HomeMy WebLinkAboutCT 83-01; Monarch Villas Lots 2-7; Soils Report; 1987-10-06LEIGHTON and ASSOCIATES
,~
-
-
-
-
-
.-
-
-
-
-
_.
-
*SOIL ENGINEERING *GEOLOGY *GEOPHYSICS *GROUND WATER aMATERIALS TESTING wAZARDDUS WASTE ASSESSMENT
October 6, 1987
Project No. 8840360-04
TO:
ATTENTION:
SUBJECT:
S & S Construction Company of San Oiego
5845 Friars Road, Suite 1106
San Oiego, California 92108
Mr. Jack Tilney
Interim As-Graded Report of Rough Grading Operations for Building Pad
Areas, Lots 2 Through 7, Proposed Condominium Complexes, Monarch
Villas, Carlsbad Tract 83-1, Carlsbad, California
Introduction
In accordance with your request and authorization, provided herein is our interim
as-graded report of rough grading operations for the subject condominium building
pads. This report summarizes our observations, field and laboratory tests, and
geotechnical conditions encountered during grading performed between September 24
and October 5, 1987. The subject site is located at the northeast corner of El
Camino Real and Levante Street in Carlsbad, California (Figure 1).
Accompanying Maps, Illustrations, and Appendices
Figure 1 - Site Location Map - Page 2
Table 1 - Summary of Building Pad Expansion Potential - Rear of Text
Table 2 - Foundation Design Considerations for Expansive Soils Underlying One-
and Two-Story Residential Buildings - Rear of Text
Plates 1 and 2 - Density Test Location Maps - In Pocket
Appendix A - References
Appendix B - Summary of Field Density Tests.
Appendix C - Laboratory Test Results
Appendix D - General Earthwork and Grading Specifications
Appendix E - Slope Maintenance Guidelines for Homeowners
5423 AVENIDA ENCINAS, SUITE C. CARLSBAD. CALIFORNIA 92008 (619) 931.9953
-
-
_.
BASE MAP: USQS ENCINITAS. CALIFORNIA QUADRANGLE
-
-
0 2000 4000
Ret
I SITE LOCATION MAP
S IL S / MONARCH
CARLSBAD, CALIFORNIA I
-
-
-
.~
-
-
-
.-
-
-
-
-
8840360-04
It is our understanding that this interim as-graded report is intended to satisfy
a requirement of the City of Carlsbad to obtain building permits. The informa-
tion presented in this report will be incorporated into the more comprehensive,
final as-graded report for the Monarch Villas subdivision to be prepared shortly
after completion of rough grading for the entire site. This interim report
summarizes our observations, test results, the geotechnical conditions of the
building pad areas. and provides recommendations for design and construction of
the proposed buildings.
The grading plan (20-scale) prepared by APEC. Inc., dated March 16, 1984, was
used as a base map to present approximate locations of field density tests
(Plates 1 and 2). Rough grading operations of the building pad area for Building
Pads 2 through 7 were performed during the period of September 24 through
October 5, 1987. Grading operations will be performed in the near future for the
remainder of the subject site. As-graded geotechnical conditions and field
density test locations of the entire site will be presented in the final as-
graded report.
Summary of Grading Operations
Grading of the subject site is being performed by Reed-Thomas Company, Inc.
Grading largely consisted of removal of the existing paved street, excavation of lower building pad areas, and minor cuts and fills of the pre-existing graded
area. Specific operations during interim rough grading included:
l Brushing and removal of surface vegetation (with the exception of slope
vegetation) and debris prior to grading of the site.
a Removal of the existing asphalt concrete paved street, and buried utilities.
In one area, a storm drain was left functioning in place. Once this storm
drain has been retired by the construction of a new storm drain, it should be
backfilled with lean concrete (Plate 2).
Geotechnical Engineering Summary
l Site Preparation and Removals
Prior to grading, the building pad areas on the subject site were stripped of
surface vegetation and debris. The existing street asphaltic concrete
pavement and aggregate base were ground in-place and processed with site soils
to make an aggregate fill mix. Existing portland cement concrete curb,
gutter, and sidewalk were removed from the site. Buried utilities, including
storm drain, water main, and sewer main lines were removed from the site. One
section of storm drain was left functioning in place. A new storm drain
alignment is planned to replace this storm drain. Once the new storm drain is
installed, the old storm drain should be backfilled with lean concrete
(Plate 2).
-3- l!lLl hl
LEIGHTON and AS3,ClATES lNCORPORATED
-
-
-
-
-
-
,-
-
-
-
-
-
8840360-04
Fill Placement
After processing the excavated areas, native fill soils and A.C. soil ag- gregate fill mix were spread in 6- to 8-inch loose lifts, moisture conditioned
as needed to obtain near-optimum moisture content, and compacted to a minimum
relative compaction of 90 percent of the maximum dry density (ASTM Test Method
D1557-78). Areas of fill in which field density tests were less than 90
percent relative compaction were reworked, recompacted, and retested until the
fill reached 90 percent relative compaction and adequate moisture content. In
areas where fill placement was observed as being nonuniform, these areas were
reworked until uniformity in soil mixture and adequate moisture was achieved.
Field and Laboratory Testing
Field density tests were performed by the sand cone, nuclear gauge, and drive
cylinder methods in general accordance with ASTM Test Methods D1566-82,
D2922-78, and D2937-71, respectively. The approximate locations of the field
density tests are shown on Plates 1 and 2. The results of the field density
tests are presented in Appendix B.
Laboratory maximum dry density tests were performed in general accordance with
ASTM Test Method D1557-78. The results are presented in Appendix C. It
should be noted that the accuracy of test results is dependent on the preci-
sion of the laboratory and field testing procedures as outlined by the
American Society for Testing and Materials (ASTM).
Representative samples were collected from near-surface soils of finish graded
pads. Laboratory tests for expansion index were performed on these samples in
accordance with UBC 29-2. The results of expansion tests are presented in
Appendix C.
Graded Slopes
Fill slopes in the "crawl space" areas between the interior and exterior
footings were constructed in accordance with our recommendations contained in
our geotechnical investigation report (Appendix A. Reference 3). The slopes
between the upper and lower footings were located by projecting a 2:l
(horizontal to vertical) slope upward from the lower pad grade to the upper
pad. Fill slope faces were compacted by sheepsfoot rollers and then track-
wal ked.
Grading for the major slopes outside the building pad areas has not been
completed at this time. As-graded geotechnical conditions of these slopes
will be addressed in the final as-graded report.
Retaining Walls
Retaining walls are proposed west of the building pads at Lots 3. 4, and 6
(Plates 1 and 2). As of this date, work has not begun on the construction of
these retaining walls. Retaining wall footing excavations and backfill should be observed by a representative of this firm and will be addressed in the
final as-graded report.
- 4 -
-
-
-
-
-
.-
-
-
-
-
-
-
-
884036D-04
l Expansive Potential
Expansion index tests were performed in accordance with UBC 29-2 on repre-
sentative samples of the near-surface soils of the subject lots. Based on
these test results and visual evaluation, the expansion index of these soils
ranged from very low to low. Results of the expansion index tests are
presented in Appendix C. Foundation and slab recommendations for building
pads with medium and high expansive potential soils within 3 feet of pad grade
are discussed in our previous report (Appendix A, Reference 3).
