HomeMy WebLinkAboutCT 90-03; Arroyo Vista Unit 2, Carlsbad Tract No 90-03; As Graded Geotechnical Report; 2003-11-07AS-GRADED GEOTECHNICAL REPORT OF POST-GRADING OPERATIONS,
ARROYO VISTA UNIT 2,
CARLSBAD TRACT NO. 90-03,
CAREBAD, CALIFORNIA
Prepared For:
CONTINENTAL HOMES
5927 Priestly Drive, Suite 200
Carlsbad, California 92008
Project No. 851855-012
Leighton and Associates, Inc.
A LEIGHTON GROUP COMPANY
November 7,2003
Project No. 851855-012
To: Continental Homes
5927 Priestly Drive, Suite 200
Carlsbad, California 92008
Attention: Mr. Carleton Clark
Subject: As-graded Geotechnical Report of Post-Grading Operations, Arroyo Vista Unit 2,
Carlsbad Tract No. 90-03, Carlsbad, California
Introduction
In accordance with the request and authorization of representatives of Continental Homes, we have
performed geotechnical observation and testing services during the post-grading operations for the
Arroyo Vista Unit 2 project (Carlsbad Tract No. 90-03) located in Carlsbad, California. The
purpose of our geotechnical observation and testing services was to document that the geotechnical
aspects of the post-grading operations for the subject tract were perfomed in general accordance
with the project geotechnical reports (Appendix A), geotechnical recommendations made during
the course of grading, and the City of Carlsbad requirements. This as-graded report summarizes our
geotechnical observations, field and laboratory test results, and conclusions concerning the post-
grading operations within the Arroyo Vista Unit 2 development.
Summatv of Post-Gradina ODerations
The post-grading operations were performed between June 2001 through May 2003 within the
streets and easements of the tract. Post-grading operations observed and/or tested by Leighton and
Associates, Inc. (Leighton) during the development of the Arroyo Vista Unit 2 subdivision
included: 1) trench excavation and backfill compaction of storm drain, water, sewer and joint utility
lines in the streets and easements; 2)sidewalk and curb/gutter subgrade soil preparation and
compaction adjacent to the streets; 3) placement and compaction of native subgrade soils, lime-
treated subgrade soils, and Class 2 aggregate base (AB) material in the streets and/or beneath the
curb/gutter, and 4) placement and compaction of asphalt concrete (AC) in the streets.
I 3934 Murphy Canyon Road, Suite 8205 1 San Diego, CA 921 23-4425
858.292.8030 m Fax 858.292.0771 w.leghtongeo.com
851855-012
Geotechnical observations and compaction testing were performed by representatives of ow firm
who were on-site on an as-needed on-call basis during the post-grading operations. Specific
observation and testing services conducted during the post-grading operations are discussed below.
-q
Field density tests were performed during the placement and compaction of trench backfill,
subgrade preparation, aggregate base material and asphalt concrete placement during the post-
grading operations at the site. Density tests were performed in general accordance with the
Nuclear-Gauge Method (ASTM Test Methods D2922 and D3017). The results and approximate
locations of the field density tests performed are summarized in Appendix B. It should be noted
that density tests taken in Arroyo Vista Unit 3 and Tiburon are included in Appendix B. The
field density testing was performed in general accordance with the applicable ASTM
standards, the current standard of care in the industry, and the precision of the testing method
itself. Variations in relative compaction should be expected from the results documented
herein.
As indicated in Appendix B, areas in which field density test results were less than the required
minimum relative compaction were reworked, recompacted, and retested until the minimum
percent relative compaction was achieved. In accordance with the City of Carlsbad criteria,
trench backfill and some of the sidewalk subgrade soils were compacted to a minimum 90
percent relative compaction while the subgrade soils and aggregate base material for the streets
and/or curb/gutter of the tract were compacted to a minimum 95 percent of the maximum dry
density (as determined by ASTM Test Method D1557). In accordance with the revised
geotechnical recommendations concerning the on-site expansive sidewalk subgrade soils
(Leighton, 2002e), some of the sidewalk subgrade soils were moisture conditioned to at least 3
percent over the optimum moisture content and compacted to a minimum 86 to 88 percent
relative compaction. Asphalt concrete was placed and compacted to a minimum 95 percent
relative compaction in accordance with the Hveem Method (California Test Nos. 304 and 308).
Representative samples of the native soil and imported material placed and compacted during
the post-grading operations were tested for maximum dry density and optimum moisture
content in accordance with ASTM Test Method D1557. Representative samples of the AC
placed on the streets were tested for laboratory maxim& density, per the Hveem Method
(California Test Nos. 304 and 308). The laboratory tests results are presented in Appendix C.
Trench Excavations and Backfill
Underground utilities, including storm drain, water, sewer, and common joint utilities were
placed in the subject streets and easements of the tract during the development of the site. Prior
to backfilling of the utility trenches, the excavations were observed by a representative from our
firm.
-2- Leighton
851855-012
- r
During the trench bacMill operations, native and import soils where placed in 4- to 8-inch thick
loose lifts, moisture-conditioned, as needed, to obtain a near-optimum moisture content
(moisture conditioning also occurred prior to fill placement), and compacted to a minimum 90
percent relative compaction (based on ASTM Test Method 01557). Compaction of the trench
backfill soils was accomplished by hand tampers, sheep’s-foot roller and/or wheel rolling with
heavy-duty construction equipment. Testing frequency and locations were performed in general
conformance with the City of Carlsbad criteria. The results and approximate location of the
backfill tests are summarized in Appendix B.
Structural Pavement Sections
Minimum structural pavement sections were provided for the streets within the subject
development based on laboratory R-value testing of representative samples of the subgrade soils
(Leighton, 2001b). Prior to placement of the aggregate base material, the subgrade soils were
scarified to a minimum depth of 12 inches and moisture-conditioned to near-optimum moisture
content. Based on our test results, the subgrade soils were then compacted to at least 95 percent
relative compaction (based on ASTM Test Method D1557). The Class 2 aggregate base
material placed beneath the curb/gutter and on the streets was compacted to a minimum of 95
percent of the maximum dry density (based on ASTM Test Method D1557). The results and
approximate location of the street subgrade soil and base material density tests are summarized
in Appendix B.
Observation and density testing during the placement of the asphalt concrete for the streets were
performed by representatives of Leighton and Associates. As required by the City of Carlsbad,
field density tests were obtained by the nuclear-gauge method during the paving operations and
the results are presented in Appendix B. The test results indicate that the AC placed on the
subject streets has a minimum relative compaction of at least 95 percent (per the Hveem
Method - California Test Methods 304 and 308).
Summaw of Conclusions
The following is a summary of our conclusions based on our site observations and field and
laboratory test results:
F Geotechnical conditions encountered during the post-grading operations were generally as
anticipated.
F Based on our observations and testing, the post-grading operations were performed in general
accordance with the project geotecbnical recommendations and the City of Carlsbad
requirements. In our professional opinion, the geotechnical aspects of the development have
been evaluated and properly treated during the post-grading operations.
P Field density testing indicated that the trench backfill soils, retaining wall backfill soils and
c -3- Leighton
851855-012
subgrade soils beneath sidewalks were compacted to a minimum 90 percent relative
compaction (based on ASTM Test Method 01557). Field density testing also indicated that the
street and curb/gutter subgrade soils and base materials were compacted to a minimum of 95
percent relative compaction (based on ASTM Test Method D1557).
P Field density testing during the paving operations and testing of the AC on the subject streets
indicates the asphalt concrete was compacted to a minimum of 95 percent relative compaction
(per California Test Nos. 304 and 308).
If you have any questions regarding our report, please contact this office. We appreciate this
opportunity to be of service.
Respectfully submitted,
LEIGHTON AND ASSOCIATES,
William D. Olson, RCE 45283
Senior Project Engineer
NC.
.-
Randall K. Waener,’CEG 1612 - Director of Geology
Attachments: Appendix A - References
Appendix B - Summary of Field Density Tests
Appendix C - Laboratory Testing Procedures and Test Results
Distribution: (8) Addressee
-4- Leighton
851855-012
APPENDIX A
References
Carlsbad, City of, 1996, Standards for Design and Construction of Public Works Improvements in
the City of Carlsbad, California, Project No. 05332-12-01, dated April 20, 1993,
revised December 10, 1996.
Leighton and Associates, Inc., 1998, Update Geotechnical Investigation, Shelley Property, Carlsbad
Tract No. 90-3, Carlsbad, California, Project No. 4851855-008, dated September 8,
1998.
, 2000, Results of Additional Field Investigation, Shelley Property, Carlsbad Tract No.
90-3, Carlsbad, California, Project No. 040137-001, dated August 14,2000.
,2001a, As-Graded Report of Rough and Fine Grading, Lots 27 through 181 and 246
through 248, Arroyo Vista Units 2 and 3, Carlsbad Tract No. 90-03, Carlsbad,
California, Project No. 851855-010, dated June 29,2001.
, 2001b, Pavement Design Recommendations, Avenida de Sueno and Calle Cordoba,
Arroyo Vista, Unit 2, Carlsbad Tract No. 90-03Project No. 851855-013, Carlsbad,
California, dated August 7,2002, revised August 16,2001.
, 2001c, Pavement Design Recommendations, Camino Alegre, Corte Del Cruce, and a
portion of Avenida La Cima, Arroyo Vista, Unit 3, Carlsbad Tract 90-03Project
No. 851855-013, Carlsbad, California, datedNovember 30,2001.
, 2002% Pavement Design Recommendations, RV Parking Facility, Lot 246, Arroyo
Vista Unit 3, Carlsbad Tract No. 90-03, Carlsbad, California, dated January 31,
2002.
, 2002b, Post-Tensioned Foundation Design Parameters, Lot 29 through 55, Arroyo
Vista Unit 2, Carlsbad Tract No. 90-003, Carlsbad, California, 851855-012, dated
February 22,2002.
, 2002c, Alternative Recommendations for Cracked Lime-Treated Soils along a portion
of Camino La Cima and Corte Del Cruce, Arroyo Vista Unit 3, CT 90-03, Carlsbad,
California, Project No. 851855-013, dated February 27,2002.
, 2002d, Pavement Design Recommendations, Avenida Del Alba and a Portion of
Avenida La Cima, Arroyo Vista Unit 3, Carlsbad Tract No. 90-03, Carlsbad,
California, Project No. 851855-013, dated February 1 I, 2002, revised February 28,
2002.
A-1
851855-012
APPENDIX A (Continued)
, 2002e, Revised Sidewalk Subgrade Preparation Guidelines for the Arroyo Vista and
Tiburon Projects, Shelley Property Units 2 through 4, Carlsbad Tract 90-03,
Carlsbad, California, Project No. 851855-013, dated August 12, 2002 (revised
September 13,2002).
, In-house unpublished and published data.
Post-Tensioning Institute, 1996, Design and Construction of Post-Tensioned Slabs-On-Ground,
Second Edition.
Project Design Consultants, 2000, Mass Grading and Erosion Control for Shelley Property, Units
2, 3, and 4, Carlsbad Tract 90-03, Drawing No. 380-1B 15 Sheets, dated
December 28,2000.
,2OOla, Plans for the Improvements of Shelley Property Unit No. 2, Carlsbad Tract No.
90-03, Carlsbad, California, Drawing No. 380-1C, 7 Sheets, dated January 10,2001.
, 2001b, Plans for the Improvement of Shelley Property Unit No. 3, Carlshad Tract
No. 90-03, Drawing No. 380-1H, 8 Sheets, dated March 29,2001.
A-2
851855-012
APPENDLX B
Exdanation of Surnrnarv of Field Densitv Tests
Test of
~ GRADING
Natural Ground
Original Ground
Existing Fill
Compacted Fill
Slow Face
Finish Grade
SEWER
STORM DRAIN
AREA DRAIN
DOMESTIC WATER
RECLAIMED WATER
SUBDRAIN
GAS
ELECTRICAL
TELEPHONE
JOINT UTILITY
IRRIGATION
Bedding Material
Shading Sand
Main
Lateral
Crossing
Manhole
Fire Hydrant Lateral
Catch Basin
Riser
Inlet
RETAINING WALL
CRIB WALL
LOFFELL WALL
STRUCT FOOTING
Footing Bottom
Backfill
Wall Cell
~ Test of
Abbreviations
~
NG
OG
EF
CF
SF
FG
B
S
M
L
X
MH
FH
CB
R
I
F
B
C
Test of
SUBGRADE
AGGREGATE BASE
CEMENT TREATED BASE
PROCESSED BASE
ASPHALT CONCRETE
Curb
Gutter
Curb and Gutter
Cross Gutter
Street
Sidewalk
Driveway
Driveway Approach
Parking Lot
Electric Box Pad
'RESATURATION
Moisture Content
NTERJOR TRENCH
Plumbing Backfll
Electrical Backfill
~ Test of
~ Abbreviations
C
G
CG
XG
ST sw
D
DA
PL
EB
M
P
E
~
N
S
15A
15B "0"
"-I"
represents nuclear gauge tests that were performed in general accordance with most recent version of ASTM Test Methods D2922 and
03017.
represents sand cone tests that were performed in general accordance with most recent version of ASTM Test Method D1556.
represents first retest ofTest No, 15
represents second retest of Test No. 15
in Test Elevation Column represents test was taken at the ground surface (e.g. finish grade or subgrade)
