HomeMy WebLinkAboutCDP 2018-0020; BUCCOLA ADDITION; GEOTECHNICAL INVESTIGATION; 2018-09-12 GEOTECHNICAL INVESTIGATION PROPOSED BUCCOLA RESIDENCE ADDITION 5031 TIERRA DEL ORO CARLSBAD, CALIFORNIA Prepared for: MR. ROBERT BUCCOLA 8140 SENTINEL STREET FAIR OAKS, CALIFORNIA Prepared by: CONSTRUCTION TESTING & ENGINEERING, INC. 1441 MONTIEL ROAD, SUITE 115 ESCONDIDO, CALIFORNIA 92026 CTE JOB NO.: 10-14444G SEPTEMBER 12, 2018 TABLE OF CONTENTS 1.0 INTRODUCTION AND SCOPE OF SERVICES ................................................................... 1  1.1 Introduction ................................................................................................................... 1  1.2 Scope of Services .......................................................................................................... 1  2.0 SITE DESCRIPTION ............................................................................................................... 2  3.0 FIELD INVESTIGATION AND LABORATORY TESTING ................................................ 2  3.1 Field Investigation ........................................................................................................ 2  3.2 Laboratory Testing ........................................................................................................ 3  4.0 PERCOLATION TESTING ..................................................................................................... 3  4.1 Percolation Test Methods ............................................................................................. 4  4.2 Calculated Infiltrated Rate ........................................................................................................ 4  5.0 GEOLOGY ............................................................................................................................... 5  5.1 General Setting ............................................................................................................. 5  5.2 Geologic Conditions ..................................................................................................... 6  5.2.1 Quaternary Marine Beach Deposits ............................................................... 6  5.2.2 Quaternary Slopewash ................................................................................... 6  5.2.3 Residual Soil .................................................................................................. 7  5.2.4 Quaternary Old Paralic Deposits ................................................................... 7  5.2.5 Tertiary Santiago Formation .......................................................................... 7  5.3 Groundwater Conditions ............................................................................................... 8  5.4 Geologic Hazards .......................................................................................................... 8  5.4.1 Surface Fault Rupture .................................................................................... 9  5.4.2 Local and Regional Faulting .......................................................................... 9  5.4.3 Liquefaction and Seismic Settlement Evaluation ........................................ 10  5.4.4 Tsunamis, Sea Surface Super Elevation and Seiche Evaluation ................. 10  5.4.5 Landsliding and Slope Stability ................................................................... 11  5.4.6 Compressible and Expansive Soils .............................................................. 13  5.4.7 Corrosive Soils ............................................................................................. 13  6.0 BLUFF EVALUATION ......................................................................................................... 14  6.1 Review of Historic Topography ................................................................................. 14  6.2 Review of Historic Photography ................................................................................. 16  6.2.1 Aerial Photographs ...................................................................................... 16  6.3 Bluff Profiles ............................................................................................................... 17  6.4 Seacliff Recession ....................................................................................................... 18  7.0 CONCLUSIONS AND RECOMMENDATIONS ................................................................. 20  7.1 General ........................................................................................................................ 20  7.2 Site Preparation ........................................................................................................... 21  7.3 Site Excavation ........................................................................................................... 22  7.4 Fill Placement and Compaction .................................................................................. 22  7.5 Fill Materials ............................................................................................................... 23  7.6 Temporary Construction Slopes ................................................................................. 24  7.7 Foundations and Slab Recommendations ................................................................... 