HomeMy WebLinkAboutCT 81-46; Carlsbad Airport Center Unit 2; Soils Report; 1991-03-21GEOTECHNICAL SITE EVALJJATION
CARLSBAD AIRPORT CENTER, UNIT 2
CARLSBAD, CALIFORNIA
FOR
COLLINS DEVELOPMENT COMF'ANY
11750 SORRENTO VALLEY ROAD
SAN DIEGO, CALIFORNIA 92121-5694
w.0. 1260-s~ MARCH 21, 1991
CeoSoils, Inc.
TABLE OF CONTENTS
SITECONDITIONS. ........................ 1
Groundwater. ..................... 2
Geologic Units .................... 3
FIELD AND LABORATORY TESTING .................. 3
FILL EVALUATION ......................... 4
Slopes ........................ 7
CONCLUSIONS ...........................
RECOMMENDATIONS .........................
a
a
Additional Grading .................. 9
Graded Slope Maintenance ............... 9
Drainage ....................... 9
LIMITATIONS........................... 9
GeoSoils, Znc.
-
"
Geotechnical Engineering Engineering Geology
- 5741 Palmer Way - Carlsbad, California 92008 - (619) 438-3155 *FAX (619) 931-0915
March 21, 1991
W.O. 1260-SD
COLLINS DEVELOPMENT COMPANY
San Diego, California 92121-5694 11750 Sorrento Valley Road
Attention: Mr. Steve Hollenbeck
Sub j ect : Geotechnical Site Evaluation Carlsbad Airport Center, Unit 2
Carlsbad, California
Gentlemen:
As requested, presented herein is a summary of our evaluation of
the previously placed fill in the Carlsbad Airport Center-Unit 2,
Carlsbad, California.
The purpose of our exploration and testing was to evaluate the as
graded geotechnical conditions on site with respect to previous
earthwork.
This report presents our findings, conclusions and
recommendations concerning future site development.
SITE CONDITIONS
General
The project site consists of twenty-three sheet graded lots, a
detention basin (Lot 26) and associated street improvements. The
street improvements and utilities for the backbone road system
are completed. An evaluation of the streets and various utility
corridors, with respect to compaction testing, is not within the
scope of this report.
Los Angeles Ca. (818) 785-2158 Omnge Co. 1714) 647-0277 f Riverside Co. (7141 677-9651
COLLINS DEVEMPMENT COMPANY
W.O. 1260-SD
MARCH 21, 1991
PAGE 2
Site drainage is typically by sheet flow across the lots to catch
basins, which convey the surface water into the storm drain
system.
Earthwork for the site has occurred in two phases. Initial
earthwork on Unit 2 took place in conjunction with mass grading
of Unit 1. Fill was placed under the observation and testing
services of Moore h Taber in the areas of Lots 40, 41 and 48 and
portions of Lots 33-35, 39, 42 and 49. Grading of Unit 1 and the
above mentioned portions of Unit 2, was performed by Templeton
Construction between November, 1985 and November, 1986.
The second phase of earthwork for Unit 2 occurred under the
observation and testing services of San Diego Geotechnical
Consultants, Inc. (currently named ICG Incorporated). Grading of
Unit 2 was performed by Astleford Construction between August,
1989 and March, 1990.
Groundwater
Groundwater seepage was encountered onsite in boring B-lb at a
depth of 67 feet, just above the bedrock contact. The seepage
encountered in this boring and seepage which is likely in other
subsurface canyons, is not an unusual condition to encounter
along a bedrock/fill contact. This water should be ultimately
picked up and conveyed offsite via the subdrain systems denoted
on the "As-Built Subdrain" map prepared by Bodas Engineering,
Inc. for Unit 2 and constructed during grading of Unit 1. As
such, this condition is not anticipated to adversely affect site
development. These observations and opinions reflect site
conditions at the time of this investigation and do not preclude
changes in local groundwater conditions in the future from heavy
irrigation or precipitation.
GeoSoils, Znc.
COLLINS DEVELOPMENT COMF'ANY
W.O. 1260-SD
HARCH 21, 1991 PAGE 3
Geolwic Units
The site is underlain by Jurassic age Santiago Peak Volcanics,
Eocene age Santiago Formation sediments and recently placed fill
materials. Fill materials are discussed under the "Fill
Evaluation" section of this report.
Santiago Peak Volcanics (Map Symbol Jsp):
The Jurassic age Santiago Peak Volcanics are a series of mildly
metamorphosed, pervasively fractured and jointed volcanic rock.
Excavation into this material should be expected to be difficult
and would likely produce poor quality fill materials.
Santiago Formation (Map Symbol Tsa):
The Eocene age Santiago Formation underlies much of the site. As
observed, this material consists of interbedded siltstones,
claystones and sandstones. The clays and silts should be
expected to be moderately to highly expansive, dependent upon the
percent sand in the materials.
FIELD AND LABORATORY TESTING
Subsurface conditions were explored .by excavating backhoe test
pits and advancing hollow stem auger borings. Logs of the test
pits and borings are included in this report as Appendix I.
Field exploration was performed in mid-December, 1990 by some of
our staff geologists, who logged the excavations, performed field
density tests and obtained samples of representative fill
materials for laboratory testing. The approximate location of
the exploratory test pits and borings are indicated on the
enclosed Geotechnical Map (Plate 1) which utilizes the 1"=80'
site plan prepared by Bodas Engineering Inc., as a base map.
Six hollow stem auger borings were advanced to varying depths to
explore subsurface conditions. For laboratory testing, ring
samples were obtained on selected intervals as the borings were
GeoSoils, Zne.
COLLINS DEVELOF" COMPANY
W.O. 1260-SD
MARCH 21, 1991
PAGE 4
advanced. In addition, fifty-two backhoe test pits were
excavated to explore and evaluate near surface conditions. Field
density tests were performed in the test pits on approximately 2
foot vertical intervals to determine in-situ moisture and density
of the fill material. Field density testing was performed using
the sand cone method (ASTM D-1556-82) or nuclear density method
(ASTM D-2922-81 and ASTM D-3017-78). These test results were
compared to the laboratory maximum dry density and optimum
moisture content (ASTM D-1557-78) of representative soil types to
determine in place relative compaction of the materials tested.
Both direct correlation and visual classification of the soils in
the field and lab were the basis for determining which optimum
moisture content and maximum dry density values to use for a
given density test. The test results are presented in Appendix
11.
Other laboratory tests were also performed on selected soil
samples to evaluate the physical characteristics of
representative on site materials. Testing included: coulomb shear
strength parameters, soil compressibility and coefficient of
consolidation, soil expansion potential and other soil index
properties.
The primary focus of our geotechnical study was to evaluate the
nature of subsurface earth materials underlying the lots and to
ascertain their engineering properties with emphasis on the fills
placed during grading performed between August 1989 and March
1990 by Astleford Construction. Lot 37 has been excluded from
this report, as it was previously evaluated and discussed in
reference 4.
GeoSoils, Inc.
COLLINS DEVELOI'MENT COMF'ANY
W.O. 1260-SD
MARCH 21, 1991 PAGE 5
Reference 1 presents the geotechnical observation and testing
services provided by Moore & Taber during mass grading of Unit 1
and portions of Unit 2.
At most of the locations of our exploratory borings and test pits
adequate removals were accomplished. For the most part,
observations made in our test pits would indicate that proper
benching was performed, as the contacts between bedrock and fill
materials were relatively flat lying and distinct. However,
topsoil and/or an abundance of organic material was exposed in
TP-3 (Lot 28), TP-18 (Lot 48) and TP-35 (Lot 42). Remedial
recommendations concerning these materials are presented in the
81Recommendationst8 section of this report.
Stabilization fills were constructed for the ascending slopes
from Lots 31, 32, 34, 35 and 49. These are documented by ICG's
"Daily Report of Grading Observations" and "Field Memos" for the
project and by the back drains locations indicated on the "AS
Built Subdrain" map prepared by Bodas Engineering Inc. In
addition, some of our test pits exposed either a portion of the
keyway or backcut of the of the subject stabilization fills.
Based on available data these appear to be constructed in
accordance with current industry standards.
A subdrain system was constructed during Unit 2 earthwork in the
canyons below Lots 26, 29 and 30 and is also indicated in ICG
documents and the "As-Built Subdrain" map prepared by Bodas
Engineering. Subdrains were also constructed in Unit 2 during
grading of Unit 1. The location of these subdrains are denoted
on the Airport Business Center Unit 1, As Built-Grading Plans,
prepared by Bodas Engineering, Inc.
Cut/fill transitions are present on Lots 28, 30-36 and 42-47.
The approximate locations of the cut/fill transitions are
indicated on the enclosed Geotechnical Map, Plate 1. A cut/fill
GeoSofls, fnc.
