HomeMy WebLinkAboutSP 181H; Home2 Carlsbad Suites; UPDATE GEOTECHNICAL RECONNAISSANCE; 2015-07-14'~ i f~Sii Geotechnical Exploration, Inc.
SOIL AND FOUNDATION ENGINEERING • GROUNDWATER e ENGINEERING GEOLOGY
04 March 2016
Royal Hospitality Carlsbad, LLC
P .0. Box· 3872
Rancho Santa· Fe, CA 92067
Attn: Mr. Koong Cho
Subject: Response to City Review Comments
Proposed Carlsbad Home 2 Suites
1901 Wright Place, APN 212-091-13-00
Carlsbad, California
Dear Mr. Cho:
Job No. 05-9085
In accordance with the request of your civil engineer, we are responding to
comments/questions made by the City reviewer for the subject project. We
previously performed a geotechnical investigation for a previously planned project
at the site, the results of which were presented in our report titled "Report of
Preliminary Geotechnical Investigation, Carlsbad Airport Center," dated April 14,
2006. In addition, we also performed an update geotechnical reconnaissance for
the currently planned project, the results of which were presented in our report
dated July 14, 2015. Our comments are presented below.
1. Based on the results of our previous investigation, it is our opinion that the
site is not suitable for infiltration of water due to the clayey nature of the on-
site soils. Further, it is our opinion that any attempt at infiltration into the
potentially expansive soils would most likely result in damage to the
proposed improvements.
2. With regard to the proposed BMP-4, a gravel detention facility beneath AC
pavement, the gravel will consist of Caltrans Class 2 Permeable Material
which will provide adequate pavement support provided th~ permeable
material is compacted with a vibratory compactor in lifts not exceeding 8
Inches in thickness.
3. In design of the retaining walls for BMPs 1 and 2, the design engineer needs
to consider hydrostatic forces which will develop when the basins are flooded
during storm events. In addition, full passive resistance for the outboard
7420 lRADE STREET• SAN DIEGO, CA. 92121 e (858) 549·7222 e FAX: (858) 549-1604 e EMAIL: geotech@gel-sd.com
I~ Proposed Carlsbad Home 2 Suites
Carlsbad, California
Job No. 05-9085
Page 2
walls should be reduced as needed as indicted in our 2006 investigation
report.
This opportunity to be of continued service is sincerely appreciated. If you have
any questions, please contact our office. Reference to our Job No. 05-9085 will
help to expedite a response to your inquiries.
Respectfully submitted,
GEOTECHNICAL EXPLORATION, INC.
~.f!i:696
Senior Geotechnical Engineer
Ge technical Exploration, Inc.
SOIL AND FOUNDATION ENGINEERING • GROUNDWATER • ENGINEERING GEOLOGY
14 July 2015
Royal Hospitality, LLC
P.O. Box 3872
Rancho Santa Fe, CA 92067
Attn: Mr. Koong Cho
Subject: Update Geotechnical Reconnaissance
Proposed Carlsbad Home 2 Suites
1901 Wright Place, APN 212-091-13-00
Carlsbad, California
Dear Mr. Cho:
·i ··:
' : ' ~· '"' \.
Job No. 05-9085
In accordance with your request, Geotechnical Exploration, Inc. has performed
an update geotechnical reconnaissance for the subject project. We previously
performed a geotechnical investigation for a previous project at the site, the results
of which were presented in our report titled "Report of Preliminary Geotechnical
Investigation, Carlsbad Airport Center," dated April 14, 2006. Our scope of services
for this update reconnaissance included review of our previous work at the site as
well as the current development plan, a site reconnaissance, and the preparation of
this update report addressing the applicability of the recommendations in our 2006
report to the current project as well as the presentation of revised/supplemental
recommendations as warranted.
Based on our review of the current project plans provided us, the currently
proposed development of the site will consist of a 3-story hotel complex. Based on
our site reconnaissance on July 10, 2015, the site appears to be essentially
unchanged from the time of our previous investigation. Accordingly, it is our
7420 TRADE STREEfil SAN DIEGO, CA. 92121 • (858) 549-7222 <9 FAX: (858) 549-1604 e EMAIL: geotech@gei-sd.com
Proposed Carlsbad Home 2 Suites
Carlsbad1 California
Job No. 05-9085
Page 2
opinion that the conclusions and recommendations presented in our April 14, 2006,
investigation report remain applicable with the exception of updated slab vapor
barrier recommendations and that the presently proposed structures will be
designed in accordance with the 2013 California Building Code. Updated vapor
barrier and seismic design parameters are presented below.
1. Updated Slab Vapor Barrier Recommendations: We recommend that the
vapor barrier for floor slabs consist of a minimum 15-mil extruded polyolefin
plastic (no recycled content or woven materials permitted). Permeance as
tested before and after mandatory conditioning (ASTM E1745 Section 7.1 and
sub-paragraphs 7.1.1-7.1.5) should be less than 0.01 perms (grains/square
foot/hour in Hg) and comply with the ASTM E1745 Class A requirements.
Installation of vapor barriers should be in accordance with ASTM E1643. The
basis of design is 15-mil StegoWrap vapor barrier placed per the
~ -'
,,
'
manufacturer's guidelines. Reef Industries Vapor Guard membrane has also 11
2.
been shown to achieve a permeance of less than 0.01 perms. We also L'
recommend that the slabs be poured directly on the vapor barrier which is ,
placed directly on the finished slab subgrade surface; no sand layers are
utilized.
Seismic Design Criteria: Site-specific seismic design criteria for the proposed
structures are presented in the following table in accordance with Section
1613 of the 2013 CBC, which incorporates by reference ASCE 7-10 for
seismic design. We have determined the mapped spectral acceleration
values for the site, based on a latitude of 33.1209 degrees and longitude of
-117.2892 degrees, utilizing a tool provided by the USGS, which provides a
solution for ASCE 7-10 (Section 1613 of the 2013 CBC) utilizing digitized files
("~
~\
L_'
,---.
L__j
' '
~-,
L___,
,_ __ j
. ___ ')
Proposed Carlsbad Home 2 Suites
Carlsbad, California
Job No. 05-9085
Page 3
for the Spectral Acceleration maps. In addition, we have assigned a Site Soil
Classification of Sc.
TABLE I
Mapped Spectral Acceleration Values and Design Parameters
In addition, the 2013 CBC requires that retaining walls 6 feet or more in
height be designed to resist seismic loads. For seismic design of
unrestrained walls, if required, we recommend that the seismic pressure
increment be taken as a fluid pressure distribution utilizing an equivalent
fluid weight of 12 pcf. For restrained walls we recommend that the seismic
pressure increment be taken as a fluid pressure distribution utilizing an
equivalent fluid weight of 18 pcf added to the active static fluid pressure
utilizing an equivalent fluid weight of 35 pcf.
LIMITATIONS
Our services consist of professional opinions and recommendations made in
accordance with generally accepted geotechnical engineering principles and
practices. This warranty is in lieu of all other warranties either expressed or
implied .
Proposed Carlsbad Home 2 Suites
Carlsbad, California
Job No. 05-9085
Page 4
This opportunity to be of service is sincerely appreciated. If you have any
questions/ please contact our office. Reference to our lob No. 05-9085 will help
to expedite a response to your inquiries.
Respectfully submitted,
GEOTECHNICAL EXPLORATION, INC.
:.:H~~
Senior Geotechnical Engineer
L_J
r:
L _ _i
L_}
c-' , I
L_,
\ _ _',
REPORT OF PRELIMINARY GEOTECHNICAL
. Carlsbad Airport Center
SE Corner of Wright Place and Palomar Oaks Way
Carlsbad, California
JOB NO. 05-9085
14 April 2006
Prepared for:
AKC San Diego, LLC
GEOTECHNICAL EXPLORATION, INC.
SOIL & FOUNDATION ENGINEERING • GROUNDWATER
HAZARDOUS MATERIALS MANAGEMENT • ENGINEERING GEOLOGY
14 April 2006
AKC San Diego, LLC
cjo McArdle Associates Architects
5838 Edison Place, Suite 100
Carlsbad,CA 92008
Attn: Ms. Kay Willis
Subject:
Gentlemen:
Report of Preliminary Geotechnical
Carlsbad Airport Center
SE Corner of Wright Place and Palomar Oaks Way
Carlsbad, California
lob No. 05-9085
In accordance with your request, and our signed proposal of September 12, 2005,
Geotechnical Exploration, Inc. has performed a preliminary geotechnical
investigation for the subject project in Carlsbad, California. The fieldwork was
performed on November 22, 2005.
If the conclusions and recommendations presented in this report are incorporated
into the design and construction of the proposed development, it is our opinion that
the site is suitable for the project.
This opportunity to be of service is sincerely appreciated. Should you have any
questions concerning the following report, please do not hesitate to contact us.
Reference to our Job No. 05-9085 will expedite a response to your inquiries.
Respectfully submitted,
GEOTECHNICAL EXPLORATION, INC.
Wm. D. Hespelef,' G.E. 396 .