in Test Elevation Column represents test was taken one foot below the ground surface
8-1
I I I I I I I 1 I I 1 I 1
SUMMARY OF FIELD DENSITY TESTS
1 1 1 1 I I
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative We)
No. Date Of Lot # Elev(ft) Type Field Max Field Opt. Cornmetion Remarks
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
1
2
3
4
5
6
7
8
9
IO
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
6126101
6/26/01
612610 1
612610 1
6/27/01
6127101
612710 1
6/27/01
6128101
612 810 1
6129101
6/29/01
612910 1
6/29/01
811 010 1
811 010 1
8110101
81 1010 1
811 o/o 1
811 010 1
8113101
81l31Ol
8113101
811 310 I
8114101
8114101
8/14/01
8117101
8117101
8/17/0 I
911 210 1
9112101
I
M
M
M
M
M
M
M
MH
MH
I
MH
M
M
M
M
M
I
L
MH
M
M
MH
M
M
MH
M
MH
I
MH
M
M
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Calle Cordoba
Calle Cordoba
Avenida Alegre
Avenida Alegre
Avenida Alegre
Avenida Alegre
Avenida Alege
Avenida Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Avenida La Cima
Camino Alegre
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Station 41+30
Station 41+55
Station 42+00
Station 42+40
Station 43+10
Station 43+56
Station 44+00
Station 44+90
Station 46+82
Station 46+74
Station 46+74
Station 45+87
Station 2+90
Station 1+70
Station 41+10
Station 40+10
Station 39+10
Station 38+80
Station 38+75
Station 38+59
Station 381-30
Station 37+53
Station 37+23
Station 36175
Station 35+68
Station 35+28
Station 3+60
Station 35+28
Station 2+67
Station 3+96
Station 18+20
Station 17+20
182.0 20
185.0 20
184.0 19
188.0 20
186.0 20
190.0 20
188.0 20
192.0 20
194.0 20
194.0 12
193.0 20
191.0 20
191.5 18
198.0 20
182.0 20
176.0 20
170.0 20
168.0 IO
168.0 12
167.0 12
164.5 12
160.0 20
156.0 12
154.0 12
148.0 12
145.0 12
148.0 15
147.0 15
148.0 12
146.0 12
146.0 20
152.0 20
100.4 105.5 19.3
96.3 105.5 21.6
110.9 120.5 12.4
96.9 105.5 19.6
97.2 105.5 22.5
98.6 105.5 18.7
98.1 105.5 20.1
100.3 105.5 18.4
98.2 105.5 21.7
109.3 118.5 12.6
97.3 105.5 22.3
96.7 105.5 19.8
108.7 118.0 14.1
99.5 105.5 19.2
96.2 105.5 21.7
97.1 105.5 22.8
96.5 105.5 20.9
103.9 114.5 18.1
107.2 118.5 16.3
109.1 118.5 17.2
107.2 118.5 15.7
100.7 105.5 22.9
108.9 118.5 15.8
109.6 118.5 16.1
108.5 118.5 16.0
107.7 118.5 15.8
109.5 119.5 14.7
110.6 119.5 15.1
110.1 118.5 15.7
109.8 118.5 16.0
97.1 105.5 20.3
95.6 105.5 21.3
20.5
20.5
12.5
20.5
20.5
20.5
20.5
20.5
20.5
13.5
20.5
20.5
13.5
20.5
20.5
20.5
20.5
16.5
13.5
13.5
13.5
20.5
13.5
13.5
13.5
13.5
12.5
12.5
13.5
13.5
20.5
20.5
95
91
92
92
92
93
93
95
93
92
92
92
92
94
91
92
91
91
90
92
90
95
92
92
92
91
92
93
93
93
92
91
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 1 of 4
Leighton and Associates, Inc 111412 1:09:16PM
I I I I I I I I I I I I I
SUMMARY OF FIELD DENSITY TESTS
I 1 i i I I
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative (Oh)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Conmaction Remarks
SD 33
SD 34
SD 35
SD 36
SD 37
SD 38
SD 39
SD 40
SD 41
SD 42
SD 43
SD 44
SD 45
SD 45A
SD 46
SD 47
SD 48
SD 48A
SD 49
SD 50
SD 50A
SD 51
SD 51A
SD 52
SD 53
SD 54
SD 55
SD 56
SD 57
SD 58
SD 59
SD 60
911210 1
911 210 I
9/12/01
9112101
9/13/01
911310 1
9/1310 1
9/13/01
911 310 1
9/13/01
9/13/0 1
9118101
911 810 1
9118101
912010 1
9/20/0 1
9/2010 1
9/20/0 1
9120101
9120101
912 I JO I
912 110 I
9/21/01
912 1/01
9/21/01
9124lOl
912410 1
9/24/01
912410 1
9/25/01
11113101
9120ro I
L
M
M
M
MH
M
MH
MH
L
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
MH
MH
M
M
M
M
Avenida La Cima
Avenida La Cima
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Lot 102 Easement
Avenida Del Alba
Avenida Del Alba
Avenida La Cima
Avenida La Cima
Avenida La Cima
Storm Drain Line C
Storm Drain Line C
Storm Drain Lie C
Storm Drain Line C
Storm Drain Lie C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Stom Drain Line C
Storm Drain Line C
Avenida Del Alba
Avenida Del Alba
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Station 16+77
Station 16+00
Station 1+43
Station 2+90
Station 3+24
Station 4+33
Station 5+39
Station 6+11
Station 1+20
Station 18+45
Station 19+34
Station 15+70
Station 16+77
Station 16+17
Station 2+71
Station 2+50
Station 2+22
Station 2+22
Station 1+98
Station 1+70
Station 1+70
Station 2+55
Station 2+55
Station 2+00
Station 1+70
Station 1152
Station 20+73
Station 20+73
Station 1+30
Station 1+47
Station 1 +20
Station 2+25
154.0 12
157.0 20
159.0 20
166.0 20
167.5 20
172.0 12
178.0 20
176.0 20
181.0 12
146.0 20
142.0 20
158.0 18
154.5 18
154.5 18
135.0 18
137.0 18
139.0 18
139.0 18
140.0 18
136.5 18
136.5 18
137.0 18
137.0 18
142.0 18
138.5 16
135.0 16
138.0 12
139.0 12
126.0 12
132.0 12
128.0 12
119.0 17
107.9 118.5 15.7
99.4 105.5 20.7
97.2 105.5 21.1
98.3 105.5 24.3
98.7 105.5 22.0
109.9 118.5 17.0
100.4 105.5 20.9
96.2 105.5 21.6
107.2 118.5 17.2
96.8 105.5 21.6
95.2 105.5 20.4
107.1 118.0 14.1
105.3 118.0 15.9
107.8 118.0 15.2
109.4 118.0 14.9
107.2 118.0 13.8
104.2 118.0 17.9
108.0 118.0 15.0
108.8 118.0 14.1
104.6 118.0 16.9
107.5 118.0 14.2
103.1 118.0 17.0
110.7 118.0 17.5
109.0 118.0 15.5
111.3 120.0 15.0
108.5 120.0 16.5
109.2 118.5 17.3
110.6 118.5 16.1
108.2 118.5 17.0
110.9 118.5 15.7
108.9 118.5 14.6
107.6 117.0 12.1
13.5
20.5
20.5
20.5
20.5
13.5
20.5
20.5
13.5
20.5
20.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
12.5
12.5
13.5
13.5
13.5
13.5
13.5
10.5
91
94
92
93
94
93
95
91
90
92
90
91
89
91
93
91
88
92
92
89
91
87
94
92
93
90
92
93
91
94
92
92
RT ON 45A
RT OF 45
RT ON 48A
RT OF 48
RT ON 50A
RT OF 50
RT ON 51A
RT OF 51
Project Number: 851855-012
Project Name: ArroyoIUnit 2
Project Location: 0
Client: 0 Page 2 of 4
Leighton and Associates, Inc 11/4/2 1:0917PM
I i I I I I I 1 I I I 1 I I I I 1 I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative (%I
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
SD 61
SD 62
SD 63
SD 64
SD 65
SD 66
SD 67
SD 68
SD 69
SD 70
SD 71
SD 72
SD 73
SD 74
SD 75
SD 76
SD 77
SD 78
SD 79
SD 80
SD 81
SD 82
SD 83
SD 84
SD 85
SD 86
SD 87
SD 88
SD 89
SD 90
SD 91
SD 92
11/13/01 M
ll/13/01 M
11/15/01 M
11/15/01 M
11/15/01 M
ll/l6/Ol M
11/16/01 M
11/16/01 M
11/19/01 M
11/19/01 M
ll/l9/Ol M
11119101 M
11/27/01 MH
11/27/01 MH
11/27/01 MH
11/27/01 MH
11/27/01 MH
4/23/02 M
4/23/02 M
4/23/02 M
4/25/02 MH
5/2/02 MH
5/2/02 M
5/3/02 M
5/3/02 M
5/3/02 M
5/6/02 MH
5/6/02 L
5/6/02 L
5/6/02 M
5/6/02 M
5/8/02 M
Storm Drain Line C
Storm Drain Line C
Storm Drain Line A
Storm Drain Line A
Storm Drain Line A
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Storm Drain Line A
Storm Drain Line A
Camino Alegre
Camino Alegre
Camino Alegre
Avenida Del Alba
Avenida Del Alba
Easement L. 237-238
Easement L. 237-238
Easement L. 237-238
Avenida Secreto
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Station 1+83
Station 1+40
Station 1+59
Station 2+00
Station 2+50
Station 32+49
Station 32+95
Station 33+92
Station 34+53
Station 35t10
Station 1+15
Station 1139
Station 33+23
Station 33+23
Station 32+35
Station 3 1 +34
Station 31+34
Station 2+85
Station 2+15
Station 1+50
Station 0+57
Station 2+25
Station 7165
Station 8+05
Station 8+48
Station 9+25
Station 7+08
Station 7+08
Station 7+08
Station 2125
Station 2+25
Station 9+60
120.0 17
117.0 17
125.0 12
128.0 18
126.5 18
128.5 18
131.0 12
137.0 18
141.0 18
143.5 12
124.0 18
128.0 18
132.0 12
133.0 12
129.0 12
125.0 12
128.0 12
118.0 19
116.0 23
114.0 23
117.5 23
113.0 19
120.0 17
123.0 17
122.0 17
125.0 17
120.0 17
122.0 17
121.0 17
114.0 19
115.0 19
123.0 17
109.1 117.0 11.6
108.2 117.0 11.7
108.7 118.5 14.7
106.9 118.0 15.9
110.2 118.0 14.2
110.0 118.0 15.6
108.5 118.5 15.6
109.1 118.0 13.7
107.3 118.0 14.2
108.5 118.5 15.1
108.1 118.0 13.9
107.2 118.0 14.6
107.1 118.5 14.9
106.9 118.5 16.1
107.5 118.5 16.5
108.7 118.5 15.8
107.5 118.5 15.7
108.9 120.5 13.7
105.0 111.5 16.8
103.4 111.5 15.7
101.7 111.5 16.5
110.6 120.5 14.6
106.7 117.0 12.6
108.2 117.0 10.4
106.9 117.0 11.1
107.0 117.0 10.7
110.6 117.0 11.3
111.2 117.0 10.6
109.3 117.0 10.7
110.7 120.5 14.7
114.1 120.5 15.1
107.5 117.0 16.2
10.5
10.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
12.5
16.5
16.5
16.5
12.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
12.5
12.5
10.5
93
92
92
91
93
93
92
92
91
92
92
91
90
90
91
92
91
90
94
93
91
92
91
92
91
91
95
95
93
92
95
92
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 3 of 4
Leighton and Associates, Inc 11/4/2 1:0917PM
1 I I 1 I I 1 1 I I I I I
SUMMARY OF FIELD DENSITY TESTS
I 1 I 1 I I
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (Oh1
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
jD 93
jD 94
jD 95
jD 96
1D 97
1D 98
1D 99
1D 100
5/8/02 M
5/13/02 MH
5/14/02 MH
5/14/02 MH
5/15/02 MH
11/15/02 M
11/15/02 M
11/15/02 M
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Line A Easement
Line A Easement
Line A Easement
Station 10+18
Station 16+87
Station 10+48
Station lot48
Station 8+87
Station 2+06
Station 1+92
Station 1+73
126.0
127.0
123.0
127.0
124.0
117.5
119.0
118.0
17 107.9 117.0
17 110.1 117.0
17 106.5 117.0
17 107.2 117.0
17 108.0 117.0
17 107.9 117.0
17 108.6 117.0
17 106.7 117.0
13.7 10.5 92
14.5 10.5 94
13.2 10.5 91
13.7 10.5 92
13.6 10.5 92
11.6 10.5 92
10.9 10.5 93
12.0 10.5 91
Project Number: 851855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 4 of 4
Leighton and Associates, Inc 11/4/2 I:09:17PM
I ! I I I 1 I I I I I 1 I
SUMMARY OF FIELD DENSITY TESTS
I I 1 I 1 !
~ ~ ~ ~ ~~ ~~ ~
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative (Yo)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. ComDactinn Remarks
SI
s2
s3
s4
s5
S6
s7
S8
s9 s IO s 11 s 12
S 13
S 14
S 15
S 16
S 17
S 18
S 19 s 20 s 21 s 22
S 23
S 24
S 25
S 26
S 27
S 28
S 29
S 30
S 31
S 32
6/14/01 L
6/14/01 L
6/14/01 L
6/14/01 L
6/14/01 M
6/14/01 M
6/15/01 M
6/15/01 M
6/15/01 M
6/15/01 M
6/15/01 M
6/15/01 M
6/15/01 M
6/15/01 M
6/15/01 M
6/18/01 M
611 810 1 L
6/18/01 L
6/18/01 M
6/18/01 M
6/18/01 M
6/18/01 L
6/18/01 M
6/18/01 M
6/18/01 M
6/18/01 M
6/18/01 MH
6/18/01 MH
6/18/01 MH
6/19/01 M
6/19/01 M
6/19/01 M
Lot 71
Lot 72
Lot 71
Lot 71
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Lot 69
Lot 69
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Lot 68
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Station 41+80
Station41+90
Station 42+00
Station 42110
Station 42+10
Station 42+25
Station 42+35
Station 42+25
Station 45+35
Station 45+40
Station 45+45
Station 42+75
Station 42+80
Station 43+00
Station 43+10
Station 43+25
Station 44+90
Station 44+75
Station 44+60
Station 41+43
Station 41+43
Station 41+43
Station 44+20
Station 44+15
Station 44+25
188.0 12
188.0 12
186.0 12
186.0 12
181.0 12
183.5 12
178.5 I2
180.0 12
183.0 12
185.5 I2
188.5 12
183.0 13
186.0 13
189.5 13
192.0 13
182.0 12
188.0 12
190.0 12
180.0 12
185.0 12
187.5 12
189.0 12
190.0 12
183.0 13
187.5 13
190.0 13
179.5 12
182.0 12
184.5 12
184.5 12
187.0 12
191.0 12
109.2 118.5 17.1
109.8 118.5 14.9
108.9 118.5 15.5
108.3 118.5 16.2
109.6 118.5 17.2
111.5 118.5 14.7
106.2 118.5 17.7
109.4 118.5 16.5
107.9 118.5 17.8
107.2 118.5 15.3
109.7 118.5 16.0
100.3 111.5 20.1
101.2 111.5 19.7
103.2 111.5 20.8
102.5 111.5 21.3
110.6 118.5 15.6
108.7 118.5 14.7
108.3 118.5 15.9
107.6 118.5 16.3
109.6 118.5 16.2
108.5 118.5 15.2
109.2 118.5 14.9
107.4 118.5 13.7
103.1 111.5 20.7
104.9 111.5 21.3
101.9 111.5 20.1
110.4 118.5 15.4
108.7 118.5 14.7
109.0 118.5 13.8
107.5 118.5 15.3
108.5 118.5 13.9
107.1 118.5 14.7
13.5 92
13.5 93
13.5 92
13.5 91
13.5 92
13.5 94
13.5 90
13.5 92
13.5 91
13.5 90
13.5 93
18.5 90
18.5 91
18.5 93
18.5 92
13.5 93
13.5 92
13.5 91
13.5 91
13.5 92
13.5 92
13.5 92
13.5 91
18.5 92
18.5 94
18.5 91
13.5 93
13.5 92
13.5 92
13.5 91
13.5 92
13.5 90
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 1 of 12
1 1/3/2 1004:48Ab Leighton and Associates, Inc
I I I t I t I I I I 1 I I
SUMMARY OF FIELD DENSITY TESTS
I I I I
~ ~~~ ~ ~ ~
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%I
No. Date Of Lot# Elev(ft) Type Field Max Field Opt. Compaction Remarks
s 33 s 34 s 35
S 36 s 37
S 38 s 39
S 40
S 41
S 42 s 43 s 44 s 45
S 46 s 47
S 48 s 49
S 50
S 51
S 52 s 53 s 54 s 55
S 56 s 57
S 58 s 59
S 60
S 61
S 62
S 63
S 64
6ll9101
611 9/01
6119101
611 910 1
6/19/01
6119101
6/19/01
6119101
6/19/01
611910 1
6119101
6119101
6120101
6120101
6120101
6120101
6120101
612010 1
612OlOl
6120101
6120101
6121101
6/21/01
612 1/01
6/21/01
612 1 IO 1
612 110 1
6/21/01
6121101
6121101
6/2 1/01
612 I101
M
MH
MH
MH
MH
MH
MH
MH
MH
M
M
M
M
M
M
L
M
M
L
L
L
L
M
M
L
M
M
M
L
MH
MH
L
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Lot 27
Avenida de Sueno
Avenida de Sueno
Lot 27
Lot 28
Lot 28
Lot 29
Avenida de Sueno
Avenida de Sueno
Lot 55
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Lot 54
Avenida de Sueno
Avenida de Sueno
Lot 31
Station 44+05
Station 43+74
Staiton 43+74
Station 43+74
Station 45+74
Station 45+74
Station 45+74
Station 45+74
Station 45174
Station 46+10
Station 46+30
Station 46+15
Station 46+50
Station 46+70
Station 46+85
Station 47+00
Station 47+25
Station 47+50
Station 47+65
Station 48+10
Station 48+35
Station 48+45
Station 48+90
Station 48+90
193.5 12
183.0 12
185.5 12
187.0 12
184.0 13
185.0 13
187.0 13
188.5 13
191.5 13
184.5 13
189.0 13
193.5 13
185.0 20
187.5 20
190.0 20
189.5 20
194.0 20
189.5 20
188.0 20
188.5 20
190.0 20
191.5 20
188.5 20
191.0 20
194.0 20
192.0 20
192.0 20
196.0 20
195.0 20
192.5 12
195.5 12
194.0 12
109.3 118.5 14.1
108.4 118.5 15.5
107.9 118.5 13.7
106.9 118.5 13.4
103.9 111.5 19.1
105.1 111.5 18.3
102.3 111.5 20.1
103.0 111.5 17.6
103.8 111.5 18.8
105.1 111.5 21.3
101.8 111.5 19.4
101.7 111.5 19.7
99.9 105.5 21.6
99.6 105.5 22.7
97.5 105.5 23.1
97.9 105.5 19.9
100.7 105.5 21.8
99.5 105.5 20.7
97.7 105.5 22.2
98.1 105.5 19.6
98.6 105.5 20.0
98.5 105.5 21.1