Conclusions
Geotechnical aspects of the building pad area of the subject site have been
evaluated and treated during grading in accordance with the recommendations
presented in our geotechnical investigation report (Appendix A, Reference 3),
field recommendations during the course of grading, and requirements of the City
of Carlsbad. It is our opinion that the building pad areas of Lots 2 through 7
are suitable for their intended use provided the recommendations of this report
and our previous report are incorporated into the design and construction. The
following is a summary of our conclusions:
o The geotechnical properties of the onsite soils encountered during site
grading were generally as anticipated.
e Site preparation and removal of utilities and pavements were observed and/or
tested prior to fill placement.
e Very low to low expansive soils at finish grade exist on the subject building
pads.
e Fill soils were derived from onsite soils and A.C. soil aggregate fill mix.
Fill soils in the pad areas of Lots 2 through 7 were placed and compacted to
at least 90 percent relative compaction in accordance with the General
Earthwork and Grading Specifications (Appendix A, Reference 3) and the
requirements of the City of Carlsbad.
Recommendations
l Foundation and Slab Design Considerations
Construction of foundations and slabs should be performed in accordance with
the recommendations of our previous report (Appendix A, Reference 3).
Laboratory test results indicate expansion potential should be very low to low
(Table 1). Treatment of.the foundation, slab and flatwork design for very low
to low expansive soil designations should be based on Table 2. It should be
noted that Table 2 of this report supersedes the Table 2 of our previous
report (Appendix A, Reference 3).
In order to help mitigate the potential for misalignment of the proposed
garage door openings(s), we recommend a grade beam be provided across the
garage door opening(s). This grade beam should be designed in accordance with
-5-
-
-
-
-
-
-
,-
-
-
-.
8840360-04
The potential for slab cracking may be reduced by careful control of
water/cement ratios. The contractor should take appropriate curing precau-
tions during the pouring of concrete in hot weather to minimize cracking of slabs. We recommend that a slipsheet (or equivalent) be utilized if grouted
tile, marble tile, or other crack-sensitive floor covering is planned directly on concrete slabs. All slabs should be designed in accordance with structural
considerations.
l Surface Drainage and Lot Maintenance
Positive drainage of surface water away from the structure is very important.
No water should be allowed to pond adjacent to the building. Positive
drainage may be accomplished by providing drainage away from the building at a
gradient of at least 2 percent for a distance of at least 5 feet away from the
building, and further maintained by a swale or drainage path at a gradient of
at least 1 percent. Where necessary, drainage paths may be shortened by use of area drains and collector pipes. We suggest the installation of eave
gutters and downspouts on the buildings, which will facilitate roof runoff
away from the foundation. The discharge water from the downspouts should be
directed away from the buildings to an appropriate noncorrosive outlet.
Drainage away from the slopes should be maintained at all times such that
water does not drain over the top of the slopes. The need for and design of
drainage devices on the site is within the purview of the design civil
engineer.
Planters with open bottoms adjacent to the building should be avoided, if
possible. Planting areas at grade should be provided with adequate positive drainage directed away from the building. Planters should not be designed
below grade unless provisions for drainage such as catch basins and pipe drains are made.
Upon sale of housing units, maintenance of lots by the homeowner and/or by the
Homeowners Association is recommended. Our Slope Maintenance Guidelines for
Homeowners is therefore included in Appendix E for your review and distribu-
tion to the future homeowners and/or Homeowners Association.
l Subdrains
Construction of a "crawl space" subdrain should be performed in accordance
with the recommendations of our previous report (Appendix A, Reference 3).
The stability fill subdrain and outlets constructed during rough grading are
identified on the As-graded Geotechnical Maps. Where outlets are not tied
into the storm drains, they should be cleared of soil cover or other potential
blockage which may have occurred since initial subdrain construction.
Drainage design from outlets that are not tied into storm drains should be
provided by the project civil engineer. It is recommended that the Homeowners
Association further maintain these outlets, as well as retaining wall drainage
outlets, to prevent future blockage for those drains in common areas.
Individual homeowners should maintain outlets on their respective properties.
The developer should provide this information to the homeowners.
-6-
LEIGHTON end ASSOCIATES !NCORPORATED
-
8840360-04
Should a subdrain be intercepted or damaged in the future, even if it is dry,
we recommend that the subdrain be repaired. If a subdrain requires reloca-
tion, the subdrain may be rerouted provided a minimum gradient of 1 percent is
provided in the direction of the outlet.
If you have any questions regarding our report, please do not hesitate to contact
this office. We appreciate this opportunity to be of service.
Respectfully submitted,
- LEIGHTON AND ASSOCIATES, INC.
-
EO/SRH/RW/lk
- Distribution: (3) Addressee
Ro&&%$?
Chief EngineeriAg Geologist
-7-
LEIGHTON and ASSOCIATES lNCORPORATED
-
-
-
-
-
.-
-
,-
-
-
8840360-04
-
Lot -
2
3
4
5
6
7
TABLE 1
Summary of Build.ing Pad Expansion Potential
Expansion Potential
Very Low
Very Low
Very Low
Low
Low
Low
Expansion
Index of
Representative
Test
3
3
3
24
24
24
LElGHTON and ASSOCIATES INCORPDRATED
___~~,. .~.-.- .-.-_ ._^~“_^_.“..
8840360-04 TABLE 2 -
-
FOUNOATION OESIGN CONSIOERATIONS FOR EXPANSIVE SOILS
UNDERLYING ONE- AND TWO-STORY RESIOENTIAL BUILDINGS
-
-
-
-
-
IID*nslOn Ind*s 0 - 20 YEPI Lhl EIPAWs,O"* Lay ElPAllSlOl * "EO,"" ElPU1510** ",C" tvP*"s,o"*
OlU-StW, FOOll"9% All IWIInqS I2 Inch.1 "11 ,.wtinp, 12 lnchcr E~twlor looclnpr II frh,far twtingr 24
ik* loll I) dwa. rooth?qr cmt,n- ""US. onr "0. , ,,bbr d..P. roollnqr contin- "WI. on, "0. , reblr Inches eep. In,.rlor ,ndl*, WD. Intwtor
top ‘"d bottm. top rnb bottom. footln9l 12 ,ncncr deep. One MO. ‘ ,.b4l top rnd fwhg, I8 lncha a.eP* one "0. I .-ear top ."d both.. boltca.
lW4kWY A11 fooottnq, II ,"Ch., cmtlnqs A11 ,o.atlnp, ,I ,"chcr
iI** ".a* I, d*eD. fWtW,l conth- footlnp‘ c.nttn- A11 footlnp, ,I Inch.1 E.rercor ‘oothq, I4 dClP. "0"s. on* "0. , *lb, deep, "O",. on. "0. , **ha, fwt,ngs ConfIn- ,nctlcr dleJ. 1ntrrtor "0"s. on* no. , ,,bl, top rnd bptto.. top rnd botton. footlnqs II I"<rm, deep. top and bcxto.. fw~. I rehw ta@ ("0
Lirlnp Area 4 inch*, LhlCk. Id- 4 inches ul,ct. 6x6- 4 Inches th,ck. 6x6- 4 Inches CllCk. ,4 floor Slab 10110 reIded wire rrh. lo/lo welded wire mall. 6/6 ",1&d *,rr man. reb., I II' on cmle* (see "Oh 2) I-lath sm* ,ryw over .P,"Ch s*n* hyer 01.r "l,h ,4 dPClS , ,I' 0.4 6 -11 vtspreen ml,,",* 2-inch rrnd l.ycr ore, 6 .,I vlsq"ecn smIst"rs 6 .,I Vlrquccn mot,t"re cmtw .ith I-1"ch l."d ~t'l;;,.wr Z-Inch brrrlrr (1~1 Z-Inch barrkr we, I-,"Cb layer 011, 6 .I, vlsq"~~" srnd bar.. sand bare. m,,turr barrit* 0.w I-inch stod base.
