HomeMy WebLinkAboutCT 83-19; CALAVERA HEIGHTS VILLAGE K; GEOTECHNICAL; 9999-10-22UPDATE OF GEOTECHNICAL REPORT
CALAVERA HILLS, VILLAGE K
CITY OF CARLSBAD, CALIFORNIA
FOR
CALAVERA HILLS II, LLC
2727 HOOVER AVENUE
NATIONAL CITY, CAUFORNIA 91950
W.O. 2747-A-SC OCTOBER 20,1999
Geotechnical • Geologic • Environmental
5741 Palmer Way • Carlsbad, California 92008 • (760)438-3155 • FAX (760) 931-0915
October 20, 1999
W.O. 2747-A-SC
Calavera Hills II, LLC
2727 Hoover Avenue
Nafional City, California 91950
Attenfion: Mr. Thom Fuller
Subject: Update of Geotechnical Report, Calavera Hillls, Village K, City of Cartsbad,
California
Genfiemen:
In accordance with your request, GeoSoils, Inc. (GSI) has performed a geotechnical
update evaluation of the subject site. The purpose of the study was to evaluate the onsite
soils and geologic condifions and their effects on the proposed site development from a
geotechnical viewpoint. Unless specifically superceded in the text of this report,
recommendations presented in the referenced reports (see Appendix A) are considered
valid and applicable.
SCOPE OF SERVICES
The scope of our services has included the following:
1. Review of the referenced reports.
2. Geologic site reconnaissance.
3. General areal seismicity update evaluafion.
4. Engineering and geologic analysis and preparation of this report.
SITE CONDITIONS/PROPOSED DEVELOPMENT
A site reconnaissance, performed by a representafive fi-om this office on October 13,1999,
indicated that site condifions have not substanfially changed since the complefion ofthe
referenced reports by others (see Appendix A). It is our understanding that planned site
development will consist of site preparation for the construcfion of approximately 89 single
family residenfial structures. Based on the site plan (O'Day, 1999), grading will consist of
cuts and fills on the order of 25 feet and 18 feet, respectively. Foundafion loads are
anticipated to be typical for this type of relatively light construction. Sewage disposal is
anficipated to be fied into the regional system. Proposed development is shown on the
attached Tentative Site Plan (Plates 1 and 2), prepared by O'Day Consultants.
EARTHWORK RECOMMENDATIONS
Site grading should be performed in accordance with the minimum standards of the City
of Carlsbad, the Uniform Building Code (1997 edifion) and the grading guidelines
presented in Appendix B. Due to the anficipated rock hardness, considerafion should be
given to over excavating street areas to at least 12 inches below lowest utility invert
elevation in cut areas. Overexcavafion within parkways should also be considered with
respect to utility laterals. This is not a geotechnical requirement, however.
SEISMIC DESIGN PARAMETERS
Based on the site condifions. Chapter 16 of the Uniform Building Code (Internafional
Conference of Building Officials, 1997), the following seismic parameters are provided.
Seismic zone (per Figure 16-2*) 4
Seismic Zone Factor (per Table 16-1*) 0.40
Soil Profile Type (per Table 16-J*) SB
Seismic Coefficient C^ (per Table 16-Q*) 0.40 N3
Seismic Coefficient C ^ (per Table 16-R*) 0.40 N„
Near Source Factor (per Table 16-S*) 1.0
Near Source Factor N„ (per Table 16-T*) 1.0
Seismic Source Type (per Table 16-U*) B
Distance to Seismic Source 7.8 mi (12.5 km)
Upper Bound Earthquake M„ 6.9
* Figure and table references from Chapter 16 of the Uniform Building Code (1997).
Calavera Hills II, LLC
Calavera Hills, Village K
File: e:\wp7\2700\2747a.ugr
W.O. 2747-A-SC
October 20, 1999
Page 2
GeoSoils, Inc.
SLOPE STABILITY
A review ofthe referenced reports (SCST, 1984,1990) indicates that cut and fill slopes are
considered grossly and surficially stable. However, due to the sometimes random nature
of fractures in this type of bedrock, adverse condifions may be exposed during grading.
Such condifions, if present, should be evaluated by the geotechnical consultant as soon
as they are exposed and the appropriate recommendafions should be provided. Such an
evaluafion may consist of a formal slope stability analysis. Possible remedial
recommendafions may include, but not necessarily limited to buttress fills, stability fills,
rock netting, and rock bolting.
FOUNDATION RECOMMENDATIONS
General
The foundafion design and construcfion recommendafions presented herein are
preliminary in nature and will be finalized at the completion of grading. Recommendafions
for conventional foundafion systems are provided in the following sections. The foundafion
systems may be used to support the proposed structures, provided they are founded in
competent bearing material and should be designed and constructed in accordance with
the guidelines contained in the Uniform Building Code. All foofing designs should be
reviewed by the project structural engineer. The use of convenfional and/or post tensioned
slab foundafions will be determined in accordance with the criteria presented in the
attached Table 1 and Table 2.
Conventional Foundation Desiqn
1. Convenfional spread and continuous foofings may be used to support the proposed
residential structures provided they are founded entirely in properly compacted fill
or other competent bearing material (i.e., bedrock). Foofings should not
simultaneously bear directly on bedrock and fill soils.
2. Analyses indicate that an allowable bearing value of 2000 pounds per square foot
may be used for design of confinuous footings per Table 1, and for design of
isolated pad foofings 24 inches square and 18 inches deep into properly
compacted fill or bedrock. The bearing value may be increased by one-third for
seismic or other temporary loads. This value may be increased by 20 percent for
each addifional 12 inches in depth, to a maximum of 2500 pounds per square foot.
No increase, in bearing, for foofing width is recommended.
3. For lateral sliding resistance, a 0.4 coefficient of fricfion may be ufilized for a
concrete to soil contact when mulfiplied by the dead load.
Calavera Hills II, LLC W.O. 2747-A-SC
Calavera Hills, Village K October 20, 1999
File: e:\wp7\2700\2747a.ugr Page 3
GeoSoils, Inc.
4. Passive earth pressure may be computed as an equivalent fluid having a density of
300 pounds per cubic foot with a maximum earth pressure of 2500 pounds per
square foot.
5. When combining passive pressure and fricfional resistance, the passive pressure
component should be reduced by one-third.
6. Footings should maintain a horizontal distance or setback between any adjacent
slope face and the bottom outer edge of the footing. The horizontal distance may
be calculated by using h/3, where (h) is the height of the slope. The horizontal
setback should not be less than 7 feet, nor need not be greater than 40 feet (per
code). The setback may be maintained by simply deepening the foofings.
Flatwork, ufilifies or other improvements within a zone of h/3 from the top of slope
may be subject to lateral distortion. Foofings, flatwork, and utilifies setbacks should
be constructed in accordance with distances indicated in this secfion, and/or the
approved plans.
7. Provided that the recommendafions contained in this report are incorporated into
final design and construcfion phase of development, a majority (>50 percent) ofthe
anficipated foundafion settlement is expected to occur during construcfion.
Maximum settlement is not expected to exceed approximately y2-inch and should
occur below the heaviest loaded columns. Differenfial settlement is not anficipated
to exceed y4-inch between similar elements, in a 20 foot span.
Conventional Foundation/Concrete Slab Construction
The following construcfion recommendafions are based on generally very low to low
expansive bearing soils and maximum fill thicknesses of less than approximately 50 feet.
1. Convenfional confinuous foofings should be constructed in accordance with
recommendafions presented in Table 1, and in accordance with Uniform Building
Code guidelines (1997 ed.). All foofings should be reinforced per Table 1.
2. Detached isolated interior or exterior piers and columns should be founded at a
minimum depth of 18 inches below the lowest adjacent ground surface and fied to
the main foundafion in at least one direcfion with a grade beam. Reinforcement
should be properly designed by the project structural engineer.
3. A grade beam, reinforced as above, and at least 12 inches square, should be
provided across the garage entrances. The base of the reinforced grade beam
should be at the same elevafion as base of the adjoining foofings.
Calavera Hills II, LLC W.O. 2747-A-SC
Calavera Hills, Village K October 20,1999
File: e:\wp7\2700\2747a.ugr Page 4
GeoSoils, Inc.
4. The residenfial fioor and garage slabs should have a minimum thickness of 4
inches, in accordance with Table 1. Concrete used in fioor slab construcfion should
have a minimum compressive strength of 2000 psi.
5. Concrete slabs should be underlain with a minimum of 4 inches of sand. In
addifion, a vapor barrier consisfing of a minimum of 10-mil, polyvinyl-chloride
membrane, with all laps sealed, should be provided at the mid-point of the sand
layer. The slab subgrade should be free of loose and uncompacted material prior
to placing concrete.
