HomeMy WebLinkAboutCT 81-46; Carlsbad Airport Center Unit 2; Soils Report; 1989-08-07ADDITIONAL GEOTECHNICAL INVESTIGATION CARLSBAD AIRPORT CENTER, UNIT 2 CARLSBAD, CALIFORNIA PREPARED FOR CENTER DEVELOPMENT 1921 PALOMAR OAKS WAY, SUITE 300 CARLSBAD, CALIFORNIA 92009 PREPARED BY SAN DIEGO GEOTECHNICAL CONSULTANTS, INC. 9240 TRADE PLACE, SUITE 100 SAN DIEGO, CALIFORNIA 92126 AUGUST 7, 1989 JOB NO. 05-4879-016-00-00 LOG NO. 9-1868 -c - SAN DIEGO SOIL ENGINEERING GEOTECHNICAL a ENGINEERING CONSULTANTS, GEOLOGY INC. - August 7, 1989 Centre Development Carlsbad, California 92009 1921 Palomar Oaks Way, Suite 300 - - Attention: Mr. Jerry Morrissey Job No. 05-4879-016-00-00 Log No. 9-1868 SUEUECT : ADDITIONAL GEOTECHNICAL INVESTIGATION Carlsbad Airport Center, Unit 2, Carlsbad, California Gentlemen: At your request, we have completed the Additional Geotechnical Investigation for the proposed Carlsbad Airport Centre, Unit 2 commercial development in Carlsbad, California. This report presents the results of our investigation, as well as our conclusions and recommendations regarding your proposed development. Our estimates of removal quantities are included, as well as our conclusion that rippability on Lot 42 will be comparable to other areas of the project. We recommend buttressing of three cut slopes during mass grading. If you have any questions after reviewing our report, please do not hesitate to contact the undersigned at your convenience. We sincerely appreciate this opportunity to be of service. Very truly yours, SAN DIEGO GEOTECHNICAL CONSULTANTS, INC. Vice President AFB/cf ~240~R~n~~1~c.~s111~~lnn~~~~nlF~nc.~~717Fi.1fi1~15?fi.11n7.~~~~Ifil~15?Fi-l?nfi A SUBSIDIARY OF THE IRVINE CONSULTING GROUP, INC. . TABLE OF CONTENTS . . " . " . . . . . . . . . . . 1.0 INTRODUCTION ...................... 1 1.1 Authorization ................... 1 1.2 Scope of Services ................. 1 2.0 SITE DESCRIPTION .................... 2 3.0 FIELD EXPLORATION ................... 3 4.0 GEOTECHNICAL SETTING AND SUBSURFACE CONDITIONS . . 4.1 Geologic Setting .............. 4.2 Geologic Units ............... 4.2.1 Santiago Peak Volcanics 4.2.2 Santiago Formation (Map Symbol Tsa) 4.2.3 Alluvium (Map Symbol Qal) ..... 4.2.4 .............. 4.2.5 Topsoil Fill ............... 4.3 Groundwater ................. ......... (Map Symbol Jsp) ... 3 4 3 ... 4 .. 5 ... 5 ... 6 ... 6 ... 7 ... ... 5.0 QUANTITIES OF REMEDIAL EARTHWORK ............ 8 5.1 Analysis of Field Data and Method of Calculations . 8 5.2 Itemized Tally of Remedial Quantities ....... 9 5.3 Limitations .................... 9 6.0 BUTTRESS FILLS ..................... 10 7.0 RIPPABILITY OF SANTIAGO PEAK BEDROCK .......... 11 8.0 OFFSITE DAYLIGHT FILL OVER EXISTING LANDFILL ...... 11 9.0 GEOTECHNICAL EVALUATION AND RECOMMENDATIONS ...... 12 9.2 Geotechnical Observation 12 9.1 General 12 9.3 Review of Grading Plans .............. 13 10.0 LIMITATIONS OF INVESTIGATION .............. 13 ...................... ............. . . i TABLE OF CONTENTS (Continued) ATTACHMENTS Fiaures . I Amendices A B Plates 1 Location Map References Field Exploration Program Geotechnical Map ii ADDITIONAL GEOTECENICAL INVESTIGATION CARLSBAD AIRPORT CENTER, UNIT 2, CARLSBAD, CALIFORNIA 1.0 INTRODUCTION This report presents the results of our Additional Geotechnical Investigation ofthe proposed commercial develop- ment in Carlsbad, California. The purpose of our work was to: (1) Estimate quantities of alluvium, (2) Estimate quantities of topsoil and colluvium in fill areas, (3) Analyze stability of proposed slopes and design buttresses, as needed, (4) Develop rock rippability recommendations. The conclusions and recommendations in this report are based on analysis of the data obtained from our field exploration, laboratory tests, and experience with similar soils and geologic conditions in this area. 1.1 Authorization This investigation was authorized by Mr. Jerry Morrissey of Centre Development on June 20, 1989. Our scope of services for this investigation generally conformed to that outlined in our Proposal No. SDP9-5277 dated June 20, 1989. 