.0 26.6 91.6 91 1331 - 1332 1333 1334 1335 04-15-86 165.0 116.5 14.9 107.5 92 04-15-86 173.5 116.5 14.2 108.6 93 04-15-86 154.0 122.5 13.6 111.4 91 04-15-86 248.5 104.0 17.6 98.9 95 04-15-86 250.0 104.0 19.0 98.8 95 1336 04-15-86 244.0 104.0 20.5 101.2 97 1337 04-15-86 246.0 104.0 17.6 102.0 98 - 1338 04-15-86 217.0 116.5 11.1 107.8 93 1339 04-15-86 218.0 104.0 19.0 96.1 92 1340 04-15-86 218.0 104.0 17.6 98.4 95 -. 1341 1342 1343 .- 1344 1345 04-15-86 224.5 04-15-86 223.0 04-16-86 169.0 04-16-86 160.5 04-16-86 149.5 113.0 101.0 112.5 117.0 116.5 13.6 106.3 94 22.0 95.6 95 11.7 102.7 91 14.2 106.8 91 13.6 111.2 95 1346 04-16-86 161.0 116.5 12.3 111.6 96 1347 04-16-86 177.0 112.5 11.1 106.2 94 1348 04-16-86 248.0 117.5 14.2 111.0 94 1349 04-16-86 249.0 112.5 12.3 106.5 95 1350 04-16-86 248.5 112.5 13.6 103.1 92 1351 04-16-86 250.0 112.5 14.2 101.7 90 - 1352 04-16-86 227.0 104.0 23.5 97.7 94 1353 04-16-86 225.0 101.0 26.6 91.2 90 1354 04-16-86 243.0 113.0 17.6 100.9 89 &by1358 1355 04-16-86 248.0 114.5 19.0 109.5 96 Job NO. 285-256 - February 25, 1987 A-39 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Table II (Continued) - MOORE & TABER GEOTECHNlCAL ENGINEERS AND GEOLOGISTS Table II (Continued) - Test Test Number Date ------ ------ .- 1356 1357 1358 - 1359 1360 04-16-86 225.0 114.0 14.9 105.8 93 04-16-86 228.0 106.0 19.0 101.0 95 sv 04-16-86 239.0 104.0 17.0 96.8 93 04-16-86 229.0 106.0 21.0 98.3 93 04-16-86 229.0 106.0 19.0 102.5 96 1361 - 1362 1363 1364 ,.. 1365 1366 1367 - 1368 1369 1370 - 04-16-86 168.5 113.0 12.3 102.0 90 04-16-86 174.0 113.0 13.6 102.9 91 04-16-86 152.0 112.5 14.9 100.9 90 04-16-86 156.0 113.0 16.2 105.3 93 04-16-86 162.0 112.5 17.6 102.9 91 04-16-86 154.0 112.5 16.9 102.1 91 04-16-86 225.0 104.0 25.0 98.1 94 04-16-86 235.0 101.0 25.0 92.6 92 04-16-86 216.0 104.0 22.7 99.8 96 04-16-86 236.0 112.5 17.6 102.0 91 1371 1372 -. 1373 1374 1375 04-16-86 136.5 116.5 11.7 111.9 96 04-16-86 138.0 116.0 17.6 109.5 94 04-16-86 140.0 115.5 12.3 110.2 95 04-16-86 144.0 116.0 13.6 112.3 97 04-16-86 144.0 117.0 14.9 109.8 94 - 1376 1377 1378 ..- 1379 1380 04-16-86 149.0 117.0 13.6 111.8 96 04-16-86 135.0 117.0 14.2 111.9 96 04-16-86 120.0 113.0 14.2 107.8 95 04-16-86 123.0 117.0 13.6 109.1 93 04-16-86 125.0 117.0 13.6 110.5 94 1381 - 1382 1383 1384 - 1385 03-16-86 236.0 101.0 23.5 90.5 90 03-16-86 233.0 112.5 20.5 101.1 90 03-16-86 250.0 106.0 16.3 97.9 92 03-16-86 237.0 101.0 25.0 92.8 92 03-16-86 254.0 106.0 17.6 102.2 96 1386 1387 -- 1388 1389 1390 - 03-16-86 236.0 101.0 25.0 89.9 03-17-86 140.0 117.0 14.2 108.9 03-17-86 130.5 113.0 13.6 111.2 03-17-86 128.0 113.0 14.2 109.9 03-17-86 127.0 113.0 14.91 109.6 Job No. 285-256 - February 25, 1987 - Test Maximum Moisture DV Relative Elev. Density Content Density Compaction (ft) (pcf) (%I (PC0 (%I --we- ------- --_---_- ------- ---------- 89 ckby1394 93 98 97 97 A-40 MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS Table II (Continued) Test Test Number Date ------ ---_-- ~- 1391 1392 1393 - 1394 1395 03-17-86 124.5 117.0 15.6 109.3 93 03-17-86 140.0 117.0 14.2 112.2 96 03-17-86 172.0 117.0 15.6 112.1 96 03-17-86 236.0 101.0 23.5 95.7 95 03-17-86 229.0 104.0 20.5 94.1 90 1396 - 1397 1398 1399 1400 03-17-86 228.0 114.5 15.6 103.8 03-17-86 232.0 101.0 25.0 94.9 03-17-86 262.0 106.0 18.3 97.7 03-17-86 262.0 106.0 22.0 99.2 03-17-86 227.0 106.0 14.9 98.7 1401 1402 - 1403 1404 1405 .- 04-17-86 129.0 104.0 19.0 97.4 04-17-86 257.0 114.5 19.0 100.5 04-17-86 257.0 114.5 17.6 103.2 04-17-86 251.0 116.0 13.6 104.2 04-17-86 255.0 104.0 16.9 100.6 1406 1407 - 1408 1409 1410 04-17-86 255.0 104.0 17.6 98.9 04-17-86 254.5 104.0 14.9 99.2 04-17-86 252.5 104.0 17.6 97.4 04-17-86 253.5 104.0 19.0 96.9 04-17-86 254.0 104.0 18.3 98.0 - 1411 1412 1413 1414 1415 04-17-86 156.0 117.0 14.9 111.5 04-17-86 158.0 106.0 23.5 97.7 04-17-86 159.0 104.0 17. 5 93.5 04-17-86 149.0 117.5 17.0 105.3 04-17-86 139.0 110.0 14.3 107.1 1416 - 1417 1418 1419 1420 04-17-86 142.0 111.8 14.9 110.9 99 04-17-86 142.0 111.8 14.9 110.9 99 04-17-86 142.0 113.0 17.0 105.5 93 04-17-86 146.0 lLO.0 11.1 104.2 95 04-17-86 146.0 110.0 10.5 106.2 97 1421 - 1422 1423 1424 1425 .- 04-17-86 151.0 115.a 12.4 102.0 93 04-18-86 141.0 110.0 11.1 102.4 93 04-18-86 146.0 110.0 12.3 100.8 92 04-18-86 151.0 110.0 14.2 102.9 94 04-18-86 135.0 113.0 13.6 105.1 93 Test Maximum Moisture Dry Elev. Density Content Density (ft) (pcf) (%I (pcf) ----- ---__-- -------- ------- Job No. 285-256 - February 25, 1987 - Reldtive Compaction ($1 ---------- 91 94 92 94 93 94 88 &by1403 90 90 97 95 95 94 93 94 95 92 90 90 97 A-41 - - Test Test Number Date ------ e-m-_- Test Maximum Elev. Density (ft) (Pcf) --m-e --m-_-m Moisture DW Content Density (%) (pcf) ------__ -----mm Reldtive Compaction (%) -----_____ - 1426 1427 1428 .- 1429 1430 04-18-86 131.0 110.0 11.7 104.7 95 04-18-86 139.0 110.0 10.4 106.8 97 04-18-86 143.0 110.0 10.4 103.6 94 04-18-86 259.0 101.0 27.4 93.6 93 04-18-86 262.0 101.0 28.2 90.3 89 Ckby1432 1431 - 1432 1433 1434 .- 1435 04-18-86 260.0 104.0 22.7 95.5 92 04-18-86 262.0 101.0 22.7 92.4 91 04-18-86 254.0 106.0 23.5 94.9 90 04-18-86 260.0 101.0 22.0 96.2 95 04-18-86 260.0 101.0 25.0 91.5 91 1436 - 1437 1438 1439 1440 -~ 04-18-86 236.0 114.5 13.6 101.9 04-18-86 236.0 114.5 19.0 103.4 04-18-86 229.0 114.5 14.9 106.2 04-18-86 262.0 112.5 14.9 104.5 04-18-86 260.0 106.0 21.2 97.6 89 ckby1437 90 93 93 92 1441 04-18-86 134.0 110.0 13.6 100.1 91 1442 04-18-86 152.0 110.0 11.7 102.9 94 1443 04-18-86 151.0 110.0 11.1 104.9 95 1444 04-18-86 149.0 116.0 14.9 111.4 96 1445 04-18-86 148.0 110.0 15.6 102.0 93 .- - 1446 04-18-86 144.0 110.0 12.3 105.4 96 1447 04-18-86 146.0 110.0 14.9 102.1 93 1448 04-18-86 140.0 110.0 11.1 104.5 95 1449 04-18-86 157.0 110.0 12.3 103.3 94 1450 04-18-86 153.0 110.0 11.7 101.5 92 1451 - 1452 1453 1454 - 1455 04-18-86 236.0 106.0 18.0 97.3 92 04-18-86 239.0 106.0 17.0 99.3 94 04-18-86 228.0 114.5 15.6 105.7 92 04-18-86 239.0 114.5 17.6 104.3 91 04-18-86 265.0 101.0 25.8 92.8 92 1456 - 1457 1458 1459 1460 04-18-86 265.0 101.0 28.2 88.5 88 ckby1457 04-18-86 265.0 101.0 28.2 92.2 91 04-21-86 264.0 101.0 19.0 98.4 97 04-21-86 263.5 101.0 23.0 93.1 92 04-21-86 264.5 101.0 25.0 92.4 91 MOORE & TABER GEOTECHNlCAL ENGINEERS AND GEOLOGISTS In-L,- YT ,“--A.1-..-A\ La”I.2 IL ,Lu‘rclnuru, Job No. 285-256 - February 25, 1987 - A-42 MOORE & TABER GEOTECHNCAL ENGINEERS AND GEOLOGlSTS - - .- Test Test Number Date 1466 - 1467 1468 1469 -. 1470 1471 - 1472 1473 1474 1475 - - 1478 1479 1480 Relhtive Compaction ($1 ------ ------ Test Maximum Elev. Density (ft) (Pcf) ----- ------- Moisture DV Content Density (%I (PC0 -------- ----WV- . 1461 1462 1463 .- 1464 1465 04-21-86 144.0 113.0 13.6 106.7 94 04-21-86 154.5 110.0 13.6 102.1 93 04-21-86 158.0 110.0 11.1 105.3 96 04-21-86 164.0 110.0 10.4 103.2 94 04-21-86 157.0 117.0 16.9 106.2 91 04-21-86 144.0 116.0 14.2 110.8 96 04-21-86 140.0 116.0 13.6 109.1 94 04-21-86 127.0 110.0 11.7 104.2 95 04-21-86 146.0 110.0 12.3 101.3 92 04-21-86 146.5 110.0 13.6 103.1 94 04-21-86 244.0 112.5 22.0 101.1 04-21-86 250.0 112.5 19.0 106.2 04-21-86 243.0 101.0 23.5 91.2 04-21-86 241.0 101.0 25.8 90.9 04-21-86 243.0 112.5 19.0 106.1 90 94 90 90 94 1476 1477 04-21-86 146.5 110.0 15.6 101.7 92 04-21-86 148.0 116.0 14.9 108.1 93 04-21-86 165.0 110.0 12.3 103.4 94 04-21-86 160.0 110.0 10.4 102.5 93 04-21-86 155.0 110.0 11.7 100.8 92 1481 04-21-86 243.0 101.0 24.2 91.9 91 1482 04-21-86 241.0 114.5 18.3 104.1 91 1483 04-21-86 234.0 114.5 19.8 104.5 91 1484 04-21-86 244.0 101.0 26.6 91.2 90 1485 04-21-86 230.0 115.5 19.0 104.2 90 - - .- - 1486 04-21-86 147.0 110.0 15.6 99.6 91 1487 04-21-86 148.0 110.0 13.6 102.8 93 1488 04-21-86 156.0 110.0 14.9 101.1 92 1489 04-21-86 158.0 110.5 16.2 101.5 92 1490 04-21-86 164.0 110.0 12.3 104.3 95 1491 sv 04-22-86 174.0 106.0 14.2 105.3 99 1492 sv 04-22-86 162.0 110.0 13.6 103.1 94 1493 04-22-86 168.0 106.0 14.9 104.6 99 1494 04-22-86 165.0 110.0 15.6 101.5 92 1495 04-22-86 146.0 106.0 16.2 102.5 97 Job No. 285-256 - February 25, 1987 A-43 - - Table II (Continued) MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date ----em ------ 1496 nu 04-22-86 147.0 106.0 18.3 99.4 94 1497 nu 04-22-86 155.0 106.0 19.0 100.8 95 1498 nu 04-22-86 170.0 106.0 20.5 99.2 94 1499 sv 04-22-86 175.0 106.0 19.0 97.2 92 1500 sv 04-22-86 169.0 106.0 17.6 96.7 91 - 1501 04-22-86 247.0 101.0 25.0 91.8 91 1502 04-22-86 249.0 106.0 16.2 101.2 95 1503 04-22-86 247.0 106.0 27.4 92.3 87 1504 04-22-86 238.0 117.5 17.6 106.0 90 1505 04-22-86 246.0 104.0 14.9 101.3 97 1506 - 1507 1508 1509 1510 ..~ 1511 1512 - 1513 1514 1515 04-22-86 250.0 106.0 25.0 96.9 91 sv 04-22-86 250.0 106.0 17.0 98.5 93 04-22-86 252.0 106.6 17.6 100.2 94 04-22-86 250.0 104.0 16.3 99.2 95 04-22-86 256.0 104.0 28.2 89.3 86 ckby1522 04-22-86 148.0 112.5 19.0 107.7 96 04-22-86 149.5 106.0 18.3 103.3 97 04-22-86 250.5 106.0 19.0 102.1 96 04-22-86 249.5 106.0 20.5 100.2 95 04-22-86 252.0 101.0 19.7 97.5 97 - 1516 1517 1518 ..