PRELIMINARY GEOTECHNICAL INVESTIGATION
PROPOSED CONDOMINIUM PROJECT
LA CORUNA PLACE
LA COSTA, CALIFORNIA
PREPARED FOR:
Community Resources Corporation
1335 Hotel Circle South, Suite 201
San Diego, California 92108
PREPARED BY:
Southern California Soil and Testing, Inc.
Post Office Box 20627
6280 Riverdale Street
San Diego, California 92120
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
BZBO RIVERDALE ST. SAN DIEGO, CALIT. 9212D • TELE ZSQ-4321 • P.O. BOX 2O&27 SAN DIEGO, CALIF. 9212D
74-B31 VELIE WAY PALM DESERT, CALIF. 9ZZ6O • TELE 346-1D78
6 7 B ENTERPRISE ST. EBCDNDIDO, CALIF. 9ZO25 • TELE 746-4544
January 31, 1983
Community Resources Corporation SCS&T 14044
1335 Hotel Circle South, Suite 201 Report No. 2-R
San Diego, California 92108
ATTENTION: Mr. Marv Berman
SUBJECT: Report of Preliminary Geotechnical Investigation for the Proposed
Condominium Project, La Coruna Place, La Costa, California.
Gentlemen:
In accordance with your request and our proposal dated May 19, 1982, we
have completed a preliminary geotechnical investigation for the proposed
project. We are presenting herewith our findings and recommendations.
The findings of this study indicate that the site is suitable for the
proposed development provided that the recommendations presented in the
attached report are complied with.
If you have any questions after reviewing the findings and recommendations
contained in this report, please do not hesitate to contact this office.
This opportunity to be of professional service is sincerely appreciated.
Respectfully submitted,
SOUTHERN J$LIFORNIA SOIL>« TESTING, INC.
*/(& ^7^ ( T- A tJ^^Y^
Charles H. Chr'istTan, R.C.E. #22330 Curtis R. Burdett, C.E.G. #1090
CHC:CRB:AFB:mw
cc: (6) Submitted
(1) SCS&T, Escondido
SOUTHERN CALIFORNIA SOIL AND TESTING, INC
TABLE OF CONTENTS
PAGE
Introduction and Project Description 1
Figure No. 1, Site Vicinity Map 2
Preject Scope 3
Findings 4
Site Description 4
General Geology and Subsurface Conditions ..4
Geologic Setting and Soil Description 4
Groundwater 4
Tectonic Setting 5
Geol ogi c Hazards 5
Recommendati ons and Concl usi ons 7
General 7
Site Preparation 7
Soi 1 P repa rat i on 7
Earthwork 7
Subdrai ns 8
Foundati ons 8
General 8
Figure No. 2, Subdrain Cross-Section 9
Beari ng Capacity 10
Sett 1 ement Character!stics 11
Earth Retaining Structures 11
General 11
Backf i 11 11
Allowable Soil Bearing Pressure 11
Pas si ve Pressure 11
Active Pressure 11
Factor of Safety 12
Slope Stabi 1 ity 13
Limitations 13
Review, Observation and Testing... 13
TABLE OF CONTENTS (continued)
Uniformity of Conditions,
Change in Scope
Time Limitations ,
Professional Standard...,
Client's Responsibility.,
Field Explorations
Laboratory Testing ,
PAGE
...14
...14
...14
...15
...15
...16
...16
ATTACHMENTS
Plate
Plate
Plate
Plate
Plate
Plate
Plate
Plate
Plate
1
2-3
4
5-6
7
8-9
9
10
11
Plot Plan
Development Cross-Sectional Views
Unified Soil Classification Chart
Boring Logs
Natural Dry Density and Moisture Content
Direct Shear Test Results
Expansion Test Results
Grain Size Distribution
Detail-Weakened Plane Joint
APPENDIX
Recommended Grading Specifications and Special Provisions
PRELIMINARY GEOTECHNICAL INVESTIGATION
PROPOSED CONDOMINIUM PROJECT
LA CORUNA PLACE
LA COSTA. CALIFORNIA
INTRODUCTION AND PROJECT DESCRIPTION
This report presents the results of our geotechnical investigation for the
proposed condominium site which is located northwest of La Coruna Place in
the La Costa area of San Diego County, California. The project site
consists of Lot 180 of La Costa South, Unit Number 1. The site location
is shown on the vicinity map provided as Figure Number 1.
It is our understanding that the project is still in the early planning
stages and that the condominium units may consist of two stories, and
three stories, and three stories over parking, and will be of wood-frame
construction. It is further our understanding that because of the planned
hillside construction, retaining walls up to approximately 10 feet in
height and cut slopes on the order of 21 feet in height are anticipated.
To assist in our investigation, we were provided with undated site and
section plans prepared by Community Contractors Corporation and a topo-
graphic map prepared by E. F. Cook and Associates, LTD, dated May 4, 1982.
The site configuration, approximate topography, and location of our subsur-
face explorations are shown on Plate Number 1 of this report. Cross-
sectional views of the proposed development are shown on Plate Numbers 2
and 3.
-M f—i-te
i
SOUTHERN CALIFORNIA
BOIL & TESTING, INC.
• 8»0 RIVKFIDALK •TBKRT
• AN DIKOO, CALIFORNIA »B1«O
La Corina Place Condos
Escondido, California
SITE VICINITY MAP
SMS
JOB NO.14044
DATE 9-29-82
Figure No. I
SCS&T 14044-R January 31, 1983 Page 3
PROJECT SCOPE
This investigation consisted of: surface reconnaissance; subsurface
explorations; obtaining representative disturbed and undisturbed samples,
laboratory testing; analysis of the field and laboratory data; research of
available geological literature pertaining to the site; and preparation of
this report. Specifically, the intent of this study was to:
a) Explore the subsurface conditions to the depths influenced by the
proposed construction.
b) Evaluate, by laboratory tests, the pertinent engineering proper-
ties of the various strata which will influence the development,
including their bearing capacities, expansive characteristics and
settlement potential.
c) Define the general geology at the site including possible geo-
logic hazards which could have an effect on the site development.
d) Develop soil engineering criteria for site grading and provide
design information regarding the stability of cut and fill
slopes.
e) Determine potential construction difficulties and provide recom-
mendations concerning these problems.
f) Recommend an appropriate foundation systems for the type of
structures anticipated and develop soil engineering design cri-
teria for these recommended foundation designs.