6. Concrete floor slabs (residence and garage) should be reinforced per Table 1. All
slab reinforcement should be supported to ensure proper mid-slab height
posifioning during placement of the concrete. "Hooking" of reinforcement is not an
acceptable method of posifioning.
7. The moisture content of the subgrade soils should be equal to or greater than
opfimum moisture to a depth of 12 inches below the adjacent ground grade in the
slab areas, and verified by this office within 72 hours of the vapor barrier placement.
8. Soils generated from footing excavations to be used onsite should be compacted
to a minimum relative compacfion 90 percent ofthe laboratory standard, whether
it is to be placed inside the foundation perimeter or in the yard/right-of-way areas.
This material must not alter posifive drainage patterns that direct drainage away
from the structural areas and toward the street.
9. As an alternative, an engineered post-tension foundation system may be used.
Recommendafions for post-tensioned slab design are presented in the following
Secfion.
Post-Tensioned Slab Foundation Systems
1. Post-tensioned (PT) slabs may be utilized for construction of typical one (1) and two
(2) story residential structures onsite. The information and recommendations
presented in this secfion are not meant to supersede design by a registered
structural engineer or civil engineer familiar with post-tensioned slab design or
corrosion engineering consultant.
2. From a soil expansion/shrinkage standpoint, a fairly common contributing factor to
distress of structures using post-tensioned slabs is a significant fiuctuafion in the
moisture content of soils underlying the perimeter of the slab, compared to the
center, causing a "dishing" or "arching" of the slabs. To mifigate this possible
phenomenon, a combinafion of soil presaturation (if necessary, or after the project
has been dormant for a period of fime) and construction of a perimeter "cut off' wall
grade beam may be employed.
Calavera Hills II, LLC W.O. 2747-A-SC
Calavera Hills, Village K October 20,1999
File: e:\wp7\2700\2747a.ugr Page 5
GeoSoils, Inc.
3. For very low to low (E.l.= 0 through 50) expansive soils, perimeter and mid span
beams should be a minimum 12 inches deep below lowest adjacent pad grade.
Perimeter beams should be a minimum of 18 inches deep for medium expansive
and 24 inches deep for highly expansive soil condifions. The perimeter foundafions
may be integrated into the slab design or independent of the slab. The perimeter
beams should be a minimum of 12 inches in width.
A vapor barrier should be utilized and be of sufficient thickness to provide an
adequate separafion of foundafion from soils (10-mil thick). The vapor barrier
should be lapped and adequately sealed to provide a confinuous water-resistant
barrier under the enfire slab. The vapor barrier should be sandwiched between two
2-inch thick layers of sand (SE>30) for a total of 4 inches of sand.
4. Isolated piers should be incorporated into the post tension slab system.
5. Specific soil presaturafion for slabs is not required for very low expansive soils;
however, the moisture content ofthe subgrade soils should be at or above the soils'
optimum moisture content to a minimum depth of 18 inches below grade
depending on the foofing embedment.
6. Post-tensioned slabs should be designed using sound engineering pracfice and be
in accordance with the Post-Tension Institute (PTI), local and/or nafional code
criteria and the recommendafions of a structural or civil engineer qualified in post-
tension slab design. Alternatives to PTI methodology may be used if equivalent
systems can be proposed which accommodate the angular distortions, expansion
parameters, and settlements noted for this project. If alternatives to PTI are
suggested by the structural consultant, considerafion should be given for additional
review by a qualified structural PT-designer. Soil related parameters for post-
tensioned slab design, are presented in Table 2.
7. Provided that the recommendations contained in this report are incorporated into
final design and construction phase of development, a majority (>50 percent) ofthe
anticipated foundafion settlement is expected to occur during construcfion.
Maximum settlement (preliminary estimate) is not expected to exceed approximately
y2-inch and should occur below the heaviest loaded columns. Differenfial
settlement is not anficipated to exceed y4-inch between similar elements, in a 20
foot span for maximum fill thicknesses up to 30 feet. Deeper fills and/or differential
fill thicknesses greater than 3:1 will be evaluated on a lot by lot basis during
grading, and may result in more onerous design.
Designers of PT slabs should review the parameters provided for post-tensioned
slabs, and compare using a span distance of 5 feet, using a modules of subgrade
reacfion, presented in Table 2.
Calavera Hills II, LLC W.O. 2747-A-SC
Calavera Hills, Village K October 20,1999
File: e:\wp7\2700\2747a.ugr Page 6
GeoSoils, Inc.
8. In accordance with guidelines presented in the Uniform Building Code,
improvements and/or foofings should maintain a horizontal distance, X, between
any adjacent descending slope face and the bottom outer edge ofthe improvement
and/or foofing. The horizontal distance, X, may be calculated by using X = h/3,
where h is the height of the slope. X should not be less than 7 feet, nor need not
be greater than 40 feet. X may be maintained by deepening the foofings.
Improvements constructed within a distance of h/3 from the top of slope may be
subject to lateral distortion.
Foundafions for any adjacent structures, including retaining walls, should be
deepened (as necessary) to below a 1:1 projection upward and away from any
proposed lower foundafion system. This recommendation may not be considered
valid, if the addifional surcharge imparted by the upper foundafion on the lower
foundafion has been incorporated into the design of the lower foundafion.
Additional setbacks, not discussed or superseded herein, and presented in the UBC
are considered valid.
DEVELOPMENT CRITERIA
Landscape Maintenance and Planting
Water has been shown to weaken the inherent strength of soil and slope stability is
significantly reduced by overly wet conditions. Posifive surface drainage away from graded
slopes should be maintained and only the amount of irrigafion necessary to sustain plant
life should be provided for planted slopes. Overwatering should be avoided.
Graded slopes constructed within and utilizing onsite materials would be erosive. Eroded
debris may be minimized and surficial slope stability enhanced by establishing and
maintaining a suitable vegetafion cover soon after construcfion. Plants selected for
landscaping should be light weight, deep rooted types which require little water and are
capable of sun/iving the prevailing climate. Compacfion to the face of fill slopes would
tend to minimize short term erosion unfil vegetafion is established. In order to minimize
erosion on a slope face, an erosion control fabric should be considered.
From a geotechnical standpoint leaching is not recommended for establishing
landscaping. If the surface soils area processed for the purpose of adding amendments
they should be recompacted to 90 percent relative compacfion.
Additional Site Improvements
Recommendafions for addifional grading, exterior concrete flatwork design and
construcfion, including driveways, can be provided upon request. If in the future, any
Calavera Hills II, LLC W.O. 2747-A-SC
Calavera Hills, Village K October 20,1999
File: e:\wp7\2700\2747a.ugr Page 7
GeoSoils, Inc.
additional improvements are planned for the site, recommendafions concerning the
geological or geotechnical aspects of design and construction of said improvements could
be provided upon request.
Trenching
All footing trench excavafions for structures and walls should be obsen/ed and approved
by a representative of this office prior to placing reinforcement. Footing trench spoil and
any excess soils generated from utility trench excavafions should be compacted to a
minimum relative compaction of 90 percent if not removed from the site. All excavations
should be obsen/ed by one of our representatives and conform to CAL-OSHA and local
safety codes. GSI does not consult in the area of safety engineers.
In addition, the potential for encountering hard spots during footing and utility trench
excavations should be anficipated. If these concretions are encountered within the
proposed foofing trench, they shouid be removed, which could produce larger excavated
areas within the foofing or ufility trenches.
Drainage
Positive site drainage should be maintained at all fimes. Drainage should not fiow
uncontrolled down any descending slope. Water should be directed away from
foundafions and not allowed to pond and/or seep into the ground. Pad drainage should
be directed toward the street or other approved area. Roof gutters and down spouts
should be considered to control roof drainage. Down spouts should outlet a minimum of
5 feet from the proposed structure or into a subsurface drainage system. We would
recommend that any proposed open bottom planters adjacent to proposed structures be
eliminated for a minimum distance of 10 feet. As an alternative, closed bottom type
planters could be ufilized. An oufiet placed in the bottom ofthe planter, could be installed
to direct drainage away from structures or any exterior concrete flatwork.
PLAN REVIEW
Final site development and foundafion plans should be submitted to this office for review
and comment, as the plans become available, for the purpose of minimizing any
misunderstandings between the plans and recommendafions presented herein. In
addition, foundafion excavafions and any addifional earthwork construction performed on
the site should be observed and tested by this office. If condifions are found to differ
substantially from those stated, appropriate recommendations would be offered at that
fime.