1.2 ScoDe of Services Our Scope Of Services for this investigation included the following: a. Review of pertinent geotechnical literature, maps and previous reports to outline the known Site conditions; Centre Development August 7, 1989 Job No. 05-4879-016-00-00 Log No. 9-1868 Page 2 b. Subsurface investigation consisting of 17 test pits excavated to a maximum depth of 16 feet: c. Logging of the test pits by our field geologist to determine depths of alluvium/colluvium: d. Analysis of field data and estimating anticipated removal quantities: e. Evaluation of pertinent engineering properties of soil units likely to affect the development: f. Analysis of slope stability and design of slope buttresses as needed: g. Review of previous seismic refraction traverses for development of rock rippability recommendations: h. Preparation of this report with accompanying maps and cross sections presenting our findings, conclusions, and recommendations; 2.0 SITE DESCRIPTION Unit 2 of the Carlsbad Airport Center will occupy a land parcel of irregular shape located in Carlsbad, California. The site includes about 70 acres of hills and associated small drainage basins located east of the existing Carlsbad Airport Center, Unit 1. The location and topography are shown on the attached Location Map (Figure 1). The site is bounded on the north and east by McClellan Palomar Airport, on the south by Palomar Airport Road, and on the west by Units 1 and 3 of the Carlsbad Airport Center. .'I ADAPTED FROM U.S.Q.S. 7.5' ENClNlTAS (1975) AND SAN LUIS REY (1975) QUADRANGLES 00 NO.: DATE: - FIQURE: - " ST 1989 1 Centre Development August 7, 1989 Job No. 05-4879-016-00-00 Log No. 9-1868 Page 3 Topographically, the site includes both low- and high-relief areas. Total relief of the site is about 40 feet, with elevations ranging from approximately 190 to 330 feet above mean sea level. Three main drainages originate near the north edge of the site and drain southwest, the largest being adjacent to Palomar Airport Road. Natural slopes along the eastern and western drainages reach approximately 1.5:l (horizonta1:vertical) or steeper. Access to the site is from improved roads in the existing Carlsbad Airport Center, Unit 1. No structures or improvements were noted on the site. An abandoned agricultural reservoir presently exists near the center ofthe site. 3.0 FIELD EXPLORATION The field exploration performed during the course of this investigation consisted of excavation of 17 test pits, to a maximum depth of 16 feet. The test pits were excavated with a Kubota KH-170L trackhoe, geologically logged and then backfilled. This field work was supervised by our staff geologist. Field work began on June 20, 1989 and was completed on June 21, 1989. 4.0 GEOTECHNICAL SETTING AND SUBSURFACE CONDITIONS 4.1 Geoloaic Settinq The site is underlain by Jurassic-age Santiago Peak Volcanics and Eocene-age Santiago Formation sedimentary rocks. Alluvial sediments are present in the canyon bottoms and upland areas are covered by a thin layer of Centre Development August 7, 1989 Job No. 05-4879-016-00-00 Log NO. 9-1868 Page 4 topsoil and colluvium. The distribution of the geologic units is shown on the attached Geotechnical Map (Plate 1) - 4.2 Geoloqic Units 4.2.1 Santiaqo Peak Volcanics (Maw Symbol JSD) The Jurassic-age Santiago Peak Volcanics, a series of mildly metamorphosed volcanic rocks, are exposed at the western part of the site. Regionally, the Santiago Peak Volcanics vary in composition from basalt to rhyolite. On the site, they are predominantly andesite. The Santiago Peak Volcanics are moderately to highly jointed. Joint spacings are variable: clay fillings are usually present. The Santiago Peak Volcanics are weathered to varying depths and excavation will be difficult. The highly weathered rock within about five feet of the existing ground surface can