COLLINS DEVEMPMENT COMPANY
W.O. 1260-SD
MARCH 21, 1991 PAGE 6
transition was also encountered in a proposed cut area on Lot 43
(TP-47). This fill was rather limited and likely associated with
the excavation of the stabilization key for the ascending slope
from Lot 49.
In TP-25 through TP-27 on Lot 40, rock fill materials were
encountered at depths of 7.5 to 8 .O feet. Rock fill was also
encountered in TP-31 on Lot 39 at a depth of 3.5 feet. Any
excavation into these materials is anticipated to be difficult
and likely will produce oversized fill materials.
Fill caps varying from three to four feet in thickness were
encountered on Lots 38 and 39 in test pits TP-28 through TP-30.
Below the fill caps Santiago Peak Volcanics were encountered.
Excavation into the volcanics is anticipated to be difficult,
possibly requiring special equipment or blasting and producing
oversized fill materials.
Density test results, presented in Appendix 11, indicate that the
fill materials tested generally meet or exceed the typical
industry standard of 90 percent relative compaction. However,
some zones are apparently not compacted to the typical 90 percent
minimum. Data indicates that these zones are rather limited.
Zones or layers of this nature are rather typical within large
fills.
While it is typical to specify a minimum 90 percent relative
compaction, the competency of a fill to support a given load is
more significant with respect to the fills overall performance.
For example: under a relatively light loading condition (1500 psf
or less) a soil compacted to 87 percent should not perform
significantly different than the same fill material compacted to
90 percent. Excluding Lots 35 and 40, which are discussed below,
there are only three remaining tests results below 89 percent
relative compaction.
GeoSoils, Inc.
COLLINS DEVEMPMENT COMPANY
W.O. 1260-SD
MARCH 21, 1991
PAGE 7
Considering the results of the fill evaluation and the following,
it is our opinion that these zones will not adversely affect
future site development for the following reasons.
1) Site grading was completed in March, 1990. Time consolidation data indicates that
primary settlement due to the weight of the fill would have already occurred.
2) Consolidation test data for samples below 90 percent and above 90 percent, indicate no significant difference in consolidation behavior.
3) Some of the failing zones will be removed or recompacted during individual lot regrading and development.
4) Zones that will not be subject to significant stress increases from foundation loading
conditions, etc., will not likely undergo additional primary settlement because without an increase in stress conditions, settlement is not likely to occur.
On Lots 35 (TP-23) and Lot 40 (TP-26), the softer fill zones in
these areas may impact development. More detailed evaluations to
better delineate the limits should be performed when site
development plans are available. Removal and recompaction might
be warranted.
Observations indicate that the surface soils (less than 1.5 feet
deep) have been desiccated, loosened and remoistened (recently)
and therefore, are likely below the minimum 90 percent compaction
standard.
sloDes
Both cut and fill slopes have performed satisfactorily to date.
However, these slopes are being heavily irrigated. Consideration
should given to providing only the amount of water necessary to
maintain plant life. Overwatering should be avoided.
GeoSoils, Inc.
COLLINS DEVELOP" COMF'ANY
W.O. 1260-SD
MARCH 21, 1991
PAGE 8
CONCLUSIONS
Based on our field exploration, laboratory testing, review of the
referenced reports and the engineering and geologic analyses
performed, it is our opinion that the project site is suited for
the proposed industrial/office development from a geotechnical
engineering and geologic viewpoint, provided the recommendations
presented herein are incorporated into the planning and design
phase of individual lot development.
RECOMMENDATIONS
Prior to development, it is recommended that a detailed
foundation investigation be conducted on each lot, so that
appropriate site preparation and foundation recommendations could
be provided with respect to the geotechnical conditions, building
locations and foundation loading.
Remedial recommendations concerning the soft fill zones in the
area of TP-23 (Lot 35) and TP-26 (Lot 40) and the topsoil and/or
an abundance of organic material exposed in TP-3 (Lot 28), TP-18
(Lot 48) and TP-35 (Lot 42) can then be provided based on
specific lot development plans.
Laboratory testing and visual observation of the surface soils
indicate, medium to highly expansive soils are exposed across the
site. They should be taken into consideration by the design
consultants providing appropriate recommendations for
construction of all improvements and landscaping. If we may be
of further assistance and aid the other design consultants in
this regard, please contact our office for additional
consultation.
If in the future, any additional improvements are planned for the
site, recommendations concerning the geological or geotechnical
GeoSoils, Inc.
COLLINS DEVELOPMENT COMPANY
W.O. 1260-SD
MARCH 21, 1991
PAGE 9
aspects of design, site preparation and construction of said
improvements could be provided upon request.
Additional Grading
This office should be notified in advance of any additional fill
placement, regrading of the site, or trench backfilling after
rough grading has been completed.
Graded Slope Maintenance
Water has been shown to weaken the inherent strength of all earth
materials. Slope stability is significantly reduced by overly
wet conditions. Irrigation for planted areas on and above slope
should be minimized to just support the vegetation and avoid
developing artificial groundwater accumulation. Only the amount
of irrigation necessary to sustain plant life should be provided.
overwatering should be avoided.
Drainaae
Positive site drainage should be maintained at all times.
Drainage should not flow uncontrolled down any descending slope.
Water should be directed away from foundations and not allowed to
pond and/or seep into the ground. Pad drainage should be
directed toward the street or other approved area.
Due to the nature of on site soils, local areas of seepage may
develop due to irrigation or heavy rainfall. Minimizing
irrigation will lessen this potential. If areas of seepage
develop, recommendations for minimizing this effect could be
provided upon request.
LIMITATIONS
The materials encountered on the project site and utilized in our
laboratory study are believed to be representative of the total
area. However, soil and bedrock materials may vary in character
CeoSoiIs, Znc.
COLLINS DEVELOPWENT COMPANY
W.O. 1260-SD
MARCH 21, 1991 PAGE 10
between excavations and natural outcrops. Test excavations are
reflective of the soil and rock materials only at the specific
location explored. Site conditions may vary due to seasonal
changes or other factors.
Since our study is based on the site materials observed,
selective laboratory testing and engineering analyses, the
conclusions and recommendations are professional opinions based
upon those parameters. These opinions have been derived in
accordance with the current standards of practice and no warranty
is expressed or implied.
The opportunity to be of service is sincerely appreciated. If
you should have any questions, please call.
Very truly yours,
Geosoils, Inc.
ap Engineer
RCS/VS/TEM/mc
Enclosures: References
Appendix I, Exploratory Logs Appendix 11, Laboratory Plate 1, Geotechnical Map
cc: (6) Addressee
GeoSoils, Inc.
REFERENCE LIST
1. "Report of Geotechnical Services Carlsbad Tract No. 81-46 Airport Business Center, Unit No. 1 City of Carlsbad, California*8, by Moore & Taber, dated February 25, 1987
2. l1Supplemental Geotechnical Investigation Carlsbad Airport Center, Unit 2 , and Off-Site Fill Area Carlsbad, California", dated July 29, 1988, by San Diego Geotechnical Consultants, Inc., Job No. 05-4879-011-00-00.
3. "Foundation Investigation Carlsbad Airport Center Unit 2, Lot 37 Carlsbad, California", dated August 6, 1990, by ICG Incorporated, Job No. 05-7967-004-00-00.
4. "Report of Geotechnical Services Carlsbad Tract No. 81-46 Airport Business Center Unit No. 1 City of Carlsbad, California", dated February 25, 1987, by Moore & Taber, Job NO. 285-256.
5. "Additional Geotechnical Investigation Carlsbad Airport Center, Unit 2 Carlsbad, Californiam8, dated August 7, 1989, by San Diego Geotechnical Consultants, Inc., Job No. 05-
4879-016-00-00.
6. "Supplemental Geotechnical Investigation Carlsbad Airport
by San Diego Geotechnical Consultants, Inc., Job No. 05-
Center, Unit 3 Carlsbad, California", dated August 22, 1989,
4879-015-00-00.
7. "Preliminary Geotechnical Investigation Proposed Palomar Business Park North San Diego County, California", dated
January 15, 1980, by H.V. Lawnmaster & Co., Inc., File No.
79-9394/654G.
8. "Addendum to Additional Geotechnical Investigation Airport
Business Center, Unit 2, Carlsbad, California", dated August
9, 1989, by San Diego Soils Engineering, Inc.
9. "Geotechnical Evaluation and Compaction Testing, Site
Regrading Carlsbad Airport Center, Unit 2, Lot 37 Carlsbad, California", dated December 11, 1990, by GeoSoils, Inc.,
W.O. 1261-SD
GeoSoils, Inc.
APPENDIX I
EXPLORATORY LOGS
-14-
GeoSoils, Znc.
Test Pit mDth (ft.1 Material DescriDtion
TP- 1 0-8 moist, dense, silty fine SAND with
-FILL: Yellow brown,
some clay.
@6.5 Becomes pale yellow brown to light brown SAND.
Total Depth= 8 feet
TP-2 0-(0-.5) ARTIFICIAL FILL: Yellow brown, moist, dense, silty SAND.