-r-.r-.MiA SOIL AND TESTING. INC
SCS&T 14044-R January 31, 1983 Page 4
FINDINGS
SITE DESCRIPTION
The project site is an irregulary shaped lot located adjacent to and south
of La Costa Avenue. Land use on adjacent lots or in the immediate area
consists of developed residential lots or undeveloped lots which are zoned
for residential use. Elevations at the site range from approximately 120
feet to 210 feet (MSLD). Drainage is accomplished by sheetflow towards
three gunite-lined interceptor ditches and then northeasterly in the
ditches. The lot slopes moderately to steeply towards La Costa Avenue
(northerly). An existing 2:1 cut slope is present along La Costa Avenue;
the remainder of the site is largely in a natural condition. Vegetation
consists of a moderate growth of iceplant on the cut slope and native
grasses and shrubs on the undisturbed portions of the site.
GENERAL GEOLOGY AND SUBSURFACE CONDITIONS
GEOLOGIC SETTING & SOIL DESCRIPTION: The subject site is located in the
Coastal Plains Physiographic Province of San Diego County and is underlain
by sedimentary deposits of Eocene age and associated residual, colluvial,
and alluvial soils. The formational materials at the site consist pre-
dominantly of greenish brown claystones and siltstones and yellowish brown
sandstones of the Santiago Formation. These lithologies are interfingered
and interbedded; however, it appears that the claystone and siltstone are
prevalent below approximate elevation 165 feet while the sandstone is
predominant above this elevation. The surficial materials at the site
consist of brown silty sand (topsoil) and dark brown, sandy, silty clay
(alluvium).
GROUNDUATER: No groundwater was encountered during our subsurface explo-
ration and we do not anticipate any major groundwater related problems,
n i I T H F R N CALIFORNIA SOIL AND TESTING. INC
SCS&T 14044-R January 31, 1983 Page 5
either during or after construction. However, it should be recognized
that minor groundwater seepage problems may occur after development of a
site even where none were present before development. Those are usually
minor phenomena and are often the result of an alteration of the perme-
ability characteristics of the soil, an alteration in drainage patterns
and an increase in irrigation water. Based on the permeability character-
istics of the soil and the anticipated usage of the development, it is our
opinion that any seepage problems which may occur will be minor in extent.
It is further our opinion that these problems can be most effectively
corrected on an individual basis if and when they develop.
TECTONIC SETTING: A review of avalable geologic maps indicates the sub-
ject site to be located approximately 6 miles east of the Rose Canyon
Fault Zone. The Rose Canyon Fault Zone is a series of northwest trending
faults of Quaternary age that is currently classified as potentially
active rather than active according to the criteria of the California
Division of Mines and Geology.
It addition it should be recognized that much of Southern California is
characterized by major, active fault zones that could possibly affect the
subject site. The nearest of these are the Elsinore Fault Zone, located
approximately 25 miles to the northeast; and the San Jacinto Fault Zone,
located approximately 46 miles to the northeast.
GEOLOGIC HAZARDS
The subject site can be considered to be relatively free of geologic
hazards. Potential hazards such as tsunamis, seiches, liquefaction, or
seismic induced settlement should be considered negligible or nonexistent.
One of the more likely major geologic hazard to affect the site is ground-
shaking as a result of movement along one of the major active fault zones
SCS&T 14044-R January 31, 1983 Page 6
mentioned previously. The maximum bedrock accelerations that would be
attributed to a maximum probable earthquake occurring along the nearest
portion of the fault zones that could affect the site are summarized in
the following table.
TABLE 1
Fault Zone
Rose Canyon
Elsinore
San Jacinto
Classification
Potentially
Active
Active
Active
Distance
6 miles
25 miles
46 miles
Maximum Probable
Earthquake
6.0 magnitude
7.3 magnitude
7.8 magnitude
Maximum Bedrock
Acceleration
0.35 g.
0.20 g.
0.13 g.
Based on the current fault zone classification, and the maximum bedrock
accelerations capable of developing, it is recommended that the Elsinore
Fault Zone be considered the design earthquake source for the subject
development.
Construction in accordance with the minimum standards of the Uniform
Building Code and the governing agency should minimize potential damage
due to seismic activity.
Another potential geologic hazard which could possibly affect the site is
slope stability problems associated with the clayier portions of the
Santiago formation. No evidence of former landsliding were observed at
the subject site proper but several landslides have been observed in the
vicinity of the site. The likelihood of slope stability problems at the
site can be satisfactorily mitigated if the recommendations presented in
this report and proper slope maintenance techniques are followed.
s a u T E R N CALIFORNIA SOIL AND TESTING.I N C
SCS&T 14044-R January 31, 1983 Page 7
RECOMMENDATIONS AND CONCLUSIONS
GENERAL
Based on the findings of this study, it is our opinion that with respect
to geotechnical aspects, the subject site is suitable for the proposed
development provided the recommendations contained in this report are
fully complied with.
SITE PREPARATION
SOIL PREPARATION: It is our understanding that it is planned to construct
cut and fill building pads for the proposed development. In areas which
are to receive structural loads or fill, we recommend that all loose
topsoils be removed to firm natural ground, where firm natural ground is
defined as soil having an in-situ density of at least 85% of its maximum
dry density as defined by A.S.T.M. Test Method 1557-78. The desired grade
should then be obtained by placing fill compacted to at least 90% relative
compaction. Fills should be properly keyed into the existing hillside in
accordance with good grading practive and the "Recommended Grading Speci-
fications" appended to this report.