Senior Geotechnical Engineer
7420TRADE STREET • SAN DIEGO, CA 92121 • (858) 549-7222 • FAX: (858) 549-1604 • E-MAIL: geotech@lxpres.com
\__)
~__i
~ --i
',,
TABLE OF CONTENTS
PAGE
I. PROJECT SUMMARY AND SCOPE OF SERVICES 1
II. SITE DESCRIPTION 2
III. FIELD INVESTIGATION 3
IV. SOIL DESCRIPTION 4
~--_j v GROUNDWATER 9
VI. SEISMIC CONSIDERATIONS 10
VII. LABORATORY TESTS AND SOIL INFORMATION 14
VIII. CONCLUSION AND RECOMMENDATIONS 16
IX. GRADING NOTES 24
X. LIMITATIONS 25
FIGURES
I. Vicinity Map
II. Site Plan
III. 1990 As-Built Grading Plan Excerpt
IVa-I. Exploratory Boring Logs
Va-c Laboratory Data
APPENDICES
A. Unified Soil Classification System
REPORT OF PRELIMINARY GEOTECHNICAL
Carlsbad Airport Center
SE Corner of Wright Place and Palomar Oaks Way
Carlsbad, California
lob No. 05-9085
The following report presents the findings and recommendations of Geotechnical
Exploration, Inc. for the subject project (for project location see Figure No. I).
I. PROJECT SUMMARY AND SCOPE OF SERVICES
It is our understanding, based on a recently received grading plan provided by
McArdle Associates Architects titled "Carlsbad Airport Center," that the subject
development will consist of 6 one and two-story office buildings and associated
paved parking and drives (for Site Plan, refer to Figure No. II). Based on our
review of the grading plan, grading at the site will generally consist of cuts and fills
of up to about 4 feet deep to attain the desired finish grades. In addition,
restrained retaining/building walls up to about 10 feet high will be constructed for
buildings D and E and unrestrained site retaining walls up to about 8 feet high will
be constructed along the eastern portion of the northern property boundary and
along the entire eastern boundary.
The scope of work performed for this investigation included review of the proposed
grading and development plans (see Figure No. II), research at the City of Carlsbad
regarding previous grading at the site, a site reconnaissance and subsurface
exploration program, laboratory testing, geotechnical engineering analysis of the
field and laboratory data, and the preparation of this report. The data obtained and
the analyses performed were for the purpose of providing design and construction
criteria for the project earthwork, building foundations, slab-on-grade floors,
retaining walls, and pavements.
n
, __ j
( __ .1
_, l
Carlsbad Airport Center
Carlsbad, California
II. SITE DESCRIPTION
Job No. 05-9085
Page 2
The site is a rectangular-shaped parcel with a plan area of about 3.85 acres. In
general, the area of the proposed structures is a relatively flat, previously graded
lot, sloping down toward the south, with ground surface elevations varying from
about +171 MSL at the northwest corner to about + 161 at the southeast corner.
The site is bounded by an existing cut and fill slope along the eastern property
boundary that descends from the adjacent property, existing cut and fill slopes
along the southerly boundary that descend to Palomar Airport Road, and an existing
cut slope along the westerly boundary descending to Palomar Oaks Way. Surface
vegetation on the graded pad in general consists of a light growth of low weeds.
The slopes surrounding the site are heavily landscaped with groundcover, shrubs
and trees.
From our research at the City of Carlsbad we obtained a copy of an as-built grading
plan by Rick Engineering Company titled "Grading Plans for C.T. 81-46 Unit No. 1,
Carlsbad, California, Sheet 5 of 11" dated January 22, 1990, that pertains to the
previous grading at the site (Lot 12). In addition, we obtained a copy of an as-built
geotechnical report by Moore & Taber that pertains to the site, dated February 25,
1987. Based on our review of the as-built information, the previous grading of the
site consisted mostly of cuts into formational material. The southeast portion of the
site, however, received fills up to about 20 feet deep. In addition, the southern
portion of the slope along the eastern boundary of the site, which descends from
the developed property to the east, is comprised of existing fill soils. The eastern
portion of the slope along the southern boundary, which descends to Palomar
Airport Road, is also comprised of existing fill soils. An excerpt from the as-built
grading plan showing Lot 12 is presented on Figure No. III.
Carlsbad Airport Center
Carlsbad, California
III. FIELD INVESTIGATION
Job No. 05-9085
Page 3
The field investigation consisted of a surface reconnaissance and a subsurface
exploration program utilizing a truck-mounted, continuous-flight auger drill rig.
Twelve exploratory borings were drilled across the site on November 22, 2005, to
depths of 3.5 to 20 feet. The soils encountered in the borings were continuously
logged in the field by our representative and described in accordance with the
Unified Soil Classification System (Refer to Appendix A). The approximate locations
of the borings are shown on Figure No. II.
Representative samples were obtained from the exploratory borings at selected
depths appropriate to the investigation. All samples were returned to our
laboratory for evaluation and testing. Standard penetration resistance blow counts
were obtained by driving a 2-inch O.D. split spoon sampler with a 140-pound
hammer dropping through a 30-inch free fall. The sampler was driven a maximum
of 18 inches and the number of blows for each 6-inch interval was recorded. The
blows per foot indicated on the boring logs represent the accumulated number of
blows that were required to drive the last 12 inches or portion thereof. Samples
contained in liners were recovered by driving a 3.0-inch O.D. California sampler 18
inches into the soil using a 140-pound hammer.
Boring logs have been prepared on the basis of our observations and laboratory test
results. Logs of the borings are attached as Figure No. IV. The following chart
provides an in-house correlation between the number of blows and the relative
density of the soil for the Standard Penetration Test and the 3-inch sampler.
L __ }
.!._.J
\ ___ )
~ ---}
Carlsbad Airport Center
Carlsbad, California
DENSITY
SOIL DESIGNATION
Sand and ·Very loose
Nonplastic Silt Loose
Medium
Dense
Very Dense
Clay and Very soft
Plastic Silt Soft
Firm
Stiff
Very stiff
Hard
Very Hard
2-INCH O.D.
SAMPLER
BLOWS/FOOT
0-4
5-10
11-30
31-50
Over 50
0-2
3-4
5-8
9-15
16-30
31-60
Over 60
IV. SOIL DESCRIPTION
Job No. 05-9085
Page 4
3-INCH O.D.
SAMPLER
BLOWS/FOOT
0-7
8-20
21-53
54-98
Over 98
0-2
3-4
5-9
10-18
19-45
46-90
Over 90
Existing fill soils consisting of medium dense silty and clayey sands and stiff sandy
clays were encountered in Borings 1 through 6 to depths of 6 to 20 feet. In Borings
1, 3, 5, and 6, the fill soils were underlain by medium dense to dense, natural silty
sands of the Del Mar Formation at depths of 6 to 17.5 feet. In Borings 7 through
10 and 12, very stiff to hard natural silty clays of the Del Mar Formation were
encountered from the ground surface to depths of 2.0 to 3.5 feet. In Boring 10 and
12, the clays were underlain by very dense silty sands. Very dense formational silty
sands were encountered in Boring 11 from the ground surface to the depth
explored. Based on the boring results and our laboratory testing, the existing fill
soils encountered in the borings appear to be in a less than uniformly well
compacted condition. Based on our laboratory testing, the clayey sand existing fill
soils and formational clays encountered have a high potential for expansion.
The boring logs and related information depict subsurface conditions only at the
specific locations shown on the site plan and on the particular date designated on
ca·rlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 5
the logs. Subsurface conditions at other locations may differ from conditions
occurring at these boring locations. Also, the passage of time may result in
changes in the subsurface conditions due to environmental changes.
V. GROUNDWATER
No groundwater was encountered during the course of our field investigation and
we do not anticipate significant groundwater problems to develop in the future if the
property is developed as proposed and proper drainage is maintained.
It should be kept in mind, however, that any required grading operations may
change surface drainage patterns and/or reduce permeabilities due to the
densification of compacted soils. Such changes of surface and subsurface
hydrologic conditions, plus irrigation of landscaping or significant increases in
rainfall, may result in the appearance of surface or near-surface water at locations
where none existed previously. The appearance of such water is expected to be
localized and cosmetic in nature, if good positive drainage is implemented, as
recommended in this report, during and at the completion of construction.
On properties such as the subject site where dense, low permeability soils and/or
formational materials exist at shallow depths/ even normal landscape irrigation
practices or periods of extended rainfall can result in shallow "perched" water
conditions. The perching (shallow depth) accumulation of water on a low
permeability surface can result in areas of persistent wetting and drowning of
lawns, plants and trees. Resolution of such conditions, should they occur, may
require site-specific design and construction of subdrain and shallow "wick" drain
dewatering systems.
n
r----,
\ J
t _)
'_j
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 6
It must be understood that unless discovered during initial site exploration or
encountered during site grading operations, it is extremely difficult to predict if or
where perched or true groundwater conditions may appear in the future. When site
fill or formational soils are fine-grained and of low permeability, water problems
may not become apparent for extended periods of time.
Water conditions, where suspected or encountered during construction, should be
evaluated and remedied by the project civil and geotechnical consultants. The
project developer and homeowner, however, must realize that post-construction
appearances of groundwater may have to be dealt with on a site-specific basis.
VI. SEISMIC CONSIDERATIONS
The San Diego area, as most of California, is located in a seismically active region.
The San Diego area has been referred to as the eastern edge of the Southern
California Continental Borderland, an extension of the Peninsular Ranges
Geomorphic Province. The borderland is part of a broad tectonic boundary between
the North American and Pacific Plates. The plate boundary is dominated by a
complex system of active major strike-slip (right lateral)1 northwest-trending faults
extending from the San Andreas Fault about 70 miles east, to the San Clemente
Fault/ about 50 miles west of the San Diego metropolitan area.
Based on a review of some available published information, including the County of
San Diego Faults and Epicenters Map, there are no faults known to pass through
the site. The prominent fault zones generally considered having the most potential
for earthquake damage in the vicinity of the site are the active Rose Canyon Fault
Zone mapped approximately 4 miles west-southwest of the site1 and the active
Elsinore and San Jacinto Fault zones, mapped approximately 40 and 63 miles
northeast of the site, respectively.