~ 1519 1520 04-22-86 251.0 101.0 25.0 91.6 91 04-22-86 251.0 101.0 19.0 97.1 96 04-22-86 249.5 101.0 17.6 95.7 95 04-22-86 250.0 106.0 18.3 101.2 95 04-22-86 250.5 101.0 19.7 97.4 96 .~- 1521 1522 1523 1524 - 1525 04-22-86 259.0 112.5 19.8 102.0 91 04-22-86 256.0 106.0 17.0 102.9 97 04-22-86 251.0 106.0 14.9 101.3 96 04-22-86 259.0 114.5 17.0 107.9 94 04-22-86 253.0 113.0 19.0 108.4 96 1526 04-22-86 255.0 106.0 22.4 97.7 92 1527 04-23-86 247.5 112.5 17.6 108.1 96 1528 sv 04-23-86 242.0 113.0 14.2 105.1 93 1529 sv 04-23-86 244.0 113.0 12.3 103.6 92 1530 04-23-86 243.0 113.0 15.6 107.4 95 Test Maximum Moisture Dry Elev. Density Content Density (ft) (pcf) (%) (pcf) ---mm ---_--- -----mm- -----mm .- Job No. 285-256 - February 25, 1987 Reldtive Compaction (%I -----a---- A-44 - .~ - Test Test Number Date ------ ------ -- 1531 1532 1533 '1534 1535 04-23-86 251.0 104.0 23.5 98.8 95 04-23-86 248.0 101.0 28.2 91.3 90 04-23-86 251.0 106.0 22.7 95.0 90 04-23-86 249.0 106.0 23.5 93.1 88 ckby1535 04-23-86 249.0 101.0 28.2 85.8 85 &by1536 1536 .- 1537 1538 1539 1540 04-23-86 248.5 106.0 19.0 99.8 94 04-23-86 238.0 117.5 16.2 109.3 93 04-23-86 232.0 117.5 17.6 109.5 93 04-23-86 253.0 101.0 25.0 92.3 91 04-23-86 252.0 101.0 19.0 100.0 99 1541 . . 1542 1543 1544 1545 ,- 04-23-86 258.0 104.0 28.2 94.9 91 04-23-86 238.0 117.5 16.2 109.3 93 04-23-86 232.0 117.5 17.6 109.5 93 04-23-86 239.0 106.0 19.7 100.6 95 04-23-86 262.0 101.0 25.7 91.7 91 1546 1547 .~- 1548 1549 1550 04-23-86 261.0 101.0 25.8 92.8 92 04-23-06 261.0 101.0 26.6 90.4 90 04-23-86 250.5 106.0 20.5 99.7 94 04-23-86 252.0 106.0 19.0 101.1 95 04-23-86 257.0 106.0 19.7 101.5 96 - 1551 1552 1553 - 1554 1555 04-23-86 262.0 106.0 17.6 101.2 95 04-23-86 261.0 104.0 19.0 99.3 95 04-23-86 252.5 116.5 16.9 105.3 90 04-23-86 243.0 113.0 12.3 104.8 93 04-23-86 253.0 113.0 13.6 106.6 94 1556 - 1557 1558 1559 - 1560 04-23-86 251.0 113.0 14.2 107.1 95 04-23-86 245.0 101.0 20.5 96.6 96 04-23-86 253.0 104.0 19.7 94.7 91 04-23-86 262.0 104.0 23.0 95.9 92 04-23-86 253.5 113.0 14.9 102.8 91 1561 04-24-86 MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS .-. 1562 sv 04-24-86 1563 sv 04-24-86 1564 sv 04-24-86 1565 04-24-86 - 258.0 114.5 14.9 105.8 92 258.0 114.0 12.4 104.1 91 259.0 114.0 17.0 107.5 94 253.0 101.0 23.5 94.5 94 242.0 106.0 25.0 97.2 92 Job No. 285-256 - February 25, 1987 - Test Maximum Moisture DW Elev. Density Content Density (ft) (pcf) (%I (pcf) ----- ------- -------- ------- Table II (Continued) Relative Compaction (%) ---------- A-45 - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS - Table II (Continued) - - - ..- - - -~ - Test Test Number Date ------ ------ 1566 04-24-86 238.0 101.0 22.0 95.2 94 1567 04-24-86 232.0 101.0 23.5 95.4 94 1568 04-24-86 248.0 104.0 19.8 93.7 90 1569 04-24-86 260.0 101.0 25.0 91.7 91 1570 04-24-86 258.0 101.0 23.5 92.1 91 1571 04-24-86 260.0 101.0 21.2 95.3 94 1572 04-24-86 260.0 101.0 27.4 93.6 93 1573 04-24-86 261.0 106.0 20.1 101.1 95 1574 04-24-86 260.5 106.0 20.5 97.8 92 1575 04-24-86 260.0 101.0 23.5 95.7 95 1576 04-24-86 260.0 106.0 23.5 95.9 90 1577 04-24-86 261.0 106.0 22.0 95.9 90 1518 04-24-86 259.0 106.0 19.8 96.3 91 1579 04-24-86 262.0 104.0 25.0 95.2 92 1580 04-24-86 261.5 101.0 22.7 93.1 92 1581 04-24-86 177.0 115.5 13.6 104.0 90 1582 04-24-86 179.0 112.5 14.9 105.5 94 1583 04-24-86 176.0 115.5 14.2 107.3 93 1584 04-24-06 146.0 116.0 17.6 105.9 91 1585 04-24-86 157.0 106.0 16.9 101.2 95 1586 04-24-86 1587 sv 04-24-86 1588 sv 04-24-86 1589 04-24-86 1590 04-24-86 1591 04-24-86 1592 04-24-86 1593 04-24-86 1594 04-24-86 1595 04-24-86 151.0 106.0 15.6 101.2 95 151.0 110.0 14.2 107.4 98 147.5 110.0 13.6 104.3 95 158.0 110.0 11.7 102.2 93 153.0 110.0 11.1 104.9 95 180.0 114.5 15.6 105.8 92 145.5 110.0 12.3 104.7 95 148.0 104.0 19.0 96.8 93 157.5 106.6 16.2 103.2 97 152.5 104.0 14.9 101.1 97 1596 04-24-86 148.0 106.0 19.7 97.9 92 1597 04-24-86 147.0 106.0 15.6 102.0 96 1598 04-24-86 163.0 106.0 16.2 106.5 100 1599 04-24-86 155.0 106.0 16.2 104.3 98 1600 04-24-86 167.0 106.0 17.6 105.7 100 Test Maximum Moisture Dry Reldtive Elev. Density Content Density Compaction (ft) (pcf) (%I (pcf) (%) ----- ------- --_----- ---m-w- ---------- Sob No. 285-256 - February 25, 1987 A-46 MOOREZTABER GEOTECHNlCAL ENGINEERS AND GEOLOGISTS Table II (Continued) - Test Test Number Date ------ ----__ Test Maximum Moisture DV Elev. Density Content Density (ft) (pcf) (%) (pcf) ----- ------- -------- ------- Reldtive Compaction (%I ---------- ,- 1601 1602 1603 1604 1605 04-25-86 255.0 106.0 22.7 101.9 96 04-25-86 254.0 106.0 23.5 98.6 93 04-25-86 253.0 101.0 25.0 93.7 93 04-25-86 260.0 101.0 25.6 93.6 93 04-25-86 261.0 101.0 25.0 93.0 92 1606 - 1607 1608 1609 1610 04-25-86 262.0 101.0 20.5 94.3 93 04-25-86 261.0 106.0 20.5 98.6 93 04-25-86 261.0 104.0 23.5 94.3 91 04-25-86 262.0 104.0 25.0 94.4 91 04-25-86 262.0 104.0 25.0 93.8 90 1611 1612 - 1613 1614 1615 - 1616 1617 1618 1619 1620 04-25-86 262.0 106.0 22.0 100.7 95 04-25-86 262.0 104.0 22.0 94.9 91 04-25-86 262.5 101.0 29.8 91.4 90 04-25-86 262.0 104.0 25.0 93.9 90 04-25-86 254.0 101.0 27.4 89.6 89 &by1616 04-25-86 254.0 101.0 22.7 92.1 91 04-25-86 254.0 101.0 25.0 92.8 92 04-25-86 163.0 106.0 17.6 100.8 95 04-25-86 154.0 106.0 20.5 100.0 94 04-25-86 161.0 106.0 19.7 99.9 94 .- 1621 1622 1623 .-~ 1624 1625 04-25-86 166.0 106.0 17.6 105.2 99 04-25-86 156.0 115.5 13.6 105.6 91 04-25-86 170.0 106.0 15.6 101.9 96 04-25-86 171.0 115.5 14.9 109.3 95 04-25-86 149.0 113.0 12.3 105.6 93 1626 - 1627 1628 1629 1630 04-25-86 151.0 106.0 16.2 101.0 95 04-25-86 183.0 113.0 14.9 104.2 92 04-25-86 186.0 106.0 16.2 99.3 94 04-25-86 157.0 104.0 14.9 97.1 93 04-25-86 155.0 115.5 13.6 107.4 93 1631 1632 - 1633 1634 1635 04-25-86 174.0 113.0 12.3 111.4 99 04-25-86 172.0 113.0 14.2 108.2 96 04-25-86 175.0 106.0 16.9 101.9 96 04-25-86 174.0 113.0 15.6 104.3 92 04-25-86 173.0 113.0 13.6 107.5 95 Job No. 285-256 - February 25, 1987 A-47 - MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS - - Test Test Number Date ------ _- 1636 1637 1638 - 1639 1640 sv 1641 1642 1643 1644 - 1645 1646 1647 .- 1648 1649 1650 - 1651 1652 1653 1654 1655 -- 1656 1657 1658 - 1659 1660 1661 .- 1662 1663 1664 - 1665 1666 1667 - 1668 1669 1670 ----__ Test Maximum Moisture DW Elev. Density Content Density (ft) (pcf) ($1 (pcf) ----- ------- -------- ----_-_ Reldtive Compaction (%) ---------- 04-25-86 158.0 106.0 19.7 99.7 94 04-25-86 162.0 106.0 20.5 98.5 93 04-25-86 156.0 116.0 14.2 111.0 96 04-25-86 157.0 116.0 15.6 108.6 94 04-28-86 155.0 106.0 16.9 102.6 97 04-28-86 157.0 106.0 19.0 98.6 93 04-28-86 165.0 110.0 14.9 102.7 93 04-28-86 260.0 101.0 19.0 97.9 97 04-28-86 261.0 101.0 19.7 95.7 95 04-28-86 158.0 106.0 23.0 101.5 96 04-28-86 167.0 110.0 16.9 100.0 91 04-28-86 180.0 106.0 19.7 98.9 93 04-28-86 188.0 106.0 20.5 99.7 94 04-28-86 171.0 112.5 17.6 103.0 92 04-28-86 172.5 112.5 16.2 105.8 94 04-28-86 174.0 112.5 14.9 104.6 93 04-28-86 180.0 110.0 12.3 104.1 95 04-28-86 170.0 112.5 15.6 102.2 91 04-28-86 248.0 101.0 17.6 100.1 99 04-28-86 249.0 101.0 18.3 96.7 96 04-29-86 155.0 106.0 17.6 100.6 95 04-29-86 163.0 112.5 15.6 103.1 92 04-29-86 157.0 112.5 16.2 100.6 90 04-29-86 249.5 104.0 14.9 98.1 94 04-29-86 250.5 101.0 16.9 94.9 94 04-29-86 166.0 112.5 15.6 102.7 91 04-29-86 171.0 112.5 17.6 102.0 91 04-29-86 168.0 112.5 16.9 102.9 91 04-29-86 203.0 113.0 16.2 105.8 94 04-29-86 210.0 121.5 14.9 111.2 92 04-29-86 207.0 121.5 12.3 111.8 92 04-29-86 157.5 113.0 14.2 103.8 92 04-29-86 160.0 113.0 12.3 107.9 95 04-29-86 161.0 112.5 14.9 106.0 94 04-29-86 159.0 112.5 15.6 106.5 95 Table II (Continued) Job No. 285-256 - February 25, 1987 - A-48 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS - Table II (Continued) - Test Test Number Date _--e-m ------ Test Maximum Moisture DW Reldtive Elev. Density Content Density Compaction (ft) (PCf) (%) (pcf) (%I ---we --e---- ---w-v-- ------- _--------- 1671 04-29-86 1672 04-29-86 1673 04-29-86 1674 04-29-86 1675 04-29-86 200.0 104.0 14.9 101.8 98 205.0 104.0 16.9 99.4 96 184.5 113.0 14.9 107.2 95 163.0 106.0 15.6 102.4 97 164.0 113.0 14.9 106.5 94 1676 - 1677 1678 1679 .~ 1680 04-29-86 04-29-86 04-29-86 04-29-86 04-30-86 201.5 104.0 23.0 94.3 91 206.0 104.0 20.5 94.2 91 209.0 104.0 19.3 95.6 92 210.5 104.0 17.6 97.4 94 164.0 113.0 13.6 104.5 92 1681 1682 1683 1684 1685 - 1686 1687 1688 1689 1690 04-30-86 04-30-86 04-30-86 04-30-86 04-30-86 170.5 101.0 19.0 96.3 95 211.5 101.0 20.5 95.6 95 213.0 101.0 23.0 94.9 94 208.5 101.0 19.7 95.5 95 183.0 113.0 12.3 103.2 91 04-30-86 04-30-86 04-30-86 04-30-86 04-30-86 176.0 113.0 13.6 104.0 92 181.0 113.0 11.7 106.5 94 167.0 112.5 14.9 102.0 91 162.0 113.0 10.4 107.7 95 170.0 112.5 14.2 99.8 89 ckby1691 .