AS-GRADED GEOTECHNICAL REPORT
CARLSBAD TRACT NO. 90-03,
OF POST-GRADING, ARROYO VISTA UNITS 3 and 4,
CARLSBAD, CALIFORNIA
Prepared For:
CONTINENTAL HOMES
5927 Priestly Drive, Suite 200
Carlsbad, California 92008
Project No. 851855-013
July 22, 2004
4
- Leighton and Associates, Inc.
A LEIGHTON GROUP COMPANY
I July 22,2004
To: Continental Homes
5927 Priestly Drive, Suite 200
Carlsbad, California 92008
Attention: Mr. Carleton Clark
Project No. 851855-013
Subject: As-graded Geotechnical Report of Post-Grading, Arroyo Vista Units 3 and 4,
Carlsbad Tract No. 90-03, Carlsbad, California
Introduction
In accordance with the request and authorization of representatives of Continental Homes, we have
performed geotechnical observation and testing services during the post-grading operations for
Units 3 and 4 of the Arroyo Vista project (Carlsbad Tract No. 90-03) located in Carlsbad,
California, The purpose of our geotechnical observation and testing services was to document that
the geotechnical aspects of the post-grading operations for the subject tract were performed in
general accordance with the project geotechnical reports (Appendix A), geotechnical
recommendations made during the course of grading, and the City of Carlsbad requirements. This
as-graded report summarizes our geotechnical observations, field and laboratory test results, and
conclusions concerning the post-grading operations within Units 3 and 4 of the Arroyo Vista
development. A summary of the post grading operations of Unit 2 of the Arroyo Vista project was
previously presented in our as-graded report of post grading dated November 7, 2003 (Leighton,
2003b).
Surnrnarv of Post-Gradinq Operations
The post-grading operations were generally performed between August 200 1 through November
2003 within the streets and easements of the tract. Post-grading operations observed and/or tested
by Leighton and Associates, Inc. (Leighton) during the development of Units 3 and 4 included: 1)
trench excavation and backfill compaction of storm drain, water, sewer and joint utility lines in the
streets and easements; 2) sidewalk and curb/gutter subgrade soil preparation and compaction
3934 Murphy Canyon Road, Suite 8205 I San Diego, CA 92123-4425
858.292.8030 Fax 858.292.0771 rn w.leightongeo.com
L
851855-013
7
adjacent to the streets; 3) placement and compaction of native subgrade soils, lime-treated subgrade
soils, and Class 2 aggregate base (AB) material in the streets and/or beneath the curb/gutter, and 4)
placement and compaction of asphalt concrete (AC) in the streets.
Geotechnical observations and compaction testing were performed by representatives of our firm
who were on-site on an as-needed on-call basis during the post-grading operations. Specific
observation and testing services conducted during the post-grading operations are discussed below.
-
-
-
Field and Laboratow Testing
c Field density tests were performed during the placement and compaction of trench backfill,
subgrade preparation, aggregate base material and asphalt concrete placement during the post-
grading operations at the site. Density tests were performed in general accordance with the
Nuclear-Gauge Method (ASTM Test Methods D2922 and D3017). The results and approximate
locations of the field density tests performed are summarized in Appendix B. It should be noted
that density tests taken in Arroyo Vista Unit 2 (Leighton, 2003b) and within Rancho Santa Fe
Road (Leighton, 2004c) are also included in Appendix B. The field density testing was
performed in general accordance with the applicable ASTM standards, the current standard of
care in the industry, and the precision of the testing method itself. Variations in relative
compaction should be expected from the results documented herein.
-
As indicated in Appendix B, areas in which field density test results were less than the required
minimum relative compaction were reworked, recompacted, and re-tested until the minimum
percent relative compaction was achieved. In accordance with the City of Carlsbad criteria,
trench backfill and some of the sidewalk subgrade soils were compacted to a minimum 90
percent relative compaction while the subgrade soils and aggregate base material for the streets
andor curb/gutter of the tract were compacted to a minimum 95 percent of the maximum dry
density (as determined by ASTM Test Method D1557). In accordance with the revised
geotechnical recommendations concerning the on-site expansive sidewalk subgrade soils
(Leighton, 20021 and 2004b), some of the sidewalk subgrade soils were moisture conditioned to
at least 3 percent over the optimum moisture content and compacted to a minimum 86 to 88
percent relative compaction. Asphalt concrete was placed and compacted to a minimum 95
percent relative compaction in accordance with the Hveem Method (California Test Nos. 304
and 308).
Representative samples of the native soil and imported material placed and compacted during
the post-grading operations were tested for maximum dry density and optimum moisture
content in accordance with ASTM Test Method D1557. Representative samples of the AC
placed on the streets were tested for laboratory maximum density, per the Hveem Method
(California Test Nos. 304 and 308). The laboratory tests results are presented in Appendix C.
2- Leighton
851855-013
-
Trench Excavations and Backfill
Underground utilities, including storm drain, water, sewer, and common joint utilities were
placed in the subject streets and easements of the tract during the development of the site. Prior
to backfilling of the utility trenches, the excavations were observed by a representative from our
firm.
During the trench backfill operations, native and import soils where placed in 4- to 8-inch thick
loose lifts, moisture-conditioned, as needed, to obtain a near-optimum moisture content
(moisture conditioning also occurred prior to fill placement), and compacted to a minimum 90
percent relative compaction (based on ASTM Test Method D1557). Compaction of the trench
backfill soils was accomplished by hand tampers, sheep’s-foot roller andor wheel rolling with
heavy-duty construction equipment. Testing frequency and locations were performed in general
conformance with the City of Carlsbad criteria. The results and approximate location of the
backtill tests are summarized in Appendix B.
Structural Pavement Sections
Minimum structural pavement sections were provided for the streets within the subject
development based on laboratory R-value testing of representative samples of the subgrade soils
(Leighton, 2001c, 2002a, 2002c, and 2002h). Prior to placement of the aggregate base material,
the subgrade soils were scarified to a minimum depth of 12 inches and moisture-conditioned to
near-optimum moisture content, and, where indicated, lime-treated. The subgrade soils were
then compacted to at least 95 percent relative compaction (based on ASTM Test Method
D1557). The Class 2 aggregate base material placed beneath the curblgutter and on the streets
was compacted to a minimum of 95 percent of the maximum dry density (based on ASTM Test
Method D1557). The results and approximate location of the street subgrade soil and base
material density tests are summarized in Appendix B.
Observation and density testing during the placement of the asphalt concrete for the streets were
performed by representatives of Leighton and Associates. As required by the City of Carlsbad,
field density tests were obtained by the nuclear-gauge method during the paving operations and
the results are presented in Appendix B. The test results indicate that the AC placed on the
subject streets has a minimum relative compaction of at least 95 percent (per the Hveem
Method - California Test Methods 304 and 308).
-
-
?
Summaw of Conclusions
The following is a summary of our conclusions based on our site observations and field and
laboratory test results:
-
.3- Leighton
851855-013
Geotechnical conditions encountered during the post-grading operations were generally as
anticipated.
Based on our observations and testing, the post-grading operations were performed in general
accordance with the project geotechnical recommendations and the City of Carlshad
requirements. In ow professional opinion, the geotechnical aspects of the development have
been evaluated and properly treated during the post-grading operations.
Field density testing indicated that the trench backfill soils and most of the subgrade soils
beneath sidewalks were compacted to a minimum 90 percent relative compaction (based on
ASTM Test Method D1557). Field density testing also indicated that the street and curblgutter
subgrade soils and base materials were compacted to a minimum of 95 percent relative
compaction (based on ASTM Test Method D1557). It should be noted that the sidewalk along
the southern side of Avenida Del Alba and other sidewalks underlain by expansive soils were
moisture conditioned to a minimum 3 percent above the optimum moisture content and
compacted to a minimum 86 to 88 percent relative compaction.
Field density testing during the paving operations and testing of the AC on the subject streets
indicates the asphalt concrete was compacted to a minimum of 95 percent relative compaction
(per California Test Nos. 304 and 308).
If you have any questions regarding our report, please contact this office. We appreciate this
opportunity to be of service.
Respectfully submitted,
LEIGHTON AND ASSOCIATES, INC.
&kWr Randall K. Warner CEG 1612
I^ Senior Associate
Attachments: Appendix A - References
Appendix B - Summary of Field Density Tests
Appendix C - Laboratory Testing Procedures and Test Results
Distribution: (6) Addressee
4
Leighton -4-
851855-013
APPENDIX A
References
Carlsbad, City of, 1996, Standards for Design and Construction of Public Works Improvements in
the City of Carlsbad, California, Project No. 05332-12-01, dated April 20, 1993,
revised December 10,1996.
Leighton and Associates, Inc., 1998, Update Geotechnical Investigation, Shelley Property, Carlsbad
Tract No. 90-3, Carlsbad, California, Project No. 4851855-008, dated September 8,
1998.
, 2000, Results of Additional Field Investigation, Shelley Property, Carlsbad Tract No.
90-3, Carlsbad, California, Project No. 040137-001, dated August 14,2000.
,20014 As-Graded Report of Rough and Fine Grading, Lots 27 through 181 and 246
through 248, Arroyo Vista Units 2 and 3, Carlsbad Tract No. 90-03, Carlsbad,
California, Project No. 851855-010, dated June 29,2001.
, 2001b, Pavement Design Recommendations, Avenida de Sueno and Calle Cordoba,
Arroyo Vista, Unit 2, Carlsbad Tract No. 90-03Project No. 851855-013, Carlsbad,
California, dated August 7,2002, revised August 16,2001.
,2001c, Pavement Design Recommendations, Camino Alegre, Corte Del Cruce, and a
portion of Avenida La Cima, Arroyo Vista, Unit 3, Carlsbad Tract 90-03Project
No. 851855-013, Carlsbad, California, dated November 30,2001.
, 2002a, Pavement Design Recommendations, RV Parking Facility, Lot 246, Arroyo
Vista Unit 3, Carlsbad Tract No. 90-03, Carlsbad, California, dated January 31,
2002.
,2002b, AlternLive Recommendations for Cracked Lime-Treated Soils along a portion
of Camino La Cima and Corte Del Cruce, Arroyo Vista Unit 3, CT 90-03, Carlsbad,
California, Project No. 851855-013, dated February 27,2002.
, 2002c, Pavement Design Recommendations, Avenida Del Alba and a Portion of
Avenida La Cima, Arroyo Vista Unit 3, Carlsbad Tract No. 90-03, Carlsbad,
California, Project No. 851855-013, dated February 11, 2002, revised February 28,
2002.
, 2002d, Results of Laboratory Tests on Class 2 Aggregate Base Samples, Corte Del
Cruce and a Portion of Avenida La Cima (Station No. 3+50 to 17+00) and Camino
Alegre (Station 36+00 to 39+92), Arroyo Vista Unit 3, Carlsbad Tract No. 90-03,
Carlsbad, California, Project No. 851855-013, dated April 12,2002.
A-1
851855-013
APPENDIX A (Continued)
, 2002e, Results of Laboratory Tests on Class 2 Aggregate Base Samples, Avenida La
Cima, Arroyo Vista Unit 3, Carlsbad Tract No. 90-03, Carlsbad, California, Project
No. 851855-013, dated April 24,2002.
, 2002f, Toe-of-Slope Subdrain Recommendations, South Side of Avenida Del Alba
Between Station No. 20+00 and 31+44, Unit 3, Arroyo Vista, Carlsbad, California,
Project No. 851855-013, dated May 8,2002.
, 2002g, Leighton and Associates, Inc., 2002, As-Graded Report of Rough and Fine
Grading, Arroyo Vista Units 2 through 4, Carlsbad Tract 90-03, Carlsbad,
California, Project No. 851855-010, dated May 10,2002.
,2002h, Pavement Design Recommendations, Avenida Aragon, Avenida Secreto, Sitio
Toledo, and Sitio Andalucia, Vista Unit 4, Carlsbad Tract No. 90-03, Carlsbad,
California, Project No. 851855-014, dated June 3,2002 (revised June 10,2002).
,2002i, As-Graded Completion Letter of Utility Line Trench Backfill and Compaction
and Street Subgrade Placement and Compaction, Avenida Aragon, Avenida Secreto,
Sitio Toledo, and Sitio Andalucia, Tiburon, Shelley Property Unit 4, Carlsbad Tract
No. 90-03, Carlsbad, California, Project No. 85 1855-013, dated June 24,2002.
,2002j, Geotechnical Review of the Revised Post-Tension Foundation Plans for Arroyo
Vista, Shelley Property Units 2 and 3, Carlsbad Tract 90-03, Carlsbad, California,
Project No. 851855-013, dated July 25,2002.
, 2002k, Geotechnical Review of the Revised Post-Tension Foundation Plans for
Tiburon, Shelley Property Unity 4, Carlsbad Tract 90-03, Carlsbad, California,
Project No. 851855-014, dated August 30,2002.
, 20021, Revised Sidewalk Subgrade Preparation Guidelines for the Arroyo Vista and
Tiburon Projects, Shelley Property Units 2 through 4, Carlsbad Tract 90-03,
Carlsbad, California, Project No. 851855-013, dated August 12, 2002 (revised
September 13,2002).
, 2002111, Elimination of the Recommendation for a Toe-of-Slope Subdrain Along the
South Side of Avenida Del Alba Between station No. 20+00 and 31+44, Unit 3,
Arroyo Vista, Carlsbad. California, Project No. 851855-013, dated September 13,
2002.
A-2
851855-013
APPENDIX A (Continued)
, 2003a, Geotechnical Review of the Phase 1 I Post Tensioned Foundation and Precise
Grading Plans and Response to Plan Check Review Comments, Arroyo Vista Phase
1 I, Carlsbad Tract No. 90-03, Carlsbad, California, Project No. 851855-013, dated
June 24,2003.
, 2003b, As-Graded Geotechnical Report of Post-Grading Operations, Arroyo Vista
Unit 2, Carlsbad Tract No. 90-03, Carlsbad, California, Project No. 851855-012,
dated, November 7,2003.
, 2003c, Geotechnical Evaluation of the Swimming Pool Excavation and Repair
Recommendations of the Existing Toe-of-Slope Subdrain, Lot 199, Tiburon Saddle
Ridge, Carlsbad Tract No. 90-03, Carlsbad, California, Project No. 851855-014,
dated December 10,2003.
, 2004a, Geotechnical Evaluation of the Reported Seepage Conditions, 3284 Avenida
Aragon, Lot 199, Tiburon, Carlsbad Tract No. 90-03, Carlsbad, California, Project
No. 851855-014, dated February 13,2004.
, 2004b, Sidewalk Subgrade Recommendations for the Heaving Sidewalks Along the
Southern Side of Avenida Del Alba, Arroyo Vista, Carlsbad Tract 90-93, Carlsbad,
California. Project No. 851855-013, dated February 13,2004.
,2004c, As-Graded Report of Rough, Fine, and Post Grading, Rancho Santa Fe Road
Improvements, Station No. 10+04 to 42+31, Carlsbad, California, Project No.
851855-01 1, dated July 29,2004.
, In-house unpublished and published data.
Post-Tensioning Institute, 1996, Design and Construction of Post-Tensioned Slabs-On-Ground,
Second Edition.
Project Design Consultants, 2000, Mass Grading and Erosion Control for Shelley Property, Units
2, 3, and 4, Carlsbad Tract 90-03, Drawing No. 380-1B 15 Sheets, dated
December 28,2000.
, 2001a, Plans for the Improvement of Shelley Property Unit No. 3, Carlsbad Tract
No. 90-03, Drawing No. 380-1H, 8 Sheets, dated March 29,2001.
,2001 b, Plans for the Improvements of Shelley Property Unit No. 4, Carlsbad Tract No.
90-03, Carlsbad, California, Drawing No. 380-1E, 8 Sheets, dated April 4,2001.
A-3
851855-013
APPENDIX B
ExDlanation of Summarv of Field Densitv Tests
Test of
GRADING
Natural Ground
Original Ground
Existing Fill
Compacted Fill
Slope Face
Finish Grade
SEWER
STORM DRAIN
AREA DRAIN
DOMESTIC WATER
RECLAIMED WATER
SUB DRAIN
GAS
ELECTRICAL
TELEPHONE
JOINT UTILITY
IRRIGATION
Bedding Material
Shading Sand
Main
Lateral
Crossing
Manhole
Fire Hydrant Lateral
Catch Basin
Riser
Inlet
RETAMING WALL
CRIB WALL
LOFFELL WALL
STRUCT FOOTING
Footing Bonom
Backfill
Wall Cell
Test of
Abbreviations
NG
OG
EF
CF
SF
FG ____
B
S
M
L
X
MH
FH
CB
R
I
F
B
C
Test of
SUBGRADE
AGGREGATE BASE
CEMENT TREATED BASE
PROCESSED BASE
ASPHALT CONCRETE
Curb
Gutter
Curb and Gutter
Cross Guner
Street
Sidewalk
Driveway
Driveway Approach
Parking Lot
Electric Box Pad
PRESATURATION
Moisture Content
INTERIOR TRENCH
Plumbing Backfill
Electrical Backfill
____ Test of
Abbreviations
C
G
CG
XG
ST
SW
D
DA
PL
EB
M
P
E
N represents nuclear gauge tests that were performed in general accordance with most recent version of ASTM Test Methods D2922 and
D3017.
S represents sand cone tests that were performed in general accordance with most recent version of ASTM Test Method 01556.