Carlsbad Airport Center
Carlsbad1 California
Job No. 05-9085
Page 7
Although research on earthquake prediction has greatly increased in recent years,
geologists and seismologists have not yet reached the point where they can predict
when and where an -earthquake will occur. Nevertheless! on the basis of current
technology, it is reasonable to assume that the proposed buildings may be subject
to the effects of at least one moderate to major earthquake during their design
lives. During such an earthquake, the danger from fault offset through the site is
remoter but relatively strong ground shaking is likely to occur.
Strong ground shaking not only can cause structures to shake, but it also has the
potential for including other phenomena that can indirectly cause substantial ground
movements or other hazards resulting in damage to structures. These phenomena
include seismically induced waves such as tsunamis and seiches, inundation due to
dam or embankment failure, soil liquefaction, landsliding, lateral spreading,
differential compaction and ground cracking. Available information indicates that
the location of and geotechnical conditions at the site are not conducive to any of
these phenomena.
VII. LABORATORY TESTS AND SOIL INFORMATION
Laboratory tests were performed on disturbed and relatively undisturbed soil
samples in order to evaluate their index, strength, expansion, compactness, and
compressibility properties. The following tests were conducted on the sampled
soils:
' ' \_ ___ .:
L)
l __ ;
L _ _~
\. i
·~. '
'--j
ca·rlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 8
1. Laboratory Compaction Characteristics (ASTM D1557-98
2. Density Tests (from relatively undisturbed boring samples)
3. Determination of Percentage of Particles Smaller
than No. 200 Sieve (ASTM D 1140-97)
4. Direct Shear Test (ASTM D 3080-98)
5. Expansion Index (ASTM D 4829-95)
Laboratory compaction tests establish the laboratory maximum dry density and
optimum moisture content of the tested soils. This test was used to aid in
evaluating the existing fill soils at the site, as well as the anticipated properties of
new structural fills.
Laboratory density tests on samples of the existing fills encountered were
performed to aid in evaluating the compactness of the existing fills encountered in
the borings.
The particle size smaller than a No. 200 sieve analysis aids in classifying the tested
soils in accordance with the Unified Soil Classification System and provide
qualitative information related to engineering characteristics such as expansion
potential, permeability, and shear strength.
Laboratory direct shear tests aid in evaluating the strength properties of the on-site
soils.
The expansion potential of soils is determined, when necessary, utilizing the
Standard Test Method for Expansion Index of Soils (ASTM D 4829-95). In
accordance with the Standard, potentially expansive soils are classified as follows;
Carlsbad Airport Center
Carlsbad, California
EXPANSION INDEX
0 to 20
21 to 50
51 to 90
91 to 130
Above 130
Job No. 05-9085
Page 9
POTENTIAL EXPANSION
Very low
Low
Medium
Hiqh
Very hiqh
Based on the test results, the clayey sand existing fill soils and clay formational
materials possess a high expansion potential, with measured expansion index
values of 97 and 1011 respectively.
The laboratory test results are shown on the borings logs and on Figure Nos. Va-c .
VIII. CONCLUSIONS AND RECOMMENDATIONS
The following conclusions and recommendations are based on the field investigation
conducted by our firm, our laboratory test results, and our experience with similar
soils and formational materials. The primary features of concern at the site are the
less than uniformly well-compacted condition of the existing fill soils at the site and
the high expansion potential of the clayey existing fill soils and the natural,
formational clays. In order to preclude the possibility of excessive settlement
damage to the proposed buildings it will be necessary to remove and recompact any
existing fill soils that are present in building areas. In order to minimize possible
damage to the structures resulting from swelling and shrinkage of the potentially
expansive on-site materials, the buildings must be supported on footings that
extend deeper than would normally be recommended and the building floor slabs,
as well as exterior slabs, should be supported on a layer of low-expansion potential
imported fill material. Grading and foundation recommendations are presented in
the following sections.
l_;
I\
:~ _)
LJ
r-1
_;,.
--_,
: __ _j
I_)
~ --]
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 10
The opinions, conclusions and recommendations presented in this report are
contingent upon Geotechnical Exploration, Inc. being retained to review the final
plans and specifications as they are developed and to observe the site earthwork
and installation of foundations.
A. Preparation of Soils for Site Development
1. Clearing and Stripping: The area of the site to be graded should be cleared
of any miscellaneous trash or debris that may be present at the time of
construction and stripped of all vegetation. The cleared and stripped
materials should be properly disposed of off-site.
2. Treatment of Existing Fill Soils: In order to provide suitable support for the
proposed buildings, we recommend that any existing fill soils in the new
building areas be removed and recompacted. The recompaction work should
consist of (a) removing all existing fill soils down to undisturbed formational
materials within and 10 feet beyond the building limits; (b) scarifying,
moisture conditioning, and compacting the exposed subgrade soils; and (c)
replacing the fill materials as compacted structural fill. The areal extent and
depth required to remove the fill soils should be determined by our
representatives during the excavation work based on their examination of the
soils being exposed. Any unsuitable materials (such as oversize rubble
and/or organic matter) should be selectively removed as directed by our
representative and disposed of off-site.
3. Subgrade Preparation: After the site has been cleared, stripped, and the
required excavations made, the exposed subgrade soils in those areas-to
receive fill, building improvements and/or pavements should be scarified to a
depth of 6 inches1 moisture conditioned1 and compacted to the requirements
Carlsbad Airport Center
Carlsbad1 California
Job No. 05-9085
Page 11
of Recommendation No. 61 "Compaction." Potentially expansive clayey soils
with an Expansion Index greater than 401 that are exposed at the finished
subgrade level. in cut areas where buildings and/or exterior slabs-on-grade
are to be constructed, should be removed and replaced with compacted low-
expansion potential (Expansion Index of 20 to 40) fill so as to provide an
18-inch minimum thickness of low-expansion potential soil at the subgrade
level. The depth and areal extent of the required removals should be
determined by our representative at the time of construction based on an
examination of the soils exposed.
4. Low Expansion Potential Imported Fill Laver: Because of the high expansion
potential of the clayey, on-site, near-surface soils, we recommend that
building floor slabs and exterior slabs-on-grade be supported on an 18-inch
minimum thickness of low-expansion potential (Expansion Index of 20 to 40
per ASTM 04829-98) imported soil. In cut areas, this will require that the
clayey soils be undercut and replaced with an 18-inch thickness of compacted
low-expansion potential fill. Similarly, in fill areas the upper 18 inches of the
finish subgrade soils should be a compacted low-expansion potential soil.
The low-expansion potential soil layer should extend a minimum of 5 feet
beyond the perimeter limits of the proposed building areas and all exterior
slabs-on-grade.
5. Material for Fill: All existing on-site soils with an organic content of less than
3 percent by volume are, in general, suitable for use as fill except where a
low-expansion potential layer is required. Imported fill materia~ should be a
low-expansion potential (Expansion Index of 20 to 40 per ASTM 04829-,98)1
granular soil with a plasticity index of 12 or less. In addition, imported· fill
materials should not contain rocks or lumps more than 3 inches in greatest
dimension, not more than 15 percent larger than 1 inch, and no more than
LJ
(__)
! _I
L)
r-. I
-_j <-
' __ i
Ca"rlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 12
6.
25 percent of the fill should be larger than Y4-inch. All materials for use as fill
should be approved by our representative prior to filling.
Fill Compaction: All structural fill should be compacted to a minimum degree
of compaction of 90 percent based upon ASTM 01557-98. The upper 6
inches of subgrade soil beneath pavements should be scarified, moisture
conditioned, and compacted to a minimum degree of compaction of 95
percent just prior to placement of the aggregate base layer. Fill material
should be spread and compacted in uniform horizontal lifts not exceeding 8
inches in uncompacted thickness. Before compaction begins, the fill should
be brought to a water content that will permit proper compaction by either:
(1) aerating the fill if it is too wet, or (2) moistening the fill with water if it is
too dry. All on-site clayey soils should be compacted at a moisture content
at least 2 percent above the laboratory optimum. The required moisture
content should be maintained until the placement of capping material or
pavement base is completed. Each lift should be thoroughly mixed before
compaction to ensure a uniform distribution of moisture.
7. Permanent Slopes: We recommend that any required permanent cut and fill
slopes be constructed to an inclination no steeper than 2 to 1 (horizontal to
vertical). The project plans and specifications should contain all necessary
design features and construction requirements to prevent erosion of the on-
site soils both during and after construction. Slopes and other exposed
ground surfaces should be appropriately planted with a protective ground
cover.
Fill slopes should be constructed to assure that the recommended minimum
degree of compaction is attained out to the finished slope face. This may be
accomplished by "backrolling" with a sheepsfoot roller or other suitable
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 13
8.
equipment as the fill is raised. Placement of fill near the tops of slopes
should be carried out in such a manner as to assure that loose, uncompacted
soils are not sloughed over the tops and allowed to accumulate on the slope
face.
Temporarv Slopes: Based on our subsurface investigation work, laboratory
test results, and engineering analysis, temporary cut-slopes for construction
of the proposed retaining walls should be safe against mass instability at an
inclination of 1 (horizontal) to 1 (vertical). Temporary slopes along the east
property boundary, however, should not start closer than 5 feet horizontally
from the existing retaining wall on the adjacent property. In addition, some
localized sloughing or ravelling of the soils exposed on the slopes may occur.
Since the stability of temporary construction slopes will depend largely on the
contractor's activities and safety precautions (storage and equipment
loadings near the tops of cut-slopes, surface drainage provisions, etc.) it
should be the contractor's responsibility to establish and maintain all
temporary construction slopes at a safe inclination appropriate to his
methods of operation.