EARTHWORK: All earthwork and grading contemplated for site preparation
should be accomplished in accordance with the attached Recommended Grading
Specifications and Special Provisions. All special site preparation
recommendations presented in the sections above will supersede those in
the standard Recommended Grading Specifications. All embankments, struct-
ural fill and fill should be compacted to a minimum of 90%. Utility
trench backfill within 5 feet of the proposed structures and beneath
asphalt pavements should be compacted to a minimum of 90% of its maximum
dry density. The maximum dry density of each soil type should be deter-
mined in accordance with A.S.T.M. Test Method 1557-78, Method A or C.
SCS&T 14044-R January 31, 1983 Page 8
SUBDRAINS
We recommend that subdrains be installed behind the proposed retaining
walls. The drains should have a fall of at least 0.5% away from the
center, and should exit to daylight at each end. A typical section for
the subdrain is shown on the following Figure Number 2.
FOUNDATIONS
GENERAL: It is anticipated that the proposed structures will be founded
on a transition between cut and fill soils. Further, some of the on-site
soils were found to have a high potential for expansion when undergoing an
increase in moisture content. In consideration of these factors, we
recommend that footings be founded at least 24 inches below lowest adja-
cent finish grade and have a width of at least 15 inches. Continuous
footings should be reinforced with at least four #4 bars (two at the top
and two at the bottom of the footings).
In addition, we recommend the following in order to minimize the effects
of the expansive soil conditions.
a) Interior slabs should be a minimum of 5 inches in thickness,
should be underlain by a 4 inch blanket of clean washed sand, pea
gravel or crushed rock, and should be reinforced with at least
6"x6"-10/10 welded wire mesh. Interior slabs should be complet-
ely surrounded with a continuous footing.
b) Exterior slabs should be a minimum of 5 inches thick. Walks or
slabs three feet or less in width need not be reinforced. Those
exceeding three feet in width should be reinforced with 6"x6"-
10/10 welded wire mesh and provided with weakened plane joints as
recommended hereinafter.
SOUTHERN CALIFORNIA SOIL AND TESTING. INC
Page 9
SOUTHERN CALIFORNIA
BOIL & TESTING , INC.
•••O RIVKROALE STRKCT
• AN OIBOO, CALIFORNIA BBIBO
La Con'na Place Condos
Escondido, California
BY
JOB NC
AFB
* 14044
DATE 9-29-82
Figure No. 2
SCS&T 14044-R January 31, 1983 Page 10
c) Weakened plane joints for exterior slabs should be provided for
any slab greater than five feet in width. Any slabs between five
and ten feet should be provided with longitudinal weakened plane
joints at the center line. Slabs exceeding ten feet in width
should be provided with a weakened plane joint located three feet
inside the exterior perimeter as indicated on attached Plate
Number 11. Both traverse and longitudinal weakened plane joints
should be constructed as detailed.
d) Clayey soils should not be allowed to dry before placing con-
crete. They should be watered if necessary so that the soils are
kept in a very moist condition or at a moisture content exceeding
three percent above optimum moisture content.
e) Surface drainage should be directed away from the proposed found-
ation. Planters should be constructed so that water is not
allowed to seep beneath foundations or slabs. Over-irrigation of
areas adjacent to foundations and slabs should be avoided.
f) Prior to placing concrete, the foundation excavations should be
observed by a representative of this office to determine that the
above recommendations have been followed.
BEARING CAPACITY: The maximum allowable bearing capacity for footings of
the minimum recommended dimensions is 3.0 kips per square foot. These
stresses may be increased by one-third for wind and/or seismic loading and
should be decreased by one-fourth for dead load only.
Adjacent footings founded at different bearing levels should be located so
that the slope from bearing level to bearing level is flatter than one
horizontal to one vertical.
AND TESTING. INC
SCS&T 14044-R January 31, 1983 Page 11
SETTLEMENT CHARACTERISTICS: The anticipated total and/or differential
settlements for the proposed structure may be considered to be within
tolerable limits provided the recommendations presented in this report are
followed.
EARTH RETAINING STRUCTURES
GENERAL: It is our understanding that the retaining structures planned
for this project will be of masonry construction and that they will have a
maximum height on the order of 10 feet.
BACKFILL: All backfill soils should be compacted to at least 90% relative
compaction. Expansive or clayey soils should not be used for backfill
material within a distance of 5 feet from the back of the wall. The
retaining structure should not be backfilled until the materials in the
wall have reached an adequate strength.
ALLOWABLE SOIL BEARING PRESSURE: The foundation for the proposed retain-
ing structures should consist of spread footings founded in the firm
native soils or compacted fill. Firm natural ground is defined as soil
having an in-situ density of at least 85% of its maximum dry density.
Footings may be designed for an allowable bearing pressure of 3.0 ksf.
PASSIVE PRESSURE: The passive pressure for prevailing soil conditions may
be considered to be 300 pounds per square foot per foot of depth. This
pressure may be increased one-third for seismic loading. The coefficient
of friction for concrete to soil may be assumed to be 0.3 for the resist-
ance to lateral movement. When combining fractional and passive resist-
ance, the latter should be reduced by one-third.
ACTIVE PRESSURE: The active soil pressure for the design of earth retain-
ing structures is as follows:
cniifHFRN CALIFORNIA SOIL AND TESTING. INC.
SCS&T 14044-R January 31, 1983 Page 12
A) Unrestrained Halls
Level Backfill:
2:1 Sloping Backfill:
EQUIVALENT FLUID PRESSURE
45 pcf
60 pcf
B) Restrained Halls
I 29H I
Level Backfill
/in
J
u 1
H
2:1 Sloping Backfill
These pressures do not consider any surcharge loading (other than the
sloping backfill). If any surcharge loadings are anticipated this office
should be contacted for the necessary change in soil pressure. All earth
retaining structures should have adequate weep holes or a subdrain system
to prevent the buildup of hydrostatic pressure behind the wall.