15A represents first retest of Test No. 15
I58 represents second retest of Test No. I5
"0" in Test Elevation Column represents test was taken at the ground surface (e.& finish grade or subgrade)
"-I" in Test Elevation Column represents test was taken one foot below the ground surface
-
-
B-1
1 I I I I I I 1 I I I I I 1 I 1 I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks
SD 1 6/26/01 I
SD 2 6/26/01 M
SD 3 6/26/01 M
SD 4 6/26/01 M
SD 5 6/27/01 M
SD 6 6/27/01 M
SD 7 6/27/01 M
SD 8 6/27/01 M
SD 9 6/28/01 MH
SD 10 6/28/01 MH
SD 11 6/29/01 I
SD 12 6/29/01 MH
SD 13 6/29/01 M
SD 14 6/29/01 M
SD 15 8110101 M
SD 16 8/10/01 M
SD 17 8/10/01 M
SD 18 8110/01 I
SD 19 8/10/01 L
SD 20 8/10/01 MH
SD 21 8/13/01 M
SD 22 8/13/01 M
SD 23 8/13/01 MH
SD 24 8/13/01 M
SD 25 8/14/01 M
SD 26 8/14/01 MH
SD 27 8/14/01 M
SD 28 8/17/01 MH
SD 29 8/17/01 I
SD 30 8/17/01 MH
SD 31 9/12/01 M
3D 32 9/12/01 M
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Calle Cordoba
Calle Cordoba
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Avenida La Cima
Camino Alegre
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Station41+30
Station 41+55
Station 42+00
Station 42+40
Station 43+10
Station 43+56
Station 44+00
Station 44+90
Station 46+82
Station 46+74
Station 46+74
Station 45+87
Station 2+90
Station 1+70
Station 41+10
Station 40+10
Station 39+10
Station 38+80
Station 38+75
Station 38+59
Station 38+30
Station 37+53
Station 37+23
Station 36+75
Station 35+68
Station 35+28
Station 3+60
Station 35+28
Station 2+67
Station 3+96
Station 18+20
Station 17+20
182.0 20
185.0 20
184.0 19
188.0 20
186.0 20
190.0 20
188.0 20
192.0 20
194.0 20
194.0 12
193.0 20
191.0 20
191.5 18
198.0 20
182.0 20
176.0 20
170.0 20
168.0 IO
168.0 12
167.0 12
164.5 12
160.0 20
156.0 12
154.0 12
148.0 12
145.0 12
148.0 15
147.0 15
148.0 12
146.0 12
146.0 20
152.0 20
100.4 105.5 19.3
96.3 105.5 21.6
110.9 120.5 12.4
96.9 105.5 19.6
97.2 105.5 22.5
98.6 105.5 18.7
98.1 105.5 20.1
100.3 105.5 18.4
98.2 105.5 21.7
109.3 118.5 12.6
97.3 105.5 22.3
96.7 105.5 19.8
108.7 118.0 14.1
99.5 105.5 19.2
96.2 105.5 21.7
97.1 105.5 22.8
96.5 105.5 20.9
103.9 114.5 18.1
107.2 118.5 16.3
109.1 118.5 17.2
107.2 118.5 15.7
100.7 105.5 22.9
108.9 118.5 15.8
109.6 118.5 16.1
108.5 118.5 16.0
107.7 118.5 15.8
109.5 119.5 14.7
110.6 119.5 15.1
110.1 118.5 15.7
109.8 118.5 16.0
97.1 105.5 20.3
95.6 105.5 21.3
20.5 95
20.5 91
12.5 92
20.5 92
20.5 92
20.5 93
20.5 93
20.5 95
20.5 93
13.5 92
20.5 92
20.5 92
13.5 92
20.5 94
20.5 91
20.5 92
20.5 91
16.5 91
13.5 90
13.5 92
13.5 90
20.5 95
13.5 92
13.5 92
13.5 92
13.5 91
12.5 92
12.5 93
13.5 93
13.5 93
20.5 92
20.5 91
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 1 of 4
Leighton and Associates, Inc 711 912 10:29: I6Ah
I I I I I I I I I 1 1 I I I 1 I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%.1
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks
SD 33 9/12/01 L
SD 34 9/12/01 M
SD 35 9/12/01 M
SD 36 9/12/01 M
SD 37 9/13/01 MH
SD 38 9/13/01 M
SD 39 9/13/01 MH
SD 40 9/13/01 MH
SD 41 9/13/01 L
SD 42 9/13/01 M
SD 43 9/13/01 M
SD 44 9/18/01 M
SD 45 9/18/01 M
SD 45A 9/18/01 M
SD 46 9/20/01 M
SD 47 9/20/01 M
SD 48 9/20/01 M
SD 48A 9/20/01 M
SD 49 9/20/01 M
SD 50 9/20/01 M
SD 50A 9/20/01 M
SD 51 9/21/01 M
SD 51A 9/21/01 M
SD 52 9/21/01 M
SD 53 9/21/01 M
SD 54 9/21/01 M
SD 55 9/24/01 MH
SD 56 9/24/01 MH
SD 57 9/24/01 M
SD 58 9/24/01 M
SD 59 9/25/01 M
SD 60 11/13/01 M
Avenida La Cima
Avenida La Cima
Corte Del Cruce
Cone Del Cruce
Corte Del Cruce
Cone Del Cmce
Corte Del Cmce
Cone Del Cmce
Lot 102 Easement
Avenida Del Alba
Avenida Del Alba
Avenida La Cima
Avenida La Cima
Avenida La Cima
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Avenida Del Alba
Avenida Del Alba
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Storm Drain Line C
Station 16+77
Station 16+00
Station 1+43
Station 2+90
Station 3+24
Station 4+33
Station 5+39
Station 61-1 1
Station 1+20
Station 18+45
Station 19+34
Station 15+70
Station 16+77
Station 16+77
Station 2+71
Station 2+50
Station 2+22
Station 2+22
Station 1+98
Station 1+70
Station 1+70
Station 2+55
Station 2+55
Station 2+00
Station 1+70
Station 1+52
Station 20+73
Station 20+73
Station 1+30
Station 1+47
Station 1+20
Station 2+25
154.0 12
157.0 20
159.0 20
166.0 20
167.5 20
172.0 12
178.0 20
176.0 20
181.0 12
146.0 20
142.0 20
158.0 18
154.5 18
154.5 18
135.0 18
137.0 18
139.0 18
139.0 18
140.0 18
136.5 18
136.5 18
137.0 18
137.0 18
142.0 18
138.5 16
135.0 16
138.0 12
139.0 12
126.0 12
132.0 12
128.0 12
119.0 17
107.9 118.5 15.7
99.4 105.5 20.7
97.2 105.5 21.1
98.3 105.5 24.3
98.7 105.5 22.0
109.9 118.5 17.0
100.4 105.5 20.9
96.2 105.5 21.6
107.2 118.5 17.2
96.8 105.5 21.6
95.2 105.5 20.4
107.1 118.0 14.1
105.3 118.0 15.9
107.8 118.0 15.2
109.4 118.0 14.9
107.2 118.0 13.8
104.2 118.0 17.9
108.0 118.0 15.0
108.8 118.0 14.1
104.6 118.0 16.9
107.5 118.0 14.2
103.1 118.0 17.0
110.7 118.0 17.5
109.0 118.0 15.5
11 1.3 120.0 15.0
108.5 120.0 16.5
109.2 118.5 17.3
110.6 118.5 16.1
108.2 118.5 17.0
110.9 118.5 15.7
108.9 118.5 14.6
107.6 117.0 12.1
13.5
20.5
20.5
20.5
20.5
13.5
20.5
20.5
13.5
20.5
20.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
12.5
12.5
13.5
13.5
13.5
13.5
13.5
10.5
91
94
92
93
94
93
95
91
90
92
90
91
89
91
93
91
88
92
92
89
91
87
94
92
93
90
92
93
91
94
92
92
RT ON 45A
RT OF 45
RT ON 48A
RT OF 48
RT ON 5OA
RT OF 50
RT ON 5 1A
RT OF 51
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 2 of 4
Leighton and Associates, Inc 711912 10:29: 16AI
I I I I I I I I I I I I I I I I ) ! I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. CnmDactinn Remarks
SD 61
SD 62
SD 63
SD 64
SD 65
SD 66
SD 67
SD 68
SD 69
SD 70
SD 71
SD 72
SD 73
SD 74
SD 75
SD 76
SD 77
SD 78
SD 79
SD 80
SD 81
SD 82
SD 83
SD 84
SD 85
SD 86
SD 87
SD 88
SD 89
SD 90
SD 91
SD 92
11/13/01 M
11/13/01 M
ll/l5/Ol M
11/15/01 M
11/15/01 M
11/16/01 M
11/16/01 M
11/16/01 M
11/19/01 M
11/19/01 M
11/19/01 M
11/19/01 M
11/27/01 MH
11/27/01 MH
11/27/01 MH
1 1/27/01 MH
1 1/27/01 MH
4/23/02 M
4/23/02 M
4/23/02 M
4/25/02 MH
5/2/02 MH
5/2/02 M
5/3\02 M
5/3\02 M
5/3/02 M
36/02 MH
5/6/02 L
5/6/02 L
5/6/02 M
5/6/02 M
5/8/02 M
Storm Drain Line C
Storm Drain Line C
Storm Drain Line A
Storm Drain Line A
Storm Drain Line A
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Storm Drain Line A
Storm Drain Line A
Camino Alegre
Camino Alegre
Camino Alegre
Avenida Del Alba
Avenida Del Alba
Easement L. 237-238
Easement L. 237-238
Easement L. 237-238
Avenida Secreto
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Station 1+83
Station 1+40
Station 1+59
Station 2+00
Station 2+50
Station 32+49
Station 32+95
Station 33+92
Station 34+53
Station 35+10
Station 1+15
Station It39
Station 33+23
Station 33+23
Station 32+35
Station 31+34
Station 3 1+34
Station 2+85
Station 2+15
Station 1+50
Station 0+57
Station 2+25
Station 7+65
Station 8+05
Station 8+48
Station 9+25
Station 7+08
Station 7+08
Station 7+08
Station 2+25
Station 2+25
Station 9+60
120.0 17
117.0 17
125.0 12
128.0 18
126.5 18
128.5 18
131.0 12
137.0 18
141.0 18
143.5 12
124.0 18
128.0 18
132.0 12
133.0 12
129.0 12
125.0 12
128.0 12
118.0 19
116.0 23
114.0 23
117.5 23
113.0 19
120.0 17
123.0 17
122.0 17
125.0 17
120.0 17
122.0 17
121.0 17
114.0 19
115.0 19
123.0 17
109.1 117.0 11.6
108.2 117.0 11.7
108.7 118.5 14.7
106.9 118.0 15.9
110.2 118.0 14.2
110.0 118.0 15.6
108.5 118.5 15.6
109.1 118.0 13.7
107.3 118.0 14.2
108.5 118.5 15.1
108.1 118.0 13.9
107.2 118.0 14.6
107.1 118.5 14.9
106.9 118.5 16.1
107.5 118.5 16.5
108.7 118.5 15.8
107.5 118.5 15.7
108.9 120.5 13.7
105.0 111.5 16.8
103.4 111.5 15.7
101.7 111.5 16.5
110.6 120.5 14.6
106.7 117.0 12.6
108.2 117.0 10.4
106.9 117.0 11.1
107.0 117.0 10.7
110.6 117.0 11.3
111.2 117.0 10.6
109.3 117.0 10.7
110.7 120.5 14.7
114.1 120.5 15.1
107.5 117.0 16.2
10.5 93
10.5 92
13.5 92
13.5 91
13.5 93
13.5 93
13.5 92
13.5 92
13.5 91
13.5 92
13.5 92
13.5 91
13.5 90
13.5 90
13.5 91
13.5 92
13.5 91
12.5 90
16.5 94
16.5 93
16.5 91
12.5 92
10.5 91
10.5 92
10.5 91
10.5 91
10.5 95
10.5 95
10.5 93
12.5 92
12.5 95
10.5 92
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 3 of 4
Leighton and Associates, Inc 7/19/2 10:2916Ab
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative PA)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Comoaction Remarks
SD 93
SD 94
SD 95
SD 96
SD 97
SD 98
SD 99
SD 100
5/8/02 M
5/13/02 MH
5/14/02 MH
5/14/02 MH
5/15/02 MH
11/15/02 M
11/15/02 M
11/15/02 M
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Line A Easement
Line A Easement
Line A Easement
Station 10+18
Station 16+87
Station 10+48
Station 10+48
Station 8+87
Station 2+06
Station 1+92
Station 1+73
126.0
127.0
123.0
127.0
124.0
117.5
119.0
118.0
17
17
17
17
17
17
17
17
107.9 117.0 13.7 10.5 92
110.1 117.0 14.5 10.5 94
106.5 117.0 13.2 10.5 91
107.2 117.0 13.7 10.5 92
108.0 117.0 13.6 10.5 92
107.9 117.0 11.6 10.5 92
108.6 117.0 10.9 10.5 93
106.7 117.0 12.0 10.5 91
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 4 of 4
Leighton and Associates, Inc 711 912 I0:29: I6AA
1 1 I I I 1 I I I I I I 1
SUMMARY OF FIELD DENSITY TESTS
I 1 1 t I
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Comoaction Remarks
S 1 6/14/01 L
S 2 6/14/01 L
S 3 6/14/01 L
S 4 6/14/01 L
S 5 6/14/01 M
S 6 6/14/01 M
S 7 6/15/01 M
S 8 6/15/01 M
S 9 6/15/01 M
S IO 6/15/01 M
S 11 6/15/01 M
S 12 6/15/01 M
S 13 6/15/01 M
S 14 6/15/01 M
S 15 6/15/01 M
S 16 6/18/01 M
S 17 6/18/01 L
S 18 6/18/01 L
S 19 6/18/01 M
S 20 6/18/01 M
S 21 6/18/01 M
S 22 6/18/01 L
S 23 6/18/01 M
S 24 6/18/01 M
S 25 6/18/01 M
S 26 6/18/01 M
S 27 6/18/01 MH
S 28 6/18/01 MH
S 29 6/18/01 MH
S 30 6/19/01 M
S 31 6/19/01 M
S 32 6/19/01 M
Lot 71
Lot 72
Lot 71
Lot 71
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Lot 69
Lot 69
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Lot 68
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Station 4 1+80
Station 411-90
Station 42+00
Station 42+10
Station 42+10
Station 42+25
Station 42+35
Station 42t25
Station 45135
Station 45+AO '
Station 45+45
Station 42+75
Station 42+80
Station 43+00
Station 43+10
Station 43+25
Station 44+90
Station 44+75
Station 44+60
Station 41+43
Station 41+43
Station 41+43
Station 44+20
Station 44+15
Station 44+25
188.0 12
188.0 12
186.0 12
186.0 12
181.0 12
183.5 12
178.5 12
180.0 12
183.0 12
185.5 12
188.5 12
183.0 13
186.0 13
189.5 13
192.0 13
182.0 12
I88.0 12
190.0 12
180.0 12
185.0 12
187.5 12
189.0 12
190.0 12
183.0 13
187.5 13
190.0 13
179.5 12
182.0 12
184.5 12
184.5 12
187.0 12
191.0 12
109.2 118.5 17.1
109.8 118.5 14.9
108.9 118.5 15.5
108.3 118.5 16.2
109.6 118.5 17.2
111.5 118.5 14.7
106.2 118.5 17.7
109.4 118.5 16.5
107.9
107.2
109.7
100.3
101.2
103.2
102.5
110.6
108.7
108.3
107.6
109.6
108.5
18.5 17.8
18.5 15.3
18.5 16.0
11.5 20.1
11.5 19.7
11.5 20.8
11.5 21.3
18.5 15.6
18.5 14.7
18.5 15.9
18.5 16.3
18.5 16.2
18.5 15.2
109.2 118.5 14.9
107.4 118.5 13.7
103.1 111.5 20.7
104.9 111.5 21.3
101.9 111.5 20.1
110.4 118.5 15.4
108.7 118.5 14.7
109.0 118.5 13.8
107.5 118.5 15.3
108.5 118.5 13.9
107.1 118.5 14.7
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
18.5
18.5
18.5
18.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
18.5
18.5
18.5
13.5
13.5
13.5
13.5
13.5
13.5
92
93
92
91
92
94
90
92
91
90
93
90
91
93
92
93
92
91
91
92
92
92
91
92
94
91
93
92
92
91
92
90
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 1 of 12
Leighton and Associates, Inc 7/1/20 3:12:49PM
I I I I I I I I I I 1 I I
SUMMARY OF FIELD DENSITY TESTS
1 I I 1 I
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%I
No. Date Of Lot# Elev (It) Type Field Max Field Opt. Compaction Remarks
S 33 6/19/01 M
S 34 6/19/01 MH
S 35 6/19/01 MH
S 36 6/19/01 MH
S 37 6/19/01 MH
S 38 6/19/01 MH
S 39 6/19/01 MH
S 40 6/19/01 MH
S 41 6/19/01 MH
S 42 6/19/01 M
S 43 6/19/01 M
S 44 6/19/01 M
S 45 6/20/01 M
S 46 6/20/01 M
S 47 6/20/01 M
S 48 6120101 L
S 49 6/20/01 M
S 50 6/20/01 M
S 51 6/20/01 L
S 52 6120101 L
S 53 6/20/01 L
S 54 6/21/01 L
S 55 6/21/01 M
S 56 6/21/01 M
S 57 6/21/01 L
S 58 6/21/01 M
S 59 6/21/01 M
S 60 6/21/01 M
S 61 6/21/01 L
S 62 6/21/01 MH
S 63 6/21/01 MH
S 64 6/21/01 L
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Lot 27
Avenida de Sueno
Avenida de Sueno
Lot 27
Lot 28
Lot 28
Lot 29
Avenida de Sueno
Avenida de Sueno
Lot 55
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Lot 54
Avenida de Sueno
Avenida de Sueno
Lot 31
Station 44+05
Station 43+74
Staiton 43+74
Station 43i74
Station 45+74
Station 45+74
Station 45+74
Station 45+74
Station 45+74
Station 46+10
Station 46+30
Station 46+15
Station 46+50
Station 46+70
Station 46+85
Station 47+00
Station 47+25
Station 47+50
Station 47+65
Station 48+10
Station 48+35
Station 48+45
Station 48190
Station 481-90
193.5 12
183.0 12
185.5 12
187.0 12
184.0 13
185.0 13
1X7.0 13
188.5 13
191.5 13
184.5 13
189.0 13
193.5 13
185.0 20
187.5 20
190.0 20
189.5 20
194.0 20
189.5 20
188.0 20
188.5 20
190.0 20
191.5 20
188.5 20
191.0 20
194.0 20
192.0 20
192.0 20
196.0 20
195.0 20
192.5 12
195.5 12
194.0 12
109.3 118.5 14.1
108.4 118.5 15.5
107.9 118.5 13.7
106.9 118.5 13.4
103.9 111.5 19.1
105.1 111.5 18.3
102.3 111.5 20.1
103.0 111.5 17.6
103.8 111.5 18.8
105.1 111.5 21.3
103.8 111.5 19.4
101.7 111.5 19.7
99.9 105.5 21.6
99.6 105.5 22.7
97.5 105.5 23.1
97.9 105.5 19.9
100.7 105.5 21.8
99.5 105.5 20.7
97.7 105.5 22.2
98.1 105.5 19.6
98.6 105.5 20.0
98.5 105.5 21.1
99.2 105.5 23.7
97.8 105.5 19.8
96.1 105.5 20.2
95.8 105.5 21.7
97.4 105.5 22.0
96.4 105.5 20.0
97.7 105.5 19.5
108.3 118.5 15.3
107.2 118.5 16.8
109.5 118.5 15.1
13.5 92
13.5 91
13.5 91
13.5 90
18.5 93
18.5 94
18.5 92
18.5 92
18.5 93
18.5 94
18.5 93
18.5 91
20.5 95
20.5 94
20.5 92
20.5 93
20.5 95
20.5 94
20.5 93
20.5 93
20.5 93
20.5 93
20.5 94
20.5 93
20.5 91
20.5 91
20.5 92
20.5 91
20.5 93
13.5 91
13.5 90
13.5 92
Project Number: 851855-012
Project Name: ArroyoIUnits 2-4
Project Location: 0
Client: 0 Page 2 of 12
Leighton and Associates, Inc 7/1/20 3:12:50PM
I 1 I I I I I I 1 I I 1 I I I 1 : I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%1
