HomeMy WebLinkAboutW.O. P-1568; Proposed 5 Condominiums - Mark Goethales; 5 Condominiums La Costa Avenue; 1998-09-30September 30, 1998
BARRY AND ASSOCIATES
GEOTECHNICAL ENGINEERING
P.O. Box 230348
Encinitas, CA 92023-0348
(760) 753-9940
Mr. Mark J. Goethales
2614 Unicornio
La Costa, California 92009-5330
Subject: PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed 5 Condominiums
La Costa Avenue
Carlsbad, California 92009
Dear Mr. Goethales,
In response to your request, we have performed a preliminary
geotechnical investigation at the subject site for the proposed 5
condominiums.
The findings of the investigation, laboratory test results and
recommendations for grading and foundation design are presented in
this report.
From a geotechnical point of view, it is our opinion that the site
is suitable for the proposed project, provided the recommendations
in this report are implemented during the design and construction
phases.
If you have any questions, please contact us at (760) 753-9940.
This opportunity to be of service is appreciated.
Respectfully submitted,
A.R. BARRY AND
A.R. Barry, P.E.
Principal Engine
PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed 5 Condominiums
La Costa Avenue
Carlsbad, California 92009
Prepared For
Mr. Mark Goethales
2614 Unicornio
La Costa, California 92009
September 30, 1998
W.O. P-1568
Prepared By:
A.R. BARRY AND ASSOCIATES
P.O. Box 230348
Encinitas, CA 92023-0348
TABLE OF CONTENTS
INTRODUCTION 2
SITE CONDITIONS 2
PROPOSED DEVELOPMENT 2
SITE INVESTIGATION 2
LABORATORY TESTING 3
GEOTECHNICAL CONDITIONS 3
CONCLUSIONS AND RECOMMENDATIONS 4
A. GENERAL 4
B . GRADING 4
C . FOUNDATIONS 4
D . SLABS ON GRADE 5
E . RETAINING WALL 6
F . DRIVEWAY 6
G . DRAINAGE 7
H. FOOTING INSPECTION 7
I. PLAN REVIEW 7
LIMITATIONS 7
LOG OF TEST TRENCHES 10
APPENDICES
APPENDIX A VICINITY MAP
SITE PLAN (SHOWING LOCATION OF TEST TRENCHES
APPENDIX B GRADING SPECIFICATIONS
September 30, 1998
W.O. ttP-1568
Page 2
INTRODUCTION
This report presents the results of our preliminary geotechnical
investigation. The purpose of this study is to evaluate the nature
and characteristics of the earth materials underlying the property
and their influence on the proposed 5 condominiums.
SITE CONDITIONS
The property is located between the north side of La Costa Avenue
and the south side of the La Costa Golf Course, and between El
Camino Real and Viejo Castilla, in the City of Carlsbad,
California.
PROPOSED DEVELOPMENT
At the time of our investigation, neither grading plans nor
building plans were available, however it is our understanding that
a level building pad will be graded for the construction of 5 two
story condominiums. It is also our understanding that the
foundation will be bearing on a level graded pad with slab on grade
construction.
SITE INVESTIGATION
Three backhoe trenches were excavated to a maximum depth of 14
feet. Earth materials encountered were visually classified and
logged by our field engineer. Bulk samples were obtained and
transported to our laboratory for testing and analysis.
September 30, 199
W.O. ttP-1568
Page 3
LABORATORY TESTING
Classification
The field classification was verified through laboratory
examination in accordance with the Unified Soil Classification
System. The final classification is shown on the enclosed Logs.
GEOTECHNICAL CONDITIONS
The site contains fill soil in varying depths to 5 feet. Most of
the fill soil was properly compacted and contains clayey sand,
sandy clay, and silty sand to the bottom of the excavations. Fill
soil will be imported and compacted to 90% of maximum density.
Expansive Soil
Existing on site soils were found to range in expansion
potential from low to moderate. Since imported soil will be used to
bring the pads up to grade we will select a sandy non-detrimentally
expansive soil.
Groundwater
Groundwater was not encountered in our test trenches to a depth of
14 feet. Groundwater related problems are not anticipated during of
after construction.
September 30, 1998
W.O. ttP-1568
Page 4
CONCLUSIONS AND RECOMMENDATIONS
General
The on site soils are suitable to receive the imported fill soil
provided the existing soil be removed and re-compacted to a depth
of 2 feet. Final depth of removal will be determined during
grading.