9. Trench and Retaining Wall Backfill: All backfill soils placed in utility trenches
or behind retaining walls should be compacted to a minimum degree of
compaction of 90 percent. Backfill material should be placed in lift
thicknesses appropriate to the type of compaction equipment utilized and
compacted to a minimum degree of 90 percent by mechanical means. In
pavement areas, that portion of the trench backfill within the pavement
section should conform to the material and compaction requirements of the
adjacent pavement section. In addition, the integrity of the low-expansion
potential fill layer should be maintained in utility trench backfills within
building and exterior slab areas. Around perimeter footings, trench backfill
L_i
u
l_ j
L .. i
l_~j
!i
!l
I ' ~--~
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 14
beneath the level of the low-expansion fill layer should consist of on-site
clayey materials in order to minimize the potential for migration of water
below the perimeter footings at the trench locations.
Our experience has shown that even shallow, narrow trenches, such as for
irrigation and electrical lines, that are not properly compacted can result in
problems, particularly with respect to shallow ground water accumulation and
migration.
10. Surface Drainage: Positive surface gradients should be provided adjacent to
the buildings, and roof gutters and downspouts should be installed so as to
direct water away from foundations and slabs toward suitable discharge
facilities. Ponding of surface water should not be allowed anywhere on the
site.
Appropriate erosion control measures should be taken at all times during and
after construction to prevent surface runoff waters from entering footing
excavations or ponding on finished building pad areas.
B. Design Parameters for Proposed Foundations
11. Footings: We recommend that the proposed office buildings be supported on
conventional, individual-spread and/or continuous footing foundations
bearing on undisturbed formational material and/or well compacted fill
material. All footings should be founded at least 24 inches below the lowest
adjacent finished grade or 6 inches below the bottom of the low-expansion
potential cap, whichever is lower. Footings located adjacent to the tops· of
slopes should be extended sufficiently deep so as to provide at least 10 feet
of horizontal cover or 1¥2 times the width of the footing, whichever is
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 15
greater, between the slope face and outside edge of the footing at the footing
bearing level. Footings located adjacent to utility trenches should have their
bearing surfaces situated below an imaginary 1.5 to 1 plane projected
upward from the bottom edge of the adjacent utility trench.
At the recommended depths, footings may be designed for allowable bearing
pressures of 3,000 pounds per square foot (psf) for combined dead and live
loads and 4,000 psf for all loads, including wind or seismic. The footings
should, however, have a minimum width of 12 inches.
All continuous footings should contain top and bottom reinforcement to
provide structural continuity and to permit spanning of local irregularities.
We recommend that a minimum of two No. 5 top and two No. 5 bottom
reinforcing bars be provided in the footings. A minimum clearance of 3
inches should be maintained between steel reinforcement and the bottom or
sides of the footing. In order for us to offer an opinion as to whether the
footings are founded on soils of sufficient load bearing capacity, it is essential
that our representative inspect the footing excavations prior to the placement
of reinforcing steel or concrete.
NOTE: The project Civil/Structural Engineer should review all reinforcing
schedules. The reinforcing minimums recommended herein are not to be
construed as structural designs, but merely as minimum reinforcement to
reduce the potential for cracking and separations.
12. Seismic Design Criteria: Site-specific seismic design criteria to calculate the
base shear needed for the design of the proposed structures are presented in
the following table. The design criteria was obtained from the California
Building Code (2001 edition) and is based on the distance to the closest
'1_1
~--.,
LJ
L_f
i __ J
,_j
l..l
l.!
l_)
\'
\__I
I--~
I ___ ,
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 16
active fault and soil profile classification. The nearest active fault zone is
mapped approximately 4 miles to the southwest of the project site.
Parameter Value Reference
Seismic Zone Factor, Z 0.40 Table 16-I
Soil Profile Type Sc Table 16-J
Seismic Coefficient, Ca 0.40Na Table 16-Q
Seismic Coefficient, Cv 0.56Nv Table 16-R
Near-Source Factor, Na 1.0 Table 16-S
Near-Source Factor, Nv 1.2 Table 16-T
Seismic Source Type B Table 16-U
13. Lateral Loads: Lateral load resistance for the structures supported on footing
foundations may be developed in friction between the foundation bottoms
and the supporting subgrade. An allowable friction coefficient of 0.30 is
considered applicable. An additional allowable passive resistance equal to an
equivalent fluid weight of 250 pounds per cubic foot (pcf) acting against the
foundations may be used in design provided the footings are poured neat
against the adjacent undisturbed formational materials or compacted fill soils.
These lateral resistance values assume a level surface in front of the footing
for a minimum distance of three times the embedment depth of the footing
and any shear keys. For ground surfaces sloping down from footings at an
inclination of 2 horizontal to 1 vertical, the allowable passive resistance
should be reduced to 60 pcf. For variations between a level surface and 2 to
1 slopes in front of footings1 passive resistance values may be interpolated.
14. Settlement: Settlements under building loads are expected to be within
tolerable limits for the proposed structures. For footings designed. in
accordance with the recommendations presented in the preceding
paragraphs, we anticipate that total settlements should not exceed 1 inch
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 17
and that post-construction differential settlements should be less than V2-inch
in 25 feet.
15. Retaining Walls: Retaining walls must be designed to resist lateral earth
pressures and any additional lateral pressures caused by surcharge loads on
the adjoining retained surface. We recommend that unrestrained (cantilever)
walls with level backfill be designed for an equivalent fluid pressure of 40
pounds per cubic foot (pcf). Unrestrained walls with 2 to 1 sloping backfill
should be designed for a fluid pressure of 52 pcf. We recommend that
restrained walls (i.e., the proposed walls supporting buildings or any walls
with angle points that restrain them from rotation) with level backfill be
designed for an equivalent fluid pressure of 40 pcf plus an additional uniform
lateral pressure of 10H pounds per square foot where H is equal to the height
of backfill above the top of the wall footing in feet. Restrained walls with 2 to
1 sloping backfill should be designed for an equivalent fluid pressure of 52 pcf
plus an additional uniform lateral pressure of 13H pounds per square foot.
Wherever walls will be subjected to surcharge loads, they should also be
designed for an additional uniform lateral pressure equal to one-third the
anticipated surcharge pressure in the case of unrestrained walls and one-half
the anticipated surcharge pressure in the case of restrained walls.
The preceding design pressures assume that the walls are backfilled with the
clayey on-site soils and that there is sufficient drainage behind the walls to
prevent the build-up of hydrostatic pressures from surface water infiltration.
We recommend that drainage be provided by a composite drainage material
such as Miradrain 6000/6200 and QuickDrain or equivalent. No gravel or
perforated pipe is used with the Miradrain/QuickDrain system. The drainage
material should terminate 12 inches below the finish surface where the
surface is covered by slabs or 18 inches below the finish surface in landscape
,--,
I_,
I~
i_ ;,
~~-,
r-',
~l
·~ J
' -'
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 18
areas. If the walls are backfilled with low expansion potential imported
materials (Expansion Index less than 40) within a 1 to 1 zone behind the
walls, the preceding values may be reduced to 35 pcf and 35 pcf plus 8H
uniform for level backfills, and 45 pcf and 45 pcf plus 10H uniform for 2 to 1
sloping backfills.
Backfill placed behind the walls should be compacted to a minimum degree of
compaction of 90 percent using light compaction equipment. If heavy
equipment is used, the walls should be appropriately temporarily braced.
Retaining walls should be supported on footing foundations designed in
accordance with the recommendations presented previously under
Recommendation No. 11, "Footings". Lateral load resistance for the walls can
be developed in accordance with the recommendations presented under
Recommendation No. 13 "Lateral Loads"
C. Concrete Slab-on-grade Criteria
16. Minimum Floor Slab Thickness and Reinforcement: Based on our experience,
we have found that, for various reasons, floor slabs occasionally crack,
causing brittle surfaces such as ceramic tiles to become damaged.
Therefore, we recommend that all slabs-on-grade contain at least a minimum
amount of reinforcing steel to reduce the separation of cracks, should they
occur. Interior floor slabs should be a minimum of 5 inches actual thickness
and be reinforced with No. 4 bars on 18-inch centers, both ways, placed at
midheight in the slab.
17. Concrete Isolation Joints: We recommend the project Civil/Structural
Engineer incorporate isolation joints and sawcuts to at least one-fourth the
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 19
thickness of the slab in any floor designs. The joints and cuts, if properly
placed, should reduce the potential for and help control floor slab cracking.
We recommend that concrete shrinkage joints be spaced no farther than
approximately 20 feet apart, and also at re-entrant corners. However, due to
a number of reasons (such as base preparation, construction techniques,
curing procedures, and normal shrinkage of concrete), some cracking of slabs
can be expected.
18. Slab Moisture Emission: Soil moisture vapor can result in damage to
moisture-sensitive floors, some floor sealers, or sensitive equipment in direct
contact with the floor, in addition to mold and staining on slabs, walls and
carpets.
The common practice in Southern California is to place vapor retarders made
of PVC, or of polyethylene. PVC retarders are made in thickness ranging
from 10-to 60-mil. Polyethylene retarders, called visqueen, range from 5-to
10-mil in thickness. The thicker the plastic, the stronger the resistance will
be against puncturing.
Although polyethylene (visqueen) products are commonly used, products
designed specifically as vapor retarders possess higher tensile strength and
are more specifically designed for and intended to retard moisture
transmission into concrete slabs. The use of such products is highly
recommended.