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. ComDaction Remarks
S 65
S 66
S 67
S 68
S 69
S 70
S 71
S 72 s 73 s 74 s 75
S 76 s 77
S 78 s 79
S 80
S 81
S 82
S 83
S 84
S 85
S 86
S 87
S 88
S 89
S 90
S 91
S 92 s 93 s 94 s 95
S 96
6/26/01 L
6/27/01 L
6/27/01 L
6/27/01 L
6/27/01 L
6/28/01 L
6/28/01 L
6/28/01 L
7/3/01
71310 1
71310 1
7/3/01
7/3/01
7/3/01
7/5/0 1
7/5/01
7/5/01
7/5/01
7/5/0 1
7/5/0 1
7/5/01
7/5/0 1
7/5/01
7/5/01
7/5/01
7/6/01
71610 1
71610 1
7/6/01
71610 1
L
M
L
L
M
L
L
M
L
L
MH
L
L
M
M
L
M
L
L
L
L
MH
7125101 1
7/25/01 M
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Camino Alegre
Camino Alegre
Station 42+04
Station 42+63
Station 43+38
Station 43+93
Station 44+49
Station 44+06
Station 46+19
Station 46+96
Station 49+11
Station 49+30
Station 49+67
Station 49+72
Station 50+10
Station 50127
Station 50148
Station 51100
Station 511-46
Station 51+82
Station 52+22
Station 52+50
Station 52+72
Station 53+00
Station 53+30
Station 53+74
Station 54+25
Station 54+56
Station 54+98
Station 54+93
Station 55+12
Station 55+05
Station 41+19
Station41+30
187.0 20
188.0 20
190.0 20
191.0 20
192.0 20
191.0 20
193.0 20
194.0 20
196.0 20
194.5 20
198.0 17
197.0 20
197.0 20
199.0 20
200.0 20
202.0 20
204.0 20
206.0 20
206.0 20
208.0 20
210.0 20
209.0 20
212.0 20
214.0 20
217.0 20
216.0 20
218.0 20
220.0 20
221.0 20
220.0 20
180.0 20
182.0 12
99.1 105.5 19.6
95.7 105.5 19.4
95.2 105.5 20.7
100.6 105.5 22.9
98.3 105.5 20.1
97.2 105.5 18.6
101.3 105.5 21.5
99.3 105.5 19.0
97.2 105.5 22.6
95.6 105.5 23.2
106.7 117.0 11.7
98.9 105.5 20.4
95.9 105.5 21.6
96.4 105.5 21.1
96.7 105.5 20.1
96.1 105.5 22.6
95.8 105.5 22.4
100.3 105.5 20.0
96.5 105.5 18.6
97.7 105.5 21.7
98.0 105.5 19.9
97.2 105.5 20.4
96.3 105.5 21.3
95.4 105.5 21.1
96.5 105.5 20.7
95.3 105.5 21.2
95.7 105.5 20.7
99.2 105.5 20.9
97.1 105.5 19.8
97.4 105.5 21.0
95.2 105.5 20.7
107.7 118.5 14.6
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
10.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
13.5
94
91
90
95
93
92
96
94
92
91
91
94
91
91
92
91
91
95
91
93
93
92
91
90
91
90
91
94
92
92
90
91
Project Number: 851855-012
Project Name: ArroyoNnits 2-4
Project Location: 0
Client: 0 Page 3 of 12
Leighton and Associates, Inc 7/1/20 3:12:50PM
I , I I 1 I I f I I 1 ? 1 I 1 1 : I I
SUMMARY OF FIELD DENSITY TESTS
______ ~
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
S 97 7/25/01 I
S 98 7/25/01 M
S 99 7/25/01 I
S 100 7/26/01 I
S 101 7/26/01 I
S 102 7/26/01 M
S 103 7/26/01 I
S 104 7/26/01 I
S 105 7/26/01 I
S 106 7/26/01 M
S 107 7/27/01 L
S 108 7/27/01 L
S 109 7/27/01 L
S 110 7/27/01 M
S 111 7/27/01 MH
S 112 7/27/01 MH
S I13 7/30/01 MH
S 114 7/30/01 MH
S 115 7/30/01 M
S 116 7/30/01 M
S 117 7130101 M
S 118 7/30/01 L
S 119 7/30/01 L
S 120 7/30/01 M
S 121 7/31/01 L
S 122 7/31/01 L
S 123 7/31/01 L
S 124 7/31/01 M
S 125 7/31/01 L
S 126 7/31/01 M
S I27 7/31/01 L
S 128 8/1/01 L
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Station 41+01
Station 40+80
Station 39+78
Station 39+23
Station 38+97
Station 38+37
Station 38+22
Station 37+95
Station 37+30
Station 37+07
Station 36+93
Station 36+67
Station 36+41
Station 36+00
Station 38+45
Station 38+45
Station 35+57
Station 35+57
Station 3+66
Station 4+34
Station 4+52
Station 4+86
Station 5+34
Station 5+60
Station 5+75
Station 6+36
Station 6+56
Station 6+71
Station 7108
Station 7+40
Station 7t92
Station 8+15
181.0 12
175.0 20
170.0 12
166.0 12
168.0 12
164.0 12
162.0 20
160.0 12
157.0 12
156.0 12
154.0 12
152.0 12
150.0 12
146.0 12
160.0 12
163.0 12
142.0 12
146.0 12
145.0 12
144.0 7
148.0 7
151.0 IO
152.0 10
151.0 10
154.0 10
155.0 IO
156.0 7
153.0 IO
157.0 IO
156.0 IO
158.5 10
158.0 IO
107.0 118.5 15.1
96.1 105.5 21.9
108.2 118.5 13.8
106.9 118.5 14.2
108.5 118.5 13.9
107.3 118.5 14.1
95.5 105.5 21.7
108.3 118.5 15.2
108.0 118.5 14.6
107.9 118.5 14.0
107.1 118.5 13.9
106.9 118.5 14.3
108.2 118.5 14.3
107.6 118.5 13.6
109.7 118.5 14.9
108.9 118.5 14.5
107.9 118.5 14.7
106.9 118.5 16.3
108.2 118.5 15.2
106.1 116.0 15.1
105.2 116.0 15.7
105.0 114.5 18.9
103.6 114.5 19.5
104.7 114.5 19.3
106.1 114.5 18.1
105.3 114.5 19.3
105.9 116.0 15.0
105.2 114.5 17.2
103.9 114.5 18.6
104.7 114.5 17.1
104.3 114.5 16.9
105.1 114.5 17.8
13.5 90
20.5 91
13.5 91
13.5 90
13.5 92
13.5 91
20.5 91
13.5 91
13.5 91
13.5 91
13.5 90
13.5 90
13.5 91
13.5 91
13.5 93
13.5 92
13.5 91
13.5 90
13.5 91
14.5 91
14.5 91
16.5 92
16.5 90
16.5 91
16.5 93
16.5 92
14.5 91
16.5 92
16.5 91
16.5 91
16.5 91
16.5 92
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 4 of 12
Leighton and Associates, Inc 7/1/20 3:12:50PM
I I 1 I I I I i I I I I I I I ) 1 I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
S 129 8/1/01 M
S 130 8/1/01 M
S 131 8/1/01 L
S 132 8/1/01 M
S 133 8/1/01 L
S 134 8/l/Ol M
S 135 8/2/01 M
S 136 8/2/01 MH
S 137 8/2/01 MH
S 138 8/2/01 L
S 139 8/2/01 L
S 140 8/2/01 MH
S 141 8/2/01 MH
S 142 8/2/01 L
S 143 8/3/01 M
S 144 8/3/01 L
S 145 8/3/01 L
S 146 8/3/01 L
S 147 8/3/01 M
S 148 8/3/01 L
S 149 8/3/01 L
S 150 8/3/01 M
S 151 8/3/01 M
S 152 8/6/01 L
S 153 8/6/01 L
S 154 8/6/01 MH
S 155 8/6/01 MH
S 156 8/6/01 M
S 157 8/6/01 L
S 158 8/6/01 L
S 159 8/7/01 M
S 160 8/7/01 L
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Station 8+25
Station 8+35
Station 8155
Station 9+36
Station 9+41
Station 9+68
Station 9+95
Station 6+09
Station 6+09
Station 8+78
Station 8+78
Station 9+ 100
Station 9+00
Station 10+04
Station 10+25
Station 10+35
Station 10+67
Station 10+95
Station I l+20
Station 11+30
Station 11+55
Station 11+85
Station 12+00
Station 12+10
Station 12+15
Station 12+50
Station 12+50
Station 12186
Station 13104
Station 13+25
Station 13152
Station 13+65
153.0 10
157.0 IO
159.0 10
154.0 IO
161.0 IO
160.0 IO
156.0 10
150.0 IO
153.0 10
157.0 10
160.0 10
154.0 IO
159.0 10
161.0 12
158.0 12
161.0 12
162.0 12
161.0 12
156.0 12
163.0 12
162.0 12
164.0 12
158.0 12
164.0 12
162.0 10
156.0 10
161.0 12
163.0 12
162.0 12
159.0 IO
156.0 12
161.0 12
103.9 114.5 20.6
104.6 114.5 20.1
104.2
104.5
106.1
107.7
104.7
104.7
106.2
14.5 19.7
14.5 20.8
14.5 17.8
14.5 18.4
14.5 21.2
14.5 18.6
14.5 19.3
105.0 114.5 19.5
104.8 114.5 18.9
105.1 114.5 20.5
104.0 114.5 20.4
107.7 118.5 15.6
107.2 118.5 16.1
108.3 118.5 17.5
106.9 118.5 16.6
108.9 118.5 15.7
107.7 118.5 16.8
107.5 118.5 15.5
108.1 118.5 17.1
110.6 118.5 14.5
107.5 118.5 15.0
107.1 118.5 14.1
103.6 114.5 17.6
104.1 114.5 18.9
107.5 118.5 15.1
108.7 118.5 16.1
109.0 118.5 15.5
105.1 114.5 20.1
108.1 118.5 17.2
108.5 118.5 16.1
16.5 91
16.5 91
16.5 91
16.5 91
16.5 93
16.5 94
16.5 91
16.5 91
16.5 93
16.5 92
16.5 92
16.5 92
16.5 91
13.5 91
13.5 90
13.5 91
13.5 90
13.5 92
13.5 91
13.5 91
13.5 91
13.5 93
13.5 91
13.5 90
16.5 90
16.5 91
13.5 91
13.5 92
13.5 92
16.5 92
13.5 91
13.5 92
~~
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 5 of 12
Leighton and Associates, Inc 7/1/20 3:12:50PM
I I I I I 1 I 1 I I I 1 I I I 1 ) \ I
SUMMARY OF FIELD DENSITY TESTS
rest Test Test Location Test Soil Dry Density Moisture (“h) Relative t%)
No. Date Of Lot# Elev(ft) Type Field Max Field Opt. Compaction Remarks
3 161 8/7/01 M
3 162 8/7/01 L
3 163 8/7/01 M
3 164 8/7/01 MH
j 165 8/7/01 MH
3 166 8/9/01 M
3 167 8/9/01 L
3 168 8/9/01 M
3 169 8/9/01 M
3 170 8/9/01 L
3 171 8/9/01 L
S 172 8/9/01 MH
3 173 8/9/01 MH
5 174 8/10/01 L
3 175 8/10/01 L
S 176 8/10/01 M
3 177 8/10/01 L
S 178 8/10/01 L
3 179 8/10/01 M
3 180 8/23/01 L
S 181 8/23/01 MH
S 182 8/23/01 L
S 183 8/24/01 L
S 184 8/24/01 M
S 185 8/24/01 L
S 186 8/24/01 M
S 187 8/27/01 L
S 188 8/27/01 L
S 189 8/27/01 L
S 190 8/27/01 M
S 191 8/27/01 L
S 192 8/27/01 L
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Cone Del Cruce
Curte Del Cruce
Cone Del Cruce
Cone Del Cruce
Corte Del Cruce
Corte Del Cruce
Curte Del Cruce
Corte Del Cruce
Corle Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Cone Del Cruce
Curte Del CNCe
Corte Del Cruce
Cone Del Cruce
Curte Del Cruce
Curte Del CNCe
COrte Del CNCe
Station 14+13
Station 14+40
Station 14+80
Station 15+50
Station 15+50
Station 1 +7 1
Station 2+01
Station 2+15
Station 2+35
Station 2+68
Station 3+03
Station 3+22
Station 3+22
Station 3+38
Station 3+61
Station 3+85
Station 4+22
Station 4+62
Station 5+15
Station 5+33
Station 5+39
Station 5+45
Station 5+55
Station 5+92
Station 6126
Station 6+52
Station 6+86
Station 6+91
Station 7+46
Station 7+8l
Station 8+11
Station 8+34
160.0 12
159.0 12
155.0 12
153.0 12
157.0 12
157.0 12
161.0 12
160.0 12
163.0 12
163.0 12
166.0 12
162.0 12
167.0 12
168.0 12
163.0 12
165.0 12
170.0 12
172.0 12
174.0 12
176.0 13
172.0 20
177.0 20
178.0 13
174.0 20
177.0 20
179.0 20
178.0 12
180.0 12
182.0 12
178.0 20
181.0 12
183.0 12
109.1 118.5 16.5
107.6 118.5 14.8
107.9 118.5 15.6
108.1 118.5 15.2
108.0 118.5 16.1
106.9 118.5 14.7
107.5 118.5 15.8
108.1 118.5 17.1
109.6
107.1
107.5
106.8
108.0
107.7
106.9
18.5 16.3
18.5 16.7
18.5 16.3
18.5 16.0
18.5 15.9
18.5 17.1
18.5 16.3
107.1 118.5 16.3
107.0 118.5 16.2
107.5 118.5 15.9
108.0 118.5 15.8
103.8 111.5 19.1
96.1 105.5 22.6
98.7 105.5 23.1
102.7 111.5 20.7
100.5 105.5 21.5
98.2 105.5 21.1
99.3 105.5 22.2
107.8 118.5 16.1
110.2 118.5 14.5
107.0 118.5 14.7
97.3 105.5 21.7
106.9 118.5 15.9
107.8 118.5 15.2
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
18.5
20.5
20.5
18.5
20.5
20.5
20.5
13.5
13.5
13.5
20.5
13.5
13.5
92
91
91
91
91
90
91
91
92
90
91
90
91
91
90
90
90
91
91
93
91
94
92
95
93
94
91
93
90
92
90
91
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 6 of 12
Leighton and Associates, Inc 7/1/20 3:12:50PM
I I I I I I I I I I I 1 I 1 I I \ I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative PA)
NO. Date Of Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks
S 193
S 194
S 195
S 196
S 197
S 198
S 199
S 200 s 201 s 202
S 203
S 204
S 205
S 206
S 207 s 208
S 209 s 210
S 211 s 212
S 213
S 214
S 215
S 216
S 217
S 218
S 219 s 220 s 221 s 222
S 223
S 224
8/27/01 L
8/28/01 L
8/28/01 M
8/28/01 M
8/29/01 L
8/29/01 M
8/29/01 M
8/29/01 L
8/29/01 MH
8/31/01 M
8/31/01 L
8/31/01 L
8/31/01 M
8/31/01 L
8/31/01 L
8/31/01 M
8/31/01 L
9/4/01 M
9/4/01 M
9/4/01 L
9/5/01 L
9/5/01 M
9/7/01 L
9/7/01 M
9/7/01 M
9/10/01 L
9/10/01 M
9/11/01 L
9/11/01 M
9/12/01 L
9/12/01 M
9/12/01 L
Cone Del Cruce
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Station 8+65
Station 28+68
Station 28+41
Station 28+10
Station 27+88
Station 27+70
Station 27+3 1
Station 27103
Station 26+80
Station 15190
Station 16+48
Station 16+48
Station 17+05
Station 17+54
Station 17+59
Station 17+91
Station 18+09
Station 18+40
Station 18+70
Station 18+93
Station 19+59
Station 20+21
Station 20+58
Station 20+90
Station 2 1+48
Station 21+78
Station 22+55
Station 23+05
Station 23195
Station 24+61
Station 24+90
Station 25+21
179.0 12
128.0 12
125.0 12
130.0 12
127.0 12
131.0 12
126.0 12
132.0 12
129.0 12
158.0 20
154.0 14
156.0 14
152.0 20
148.0 2
150.0 3
144.0 20
146.0 12
140.0 II
143.0 14
142.0 I1
138.0 12
136.0 12
139.0 12
132.0 12
135.0 14
137.0 3
130.0 12
135.0 3
132.0 11
134.0 11
128.0 12
131.0 12
107.1 118.5 16.3
109.2 118.5 17.1
111.8 118.5 16.3
108.6 118.5 16.5
109.5 118.5 17.1
107.5 118.5 18.3
107.9 118.5 16.2
106.9 118.5 15.9
107.7 118.5 16.3
96.2 105.5 21.5
111.7 122.0 12.7
110.8 122.0 13.1
97.9 105.5 20.8
110.7 121.5 16.7
94.1 103.5 22.9
97.2 105.5 22.1
107.1 118.5 15.8
110.3 122.0 16.1
112.1 122.0 12.2
110.0 122.0 13.6
107.1 118.5 15.1
109.2 118.5 15.8
106.9 118.5 14.7
107.4 118.5 15.0
111.7 122.0 12.1
95.2 103.5 22.9
108.5 118.5 14.1
94.6 103.5 23.6
112.2 122.0 13.1
110.6 122.0 12.9
109.8 118.5 12.8
111.7 118.5 13.6
13.5 90
13.5 92
13.5 94
13.5 92
13.5 92
13.5 91
13.5 91
13.5 90
13.5 91
20.5 91
11.5 92
11.5 91
20.5 93
13.0 91
22.0 91
20.5 92
13.5 90
12.5 90
11.5 92
12.5 90
13.5 90
13.5 92
13.5 90
13.5 91
11.5 92
22.0 92
13.5 92
22.0 91
12.5 92
12.5 91
13.5 93
13.5 94
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 7 of 12
Leighton and Associates, Inc 7/1/20 3:12:50PM
I I I I I I I I I I I I I I I I 1 I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative ("A)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Comoaction Remarks
S 225
S 226
S 227
S 228
S 229
S 230
S 231
S 232
S 233
S 234
S 235
S 236
S 237
S 238
S 239
S 240
S 241
S 242
S 243
S 244
S 245
S 246
S 247
S 248
S 249
S 250
S 251
S 252
S 253
S 254
S 255
S 256
9/12/01 M
9/12/01 M
9/12/01 L
10/29/01 M
10/29/01 L
10/29/01 M
10/29/01 L
10/31/02 M
10/31/02 L
10/31/02 L
10/31/02 M
10/31/02 M
10/31/02 L
10/31/02 M
10/31/02 L
10/31/02 M
10/31/02 L
10/31/02 M
10/31/01 M
11/1/01 MH
11/1/01 MH
11/1/01 MH
11/1/01 MH
11/2/01 MH
11/6/01 M
11/6/01 M
11/7/01 M
11/7/01 M
11/7/01 M
11/8/01 MH
11/8/01 MH
11/8/01 MH
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Storm Drain Line A
Avenida Del Alba
Avenida Del Alba
Line A
Line A
Line A
Line A
Line A
Line A
Line A
Line A
Station 25+76
Station 26110
Station 26+41
Station 34+84
Station 34+63
Station 34+42
Station 34+00
Station 33+60
Station 33+50
Station 33+25
Station 33+40
Station 33+06
Station 32+59
Station 29+00
Station 29+88
Station 30+54
Station 30+96
Station 31+75
Station 32+04
Station 32+37
Station 32+37
Station 5+91
Station 30+01
Station 30101
Station 5+42
Station 4+90
Station 4+00
Station 3+25
Station 2+69
Station 3+60
Station 3+60
Station 4+43
132.0 12
126.0 12
131.0 12
138.0 18
140.0 18
136.0 I8
138.0 20
130.0 18
134.0 20
132.0 18
133.0 18
128.0 18
127.0 18
125.0 15
128.0 18
123.0 I8
127.0 18
124.0 14
126.0 18
122.0 18
126.0 18
125.0 I8
123.0 I8
127.0 12
128.0 18
125.0 12
126.0 12
127.0 18
126.0 18
124.0 18
127.0 18
124.0 12
109.2 118.5 12.8
108.4 118.5 14.1
108.5 118.5 13.2
108.2 118.0 12.6
108.9 118.0 13.8
106.9 118.0 13.2
96.2 105.5 22.6
108.9 118.0 14.1
95.8
107.5
109.2
107.4
106.5
108.2
108.5
109.9
107.4
110.5
106.9
107.5
107.5
108.3
107.6
108.1
106.7
107.2
106.9
35.5 21.7
18.0 12.7
18.0 15.1
18.0 14.2
18.0 14.6
19.5 13.7
18.0 15.1
18.0 13.2
18.0 12.1
22.0 13.7
18.0 13.7
18.0 15.0
18.0 14.8
18.0 14.2
18.0 13.9
18.5 12.9
18.0 13.2
18.5 14.7
18.5 13.8
108.5 118.0 12.6
109.2 118.0 14.2
107.1 118.0 13.9
110.6 118.0 15.0
107.1 118.5 14.7
13.5 92
13.5 91
13.5 92
13.5 92
13.5 92
13.5 91
20.5 91
13.5 92