(0-.5)-2.5 BEDROCK - SANTIAGO FORMATION: Pale yellow and red brown, dense, slightly moist, cross bedded SANDSTONE.
Bedding attitude: N35E, 15"SE: N45E, 12'SE.
@2' Becomes olive brown and red
brown, moist, dense, cemented, and thinly laminated silty fine SANDSTONE.
Bedding attitude: N67W/6SW.
Total Depth= 2.5 feet
CeoSofls, fnc.
CENTRE DEVELOPMENT
W.O. 1260-SD
TEST PIT LOG
Test Pit Depth (ft.1 Material DescriDtion
TP-3 SEE GRAPHIC LOG TP-3
TP-4 SEE GRAPHIC LOG TP-4
MARCH 21, 1991
TP-5 0-3 BEDROCK - SANTIAGO FORMATION: Gray with red brown, lamination, moist, dense, weakly laminated SANDSTONE.
@la Grades to red brown, well cemented SANDSTONE.
Bedding attitude: N70W, 8"SW
Total Depth= 3 feet
TP-6 SEE GRAPHIC LOG TP-6
TP-7 0-2 BEDROCK - SANTIAGO FOmTION: Black, moist, dense, well rounded and cemented, fissile in parts, thinly
laminated SILTSTONE. Bedding attitude N60'W, 1O'SW.
Upper 1 foot is mottled olive yellow
grade horizontally to a pale red along bedding planes. Appears to
dense SILTSTONE.
Total Depth= 2 feet
TP-8 SEE GRAPHIC LOG TP-8
-2-
GeoSoils, Inc.
CENTRE DEVELOPMENT
W.O. 1260-SD
TEST PIT LOG
MimcH 21, 1991
Test Pit mDth (ft.1 Material DescriDtion
TP-9 0-8 ARTIFICIAL FILL: Light yellow brown, dry, dense, silty SAND.
moist.
@.5 feet becomes yellow brown and
@2.5* Becomes dark brown, moist, dense, clayey SAND, abrupt smooth ct. at base.
@3' Yellow gray, slightly moist, dense, silty SAND.
Total Depth= 8 feet
TP-10 0-3 BEDROCK - SANTIAGO FORPlATION: Mottled olive gray, gray brown and red brown, dry, dense, fissile thinly laminated silty fine SANDSTONE.
Bedding attitudes: N20W, 5'SW, N30W,
9'NE, N60E, 5'SE.
Total Depth= 3 feet
TP-11 0-2.5 ARTIFICIAL FIJA: Grayish yellow brown, dry, dense, silty fine SAND with some clay.
2.5-3 BEDROCK SANTIAGO FORMATION: Olive brown, moist, dense, massive weakly
fissile sandy SILTSTONE with fossil shells and wood stems.
Total Depth= 3 feet
-3-
GeoSoils, he.
CENTRE DEVELOPMENT
W.O. 1260-SD
TEST PIT LOG
MARCH 21, 1991
Test Pit Haterial Descriution
TP-12 0-2
brown, moist, dense, weakly laminated
BEDROCK - SANTIAGO FORMATION: Olive
and fissile fossilli ferrous
SANDSTONE.
81.5' Becomes very cemented and
inundated.
Total Depth= 2 feet
2.5-4
TP-13 0-2.5 ARTIFICIAL FILL: Interlayered dark
brown, moist, clayey SAND; orange
brown, moist, dense SAND and gray
brown silty sand.
BEDROCK - SANTIAGO FORMATION: Olive
brown and red brown, moist, dense,
fissile, thinly laminated fine sandy
SILTSTONE.
Bedding attitude: N60W, 6'SW
NZOE, 10'NE
Total Depth= 4 feet
TP-14 0-2.5 BEDROCK - SANTIAGO FORMATION: Gray
brown, dry, dense and laminated
SANDSTONE.
Bedding attitude: N50E 6" SE.
becomes moist dense, well cemented
@.5' Gray brown and yellowish gray
weakly laminated SANDSTONE.
Total Depth= 2.5 feet
-4-
CeoSoffs, Inc.
CENTRE DEVELOPMENT
W.O. 1260-SD
TEST PIT LOG
MARCH 21, 1991
Test Pit DeDth fft.) gaterial Description
TP-15 0-4.5 -: Gray brown and pale
yellow dry dense SAND.
6.5' Becomes moist.
4.5-7 BEDROCK - SANTIAGO FORMATION: Dark
arav to dark bluish qray slightly " " moist, dense, massive to weakly laminated locally very hard micaceous
discontinuous fossil ferrous zones silty SAND. Contains common
and scattered shell float.
Total Depth= 7 feet
TP-16 SEE GRAPHIC LOG TP-16
TP-17 0-10
dense, silty SAND.
ARTIFICIAL FILL: Gray brown, dry,
6.5' Becomes moist.
Total Depth= 10 feet
TP-18 SEE GRAPHIC LOG TP-18
TP-19 0-9 ARTIFICIAL FILL: Brown, dry, dense, silty SAND.
61' Becomes moist.
Total Depth= 9 feet
-5-
GeoSoils, Znc.
CENTRE DEVELOPWENT
W.O. 1260-SD
TEST PIT LOG
MARCH 21, 1991
Test Pit DeDth fft.1 Material DescriDtion
TP-2 0 0-9 ARTIFICIAL FILL: Gray brown, dry, medium dense, silty SAND.
moist, dense, silty SAND. @1.5' Becomes brown to yellow brown,
Total Depth= 9 feet
TP-2 1 0-10 ARTIFICIAL FILL: Gray brown, dry, medium, silty SAND with some clay.
@1' Becomes brown, moist and dense.
Total Depth= 10 feet
TP-22 SEE GRAPHIC LOG TP-22
TP-23 0-11 ARTIFICIAL FILL: Yellow to gray brown, dry, medium dense, silty SAND
with CLAY.
@1' Becomes moist.
clayey SAND and gray brown to brown @4' Becomes brown, moist, dense,
cobbles. silty SAND with occasional small
@El Becomes medium brown, slightly
moist.
10-11 BEDROCK - SANTIAGO FORMATION: Mottled dark qrav, sliqhtlv moist, dense, silty fine. SANDsTONk.
Total Depth= 11 feet
-6-
GeoSoils, Inc.
CENTRE DEVELOPMENT
W.O. 1260-SD
TEST PIT LOG
MARCH 21, 1991
Test Pit DeDth (ft.1 Material DescriDtion
TP-24 0-1.5 BEDROCK - SANTIAGO FORMATION: Olive gray moist dense laminated fine sandy
SILT with red orange mottling or few bedding planes.
Bedding attitudes: N2OE/6'SE,
N40E, 10SE.
Total Depth= 1.5 feet
TP-25 0-8 ARTIFICIAL FILL: Gray brown, dry, medium dense, silty SAND with clay.
@1' Becomes moist.
clayey SAND.
@2' Becomes brown, moist, dense,
@4' Becomes dark gray, moist, dense
micaceous sandy SILT to silty fine SAND.
@6' Becomes yellow brown, moist, dense silty fine SAND.
@7.5' Becomes blue gray VOLCANIC rock
clayey SAND matrix (rock fill).
fragments in a red brown moist,
Practical refusal at 8 feet.
-7-
GeoSoiIs, Znc.
CENTFE DEVELOPMENT
W.O. 1260-SD
TEST PIT LOG
MARCH 21, 1991
Test Pit DeDth (ft.) Material DescriDtion
TP-2 6 0-8 ARTIFICIAL FILL: Gray brown, dry,
medium dense, silty SAND with clay.
@1' Becomes moist.
clayey SAND.
@2' Becomes brown, moist, dense,
@4' Becomes dark gray, moist, dense
micaceous sandy SILT to silty fine
SAND.
dense silty fine SAND.
@6' Becomes yellow brown, moist,
@7.5' Becomes blue gray VOLCANIC rock
clayey SAND matrix (rock fill). fragments in a red brown moist,
Practical refusal at 8 feet.
TP-27 0-8 ARTIFICIAL FILL: Gray brown, dry,
dense, silty fine SAND.
@1.5' Becomes moist.
@2.5' Becomes interlayered brown, moist, dense, clayey SAND and gray
brown moist, dense micaceous silty SAND.
@8' Becomes small cobble size
volcanic rock fragments in a moist red brown clay matrix (rock fill).
Practical refusal at 8 feet.
-8-
GeoSofZs, Inc.
CENTRE DEVELOPMENT
W.O. 1260-SD
TEST PIT LOG
Test Pit mDth (ft. 1 Material DescriDtion
MARCH 21, 1991
TP-28 0-3
.silty fine SAND to clayey SAND. ARTIFICIAL FILL: Brown, dry, dense,
3+
@.5' Becomes moist.
BEDROCK - SANTIAGO PEAK VOLCANICS:
Blue gray and red brown, dense
rock. fractured and weathered volcanic
Practical refusal at 3 feet.
