HomeMy WebLinkAboutCT 83-19; CALAVERA HILLS VILLAGE T; REVIEW OF COMPACTED SOIL CONDITIONS; 1999-05-27crc'3 - I'.
Geotechnical Geologic • Environmental
5741 Palmer Way • Carlsbad, California 92008 • (760) 438-3155 • FAX (760) 931-015
May27, 1999
W.O. 2393-8-SC
McMillin Companies
2727 Hoover Avenue
National City, California 91980
Attention: Mr. Dave Warren
Subject Review of Compacted Soi Conons, Lote 187 through 225. and 234 through 343
Nantucket at Calavera Hills, Calavora Hills Village T North, C.T. 83-19, Carlsbad,
Califomia
Reference: Report of Rough Grading, Calavera Hills, Village dT North, Building Lots-1.63-
through 343, and Open Sçcn Lcft 344 tiough 381 and 363. Carlsbad Tract 83-19,
City of Carisbad, CarliaTnia,' W.O. 2393-B-SC, dated January 14, 1999, by
GeoSoils. Inc.
Gentlemen:
Removals, processing of crWW ground, cuts and flils completed for the subject lots have been
observed and compaction testing performed under the purview of the referenced report using the
selective testing and observations Bervicee of GeoSolls, Inc. Earthwork was found to be in
compliance with the Graffig Code of the Cy of Carlsd, California. Our findings were made and
recommendations prepared in conformance with generally accepted professional engineering
practices and no further warranty is implied nor made.. This report is subject to review by the
controlling authorities for this project. GeoSoila, Inc. is not responsible nor liable for work, testing
or recommendations performed or provided by others.
The opportunity to be of service is greatly appreciated. If you have any questions concerning this
report or if we may be of further assistance, please do not hesitate to contact any of the
undersigned.
RespecfuUy submitted.
GeoSolls, Inc.
'OOC4 (~~- , Rcberi G. Crisman
rc:ec Geo:cgist. CEG
GCARKi1pf,'mo
flictr.rimrrn (11 Aritirp-
Albert A. Xleisi
Geotecrnicai Engineer IGIE
Nantucket - Phase 8
Village "T" North
Sequence Sheet
Revised - 6/20/2000
PLAN I SIZE COLOR OPTIONAL BALCONY
LOT NO. STREET ADDRESS ELEV. LIV/GAR SCHEME VG.SQ. FT SQ.FT.
255 3919 Rockfield Court IAR 2,050SF/448SF
256 3924 Rockfield Court 2C 2,462SF/658SF
257 3920 Rockfield Court 3AR 2,585SF/6098F
258 3916 Rockfield Court 413 2,944SF/619SF
259 3912 Rockfield Court ICR 2,050SF/448SF
260 3908 Rockfield Court 4C 2,944SF/619SF
261 3904 Rockfield Court 3BR 2,585SF/609SF
252 3907 Rockfield Court 4A 2,944SF/619SF
253 3911 Rockfield Court 213R 2,462SF/658SF
254 3915 Rockfield Court 3C 2,585SF/609SF
248 3530 Hummock Drive 3BR 2,585SF/609SF
249 3534 Hummock Drive 4CR 2,944SF/619SF
250 3538 Hummock Drive IBR 2,050SF/448SF
251 3542 Hummock Drive 3A 2,585SF/609SF
A B C
mix, 1
2
3
4
1 1 1 1 3
0 .1 1 J 2
2 2 1 1_5
I _1 1_2 L4
14
Constr
Phase
Unit
Count
Color
Code
Sales
Phase
Build-out
Job No.
MCS
Job No.
DRE
Phase
PAHL/
Pre
Models 4 Models 490900 303020 Phase 9 Pre-plot
Phase 1 9 Phase 1 491000 303021 Phase 1 Pie-plot
Phase 2
Phase 2
7
6
Phase 2a
Phase 2b
492000
492000
303022
303022
Phase 1
Phase I
Pie-plot
Pie-plot
Phase 3
Phase 3
7
7
Phase 3a
Phase 3b
493000
493000
303023
303023
Phase 2
Phase 2
Pie-plot
Pre-plot
Phase 4
Phase 4
9
9
Phase 4a
Phase 4b
494000
494000
303024
303024
Phase 3
Phase, 3
Pie-plot
Pie-plot
Phase 5
Phase 5
8
8
Phase 5a
Phase Sb
495000
1 495000
303025
303025
Phase 4
Phase 4
Pre-plot
Pie-plot
Phase 6
Phase 6
8
9
Phase 6a
Phase 6b
496000
496000
303026
303026
Phase 5
Phase 5
Pie-plot
Pre-plot
Phase 7
Phase 7
10
10
Phase 7a
Phase Th.
497000
497000
303027
303027
Phase 6
Phase 6
Pre-plot
Pie-plot
Phase 8
Phase 8
7
7
Phase 8a
Phase 8b
498000
498000
303028
303028
Phase 7
Phase 7
Pie-plot
Pie-plot
Phase 9
Phase 9
Phase 9
7
7
10
Phase 9a
Phase 9b
Phase 9c
499000
499000
499000 1
303029
303029
303029
Phase 8
Phase 8
Phase 9
Pie-plot
Pie-plot
Pie-plot
Total 149 Date Revised: 12/14/98