- 1691 1692 1693 -~ 1694 1695 04-30-86 04-30-86 04-30-86 04-30-86 04-30-86 170.0 112.5 14.2 102.1 91 178.0 112.5 14.9 103.0 92 174.0 113.0 13.6 106.1 94 212.0 101.0 15.6 100.5 100 213.0 101.0 19.7 95.6 95 1696 - 1697 1698 1699 1700 04-30-86 04-30-86 04-30-86 04-30-86 04-30-86 207.5 101.0 15.6 98.1 97 210.0 101.0 19.7 101.0 100 213.0 101.0 20.5 97.6 97 141.5 113.0 14.2 104.4 92 179.5 112.5 14.9 102.1 91 1701 .- 1702 1703 1704 1705 05-01-86 05-01-86 05-01-86 05-01-86 05-01-86 142.0 106.0 16.9 103.3 97 145.0 112.5 14.2 104.3 93 176.0 113.0 11.7 107.4 95 176.0 113.0 13.6 103.3 91 203.0 106.0 13.6 106.1 100 Job No. 285-256 - February 25, 1987 A-49 - - - Test Test Number Date ------ ----_- - 1706 1707 1708 1709 1710 05-01-86 200.0 106.0 17.6 105.6 100 05-01-86 193.0 113.0 14.2 106.3 94 05-01-86 178.5 101.0 19.7 96.7 96 05-01-86 186.5 106.0 19.0 103.0 97 05-01-86 179.0 106.0 19.7 101.5 96 1711 1712 1713 1714 -.. 1715 1716 1717 .- 1718 1719 1720 - 1721 1722 05-01-86 179.0 106.0 17.6 104.0 98 05-01-86 182.0 106.0 16.9 103.5 98 05-01-86 181.0 106.0 17.6 101.8 96 05-01-86 176.0 106.0 17.3 102.4 97 05-02-86 176.0 106.0 16.9 105.3 99 05-02-86 171.0 104.0 18.3 100.7 97 05-02-86 183.0 106.0 17.6 102.7 97 05-02-86 173.0 106.0 19.0 102.0 96 05-02-86 178.0 106.0 19.7 101.0 95 05-02-86 184.0 106.0 18.3 100.4 95 -. 1723 1724 1725 05-02-86 189.0 101.0 19.7 98.0 97 05-02-86 193.0 104.0 17.6 101.3 97 05-02-86 197.0 106.0 15.6 104.3 98 05-02-86 191.0 101.0 19.0 99.2 98 05-02-86 194.0 101.0 14.9 99.2 98 - 1726 1727 1728 - 1729 1730 05-02-86 205.0 101.0 17.6 96.4 95 05-05-86 172.0 112.5 14.9 108.6 97 05-05-86 180.0 106.0 19.7 103.4 98 05-05-86 192.5 112.5 14.9 107.2 95 05-05-86 176.5 101.0 18.3 96.2 95 1731 .- 1732 1733 1734 1735 05-05-86 181.0 112.5 16.2 101.3 90 05-05-86 193.0 112.5 14.9 103.0 92 05-05-86 175.5 112.5 16.9 102.3 91 05-05-86 183.0 106.0 17.6 98.8 93 05-05-86 194.0 112.5 14.9 104.7 93 1736 05-05-86 MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS 1737 sv 05-06-86 1738 sv 05-06-86 1739 sv 05-06-86 1740 05-06-86 .- Test Maximum Moisture Elev. Density Content (ft1 (pcf) (%I ---me ------- -------- DrY Density (pcf) ----e-e Rela'tive Compaction (0) -_-__-____ 177.0 112.5 16.2 102.4 91 178.0 101.0 18.3 99.1 98 183.0 101.0 16.9 96.2 95 192.0 106.0 15.6 103.2 97 186.0 113.5 17.6 106.1 93 Table II (Continued) Job No. 285-256 - February 25, 1987 A-50 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Table II (Continued) - Test - Number ----__ Test Date ------ Test Maximum Moisture Dry Elev. Density Content (ft) Density (pcf) ($1 (pcf) ----- ------- ------me ------- - 1741 1742 1743 - 1744 1745 05-06-86 180.0 113.5 16.9 106.0 93 05-06-86 213.0 112.5 16.2 105.8 94 05-06-86 217.0 112.5 17.2 102.7 91 05-06-86 180.0 112.5 16.9 105.5 94 05-06-86 185.0 104.0 16.9 100.9 97 1746 .- 1747 1748 1749 1750 05-06-86 189.5 104.0 19.7 97.4 94 05-07-86 183.0 112.5 14.9 103.2 92 05-07-86 187.0 106.0 17.6 100.0 94 05-07-86 189.0 112.5 16.2 103.7 92 05-07-86 126.0 117.0 16.2 106.5 91 1751 - 1752 1753 1754 1755 - 05-07-86 132.0 117.0 14.9 108.9 93 05-07-86 135.0 110.5 8.7 99.4 90 05-07-86 137.0 110.5 14.2 102.6 93 05-07-86 134.5 110.5 12.3 102.4 93 05-07-86 217.0 112.5 17.6 100.8 90 1756 1757 -- 1758 1759 1760 05-07-86 219.0 104.0 19.0 98.6 95 05-07-86 213.0 104.0 19.7 95.2 92 05-07-86 187.0 113.0 12.3 106.8 95 05-07-86 185.0 114.5 16.9 103.6 90 05-07-86 188.0 116.0 16.2 104.8 90 - 1761 1762 1763 - 1764 1765 05-08-86 191.0 113.0 17.6 104.7 93 05-08-86 188.0 115.5 18.3 105.1 91 05-08-86 122.0 106.0 15.6 100.3 95 05-08-86 119.0 106.0 16.9 100.0 94 05-08-86 135.0 110.5 12.3 105.6 96 1766 - 1767 1768 1769 - 1770 05-08-86 138.0 110.5 14.2 104.5 95 05-08-86 140.0 110.5 7.5 100.6 91 05-08-86 143.0 110.5 13.6 103.1 93 05-08-86 164.0 106.0 14.9 103.2 97 05-08-86 169.0 106.0 13.6 102.6 97 1771 - 1772 1773 1774 1775 05-08-86 174.0 106.0 14.2 99.8 94 05-08-86 180.0 106.0 14.9 98.7 93 05-09-86 139.0 117.0 16.2 106.2 91 05-09-86 141.0 110.5 13.6 104.0 94 05-09-86 144.5 117.0 13.6 107.0 91 Job No. 285-256 - February 25, 1987 A-51 Relakive Compaction (%) ---_--___- - .- ,_ - MOORE & TABER GEOTECHNICAL ENGlNEERSAND GEOLOGISTS Test Test Number Date --m-e- e----e .- 1776 1777 1778 - 1779 1780 sv 05-09-86 143.5 117.0 13.6 108.7 93 sv 05-09-86 140.0 117.0 12.3 108.3 93 05-09-86 95.0 113.0 14.9 103.7 92 05-09-86 98.0 113.0 14.9 105.8 94 05-09-86 100.0 113.0 14.2 105.6 93 1781 sv 05-12-86 96.5 113.0 14.2 104.6 93 1782 sv 05-12-86 99.0 113.0 13.6 107.3 95 1783 05-12-86 124.0 101.0 19.0 95.3 94 1784 05-12-86 126.0 113.0 12.3 106.6 94 1785 05-12-86 191.0 110.0 14.2 104.2 95 1786 1787 .- 1788 1789 1790 - 1791 1792 05-12-86 189.0 115.5 18.3 104.3 90 05-12-86 128.0 101.0 19.7 95.9 95 05-12-86 127.0 101.0 23.0 94.8 94 05-12-86 194.0 113.0 13.6 104.2 92 05-12-86 129.0 104.0 18.3 99.5 96 - 1793 1794 1795 05-13-86 196.0 113.0 12.3 106.1 94 05-13-86 194.0 113.0 11.1 106.4 94 05-13-86 192.0 113.0 9.8 106.9 95 05-13-86 131.0 112.5 15.6 103.3 92 05-13-86 133.0 112.5 17.6 103.0 92 - 1796 1797 1798 - 1799 1800 05-13-86 136.5 113.0 13.6 103.7 92 05-13-86 100.0 113.0 14.2 105.0 93 05-13-86 102.0 113.0 13.6 104.9 93 05-13-86 103.0 113.0 10.2 102.2 90 05-13-86 105.0 113.0 16.9 102.1 90 1801 .- ‘1802 1803 1804 - 1805 05-13-86 106.5 112.5 14.2 103.3 92 05-13-86 109.0 112.5 16.2 102.4 91 05-13-86 112.0 113.0 16.9 103.5 92 05-13-86 118.0 113.0 16.9 103.1 91 05-14-86 234.0 114.5 16.2 104.6 91 1806 1807 -- 1808 1809 1810 ..- 05-14-86 235.0 114.5 14.9 106.6 93 05-14-86 114.0 112.5 14.2 106.6 95 05-14-86 119.0 113.0 13.6 104.4 92 05-14-86 115.5 112.5 12.3 106.3 94 05-14-86 120.0 113.0 14.9 104.6 93 Test Maximum Moisture Dry Reldtive Elev. Density Content Density Compaction (ft) (pcf) (0) (pcf) (%) --m-e ----mm- -------- ---me-- ---------- Table II (Continued) Job No. 285-256 - February 25, 1987 A-52 - - .- Test Test Number Date ------ ------ Test Maximum Elev. Density (ft1 (pcf) ----- ----w-m Moisture Content 0) ------me Dry Relative Density Compaction (PCf) (%I ------- ------mm__ -- 1811 1812 1813 1814 1815 05-14-86 194.0 116.5 15.6 105.7 91 05-14-86 196.0 116.5 14.2 106.3 91 05-14-86 118.0 112.5 17.6 105.2 94 05-14-86 122.0 112.5 16.9 104.7 93 05-14-86 197.0 116.5 14.2 105.6 91 1816 ..- 1817 1818 1819 - 1820 05-14-86 198.5 113.0 13.6 104.9 93 05-14-86 198.0 113.0 14.9 105.6 93 05-15-86 203.0 106.0 14.2 100.3 95 05-15-86 201.0 106.0 16.9 99.7 94 05-15-86 174.0 112.5 13.6 104.0 92 1821 1822 - 1823 1824 1825 05-15-86 168.0 112.5 14.9 103.9 92 05-15-86 204.5 114.5 13.6 107.7 94 05-15-86 205.5 114.5 14.2 106.4 93 05-15-86 123.0 113.0 14.2 105.0 93 05-15-86 126.5 113.0 13.6 106.5 94 1826 05-15-86 188.0 106.0 15.6 101.5 96 1827 05-15-86 191.0 106.0 17.6 100.3 95 1828 05-15-86 207.0 114.5 16.2 106.5 93 1829 05-15-86 197.5 104.0 14.9 97.8 94 1830 05-15-86 198.0 104.0 15.6 98.4 95 .~ 1831 1832 1833 - 1834 1835 05-15-86 197.0 114.5 14.9 104.7 91 05-15-86 165.0 114.5 14.2 105.0 92 05-16-86 168.0 114.5 14.9 106.1 93 05-16-86 170.0 114.5 13.6 105.9 92 05-16-86 197.0 113.0 14.9 106.7 94 '1836 - 1837 1838 1839 1840 05-16-86 205.0 113.0 16.2 106.3 94 05-16-86 193.0 112.5 15.6 102.4 91 05-16-86 209.5 113.0 13.6 106.5 94 05-16-86 211.0 113.0 14.2 104.9 93 05-16-86 177.0 114.5 12.3 107.5 94 1841 - 1842 1843 1844 1845 05-16-86 174.0 113.0 14.2 103.5 92 05-16-86 176.0 113.0 13.6 106.1 94 05-16-86 212.0 113.0 14.2 108.2 96 05-16-86 210.0 113.0 12.3 108.9 96 05-16-86 202.0 113.0 14.9 108.9 96 Job No. 285-256 - February 25, 1987 A-53 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Table II (Continued) - - -- - .- .- .- .- .- .~ - - .