k&g. floor 4 ‘"CrwS Ch,Ck. ‘d- 4 ,"Ch~, m,.d. ‘s‘- 4 Inches Lhkk. &I- 4 ,ncn*s thkk. loll0 reldrd rlr* meIll loll0 "lldd l,,. rm 616 welded rlr. r,h I4 *St..*, I*' 0"
I%,$ i:rb;dy slab. 24ncD ~9"~::: slab. Z-,ncb or qurrtrr slab. center tad q".rter slab. I-‘"Cl! Sl"d b‘s*. 4-sna ‘410 base.
Presoakf"g SolI, alstcned to nar Sark upp(, 12 Inches
OY urirq Soak UPPI, LII inchrs to SO,, "OW, t4 f"ChCS opthum mi,tur, content to IL IC,Sl 1.2 I to It \e,,t 1.4 A wthm A**1 ."d 6Waqc Slab ~,:c;;h,. depth of optb". mtsturc *t ,*rst 1.3 I opthim rr,,ture CO"te"t oc misture ContenL or content or 4 percent
SOilS rbilr. opthun mist"r* 5 perctnt abare oprh". 5 pcrrmt .bo"l opt1m. mlsture contml. rhld- mlrt",~ cmtmt. rhlch- (se* note 41 content. rhichcrer is tre, IS prcrter. WC, is orrater. gnat4r.
l Erpmrton Itld,, drlrr.lnrd ,n rccord~ncc r,tll test "ethod WC 29-z.
NOTES: 1. "lni.". ,.,,,t,ng "l&h should be 12 Inchel for on.-sto,, b"lld,ngl. 15 Incbel for t"O-story kulldlnp,. mei t4 fnch*r ,or lrolrred spread fOOLi"OS.
2. Urr msh and reb,, ,hwtd be ,,,,ced ,t .MlOHElGHt of slab. I I. ,,o,,t, .~wl,,, Slab tro. wrlrter foOtln9S. S,,b ,l"C"I, ,hWM be a mhltum Of
I huh deep. I
4. It lhw,d be noted thrt ~rcrork,"~ "y re.qu,re an rztmde.3 ,x,,od 0, tlr to red ul, recol"ded a,rturt content.
5. h* WW,,O" tndrs over ,,O. ,peChI r,coll"d,tk.", "(11 b. ~'o.,dtd by th. peotemnicr, ~m,u,tmt (,I nrc~rrrr,, Ms.0 01 rcturl 11~14 co"dltlo"t.
I
6. A,, depth, arc ,,,rt,re lo 11.0 ,"bgr,dr or fInIshed 0ro""d S"rfaC*. whlchevw 1% lore*. I I
1. th* rb.art nbeacnt and ,*lnforcemnl Con,,*rrrtlo", ,I. .,n,w. &wld*ll"*s IhlCb "y bs ,nc,rr,,* at tll, *o~rcL,on 0, th, ,lr"Ct"rll rnginrrr. I
APPENDIX A
8840360-04
APPENDIX A
REFERENCES -
1. Associated Professional Engineering Corporation (APEC), 1984. Grading plans
for Monarch Villas, Carlsbad Tract No. 83-l. 5 Sheets, Drawing
No. 233-4A, Dated March 16.
2. Dale Naegle, AIA, Architecture and Planning, Inc., Plans for Monarch Villas,
Prepared for Shape11 Industries, 37 Sheets, Dated April 1984,
Revised November 17, 1986.
- 3. Leighton and Associates, Inc., 1984, Geotechnical investigation, Monarch
Villas, Carlsbad Tract 83-1. Carlsbad, California, Dated June 6.
- 4. , Unpublished, in-house data.
- AERIAL PHOTOGRAPHS
Date
1973
Source
San Diego County
Scale
1:12,000'
1:12,000’ - 1978 San Diego County
Flight
31 - 38
17B - 31
Photo No.
39 and 40
32 and 33
-
-
-
-
A-i
APPENDIX B
- 8840360-04
- APPENOIX B
EXPLANATION OF SUMMARY OF FIELD DENSITY TESTS
-
A. Test No. _: OOl* Field density test by Sand-Cone Method (ASTM 0155642)
- 001. Field density test by Drive Cylinder Hethod
(ASTH 02937-83)
- 0011 Field density test by Nuclear Method (ASTM 02922-81)
B. Test of: CF --- Compacted fill -
SF --- Slope face
- FG --- Finish grade
NOTE: - Soil type and descriptions are presented in Appendix C (Summary of
Laboratory Test Results).
-
-
-
-,
B-i
j
-
-
-i
1
-j
-
PROJECT NW : S 6 S CONSTRUCTION I JWRCH VIURS
TEST LOCRTION SOIL ELEV OR DRY IIENSLPCF) MOISTURE(~I RELATIVE llEl%lRHS TEST TEST iES1
No DATE OF
IN Y/26/87 CF
TYPE
LOT 4 NW10 ElWiS 4
LOT 4 N&U25 El0285 4
LOT 2 Nl'dffi El@290 4
LOT 3 Nl0lW El8175 4
LOT 4 N10245 El0155 4
LOT 6 NlKW El0048 4
LOT 3 NlBlZB ElUlSS 4
LOT 3 N10115 El@228 4
LOT 4 NM264 El8155 4
LOT 4 Nl0245 El0110 4
LOT 4 N10258 El0098 4
LOT 4 NW65 El0120 4
LOT 2 Nl0110 El’&% 4
LOT 2 NW15 Elm 4
LOT 2 N10235 El6270 4
LOT 2 NW35 El0278 4
LM 2 N18198 El= 4
LM 2 N18140 El8305 7
LM 2 N10115 El0255 7
LOT 2 NkW@El& 5
LM 2 NW15 El0278 5
LM 2 NW40 El0325 4
LM2 Nl’ZS5 El0285 4
XPTH
(FEET1
67.8
FIELII !W FIELD OPT CWPKTIffl
24 3/26/07 CF
3Y Y/26/87 ff
411 9/28/07 CF
5u Y/28/87 cF
6u Y/28/07 CF
7u 9i2aia7 cF
a* 9i2aia7 cF
9: 9i2aia7 CF
lW Yi20lal CF
11s 9i2Yia7 a
i2u Yma7 cF
138 ¶/29/07 CF
1411 Yma7 a
1st mia7 cF
164 Y/29/87 CF
171 9/29/87 CF
lau 9i30ia7 u
19~ 9ma7 SF
2w Y/38/87 CF
21s Ymia7 a
22s 9ma7 CF
23; Yi30ia7 a
2u Yma7 a
70.0
68.0
73.5
73.0
73.0
74.5
74.0
73.0
76.0
78.0
11.0
67.0
7%.8
69.8
73.0
71.8
76.8
75.0
72.0
71.8
78.0
75.0
LM2 N10260E10325 4 77.5
110.3 117.5 11.5 12.0
185.3 117.5 11.8 12.8
lea.2 117.5 12.1 12.8
112.1 117.5 12.8 12.0
111.6 Iii.5 13.1 12.0
113.9 117.5 12.8 12.0
114.1 lli.5 11.8 12.0
189.2 117.5 11.7 12.8
111.6 117.5 12.5 12.0
107.6 117.5 14.5 12.0
186.1 117.5 11.9 12.8
107.4 117.5 11.8 12.0
lea.1 117.5 13.1 12.8
187.0 117.5 12.1 12.0
113.4 117.5 14.0 12.0
111.5 117.5 13.2 12.8
109.5 117.5 11.7 12.8
186.0 116.5 13.3 13.5
105.2 116.5 13.0 13.5
187.5 113.8 19.3 17.8
ie4.9 ii3.e 16.6 17.0
105.8 117.5 11.7 12.0
112.1 117.5 13.8 12.0
1187 117.5 11.1 12.0
WI
94.