TP-29 0-4 ARTIFICIAL FILL: Gray brown, dry,
dense, to medium dense, fine sandy SILT to silty fine SAND.
@.5' Becomes yellow brown and moist.
4-5 BEDROCK - SANTIAGO PEAK VOLCANICS: Blue gray and red brown, dense
fractured and weathered VOLCANIC rock and clay matrix along fractures.
Joint attitude N25W, 70SW.
Total Depth= 5 feet
TP-3 0 0-4
silty to clayey SAND. ARTIFICIAL PILL: Brown, dry, dense,
@.5' Becomes moist.
4+ BEDROCK - SANTIAGO PEAK VOLCANICS: Blue gray and red brown, dense
CLAY matrix along fracture. fractured volcanic rock and moist
Total Depth= 4 feet
-9-
GeoSoSls, Inc.
CENTRE DEVELOPMENT
W.O. 1260-SD
TEST PIT LOG
Test Pit DeDth ift.1 Material DescriDtion
MARCH 21, 1991
TP-3 1 0-3.5 ARTIFICIAL FILL: Gray brown, dry, dense, silty fine SAND.
@.5' Becomes yellow brown, moist,
dense fine sandy SILT to silty SAND.
3.5' Blue gray volcanic rock fragments in red brown CLAY matrix (rock fill).
Total Depth= 3.5 feet
TP-3 2 0-10 ARTIFICIAL FILL: Yellow brown, dry, medium dense silty fine SAND.
moist, dense silty to clayey fine @1.5' Becomes interlayered brown,
SAND and dark to light gray dense
SAND.
@2' Yellow brown moist, dense clayey
to silty SAND brown moist dense sandy CLAY and dark gray to blocky clayey
SAND and red brown, dry, sandy SILT.
Few stems and twigs, musty organic odor. Occurs as thin layer 0.5 to 1
foot thick.
@5' Red brown and dark gray brown, moist dense clayey SAND and yellow brown moist dense silty fine SAND. As thin layers .5 to 1 foot thick.
Total Depth= 10 feet.
-10-
GeoSoils, Inc.
CENTRe DEVFXOPMENT
W.O. 1260-SD
TEST PIT LOG
Test Pit Material DescriDtion
TP-33 0-10 FRTIFICIAL FILL: Yellow brown,
moist, dense, silty fine SAND, moist, dense, dark gray, clayey SAND and brown sandy CLAY.
Total Depth= 10 feet
TP-34
HARCH 21, 1991
0-10 ARTIFICIAL FILL.: Yellow brown,
moist, dense, silty fine SAND, moist, dense, dark gray, clayey SAND and brown sandy CLAY.
10-10.5 BEDROCK - SANTIAGO FORMATION: Pale
massive silty SANDSTONE. yellow and orange brown, dry, dense,
Total Depth= 10.5 feet
TP-3 5 SEE GRAPHIC LOG TP-35
TP-3 6 0-10 ARTIFICIAL FILL: Yellow brown, moist,
dense, silty fine SAND, moist, dense, dark gray, clayey SAND and brown sandy CLAY.
Total Depth: 10 feet
TP-37 SEE GRAPHIC LOG TP-36
TP-38 SEE GRAPHIC LOG TP-38
-11-
GeoSofls. Inc.
CENTRE DEVELOPWENT
W.O. 1260-SD
TEST PIT LOG
Test Pit Depth fft.1 Material DescriDtion
TP-39 0-8 ARTIFICIAL FILL: Interlayered yellow brown, moist, dense, clayey fine SAND and dark gray, moist, dense, sandy
SILT.
Total Depth= 8 feet
MARCH 21, 1991
TP-4 0 SEE GRAPHIC LOG TP-40
TP-4 1 0-9 ARTIFICIAL FILL: Interlayered yellow
brown, moist to dry, dense, clayey fine SAND and dark gray, sandy SILT.
@4' Becomes dark gray moist to slightly moist dense, fine sandy SILT, with yellow brown to brown, moist, dense clayey fine SAND, occasional larger bedrock fragment of dense laminated dark gray sandy
SILTSTONE.
Total Depth= 9 feet
TP-42 SEE GRAPHIC LOG TP-42
TP-4 3 SEE GRAPHIC LOG TP-43
TP-44 0-8 ARTIFICIAL FILL: Interlayered yellow brown, moist to dry, dense, clayey fine SAND and dark gray, sandy SILT.
Total Depth= 8 feet
-12-
GeoSoils, Ine.
CENTRE DEVELOPMENT
W.O. 1260-SD
TEST PIT LOG
Test Pit DeDth fft.1 Haterial DescriDtion
TP-45 SEE GRAPHIC LOG TP-45
MARCH 21, 1991
TP-46 0-8 ARTIFICIAL FILL,: Interlayered moist,
brown, clayey SAND. Moist dark gray sandy SILT and moist, dense, yellow brown, silty fine SAND.
Total Depth= 8 feet
TP-47 SEE GRAPHIC LOG TP-47
TP-48 0-3 BEDROCK - SANTIAGO FORMATION: Medium gray brown, dry, dense, thinly laminated fissile clayey SILTSTONE.
gray to black slightly moist, dense,
@.5' Grades to less weathered dark
thinly laminated SILTSTONE.
N70E/5'SE; N80W/7'SW.
Total Depth= 8 feet
TP-49
TP-50 TP-51
TP-52
SEE GRAPHIC LOG TP-49 SEE GRAPHIC LOG TP-50
SEE GRAPHIC LOG TP-51 SEE GRAPHIC LOG TP-52
-13-
GeoSoils, Znc.
o* ;7: ~. .. .......... ..... c I" ~. . .~
... .- ............. - ...... .............. .... ~ ...... ._ ...... -. ............ . I :I ................. ~- ... . ... __ .......... ~* ....... ". ...... ...... .-I ..... -. .. -~ -
-I _" ". < "~ ....... a .........
c ,~~. . ~- 3 L
< .............. z .............
.......
..... _. ....
~ " ....
.... ...
....... ..... __ . . ....... . . ~~~
z 0
I- -
% a 0
(D W
(D -1
a
5 a W I- < I
~~-, - .. "
~ ........ - ..... ..... ......... .... _" i. ......
4 c
"
......... ,. ....
...... .. , ...
L..~~~ ............ ., ,,
...... .~_. ........ .~. " . - . i:~: 1.. L~. . , . , !- ". ... _~_ ........
, - . *~. ..
l_:_.~T_~~" ~. .~. .................. .. .. .~ .............. . .. . .~ ............ 'W I- .... .....
I .~ . . 4
....
..... .........
..... .~, ...... ........... ~. ~
.. ....
,~ . ." . ~.. ....
.... .. ........
....... . -. ." ~ ~ .~ .
:
,. ~. . .. ..
.....
..... ..
.. ...
..
m c z W I x 0 0
.
0 0 W
z 0 c -
E a 0 m W 0
01 -1 5 a W c < I
c I
P W 0
)RM
............. , .. ... .... .. , .
c ._ .- . ., .~. . ~. . ..........
.
........ ..... , ... - ... ....... ....
a
m
E
I
cn I- z W I I 0 0
z 0
I- -
o a 0 01 W 0
01
c < L
......... ..*. . ~ . . ~.., .. i 0 ...... ....... .. .~. ._ .... 1 ....
.. .......... y .... P ... 0 ...... -1 ...
01 ......... ........
.........
-1 ~- <*~. .. .. a r. . ~. . ~. . a ....... c .......... < ........ . ~. z .........
e~ " ..........
I . .
.. ..................... .. ~ ~ . ,~ ~~ ...
w ....... ...........
~. ~. . , .......... ...
..
aw
Y
0 a
3
i
c w
A 4
n
I
.. .. . 1- ,. .
.~.~~..~ .~." ... .. ~. ".. ,!_~ ........... ..................................
... ~. ....
..... ~ - ....
p .......
_.( ............... .I . ~ ~ . . . .......
....... -1 . . ~ ~~. < ..~ . . K ......... 3.- .... I- ....... <... .... z ~. ~ ~~
"
..~ . *
KW wt
..
a< ~a 0
60 zo
- ........... __ ... _-~T .. ~,~..~ ........ ~.~.. ..
/.
I ............. .......... , ................... , ...... .1 - ... ............ .......... .... * .......... ...... - .... . w I- U -I
........ -. ... - :+ . ;~.~--~. -. . - .. a
. ........... ....... ............ ,~I ..... ;, ~r
L - ............... . ..
i_ ......... . -
.... w "" .........
Q A L ~
z ........... L ...............
.....
..... ..... ..........
.... ~. ..... ... ........ ... J 1 .~~. " . ......
. ................ =I- .'
.... ...... = ". .........
i
....... ............. ............
...
". .~. . " ~--~ r-~~ ,-Ti ............... I- ,, ........... '1 ....... i ........ I_ ..... 1:"' .............. ..
.... ....
L .................
