FE JJ81~4r
INTERIM REPORT OF
AS-BUILT GEOLOGY,
FIELD OBSERVATIONS AND TESTS,
PROPOaED WINDSONG SHORES PROJECT
HARBOR DRIVE
CARLSBAD, CALIFORNIA
PREPARED FOR:
Marlborough Development Corporation
28751 Rancho California Road, #208
Rancho California, California 92390
PREPARED BY:
Southern California Soil & Testing, Inc.
Post Office Box 20627
6280 Riverdale Street
San Diego, California 92120
..
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6280 RIVERDAL.E ST. SAN DIEGO, CAL.IF. 92120 • TEL.E 280-4321 P.O. 80X 20627 SAN DIEGO, CAL.IF. 92120
678 ENTERPRISE ST. ESCONDIDO, CALIF". 92025
January 26, 1990
Marlborough Development Corporation
28751 Rancho California Road, #208
Rancho California, California 92390
SCS&T 8821027
Report No. 7
SUBJECT: Interim Report of As-Built Geology, Field Observations
and Tests, Proposed Windsong Shores Project, Harbor
Drive, Carlsbad, California.
REFERENCE:
Gentlemen:
1) "Report of Geotechnical Investigation,
Windsong Shores, Carlsbad, California", by
Southern California Soil & Testing, Inc., dated
March 15, 1988.
In accordance with your request, this report has been prepared to
present a summary of our field observations and the results of
relative compaction tests performed at the subject site by
Southern California Soil & Testing, Inc. Our testing services
were performed between October 24 and October 27, 1989. Our
geologist's observations were made subsequent to the excavations
for Lot 1 of the site.
SITE DESCRIPTION
The subject site is an approximate 10 acre parcel of land
located at the southern terminus of Harbor Drive in the City of
SOUTHERN CALIFORNIA SOIL AND TESTING, I N C.
I
I
I
I
I
I
,I
I
I
I
I
I
I
I
I
I
I
I
I
SCS&T 8821027 January 26, 1990 Page 2
Carlsbad, California and a narrow strip of land located east of
the proposed condominiums, parallel with AT&SF railroad right-of-
way. The 10 acre condominium site is comprised of Lots 1 and 2.
Only Lot 1 has been excavated at this time. Lot 2 is to be
excavated in the future. As detailed in the referenced
Geotechnical Report, the condominium area was lightly to heavily
vegetated with both native and transplanted plants. S'oils
encountered during the grading operations consisted of quaternary
marine terrace deposits comprised of sands and silty sands.
The narrow strip of land extending from the east side of the site
northerly to Chinquapin Avenue is intended for use as an all-
weather access road to the condominium site and to the'contiguous
Y.M.C.A. Aquatic Facility. This area was not included in our
Geotechnical Investigation for the site. Prior to grading, this
area was devoid of significant vegetation. Existing soils
consisted of locally derived undocumented fills and undisturbed
terrace deposits. Earthwork in the area consisted primarily of
filling an existing drainage channel that paralleled the AT&SF
-railroad tracks.
PROPOSED CONSTRUCTION
It is our understanding that the site will be developed to
receive a condominium complex consisting of two-story and three-
story structures over single level underground parking garages.
Shallow foundations as well as conventional slab-on-grade floor
systems are anticipated.
AVAILABLE PLANS
To assist in determining the locations and elevations of our
field density tests and to define the general extent of the site
grading for this phase of work, we were provided with a grading
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCS&T 8821027 January 26, 1990 Page 3
plan prepared by Crosby Mead Benton & Associates of Carlsbad,
California, dated October 3, 1989.
SITE PREPARATION, ACCESS ROAD AREA
Prior to the grading operations, vegetation was cleared from the
area to receive fill and materials thus generated were exported
from the jobsite. Soil obtained from cuts made on Lot 1 of the
proposed condominium project were then placed in approximate six'
to eight inch lifts, moisture conditioned to near optimum.
moisture content, and compacted to a minimum of 90 percent
relative compaction by means of heavy construction equipment.
The existing undocumented fills were not removed prior to these
operations.
SITE PREPARATION, CONDOMINIUM AREA
The grading operations on Lot 1 of the proposed condominium
project consisted entirely of cuts to the designed finish grade
elevations. The As-Built Geology section of this report pertains
only to Lot 1 of the condominium site. The excavations on ~ot 2
are not complete.