Calavera Hills II, LLC W.O. 2747-A-SC
Calavera Hills, Village K October 20,1999
File: e:\wp7\2700\2747a.ugr Page 8
GeoSoils, Inc.
LIMITATIONS
The materials obsen/ed on the project site and the referenced reports reviewed are
believed to be generally representative ofthe area; however, soil and bedrock materials
vary in character between excavafions and natural outcrops or condifions exposed during
mass grading. Site condifions may vary due to seasonal changes or other factors. GSI
assumes no responsibility or liability for work, tesfing or recommendafions performed or
provided by others. The scope of work was performed within the limits of a budget.
Inasmuch as our study is based upon the site materials observed, selective laboratory
tesfing and engineering analysis, the conclusion and recommendafions are professional
opinions. These opinions have been derived in accordance with current standards of
practice, and no warranty is expressed or implied. Standards of practice are subject to
change with fime.
The opportunity to be of sen/ice is sincerely appreciated. If you should have any
questions, please do not hesitate to contact the undersigned at (760) 438-3155.
Respectfully submitted,
GeoSoils, Inc.
Robert G. Crisman
Engineering Geologist
RGC/DWS/JPF/mo
Attachments:
/(L^itij.^
David W. Skelly
Civil Engineer, RCE
Table 1 - Convenfional Foundation Recommendafions
Table 2 - Post Tensioned Foundafion Recommendafions
Appendix A - References
Appendix B - General Earthwork and Grading Guidelines
Plates 1 and 2 - Geologic Maps
Distribufion: (4) Addressee
Calavera Hills II, LLC
Calavera Hills, Village K
File: e:\wp7\2700\2747a.ugr
W.O. 2747-A-SC
October 20, 1999
Page 9
GeoSoils, Inc.
TABLE 1
Conventional Perimeter Footings. Slabs, and Exterior Flatwork for Calavera Hills. Viliaqe K
FOUNDATION
CATEGORY
MINIMUM
FOOTING
SIZE
INTERIOR
v;-.::sLAii[i^'.?;
THICKNESS
REINFORCING
•3^t|Et>;:'^-^^
INTERIOR SLAB
REINFORCEMENT
UNDER-SLAB
TREATMENT
GARAGE SLAB
REINFORCEMENT
EXTERIOR
FLATWORK
REINFORCING
1 12" Wide
X
12" Deep
4" Thick 1-#4 Bar Top
and Bottom
#3 Bars
@
24" o.c.
Both Directions
2" Sand Over 10-
Mil Polyvinyl
Membrane Over
2" Sand Base
6" X 6"
(10/10)
WWF
none
II 12" Wide
X
18" Deep
4" Thick 2- #4 Bars Top
and Bottom
#3 Bars
@
18" o.c.
Both Directions
2" Sand Over 10-
Mil Polyvinyl
Membrane Over
2" Sand Base
6" X 6"
(6/6)
WWF
6" X 6"
(10/10)
VWVF
III 12" Wide
X
24" Deep
4" Thick 2- #5 Bars Top
and Bottom
#3 Bars
@
18" o.c.
Both Directions
2" Sand Over 10-
Mil Polyvinyl
Membrane Over
2" Sand Base
Same as
Interior Slab
6" X 6"
(6/6)
WWF
Cateaorv Criteria
Category I:
Category II:
Category III:
Notes: 1.
Max. Fill Thickness is less than 20' and Expansion Index is less than or equal to 50 and Differential Fill Thickness is less than 10' (see note 1).
Max. Fill Thickness is less than 50' and Expansion Index is less than or equal to 90 or Differential Fill Thickness is between 10 and 20' (see note 1).
Max. Fill Thickness exceeds 50', or Expansion Index exceeds 90 but is less than 130, or Differential Fill Thickness exceeds 20' (see note 1).
thickness Post tension (PT) foundations are required where maximum fill exceeds 50', or the ratio of the maximum fill thickness to the minimum 1
exceeds 3:1. Consideration should be given to using post tension foundations where the expansion index exceeds 90.
2. Footing depth measured from lowest adjacent subgrade.
3. Allowable soil bearing pressure is 2,000 PSF.
4. Concrete for slabs and footings shall have a minimum compressive strength of 2,000 PSI (2,500 PSI for exterior flatwork), or adopted UBC min.,
at 28 days, using 5 sacks of cement. Maximum Slump shall be 5".
5. Visqueen vapor barrier not required under garage slab. However, consideration should be given to future uses of the slab area, such as room
conversion and/or storage of moisture-sensitive materials.
6. Isolated footings shall be connected to foundations per soils engineer's recommendations (see report).
7. Sand used for base under slabs shall be very low expansive, and have SE > 30.
8. Additional exterior flatwork recommendations are presented in the text of this report.
9. All slabs should be provided with weakened plane joints to control cracking. Joint spacing should be in accordance with correct industry standards
and reviewed by the project structural engineer.
TABLE 2
PRELIMINARY POST TENSION SLAB FOUNDATION RECOMMENDATIONS
Expansion Index
Foundation Category
Expansion Index
l(PT)
Very Lowto
Low (0-50)
II(PT)
Medium (51-90)
HI (PT)
High (>90)
Perimeter footing embedment 12" 18" (w/premoistening) (24" (w/premoistening)
Allowable bearing value 1200 psf* 1200 psf* 1200 psf*
Modulus of subgrade reaction 100 pci/inch 75 pci/inch 75 pci/inch
Coefficient of friction 0.35 0.35 0.35
Passive pressure 225 pcf 225 pcf 225 pcf
Soil suction (Pf) 3.6 3.6 3.6
Depth to constant soil suction 5 feet 5 feet 5 feet
Thornthwaite moisture -20.0 -20.0 -20.0
edge 2.5 2.7 3.0
e^ center 5.0 5.5 5.5
Vm edge 0.35 0.5 0.75
Vm center 1.1 2.0 2.5
Minimum slab thickness 5 inches 5 inches 5 inches
*lnternal bearing values for grade beams of the Post-tension slab may be designed per the criteria provided
for conventional foundations.
APPENDIX A
REFERENCES
I
APPENDIXA
REFERENCES
Internafional Conference of Building Officials, 1997, Uniform Building Code, Whittier,
California.
O'Day Consultants, 1999, Site Plan, Carlsbad, California, 1"=40' scale. Dated August 6,
1999
Southern California Soil and Tesfing, Inc., 1990, Interim report of geotechnical
Invesfigafion, Calavera Heights, Village K, Carlsbad, Californa, W.O. 9021022, dated
March 20.
, 1984, Summary of geotechnical invesfigafion for Lake Calavera Hills, Villages E-1,
E-2, H, K, L-2, L-3, Q, R, S, T, U and W-X, Carlsbad, California, W.O. 14112, Report
No. 6., dated August 6.
GeoSoils, Inc.
APPENDIX B
GENERAL EARTHWORK AND GRADING GUIDELINES
GENERAL EARTHWORK AND GRADING GUIDELINES
General
These guidelines present general procedures and requirements for earthwork and grading
as shown on the approved grading plans, including preparafion of areas to filled,
placement of fill, installafion of subdrains and excavafions. The recommendafions
contained in the geotechnical report are part of the earthwork and grading guidelines and
would supersede the provisions contained hereafter in the case of conflict. Evaluations
performed by the consultant during the course of grading may result in new
recommendafions which could supersede these guidelines or the recommendafions
contained in the geotechnical report.
The contractor is responsible for the safisfactory complefion of all earthwork in accordance
with provisions of the project plans and specifications. The project soil engineer and
engineering geologist (geotechnical consultant) or their representafives should provide
observafion and tesfing sen/ices, and geotechnical consultafion during the durafion of the
project.
EARTHWORK OBSERVATIONS AND TESTING
Geotechnical Consultant
Prior to the commencement of grading, a qualified geotechnical consultant (soil engineer
and engineering geologist) should be employed for the purpose of observing earthwork
procedures and tesfing the fills for conformance with the recommendafions of the
geotechnical report, the approved grading plans, and applicable grading codes and
ordinances.
The geotechnical consultant should provide testing and observafion so that determinafion
may be made that the work is being accomplished as specified, ft is the responsibility of
the contractor to assist the consultants and keep them apprised of anticipated work
schedules and changes, so that they may schedule their personnel accordingly.
All clean-outs, prepared ground to receive fill, key excavafions, and subdrains should be
observed and documented by the project engineering geologist and/or soil engineer prior
to placing and fill, ft is the contractors's responsibility to notify the engineering geologist
and soil engineer when such areas are ready for observafion.