20.5 91
13.5 91
13.5 93
13.5 91
13.5 90
12.5 91
13.5 92
13.5 93
13.5 91
11.5 91
13.5 91
13.5 91
13.5 91
13.5 92
13.5 91
13.5 91
13.5 90
13.5 90
13.5 90
13.5 92
13.5 93
13.5 91
13.5 94
13.5 90
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 8 of 12
Leighton and Associates, Inc 7/1/20 3:12:50PM
I I I I I I i \ I I I I I I 1 1 I 1 I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks
S 257
S 258
S 259
S 260
S 261
S 262
S 263
S 264
S 265
S 266
S 267
S 268
S 269
S 270
S 271
S 272
S 272A
S 273
S 274
S 275
S 276
S 277
S 278
S 279
S 280
S 281
S 282
S 283
S 284
S 285
S 286
S 287
11/8/01 MH
4/10/02 M
4110102 M
4/10/02 M
4/12/02 M
4/15/02 M
4/15/02 M
4/15/02 M
4/15/02 M
4/16/02 M
4/16/02 M
4/16/02 M
4/16/02 M
4/16/02 L
4/16/02 M
4/16/02 L
4/16/02 L
4/16/02 L
4/16/02 L
4/16/02 L
4/16/02 L
4/16/02 M
4/16/02 L
4/16/02 MH
4/16/02 M
4/16/02 L
4/16/02 M
4/17/02 MH
4/17/02 M
4/17/02 MH
4/17/02 MH
4/17/02 L
Line A
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Line A
Line A
Line A
Line A
Line A
Line A
Line A
Line A
Avenida Secreto
Avenida Secreto
Avenida Secreta
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreta
Avenida Secreta
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreta
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Station 4+43
Station 2+33
Station 2+60
Station 3+00
Station 3+40
Station 1+15
Station 1135
Station 1+85
Station 1+65
Station 2+15
Station 2+53
Station 2+73
Station 3+10
Station 0+98
Station 1+27
Station 2+99
Station 2+99
Station 3+19
Station 2+60
Station 2+5 1
Station 2+08
Station 1+85
Station 6+16
Station 6+10
Station 4+10
Station 4+39
Station 5+85
Station 2+65
Station 2+60
Station 2+15
Station 1+85
Station 3+97
126.0 18
109.0 19
114.0 19
112.0 19
113.0 19
108.0 19
113.0 19
109.0 19
117.0 17
115.0 17
118.0 17
114.0 17
116.0 17
119.0 19
118.0 19
123.0 20
123.0 20
125.0 21
123.0 23
122.0 23
121.0 23
120.0 17
135.0 19
133.0 19
126.0 19
130.0 19
131.0 17
120.0 23
121.0 20
121.0 19
108.0 23
126.0 19
109.0 118.0 13.8
110.3 120.5 16.4
109.1 120.5 17.1
110.0 120.5 16.6
113.0 120.5 16.2
109.9 120.5 16.6
110.7 120.5 17.3
109.8 120.5 17.5
106.2 117.0 16.1
107.8 117.0 15.5
108.3 117.0 14.8
107.1 117.0 15.6
106.0 117.0 13.6
112.5 120.5 16.3
110.9 120.5 15.5
91.6 105.5 18.9
95.7 105.5 21.6
112.0 123.0 16.7
102.6 111.5 18.3
101.4 111.5 20.5
101.7 111.5 19.3
107.9 117.0 14.7
113.6 120.5 14.7
112.4 120.5 14.2
108.7 120.5 16.1
109.8 120.5 15.3
106.0 117.0 12.2
102.9 111.5 20.3
96.8 105.5 21.9
108.2 120.5 15.6
104.9 111.5 17.5
108.6 120.5 16.9
13.5 92
12.5 92
12.5 91
12.5 91
12.5 94
12.5 91
12.5 92
12.5 91
10.5 91
10.5 92
10.5 93
10.5 92
10.5 91
12.5 93
12.5 92
20.5 87
20.5 91
12.0 91
16.5 92
16.5 91
16.5 91
10.5 92
12.5 94
12.5 93
12.5 90
12.5 91
10.5 91
16.5 92
20.5 92
12.5 90
16.5 94
12.5 90
RT ON 272A
RT OF 272
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 9 of 12
Leightnn and Associates, Inc 7/1/20 3:12:50PM
I I I I I 1 I 1 I I 1 I I I I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("h) Relative ("A)
NO. Date Of Lot # Elev (ft) Type Field Max Field Opt. ComDaction Remarks
S 288 4/17/02 M
S 289 4/17/02 L
S 290 4/17/02 M
S 291 4/17/02 MH
S 292 4/17/02 M
S 293 4/17/02 M
S 294 4/17/02 L
S 295 4/17/02 M
S 296 4/18/02 M
S 297 4/18/02 L
S 298 4/18/02 M
S 299 4/18/02 L
S 300 4/18/02 M
S 301 4/18/02 M
S 301A 4/18/02 M
S 302 4/18/02 M
S 303 4/18/02 M
S 304 4/18/02 M
S 305 4/18/02 MH
S 306 4/18/02 MH
S 307 4/18/02 M
S 308 4/18/02 M
S 309 4/19/02 M
S 310 4/22/02 L
S 31 1 4/22/02 M
S 312 4/22/02 M
S 313 4/22/02 L
S 314 4/22/02 M
S 315 4/23/02 M
S 316 4/23/02 M
S 317 4/25/02 MH
S 318 4/25/02 MH
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Station 4+95
Station 0+93
Station 6+50
Station 0+80
Station 3+75
Station 6+70
Station 6+67
Station 7+20
Station 7+50
Station 7+70
Station 7+80
Station 7+94
Station 8+25
Station 8+60
Station 8+60
Station 4+00
Station 4+40
Station 4+60
Station 5+05
Station 5+10
Station 5+50
Station 5+90
Station 6+10
Station 6+43
Station 6+65
Station 7+25
Station 8+34
Station 8+00
Station 8+65
Station 8+65
Station 6+21
Station 6+21
130.0 19
117.0 20
131.0 17
116.0 23
110.0 23
129.0 17
131.0 17
125.0 17
122.0 19
123.0 19
119.0 23
121.5 23
120.0 23
115.0 23
15.0 23
14.0 23
11.0 23
16.0 23
14.0 23
12.0 23
17.0 23
113.0 23
116.0 23
114.0 23
118.0 23
116.0 19
121.0 23
117.0 23
118.0 19
118.0 19
114.0 19
118.0 19
110.2 120.5 14.1
96.2 105.5 20.8
107.4 117.0 15.4
102.1 111.5 17.9
100.6 111.5 17.1
106.9 117.0 14.3
108.4 117.0 14.0
105.1 117.0 15.7
113.4 120.5 13.6
111.0 120.5 13.8
102.9 111.5 18.7
101.8 111.5 20.4
103.8 111.5 17.5
96.3 111.5 16.9
101.6 111.5 17.5
103.5 111.5 16.6
100.6 111.5 19.8
102.9 111.5 17.8
105.1 111.5 16.9
104.0 111.5 16.9
101.2 111.5 17.5
103.4 111.5 16.6
105.4 111.5 16.9
106.4 111.5 16.4
104.5 111.5 16.8
111.3 120.5 14.5
103.9 111.5 16.2
104.6 111.5 17.0
109.9 120.5 15.2
108.8 120.5 12.9
110.6 120.5 15.3
112.6 120.5 16.1
12.5 91
20.5 91
10.5 92
16.5 92
16.5 90
10.5 91
10.5 93
10.5 90
12.5 94
12.5 92
16.5 92
16.5 91
16.5 93
16.5 86
16.5 91
16.5 93
16.5 90
16.5 92
16.5 94
16.5 93
16.5 91
16.5 93
16.5 95
16.5 95
16.5 94
12.5 92
16.5 93
16.5 94
12.5 91
12.5 90
12.5 92
12.5 93
RT ON 301A
RT OF 301
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Parre 10 of 12 I
7/1/20 3:12:50PM Leighton and Associates, Inc
I I I I I I I 1 1 I I I I 1 I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. ComDaction Remarks
S 319
S 320
S 321
S 322
S 323
S 324
S 325
S 326
S 327
S 328
S 329
S 330
S 331
S 332 s 333 s 334 s 335
S 336 s 337 s 338 s 339
S 340
S 341
S 342 s 343 s 344 s 345
S 346 s 347
S 348 s 349
S 350
4/26/02 MH
4/26/02 MH
4/29/02 L
4/29/02 M
4/29/02 MH
4/29/02 MH
4/29/02 M
4/29/02 L
4/30/02 M
4/30/02 M
5/3/02 M
5/3/02 L
5/3/02 L
5/6/02 M
5/6/02 L
5/6/02 M
5/6/02 L
5/6/02 L
5/7/02 L
5/7/02 M
5/7/02 M
5/7/02 M
517102 L
5/8/02 M
5/8/02 L
5/9/02 M
5/9/02 M
5/9/02 L
5/9/02 L
5/9/02 M
5/9/02 M
5/9/02 L
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Station 7+74
Station 7+74
Station 9+37
Station 9+60
Station 9+88
Station 9+88
Station 10+30
Station 10+60
Station 1+25
Station 1+50
Station 3+22
Station 3+03
Station 2+55
Station 2+45
Station 2+24
Station 1+65
Station 0+99
Station 0+94
Station I1+23
Station 11+45
Station 11+75
Station 12+40
Station 12+45
Station 13+00
Station 16+46
Station 16+35
Station 16+10
Station 15+95
Station 15+85
Station 15+56
Station 15+10
Station 14+75
115.0 19
119.0 19
116.0 17
120.0 17
116.0 17
120.0 17
119.0 17
122.0 17
107.0 19
111.0 19
124.0 17
128.0 17
130.0 17
129.0 17
133.0 17
135.0 17
139.0 17
138.0 17
129.0 19
121.0 19
128.0 19
125.0 19
130.0 19
130.0 19
127.0 19
125.0 19
129.0 19
128.0 19
125.0 19
127.0 19
130.0 19
129.0 19
109.7 120.5 15.7
110.0 120.5 13.5
110.3 117.0 12.3
108.5 117.0 10.7
109.2 117.0 11.1
109.5 117.0 11.5
109.0 117.0 10.9
107.3 117.0 11.6
109.9 120.5 14.7
108.6 120.5 16.3
105.8 117.0 12.6
107.3 117.0 10.7
107.1 117.0 11.1
107.8 117.0 12.1
106.1 117.0 10.9
108.5 117.0 10.5
109.1 117.0 11.6
106.1 117.0 12.6
111.6 120.5 14.1
109.2 120.5 15.6
108.9 120.5 12.8
110.1 120.5 13.1
109.9 120.5 13.7
111.0 120.5 12.9
109.4 120.5 13.6
110.1 120.5 13.4
109.6 120.5 13.7
112.1 120.5 13.6
109.7 120.5 14.7
110.6 120.5 14.5
109.9 120.5 15.1
110.1 120.5 13.2
12.5
12.5
10.5
10.5
10.5
10.5
10.5
10.5
12.5
12.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
91
91
94
93
93
94
93
92
91
90
90
92
92
92
91
93
93
91
93
91
90
91
91
92
91
91
91
93
91
92
91
91
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 11 of 12
Leighton and Associates, Inc 7/1/20 3:12:50Ph,
I I I I 1 I I I I I I I I
SUMMARY OF FIELD DENSITY TESTS
I I I I I I
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (‘A1
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
S 351
S 352 s 353 s 354 s 355
S 356 s 357
S 358 s 359
S 360
S 361
S 362
S 363
S 364
S 365
S 366
S 367
5/9/02 M
5/9/02 L
5/9/02 M
5/10/02 M
5110102 L
5/10/02 M
5110102 L
5/10/02 M
5/10/02 M
5/10/02 M
5/10/02 L
5/10/02 M
5/13/02 L
5/13/02 L
5/13/02 MH
5/14/02 MH
5/14/02 MH
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Avenida Aragon
Sitio Toledo
Sitio Andalucia
Station 14+50
Station 14+26
Station 14+35
Station 13180
Station 13+89
Station 1+14
Station 1+37
Station 1+50
Station 1+65
Station 2+15
Station 2+45
Station 2+62
Station 1+07
Station 0+98
Station 13+38
Station 0+66
Station 0+93
124.0 19 108.9 120.5 13.6
131.0 19 109.7 120.5 12.9
126.0 19 110.0 120.5 14.1
125.0 19 109.6 120.5 13.7
131.0 19 112.9 120.5 14.1
140.0 23 104.3 111.5 17.1
139.0 23 101.7 111.5 16.9
135.0 23 102.0 111.5 16.5
137.0 23 102.7 111.5 17.7
131.0 23 102.1 111.5 16.3
133.0 23 103.5 111.5 17.8
126.0 23 100.9 111.5 18.0
141.0 17 108.2 117.0 14.1
140.0 17 107.5 117.0 13.6
126.0 17 107.9 117.0 14.7
139.0 17 108.4 117.0 12.7
138.0 17 110.3 117.0 13.6
12.5 90
12.5 91
12.5 91
12.5 91
12.5 94
16.5 94
16.5 91
16.5 91
16.5 92
16.5 92
16.5 93
16.5 90
10.5 92
10.5 92
10.5 92
10.5 93
10.5 94
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 12 of 12
Leighton and Associates, Inc 7/1/20 3:12:50PM
I 1 I I I I ! I I I 1 I I I I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. ComDaction Remarks
WI
w2
w3
w4
w5
W6
w7
W8
w9 w IO w 11 w 12
W 13
W 14
W 15
W 16
W 17 w 18
W 19 w 20 w 21 w 22
W 23
W 24
W 25
W 25A
W 26
W 26A
W 27
7/11/01 s
7/11/01 S
7/11/01 s
7/12/01 S
7/12/01 S
7/18/01 S
7/18/01 S
7/18/01 s
8/7/01 L
8/7/01 L
8/7/01 L
8/7/01 L
8/7/01 L
8/7/01 L
8/7/01 L
8/7/01 L
8/7/01 FH
8/7/01 L
8/7/01 L
8/24/01 L
8/24/01 M
8/24/01 L
8/24/01 M
8/27/01 L
8/27/01 L
8/27/01 L
8/27/01 M
8/27/01 M
8/27/01 L
W 27A 8/27/01 L
W 28 8/27/01 L
W 28A 8/27/01 L
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino AIegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Station 421-46
Station 43+59
Station 44+62
Station 46+70
Station 49+53
Station 5 1+44
Station 54S28
Station 52+76
Station 54+88
Station 53+84
Station 52+82
Station 51+21
Station 50+37
Station 49+11
Station 48+04
Station 47+17
Station 46+3 1
Station 45+16
Station 42+38
Station 41+55
Station 41+30
Station 40+5 1
Station 40+05
Station 39+87
Station 39+12
Station 39+12
Station 39+45
Station 39+45
Station 38+09
Station 38+09
Station 37+63
Station 37+63
175.5 22
176.0 22
178.0 22
182.0 22
190.5 22
204.0 22
217.0 22
210.0 22
222.0 20
217.0 20
212.0 20
205.0 20
201.0 20
198.0 20
197.0 13
196.0 13
195.0 20
193.5 20
190.5 12
186.0 12
184.0 12
179.0 13
176.0 12
175.0 12
170.0 12
170.0 12
172.5 12
172.5 12
164.0 20
164.0 20
160.0 12
160.0 12
116.3 128.0 8.9
115.8 128.0 9.2
116.2 128.0 10.1
117.4 128.0 10.7
116.2 128.0 9.8
116.3 128.0 9.7
115.8 128.0 8.8
115.5 128.0 9.2
97.2 105.5 22.6
96.1 105.5 21.5
97.8 105.5 20.8
95.1 105.5 20.6
96.5 105.5 21.7
96.0 105.5 20.1
102.3 111.5 17.9
103.0 111.5 18.1
97.5 105.5 20.6
95.6 105.5 20.0
107.0 118.5 14.7
110.1 118.5 13.2
109.5 118.5 15.2
100.9
108.3
107.6
103.2
107.9
104.5
11.5 20.0
18.5 15.6
18.5 15.2
18.5 14.9
18.5 15.2
18.5 14.6
109.2 118.5 15.0
91.2 105.5 20.1
96.1 105.5 20.6
103.0 118.5 14.0
107.9 118.5 13.9
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
20.5
20.5
20.5
20.5
20.5
20.5
18.5
18.5
20.5
20.5
13.5
13.5
13.5
18.5
13.5
13.5
13.5
13.5
13.5
13.5
20.5
20.5
13.5
13.5
91
90
91
92
91
91
90
90
92
91
93
90
91
91
92
92
92
91
90
93
92
90
91
91
87
91
88
92
86
91
87
91
RT ON 25A
RT OF 25
RT ON 26A
RT OF 26
RT ON 27A
RT OF 27
RT ON 28A
RT OF 28
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page I of 5 -
Leighton and Associates, Inc 7/1/20 3:13:41PM
I I I I I I I 1 I I I I I
SUMMARY OF FIELD DENSITY TESTS
I I I I I
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (Oh)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. ComDaetion Remarks
W 29 8/27/01 L
W 29A 8/27/01 L
W 30 8/27/01 M
W 31 8/27/01 L
W 32 8/27/01 L
W 33 9/6/01 M
W 34 9/6/01 L
W 35 9/6/01 L
W 36 9/6/01 L
W 37 9/6/01 M
W 38 9/10/01 M
W 39 9/10/01 L
W 40 9/10/01 M
W 41 9/10/01 L
W 42 9110101 M w 43 9/10/01 L
W 44 9/10/01 M
W 45 9/14/01 L
W 46 9/14/01 L
W 47 9/14/01 L
W 48 9/14/01 M
W 49 9/18/01 B
W 50 9/18/01 B
W 51 9/18/01 B
W 52 9/18/01 B
W 53 9/18/01 B
W 54 9/18/01 B
W 55 10/2/01 M
W 56 10/2/01 L w 57 10/2/01 L w 58 10/2/01 L w 59 10/2/01 L
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Corte Del Cruce
Corte Del Cruce
Cone Del Cruce
Cone Del Cruce
Corte Del Cruce
Cone Del Cruce
Cone Del Cruce
Cone Del Cruce
Cone Del Cruce
Corte Del Cruce
Cone Del CNCe
Station 37+40
Station 37+40
Station 36190
Station 36+31
Station 36+26
Station 4+60
Station 5+86
Station 6+66
Station 7+18
Station 7+54
Station 8+45
Station 8+86
Station 9+52
Station 10+14
Station 10+90
Station 11+40
Station 11+90
Station 12+20
Station 12+25
Station 14+25
Station 14+00
Station 2+00
Station 3+25
Station 4150
Station 5t75
Station 7+00
Station 8+10
Station 1+75
Station 1+63
Station 2+63
Station 3+71
Station 4+12
158.0 12
158.0 12
154.0 20
152.0 12
152.0 12
151.0 12
154.0 12
156.5 12
158.0 12
158.5 16
159.5 12
160.0 16
160.5 12
161.5 12
162.0 12
163.0 12
163.5 12
164.0 12
163.5 12
161.0 12
161.5 12
162.5 22
168.5 22
171.5 22
177.0 22
179.0 22
180.5 22
161.0 17
160.0 17
164.0 17
169.5 20
171.5 20
101.7 118.5 13.2
109.2 118.5 14.6
95.9 105.5 21.1
109.7 118.5 15.1
109.1 118.5 14.5
108.1 118.5 14.2
108.9 118.5 13.6
107.7 118.5 15.2
108.5 118.5 13.8
110.1 120.0 12.9
109.2 118.5 13.7
109.6 120.0 14.1
107.5 118.5 14.6
108.6 118.5 15.2
106.9 118.5 14.0
107.2 118.5 14.9
109.5 118.5 13.7
108.7 118.5 14.1
107.1 118.5 13.8
108.2 118.5 15.1
107.5 118.5 15.0
115.4 128.0 7.6
116.1 128.0 8.1
115.9 128.0 8.0
116.3 128.0 8.9
116.5 128.0 9.2
115.6 128.0 7.9
107.1 117.0 11.6
106.9 117.0 12.8
106.0 117.0 11.9
96.1 105.5 21.7
95.2 105.5 20.2
13.5
13.5
20.5
13.5
13.5
13.5
13.5
13.5
13.5
12.5
13.5
12.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
9.0
9.0
9.0
9.0
9.0
9.0
10.5
10.5
10.5
20.5
20.5
86 RT ON 29A
92 RT OF 29
91
93
92
91
92
91
92
92
92
91
91
92
90
90
92
92
90
91
91
90
91
91
91
91
90
92
91
91
91
90
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 2 of 5
7/1/20 3:13:42PM Leighton and Associates, Inc
! I I I I I I I I I 1 I I I I 1 1 I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks
W 60
W 61
W 62
W 63
W 64
W 65
W 66
W 67
W 68
W 69
W 70
W 71
W 72 w 73 w 74 w 75
W 76 w 77
W 78 w 79 w so w 81
W 82
W 83
W 84 w 85
W 86
W 87
W 88
W 89
W 90
W 91
1013/01 M
10/3/01 L
1013101 HL
1013/01 M
10/3101 L
1014101 M
1014/01 L
10/4/01 L
1014101 HL
1014101 M
10/4/01 L
10/4/01 L
1014101 M
1015101 L
1015101 L
1015/01 M
1015101 L
1015101 M
1015101 L
1015101 M
10/9/01 L
1019101 M
IO19/01 M
10/9/01 L
1019101 M
11114101 M
ll114/0l L
111l410l M
11114101 L
l111410l M
11114101 L
11114101 L
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Cone Del Cruce
Cone Del Cruce
Corte Del Cruce
Corte Del Cmce
Corte Del Cruce
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Station 4+69
Station 5+42
Station 5+84
Station 6+46
Station 7+06
Station 7+90
Station 8+21
Station 8+68
Station 20+68
Station 221-00
Station 22+28
Station 23+60
Station 24+61
Station 25+11
Station 14+99
Station 16+22
Station 16+37
Station 17+00
Station 17+92
Station 18+43
Station 25+66
Station 26+3 1
Station 27+60
Station 28+58
Station 29+18
Station 35+05
Station 34+92
Station 34+30
Station 34+15
Station 33+65
Station 32+81
Station 32+18
174.0 20
178.0 20
179.5 20
180.5 17
181.5 17
182.0 20
182.5 20
183.0 20
139.0 17
138.0 17
137.5 17
136.0 17
135.0 17
134.5 17
159.5 I8
157.5 IS
157.0 18
154.0 IS
148.5 17
145.5 17
134.0 12
133.0 12
132.5 12
131.0 12
130.5 12
144.0 20
143.0 12
140.0 12
139.0 12
136.0 12
132.0 20
128.5 12
96.0 105.5 22.5
95.8 105.5 22.0
97.2 105.5 21.4
108.4 117.0 11.7
107.4 117.0 13.1
98.6 105.5 22.8
95.7 105.5 20.3
97.4 105.5 21.3
106.3 117.0 13.2
108.2 117.0 12.6
107.4 117.0 14.1
106.9 117.0 13.5
105.8 117.0 12.9
107.0 117.0 12.4
108.6 118.0 16.1
111.2 118.0 13.7
109.0 118.0 14.4
108.3 118.0 14.0
107.1 117.0 12.6
108.0 117.0 13.1
108.1 118.5 16.1
107.2 118.5 13.4
107.4 118.5 14.4
107.1 118.5 14.8
109.6 118.5 14.7
95.2 105.5 22.6
107.5 118.5 12.7
106.9 118.5 14.3
108.7 118.5 13.8
108.1 118.5 13.1
96.3 105.5 21.9
107.7 118.5 12.9
20.5
20.5
20.5
10.5
10.5
20.5
20.5
20.5
10.5
10.5
10.5
10.5
10.5
10.5
13.5
13.5
13.5
13.5
10.5
10.5
13.5
13.5
13.5
13.5
13.5
20.5
13.5
13.5
13.5
13.5
20.5
13.5
91
91
92
93
92
93
91
92
91
92
92
91
90
91
92
94
92
92
92
92
91
90
91
90
92
90
91
90
92
91
91
91
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 3 of 5 I
Leighton and Associates, Inc 7/1/20 3:13:42PM
I I I I I I I I 1 I 1 I I 1 I I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. ComDaction Remarks
W 92 w 93 w 94
W 95
W 96 w 97
W 98 w 99 w 100 w 101
W 102
W 103
W 104
W 105
W 106
W 107 w IO8
W 109 w 110 w 111
W 112
W 113
W 114
W 115
W 116
W 117 w 118
W 119
W 120
W 121 w 122
W 123
11/15/01 M
11/15/01 L
11/15/01 L
11/15/01 M
12/10/01 M
12/10/01 M
5/6/02 M
5/6/02 M
5/6/02 M
5/6/02 M
5/15/02 L
5/15/02 M
5/15/02 L
5/15/02 M
5/15/02 L
5/15/02 L
5/15/02 M
5/15/02 L
5/15/02 M
5/15/02 L
5/15/02 M
5/15/02 L
5/15/02 M
5/15/02 L
5/15/02 L
5/15/02 M
5/16/02 M
5/16/02 L
5/16/02 L
5/16/02 M
5/16/02 L
5/16/02 L
Camino Del Alba
Camino Del Alba
Camino Del Alba
Camino Del Alba
Camino La Cima
Camino La Cima
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Station 29+62
Station 29+78
Station 30+29
Station 3 1+00
Station 1+51
Station 1+23
Station 2+10
Station 2+60
Station 3+50
Station 4+60
Station 1+08
Station 1 +5 1
Station 2+23
Station 3+15
Station 3+29
Station 3+44
Station 4+80
Station 5+69
Station 6140
Station 6+75
Station 7+75
Station 7+87
Station 6+20
Station 6+59
Station 8+90
Station 8+50
Station 10+30
Station 1+04
Station 1+00
Station 1+70
Station 2+43
Station 2+83
131.0 12
130.0 12
129.0 12
128.0 12
150.0 12
151.0 12
111.0 19
115.0 19
114.0 17
118.0 17
120.0 17
121.5 17
123.0 17
126.0 17
127.0 17
127.0 17
133.0 17
134.0 23
132.0 17
131.0 23
125.0 23
124.0 23
121.0 23
122.0 23
125.0 23
124.0 23
128.0 23
140.0 21
139.5 21
136.0 21
132.0 19
130.0 19
110.1 118.5 14.1
107.2 118.5 15.6
108.3 118.5 15.0
107.1 118.5 14.7
107.2 118.5 14.7
107.5 118.5 15.5
109.1 120.5 13.7
110.6 120.5 14.0
106.3 117.0 11.6
108.2 117.0 12.1
108.3 117.0 12.7
111.6 117.0 12.8
109.3 117.0 13.6
108.9 117.0 12.7
109.7 117.0 13.0
110.0 117.0 14.7
107.2 117.0 11.7
103.6 111.5 17.1
106.5 117.0 18.3
101.2 111.5 18.6
104.7 111.5 16.2
100.9 111.5 17.7
101.7 111.5 20.1
101.2 111.5 19.3
102.3 111.5 17.9
101.9 111.5 19.5
101.2 111.5 18.7
112.6 123.0 15.6
111.8 123.0 14.9
113.0 123.0 12.1
109.6 120.5 13.5
110.9 120.5 16.1
13.5 93
13.5 90
13.5 91
13.5 90
13.5 90
13.5 91
12.5 91
12.5 92
10.5 91
10.5 92
10.5 93
10.5 95
10.5 93
10.5 93
10.5 94
10.5 94
10.5 92
16.5 93
10.5 91
16.5 91
16.5 94
16.5 90
16.5 91
16.5 91
16.5 92
16.5 91
16.5 91
12.0 92
12.0 91
12.0 92
12.5 91
12.5 92
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 4 of 5
Leighton and Associates, Inc 711 /20 3: 13:42PM
i I 1 I ! I I I 1 I 1 1 I
SUMMARY OF FIELD DENSITY TESTS
I I I I t
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
NO. Date Of Lot# Elev(ft) Type Field Max Field Opt. Comoaction Remarks
W 124
W 125
W 126
W 127
W 128
W 129
W 130
W 131
W 132
W 133
W 134
W 135
W 136
W 137
W 138
W 139
W 140
5/16/02
5/16/02
511 6/02
5/16/02
5/16/02
5116102
5/16/02
511 6/02
5/16/02
5/16/02
5/16/02
5/16/02
7/1/03
712103
8/6/03
8/6/03
8/6/03
M
L
M
L
M
M
L
M
L
L
L
L
M
M
S
S
M
Sitio Toledo
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Lot 199 Easement
Lot 199 Easement
Lot 199 Easement
Lot 199 Easement
Lot 199 Easement
Station 3+25
Station 0+94
Station 1+95
Station 2+35
Station 2+70
Station 11+60
Station 12+55
Station 14+20
Station 14+60
Station 15+25
Station 15+79
Station 16+14
Station 2+58
Station 2+38
Station 1+64
Station 1+90
Station 2+10
127.0 19 111.7
141.0 21 110.9
137.0 21 11 1.2
135.0 19 111.0
135.0 21 112.6
130.0 21 111.1
132.0 21 111.7
132.0 21 110.9
131.0 21 112.1
130.0 21 113.2
129.0 21 111.7
129.0 21 111.5
130.0 19 108.3
128.0 19 109.9
126.5 22 115.5
127.0 22 115.6
130.0 19 110.1
120.5
123.0
123.0
120.5
123.0
123.0
123.0
123.0
123.0
123.0
123.0
123.0
120.5
120.5
128.0
128.0
120.5
14.2
14.0
13.0
12.2
14.1
12.8
12.9
13.6
12.9
13.5
13.9
14.7
12.7
12.9
10.0
9.5
12.5
12.5 93
12.0 90
12.0 90
12.5 92
12.0 92
12.0 90
12.0 91
12.0 90
12.0 91
12.0 92
12.0 91
12.0 91
12.5 90
12.5 91
9.0 90
9.0 90
12.5 91
Project Number: 851855-012
Project Name: ArroyoNnits 2-4
Project Location: 0
Client: 0 Page 5 of 5
Leighton and Associates, Inc 7/1/20 3:13:42PM
I I I I I I 1 I I I I I I I 1 1 I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative ("A)
No. Date Of Lot# Elev(ft) Type Field Max Field Opt. Comoaction Remarks
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
8/15/01 M
8/15/01 M
8/15/01 X
8/15/01 M
8/15/01 x
8/15/01 X
8/15/01 X
8/15/01 M
8/15/01 X
8/18/01 M
8/18/01 x
8/18/01 X
8/18/01 M
8/18/01 x
8/18/01 x
8/18/01 M
11/8/01 M
11/8/01 x
11/8/01 M
11/8/01 M
ll/S/Ol x
11/8/01 M
11/8/01 X
11/8/01 M
Il/X/OI x
11/8/01 M
11/8/01 M
11/8/01 x
11/8/01 M
11/8/01 M
11/8/01 x
2/1/02 M
Adjacent to Lot 48
Adjacent to Lot 53
Adjacent to Lot 28
Adjacent to Lot 51
Adjacent to Lot 32
Adjacent to Lot 35
Adjacent to Lot 38
Adjacent to Lot 44
Adjacent to Lot 45
Adjacent to Lot 66
Adjacent to Lot 60
Adjacent to Lot 61
Adjacent to Lot 61
Adjacent to Lot 63
Adjacent to Lot 65
Adjacent to Lot 70
Adjacent to Lot 181
Adjacent to Lot 176
Adjacent to Lot 174
Adjacent to Lot 152
Adjacent to Lot 78
Adjacent to Lot 157
Adjacent to Lot 83
Adjacent to Lot 163
Adjacent to Lot 89
Adjacent to Lot 168
Adjacent to Lot 169
Adjacent to Lot 92
Adjacent to Lot 95
Adjacent to Lot 99
Adjacent to Lot 112
Adjacent to Lot 137
212.0 20
198.0 20
196.0 20
195.5 13
200.5 13
211.0 20
219.0 13
222.0 13
220.0 13
197.5 20
195.0 20
193.5 12
192.5 12
192.0 12
191.0 12
191.5 12
185.0 12
168.0 12
157.0 12
150.0 20
155.0 12
158.0 12
160.5 12
163.0 12
164.0 20
161.0 12
159.0 12
161.5 17
167.5 17
178.5 12
182.0 12
129.5 12
96.2 105.5 21.6
97.1 105.5 20.7
96.0 105.5 22.1
101.7 111.5 20.1
102.1 111.5 20.4
95.7 105.5 21.6
100.9 111.5 21.7
101.0 111.5 21.0
102.2 111.5 20.4
96.3 105.5 22.9
101.7 105.5 21.7
108.7 118.5 15.6
109.1 118.5 16.2
107.9 118.5 16.9
108.6 118.5 15.8
108.6 118.5 16.0
108.3 118.5 14.6
108.3 118.5 13.9
107.5 118.5 13.5
96.2 105.5 21.2
107.8 118.5 14.9
108.8 118.5 15.1
107.7 118.5 13.2
108.3 118.5 13.6
95.7 105.5 22.7
109.2 118.5 14.8
108.1 118.5 13.2
109.2 117.0 12.6
110.1 117.0 13.2
108.5 118.5 15.1
107.6 118.5 14.0
106.7 118.5 14.7
20.5 91
20.5 92
20.5 91
18.5 91
18.5 92
20.5 91
18.5 90
18.5 91
18.5 92
20.5 91
20.5 96
13.5 92
13.5 92
13.5 91
13.5 92
13.5 92
13.5 91
13.5 91
13.5 91
20.5 91
13.5 91
13.5 92
13.5 91
13.5 91
20.5 91
13.5 92
13.5 91
10.5 93
10.5 94
13.5 92
13.5 91
13.5 90
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 1 of 2
Leighton and Associates, Inc 711912 IO:29:33AM
I I \ I I I 1 I I I I I I I 1 I 1 I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
J
I
J
I
J
I
I
J
I
I
J
J
I
J
J
J
I
J
J
J
J
J
J
33 2/1/02 M
34 2/1/02 M
35 2/1/02 x
36 2/1/02 M
37 2/2/02 M
38 2/2/02 M
39 2/2/02 x
40 5/29/02 M
41 5/29/02 M
42 5/29/02 M
43 5/29/02 M
44 5130102 X
45 5/30/02 M
46 5130102 X
47 5/30/02 M
48 5/31/02 M
49 5/31/02 M
50 6/4\02 X
51 6/4\02 M
52 6/4/02 M
53 614102 M
54 614102 X
55 614102 M
Adjacent to Lot 141
Adjacent to Lot 145
Adjacent to Lot 146
Adjacent to Lot 134
Adjacent to Lot 129
Adjacent to Lot 125
Adjacent to Lot 171
Avenida Aragon
Avenida Aragon
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Aragon
Sitio Toledo
Sitio Toledo
Sitio Toledo
Avenida Aragon
Sitio Andalucia
Sitio Andalucia
Avenida Aragon
Avenida Aragon
Station 2+50
Station 4+70
Station 1185
Station 3+30
Station 3+85
Station 6+20
Station 7+80
Station 7+20
Station 2+50
Station 0+66
Station 1+98
Station I1+30
Station 2+20
Station 0+80
Station 14+25
Station 15+70
128.0 12
131.5 12
136.0 12
132.0 12
137.0 12
138.5 12
154.0 12
116.0 19
119.0 23
121.0 19
127.0 19
129.0 19
133.0 21
125.0 19
123.0 19
132.0 21
141.0 21
135.0 21
130.0 21
136.0 19
141.0 19
132.0 19
130.0 19
108.2 118.5 17.1
107.5 118.5 16.3
107.1 118.5 15.7
109.3 118.5 15.1
107.1 118.5 15.7
108.6 118.5 14.1
107.7 118.5 13.9
110.1 120.5 16.9
104.2 111.5 16.5
109.7 120.5 13.1
110.1 120.5 11.9
110.8 120.5 14.6
112.7 123.0 14.1
109.6 120.5 14.5
111.8 120.5 15.0
112.3 123.0 13.5
112.7 123.0 14.7
113.8 123.0 14.1
111.9 123.0 12.9
110.6 120.5 13.6
111.5 120.5 13.2
109.8 120.5 13.6
110.1 120.5 14.1
13.5 91
13.5 91
13.5 90
13.5 92
13.5 90
13.5 92
13.5 91
12.5 91
16.5 93
12.5 91
12.5 91
12.5 92
12.0 92
12.5 91
12.5 93
12.0 91
12.0 92
12.0 93
12.0 91
12.5 92
12.5 93
12.5 91
12.5 91
~~
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 2 of 2 e
Leighton and Associates, Inc 7/1912 10:29:33AN
I I I I I I I I I I I I I I 1 I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. CornDaction Remarks
SG I
SG 2
SG 3
SG 4
SG 5
SG 6
SG 7
SG 8
SG 9
SG IO
SG II
SG 12
SG 13
SG 14
SG 15
SG 16
SG 17
SG 18
SG 19
SG 20
SG 21
SG 22
SG 23
SG 24
SG 25
SG 26
SG 27
SG 28
SG 29
SG 30
SG 31
SG 32
8/30/01 ST
8/30/01 ST
8/30/01 ST
8130101 ST
Y/5/01 CG
9/5/01 ST
9/5/01 CG
9/5/01 ST
9/5/01 CG
9/5/01 ST
9/5/01 ST
9/5/01 ST
9/5/01 CG
915101 CG
9/5/01 ST
9/5/01 CG
9/5/01 ST
9/5/01 ST
9/5/01 CG
9/5/01 ST
9/28/01 SW
9/28/01 SW
9/28/01 SW
9/28/01 SW
11/16/01 SW
11/16/01 SW
11/16/01 SW
2/7/02 ST
2/7/02 ST
2/7/02 ST
2/7/02 ST
2/7/02 CG
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Calle Cordoba
L. Side Ave. Sueno
Avenida de Sueno
L. Side Ave. Sueno
Avenida de Sueno
R. Side Ave. Sueno
Avenida de Sueno
Avenida de Sueno
R. Side Ave. Sueno
L. Side Ave. Sueno
L. Side Ave. Sueno
Avenida de Sueno
R. Side Ave. Sueno
Avenida de Sueno
Avenida de Sueno
L. Side C. Cordoba
Calle Cordoba
R Side Calle Cordoba
R Side Calle Cordoba
L Side Calle Cordoba
L Side Calle Cordoba
R Side Calle Cordoba
L Side Calle Cordoba
R Side Calle Cordoba
R. Side Del Cmce
R. Side Del Cmce
R. Side Del Cmce
L. Side Del Cmce
R. Side Del Cruce
Station 49+50
Station 47+85
Station 45+55
Station 11-85
Station 55+30
Station 54+60
Station 53+80
Station 53+55
Station 52+00
Station 51+90
Station 50+70
Station 48+90
Station 46+95
Station 44+35
Station 44+35
Station 42+65
Station 42+65
Station 4 1 +65
Station 2+50
Station 1+40
Station 1+68
Station 2t70
Station 2+82
Station 1+98
Station 1+80
Station 1+5 1
Station 1+29
Station 8+50
Station 8+75
Station 8+35
Station 7+76
Station 7+70
0.0 20
0.0 20
0.0 20
0.0 20
0.0 20
0.0 20
0.0 20
0.0 20
0.0 12
0.0 12
0.0 20
0.0 20
0.0 20
0.0 12
0.0 12
0.0 12
0.0 12
0.0 20
0.0 16
0.0 16
0.0 17
0.0 17
0.0 17
0.0 17
0.0 24
0.0 24
0.0 24
0.0 25
0.0 25
0.0 25
0.0 25
0.0 25
101.6 105.5 24.1
100.9 105.5 22.6
102.3 105.5 23.5
100.6 105.5 22.2
101.4 105.5 21.6
100.9 105.5 20.2
101.1 105.5 22.0
113.9 118.5 15.1
112.8 118.5 14.8
103.3 105.5 21.6
101.9 105.5 23.6
102.5 105.5 20.8
114.1 118.5 16.2
113.2 118.5 15.7
113.0 118.5 16.0
112.9 118.5 13.7
100.9 105.5 19.9
115.0 120.0 12.7
114.0 120.0 13.1
105.7 117.0 9.7
106.1 117.0 10.1
107.9 117.0 9.3
106.5 117.0 10.3
116.2 128.5 10.1
116.7 128.5 11.3
115.9 128.5 10.7
106.2 111.0 19.8
105.8 111.0 20.3
107.1 111.0 19.5
106.7 111.0 21.2
106.6 111.0 20.6
101.7 105.5 20.7
20.5
20.5
20.5
20.5
20.5
20.5
20.5
20.5
13.5
13.5
20.5
20.5
20.5
13.5
13.5
13.5
13.5
20.5
12.5
12.5
10.5
10.5
10.5
10.5
9.0
9.0
9.0
17.0
17.0
17.0
17.0
17.0
96
96
97
95
96
96
96
96
96
95
98
97
97
96
96
95
95
96
96
95
90
91
92
91
90
91
90
96
95
96
96
96
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 1 of9
Leighton and Associates, Inc 711912 IO:28:38Ah
I I I I I I I I I I I 1 I I I I i I i
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Comnaction Remarks
SG 33 217102 CG
SG 34 2/7/02 ST
SG 35 2/8/02 CG
SG 36 2/8/02 ST
SG 37 2/8/02 CG
SG 38 2/8/02 ST
SG 39 2/8/02 ST
SG 40 2/8/02 CG
SG 41 2/8/02 CG
SG 42 2/8/02 ST
SG 43 2/8/02 CG
SG 44 2/8/02 CG
SG 45 2/11/02 ST
SG 46 2/11/02 CG
SG 47 2111102 CG
SG 48 2/11/02 ST
SG 49 2115102 ST
SG 50 2/15/02 CG
SG 51 2/15/02 ST
SG 52 2/15/02 CG
SG 53 3/28/02 ST
SG 53A 3/29/02 ST
SG 54 3/28/02 ST
SG 54A 3/29/02 ST
SG 55 3/28/02 ST
SG 55A 3/28/02 ST
SG 56 4/3/02 ST
SG 57 4/3/02 CG
SG 58 4/3/02 CG
SG 59 4/3/02 ST
SG 60 4/3/02 ST
SG 61 4/3/02 CG
L. Side Del Cruce
L. Side Del Cruce
R. Side Del Cruce
L. Side Del Cruce
L. Side Del Cruce