generally be excavated with conventional heavy earthmoving equipment. Below that depth heavy ripping and blasting should be expected. Heavy ripping or blasting will generally produce oversize materials. The difficulty of handling and placing these materials in fills will tend to increase the cost of grading the site. Centre Development August 7, 1989 Job NO. 05-4879-016-00-00 Log No. 9-1868 Page 5 4.2.2 Santiaao Formation fMaD Svmbol Tsa) The Eocene-age Santiago Formation underlies about three-fourths of the site. As observed, the unit is massive to thick-bedded silty to clayey sandstone with interbedded sandy claystone and siltstone. Santiago Formation rocks probably can be excavated by conventional earth moving equipment. The claystones and some siltstones are moderately to highly expansive. 4.2.3 Alluvium (MaD Svmbol Oal) Alluvium is present in the drainages. As mapped for this project, the alluvium includes variable deposits of colluvium at the base of canyon side slopes. Most alluvium and colluvium consists of dry to moist, soft, silty and sandy clay and silty and clayey sand. Alluvium was observed to a maximum depth of about 14 feet and was, on the average, about six feet deep. The alluvium appeared to be deepest near the center of the drainage courses, with shallower depths observed along the margins. The colluvium was observed to a maximum depth of about five feet and averaged about three feet deep on canyon side slopes. The primary concern with regard to alluvium and colluvium is their potential for settlement in response to loads imposed by fills or structures. Unacceptable settlement may occur after construction, especially if these soils Centre Development August 7, 1989 Job No. 05-4879-016-00-00 Log No. 9-1868 Page 6 become saturated at a later date. Removal and recompaction is recommended to mitigate this problem. Alluvium which cannot be removed because of a high water table may require settlement monitoring and site specific recommendations. Ourprevious report(Reference 1) addresses this situation in Section 7.2.3, Site Preparation. 4.2.4 Tormoil The topsoil seen on the site consisted of loose, dry, fine-grained silty sand. fills or structures should not be founded directly on topsoil due to its limited strength and potential for settlement and seepage. Topsoil may be used in compacted fills if vegetation is removed. The topsoil is not shown on the Geotechnical Map, Plate 1. 4.2.5 Fill Two areas of the site contain undocumented fill and debris. In the north-central area, the fill consists of sandy clay used to construct an agricultural reservoir. The embankment has been breached and the pond empty for some time. This material may be reused as fill material for grading if it is properly processed before use. North of the property line in the area of Lots 29 and 30, the fill is the result of a prior Centre August Development 7, 1989 Job NO. 05-4879-016-00-00 Log NO. 9-1868 Page 7 landfill operation. This fill consists of rocky soil which contains trash and debris and is therefore not suitable for use as compacted fill. It should be removed from the site and properly disposed of. Sizeable documented fills were placed on the site along Camino Vida Robles during the grading of Unit 1 in 1985 and 1986. These are mostly canyon fills with maximum depths of 20 to more than 50 feet. According to the as- graded soils report (Reference 2) these were placed as engineered, compacted fills in accordance with the local standards of practice for such fills. We did not investigate or test the fill for this report, and we relied on Reference 2 for all information relating to the nature and quality of the site preparation and grading. 