- 1866 05-19-86 219.0 101.0 19.7 97.4 96 1867 sv 05-20-86 195.0 113.5 12.3 107.2 94 1868 sv 05-20-86 190.0 113.5 13.6 107.8 95 1869 sv 05-20-86 188.0 113.0 14.2 106.1 94 1870 05-20-86 133.5 116.5 11.1 104.4 90 1871 05-20-86 135.0 114.5 11.7 108.8 95 1872 05-20-86 136.0 114.5 12.3 107.4 94 1873 05-20-86 188.0 104.0 17.6 98.8 95 1874 05-20-86 190.0 104.0 19.7 95.5 92 1875 05-20-86 138.0 106.0 23.0 96.7 91 1876 05-20-86 1877 sv 05-20-86 1878 sv 05-20-86 1879 05-20-86 1880 05-20-86 142.0 106.0 20.5 99.5 94 191.0 113.0 14.2 106.0 94 193.0 113.5 13.6 104.8 92 192.0 106.0 17.6 102.2 96 198.0 106.0 19.0 101.6 96 Job No. 285-256 - February 25, 1987 - MOORE & TABER GEOTECHNlCAL ENGINEERS AND GEOLOGISTS Test Test Number Date 1846 05-16-86 178.5 110.0 13.6 100.3 91 1847 05-19-86 181.0 110.0 12.3 100.9 92 1848 05-19-86 185.0 110.0 13.6 101.9 93 1849 05-19-86 207.0 113.0 13.6 105.4 93 1850 05-19-86 206.0 113.0 12.3 108.3 96 1851 05-19-86 207.0 113.0 12.3 109.7 97 1852 05-19-86 209.0 113.0 13.6 107.9 95 1853 05-19-86 210.0 113.0 13.6 106.1 94 1854 05-19-86 255.0 114.0 13.0 102.6 90 1855 05-19-86 258.0 104.0 15.6 99.6 96 1856 05-19-86 258.0 106.0 13.6 98.2 93 1857 05-19-86 251.0 116.5 13.0 104.7 90 1858 05-19-86 188.0 106.0 17.6 103.2 97 1859 05-19-86 193.0 106.0 19.0 102.8 97 1860 05-19-86 185.0 113.0 15.6 103.1 91 1861 05-19-86 188.0 110.0 12.3 102.5 93 1862 05-19-86 183.0 110.0 13.6 100.3 91 1863 05-19-86 212.0 114.5 14.2 104.0 91 1864 05-19-86 215.0 114.5 14.2 105.0 92 1865 05-19-86 218.0 101.0 16.9 101.7 101 Test Elev. (ft) ----- Table II (Continued) Maximum Moisture Dry Relative Density Content Density Compaction (pcf) (%) (pcf) (%I -mm---- -------- ---me-- ---___--__ A-54 - -. MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date ------ ------ Relative Compaction (%I ------mm__ 1881 1882 1883 - 1884 1885 05-21-86 201.0 106.0 19.7 103.1 97 SV 05-21-86 191.0 112.5 20.5 104.4 93 sv 05-21-86 196.0 112.5 20.5 104.5 93 sv 05-21-86 199.0 112.5 19.0 101.0 90 05-21-86 197.0 112.5 14.9 101.6 90 1886 - 1887 1888 1889 1890 05-21-86 201.0 112.5 15.6 106.5 95 05-21-86 204.0 104.0 15.6 103.2 99 05-21-86 148.0 116.0 16.2 106.3 92 05-21-86 187.0 113.0 12.3 107.7 95 05-21-86 189.0 113.0 13.6 108.4 96 1891 1892 1893 1894 1895 -- 1896 1897 1898 - 1899 1900 05-21-86 190.0 113.0 13.6 105.6 93 05-21-86 153.0 113.0 11.1 108.1 96 05-21-86 158.0 113.0 13.6 104.9 93 05-21-86 162.0 113.0 14.2 107.1 95 05-21-86 164.0 114.5 12.3 108.2 94 05-22-86 170.0 113.0 13.6 105.1 93 05-22-86 182.0 114.5 14.2 107.7 94 05-22-86 148.0 113.0 11.7 107.4 95 05-22-86 150.0 113.0 14.2 107.8 95 05-22-86 175.0 113.0 11.1 107.6 95 .- 1901 1902 1903 .- 1904 1905 05-22-86 177.0 113.0 12.3 109.5 05-22-86 157.0 114.5 s.9 103.0 05-22-86 152.0 113.0 12.3 103.2 05-22-86 155.0 113.0 12.3 104.1 05-22-86 192.0 106.0 16.2 98.4 2 91 92 93 1906 05-22-86 194.0 106.0 16.9 97.3 92 1907 05-22-86 196.0 104.0 15.6 98.6 95 1908 05-22-86 180.0 114.5 14.2 103.3 90 1909 05-22-86 180.0 114.5 14.2 107.7 94 1910 05-22-86 184.0 114.5 13.6 106.8 93 1911 1912 1913 1914 1915 - 05-23-86 189.0 106.0 14.9 102.8 97 05-23-86 186.0 106.0 15.6 103.4 98 05-23-86 154.0 106.0 16.2 99.3 94 05-23-86 157.0 113.0 12.3 103.8 92 05-23-86 160.0 104.0 16.2 98.2 94 Job No. 285-256 - February 25, 1987 - A-55 Test Maximum Moisture DW Elev. Density Content Density (ft) (pcf) (%I (pcf) ----- -----mm -----___ ----mm_ m-Ll- . . 1---L>-..--.. K~DL~ II (umrmueaj - - - ,- - .- - .- MOORE & TABER GEOTECHNKAL ENGINEERS AND GEOLOGISTS Test Test Number Date ------ ------ 1916 05-23-86 193.0 112.5 16.2 101.5 90 1917 05-23-86 191.0 112.5 17.6 101.8 90 1918 05-23-86 155.0 113.0 13.6 107.4 95 1919 05-23-86 156.5 113.0 17.6 103.4 92 1920 05-23-86 158.0 113.0 16.9 102.9 91 1921 05-23-86 194.0 112.5 17.6 104.9 93 1922 05-23-86 192.0 112.5 16.9 104.8 93 1923 05-23-86 194.0 113.0 11.7 102.7 91 1924 05-23-86 195.0 113.0 14.2 103.6 92 1925 05-23-86 157.0 106.0 16.9 102.1 96 1926 05-23-86 156.0 106.0 17.6 101.2 95 1927 05-23-86 196.0 113.0 14.2 101.2 90 1928 05-23-86 197.0 113.0 13.6 105.9 94 1929 05-23-86 195.0 113.0 13.6 107.7 95 1930 05-23-86 196.5 113.0 12.3 109.5 97 1931 05-27-86 157.5 113.0 12.3 103.3 91 1932 sv 05-27-86 161.5 113.0 12.3 106.3 94 1933 sv 05-27-86 159.0 116.5 13.0 111.5 96 1934 05-27-86 126.0 110.0 11.7 103.1 94 1935 05-27-86 124.0 113.0 13.6 103.1 91 1936 05-27-86 128.5 110.0 12.3 101.1 92 1937 sv 05-27-86 142.0 106.0 16.9 102.1 96 1938 sv 05-27-86 146.0 113.0 12.3 109.4 97 1939 05-27-86 180.0 113.0 12.3 108.6 96 1940 05-27-86 172.0 113.0 14.2 106.4 94 1941 05-27-86 262.0 116.0 14.9 110.1 95 1942 05-27-86 260.0 115.5 13.6 109.5 95 1943 05-27-86 261.0 115.5 13.0 109.2 95 1944 05-27-86 173.0 112.5 14.9 105.8 94 1945 05-27-86 175.0 112.5 16.2 105.6 94 1946 sv 05-27-86 127.0 113.0 13.6 110.2 98 1947 sv 05-27-86 130.0 112.5 15.6 107.2 95 1948 05-27-86 205.0 106.0 17.6 103.2 97 1949 05-27-86 203.0 106.0 16.2 104.1 98 1950 05-27-86 208.0 104.0 14.2 102.4 98 Test Elev. (ft) ----- Table II (Continued) Maximum Density (PCf) ------- Job No. 285-256 - February 25, 1987 A-56 Moisture Content (8) ------__ DW Density (pcf) -----__ Relative Compaction (%) ---------- MOORE & TABER GEOTECHNICAL ENGINEERS AN0 GEOLOGISTS - - - - -- .- .- - Test Test Number Date ------ ------ 1951 05-27-86 139.0 104.0 19.7 96.9 93 1952 05-28-86 134.5 104.0 19.0 100.1 96 1953 05-28-86 137.0 104.0 19.7 98.2 94 1954 05-28-86 136.0 113.0 11.1 107.8 95 1955 sv 05-28-86 138.0 113.0 13.6 107.7 95 1956 sv 05-28-86 142.0 113.0 12.3 108.6 96 1957 05-28-86 139.0 113.0 9.8 103.2 91 1958 05-28-86 144.0 113.0 12.3 102.5 91 1959 sv 05-28-86 199.5 112.5 20.5 106.9 95 1960 SV 05-28-86 197.0 106.0 17.6 103.5 98 1961 05-28-86 140.0 112.5 15.6 105.8 94 1962 05-28-86 141.0 113.0 14.2 109.4 97 1963 05-28-86 195.0 110.5 11.7 101.1 91 1964 05-28-86 200.0 106.0 15.6 102.9 97 1965 05-28-86 239.0 112.5 14.2 100.7 90 1966 05-28-86 231.0 112.5 13.6 103.1 92 1967 05-28-86 240.0 112.5 14.2 103.3 92 1968 05-28-86 223.0 106.0 15.6 100.3 95 1969 05-28-86 233.0 106.0 14.2 98.6 93 1970 05-28-86 231.0 106.0 12.3 101.7 96 1971 05-28-86 202.0 106.0 17.6 100.5 95 1972 05-28-86 201.0 106.0 16.2 101.0 95 1973 05-28-86 142.0 112.5 16.2 102.6 91 1974 05-28-86 143.0 112.5 16.9 103.1 92 1975 05-29-86 202.0 112.5 15.6 107.1 95 1976 05-29-86 193.0 106.0 18.3 97.3 92 1977 05-29-86 198.0 113.0 13.6 101.2 90 1978 05-29-86 193.0 104.0 15.6 98.1 94 1979 05-29-86 194.0 104.0 16.9 97.7 94 1980 05-29-86 144.0 113.0 12.3 106.8 95 1981 sv 05-29-86 1982 05-29-86 1983 05-29-86 1984 05-29-86 1985 05-29-86 137.0 113.0 13.6 106.1 94 193.5 114.5 14.2 103.3 90 196.0 106.0 14.9 97.4 92 202.5 113.0 14.9 106.7 94 238.0 101.0 18.3 95.8 95 - Job No. 285-256 - February 25, 1987 - Test Elev. (ft) ----- Table II (Continued) Maximum Density (pcf) ------- Moisture DW Content Density ($1 (pcf) -------_ ------- Relative Compaction (%) ----mm____ A-57 - - - ~. - - .- - .- - - - - 2016 sv 06-02-86 2017 06-02-86 2018 06-02-86 2019 06-02-86 2020 06-02-86 159.0 104.0 18.3 101.2 97 164.0 101.0 19.7 95.2 94 122.0 113.0 10.4 104.3 92 134.0 113.0 12.3 104.1 92 141.0 116.5 11.7 106.7 92 Job No. 285-256 - February 25, 1987 - MOORE & TABER GEOTECHNICAL ENGINEERSANDGEOLOGISTS Test Test Number Date ------ ------ 1986 05-29-86 236.0 101.0 19.7 95.9 95 1987 05-29-86 235.0 106.0 7.5 96.7 91 1988 05-29-86 246.0 104.0 19.0 98.5 95 1989 05-29-86 139.0 112.5 14.9 105.6 94 1990 05-29-86 146.0 112.5 15.6 106.7 95 1991 sv 05-30-86 1992 sv 05-30-86 1993 05-30-86 1994 05-30-86 1995 05-30-86 1996 05-30-86 1997 05-30-86 1998 05-30-86 1999 sv 05-30-86 2000 sv 05-30-86 205.0 113.0 15.6 107.7 95 204.0 113.0 14.2 108.4 96 181.0 113.0 12.3 102.9 91 165.0 113.0 13.6 102.6 91 157.0 110.5 11.7 102.7 93 158.0 110.5 13.6 102.8 93 172.0 113.0 13.0 107.9 95 204.0 104.0 16.9 99.2 95 149.0 113.0 14.2 105.2 93 147.0 113.0 13.6 107.3 95 2001 05-30-86 2002 05-30-86 2003 05-30-86 2004 05-30-86 2005 05-30-86 2006 05-30-86 2007 05-30-86 2008 05-30-86 2009 05-30-86 2010 05-30-86 201.0 113.0 14.2 106.1 94 198.5 113.0 13.0 105.3 93 145.0 113.0 13.6 105.1 93 142.0 113.0 13.0 104.7 93 141.0 117.0 11.1 109.9 94 201.5 113.0 13.0 106.5 94 200.0 113.0 12.3 108.4 96 154.0 110.5 7.5 102.3 93 151.0 113.0 11.7 103.1 91 150.0 113.0 12.3 104.5 92 2011 06-02-86 176.0 112.5 16.2 105.3 94 2012 06-02-86 181.5 106.0 17.6 101.5 96 2013 06-02-86 170.0 112.5 13.6 105.4 94 2014 sv 06-02-86 160.0 106.0 17.6 104.3 98 2015 sv 06-02-86 163.0 106.0 20.5 103.4 98 Test Maximum Elev. Density (ft) (pcf) ----- ------- Table II (Continued) Moisture Dry Content Density ($1 (PCf) -------- ------- Reldtive Compaction (%) ---------- A-58 - ,.- - MOORE & TABER GEOTECHNlC.4‘ ENGINEERSAND GEOLOGISTS - Test Test Number Date ---m-e _----- 2021 06-02-86 126.0 116.5 11.1 105.8 91 2022 sv 06-02-86 161.0 104.0 21.2 97.2 93 2023 sv 06-02-86 162.0 104.0 19.0 100.1 96 2024 06-03-86 175.0 106.0 17.6 103.4 98 2025 06-03-86 174.0 106.0 18.3 101.7 96 2026 06-03-86 173.0 110.0 11.1 101.1 92 2027 06-03-86 234.0 112.5 14.9 101.3 90 2028 06-03-86 234.0 116.0 13.6 106.8 92 2029 06-03-86 226.0 104.0 16.2 97.4 94 2030 06-03-86 196.0 113.0 12.3 106.3 94 2031 06-03-86 195.0 113.0 13.6 106.3 94 2032 06-03-86 144.0 113.0 13.0 110.8 98 2033 06-03-86 145.0 112.5 16.2 106.0 94 2034 06-03-86 150.0 113.0 12.3 108.6 96 2035 06-03-86 175.0 106.0 16.9 102.6 97 2036 06-03-86 177.0 106.0 17.6 101.5 96 2037 06-03-86 179.0 113.0 14.2 107.7 95 2038 06-03-86 180.0 106.0 16.9 100.9 95 2039 06-03-86 180.5 106.0 19.0 99.5 94 2040 06-04-86 141.0 106.0 13.6 102.1 96 2041 SV 06-04-86 143.0 116.0 16.9 105.4 91 2042 sv 06-04-86 145.0 116.0 15.6 107.4 93 2043 SV 06-04-86 146.0 106.0 19.0 103.9 98 2044 SV 06-04-86 147.0 116.0 16.2 110.2 95 2045 sv 06-04-86 152.0 116.0 16.2 106.4 92 2046 06-04-86 184.5 112.5 14.2 107.5 96 2047 06-04-86 186.0 106.0 16.9 100.4 95 2048 06-04-86 188.5 106.0 18.3 98.5 93 2049 06-04-86 187.5 106.0 17.6 100.3 95 2050 06-04-86 142.0 116.0 16.9 106.0 91 2051 06-04-86 210.0 106.0 15.6 100.0 94 2052 06-04-86 212.0 106.0 14.9 99.2 94 2053 06-04-86 211.0 106.0 19.0 98.3 93 2054 06-04-86 156.5 113.0 13.6 104.4 92 2055 06-04-86 151.5 113.0 13.0 106.0 94 Teat Elev. (ft) ----- ,..