FACTOR OF SAFETY: The above values, with the exception of the allowable
soil bearing pressure, do not include a factor of safety. Appropriate
factors of safety should be incorporated into the design of all earth
retaining structures to reduce the possibility of over turning and slid-
ing.
SHUT F R N C A L F D R N I A SOIL AND TESTING.I N C
SCS&T 14044-R January 31, 1983 Page 13
SLOPE STABILITY
The proposed slope configurations for the project were analyzed for deep-
seated rotational failures using a computer program incorporating the
Simplified Bishop Method. The proposed slope configuration and assumed
soil strength parameters, are shown on the attached Plate Numbers 2 and 3.
It is our opinion that the cut and fill slopes as shown on the proposed
plans should be stable with relation to deep-seated failures with a factor
of safety of at least 1.5. In the event that slope heights or slope
ratios are changed, our office should be contacted for evaluation of slope
stability. All grading plans should be reviewed by our office.
It is recommended that footings not be founded nearer than 5 feet measured
horizontally inward from the face of the slopes. Slopes should be planted
with erosion resisting plants, preferably deep-rooted varieties adapted to
semi-arid climates. Drainage should be directed away from the tops of all
slopes.
LIMITATIONS
REVIEW, OBSERVATION AND TESTING
The recommendations presented in this report are contingent upon our
review of final plans and specifications. The soil engineer and engineer-
ing geologist should review and verify the compliance of the final grading
plan with this report and with Chapter 70 of the Uniform Building Code.
It is recommended that Southern California Soil & Testing, Inc. be retain-
ed to provide continuous soil engineering services during the earthwork
operations. This is to observe compliance with the design concepts,
SOUTHERN CALIFORNIA SOIL AND TESTING. INC
SCS&T 14044-R January 31, 1983 Page 14
specifications or recommendations and to allow design changes in the event
that subsurface conditions differ from those anticipated prior to start of
construction.
UNIFORMITY OF CONDITIONS
The recommendations and opinions expressed in this report reflect our best
estimate of the project requirements based on an evaluation of the subsur-
face soil conditions encountered at the subsurface exploration locations
and the assumption that the soil conditions do not deviate appreciably
from those encountered. It should be recognized that the performance of
the foundations and/or cut and fill slopes may be influenced by undis-
closed or unforeseen variations in the soil conditions that may occur in
the intermediate and unexplored areas. Any unusual conditions not covered
in this report that may be encountered during site development should be
brought to the attention of the soils engineer so that he may make modifi-
cations if necessary.
CHANGE IN SCOPE
This office should be advised of any changes in the project scope or
proposed site grading so that it may be determined if the recommendations
contained herein are appropriate. This should be verified in writing or
modified by a written addendum.
TIME LIMITATIONS
The findings of this report are valid as of this date. Changes in the
condition of a property can, however, occur with the passage of time,
whether they be due to natural processes or the work of man on this or
adjacent properties. In addition, changes in the State-of-the-Art and/or
Government Codes may occur. Due to such changes, the findings of this
SOUTHERN CALIFORNIA BOIL AND TESTING. INC
SCS&T 14044-R January 31, 1983 Page 15
report may be invalidated wholly or in part by changes beyond our control.
Therefore, this report should not be relied upon after a period of two
years without a review by us verifying the suitability of the conclusions
and recommendations.
PROFESSIONAL STANDARD
In the performance of our professional services, we comply with that level
of care and skill ordinarily exercised by members of our profession cur-
rently practicing under similar conditions and in the same locality. The
client recognizes that subsurface conditions may vary from those encoun-
tered at the locations where our borings, surveys, and explorations are
made, and that our data, interpretations, and recommendations are based
solely on the information obtained by us. We will be responsible for
those data, interpretations, and recommendations, but shall not be re-
sponsible for the interpretations by others of the information developed.
Our services consist of professional consultation and observation only,
and no warranty of any kind whatsoever, express or implied, is made or
intended in connection with the work performed or to be performed by us,
or by our proposal for consulting or other services, or by our furnishing
of oral or written reports or findings.
CLIENT'S RESPONSIBILITY
It is the responsibility of Community Resources Corporation, or their
representative to ensure that the information and recommendations con-
tained herein are brought to the attention of the engineer and architect
for the project and incorporated into the project's plans and specifica-
tions. It is further their responsibility to take the necessary measures
to ensure that the contractor and his subcontractors carry out such recom-
mendations during construction.
OUTHERN CALIFORNIA SOIL AND TESTING. INC
SCS&T 14044-R January 31, 1983 Page 16
FIELD EXPLORATIONS
Two subsurface explorations were made at the locations indicated on the
attached Plate Number 1 on June 18, 1982. These explorations consisted of
borings made with a truck mounted bucket auger. In addition near surface
samples were taken from hand dug pits at eleven locations on the existing
slope at the site. The field work was conducted under the observation of
our engineering geology personnel.
The explorations were carefully logged when made. These logs are presen-
ted on the following Plate Numbers 5 and 6. The soils are described in
accordance with the Unified soils Classification System as illustrated on
the atttached simplified chart on Plate 4. In addition, a verbal textural
description, the wet color, the apparent moisture and the density or
consistency are given on the Logs. Soil densities for granular soils are
given as either very loose, loose, medium dense, dense or very dense. The
consistency of silts or clays is given as either very soft, soft, medium
stiff, stiff, very stiff, or hard.
Disturbed and undisturbed samples of typical and representative soils were
obtained and returned to the laboratory for testing.