....... ..~ . ..... 1 .~ .
..... .....
. ~. . . . 1 ........ ....... - ..... ........... ....... .,- . .....
......
... ... ;~.~. ................... . .~-~. .2 .- ... II " " __,_. I~~r ~..~. I.
, ................ .......... ..
aw
a< ao
wc
0 -
x
0 a
- s
" W CL
m c z W
0 0
... ~" ... ........ .... ,.._ ~. , ~. -. . ....... ...... .............. " ............ ~- w I- a A
............. ..... ...... __ . ~~ ~~. , - . ...... - -, ....
Ln .................... " t_ ...... ,~. ~~~ ......... I~ ~ . - .. ........ ..... ~. . . -. ........ ...... .~. ' ... ~~ a. ........ - .......... a ....... ~. . : ...... c: ,~~_ .- ...... ._ ... " i ..........
~~ .... . . ." ...... ~. . ~.
....... ..... , " . ... .- . . ... - ...........................
" ~. ........................ ......... _. ....... .- ...... ... ..................... -. ". ....... M, ............ .. . .. a. .. ............................
.. ......... ........... ... ...... .- , -... ;a
aw
"
a<
<I Y(n
..... ...................... w -~ ."
a _. 2 - : L _" ........... " ... .- .............
.... .......... A ........ ....................... . . , .~. . ~
...................... .. ... ......
.,
aw
a< an 0
we
N e
c 0 -1
d, b
*I- o* WW
(3I-
......... -!~""', ...... ! ..... : ......... " ..... ............. ........... ,, ................................... ..... ..... ... ~ ..... ....... ........... , .. - . ~ .............. .. . , ......... 8. ......... ... ~. ". I ~ .~ ............ : ....... .... ..... .. ., . ~, ..... . ,. I ......... ..
c __ ... ..., ............... .-1 .- ... *.
W I- <
a. A
01 ... !.. ... .................... ~. . ~. ~~. t ~' ' "_ ...........
< 'L. ........ a -. .............. 3 ......... I.. ..... I- ~.. ~. .~~. 1~ ~. < ...... ..~ - ...... z ...............
I
4 I :.: 1~ L: .: .......
Q) c z W I I 0 0
W
z 0 c
U 0 u) W 0
8 A
-
E
5 a Y I- < I
X c P W - n
DRM
7-~~~ ""
_-_ l_~ .... _- . .... .... * .............. . ~~ - . .......... ." . .. ...... ................................ , ...........
.. ............ ..... ... .... . , . . ~. , .~ ... .,i ...... - - . , .. ........ ~ .............. ".I
............. ." ..............
i~ . ~ . -~
-1 -~_ ............ < ,- . ....... a _..... ....... 3 " .. ..... . . ~ . - ~~ ~. . < ... .. z ..........
........ ..~.~ . ......
~ n ........... n
.. , "~ .~. .~.
...... L
" ~. - ~
" ..... ~ ... ......
c".. ........ . ~.
y ........... z ................
L .~ . .~ h "~ ' ' ..........
, ....... - ~ ~. . . ....... ......
..... ..... ..... ............ I -. w "" ..1 -1 .~. . .. .......... 0 z
... ...............
~ +.__.., ... .................
_r ..........................
*.. ". - ~" .~~. . - ~. , .. ., " ..... .- ............ , .... w 0 ....... .- .........
-1 -~ ......
.. .... ...............
0 ~- ... . ~-
m ............
.~
.... ll .:
: . .::~ ~ . . '
.. .- ....... ,. .. .......... ..............
.
.~
~.
, . . ~ ,:.: ~.~~ . - " ...... ....... u :-I
& I~
> .~ ............ ~. .
................ ......... ,. ................... .,~
,, . - - ......... ... - .... _... ..
,~~ .~
.......... . ....... ............. ~- - .' ~ . .~ . 4 . ~. . ~~ . .................... , ... .................... ..
, ..... - .... '~- ......... , .. .. .. . . ~.
........ ..
........ ........
~ ...... ,~l ... ...... .. .- - ... ..
. - ..... . .
. ~~. ..
~. .,
.. ..........
, ..........
d e
! I
cia Eo
.... ...... 7": : - ~
_~__ "_ -~_~~ ~_?.__~~_~- I ................... .. .......... i. .... ~ ... ... i':'. -. .......... .. ..... ... 1; r. -~. ~~. -
.............. ,- , .. , ~~
." ..................... - .. -. ........ .. ... ..
,~~. ..... ...... >. ......... ~. -~~ .... " ................... ...........
9 1 :L .............. ~~ . . ~. . ~
......... I- i~~.~ - ", .................. ._~_ ~. . ~ .~~ .. ...... , !-_ .~ ~ __ . .~.. ................... - - ...........
.. ..... .. w -~ ." n - __ 0 -1 ... ...... : ... cn ...............
__ ..... ....... .~~.~
: ...... -. . .~ . ..............
, - ~.~ ~~ ~ ~. -I < - ~. .~~. u ........
I-." 3 -~.
< ,~-~~ .................. z ....... ~ : ....
.,'.. ~ .. ..
.......... ..........
- ........... ~.. ....... .......... ........ .. .... .~ ~. .~~ . . ~ .~ . ........ .- . ~ .................. ... ............ ~. -.
$ L 1" ......... ....
U z .. ~ ..~ .. ~~. . .....
.......... ,~. .~~ ~.., ............ - ... z ....... . w ... - ..... .~ .
0
- . ~~ ." . _.
.,. .~~ .. ... .......... . ::. ~ . . ~~. . . . ,. ~. .........
" ........
......
....
..
...
...... .............
Y a 0 z
+ c a E
r C
a >
c a
+ E a c
e
z 0 - L
.~_ . . ........ ... ..~. ..... ~ ............ ~~ ..~. . eL
"C 30
. ~. .. ...... ......
N
aw
an
Wt o<
0
60 zo
z 0
t -
E a
m 0
W 0
01 -J
a I
W t 2
.r v. VI .- ?
....
...
0 .~'~ ' ..
I- ~ . ~
.. . ,. -
... ..............
........ N " ..........
. . , . .~
..............
.......... .. .. ........ w:.. ...... -1 .......... Q ..__ . .~ - . 2.. ~ e:" ............
p ......... 0 ..........
....... w .. ...........
-1 ......... m
t < .~ ~ z ......
...
. ~.. , . .~ ....... c: . ~~ ~ Ib , ......... ...... - .............
: ........... * . 4 . ~ ~ . " '.
... I .. > .. . . ~,
..
~. . .
,, ............ I ....... -~ ...
.. .. ~.
,, .....
,.. ....
.. .... .~.
... ..
..... ......
......
........ ~ ...... . ...... -, .. .. .................. ... - ........ .- ..
-
0) I- 2 W I I 0 0
I . ~. . ~.-. - . : ~; ........ .. .. ..... .. t i~_ ..... __ ........... , .... ~' L ..
.,.
,._ .......... ............. ........ ,. ........
"
-1 ".
a __ .......... 3 __ ........... I- .............. < ............ - ..... 2 ............
...........
, ~ ....... .........
..... \~: ........ ,, ~ ... .........
.. . - ...
.. .. ...
,
.~. ........
au we n< an 0
Y a 0 s
zz NLL
c
.. .- 1- ,-... .. .~- .~ " i~. . - ." "~ .......... .,.,.. .................. _~. ...... ......................
i..~ ....... ... ..
r". ............. -.. . ~..+, ................
....... .......... ..
..
... __ ..........
,.1 G~~ 1
.. ...
.Y 1- .. ... .........................
W I- 4 -I .~ n
" .. .- ..... ....... .. .~ ..... - \-<
. ~. ..........
~ ~. ~ ~~ .. _. ". . -;), . . -. ....... ....... 2
... c ........ ..... .
" ~ . L -. :"
- ............. .- ......... ~. ~. . ~. .. ... ......... ...... .. ..........
...
, ..~ .
...... ... ... . .~
...... , ... ........ ." .......... LL~~... .... ......... .. ~. ............................ -
~, _. . ~ . .... _~. .......... .,. .
............... ...............
" ..~. - .. - ........ ... ....
&
aw
?
7 .r LC .
~~.. . - ..........
r""" ... - .. , .........
~ ....... . ..... ,~.~. ~. . , : ........... __ .......... ......
N
-.~
.........
9 . ~. . ' . c ,.- ~
.. ....... ............ .... . ~. ............... ..... -~ .............
.. ~~- ~ ~. . ~~~ . . ~. .. . " . - .. - ... . . ,~ .
la :. " ~~ .... -~ ............ .~ .......... - " .............................
w i-" .. -. .. ............ -I ." ~ Q L z ". .......
..... ...... ~- ... .~ .. " . -. ..... ....... 2
. - .~ ". , _~.
.. .~. ........ .................. .- .. -~, ..... ...
..... ........