Laboratory and Field Tests
Maximum dry density tests to determine the degree of compacfion should be performed
in accordance with American Standard Testing Materials test method ASTM designation
D-1557-78. Random field compacfion tests should be performed in accordance with test
method ASTM designafion D-1556-82, D-2937 or D-2922 and D-3017, at inten/als of
approximately 2 feet of fill height or every 100 cubic yards of fill placed. These criteria
GeoSoils, Inc.
would vary depending on the soil condifions and the size ofthe project. The locafion and
frequency of tesfing would be at the discrefion of the geotechnical consultant.
Contractor's Responsibility
All clearing, site preparafion, and earthwork performed on the project should be conducted
by the contractor, with obsen/ation by geotechnical consultants and staged approval by
the governing agencies, as applicable. It is the contractor's responsibility to prepare the
ground surface to receive the fill, to the safisfacfion of the soil engineer, and to place,
spread, moisture condifion, mix and compact the fill in accordance with the
recommendafions ofthe soil engineer. The contractor should also remove all major non-
earth material considered unsatisfactory by the soil engineer.
It is the sole responsibility ofthe contractor to provide adequate equipment and methods
to accomplish the earthwork in accordance with applicable grading guidelines, codes or
agency ordinances, and approved grading plans. Sufficient watering apparatus and
compacfion equipment should be provided by the contractor with due considerafion for
the fill material, rate of placement, and climafic condifions. If, in the opinion of the
geotechnical consultant, unsafisfactory condifions such as quesfionable weather,
excessive oversized rock, or deleterious material, insufficient support equipment, etc., are
resulting in a quality of work that is not acceptable, the consultant will inform the
contractor, and the contractor is expected to rectify the conditions, and if necessary, stop
work until conditions are satisfactory.
During construcfion, the contractor shall properly grade all surfaces to maintain good
drainage and prevent ponding of water. The contractor shall take remedial measures to
control surface water and to prevent erosion of graded areas until such time as permanent
drainage and erosion control measures have been installed.
SITE PREPARATION
All major vegetafion, including brush, trees, thick grasses, organic debris, and other
deleterious material should be removed and disposed of off-site. These removals must be
concluded prior to placing fill. Exisfing fill, soil, alluvium, colluvium, or rock materials
determined by the soil engineer or engineering geologist as being unsuitable in-place
should be removed prior to fill placement. Depending upon the soil condifions, these
materials may be reused as compacted fills. Any materials incorporated as part of the
compacted fills should be approved by the soil engineer.
Any underground structures such as cesspools, cisterns, mining shafts, tunnels, sepfic
tanks, wells, pipelines, or other structures not located prior to grading are to be removed
or treated in a manner recommended by the soil engineer. Soft, dry, spongy, highly
fractured, or othen/vise unsuitable ground extending to such a depth that surface
processing cannot adequately improve the condifion should be overexcavated down to
Calavera Hills II, LLC Appendix B
File: e:\wp7\2700\2747a.ugr Page 2
GeoSoils, Inc.
firm ground and approved by the soil engineer before compacfion and filling operafions
continue. Overexcavated and processed soils which have been properly mixed and
moisture condifioned should be re-compacted to the minimum relative compacfion as
specified in these guidelines.
Existing ground which is determined to be safisfactory for support of the fills should be
scarified to a minimum depth of 6 inches or as directed by the soil engineer. After the
scarified ground is brought to opfimum moisture content or greater and mixed, the
materials should be compacted as specified herein. If the scarified zone is grater that 6
inches in depth, it may be necessary to remove the excess and place the material in lifts
restricted to about 6 inches in compacted thickness.
Existing ground which is not satisfactory to support compacted fill should be
overexcavated as required in the geotechnical report or by the on-site soils engineer
and/or engineering geologist. Scarification, disc harrowing, or other acceptable form of
mixing should confinue unfil the soils are broken down and fi-ee of large lumps or clods,
until the working surface is reasonably uniform and free from ruts, hollow, hummocks, or
other uneven features which would inhibit compacfion as described previously.
Where fills are to be placed on ground with slopes steeper than 5:1 (horizontal to vertical),
the ground should be stepped or benched. The lowest bench, which will act as a key,
should be a minimum of 15 feet wide and should be at least 2 feet deep into firm material,
and approved by the soil engineer and/or engineering geologist. In fill over cut slope
condifions, the recommended minimum width ofthe lowest bench or key is also 15 feet
with the key founded on firm material, as designated by the Geotechnical Consultant. As
a general rule, unless specifically recommended othenwise by the Soil Engineer, the
minimum width of fill keys should be approximately equal to V2 the height ofthe slope.
Standard benching is generally 4 feet (minimum) vertically, exposing firm, acceptable
material. Benching may be used to remove unsuitable materials, although it is understood
that the vertical height ofthe bench may exceed 4 feet. Pre-stripping may be considered
for unsuitable materials in excess of 4 feet in thickness.
All areas to receive fill, including processed areas, removal areas, and the toe of fill
benches should be observed and approved by the soil engineer and/or engineering
geologist prior to placement of fill. Fills may then be properly placed and compacted until
design grades (elevafions) are attained.
COMPACTED FILLS
Any earth materials imported or excavated on the property may be ufilized in the fill
provided that each material has been determined to be suitable by the soil engineer.
These materials should be free of roots, tree branches, other organic matter or other
deleterious materials. All unsuitable materials should be removed from the fill as directed
Calavera Hills II, LLC Appendix B
File: e:\wp7\2700\2747a.ugr Page 3
GeoSoils, Inc.
by the soil engineer. Soils of poor gradafion, undesirable expansion potenfial, or
substandard strength characteristics may be designated by the consultant as unsuitable
and may require blending with other soils to serve as a safisfactory fill material.
Fill materials derived from benching operations should be dispersed throughout the fill
area and blended with other bedrock derived material. Benching operations should not
result in the benched material being placed only within a single equipment width away
from the fill/bedrock contact.
Oversized materials defined as rock or other irreducible materials with a maximum
dimension greater than 12 inches should not be buried or placed in fills unless the locafion
of materials and disposal methods are specifically approved by the soil engineer.
Oversized material should be taken off-site or placed in accordance with recommendafions
of the soil engineer in areas designated as suitable for rock disposal. Oversized material
should not be placed within 10 feet vertically of finish grade (elevation) or within 20 feet
horizontally of slope faces.
To facilitate future trenching, rock should not be placed within the range of foundafion
excavations, future utilities, or underground construcfion unless specifically approved by
the soil engineer and/or the developers representative.
If import material is required for grading, representative samples of the materials to be
utilized as compacted fill should be analyzed in the laboratory by the soil engineer to
determine its physical properties. If any material other than that previously tested is
encountered during grading, an appropriate analysis ofthis material should be conducted
by the soil engineer as soon as possible.
Approved fill material should be placed in areas prepared to receive fill in near horizontal
layers that when compacted should not exceed 6 inches in thickness. The soil engineer
may approve thick lifts if testing indicates the grading procedures are such that adequate
compaction is being achieved with lifts of greater thickness. Each layer should be spread
evenly and blended to attain uniformity of material and moisture suitable for compaction.
Fill layers at a moisture content less than optimum should be watered and mixed, and wet
fill layers should be aerated by scarificafion or should be blended with drier material.
Moisture condifion, blending, and mixing of the fill layer should confinue unfil the fill
materials have a uniform moisture content at or above opfimum moisture.
After each layer has been evenly spread, moisture condifioned and mixed, it should be
uniformly compacted to a minimum of 90 percent of maximum density as determined by
ASTM test designafion, D-1557-78, or as othenwise recommended by the soil engineer.
Compacfion equipment should be adequately sized and should be specifically designed
for soil compaction or of proven reliability to efficiently achieve the specified degree of
compacfion.
Calavera Hills II, LLC Appendix B
File: e:\wp7\2700\2747a.ugr P^Qe 4
GeoSoils, Inc.
Where tests indicate that the density of any layer of fill, or portion thereof, is below the
required relative compaction, or improper moisture is in evidence, the particular layer or
portion shall be re-worked until the required density and/or moisture content has been
attained. No addifional fill shall be placed in an area unfil the last placed lift of fill has been
tested and found to meet the density and moisture requirements, and is approved by the
soil engineer.
Compacfion of slopes should be accomplished by over-building a minimum of 3 feet
horizontally, and subsequently trimming back to the design slope configurafion. Tesfing
shall be performed as the fill is elevated to evaluate compacfion as the fill core is being
developed. Special efforts may be necessary to attain the specified compacfion in the fill
slope zone. Final slope shaping should be performed by trimming and removing loose
materials with appropriate equipment. Afinal determinafion of fill slope compacfion should
be based on observation and/or testing of the finished slope face. Where compacted fill
slopes are designed steeper than 2:1 (horizontal to vertical), specific material types, a
higher minimum relative compacfion, and special grading procedures, may be
recommended.