4.3 Groundwater Groundwater was found in test pits 2, 3, 4, 6, 7, 8, 10 at or near the contact between alluvium and bedrock. These are probably localized, "perchedvv water tables and do not reflect the regional water table. Groundwater conditions may fluctuate with seasonal rainfall conditions, and will probably change in response to development of the site. Centre Development August 7, 1989 5.0 QUANTITIES OF REMEDIAL EARTHWORK Job No. 05-4879-016-00-00 Log No. 9-1868 Page 8 5.1 Analvsis of Field Data and Method of Calculations Our estimates of remedial grading quantities in the proposed fill areas for Unit 2 were based on the 80 scale grading plan supplied by Bodas Engineering. In addition to our field work, we have used subsurface data from our earlier Supplemental Geotechnical Investigation (Reference 1). Materials requiring remedial removal consist of alluvium in canyon bottoms, colluvium and topsoil on slopes, and undocumented fill. Logs of the test pits excavated during our Additional Investigation are shown in Appendix B, Figures B-1 through B-17. Remedial removal depths measured in these test pits, plus those from our earlier Supplemental Investigation were plotted on the Geotechnical Map. The mapped boundary between alluvial removal areas and colluvium and topsoil removal areas was arbitrarily placed at the approximate contour where remedial removal depths reach 3 feet. This contact is shown on the Geotechnical Map. The depth of topsoil\colluvium removal was taken to be 3 feet in all topsoil\colluvium areas. Atypical cross section illustratingthe boundary between an alluvium removal area, and colluvium and topsoil removal areas is shown on Figure 2. Typical canyon benching and cleanouts, and sidehill benching are shown as well. Our procedure for developing the remedial quantities utilized a digital planimeter to measure mapped areas, I f ESTIMATED CANYON DE (ARBITRARY) BEDROCK BENCHES CANYON BENCHES AND CLEANOUT AREA TYPICAL CANYON CROSS-SECTION )B NO.: - - DATE: FIQURE: -- AUGUST 1989 2 Centre Development August 7, 1989 Job NO. 05-4879-016-00-00 Log No. 9-1868 Page 9 which were multiplied by the appropriate average removal depths. Alluvial depths were extrapolated between test pit data. The canyon bottom benching quantities are based on our experience with similar grading projects utilizing large earth moving equipment. 5.2 Itemized Tally of Remedial Ouantities The total estimated quantities of remedial earthwork are presented as follows: Table I Removal Quantities in Unit 2 Alluvium (canyons) 107,000 cubic yards Topsoil/Colluvium (slope and ridges in fill areas) 122,000 cubic yards Undocumented Fill (farm ponds) 26,000 cubic yards Landfill Benching (north of Lots 29, 30) 5,000 cubic yards Total 260,000 cubic yards The quantities shown include weathered bedrock materials expected to be removed within the mapped boundaries. 5.3 Limitations Quantities of earth materials were derived from our field exploration. Assumed depths were extrapolated between test pits and borings, and were extrapolated up canyon .- Centre Development August 7, 1989 Job No. 05-4879-016-00-00 Log NO. 9-1868 Page 10 sides to intercept cut/fill daylights. These quantities are intended to be used for estimating purposes only. Final removal depths should be determined in the field by the geotechnical consultant during grading. Variations in anticipated subsurface conditions as well as methods of field measurements will affect final earthwork quantities. 6.0 BUTTRE88 FILLS Stability against gross sliding was analyzed using the STABL5 computer program for three proposed cut slopes in Unit 2. The locations of the cross sections are shown on the accompanying Plate 1. Downhole logging by our geologists located remolded and sheared clay zones in those slopes which were included in the computer models. The calculated factors of safety fell below 1.5. Buttress fills were added to the cross sections and the factors of safety rechecked to verify that they exceeded 1.5. It was assumed that the buttresses would be constructed of selected sandy on-site soil. Figure 3 contains a typical buttress design. The three buttresses are summarized below: CROSS SECTION BUTTRESS EARTH QUANTITIES (Cubic yards) AA 20 foot key 1,800 BB 15 foot key 1,300 cc 20 foot key 2,100 During construction, our geologist should map all back-cuts to determine that the assumptions used in the analyses are valid. 