-LI- -- ,--~~L1-..--.. ~arue II (Lonrinueo) Maximum Density (pcf) ------- Job No. 285-256 - February 25, 1987 - Moisture Content (%) -----m-m Dry Density (Pcf) ----e-o Reldtive Compaction (%I -----__c-- A-59 - - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Table II (Continued) - Test Test Number Date ------ ------ - 2056 06-04-86 2057 06-04-86 2058 06-04-86 .- 2059 06-04-86 2060 06-04-86 2061 sv 06-05-86 2062 06-05-86 2063 sv 06-05-86 2064 06-05-86 - 2065 06-05-86 2066 06-05-86 2067 06-05-86 2068 06-05-86 2069 06-05-86 2070 06-05-86 2071 06-05-86 2072 06-05-86 - 2073 06-05-86 2074 06-05-86 2075 06-05-86 - 2076 06-05-86 2077 06-05-86 2078 06-05-86 .~~ 2079 06-06-86 2080 sv 06-06-86 2081 sv 06-06-86 2082 06-06-86 2083 06-06-86 2084 06-06-86 2085 06-06-86 2086 06-06-86 - 2087 06-06-86 2088 06-06-86 2089 06-06-86 2090 06-06-86 - Test Elev. (ft) ----- Maximum Density (pcf) ------- 154.0 106.0 14.2 103.5 98 211.0 106.0 14.9 100.2 95 213.0 106.0 13.6 101.5 96 147.0 113.0 14.2 104.2 92 153.0 106.0 14.9 101.3 96 157.0 106.0 16.9 98.6 93 149.0 115.5 16.2 103.6 90 144.0 112.5 15.6 106.7 95 151.0 115.5 14.9 106.8 92 213.0 104.0 18.3 98.0 94 216.0 104.0 19.0 98.4 95 151.5 106.0 16.2 101.3 96 145.0 115.5 14.9 107.4 93 149.0 106.0 16.2 101.3 96 158.0 113.0 12.3 107.0 95 215.0 104.0 16.9 99.4 96 217.0 104.0 15.6 98.7 95 158.0 113.0 13.0 108.8 96 133.0 110.5 12.3 99.3 90 153.0 113.0 11.7 105.9 94 147.0 116.0 14.9 108.1 93 135.0 114.5 12.3 108.9 95 136.0 116.0 13.6 105.9 91 151.5 112.5 16.2 104.9 93 155.0 112.5 16.2 102.3 91 150.0 112.5 14.9 105.7 94 162.0 104.0 14.2 102.8 99 153.0 113.0 13.0 105.1 93 193.0 106.0 13.6 99.8 94 194.5 106.0 14.9 101.4 96 196.0 106.0 14.2 101.2 191.5 113.0 14.9 103.4 183.0 113.0 16.2 107.1 199.0 113.0 16.9 102.1 196.5 112.5 15.6 109.6 Job No. 285-256 - February 25, 1987 - Moisture Content ($1 -------- DV Density (PC0 -----mm Relative Compaction (%I -------___ 95 92 95 90 97 A-60 MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS Test Test Number Date ----me ----mm Test Maximum Moisture Elev. Density Content (ft) (pcf) (%) ----- ---mm-- -------- Dry Relative Density Compaction (pcf) (%) ------- --------__ 2056 06-04-86 154.0 106.0 14.2 103.5 98 2057 06-04-86 211.0 106.0 14.9 100.2 95 2058 06-04-86 213.0 106.0 13.6 101.5 96 2059 06-04-86 147.0 113.0 14.2 104.2 92 2060 06-04-86 153.0 106.0 14.9 101.3 96 2061 sv 06-05-86 2062 06-05-86 2063 sv 06-05-86 2064 06-05-86 2065 06-05-86 2066 06-05-86 2067 06-05-86 2068 06-05-86 2069 06-05-86 2070 06-05-86 157.0 106.0 16.9 98.6 93 149.0 115.5 16.2 103.6 90 144.0 112.5 15.6 106.7 95 151.0 115.5 14.9 106.8 92 213.0 104.0 18.3 98.0 94 216.0 104.0 19.0 98.4 95 151.5 106.0 16.2 101.3 96 145.0 115.5 14.9 107.4 93 149.0 106.0 16.2 101.3 96 158.0 113.0 12.3 107.0 95 2071 06-05-86 215.0 104.0 16.9 99.4 96 2072 06-05-86 217.0 104.0 15.6 98.7 95 2073 06-05-86 158.0 113.0 13.0 108.8 96 2074 06-05-86 133.0 110.5 12.3 99.3 90 2075 06-05-86 153.0 113.0 11.7 105.9 94 2076 06-05-86 147.0 116.0 14.9 108.1 93 2077 06-05-86 135.0 114.5 12.3 108.9 95 2078 06-05-86 136.0 116.0 13.6 105.9 91 2079 06-06-86 151.5 112.5 16.2 104.9 93 2080 sv 06-06-86 155.0 112.5 16.2 102.3 91 2081 sv 06-06-86 150.0 112.5 14.9 105.7 94 2082 06-06-86 162.0 104.0 14.2 102.8 99 2083 06-06-86 153.0 113.0 13.0 105.1 93 2084 06-06-86 193.0 106.0 13.6 99.8 94 2085 06-06-86 194.5 106.0 14.9 101.4 96 2086 06-06-86 196.0 106.0 14.2 101.2 2087 '06-06-86 191.5 113.0 14.9 103.4 2088 06-06-86 183.0 113.0 16.2 107.1 2089 06-06-86 199.0 113.0 16.9 102.1 2090 06-06-86 196.5 112.5 15.6 109.6 95 92 95 90 97 A-60 Table II (Continued) Job No. 285-256 - February 25, 1987 MOOREZLTABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS - - .~- - Test Test Number Date me---- ---e-m Test Elev. (ft) --m-w Maximum Density (pcf) ------- Moisture Dry Reldtive Content Density Compaction (%I (Pcf) (%) ------we -----mm ---------- 2091 sv 06-06-86 155.0 113.0 13.0 113.6 101 2092 sv 06-06-86 154.0 113.0 14.2 110.8 98 2093 06-06-86 163.0 121.5 13.6 112.1 92 2094 06-06-86 157.0 114.5 13.6 103.8 91 2095 06-06-86 156.0 117.0 13.0 107.4 92 2096 06-06-86 158.0 117.0 13.6 107.7 92 2097 06-06-86 193.0 115.5 14.2 107.1 93 2098 06-06-86 194.0 115.5 13.6 108.8 94 2099 06-09-86 204.0 116.5 15.6 110.3 95 2100 06-09-86 194.0 113.0 13.6 107.4 95 2101 sv 06-09-86 158.0 104.0 20.5 103.2 99 2102 sv 06-09-86 160.0 117.0 14.2 113.7 97 2103 sv 06-09-86 153.0 110.5 9.8 105.1 95 2104 sv 06-09-86 158.0 113.0 14.2 105.1 93 2105 sv 06-09-86 156.0 117.0 14.9 107.4 92 2106 06-09-86 203.0 110.5 11.1 102.2 92 2107 06-09-86 196.5 106.0 12.3 102.0 96 2108 06-09-86 212.5 104.0 18.3 97.3 94 2109 06-09-86 209.0 104.0 16.9 97.0 93 2110 06-09-86 160.0 113.5 13.6 106.3 94 2111 06-09-86 163.0 113.5 13.0 107.7 95 2112 06-09-86 162.0 113.0 13.0 106.7 94 2113 06-09-86 164.0 113.5 12.3 106.5 94 2114 06-09-86 155.0 113.5 14.2 105.2 93 2115 06-09-86 159.0 113.0 13.0 105.4 93 2116 06-09-86 158.0 112.5 16.2 101.9 91 2117 06-09-86 198.5 104.0 15.6 99.4 96 2118 06-09-86 200.0 104.0 19.7 95.4 92 2119 06-09-86 196.0 113.5 14.2 107.7 95 2120 06-09-86 195.0 113.0 11.7 109.4 97 2121 06-10-86 201.5 104.0 14.2 92.3 89 ckby2122 2122 06-10-86 201.5 104.0 17.6 93.7 90 2123 06-10-86 200.5 113.0 13.0 103.3 91 2124 06-10-86 198.0 113.5 13.6 104.2 92 2125 06-10-86 196.0 113.5 14.2 104.5 92 Table II (Continued) Job No. 285-256 - February 25, 1987 A-61 - - .- - .,- - - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date ------ ------ 2126 sv 06-10-86 163.0 116.5 12.3 106.1 91 2127 sv 06-10-86 159.0 106.0 17.6 104.0 98 2128 06-10-86 155.0 114.5 14.2 108.0 94 2129 06-10-86 157.0 116.5 16.2 107.0 92 2130 06-10-86 159.0 113.0 11.7 109.7 97 2131 06-10-86 195.5 114.5 14.2 109.1 95 2132 06-10-86 201.0 113.5 13.0 106.5 94 2133 06-10-86 162.0 121.5 12.3 111.8 92 2134 06-10-86 160.0 117.0 13.6 108.1 92 2135 06-10-86 157.0 110.0 10.4 103.2 94 2136 sv 06-10-86 156.0 113.0 12.3 104.2 92 2137 sv 06-10-86 158.0 113.0 13.0 105.2 93 2138 sv 06-10-86 160.5 117.0 14.2 109.8 94 2139 06-10-86 162.5 117.0 12.3 105.0 90 2140 06-10-86 201.5 116.5 16.2 107.2 92 2141 06-10-86 203.0 116.5 14.9 109.3 94 2142 06-10-86 198.0 113.5 14.2 107.7 95 2143 06-10-86 199.0 113.0 13.0 105.8 94 2144 06-10-86 202.0 113.5 11.7 107.7 95 2145 06-11-86 221.0 114.5 12.3 107.9 94 2146 06-11-86 219.0 114.5 11.7 109.7 96 2147 sv 06-11-86 160.0 110.0 10.4 106.3 97 2148 06-11-86 162.0 110.0 13.6 101.5 92 2149 06-11-86 158.0 110.0 13.0 104.2 95 2150 06-11-86 118.0 115.5 16.2 104.1 90 2151 06-11-86 120.0 115.5 14.9 106.8 92 2152 06-11-86 123.5 115.5 14.2 105.2 91 2153 06-11-86 161.0 113.5 13.0 105.8 93 2154 06-11-86 162.0 113.0 14.2 103.6 92 2155 06-11-86 129.0 114.0 18.3 104.9 92 2156 06-11-86 2157 06-12-86 2158 06-12-86 2159 06-12-86 2160 06-12-86 132.5 106.0 17.6 102.2 96 124.0 106.0 19.0 100.1 94 164.0 113.5 13.6 105.6 93 166.0 113.5 12.3 102.0 90 169.0 110.0 11.1 105.5 96 Job No. 285-256 - February 25, 1987 - Test Maximum Moisture DW Elev. Density Content Density (ft) (pcf) ($1 (pcf) ----- ------- -------- -----mm Table II (Continued) Reldtive Compaction (%) ---------- A-62 Test Test Number Date ---a-- Test Maximum Elev. Density (ft) (PCf) -m--e ---m-w- Moisture DW Content Density (%I (pcf) -------- -----mm Rela'tive Compaction (%I ------____ - 2161 2162 2163 .- 2164 2165 06-12-86 170.0 110.0 14.9 100.2 91 06-12-86 172.0 110.0 13.0 101.2 92 06-12-86 174.0 110.0 14.2 102.8 93 06-12-86 182.0 114.5 14.2 105.0 92 06-12-86 185.0 106.0 10.4 103.2 97 - 2166 2167 2168 2169 - 2170 06-12-86 173.0 110.0 10.4 103.8 94 06-12-86 176.0 110.0 12.3 102.9 94 06-12-86 177.0 110.5 14.2 102.1 92 06-12-86 179.0 110.0 12.3 100.9 92 06-12-86 175.0 110.0 14.9 103.2 94 2171 - 2172 2173 2174 2175 .- 06-12-86 187.0 114.5 19.7 105.7 06-12-86 188.5 114.0 19.0 104.2 06-13-86 191.0 114.0 20.5 105.2 06-13-86 193.0 114.0 17.6 106.9 06-13-86 211.0 110.0 14.9 103.4 92 91 92 94 94 2176 06-13-86 214.0 110.0 13.0 103.8 94 2177 06-13-86 219.0 116.5 16.2 106.5 91 2178 06-13-86 224.0 110.0 10.4 104.1 95 2179 06-13-86 193.0 106.0 20.5 99.5 94 2180 06-13-86 196.0 106.0 21.6 97.7 92 - 2181 2182 2183 - 2184 2185 06-13-86 197.0 113.0 19.7 101.9 90 06-13-86 202.0 106.0 17.6 95.2 90 06-13-86 203.0 106.0 16.9 101.9 96 06-13-86 204.0 106.0 9.8 96.9 91 06-13-86 204.0 106.0 18.3 97.0 92 -- 2186 06-13-86 212.0 110.0 16.2 103.4 94 2187 06-13-86 227.0 110.0 15.6 101.3 92 2188 06-13-86 224.0 110.0 15.6 102.0 93 2189 06-13-86 199.0 106.0 16.9 98.8 93 2190 06-13-86 200.0 106.0 16.9 104.8 99 2191 sv 2192 sv 2193 sv 2194 sv 2195 06-13-86 06-13-86 06-16-86 06-16-86 06-16-86 181.0 101.0 14.2 98.9 98 182.0 110.0 14.9 106.0 96 184.0 110.5 16.2 106.7 97 186.0 110.0 15.6 104.4 95 208.0 106.0 17.6 103.5 98 Job No. 285-256 - February 25, 1987 - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Table II (Continued) A-63 - - - - - - - .