LABORATORY TESTING
Laboratory tests were performed in accordance with the generally accepted
American Society for Testing and Materials (A.S.T.M.) test methods or
suggested procedures. A brief description of the tests performed is
presented below:
A i i r n o KI i A t; n i L AND TESTING. INC
SCS&T 14044-R January 31, 1983 Page 17
a) MOISTURE-DENSITY: Field moisture content and dry density were
determined for representative undisturbed samples obtained. This
information was an aid to classification and permitted recogni-
tion of variations in material consistency with depth. The dry
unit weight is determined in pounds per cubic foot, and the field
moisture content is determined as a percentage of the soil's dry
weight. The results are summarized in the trench logs and Plate
Number 7.
b) CLASSIFICATION: Field classifications were verified in the
laboratory by visual examination. The final soil classifi-
cations are in accordance with the Unified Soil Classification
system.
c) DIRECT SHEAR TESTS: Consolidated drained shear tests were per-
formed to determine the failure envelope based on yield shear
strength. The shear box was designed to accomodate a sample
having a diameter of 2.375 inches or 2.50 inches and a height of
1.0 inch. Samples were tested at different vertical loads and at
saturated moisture content. The shear stress was applied at a
constant rate of strain of approximately 0.006 inches per minute
and 0.05 inches per minute as indicated on the attached data
sheets. The results of these tests are presented on attached
Plate Numbers 8 and 9.
d) EXPANSION TEST: The expansive potential of clayey soils was
determined in accordance with the following test procedure and
the results of these tests appear on Plate Number 9.
Allow the trimmed, undisturbed or remolded sample to air dry
to a constant moisture content, at a temperature of 100
degrees F. Place the dried sample in the consolidometer and
allow to compress under a load of 150 psf. Allow moisture
to contact the sample and measure its expansion from an air
dried to saturated condition.
SOUTHERN CALIFORNIA SOIL AND TESTING. INC
SCS&T 14044-R January 31, 1983 Page 18
e) GRAIN SIZE DISTRIBUTION: The grain size distribution was deter-
mined for representative samples of the native soils in accor-
dance with A.S.T.M. Standard Test D-422. The results of these
tests are presented on Plate Number 10.
f) PLASTICITY INDEX: The Plasticity Index (PI) which is defined as
the liquid limit of a soil minus its plastic limit was determined
for certain representative cohesive samples. The liquid limits
and plastic limits were determined in accordance with A.S.T.M.
Test Method 0433-66 and 0424-59 respectively. The results of
these tests are presented on Plate Number 10.
SOUTHERN CALIFORNIA BOIL AND TESTING. INC
1
$•'?!H' .1
CO
3
O
CP
CCL
olo»
t (/I
FH
m 0)Kif
CO
R
o
o
<jj
00
r rr
SUBSURFACE EXPLORATION L.EGEND
UNIFIED SOIL CLASSIFICATION CHART
SOIL DESCRIPTION
1.COARSE GRAINED, More than
half of material is larger
than No. 200 sieve size.
GRAVELS CLEAN GRAVELS
More than half of
coarse fraction is
larger than No. 4
sieve size but
smaller than 3".GRAVELS WITH FINES
(Appreciable amount
of fines)
SANDS
More than half of
coarse fraction is
smaller than No. 4
sieve size.
CLEAN SANDS
SANDS WITH FINES
(Appreciable amount
of fines)
11. FINE GRAINED, More than
half of material is smaller
than No. 200 sieve size.
SILTS AND CLAYS
Liquid Limit
less than SO
SILTS AND CLAYS
Liquid Limit
greater than 50
HIGHLY ORGANIC SOILS
GROUP SYMBOL
GW
GP
GM
GC
SW
SP
SM
sc
ML
CL
OL
MH
CH
OH
PT
TYPICAL NAMES
Well graded qravels, gravel-
sand mixtures, little or no
fines.
Poorly graded gravels, gravel
•and mixtures, little or no
fines.
Silty gravels, poorly graded
gravel-sand-silt mixtures.
Clayey gravels, poorly
graded gravel-sand, clay
mixtures.
Well graded sand,gravelly
sands, little or no fines.
Poorly graded sands,gravelly
sands, little or no fines.
Silty sands, poorly graded
sand and silt mixtures.
Clayey sands, poorly graded
sand and clay mixtures.
Inorganic silts and very
fine sands, rock flour, sandy
silt or clayey-silt-sand
mixtures with slight plast-
icity
Inorganic clays of low to
medium plasticity,gravelly
clays, sandy clays,silty
clays, lean clays.
Organic silts and organic
silty clays of low plasticity
Inorganic silts, micaceous
or diatomaceous fine sandy
or silty soils, elastic
silts.
Inorganic clays of high
plasticity, fat clays.
Organic clays of medium
to high plasticity.
Peat and other highly
organic soils.
•^ - Water level at time of excavation or as indicated
US
CK
B
- Undisturbed, driven ring sample or tube sample
- Undisturbed chunk sample
- Bulk sample
SOUTHERN CALIFORNIA
BOIL & TESTING , INC.
• ••O MIVinOALSj «TP>BT
• AN oi«aa, CALIFORNIA siaiBo
La Corina Place Condos
Escondido, California
BY
AFB
JOB NO.14044
DATE 9-29-82
Plate No. 4
'
-
-
1 ~~
-A — .SAMPLE TYPEUS
BG
CK
US
US
z0
I—
4
U
SO'LCLASSIFML/
CL
SC
SM/
SC
rr
BORING NUMBER 1
ELEVATION ] 3(3
DESCRIPTION
-SANDY, VERY SILTY, CLAY
(ALLUVIUM)
VERY CLAYEY SAND
GRADES TO SILTY CLAYEY
SAND
BOTTOM COLORDRK-BRN
GRN-BRN
YEL-BRN APPARENTMOI^TI mrMOIST
MOIST APPARENTCONSISTENCYon DE-NSITY^STIFF
VERY
DENSE PENETRATION |RESISTANCE *«*•IBLOWS/FT OF DRIVL f12
17
24 STANDARDPENETRATIONRESISTANCE(BLOVA/S/FT OF DRIVE )DRY DENSITYtPCF)108.0 MOISTURECONTENT (c<o)13.3 RELATIVECOMPACTION e°'o>t•
•
•
•
•
-
&f^ SOUTHERN CALIFORNIAr~r •»
\ \^r SOIL & TESTING, INC.