16' MINIMUM 7 4. DIAMETER PERFORATED PIPE BACXDRAIN \ 4. DIAMETER NON-PERFORATED PIPE LATERAL DRAIN SLOPE PER PLAN BENCHING LPROVIDE BACKDRAIN PER BACKDRAIN DETAIL. AN ADDITIONAL BACKDRAIN AT MID-SLOPE WILL BE REQUIRED FOR SLOPE IN EXCESS OF 40 FEET HIGH. TYPICAL BUTTRESS FILL DETAIL OB NO.: FIGURE: DATE: - - " AUGUST 1989 3 Centre Development August 7, 1989 Job No. 05-4879-016-00-00 Log NO. 9-1868 Page 11 7.0 RIPPABILITY OF SANTIAGO PEAK BEDROCK Rippability of the Santiago Peak metavolcanic rock was addressed in our report on Unit 2, Reference 1. However an area of the rock located in Unit 2, Lot 42 was not tested by us. A prior investigation by H.V. Lawmaster & Co. had run a seismic line in Lot 42. We have reviewed the Lawmaster data and it appears that rippability will be similar to the main rock area in Unit 2, that is, relatively easily rippable down to about six feet, and moderately difficult ripping below with some blasting required due to the variable nature of the formation. 8.0 OFFSITE DAYLIGHT FILL OVER EXISTING LANDFILL Our field work included a test trench (T-11) in the old landfill north of Lots 29 and 30 in Unit 2. The grading plan calls for an offsite daylight fill to be placed over the existing slope. We recommend that a limited removal be made into the slope with a 1:l backcut (if possible). The fill key subgrade should be scarified and recompacted at optimum moisture and the new fill placed to final grade. The backcut should encroach as far as possible into the landfill in order to expose as much firm key area as possible. Spoils from the landfill excavation should be removed from the site and properly disposed of. Centre Development August 7, 1989 Job No. 05-4879-016-00-00 Log No. 9-1868 Page 12 9.0 GEOTECHNICAL EVALUATION AND RECOMMENDATIONS 9.1 General In this investigation, we have addressed the following subjects : (1) Quantities of soil requiring removal and recompaction consisting of alluvium in drainages, topsoil and colluvium on slopes (in fill areas) , and undocumented fill. (2) Buttressing of cut slopes containing pre-sheared clay layers. (3) Rippability of Santiago Peak volcanic rock. We did not identify and geotechnical conditions during our investigation that would prevent development of Unit 2 as it is now planned, providing that the recommendations contained in this report and our prior report (Reference 1) are followed. 9.2 Geotechnical Observation San Diego Geotechnical Consultants personnel should continuously observe the grading and earthwork operations for this project. Such observations are essential to identify field conditions that differ from those predicted by preliminary investigations, to adjust designs to actual field conditions, and to determine that the grading is in general accordance with the recommendations of this report. Our personnel should perform sufficient testing of fill during grading to support the geotechnical consultant's professional opinion as to compliance of the fill with compaction requirements. Centre Development August 7, 1989 Job NO. 05-4879-016-00-00 Log NO. 9-1868 Page 13 9.3 Review of Gradina Plans San Diego Geotechnical Consultants should review the final grading plans for the proposed development prior to construction. This review will allow us to assess the compatibility of those plans with the recommendations in this report. If the final plans differ materially from our present understanding of the project, further investigation and analysis or recommendations for design changes may be necessary. 