99.2 105.5 23.7
97.8 105.5 19.8
96.1 105.5 20.2
95.8 105.5 21.7
97.4 105.5 22.0
96.4 105.5 20.0
97.7 105.5 19.5
108.3 118.5 15.3
107.2 118.5 16.8
109.5 118.5 15.1
13.5 92
13.5 91
13.5 91
13.5 90
18.5 93
18.5 94
18.5 92
18.5 92
18.5 93
18.5 94
18.5 93
18.5 91
20.5 95
20.5 94
20.5 92
20.5 93
20.5 95
20.5 94
20.5 93
20.5 93
20.5 93
20.5 93
20.5 94
20.5 93
20.5 91
20.5 91
20.5 92
20.5 91
20.5 93
13.5 91
13.5 90
13.5 92
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 2 of 12
Leighton and Associates, Inc 1113/2 10:04:49A8
1 I I I I i I I I I I 1 t I 1 I 1 I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
S 65
S 66
S 67
S 68
S 69
S 70
S 71
S 72 s 73 s 74 s 75
S 76 s 77
S 78 s 79 s 80 s 81 s 82 s 83 s 84 s 85
S 86
S 87
S 88
S 89
S 90
S 91
S 92 s 93 s 94 s 95
S 96
612610 1
612710 1
6127101
612710 1
6127101
6/28/01
6/28/Ol
6128101
7/3/01
7/3/01
71310 1
7/3/01
7/3/01
71310 1
7/5/0 1
7/5/01
7/5/01
71510 1
7/5/01
7/5/01
7/90 1
7/5/0 1
7/5/01
7/5/01
7/5/01
71610 1
71610 1
71610 1
71610 1
71610 1
7/25/01
7/25/01
L
L
L
L
L
L
L
L
L
M
L
L
M
L
L
M
L
L
MH
L
L
M
M
L
M
L
L
L
L
MH
I
M
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Camino Alegre
Camino Alegre
Station 42+04
Station 42+63
Station 43+38
Station 43+93
Station 44+49
Station 44+06
Station 46+19
Station 46+96
Station 49+11
Station 49+30
Station 49+67
Station 49+72
Station 50+10
Station 50+27
Station 50+48
Station 51+00
Station 51146
Station 51+82
Station 52+22
Station 52+50
Station 52+72
Station 53+00
Station 53+30
Station 53+74
Station 54+25
Station 54+56
Station 54+98
Station 54+93
Station 55+12
Station 55+05
Station 41+19
Station 41+30
187.0 20
188.0 20
190.0 20
191.0 20
192.0 20
191.0 20
193.0 20
194.0 20
196.0 20
194.5 20
198.0 17
197.0 20
197.0 20
199.0 20
200.0 20
202.0 20
204.0 20
206.0 20
206.0 20
208.0 20
210.0 20
209.0 20
212.0 20
214.0 20
217.0 20
216.0 20
218.0 20
220.0 20
221.0 20
220.0 20
180.0 20
182.0 12
99.1 105.5 19.6
95.7 105.5 19.4
95.2 105.5 20.7
100.6 105.5 22.9
98.3 105.5 20.1
97.2 105.5 18.6
101.3 105.5 21.5
99.3 105.5 19.0
97.2 105.5 22.6
95.6 105.5 23.2
106.7 117.0 11.7
98.9 105.5 20.4
95.9 105.5 21.6
96.4 105.5 21.1
96.7 105.5 20.1
96.1 105.5 22.6
95.8 105.5 22.4
100.3 105.5 20.0
96.5 105.5 18.6
97.7 105.5 21.7
98.0 105.5 19.9
97.2 105.5 20.4
96.3 105.5 21.3
95.4 105.5 21.1
96.5 105.5 20.7
95.3 105.5 21.2
95.7 105.5 20.7
99.2 105.5 20.9
97.1 105.5 19.8
97.4 105.5 21.0
95.2 105.5 20.7
107.7 118.5 14.6
20.5 94
20.5 91
20.5 90
20.5 95
20.5 93
20.5 92
20.5 96
20.5 94
20.5 92
20.5 91
10.5 91
20.5 94
20.5 91
20.5 91
20.5 92
20.5 91
20.5 91
20.5 95
20.5 91
20.5 93
20.5 93
20.5 92
20.5 91
20.5 90
20.5 91
20.5 90
20.5 91
20.5 94
20.5 92
20.5 92
20.5 90
13.5 91
Project Number: 851855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 3 of 12
Leighton and Associates, Inc 111312 IO:04:49Ah
I I I I 1 I 1 I I I I t I 1 I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Comoaction Remarks
s 97
S 98 s 99 s 100 s 101 s 102
S 103
S 104 s 105
S 106
S 107 s 108
S 109 s 110 s 111 s 112
S 113
S 114
S 115
S 116
S 117
S 118
S 119 s 120 s 121 s 122
S 123
S 124
S 125
S 126
S 127
S 128
7/25/01
7/25/01
7/25/01
712610 1
712610 1
712610 1
7126101
712610 1
7/26/01
7/26/01
7/27/01
712710 1
7/27/01
712710 1
7/27/01
712710 1
7/30/01
713010 I
7/30/01
7/30/0 1
7/30/01
713010 1
7130101
7/30/0 1
7/31/01
7131101
7131101
7/31/01
7/31/01
7131101
7/31/01
8/1/01
I
M
I
I
I
M
1
I
I
M
L
L
L
M
MH
MH
MH
MH
M
M
M
L
L
M
L
L
L
M
L
M
L
L
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Avenida La Cia
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cia
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cirna
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Station 41+01
Station 40+80
Station 39+78
Station 39+23
Station 38+97
Station 38+37
Station 38122
Station 37195
Station 37+30
Station 37+07
Station 36+93
Station 36+67
Station 36+41
Station 36+00
Station 38+45
Station 38+45
Station 35+57
Station 35+57
Station 3+66
Station 4+34
Station 4+52
Station 4+86
Station 5+34
Station 5+60
Station 5+75
Station 6+36
Station 6+56
Station 6+71
Station 7+08
Station 7+40
Station 7+92
Station 8+15
181.0 12
175.0 20
170.0 12
166.0 12
168.0 12
164.0 12
162.0 20
160.0 12
157.0 12
156.0 12
154.0 12
152.0 12
180.0 12
146.0 12
160.0 12
163.0 12
142.0 12
146.0 12
145.0 12
144.0 7
148.0 7
151.0 IO
152.0 10
151.0 10
184.0 IO
155.0 IO
156.0 7
153.0 10
157.0 10
156.0 IO
158.5 IO
158.0 10
107.0 118.5 15.1
96.1 105.5 21.9
108.2 118.5 13.8
106.9 118.5 14.2
108.5 118.5 13.9
107.3 118.5 14.1
95.5 105.5 21.7
108.3 118.5 15.2
108.0 118.5 14.6
107.9 118.5 14.0
107.1 118.5 13.9
106.9 118.5 14.3
108.2 118.5 14.3
107.6 118.5 13.6
109.7 118.5 14.9
108.9 118.5 14.5
107.9 118.5 14.7
106.9 118.5 16.3
108.2 118.5 15.2
106.1 116.0 15.1
105.2 116.0 15.7
105.0 114.5 18.9
103.6 114.5 19.5
104.7 114.5 19.3
106.1 114.5 18.1
105.3 114.5 19.3
105.9 116.0 15.0
105.2 114.5 17.2
103.9 114.5 18.6
104.7 114.5 17.1
104.3 114.5 16.9
105.1 114.5 17.8
13.8 90
20.5 91
13.5 91
13.5 90
13.5 92
13.5 91
20.5 91
13.5 91
13.5 91
13.5 91
13.5 90
13.5 90
13.5 91
13.5 91
13.5 93
13.5 92
13.5 91
13.5 90
13.5 91
14.5 91
14.5 91
16.5 92
16.5 90
16.5 91
16.5 93
16.5 92
14.5 91
16.8 92
16.5 91
16.5 91
16.5 91
16.5 92
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 4 of 12
Leighton and Associates, Inc 11/3/2 1004:49AA
I I I I I I I I I I I r 1 1 1 1 I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. ComDaction Remarks
S 129
S 130
S 131
S 132
S 133
S 134
S 135
S 136
S 137
S 138
S 139
S 140
S 141
S 142
S 143
S 144
S 145
S 146
S 147
S 148
S 149
S 150
S 151
S 152
S 153
S 154
S 155
S 156
S 157
S 158
S 159
S 160
8/1/01 M
8/1/01 M
8/1/01 L
8/1/01 M
8/1/01 L
8/1/01 M
8/2/01 M
8/2/01 MH
8/2/01 MH
8/2/01 L
8/2/01 L
8/2/01 MH
8/2/01 MH
8/2/01 L
8/3/01 M
8/3/01 L
8/3/01 L
8/3/01 L
8/3/01 M
8/3/01 L
8/3/01 L
8/3/01 M
8/3/01 M
8/6/01 L
8/6/01 L
8/6/01 MH
8/6/01 MH
8/6/01 M
8/6/01 L
8/6/01 L
8/7/01 M
8/7/01 L
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cia
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Station 8+25
Station 8+35
Station 8+55
Station 9+36
Station 9+4l
Station 9+68
Station 9+95
Station 6+09
Station 6+09
Station 8+78
Station 8+78
Station 91100
Station 9+00
Station lot04
Station 10+25
Station 10+35
Station 10+67
Station 10+95
Station 11+20
Station 11+30
Station 1 IC55
Station 11+85
Station 12+00
Station 12+10
Station 12+15
Station 12+50
Station 12+50
Station 12+86
Station 13+04
Station 13+25
Station 13+52
Station 13+65
153.0 10
157.0 IO
159.0 IO
154.0 10
161.0 10
160.0 IO
156.0 IO
150.0 IO
153.0 IO
157.0 IO
160.0 10
154.0 IO
159.0 IO
161.0 12
158.0 12
161.0 12
162.0 12
161.0 12
156.0 12
163.0 12
162.0 12
164.0 12
158.0 12
164.0 12
162.0 IO
156.0 10
161.0 12
163.0 12
162.0 12
159.0 IO
156.0 12
161.0 12
103.9 114.5 20.6
104.6 114.5 20.1
104.2 114.5 19.7
104.5 114.5 20.8
106.1 114.5 17.8
107.7 114.5 18.4
104.7 114.5 21.2
104.7 114.5 18.6
106.2 114.5 19.3
105.0 114.5 19.5
104.8 114.5 18.9
105.1 114.5 20.5
104.0 114.5 20.4
107.7 118.5 15.6
107.2 118.5 16.1
108.3 118.5 17.5
106.9 118.5 16.6
108.9 118.5 15.7
107.7 118.5 16.8
107.5 118.5 15.5
108.1 118.5 17.1
110.6 118.5 14.5
107.5 118.5 15.0
107.1 118.5 14.1
103.6 114.5 17.6
104.1 114.5 18.9
107.5 118.5 15.1
108.7 118.5 16.1
109.0 118.5 15.5
105.1 114.5 20.1
108.1 118.5 17.2
108.5 118.5 16.1
16.5 91
16.5 91
16.5 91
16.5 91
16.5 93
16.5 94
16.5 91
16.5 91
16.5 93
16.5 92
16.5 92
16.5 92
16.5 91
13.5 91
13.5 90
13.5 91
13.5 90
13.5 92
13.5 91
13.5 91
13.5 91
13.5 93
13.5 91
13.5 90
16.5 90
16.5 91
13.5 91
13.5 92
13.5 92
16.5 92
13.5 91
13.5 92
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 5 of 12
Leiphton and Associates, Inc 11/3/2 30:04:49Ab
I I I I I I I I I 1 1 I I
SUMMARY OF FIELD DENSITY TESTS
I 1 1 1 I
~ ~ ~~
Test Test Test Location Test Soil Dry Density Moisture (%) Relative ("A)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. ComDaction Remarks
S 161
S 162
S 163
S 164
S 165
S 166
S 167
S 168
S 169
S 170
S 171
S 172
S 173
S 174
S 175
S 176
S 177
S I78
S 179
S 180
S 181
S 182
S 183
S 184
S 185
S 186
S 187
S 188
S 189
S 190
S 191
S 192
81710 1
81710 1
81710 I
81710 I
8/7/0 1
8/9/0 1
8/9/01
81910 1
8/9/0 1
81910 1
81910 1
8/9/0 1
81910 1
811 010 1
8/10/01
8/10/01
811 o/o 1
811 o/o 1
8/10/0 1
8/23/01
8/23/01
8/23/01
8/24/01
8/24/01
8/24/01
812410 1
812710 I
8/27/0 I
8/27/01
8/27/01
8/27/01
812710 1
M
L
M
MH
MH
M
L
M
M
L
L
MH
MH
L
L
M
L
L
M
L
MH
L
L
M
L
M
L
L
L
M
L
L
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Corte Del Cruce
Corte Del Cruce
Cone Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Cone Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Cone Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Cone Del Cruce
Cone Del Cruce
Cone Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Station 14+13
Station 14140
Station 14+80
Station 15+50
Station 15+50
Station 1+71
Station 2+01
Station 2+15
Station 2+35
Station 2168
Station 3+03
Station 3+22
Station 3+22
Station 3+38
Station 3+61
Station 3+85
Station 4+22
Station 4+62
Station 5+15
Station 5+33
Station 5+39
Station 5+45
Station 5+55
Station 5+92
Station 6+26
Station 6+52
Station 6+86
Station 6+91
Station 7+46
Station 7+81
Station 8+11
Station 8+34
160.0
159.0
155.0
153.0
157.0
157.0
161.0
160.0
163.0
163.0
166.0
162.0
167.0
168.0
163.0
165.0
170.0
172.0
174.0
176.0
172.0
177.0
178.0
174.0
177.0
179.0
178.0
180.0
182.0
178.0
181.0
183.0
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
13
20
20
13
20
20
20
12
12
12
20
12
12
109.1 118.5 16.5
107.6 118.5 14.8
107.9 118.5 15.6
108.1 118.5 15.2
108.0 118.5 16.1
106.9 118.5 14.7
107.5 118.5 15.8
108.1 118.5 17.1
109.6 118.5 16.3
107.1 118.5 16.7
107.5 118.5 16.3
106.8 118.5 16.0
108.0 118.5 15.9
107.7 118.5 17.1
106.9 118.5 16.3
107.1 118.5 16.3
107.0 118.5 16.2
107.5 118.5 15.9
108.0 118.5 15.8
103.8 111.5 19.1
96.1 105.5 22.6
98.7 105.5 23.1
102.7 111.5 20.7
100.5 105.5 21.5
98.2 105.5 21.1
99.3 105.5 22.2
107.8 118.5 16.1
110.2 118.5 14.5
107.0 118.5 14.7
97.3 105.5 21.7
106.9 118.5 15.9
107.8 118.5 15.2
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
18.5
20.5
20.5
18.5
20.5
20.5
20.5
13.5
13.5
13.5
20.5
13.5
13.5
92
91
91
91
91
90
91
91
92
90
91
90
91
91
90
90
90
91
91
93
91
94
92
95
93
94
91
93
90
92
90
91
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 6 of 12 -
Leighton and Associates, Inc 11l3l2 10:04:49Ah
I 1 I I I I I I I 1 I I 1 I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative ,%)
No. Date Of Lot # Elev(ft) Type Field Max Field Opt. ComDaction Remarks
S 193
S 194
S 195
S 196
S 197
S I98
S 199 s 200 s 201 s 202
S 203
S 204
S 205
S 206
S 207
S 208
S 209 s 210 s 211 s 212
S 213
S 214
S 215
S 216
S 217
S 218
S 219 s 220 s 221 s 222
S 223
S 224
812710 1
8/28/01
8128101
812810 1
8/29/01
8129101
8/29/01
812910 I
8/29/01
813 1/01
8/31/01
8131101
8/31/01
8/31/01
8/31/01
813 110 1
8/31/01
914101
91410 1
9/4/01
91510 I
91510 1
9/7/01
9/7/01
91710 1
9llOlO 1
9110101
9111101
911 1/01
9/12/0 1
911 210 I
911 210 1
L
L
M
M
L
M
M
L
MH
M
L
L
M
L
L
M
L
M
M
L
L
M
L
M
M
L
M
L
M
L
M
L
Corte Del Cmce
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Station 81-65
Station 28+68
Station 28+41
Station 28+10
Station 27+88
Station 27+70
Station 27+3 1
Station 27+03
Station 26+80
Station 15+90
Station 16+48
Station 16148
Station 17+05
Station 17+54
Station 17+59
Station 17+91
Station 18+09
Station 18+40
Station 18+70
Station 18+93
Station 19+59
Station 20+21
Station 20+58
Station 20+90
Station 21+48
Station 21+78
Station 221-55
Station 23+05
Station 23+95
Station 24+61
Station 24+90
Station 25+21
179.0 12
128.0 12
125.0 12
130.0 12
127.0 12
131.0 12
126.0 12
132.0 12
129.0 12
158.0 20
154.0 14
156.0 14
152.0 20
148.0 2
150.0 3
144.0 20
146.0 12
140.0 11
143.0 14
142.0 11
138.0 12
136.0 12
139.0 12
132.0 12
135.0 14
137.0 3
130.0 12
135.0 3
132.0 11
134.0 11
128.0 12
131.0 12
107.1 118.5 16.3
109.2 118.5 17.1
111.8 118.5 16.3
108.6 118.5 16.5
109.5 118.5 17.1
107.5 118.5 18.3
107.9 118.5 16.2
106.9 118.5 15.9
107.7 118.5 16.3
96.2 105.5 21.5
111.7 122.0 12.7
110.8 122.0 13.1
97.9 105.5 20.8
110.7 121.5 16.7
94.1 103.5 22.9
97.2 105.5 22.1
107.1 118.5 15.8
110.3 122.0 16.1
112.1 122.0 12.2
110.0 122.0 13.6
107.1 118.5 15.1
109.2 118.5 15.8
106.9 118.5 14.7
107.4 118.5 15.0
111.7 122.0 12.1
95.2 103.5 22.9
108.5 118.5 14.1
94.6 103.5 23.6
112.2 122.0 13.1
110.6 122.0 12.9
109.8 118.5 12.8
111.7 118.5 13.6
13.5 90
13.5 92
13.5 94
13.5 92
13.5 92
13.5 91
13.5 91
13.5 90
13.5 91
20.5 91
11.5 92
11.5 91
20.5 93
13.0 91
22.0 91
20.5 92
13.5 90
12.5 90
11.5 92
12.5 90
13.5 90
13.5 92
13.5 90
13.5 91
11.5 92
22.0 92
13.5 92
22.0 91
12.5 92
12.5 91
13.5 93
13.5 94
Project Number: 851855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 7 of 12
Leighton and Associates, Inc I1/3/2 10:04:49Ah
I I I I I I I I I I I I I I I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Comoaction Remarks
S 228 9/12/01 M
S 226 9/12/01 M
S 227 9/12/01 L
S 228 10/29/01 M
S 229 10/29/01 L
S 230 10/29/01 M
S 231 10/29/01 L
S 232 10/31/02 M
S 233 10/31/02 L
S 234 10/31/02 L
S 238 10/31/02 M
S 236 10/31/02 M
S 237 10/31/02 L
S 238 10/31/02 M
S 239 10/31/02 L
S 240 10/31/02 M
S 241 10/31/02 L
S 242 10/31/02 M
S 243 10/31/01 M
S 244 11/1/01 MH
S 245 ll/l/Ol MH
S 246 11/1/01 MH
S 247 11/1/01 MH
S 248 11/2/01 MH
S 249 11/6/01 M
S 250 11/6/01 M
S 251 11/7/01 M
S 252 11/7/01 M
S 253 11/7/01 M
S 284 11/8/01 MH
S 285 11/8/01 MH
S 256 11/8/01 MH
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Storm Drain Line A
Avenida Del Alba
Avenida Del Alba
Line A
Line A
Line A
Line A
Line A
Line A
Line A
Line A
Station 28+76
Station 26t10
Station 26+41
Station 34+84
Station 34+63
Station 34+42
Station 34+00
Station 33+60