If an alternative to over-building and cutting back the compacted fill slopes is selected,
then special effort should be made to achieve the required compaction in the outer 10 feet
of each lift of fill by undertaking the following:
1. An extra piece of equipment consisting of a heavy short shanked sheepsfoot should
be used to roll (horizontal) parallel to the slopes confinuously as fill is placed. The
sheepsfoot roller should also be used to roll perpendicular to the slopes, and
extend out over the slope to provide adequate compacfion to the face of the slope.
2. Loose fill should not be spilled out over the face of the slope as each lift is
compacted. Any loose fill spilled over a previously completed slope face should be
trimmed off or be subject to re-rolling.
3. Field compaction tests will be made in the outer (horizontal) 2 to 8 feet of the slope
at appropriate vertical intervals, subsequent to compacfion operafions.
4. After complefion of the slope, the slope face should be shaped with a small tractor
and then re-rolled with a sheepsfoot to achieve compaction to near the slope face.
Subsequent to tesfing to verify compacfion, the slopes should be grid-rolled to
achieve compacfion to the slope face. Final tesfing should be used to confirm
compacfion after grid rolling.
5. Where tesfing indicates less than adequate compacfion, the contractor will be
responsible to rip, water, mix and re-compact the slope material as necessary to
achieve compaction. Additional testing should be performed to verify compaction.
Calavera Hills II, LLC Appendix B
File: e:\wp7\2700\2747a.ugr Page 5
GeoSoils, Inc.
6. Erosion control and drainage devices should be designed by the project civil
engineer in compliance with ordinances ofthe controlling governmental agencies,
and/or in accordance with the recommendafion of the soil engineer or engineering
geologist.
SUBDRAIN INSTALLATION
Subdrains should be installed in approved ground in accordance with the approximate
alignment and details indicated by the geotechnical consultant. Subdrain locafions or
materials should not be changed or modified without approval of the geotechnical
consultant. The soil engineer and/or engineering geologist may recommend and direct
changes in subdrain line, grade and drain material in the field, pending exposed
conditions. The locafion of constructed subdrains should be recorded by the project civil
engineer.
EXCAVATIONS
Excavafions and cut slopes should be examined during grading by the engineering
geologist. If directed by the engineering geologist, further excavations or overexcavation
and re-filling of cut areas should be performed and/or remedial grading of cut slopes
should be performed. When fill over cut slopes are to be graded, unless othenwise
approved, the cut portion of the slope should be observed by the engineering geologist
prior to placement of materials for construcfion of the fill portion of the slope.
The engineering geologist should obsen/e all cut slopes and should be notified by the
contractor when cut slopes are started.
if, during the course of grading, unforeseen adverse or potenfial adverse geologic
condifions are encountered, the engineering geologist and soil engineer should
investigate, evaluate and make recommendations to treat these problems. The need for
cut slope buttressing or stabilizing should be based on in-grading evaluafion by the
engineering geologist, whether anficipated or not.
Unless othenwise specified in soil and geological reports, no cut slopes should be
excavated higher or steeper than that allowed by the ordinances of controlling
governmental agencies. Addifionally, short-term stability of temporary cut slopes is the
contractors responsibility.
Erosion control and drainage devices should be designed by the project civil engineer and
should be constructed in compliance with the ordinances ofthe controlling governmental
agencies, and/or in accordance with the recommendafions of the soil engineer or
engineering geologist.
Calavera Hills II, LLC Appendix B
File: e:\wp7\2700\2747a.ugr Page 6
GeoSoils, Inc.
COMPLETION
Observafion, tesfing and consultafion by the geotechnical consultant should be conducted
during the grading operations in order to state an opinion that all cut and filled areas are
graded in accordance with the approved project specificafions.
After complefion of grading and after the soil engineer and engineering geologist have
finished their obsen/ations of the work, final reports should be submitted subject to review
by the controlling governmental agencies. No further excavation or filling should be
undertaken without prior notificafion of the soil engineer and/or engineering geologist.
All finished cut and fill slopes should be protected from erosion and/or be planted in
accordance with the project specifications and/or as recommended by a landscape
architect. Such protecfion and/or planning should be undertaken as soon as pracfical after
complefion of grading.
JOB SAFETY
General
At GeoSoils, Inc. (GSI) getting the job done safely is of primary concern. The following is
the company's safety considerafions for use by all employees on mulfi-employer
construcfion sites. On ground personnel are at highest risk of injury and possible fatality
on grading and construction projects. GSI recognizes that construction activities will vary
on each site and that site safety is the prime responsibility of the contractor; however,
everyone must be safety conscious and responsible at all times. To achieve our goal of
avoiding accidents, cooperafion between the client, the contractor and GSI personnel must
be maintained.
In an effort to minimize risks associated with geotechnical tesfing and obsen/afion, the
following precaufions are to be implemented for the safety of field personnel on grading
and construction projects:
Safety Meetings: GSI field personnel are directed to attend contractors regularly
scheduled and documented safety meefings.
Safety Vests: Safety vests are provided for and are to be worn by GSI personnel at
all fimes when they are working in the field.
Safety Flags: Two safety fiags are provided to GSI field technicians; one is to be
affixed to the vehicle when on site, the other is to be placed atop the
spoil pile on all test pits.
Calavera Hills II, LLC Appendix B
File: e:\wp7\2700\2747a.ugr Page 7
GeoSoils, Inc.
Flashing Lights: All vehicles stafionary in the grading area shall use rotafing or flashing
amber beacon, or strobe lights, on the vehicle during all field tesfing.
While operafing a vehicle in the grading area, the emergency fiasher
on the vehicle shail be acfivated.
In the event that the contractor's representafive observes any of our personnel not
following the above, we request that it be brought to the attenfion of our office.
Test Pits Location. Orientation and Clearance
The technician is responsible for selecfing test pit locations. A primary concern should be
the technicians's safety. Efforts will be made to coordinate locafions with the grading
contractors authorized representafive, and to select locations following or behind the
established traffic pattern, preferably outside of current traffic. The contractors authorized
representative (dump man, operator, supen/isor, grade checker, etc.) should direct
excavation ofthe pit and safety during the test period. Of paramount concern should be
the soil technicians safety and obtaining enough tests to represent the fill.
Test pits should be excavated so that the spoil pile is placed away form oncoming traffic,
whenever possible. The technician's vehicle is to be placed next to the test pit, opposite
the spoil pile. This necessitates the fill be maintained in a driveable condition.
Alternatively, the contractor may wish to park a piece of equipment in front of the test
holes, particularly in small fill areas or those with limited access.
A zone of non-encroachment should be established for all test pits. No grading equipment
should enter this zone during the tesfing procedure. The zone should extend
approximately 50 feet outward from the center of the test pit. This zone is established for
safety and to avoid excessive ground vibration which typically decreased test results.
When taking slope tests the technician should park the vehicle directly above or below the
test locafion. If this is not possible, a prominent fiag should be placed at the top of the
slope. The contractor's representafive should effectively keep all equipment at a safe
operation distance (e.g. 50 feet) away from the slope during this tesfing.
The technician is directed to withdraw from the active portion of the fill as soon as possible
following tesfing. The technician's vehicle should be parked at the perimeter of the fill in
a highly visible locafion, well away from the equipment traffic pattern.
The contractor should inform our personnel of all changes to haul roads, cut and fill areas
or other factors that may affect site access and site safety.
In the event that the technicians safety is jeopardized or compromised as a result of the
contractors failure to comply with any of the above, the technician is required, by company
policy, to immediately withdraw and notify his/her supervisor. The grading contractors
representative will eventually be contacted in an effort to effect a solution. However, in the
Calavera Hills II, LLC Appendix's
File: e:\wp7\2700\2747a.ugr Page 8
GeoSoils, Inc.
interim, no further tesfing will be performed unfil the situafion is rectified. Any fill place can
be considered unacceptable and subject to reprocessing, recompaction or removal.
In the event that the soil technician does not comply with the above or other established
safety guidelines, we request that the contractor brings this to his/her attention and notify
this office. Effective communication and coordinafion between the contractors
representafive and the soils technician is strongly encouraged in order to implement the
above safety plan.
Trench and Vertical Excavation
It is the contractor's responsibility to provide safe access into trenches where compaction
tesfing is needed.
Our personnel are directed not to enter any excavation or vertical cut which 1) is 5 feet or
deeper unless shored or laid back, 2) displays any evidence of instability, has any loose
rock or other debris which could fall into the trench, or 3) displays any other evidence of
any unsafe condifions regardless of depth.