- - - .- .~- ,- - 2216 sv 06-16-86 190.0 110.0 13.0 102.7 93 2217 sv 06-17-86 192.0 110.0 13.6 103.8 94 2218 sv 06-17-86 195.0 110.0 12.3 103.6 94 2219 06-17-86 121.0 112.5 13.0 100.8 90 2220 sv 06-17-86 215.0 117.0 14.9 105.2 90 2221 sv 06-17-86 214.0 117.0 14.9 106.9 91 2222 sv 06-17-86 223.0 113.0 13.6 106.0 94 2223 sv 06-17-86 222.5 113.0 14.2 104.3 92 2224 sv 06-17-86 216.0 117.0 7.5 107.8 92 2225 sv 06-17-86 214.0 117.0 13.6 106.6 91 2226 sv 06-17-86 2227 sv 06-17-86 2228 sv 06-17-86 2229 sv 06-17-86 2230 06-17-86 215.0 115.5 14.2 108.8 94 213.0 116.0 13.0 105.2 91 194.0 113.0 13.0 105.1 93 196.0 113.0 13.6 105.5 93 216.0 113.5 12.3 107.7 95 Job No. 285-256 - February 25, 1987 - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date ------ ------ 2196 06-16-86 210.0 106.0 19.0 103.5 98 2197 06-16-86 209.0 112.5 16.9 102.7 91 2198 06-16-86 232.0 114.5 15.6 103.6 90 2199 sv 06-16-86 237.0 115.5 14.2 111.0 96 2200 sv 06-16-86 240.0 104.0 16.2 97.0 93 2201 sv 06-16-86 203.0 110.0 13.6 105.4 96 2202 sv 06-16-86 204.5 104.0 15.6 97.3 94 2203 06-16-86 209.0 113.0 12.3 105.4 93 2204 06-16-86 213.0 110.0 13.6 103.3 94 2205 06-16-86 210.5 110.0 14.9 102.8 93 2206 06-16-86 185.0 110.0 12.3 103.8 94 2207 06-16-86 139.0 121.5 12.3 113.9 94 2208 06-16-86 207.0 104.0 16.9 98.8 95 2209 06-16-86 230.0 113.0 14.2 102.1 90 2210 06-16-86 222.0 104.0 16.9 104.2 100 2211 06-16-86 209.0 104.0 14.2 100.0 96 2212 sv 06-16-86 207.0 104.0 17.6 103.0 99 2213 06-16-86 233.0 113.0 14.2 103.1 91 2214 06-16-86 235.0 113.0 16.9 101.4 90 2215 sv 06-16-86 188.0 110.0 14.2 101.7 92 Test Maximum Moisture DW Elev. Density Content Density (ft) (pcf) (%I (pcf) ----- ------- -------- ------- Table II (Continued) Relative Compaction ($1 ---------- A-64 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS .- .~- .- - - - - - Test Test Number Date e---s- --e--s 2231 06-17-86 214.0 113.5 11.7 107.7 95 2232 sv 06-17-86 213.0 113.0 14.2 105.7 94 2233 sv 06-17-86 220.0 116.5 13.0 104.8 90 2234 06-17-86 216.0 113.0 16.2 102.5 91 2235 06-17-86 215.0 113.0 13.0 104.2 92 2236 sv 06-18-86 217.0 113.0 16.2 108.3 96 2237 sv 06-18-86 217.0 113.0 15.6 108.1 96 2238 06-18-86 202.0 113.0 16.9 101.2 90 2239 sv 06-18-86 224.5 113.0 15.6 107.8 95 2240 sv 06-18-86 209.0 113.0 16.2 106.9 95 2241 sv 06-18-86 220.0 113.5 14.9 104.6 92 2242 sv 06-18-86 219.0 112.5 14.2 107.0 95 2243 06-18-86 222.0 115.5 16.2 105.6 91 2244 06-18-86 225.0 117.0 14.9 107.4 92 2245 06-18-86 224.0 115.5 13.6 109.8 95 2246 sv 06-18-86 217.0 117.0 16.2 107.3 92 2247 sv 06-18-86 218.0 116.0 14.2 109.9 95 2248 sv 06-18-86 194.0 113.5 12.3 108.4 96 2249 sv 06-18-86 195.0 113.5 13.6 106.7 94 2250 06-18-86 140.5 104.0 14.9 101.4 98 2251 sv 06-18-86 217.0 2252 sv 06-18-86 196.0 2253 sv 06-18-86 195.0 2254 sv 06-19-86 198.0 2255 sv 06-19-86 222.0 2256 sv 06-19-86 220.0 2257 06-19-86 219.0 2258 sv 06-19-86 218.0 2259 sv 06-19-86 220.0 2260 06-19-86 204.0 2261 sv 06-19-86 201.0 2262 sv 06-19-86 206.0 2263 06-19-86 142.0 2264 06-19-86 144.0 2265 06-19-86 146.0 113.5 113.5 113.5 113.5 117.0 117.0 117.0 114.0 117.0 117.0 110.0 117.0 104.0 104.0 104.0 11.7 106.6 94 16.2 105.0 93 13.0 102.6 90 13.6 103.9 92 14.2 110.8 95 13.6 110.3 94 15.6 105.0 90 11.7 110.0 96 13.6 110.9 95 16.9 105.4 90 18.3 109.6 100 14.2 110.8 95 15.6 99.4 96 19.7 97.9 94 20.5 101.9 98 Test Elev. (ft) ---we Table II (Continued) Maximum Density (pcf) --mm--- Job No. 285-256 - February 25, 1987 - Moisture DW Content Density (%I (pcf) ---we--- ------- Relative Compaction (%) --____--__ A-65 MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGlSTS - Table II (Continued) - - - Test Test Number Date ------ ----__ 2266 sv 06-19-86 147.0 104.0 18.3 100.5 97 2267 sv 06-19-86 148.0 104.0 19.7 102.3 98 2268 sv 06-19-86 149.0 113.0 16.2 106.0 94 2269 sv 06-19-86 150.0 104.0 20.5 100.3 96 2270 sv 06-19-86 150.0 113.0 14.9 107.4 95 2271 sv 06-20-86 152.0 106.0 14.9 106.5 100 2272 sv 06-20-86 153.5 106.0 17.6 104.8 99 2273 sv 06-20-86 156.0 113.0 14.9 106.4 94 2274 sv 06-20-86 157.0 113.0 13.6 105.1 93 2275 06-20-86 152.0 113.0 13.6 105.1 93 2276 06-20-86 214.0 104.0 14.9 98.3 95 2277 06-20-86 210.0 112.5 15.6 105.8 94 2278 sv 06-20-86 224.0 104.0 18.3 101.0 97 2279 sv 06-20-86 223.0 113.0 13.0 109.5 97 2280 06-20-86 221.0 112.5 13.0 102.6 91 2281 sv 06-20-86 155.0 113.0 13.6 108.4 96 2282 sv 06-20-86 157.5 113.0 13.6 109.0 96 2283 sv 06-20-86 158.0 113.0 14.2 107.1 95 2284 sv 06-20-86 158.5 113.0 13.0 106.2 94 2285 sv 06-23-86 159.0 113.0 13.6 107.6 95 2286 sv 06-23-86 159.0 113.0 13.0 107.8 95 2287 sv 06-23-86 160.0 113.0 14.2 109.0 96 2288 sv 06-23-86 143.0 113.0 14.2 109.1 97 2289 sv 06-23-86 144.0 113.0 12.3 108.8 96 2290 sv 06-23-86 143.5 113.0 13.0 108.7 96 2291 06-23-86 133.0 113.0 13.6 101.7 90 2292 sv 06-23-86 135.0 115.5 12.3 109.7 95 2293 06-23-86 136.0 113.0 12.3 102.5 91 2294 sv 06-23-86 146.0 113.0 13.6 111.5 99 2295 sv 06-23-86 147.0 113.0 14.2 110.3 98 2296 sv 06-23-86 2297 sv 06-23-86 2298 sv 06-23-86 2299 sv 06-23-86 2300 sv 06-23-86 148.0 113.0 12.3 109.3 97 149.0 121.5 11.1 116.9 96 151.0 121.5 10.4 115.2 95 155.0 121.5 11.7 110.8 91 153.0 121.5 12.6 116.3 96 Job No. 285-256 - February 25, 1987 - Test Elev. (ft) ---mm Maximum Density (pcf) ------- Moisture Dry Content Density (%) (pcf) -------- -----mm Relative Compaction ($1 -----_____ A-66 - - - MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS Table II (Continued) .- - - .- - - - -. - Test Test Number Date Test Maximum Moisture DW Elev. Density Content Density (ft) (pcf) (2) (pcf) -m--w ------- -------- -----mm Reldtive Compaction (%I ------ ------ 2301 sv 06-23-86 156.0 121.5 10.4 115.1 95 2302 sv 06-24-86 158.0 113.0 11.7 105.6 93 2303 sv 06-24-86 158.5 113.0 12.3 103.8 92 2304 sv 06-24-86 160.0 113.0 14.2 108.7 96 2305 sv 06-24-86 161.0 113.0 13.6 110.5 98 2306 sv 06-24-86 213.5 112.5 13.0 104.4 2307 06-24-86 215.0 113.5 14.2 106.8 2308 sv 06-24-86 212.0 113.5 13.0 108.1 2309 06-24-86 197.0 112.5 16.2 102.5 2310 06-24-86 210.0 115.5 15.6 104.3 2311 06-24-86 215.0 112.5 14.9 104.1 2312 06-24-86 223.0 116.0 14.9 104.8 2313 sv 06-24-86 207.0 114.5 12.3 105.4 2314 sv 06-24-86 208.0 113.5 14.2 104.5 2315 sv 06-24-86 208.5 113.5 13.6 108.9 93 94 95 91 90 93 9Q 92 92 96 2316 sv 06-24-86 214.0 113.5 14.2 111.1 98 2317 06-25-86 212.0 112.5 14.9 101.8 90 2318 06-25-86 216.0 104.0 18.3 100.7 97 2319 sv 06-25-86 213.5 110.0 11.7 106.5 97 2320 sv 06-25-86 216.0 110.0 12.3 106.2 97 2321 06-25-86 239.0 106.0 17.6 96.2 91 2322 06-25-86 243.0 106.0 16.9 98.8 93 2323 06-25-86 240.0 114.5 13.6 104.4 91 2324 06-25-86 242.0 106.0 17.6 98.3 93 2325 sv 06-25-86 217.0 110.0 14.9 109.4 99 2326 sv 06-25-86 212.0 110.0 10.4 108.4 99 2327 sv 06-25-86 214.0 110.0 12.3 104.5 95 2328 sv 06-25-86 153.5 112.5 16.9 105.4 94 2329 sv 06-25-86 155.0 112.5 16.2 106.7 95 2330 sv 06-25-86 154.0 112.5 17.6 103.3 92 2331 sv 06-26-86 2332 sv 06-26-86 2333 06-26-86 2334 06-26-86 2335 sv 06-26-86 157.0 112.5 19.0 104.1 93 156.0 112.5 18.3 103.7 92 217.0 113.0 14.2 103.3 91 217.0 113.0 13.0 103.3 91 158.0 112.5 19.7 104.6 93 Job No. 285-256 - February 25, 1987 - A-67 - - - - - - - - .,- MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date ------ ----mm 2336 sv 06-26-86 157.5 112.5 15.6 108.8 97 2337 sv 06-26-86 158.5 112.5 16.2 105.0 93 2338 06-26-86 214.0 114.5 13.6 106.7 93 2339 06-26-86 213.0 113.5 13.0 105.6 93 2340 sv 06-27-86 159.0 104.0 18.3 100.0 96 2341 sv 06-27-86 162.0 113.0 12.3 106.1 94 2342 sv 06-27-86 160.0 110.0 13.6 106.2 97 2343 sv 06-27-86 163.0 113.0 11.1 104.6 93 2344 sv 06-27-86 162.0 113.5 14.2 104.3 92 2345 sv 06-27-86 198.0 104.0 19.0 102.8 99 2346 sv 06-27-86 200.0 104.0 19.0 99.1 95 2347 sv 06-27-86 163.0 113.5 13.6 105.9 93 2348 sv 06-27-86 164.0 113.5 13.0 105.3 93 2349 sv 06-27-86 164.0 113.5 12.3 108.7 96 2350 sv 06-27-86 170.0 113.5 14.2 106.3 94 2351 sv 06-30-86 166.0 110.5 13.6 103.0 93 2352 sv 06-30-86 164.0 113.5 10.4 105.4 93 2353 sv 06-30-86 161.0 113.5 14.2 106.6 94 2354 sv 06-30-86 158.0 113.5 13.0 106.2 94 2355 06-30-86 212.0 112.5 14.2 105.0 93 2356 06-30-86 198.0 106.0 12.3 101.5 96 2357 sv 06-30-86 170.0 113.5 13.6 104.0 92 2358 sv 06-30-86 167.0 114.5 13.6 102.9 90 2359 06-30-86 116.0 115.5 17.6 104.7 91 2360 06-30-86 119.0 115.5 16.2 104.4 90 2361 sv 06-30-86 120.5 114.5 16.9 102.7 90 2362 sv 06-30-86 121.0 113.0 9.8 109.2 97 2363 sv 06-30-86 122.5 113.5 10.4 106.6 94 2364 sv 07-01-86 123.0 110.0 10.4 106.6 97 2365 sv 07-01-86 122.0 110.0 14.2 107.1 97 2366 sv 07-01-86 2367 sv 07-01-86 2368 sv 07-01-86 2369 07-01-86 2370 07-01-86 Test Elev. (ft) ---es Maximum Density (PCf) ------- Moisture Dry Content Density (%I (pcf) -------- ------- Relative Compaction (%I ---------- 155.0 110.0 13.3 103.4 94 158.0 112.5 13.6 103.6 92 157.0 110.0 11.7 102.5 93 120.0 114.5 13.6 100.7 88 ckby2370 120.0 114.5 14.2 103.6 90 Job No. 285-256 - February 25, 1987 A-68 - - ,- .