24  7.7.1 Foundations .................................................................................................. 25  7.7.2 Foundation Settlement ................................................................................. 26  7.7.3 Foundation Setback ...................................................................................... 26  7.7.4 Interior Concrete Slabs ................................................................................ 26  7.8 Seismic Design Criteria .............................................................................................. 28  7.9 Lateral Resistance and Earth Pressures ...................................................................... 29  7.10 Exterior Flatwork ...................................................................................................... 31  7.11 Vehicular Pavement .................................................................................................. 32  7.12 Drainage .................................................................................................................... 33  7.13 Slopes ........................................................................................................................ 33  7.14 Controlled Low Strength Materials (CLSM) ............................................................ 34  7.15 Plan Review .............................................................................................................. 35  7.16 Construction Observation ......................................................................................... 35  8.0 LIMITATIONS OF INVESTIGATION ................................................................................. 36  FIGURES FIGURE 1 SITE LOCATION MAP FIGURE 2 GEOLOGIC/ EXPLORATION LOCATION MAP FIGURE 2A CROSS SECTION A-A' FIGURE 3 REGIONAL GEOLOGIC MAP FIGURE 4 REGIONAL FAULT AND SEISMICITY MAP FIGURE 5 RETAINING WALL DRAINAGE DETAIL APPENDICES APPENDIX A REFERENCES APPENDIX B FIELD EXPLORATION METHODS AND BORING LOGS APPENDIX C LABORATORY METHODS AND RESULTS APPENDIX D STANDARD GRADING SPECIFICATIONS APPENDIX E SLOPE/W OUTPUT APPENDIX F PERCOLATION TO INFILTRATION CALCULATIONS AND FIELD DATA APPENDIX G I-8 WORKSHEET APPENDIX H HISTORIC TOPOGRAPHIC MAPS APPENDIX I HISTORIC OBLIQUE AERIAL PHOTOGRAPHS BY CALIFORNIA COSTAL PROJECT APPENDIX J HISTORIC AERIAL PHOTOGRAPHS Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 1 1.0 INTRODUCTION AND SCOPE OF SERVICES 1.1 Introduction Construction Testing and Engineering, Inc. (CTE) has completed a geotechnical investigation and report providing conclusions and recommendations for the proposed improvements at the subject site in Carlsbad, California. It is understood that the proposed improvements are to consist of a second-story addition to the existing residence with associated flatwork, utilities, landscaping and other minor improvements. CTE has performed this work in general accordance with the terms of proposal G-4454 dated July 20, 2018. Based on the investigation findings, geotechnical recommendations for the proposed residential addition are presented herein. 1.2 Scope of Services The scope of services provided included:  Review of readily available geologic and soils reports.  Coordination of USA utility mark-out and location.  Excavation of exploratory borings and soil sampling utilizing limited-access drilling equipment consisting of a tripod drill rig and a manually operated auger.  Percolation testing in accordance with County of San Diego Department of Environmental Health (DEH) procedures.  Laboratory testing of selected soil samples.  Description of the site geology and evaluation of potential geologic hazards.  Engineering and geologic analysis.  Preparation of this geotechnical report. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 2 2.0 SITE DESCRIPTION The subject site is located at 5031 Tierra Del Oro in Carlsbad, California (Figure 1). The site is bounded by existing residential properties to the north and south, by the Pacific Ocean to the west, and by Tierra Del Oro to the east. The site layout is illustrated on Figure 2. The improvement area is currently developed with a single-story residential structure (with a partially subterranean lower floor), associated flatwork, landscaping, utilities, and other minor improvements. Based on reconnaissance and review of topography, the site descends to the southwest with elevations ranging from approximately 37 feet above mean sea level (msl) in the northeast adjacent to Tierra Del Oro to sea level at the southwestern limit of the site. In the western portion of the site an approximately 15 feet high 1.4:1 (horizontal: vertical) slope descends to the southwest with stabilizing rip rap placed at the toe of slope on the eastern limit of the beach. 