.. ........... ~- ......... .. ........... ............ ~- ....... W"~" ................ a __ .......... 0 ," . " ............................ A ". ... m ". ... ~ ....
... ,
. ~~ ........ .............
.......
-J ........... < .- a .~ .. ......
x ... ..... I' . .~. ~ .~ .
2 L.. ...........
......... .~,..~ . .*. ... ....... . ~. ~
., . .. ~ .... ...
~~ . . ~. .. . .~ ...... .~ ~.
~~ ..
.. .~ ~~ ...... ........ ....... - ......
...
... . ~~ ..... ...........
-
e (b
z W I I 0 O
m
- ........... - ......................... ...... .. , . ..... ~. .... ..... _. ..... .~ .. .. . ~ ..
.~ . . u ........ .. .... , "1 -~ ~- . . . ~~ ......... .. ~ ~ i __ ...................... n
0.~ . .~. ......
0 ;.. .. ... e,-. ............. ...... ,~ .. .-
- .~ ..............
"~
". . . ... . ... .....
Y a 0
. ~. ..... ..... -.
........ .~ - .. . .....
..... *. . ~. .~
I.
.- ....... .~ ....
... .
..... ... ...... - .. .....
, .- . ". .......... ...
" ~" ...... - . .~ ... .... .... .... .....
.
..
..... ....... .~ . .~. .~ ~. ..... . . ~~ ......
. ......... . . ~~~. ~ , .
.. ,..
..
." . . ~ . ~~ ......
.....
~. ....... ........ ..
" ~~..
............. ~. .~
..... .. ... ............. ... . .~. ~. ........ ..... ....... .~ . , . . .~ ~~ ~
c" ... & .... ......
I I
t i . - _. " ~* - . ; ................ L.. ... ~ .
......... .. ,. ~.
4+ ... .- . ..... ~~~
...... ......
.... . ........ ,- .- ..
BORING LOG
W. 0. 1260-SO
Project: CARLSBAD AIRPORT CENTER UNIT I1 Boring B-la Sheet 1 of 4
110.6
110.6
107.7
109.5
112.3
106.9
-
a, h 1- 4JLW Lo- .rl - 2
14 .o
13.1
14.9
14.2
14.0
18.6
Date Excavated 12-17-90
Sample Method: HOLLOW STEM AUGER
Ring Sampler using
140 lb harmer and 30' drop
~ ~ ~ Descriution of Material
ARTIFICIAL FILL: Yellow brown, moist, dense, silty to clayey
SAND.
@7' Brown, moist, dense, sandy CLAY.
@lo' Dark gray, moist, dense, clayey SAND, (weak organic odor) and
yellow brown, dense, moist, silty SAND.
612' Brown moist, dense, sandy CLAY.
ye1 1 ow SAND.
@16' Grades to yellow brown, moist, dense, clayey SAND and pale
Refusal on rock at 24.5 feet. Pulled off hole and relocated 20 feet
east.
Plate
Project: RRLSBAO AIRPORT CENTER UNIT I1
-
s"
CI
Ti - cw 3u
x- a
M a -
110.6
110.6
107.7
109.5
112.3
106.9
110.0
109.3
a, M
L)dP 3-
4 m-
2 -
14.0
13.1
14.9
14.2
14.0
18.6
15.3
12.1
-
w.0. 1260-SO
Boring B-lb Sheet 2 of4
Date Excavated 12-17-90
Sample Method: HOLLOW STEM AUGER
Ring Sampler using
140 lb hamner and 30' drop
Description of Material
\RTIFICIN FILL: Yellow brown, moist, dense, silty to clayey
SAND.
@7' Brown, moist, dense, sandy CLAY.
@lo' Dark gray, moist, dense, clayey SAND, weak organic odor and
yellow brown, moist, dense, silty SAND.
@12' Brown moist, dense, SAND, clay.
@16' Grades to yellow brown, moist, dense, clayey SAND and pale
yellow SAND.
Refusal on rock at 24.5 feet. Pulled off hole and relocated 20 feet
east.
825' Olive, moist. dense CLAY and brown, moist, dense sandy CLAY.
P27' Dark gray and mottled yellow brown, clayey SAND, moist, dense,
with very few roots, organic odor.
828' Pale yellow, moist, dense SAND.
I Plate
Project: CARLSBAD AIRPORT CENTER UNIT I1
-
4 - 4J
30 cw
a h' u - n
110.4
112.0
110.9
112.5
108.6
105.7
115.6
112.4
a, u +J* 2-
,rl
a-
2 -
11.2
14.6
15.9
15.4
18.1
17.9
11.1
16.3
W. 0. 1260-SD
Boring B-lb Sheet 3 of 4
Date Excavated 12-17-90/12-26-g0
Sample Method: HOLLOW STEM AUGER
Ring Sampler using
140 lb hamner and 30' drop
Description of Material
dense, clayey, SAND, and brown, moist, dense CLAY.
Interlayered dark gray, moist, dense, sandy CLAY, yellow brown, moist
840' Brown, moist, dense, sandy CLAY and olive brown, clayey SAND
with few bedrock fragments and one small stick.
@45' Interlayer of olive brown and yellow brown, moist, dense, silty
fine SAND and brown, sandy CLAY.
Plate
KO' Brown, moist, dense, silty, fine SAND with clay.
BORING LOG
Project:
W. 0. 1260-SD
CARLSBAD AIRPORT CENTER UNIT I1 Boring 6-lb Sheet 4 of 4
111.1
101 .E
"
25.0
"
Date Excavated 12-26-90
Sample Method: HOLLOW STEM AUGER
Ring Sampler using
140 lb hamner and 30' drop
Description of Material
65' Brown, moist, dense, sandy CLAY.
367' Groundwater encountered.
@68' BEDROCK - UI(TIA60 FOWTIOII: Olive, moist, dense, weakly
laminated silty CLAYSTONE.
Total Depth- 71 feet
Groundwater at 67 feet
Hole Backfilled
Plate
W. 0. 1260-SO
Project: CARLSBAD AIRPORT CENTER UNIT I1 Boring 8-2 Sheet 1 of 1
-
.rl u
30 cw
h- a
%4 - a
105.1
111.1
111.2
108 .o
105.3
108.9
"
-
-
al !+ 3- !J* In- .+ : -
11.3
15.3
14.0
12.5
17.7
-
14.3
"
-
Date Excavated 12-17-90
Sample Method: HOLLOW STEM AUGER
Ring Sampler using
140 lb hamr and 30' drop
~~~ ~
Description of Material
FTIFICIAL FILL: Pale yellow brown, dry, dense, SAND and
ellow brown, dense, silty, fine SAND.
3' Becomes moist.
5' Becomes dark gray brown, moist, dense, sandy CLAY. Interlayered
ith pale yellow brown, moist, dense SAND and brown, sandy CLAY.
18' Pale yellow moist, dense, SAND and yellow brown, moist, dense.
AND with some CLAY.
26' BEDROCK - SANTIAGO FmTI(II: Pale yellow and pale olive ,ray, slightly moist, dense, thinly laminated, fine grained SANDSTONE
'otal Depth= 28 Feet
lo Groundwater
lole Backfilled Plate
BORING LOG
C.
Project: CARLSBAD AIRPORT CENTER UNIT I1 Boring 8-3 Sheet 1 of 1
1
- s
4 - +1
30 CW
a 5- n -
109.9
107.2
_”
109.3
109.8
-
”
110.6
-
a M
UdP 9-
.rl In-
i2
I_
14.9
14.7
_”
16.1
14.1
-
14.9
”
-
Date Excavated I?-lR-qn
Sample Method: HOLLOW STEM AUGER
Ring Sampler using
140 lb hamner and 30’ drop
Description of Material
ICIM FILL: Yellow brown, dry, dense, silty, fine SAND.
ecomes moist.
layered, yellow brown and brown, moist, dense, silty. fine SAND
clay and yellow brown, clayey SAND and sandy CLAY.
Frequent
ic ordor.
inter ,layers o f re d brown, moist, dense, sandy, CLAY,
, dense, fine grained, SANDSTONE.
BEDROCK - WTIAGO FOlMATIOW: Pale olive gray, slightly
Depth= 23.5 Feet
oundwater
Backfilled
Plate
BORING LOG
C.
, ., .. . . ., W. 0. 1260-SD
Project: CARLSBAD AIRPORT CENTER UNIT 11 Boring 8-4 Sheet 1 of 1
-
&!
+J 4 - cw 3u a >I- !4 n -
111.7
111.4
113.6
102.5
107.9
107.1
"
-
-
a, u 3- u6p 0- TI - 2
13.6
16.2
11.1
23.8
19.6
19.4 -
"
-
Date ExcavatedLz-16-90
Sample Method: HOLLOW STEM AUGER
Ring Sampler using
140 lb hamner and 30' drop
-~ ~ Description of Material
LRTIFICIAL FILL: Light yellow brown, moist, dense, silty,
:ine SAND and brown. moist, dense, clayey SAND.