FIELD OBSERVATION AND TESTING
Observations and field density tests were performed by a
representative of Southern California Soil & Testing, Inc. during
the site grading operations. The density tests were taken
according to A.S.T.M. Test 1556-74 and the results of those tests
are shown on the attached Plate No.2. The accuracy of the in-
place density tests locations and elevations is a function of the
accuracy of the survey control provided by other than Southern
California Soil & Testing, Inc. representatives. Unless
otherwise noted, their locations and elevations were determined
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCS&T 8821027 January 26, 1990 Page 4
by pacing and hand level methods and should be considered
accurate only to the degree implied by the method used.
As used herein, the term "observation" implies only that we
observed the progress of work we agreed to be involved with, and
performed tests, on which, together, we based our opinion as to
whether the work essentially complies with the job requirements,
local grading ordinances and the Uniform Building Code.
LABORATORY TEST
A maximum dry density determination was performed on a
representative sample of the soils used in the compacted fills
according to A.S.T.M. Test 1557-78, Method A. This method
specifies that a four inch diameter cylindrical mold of 1/30
cubic foot volume be used and that soil tested be placed in five
equal layers with each layer compacted by twenty-five blows of a
10-pound hammer with an 18-inch drop. The result of this test,
as presented on Plate No.2, were used in conjunction with the
field density tests to determine the degree of relative
compaction of the compacted fill.
AS-BUILT GEOLOGY
Based on the results of on-site observation by a member of our
engineering geology staff, the following conclusions pertaining
to the excavations made on Lot 1 of the proposed condominium
project are presented:
1) The geologic conditions exposed during the grading
operations at the site are similar to those anticipated
and described in the referenced report.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCS&T 8821027 January 26, 1990 Page 5
2) Cut slopes have been observed and, in our opinion,
found to be free of geologic conditions which may lead
to significant instability problems.
3) All adverse geologic conditions found to exist on the
site were corrected and it is our opinion that the site
is geologically suitable and safe for construction.
CONCLUSIONS
Based upon our field observations, it is our opinion that the
soils on the condominium site are as anticipated in the
referenced "Report of Geotechnical Investigation", and the
recommendations contained therein remain applicable.
LIMITATIONS
This report covers only the services performed between October 24
and October 27, 1989. As limited by the scope of the services
which we agreed to perform, our opinions presented herein are
based on our observations and the relative comp-action test
results. Our services were performed in accordance w~th the
currently accepted standard of practice and in such a manner as
to provide a reasonable measure of the compliance of the grading
operations with the job requirements. No warranty, express or
implied, is given or intended with respect to the services which
we have performed, and neither the performance of those services
nor the submittal of this report should be construed as relieving
the grading contractor of his responsibility to conform with the
job requirements.
If you should have any questions after reviewing this rep.ort,
please do not hesitate to contact this office.
I
I
I
I
I
I
I
I
I
I'
I
I
I
I
I
I
I
I
I
SCS&T 8821027 January 26, 1990
This opportunity to be of professional
appreciated.
Respectfully submitted,
SOUTHERN CALIFORNIA SOIL & TESTING, INC.
DBA/DH/MH/rr
cc: (4) Submitted
(1) SCS&T, Escondido
. Page 6
service is sincerely
I
I JOB NAME: Windsong Shores JOB NO: 8821027
PLATE NO: 2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TEST DATE
NO.
LOCATION ELEVATION MOISTURE DRY DEN. SOIL ~EL.CbMP.
(percent) (p.c.f.) TYPE (percent)
1
2
3
4
5
6
7
8
9
10
10-24-89 Access Road 22.0 8.7 125.3 1
Station 14+50
10-24-89 Access Road 21.0 11.1 120.9 1
Station 12+00
10-25-89 Access Road 26.0 10.5 125.2 1
Station 12+90
10-25-89 Access Road 24.5 10.5 127.1 1
Station 16+00
10-25-89 _ Access Road 27.0 9.9 124.7 1
Station 15+00
10-25-89 Access Road 28.0 12.4 125.5 1
Station 14+50
10-2-6-89 Access Road 28.0 11.7 126.3 1
Station 11+00
10-26-89 Access Road 27.5 12.4 125.2 1
Station 15+50
10-27-89 Access Road 30.5 11.1 123.6 1
Station 13+50
10-27-89 Access Road 36.5 11.7 120.4 1
Station 14+10
MAXIMUM DENSITY AND OPTIMUM MOISTURE DETERMINATIONS, ASTM 1557-78 -----------------------------------------------------------------
SOIL
TYPE
1
METHOD DESCRIPTON OPTIMUM
MOISTURE
(percent)
A Reddish/Brown, Fine to 8.8
to Medium Grained Sand
--
MAXIMUM
D~NSITY
(pcf)
132.0
94.9
91.6
94.8
96.3
-94.5
95.1
95.7
94.8
93.:6
91.2