- .- - .~ - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS T8St Test Number Date -----s --m-m- 2371 07-01-86 191.0 112.5 13.0 100.8 2372 sv 07-01-86 157.0 110.0 14.9 106.6 2373 07-01-86 200.0 110.5 13.6 94.3 2374 07-01-86 200.0 110.5 14.2 93.3 2375 07-02-86 216.0 112.5 16.2 108.8 90 97 85 Ckby2374 84 ckby239.5 97 2376 sv 07-02-86 146.5 114.5 12.3 107.7 94 2377 sv 07-02-86 150.0 115.5 16.9 111.3 96 2378 sv 07-02-86 155.0 110.0 14.9 105.2 96 2379 sv 07-03-86 158.0 110.0 14.9 109.0 99 2380 sv 07-03-86 160.0 110.0 17.6 103.8 94 2381 07-03-86 189.0 110.0 10.4 103.4 94 2382 07-03-86 184.0 110.0 13.0 101.9 93 2383 sv 07-03-86 162.0 113.0 12.3 108.2 96 2384 sv 07-03-86 161.0 113.0 14.2 109.8 97 2385 sv 07-03-86 163.0 113.0 13.6 107.2 95 2386 07-03-86 210.0 113.0 13.6 104.9 93 2387 07-03-86 215.0 114.5 14.9 106.0 93 2388 07-03-86 212.0 113.0 13.0 104.7 93 2389 sv 07-03-86 162.0 114.5 14.9 108.7 95 2390 sv 07-07-86 162.0 106.0 17.6 100.6 95 2391 sv 07-07-86 159.0 106.0 18.3 102.4 97 2392 sv 07-07-86 158.5 110.0 16.9 100.3 91 2393 sv 07-07-86 154.0 110.0 16.2 101.3 92 2394 sv 07-07-86 178.5 106.0 17.6 99.4 94 2395 sv 07-07-86 180.0 106.0 17.6 99.9 94 2396 07-07-86 200.0 106.0 13.6 95.6 90 2397 07-07-86 190.0 106.0 12.3 96.1 91 2398 07-07-86 186.0 114.5 14.2 103.1 90 2399 07-07-86 195.0 110.0 11.7 99.5 90 2400 07-07-86 193.0 110.0 14.2 100.3 91 2401 07-08-86 190.0 110.0 13.6 104.5 95 2402 07-08-86 192.0 110.0 14.2 101.7 92 2403 07-08-86 194.0 110.0 11.1 101.5 92 2404 sv 07-08-86 162.0 113.0 12.3 107.0 95 2405 sv 07-08-86 163.0 113.0 13.6 106.3 94 Table II (Continued) Test Elev. (ft) ----- Maximum Density (PW -----mm Job No. 285-256 - February 25, 1987 A-69 - Moisture Content (2) -------- Dry Density (PCf) --m--e- Relative Compaction (%I - .- - -- Table II (Continued) .- - - - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date -e---m --e-w- 2406 sv 07-08-86 164.0 113.0 14.2 104.6 93 2407 sv 07-09-86 160.0 113.0 11.1 103.9 92 2408 sv 07-09-86 162.0 113.0 14.2 109.7 97 2409 sv 07-09-86 164.0 113.0 13.0 105.0 93 2410 sv 07-09-86 161.0 113.0 12.3 106.1 94 2411 sv 07-10-86 201.0 113.0 13.6 108.7 96 2412 07-10-86 158.0 110.0 12.3 100.8 92 2413 07-10-86 150.0 106.0 13.6 96.4 91 2414 07-10-86 156.0 113.0 14.2 103.6 92 2415 sv 07-10-86 161.0 113.0 13.0 104.7 93 2416 sv 07-10-86 163.0 112.5 13.6 106.3 94 2417 sv 07-10-86 162.0 113.0 12.3 109.1 97 2418 07-10-86 160.0 110.5 11.7 100.2 91 2419 07-10-86 165.0 113.0 12.3 102.5 91 2420 sv 07-10-86 213.0 113.0 14.2 105.4 93 2421 sv 07-11-86 177.0 114.5 14.9 103.7 91 2422 sv 07-11-86 176.5 113.0 13.6 104.9 93 2423 sv 07-04-86 178.0 113.0 14.2 107.0 95 2424 sv 07-04-86 185.0 113.0 13.0 104.3 92 2425 sv 07-04-86 186.0 113.0 14.2 104.7 93 2426 07-04-86 173.0 112.5 14.9 102.0 91 2427 07-04-86 177.0 110.5 12.3 99.3 90 2428 sv 07-16-86 214.0 113.0 16.2 104.7 93 2429 sv 07-16-86 214.5 113.0 14.2 109.7 97 2430 07-16-86 197.0 110.5 11.1 95.4 86 &by2433 2431 sv 07-16-86 184.0 2432 sv 07-16-86 185.0 2433 07-16-86 197.0 2434 sv 07-16-86 187.0 2435 sv 07-17-86 189.0 2436 07-17-86 213.0 2437 07-17-86 215.0 2438 07-17-86 209.0 2439 07-17-86 194.0 2440 07-17-86 195.0 115.5 115.5 110.5 115.5 115.5 104.0 113.0 113.0 110.5 113.0 15.6 111.9 97 12.3 104.9 91 12.3 102.2 92 17.6 106.0 92 19.0 105.5 91 19.7 97.9 94 13.6 105.4 93 15.6 105.0 93 12.3 103.3 93 13.0 102.1 90 Test Maximum Moisture DW Elev. Density Content Density (it) (PCf) (%I (pcf) -a--- ------- -----es- ---mm-- Job No. 285-256 - February 25, 1987 - Relative Compaction (%I A-70 - -- - .- .- - - - - - - .- - - - 2451 07-21-86 137.0 113.0 12.3 103.4 92 2452 07-21-86 126.0 112.5 12.3 101.1 90 2453 07-21-86 130.0 112.5 13.6 103.1 92 2454 07-22-86 165.5 114.5 16.2 104.6 91 2455 sv 07-22-86 162.0 113.0 14.2 110.3 98 2456 sv 07-22-86 163.0 113.0 13.0 112.0 99 2457 07-22-86 217.0 122.5 14.9 112.4 92 2458 07-22-86 217.0 122.5 12.3 113.9 93 2459 07-22-86 175.0 110.0 11.7 102.0 93 2460 07-22-86 168.0 110.0 13.0 99.1 90 2461 07-22-86 173.0 110.0 13.6 101.7 92 2462 sv 07-23-86 218.0 122.5 12.3 116.0 95 2463 sv 07-23-86 219.0 114.5 14.9 108.2 94 2464 07-23-86 220.0 114.5 15.6 106.0 93 2465 07-23-86 218.0 114.5 14.2 106.3 93 2466 sv 07-24-86 218.0 116.5 13.6 108.8 93 2467 sv 07-24-86 219.5 113.0 13.0 111.9 99 2468 sv 07-25-86 221.0 115.5 14.2 109.0 94 2469 sv 07-25-86 223.0 113.0 13.6 107.2 95 2470 sv 07-25-86 244.0 113.0 14.2 107.8 95 2471 07-25-86 2472 07-28-86 2473 sv 07-28-86 2474 sv 07-28-86 2475 07-28-86 236.0 112.5 15.6 103.4 92 222.0 116.0 14.9 111.4 96 224.0 116.0 15.6 109.3 94 224.0 114.5 14.2 105.0 92 240.0 112.5 14.2 102.6 91 Job No. 285-256 - February 25, 1987 - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Test Test Number Date ------ ------ 2441 07-18-86 215.0 117.0 14.2 106.6 91 2442 07-18-86 224.0 112.5 13.6 107.7 96 2443 sv 07-18-86 218.0 122.5 13.0 110.0 90 2444 sv 07-18-86 219.0 122.5 12.3 111.4 91 2445 sv 07-18-86 225.0 116.5 14.2 111.3 96 2446 ev 07-21-86 162.0 115.5 16.2 107.6 93 2447 sv 07-21-86 163.0 116.5 16.2 111.1 95 2448 07-21-86 142.0 112.5 14.9 103.5 92 2449 07-21-86 159.0 112.5 16.2 101.3 90 2450 07-21-86 143.0 112.5 16.2 101.3 90 Test Elev. (ft) ----- Table II (Continued) Maximum Density (PCf) ------- Moisture Content (%) -------- DW Density (PCf) ------- Relative Compaction ($1 ---------- A-71 - - MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS -- .- - - .- - Test Test Number Date -w---e ---m-s 2476 07-29-86 218.0 114.0 13.6 107.9 95 2477 07-29-86 225.0 113.0 13.0 108.3 96 2478 sv 07-29-86 225.5 114.0 13.6 110.8 97 2479 sv 07-29-06 226.0 117.0 14.2 108.0 92 2480 07-29-06 159.0 112.5 14.2 100.7 90 2481 07-29-86 156.0 112.5 10.4 102.7 91 2482 07-29-86 161.0 112.5 13.0 103.5 92 2483 sv 07-30-86 221.0 113.0 13.6 109.1 97 2484 sv 07-31-86 224.0 116.0 14.9 110.7 95 2485 08-01-86 177.0 112.5 13.6 107.4 95 2486 08-01-86 171.0 112.5 12.3 105.2 94 2487 08-01-86 182.0 112.5 13.6 102.6 91 2488 08-04-86 218.0 110.0 12.3 103.4 94 2489 08-04-86 127.0 110.0 13.6 103.1 94 2490 08-04-86 111.0 110.0 14.2 99.6 91 2491 sv 08-06-86 2492 08-06-86 2493 2494 6%; 08-06-86 08-06-86 2495 sv 08-06-86 166.0 104.0 20.5 102.2 98 168.0 101.0 19.7 94.0 93 170.0 101.0 16.2 95.3 94 169.0 104.0 20.5 98.9 95 170.5 104.0 19.0 100.1 96 2496 00-07-06 172.0 101.0 23.0 97.0 96 2497 08-07-86 173.0 101.0 24.2 96.7 96 2490 08-07-86 170.0 104.0 19.7 99.2 95 2499 sv 08-07-86 172.0 106.0 15.6 103.8 98 2500 sv 08-07-86 171.5 106.0 16.2 101.7 96 2501 08-08-86 2502 sv 08-08-86 2503 sv 08-08-86 2504 00-08-06 2505 08-08-86 2506 00-08-86 2507 08-08-86 2508 08-08-86 2509 10-09-86 2510 10-09-86 177.0 106.0 14.9 99.2 94 172.0 113.0 14.9 106.1 94 176.0 106.0 16.2 100.5 95 170.0 112.5 19.0 101.5 90 173.0 112.5 15.6 103.8 92 158.0 113.0 11.1 109.6 97 147.0 116.5 10.4 109.2 94 157.0 112.5 14.9 103.7 92 211.0 113.5 19.0 105.2 93 213.0 111.8 14.0 106.3 95 Test Maximum Moisture DW Relative Elev. Density Content Density Compaction (ft) (pcf) (%I (Pcf) (2) --m-e -----me -------- ------- --------mm Table II (Continued) Job No. 285-256 - February 25, 1987 A-72 - ,- - .- ,~- - .- - - - - - - .~ - .- .- - Test Number Test Date ------ ------ Test Maximum Moisture DW Relative Elev. Density Content Density Compaction (ft) (pcf) (%) (pcf) (2) ----- ------- -------- ------- ---------- 2511 10-09-86 217.0 117.5 11.0 108.4 92 2512 10-09-86 218.0 114.5 10.4 102.5 90 2513 10-09-86 218.0 117.5 11.0 107.8 92 2514 10-09-86 217.0 117.5 11.0 114.1 97 2515 10-09-86 216.0 117.5 13.6 108.0 92 2516 10-09-86 218.0 106.0 20.4 99.8 94 2517 10-09-86 219.0 110.0 17.0 101.8 93 2518 10-09-86 222.0 116.0 14.9 108.6 94 2519 10-09-86 224.0 111.8 14.2 111.2 99 2520 10-09-86 225.0 111.8 14.0 107.0 96 2521 10-13-86 221.0 111.8 14.2 105.6 94 2522 10-13-86 223.0 111.8 14.6 105.4 94 2523 10-13-86 223.0 111.8 14.6 107.2 96 2524 10-13-86 225.0 111.8 15.6 104.8 94 2525 10-13-86 227.0 111.8 14.9 106.0 95 2526 10-13-86 174.0 116.5 14.9 109.3 94 2527 10-13-86 175.0 116.5 15.3 109.7 94 2528 10-13-86 173.5 116.5 14.6 110.5 95 2529 10-13-86 175.0 116.5 15.0 109.9 94 2530 10-14-86 174.0 116.5 15.6 109.9 94 2531 10-14-86 175.0 116.5 17.6 107.6 92 2532 10-14-86 177.0 111.8 15.0 110.7 99 2533 10-14-86 176.0 111.8 16.2 109.6 98 2534 10-14-86 175.5 116.5 14.9 111.0 95 2535 10-14-86 176.0 111.8 15.6 108.4 97 2536 10-14-86 2537 10-14-86 177.0 111.8 15.2 108.1 97 177.5 113.0 20.0 102.9 91 178.0 113.0 19.0 105.9 94 177.0 113.0 19.6 102.3 91 177.5 113.0 18.6 104.9 93 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Table II (Continued) 2538 sv 10-14-86 2539 sv 10-14-86 2540 sv 10-14-86 2541 sv 10-14-86 178.0 113.0 18.0 103.6 92 2542 sv 10-14-86 176.0 113.0 17.0 101.8 90 2543 sv 10-14-86 177.0 111.8 15.0 108.6 97 2544 10-15-86 138.0 113.0 14.9 106.9 95 2545 10-15-86 139.0 113.0 14.6 104.7 93 Job No. 285-256 - February 25, 1987 A-73 - - MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS - Table II (Continued) Test Test - Number Date ------ ------ Test Maximum Moisture DW Rela-tive Elev. Density Content Density Compaction (ft) (pcf) (%I (pcf) (%) ----- ------- -------- ------- ------____ .