Station 33+50
Station 33+25
Station 33+40
Station 33+06
Station 32+59
Station 29+00
Station 29+88
Station 30+54
Station 30s96
Station 3 1+75
Station 32+04
Station 32+37
Station 32t37
Station 5+91
Station 30+01
Station 30+01
Station 5+42
Station 4+90
Station 4+00
Station 3+25
Station 2169
Station 3+60
Station 3+60
Station 4+43
132.0 12
126.0 12
131.0 12
138.0 18
140.0 18
136.0 18
138.0 20
130.0 18
134.0 20
132.0 I8
133.0 18
128.0 18
127.0 18
128.0 18
128.0 18
123.0 18
127.0 18
124.0 14
126.0 18
122.0 18
126.0 18
125.0 I8
123.0 18
127.0 12
128.0 18
128.0 12
126.0 12
127.0 18
126.0 18
124.0 18
127.0 18
124.0 12
109.2 118.5 12.8
108.4 118.5 14.1
108.8 118.8 13.2
108.2 118.0 12.6
108.9 118.0 13.8
106.9 118.0 13.2
96.2 105.5 22.6
108.9 118.0 14.1
95.8 105.5 21.7
107.5 118.0 12.7
109.2 118.0 15.1
107.4 118.0 14.2
106.5 118.0 14.6
108.2 119.8 13.7
108.5 118.0 18.1
109.9 118.0 13.2
107.4 118.0 12.1
110.5 122.0 13.7
106.9 118.0 13.7
107.8 118.0 15.0
107.5 118.0 14.8
108.3 118.0 14.2
107.6 118.0 13.9
108.1 118.5 12.9
106.7 118.0 13.2
107.2 118.5 14.7
106.9 118.8 13.8
108.5 118.0 12.6
109.2 118.0 14.2
107.1 118.0 13.9
110.6 118.0 15.0
107.1 118.8 14.7
13.5
13.8
13.5
13.5
13.5
13.5
20.5
13.5
20.5
13.5
13.5
13.5
13.5
12.8
13.5
13.5
13.5
11.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
92
91
92
92
92
91
91
92
91
91
93
91
90
91
92
93
91
91
91
91
91
92
91
91
90
90
90
92
93
91
94
90
Project Number: 851855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 8 of 12
Leighton and Associates, Inc 11/3/2 I0:04:49Ab
I I I I I I 1 I I 1 I I I I 1 I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (Ye) Relative (Yo]
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. ComDaction Remarks
S 257
S 258
S 259
S 260
S 261
S 262
S 263
S 264
S 265
S 266
S 267
S 268
S 269
S 270
S 271
S 272
S 272A
S 273
S 274
S 275
S 276
S 277
S 278
S 279
S 280
S 281
S 282
S 283
S 284
S 285
S 286
S 287
ll/X/OI MH
4110102 M
4/10/02 M
4110102 M
4112102 M
4/15/02 M
4/15/02 M
4/15/02 M
4/15\02 M
4/16/02 M
4/16/02 M
4/16/02 M
4/16/02 M
4/16/02 L
4/16/02 M
4/16/02 L
4/16/02 L
4/16/02 L
4/16/02 L
4/16/02 L
4/16/02 L
4/16/02 M
4/16/02 L
4/16/02 MH
4/16/02 M
4/16/02 L
4/16/02 M
4/17/02 MH
4/17/02 M
4/17/02 MH
4/17/02 MH
4/17/02 L
Line A
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Line A
Line A
Line A
Line A
Line A
Line A
Line A
Line A
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Station 4+43
Station 2+33
Station 2+60
Station 3+00
Station 3+40
Station 1+15
Station 1 +3 5
Station 1+85
Station 1+65
Station 2+15
Station 2+53
Station 2+73
Station 3+10
Station 0+98
Station 1+27
Station 2+99
Station 2+99
Station 3+19
Station 2+60
Station 2+5 1
Station 2+08
Station l+85
Station 6+16
Station 61-10
Station 4+10
Station 4+39
Station 5+85
Station 2+65
Station 2+60
Station 2+15
Station 1185
Station 3+97
126.0 18
109.0 19
114.0 19
112.0 19
113.0 19
108.0 19
113.0 19
109.0 19
117.0 17
115.0 17
118.0 17
114.0 17
116.0 17
119.0 19
118.0 19
123.0 20
123.0 20
125.0 21
123.0 23
122.0 23
121.0 23
120.0 17
135.0 19
133.0 19
126.0 19
130.0 19
131.0 17
120.0 23
121.0 20
121.0 19
108.0 23
126.0 19
109.0 118.0 13.8
110.3 120.5 16.4
109.1 120.5 17.1
110.0 120.5 16.6
113.0 120.5 16.2
109.9 120.5 16.6
110.7 120.5 17.3
109.8 120.5 17.5
106.2 117.0 16.1
107.8 117.0 15.5
108.3 117.0 14.8
107.1 117.0 15.6
106.0 117.0 13.6
112.5 120.5 16.3
110.9 120.5 15.5
91.6 105.5 18.9
95.7 105.5 21.6
112.0 123.0 16.7
102.6 111.5 18.3
101.4 111.5 20.5
101.7 111.5 19.3
107.9 117.0 14.7
113.6 120.5 14.7
112.4 120.5 14.2
108.7 120.5 16.1
109.8 120.5 15.3
106.0 117.0 12.2
102.9 111.5 20.3
96.8 105.5 21.9
108.2 120.5 15.6
104.9 111.5 17.5
108.6 120.5 16.9
13.5 92
12.5 92
12.5 91
12.5 91
12.5 94
12.5 91
12.5 92
12.5 91
10.5 91
10.5 92
10.5 93
10.5 92
10.5 91
12.5 93
12.5 92
20.5 87
20.5 91
12.0 91
16.5 92
16.5 91
16.5 91
10.5 92
12.5 94
12.5 93
12.5 90
12.5 91
10.5 91
16.5 92
20.5 92
12.5 90
16.5 94
12.5 90
RT ON 272A
RT OF 212
Project Number: 851 855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 9 of 12
Leighton and Associates, Inc 111312 10:04:49AM
I I 1 I I I I 1 I I I I I I 1 I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (Oh)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Comnaction Remarks
S 288
S 289
S 290
S 291
S 292
S 293
S 294
S 295
S 296
S 297
S 298
S 299
S 300
S 301
S 301A
S 302
S 303
S 304
S 305
S 306
S 307
S 308
S 309
S 310
S 311
S 312
S 313
S 314
S 315
S 316
S 317
S 318
411 7/02
411 7/02
4/17/02
4/17/02
411 7/02
4/17/02
4/17/02
41 17/02
411 8/02
411 8/02
4/18/02
4/18/02
4/18/02
411 8/02
4118102
4/18/02
411 8102
411 8/02
4/18/02
4/18/02
4/18/02
411 8/02
4/19/02
4/22/02
4/22/02
4/22/02
4/22/02
4/22/02
4/23/02
4/23/02
4/25/02
4/25/02
M
L
M
MH
M
M
L
M
M
L
M
L
M
M
M
M
M
M
MH
MH
M
M
M
L
M
M
L
M
M
M
MH
MH
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragoo
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Station 4+95
Station 0+93
Station 6+50
Station 0+80
Station 3+75
Station 6+70
Station 6+67
Station 7+20
Station 7+50
Station 7+70
Station 7+80
Station 7+94
Station 8+25
Station 8+60
Station 8+60
Station 4100
Station 4+40
Station 4+60
Station 5+05
Station 5+10
Station 5+50
Station 5+90
Station 6+10
Station 6+43
Station 6+65
Station 7+25
Station 8+34
Station 8+00
Station 8+65
Station 8+65
Station 6+21
Station 6+21
130.0 19
117.0 20
131.0 17
116.0 23
110.0 23
129.0 17
131.0 17
125.0 17
122.0 19
123.0 19
119.0 23
121.5 23
120.0 23
115.0 23
115.0 23
114.0 23
111.0 23
116.0 23
114.0 23
112.0 23
117.0 23
113.0 23
116.0 23
114.0 23
118.0 23
116.0 19
121.0 23
117.0 23
118.0 19
118.0 19
114.0 19
118.0 19
110.2 120.5 14.1
96.2 105.5 20.8
107.4 117.0 15.4
102.1 111.5 17.9
100.6 111.5 17.1
106.9 117.0 14.3
108.4 117.0 14.0
105.1 117.0 15.7
113.4 120.5 13.6
111.0 120.5 13.8
102.9 111.5 18.7
101.8 111.5 20.4
103.8 111.5 17.5
96.3 111.5 16.9
101.6 111.5 17.5
103.5 111.5 16.6
100.6 111.5 19.8
102.9 111.5 17.8
105.1 111.5 16.9
104.0 111.5 16.9
101.2 111.5 17.5
103.4 111.5 16.6
105.4 111.5 16.9
106.4 111.5 16.4
104.5 111.5 16.8
111.3 120.5 14.5
103.9 111.5 16.2
104.6 111.5 17.0
109.9 120.5 15.2
108.8 120.5 12.9
110.6 120.5 15.3
112.6 120.5 16.1
12.5
20.5
10.5
16.5
16.5
10.5
10.5
10.5
12.5
12.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
12.5
16.5
16.5
12.5
12.5
12.5
12.5
91
91
92
92
90
91
93
90
94
92
92
91
93
86
91
93
90
92
94
93
91
93
95
95
94
92
93
94
91
90
92
93
RT ON 301A
RT OF 301
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 10of 12
Leighton and Associates, Inc 11/3/2 IO:M49Ab
I I I I I I 1 I I I I 1 I I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (YO) Relative ("A)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. CnmDaction Remarks
S 319 4/26/02 MH
S 320 4/26/02 MH
S 321 4/29/02 L
S 322 4/29/02 M
S 323 4/29/02 MH
S 324 4129102 MH
S 325 4/29\02 M
S 326 4/29/02 L
S 327 4130102 M
S 328 4130102 M
S 329 5/3/02 M
S 330 5/3/02 L
S 331 5/3/02 L
S 332 5/6/02 M
S 333 5/6/02 L
S 334 5/6/02 M
S 335 5/6/02 L
S 336 5/6/02 L s 337 5/7/02 L
S 338 5/7/02 M
S 339 5/7/02 M
S 340 5/7/02 M
S 341 5/7/02 L
S 342 5/8/02 M
S 343 5/8/02 L
S 344 5/9/02 M
S 345 5/9/02 M
S 346 5/9/02 L
S 347 5/9/02 L
S 348 5/9/02 M
S 349 5/9/02 M
S 350 5/9/02 L
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Station 7+74
Station 7+74
Station 9+37
Station 9+60
Station 9+88
Station 9+88
Station 10+30
Station 10+60
Station 1+25
Station 1+50
Station 3+22
Station 3103
Station 2+55
Station 2+45
Station 2+24
Station 1+65
Station 0+99
Station 0+94
Station 11+23
Station 11+45
Station 11+75
Station 12+40
Station 12+45
Station 13+00
Station 16+46
Station 16+35
Station 16+10
Station 15+95
Station 15+85
Station 15+56
Station 15+10
Station 14+75
115.0 19
119.0 19
116.0 17
120.0 17
116.0 17
120.0 17
119.0 17
122.0 17
107.0 19
111.0 19
124.0 17
128.0 17
130.0 17
129.0 17
133.0 17
135.0 17
139.0 17
138.0 17
129.0 19
121.0 19
128.0 19
125.0 19
130.0 19
130.0 19
127.0 19
125.0 19
129.0 19
128.0 19
125.0 19
127.0 19
130.0 19
129.0 19
109.7 120.5 15.7
110.0 120.5 13.5
110.3
108.5
109.2
109.5
109.0
107.3
109.9
17.0 12.3
17.0 10.7
17.0 11.1
17.0 11.5
17.0 10.9
17.0 11.6
20.5 14.7
108.6 120.5 16.3
105.8 117.0 12.6
107.3 117.0 10.7
107.1 117.0 11.1
107.8 117.0 12.1
106.1 117.0 10.9
108.5 117.0 10.5
109.1 117.0 11.6
106.1 117.0 12.6
111.6 120.5 14.1
109.2 120.5 15.6
108.9 120.5 12.8
110.1 120.5 13.1
109.9 120.5 13.7
111.0 120.5 12.9
109.4 120.5 13.6
110.1 120.5 13.4
109.6 120.5 13.7
112.1 120.5 13.6
109.7 120.5 14.7
110.6 120.5 14.5
109.9 120.5 15.1
110.1 120.5 13.2
12.5 91
12.5 91
10.5 94
10.5 93
10.5 93
10.5 94
10.5 93
10.5 92
12.5 91
12.5 90
10.5 90
10.5 92
10.5 92
10.5 92
10.5 91
10.5 93
10.5 93
10.5 91
12.5 93
12.5 91
12.5 90
12.5 91
12.5 91
12.5 92
12.5 91
12.5 91
12.5 91
12.5 93
12.5 91
12.5 92
12.5 91
12.5 91
Project Number: 851855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 11 of 12
Leighton and Associates, Inc I1/3/2 10:04:49AIL
I 1 I I I 1 I I I I I I I 1 I I I 1
SUMMARY OF FIELD DENSITY TESTS
~~ ~ ~
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
S 351
S 352 s 353 s 354 s 355
S 356 s 357 s 358 s 359
S 360
S 361
S 362
S 363
S 364
S 365
S 366
S 367
5/9/02
5/9/02
5/9/02
5/10/02
5110102
5/10/02
5/10/02
5110/02
5110102
5/10/02
5/10/02
511 0102
5/13/02
5/13/02
5/13/02
5/14/02
5/14/02
M
L
M
M
L
M
L
M
M
M
L
M
L
L
MH
MH
MH
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Avenida Aragoo
Sitio Toledo
Sitio Andalucia
Station 14+50
Station 14+26
Station 14+35
Station 13+80
Station 13+89
Station 1+14
Station 1137
Station 1+50
Station 1+65
Station 2+15
Station 2+45
Station 2+62
Station 1+07
Station 0+98
Station 13+38
Station 0+66
Station 0+93
124.0 19
131.0 19
126.0 19
125.0 19
131.0 19
140.0 23
139.0 23
135.0 23
137.0 23
131.0 23
133.0 23
126.0 23
141.0 17
140.0 17
126.0 17
139.0 17
138.0 17
108.9 120.5 13.6
109.7 120.5 12.9
110.0 120.5 14.1
109.6 120.5 13.7
112.9 120.5 14.1
104.3 111.5 17.1
101.7 111.5 16.9
102.0 111.5 16.5
102.7 111.5 17.7
102.1 111.5 16.3
103.5 111.5 17.8
100.9 111.5 18.0
108.2 117.0 14.1
107.5 117.0 13.6
107.9 117.0 14.7
108.4 117.0 12.7
110.3 117.0 13.6
12.5 90
12.5 91
12.5 91
12.5 91
12.5 94
16.5 94
16.5 91
16.5 91
16.5 92
16.5 92
16.5 93
16.5 90
10.5 92
10.5 92
10.5 92
10.5 93
10.5 94
Project Number: 851855-012
Project Name: ArroyoNnit 2
Project Location: 0
Client: 0 Page 12 of 12
Leighton and Associates, Ioc I1/3/2 1004:49Ah
I I ! I I I I I 1 I I I I I I 1 1 I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative (%)
NO. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
w1
w2
w3
w4
w5
W6
w7
W8
w9 w IO w 11 w 12
W 13
W 14
W 15
W 16
W 17 w 18
W 19 w 20 w 21 w 22
W 23
W 24
W 25
W 25A
W 26
W 26A
W 27
W 27A w 28
W 28A
7/11/01
7/11/01
711 1/01
7/12/01
71 1210 1
711 810 1
711 810 1
711 810 1
8/7/01
81710 1
8/7/01
81710 I
8/7/01
81710 1
8/7/0 1
81710 1
8/7/01
81710 1
8/7/0 I
SI2410 I
8/24/01
8/24/01
8/24/01
812710 I
8127101
8/27/01
8/27/01
8/27/0 1
8/27/01
8/27/01
8127101
8/27/01
S
S
S
S
S
S
S
S
L
L
L
L
L
L
L
L
FH
L
L
L
M
L
M
L
L
L
M
M
L
L
L
L
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Camino Alegre
Carnino Alegre
Carnino Alegre
Carnino Alegre
Camino Alegre
Carnino Alegre
Carnino Alegre
Carnino Alegre
Carnino Alegre
Camino Alegre
Carnino Alegre
Camino Alegre
Carnino Alegre
Station 42+46
Station 43+59
Station 44+62
Station 46+70
Station 49+53
Station 51+44
Station 54C28
Station 52+76
Station 54+88
Station 53+84
Station 52+82
Station 51+21
Station 50+37
Station 49+l1
Station 48+04
Station 47+17
Station 46+3 1
Station 45+16
Station 42+38
Station 41+55
Station 41+30
Station 40+5 1
Station 40+05
Station 39+87
Station 39+12
Station 39+12
Station 39+45
Station 39+45
Station 38+09
Station 38+09
Station 37C63
Station 37+63
175.5 22
176.0 22
178.0 22
182.0 22
190.5 22
204.0 22
217.0 22
210.0 22
222.0 20
217.0 20
212.0 20
205.0 20
201.0 20
198.0 20
197.0 13
196.0 13
195.0 20
193.5 20
190.5 12
186.0 12
184.0 12
179.0 13
176.0 12
175.0 12
170.0 12
170.0 12
172.5 12
172.5 12
164.0 20
164.0 20
160.0 12
160.0 12
116.3 128.0 8.9
115.8 128.0 9.2
116.2 128.0 10.1
117.4 128.0 10.7
116.2 128.0 9.8
116.3 128.0 9.7
115.8 128.0 8.8
115.5 128.0 9.2
97.2 105.5 22.6
96.1 105.5 21.5
97.8 105.5 20.8
95.1 105.5 20.6
96.5 105.5 21.7
96.0 105.5 20.1
102.3 111.5 17.9
103.0 111.5 18.1
97.5 105.5 20.6
95.6 105.5 20.0
107.0 118.5 14.7
110.1 118.5 13.2
109.5 118.5 15.2
100.9 111.5 20.0
108.3 118.5 15.6
107.6 118.5 15.2
103.2 118.5 14.9
107.9 118.5 15.2
104.5 118.5 14.6
109.2 118.5 15.0
91.2 105.5 20.1
96.1 105.5 20.6
103.0 118.5 14.0
107.9 118.5 13.9
9.0 91
9.0 90
9.0 91
9.0 92
9.0 91
9.0 91
9.0 90
9.0 90
20.5 92
20.5 91
20.5 93
20.5 90
20.5 91
20.5 91
18.5 92
18.5 92
20.5 92
20.5 91
13.5 90
13.5 93
13.5 92
18.5 90
13.5 91
13.5 91
13.5 87
13.5 91
13.5 88
13.5 92
20.5 86
20.5 91
13.5 87
13.5 91
RT ON 25A
RT OF 25
RT ON 26A
RT OF 26
RT ON 27A
RT OF 21
RT ON 28A
RT OF 28
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page I of 5
Leighton and Associates, Inc 11/4/2 1:09:33PM
I I I I I I I I I I I I 1 i I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. ComDaction Remarks
W 29
W 29A
W 30
W 31
W 32 w 33 w 34 w 35
W 36 w 37
W 38 w 39
W 40
W 41
W 42 w 43 w 44 w 45
W 46 w 47
W 48 w 49
W 50
W 51
W 52 w 53 w 54 w 55
W 56
W 57
W 58 w 59
8/27/01 L
8/27/01 L
8/27/01 M
8/27/01 L
8/27/01 L
9/6/01 M
9/6/01 L
9/6/01 L
9/6/01 L
9/6/01 M
9110101 M
9/10/01 L
9/10/01 M
9/10/01 L
9/10/01 M
9/10/01 L
9/10/01 M
9/14/01 L
9/14/01 L
9/14/01 L
9114101 M
9/18/01 B
9/18/01 B
9/18/01 B
9/18/01 B
9/18/01 B
9/18/01 B
10/2/01 M
10/2/01 L
10/2/01 L
10/2/01 L
10/2/01 L
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Corte Del Cruce
Corte Del Cruce
Cone Del Cruce
Cone Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del CNCe
Station 37+40
Station 37+40
Station 36+90