10.0 LIMITATIONS OF INVESTIGATION our investigation was performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable soils engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. The samples taken and used for testing and the observations made are believed typical of the entire project. However, soil and geologic conditions can vary significantly between drillholes, test pits, or other exploration locations. As in most projects involving earthwork, the conditions revealed by excavation during construction may vary from those predicted in our preliminary findings. If such changed conditions are found, they should be evaluated by the project soils engineer and geologist. It may then be necessary to adjust the project designs or to recommend alternate designs. This report is issued with the understanding that the owner, or his representative, is responsible for bringing the information and recommendations contained herein to the attention of the architects and engineers involved in the Centre Development August 7, 1989 Job No. 05-4879-016-00-00 Log NO. 9-1868 Page 14 project. The owner or his representative is also responsible for assuring that the information and recommendations are incorporated into the plans, and that the necessary steps are taken to see that the contractor and subcontractors carry our the recommendations in the field. This firm does not practice or consult in the field of safety engineering. we do not direct the contractor's operations, and we cannot be responsible for anyone other than our own personnel on the j obsite. Therefore, the safety of other persons at the jobsite is the responsibility of the contractor. The contractor should notify the owner promptly if he considers any of the recommendations in the report to be unsafe. Our findings in this report are valid as the date of issue. However, changes in the condition of the site can occur with the passage of time, due either to natural processes or the works of man on this or adjacent properties. In addition, changes to the applicable or appropriate laws, regulations, and standards of practice may occur as a result of either new legislation or the broadening of knowledge. Our findings may be invalidated wholly or in part by such changes, over which we have no control. The validity of this report therefore should not be relied upon after a period of three years without a comprehensive review by San Diego Geotechnical Consultants. Centre Development August 7, 1989 Job No. 05-4879-016-00-00 Log NO. 9-1868 Page 15 *** - SAN DIEGO GEOTECHNICAL CONSULTANTS, INC. " - Victoria Stocker WWG Rahond M. Masson Staff Geologist Project Engineer - W. Shaw, C.E.G. 1251 Registration Expires: 3-31-91 Registration Expires: 6-30-90 Principal Engineer Chief Geologist APPENDIX A References References 1. San Diego Geotechnical Consultants, Supplemental Geotechnical Investigation Carlsbad Airport Centre, Unit 2, and Off- Site Fill Area, Carlsbad, California, Job No. 05-4879- 011-00-00, July 29, 1988 2. H. V. Lawmaster & Company, Inc., 1980, Preliminary Geotechnical Investigation, Proposed Palomar Business Park, North San Diego County, California: Unpublished Report No. 79-9394/654Gto Palomar Business Park, January 15, 1980 (includes grading plan review letters dated June 8, 1982 and September 27, 1982). 3. Moore h Taber, 1987, Report of Geotechnical Services, Carlsbad Tract No. 81-46, Airport Business Center, Unit No. 1, City of Carlsbad, California: Unpublished Report to Centre Development Company, February 25, 1987. 4. Bonilla, M. G., 1970, Surface Faulting and Related Effects, - in Wiegel, R. L. (ea.), Eacthcruake Ensineerinq: Englewood Cliffs, New Jersey, Prentice-Hall, p. 47-74. 5. Seed, H. B., and Idriss, I. M., 1982, Ground Motions and Soil Research Institute, Monograph Series. Liquefaction During Earthquakes, Earthquake Engineering 6. Ploessel, M. R., and Slosson, J. E., 1974, Repeatable High Ground Accelerations From Earthquakes, California Geology, September. 