98.
92.
95.
95.
97.
91.
93.
95.
92.
90.
91.
92.
91.
97.
95.
93.
91.
?a.
95.
93.
Ye.
%.
94.
SM!NfY OF FIELS DENSITY TESTS i?wi I PROJECT W4EER : WG0-84
-
-
-.
-
-
-
-
-
SWX3V ff FIELD DENSITY TESTS PAGE2
PROKCT tUlStR : aa4UU-04
PKWECT t&HE : S 6 S UlNSTkitTION I loylRcH VILL!X
TEST TEST TEST TEST LOCRTIffl SOIL ELEV OR DRY DEtiSGtF) KWlJRE(Il RELRTIVE RfPARKS
No ME a TYPE
251 Y/38/07 ff CM II)yIRcR NlW5 Elm 4
26* lW?N07 CF LOT 4 N10378 El0110 4
274 l’Ull07 F6 LOT 3 NW25 El'&%5 4
281 ieielia7 ~6 LOT 3 N1&?10 El0095 4
29l 1eiwa7 F6 LOT 2 Nle140 El0365 4
3ei ieielia7 F6 LM 2 NW55 El@315 4
318 10101/07 CF CJ KU&W NM475 El0195 1
CmH
(FEET1
70.8
75.0
75.6
75.6
79.5
79.5
63.0
33 1eielia7 ff
351 iwalia7 a
34t wwa7 ff
354 10ifwa7 a
JM~ wcwa7 CF
37~ leieiia7 a
381 welia7 CF
3w leielia7 a
4m 10/01167 CF
41: leiwa7 SF
424 lwa2ia7 a
43 ltaiwa7 a
44# 18/@2/87 a
451 leie2ia7 a
464 imia7 ix
478 iwwa7 CF
40~ ram07 SF
LOT 5 N10530 El@318 4 71.8
LOT 1 N10765 El8228 4 76.0
LOT 5 NM490 El0265 1 66.8
LM 5 NlE46e El0315 4 73.5
LOT 5 NW15 El8265 4 75.0
LOTS NM475 E1924e 1 69.0
LOT a N1&25 ElOlle 1 62.8
LM4 N1@370 Elelbe 1 77.0
LM 5 NIBJIB El@350 7 76.8
LOT2 N10210 ElBJ35 1 73.0
LOT 5 NW70 El&W0 4 73.0
LM7 N10Z65 El0330 7 75.5
LM a HI0623 El0125 4 65.0
LOT6 NlW5 El0110 4 73.5
LOT 7 NiU5 El@315 1 77.5
LOT6 NW% El8870 5 70.8
LM3 NlelZB El8158 1 72.0
FIELD lylX FIELD OPT CWWTIaY
106.0 117.5 13.2 12.8
109.0 117.5 13.5 12.0
lea.7 117.5 11.2 12.0
lea.9 117.5 11.1 12.0
110.6 117.5 11.4 12.0
110.2 117.5 11.7 12.0
111.3 119.5 1i.e 10.5
189.7 117.5 11.0 12.0
110.2 117.5 12.2 12.0
109.9 119.5 11.4 10.5
109.9 117.5 11.7 128
lie.2 117.5 11.2 12.8
189.2 119.5 11.4 10.5
lE&l 119.5 11.1 10.5
112.9 119.5 13.5 le.5
108.2 116.5 14.5 13.5
110.7 119.5 18.0 18.5
109.3 117.5 12.7 12.0
lea.9 116.5 16.5 13.5
107.0 117.5 12.0 12.0
189.9 117.5 12.3 12.0
112.3 119.5 14.3 10.5
104.7 113.8 16.0 17.8
110.9 119.5 11.1 IL5
CL)
91.
93.
93.
93.
94.
94.
93.
93.
94.
R
94.
94.
91.
98.
94.
93.
93.
93.
93.
92.
94.
94.
93.
93.
-
- SWIRRY ff FIELD KNSITY TESTS Pa3 PROJECTWi8ER:-
PROJECT t&HE : S L 5 CoNsTiWTIffl / llwRFiUi VILLRS
TEST LOCATION SOIL ELEV OR TEST TEST TEST
ta cm OF
491 10/02/87 a
508 10/02/87 CF
51~ wwa7 ff
521 10/03/87 SF
S?,: lBi03/07 FG
541 18103187 F6
551 i0103/07 a
564 10/03t07 CF
571 10/03/87 F6
581 10/03/87 F6
5% 10/03/07 SF
681 10/03187 CF
614 10103i07 F6
621 10103l2.7 SF
63 10105H.7 F6
648 10105)5/87 CF
65~ 10ma7 a
661 10/05/87 CF
67# 10105/07 a
w 10/85/87 a
6% 10/05/87 F6
781 101W87 F6
711 10/05/87 SF
72- 10ma7 a
DRY DEtiWCR Iw)ISTUREW RELRTIVE REWIIKS
FIELD WIX FIELD OPT MIPRCTION
--
-
-
LOT 0
LM 7
LOT 7
LOT 4
LOT 4
LOT 4
LOT6
LM 5
LOT 6
LOT 6
LM 6
LOT 7
LOT5
LM 5
LM 5
LM 7
LM 1
LM 0
LM 7
LOT 8
LOT 7
LM 7
LM 7
LOT B
WE DEPTH
(FEET)
N10625 El@85 7 68.0
NlW5 El0265 7 73.5
Nl’&B El0195 5 75.5
NW65 El0115 4 76.0
NIB285 El0120 4 73.5
Nl036~0 El0095 4 79.0
N10405 El0185 4 79.0
Nl03B El8275 4 78.0
N10395 El0135 4 79.9
Nl043# El0075 4 74.5
NlD410 El0145 4 77.5
NW90 El@238 1 77.0
N10475 El0360 7 88.0
NlW El0270 7 77.5
NW75 El0360 4 74.7
N18688 El@90 5 79.0
NW’05 El0205 7 76.0
N105B El0130 2 74.5
NW90 El023 7 70.0
HI8565 El0010 7 Z0
N1’2675 El0295 1 80.0
Nls615 El0185 1 74. .9
N1057.5 El0300 1 77.S
Ml8638 El0115 1 77.0
104.9 116.5 12.2 13.5
104.8 116.5 13.7 13.5
LB?.0 113.0 17.4 17.0
109.2 117.5 11.9 12.0
114.0 117.5 11.9 12.0
114.4 117.5 12.1 12.0
114.2 117.5 11.5 12.0
112.3 117.5 11.8 12.0
113.9 117.5 11.6 12.0
113.8 117.5 13.3 12.0
110.8 117.5 11.1 12.0
111.1 119.5 11.2 10.5
109.4 116.5 11.9 13.5
109.7 116.5 12.1 13.5
110.8 117.5 10.9 12.0
188.5 113.0 17.0 17.0
188.7 116.5 15.7 13.5
112.4 119.5 11.9 11.5
107.3 116.5 14.3 13.5
105.9 116.5 12.7 13.5
110.7 119.5 11.7 10.5
111.7 119.5 10.8 10.5
111.0 119.5 10.9 le.5
110.5 119.5 12.4 10.5
(iI
9a
90.