Station 36+3 1
Station 36+26
Station 4160
Station 5+86
Station 6+66
Station 7+18
Station 7+54
Station 8+45
Station 8+86
Station 9+52
Station 10+14
Station 10+90
Station 11+40
Station 11+90
Station 12120
Station 12+25
Station 14+25
Station 14+00
Station 2+00
Station 3+25
Station 4+50
Station 5+75
Station 7+00
Station 8+10
Station 1+75
Station 1+63
Station 2+63
Station 3+71
Station 4+12
158.0 12
158.0 12
154.0 20
152.0 12
152.0 12
151.0 12
154.0 12
156.5 12
158.0 12
158.5 16
159.5 12
160.0 16
160.5 12
161.5 12
162.0 12
163.0 12
163.5 12
164.0 12
163.5 12
161.0 12
161.5 12
162.5 22
168.5 22
171.5 22
177.0 22
179.0 22
180.5 22
161.0 17
160.0 17
164.0 17
169.5 20
171.5 20
101.7 118.5 13.2
109.2 118.5 14.6
95.9 105.5 21.1
109.7 118.5 15.1
109.1 118.5 14.5
108.1 118.5 14.2
108.9 118.5 13.6
107.7 118.5 15.2
108.5 118.5 13.8
110.1 120.0 12.9
109.2 118.5 13.7
109.6 120.0 14.1
107.5 118.5 14.6
108.6 118.5 15.2
106.9 118.5 14.0
107.2 118.5 14.9
109.5 118.5 13.7
108.7 118.5 14.1
107.1 118.5 13.8
108.2 118.5 15.1
107.5 118.5 15.0
115.4 128.0 7.6
116.1 128.0 8.1
115.9 128.0 8.0
116.3 128.0 8.9
116.5 128.0 9.2
115.6 128.0 7.9
107.1 117.0 11.6
106.9 117.0 12.8
106.0 117.0 11.9
96.1 105.5 21.7
95.2 105.5 20.2
13.5 86 RT ON 29A
13.5 92 RT OF 29
20.5 91
13.5 93
13.5 92
13.5 91
13.5 92
13.5 91
13.5 92
12.5 92
13.5 92
12.5 91
13.5 91
13.5 92
13.5 90
13.5 90
13.5 92
13.5 92
13.5 90
13.5 91
13.5 91
9.0 90
9.0 91
9.0 91
9.0 91
9.0 91
9.0 90
10.5 92
10.5 91
10.5 91
20.5 91
20.5 90
Project Number: 851855-012
Project Name: Arroyo/Unit 2
Project Location: 0 Client: 0 Page 2 of 5 -
Leighton and Associates, Inc 11/4/2 1:0934PM
I I I I I I I I I I I I I
SUMMARY OF FIELD DENSITY TESTS
I I 1 I 1 I
Test Test Test Location Test Soil Dry Density Moisture ("h) Relative ("A)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Comuaction Remarks
W 60
W 61
W 62
W 63
W 64
W 65
W 66
W 67
W 68
W 69
W 70
W 71
W 72 w 73 w 74 w 75
W 16 w 77
W 78 w 79 w 80
W 81
W 82
W 83
W 84
W 85
W 86
W 87 w 88
W 89 w 90
W 91
10/3/01 M
10/3/01 L
10/3/03 HL
10/3/01 M
10/3/01 L
10/4/01 M
10/4/01 L
10/4/01 L
10/4/01 HL
10/4/01 M
10/4/01 L
10/4/01 L
10/4/01 M
10/5/01 L
10/5/01 L
10/5/01 M
10/5/01 L
10/5/01 M
10/5/01 L
10/5/01 M
10/9/01 L
10/9/01 M
10/9/01 M
10/9/01 L
10/9/01 M
11/14/01 M
ll/l4/0l L
11/14/01 M
ll/l4/0l L
11/14/01 M
lI/l4/01 L
1l/14/01 L
Carte Del Cruce
Carte Del Cruce
Carte Del Cruce
Carte Del Cruce
Corte Del Cruce
Carte Del Cruce
Cone Del Cruce
Carte Del Cruce
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Station 4+69
Station 5+42
Station 5+84
Station 6+46
Station 7+06
Station 7+90
Station 81-21
Station 8+68
Station 20+68
Station 22+00
Station 22+28
Station 23+60
Station 24+61
Station 25+11
Station 14+99
Station 16+22
Station 16+37
Station 17+00
Station 17+92
Station 18+43
Station 25C66
Station 26+3 1
Station 27+60
Station 28+58
Station 29118
Station 3905
Station 34+92
Station 34+30
Station 34+ 15
Station 33+65
Station 32+81
Station 32+18
174.0 20
178.0 20
179.5 20
180.5 17
181.5 17
182.0 20
182.5 20
183.0 20
139.0 17
138.0 17
137.5 17
136.0 17
135.0 17
134.5 17
159.5 18
157.5 18
157.0 18
154.0 18
148.5 17
145.5 17
134.0 12
133.0 12
132.5 12
131.0 12
130.5 12
144.0 20
143.0 12
140.0 12
139.0 12
136.0 12
132.0 20
128.5 12
96.0 105.5 22.5
95.8 105.5 22.0
97.2 105.5 21.4
108.4 117.0 11.7
107.4 117.0 13.1
98.6 105.5 22.8
95.7 105.5 20.3
97.4 105.5 21.3
106.3 117.0 13.2
108.2 117.0 12.6
107.4 117.0 14.1
106.9 117.0 13.5
105.8 117.0 12.9
107.0 117.0 12.4
108.6 118.0 16.1
111.2 118.0 13.7
109.0 118.0 14.4
108.3 118.0 14.0
107.1 117.0 12.6
108.0 117.0 13.1
108.1 118.5 16.1
107.2 118.5 13.4
107.4 118.5 14.4
107.1 118.5 14.8
109.6 118.5 14.7
95.2 105.5 22.6
107.5 118.5 12.7
106.9 118.5 14.3
108.7 118.5 13.8
108.1 118.5 13.1
96.3 105.5 21.9
107.7 118.5 12.9
20.5 91
20.5 91
20.5 92
10.5 93
10.5 92
20.5 93
20.5 91
20.5 92
10.5 91
10.5 92
10.5 92
10.5 91
10.5 90
10.5 91
13.5 92
13.5 94
13.5 92
13.5 92
10.5 92
10.5 92
13.5 91
13.5 90
13.5 91
13.5 90
13.5 92
20.5 90
13.5 91
13.5 90
13.5 92
13.5 91
20.5 91
13.5 91
Project Number: 851855-012
Project Name: ArroyoIUnit 2
Project Location: 0
Client: 0 Page 3 of 5
Leighton and Associates, Inc 11/4/2 1:0934PM
I I 1 I I I I 1 I I I I 1
SUMMARY OF FIELD DENSITY TESTS
I 1 I I I
Test Test Test Location Test Soil Dry Density Moisture (%) Relative CXj
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
W 92 11/15/01 M w 93 lI/l5/01 L w 94 11115101 L
W 95 11/15/01 M
W 96 12/10/01 M
W 97 12/10/01 M
W 98 5/6/02 M W 99 5/6/02 M
W 100 5/6/02 M
W 101 5/6/02 M
W 102 5/15/02 L
W 103 5/15/02 M
W 104 5/15/02 L
W 105 5/15/02 M
W 106 5/15/02 L
W 107 5/15/02 L
W 108 5/15/02 M
W 109 5/15/02 L
W 110 5/15/02 M
W 111 5/15/02 L
W 112 5/15/02 M
W 113 5/15/02 L
W 114 5/15/02 M W 115 5/15/02 L
W 116 5/15/02 L
W 117 5/15/02 M
W 118 5/16/02 M W I19 5/16/02 L
W 120 5/16/02 L
W 121 5/16/02 M
W 122 5/16/02 L
W 123 5/16/02 L
Camino Del Alba
Camino Del Alba
Camino Del Alba
Camino Del AIba
Camino La Cima
Camino La Cima
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreta
Avenida Secreto
Aveoida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Station 29+62
Station 29+78
Station 30+29
Station 31tOO
Station 1+51
Station 1+23
Station 2+10
Station 2+60
Station 3+50
Station 4160
Station 1+08
Station 1+51
Station 2+23
Station 3+15
Station 3+29
Station 3+44
Station 4+80
Station 5+69
Station 6+40
Station 6175
Station 7+75
Station 7+87
Station 6+20
Station 6+59
Station 8+90
Station 8+50
Station 10+30
Station lt04
Station 1+00
Station 1+70
Station 2t43
Station 2+83
131.0 12
130.0 I2
129.0 12
128.0 12
150.0 12
151.0 12
111.0 19
115.0 19
114.0 17
118.0 17
120.0 17
121.5 17
123.0 17
126.0 17
127.0 17
127.0 17
133.0 17
134.0 23
132.0 17
131.0 23
125.0 23
124.0 23
121.0 23
122.0 23
125.0 23
124.0 23
128.0 23
140.0 21
139.5 21
136.0 21
132.0 19
130.0 19
110.1 118.5 14.1
107.2 118.5 15.6
108.3 118.5 15.0
107.1 118.5 14.7
107.2 118.5 14.7
107.5 118.5 15.5
109.1 120.5 13.7
110.6 120.5 14.0
106.3
108.2
108.3
111.6
109.3
108.9
109.7
110.0
107.2
103.6
106.5
101.2
104.7
17.0 11.6
17.0 12.1
17.0 12.7
17.0 12.8
17.0 13.6
17.0 12.7
17.0 13.0
17.0 14.7
17.0 11.7
11.5 17.1
17.0 18.3
11.5 18.6
11.5 16.2
100.9 111.5 17.7
101.7 111.5 20.1
101.2 111.5 19.3
102.3 111.5 17.9
101.9’ 111.5 19.5
101.2 111.5 18.7
112.6 123.0 15.6
111.8 123.0 14.9
113.0 123.0 12.1
109.6 120.5 13.5
110.9 120.5 16.1
13.5
13.5
13.5
13.5
13.5
13.5
12.5
12.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
16.5
10.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
12.0
12.0
12.0
12.5
12.5
93
90
91
90
90
91
91
92
91
92
93
95
93
93
94
94
92
93
91
91
94
90
91
91
92
91
91
92
91
92
91
92
Project Number: 851855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 4 of 5
Leighton and Associates, Inc 11/4/2 1:09:34PM
I I I I I I I I I I I 1 I
SUMMARY OF FIELD DENSITY TESTS
1 1 I I I
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%.1
NO. Date Of Lot # Elev (ft) Type Field Max Field Opt. Comoactinn Remarks
W 124
W 125
W 126
W 127
W I28
W 129
W 130
W 131
&' 132
W 133
W 134
W 135
W 136
W 137
W 138
W 139
W 140
5/16/02 M
5/16/02 L
5/16/02 M
5/16/02 L
5/16/02 M
5/16/02 M
5/16/02 L
5/16/02 M
5/16/02 L
5/16/02 L
5/16/02 L
5/16/02 L
7/1/03 M
7/2/03 M
8/6\03 S
8/6/03 S
8/6/03 M
Sitio Toledo
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Lot 199 Easement
Lot 199 Easement
Lot 199 Easement
Lot 199 Easement
Lot 199 Easement
Station 3+25
Station 0+94
Station 1+95
Station 2+35
Station 2+70
Station 11+60
Station 12+55
Station 14+20
Station 14+60
Station 15+25
Station 15+79
Station 16+14
Station 2+58
Station 2+38
Station 1+64
Station 1+90
Station 2+10
127.0
141.0
137.0
135.0
135.0
130.0
132.0
132.0
131.0
130.0
129.0
129.0
130.0
128.0
126.5
127.0
130.0
19 111.7
21 110.9
21 111.2
19 111.0
21 112.6
21 111.1
21 111.7
21 110.9
21 112.1
21 113.2
21 111.7
21 111.5
19 108.3
19 109.9
22 115.5
22 115.6
19 110.1
120.5
123.0
123.0
120.5
123.0
123.0
123.0
123.0
123.0
123.0
123.0
123.0
120.5
120.5
128.0
128.0
120.5
14.2
14.0
13.0
12.2
14.1
12.8
12.9
13.6
12.9
13.5
13.9
14.7
12.7
12.9
10.0
9.5
12.5
12.5 93
12.0 90
12.0 90
12.5 92
12.0 92
12.0 90
12.0 91
12.0 90
12.0 91
12.0 92
12.0 91
12.0 91
12.5 90
12.5 91
9.0 90
9.0 90
12.5 91
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 5 of 5
Leighton and Associates, Inc 1 1/4/2 1:0934PM
I I ! I I I \ '~ I I ) 1 I I ! I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative f%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. ComDaction Remarks
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
5
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
1 8/15/01 M
2 8/15/01 M
3 8/15/01 X
4 8/15/01 M
5 8/15/01 X
6 8/15/01 X
7 8/15/01 X
8 8/15/01 M
9 8/15/01 X
10 8/18/01 M
11 8/18/01 x
12 8/18/01 x
13 8/18/01 M
14 8/18/01 X
15 8/18/01 X
16 8/18/01 M
17 11/8/01 M
I8 31/8/01 x
19 ll/S/Ol M
20 11/8/01 M
21 11/8/01 x
22
23
24
25
26
27
1/8/01 M
l/S/Ol x
1/8/01 M
1/8/01 x
1/8/01 M
l/S/Ol M
28 11/8/01 X
29 11/8/01 M
30 11/8/01 M
31 11/8/01 X
32 2/1/02 M
Adjacent to Lot 48
Adjacent to Lot 53
Adjacent to Lot 28
Adjacent to Lot 57
Adjacent to Lot 32
Adjacent to Lot 35
Adjacent to Lot 38
Adjacent to Lot 44
Adjacent to Lot 45
Adjacent to Lot 66
Adjacent to Lot 60
Adjacent to Lot 61
Adjacent to Lot 67
Adjacent to Lot 63
Adjacent to Lot 65
Adjacent to Lot 70
Adjacent Lot 181
Adjacent Lot 176
Adjacent Lot 174
Adjacent Lot 152
Adjacent Lot 78
Adjacent Lot 157
Adjacent Lot 83
Adjacent Lot 163
Adjacent Lot 89
Adjacent Lot 168
Adjacent Lot 169
Adjacent Lot 92
Adjacent Lot 95
Adjacent Lot 99
Adjacent Lot 112
Adjacent Lot 137
212.0 20
198.0 20
196.0 20
195.5 13
200.5 13
211.0 20
219.0 13
222.0 13
220.0 13
197.5 20
195.0 20
193.5 12
192.5 12
192.0 12
191.0 12
191.5 12
185.0 12
168.0 12
157.0 12
150.0 20
155.0 12
158.0 12
160.5 12
163.0 12
164.0 20
161.0 12
159.0 12
161.5 17
167.5 17
178.5 12
182.0 12
129.5 12
96.2 105.5 21.6
97.1 105.5 20.7
96.0 105.5 22.1
101.7 111.5 20.1
102.1 111.5 20.4
95.7 105.5 21.6
100.9 111.5 21.7
101.0 111.5 21.0
102.2 111.5 20.4
96.3 105.5 22.9
101.7 105.5 21.7
108.7 118.5 15.6
109.1 118.5 16.2
107.9 118.5 16.9
108.6 118.5 15.8
108.6 118.5 16.0
108.3 118.5 14.6
108.3 118.5 13.9
107.5 118.5 13.5
96.2 105.5 21.2
107.8 118.5 14.9
108.8 118.5 15.1
107.7 118.5 13.2
108.3 118.5 13.6
95.7 105.5 22.7
109.2 118.5 14.8
108.1 118.5 13.2
109.2 117.0 12.6
110.1 117.0 13.2
108.5 118.5 15.1
107.6 118.5 14.0
106.7 118.5 14.7
20.5 91
20.5 92
20.5 91
18.5 91
18.5 92
20.5 91
18.5 90
18.5 91
18.5 92
20.5 91
20.5 96
13.5 92
13.5 92
13.5 91
13.5 92
13.5 92
13.5 91
13.5 91
13.5 91
20.5 91
13.5 91
13.5 92
13.5 91
13.5 91
20.5 91
13.5 92
13.5 91
10.5 93
10.5 94
13.5 92
13.5 91
13.5 90
!
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 1 of 2
911 1/2 9:44:1OAM Leighton and Associates, Inc
1 , I 1 1 1 I 1 I I I I ’. 1 i I r I \
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. ComDaction Remarks
J
J
J
J
I
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
33
34
35
36
31
38
39
40
41
42
43
44
45
46
41
48
49
50
51
52
53
54
55
2/1/02 M
2/1/02 M
2/1/02 x
211102 M
2/2/02 M
2/2/02 M
212102 x
5/29/02 M
5/29/02 M
5129102 M
5/29/02 M
5130102 X
5/30/02 M
5130102 X
5/30/02 M
5/31/02 M
5131102 M
6/4/02 X
6/4/02 M
6/4/02 M
614102 M
6/4/02 X
6/4/02 M
Adjacent Lot 141
Adjacent Lot 145
Adjacent Lot 146
Adjacent Lot 134
Adjacent Lot 129
Adjacent Lot 125
Adjacent Lot 171
Avenida Aragon
Avenida Aragon
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Aragon
Sitio Toledo
Sitio Toledo
Sitio Toledo
Avenida Aragon
Sitio Andalucia
Sitio Andalucia
Avenida Aragon
Avenida Aragon
Station 2+50
Station 4+70
Station 1+85
Station 3+30
Station 3+85
Station 6+20
Station 7+80
Station 7+20
Station 2+50
Station 0+66
Station 1+98
Station 11+30
Station 2+20
Station 0+80
Station 14+25
Station 15+70
128.0 12
131.5 12
136.0 12
132.0 12
137.0 12
138.5 12
154.0 12
116.0 19
119.0 23
121.0 19
127.0 19
129.0 19
133.0 21
125.0 19
123.0 19
132.0 21
141.0 21
135.0 21
130.0 21
136.0 19
141.0 19
132.0 19
130.0 19
108.2 118.5 17.1
107.5 118.5 16.3
107.1 118.5 15.7
109.3 118.5 15.1
107.1 118.5 15.7
108.6 118.5 14.1
107.7 118.5 13.9
110.1 120.5 16.9
104.2 111.5 16.5
109.7 120.5 13.1
110.1 120.5 11.9
110.8 120.5 14.6
112.7 123.0 14.1
109.6 120.5 14.5
111.8 120.5 15.0
112.3 123.0 13.5
112.7 123.0 14.7
113.8 123.0 14.1
111.9 123.0 12.9
110.6 120.5 13.6
111.5 120.5 13.2
109.8 120.5 13.6
110.1 120.5 14.1
13.5 91
13.5 91
13.5 90
13.5 92
13.5 90
13.5 92
13.5 91
12.5 91
16.5 93
12.5 91
12.5 91
12.5 92
12.0 92
12.5 91
12.5 93
12.0 91
12.0 92
12.0 93
12.0 91
12.5 92
12.5 93
12.5 91
12.5 91
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 2 of 2
Leighton and Associates, Inc 9/1lt2 944.10AM
I I i I I I I 1 1 1 b I I 1 I i i
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative PA)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Comnaction Remarks
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
SG
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
8/30/01 ST
8/30/01 ST
8/30/01 ST
8130/01 ST
9/5/01 CG
9/5/01 ST
9/5/01 CG
9/5/01 ST
9/5/01 CG
9/5/01 ST
9/5/01 ST
9/5/01 ST
9/5/01 CG
9/5/01 CG
9/5/01 ST
9/5/01 CG
9\5/01 ST
9/5/01 ST
9/5/01 CG
9/5/01 ST
9/28/01 sw
9/28/01 sw
9/28/01 SW
9/28/01 SW
11/16/01 SW
11/16/01 SW
11/16/01 SW
217102 ST
2/7/02 ST
2/7/02 ST
2/7/02 ST
2/7/02 CG
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Calle Cordoba
L. Side Ave. Sueno
Avenida de Sueno
L. Side Ave. Sueno
Avenida de Sueno
R. Side Ave. Sueno
Avenida de Sueno
Avenida de Sueno
R Side Ave. Sueno
L. Side Ave. Sueno
L. Side Ave. Sueno
Avenida de Sueno
R. Side Ave. Sueno
Avenida de Sueno
Avenida de Sueno
L. Side C. Cordoba
Calle Cordoba
R Side Calle Cordoba
R Side Calle Cordoba
L Side Calle Cordoba