SUBSURFACE EXPLORATION LOB
LOGGED BY
CRB
JOB NUMBER
14044
DATE DRILLED
6-18-82
Plate No. 5
_-—--_ .J»"
"
'
—
2-
4-
—
6-
j
-
o-
2~
i
4~
6-
p —0
in •U
(SAMPLE TYPEUS
CK
CK
US
CK
' z
0
u
SO'LCLASSIFIML/
CL
r f
BORIMB NUMBER 2
ELEVATION 154
DESCRIPTION
VERY SANDY, VERY SILTY
•CLAY
BOTTOM COLORGRN-BRN
GRN-BRN
TO
YEL-BRN APPARENTMOISTUREMOIST
r * *APPARENTCONSISTENCYOR DE'NSITYVERY
STIFF
g
PENETRATIONRESISTANCEt BLOXA/S/FT OF D9
13
UJ>STANDARDPENETRATIONRESISTANCEC BLOWS/FT OF OFDRY DENSITYtPCF)116.8
112.1 MO'STURECONTENT fov,)24.6
15.6
5
RELATIVECOMPACTION Cr™
•
•
-
•
-
•
-
.
-
-
-
^f\. SOUTHERN CALIFORNIA
V lyT SOIL & TESTING, INC.
SUBSURFACE EXPLORATION LOG
LOGGED BY
JOB NUMBER
14044
DATE DRILLED C 1 0 QO
Plate No. 6
r r
Natural Dry Density and
Moisture Content
Sample
P3
P6
P9
P10
Description
Sandstone
Si Its tone
Sandstone
Si Its tone
Density
p.c.f.
132.8
112.3
136.8
119.3
MoistureContent•h
9.5
18.3
8.1
15.6
S\ SOUTHERN CALIFORNIA
X§US SOIL & TESTING , INC.
^W 1 yT •••O MIVIPDALH »TB««T
^W<|^r BAN OIBOO, CALIFORNIA ••1BO
La Corina Place Condos
Escondido, California
BY
AFB
JOB N°- 14044
DATE
9-29-82
Plate No. 7
4-5
to 20
NORMAL STRESS
4-0
SOUTHERN CALIFORNIA
BOIL A TESTING , INC.
• ••O HIVKROALK BTBKBT
• AN OIBOO. CALIFORNIA •B1*D
La Corina Place Condos
Escondido, California
BY
DIRECT SHEAR TEST DATA AFB
JOB NO.
14044
DATE 9-29-82
Plate No. 8
DIRECT SHEAR I c!$ i RESULTS
SAMPLE
BI @ e
B2 0 10
P7
P4
PI 2
DESCRIPTION
Undisturbed Ring Sample
Undisturbed Ring Sample
Undisturbed (ring cut from chunk)
Undisturbed (ring cut from chunk)
Remolded to Natural Density
Angle of
internal
friction( °)
25.5
31
32
39
39
Cohesion
intercept
(psf)
300
250
200
2400
550
EXPANSION TEST RESULTS
SAMPLE
CONDITION
INITIAL M.C.CVo)
INITIAL DENS1TY(PCF)
FINAL M.C. (•/.)
NORMAL STRESS (PSF
EXPANSION («/.)
B2 9 2
Undisturbed
Air Driprl
6.9
116.8
24.6
150.0
14.6
P6
Remolded
Air Dried
5.0
129.7
19.2
150.0
15.8
SOUTHERN CALIFORNIA
BOIL & TESTING LAB, INC.
• 8BO RIVERDALB STREET
SAN DIEOO, CALIFORNIA BB1BO
La Corina Place Condos
Escondido» California
BY AFB DATE 9_29-82
» ' 4f^~
^^
*a
r
8
US Standard S/eves HydrometerVf «io »20 ««o *eo (Minutss)IT *<» «8 «<6 *30 «50 «IOO «200 125 3O*•
A
V,
(\t
'CD
rT
-s
8
|
? o o o a? o> » r~ y
_*_• •*
...J
1 jj
^T Tl••••f
-f —
^ \
I
1
1 ' '
ci e} C1) 0
/
/
\
) C} f
i
Ml
«
-
/
-
—
S
V*
f "*i
i 'T°T \ '/or* irw_/ luaojsd
O O O O O.. in •» i« CM - O
^/
1
\ s
<//J/
jff
...
\ s
tu
••'•'?
jf^--'-
i s
90 JA
".".".•:•:•:•„.
"-•:-4i..,.,.
1
;/r
.....
? i
d
XqrS. SOUTHERN CALIFORNIA
>^W/ BOH. A TESTING , INC.
GRAIN SIZE DISTRIBUTION i
\~r
/
••:•:•,.
"*:»•:
/
r "
—
--
\ t-
._
> C
O
* *^
tn *
* t— : -J
nj
•o
» UJ
0 *> fg
;|
in
°>O UJ
_J
U
<r
rt tff
« Q.
m
(0
5§
U)
u
o
m
o
(0
[ GRAVEL_c
Medium1
il
U
COBBLESI
1
o
oiuj o
1 12 cO
*J u oI 2•>
u
0 >
* UJ
o
2 < *-- • "**-e o x> w ^
-. i-
T M — — •
X
« •- t Sc => i ? ?
MilS 2 |
a.
La Corina Place Condos
Escondido, California
" AFB
JOB NO.
DATE 9-29-82
r
/Vy
.. .'
•
^
WEAKENED
' PI AMP ° •r l_MINt .
• JOINTS '
^>. ••'••" '•' •' ;
10'
^•:-:S
>•**•
• • •
.' ''•
>TRANSVERSEL/P A i/FMpnM CM i\U IN C.U
PLANE JOINTS
6' ON CENTER
(MAX,)
3'
w
W/2
^
;-K'. '.