Grading
General
Grading will consist of the preparation of on site soil to receive
the imported fill, cutting and filling the northerly facing slope
in order to create a level building pad for the 5 proposed
condominiums. The excavation and re-compaction should include the
area 5 feet beyond the building line.
See Grading Specifications, Appendix B
Foundation
Footings for the proposed residence and garage should be a minimum
of 15 inches wide and founded a minimum of 18" below grade. A 12-
inch-by-12-inch grade beam should be placed across the garage
opening. Footings founded a minimum of 18" below grade may be
designed for a bearing value of 1500 psf.
The bearing value indicated above is for the total of dead and
applied live loads. This value may be increased by 33 percent for
September 30, 1998
W.O. #P-1568
Page 5
short durations of loading, including the effects of wind and
seismic forces.
Resistance to lateral load may be provided by friction acting at
the base of foundations and passive earth pressure. A coefficient
of friction of 0.3 should be used with dead-load forces. A passive
earth pressure of 250 pounds per square foot, per foot of depth of
fill penetrated to a maximum of 1500 pounds should be used in the
design.
Steel reinforcement should consist of 4-#4 bars, 2 placed 3" from
the bottom of the footing and 2 placed 2" below the top of the
footing.
Slabs on grade
If slab on grade is planned it should be a minimum of 4.0 inches
thick and reinforced in both directions with No. 3 bars, placed 18
inches on center. The slab should be underlain by a minimum 4-inch
sand blanket which incorporates a minimum 6.0-mil Visqueen or
equivalent moisture barrier in its center, for moisture sensitive
floors. Utility trenches underlying the slab should be bedded in
clean sand to at least one foot above the top of the conduit, then
backfilled with the on-site granular materials, compacted to a
minimum of 90 percent of the laboratory maximum dry density.
However, sufficiently compacting the backfill deposits may damage
or break shallow utility lines. Therefore, minor settlement of the
September 30, 1998
W.O. #P-1568
Page 6
backfill in the trenches is anticipated in these shallow areas. To
reduce the possibility of cracks occurring, the slab should be
provided with additional reinforcement to bridge the trenches.
Retaining Walls
Retaining walls should be designed in accordance with the following
soil perimeters:
Soil Type Equivalent Additional Uniform
Fluid Pressure (PCF) Pressure (PSF)
(Unrestrained Walls) (Restrained Walls)
Native Soil 33 6xH*
{Level Backfill)
*H= Height of wall in feet
Walls should be adequately drained to prevent build-up of
hydrostatic pressures. Footings should be designed in accordance
with the previous foundation recommendations.
Driveway
The following recommendations are submitted as preliminary
guidelines for pavement construction and are based on a non-
expansive soils condition in the upper 12" of subgrade.
Asphalt Concrete
The driveway section should consist of 2.0 inches of asphalt over
4.0 inches of Class II base. The Class II base and the upper 12
inches of the subgrade deposits should be compacted to a minimum of
September 30, 1998
W.O. ttP-1568
Page 7
95 percent of the laboratory maximum dry density. The upper 12" of
subgrade should consist of non-expansive soil.
Paved areas should be protected from moisture migrating under
pavement.
Drainage
All roof water should be collected and conducted to a suitable
location via non-erodible devices. Roof gutters are recommended.
Pad water should be directed away from foundations and around the
residence to a suitable location. Pad water should not pond.
Footing Inspections
Structural footing excavations should be inspected by a
representative of this firm prior to the placement of reinforcing
steel.
Plan Review
A copy of the final building plans should be submitted to this
office for review, prior to the initiation of construction.
Additional recommendations may be necessary at that time.
moderately
LIMITATIONS
This report is presented with the provision that it is the
responsibility of the owner or the owner's representative to bring
the information and recommendations given herein to the attention
September 30, 1998
W.O. #P-1568
Page 8
of the project's architects and/or engineers so that they may be
incorporated into the plans.
If conditions encountered during construction appear to differ from
those described in this report, our office should be notified so
that we may consider whether or not modifications are needed. No
responsibility for construction compliance with design concepts,
specifications or recommendations given in this report is assumed
unless on-site review is performed during the course of
construction.
The conclusions and recommendations of this report apply as of the
current date. In time, however, changes can occur on a property
whether caused by acts of man or nature on this or adjoining
properties. Additionally, changes in professional standards may be
brought about by legislation or the expansion of knowledge.