R. Side Del Cruce
L. Side La Cima
R. Side La Cima
L. Side La Cima
L. Side La Cima
R. Side La Cima
L. Side La Cima
R. Side Del Cmce
L. Side Del Cruce
R. Side Del Cruce
R. Side Del Cruce
L. Side Cam. Alegre
L. Side Cam. Alegre
L. Side Cam. Alegre
L. Side Cam. Alegre
L. Side La Cima
L. Side La Cima
R. Side La Cima
R. Side La Cima
R. Side Del Cruce
R. Side Del Cruce
R. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Ave. La Cima
L. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Ave. La Cima
Station 6+70
Station 5+70
Station 5+10
Station 3+84
Station 2+15
Station 1+39
Station 14+79
Station 13+32
Station 11+40
Station 10+65
Station 8+70
Station 7+89
Station 6+90
Station 6+00
Station 5+00
Station 4+72
Station 40+50
Station 39+90
Station 37+93
Station 36+75
Station 5+21
Station 5+21
Station 12+72
Station 12+72
Station 6+40
Station 6+40
Station 4+70
Station 5+02
Station 7+00
Station 7+10
Station 9+92
Station 10+75
0.0 25
0.0 25
0.0 25
0.0 25
0.0 25
0.0 25
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 26
0.0 12
0.0 12
0.0 12
0.0 10
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
105.9 111.0 20.2
107.4 111.0 19.4
108.1
107.5
107.9
107.6
109.2
109.5
107.9
11.0 18.7
11.0 20.2
11.0 19.6
11.0 19.8
13.0 20.1
13.0 18.7
13.0 19.6
108.7 113.0 21.7
108.7 113.0 22.6
108.8 113.0 21.8
107.9 113.0 20.5
108.1 113.0 21.7
107.7 113.0 20.9
108.6 113.0 19.3
113.7 118.5 15.3
114.6 118.5 14.7
113.6 118.5 15.6
110.4 114.5 16.0
96.5 109.5 22.3
105.9 109.5 20.6
99.8 109.5 17.8
104.7 109.5 19.7
101.1 109.5 21.7
105.1 109.5 20.8
104.5 109.5 20.0
106.7 109.5 20.4
104.8 109.5 19.6
105.2 109.5 21.0
105.2 109.5 21.6
104.5 109.5 20.4
17.0 95
17.0 97
17.0 97
17.0 97
17.0 97
17.0 97
16.5 97
16.5 97
16.5 95
16.5 96
16.5 96
16.5 96
16.5 95
16.5 96
16.5 95
16.5 96
13.5 96
13.5 97
13.5 96
16.5 96
18.0 88
18.0 97
18.0 91
18.0 96
18.0 92
18.0 96
18.0 95
18.0 97
18.0 96
18.0 96
18.0 96
18.0 95
RTON 53A
RT OF 53
RT ON 54A
RT OF 54
RT ON 55A
RT OF 55
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 2 of 9
Leighton and Associates, Inc 711 9/2 10:28:40Ah
I I 1 I I I I 1 I I I I
SUMMARY OF FIELD DENSITY TESTS
1 1 1 i I I
Test Test Test Location Test Soil Dry Density Moisture (“4,) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
SG 62 4/3/02 CG
SG 63 4/3/02 ST
SG 64 4/3/02 CG
SG 65 4/3/02 ST
SG 66 4/3/02 ST
SG 67 4\3/02 CG
SG 68 4/3/02 CG
SG 69 4/3/02 ST
SG 70 4/3/02 ST
SG 71 4/3/02 CG
SG 72 4/3/02 ST
SG 73 4/3/02 CG
SG 74 4/3/02 ST
SG 75 4/3/02 ST
SG 76 4/17/02 ST
SG 77 4/17/02 CG
SG 78 4117102 ST
SG 79 4/17/02 CG
SG 80 4/17/02 ST
SG 81 4/17/02 CG
SG 82 4/17/02 ST
SG 83 4/17/02 CG
SG 84 4/17/02 CG
SG 85 4/17/02 ST
SG 86 4/17/02 ST
SG 87 4/17/02 CG
SG 88 4/17/02 ST
SG 89 4/17/02 CG
SG 90 4/18/02 SW
SG 91 4118102 SW
SG 92 4/18/02 CG
SG 93 4/18/02 CG
L. Side Ave. La Cima
R. Side Ave. La Cima
R. Side Ave. La Cima
Center Ave. La Cima
R. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Del Cruce
R. Side Del Cruce
Center Del Cruce
L. Side Del Cruce
L. Side Del Cruce
R. Side Del Cruce
L. Side Del Cruce
Center Del Cruce
L. Side Del Alba
R. Side Del Alba
R. Side Del Alba
R. Side Del Alba
Center Del Alba
R. Side Del Alba
L. Side Del Alba
L. Side Del Alba
R. Side Del Alba
R. Side Del Alba
R. Side Del Alba
L. Side Cam. Alegre
Center Cam. Alegre
R. Side Cam. Alegre
Adjacent Lot 59
Adjacent Lot 56
R. Side La Cima
L. Side La Cima
Station 12170
Station 12+22
Station 13+60
Station 14+60
Station 16+52
Station 16+68
Station 1+60
Station 2+25
Station 2+86
Station 4+55
Station 5+10
Station 6+05
Station 6+78
Station 8+45
Station 30+90
Station 28+26
Station 27+53
Station 27+45
Station 26+35
Station 25+43
Station 24+30
Station 22+80
Station 22+80
Station 19175
Station 3 1+90
Statinn 32+37
Station 34+00
Station 34+73
Station 2+87
Station 2+85
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 28
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 17
0.0 17
0.0 12
0.0 12
105.0 109.5 20.7
105.7 109.5 21.8
107.8 109.5 22.9
104.9 109.5 18.9
105.7 109.5 19.2
108.2 109.5 17.6
107.3 109.5 18.3
105.2 109.5 19.2
105.2 109.5 20.3
104.7 109.5 18.8
104.7 109.5 17.9
106.8 109.5 19.6
105.6 109.5 19.3
107.2 109.5 21.2
114.6 118.5 13.6
112.9 118.5 19.1
114.1 118.5 12.7
113.2 118.5 13.4
115.1 118.5 12.6
116.0 118.5 13.8
113.2 118.5 15.1
113.6 118.5 14.6
113.0 118.5 15.0
113.8 118.5 14.2
114.6 118.5 14.7
115.2 118.5 13.9
113.6 118.5 14.5
114.0 118.5 12.9
107.1 117.0 11.3
106.9 117.0 10.9
113.8 118.5 13.1
112.9 118.5 12.7
18.0 96
18.0 97
18.0 98
18.0 96
18.0 97
18.0 99
18.0 98
18.0 96
18.0 96
18.0 96
18.0 96
18.0 98
18.0 96
18.0 98
13.5 97
13.5 95
13.5 96
13.5 96
13.5 97
13.5 98
13.5 96
13.5 96
13.5 95
13.5 96
13.5 97
13.5 97
13.5 96
13.5 96
10.5 92
10.5 91
13.5 96
13.5 95
~~ e Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 3 of 9
Leighton and Associates, Inc 711912 10:28:40Ah/
i ! I I I I I I I I I 1 I 1 1 i I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative PA)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. ComDaction Remarks
SG 94 4/18/02 ST
SG 95 4/18/02 XG
SG 96 5/31/02 PL
SG 97 5/31/02 PL
SG 98 6110102 ST
SG 98A 6/14/02 ST
SG 99 6110102 ST
SG 99A 6/14/02 ST
SG 100 6/13/02 CG
SG lOOA 6/14/02 CG
SG 101 6/13/02 CG
SG IOlA 6/14/02 CG
SG 102 6/13/02 SW
SG 103 6/13/02 SW
SG 104 6/13/02 SW
SG 105 6/13/02 SW
SG 106 6/14/02 ST
SG 107 6/14/02 CG
SG 108 6/14/02 ST
SG 109 6/14/02 CG
SG 110 6/14/02 ST
SG 111 6/14/02 CG
SG 112 6/14/02 ST
SG 113 6/14/02 CG
SG 114 6/14/02 ST
SG 115 6/14/02 CG
SG 116 6/17/02 CG
SG 117 6/17/02 ST
SG 118 6/17/02 CG
SG 119 6/17/02 CG
SG 120 6/17/02 ST
SG 121 6/17/02 ST
L. Side La Cima
R. Side La Cima
Open Space Lot 246
Open Space Lot 246
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
L. Side Ave. Secreto
L. Side Ave. Secreto
R. Side Ave. Secreto
R. Side Ave. Secreto
N. of Lot 124
N. of Lot 128
W. ofLot 135
N. of Lot 143
Avenida Secreto
R. Side Ave. Secreto
R. Side Ave. Secreto
L. Side Ave. Secreto
L. Side Ave. Secreto
R. Side Ave. Secreto
Avenida Secreto
L. Side Ave. Secreto
L. Side Ave. Secreto
R. Side Ave. Secreto
L. Side Sitio Toledo
L. Side Sitio Toledo
R. Side Sitio Toledo
L. Side Sitio Toledo
L. Side Sitio Toledo
Sitio Andalucia
Station 2+25
Station 3+06
Station 1+15
Station 1 + 15
Station 4+15
Station 4+15
Station 1+52
Station 1+52
Station 3+60
Station 3+60
DG Path
DG Path
DG Path
DG Path
Station 0+88
Station 1+90
Station 2+65
Station 6103
Station 5+28
Station 5+35
Station 6+50
Station 6+90
Station 7+55
Station 8+25
Station 0+74
Station 1+20
Station 1+92
Station 2+98
Station 3+00
Station 1+20
0.0 12
0.0 12
0.0 17
0.0 17
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
113.5 118.5 14.6
114.2 118.5 14.4
113.4 117.0 12.2
112.6 117.0 13.1
103.4 118.5 10.6
109.3 118.5 16.2
102.1 118.5 11.5
107.1 118.5 13.9
104.6 118.5 15.1
108.5 118.5 14.1
105.1 118.5 13.5
110.7 118.5 14.7
108.2 118.5 16.1
107.7 118.5 14.7
108.0 118.5 15.4
107.9 118.5 15.8
115.0 118.5 14.8
114.5 118.5 13.8
113.2 118.5 14.1
115.0 118.5 13.1
112.8 118.5 15.1
117.5 118.5 12.6
113.0 118.5 12.8
116.1 118.5 12.9
114.3 118.5 14.7
112.7 118.5 15.1
113.5 118.5 12.7
115.2 118.5 13.7
115.0 118.5 14.4
114.7 118.5 13.3
112.9 118.5 13.5
113.9 118.5 14.4
13.5 96
13.5 96
10.5 97
10.5 96
13.5 87
13.5 92
13.5 86
13.5 90
13.5 88
13.5 92
13.5 89
13.5 93
13.5 91
13.5 91
13.5 91
13.5 91
13.5 97
13.5 97
13.5 96
13.5 97
13.5 95
13.5 99
13.5 95
13.5 98
13.5 96
13.5 95
13.5 96
13.5 97
13.5 97
13.5 97
13.5 95
13.5 96
RT ON 98A
RT OF 98
RT ON 99A
RT OF 99
RT ON lOOA
RT OF 100
RTON lOiA
RTOF 101
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 4 of 9
Leighton and Associates, Inc 7/19/2 102K:40A!v
! ! I I I I I I I I 1 I I 1 I I I 1
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative PA)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. CnmDaction Remarks
SG 122
SG 123
SG 124
SG 125
SG 126
SG 127
SG 128
SG 129
SG 130
SG 131
SG 132
SG 133
SG 134
SG 135
SG 136
SG 137
SG 138
SG 139
SG 140
SG 141
SG 142
SG 143
SG 144
SG 145
SG 146
SG 147
SG I48
SG 149
SG 150
SG 152
SG 153
SG 154
6/17/02 ST
6/17/02 CG
6/17/02 ST
6/17/02 ST
6/18/02 CG
6/18/02 ST
6/18/02 CG
6/18/02 ST
6/18/02 CG
6/18/02 ST
6/18/02 CG
6/18/02 ST
6/18/02 CG
6/18/02 CG
6/18/02 ST
6/18/02 CG
6/18/02 ST
6/18/02 CG
7/1/02 sw
7/1/02 SW
7/1/02 SW
7/1/02 SW
7/1/02 sw
7/5/02 DA
7/5/02 SW
7/5/02 DA
7/5/02 SW
7/5/02 DA
7/5/02 SW
7/5/02 DA
715102 SW
8/12/02 ST
Sitio Andalucia
L. Side Andalucia
L. Side Andalucia
L. Side Andalucia
L. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
R. Side La Cima
R. Side Del Alba
R. Side Del Alba
R. Side Del Alba
R. Side Del Alba
R Side Ave De Sueno
R Side Ave De Sueno
R Side Ave De Sueno
R Side Ave De Sueno
L Side Ave De Sueno
L Side Ave De Sueno
L. Side Ave De Sueno
L Side Camino Alegre
R. Side Ave. Aragon
Station 1 + 15
Station 1+50
Station 1+85
Station 2+45
Station 16+60
Station 16+28
Station 15+05
Station 13+50
Station 12+60
Station 12+00
Station 10+92
Station 9+50
Station 8+52
Station 8+03
Station 6+60
Station 5+15
Station 3+50
Station 2+82
Station I8+65
Station 20+31
Station 22+45
Station 25+18
Station 28165
Station 44+76
Station 43+50
Station 42+06
Station 41+83
Station 44+27
Station 43+5 1
Station 42+40
Station 40+35
Station 16+68
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 12
0.0 18
0.0 I8
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 19
113.9 118.5 12.9
114.7 118.5 13.1
112.9 118.5 12.9
113.5 118.5 13.8
112.9 118.5 14.3
113.1 118.5 14.0
114.0 118.5 15.1
113.5 118.5 12.8
113.9 118.5 13.6
113.3 118.5 14.0
114.3 118.5 14.1
113.8 118.5 13.9
115.0 118.5 14.7
114.0 118.5 13.2
112.9 118.5 15.2
113.6 118.5 14.7
113.1 118.5 13.8
113.7 118.5 13.2
108.3 118.5 16.1
107.9 118.5 14.7
107.5 118.5 17.3
108.0 118.5 17.0
106.9 118.5 16.8
113.3 118.0 12.6
113.6 118.0 13.1
114.1 118.0 14.6
113.0 118.0 12.9
112.7 118.0 13.8
108.3 118.0 14.6
112.7 118.0 13.2
109.9 118.0 13.7
115.2 120.5 14.2
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
12.5
96
97
95
96
95
95
96
96
96
96
96
96
97
96
95
96
95
96
91
91
91
91
90
96
96
97
96
96
92
96
93
96
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 5 of 9
Leighton and Associates, Inc 711912 IO:28:40Ah
I ! I I I 1 I I 1 1 I I I I I t I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (Oh) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks
SG 155
SG 156
SG 157
SG 158
SG 159
SG 160
SG 161
SG 162
SG 163
SG 164
SG 165
SG 166
SG 167
SG 168
SG 169
SG 170
SG 171
SG 172
SG 173
SG 174
SG 175
SG 176
SG 177
SG 178
SG 179
SG 180
SG 181
SG 182
SG 183
SG 184
SG 185
SG 186
8/12/02 CG
8/12/02 CG
8/12/02 ST
8/12/02 CG
8/12/02 CG
8/12/02 ST
8/12/02 CG
8/12/02 sw
8/12/02 SW
8/12/02 sw
8/12/02 SW
8/12/02 sw
8/12/02 sw
8/13/02 sw
8/15/02 sw
8/15/02 SW
8/15/02 SW
8/15/02 sw
9/9/02 sw
9/9/03 SW
9/9/02 SW
9/9/02 DA
9/9/02 DA
9/9/02 sw
9/9/03 SW
9/25/02 SW
9/25/02 DA
9/25/02 SW
9/25/02 DA
9/25/02 SW
9/25/02 SW
9/25/02 SW
R. Side Ave. Aragoo Station 16+87
L. Side Ave. Aragoo Station 16+94
L. Side Ave. Aragon Station 2+00
L. Side Ave. Aragon Station It78
Median Ave. Aragon Station It78
R. Side Ave. Aragon Station 1+94
L. Side Ave. Aragon Station 2+02
L. Side Ave. Aragon Station 3+07
L. Side Ave. Aragon Station 4+70
L. Side Ave. Aragon Station 5+84
L. Side Ave. Aragon Station 6+59
L. Side Ave. Aragon Station 7+35
L. Side Ave. Aragon Station 8+93
L. Side Toledo Station 3+38
R. Side Ave. Aragon Station 2+96
R. Side Ave. Aragon Station 5+25
R. Side La Cima Station 2+02
L. Side La Cima Station 1+98
R Side Ave. De Sueno Station 53+94
R Side Ave. De Sueno Station 53+44
R Side Ave. De Sueno Station 54t40
R Side Ave. De Sueno Station 55+21
R Side Ave. De Sueno Station 55+10
R Side Ave. De Sueno Station 54t18
R Side Ave. De Sueno Station 53t10
R Side Ave. Alege Station 40+46
R Side Ave. Alegre Station 40+14
R Side Ave. Alep Station 38+78
R Side Ave. Alegre Station 37+50
R Side Ave. Alegre Station 36+16
R Side Ave. Alegre Station 35+15
R Side La Cima Station 3+87
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 19
0.0 12
0.0 12
0.0 16
0.0 16
0.0 16
0.0 16
0.0 16
0.0 16
0.0 16
0.0 12
0.0 15
0.0 15
0.0 15
0.0 15
0.0 15
0.0 15
116.8 120.5 15.1
115.7 120.5 13.6
117.2 120.5 12.9
114.9 120.5 14.1
115.3 120.5 14.7
115.0 120.5 14.5
116.3 120.5 15.1
110.3 120.5 14.6
108.9 120.5 15.2
109.7 120.5 12.5
109.1 120.5 13.1
109.7 120.5 14.6
111.1 120.5 15.5
110.5 120.5 13.2
105.2 120.5 16.1
106.2 120.5 16.5
102.2 118.5 17.1
102.5 118.5 16.8
104.9 120.0 16.1
105.2 120.0 15.7
109.3 120.0 12.9
108.6 120.0 14.3
110.3 120.0 13.2
105.0 120.0 16.5
110.0 120.0 12.9
108.5 118.5 12.9
114.9 119.5 13.1
104.1 119.5 16.3
116.2 119.5 12.9
103.7 119.5 15.8
105.0 119.5 16.1
108.5 119.5 12.7
12.5 97
12.5 96
12.5 97
12.5 95
12.5 96
12.5 95
12.5 97
12.5 92
12.5 90
12.5 91
12.5 91
12.5 91
12.5 92
12.5 92
12.5 87
12.5 88
13.5 86
13.5 86
12.5 87
12.5 88
12.5 91
12.5 90
12.5 92
12.5 88
12.5 92
13.5 92
12.5 96
12.5 87
12.5 97
12.5 87
12.5 88
12.5 91
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86Oh
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 6 of 9
Leighton and Associates. Inc 711912 30:28:4OAb
1 I I I I I I I 1 I I I I I i I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“h) Relative (Oh)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. ComDaction Remarks
SG 187
SG 188
SG 189
SG 190
SG 191
SG 192
SG 193
SG 194
SG 195
SG 196
SG 197
SG I98
SG 199
SG 200
SG 201
SG 202
SG 203
SG 204
SG 205
SG 206
SG 207
SG 208
SG 209
SG 210
SG 211
SG 212
SG 213
SG 214
SG 215
SG 216
SG 217
SG 218
9/25/02 sw
9/25/02 DA
9/25/02 sw
12/26/02 SW
12/26/02 SW
12/26/02 DA
12/26/02 SW
12/26/02 DA
12/26/02 DA
12/26/02 SW
1216102 DA
12/6/02 SW
12/6/02 SW
12/27/02 sw
12/27/02 DA
12/27/02 SW
12/27/02 DA
12/27/02 sw
12/27/02 DA
1/27/03 sw
1/27/03 sw
1/27/03 DA
1/27/03 sw
4/8/03 DA
4/8/03 SW
4/8/03 DA
4/8/03 sw
4/8/03 DA
4/8/03 sw
4/8/03 DA
4/8/03 DA
4/8/03 sw
L. Side Ave. Alege
L. Side Ave. Alegre
L. Side Ave. Alegre
R. Side Ave. La Cima
R. Side Ave. La Cima
R. Side Ave. La Cima
R. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Ave. La Cima
L. Side Ave. La Cima
L. Side Ave. La Cima