3.0 FIELD INVESTIGATION AND LABORATORY TESTING 3.1 Field Investigation CTE performed the subsurface investigation on August 7 and 8, 2018 to evaluate underlying soil conditions. This fieldwork consisted of site reconnaissance, and the excavation of four exploratory soil borings and two percolation test holes. The borings were advanced to a maximum explored depth of approximately 20 feet below the ground surface (bgs). Bulk samples were collected from the cuttings, and relatively undisturbed samples were collected by driving Standard Penetration Test (SPT) and Modified California (CAL) samplers. The borings on the upper portion of the site were excavated with a tripod-supported, six-inch-diameter, solid-stem auger. Based on limited Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 3 accessibility, the two borings at the base of the existing slope adjacent to the rip rap were advanced with a manually operated auger. Approximate locations of the soil borings and test holes are shown on the attached Figure 2. Soils were logged in the field by a CTE Engineering Geologist, and were visually classified in general accordance with the Unified Soil Classification System. The field descriptions have been modified, where appropriate, to reflect laboratory test results. Boring logs, including descriptions of the soils encountered, are included in Appendix B. The approximate locations of the borings are presented on Figure 2. 3.2 Laboratory Testing Laboratory tests were conducted on selected soil samples for classification purposes, and to evaluate physical properties and engineering characteristics. Laboratory tests included: In-Place Moisture and Density, Expansion Index, Grain Size Analysis, Direct Shear, and Chemical Characteristics. Test descriptions and laboratory test results are included in Appendix C. 4.0 PERCOLATION TESTING The specific stormwater BMP locations were not known at the time of percolation testing. Therefore, testing was performed in two representative locations in the central portion of the site west of the existing structure. The percolation test holes were excavated to depths of approximately 3.1 and 5.3 feet bgs. The attached Figure 2 shows the approximate percolation test locations. The evaluation was performed in accordance with Appendix C of the Model BMP Design Manual for the Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 4 San Diego Region “Geotechnical and Groundwater Investigation Requirements”, dated January 2018. 4.1 Percolation Test Methods The percolation tests were performed in general accordance with methods approved by the San Diego Region BMP Design Manual with a presoak period of approximately 18 to 19 hours. Percolation test results and calculated infiltration rates are presented below in Table 4.2. Field Data and percolation to infiltration calculations are included in Appendix F. 4.2 Calculated Infiltrated Rate As per the San Diego Region BMP design documents (2018) infiltration rates are to be evaluated using the Porchet Method. San Diego BMP design documents utilized the Porchet Method through guidance of the County of Riverside (2011). The intent of calculating the infiltration rate is to take into account bias inherent in percolation test borehole sidewall infiltration that would not occur at a basin bottom where such sidewalls are not present. The infiltration rate (It) is derived by the equation: It = ΔH πr2 60 = ΔH 60 r Δt(πr2 +2πrHavg) Δt(r+2Havg) Where: It = tested infiltration rate, inches/hour ΔH = change in head over the time interval, inches Δt = time interval, minutes * r = effective radius of test hole Havg = average head over the time interval, inches Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 5 Given the measured percolation rates, the calculated infiltration rates are presented with and without a Factor of Safety applied in Table 4.2 below. The civil engineer of record should determine an appropriate factor of safety to be applied via completion of Worksheet D.5-1 of County of San Diego “Best Management Practice Design Manual”, Appendix D or other approved methods. The I- 8 Worksheet is included in Appendix G of this report. CTE does not recommend using a factor of safety of less than 2.0. TABLE 4.2 RESULTS OF PERCOLATION TESTING WITH FACTOR OF SAFETY APPLIED Test Location Test Depth (inches) Case Geologic Unit Percolation Rate (inches per hour) Infiltration Rate (inches per hour) Infiltration Rate with FOS of 2 Applied (inches per hour) P-1 63 II Qop 15.00 1.27 0.63 P-2 37 II Qop 20.25 3.71 1.85 NOTES Water level was measured from a fixed point at the top of the hole. Weather was sunny and warm during percolation testing. Qop = Quaternary Old Paralic Deposits The test holes were six inches in diameter. 5.0 GEOLOGY 5.1 General Setting Carlsbad is located within the Peninsular Ranges physiographic province that is characterized by northwest-trending mountain ranges, intervening valleys, and predominantly northwest trending regional faults. The greater San Diego Region can be further subdivided into the coastal plain area, a central mountain–valley area and the eastern mountain valley area. The project site is located Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 6 within the coastal plain area that is characterized by Cretaceous, Tertiary, and Quaternary sedimentary deposits that onlap an eroded basement surface consisting of Jurassic and Cretaceous crystalline rocks. 5.2 Geologic Conditions Based on the regional geologic map prepared by Kennedy and Tan (2007), the near surface geologic units that underlie the site consist of Quaternary Marine Beach Deposits, Quaternary Old Paralic Deposits, Unit 6-7 and the Tertiary Santiago Formation (Figure 3). Based on recent explorations, Quaternary Slopewash and Residual Soil were observed overlying the Old Paralic Deposits. The Tertiary Santiago Formation was encountered at depth and the Marine Beach Deposits were observed within the western portion of the site. Descriptions of the geologic units observed during the recent investigation are presented below. Surficial geologic materials are depicted on Figure 2, and a generalized geologic cross-section is presented on Figure 2A. 5.2.1 Quaternary Marine Beach Deposits Where observed, the Marine Beach Deposits generally consist of loose, light gray, poorly graded fine grained sand. This unit consists of the active beach deposits located on the western portion of the site. 5.2.2 Quaternary Slopewash Where observed, the Slopewash generally consists of loose, reddish brown, silty fine to medium grained sand. This unit is relatively thin and was observed at the base of the west facing slope. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 7 5.2.3 Residual Soil Where observed, the Residual Soil generally consists of loose to medium dense, dark brown, silty to clayey fine to medium grained sand. Exploratory excavations encountered Residual Soil to a maximum depth of approximately 3.0 feet (bgs). This unit is relatively thin and blankets the underlying Old Paralic Deposits. 5.2.4 Quaternary Old Paralic Deposits Quaternary Old Paralic Deposits were observed beneath the surficial soils in all of the borings. Where observed, these materials generally consist of medium dense to dense, reddish brown, silty to clayey fine to medium grained sandstone. This unit is a generally massive flat-lying terrace that unconformably overlies the Santiago formation. 5.2.5 Tertiary Santiago Formation Tertiary Santiago Formation was observed as the underlying geologic unit beneath the site. Where observed, these materials generally consist of very dense, light gray, fine grained sandstone. Based on regional mapping by Kennedy and Tan (2007) and observation of cliff exposures, this unit is generally thinly to thickly bedded, and dips to the north and east with dip angles ranging from approximately 4 to 10 degrees, which represents neutral to favorable geologic structure. Significant jointing was not observed in nearby exposures and is not anticipated at the site. The Tertiary Santiago Formation is anticipated to underlie the entire site at depth beneath the Old Paralic Deposits and makes up the wave-cut platform at the toe of the bluff that extends to the west. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 8 5.3 Groundwater Conditions During the recent investigation, minor seepage was encountered at an approximate depth of five feet bgs in B-1 (approximate elevation 8 feet) at the base of the western facing slope. This water is likely derived from excess irrigation water locally accumulating on top of the relatively impermeable Santiago Formation. Groundwater or seepage was not observed in the other borings that extended to a depth of approximately 20 feet bgs (approximate elevation 9 feet) including Boring B-1A that was advanced adjacent to Boring B-1 at the same approximate surface elevation of 14 feet. The minor amount of water locally observed during the recent investigation is not anticipated to impact the global stability of the slope or adversely affect shallow construction activities, provided proper site drainage is designed, installed, and maintained as per the recommendations of the project civil engineer of record. However, if the amount of water discharging into the subgrade beneath the site is dramatically increased soil softening and erosion may occur, potentially resulting in stability issues. Recommendations to construct the proposed retention basins with impermeable liners are presented herein to minimize such potential for subgrade saturation and associated effects. 5.4 Geologic Hazards Geologic hazards considered to have potential impacts to site development were evaluated based on field observations, literature review, and laboratory test results. The following paragraphs discuss geologic hazards considered and associated potential risk to the site. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 9 5.4.1 Surface Fault Rupture Based on the site reconnaissance and review of referenced literature, the site is not within a State of California-designated Alquist-Priolo Earthquake Fault Studies Zone and no known active fault traces underlie or project toward the site. According to the California Division of Mines and Geology, a fault is active if it displays evidence of activity in the last 11,000 years (Hart and Bryant, 1997). As such, the potential for surface rupture from displacement or fault movement beneath the proposed improvements is considered to be low. 5.4.2 Local and Regional Faulting The California Geological Survey (CGS) and the United States Geological Survey (USGS) broadly group faults as “Class A” or “Class B” (Cao, 2003; Frankel et al., 2002). Class A faults are identified based upon relatively well-defined paleoseismic activity, and a fault-slip rate of more than 5 millimeters per year (mm/yr). In contrast, Class B faults have comparatively less defined paleoseismic activity and are considered to have a fault-slip rate less than 5 mm/yr. The nearest known Class B fault is the Rose Canyon Fault, which is approximately 7.0 kilometers from of the site (Blake, T.F., 2000). The nearest known Class A fault is the Temecula segment of the Elsinore Fault, which is located approximately 40.6 kilometers from of the site. The attached Figure 4 shows regional faults and seismicity with respect to the site. The site could be subjected to significant shaking in the event of a major earthquake on any of the faults noted above or other faults in the southern California or northern Baja California area. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 10 5.4.3 Liquefaction and Seismic Settlement Evaluation Liquefaction occurs when saturated fine-grained sands or silts lose their physical strengths during earthquake-induced shaking and behave like a liquid. This is due to loss of point-to-point grain contact and transfer of normal stress to the pore water. Liquefaction potential varies with water level, soil type, material gradation, relative density, and probable intensity and duration of ground shaking. Seismic settlement can occur with or without liquefaction; it results from densification of loose soils. The site is underlain at shallow depths by medium dense to very dense Old Paralic Deposits and Tertiary Santiago Formation. Based on the noted subsurface conditions, the potential for liquefaction or significant seismic settlement in the site improvement areas is considered to be low. 5.4.4 Tsunamis, Sea Surface Super Elevation and Seiche Evaluation Based on emergency planning maps prepared by California Emergency Management Agency and CGS, the site is not located in a zone of potential tsunami inundation. In addition, oscillatory waves (seiches) are considered unlikely due to the absence of large nearby confined bodies of water. According to McCulloch (1985), the potential in the San Diego County coastal area for “100-year” and “500-year” tsunami waves is approximately five and eight feet, or less. This suggests that there is a low probability of a tsunami reaching the developed portion of the site based on elevation of the improvements at greater than 26 feet above mean sea level Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 11 (msl). However, the lower portion of the western slope may be susceptible to erosion damage if a tsunami were to reach the site. The lower portion of the slope could also be potentially subject to erosion if a sea surface super elevation were to occur during a significant large swell storm event and the waves were able to overtop the rip rap. This has not occurred in the 32 years the rip rap has been in place, a period that has included numerous large storm events. Based on the investigation findings, the likelihood of a tsunami or storm event during a sea surface super elevation impacting the proposed improvement area of the site is considered to be low but the lower portion the bluff may be susceptible to erosion. 5.4.5 Landsliding and Slope Stability The developed portion of the site is set back approximately 30 feet from the top of an approximately 15 feet high 1.4:1 (horizontal: vertical) slope that descends to the southwest. According to mapping by Tan (1995), the site is located in area 2.0, which is described as “Marginally Susceptible” to landsliding. Kennedy and Tan (2007) do not indicate the presence of mapped landslides at the subject site. In addition, on site field observations did not indicate the presence of deep gross instabilities, and bedding orientations generally indicate neutral to favorable bedding with respect to the descending slope. Based on the investigation findings, the potential for deep seated landslides at the subject site is considered to be low. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 12 The final input and output from the limited evaluation of slope stability is presented in Appendix E. For the analysis, the existing slope was modeled based on site topographic and geologic conditions. Based on laboratory testing, the minimum soil strength values utilized for the Quaternary Old Paralic Deposits, which is the primary unit making up the existing slope, were phi = 38o and cohesion = 100 psf. Strength values for the other units were conservatively estimated based on previous testing and observations made during the investigation. The analysis, which was performed utilizing SLOPE/W slope stability software, yielded a factor of safety of 2.1. Based on the evaluation, the existing slope condition exhibits a global factor of safety in excess of 1.5. However, residual and slopewash soils in the western portion of the site are susceptible to potential erosion and may locally develop shallow slumps and failures. Currently the rip rap placed at the base of the slope and thick ice plant throughout the existing slope face appear to be providing adequate erosion protection. Based on the investigation findings, slope instability is not anticipated to impact the proposed improvement area of the site provided erosion protection measures are maintained and the minimum City of Carlsbad Costal Shoreline Development Overlay Zone setbacks are implemented. In addition, the proposed second story residential addition will not modify the existing structural footprint and is not anticipated to have a negative impact on the overall stability of the bluff. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 13 5.4.6 Compressible and Expansive Soils The near surface Slope Wash and Residual Soil encountered at the site are considered to be potentially compressible in their current condition. Therefore, if new foundations are proposed, it is recommended that these soils be overexcavated and properly compacted beneath proposed improvement areas as recommended herein and as determined to be necessary during construction. Alternatively, new footings should be extended to bear entirely in competent native Old Paralic Deposits. Based on field data, site observations, and CTE’s experience with similar soils in the vicinity of the site, dense native soils underlying the site are not considered to be subject to significant compressibility under the proposed loads. Laboratory testing results indicate that the granular site exhibit a Very Low expansion potential (Expansion Index of 20 or less). Therefore, expansive soils are generally not anticipated to present significant adverse impacts to site development. Additional evaluation of near-surface soils should be performed based on field observations during grading and excavation activities. 5.4.7 Corrosive Soils Testing of representative site soils was performed to evaluate the potential corrosive effects on concrete foundations and buried metallic utilities. Soil environments detrimental to concrete generally have elevated levels of soluble sulfates and/or pH levels less than 5.5. According to the American Concrete Institute (ACI) Table 318 4.3.1, specific guidelines have been provided for concrete where concentrations of soluble sulfate (SO4) in soil exceed Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 14 0.10 percent by weight. These guidelines include low water: cement ratios, increased compressive strength, and specific cement type requirements. A minimum resistivity value less than approximately 5,000 ohm-cm and/or soluble chloride levels in excess of 200 ppm generally indicate a corrosive environment for buried metallic utilities and untreated conduits. Chemical test results indicate that near-surface soils at the site generally present a negligible corrosion potential for Portland cement concrete. Based on resistivity and chloride testing, the site soils have been interpreted to have a moderate to severe corrosivity potential to buried metal improvements. Based on the results of the limited testing performed, it is likely prudent to utilize plastic piping and conduits where buried and feasible. However, CTE does not practice corrosion engineering. Therefore, if corrosion of metallic or other improvements is of more significant concern, a qualified corrosion engineer could be consulted. 6.0 BLUFF EVALUATION 6.1 Review of Historic Topography A series of topographic maps of the Oceanside and San Luis Rey Quadrangles were collected from EDR Environmental Data Resources, Inc. The topographic maps reviewed are presented in the table below. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 15 TABLE 1 Quadrangle Year Series Scale Oceanside 1893 15 minute 1:62500 Oceanside 1898 15 minute 1:62500 Oceanside 1901 15 minute 1:62500 Oceanside 1947 15 minute 1:50000 San Luis Rey 1948 7.5 minute 1:24000 San Luis Rey 1949 7.5 minute 1:24000 San Luis Rey 1968 7.5 minute 1:24000 San Luis Rey 1975 7.5 minute 1:24000 San Luis Rey 1997 7.5 minute 1:24000 San Luis Rey 2012 7.5 minute 1:24000 Based on our review, it appears that the surface elevation of the upper portion of the site is indicated to be greater than 50 feet msl on the 1893, 1898, and 1901 maps. The 1947 to 2012 maps indicate the upper surface elevation between approximately 35 to 38 feet msl, which is consistent with current elevations. The difference in site elevation is likely due to the difference in mapping precision based on the change in reported elevation occurring between 1901 and 1947 before the Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 16 area was developed. It does not appear that the top of the terrace has been significantly eroded or excavated in that time frame. The present surface elevations, as shown on Figure 2, range from sea level on the western limit of the site to approximately 37 feet msl on the eastern portion of the site adjacent to Tierra Del Oro. Copies of the topographic maps are presented in Appendix H. 6.2 Review of Historic Photography Aerial and surface photographs of the site and surrounding area were reviewed to help re-construct the site development history and provide correlative data for the review of the historic topographic maps. Aerial photographs were collected from the California Coastal Records Project (www.californiacoastline.org), (Appendix I), and a data search completed by EDR Environmental Data Resources Inc., (Appendix J). 6.2.1 Aerial Photographs Oblique aerial photographs of the Carlsbad area available from the California Coastal Project included photographs from 1979, 1989, 2008 and 2013. Aerial photographs from the EDR data search included photographs from 1928, 1939, 1946, 1953, 1964, 1967, 1970, 1979, 1985, 1990, 1994, 2005, 2009, 2012, and 2016. Review of the aerial photographs shows that Tierra Del Oro was constructed and development of the area began between the years of 1953 and 1964. The subject site was developed between 1970 and 1979. Based on review of a previous adjacent investigation Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 17 (GEI 2013) in addition to the aerial photographs, a limited amount of smaller class boulder rip rap was placed south of the site in the 1970’s in an attempt to stabilize the lower portion of the bluff. Two significant storm events that occurred in 1978 and 1983 resulted in severe erosion damage to a nearby recreational area. In response to damage caused by the storms, the recreation area was closed and the current larger class rip rap (8- to 12- ton class) was placed at the toe of the existing western slope from 1985 to 1986. This placement of rip-rap