!5' Interlayered dark gray, moist, dense, micaceous, silty, fine
jAND and brown to yellow brown, clayey SAND and pale yellow, moist,
lense, fine SAND.
312' Red brown, moist, dense CLAY and olive gray, moist, dense, silty
fine SAND.
P16' Olive brown, moist, dense CLAY and olive brown, clayey SAND.
318.5' BEDROCK - SANTIAGO FOWTIOII: Light olive gray,
slightly moist, dense, silty, fine grained SANDSTONE.
Total Depth- 19 Feet
No Groundwater
Hole Backfilled
Plate
BORING LOG
C.
Project:
:* . -
CARLSBAD AIRPORT CENTER UNIT I1
T
w. 0. XO-SO
Boring 6-5 Sheet 1 of 1
Date Excavated 12-18-90
Sample Method: HOLLOW STEM AUGER
Ring Sampler using
140 Ib hamner and 30' drop
Description of Material
RTIFICIAL FILL: Wet, loose, sandy CLAY and clayey SAND.
2' Becomes very moist.
3' Becomes brown, moist, dense, sandy CLAY and olive brown, silty
o clayey fine SAND.
~~~~ ~~ ~ ~~
3.5' BEDROCK - SANTIAGO PEM VOLC4NIC.S: Blue gray VOLCANIC rock and
ed brown, moist, CLAY.
rota1 Depth = 9 feet
lo Groundwater
{ole Backfilled
Plate
APPENDIX I1
LABORATORY TESTING
CeoSoiIs, Inc.
LABORATORY TESTING
General
Laboratory tests were performed on selected Soil Samples to
evaluate the physical characteristics of representative On site
materials.
Laboraton Standard-Maximum Dn Density
To determine the compaction character of representative samples
of onsite soils, laboratory testing was performed in accordance
with ASTM Test Method D-1557-78. The maximum density and optimum
moisture content from these tests are summarized below:
Maximum Density Optimum
Location DescriDtion Density Iwf) Moisture 8
Soil Type-A Yellowish gray
TP-1 @ 30' silty fine Sand 114.0
Soil Type-B Yellowish gray TP-3 @ 3' silty fine Sand 115.5
Soil Type-C Yellowish gray
TP-15 @ 2' silty fine Sand 117.0
Soil Type-D Yellowish brown
TP-23 @ 3.5' silty fine Sand 118.0
Soil Type-E Yellowish gray TP-30 @ 2' silty fine Sand 113.5
16.0
15.5
15.5
15.0
17.0
Soil Type-F Dark gray TP-41 @ 8' sandy Clay 111.0 18.5
Soil Type-G Dark olive gray B-1 @ 55.0' sandy Clay 121.5 12.5
Field Moisture and Density
For selected "undisturbed" samples of fill materials, the field
moisture content and dry unit weight were determined. The dry
GeoSoils, Znc.
COLLINS DEVELOPEIENT COMPANY
W.O. 1260-SD
LABORATORY TESTING PAGE 2
HARm 21, 1991
unit weight was determined in pounds per cubic foot and the field
moisture content was determined as a percentage of the dry unit
weight. Where possible, the in-situ dry unit weight of the
samples were compared to the laboratory standard-maximum dry
density and optimum moisture content of the representative soil
types, to determine in place relative compaction of the materials
tested. The results of field density, field moisture content
and relative compaction determinations are summarized below:
Field Field Dry Relative Soi I
Location Descrimtion Moisture X Density (Dcf) ComDaction Tyme
TP-17 0 5' Yellow gray silty fine SAND 13.3 111.4 95 c
TP-19 a 5' Yellow gray silty fine SAND 16.6 104.0 92 E
TP-21 a 5' Yellow gray silty fine SAND 15.9 108.3 93 c
TP-23 a 5' yellow brown silty fine SAND 13.3 112.3 95 D
Yellow gray silty fine SAND
Yellow gray silty fine SAND
Yellow gray silty fine SAND
Yellou gray silty fine SAND
Yellow gray silty fine SAND
Greenish gray silty fine SAND
Greenish gray clayey SAND
Yellow gray silty fine SAND
Yellow brown silty SAND
Dark olive gray sandy CLAY
Dark olive gray sandy CLAY
Dark alive gray sandy CLAY
Dark olive gray sandy CLAY
14.0
13.1
14.9
14.2
14.0
18.6
15.3
12.1
11.2
14.6
15.9
15.4
18.1
110.6
110.6
107.7
109.5
112.3
106.9
110.0
109.3
110.4
112.0
110.9
712.5
109.8
95 c
95 c
92 c
94 c
96 c
91 c
94 C
93 C
94 0
92 G
91 G
93 G
90 G
GeoSoils, Inc.
COLLINS DEVELOPMENT COMPANY
W.O. 1260-SD
Dark olive gray sandy CLAY
Dark olive gray sandy CLAY
Dark Olive gray sandy CLAY
Olive gray sandy CLAY
Green gray silty CLAY
Yellow gray silty fine SAND
Oark gray olive sandy CLAY
Yellow brown silty
fine SAND
Yellow gray silty fine SAND
Yellow gray silty fine SAND
Yellow gray silty fine SAND
Yellow gray silty fine SAND
Yellow gray silty fine SAND
Yellow gray silty fine SAND
Yellow gray silty fine SAND
Yellow gray silty fine SAND
Yellowish brown silty SAND
Yellow gray silty SAND
Yellow gray silty SAND
Yellow brown sandy silty CLAY
Dark gray sandy CLAY
Yellow brown silty SAND
Yellow brown silty SAND
* Denotes that no applicable
MARCH 21, 1991
11.1
16.6
17.9
16.3
25 .O
11.3
15.3
14.0
12.5
17.7
14.3
14.9
14.7
16.1
14.1
14.9
13.6
16.2
11.1
23.8
19.6
19.4
15.9
laboratorv
115.6
111.1
107.0
112.4
101.8
105.1
111.1
111.2
108.0
105.3
108.9
109.9
107.2
109.3
109.8
110.6
111.7
111.4
113.6
102.5
107.9
107.1
110.1
standard
95
91
a8
93
brx
91
91
94
92
90
93
94
92
93
94
95
95
95
97
92
97
91
93
curves were - available for these soil types and therefore no accurate
estimation of relative compaction could be provided.
"
G
G
G
G
*
8
G
D
C
C
C
C
C
C
C
C
0
C
C
*.
F
D
D
GeoSoiIs, Inc.
COLLINS DEVELOPMENT COMPANY
W.O. 1260-SD
LABORATORY TESTING PAGE 4
MARCH 21, 1991
Field Density Testing
Field density tests were performed in the test pits on
approximately 2 foot vertical intervals to determine in-situ
moisture and density of the fill material. Field density testing
was performed using the sand cone method (ASTM D-1556-82) or
nuclear density method (ASTM D-2922-81 and ASTM D-3017-78).
These test results were compared to the laboratory maximum dry
density and optimum moisture content (ASTM D-1557-78) of
representative soil types to determine in place relative
compaction of the materials tested. Both direct correlation and
visual classification of the soils in the field and lab were the
basis for determining which optimum moisture content and maximum
dry density values to use for a given density test. The test
results are presented below.
MOISTURE DRY RELATIVE SOIL
MCATION AND DEPTH CONTENT % DENSITY COMPACTION % TYPE
TP-1 @ 2'
TP-1 @ 4'
TP-1 @ 6'
TP-1 @ 8'
TP-3 @ 3'
TP-4 @ 1.5'
TP-6 @ 1.5'
TP-9 @ 4'
TP-9 @ 8'
TP-15 @ 2 '
15.9
13.5
11.1
14.0
13.3
13.6
14.3
13.3
16.3
11.3
106.1
107.8
105.6
99.3
104.9
102.2
111.7
110.8
103.7
107.4
93
92
90
88
91
90
95
94
91
91
A
C
C
E
B
A
D
D
A
D
GeoSoils, Znc.