L. Side Ave. La Cima
L. Side Ave. La Cima
R Side Ave. Aragon
R Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Cone Del Cruce
Corte Del Cruce
Cone Del Cruce
Cone Del Cruce
Corte Del Cruce
Corte Del Cruce
Station 36+90
Station 38+00
Station 39+56
Station 5+66
Station 6+89
Station 7+90
Station 9+04
Station 9+78
Station lO+lO
Station 9+12
Station 7+62
Station 6+42
Station 5+52
Lot 182
Lot 182
Lot 183
Lot 183
Lot 184
Lot 185
Lot 89
Lot 163
Lot 86
Lot 166
Lot 92
Lots 93/94
Lot 95
Lot 97
Lot 100
Lot 113
Lot 113
Lots I14/155
Lot 1 I6
0.0 15
0.0 15
0.0 15
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 I8
0.0 18
0.0 18
0.0 18
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 18
0.0 I8
109.2 119.5 14.8
116.0 119.5 13.6
103.6 119.5 15.7
103.0 118.0 16.7
105.7 118.0 17.1
106.8 118.0 15.6
104.9 118.0 16.9
104.5 118.0 16.5
103.6 118.0 18.1
107.2 118.0 16.1
106.0 118.0 17.5
107.7 118.0 17.0
106.0 118.0 17.3
108.2 122.0 17.1
114.1 122.0 16.1
110.6 122.0 16.0
109.6 122.0 16.3
110.8 122.0 16.1
113.7 122.0 16.8
107.0 122.0 15.2
109.3 122.0 13.9
109.2 122.0 15.9
112.3 122.0 13.7
108.6 122.0 14.6
107.6 122.0 15.4
109.3 122.0 14.5
110.5 122.0 15.0
111.1 122.0 14.8
111.3 122.0 14.6
109.6 122.0 15.0
106.1 118.0 16.5
104.7 118.0 16.9
12.5 91
12.5 97
12.5 87
13.5 87
13.5 90
13.5 91
13.5 89
13.5 89
13.5 88
13.5 91
13.5 90
13.5 91
13.5 90
11.5 89
11.5 94
11.5 91
11.5 90
11.5 91
11.5 93
11.5 88
11.5 90
11.5 90
11.5 92
11.5 89
11.5 88
11.5 90
11.5 91
11.5 91
11.5 91
11.5 90
13.5 90
13.5 89
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 7 of 9
711912 10:28:4OAk Leighton and Associates, Inc
I I I 1 I I I I 1 I \ 1 i I I 1 I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative f%)
No. Date Of Lot # Elevfft) Type Field Max Field Opt. ComDaction Remarks
SG 219 4/8/03 SW
SG 220 4/8/03 SW
SG 221 5/19/03 DA
SG 222 5/19/03 SW
SG 223 5/19/03 DA
SG 224 5/19/03 SW
SG 225 719103 SW
SG 226 7/9/03 DA
SG 227 7/9/03 DA
SG 228 719103 SW
SG 229 7/9/03 DA
SG 230 7/9/03 DA
SG 231 7/9/03 SW
SG 232 7/9/03 DA
SG 233 7/9/03 SW
SG 234 7/9/03 DA
SG 235 7/9/03 SW
SG 236 7/9/03 SW
SG 237 7/9/03 DA
SG 238 7/9/03 DA
SG 239 8121103 DA
SG 240 8/21/03 SW
SG 241 8/21/03 SW
SG 242 8/21/03 DA
SG 243 8/21/03 SW
SG 244 8/21/03 DA
SG 245 8/21/03 DA
SG 246 8/21/03 DA
SG 247 8/4/03 SW
SG 247A 8/21/03 SW
SG 248 8/21/03 SW
SG 248A 8/21/03 SW
Corte Del Cmce
Avenida La Cima
Cone Del Cmce
Corte Del Cruce
Corte Del CNCe
Corte Del Cmce
Avenida la Cima
Avenida la Cima
Avenida la Cima
Avenida la Cima
Lot 189
Lot 191
Lot 193
Lot 203
Lot 206
Lot 205
Lot 204
Lot 129
Lot 126
Lot 124
Lot 130
Lot 131
Lot 132
Lot 133
Lot 134
Lot 135
Lot 204
Lot 204
Lot 203
Lot 203
Lot 202
Lot 202
Lot 117
Lot 92
Lot 103
Station 8+05
Lot 108
Station 7+50
Lot 168
Lot 118
Lot 120
Lot 121
0.0 18
0.0 18
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 9
0.0 9
0.0 9
0.0 9
0.0 9
0.0 9
0.0 9
0.0 9
0.0 9
0.0 18
0.0 I8
0.0 18
0.0 I8
0.0 18
0.0 18
107.3 118.0 17.5
106.1 118.0 17.1
114.3 122.0 14.0
115.0 122.0 14.7
114.0 122.0 13.9
112.8 122.0 14.3
111.9 122.0 12.5
115.9 122.0 13.6
116.7 122.0 11.6
113.5 122.0 11.8
113.8 118.0 13.8
110.4 118.0 14.2
109.9 118.0 14.9
112.6 118.0 13.9
106.4 118.0 16.9
113.2 118.0 15.4
108.3 118.0 14.4
108.5 119.0 13.6
109.7 119.0 14.1
107.3 119.0 13.8
107.2 119.0 16.2
108.0 119.0 14.3
109.5 119.0 15.0
111.1 119.0 14.7
109.6 119.0 13.9
111.1 119.0 14.9
108.4 118.0 14.9
109.5 118.0 15.2
101.5 118.0 19.5
110.1 118.0 16.8
105.1 118.0 15.9
107.2 118.0 15.2
13.5 91
13.5 90
11.5 94
11.5 94
11.5 93
11.5 92
11.5 92
11.5 95
11.5 96
11.5 93
13.5 96
13.5 94
13.5 93
13.5 95
13.5 90
13.5 96
13.5 92
12.0 91
12.0 92
12.0 90
12.0 90
12.0 91
12.0 92
12.0 93
12.0 92
12.0 93
13.5 92
13.5 93
13.5 86 RT ON 247A
13.5 93 RT OF 247
RT ON 24812 13.5 89
13.5 91 RT OF 248
Project Number: 851855-012
Project Name: ArroyoNnits 2-4
Project Location: 0
Client: 0 Page 8 of 9
711912 10:28:40Ah Leighton and Associates, Inc
I I I I I 1 I 1 I I 1 I I I I i ) I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%I
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Comuaction Remarks
SG 249 8/21/03 DA
SG 250 8/21/03 SW
SG 251 8/21/03 SW
SG 252 8/21/03 DA
SG 253 8/21/03 SW
SG 254 8/21/03 DA
SG 255 8/21/03 SW
SG 255A 8/21/03 SW
SG 256 8/21/03 DA
SG 257 8/21/03 DA
SG 258 9/10/03 DA
SG 259 9/10/03 SW
SG 260 9/10/03 DA
SG 261 9/10/03 SW
SG 262 9/10/03 DA
SG 263 9/10/03 SW
SG 264 9110103 DA
SG 265 9110103 DA
SG 266 11/13/03 SW
SG 267 11/13/03 D/A
SG 268 11/13/03 SW
SG 269 11/13/03 D/A
SG 270 31/13/03 SW
SG 271 11/13/03 D/A
SG 272 11/13/03 SW
SG 273 11/13/03 D/A
SG 274 11/13/03 D/A
SG 275 11/13/03 SW
Lot 201
Lot 200
Lot 199
Lot 199
Lot 198
Lot 197
Lot 196
Lot 196
Lot 195
Lot 186
Lot 143
Lot 142
Lot 141
Lot 140
Lot I39
Lot 138
Lot 137
Lot 136
Avenida del Alba
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Canlino Alegre
Camino Alegre
Camino Alegre
Avenida de Sueno
Avenida de Sueno
Lot 149
Lot 150
Lot 151
Lot 152
Lot 147
Lot 146
Lot 145
Lot 144
Lot 29
Lot 28
0.0 18
0.0 18
0.0 18
0.0 I8
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 18
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
0.0 14
SG 276 11/13/03 D/A Avenida de Sueno Lot 27 0.0 14
TEST NO SG 15 1 DOES NOT EXIST
106.1 118.0 16.1
106.8 118.0 16.2
106.5 118.0 16.3
107.9 118.0 16.0
110.1 118.0 15.2
106.4 118.0 16.7
104.9 118.0 16.0
108.7 118.0 16.3
109.2 118.0 16.6
107.4 118.0 16.0
112.5 122.0 12.4
114.7 122.0 12.4
113.6 122.0 11.6
114.1 122.0 12.4
115.5 122.0 13.1
111.3 122.0 15.4
112.4 122.0 13.7
112.6 122.0 11.2
105.8 122.0 13.0
116.8 122.0 14.1
110.9 122.0 13.5
112.3 122.0 14.0
109.9 122.0 13.9
112.9 122.0 14.6
105.1 122.0 14.9
112.8 122.0 13.3
109.3 122.0 13.5
107.5 122.0 14.5
109.9 122.0 14.1
13.5 90
13.5 91
13.5 90
13.5 91
13.5 93
13.5 90
13.5 89
13.5 92
13.5 93
13.5 91
11.5 92
11.5 94
11.5 93
11.5 94
11.5 95
11.5 91
11.5 92
11.5 92
11.5 87
11.5 96
11.5 91
11.5 92
11.5 90
11.5 93
11.5 86
11.5 92
11.5 90
11.5 88
11.5 90
MINIMUM 86%
RT ON 255A
RT OF 255
MINIMUM 86%
MINIMUM 86%
MINIMUM 86%
1 1
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 9 of 9
Leighton and Associates, Inc 711 912 IO:28:40AM
1 I I I I 1 I 1 1 I I I 1 1 I 1 I )
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative (%)
No. Date Of Lot # EIev (ft) Type Field Max Field Opt. Compaction Remarks
AB 1
AB 2
AB 3
AB 4
AB 5
AB 6
AB 7
AB 8
AB 9
AB 10
AB 11
AB 12
AB 13
AB 14
AB 15
AB 16
AB 17
AB 18
AB 19
AB 20
AB 21
AB 22
AB 23
AB 24
AB 25
AB 26
AB 27
AB 28
AB 29
AB 30
AB 31
AB 32
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/7\01 CG
9/7/01 CG
9/7\01 CG
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/7/01 CG
9/13/01 XG
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
9/19/01 ST
10/22/01 ST
10/22/01 ST
10/22/01 ST
2/25/02 CG
2/25/02 CG
2/25/02 CG
2/25/02 CG
2/25/02 CG
2/25/02 CG
3/14/02 ST
3/14/02 ST
L. Side De Sueno
R. Side De Sueno
L. Side De Sueno
R. Side De Sueno
R. Side De Sueno
L. Side De Sueno
R. Side De Sueno
L. Side De Sueno
L. Side Cordoba
R. Side Cordoba
Calle Cordoba
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Avenida de Sueno
Calle Cordoba
Calle Cordoba
Calle Cordoba
Calle Cordoba
R. Side Cam. Alegre
R. Side Cam. Alegre
R. Side Cam. Alegre
L. Side Cam. Alegre
L. Side Cam. Alegre
L. Side Cam. Alegre
Camino Alegre
Camino Alegre
Station 54+80
Station 531-15
Station 52+45
Station 50+70
Station 46+70
Station 44+65
Station 43+83
Station 42+25
Station 2+30
Station 1+80
Station 2+90
Station 54+60
Station 53+20
Station 51+55
Station 50+00
Station 48+50
Station 47+10
Station 45+40
Station 44+00
Station 42+50
Station 2+10
Station 1+23
Station It27
Station 1+50
Station 36+40
Station 38+42
Station 40+73
Station 40+00
Station 38+50
Station 37+50
Station 41175
Station 40+70
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 24
0.0 27
0.0 27
0.0 27
0.0 27
0.0 27
0.0 27
0.0 24
0.0 24
124.1 128.5 10.1
122.8 128.5 9.8
123.1 128.5 10.7
122.5 128.5 11.5
123.7 128.5 10.1
122.7 128.5 10.7
125.2 128.5 9.9
124.5 128.5 12.1
124.0 128.5 11.6
123.6 128.5 10.5
122.6 128.5 9.8
123.4 128.5 8.1
125.1 128.5 8.9
124.5 128.5 8.5
124.1 128.5 8.6
126.2 128.5 9.0
125.0 128.5 8.1
123.5 128.5 8.0
124.6 128.5 8.5
122.7 128.5 8.6
125.0 128.5 8.7
123.6 128.5 10.1
122.8 128.5 9.6
123.7 128.5 9.2
111.7 116.0 12.6
110.8 116.0 13.2
112.3 116.0 13.0
111.4 116.0 14.3
110.5 116.0 13.9
111.7 116.0 14.5
123.2 128.5 8.9
122.7 128.5 9.2
9.0 97
9.0 96
9.0 96
9.0 95
9.0 96
9.0 95
9.0 97
9.0 97
9.0 96
9.0 96
9.0 95
9.0 96
9.0 97
9.0 97
9.0 97
9.0 98
9.0 97
9.0 96
9.0 97
9.0 95
9.0 97
9.0 96
9.0 96
9.0 96
14.0 96
14.0 96
14.0 97
14.0 96
14.0 95
14.0 96
9 .O 96
9.0 95
Project Number: 851855-012
Project Name: ArroyoIUnits 2-4
Project Location: 0
Client: 0 Page 1 of 5
Leighton and Associates, Inc 711912 30:44:56Ab
! I I I I I I I I I I ! I I I I 1
SUMMARY OF FIELD DENSITY TESTS
~ ~ ~ ~ ~ ~ ~ ~~
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%.1
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
AB 33 3/14/02 ST
AB 34 3/14/02 ST
AB 35 4/10/02 CG
AB 36 4/10102 CG
AB 37 4110102 CG
AB 38 4/10/02 CG
AB 39 4/10/02 CG
AB 40 4/10/02 CG
AB 41 4110102 XG
AB 42 4110102 CG
AB 43 4/10/02 CG
AB 44 4/10/02 CG
AB 45 4/10102 CG
AB 46 4/18/02 CG
AB 47 4/18/02 CG
AB 48 4/18/02 CG
AB 49 4/18/02 CG
AB 51 4/18/02 CG
AB 52 4/18/02 CG
AB 53 4/18/02 CG
AB 54 4/18/02 CG
AB 55 4/18/02 CG
AB 56 4/18/02 CG
AB 57 4/18/02 CG
AB 58 4/22/02 ST
AB 59 4/22/02 ST
AB 60 4/22/02 ST
AB 61 4/22/02 ST
AB 62 4122102 ST
AB 63 4/22/02 ST
AB 64 4/22/02 ST
AB 65 4/22/02 ST
Camino Alegre
Camino Alegre
L. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Ave. La Cima
R. Side Ave. La Cima
R. Side Ave. La Cima
L. Side Del Cruce
R. Side Del Cruce
L. Side Del Cruce
R. Side Del Cruce
R. Side Del Cruce
R. Side Del Alba
L. Side Del Alba
R. Side Del Alba
L. Side Del Alba
R. Side Del Alba
L. Side Del Alba
R. Side Del Alba
L. Side Cam. Alegro
R. Side Cam. Alegro
L. Side Cam. Alegro
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Cone Del Cruce
Station 38+15
Station 36+52
Station 4+65
Station 6+03
Station 8+15
Station 8+35
Station 10+55
Station 13+65
Station 15+75
Station 1+77
Station 2+90
Station 5+16
Station 7+60
Station 30+45
Station 29+20
Station 27+00
Station 25+25
Station 22+40
Station 21+65
Station 20+30
Station 18140
Station 32+45
Station 33+75
Station 34+90
Station 3+80
Station 5+60
Station 8+00
Station 10+80
Station 12+50
Station 15+55
Station 16+90
Station 2+45
0.0 24
0.0 24
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 31
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
122.5 128.5
123.0 128.5
137.1 141.5
135.5 141.5
135.6 141.5
138.1 141.5
136.4 141.5
135.9 141.5
137.7 141.5
138.9 141.5
136.0 141.5
134.7 141.5
137.6 141.5
139.3 142.0
136.0 142.0
134.9 142.0
138.0 142.0
139.6 142.0
137.9 142.0
136.0 142.0
140.3 142.0
138.2 142.0
134.6 142.0
135.3 142.0
137.9 142.0
136.5 142.0
140.3 142.0
138.3 142.0
134.6 142.0
136.6 142.0
139.6 142.0
135.5 142.0
8.6
9.0
4.7
5.5
5.1
4.9
6.0
5.6
6.3
6.1
5.6
5.9
6.3
5.2
7.4
6.9
6.3
5.5
6.1
7.2
5.1
6.5
7.2
7.1
7.3
6.8
5.5
5.2
5.9
6.3
5.2
6.8
9.0 95
9.0 96
6.0 97
6.0 96
6.0 96
6.0 98
6.0 96
6.0 96
6.0 97
6.0 98
6.0 96
6.0 95
6.0 97
6.0 98
6.0 96
6.0 95
6.0 97
6.0 98
6.0 97
6.0 96
6.0 99
6.0 97
6.0 95
6.0 95
6.0 97
6.0 96
6.0 99
6.0 97
6.0 95
6.0 96
6.0 98
6.0 95
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 2 of 5
Leighton and Associates, Inc 711912 11:55:59AI
I i I I I I I I i I I 1 1 1 I I I
SUMMARY OF FIELD DENSITY TESTS
~ ~ ~ ~ ~ ~
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
AB 66
AB 67
AB 68
AB 69
AB 70
AB 71
AB 72
AB 73
AB 74
AB 75
AB 76
AB 17
AB 78
AB 79
AB 80
AB 81
AB 82
AB 83
AB 84
AB 85
AB 86
AB 87
AB 88
AB 89
AB 90
AB 91
AB 92
AB 93
AB 94
AB 95
AB 96
AB 97
4/22/02 ST
4/22/02 ST
4/22/02 ST
4/22/02 ST
4/22/02 ST
4/24/02 CG
4/24/02 XG
5/1/02 ST
511102 ST
5/1/02 ST
5/1/02 ST
5/1/02 ST
5/1/02 ST
5/1/02 ST
5/1/02 ST
5/1/02 ST
5/1/02 ST
5/1/02 ST
5/1/02 XG
5/1/02 ST
5/1/02 ST
6/3/02 PL
6/3/02 PL
6/3/02 PL
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
L. Side La Cima
L. Side La Cima
R. Side La Cima
R. Side Del Alba
L. Side Del Alba
L. Side Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Avenida Del Alba
Camino Alegre
Camino Alegre
R. Side Alegre
Avenida La Cima
Avenida La Cima
Open Space Lot 246
Open Space Lot 246
Driveway Open Space
R. Side Ave. Secreto
R. Side Ave. Secreto
L. Side Ave. Secreto
L. Side Ave. Secreto
R. Side Ave. Secreto
R. Side Sitio Toledo
L. Side Sitio Toledo
R. Side Sitio Toledo
Station 5+05
Station 6+60
Station 7+56
Station 8+70
Station 3+70
Station 2+65
Station 3+05
Station 17+35
Station 18+13
Station 19+35
Station 20+68
Station 22+80
Station 25+42
Station 26181
Station 29+50
Station 3 I +70
Station 32+70
Station 34+72
Station 35+75
Station 2+70
Station 2+3 1
Lot 246
Station 4+10
Station 0+50
Station 2+60
Station 5+90
Station 7+74
Station 1+23
Station 2+30
Station 3+15
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 33
0.0 29
0.0 29
0.0 29
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
138.2 142.0
136.2 142.0
139.6 142.0
136.0 142.0
137.9 142.0
136.7 142.0
137.3 142.0
137.4 142.0
135.2 142.0
136.8 142.0
136.5 142.0
137.1 142.0
140.3 142.0
137.8 142.0
138.1 142.0
136.2 142.0
136.2 142.0
136.9 142.0
139.1 142.0
138.5 142.0
135.2 142.0
134.6 139.5
135.8 139.5
133.2 139.5
116.3 119.5
116.0 119.5
113.7 119.5
115.6 119.5
115.9 119.5
115.6 119.5
114.2 119.5
117.2 119.5
6.3
7.1
6.0
7.2
6.8
6.1
6.5
6.6
7.4
7.1
7.5
6.1
5.1
6.1
6.5
7.3
6.1
6.0
5.5
5.9
6.7
6.9
8.2
7.6
11.7
12.1
11.3
11.4
12.6
12.0
11.5
12.6
6.0 97
6.0 96
6.0 98
6.0 96
6.0 97
6.0 96
6.0 97
6.0 97
6.0 95
6.0 96
6.0 96
6.0 97
6.0 99
6.0 91
6.0 97
6.0 96
6.0 96
6.0 96
6.0 98
6.0 98
6 .O 95
8.0 96
8.0 97
8.0 95
12.0 97
12.0 97
12.0 95
12.0 97
12.0 97
12.0 97
12.0 96
12.0 98
Project Number: 851 855-012
Project Name: ArroyoIUnits 2-4
Project Location: 0
Client: 0 Page 3 of 5
Leighton and Associates, Inc 711912 10:44:57AM
I I I I I I I I I I I 1 I 1 I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (Oh)