98.
93.
97.
97.
97.
96.
97.
97.
94.
93.
94.
94.
94.
96.
93.
94.
92.
91.
93.
93.
93.
%.
-
-
-
-
,-
SUlQlARY OF FIELD DEHTY TESTS pRGE4 PAaTECTt4WBZR:@#3#%4
PROJECT =:S 6 SCUKTRLKTION / WEylRUiVILLRS
TEST TEST TEST
No Dm OF
73~ 10ma7 CF
74^ !0/05/87 SF
7% imi/a7 FG
7M1 W05f2.7 FG
77^ 10/05/87 SF
781 10/06/87 FG
TEST LOCRTIffl SOIL ELEV OR DRY DENSWF) K!ISTUREWI RELllTIVE REmtim
TYPE DEPTH FIELD WIX FIELD OPT capRcT1L-N
(FEET)
LOT 8 NlR&05 El8885 7 78.0 107.8 116.5 13.3 13.5
LOT 4 NW90 El0045 4 66.0 166.6 117.5 11.7 12.0
LOT b N10645 El0010 4 73.7 109.7 117.5 12.3 12.8
LOT 8 NlW8 El0075 4 79.0 108.1 117.5 12.8 12.0
LM 8 NlR565 E9975 7 76.5 107.4 116.5 14.2 13.5
LOT 3 N10165 El0130 1 70.3 114.3 119.5 8.7 10.5
Ii)
93.
91.
93.
92.
92.
96.
-
-
-
-
APPENDIX C
-
-
-
-
-
-
-
-
-
-
-
,-
-
.-
-
-
.-
MAXIMUM DENSITY TEST RESULTS
1 MAXIMUM OPTIMUM SAMPLE SOIL DESCRIPTION DRY DENSITY MOISTURE (PCF) CONTENT W
1 Light brown, silty sand (Fill) 119.5 10.5
2 Gray-brown, clayey sand (Topsoil) 119.5 11.5
3 Gray-brown, slightly silty, fine sand 119.0 12.0
4 Light brown, fine sand 117.5 12.0
5 Green, silty clay 113.0 17.0
6 Processed A.C. with sand 125.0 10.0
7 Light to medium brown, silty sand 116.5 13.5
a Green, sandy clay 116.5 16.5
S & S CONSTRUCTION/MONARCH VILLAS
APPENDIX D
-
8840360-04
GENERAL EARTHWORK AND GRADING SPECIFICATIONS
-
-
-
-
-
-
--
-
1.0 General Intent
These specifications are presented as general procedures and recommendations
for grading and earthwork to be utilized in conjunction with the approved
grading plans. These general earthwork and grading specifications are a
part of the recommendations contained in the geotechnical report and shall
be superseded by the recommendations in the geotechnical report in the case
of conflict. Evaluations performed by the consultant during the course of
grading may result in new recommendations which could supersede these
specifications or the recommendations of the geotechnical report. It shall
be the responsibility of the contractor to read and understand these
specifications, as well as the geotechnical report and approved grading
plans.
2.0 Earthwork Observation and Testing
Prior to the commencement of grading, a qualified geotechnical consultant
should be employed for the purpose of observing earthwork procedures and
testing the fills for conformance with the recommendations of the geotechni-
cal report and these specifications. It shall be the responsibility of the
contractor to assist the consultant and keep him apprised of work schedules
and changes, at least 24 hours in advance, so that he may schedule his
personnel accordingly. No grading operations should be performed without
the knowledge of the geotechnical consultant. The contractor shall not
assume that the geotechnical consultant is aware of all grading operations.
It shall be the sole responsibility of the contractor to provide adequate
equipment and methods to accomplish the work in accordance with applicable
grading codes and agency ordinances, recommendations in the geotechnical
report, and the approved grading plans not withstanding the testing and
observation of the geotechnical consultant. If, in the opinion of the
consultant, unsatisfactory conditions, such as unsuitable soil, poor
moisture condition, inadequate compaction, adverse weather, etc., are
resulting in a quality of work less than recommended in the geotechnical
report and the specifications, the consultant will be empowered to reject
the work and recommend that construction be stopped until the conditions are
rectified.
Maximum dry density tests used to evaluate the degree of compaction should
be performed in general accordance with the latest version of the American
Society for Testing and Materials test method ASTM D1557.
3.0 Preparation of Areas to be Filled
3.1 Clearing and Grubbing: Sufficient brush, vegetation, roots, and all
other deleterious material should be removed or properly disposed of in
a method acceptable to the owner, design engineer, governing agencies
and the geotechnical consultant.
- -iv
8840360-04
-
-
-
-
-
-
3.2
3.3
3.4
3.5
3.6
3.7
The geotechnical consultant should evaluate the extent of these
removals depending on specific site conditions. In general, no more
than 1 percent (by volume) of the fill material should consist of these
materials and nesting of these materials should not be allowed.
Processing: The existing ground which has been evaluated by the
geotechnica ,l consultant to be satisfactory for support of fill, should
be scarified to a minimum depth of 6 inches. Existing ground which is
not satisfactory should be overexcavated as specified in the following
section. Scarification should continue until the soils are broken down
and free of large clay lumps or clods and until the working surface is
reasonably uniform, flat, and free of uneven features which would
inhibit uniform compaction.
Overexcavation: Soft, dry, organic-rich, spongy, highly fractured, or
otherwise unsuitable ground, extending to such a depth that surface
processing cannot adequately improve the condition, should be overex-
cavated down to competent ground, as evaluated by the geotechnical
consultant. For purposes of determining quantities of materials
overexcavated, a licensed land surveyor/civil engineer should be
utilized.
Moisture Conditionin : Overexcavated and processed soils should be
watered, dried-back, b ended, and/or mixed, as necessary to attain a
uniform moisture content near optimum.
Recompaction: Overexcavated and processed soils which have been
properly mixed, screened of deleterious material, and moisture-
conditioned should be recompacted to a minimum relative compaction of
90 percent or as otherwise recommended by the geotechnical consultant.
;;Ehy:y Where fills are to be placed on ground with slopes steeper
(horizontal to vertical), the ground should be stepped or
benched. The lowest bench should be a minimum of 15 feet wide, at
least 2 feet into competent material as evaluated by the geotechnical
consultant. Other benches should be excavated into competent material
as evaluated by the geotechnical consultant. Ground sloping flatter
than 5:l should be benched or otherwise overexcavated when recommended
by the geotechnical consultant.