Consequently, the conclusions and recommendations of this report
may be rendered wholly or partially invalid by events beyond our
control. This report is therefore subject to review and should not
be relied upon after the passage of three years.
The professional judgments presented herein are founded partly
on our assessment of the technical data gathered, partly on our
understanding of the proposed construction and partly on our
general experience in the geotechnical field.
September 30, 1998
W.O. #P-1568
Page 9
If you have any questions,
760.753.9940.
please contact our office at
The opportunity to be of service is appreciated
Respectfully submitted,
A. R. BARRY,
A.R. Barry, P.E.
Principal Engine
September 30, 199
W.O. ttP-1568
Page 10
LOG OF EXPLORATORY TRENCHES
TRENCH # DEPTH CLASSIFICATION
TP-1
TP-2
0-2'
2' -5'
5'-14'
0-2
2-10
SM
SM,SC
SM,SC
SM
SM,SC
DESCRIPTION
Fill- Gray and tan clayey sand,
loose, dry
Fill- Gray and tan silty sand and
sandy clay, mod. dense, moist.
Brown to gray silty sand and sandy
clay, mod.dense, moist.
Bottom of excavation 14 feet, no
groundwater.
Fill- Dark brown silty sand dry,
loose
Fill- Gray and tan silty sand and
sandy clay, mod. dense, moist.
Bottom of excavation 10', no
groundwater.
TP-3 0-2
2-10
SM
SM,SC
Fill- Dark: brown silty sand dry,
loose
Fill- Gray and tan silty sand and
sandy clay, mod. dense, moist.
Bottom of excavation 10', no
groundwater.
ARRENDIX A
J>tt / i i ', 7 \HM>IU7
«\\^..:,\ ^w^&ss^
5 g$ -fc «'?lj! . Kff-LB..^5*^
LA TA SITE '
MAX, PAtP STUPV
TEST TRENCH LOCATION PLAN
ARRENDIX B
APPENDIX B
RECOMMENDED GRADING SPECIFICATIONS
GRADING INTENT
The intent of these specifications is to establish procedures for
clearing, compacting natural ground, preparing areas to be filled
and placing and compacting fill soil to the lines and grades shown
on the accepted plans. The recommendations contained in the
preliminary geotechnical investigation report are a part of the
recommended grading specifications and would supersede the
provisions contained herein in case of conflict.
INSPECTION AND TESTING
A geotechnical engineer should be employed to observe and test the
earthwork in accordance with these specifications. It will be
necessary that the geotechnical engineer or his representative make
adequate observations so that he may provide a memorandum that the
work was or was not accomplished as specified. Deviations from
these specifications will be permitted only upon written
authorization from the geotechnical engineer. It should be the
responsibility of the contractor to assist the geotechnical
engineer and to keep him apprised of work schedules, changes and
new information and data so that he may provide the memorandum to
the owner and governmental agency as required.
If in the opinion of the geotechnical engineer, substandard
conditions such as questionable soil, poor moisture control,
inadequate compaction, adverse weather, etc. are encountered, the
contractor should stop construction until the conditions are
remedied.
Unless otherwise specified, fill material should be compacted by
the contractor while near the optimum moisture content to a density
that is no less than 90 percent of the maximum dry density
determined in accordance with ASTM Test No. D1557-78 or other
density test methods that will yield equivalent results.
CLEARING AND PREPARATION OF AREAS TO RECEIVE FILL
All trees, brush, grass and other objectionable material should be
collected, piled and burned or otherwise disposed of by the
contractor so as to leave the areas that have been cleared with a
neat and finished appearance, free from unsightly debris.
APPENDIX B
Page 2
All vegetable matter and objectionable material should be removed
by the contractor from the surface upon which the fill is to be
placed, and any loose or porous soils should be removed or
compacted to the depth determined by the geotechnical engineer.
The surface should then be plowed or scarified to a minimum depth
of 6 inches until the surface is free from uneven features that
would tend to prevent uniform compaction by the equipment to be
used.
When the slope of the natural ground receiving fill exceeds 20
percent (5 horizontal to 1 vertical), the original ground should be
stepped or benched as shown on the attached plate. tBenches should
be cut to a firm, competent soil condition. The lower bench should
be at least 10 feet wide and all other benches at least 6 feet
wide, ground slopes flatter than 20 percent should be benched when
considered necessary by the geotechnical engineer.
FILL MATERIAL
Materials for compacted soil should consist of any material
imported or excavated from the cut areas that in the opinion of the
geotechnical engineer is suitable for use in construction fills.