. • • ' _
5'-
lW/2
.V?^|
'.'•'.'
• • .- •
-10'
SLABS IN EXCESS OF 10 FEET IN WIDTH SLABS 5 TO 10 FEET IN WIDTH
PLAN
N.T.S,
1 -
\
\-'-.'-: '••'••':/.'• .'u/4 [,' •'-..':
\ ' * * " • * ^^^^Z^_ * O
\. -o- .. . • o j • . • . • • o
_ 1/8 TO 1/4
JOINT SEALER
• ' • • • • . ' • '.'••.'
'•'..'-.'••
.:• •.•".•• -1-V9- '.
\
' • • ' "\ c. i• • \ o
• o • . . . o . \
18"
6"x6"-10/10 WWM
CONTINUOUS
\6"x6"-10/10
STRIP IN ADDITION TO CON-
TINUOUS REINFORCEMENT
DETAIL-WEAKENED PLANE JOINT
N.T.S,
SOUTHERN CALIFORNIA
SOIL & TESTING LAB, INC.
RIVEROALK BTRKET
SAN DIEOO, CALIFORNIA BB1RQ
La Corina Place Condos
Escondido, California
BY
AFB
JOB NO.14044
DATE 9-29-82
Plate No. II
SCS&T 14U44 September 29, 1982 Appendix A, Page 1
PROPOSED CONDOMINIUM PROJECT, LA CORINA PLACE, LA COSTA, CALIFORNIA
RECOMMENDED GRADING SPECIFICATIONS - GENERAL PROVISIONS
GENERAL INTENT
The intent of these specifications is to establish procedures for clear-
ing, compacting natural ground, preparing areas to be filled, and placing
and compacting fill soils to the lines and grades shown on the accepted
plans. The recommendations contained in the preliminary soil investiga-
tion report and/or the attached Special Provisions are a part of the
Recommended Grading Specifications and shall supersede the provisions
contained hereinafter in the case of conflict. These specifications shall
only be used in conjunction with the soil report for which they are a
part. No deviation from these specifications will be allowed, except
where specified in the soil report or in other written communication
signed by the Soil Engineer.
OBSERVATION AND TESTING
Southern California Soil & Testing, Inc. shall be retained as the Soil
Engineer to observe and test the earthwork in accordance with these speci-
fications. It will be necessary that the Soil Engineer or his representa-
tive provide adequate observation so that he may provide an opinion that
the work was or was not accomplished as specified. It shall be the re-
sponsibility of the contractor to assist the soil engineer and to keep him
apprised of work schedules, changes and new information and data so that
he may provide these opinions. In the event that any unusual conditions
not covered by the special provisions or preliminary soil report are
encountered during the grading operations, the Soil Engineer shall be
contacted for further recommendations.
SCS&T 14U44 September 29, 1982 Appendix A, Page 2
If, in the opinion of the Soil Engineer, substandard conditions are en-
countered, such as; questionable or unsuitable soil, unacceptable moisture
content, inadequate compaction, adverse weather, etc., he will be empower-
ed to either stop construction until the conditions are remedied or cor-
rected or recommend rejection of this work.
Test methods used to determine the degree of compaction should be per-
formed in accordance with the following American Society for Testing and
Materials test methods:
Maximum Density & Optimum Moisture Content - A.S.T.M. D-1557-78.
Density of Soil In-Place - A.S.T.M. D-1556-64 or A.S.T.M. D-2922.
All densities shall be expressed in terms of Relative Compaction as deter-
mined by the foregoing A.S.T.M. testing procedures.
PREPARATION OF AREAS TO RECEIVE FILL
All vegetation, brush and debris derived from clearing operations shall be
removed, and legally disposed of. All areas disturbed by site grading
should be left in a neat and finished apperance, free from unsightly
debris.
Any abandoned buried structures encountered during grading operations must
be totally removed. All underground utilities to be abandoned beneath any
proposed structure should be removed from within 10 feet of the structure
and properly capped off. The resulting depressions from the above des-
cribed procedures should be backfilled with acceptable soil that is com-
pacted to the requirements of the Soil Engineer. This includes, but is
not limited to, septic tanks, fuel tanks, sewer lines or leach lines,
SOUTHERN CALIFORNIA SOIL AND TESTING. INC
SCbiT 14U44 September 29, 1982 Appendix A, Page 3
storm drains and water lines. Any buried structures or utilities not to
be abandoned should be investigated by the Soil Engineer to determine if
any special recommendation will be necessary.
All water wells which will be abandoned should be backfilled and capped in
accordance to the requirements set forth in the Geotechnical Report. The
top of the cap should be at least 4 feet below finish grade or 3 feet
below the bottom of footing whichever is greater. The type of cap will
depend on the diameter of the well and should be determined by the Soil
Engineer and/or a qualified Structural Engineer.
When the slope of the natural ground receiving fill exceeds 20% (5 hori-
zontal units to 1 vertical unit), the original ground shall be stepped or
benched. Benches shall be cut to a firm competent soil condition. The
lower bench shall be at least 10 feet wide or 1 1/2 times the equipment
width which ever is greater and shall be sloped back into the hillside at
a gradient of not less than two (2) percent. All other benches should be
at least 6 feet wide. The horizontal portion of each bench shall be
compacted prior to receiving fill as specified hereinbefore for compacted
natural ground. Ground slopes flatter than 20% shall be benched when
considered necessary by the Soil Engineer.
After clearing or benching, the natural ground in areas to be filled shall
be scarified to a depth of 6 inches, brought to the proper moisture con-
tent, compacted and tested for the minimum degree of compaction in the
Special Provisions or the recommendation contained in the preliminary soil
investigation report. All loose soils in excess of 6 inches thick should
be removed to firm natural ground which is defined as natural soil which
possesses an in-s1tu density of at least 85% of its maximum dry density.