All trench excavations or vertical cuts in excess of 5 feet deep, which any person enters,
should be shored or laid back.
Trench access should be provided in accordance with CAL-OSHA and/or state and local
standards. Our personnel are directed not to enter any trench by being lowered or "riding
down" on the equipment.
If the contractor fails to provide safe access to trenches for compaction testing, our
company policy requires that the soil technician withdraw and notify his/her supervisor.
The contractors representative will eventually be contacted in an effort to effect a solution.
All backfill not tested due to safety concerns or other reasons could be subject to
reprocessing and/or removal.
If GSI personnel become aware of anyone working beneath an unsafe trench wall or
vertical excavafion, we have a legal obligation to put the contractor and owner/developer
on notice to immediately correct the situation. If corrective steps are not taken, GSI then
has an obligafion to notify CAL-OSHA and/or the proper authorifies.
Calavera Hills II, LLC Appendix B
File: e:\wp7\2700\2747a.ugr Page 9
GeoSoils, Inc.
NATURAL GROUND
CANYON SUBDRAIN DETAIL
TYPE A
PROPOSED COMPACTED FILL
y\
COLLUVIUM AND ALLUVIUM (REMOVE) wm/i
TYPICAL BENCHING '^5'^^^^
^ \\\^f/ BEDROCK
SEE ALTERNATIVES
TYPE B
\ N S
PROPOSED COMPACTED FILL
NATURAL GROUND
COLLUVIUM AND ALLUVIUM (REMOVE)
4:
wm
4,4"i
Ir
MII^W
BEDROCK
TYPICAL BENCHING
SEE ALTERNATIVES
NOTE: ALTERNATIVES. LOCATION AND EXTENT OF SUBDRAINS SHOULD BE DETERMINED
BY THE SOILS ENGINEER AND/OR ENGINEERING GEOLOGIST DURING GRADING.
PLATE EG-1
CANYON SUBDRAIN ALTERNATE DETAILS
ALTERNATE 1: PERFORATED PIPE AND FILTER MATERIAL
MINIMUM
A-1
FILTER MATERIAL MINIMUM VOLUME OF 9 FT.'
/UNEAR FT. 5' ^ ABS OR PVC PIPE OR APPR'OVED^ V.''v//.* ^
SUBSTITUTE WITH MINIMUM 8 (1/4* 0) PERFS. ^'-^.Q^.^ SUBSTITUTE WITH
UNEAR FT. IN BOTTOM HALF OF P\Pi.
ASTM D2751. SDR 35 OR ASTM D1527. SCHD,
ASTM D3034. SDR 35 OR ASTM D1785. SCHD.
FOR CONTINUOUS RUN IN EXCESS OF 56o FT.
USE 8*jf PIPE
MINIMUM
• MINIMUM
•1
1 INCH
3/4 INCH
3/8 INCH
NO. i
NO. 8
NO. 30
"NO. 50
NO. 200
FILTER MATERIAL
SIEVE SIZE PSRCSNT PA$?1N(?
. too
90-100
AO-100
25-40.
18-33
5-15
.0-7
0-3
ALTERNATE 2: PERFORATED PIPE. GRAVEL AND. FILTER FABRIC
6* MINIMUM OVERLAP MINIMUM OVERLAP
6* MINIMUM COVER
ZZ4* MINIMUM BEDDING
A-2 B-2
A- MINIMUM BEDDING^;
GRAVEL MATERIAL 9 Fr/UNEAR FT.
PERFORATED PIPE: SEE ALTERNATE 1
GRAVEL CLEAN 3/L INCH ROCK OR APPROVED SUBSTITUTE
RLTER FABRIC. MIRAFI UO OR APPROVED SUBSTITUTE
PLATE EG-2
DETAIL FOR FILL SLOPE TOEING OUT
ON FLAT ALLUVIATED CANYON
TOE OF SLOPE AS SHOWN ON GRADING PLAN
ORIGINAL GROUND SURFACE TO BE
RESTORED WITH COMPACTED RLL
BACKCUTS VARIES. FOR DEEP REMOVALS,
BACKCUT ^VKSHOULD BE MADE NO
STEEPER THAI^II OR AS NECESSARY^
COMPACTED FILL
ORIGINAL GROUND SURFACE
r FOR SAFETY CONSIDERATIONS
ANTICIPATED ALLUVIAL REMOVAL
DEPTH PER SOIL ENOmSER.
r PROVIDE A 1:1 MINIMUM PROJECTION FROM T0€ OF
SLOPE AS SHOWN ON GRADING PLAN TO THE RECOMMENDED
REMOVAL DEPTH. SLOPE HEIGHT. SITE CONDITIONS AMO/OR
LOCAL CONDITIONS COULD DICTATE FLATTER PROJECTIONS.
REMOVAL ADJACENT TO EXISTING FILL
ADJOINING CANYON FILL
COMPACTED FILL LIMITS UNE
Qaf
(EXISTING COMPACTE
BE REMOVED BEFORE
PLACING ADDITIONAL
COMPACTED RLL
Qaf ARTIFICIAL FILL
Qal ALLUVIUM
PLATE EG-3
TYPICAL STABILIZATION / BUTTRESS FILL DETAIL
15' TYPICAL
1-2' CLEA
Tl r"
>
m
m o
I
:LEAR
' W=15'MINIMUM OR H/2
OUTLETS TO BE SPACED AT 100* MAXIMUM INTERVALS. AND SHALL EXTEND
12- BEYOND THE FACE OF SLOPE AT TIME OF , ROUGH GRADING COMPLETION.
BLANKET FILL IF RECOMMENDED
BY THE SOIL ENGINEER
DESIGN FINISH SLOPE
TYPICAL BENCHING
,2% GRADIENT
BUTTRESS OR SIDEHILL FILL f \ t,' DIAMETER NON-PERFORATED OUTLET PIPE
___r AND BACKDRAIN (SEE ALTERNATIVESI
BEDROCK
HEEL 3'MINIMUM KEY DEPTH
TYPICAL STABILIZATION / BUTTRESS SUBDRAIN DETAIL
4- MINIMUM
PIPE
2* MINIMUM
2' MINIMUM
m
o
I
cn
FILTER MATERIAL: MINIMUM OF FIVE FtVLINEAR Ft OF PIPF
OR FOUR FP/LINEAR Fl OF PIPE WHEN PLACED IN SQUARE
CUT TRENCH.
ALTERNATIVE IN UEU OF RLTER MATERIAL: GRAVEL MAY BE
EMCASED IN APPROVED FILTER FABRIC. FILTER FABRIC
SHALL BE MIRAFI UO OR EQUIVALENT. FILTER FABRIC
SHALL BE LAPPED A MINIMUM OF 12" ON ALL JOINTS.
MINIMUM 4' DIAMETER PIPE: ABS-ASTM D-2751. SDR 35
OR ASTM D-1527 SCHEDULE 40 PVC-ASTM D-3034.
SpR 35 OR ASTM D-1785 SCHEDULE 40 WITH A CRUSHING
STRENGTH OF 1.000 POUNDS MINIMUM. AND A MINIMUM OF
8 UNIFORMLY SPACED PERFORATIONS PER FOOT OF PIPE
INSTALLED WITH PERFORATIONS OF BOTTOM OF PIPE.
PROVIDE CAP AT UPSTREAM END OF PIPE. SLOPE AT 2%
TO OUTLET PIPE. OUTLET PIPE TO BE CONNECTED TO
SUBDRAIN PIPE WITH TEE OR ELBOW.
NOTE: 1. TRENCH FOR OUTLET PIPES TO BE BACKFILLED
WITH ON-SITE SOIL.
2. BACKDRAINS AND LATERAL DRAINS SHALL BE
LOCATED AT ELEVATION OF EVERY BENCH DRAIN.
FIRST DRAIN LOCATED AT ELEVATION JUST ABOVE
LOWER LOT GRADE. ADDITIONAL DRAINS MAY BE
REQUIRED AT THE DISCRETION OF THE SOILS
ENGINEER AND/OR ENGINEERING GEOLOGIST.