18.1 Vapor retarder joints must be lapped and sealed with mastic or. the
manufacturer's recommended tape. To provide protection of the
moisture retarder1 a layer of at least 2 inches of clean sand (minimum
Sand Equivalent value of 50) on top and 2 inches at the bottom should
l_]
' L ... J
l __ j
L .i
L'
I L~
L_l
l __ j
, _ _j
•: _ _';
~-I
\_ __ j
Carlsbad Airport Center
Carlsbadr California
also be provided.
Job No. 05-9085
Page 20
The bottom clean sand layer may be omitted
provided the low expansion capping material is free of any gravel
which could damage the membrane. The clean sand layer(s) may be
counted as part of the recommended low-expansion potential layer
(see Recommendation No. 4). No heavy equipment, stakes or other
puncturing instruments should be used on top of the liner before or
during concrete placement. In actual practicer stakes are often driven
through the retarder material, equipment is dragged or rolled across
the retarder! overlapping or jointing is not properly implemented1 etc.
All these construction deficiencies reduce the retarder's effectiveness.
18.2 The vapor retarders are not waterproof. They are intended to help
prevent or reduce vapor transmission and capillary migration through
the soil into the pores of concrete slabs. Waterproofing systems must
supplement vapor retarders if full waterproofing is desired. The owner
should be consulted to determine the specific level of protection
required.
19. Exterior Slab Reinforcement: As a minimum for protection of on-site
improvements, we recommend that all exterior pedestrian concrete slabs be
founded on properly compacted, low-expansion potential fill soils as stated
previously in Recommendation No. 4. The slabs should be 4 inches thick and
reinforced with No. 4 bars at 24-inch centers, both waysr at the center of the
slab, and contain adequate isolation and control joints. The performance of
on-site improvements can be greatly affected by soil base preparation and
the quality of construction. It is therefore important that all improvements
are properly designed and constructed for the existing soil conditions. The
improvements should not be built on loose soils or fills placed without our
observation and testing.
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 21
For exterior slabs with the minimum shrinkage reinforcement, control joints
should be placed at spaces no farther than 15 feet apart or the width of the
slab, whichever is less, and also at re-entrant corners. Control joints in
exterior slabs should be sealed with elastomeric joint sealant. The sealant
should be inspected every 6 months and be properly maintained.
D. Slope Performance
20. Slope Top/Face Performance: The soils that occur in close proximity to the
top or face of even properly compacted fill or dense natural ground cut slopes
often possess poor lateral stability. The degree of lateral and vertical
deformation depends on the inherent expansion and strength characteristics
of the soil types comprising the slope, slope steepness and height, loosening
of slope face soils by burrowing rodents, and irrigation and vegetation
maintenance practices, as well as the quality of compaction of fill soils.
Structures and other improvements could suffer damage due to these soil
movement factors if not properly designed to accommodate or withstand
such movement.
21. Slope Top Structure Performance: Rigid improvements such as top-of-slope
walls (with the exception of the planned restrained building walls), columns,
decorative planters, concrete flatwork, and other similar types of
improvements can be expected to display varying degrees of separation
typical of improvements constructed at the top of a slope. The separations
result primarily from slope top lateral and vertical soil deformation processes.
These separations often occur regardless of being underlain by cut or fill
slope material. Proximity to a slope top is often the primary factor affecting
the degree of separations occurring.
u
,,
\_,_ __ _]
LJ
I L __ J
' ' L_-'
,---1
'___ -~ j
Ca'rlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 22
Typical and to-be-expected separations can range from minimal to up to 1
inch or greater in width. In order to minimize the effect of slope-top lateral
soil deformation, we recommend that the top-of-slope improvements be
designed with flexible connections and joints in rigid structures so that the
separations do not result in visually apparent cracking damage and/or can be
cosmetically dressed as part of the ongoing property maintenance. These
flexible connections may include "slip joints" in wrought iron fencing, evenly
spaced vertical joints in block walls or fences, control joints with flexible
caulking in exterior flatwork improvements, etc.
E. Pavements
22. Concrete Pavement: We recommend that concrete pavements subject only
to automobile and light truck traffic be 6 inches thick and be supported
directly on properly prepared on-site subgrade soils. Concrete pavement for
areas subject to occasional heavy truck traffic1 such as trash trucks, should
have a minimum thickness of 8 inches. The upper 8 inches of the subgrade
below the slab should be compacted to a minimum degree of compaction of
95 percent just prior to paving. The concrete should conform to Section 201
of The Standard Specifications for Public Works Construction, 1994 Edition,
for Class 560-C-3250.
In order to control shrinkage cracking1 we recommend that saw-cut1
weakened-plane joints be provided at about 15-foot centers both ways. The
pavement slabs should be saw-cut no more than 24 hours after the
placement of the concrete. The depth of the joint should be one-quarter of
the slab thickness and its width should not exceed 0.02-feet. Reinforcing
steel is not necessary unless it is desired to increase the joint spacing
recommended above.
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 23
23. Asphalt Concrete Pavements: It is our understanding that the City's
Standards require a minimum Traffic Index of 4.5 for the design of the
structural section for parking lots and automobile driveways with a minimum
of 3 inches of asphalt concrete. For truck routes subject to occasional heavy
trucks (such as trash, fire, and delivery trucks) with a Traffic Index of 5Y2 ,
the minimum section required by the City is 4 inches of asphalt concrete on 6
inches of aggregate base.
Based on our experience with materials similar to those on site, and the City
of Carlsbad minimum traffic index of 4.5 for automobile drives and parking
stalls and 5.5 for truck drives, we anticipate that pavement sections for the
development should consist of 3 inches of asphalt concrete on ?Y2 inches of
aggregate base for parking stalls and automobile traffic channels and 4
inches on 9 inches for pavements subject to up to 8 heavy trucks per week.
Final pavement section recommendations should be based on R-value
(Resistance) tests performed on bulk samples of the soils that are exposed at
the finished subgrade elevations across the site at the completion of the
mass grading operations.
Asphalt concrete should consist of Type III-C2-AR-4000 conforming to the
Standard Specifications for Public Works Construction, 2000 Edition
(Standard Specifications), Section 400-4 and be placed in accordance with
Section 302-5. Aggregate base should conform to the requirements for
Crushed Aggregate Base or Crushed Miscellaneous Base in Section 200-2 of
the Standard Specifications. The upper 6 inches of the pavement subgrade
soil as well as the aggregate base layer should be compacted to a minimum
degree of compaction of 95 percent. Preparation of the subgrade and
placement of the asphalt concrete and base materials should be performed
under the observation of our representative.
' ' L__,
r'
L]
'· -~j
~ _j
Carlsbad Airport Center
Carlsbad, California
F. General Recommendations
Job No. 05-9085
Page 24
24. Project Start Up Notification: In order to minimize any work delays during
site development, this firm should be contacted 24 hours prior to any need
for observation of footing excavations or field density testing of compacted fill
soils. If possible, placement of formwork and steel reinforcement in footing
excavations should not occur prior to observing the excavations; in the event
that our observations reveal the need for deepening or redesigning
foundation structures at any locations, any formwork or steel reinforcement
in the affected footing excavation areas would have to be removed prior to
correction of the observed problem (i.e.1 deepening the footing excavation,
recompacting soil in the bottom of the excavation, etc.)
IX. GRADING NOTES
Geotechnical Exploration, Inc. recommends that we be retained to verify the
actual soil conditions revealed during site grading work and footing excavation to be
as anticipated in this "Report of Preliminary Geotechnical Investigation" for the
project. In addition, the compaction of any fill soils placed during site grading work
must be observed and tested by the soil engineer. It is the responsibility of the
grading contractor to comply with the requirements on the grading plans and the
local grading ordinance. All retaining wall and trench backfill should be properly
compacted. Geotechnical Exploration, Inc. will assume no liability for damage
occurring due to improperly or uncompacted backfill placed without our
observations and testing.
Cadsbad Airport Center
Carlsbad, California
X. LIMITATIONS
Job No. 05-9085
Page 25
Our conclusions and recommendations have been based on available data obtained
from our field investigation and laboratory analysis, as well as our experience with
similar soils and formational materials located in this area of Carlsbad. Of
necessity/ we must assume a certain degree of continuity between exploratory
excavations. It is, therefore, necessary that all observations, conclusions, and
recommendations be verified at the time grading operations begin or when footing
excavations are placed. In the event discrepancies are noted1 additional
recommendations may be issued/ if required.
The work performed and recommendations presented herein are the result of an
investigation and analysis that meet the contemporary standard of care in our
profession within the City of San Diego. No warranty is provided.
This report should be considered valid for a period of two (2) years, and is subject
to review by our firm following that time. If significant modifications are made to
the building plans, especially with respect to the height and location of any
proposed structures1 this report must be presented to us for immediate review and
possible revision.
It is the responsibility of the owner and/or developer to ensure that the
recommendations summarized in this report are carried out in the field operations
and that our recommendations for design of this project are incorporated in the
structural plans. We should be retained to review the project plans once they are
available1 to see that our recommendations are adequately incorporated in, the
plans.
I ~ ,
L,_,
t__j
\ ___ j
\___)
\ __ j
L~
\_ 1
l j
\_ __ _/
,,
L_,_!
Carlsbad Airport Center
Carlsbad, California
Job No. 05-9085
Page 26
This firm does not practice or consult in the field of safety engineering. We do not
direct the contractor's operations, and we cannot be responsible for the safety of
personnel other than· our own on the site; the safety of others is the responsibility
of the contractor. The contractor should notify the owner if any of the
recommended actions presented herein are considered to be unsafe.