COLLINS DEVELOPMENT COMPANY
W.O. 1260-SD
TP-17 @ 2 '
TP-17 @ 4 '
TP-17 @ 6'
TP-17 @ 9'
TP-18 @ 2'
TP-19 @ 2'
TP-19 @ 6'
TP-19 @ 8 '
TP-19 @ 9'
TP-20 @ 2'
TP-20 @ 4'
TP-20 @ 6'
TP-20 @ 9'
TP-21 @ 2 '
TP-21 @ 4'
TP-21 @ 6'
TP-21 @ 9'
TP-23 @ 8'
TP-23 @ 6'
TP-23 @ 4'
TP-23 @ 2 '
TP-25 @ 6'
TP-25 @ 4 '
TP-25 @ 2'
TP-26 @ 2'
TP-26 @ 4 '
TP-26 @ 6'
TP-27 @ 2 '
TP-27 @ 4'
TP-27 @ 6'
TP-29 @ 2 '
TP-30 @ 2'
19.4
19.2
15.1
14.6
13.6
12.6
15.9
14.3
21.2
12.4
14.0
16.6
18.0
16.6
17.6
17.6
19.1
15.2
14.6
13.6
15.6
16.3
11.4
18.3
19.8
19.8
23.1
14.9
16.6
15.3
17.9
11.5
106.5
107.6
107.9
116.2
109.2
106.0
104.1
110.3
106.1
107.9
105.9
100.9
112.8
102.9
105.8
104.3
loa. 8
107.2
101.5
98.0
97.0
114.3
106.4
107.4
113.0
100.9
95.6
111.0
104.0
106.0
104.4
110.5
MARCH 21, 1991
93
94
92
99
93
90
90
94
93
91
91
89
96
90
93
92
92
94
89
86
85
97
90
91
96
a9
84
94
91
92
90
94
A
A
C
D
D
D
B
D
A
D
C
A
D
A
A
A
D
A
A
A
A
D
D
D
D
E
E
D
A
B
B
D
GeoSoils, Inc.
COLLINS DEWELOF'MENT COMPANY
W.O. 1260-SD
TP-31 @ 2'
TP-32 @ 2'
TP-32 @ 4'
TP-32 @ 7'
TP-32 @ 10'
TP-33 @ 3'
TP-33 @ 6'
TP-33 @ 8'
TP-33 @ 10'
TP-34 @ 2'
TP-34 @ 4'
TP-34 @ 5'
TP-34 @ 8'
TP-35 @ 3'
TP-35 @ 8'
TP-38 @ 2 '
TP-36 @ 3'
TP-36 @ 5'
TP-36 @ 8'
TP-36 @ 10'
TP-39 @ 3'
TP-39 @ 6'
TP-39 @ 8'
TP-41 @ 3 '
TP-44 @ 2'
TP-44 @ 4'
TP-44 @ 6'
TP-44 @ 8'
TP-47 @ 2'
TP-47 @ 3 '
TP-46 @ 6'
TP-46 @ 8'
LABORATORY TESTING PAGE 6
13.0
16.6
12.7
17.7
9.6
14.9
14.6
13.3
16.6
19.8
12.1
14.6
13.3
17.0
17.7
11.4
12.4
17.3
10.8
12.1
16.6
18.7
13.6
19.8
20.9
16.6
14.6
17.0
19.8
18.0
19.4
17.0
112.1
103.3
108.5
107.2
106.8
107.6
112.5
104.1
107.3
104.8
99.1
107.3
111.0
109.0
103.6
102.2
105.9
106.2
108.7
115.2
103.8
101.9
104.5
106.8
100.7
102.2
104.0
101.5
105.2
100.1
105.4
107.8
MARCH 21, 1991
95 D
93 D
D
91 C
91 C
91 D
98 D
90 B
93 B
92 A
87 A
91 D
94 D
92 D
91 A
89 B
96 C
91 C
92 D
98 D
91 A
89 A
90 B
91 D
89 E
90 A
90 B
89 E
92 A
88 E
93 E
91 D
"
GeoSoits, fnc.
COLLINS DEVEMPMENT COMF'ANY
W.O. 1260-SD
MARCH 21, 1991
LABORATORY TESTING PAGE 7
Expansion Tests
Swell tests were performed on remolded samples of near surface
soil. The samples were prepared at 80 percent of the optimum
moisture and at 90 percent of the maximum dry density, placed
under a 60 pound per square foot surcharge, and submerged in
water for 24 hours. The percent swell was then recorded as the
amount of vertical rise compared to the original one inch sample
height.
Expansion index tests were also performed on samples of the near
surface material. Testing was performed in accordance with
Standard 29-2 of the Uniform Building Code.
Test results are summarized below:
Expansion Location Swell % Expansion Index Potential Iswell/EIL
TP-3 @ 3' 13.1 92 critical/high
TP-6 @ 2' 5.6 23 moderate/low
TP-41 @ 8' 17.1
TP-46 @ 7' 11.2
119 critical/high
56 high/medium
Shear Test
Shear tests were performed on undisturbed soil samples in a
strain control-type direct shear machine. The rate of
GeoSoils, Inc.
COLLINS DEVELOPMENT COMPANY
W.O. 1260-SD
MARCH 21, 1991
LABORATORY TESTING PAGE 8
deformation was approximately 0.025 inches per minute. The
samples were sheared and resheared under varying confining loads
in order to determine the Coulomb shear strength parameters,
cohesion and angle of internal friction. The samples were tested
in an artificially saturated condition. The results are plotted
on the enclosed Shear Test Diagrams, Plate SH-1 through SH-5.
Consolidation Test
Consolidation tests were performed on relatively undisturbed ring
samples in accordance with ASTM test method D-2435. This test
determines the magnitude of consolidation (or expansion), in
vertical percent volume change, when the soil sample is
restrained laterally and drained axially. This is accomplished
by placing the samples in a restraining apparatus and applying a
succession of vertical loads. Time dependant measurements then
record the amount of consolidation a particular sample undergoes
at each load increment. After the samples are fully loaded,
similar measurements are taken during the rebound of the sample
as the load is incrementally reduced. The results of the
consolidation tests are presented as Plates C-1 through C-15.
GeoSoils, Znc.
0 I a 4 W
u) I
0 0 (
phi angle =
cohesion = I +
1.0 1 2.0 2
10
I ksf
NORMAL PRESSURE-KSF
EXPLANATION
0 RESHEAR - AT SATURATED MOISTURE CONTENT
0 PEAK - AT SATURATED MOISTURE CONTENT
RELATIVE DENSITY; THEN SATURATED DIRECT SHEAR REMOLDED TO 90% UNDISTURBED NATURAL SHEAR SATURATED
% SATURATED MOISTURE CONTENT
PCF % MOISTURE % SATURATED MOISTURE CONTENT
I SHEAR TEST DIAGRAM
Undisturbed Shear
8-1 0 5' GeoSoSZs, I##& :DATE -1w.0. NO 1260-m
Soil Mechanics Geology Foundation Engineering
NORMAL PRESSURE-KSF
EXPLANATION
0 RESHEAR - AT SATURATED MOISTURE CONTENT
0 PEAK - AT SATURATED MOISTURE CONTENT
DIRECT SHEAR REMOLDED TO 00% RELATIVE DENSITY; THEN SATURATED UNDISTURBED NATURAL SHEAR SATURATED
% SATURATED MOISTURE CONTENT
PCF % MOISTURE ~. % SATURATED MOISTURE CONTENT
I I SHEAR TEST DIAGRAM Undisturbed Shear
8-2 P 5'
Soil Mechanics Geology Foundation Engineering
:nnu ur!n-gA
3.
2.
Y m Y
L c
I
c) z w a
m i- 1.
c1
K 4 w L m
2.
f
1.
0.
NORMAL PRESSURE-KSF
EXPLANATION
0 RESHEAR - AT SATURATED MOISTURE CONTENT
PEAK - AT SATURATED MOISTURE CONTENT
DIRECT SHEAR REMOLDED TO 90% RELATIVE DENSITY; THEN SATURATED UNDISTURBED NATURAL SHEAR SATURATED
PCF 'x MOISTURE
% SATURATED MOISTURE CONTENT
.~ % SATURATED MOISTURE CONTENT
I SHEAR TEST DIAGRAM
Undisturbed Shear
0-4 e 3'
GeoSoOZs, Ine, iATE 2/91 I W. 0. NO 1260-y)
Soil Mechanics Geology Foundation Engineering
NORMAL PRESSURE-KSF
EXPLANATION
0 RESHEAR - AT SATURATED MOISTURE CONTENT
0 PEAK - AT SATURATED MOISTURE CONTENT
DIRECT SHEAR REMOLDED TO 00% RELATIVE DENSITY; THEN SATURATED UNDISTURBED NATURAL SHEAR SATURATED
PCF % MOISTURE
% SATURATED MOISTURE CONTENT % SATURATED MOISTURE CONTENT
SHEAR TEST DIAGRAM
Undisturbed Shear
TP-17 @ 5'
GeoSot'ts, Itt~. W.O. NO 1260-Y) DATE 2/91
Soil Mechanics Geology Foundation Engineering
3
2
LL
v) Y
I- X I
c1 z W
I- 1. In
0
2
a
f a < W I In
1.
0.
f
NORMALPRESSURE-KSF
EXPLANATION
0 RESHEAR - AT SATURATED MOISTURE CONTENT
0 PEAK - AT SATURATED MOISTURE CONTENT
DIRECT SHEAR REMOLDED TO 00% RELATIVE DENSITY; THEN SATURATED UNDISTURBED NATURAL SHEAR SATURATED
% SATURATED MOISTURE CONTENT
PCF % MOISTURE 1 % SATURATED MOISTURE CONTENT
I SHEAR TEST DIAGRAM
Undisturbed Shear
TP-23 @ 5'
I Soil Mechanics Geology Foundation Engineering