FILTER MATERIAL SHALL BE OF
THE FOLLOWING SPECIFICATION
OR AN APPROVED EQUIVALENT:
SIEVE SIZE PERCENT PASSING
1 INCH 10 0
3/4 INCH 90-100
3/8 INCH 40-100
NO. 4 25-40
NO. 8 18-33
NO. 30 5-15
NO. 50 0-7
NO. 200 0-•3
GRAVEL SHALL BE OF THE
FOLLOWING SPECIFICATION OR
AN APPROVED EQUIVALENT:
SIEVE SIZE PERCENT PASSING
1 1/2 INCH
NO. 4
NO. 200
100
50
8
SAND EQUIVALENT: MINIMUM OF 50
FILL OVER NATURAL DETAIL
SIDEHILL FILL
COMPACTED FILL
PROPOSED GRADE
TOE OF SLOPE AS SHOWN ON GRADING PLAN
PROVIDE A 1:1 MINIMUM PROJECTION FROM
DESIGN TOE OF SLOPE TO TOE OF KEY
AS SHOWN ON AS BUILT
r-
>
m
m
o
I
cn
NATURAL SLOPE TO
BE RESTORED WITH
COMPACTED FILL
BACKCUT VARIES
M
15'MINIMUM KEY WIDTH
2*X 3'MINIMUM KEY DEPTH
2'MINIMUM IN BEDROCK OR
APPROVED MATERIAL
(ll^\y/^V/A^\lll^ BENCH WIDTH MAY VARY
"^3', MINIMUM
NOTE: 1. WHERE THE NATURAL SLOPE APPROACHES OR EXCEEDS THE
DESIGN SLOPE RATIO. SPECIAL RECOMMENDATIONS WOULD BE
PROVIDED BY THE SOILS ENGINEER.
2. THE NEED FOR AND DISPOSITION OF DRAINS WOULD BE DETERMINED
BY THE SOILS ENGINEER BASED UPON EXPOSED CONDITIONS.
FILL OVER CUT DETAIL
CUT/RU CONTACT
1. AS SHOWN ON GRADING PLAN
2. AS SHOWN ON AS BUILT
MAINTAIN MINIMUM 15'FILL SECTION FROM
BACKCUT TO FACE OF FINISH SLOPE
BENCH WIDTH MAY VARY
^^^^ BEDROCK OR APPROVED MATERIAL
LOWEST BENCH WIDTH
15'MINIMUM OR H/2
"0
>
m
m o
I
NOTE: THE CUT PORTION OF THE SLOPE SHOULD BE EXCAVATED AND
EVALUATED BY THE SOILS ENGINEER AND/OR ENGINEERING
GEOLOGIST PRIOR TO CONSTRUCTING THE FILL PORTION.
STABILIZATION FILL FOR UNSTABLE MATERIAL
EXPOSED IN PORTION OF CUT SLOPE
>
m
m o
I
00
"/^y^//^^ UNWEATHERED BEDROCK
^ OR APPROVED MATERIAL
COMPACTED STABILIZATION RLL
1'MINIMUM TILTED BACK
IF RECOMMENDED BY THE SOILS ENGINEER AND/OR ENGINEERING
GEOLOGIST. THE REMAINING CUT PORTION OF THE SLOPE MAY
REQUIRE REMOVAL AND REPLACEMENT WITH COMPACTED RLL
NOTE: 1. SUBDRAINS ARE NOT REQUIRED UNLESS SPECIFIED BY SOILS ENGINEER AND/OR ENGINEERING GEOLOGIST,
2. -W- SHALL BE EQUIPMENT WIDTH Il5'l FOR SLOPE HEIGHTS LESS THAN 25 FEET. FOR SLOPES GREATER
THAN 25 FEET 'W SHALL BE DETERMINED BY THE PROJECT SOILS ENGINEER AND /OR ENGINEERING
GEOLOGIST. AT NO TIME SHALL 'W BE LESS THAN H/2.
SKIN FILL OF NATURAL GROUND
ORIGINAL SLOPE
»ROPOSED FINISH GRADE
15'MINIMUM TO BE MAINTAINED FROM
PROPOSED FINISH SLOPE FACE TO BACKCUT
PROPOSED FINISH SLOPE
T)
H
m m o
I
ID
74^^<
MINIMUM
^y^W,^ BEDROCK OR APPROVED MATERIAL
EY DEPTH
NOTE: 1. THE NEED AND DISPOSITION OF DRAINS WILL BE DETERMINED! BY THE SOILS ENGINEER AND/OR
ENGINEERING GEOLOGIST BASED ON FIELD CONDITIONS.
2. PAD OVEREXCAVATION AND RECOMPACTION SHOULD BE PERFORMED IF DETERMINED TO BE
NECESSARY BY THE SOILS ENGINEER AND/OR ENGINEERING GEOLOGIST.
DAYLIGHT CUT LOT DETAIL
RECONSTRUCT COMPACTED FILL SLOPE AT 2:1 OR FLATTER
(MAY INCREASE OR DECREASE PAD AREA).
OVEREXCAVATE AND RECOMPACT
REPLACEMENT FILL
PROPOSED FINISH GRADE
AVOID AND/OR CLEAN UP SPILLAGE OF
MATERIALS ON THE NATURAL SLOPE
Ts'MINIMUM BLANKET FILL
!9^ GRADIENT,.,.
BEDROCK OR APPROVED MATERIAL
TYPICAL BENCHING
"D
r"
> -H
m
m
o
I
NOTE: 1. SUBDRAIN AND KEY WIDTH REQUIREMENTS W,ILL BE DETERMINED BASED ON EXPOSED SUBSURFACE
CONDITIONS AND THICKNESS OF OVERBURDEN.
2. PAD OVER EXCAVATION AND RECOMPACTION SHOULD BE PERFORMED IF DETERMINED NECESSARY BY
THE SOILS ENGINEER AND/OR THE ENGINEERING GEOLOGIST.
TRANSITION LOT DETAIL
CUT LOT (MATERIAL TYPE TRANSITION)
NATURAL GRADE
COMPACTED RLL
OVEREXCAVATE AMD RECOMPACT y^/X
'(/^//^//<:!y//<:iS/V/^^ 3- MINIMUM*
§ UNWEATHERED BEDROCK OR APPROVED MATERIAL
TYPICAL BENCHING
CUT-FILL LOT (DAYUGHT TRANSITION)
PAD GRADE
NATURAL GRADE -^e^'
0^'
5'MINIMUM
COMPACTED FILL
OVEREXCAVATE
AND RECOMPACT
CO' yyS^'^^^^^^/^ 3'MINIMUM*
y^ UNWEATHERED BEDROCK OR APPROVED MATERIAL
_ TYPICAL BENCHING
NOTE: * DEEPER OVEREXCAVATION MAY BE RECOMMENDED BY THE SOILS ENGINEER
AND/OR ENGINEERING GEOLOGIST IN STEEP CUT-RLL TRANSITION AREAS.
PLATE EG-11
OVERSIZE ROCK DISPOSAL
VIEWS ARE DIAGRAMMATIC ONLY. ROCK SHOULD NOT TOUCH
AND VOIDS SHOULD BE COMPLETELY FILLED IN.
VIEW NORMAL TO SLOPE FACE
PROPOSED RNISH GRADE
10' MINIMUM (El
'20* MINIMUM
oo
IS' MINIMUM
BEDROCK OR APPROVED MATERIAL
CO
OO
MINIMUM ICI
So
CO
OD CO
INIMUM (A)
OO (Fl
CO
(Gl
OO
CO
VIEW PARALLEL TO SLOPE FACE
PROPOSED RNISH GRADE
10' MINIMUM (El 1^100' MAXIMUM (B)^
CD
0OC3O
Qoooeoooooo
10'MINIMUM
o«.xj«.jQriOcjr"'c
3' MINIMUM
c^ocoooco r^D
10'MINIMUM
XJCJOO
(Gl
Is'MINIMUM (C)
BEDROCK OR APPROVED MATERIAL
NOTE: IA) ONE EQUIPMENT WIDTH OR A MINIMUM OF 15 FEET.
(B) HEIGHT AND WIDTH MAY VARY DEPENDING ON ROCK SIZE AND TYPE OF
EQUIPMENT USED. LENGTH OF WINDROW SHALL BE NO GREATER THAN 100*
MAXIMUM.
(C) IF APPROVED BY THE SOILS ENGINEER AND/OR ENGINEERNG GEOLOGIST^
WINDROWS MAY BE PLACED DIRECTLY ON COMPETENT MATERIALS OR BEDROCK
PROVIDED ADEQUATE SPACE IS AVAILABLE FOR COMPACTION.
(D) ORIENTATION OF WINDROWS MAY VARY BUT SHALL BE AS RECOMMENDED BY
THE SOILS ENGINEER AND/OR ENGINEERING GEOLOGIST. STAGGERING OF
WINDROWS IS NOT NECESSARY UNLESS RECOMMENDED.
IE) CLEAR AREA FOR UTIUTY TRENCHES, FOUNDATIONS AND SWIMMING POOLS.