L Side Calle Cordoba
R Side Calle Cordoba
L Side Calle Cordoba
R Side Calle Cordoba
R. Side Del Cruce
R. Side Del Cmce
R. Side Del Cruce
L. Side Del Cmce
R. Side Del Cruce
Station 49+50
Station 47+85
Station 45+55
Station 1+85
Station 551-30
Station 54+60
Station 53+80
Station 53+55
Station 52+00
Station 51+90
Station 50+70
Station 48+90
Station 46+95
Station 44+35
Station 44+35
Station 42+65
Station 42+65
Station 41+65
Station 2+50
Station 1+40
Station 1+68
Station 2+70
Station 2+82
Station 1+98
Station 1+80
Station 1+51
Station 1+29
Station 8+50
Station 8+75
Station 8+35
Station 7+76
Station 7+70
0.0 20
0.0 20
0.0 20
0.0 20
0.0 20
0.0 20
0.0 20
0.0 20
0.0 12
0.0 12
0.0 20
0.0 20
0.0 20
0.0 12
0.0 12
0.0 12
0.0 12
0.0 20
0.0 16
0.0 16
0.0 17
0.0 17
0.0 17
0.0 17
0.0 24
0.0 24
0.0 24
0.0 25
0.0 25
0.0 25
0.0 25
0.0 25
101.6 105.5 24.1
100.9 105.5 22.6
102.3 105.5 23.5
100.6 105.5 22.2
101.4 105.5 21.6
100.9 105.5 20.2
101.1 105.5 22.0
101.7 105.5 20.7
113.9 118.5 15.1
112.8 118.5 14.8
103.3 105.5 21.6
101.9 105.5 23.6
102.5 105.5 20.8
114.1 118.5 16.2
113.2 118.5 15.7
113.0 118.5 16.0
112.9 118.5 13.7
100.9 105.5 19.9
115.0 120.0 12.7
114.0 120.0 13.1
105.7 117.0 9.7
106.1 117.0 10.1
107.9 117.0 9.3
106.5 117.0 10.3
116.2 128.5 10.1
116.7 128.5 11.3
115.9 128.5 10.7
106.2 111.0 19.8
105.8 111.0 20.3
107.1 111.0 19.5
106.7 111.0 21.2
106.6 111.0 20.6
20.5 96
20.5 96
20.5 97
20.5 95
20.5 96
20.5 96
20.5 96
20.5 96
13.5 96
13.5 95
20.5 98
20.5 97
20.5 97
13.5 96
13.5 96
13.5 95
13.5 95
20.5 96
12.5 96
12.5 95
10.5 90
10.5 91
10.5 92
10.5 91
9.0 90
9.0 91
9.0 90
17.0 96
17.0 95
17.0 96
17.0 96
17.0 96
Project Number: 851855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page I of 9
Leighton and Associates, Inc 111412 1 :40:40PM
1 1 I I I I ! \ 1 t \ 1 ! 1 1 i I I
SUMMARY OF FIELD DENSITY TESTS
I
~~ ~~ ~~ ~ ~~~~ ~ ~~~~ ~~
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative PA1
No. Date Of Lot# Elev(ft) Type Field Max Field Opt. Comoaction Remarks
SG 33
SG 34
SG 35
SG 36
SG 37
SG 38
SG 39
SG 40
SG 41
SG 42
SG 43
SG 44
SG 45
SG 46
SG 47
SG 48
SG 49
SG 50
SG 51
SG 52
SG 53
SG 53A
SG 54
SG 54A
SG 55
SG 55A
SG 56
SG 57
SG 58
SG 59
SG 60
SG 61
2/7/02
2/7/02
2/8/02
218102
2/8/02
2\8/02
2/8/02
2/8/02
2/8/02
2/8/02
2/8/02
2/8/02
211 1/02
211 1/02
2/11/02
211 1/02
2/15\02
2/15/02
2/15/02
2/15/02
3128102
3/29/02
3/28/02
3/29/02
3/28/02
3/28/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
CG
ST
CG
ST
CG
ST
ST
CG
CG
ST
CG
CG
ST
CG
CG
ST
ST
CG
ST
CG
ST
ST
ST
ST
ST
ST
ST
CG
CG
ST
ST
CG
L. Side Del Cruce
L. Side Del Cruce
R. Side Del Cruce
L. Side Del Cruce
L. Side Del Cruce
R. Side Del Cruce
L. Side La Cima
R. Side La Cima
L. Side La Cima
L. Side La Cima
R. Side La Cima
L. Side La Cima
R. Side Del Cruce
L. Side Del Cruce
R. Side Del Cruce
R. Side Del Cruce
L. Side Cam. Alegre
L. Side Cam. Alegre
L. Side Cam. Alegre
L. Side Cam. Alegre
L. Side La Cima
L. Side La Cima
R. Side La Cima
R. Side La Cima
R. Side Del Crnce
R. Side Del Cruce
R. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Ave. La Cima
L. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Ave. La Cima
Station 6+70
Station 5+70
Station 5+10
Station 3+84
Station 2+15
Station 1+39
Station 14+79
Station 13+32
Station 11+40
Station 10+65
Station 8+70
Station 7+89
Station 6+90
Station 6+00
Station 5+00
Station 4+72
Station 40+50
Station 39+90
Station 37+93
Station 36+75
Station 5+21
Station 5+2 I
Station 12172
Station 12+72
Station 6+40
Station 6+40
Station 4+70
Station 5+02
Station 7+00
Station 7+10
Station 9+92
Station 10+75
0.0 25
0.0 25
0.0 25
0.0 25
0.0 25
0.0 25
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 12
0.0 12
0.0 12
0.0 10
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
105.9 111.0 20.2
107.4 111.0 19.4
108.1 111.0 18.7
107.5 111.0 20.2
107.9 111.0 19.6
107.6 111.0 19.8
109.2 113.0 20.1
109.5 113.0 18.7
107.9 113.0 19.6
108.7 113.0 21.7
108.7 113.0 22.6
108.8 113.0 21.8
107.9 113.0 20.5
108.1 113.0 21.7
107.7 113.0 20.9
108.6 113.0 19.3
113.7 118.5 15.3
114.6 118.5 14.7
113.6 118.5 15.6
110.4 114.5 16.0
96.5 109.5 22.3
105.9 109.5 20.6
99.8 109.5 17.8
104.7 109.5 19.7
101.1 109.5 21.7
105.1 109.5 20.8
104.5 109.5 20.0
106.7 109.5 20.4
104.8 109.5 19.6
105.2 109.5 21.0
105.2 109.5 21.6
104.5 109.5 20.4
17.0
17.0
17.0
17.0
17.0
17.0
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
16.5
13.5
13.5
13.5
16.5
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
18.0
95
97
97
97
97
97
97
97
95
96
96
96
95
96
95
96
96
97
96
96
88
97
91
96
92
96
95
97
96
96
96
95
RT ON 53A
RT OF 53
RT ON 54A
RT OF 54
RT ON 55A
RT OF 55
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 2 of 9
Leighton and Associates, Inc 11/4/2 1:40:41PM
I I I I I I I \ I I I 1 I I I \ 1 I I
SUMMARY OF FIELD DENSITY TESTS
~ ~ ~ ~ ~ _ ~ ~ ~ ~ __ __
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative (%)
No. Date Of Lot# Elev(ft) Type Field Max Field Opt. Compaction Remarks
SG 62
SG 63
SG 64
SG 65
SG 66
SG 67
SG 68
SG 69
SG 70
SG 71
SG 72
SG 73
SG 74
SG 75
SG 76
SG 77
SG 78
SG 79
SG 80
SG 81
SG 82
SG 83
SG 84
SG 85
SG 86
SG 87
SG 88
SG 89
SG 90
SG 91
SG 92
SG 93
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/3/02
4/17/02
41 17/02
411 7/02
4/17/02
4/17/02
4/17/02
4/17/02
411 7/02
4/17/02
4/17/02
41 17/02
4/17/02
4/17/02
41 17102
411 8/02
4/18/02
4/18/02
411 8/02
CG
ST
CG
ST
ST
CG
CG
ST
ST
CG
ST
CG
ST
ST
ST
CG
ST
CG
ST
CG
ST
CG
CG
ST
ST
CG
ST
CG sw sw
CG
CG
L. Side Ave. La Cinla
R. Side Ave. La Cima
R. Side Ave. La Cima
Center Ave. La Cima
R. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Del Cruce
R. Side Del Cruce
Center Del Cruce
L. Side Del Cruce
L. Side Del Cruce
R. Side Del Cruce
L. Side Del Cruce
Center Del Cruce
L. Side Del Alba
R. Side Del Alba
R. Side Del Alba
R. Side Del Alba
Center Del Alba
R. Side Del Alba
L. Side Del Alba
L. Side Del Alba
R. Side Del Alba
R. Side Del Alba
R. Side Del Alba
L. Side Cam. Alegre
Center Cam. Alegre
R. Side Cam. Alegre
Adjacent Lot 59
Adjacent Lot 56
R. Side La Cima
L. Side La Cima
Station 12+70
Station 12+22
Station 13+60
Station 14+60
Station 16+52
Station 16+68
Station 1+60
Station 2+25
Station 2+86
Station 4+55
Station 5+10
Station 6+05
Station 6+78
Station 8+45
Station 30+90
Station 28+26
Station 27+53
Station 27+45
Station 26+35
Station 25+43
Station 24+30
Station 22+80
Station 22+80
Station 19+75
Station 3 1 +90
Station 32+37
Station 34100
Station 34+73
Station 2+87
Station 2+85
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 17
0.0 17
0.0 12
0.0 12
105.0 109.5 20.7
105.7 109.5 21.8
107.8 109.5 22.9
104.9 109.5 18.9
105.7 109.5 19.2
108.2 109.5 17.6
107.3 109.5 18.3
105.2 109.5 19.2
105.2 109.5 20.3
104.7 109.5 18.8
104.7 109.5 17.9
106.8 109.5 19.6
105.6 109.5 19.3
107.2 109.5 21.2
114.6 118.5 13.6
112.9 118.5 19.1
114.1 118.5 12.7
113.2 118.5 13.4
115.1 118.5 12.6
116.0 118.5 13.8
113.2 118.5 15.1
113.6 118.5 14.6
113.0 118.5 15.0
113.8 118.5 14.2
114.6 118.5 14.7
113.6 118.5 14.5
114.0 118.5 12.9
107.1 117.0 11.3
106.9 117.0 10.9
113.8 118.5 13.1
112.9 118.5 12.7
115.2 118s 13.9
18.0 96
18.0 97
18.0 98
18.0 96
18.0 97
18.0 99
18.0 98
18.0 96
18.0 96
18.0 96
18.0 96
18.0 98
18.0 96
18.0 98
13.5 97
13.5 95
13.5 96
13.5 96
13.5 97
13.5 98
13.5 96
13.5 96
13.5 95
13.5 96
13.5 97
13.5 97
13.5 96
13.5 96
10.5 92
10.5 91
13.5 96
13.5 95
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Pace 1 of 9 D- - -- - ~-
Leighton and Associates, Inc 11/4/2 I:4041PM
I I 1 I I I I ! 1 I 1 I 1 I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative ,%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
SG 94
SG 95
SG 96
SG 97
SG 98
SG 98A
SG 99
SG 99A
SG 100
SG IOOA
SG 101
SG IOlA
SG 102
SG 103
SG 104
SG 105
SG 106
SG 107
SG 108
SG 109
SG 110
SG 111
SG 112
SG 113
SG 114
SG 115
SG 116
SG 117
SG 118
SG 119
SG 120
SG 121
411 8/02
4/18/02
513 1/02
513 1/02
6/10/02
6114102
6/10/02
6/14/02
6/13/02
6/14/02
6/13/02
6/14/02
6/13/02
6/13/02
6/13/02
6/13/02
61 14/02
6/14/02
6/14/02
6/14/02
6/14/02
6/14/02
6/14/02
6/14/02
6/14/02
6/14/02
6/17/02
611 7/02
6/17/02
6/17/02
6/17/02
6/17/02
ST
XG
PL
PL
ST
ST
ST
ST
CG
CG
CG
CG sw sw sw sw
ST
CG
ST
CG
ST
CG
ST
CG
ST
CG
CG
ST
CG
CG
ST
ST
L. Side La Cima
R. Side La Cima
Open Space Lot 246
Open Space Lot 246
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
L. Side Ave. Secreto
L. Side Ave. Secreto
R. Side Ave. Secreto
R. Side Ave. Secreto
N. ofLot 124
N. ofLot 128
W. ofLot 135
N. ofLot 143
Avenida Secreto
R. Side Ave. Secreto
R. Side Ave. Secreto
L. Side Ave. Secreto
L. Side Ave. Secreto
R. Side Ave. Secreto
Avenida Secreto
L. Side Ave. Secreto
L. Side Ave. Secreto
R. Side Ave. Secreto
L. Side Sitio Toledo
L. Side Sitio Toledo
R. Side Sitio Toledo
L. Side Sitio Toledo
L. Side Sitio Toledo
Sitio Andalucia
Station 2+25
Station 3+06
Station t15
Station 615
Station +I5
Station tl5
Station t52
Station 1+52
Station 3+60
Station 3+60
DG Path
DG Path
DG Path
DG Path
Station 0+88
Station 1+90
Station 2+65
Station 6103
Station 5+28
Station 5+35
Station 6150
Station 6+90
Station 7+55
Station 8+25
Station 0+74
Station 1+20
Station It92
Station 2+98
Station 3+00
Station 1+20
0.0 12
0.0 12
0.0 17
0.0 17
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
113.5 118.5 14.6
114.2 118.5 14.4
113.4 117.0 12.2
112.6 117.0 13.1
103.4 118.5 10.6
109.3 118.5 16.2
102.1 118.5 11.5
107.1 118.5 13.9
104.6 118.5 15.1
108.5 118.5 14.1
105.1 118.5 13.5
110.7 118.5 14.7
108.2 318.5 16.1
107.7 118.5 14.7
108.0 118.5 15.4
107.9 118.5 15.8
115.0 118.5 14.8
114.5 118.5 13.8
113.2 118.5 14.1
115.0 118.5 13.1
12.8
17.5
13.0
16.1
14.3
12.7
13.5
18.5 15.1
18.5 12.6
18.5 12.8
18.5 12.9
18.5 14.7
18.5 15.1
18.5 12.7
115.2 118.5 13.7
115.0 118.5 14.4
114.7 118.5 13.3
112.9 118.5 13.5
113.9 118.5 14.4
13.5
13.5
10.5
10.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
96
96
97
96
87
92
86
90
88
92
89
93
91
91
91
91
97
97
96
97
95
99
95
98
96
95
96
97
97
97
95
96
RT ON 98A
RT OF 98
RT ON 99A
RT OF 99
RT ON IOOA
RT OF 100
RT ON lOlA
RT OF 101
Project Number: 851855-012
Project Name: ArroyoNnit 2
Project Location: 0
Client: 0 Page 4 of 9
Leighton and Associates, Inc 11/4/2 1:4041PM
I I I I I I I r 1 I 1 1 I 1 1 I I I
SUMMARY OF FIELD DENSITY TESTS
I
Test Test Test Location Test Soil Dry Density Moisture (%) Relative PA)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks
SG 122
SG 123
SG 124
SG 125
SG 126
SG 127
SG 128
SG 129
SG 130
SG 131
SG 132
SG 133
SG 134
SG 135
SG 136
SG 137
SG 138
SG 139
SG 140
SG 141
SG 142
SG 143
SG 144
SG 145
SG 146
SG 147
SG 148
SG 149
SG 150
SG 152
SG 153
SG 154
611 7/02
611 7/02
611 7/02
61 17/02
611 8/02
61 18/02
6/18/02
611 8/02
611 8/02
6/18/02
6118102
611 8/02
6/18/02
6/18/02
611 8/02
6/18/02
611 8/02
61 18/02
7/1/02
7/1/02
7/1/02
7/1/02
7/1/02
115102
7/5/02
7/5/02
7/5/02
7/5/02
7/5/02
7/5/02
7/5/02
8112102
ST
CG
ST
ST
CG
ST
CG
ST
CG
ST
CG
ST
CG
CG
ST
CG
ST
CG sw sw sw sw sw
Dh sw
DA sw
DA sw
DA sw
ST
Sitio Andalucia
L. Side Andalucia
L. Side Andalucia
L. Side Andalucia
L. Side Ave. Aragon
L. Side Ave. Aragon
R. Side hue. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
R. Side La Cima
R. Side Del Alba
R. Side Del Alba
R. Side Del Alba
R. Side Del Alba
R Side hve De Sueno
R Side Ave De Sueno
R Side Ave De Sueno
R Side Ave De Sueno
L Side Ave De Sueno
L Side Ave De Sueno
L. Side Ave De Sueno
L Side Camino Alegre
R. Side Ave. Aragon
Station 1+15
Station 1+50
Station 1+85
Station 2+45
Station 16+60
Station 16+28
Station 15+05
Station 13+50
Station 12+60
Station 12+00
Station 10+92
Station 9+50
Station 8152
Station 8+03
Station 6+60
Station 5+15
Station 3+50
Station 2+82
Station 18+65
Station 20+3 1
Station 22+45
Station 25+18
Station 28+65
Station 44+76
Station 43+50
Station 42+06
Station 41+83
Station 44+27
Station 43+5 1
Station 42+40
Station 40+35
Station 16+68
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 18
0.0 I8
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 I8
0.0 19
113.9 118.5 12.9
114.7 118.5 13.1
112.9 118.5 12.9
113.5 118.5 13.8
112.9 118.5 14.3
113.1 118.5 14.0
114.0 118.5 15.1
113.5 118.5 12.8
113.9 118.5 13.6
113.3 118.5 14.0
114.3 118.5 14.1
113.8 118.5 13.9
115.0 118.5 14.7
114.0 118.5 13.2
112.9 118.5 15.2
113.6 118.5 14.7
113.1 118.5 13.8
113.7 118.5 13.2
108.3 118.5 16.1
107.9 118.5 14.7
107.5 118.5 17.3
108.0 118.5 17.0
106.9 118.5 16.8
113.3 118.0 12.6
113.6 118.0 13.1
114.1 118.0 14.6
113.0 118.0 12.9
112.7 118.0 13.8
108.3 118.0 14.6
112.7 118.0 13.2
109.9 118.0 13.7
115.2 120.5 14.2
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
12.5
96
97
95
96
95
95
96
96
96
96
96
96
97
96
95
96
95
96
91
91
91
91
90
96
96
97
96
96
92
96
93
96
Project Number: 851 855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 5 of 9 I
Leighton and Associates, Inc Ill412 1:4041PM
I I I I I I 1 1 I I I I I
SUMMARY OF FIELD DENSITY TESTS
I I I I I
~ ~~
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot# Elev(ft) Type Field Max Field Opt. Compaction Remarks
SG 155
SG 156
SG 157
SG 158
SG 159
SG 160
SG 161
SG 162
SG 163
SG 164
SG 165
SG 166
SG 167
SG 168
SG 169
SG 170
SG I71
SG 172
SG 173
SG 174
SG 175
SG 176
SG 177
SG 178
SG 179
SG 180
SG 181
SG 182
SG 183
SG 184
SG 185
SG 186
81 12/02
8/12/02
8/12/02
8/12/02
8/1 2/02
8/12\02
8/12/02
8/12/02
8/12/02
8/12/02
8/12/02
8/12/02
81 12/02
8/13/02
8/15/02
8/15/02
8/15/02
8/15/02
9/9/02
9/9/03
9/9/02
9/9/02
9/9/02
9/9/02
9/9/03
9/25/02
9/25/02
9125/02
9/25/02
9/25/02
9/25/02
9/25/02
CG
CG
ST
CG
CG
ST
CG sw sw sw sw sw sw sw sw sw sw sw sw sw sw
DA
DA sw sw sw
DA sw
DA sw sw sw
R. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
Median Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Toledo
R. Side Ave. Aragon
R. Side Ave. Aragon