7. California Division of Mines and Geology, 1975, Recommended Guidelines for Determining the Maximum Credible and the Maximum Probable Earthquakes: California Division of Mines and Geology Notes, Number 43. APPENDIX B Field Exploration m I A ! ! TR PROJECT NAME: Carlsbad P-irport Centre TRENCH NO.: JOB NO.: 05-4879-016-00-00 DATE: 6-20-89 EQUIPMENT: Trackhoe 170L 24" bucket ELEVATION: 218 LOQQED BY: "' LOCATION See Map DESCRIPTION Topsoil/Qal: Dark brown silty CLAY, dry to moist, stiff Santiago FM (Tsa): Weathered, brown, gray, green mottled silty clay. Moist to wet, stiff, tan, orange iron oxide staining, mottled. W -I n 00 Y m t a (II I N I JOB NO.: 05-4079-016-00-00 EQ~~~~~~~: Trackhoe 170L 24" bucket ELEVATION: 215 LOQQED BY: vs LOCATION See Map DESCRIPTION Alluvium (Qal): Light tan silty SAND, loose, damp. Plluvium/Topsoil (pal): Dark brown silty CLAY, moist to wet, medium dense. Santiago FM (Tsa): Weathered, brown gray silty SAND, moist to wet, medium dense. Santiago FM (Tsa): Green gray mottled clayey SAND, wet, dense. Water weeping into trench between 209' and 203'. Minor caving. " " 1 ENCH LOO n Drainage 4- - e-- - """ L -- 4- 4 - " c - - " "" " - " """--- " - " - I \ I I ! I I I I I I I I I PROJECT NAME Carlsbad Airport Centre TRENCH NO.: JOB NO.: 05-4879-016-00-00 DATE: 6-20-89 EQUIPMENT Trackhoe 170: 24" bucket ELEVATION: 214 LOGGED ey: Vs LOCATION See Map DESCRIPTION Alluvium (Qal): Tan SAND, dry to moist, loose. AlluviuIn/TOpSoil (Qal): Dark brown silty, clayey SAND, moist to wet, medium dense. Santiago FM (Tsa): Weathered, dark brown and brown clayey, silty SAND, moist to wet, medium dense. Water weeping into bottom of trench. (II I P I J~~ 05-4879-016-00-00 DATE: 6-20-89 EQUIPMENTTrackhoP 170: 24" bucket ELEVATION: 240' LOQQED BY: "' LOCATION See Map DESCRIPTION ENQINEERINQ PI I I \ t I j ! I ! ! ! i ! PROJECT NAME: Carlsbad Airport Centre TRENCH NO.: 5 JOB NO.: EQUIP MEN^: LOQQED BY: 05-4879-016-00-00 DATE: ELEVATION: LOCATION 6-20-89 Trackhoe 170L 24” bucket 230 ‘ ”’ See Map DESCRIPTION Topsoil: Dark brown silty CLAY, dry to damp, medium stiff to stiff. Santiago FM (Tsa): Tan, gray, orange mottled silty CLAYSTONE, moist, stiff to medim stiff. I DROJE~T NAM~: Carlsbad Airport Centre TRENCH NO.: 108 NO.: EQUIPMENT: Trackhoe 170: 24" bucket ELEVATION: 228' LOQQED BY: 05-4879-016-00-00 DATE 6-20-89 "' LOCATION See Map DESCRIPTION Alluvium (pal): Brown, tan, gray clayey SAND, moist to wet, medium dense. Santiago E" (Tsa): Gray, green, orange, tan mottled clayey silty SAND, wet medium dense. Water below 91I' caving. BCALE 1"=10' horiz & vertical TOPOQRAPHY: TRENCH I I I I I I I IRIEh - I I ! m I -4 i PROJECT ~~~~Carlsbad Airport Centre TRENCH NO.:- - NQ RING PRO DATE: ELEVATION: 227' LOCATION See Map - NO.: 05-4879-016-00-00 6-20-89 EQUIPMENT: Trackhoe 1~70L 24" bucket LOGQED BY: vs DESCRIPTION " " " Fill (Qaf): Light tan, brown clayey SAND, dry to moist, loose to medium dense. Topsoil: Dark brown clayey SAND, moist, medium dense. Alluvium (Qal): Tan, brown clayey SAND, moist to wet medium dense. Santiago FM (Tsa): Weathered, gray qreen tan mottled clayey SAND grades to green, tan orange brown mottled sandy CLAY, moist, stiff SCALE: 1''=10' horiz & verticalTOPOQRAPHY: - ~ TRENCH ORIENTATION N41°E - " - " " - " " - \ " I I I I- " I I I I "' I,,, It1 Ill, " I IIII I,,, I,, - ,*<:>< ((1, - Qaf - 'f~ropso,p. \ - IIVI #I,, III -:" -, Qal - \ \ 3- " " - 1 -4 \ " .- - - "" -\ \ - - " ._ - " " " - Tsa __ \ W - - - ?" - ,- - a "" - " t TRENCH LOG m I aD ! JOB NO.: EQUIPMENT: LOQQED BY: vs LOCATION See Map 05-4879-016-00-00 DATE ELEVATION: 6-20-89 Trackhoe 1701. 24" bucket 222' DESCRIPTION Alluvium (Qal): Dark brown, SAND, wet loose grades to dark brown sandy CLAY with gray and orange mottled stringers, wet, stiff. Santiago FM (Tsa): Tan, orange, gray mottled silty CLAY, wet, medium dense, water and caving. W 2 a 2 OD 2 3 Y m I m I (D I - E HQ Pf - - PROJECT NAME- TRENCH NO.: 9 JOB NO.: NQlNEERll *O EQUIPMENT: Trackhoe 17OL 24" bucket LOQQED BY: vs LOCATION See Map - - - 05-4879-016-00-00 DATE ELEVATION: 234' 6-21-89 DESCRIPTION " " " - Topsoil: Dark brown clayey SAND, fine grained, dry to moist, medium dense. Alluvium (Qal): Brown Clayey SAND, fine-grained, moist, medium dense. Santiago FM (Tsa): Tan clayey