No. Date Of Lot# Elev(ft) Type Field Max Field Opt. CornDaction Remarks
AB 98
AB 99
AB IO0
AB 101
AB 102
AB 103
AB 104
AB 105
AB 106
AB 107
AB 108
AB 109
AB 110
AB 111
AB 112
AB 113
AB 114
AB 115
AB 116
AB 117
AB 118
AB 119
AB 120
AB 121
AB 122
AB 123
AB 124
AB 125
AB 126
AB 127
AB 128
AB 129
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
6119102 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
6/19/02 CG
7/9/02 ST
7/9/02 ST
7/9/02 ST
7/9/02 ST
7/9/02 ST
7\9/02 ST
7/9/02 ST
7/9/02 ST
7/9/02 ST
7/9/02 ST
7/9/02 ST
7/12/02 SW
7/12/02 SW
7/15/02 SW
7/15/02 sw
7/15/02 SW
7/25/02 sw
7/25/02 sw
7/25/02 sw
L. Side Andalucia
R. Side Andalucia
L. Side Andalucia
R. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
R. Side Ave. Aragon
L. Side Ave. Aragon
Center Ave. Aragon
L. Side Ave. Aragon
L. Side Ave Secreto
R. Side Ave Secreto
R. Side Ave Secreto
L. Side Ave Secreto
Center Ave Secreto
DG Path
DG Path
DG Path
DG Path
DG Path
DG Path
DG Path
DG Path
Station l+lO
Station 1+35
Station 2+32
Station 16+57
Station 15+5 I
Station l3+38
Station 11+50
Station 9+52
Station 7+74
Station 5+90
Station 4+80
Station 4+25
Station 2+82
Station 3+01
Station 3119
Station 5+01
Station 6t05
Station 1+17
Station 1+98
Station 2+75
Station 4+54
Station 6+00
Station 7+20
Station 81-17
N. of Lot 123
N. ofLot 124
N. ofLot 127
N. ofLot 133
N. of Lot 248
N. of Lot 143
N. of Lot 140
N. of Lot 137
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 30
0.0 34
0.0 34
0.0 34
0.0 34
0.0 34
0.0 34
0.0 34
0.0 34
115.1 119.5 13.1
114.8 119.5 12.2
115.6 119.5 12.7
115.6 119.5 13.0
113.9 119.5 11.8
114.1 119.5 11.5
115.2 119.5 12.1
116.7 119.5 12.6
116.0 119.5 13.0
114.6 119.5 12.7
116.8 119.5 11.9
115.2 119.5 13.1
115.0 119.5 12.5
116.3 119.5 11.8
115.8 119.5 10.6
117.5 119.5 12.2
116.7 119.5 11.8
117.9 119.5 12.6
117.0 119.5 12.0
115.1 119.5 11.6
114.7 119.5 10.9
116.0 119.5 10.8
116.1 119.5 12.1
115.7 119.5 11.6
110.6 121.0 12.6
108.9 121.0 13.2
109.5 121.0 11.9
111.6 121.0 12.0
111.2 121.0 12.1
110.8 121.0 12.6
110.5 121.0 11.7
109.8 121.0 13.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
96
96
97
97
95
95
96
98
97
96
98
96
96
97
97
98
98
99
98
96
96
97
97
97
91
90
90
92
92
92
91
91
Project Number: 851855-012
Project Name: ArroyoIUnits 2-4
Project Location: 0
Client: 0 Page 4 of 5
Leighton and Associates, Inc 711912 10:4457AW
I 1 I I I 1 I I I I I I 1
SUMMARY OF FIELD DENSITY TESTS
I I 1 I I I
~
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Comuaction Remarks
AB 130 8/12/02 CG L. Side Ave. Aragon Station 16+92
AB 131 8/12/02 CG Median Ave. Aragon Station 1+96
AB 132 8112102 CG Median Ave. Aragon Station 2+13
AB 133 8/12/02 CG R. Side Ave. Aragon Station 1+70
“TEST NO. 50 DOES NOT EXIST”
0.0 30 115.3 119.5 11.2 12.0 96
0.0 30 115.0 119.5 10.9 12.0 96
0.0 30 115.7 119.5 12.1 12.0 97
0.0 30 114.9 119.5 11.7 12.0 96
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 5 of 5
Leighton and Associates, Inc 711912 1044:57A\
I I I I I 1 I 1 I 1 I 1 I
SUMMARY OF FIELD DENSITY TESTS
I I I I I I
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%)
No. Date Of Lot# Elev(ft) Type Field Max Field Opt. Compaction Remarks
AC 1 9121101 ST
AC 2 9/21/01 ST
AC 3 9\21/01 ST
AC 4 9/21/01 ST
AC 5 9/21/01 ST
AC 6 9/21/01 ST
AC 7 9/21/01 ST
AC 8 9/21/01 ST
AC 9 9/21/01 ST
AC 10 9/21/01 ST
AC 11 llil3/Ol ST
AC 11A 11/13/01 ST
AC 12 l1/13/01 ST
AC 13 3/15/02 ST
AC 14 3/15/02 ST
AC 15 3/15/02 ST
AC 16 3/15/02 ST
AC I7 4/24/02 ST
AC I8 4/24/02 ST
AC 19 4/24/02 ST
AC 20 4/24/02 ST
AC 21 4/24/02 ST
AC 22 4/24/02 ST
AC 23 4/24/02 ST
AC 24 4/24/02 ST
AC 25 4/24/02 ST
AC 26 4/24/02 ST
AC 27 4/24/02 ST
AC 28 4/25/02 ST
AC 29 4125102 ST
AC 30 4/25/02 ST
AC 31 4/25/02 ST
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Calle Cordoba
Calle Cordoba
Calle Cardoba
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Corte Del Cmce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cmce
Corte Del Cmce
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Station 54+50
Station 53+50
Station 52+50
Station 51+00
Station 49+50
Station 48+00
Station 46+50
Station 45+00
Station 43+50
Station 42+00
Station 1+35
Station 1135
Station 1+25
Station 40+75
Station 39+55
Station 37+20
Station 36+42
Station 5+15
Station 7+75
Station 10+65
Station 11+65
Station 14+90
Station 2t70
Station 5+50
Station 8+00
Station 8+62
Station 6+18
Station 3+42
Station 16+35
Station 14+00
Station 13t00
Station 11+50
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
AC 1
AC 1
AC 1
AC 1
AC 1
AC 1
AC 1
AC I
AC I
AC 1
AC2
AC2
AC2
AC2
AC2
AC2
AC2
AC3
AC3
AC3
AC3
AC3
AC3
AC3
AC3
AC3
AC3
AC3
AC3
AC3
AC3
AC3
134.5 141.5
135.0 141.5
133.8 141.5
134.7 141.5
134.6 141.5
136.0 141.5
139.3 141.5
137.1 141.5
136.5 141.5
137.5 141.5
135.9 155.0
152.3 155.0
150.9 155.0
149.3 155.0
147.9 155.0
148.5 155.0
149.5 155.0
138.7 144.0
138.2 144.0
139.6 144.0
137.5 144.0
138.2 144.0
137.0 144.0
138.5 144.0
140.1 144.0
141.3 144.0
138.6 144.0
137.5 144.0
136.9 144.0
138.5 144.0
138.1 144.0
137.9 144.0
0.0 95
0.0 95
0.0 95
0.0 95
0.0 95
0.0 96
0.0 98
0.0 97
0 .o 96
0.0 97
0.0 88
0.0 98
0.0 97
0.0 96
0.0 95
0.0 96
0.0 96
0.0 96
0.0 96
0.0 91
0.0 95
0.0 96
0.0 95
0.0 96
0.0 97
0.0 98
0.0 96
0.0 95
0.0 95
0.0 96
0.0 96
0.0 96
RTON 11A
RTOF 11
Project Number: 851 855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 1 of 4
Leighton and Associates, Inc 112012 3: I0:45PM
I I I I I I I 1 1 I I I 1 1 I 1 1 I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (“A) Relative (%)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. ComDaction Remarks
AC 32
AC 33
AC 34
AC 35
AC 36
AC 37
AC 38
AC 39
AC 40
AC 41
AC 42
AC 43
AC 44
AC 45
AC 46
AC 47
AC 48
AC 49
AC 50
AC 51
AC 52
AC 53
AC 54
AC 55
AC 56
AC 57
AC 58
AC 59
AC 60
AC 61
AC 62
AC 63
4/25/02 ST
4/25/02 ST
4125102 ST
4/25/02 ST
7/10/02 ST
7110102 ST
7110103 ST
7110102 ST
7110102 ST
7110102 ST
7110102 ST
7110102 ST
7110102 ST
7110102 ST
7110102 ST
7110102 PL
7/10102 PL
7110102 PL
8/21/02 ST
8/21/02 ST
8121102 ST
8/21\02 ST
8121102 ST
8121102 ST
8/21/02 ST
8/21/02 ST
8/21/02 ST
8121102 ST
8121102 ST
8121102 ST
8/21/02 ST
8/21/02 ST
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida Secreto
Avenida Secretn
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Lot 246
Lot 246
Lot 246
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Andalucia
Sitio Andalucia
Sitio Andalucia
Calle Acervo
Calle Acervo
Calle Acervo
Calle Acervo
Calle Acervo
Calk Acervo
Calk Acervo
Calle Acervo
Station 9+90
Station 8+12
Station 6+50
Station 4+20
Station 0+79
Station 1+78
Station 2136
Station 3+84
Station 5+43
Station 6+75
Station 8+40
Station 2+95
Station 4+25
Station 4+40
Station 6+55
Station 1+34
Station 2+20
Station 3+10
Station 0+70
Station 1+54
Station 2+10
Station 16+84
Station 14+58
Station I1+80
Station 9+10
Station 7+32
Station 14+75
Station 13+16
Station 7+86
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
AC3
AC3
AC3
AC3
AC5
AC 5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC5
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
AC6
140.0 144.0
141.6 144.0
139.8 144.0
138.7 144.0
140.3 146.0
141.7 146.0
140.9 146.0
139.8 146.0
142.6 146.0
143.7 146.0
141.8 146.0
140.9 146.0
141.5 146.0
139.9 146.0
140.1 146.0
139.2 146.0
141.7 146.0
140.2 146.0
143.1 146.8
144.5 146.8
142.6 146.8
142.0 146.8
143.2 146.8
140.8 146.8
141.7 146.8
139.9 146.8
140.8 146.8
142.6 146.8
141.9 146.8
144.2 146.8
141.5 146.8
142.5 146.8
0.0 97
0.0 98
0.0 97
0.0 96
0.0 96
0.0 97
0.0 97
0.0 96
0.0 98
0.0 98
0.0 97
0.0 91
0.0 91
0.0 96
0.0 96
0.0 95
0.0 97
0.0 96
0.0 97
0.0 98
0.0 97
0.0 97
0.0 98
0.0 96
0.0 97
0.0 95
0.0 96
0.0 97
0.0 97
0.0 98
0.0 96
0.0 97
~ ~~ ~ ~~
Project Number: 851855-012
Project Name: Arroyo/Units 2-4
Project Location: 0
Client: 0 Page 2 of 4
Leighton and Associates, Inc 7/20/2 3:lO 46PM
1 I I I I I 1 I 1 I I I I 1 I I I I
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture ("A) Relative (%)
No. Date Of Lot# Elev (ft) Type Field Max Field Opt. Compaction Remarks
AC 64
AC 65
AC 66
AC 67
AC 68
AC 69
AC 70
AC 71
AC 72
AC 73
AC 74
AC 75
AC 76
AC 77
AC 78
AC 79
AC 80
AC 81
AC 82
AC 83
AC 84
AC 85
AC 86
AC 87
AC 88
AC 89
AC 90
AC 91
AC 92
AC 93
AC 94
AC 95
2/8/03
2/8/03
2/8/03
2/8/03
2/8/03
2/8/03
2/8/03
2/8/03
5/6/03
5/6/03
5/6/03
5/6/03
5/6/03
5/6/03
5/6/03
5/6/03
5/6/03
5/6/03
5/7/03
5/7/01
5/7/03
5/7/03
5/7/03
5/7/03
5/7/03
5/7/03
5/7/03
5/7/03
5/7/03
7/29/03
7/29/03
7/29/03
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida Aragon
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Avenida La Cima
Calle Cordoba
Calle Cordoba
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Avenida De Sueno
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Camino Alegre
Avenida Secreto
Avenida Secreto
Avenida Secreto
Station 54t-50
Station 53+25
Station 51150
Station 49+25
Station 3125
Station 5+10
Station 6t50
Station 9+00
Station 14+20
Station 11+50
Station 8+55
Station 5+30
Station 3145
Station 13+00
Station 9+50
Station 5+60
Station 2+65
Station 2+00
Station 0+15
Station Ot40
Station 49+50
Station 45+00
Station 46+00
Station 42-tOO
Station 39+40
Station 37+00
Station 39+90
Station 38+35
Station 36+75
Station 1+75
Station 2+50
Station 3+50
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC7
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC8
0.0 AC4
0.0 AC4
0.0 AC4
142.5 146.5
141.1 146.5
139.3 146.5
140.9 146.5
142.3 146.5
139.6 146.5
140.9 146.5
144.0 146.5
139.6 146.0
138.9 146.0
139.6 146.0
142.3 146.0
143.3 146.0
140.6 146.0
138.7 146.0
141.2 146.0
138.9 146.0
144.0 146.0
138.9 146.0
142.4 146.0
140.5 146.0
139.2 146.0
143.1 146.0
141.2 146.0
141.5 146.0
138.9 146.0
139.5 146.0
142.5 146.0
138.6 146.0
139.8 143.5
140.7 143.5
141.2 143.5
0.0 97
0.0 96
0.0 95
0.0 96
0.0 97
0.0 95
0 .o 96
0.0 98
0.0 96
0.0 95
0.0 96
0.0 97
0.0 98
0.0 96
0.0 95
0.0 97
0.0 95
0.0 99
0.0 95
0.0 98
0.0 96
0.0 95
0.0 98
0.0 97
0.0 97
0.0 95
0.0 96
0 .o 98
0.0 95
0.0 97
0.0 98
0.0 98
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 3 of 4
Leiehton and Associates. Inc 712012 3'10:46PM
I I 1 I I I I 1 1 1 1 I 1 1 I I 1 I 1
SUMMARY OF FIELD DENSITY TESTS
Test Test Test Location Test Soil Dry Density Moisture (%) Relative (Ye)
No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks
AC 96
AC 97
AC 98
AC 99
AC 100
AC 101
AC 102
AC 103
AC 104
AC 105
AC 106
AC 107
AC 108
AC 109
AC 110
AC 111
AC 112
AC 113
AC 114
AC 115
AC 116
AC 117
AC 118
AC 119
AC 120
AC 121
AC 122
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
1/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7129103 ST
7/29/03 ST
7/29/03 ST
7/29/03 ST
7129103 ST
7129103 ST
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Avenida Secreto
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Sitio Toledo
Avenida Aragon
Avenida Aragon
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cruce
Corte Del Cmce
Cone Del Cruce
Corte Del Cruce
Cone Del Crnce
Corte Del Cruce
Station 4+25
Station 5+50
Station 6+25
Station 7+25
Station 8+00
Station 1+00
Station 8+50
Station 1+00
Station 2+20
Station 2+80
Station 3+23
Station 1+50
Station 2+75
Station 3+00
Station 3+20
Station 6+00
Station 6+75
Station 2+30
Station 4+00
Station 5+70
Station 7+35
Station 8+30
Station 7+60
Station 6+75
Station 5+15
Station 3+45
Station 2+20
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
AC4
140.4 143.5
139.4 143.5
141.0 143.5
138.4 143.5
142.2 143.5
141.9 143.5
143.1 143.5
140.7 143.5
141.1 143.5
142.2 143.5
140.1 143.5
139.9 143.5
143.1 143.5
140.9 143.5
142.0 143.5
140.7 143.5
141.7 143.5
140.2 143.5
141.1 143.5
140.7 143.5
139.8 143.5
139.9 143.5
140.9 143.5
140.3 143.5
140.1 143.5
140.0 143.5
138.5 143.5
0.0 98
0.0 97
0.0 98
0.0 96
0.0 99
0.0 99
0.0 100
0.0 98
0.0 98
0.0 99
0.0 98
0.0 97
0.0 100
0.0 98
0.0 99
0.0 98
0.0 99
0.0 98
0.0 98
0.0 98
0.0 97
0.0 97
0.0 98
0.0 98
0.0 98
0.0 98
0.0 97
Project Number: 851855-012
Project Name: ArroyolUnits 2-4
Project Location: 0
Client: 0 Page 4 of 4
Leichton and Aswclates Tnc
851855-013
10 Olive-gray sandy silt
APPENDIX C
Laboratow Testina Procedures and Test Results
114.5 16.5
Maximum Density Tests: The maximum dry density and optimum moisture content of typical soils
were determined in accordance with ASTM Test Method D1557. The results of these tests are
presented in the table below:
12 Olive-brown clayey sandy silt
Sample
Number
118.5 13.5
Sample Description
/I 13 I Gray green clayey silt 111.5 18.5
Optimum
Moisture Content Maximum Dry
Density (pcQ
I
14
15
Pale yellow-light browdmedium brown clayey 122.0 11.5
Pale yellow-light brown fine to medium sand 119.5 12.5
sand
16 I Pale yellow light brown sand with green clay I 120.0 12.5 I/ 17 I Orange-brown silty sand 117.0 10.5 I
18 Gray-light brown fine to medium sand 118.0 13.5
c-1
11 19 I Gray-light brown sand with green clay 120.5 12.5 I
20 I Light brown silty fine sand with yellow limonite 1 105.5 20.5
851855-013
Dry Density (pcQ
APPENDIX C (Continued)
Optimum
Moisture Content
(%I
Sample
Number
23
24
Sample Description
Green silty sandy clay 111.5 16.5
Miscellaneous Recycled Aggregate Base 128.5 9.0
26
27
I1 21 I Olive-gray/pale brown silty sand I 123.0 I 12.0 II
Lime-treated subgrade soil 113.0 16.5
Miscellaneous Recycled Aggregate Base 116.0 14.0
I1 22 I Pale gray silty sand I 128.0 1 9.0 II
29
30
Class 2 Aggregate Base 139.5 8.0
Recycled Class 2 Aggregate Base 119.5 12.0
11 25 I Lime-treated subgrade soil I 11 1.0 I 17.0 II
33
34
Class 2 Aggregate Base 142.0 6.0
Recycled Class 2 Aggregate Base 121.0 11.0
11 28 I Lime-treated subgrade soil I 109.5 I 18.0 I1
Sample Number Sample Description Laboratory Density (pcQ
11 31 1 Class 2 Aggregate Base I 141.5 I 6.0 II
AC2
11 32 I Shading sand I 132.0 I 8.5 II
3/4-inch AC 155.0
AC4
AC Laboratory Maximum Density Tests: The laboratory maximum density of the asphalt concrete
samples was determined by the Hveem Method, California Test Method Nos. 304 and 308. The
results of the tests are presented in the table below:
3/4-inch AC 143.5
AC6 3/4-inch AC 146.8
II AC3 I 3/4-inch AC I 144.0 I1
AC8 3/4-inch AC 146.0
c-2