The firm of Geotechnical Exploration, Inc. shall not be held responsible for
changes to the physical condition of the property, such as addition of fill soils or
changing drainage patterns, which occur subsequent to issuance of this report and
the changes are made without our observations, testing, and approval.
Once again, should any questions arise concerning this report, please feel free to
contact the undersigned. Reference to our Job No. 05-9085 will expedite a reply
to your inquiries.
Respectfully submitted,
GEOTECHNICAL EXPLORATION, INC.
VICINITY MAP
Thomas Bros. Guide San Diego County pg. 1127
Carlsbad Airport Center
Wright Place and Palomar Oaks Way
Carlsbad, CA.
Figure No.I
Job No. 05-9085
I I .
REFERENCE: This Plot Pion was prepared from on existing
electronically tran sferred CAD file provided by the client I and from on-site field reconnaissance perform ed by GEl.
.l
NOTE: This Plot Plan is not to be used for legal
purposes. Locations and dimensions ore approxi-
mate. Actual property dimensions and locations
of utilities may be obtained from the Approved
Building Pions or the "As-Built" Grading Plans.
~' ,,
'\,
05-9085-pl
,,
'\,
'\ \,
-......... -............
.........
('J ~-......... .... ~ -}-..?::
OQ, -J"< ~
"
-......... _
.'
Legend
/
,./
t 2
Cut-RII contact from Sheet 5 of As-Built grading plan
for "C.T. 81-46 Unit N0.1. Airport Business Center-Carlsbad''
by Rick Engineering Company, dated 1/22/90
INDICATES APPROXIMATE LOCATION
OF EXPLORATORY BORING
I I I I I I
I I I I I I
I I I I
I I &i I I I I ~t I ' ' I I I I I I i
i
i
i
I I I I I I
I I I I ' I
I I I ' I ,
I I
I I
I I
I I
I I
I I
~ <.'J!8'&.!"'""!5a {I)
SCALE: 111 = 60'
(approximate)
' I I
i ' I
I I I
I I
I
I I I i i
I I i i
I I I I I I I I
I I
I I I I I I
I I I I I I I I I I I I
SITE PLAN
Carlsbad Airport Center
Wright Place and Palomar Osks Way
Carlsbad, CA.
Figure No. II
Job No. 05-9085
Geotechnical
Exploration, Inc.
Apri/2006
I
Carlsbad Airport Center
Wright Place and Palomar Oaks Way
Carlsbad, CA.
Excerpt from As-Built Grading Plan by Rick Engineering
Company titled "Grading Plans for C.T. 81-46 Unit No. l ,
Carlsbad, California, Sheet 5 of l l " dated Jan 22, 1990.
Figure No. Ill
Job No. 05-9085
EQUIPY:NT DIMENSION & TYPE OF EXCAVATION DATE LOGGED
Truck-mounted Auger Drill Rig 8-lnch diameter boring 11-22-05
SURFACE ELEVATION GROUNDWATER/ SEEPAGE DEPTH LOGGED BY
:t 161' Mean Sea Level Not Encountered WOH
FIELD DESCRIPTION ~ AND t:. ii:'U ~ ~'6"
t: CLASS! FICA TION w oa ::i~ :i.e wo: ~~ ~ (.)i= ~i= j~ ::5~ :5w ii:!!l -(/) ~0 ~if) x:z w 0~ ~l!:l 0 -~ -0
-49% passing #200 sieve. 7.0 12.5 120.0
2 : -material appears dry and chunky in drive
sample. 11.9 103.2 86 41 3"
13.1 99.9 83
4 I
-38% passing #200 sieve. 11.7 91.7 76 41 3"
6 I -material appears dry and chunky in drive 12.4 101.0 84
sample.
8 I
FILL (Qaf)
10 I 15.9 103.6 86 32 3"
16.4 103.0 86
12 I
14
101.4 85 41 3"
16 98.2 82
107.8
18
JOB NAME I
.Y WATER TABLE Carlsbad Center
cgJ LOOSE BAG SAMPLE SITE LOCATION
[II IN-PLACE SAMPLE Carlsbad, CA
• MODIFIED CALIFORNIA SAMPLE JOB NUMBER REVIEWED BY LDRIWDH lOG No .
~ FIELD DENSITY TEST 06-9086 B-1 FIGURE NUM3ER
~ STANDARD PENETRATION TEST IVa
I
I
I
I
I
! ;
~
~I
~ "' a! tS
~ :$
(!) g
z 0 I= ~ 0 -' 0.. ~
EQUIPMENT DIMENSION & TYPE OF EXCAVATION DATE LOGGED
Truck-mounted Auger Drill Rig 8-inch diameter boring 11-22-05
SURFACE ELEVATION GROUI'lJWATERI SEEPAGE DEPn-t LOGGED BY
:t 162' Mean Sea Level Not Encountered WDH
FIELD DESCRIPTION ~ ~
AND ~ ~:a 0 ~:a ~ ~
CLASSIFICATION ci z t: II[ t: w ::d~ + 0 0
_J li wcr: w~ ::::;;>->-0 _j <n Cil
I 0 DESCRIPTION At-Ll REMARKS uj 0::> ~<n ::>::> ::>f-!:::::;; z.g f-:'5~ ::::;;f-::::!E-z
f-m u -en -en ~'15 <z ~ ~z
Eb ::::;; (Grain size, Density, Moisture, Color) uj a.o a. as f--~as o=>
>-&~ w* c.. 0 ~ _.o
Cl en ::i ~::::;; ~Cl :::<:CJ Cl-~(.) <DO
~~ -SANDY CLAY Stiff. Moist. Light brown. ICL
-8 B FILL (Qat)
2 -~~ i.X -56% passing #200 sieve. 16.3 96.2 80 32 3" --55% passing #200 sieve. 17.9 97.5 81
4 -~
-I
SILTY -SAND, fine-=9raTntid-:--M-edium----rsr~f
dense. Moist. Light brown.
6-~ -34% passing #200 sieve. 16.5 102.8 86 30 3"
~ -~ FILL (Qat) ~
8-~ ~ -~ 10-"CIAYEYSANQ-filie:Qriililed.-MedlUin---rsc
-dense. Moist. Light brown. 17.9 103.5 86 26 3"
12-FILL (Qat)
~ -§
14 IV 11.0 122.0 97 s -~-43% passing #200 sieve. 16-21 .1 88.2 73 27 3"
-~ 18 -g
-~ m~ 20 ~ 16 2"
-Bottom@ 20'
22-
y JOB NAME
WATER TABLE Carlsbad Airport Center
~ LOOSE BAG SAMPLE SITE LOCATION
[I] IN-PLACE SAMPLE Carlsbad, CA
• JOB NUMBER REVIEWED BY LOG No .
MODIFIED CALIFORNIA SAMPLE LDRJWDH
II] 05-9085 a&--B-2 FIELD DENSITY TEST FIGURE NUMBER FJ!ploratlon, me.
~ STANDARD PENETRATION TEST IVb
~
iii
ii. C!
/EQUIPMENT DIMENSION & TYPE OF EXCAVATION
Truck-mounted Auger Drill Rig 8-inch diameter boring
SURFACE ELEVATION GROUNDWATER/ SEEPAGE DEPTH
:!: 162' Mean Sea level Not Encountered
FIELD DESCRIPTION
AND
ti CLASSIFICATION
I DESCRIPTION At-1> REw.RKS ..... fu 0
2 FILL (Qaf)
4
6
8
10
12 DEL MAR FORMATION (Td)
14
16
Bottom@ 16'
~ ~'a UJ UJO:: UJ>-~~ ~~ a.. en a..z ,(5 0 UJ ~::::E ~0
17.8 106.9
17.3 100.9
15.9 110.0
DATE LOGGED
11-22.05
LOGGED BY
WDH
~ 1E ~~ UJ c::i + ' ~ ::EO:: ?5r: r:q :::>:::> __J
:z'~ ..... ~ti) ~(I) u;::::E s:z h:o ~ru ru't5 it.z o=> i'ti8 ..JO O::::E ::::EO 0~ <DO
88 36 3"
84 35 3"
45 3"
67 2"
lr ~L---~--~~------------------------------------~~--~----~--~--~~~----~--~~
<(
0 i ~
~ g
z i ~
.Y
~
[II • ~
~
WATER TABLE
LOOSE BAG SAMPLE
IN-PLACE SAMPLE
MODIFIED CALIFORNIA SAMPLE
FIElD DENSITY TEST
STANDARD PENETRATION TEST
JOB NAME
Carlsbad Airport Center
SITE LOCATION
Carlsbad, CA
JOB NUMBER REVIEWED BY LDR/WDH LOG No.
05-9085 :;&= ... B-3 AGURE NUMBER
IVc ~
I
I
I
I
I
-------------
EQUIF't.£NT DIMENSION & TYPE OF EXCAVATION
Truck-mounted Auger Drill Rig 8-lnch diameter boring
SURFACE 8.£VATION GROUNrM'ATER/ SEEPAGE DEPTH
:t 164' Mean Sea Level Not Encountered
~
~
[!]
FIELD DESCRIPTION
AND
CLASSIFICA TlON
some
of gray-brown claystone. Medium dense. Moist.
Light brown.
ALL(Qaf)
-39% passing #200 sieve.
-black soil in sampler tip.
-rultings from 11' to 14' were black with organics;
very strong organic odor.
-some gray clay (CH) chunks in sample.