Evaluation of Fill Areas: All areas to receive fill, including
processed areas, removal areas, and toe-of-fill benches, should be
evaluated by the geotechnical consultant prior to fill placement.
-
-
8840360-04
4.0 Fill Material
.-
-
-
-
-
-
-~
-
-
-
-
-
-
4.1
4.2
4.3
General: Material to be placed as fill should be sufficiently free of
organic matter and other deleterious substances, and should be
evaluated by the geotechnical consultant prior to placement. Soils of
poor gradation, expansion, or strength characteristics should be placed
as recommended by the geotechnical consultant or mixed with other soils
to achieve satisfactory fill material.
Oversize: Oversize material, defined as rock or other irreducible
material with a maximum dimension greater than 6 inches, should not be
buried or placed in fills, unless the location, materials, and disposal
methods are specifically recommended by the geotechnical consultant.
Oversize disposal operations should be such that nesting of oversize
material does not occur, and such that the oversize material is
completely surrounded by compacted or densified fill. Oversize
material should not be placed within 10 feet vertically of finish
grade, within 2 feet of future utilities or underground construction,
or within 15 feet horizontally of slope faces, in accordance with the
attached detail.
Import: If importing of fill material is required for grading, the
import material should meet the requirements of Section 4.1.
Sufficient time should be given to allow the geotechnical consultant to
observe (and test, if necessary) the proposed~import materials.
5.0 Fill Placement and Compaction
5.1
5.2
5.3
Fill Lifts: Fill material should
previously evaluated to receive .._-.. .
be placed in areas prepared and
fill, in near-horizontal layers
approximately b incnes in compacted thickness. Each layer should be
spread evenly and thoroughly mixed to attain uniformity of material and
moisture throughout.
Moisture Conditioninq:
blended, and/or mixed,
content near optimum.
Fill soils should be watered, dried-back,
as necessary to attain a uniform moisture
Compaction of Fill: After each layer has been evenly spread, moisture-
conditioned, and mixed, it should be uniformly compacted to not less
than 90 percent of maximum dry density (unless otherwise specified).
Compaction equipment should be adequately sized and be either specifi-
cally designed for soil compaction or of proven reliability, to
efficiently achieve the specified degree and uniformity of compaction.
- _ iii _
8840360-04 -
-
-
-
-
5.4
5.5
6.0
-
-
-
-
7.0
-
-
-
-
-
-
-
8.0
Fill Slopes: Compacting of slopes should be accomplished, in addition to
normal compacting procedures, by backrolling of slopes with sheepsfoot
rollers at increments of 3 to 4 feet in fill elevation gain, or by other
methods producing satisfactory results. At the completion of grading, the
relative compaction of the fill out to the slope face should be at least
90 percent.
Compaction Testing: Field tests of the moisture content and degree of
compaction of the fill soils should be performed by the geotechnical
consultant. The location and frequency of tests should be at the consult-
ant's discretion based on field conditions encountered. In general, the
tests should be taken at approximate intervals of 2 feet in vertical rise
and/or 1,000 cubic yards of compacted fill soils. In addition, on slope
faces, as a guideline approximately one test should be taken for each 5,000
square feet of slope face and/or each 10 feet of vertical height of slope.
Subdrain Installation
Subdrain systems, if recommended, should be installed in areas previously
evaluated for suitability by the geotechnical consultant, to conform to the
approximate alignment and details shown on the plans or herein. The
subdrain location or materials should not be changed or modified unless
recommended by the geotechnical consultant. The consultant, however, may
recommend changes in subdrain line or grade depending on conditions
encountered. All subdrains should be surveyed by a licensed land
surveyor/civil engineer for line and grade after installation. Sufficient
time shall be allowed for the surveys, prior to commencement of filling over
the subdrains.
Excavation
Excavations and cut slopes should be evaluated by a representative of the
geotechnical consultant (as necessary) during grading. If directed by the
geotechnical consultant, further excavation, overexcavation, and refilling
of cut areas and/or remedial grading of cut slopes (i.e., stability fills or
slope buttresses) may be recommended.
Quantity Determination
For purposes of determining quantities of materials excavated during grading
and/or determining the limits of overexcavation, a licensed land
surveyor/civil engineer should be utilized.
- iv -
-
-
-
-
-
-
--
-
-
-
-
-
-
-
CEY EpTH
STABILITY FILL / BUTTRESS DETAIL
OUTLET PIPE8
4’ 0 NONPERFORATED PIPE. loo’ MAX. O.C. ~IORIZONTALLY. 30’ MAX. O.C. VERTICALLY
1:l OR FLATTER
SEE SUEDRAIN TRENCI -______- ___-__-__ __-__-__ ____-_
OWES1 SUSDRAIN SHOULD
BE SITUATED A8 LOW A8 POSSIBLE TO ALLOW
SUITABLE OUTLET
KEY WIDTH AS NOTED ON QRADINQ PLANS 15’ MIN.
8. MIN. /
SEE ‘-,“p~EC”O”
-I+$&A~ED 3N.
ILTER FABRIC
NVELOPE MP*=’ ..~“-rl
40N OR APf ‘ROVED
4’ MIN. SEDDINQ
314’-I-112* \
rTED
iOUIVALENT)*
SUBDRAIN TRENCH DETAIL
NOTES:
For buttrwa dlmwtrlonr. see gwtochnlcal r~pcrtlpl~ns. Actual dlmenelon~ of buttwan rnd, rubdrrl may be chwwed by the gectechnlc~l CCnwltwtt bwed on field condltionr.
T-CONNECTION DETAIL I
*IF CALTRANS CLASS 2 PERMEABLE
MATERIAL IS USED IN PLACE OF
3/4=-1-l/2* QRAVEL. FILTER FABRIC
MAY SE DELETED
SPECIFICATIONS FOR CALTRANS
CLASS 2 PERMEABLE MATERIAL
U.S. Standard
Sieve Size % Passing
1” 100
3/4” go- 100
3/B” 40-100
No. 4 25-40
No. a 18-33
No. 30 5-15
No. 50 No. 200 :::
Sand Equivalent>75
SUSDRAIN INSTALLATION-SubdraIn pipe rhould be Inrtalled with perforntlonr down M depIcted.
At locatlonr recommended by the g~ctechnlo~l~conrult~nt. nonoerforatad pipe should be Instilled
SUBDRAIN TYPE-Subdraln type should be Acrylonltrllo Sut~dlene StYrOn* (A.S.9.). Pclyvlnyl Chlorldo
(PVC) Or approved oqulvalont. Claee 126,SDR 32.5 l hculd be uwd for maxImum fill depth8 of 36 fee
Clara 204SDR 21 should be wed for mwlmum fill doptha of 100 feet.
-
-
-.
-
-
.-
-
.-
-
-
-
-
-
-
I TRANSlTl,ON LOT DETAILS
CUT-FILL LOT
EXISTING
QROUND SURFACE
I
l- 30” MIN.* =’
~OVEREXCAVATE AN0 RECOMPACT
Y BY THE CONSULTANT
ffo J
GEOTECHNICAL
EXISTINQ GROiJND SURFACE
j-l-
--- I
I--
/,-R&&i
I’
UNSUITABLE MATERIAL,-
, /’ 5“ -
-- MIN.