R. Side La Cima
L. Side La Cima
R Side Ave. De Sueno
R Side Ave. De Sueno
R Side Ave. De Sueno
R Side Ave. De Sueno
R Side Ave. De Sueno
R Side Ave. De Sueno
R Side Ave. De Sueno
R Side Ave. Alegre
R Side Ave. Alegre
R Side Ave. Alegre
R Side Ave. Alegre
R Side Ave. Alegre
R Side Ave. Alegre
R Side La Cima
Station 16+87
Station 16+94
Station 2+00
Station 1+78
Station 1+78
Station 1+94
Station 2+02
Station 3+07
Station 4+70
Station 5+84
Station 6+59
Station 7+35
Station 8+93
Station 3+38
Station 2+96
Station 5+25
Station 2+02
Station 1+98
Station 53+94
Station 53+44
Station 54+40
Station 55+21
Station 55+10
Station 54+18
Station 53+10
Station 40+46
Station40+14
Station 38+78
Station 37+50
Station 36+16
Station 35+15
Station 3+87
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 12
0.0 12
0.0 16
0.0 16
0.0 16
0.0 16
0.0 16
0.0 16
0.0 16
0.0 12
0.0 15
0.0 15
0.0 15
0.0 15
0.0 15
0.0 15
116.8 120.5 15.1
115.7 120.5 13.6
117.2 120.5 12.9
114.9 120.5 14.1
115.3 120.5 14.7
115.0 120.5 14.5
116.3 120.5 15.1
110.3 120.5 14.6
108.9 120.5 15.2
109.7 120.5 12.5
109.1 120.5 13.1
109.7 120.5 14.6
111.1 120.5 15.5
110.5 120.5 13.2
105.2 120.5 16.1
106.2 120.5 16.5
102.2 118.5 17.1
102.5 118.5 16.8
104.9 120.0 16.1
105.2 120.0 15.7
109.3 120.0 12.9
108.6 120.0 14.3
110.3 120.0 13.2
105.0 120.0 16.5
110.0 120.0 12.9
108.5 118.5 12.9
114.9 119.5 13.1
104.1 119.5 16.3
116.2 119.5 12.9
103.7 119.5 15.8
105.0 119.5 16.1
108.5 119.5 12.7
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
13.5
13.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
13.5
12.5
12.5
12.5
12.5
12.5
12.5
97
96
97
95
96
95
97
92
90
91
91
91
92
92
87
88
86
86
87
88
91
90
92
88
92
92
96
87
97
87
88
91
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
Project Number: 851855-012
Project Name: ArroyoNnit 2
Project Location: 0 Client: 0 Page 6 of 9
Leighton and Associates, Inc I1/4/2 1:40:41PM
I I I I I I I \ I 1 I I I I 1 I 1 I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative I%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks
SG 187
SG 188
SG 189
SG 190
SG 191
SG 192
SG 193
SG 194
SG 195
SG 196
SG 197
SG 198
SG 199
SG 200
SG 201
SG 202
SG 203
SG 204
SG 205
SG 206
SG 207
SG 208
SG 209
SG 210
SG 211
SG 212
SG 213
SG 214
SG 215
SG 216
SG 217
SG 218
9/25/02 sw
9/25/02 DA
9125102 SW
12/26/02 SW
12/26/02 SW
12126102 DA
12126102 SW
12/26/02 DA
12/26/02 DA
12/26/02 SW
12/6/02 DA
12/6/02 SW
12/6/02 SW
12/27/02 SW
12/27/02 DA
12/27/02 sw
12/27/02 DA
12/27/02 SW
12/27/02 DA
1/27/03 sw
1127103 sw
1/27/03 DA
1/27/03 sw
418103 DA
4/8/03 SW
4/8/03 DA
4/8/03 SW
4/8/03 DA
4/8/03 SW
4/8/03 DA
4/8/03 DA
4/8/03 SW
L. Side Ave. Alegre
L. Side Ave. Alegre
L. Side Ave. Alegre
R. Side Ave. La Cima
R. Side Ave. La Cima
R. Side Ave. La Cia
R. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Ave. La Cima
L. Side Ave. La Cima
L. Side Ave. La Cima
L. Side Ave. La Cima
L. Side Ave. La Cima
R Side Ave. Aragon
R Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Corte Del Cmce
Cone Del Cmce
Corte Del Cruce
Cone Del Cruce
Cone Del Cruce
Cone Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Station 36+90
Station 38+00
Station 39+56
Station 5+66
Station 6+89
Station 7+90
Station 9+04
Station 9+78
Station lO+lO
Station 9+12
Station 7+62
Station 6+42
Station 5+52
Lot 182
Lot 182
Lot 183
Lot 183
Lot 184
Lot 185
Lot 89
Lot 163
Lot 86
Lot 166
Lot 92
Lots 93/94
Lot 95
Lot 97
Lot 100
Lot 113
Lot 1 I3
Lots I141155
Lot 116
0.0 15
0.0 15
0.0 15
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 18
0.0 18
109.2 119.5 14.8
116.0 119.5 13.6
103.6 119.5 15.7
103.0 118.0 16.7
105.7 118.0 17.1
106.8 118.0 15.6
104.9 118.0 16.9
104.5 I18.0 16.5
103.6 118.0 18.1
107.2 118.0 16.1
106.0 118.0 17.5
107.7 118.0 17.0
106.0 118.0 17.3
108.2 122.0 17.1
114.1 122.0 16.1
110.6 122.0 16.0
109.6 122.0 16.3
110.8 122.0 16.1
113.7 122.0 16.8
107.0 122.0 15.2
109.3 122.0 13.9
109.2 122.0 15.9
112.3 122.0 13.7
108.6 122.0 14.6
107.6 122.0 15.4
109.3 122.0 14.5
110.5 122.0 15.0
111.1 122.0 14.8
111.3 122.0 14.6
109.6 122.0 15.0
106.1 118.0 16.5
104.7 118.0 16.9
12.5 91
12.5 97
12.5 87
13.5 87
13.5 90
13.5 91
13.5 89
13.5 89
13.5 88
13.5 91
13.5 90
13.5 91
13.5 90
11.5 89
11.5 94
11.5 91
11.5 90
11.5 91
11.5 93
11.5 88
11.5 90
11.5 90
11.5 92
11.5 89
11.5 88
11.5 90
11.5 91
11.5 91
11.5 91
11.5 90
13.5 90
13.5 89
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
Project Number: 851 855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 7 of 9
Leighton and Associates, Inc I1/4/2 1:40:41PM
I I I I I I I I 1 I I I I I 1 I I I
SUMMARY OF FIELD DENSITY TESTS
~ __
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. ComDaction Remarks
SG 219
SG 220
SG 221
SG 222
SG 223
SG 224
SG 225
SG 226
SG 227
SG 228
SG 229
SG 230
SG 231
SG 232
SG 233
SG 234
SG 235
SG 236
SG 237
SG 238
SG 239
SG 240
SG 241
SG 242
SG 243
SG 244
SG 245
SG 246
SG 247
4/8/03
4/8/03
5/19/03
5/19/03
511 9/03
5/19/03
7/9/03
7/9/03
7/9/03
7/9/03
7/9/03
7/9/03
7/9/03
7/9/03
7/9/03
7/9/03
7/9/03
7/9/03
7/9/03
7/9/03
8121103
8/21/03
8/21/03
8/21/03
8/21/03
812 1/03
8/21/03
8/21/03
8/4/03
sw sw
DA sw
DA sw sw
DA
DA sw
DA
DA sw
DA sw
DA sw sw
DA
DA
DA sw sw
DA sw
DA
DA
DA sw
Corte Del Cruce
Avenida La Cima
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Avenida la Cima
Avenida la Cima
Avenida la Cima
Avenida la Cima
Lot 189
Lot 191
Lot 193
Lot 203
Lot 206
Lot 205
Lot 204
Lot 129
Lot 126
Lot 124
Lot 130
Lot 131
Lot 132
Lot 133
Lot 134
Lot 135
Lot 204
Lot 204
Lot 203
SG 247A 8/21/03 SW Lot203
SG 248 8/21/03 SW Lot202
SG 248A 8/21/03 SW Lot202
Lot 117
Lot 92
Lot 103
Station 8+05
Lot 108
Station 7+50
Lot 168
Lot 118
Lot 120
Lot 121
0.0 18
0.0 I8
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 9
0.0 9
0.0 9
0.0 9
0.0 9
0.0 9
0.0 9
0.0 9
0.0 9
0.0 18
0.0 18
0.0 18
0.0 I8
0.0 18
0.0 18
107.3 118.0 17.5
106.1 118.0 17.1
114.3 122.0 14.0
115.0 122.0 14.7
114.0 122.0 13.9
112.8 122.0 14.3
111.9 122.0 12.5
115.9 122.0 13.6
116.7 122.0 11.6
113.5 122.0 11.8
113.8 118.0 13.8
110.4 118.0 14.2
109.9 118.0 14.9
112.6 118.0 13.9
106.4
113.2
108.3
108.5
109.7
107.3
107.2
108.0
109.5
111.1
109.6
111.1
108.4
18.0 16.9
18.0 15.4
18.0 14.4
19.0 13.6
19.0 14.1
19.0 13.8
19.0 16.2
19.0 14.3
19.0 15.0
19.0 14.7
19.0 13.9
19.0 14.9
18.0 14.9
109.5 118.0 15.2
101.5 118.0 19.5
110.1 118.0 16.8
105.1 118.0 15.9
107.2 118.0 15.2
13.5
13.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
13.5
13.5
13.5
13.5
13.5
13.5
91
90
94
94
93
92
92
95
96
93
96
94
93
95
90
96
92
91
92
90
90
91
92
93
92
93
92
93
86 RT ON 247A
RT OF 247 93
89 RT ON 248h
91 RT OF 248
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 8 of 9
Leighton and Associates, Inc 11/4/2 1:40:41PM
I I I I I I I I I I 1 ) 1 I I ! I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. ComDaction Remarks
3G 249
3G 250
3G 251
3G 252
3G 253
SG 254
SG 255
3G 255A
3G 256
jG 257
3G 258
3G 259
3G 260
SG 261
8/21/03
8/21/03
8/2l/03
8/21/03
8/21/03
812 1/03
812 1/03
8/21/03
8/21/03
8/21/03
9/10/03
9/10/03
9/10/03
9/10/03
DA sw sw
DA
SW
DA
SW sw
DA
DA
DA
SW
DA sw
Lot 201
Lot 200
Lot 199
Lot 199
Lot 198
Lot 197
Lot 196
Lot 196
Lot 195
Lot 186
Lot 143
Lot 142
Lot 141
Lot 140
3G 262 9/10/03 DA Lot 139
3G 263 9/10/03 SW Lot 138
3G 264 9/10/03 DA Lot 137
jG 265 9110103 DA Lot 136
TEST NO SG 15 1 DOES NOT EXIST
0.0 14
0.0 14
0.0 14
0.0 14
0.0 18 106.1 118.0 16.1
0.0 18 106.8 118.0 16.2
0.0 I8 106.5 118.0 16.3
0.0 18 107.9 118.0 16.0
0.0 I8 110.1 118.0 15.2
0.0 I8 106.4 118.0 16.7
0.0 I8 104.9 118.0 16.0
0.0 18 108.7 118.0 16.3
0.0 18 109.2 118.0 16.6
0.0 18 107.4 118.0 16.0
0.0 14 112.5 122.0 12.4
0.0 14 114.7 122.0 12.4
0.0 14 113.6 122.0 11.6
0.0 14 114.1 122.0 12.4
15.5 122.0 13.1
11.3 122.0 15.4
12.4 122.0 13.7
12.6 122.0 11.2
13.5 90
13.5 91
13.5 90
13.5 91
13.5 93
13.5 90
13.5 89 RT ON 255A
13.5 92 RT OF 255
13.5 93
13.5 91
11.5 92
11.5 94
11.5 93
11.5 94
11.5 95
11.5 91
11.5 92
11.5 92
Project Number: 851855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 9 of 9
Leighton and Associates, Inc I1/4/2 1:40:41PM
I I I I I I I 1 I 1 I I 1 I I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
NO. Date Of Lot # Elev (ft) Type Field Max Field Opt. Cormaction Remarks
AB 1
AB 2
AB 3
AB 4
AB 5
AB 6
AB 7
AB 8
AB 9
AB IO
AB 11
AB 12
AB 13
AB 14
AB 15
AB 16
AB 17
AB I8
AB 19
AB 20
AB 21
AB 22
AB 23
AB 24
AB 25
AB 26
AB 27
AB 28
AB 29
AB 30
AB 31
AB 32
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/13/01 XG
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
10/22/01 ST
10/22/01 ST
10/22/01 ST
2/25/02 CG
2/25/02 CG
2/25/02 CG
2/25/02 CG
2/25/02 CG
2/25/02 CG
3/14/02 ST
3/14/02 ST
L. Side De Sueno
R. Side De Sueno
L. Side De Sueno
R. Side De Sueno
R. Side De Sueno
L. Side De Sueno
R. Side De Sueno
L. Side De Sueno
L. Side Cordoba
R. Side Cordoba
Calle Cordoba
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Calle Cordoba
Calle Cordoba
Calle Cordoba
Calle Cordoba
R. Side Alegre
R. Side Alegre
R. Side Alegre
L. Side Alegre
L. Side Alegre
L. Side Alegre
Camino Alegre
Camino Alegre
Station 54+80
Station 53+15
Station 52+45
Station 50+70
Station 46+70
Station 44+65
Station 43+83
Station 42+25
Station 2+30
Station 1+80
Station 2+90
Station 54+60
Station 53+20
Station 51+55
Station 50+00
Station 48+50
Station 47+10
Station 45+40
Station 44+00
Station 42+50
Station 2+10
Station 1+23
Station 1+27
Station 1+50
Station 36+40
Station 38+42
Station 40+73
Station 40+00
Station 38+50
Station 37+50
Station 4 1 +75
Station 40+70
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 27
0.0 27
0.0 27
0.0 27
0.0 27
0.0 27
0.0 24
0.0 24
124.1 128.5 10.1
122.8 128.5 9.8
123.1 128.5 10.7
122.5 128.5 11.5
123.7 128.5 10.1
122.7 128.5 10.7
125.2 128.5 9.9
124.5 128.5 12.1
124.0 128.5 11.6
123.6 128.5 10.5
122.6 128.5 9.8
123.4 128.5 8.1
125.1 128.5 8.9
124.5 128.5 8.5
124.1 128.5 8.6
126.2 128.5 9.0
125.0 128.5 8.1
123.5 128.5 8.0
124.6 128.5 8.5
122.7 128.5 8.6
125.0 128.5 8.7
123.6 128.5 10.1
122.8 128.5 9.6
123.7 128.5 9.2
111.7 116.0 12.6
110.8 116.0 13.2
112.3 116.0 13.0
111.4 116.0 14.3
110.5 116.0 13.9
111.7 116.0 14.5
123.2 128.5 8.9
122.7 128.5 9.2
9.0 97
9.0 96
9.0 96
9.0 95
9.0 96
9.0 95
9.0 97
9.0 97
9.0 96
9.0 96
9.0 95
9.0 96
9.0 97
9.0 97
9.0 97
9.0 98
9.0 97
9.0 96
9.0 97
9.0 95
9.0 97
9.0 96
9.0 96
9.0 96
14.0 96
14.0 96
14.0 97
14.0 96
14.0 95
14.0 96
9.0 96
9.0 95
~ 4 Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 1 of 5
Leighton and Associates, Inc I1/4/2 I:O8:28PM
I I I I I I I I 1 I I I I I I 1 1 I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot # Elev(ft) Type Field Max Field Opt. ComDaction Remarks
AB 33
AB 34
AB 35
AB 36
AB 37
AB 38
AB 39
AB 40
AB 41
AB 42
AB 43
AB 44
AB 45
AB 46
AB 47
AB 48
AB 49
AB 51
AB 52
AB 53
AB 54
AB 55
AB 56
AB 57
AB 58
AB 59
AB 60
AB 61
AB 62
AB 63
AB 64
AB 65
3/14/02
3/14/02
4110102
4110102
4/10/02
4/10/02
41 10102
411 0102
4/10/02
4/10/02
4/10/02
411 0102
4/10/02
41 18/02
411 8102
4/18/02
411 8/02
411 8/02
4/18/02
4/18/02
411 8/02
41 1 8/02
411 8/02
411 8/02
4/22/02
4122102
4/22/02
4/22/02
4/22/02
4/22/02
4/22/02
4/22/02
ST
ST
CG
CG
CG
CG
CG
CG
XG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
ST
ST
ST
ST
ST
ST
ST
ST
Camino Alegre
Camino Alegre
L. Side La Cima
R. Side La Cima
L. Side La Cima
R. Side La Cima
L. Side La Cima
R. Side La Cima
R. Side La Cima
L. Side Del Cruce
R. Side Del Cruce
L. Side Del Cruce
R. Side Del Cruce
R. Side Del Cruce
R. Side Del Alba
L. Side Del Alba
R. Side Del Alba
L. Side Del Alba
R. Side Del Alba
L. Side Del Alba
R. Side Del Alba
L. Side Cam. Alegro
R. Side Cam. Alegro
L. Side Cam. Alegro
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Corte Del Cruce
Station 38+15
Station 36+52
Station 4+65
Station 6+03
Station 8+15
Station 8+35
Station IO+%
Station 13+65
Station 15+75
Station 1+77
Station 2+90
Station 5+16
Station 7+60
Station 30+45
Station 29+20
Station 27+00
Station 25+25
Station 22+40
Station 21+65
Station 20+30
Station 18+40
Station 32+45
Station 33+75
Station 34+90
Station 3+80
Station 5+60
Station 8+00
Station 10+80
Station 12+50
Station 15+55
Station 16+90
Station 2+45
0.0 24
0.0 24
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
122.5 128.5
123.0 128.5
137.1 141.5
135.5 141.5
135.6 141.5
138.1 141.5
136.4 141.5
135.9 141.5
137.7 141.5
138.9 141.5
136.0 141.5
134.7 141.5
137.6 141.5
139.3 142.0
136.0 142.0
134.9 142.0
138.0 142.0
139.6 142.0
137.9 142.0
136.0 142.0
140.3 142.0
138.2 142.0
134.6 142.0
135.3 142.0
137.9 142.0
136.5 142.0
140.3 142.0
138.3 142.0
134.6 142.0
136.6 142.0
139.6 142.0
135.5 142.0
8.6
9.0
4.7
5.5
5.1
4.9
6.0
5.6
6.3
6.1
5.6
5.9
6.3
5.2
7.4
6.9
6.3
5.5
6.1
7.2
5.1
6.5
7.2
7.1
7.3
6.8
5.5
5.2
5.9
6.3
5.2
6.8
9.0
9.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6 .O
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
95
96
97
96
96
98
96
96
97
98
96
95
97
98
96
95
97
98
97
96
99
97
95
95
97
96
99
97
95
96
98
95
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 2 of 5
Leighton and Associates, Inc 11/4/2 1:08:28PM
1 I I I ! i I \ i 1 I I i I I 1 1 I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative
NO. Date Of Lot# Elev(ft) Type Field Max Field Opt. Compaction Remarks
AB 66
AB 67
AB 68
AB 69
AB 70
AB 71
AB 72
AB 73
AB 74
AB 75
AB 76
AB 77
AB 78
AB 19
AB 80
AB 81
AB 82
AB 83
AB 84
AB 85
AB 86
AB 87
AB 88
AB 89
AB 90
AB 91
AB 92
AB 93
AB 94
AB 95
AB 96
AB 97
4/22/02
4/22/02
4/22/02
4/22/02
4/22/02
4/24/02
4/24/02
5/1/02
5/1/02
5/1/02
5/1/02
5/1/02
5/1/02
5/1/02
5/1/02
5/1/02
5/ 1/02
5/1/02
5/1/02
5/1/02
5/1/02
6/3/02
6/3/02
6/3/02
6/19/02
61 19/02
6/19/02
61 19/02
61 19/02
611 9/02
6/ 19/02
61 19/02
ST
ST
ST
ST
ST
CG
XG
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
XG
ST
ST
PL
PL
PL
CG
CG
CG
CG
CG
CG
CG
CG