SOUTHERN CALIFORNIA SOIL AND TESTING. INC
SCS&T 14U44 September 29, 1982 Appendix A, Page 4
FILL MATERIAL
Materials placed In the fill shall be approved by the soil engineer and
shall be free of vegetable matter and other deleterious substances. Gran-
ular soil shall contain sufficient fine material to fill the voids. The
definition and disposition of oversized rocks, expansive and/or detrimen-
tal soils are covered in the soils report or Special Provisions. Expan-
sive soils, soils of poor gradation, or soils with low strength character-
istics may be thoroughly mixed with other soils to provide satisfactory
fill material, but only with the explicit consent of the soil engineer.
Any import material shall be approved by the Soil Engineer before being
brought to the site.
PLACING AND COMPACTION OF FILL
Approved fill material shall be placed in areas prepared to receive fill
in layers not to exceed 6 inches in compacted thickness. Each layer shall
have a uniform moisture content in the range that will allow the compac-
tion effort to be efficiently applied to achieve the specified degree of
compaction. Each layer shall be uniformly compacted to the minimum speci-
fied degree of compaction with equipment of adequate size to economically
compact the layer. Compaction equipment should either be specifically
designed for soil compaction or of proven reliability. The minimum degree
of compaction to be achieved is specified in either the Special Provisions
or the recommendations contained in the preliminary soil investigation
report.
When the structural fill material includes rocks, no rocks will be allowed
to nest and all voids must be carefully filled with soil such that the
minimum degree of compaction recommended in the Special Provisions is
SOUTHERN CALITQRNIA SOIL AND TESTING. INC
SCS&T 14044 September 29 1982 Appendix A Page 5
achieved. The maximum size and spacing of rock permitted in structural
fills and in non-structural fills is discussed in the soil report, when
applicable.
Field observation and compaction tests to estimate the degree of compac-
tion of the fill will be taken by the Soil Engineer or his representative.
The location and frequency of the tests shall be at the Soil Engineer's
discretion. When the compaction test indicates that a particular layer is
less than the required degree of compaction, the layer shall be reworked
to the satisfaction of the Soil Engineer and until the desired relative
compaction has been obtained.
Fill slopes shall be compacted by means of sheepsfoot rollers or other
suitable equipment. Compaction by sheepsfoot rollers shall be at vertical
intervals of not greater than four feet. In addition, fill slopes at
ratios of two horizontal to one vertical or flatter, should be track-
rolled. Steeper fill slopes shall be over-built and cut-back to finish
contours. Slope compaction operations shall result in all fill material
six or more inches inward from the finished face of the slope having a
relative compaction of at least 90% of maximum dry density or that speci-
fied in the Special Provisions section of this specification. The compac-
tion operation on the slopes shall be continued until the Soil Engineer is
satisfied that the slopes will be stable in regards to surficial stabil-
ity.
Slope tests will be made by the Soils Engineer during construction of the
slopes to determine if the required compaction is being achieved. Where
failing tests occur or other field problems arise, the Contractor will be
notified that day of such conditions by written communication from the
Soil Engineer in the form of a daily field report.
SOUTHERN CALIFORNIA SOIL AND TESTING. INC
SCS&T 14044 September 29, 1982 Appendix A, Page 6
If the method of achieving the required slope compaction selected by the
Contractor fails to produce the necessary results, the Contractor shall
rework or rebuild such slopes until the required degree of compaction is
obtained, at no additional cost to the Owner or Soils Engineer.
CUT SLOPES
The Engineering Geologist shall inspect all cut slopes excavated in rock
or lithified formational material during the grading operations at inter-
vals determined at his discretion. If any conditions not anticipated in
the preliminary report such as perched water, seepage, lenticular or
confined strata of a potentially adverse nature, unfavorably inclined
bedding, joints or fault planes are encountered during grading, these
conditions shall be analyzed by the Engineering Geologist and Soil Engi-
neer to determine if mitigating measures are necessary.
Unless otherwise specified in the soil and geological report, no cut
slopes shall be excavated higher or steeper than that allowed by the
ordinances of the controlling governmental agency.
ENGINEERING OBSERVATION
Field observation by the Soil Engineer or his representative shall be made
during the filling and compacting operations so that he can express his
opinion regarding the conformance of the grading with acceptable standards
of practice. The presence of the Soil Engineer or his representative or
the observation and testing shall not release the Grading Contractor from
his duty to compact all fill material to the specified degree of compac-
tion.
SOUTHERN CALIFORNIA SOIL AND TESTING. INC
SCS&T 14044 September 29, 1982 Appendix A, Page 7
SEASON LIMITS
Fill shall not be placed during unfavorable weather conditions. When work
is interrupted by heavy rain, filling operations shall not be resumed
until the proper moisture content and density of the fill materials can be
achieved. Damaged site conditions resulting from weather or acts of God
shall be repaired before acceptance of work.
RECOMMENDED GRADING SPECIFICATIONS-SPECIAL PROVISIONS
The minimum degree of compaction to be obtained in compacting natural
ground, in the compacted fill, and in the compacted backfill shall be at
least 90 percent.
Detrimentally expansive soil is defined as soil which will swell more than
3 percent against a pressure of 150 pounds per square foot from a condi-
tion of 90 percent of maximum dry density and air dried moisture content
to saturation.
Oversized fill Material is defined as rocks or lumps over 6 inches in
diameter. At least 40 percent of the fill soils shall pass through a No.
4 U.S. Standard Sieve.
Transition Lots: Where transitions between cut and fill occur within the
proposed building pad, the cut portion should be undercut a minimum of one
foot below the base of the proposed footings and recompacted as structural
backfill.
SOUTHERN CALIFORNIA SOIL AND TESTING. INC
LOCAT
CASE NO.
A P P LIC A N T_lCRC/L_AjCO_STA_._ VICINITY MAP