OVEREXCAVATE AND RECOMPACT
COMPETENT BEDROCK R MATERIAL EVALUATED
BY THE GEOTECHNICAL
CONSULTANT
*NOTE: *NOTE:
Deeper or laterally more extensive overexcavation and Deeper or laterally more extensive overexcavation and reoompaotlon may be recommended by the geoteohnlcal recomoactlon mav be recommended bv the oeotechnical _~~~~ _~.~~~~~~~ ~~, conrultant based on actual field conditioni encountered oonrultant based on actual field conditiona encountered’ and location8 of proposed improvementa and location8 of proposed improvementa
-
-
-
-
-
-
-
-.
-
-
.-
-
-
-
ROCK DISPOSAL DETAIL
PlNl8H QRADE
I
___-------- ---- ___------ ----- ---------- -- ---
------------ ---- _-------- ----- -------- ---- ---
TypicAL PROFILE ALONG WINDROW
1) Rock with maximum dimensions greater than 6 inches should not be used within10 feet vertically of.finiah grade (or 2 feet below depth of lowest utility whichever is greater), and 15 feet horizontally of elope faces.
2) Rooks with maximum dimensions greater than 4 feet should not be utiiized in fills.
3) Rook placement, flooding of granular soil, and fill placement should be observed by the geotechnioai consultant.
41 Maximum sire and spacing of windrowa should be in accordance with the above details Width of windrow should not exceed 4 feet. Windrowa should be staggered vertically (as depicted).
6) Rock should be placed in excavated trenches. Granular soil (S.E. greater than or equal to 30) should be flooded in the windrow to completely fill voids around and beneath rocks.
-
-~
-
-
-
-
-
-
-
--
.-,
-
.~.
-
-
CANYON SUBDRAIN DETAILS -
QROUND SURFACE
-_--__--________-___-------------- ___________-________--------------- - - - - - - - - _ _ - - - _ _ - - - - - - - _ -------- - ------- - - :~-Z~c<?<COMPACTE,, FILLr~~~zz~-z~ --
--------------- ---------------- _--__-__-__-___ --------_-------
TRENCH
aEE BELOW
SUBDRAIN TRENCH DETAILS
8’ MIN. OVER a’ YIN. OVERLAP
314.-1-112. CLEI
314’-1-112’CLEAN
QRAVEL tStt.%tt. MIN.)
PERFORATED
PIPE
IF CALTRANS CLASS 2 PERMEAI
MATERIAL IS USED IN PLACE. OF
314’1-112’ GRAVEL. FILTER FAE
MAY SE DELETED
DETAIL OF CANYON SUBDRAIN TERMINAL
DESIQN FINISH
SUBDRAIN TRENCH
SPECIFICATIONS FOR CALTRANS
CLASS 2 PERMEABLE MATERIAL
U.S. Standard
Sieve Size % Passing
1" 100 3/4" go-100
318" 40- 100
No. 4 X-40
No. a la-33
No. 30 5-15
No. 50 o-7
No. 200 o-3
Sand Equivalent>75
Subdraln should be Conetructed only on COmP.t.nt material a. evaluated by th. 3aotechnloal c0n*ultwlt.
SUBDRAIN INSTALLATION Subdrain DIP. Should be Inrtalled wlth perforatIona down . . doplctw
At locatIona recommended by the peot~chnlcal consultant. nonperforated pipe should be Installa~
SUBDRAIN TYPE-Subdraln type should be Acrylonitrllo Butrdleno Styrone (A.B.S.1. Polyvinyl
Chloride (PVC) Or approved Wjulv~lwtt. Clear 123, SDR 32.S should bs wed tar maxlmum
fill depth* Of 36 1e.t. Claw 200,SDR 21 should b. u.ed for m~xlmum till depth* of 100 1.M.
-
.~-
-
-
-
-
-
-
-
-.
-
-
-
-
-
-
SIDE HILL STABILITY FILL DETAIL
EXISTINQ QROUND SURFACE I’
7 A’ I
0’ >‘- ,I’ A’ I
FINISHED SLOPE FACE /’
PROJECT t TO 1 LINE 7
/ FINISHED CUT PAD
/
PAD OVEREXCAVATION DEPTH
AND RECOMPACTION MAY BE RECOYYENDEB BY T”E I ~~-- -~~~...- ..-- - -. . .._
QEOTECHNICAL CONSULTANT BASED ON ACTUAL FIELD I
CONDITIONS ENCOUNTERED. I
NOTE: Subdrain details and key width recommendations to be provided baaed on exposed subsurface conditions
-
-
-
-
-
.
-
-
-
-
-
-
KEY AND BENCHING DETAILS
FILL SLOPE PROJECT 1 TO 1 LINE FROM TOE OF SLOPE
TO COMPETENT MATERIAL
EXl8TlNQ QROUND SURFACE
MATERIAL
22Y%~l DEPTH
(KEY)
FILL-OVER-CUT SLOPE
MATERIAL
CUT SLOPE (TO SE EXCAVATED
PRIOR TO FILL PLACEMENT)
CUT-OVER-FILL SLOPE PRIOR TO FILL PLACEMENT)
PROJECT 1 TO 1
LINE FROM TOE
OF SLOPE TO
COMPETENT
NOTE: Back drain may be recommended by the geotechnical consultant based on
actual field condition8 encountered. Bench dimension recommendation8 may also be altered baaed on field conditione encountered.
_-
-
-
-
-
-
-
-
-
-
-
-
.-
-
-
RETAINING WALL DRAINAGE DETAIL
SON. BACKFILL. COMPACTED TO
90 PERCENT RELATIVE COMPACTION*
RETAININQ WALL-
WALL’ WATERPROOFINQ
PER ARCHITECT’S
8PEClFICATIONS
FINISH GRADE
_--. --- - FILTER FABRIC ENVELOPE -Z~
‘--- (MIRAFI 140N OR APPROVED
EQUIVALENT) *
3/4’-i-112’ CLEAN GRAVEL*
4’ (MIN.) DIAMETER PERFORATED
PVC PIPE (SCHEDULE 40 OR
---- EQUIVALENT) WITH PERFORATIONS
ORIENTED DOWN AS DEPICTED
MINIMUM i PERCENT GRADIENT
TO SUITABLE OUTLET
SPECIFICATIONS FOR CALTRANS
CLASS 2 PERMEABLE MATERIAL
U.S. Standard
Sieve Size X Passing
1" 100 3/4" 90-100
3/B" 40-100
No. 4 25-40
No. B 18-33
No. 30 5-15
No. 50 o-7
No. 200 o-3
Sand Equivalent>75
\ COMPETENT BEDROCK OR MATERIAL
AS EVALUATED BY THE GEOTECHNICAL
CONSULTANT
*BASED ON ASTM D1667
**IF CALTRANS CLASS 2 PERMEABLE MATERIAL
(SEE GRADATION TO LEFT) IS USED IN PLACE OF
3/4*-1-l/2’ GRAVEL, FILTER FABRIC MAY BE DELETED. CALTRANS CLASS 2 PERMEABLE
MATERIAL SHOULD BE COMPACTED TO 90
PERCENT RELATIVE COMPACTION l
NOT TO SCALE
8840360-04
SLOPE NAINTENANCE GUIDELINES FOR HOhEOWNERS
TIPS FOR THE HOMEOWNER
-
.-
.,-
-
.-
-
Homesites, in general, and hillside lots, in particular, need maintenance to
continue to function and retain their value. Many homeowners are unaware of this
and allow deterioration of their property. In addition to his own property, the
homeowner may be subject to liability for damage occurring to neighboring properties as a result of his negligence. It is therefore important to
familiarize homeowners with some guidelines for maintenance of their properties
and make them aware of the importance of maintenance.