IF) VOIDS IN WINDROW SHALL BE FILLED BY FLOODING GRANULAR SOIL INTO PLACE.
GRANULAR SOIL SHALL BE ANY SOIL WHICH HAS A UNIRED SOIL CLASSIRCATION
SYSTEM (UBC 29-1) DESIGNATION OF SM. SP. SW. GP. OR GW. ALL RLL OVER
AND AROUND ROCK WINDROW SHALL BH COMPACTED TO 90% RELATIVE
COMPACTION.
(G) AFTER RLL BETWEEN WINDROWS IS PLACED AND COMPACTED WITH THE UFT
OF FILL COVERING WINDROW. WINDROW SHALL BE PROOF ROLLED WITH A D-9
DOZER OR EQUIVALENT.
(HI OVERSIZED ROCK IS DEHNED AS LARGER THAN M; ANO LESS THAN 4 FEET
IN SIZE. PLATE EG-12
ROCK DISPOSAL PITS
FILL LIFTS COMPACTED OVER
ROCK AFTER EMBEDMENT
COMPACTED FILL
GRANULAR MATERIAL
SIZE OF EXCAVATION TO BE COMMENSURATE
WITH ROCK SEE.
NOTE: 1. LARGE ROCK IS DEFINED AS ROCK LARGER THAN 4 FEET IN MAXIMUM SEE,
2. PIT IS EXCAVATED INTO COMPACTED RLL TO A DEPTH EQUAL TO 1/2 OF
ROCK SIZE.
3. GRANULAR SOIL SHOULD BE PUSHED INTO PIT AND DENSIFIED BY FLOODING.
USE A SHEEPSFOOT AROUND ROCK TO AID IN COMPACTION.
4. A MINIMUM OF 4 FEET OF REGULAR COMPACTED FILL SHOULD OVERLIE
EACH PIT.
5. PITS SHOULD BE SEPARATED BY AT LEAST 15 FEET HORIZONTALLY.
5. PITS SHOULD NOT BE PLACED WITHIN 20 FEET OF ANY RLL SLOPE.
7. PITS SHOULD ONLY BE USED IN DEEP FILL AREAS.
PLATE EG-13
SETTLEMENT PLATE AND RISER DETAIL
2'X 2'X 1/4- STEEL PLATE
STANDARD 3/4" PIPE NIPPLE WELDED TO TOP
OF PLATE.
3/4- X 5'GALVANIZED PIPE. STANDARD PIPE
THREADS TOP AND BOTTOM. EXTENSIONS
THREADED ON BOTH ENDS AND ADDED IN 5'
INCREMENTS.
3 INCH SCHEDULE 40 PVC PIPE SLEEVE. ADD IN
5* INCREMENTS WITH GLUE JOINTS.
FINAL GRADE
MAINTAIN 5'CLEARANCE OF HEAVY EQUIPMENT.
MECHANICALLY HAND COMPACT IN 2'VERTICAL
-rVUFTS OR ALTERNATIVE SUITABLE TO AND
1 ACCEPTED BY THE SOILS ENGINEER.
MECHANICALLY HAND COMPACT THE INITIAL 5*
VERTICAL WITHIN A 5'RADIUS OF PLATE BASE.
BOTTOM OF CLEANOUT
PROVIDE A MINIMUM 1' BEDDING OF COMPACTED SANO
NOTE:
1.
3.
5.
6.
LOCATIONS OF SETTLEMENT PLATES SHO^^^^^^^ MARKED AND READILY
VISIBLE (RED FLAGGEDl TO EQUIPMENT OPER^^^
CONTRACTOR SHOULD MAINTAIN CLEARA^^^ SHOULD
^^'KrNE'K^k'D'?S PloTcfTPES'ATSNS' Sfi^cTMp'A^l^lD'B^Y'ALTERNATIVE
APPROVED^BY/H^JO'L^^^^^^ CONTRACTOR SHOULD MAINTAIN A 5'RADIUS
lli'^n^l SSAUV°'AND COMPACT INITIAL 2'OF RLL PRIOR TO ESTABLISHING
THE INITIAL READING. TIMP
IN THE EVENT OF DAMAGE TO THE SETTLEMENT PLATE OR EXTENSION RESJJLTING
^nM POufpMENT OPERATING WIT^ THE SPECIRED CLEARANCE AREA. CONTRACTOR
SHSULDTJSATELY NOTIFY THE SOILS ENGINEER AND SHOULD BE RESPONSIBLE
ISR RESTORING THE SETTLEMENT PLATES TO WORKING ORDER.
AS ALSRSATE DESIGN AND METHOD OF INSTALLATION MAY BE PROVIDED AT THE
DISCRETION OF THE SOILS ENGINEER.
PLATE EG-U
TYPICAL SURFACE SETTLEMENT MONUMENT
RNISH GRADE
3--5'
•-6" DIAMETER X 3 1/2'LENGTH HOLE
3/8* DIAMETER X 6* LENGTH
CARRIAGE BOLT OR EQUIVALENT
CONCRETE BACKRLL
PLATE EG-15
TEST PIT SAFETY DIAGRAM
SIDE VIEW
( NOT TO SCALE )
TOP VIEW
100 FEET
FLAG
50 FEET
SPOIL
RLE
^TST P'T^ l^lffgjgg^
a in 50 FEET
VBflCLE
APPROXIMATE CENTER
OF TEST PIT
a
u. a in
FLAG
( NOT TO SCALE )
PLATE EG-16
OVERSIZE ROCK DISPOSAL
VIEW NORMAL TO SLOPE FACE
20'MINIMUM
CO
J 5'MINIMUM (A
oo
oo
PROPOSED FINISH GRADE
10'MINIMUM (E)
CO CO
15'MINIMUM (A)
oo
i<=0 oo
CO
(G)
C30 oo(Fl
fs* MINIMUM (C)
BEDROCK OR APPROVED MATERIAL
VIEW PARALLEL TO SLOPE FACE
PROPOSED RNISH GRADE
y/7*Tr9-:-;.,-ii!M'NIMUM (C)
V//\V/A BEDROCK OR APPROVED MATERIAL
NOTE: (A) ONE EQUIPMENT WIDTH OR A MINIMUM OF 15 FEET.
(B) HEIGHT AND WIDTH MAY VARY DEPENDING ON ROCK SIZE AND TYPE OF
EQUIPMENT LENGTH OF WINDROW SHALL BE NO GREATER THAN 100'MAXIMUM.
(C) IF APPROVED BY THE SOILS ENGINEER AND/OR ENGINEERING GEOLOGIST.
WINDROWS MAY BE PLACED DIRECTLY ON COMPETENT MATERIAL OR BEDROCK
PROVIDED ADEQUATE SPACE IS AVAILABLE FOR COMPACTION,
(Dl ORIENTATION OF WINDROWS MAY VARY BUT SHOULD BE AS RECOMMENDED BY
THE SOILS ENGINEER AND/OR ENGINEERING GEOLOGIST. STAGGERING OF
WINDROWS IS NOT NECESSARY UNLESS RECOMMENDED.
(E) CLEAR AREA FOR UTIUTY TRENCHES. FOUNDATIONS AND SWIMMING POOLS.
(F) ALL RLL OVER AND AROUND ROCK WINDROW SHALL BE COMPACTED TO 90%
RELATIVE COMPACTION OR AS RECOMMENDED.
(G) AFTER FILL BETWEEN WINDROWS IS PLACED AND COMPACTED WITH THE UFT OF
FILL COVERING WINDROW. WINDROW SHOULD BE PROOF ROLLED WITH A
• -9 DOZER OR EQUIVALENT.
VIEWS ARE DIAGRAMMATIC ONLY. ROCK SHOULD NOT TOUCH
AND VOIDS SHOULD BE COMPLETELY RLLED IN. PLATE RQ-1
ROCK DISPOSAL PITS
VIEWS ARE DIAGRAMMATIC ONLY. ROCK SHOULD NOT TOUCH
AND VOIDS SHOULD BE COMPLETELY RLLED IN.
RLL UFTS COMPACTED OVER
ROCK AFTER EMBEDMENT
GRANULAR MATERIAL
COMPACTED RLL
SIZE OF EXCAVATION TO BE
COMMENSURATE WITH ROCK SIZE
ROCK DISPOSAL LAYERS
GRANULAR SOIL TO RLL VOIDS. ^ ^OMPACTED^LL
DENSIRED BY FLOODING
LAYER ONE ROCK
PROPOSED RNISH GRADE PROFILE ALONG LAYER
FROBsSLOPE FACE
"J~CLEAR ZONE 20'MINIMUM
LAYER ONE ROCK HIGH
PLATE RD-2