Bottom@ 20'
JOB NAME WATER TABLE Carlsbad
LOOSE BAG SAMPLE SITE LOCATION
IN-PLACE SAMPLE Cartsbad,CA
~ ~:i w w~ ~~ ui= :5!!2 ~CI) t~ :Zifi -0
20.7 103.2
20.2 99.4
18.5 107.7
20.6 103.5
Center
!MTELOGGED
11·22..05
LOGGED BY
WDH
~ ~'[ :;~ :;-
=>i= 3~ ;;!a xrn ~~ ~~
• MODIFIED CALIFORNIA SAMPLE JOB NUMBER REVIEWED BY LDRIWDH
0 FIELD DENSITY TEST 05-9085
FIGURE NUMBER
~ STANDARD PENETRATION TEST IVd
~
85 31 3"
83 26 3"
90 35 3"
86 39 3"
21 2"
LOG No .
B-4
EQUifVENT Dlt.ENSION & TYPE OF EXCAVATION DATE LOGGED
Truck-mounted Auger Drtll Rig 8-lnch diameter bortng 11-22-05
SURFACE ELEVATION GROUNDWATER/ SEEPAGE DEPTH LOGGED BY
::t 165' Mean Sea Level Not Encountered WDH
FIELD DESCRIPTION ~ AND ~ ~E ~ ~E t: CLASSIFICATION w ;:,:~ ci + . ~i wa: ~~ ~~ ~c:! ....i
~ oi= ~~ ~-~~ ~!!2 ~en ~!!2 -~ -(I) ~'!5 zffi ~!I x:z: ~8 0~ ~i ~~ w~ _.o c -C o-mo
FILL (Qaf)
1 I
2
-30% passing #200 sieve. 9.5 100.1 83 40 3R I 3
4 I
5 I
49 3" I
6
7
Bottom @ 6.5'
8
y WATER TABLE JOBNAA£ carts bad Center
[81 LOOSE BAG SAMPLE SITE LOCATION I [I] IN-PLACE SAMPLE Carlsbad, CA
• MODIFIED CALIFORNIA SAMPLE JOBNUt.eER REVIEWED BY LDRIWDH LOG No.
[!] FIELD DENSITY TEST 05-9086 B-5 I FIGURE NUt.IIER
~ STANDARD PENETRATION TEST IVe
EQUI~NT DIMENSION & TYPE OF EXCAVATION
Truck-mounted Auger Drill Rig 8-inch diameter boring
SURFACE ELEVATION GROUNDWATER/ SEEPAGE DEPTli
:t 165' Mean Sea Level Not Encountered
t:
:X: ~
FIELD DESCRIPTION
AND
CLASSIFICATION
----~~~jg~~--------CLAY. .:>un. VVet. Ught brown.
~ i'i:'D w o.e, wa: ~~ :s~ ~(I) ~0 q.:z zw -:::IE _c
23.4 96.6
Y.
~
[I)
FILL (Qaf)
-becomes very stiff.
gray
Dense. Very moist Ught brown.
DEL MAR FORMA TlON (Td)
Bottom 20'
WATER TABLE JOB NAME
Carlsbad
LOOSE BAG SAMPLE SITE LOCATION
IN-PLACE SAMPLE Carlsbad,CA
Center
DATE LOGGED
11-22-05
LOGGED BY
WDH
~ i'i:'D
::d~ Oc.. ::::;:~
~~ ::l~ ::Ern 1=-~~ a..O o::::E
• MODIFIED CALIFORNIA SAMPLE JOB NUMBER REVIEWED BY LDRIWDH
m FIELD DENSITY TEST 05-9085
FIGURENU~R
~ STANDARD PENETRATION TEST IVf
~
29 3"
24 3"
21 2"
23 2"
81 2"
LOG No .
B-6
EQUIPJ.£NT DIMENSION & TYPE OF EXCAVATION
Truck-mounted Auger Drill Rig 8-lnch diameter boring
SURFACE ELEVATION GROUNCM'ATER/ SEEPAGE DEPTH
:t 164' Mean Sea Level Not Encountered
FIELD DESCRIPTION
AND l ~'D
t: CLASSIFICATION ~~ o,a.
i ~i; _, ~ E 0 DESCRIPTION N¥J REMARKS :5~ ! :5cn
(Grail size, Densly, Molstl.n, Cdor) q.-~ifi ~~ 0 -0
~}~ SILTY CLAY. y~ stiff. MOiSt Ught brown and CH -gray, interbedded.
-t~~ DEL MAR FORMATION (Td) ~ -
1-
-~ ~ -~~ -
2-~1~
-~~
-~ -~~i' -84% passing #200 sieve. 24.9
3-~ -
-
4-
-Bottom @ 3.5'
-
-
5 -
-
I -
-
6-
~ -
! -
~ -
~ q Y. WATER TABLE JOB NAME
~ Carlsbad Ali t"'•1 Center
~ LOOSE BAG SAMPLE SITE LOCATION i [!] IN-PLACE SAMPLE Cartsbad, CA
~ • MODIFIED CALIFORNIA SAMPLE JOB NUt.I!ER REVIEWED BY
I ~ FIELD DENSITY TEST 05-9085 ·~~ FIGURE NUMBER , ........
~ STANDARD PENETRATION TEST IVg ~
DATE LOGGED
11-22-05
LOGGED BY
WDH
~ ~'D
::i~ Ca.
::IE~ ~i; ~~ ~-;~ ~~
LDRIWDH
-,nc.
~ a-+ ' ~ i;o __j ·o ffi~ zw ~z ~~ o=> 0~ _,o wo CDO
28
LOG No .
B-7
III
2"
I
I
I
I
I
EQUimENT DIMENSION & TYPE OF EXCAVATION DATE LOGGED
Truck-mounted Auger Drill Rig 8-inch diameter boring 11-22-05
SURFACE ELEVATION GROUNJ:MIATERI SEEPAGE DEPTH LOGGED BY
± 167' Mean Sea Level Not Encountered WDH
FIELD DESCRIPTION ~ AND ~ ir'ff ~ ~'[ CLASS I FICA liON
.....,. It c:i
t: ~~ o,e ::::.;:;~ 0 + • 0~ ~~ ::::.;:;~ ~q _. ~ u) ::lj:! ;:)~ .J ==~ ~f3 t 0 DESCRIPTION AND REMARKS ~~ z~ ~ ~ ~ ~~ ::::EU) ;!ffi U)::::E !!5 (Grain size, Dendy, Moisllle, Color) ~0 ~-zl; <z o=> w U) ~w 0~ io W;a~! ~8 ~8 ~~ 0 =:; _;:E -0 o~
~ SILTY CLAY. Hard. Dry to moist Ught brown ICH
-with yellow-brown seams/fractures.
-~ DEL MAR FORMATION (Td) -~ 1-
-~ -
-
2-~~ I 53 2"
-
-I -I
3 -~~ -~~:·
-
4-
-Bottom@ 3.5'
-
-
5 -
-
-
-
6-
-
-
-
.Y. WATER TABLE JOB NAME
Cartsbad Airport Center
~ LOOSE BAG SAMPLE SITE LOCATION
m IN-PLACE SAMPLE Cartsbad, CA
• MODIFIED CALIFORNIA SAMPLE JOB NUMBER REVIEWED BY LDRIWDH lOG No.
~ FIELD DENSITY TEST 05-9085 ~-B-8 FIGURE NUMBER Ellploratton. w.
~ STANDARD PENETRATION TEST IVh
EQUIPMENT DIMENSION & TYPE OF EXCAVATION DATE LOGGED
Truck-mounted Auger Drill Rig 8-lnch diameter boring 11-22-05
SURFACE ELEVATION GROUNDWATER/ SEEPAGE DEPTH LOGGED BY
:1: 169' Mean Sea level Not Encountered WDH
FIELD DESCRIPTION
AND ~ ~~ ~ ~'D CLASSIFICATION li w ~~ C,s, .... wa:: ~~ ~~ § 0 ~ DESCRIPllON AND REMARKS uj (.)~ ~(I) ! !I ti :5cn :5cn -!!l (Grain size, Densly, Moistln, Color) u:! ~-a..:z ~~ x:z Ei; (":j ~~ t~ ~~ :::::0
I SILTY CLAY. Very stiff. Moist. Ught brown and ICH -gray.
-~: DEL MAR FORMATION (Td) -~~ 1-~ -I -I
-
2-
-
-~I I
-~ffi 3-~ -~
-
4 -
-Bottom @ 3.5'
-
-
5-
-
~ -
-
b 6-(!) ..J ~ -
0 w (!) -
2 ~ ti: 0 ...
-
.Y WATER TABLE JOB NAME
Carlsbad Airport Center
[81 LOOSE BAG SAMPLE SITE LOCATION
m IN-PLACE SAMPLE Carlsbad, CA
• MODIFIED CALIFORNIA SAMPLE JOBNU~ER REVIEWED BY LDRIWDH
0 FIELD DENSITY TEST 06-9085 aa-FIGURE NUMBER lbploratlon, Inc.
~ STANDARD PENETRATION TEST lVI
~
ci ~i + . ~ci _j
:Z~ ffi~ §8 o :::::o c~ .... o CD (.)
27
LOG No .
B-9
~
ci 0~ ~ffi !In (":j~
2"
I
I
I
I
I
I
I
I
~
~
~
§ ~
li t i ~
§
I
/ EQUIPt.ENT DIMENSION & TYPE OF EXCAVATION
Truck-mounted Auger Drill Rig 8-lnch diameter boring
SURFACE aEVATlON GROUNDWATER/ SEEPAGE DEPTH
:t 171' Mean Sea Level Not Encountered
FIELD DESCRIPTION
AND
CLASSIFICATION
~ Iii! DESCRIPTlON AND REMARKS ~ 1 ~ (Grain size, Oensly, Molsl1.re, Color) _ J~~ SILTY CLAY. Very Sfiff. Moist Gray.