SAND, fine-grained, moist, dense, discontinuous orange staining. " SCALE: I"= 10' horiz & verticalTOPOQRAPHY: - - TRENCH ORIENTATION N38'~ - " " " - " - " " " - " - - - - - - - - - - - " " - " - - " Tsa " - - " .. - - TRENCH LOO Y PER1 - 1 " I I I I I I I I I 1 I I ! I I ! m I 0 4 PROJECT NAME:Carlsbad Airport Centre TRENCH NO.: JOB NO.: 05-4879-016-00-00 DATE: 10 6-21-89 EOUIPMEN~;~~~P 170L 24" bucket ELEVATION: 242' LOCATION: See Map Alluvium (gal): Light tan clayey SAND, dry to moist, loose to medium dense grading to dark gray sandy clay and clayey sand, wet, medium dense. Santiago FM (Tsa): Light tan and orange tan silty SAND, fine-grained, wet dense micaceous, water and minor caving. E n t a 0 > 0 W 2 w m I d d I PROJECT NAME: Carlsbad Airport Centre TRENCH NO.: l1 JOB NO.: 6-21-89 EQUIPMENT: 05-4879-016-00-00 DATE Trackhoe 170L 24" bucket ELEVATION: 255' to 270' LOGQED BY: vs LOCATION See Map DESCRIPTION ToJ~soil/Colluvium: Light tan silty SAND, dry to moist, loose. Fill (Qaf): Brown clayey SAND, damp, loose to medium dense, grades to dark gray clayey sand, moist, medium desne, fill contains riprap debris and trash. Santiago FM (Tsa): Green gray mottled sandy CLP-Y, moist, stiff to very stiff, excavation caved after 90 min. W A : < 0 Y A a m - TlON 'PERTIES " L ENCH LOQ I I i I i I I I I i I ! I I I 1 I I PROJECT NAME: Carlsbad Airport Centre TRENCH NO.: l2 NO.: n~-4~79-n~~-no-nn DATE: 6-21-89 EQUIPMENT: LOQQED BY: vs LOCATION See Map Trackhoe 17OL 24" bucket ELEVATION: 268' DESCRIPTION I Alluvium (Qal): Brown to dark brown clayey SAND, dry to damp medium dense 40% trash and bottles. Grade to light tan, orange silty sand, moist, medium dense. Santiago FM (Tsa): Green brown clayey SAND, mottled discontinuous orange staining, moist, dense, micaceous. L T PROJECT NAME: Carlsbad Airport Centre TRENCH NO.: 13 )OB NO.: 05-4879-016-00-00 DATE: 6-21-89 EQUIPMENT: Trackhoe 170L 24” bucket ELEVATION: 301‘ LOQQED BY: vs LOCATION See Map DESCRIPTION Alluvium (pal): Dark brown SAND, loose, moist, grades to dark green brown silty clay, wet stiff to very stiff. Santiago FM (Tsa): Orange tan SANDSTONE, moist, very dense, iron oxide staining. I i ! ENQINEERINQ PI - RO W -1 4 Y m a m PROJECT NAME: Carlsbad Airport Centre TRENCH NO.: 14 J~~ 6-21-89 05-4879-016-00-00 DATE: EQUIPMENTTrackhoe 170L 24" bucket ELEVATION: 304' LOQQED BY: vs LOCATION See Map DESCRIPTION Fill (oaf): Dark brown silty CLAY, dry to moist, soft to stiff, grades to reddish brown silty clay, moist, stiff. Santj~ayo FM (Tsa): Orange tan weathered SANDSTONE, moist, dense. TRENCH NO.: l5 JOB NO.: 05-4879-016-00-00 DATE: 6-21-89 EQUIPMENT: Trackhoe 170L 24" bucket ELEVATION: 293' LOQQED BY: 'JS LOCATION See Map DESCRIPTION Alluvium (Qal): Dark brown silty CLAY, dry to moist, stiff. Santiago FM (Tsa): Tan orange silty CLAYSTONE, moist, stiff, gypsum stringers angular andesitic rocks measuring from 2" to 12". and red iron oxide staining. Rare quartzite cobbles and I 1 I I I I I T Tsa I I I I I I ! t I I I PIKMCT Carlsbad Airport Centre TRENCH NO.: l6 05-4879-016-00-00 DATE 6-22-89 EQUIWENT: LWD BY: Trackhoe 170L 24" bucket ELEVATION: LOCATION "' See Map DESCRIPTION Alluvium (Qal): Brown silty matrix with angular andesitic rocks ranging in size from pebbles to 2' boulders, dry, loose. Santiago Peak FM (Jsp): Orange tan silty matrix in joints and seams around angular andesitic rocks matrix is damp and dense. ! I I I 1 ! I I I I I 1. ! I [II I PROJECT NAME: Carlsbad Airport Centre TRENCH NO.: 17 JOB NO.: EQUIPMENT: Trackhoe 170L 24" bucket LOGGED BY: "' LOCATION See Map 05-4879-016-00-00 DATE: 6-22-89 ELEVATION: 232' DESCRIPTION Alluvium (Qaf): Light tan silty matrix, dry and loose, surrounding angular andesitic rocks ranging in size from pebbles to boulders (4' on a side) and minor amounts of trash. Santiago Peak FM (Jsp): Dark brown silty matrix 60% angular andesitic rock. Matrix is moist and dense. "I-+ 'RENCH LOQ j I I I INEE - Y 2 a m PER1 - 0 Y * Y a a c : s I I I I I I I I I I I I I ! I