Nature slowly wears away land, but human activities such as construction increase the rate of erosion 200, even 2,000 times that amount. When we remove vegetation
or other objects that hold soil in place, we expose it to the action of wind and
water and increase its chances of eroding.
The following maintenance guidelines are provided for the protection of the
homeowner's investment, and should be employed throughout the year.
a)
b)
cl
d)
e)
f)
9)
h)
Care should be taken that slopes, terraces, berms (ridges at crown of slopes), and proper lot drainage are not disturbed. Surface drainage should
be conducted from the rear yard to the street by a graded swale through the
sideyard, or alternative approved devices.
In general, roof and yard runoff should be conducted to either the street or
storm drain by nonerosive devices such as sidewalks, drainage pipes, ground
gutters, and driveways. Drainage systems should not be altered without
expert consultation.
All drains should be kept cleaned and unclogged, including gutters and downspouts. Terrace drains or Gunite ditches should be kept free of debris
to allow proper drainage. During heavy rain periods, performance of the
drainage system should be inspected. Problems, such as gullying and ponding,
if observed, should be corrected as soon as possible.
Any leakage from pools, waterlines, etc. or bypassing of drains should be
repaired as soon as possible.
Animal burrows should be filled since they may cause diversion of surface
runoff, promote accelerated erosion, and even trigger shallow soil failures.
Slopes should not be altered without expert consultation. Whenever a
homeowner plans a significant topographic modification of the lot or slope, a qualified geotechnical consultant should be contacted.
If plans for modification of cut, fill, or natural slopes within a property are considered, an engineering geologist should be consulted. Any over- steepening may result in a need for expensive retaining devices.
Undercutting of the bottom of a slope might possibly lead to slope in- stability or failure and should not be undertaken without expert consultation.
If unusual cracking, settling, or earth slippage occurs on the property, the homeowner should consult a qualified soil engineer or an engineering
geologist immediately.
E -i
-
.-
-
-
8840360-04
i) The most common causes of slope erosion and shallow slope failures are as
follows:
a Gross neglect of the care and maintenance of the slopes and drainage
devices.
l Inadequate and/or improper planting. (Barren areas should be replanted as
soon as possible.)
o Excessive or insufficient irrigation or diversion of runoff over the slope.
l Foot traffic on slopes destroying vegetation and exposing soil to erosion potential.
j) Homeowners should not let conditions on their property create a problem for their neighbors. Cooperation with neighbors could prevent problems and also
increase the aesthetic attractiveness of the property.
Winter Alert
- It is especially important to "winterize" your property by mid-September. Don't
wait until spring to put in landscaping.
landscaping can be done later.
You need winter protection. Final
Inexpensive measures installed by mid-September
Will give you protection quickly that will last all during the wet season.
l -
l
-
0
Check before storms to see that drains, gutters, downspouts, and ditches are
not clogged by leaves and rubble.
Check after major storms to be sure drains are clear and vegetation is holding on slopes. Repair as necessary.
Spot seed any bare areas. Broadcast seeds or use a mechanical seeder. A
typical slope or bare areas can be done in less than an hour.
*
-. a
l
0
5
a
-
-
-
-
-
Give seeds a boost with fertilizer.
Mulch if you can, with grass clippings and leaves, bark chips or straw.
Use netting to hold soil and seeds on steep slopes.
Check with your landscape architect or local nursery for advise.
Prepare berms and ditches to drain surface runoff water away from problem areas such as steep, bare slopes.
Prepare bare areas on slopes for seeding by raking the surface to loosen and roughen soil so it will hold seeds.
E - ii
8840360-04
CONSTRUCTION
-
.-
-
-
-
--
l Plan construction activities during spring and summer, so that erosion control
measures can be in place when the rain comes.
l Examine your site carefully before building. Be aware of the slope, drainage patterns and soil types. Proper site design will help you avoid expensive
stabilization work.
o Preserve existing vegetation as much as possible. Vegetation will naturally
curb erosion, improve the appearance and the value of your property, and reduce the cost of landscaping later.
l Use fencing to protect plants from fill material and traffic. If you have to
pave near trees, do so with permeable asphalt or porous paving blocks.
l Preserve the natural contours of the land and disturb the earth as little as
possible. Limit the time in which graded areas are exposed.
0 Minimize the length and steepness of slopes by benching, terracing, or
constructing diversion structures. Landscape benched areas to stablilize the
slope and improve its appearance.
l As soon as possible after grading a site, plant vegetation on all areas that
are not to be paved or otherwise covered.
TEMPORARY NEASURES TO
STABILIZE THE SOIL
Grass provides the cheapest and most effective short-term erosion control. It grows quickly and covers the ground completely. To find the best seed mixtures and plants for your area, check with your local landscape architect, local nursery, or the U.S. Department of Agriculture Soil Conservation Service.
Mulches hold soil moisture and provide ground protection from rain damage. They
movide a favorable environment for starting and growing plants. Easy-to- obtain mulches are grass clippings, leaves, sawdust, bark chips, and straw.
Straw mulch is nearly 100 percent effective when held in place by spraying with
an organic glue or wood fiber (tackifiers), by punching it into the soil with a shovel or roller, or by tacking a netting over it.
Commercial applications of wood fibers combined with various seeds and fer- tilizers (hydraulic mulching) are effective in stabilizing sloped areas.
Hydraulic mulching with a tackifier should be done in two separate applications: the first composed of seed fertilizer and half the mulch, the second composed of the remaining mulch and tackifier. Commercial hydraulic mulch applicators - who also provide other erosion control services - are listed under "landscaping" in
the phone book.
Mats of excelsior, jute netting, and plastic sheets can be effective temporary zrs, but they must be in contact with the soils and fastened securely to work effectively.
E - iii
-
.-
-
-
-
-
-
-
Roof draina e can be collected in barrels or storage containers or routed into der boxes and gardens. Be sure to cover stored water so you don't
Collect mosquitos. Exiessive runoff should be directed away from your house. Too much water can damage trees and make foundations unstable.
STRUCTURAL RUNOFF CONTROLS
Even with proper timing and planting, you may need to protect disturbed areas from rainfall until the plants have time to establish themselves. Or you may need permanent ways to transport water across your property so that it doesn't
cause erosion.
To keep water from carrying soil from your site and dumping it into nearby lots, streets, streams and channels, you need ways to reduce its volume and speed. Some examples of what you might use are:
Riprap (rock lining) - to protect channel banks from erosive water flow.
Sediment trap - to stop runoff carrying sediment and trap the sediment.
Storm drain outlet protection - to reduce the speed of water flowing from a
pipe onto open ground or into a natural channel.
Oiversion dike or perimeter dike - to divert excess water to places where it
can be disposed of properly.
Straw bale dike - to stop and detain sediment from small unprotected areas (a
short-term measure).
Perimeter swale - to divert runoff from a disturbed area or to contain runoff within a disturbed area.
Grade stabilization structure - to carry concentrated runoff down a slope.
E - iv