-J~~ DEL MAR FORMA110N (Td)
-~~~~ 1-:'ir-
-IX =~~~ 2=~~:1
-~}
3 -1: ~ Si[fi-s"A"NQfine:QraTneciveiYder.se-:---lsM
-i:l: ~ Moist. Gray.
\ DEL MAR FORMATION (Td) /'r-
-
4 -
-Bottom @ 3.5'
-
-
5 -
-
-
-
6 -
-
-
-
JOB NAME
~
w~ Oj: ~"' ~-ad~
~'ff ~ o.e, ::::!:~ ~~ =>j: :50 ::::!:U)
~z t=-zw ~0
-0 0::::!:
.Y WATER TABLE Carlsbad ;.:, t'V' ~ Center
~ LOOSE BAG SAMPLE SITE LOCATION
IIl IN-PLACE SAMPLE Carlsbad, CA
• MODIFIED CALIFORNIA SAMPLE JOB NUMBER REVIEWED BY
0 FIELD DENSITY TEST 05.S086 .41P'".41~.
FIGURE NUMBER ~ ... ~ .....
~ STANDARD PENETRATION TEST IV) -~
DATE LOGGED
11-22-05
LOGGED BY
WDH
.-. ~ ~'ff ~ ~ Ill CD. ci z ~ ::::e-~q + • 0 :::>~ -~ Ci5 :!liffi ffi~ Zen z ;::!z ~z § o::::::> ic ~8 _,o 0~ mo
101
67 2"
LDRIWDH LOG No .
.-Inc. B-10
EQUJPP.£NT Dlt.eiSION & TYPE OF EXCAVATION
Truck-mounted Auger Drtll Rig 8-inch diameter boring
SURFACE ELEVATION GROUNDWATER/ SEEPAGE DEPllf
:t 189' Mean Sea Level Not Encountered
FIELD DESCRIPTION
AND ~ ~'ts
t.: CLASSIFICATION w oa
i i wa: ~?= ~ 0::> :I: DESCRIPTION AND REMARKS li: ~t; ~U)
(Gialn size, Densly, Molst\Je, Colo~ 'T-Q.ifi w ~~ to 0
t SILTY SANQTne:.grained. Very dense. Dry. SM
-Light brown.
-DEL MAR FORMATION (Td) -
1-
-
-
-
2-
-
-
-
3-
-
-
4-
-Bottom @ 3.5'
-
-
5-
-
~ -
-
~ 6-
-
I -
-
i: ~ .Y WATER TABLE JOB NAME
~ Carlsbad A1rpon Center
~ LOOSE BAG SAMPLE SITE LOCATION i IT] IN-PLACE SAMPLE Carlsbad, CA
§ • MODIFIED CALIFORNIA SAMPLE JOBNJMBER REVIEWED BY
! 0 FIELD DENSITY TEST 05-9085 .........
FIGURE NUWER .. ~,., ...
~ STANDARD PENElRATION TEST IVk ~
DATE LOGGED
11-22-05
LOGGED BY
WDH
~ ~'ts
::d~ Ca. :::!:-
~i=! =>?= :!:en -en ~~ li:o 0~
LDRIWDH
Inc.
~
i! + '. ~ ...J :Z 0 ~!Z §§ o=> ...JO CDU
84
lOG No .
B-11
"""
li
2"
I
I
I
I
I
EQUIPMENT DI~SJON & TYPE OF EXCAVATION DA.TE LOGGED
Truck-mounted Auger DrUI Rig 8-lnch diameter boring 11-22-05
SURFACE B.EVATJON GROUNDWATER/ SEEPAGE DEPTH LOGGED BY
:t 168' Mean Sea Level Not Encountered WDH
FIELD DESCRIPTION ~ AND ~ i!i:'g: ~ ~'R CLASSIFICATION
..,. ~ q
t: ~~ c~ ::l<~ ::l<~ c + ' 0~ _, ~ uj ~~ ~i2 :::::>~ ~q J ~ffi ~ 0 DESCRIPTION AKl REMARKS :s~ zg 3:!z !i ~ 0 ~ffi ::l<(f) ~~ "'::E a..:z:
(Gnin size, Oensly, Moisttre, Cdo~ <4 ~-~-i~ z'D ~i:5 0~ ~~ ~ ~~ WOJ!! _,o
c :::::> _!i to o~ w 0 alO
~){ SILTY CLAY. Stiff. Moist Brown. ICH -
-~~ DEL MAR FORMATJON (Td)
-
1-~ -
-~ -['}{
2 11 I --------------------------1-sl;,f SILTY SAND. fine-grained. Very dense. Moist.
-Ught brown.
-DEL MAR FORMATJON (Td) -75 2"
3-
-
-
4-
-Bottom @ 3.5'
-
-
5-
-
-
-
~ w
6-
-
-
-
.Y WATER TABLE JOB NAME
Carlsbad Airport Center
181 LOOSE BAG SAMPLE SITE LOCA TJON
[I] IN-PLACE SAMPLE Cartsbad, CA
• MODIFIED CALIFORNIA SAMPLE JOB NUMBER REVIEWED BY LOG No. LDRIWDH
[!] FIELD DENSITY TEST 05-SOBS :;;=---=-B-12 FIGURE NUMBER
~ STANDARD PENETRATION TEST M
0 c..
~ u; z w 0 >-et: 0
CD Q
135 1\ \
\ \
\
\ '
130 '\ ~
1\ I\
\
\ 1\
\ \
125 1\
\ \
\ Source of Material s-1@1.0·
\ \ Light gray-brown CLAYEY \ \ Description of Material
120 \ SAND (SC}
~ ~ 1\ \ Test Method ASTM 01557 Method A "' \ \ ,. ~· [\
I '[\ \
115 .. ~ ~ I ~ '"' ~ ~\ 1\ TEST RESULTS ' \~
\ ~ Maximum Dry Density 120.0 PCF
110 \ Optimum Water Content 12.5 o/o \ 1\
1\
\ \
\
\ \ 1\ A TTERBERG LIMITS
105 \ \
,----· \'f\ ~\ LL PL PI ----
\ '
100 \ \.
1\ \ Curves of 100% Saturation '\ ' 1\ for Specific Gravity Equal to: -..;..:
\. \ 2.80
95 I'\ ' \ i\. 2.70
1\ \.
i\ ' 2.60
\ \ '\
90 '\ ~
1\
\ ' \. 1'-\ ~
85 '\. ' 1\ ' \. ' \. ~
\. '\
80 " 1"-
' 1\
1\
75 " 0 5 10 15 20 25 30 35 40 45
WATER CONTENT, %
4(;-4&-11 Geotechnical MOISTURE-DENSITY RELATIONSHIP
Exploration, Inc. Figure Number: Va
..>. --"""= ~ Job Name: Carlsbad Airport Center ~:~~ ~ Site Location: Carlsbad, CA
Job Number: 05-9085
I
I
I
I
I
I
I
I
I
I
I
I
135 [\""'\
i\
\ 1\ i\ -,
130 1\ f\
\
\
\ 1\
' \ 125 \
~' Source of Material B-2@ 14.0'
~~ A~\ Description of Material light brown CLAYEY SAND
120 {SC}
'I 1\ \ Test Method ASTM 01557 Method A II 1\
l\ 1\
I ll 1\
115 '-\ 1\
I' \
\ 1\ TEST RESULTS 1\' \ 1\ Maximum Dry Density 122.0 PCF
110 1\ ~
\ \ Optimum Water Content 11.0%
'ti \
c. 1\ ~ \
(/) 105 1\1\ A TTERBERG liMITS
z w \ 0
& 1\ \ _!:!:_ PL PI
0 \ t\ ----
\ '
100
\ [\
1\ \ Curves of 100% Saturation [\'
'\ 1\ for Specific Gravity Equal to:
\ \ 1\. 2.80
95 1\' \ ~ 2.70
1\. l\.
!'\ ' 2.60
l\. ' 90 \. 1\
1\. ' f\ ""' 1\. i'\
"'
\ I'\.
~ ~ 85 '\ 1\
'" " ..... 0 Cl 1\. \
-' D.. ' 1\
1;'i I" ', __ j
0 w 80 1"'..
C!l ~ too..
i"\. n: Cl "\,
~ !'.... f'\.
0 =R= !'-. '\
D.. g; 1\. -.;;;
75 r"
; ___ ;
0 5 10 15 20 25 30 35 40 45
WATER CONTENT,%
41;4&11 Geotechnical MOISTURE-DENSITY RELATIONSHIP
Exploration, Inc. Figure Number: Vb
~~~ Job Name: Carlsbad Airport Center
~ f/ Site Location: Carlsbad, CA
Job Number: 05-9085
5,000
4,000
3,000 / '0 v c.
:i" 1-/ (!) z w a:: 1-(/) a:: ~ <( w J: (/) 2,000 ~ / / 1,000 v L;
0 0 1,000 2,000 3,000 4,000 5,000 l_i
"' NORMAL PRESSURE, psf
~ >::: "' >-0 :J 0.. ~ Specimen Identification Classification t. MC% c • @ • B-2@ 14.0' light brown CLAYEY SAND (SC) 897 25 (!) ..,
"-(!) r-',
,_: <!: 0 "-DC
<{ a :i ".l <!: i5
"' "' 4Jr4eii Geotechnical DIRECT SHEAR TEST 0 "' <!: iii Figure Number: Vc ::t: Exploration, Inc. rn
~ ...3,. ....-=1~ Job Name: Carlsbad Airport Center :::%:~~ Site Location: Carlsbad, CA a ~ rn Job Number: 05-9085 =>