July 2,-1986
Work Order 400011
Attention: Mr. Bruce Crable,
Director of Construction
Subject: . Interim Pavement Design Report No.2, _
.824T1.n the City of Carlsbad, CA.
-
References: 1) Addendum to Interim Pavement De-
sign, Report, Sea Gate Village, Carls-
bad Tract No.82-24, dated May 28, 1986,
by Pacific -Soils Engineering, Inc.'
2) 'Project Grading Report for Sea
Gate Village, Carlsbad Tract No.82-24,
dated, November 27,' 1985, by Pacific
Soils Engineering, Inc.
Gentlemen:
This report presents engineering data,' test results and calculations
relative to the pavement design for a portion of the subject pro-
ject.
This report specifically pertains to' the limits of streets as
described below:' '
''Li1ri'ts <'f' :Paven'e.n:t Design
'Street ' , 'S't'at;i:On
P.aseo del Norte 26+00 to 36+20
Three (3) subgrade samples were.obtained, from Paseo del Norte.
Classification tests' indicated that all the soils were very similar
so one (1) "R"-Value test was conducted -for analysis.
I.,
.' I
Work Order 400011 Page Two
July 2, 1986
Test results indicated a "R"-Valué of 22 and a hydrometer analysis
shows there is 71 percent sand, 15 percent silt and '14 percent
clay,for a portion of Paseo del Nôrte. All results are present-
ed in Table I andon Plate -A.
A 'Traffic Index of 8.0 has been utilized for Paseo del' Norte
as per discussions with City of Carlsbad personnel and Table 'A
for secondary arterial streets.
The following design calculation is presented:
G.E. = (0.0384) (T.I.) (100-11 R")
(0.0384) (8.0) (78) = 24.0-inches G.E.
Try '4-inches of A.C.= 8.0-inches G.E.
15-inches of A.B. 16.5-inches G.E.
24.5-inches G.E.
Since 24.5 is greater -than 24.0, Section' is okay.
In summary the' recommended section .f or a portion of Paseo del
Norte is:
4-inches asphaltic concrete., over 15-inches aggregate base
The on-site soils are not expansive in nature' and special treat-
ment beneath the curb, gutter and sidewalks is not necessary.
fAs a part of preparation for base and asphaltic concrete, the .sub-
grade shall be suitably moisture conditioned, processed and mixed
as necessary,to attain near optimum moisture and compacted in-
place to a minimum of 95 percent of the Laboratory Standard ASTM:
D 1557-78. All utility trench backfill should likewise be compacted.
PACIFIC BOILS ENGINEERING, INC.
Work Order 400011 Page Three
July 2, 1986
Aggregate base material should be placed on the compacted sub-
grade and compacted in-place to a minimum of 95 percent of the
Laboratory Standard Test Method California 216E.
Preparation for cornpaction'operations and base and pavement
construction operations should be accomplished in accordance
with current requirements of the City -of Carlsbad and under
the observation, inspection and testing of a representative of
the-site-soil engineering firm.'..
Respectfully submitted,
PACIFIC; SOILSI ENGINEERING, INC;
By: ztlot4~
DOUGLOS DUNHAM,
Staff Engineer'
Dist: (3) Addressee '
(2) 'City of Carlsbad
Reviewed by:
REX P. KETTER,'R.C.E. 15251
Executive Vice President '
DD/RPK:kr
H
Work Order 400011
July 2, 1986
T AD L E 1..
Hydrometer Analysis ...............
Sample No. Safllple:. :S;t:a:t:in. . %Sn,S.ilt-,%c-1y:
1 . 79 8 13
2 31+00 •. 71 15 14 22
3. 34+00 84 5 11
p
PACIFIC SOILS ENGINEERING, INC. .
AC.IFrC -.SOTTJS1.NCINEEi(G PAVEMENT DESIGN' DATA
C
- . I
I-'
w. o. 400c//
Project G1qr ½a,46B
Axsao y
Sample
Location 10,4590 2L. .A'917 (577?
Depth /•c; .ø/•5•
SPECIMEN A C
1{oisture Content .7. /44 ,2 /S.7
Compaction Pressure, psi 3 4
Dry Density, psf //SB '21.0 1/9.2
Exudation Pressure, psi // 5
Expansion Pressure:pL Q.D. 7 5
it-Value by Stabilometer
EXUDATION PRESSURE CEART
IIIIMRIIIIRII U UIMI$RIIIIIII U :.UIIIRII$III MRIRi ,IIIIMU$MI$ IIUM.IRRIII .IIIIRUMIUNa
MEIRMEEMINERNMEN
MENOMONEE so
MOMMIKEREAKEEMN
MOMEMEEMEMEME •I1IRIIINRIUI
MEMEMEMEMWEEME U RIRMIRI*IRI
U IIUI•R5SRIII U MRRIRUIiIII
U I IMRRIUIIJI•I U $IIRRUUNIRIII
• . Is .1. II ii II II II
U .S. STANDAIm sirt .
• I_a__lI a aaii
a- — -- I
_____
,I -j
I
II
II
____
I .
I
U— TIUUI
R-VALUE @ 300 psi
22.
SAND EQUIVALENT
VALUE
PL!TE_/4