Loading...
HomeMy WebLinkAboutCDP 2016-0006; MFD-01; HYDROLOGY CALCULATIONS; 2017-04-10Victor Rodriguez-Fernandez, PE. 1283 E Main St., Ste 109, El Cajon, CA, 92021 en~ineervictorrf@aol.com PH: (760) 357-2434 HYDROLOGY CALCULATIONS for 2637 JEFFERSON ST., Carlsbad Victor Rodriguez-Fernandez, RCE 35373 APR 11 2017 err'(~~-_:-1-~'J .r~~:·:-:-,_L\o r ""· .. r, .r· · r, 1 / t r _/ ·.. ~ . i -,_J -.J , J , __, --, , ~ 4/07/2017 Description Existing property is a flat 0.25 Acre residential lot draining with about a 1 % slope towards the West towards an existing multi-family development that is accepting the existing flows with an exisitng retaining wall. Existing structures and pool to be demolished. No offsite drainage flows were observed. The project proposes 4 Apartment Units structure with permeable pavers driveway and landscaping. There will be an increase of 704 SF the impermeable surface (from 4152 SF to 4856 SF). The drainage proposed will be directed towards the same west property line. There will be no increase of flows by mitigating the imperviousness surfaces increase by providing permeable pavers and 3" Landscape ponds to increase the Time of Concentration of the flows and decrease the peak flow. The expected proposed conditions runoff will be less than the existing conditions runoff. Calculations: EXISTING CONDITIONS tributary Area= 0.25 Ac (same area as proposed tributary area) C = 0.55 (Per Table 2) L=l50' S = 1% 1/2 1.8 X (1.1-0.55) X (150) Tc -----------------------------12.1 Min (Fig. 3-3) -I= 4.2 (Fig. 3-1) 1/3 (1) Q 100 =CIA= 0.55 x 4.2 x 0.25 = 0.58 CFS Sheet Flow PROPOSED CONDITIONS Tributazy Area = 0.25 Ac C = 0.70 (Per Table 2) L1 =200' H2-Hl = 58.3 -56.5 = 1.8' 1/2 1.8 X 0.40 X (200) S =0.9% Tc -----------------------------= 10.7 Min (Fig. 3-3) 1/3 (0.9) The initial To at the 3" Landscape pond# 1 area with initial area of 700 SF, pond volume 286SF@ 3" (V=72CF), assuming 100 yr Intensity of 4.2 in/hr To= 72CF I (4.2/12) 700 = 0.29 Hrs= 17.6 min L2 = 150' S = 1% NOT CONSIDERING PAYERS DETENTION TIME 1/2 1.8 X (0.40) X (150) Tc -----------------------------= 8.8 Min (Fig. 3-3) 1/3 (1) Total Tc= 10.7 + 8.8 = 19.5 min -I= 3.1 (Fig. 3-1) Q 100 =CIA= 0.7 x 3.1 x 0.25 = 0.54 CFS Sheet Flow NO INCREASE OF RUNOFF EXPECTED