- 2546 10-15-86 140.0 113.0 14.2 104.1 92 2547 10-15-86 226.0 110.5 14.9 108.9 99 2548 10-15-86 227.0 110.5 14.0 107.0 97 2549 10-15-86 226.0 110.5 14.0 106.0 96 2550 10-15-86 225.0 110.5 13.6 105.3 95 .- 2551 10-15-86 222.0 112.5 15.6 106.2 94 2552 10-15-86 223.0 110.5 13.6 104.1 94 2553 10-15-86 221.0 112.5 16.3 104.7 93 2554 10-15-86 222.0 110.5 13.0 102.6 93 2555 10-15-86 228.0 110.5 15.2 100.0 90 2556 .- - 2557 2558 2559 2560 10-15-86 231.0 110.5 14.9 102.8 93 10-15-86 231.0 112.5 16.9 102.9 91 10-15-86 228.0 110.5 15.6 103.1 93 10-15-86 225.0 110.5 14.2 102.4 93 10-15-86 226.0 110.5 14.6 102.7 93 2561 10-15-86 223.0 110.5 13.5 101.3 92 2562 10-15-86 222.5 110.5 14.0 101.6 92 ,- 2563 10-15-86 223.0 110.5 14.9 100.9 91 2564 10-15-86 223.5 110.5 14.0 100.6 91 2565 10-15-86 215.0 113.5 13.0 104.7 92 - 2566 2567 2568 .- 2569 2570 10-15-86 214.5 113.5 12.9 104.3 92 10-16-86 216.0 112.5 19.6 102.6 91 10-16-86 218.0 112.5 20.0 103.1 92 sv 10-16-86 228.0 110.5 14.1 103.3 93 .sv 10-16-86 234.0 110.5 13.6 106.0 96 - 2571 2572 2573 2574 - 2575 10-16-86 232.5 110.5 13.0 100.5 91 10-16-86 230.0 110.5 14.9 102.3 93 10-16-86 222.2 110.5 15.0 103.0 93 10-16-86 222.5 110.5 15.3 101.5 92 10-16-86 222.0 112.5 15.6 108.3 96 2576 .- 2577 2578 2579 2580 .~- 10-16-86 220.0 112.5 16.2 107.4 95 10-16-86 215.0 112.5 16.9 106.5 95 10-16-86 223.0 112.5 15.6 107.6 96 10-16-86 223.0 113.0 14.6 107.5 95 10-16-86 218.0 113.0 14.9 107.1 95 Job No. 285-256 - February 25, 1987 A-74 - - - MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS - Table II (Continued) - Test Test Number Date _----- ---m-e Test Maximum Moisture Elev. Density Content (ft) (pcf) (0) ----- --w-v-- -------- DW Reldtive Density Compaction (pcf) (%) ------- ---------- - 2581 2582 2583 2584 2585 10-16-86 217.0 113.0 14.9 107.9 95 10-16-86 219.0 113.0 15.3 108.7 96 10-16-86 223.0 113.0 19.6 109.0 96 10-16-86 225.0 113.0 15.0 107.1 95 10-17-86 266.0 113.0 16.2 107.5 95 - 2586 2587 2588 2589 - 2590 10-17-86 224.0 113.0 15.3 107.3 95 10-17-86 176.5 112.5 15.4 103.4 92 10-17-86 177.5 112.5 16.3 104.3 93 10-17-86 178.5 112.5 15.6 104.0 92 10-17-86 179.0 112.5 16.2 103.8 92 2591 - 2592 2593 2594 2595 .- 10-21-86 224.0 113.0 19.6 103.0 91 10-21-86 224.0 113.0 20.0 102.5 91 10-21-86 266.0 113.0 19.1 103.0 91 10-21-86 225.0 113.0 19.0 102.3 91 10-23-86 170.0 110.5 6.4 106.7 97 2596 10-23-86 167.5 113.0 9.8 106.7 94 2597 10-23-86 172.0 113.5 16.2 105.3 93 - 2598 10-23-86 173.0 113.5 15.6 105.0 93 2599 10-23-86 176.0 110.5 12.3 107.0 97 2600 10-23-86 180.0 110.0 11.7 106.9 97 - 2601 2602 2603 .- 2604 2605 10-23-86 177.5 110.0 13.6 103.7 94 10-23-86 181.0 110.0 13.0 102.6 93 10-24-86 183.0 113.0 14.9 102.6 91 10-24-86 184.0 116.5 7.5 112.7 97 10-24-86 187.0 113.0 13.0 109.2 97 - 2606 10-24-86 190.0 113.0 12.3 109.5 97 2607 10-24-86 192.0 113.0 12.3 107.9 95 2608 10-24-86 191.0 113.0 11.1 108.3 96 2609 10-27-86 175.0 116.5 12.3 109.7 94 2610 10-27-86 169.0 116.0 17.6 105.9 91 2611 .- 2612 2613 2614 2615 - 10-27-86 171.0 116.0 14.9 109.3 94 10-27-86 171.0 113.0 11.1 108.0 96 10-27-86 179.0 113.0 10.4 107.0 95 10-27-86 181.0 113.0 13.0 105.4 93 10-27-86 183.0 113.0 13.6 106.1 94 Job NO. 285-256 - February 25, 1987 - A-75 - - - Table II (Continued) - Test Test Number Date ------ ------ Test Maximum Elev. Density (ft) (pcf) ----- --w-m-- Moisture DW Content Density (%I (pcf) -------- ------- Relative Compaction (2) ---------- - 2616 2617 2618 .- 2619 2620 10-28-86 185.0 113.0 11.7 109.4 97 10-28-86 187.0 113.0 10.4 109.0 96 10-28-86 178.0 110.0 7.5 107.9 98 10-28-86 181.0 110.0 8.2 108.3 98 10-28-86 183.0 113.0 10.4 109.2 97 2621 - 2622 2623 2624 - 2625 10-28-86 185.0 110.0 9.8 104.9 95 10-28-86 181.5 113.0 12.3 102.9 91 10-28-86 186.0 113.0 12.3 106.3 94 10-28-86 185.0 113.0 13.0 104.4 92 10-28-86 184.0 110.0 12.3 108.1 98 2626 2627 2628 2629 2630 - 10-28-86 186.0 110.0 12.3 108.6 99 10-28-86 190.0 110.0 14.9 107.0 97 10-28-86 193.0 110.0 9.8 108.3 98 10-29-86 195.0 110.0 13.0 106.2 97 10-29-86 191.0 110.0 13.6 106.1 96 2631 10-29-86 187.0 113.0 7.5 109.6 97 2632 10-29-86 189.0 110.0 16.2 108.7 99 - 2633 10-29-86 192.0 113.0 13.6 107.7 95 2634 10-30-86 195.0 113.0 13.6 110.9 98 2635 10-30-86 192.0 115.5 13.6 108.4 94 - 2636 2637 2638 .- 2639 2640 10-30-86 194.0 113.0 14.2 106.4 94 10-30-86 196.0 113.0 16.2 106.2 94 10-30-86 197.0 113.0 16.9 106.0 94 11-03-86 193.0 115.5 11.1 107.6 93 11-03-86 195.0 113.0 15.6 103.9 92 2641 2642 2643 2644 .- 2645 11-03-86 198.0 112.5 14.9 103.0 92 11-03-86 197.0 112.5 14.2 102.9 91 11-04-86 197.0 104.0 la.3 97.5 94 11-04-86 189.0 113.0 11.1 106.4 94 11-04-86 195.0 116.5 14.2 108.4 93 2646 .- - 2647 2648 2649 2650 11-04-86 162.5 113.0 14.9 106.1 94 11-04-86 164.0 113.0 16.9 105.2 93 11-05-86 176.0 114.0 12.3 105.7 93 11-05-86 176.5 115.5 13.0 106.2 92 11-12-86 140.0 110.5 12.3 107.0 97 MOOREZTABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS Job No. 285-256 - February 25, 1987 A-76 - - - - Test Number ------ - - - - 2651 11-12-86 142.0 113.0 13.0 109.0 96 2652 11-12-86 178.0 104.0 20.5 98.5 95 2653 11-12-86 175.0 113.0 14.2 105.4 93 2654 11-12-86 144.0 104.0 19.7 100.2 96 2655 11-12-86 145.0 112.5 16.2 106.2 94 2656 11-12-86 147.0 112.5 16.9 102.8 91 2657 11-13-86 148.0 112.5 13.0 105.8 94 2658 11-13-86 190.0 113.0 13.0 104.9 93 2659 11-13-86 192.0 113.0 10.4 106.8 95 2660 11-13-86 185.0 113.0 11.1 105.6 93 2661 11-13-86 183.0 110.0 12.3 100.4 91 2662 11-13-86 174.0 113.0 12.3 104.1 92 2663 11-13-86 194.0 113.0 13.6 104.9 93 2664 11-13-86 185.0 110.0 11.7 107.2 97 2665 11-14-86 230.0 112.5 15.6 106.5 95 2666 11-14-86 228.0 112.5 14.2 105.4 94 2667 11-14-86 227.0 112.5 13.6 108.9 97 2668 11-14-86 299.0 112.5 16.9 106.4 95 2669 11-14-86 182.0 113.0 11.1 108.9 96 2670 11-14-86 195.0 112.5 11.7 110.3 98 2671 11-17-86 170.0 113.0 14.2 106.8 95 2672 11-17-86 171.0 112.5 13.6 106.5 95 MOORE & TABER GEOTECHNICAL ENGINEERSAND GEOLOGISTS Table II (Continued) Test Date ------ Test Maximum Moisture Dry Elev. Density Content Density (ft) (pcf) (%) (pcf) ----- ------- ------mm ------- Relative Compaction (0) (ck by 12) - signifies that this failing test area was reworked, recompacted, and retested by test number 12 - nu - indicates that this test is nuclear test sv - indicates that this test is a sand volume test - - Job NO. 285-256 - February 25, 1987 A-77 - - - - - - .- - - - - - Test No. ---- Initial Moisture Location Content -------- ---------------- (percent) 1 Lot 2 13.5 2 Lot 3 12.6 3 Lot 2 12.9 4 Lot 2 13.4 5 Lot 3 12.7 6 North of Lot 3 13.1 7 Owens Avenue 16.3 8 Lot 1 13.3 9 Lot 1 12.5 9A Lot 1 16.3 10 Lot 1 14.4 10A Lot 1 11.5 11 Lot 2 13.4 12 Lot 2 11.5 13 Lot 4 16.1 14 Let 4 14.0 15 Lot 4 13.9 16 Lot 3 14.0 17 Lot 3 14.0 18 Lot 6 10.0 19 Lot 6 13.5 Job No. 285-256 - February 25, 1987 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS TABLE III Initial Dry Density ----------- (pcf) 98.9 99.9 98.8 97.2 101.1 98.0 88.5 98.8 100.1 89.7 94.7 103.2 98.1 103.9 90.5 96.0 95.8 95.8 95.8 109.9 97.2 Expansioli Percent Index ------- ----- 7.3 5.3 2.7 9.0 1.9 6.2 14.6 0.3 8.5 2.4 9.0 8.0 0.7 4.8 4.5 6.2 8.1 7.9 8.8 6.1 7.5 73 53 27 90 19 62 146 3 85 24 90 80 7 48 45 62 81 79 as 61 75 B-l - .- Test No. ---- 20 - 21 22 .- 23 24 25 26 27 - 28 29 - 30 31 - 32 - 33 34 - 35 36 37 .- 38 39 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS TABLE III (cont'd) Location -------- Initial Moisture Content ---------------- (percent) Initial Dry Density ----------- (pcf) Expansion' Percent Index ------- --mm- Lot 5 16.0 90.4 5.1 51 Lot 5 11.4 105.0 6.6 66 Lot 18 9.5 111.2 6.6 66 Lot 19 11.5 103.2 6.4 64 Lot 23 9.5 111.0 5.4 54 Lot 23 9.2 112.1 1.7 17 Lot 22 11.3 104.2 0.6 6 Lot 22 11.0 105.2 4.8 48 Lot 22 12.0 101.7 3.4 34 Lot 24 11.3 105.4 4.0 40 Lot 24 16.0 89.8 3.6 36 Lot 24 10.0 109.6 4.0 40 Lot 25 10.0 109.3 2.7 27 Let 25 11.3 105.3 5.9 59 Lot 20 15.6 91.0 10.9 109 Lot 20 11.5 103.0 1.3 13 Lot 19 13.3 98.0 7.5 75 Lot 19 15.5 91.7 14.4 144 Lot 20 12.0 102.7 10.4 104 Let 21 11.5 103.0 2.0 20 Job No. 285-256 - February 25, 1987 B-2 MOORE & TABER GEOTECHNICAL ENGINEERS AND GEOLOGISTS TABLE III (contld) Test Initial Moisture Initial Dry Expansion No. Location Content Density Percent Index ---- -------- ---------------- ----------- ------- --we- (percent) (PW 40 Lot 8 12.0 41 Lot 8 9.6 42 Lot 7 10.5 43 Lot 7 10.0 44 Lot 10 14.2 45 Lot 10 14.7 46 Lot 15 9.2 47 Lot 11 17.3 Job No. 285-256 - February 25, 1987 23.1 3.5 35 110.3 1.0 10 107.6 1.2 12 109.0 0.1 1 95.6 5.8 58 94.5 7.9 79 112.7 1.1 11 87.4 6.1 61 B-3