The material should contain no rocks or hard lumps greater than 12
inches in size and should contain at least 40 percent of material
smaller than 1/4 inch in size. (Materials greater than 6 inches in
size should be placed by the contractor so that they are surrounded
by compacted fines; no nesting of rocks will be permitted.) No
material of a perishable, spongy or otherwise improper nature
should be used in filling.
Material placed within 36 inches of rough grade should be select
material that contains no rocks or hard lumps greater than 6 inches
in size and that swells less than 3 percent when compacted (as
specified later herein for compacted fill) and soaked under an
axial pressure of 150 psf.
Potentially expansive soils may be used in fills below a depth of
36 inches and should be compacted' at a moisture greater than the
optimum moisture content for the material.
PLACING, SPREADING AND COMPACTING OF FILL
Approved material should be placed in areas prepared to receive
fill in layers not to exceed 6 inches in compacted thickness. Each
layer should have a uniform moisture content in the range that will
allow the compaction effort to be efficiently applied to achieve
the specified degree of compaction to a minimum specified density
with adequately sized equipment, either specifically designed for
soil compaction or of proven reliability. Compaction should be
continuous over the entire area and the equipment should make
APPENDIX B
Page 3
sufficient trips to ensure that the desired density has been
obtained throughout the fill.
When moisture content of the fill material is below that specified
by the geotechnical engineer, water should be added by the
contractor until the moisture content is as specified.
When the moisture content of the fill material is above that
specified by the geotechnical engineer, the fill material should be
aerated by the contractor by blading, mixing or other satisfactory
methods until the moisture content is as specified.
The surface of fill slopes should be compacted and there should be
no excess loose soil on the slopes.
UNIFIED SOIL CLASSIFICATION
Identifying Criteria Group Symbol Soil Description
COARSE-GRAINED (more than 50
percent larger than #200 sieve)
Gravel {more than 50 percent
larger than #4 sieve but
smaller than three inches)
Non-plastic
GW
GP
Sands (more than 50 percent
smaller than #4 sieve)
GM
GC
SW
SP
Gravel, well-graded
gravel-sand mixture,
little or no fines
Gravel, poorly grad-
ed gravel-sand mix-
ture, little or no
fines
Gravel, silty, poor-
ly graded, gravel-
sand-silt mixtures
Gravel, clayey,
poorly graded, grav-
el-sand-clay mixture
Sand, well-graded,
gravelly sands,
little or no fines
Sand, poorly graded,
gravelly sands,
little or no fines
APPENDIX B
Page 4
SM Sand, silty, poorly
graded, sand-clay
mixtures
FINE-GRAINED (more than 50
percent but smaller than
#200 sieve)
Liquid limit less than 50 ML
CL
Liquid limit greater than 50 OL
MH
CH
OH
Silt, inorganic silt
and fine sand, sandy
silt or clayey-silt-
sand mixtures with
slight plasticity
Clay, inorganic clay
of low to medium
plasticity, gravelly
clays, sandy clays,
silty clays, lean
clays
Silt, inorganic,
silts and organic
silt-clays of low
plasticity
Silt, inorganic,
silts micaceous or
diatomaceous fine,
sandy or silty soils
elastic silts
Clay, inorganic,
clays of medium to
high plasticity, fat
clays
Clay, organic, clays
of medium to high
plasticity
HIGHLY ORGANIC SOILS PT Peat, other highly
organic swamp soils
APPENDIX B
Page 5
INSPECTION
Observation and compaction tests will be made by the geotechnical
engineer during the filling and compacting operations so that he
can state whether the fill was constructed in accordance with the
specifications.
The geotechnical engineer will make field density tests in
accordance with ASTM Test No. D1557-78. Density tests will be made
in the compacted materials below the surface where the surface is
disturbed. When these tests indicated that the density of any
layer of fill or portion thereof is below the specified density,
that particular layer or portion should be reworked until the
specified density has been obtained.
The location and frequency of the tests well be at the soil
engineer's discretion. In general, the density tests will be made
at an interval not exceeding 2 feet in vertical rise and/or 500
cubic yards of embankment.
PROTECTION OF WORK
During construction, the contractor should properly grade all
excavated surfaces to provide positive drainage and prevent ponding
of water. He should control surface water to avoid damage to
adjoining properties or to finished work on the site. The
contractor should take remedial measures to prevent erosion of
freshly graded areas and until such time as permanent drainage and
erosion control features have been installed.