Corte Del Cruce
Cone Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
L. Side La Cima
L. Side La Cima
R. Side La Cima
R. Del Alba
L. Del Alba
L. Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Camino Alegre
Camino Alegre
R. Side Alegre
Avenida La Cima
Avenida La Cima
Open Space Lot 246
Open Space Lot 246
Driveway Open Space
R. Side Ave. Secreto
R. Side Ave. Secreto
L. Side Ave. Secreto
L. Side Ave. Secreto
R. Side Ave. Secreto
R. Side Sitio Toledo
L. Side Sitio Toledo
R. Side Sitio Toledo
Station 5+05
Station 6+60
Station 7+56
Station 8+70
Station 3t70
Station 2+65
Station 3+05
Station 17+35
Station 18+13
Station 19+35
Station 20+68
Station 22+80
Station 25+42
Station 26+81
Station 29+50
Station 3 1+70
Station 32+70
Station 34+72
Station 35+75
Station 2+70
Station 2+3 1
Lot 246
Station 4+10
Station 0+50
Station 2+60
Station 5+90
Station 7+74
Station 1+23
Station 2+30
Station 3+15
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 29
0.0 29
0.0 29
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
138.2 142.0
136.2 142.0
139.6 142.0
136.0 142.0
137.9 142.0
136.7 142.0
137.3 142.0
137.4 142.0
135.2 142.0
136.8 142.0
136.5 142.0
137.1 142.0
140.3 142.0
137.8 142.0
138.1 142.0
136.2 142.0
136.2 142.0
136.9 142.0
139.1 142.0
138.5 142.0
135.2 142.0
134.6 139.5
135.8 139.5
133.2 139.5
116.3 119.5
116.0 119.5
113.7 119.5
115.6 119.5
115.9 119.5
115.6 119.5
114.2 119.5
117.2 119.5
6.3
7.1
6.0
7.2
6.8
6.1
6.5
6.6
7.4
7.1
7.5
6.7
5.7
6. I
6.5
7.3
6.1
6.0
5.5
5.9
6.7
6.9
8.2
7.6
11.7
12.1
11.3
11.4
12.6
12.0
11.5
12.6
6.0 97
6.0 96
6.0 98
6.0 96
6.0 97
6.0 96
6.0 97
6.0 97
6.0 95
6.0 96
6.0 96
6.0 97
6.0 99
6.0 97
6.0 97
6.0 96
6.0 96
6.0 96
6.0 98
6.0 98
6.0 95
8.0 96
8.0 97
8.0 95
12.0 97
12.0 97
12.0 95
12.0 97
12.0 97
12.0 97
12.0 96
12.0 98
Project Number: 851855-012
Project Name: ArroyoIUnit 2
Project Location: 0
Client: 0 Page 3 of 5
Leighton and Associates, Inc Ill412 1:08:28PM
I I I I I I I 1 I I I I I I I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative ("A)
No. Date Of Lot # Elev(ft) Type Field Max Field Opt. Compaction Remarks
AB 98
AB 99
AB 100
AB 101
AB 102
AB 103
AB 104
AB 105
AB 106
AB 107
AB 108
AB 109
AB 110
AB 111
AB 112
AB 113
AB 114
AB 115
AB 116
AB 117
AB 118
AB 119
AB 120
AB 121
AB 122
AB 123
AB 124
AB 125
AB 126
AB 127
AB 128
AB 129
6/19/02
611 9/02
611 9/02
6/19/02
6/ 19/02
611 9/02
6/19/02
61 19/02
611 9/02
6119102
61 19/02
6/19/02
6119102
719102
7/9/02
7/9/02
7/9/02
7/9/02
7/9/02
7/9/02
7/9/02
7/9/02
719102
7/9/02
7/12/02
7/12/02
711 5/02
7/15/02
7/15/02
7/25/02
7125102
7/25/02
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST sw sw sw sw sw sw sw sw
L. Side Andalucia
R. Side Andalucia
L. Side Andalucia
R. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
Center Ave. Aragon
L. Side Ave. Aragon
L. Side Ave Secreto
R. Side Ave Secreto
R. Side Ave Secreto
L. Side Ave Secreto
Center Ave Secreto
DG Path
DG Path
DG Path
DG Path
DG Path
DG Path
DG Path
DG Path
Station 1+10
Station 1+35
Station 2+32
Station 16+57
Station 15+51
Station 13+38
Station 11+50
Station 9+52
Station 7+74
Station 5+90
Station 4+80
Station 4+25
Station 2+82
Station 3+01
Station 3+19
Station 5+01
Station 6+05
Station 1+17
Station 1+98
Station 2+75
Station 4+54
Station 6+00
Station 7+20
Station 81-17
N. of Lot 123
N. of Lot 124
N. of Lot 127
N. of Lot 133
N. of Lot 248
N. of Lot 143
N. of Lot 140
N. ofLot 137
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 34
0.0 34
0.0 34
0.0 34
0.0 34
0.0 34
0.0 34
0.0 34
115.1 119.5 13.1
114.8 119.5 12.2
115.6 119.5 12.7
115.6 119.5 13.0
113.9 119.5 11.8
114.1 119.5 11.5
115.2 119.5 12.1
116.7 119.5 12.6
116.0 119.5 13.0
114.6 119.5 12.7
116.8 119.5 11.9
115.2 119.5 13.1
115.0 119.5 12.5
116.3 119.5 11.8
115.8 119.5 10.6
117.5 119.5 12.2
116.7 119.5 11.8
117.9 119.5 12.6
117.0 119.5 12.0
115.1 119.5 11.6
114.7 119.5 10.9
116.0 119.5 10.8
116.1 119.5 12.1
115.7 119.5 11.6
110.6 121.0 12.6
108.9 121.0 13.2
109.5 121.0 11.9
111.6 121.0 12.0
111.2 121.0 12.1
110.8 121.0 12.6
110.5 121.0 11.7
109.8 121.0 13.0
12.0 96
12.0 96
12.0 97
12.0 97
12.0 95
12.0 95
12.0 96
12.0 98
12.0 97
12.0 96
12.0 98
12.0 96
12.0 96
12.0 97
12.0 97
12.0 98
12.0 98
12.0 99
12.0 98
12.0 96
12.0 96
12.0 97
12.0 97
12.0 97
11.0 91
11.0 90
11.0 90
11.0 92
11.0 92
11.0 92
11.0 91
11.0 91
Project Number: 851 855-012
Project Name: Arroyo/Unit 2
Project Location: 0
Client: 0 Page 4 of 5
Leighton and Associates, Inc I1/4/2 I :08:28PM
1 1 I I I I 1 I I 1 1 I 1 I 1 I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. ComDaction Remarks
AB 130
AB 131
AB 132
AB 133
8/12/02 CG L. Side Ave. Aragon Station 16192
8/12/02 CG Median Ave. Aragon Station 1+96
8/12/02 CG Median Ave. Aragon Station 2+13
8/12/02 CG R. Side Ave. Aragon Station 1+70
0.0 30 115.3 119.5 11.2 12.0 96
0.0 30 115.0 119.5 10.9 12.0 96
0.0 30 115.7 119.5 12.1 12.0 97
0.0 30 114.9 119.5 11.7 12.0 96
Project Number: 851855-012
Project Name: ArroyoIUnit 2
Project Location: 0
Client: 0 Page 5 of 5
Leighton and Associates, Inc 11/4/2 1:08:28PM
I
I I I 1 I I I I 1 I 1 I I I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks
AC 1
AC 2
AC 3
AC 4
AC 5
AC 6
AC 7
AC 8
AC 9
AC IO
AC II
AC IIA
AC 12
AC 13
AC 14
AC 15
AC 16
AC 17
AC 18
AC 19
AC 20
AC 21
AC 22
AC 23
AC 24
AC 25
AC 26
AC 27
AC 28
AC 29
AC 30
AC 31
912 1/01
9/2 110 1
9/2 1/01
912 110 1
912 110 1
912 110 1
912 110 1
9/21/01
912 1/01
9/21/01
11/13/01
11/13/01
lI/l3/01
3/15/02
3/15/02
3/15/02
3/15/02
4/24/02
4/24/02
4\24/02
4/24/02
4/24/02
4/24/02
4/24/02
4/24/02
4/24/02
4/24/02
4/24/02
4/25/02
4/25/02
4/25/02
4/25/02
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Calle Cordoba
Calle Cordoba
Calle Cardoba
Calle Alegre
Calle Alegre
Calle Alegre
Calle Alegre
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida Del Cruce
Avenida Del Cruce
Avenida Del Cruce
Avenida Del Cruce
Avenida Del Cmce
Avenida Del Cruce
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Station 54+50
Station 53150
Station 52+50
Station 51+00
Station 49+50
Station 48+00
Station 46+50
Station 45+00
Station 43+50
Station 42+00
Station 1+35
Station 1+35
Station 1+25
Station 40+75
Station 39+55
Station 37+20
Station 36+42
Station 5115
Station 7+75
Station 10+65
Station 11165
Station 14+90
Station 2+70
Station 5+50
Station 8+00
Station 8+62
Station 6+18
Station 3+42
Station 16+35
Station 14+00
Station 13+00
Station 11+50
0.0 ACI
0.0 ACI
0.0 ACI
0.0 ACI
0.0 ACI
0.0 ACl
0.0 ACI
0.0 ACl
0.0 ACI
0.0 ACl
0.0 AC2
0.0 AC2
0.0 AC2
0.0 AC2
0.0 AC2
0.0 AC2
0.0 AC2
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
0.0 AC3
134.5 141.5
135.0 141.5
133.8 141.5
134.7 141.5
134.6 141.5
136.0 141.5
139.3 141.5
137.1 141.5
136.5 141.5
137.5 141.5
135.9 155.0
152.3 155.0
150.9 155.0
149.3 155.0
147.9 155.0
148.5 155.0
149.5 155.0
138.7 144.0
138.2 144.0
139.6 144.0
137.5 144.0
138.2 144.0
137.0 144.0
138.5 144.0
140.1 144.0
141.3 144.0
138.6 144.0
137.5 144.0
136.9 144.0
138.5 144.0
138.1 144.0
137.9 144.0
0.0 95
0.0 95
0.0 95
0.0 95
0.0 95
0.0 96
0.0 98
0.0 97
0.0 96
0.0 97
0.0 88
0.0 98
0.0 97
0.0 96
0.0 95
0.0 96
0.0 96
0.0 96
0.0 96
0.0 97
0.0 95
0.0 96
0.0 95
0.0 96
0.0 97
0.0 98
0.0 96
0.0 95
0.0 95
0.0 96
0.0 96
0.0 96
RT ON 1 IA
RTOF 11
Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 1 of 3
Leighton and Associates, Inc 11/4/2 1:OSIlPM
I I I I I I I I I I I I 1 I I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
AC 32 4/25/02 ST
AC 33 4/25/02 ST
AC 34 4/25/02 ST
AC 35 4/25/02 ST
AC 36 7110/02 ST
AC 37 7/10/02 ST
AC 38 7/10/03 ST
AC 39 7110102 ST
AC 40 7/10/02 ST
AC 41 7110102 ST
AC 42 7/10/02 ST
AC 43 7/10/02 ST
AC 44 7110102 ST
AC 45 7/10/02 ST
AC 46 7/10/02 ST
AC 47 7/10/02 PL
AC 48 7/10/02 PL
AC 49 7/10/02 PL
AC 50 8/21/02 ST
AC 51 8/21/02 ST
AC 52 8121102 ST
AC 53 8/21/02 ST
AC 54 8/21/02 ST
AC 55 8/21/02 ST
AC 56 8/21/02 ST
AC 57 8/21/02 ST
AC 58 8/21/02 ST
AC 59 8/21/02 ST
AC 60 8/21/02 ST
AC 61 8/21/02 ST
AC 62 8/21/02 ST
AC 63 8/21/02 ST
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Lot 246
Lot 246
Lot 246
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Calle Acervo
Calle ACervo
Calle Acervo
Calle Acervo
Calle Acervo
Calle ACervo
Calle Acervo
Calle Acervo
Station 9+90
Station 8+12
Station 6+50
Station 4+20
Station 0+79
Station 1+78
Station 2+36
Station 3+84
Station 5+43
Station 6+75
Station 8+40
Station 2+95
Station 4+25
Station 4+40
Station 61-55
Station 1+34
Station 2+20
Station 3+10
Station 0+70
Station 1+54
Station 2+10
Station 16+84
Station 14+58
Station 11+80
Station 9+10
Station 7+32
Station 14+75
Station 13+16
Station 7+86
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
AC3
AC3
AC3
AC3
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
140.0 144.0
141.6 144.0
139.8 144.0
138.7 144.0
140.3 146.0
141.7 146.0
140.9 146.0
139.8 146.0
142.6 146.0
143.7 146.0
141.8 146.0
140.9 146.0
141.5 146.0
139.9 146.0
140.1 146.0
139.2 146.0
141.7 146.0
140.2 146.0
143.1 146.8
144.5 146.8
142.6 146.8
142.0 146.8
143.2 146.8
140.8 146.8
141.7 146.8
139.9 146.8
140.8 146.8
142.6 146.8
141.9 146.8
144.2 146.8
141.5 146.8
142.5 146.8
0.0 97
0.0 98
0.0 97
0.0 96
0.0 96
0.0 97
0.0 97
0.0 96
0.0 98
0.0 98
0.0 97
0.0 97
0.0 97
0.0 96
0.0 96
0.0 95
0.0 97
0.0 96
0.0 97
0.0 98
0.0 97
0.0 97
0.0 98
0.0 96
0.0 97
0.0 95
0.0 96
0.0 97
0.0 97
0.0 98
0.0 96
0.0 97
~ ~ ~ ~~ ~ ~ ~-
Project Number: 851855-012
Project Name: ArroyoNnit 2
Project Location: 0
Client: 0 Page 2 of 3
Leighton and Associates, Inc 111412 1:08:11PM
I I I I I I 1 I I 1 I I I 1 I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. ComDaction Remarks
AC 64
AC 65
AC 66
AC 67
AC 68
AC 69
AC 70
AC 71
AC 72
AC 73
AC 74
AC 75
AC 16
AC 77
AC 78
AC 79
AC 80
AC 81
AC 82
AC 83
AC 84
AC 85
AC 86
AC 87
AC 88
AC 89
AC 90
AC 91
AC 92
2/8/03 ST
2/8/03 ST
2/8/03 ST
2/8/03 ST
2/8/03 ST
2/8\03 ST
2/8/03 ST
218103 ST
5/6/01 ST
5/6/03 ST
5/6/03 ST
5/6/03 ST
5/6/03 ST
5/6/03 ST
5/6/03 ST
5/6/03 ST
5/6/03 ST
5/6/03 ST
5/7/03 ST
5/7/03 ST
5/7/03 ST
5/7/03 ST
5/7/03 ST
5/7/03 ST
5/7/03 ST
5/7/03 ST
5/7/03 ST
5/7/03 ST
5/7/03 ST
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cia
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cia
Calle Cordoba
Calle Cordoba
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Station 54+50
Station 53+25
Station 51+50
Station 49+25
Station 3+25
Station 5+10
Station 6+50
Station 9+00
Station 14+20
Station 11150
Station 8+55
Station 5+30
Station 3+45
Station 13+00
Station 9150
Station 5+60
Station 2165
Station 2+00
Station O+ 15
Station 0+40
Front of Lot 30
Front of Lot 66
Front of Lot 59
Front of Lot 65
Station 39+40
Station 37+00
Station 39+90
Station 38+35
Station 36+75
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
142.5 146.5
141.1 146.5
139.3 146.5
140.9 146.5
142.3 146.5
139.6 146.5
140.9 146.5
144.0 146.5
139.6 146.0
138.9 146.0
139.6 146.0
142.3 146.0
143.3 146.0
140.6 146.0
138.7 146.0
141.2 146.0
138.9 146.0
144.0 146.0
138.9 146.0
142.4 146.0
140.5 146.0
139.2 146.0
143.1 146.0
141.2 146.0
141.5 146.0
138.9 146.0
139.5 146.0
142.5 146.0
138.6 146.0
0.0 97
0.0 96
0.0 95
0.0 96
0.0 97
0.0 95
0.0 96
0.0 98
0.0 96
0.0 95
0.0 96
0.0 97
0.0 98
0.0 96
0.0 95
0.0 97
0.0 95
0.0 99
0.0 95
0.0 98
0.0 96
0.0 95
0.0 98
0.0 97
0.0 91
0.0 95
0.0 96
0.0 98
0.0 95
~ 4 Project Number: 851855-012
Project Name: ArroyolUnit 2
Project Location: 0
Client: 0 Page 3 of 3
1 1/5/2 I1:31:05AIv Leighton and Associates, Inc
L
851855-012
APPENDIX C
Laboratow Testing Procedures and Test Results
Maximum Density Tests: The maximum dry density and optimum moisture contei of typical soils
were determined in accordance with ASTM Test Method D1557. The results of these tests are
presented in the table below:
Sample
Number Sample Description
Optimum Maximum Dry Moisture Content Density (pcf)
1 Yellow-brown sandy silt 117.5 13.5 I 21 Dark erav-brown sandv clav I 121.5 I 13.0 II
3 Yellow-brown sandy silty clay 103.5 22.0 I 41 Grav-brown sandv clav I 105.5 I 21.0
5 Light brown silty sand 116.0 14.0 I 61 Pale vellow-brown siltv sand I 120.0 I 12.0 II
7 Olive green-gray sandy clay 116.0 14.5 I 81 Brown sandv siltv clav I 122.0 I 11.5
9 I Pale yellow-light brown fine to medium sand I 119.0 12.0 I IO I Olive-grav sandv silt I 114.5 I 16.5 II
11 Medium olive-brown sandy clay fill mix 122.0 12.5 I 12 Olive-brown clayey sandy silt 118.5 13.5
13 Gray green clayey silt 111.5 18.5
122.0 I Pale yellow-light brodmedium brown clayey
sand
15 I Pale yellow-light brown fine to medium sand 1 119.5 12.5 I 16 1 Pale vellow hht brown sand with green clav I 120.0 I 12.5
Orange-brown silty sand I 117.0 1 10.5
18 Gray-light brown fine to medium sand 118.0 13.5
19 Gray-light brown sand with green clav 120.5 12.5
20 I Light brown silty fine sand with yellow limonite 1 105.5 20.5
c-l
851855-012
Sample
Number
21
22
APPENDIX C (Continued)
Optimum
Moisture Content Maximum Dry
Density (pcf) (“/I
Olive-gray/pale brown silty sand 123.0 12.0
Sample Description
~~~~
Pale gray silty sand 128.0 9.0
23
24
Green silty sandy clay 111.5 16.5
Miscellaneous Recycled Aggregate Base 128.5 9.0
25
26
27
Lime-treated subgrade soil 111.0 17.0
Lime-treated subgrade soil 113.0 16.5
Miscellaneous Recycled Aggregate Base 116.0 14.0
28
31
AC Laboratory Maximum Density Tests: The laboratory maximum density of the asphalt concrete
samples were determined by the Hveem Method, California Test Method Nos. 304 and 308. The
results of the tests are presented in the table below:
Lime-treated subgrade soil 109.5 18.0
Class 2 Aggregate Base 141.5 6.0
32
33
c-2
Shading sand 132.0 8.5
Class 2 Aggregate Base 142.0 6.0
Sample Number Sample Description Laboratory Density (pcf)
~~~
AC 1
AC2
AC3
3/4-inch AC 141.5
3/4-inch AC 155.0
314-inch AC 144.0