extends the entire length of Tierra Del Oro providing bluff erosion protection for the site and adjacent areas. Following placement of the larger class rip rap, the coastline along this portion of bluff has remained relatively unchanged. Due to the construction of jetties, rip rap barriers and other erosion resistant structures throughout the region, supply of sand to beaches has been reduced by approximately 26% according to the California Beach Restoration Study performed by Griggs in 2002. This beach reduction can be observed on the aerial photographs between 1967 and 1979 following construction of jetty structures associated with the power plant located north of the site. 6.3 Bluff Profiles A cross section was constructed perpendicular to the bluff, which shows the current surface and geologic units encountered during the field investigation (Figure 2A). The location of the section is shown on the site Geologic/ Exploration Location Map (Figure 2). The coastal bluff edge, as determined by the Coastal Bluffs and Beaches Guidelines, is currently at an approximate elevation of 27 feet msl. The toe of bluff was interpreted based on information from the westernmost borings Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 18 at the toe of slope and estimated location of the present day abrasion platform based on our aerial photograph and literature reviews as well as reef exposures observed during the field investigation. The depth of beach deposits and thickness of rip rap over the Santiago Formation (from which the wave-cut platform is derived) were based on borings at the toe of slope and reef exposures. 6.4 Seacliff Recession The coastline in San Diego County has been divided into several different segments that have been evaluated for seacliff recession with rates based on bedrock type, rock strength, structural weaknesses, wave energy, and terrestrial processes. As part of our site specific evaluation of seacliff recession we reviewed two studies performed by Moore, Benumof and Griggs (1999) and Benumof and Griggs (1999). These studies determined rates of seacliff recession by utilizing a high- resolution state-of-the-art, soft-copy photogrammetric and geographic information system (GIS) imaging laboratory to compare aerial photographs collected by the National Oceanic and Atmospheric Administration (NOAA) in 1994 to historic aerial photographs that were flown in 1932, 1949, 1952 and 1956. The study performed by Moore, Benumof and Griggs (1999) titled “Erosion Hazards in Santa Cruz and San Diego Counties, California” determined the Carlsbad area to have a seacliff recession rate ranging from 3 to 58 cm/year between 1956 and 1994. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 19 The study performed by Benumof and Griggs (1999) titled “The Dependence of Seacliff Erosion Rates on Cliff Material Properties and Physical Processes: San Diego County, California” determined that the Carlsbad area had a recession rate of 43.02 cm per year. These rates are largely based on geologic composition of the seacliff, significant storm events, and man-made protection. The wide range in the erosion rates presented above can be explained by the presence and height of the erosion resistant Santiago Formation material and the presence of man- made protection “armor” being factored into the duration of time the seacliff was exposed to erosion. Relatively erodible Old Paralic Deposits (terrace materials) at an elevation that is exposed to the ocean swell, will typically erode much faster than an area where the erosion resistant Santiago Formation is present and extends to a higher elevation. The difference in rates can also be impacted by armoring portions of the erodible material, which would result in unprotected portions of the seacliff eroding much faster than the armored segments. This difference in erosion rate was also exaggerated by localized armoring occurring before a number of significant storm events that occurred between 1978 and 1994, which was a period of accelerated erosion. Based on review of bluff recession studies and observations of the historic aerial photographs, areas that have been adequately armored were able to stop or significantly reduce recession of the seacliff. At the subject site, the rip rap that exists at the toe of the western slope has provided adequate protection of the bluff since 1986 and, based on recent observation, shows minimal signs of deterioration and has maintained a configuration that remains interlocked and secure. This rip rap has been in place during the significant coastal storms of 1988, 1992-1994 and 1997-1998 that Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 20 produced ocean swells up to 20 feet in height and has not been noticeably compromised. In addition, the entire slope that extends up from the rip rap has been planted with thick vegetation that should minimize erosion resulting from precipitation and aeolian processes. Based on the investigation findings, it is CTE’s opinion that the seacliff adjacent to the site is adequately armored and protected from significant erosion. Provided the City of Carlsbad Costal Shoreline Development Overlay Zone setbacks are recognized and the rip rap and existing slope are maintained, the proposed second story addition is considered to be adequately protected from seacliff recession for the anticipated life of the structure. 7.0 CONCLUSIONS AND RECOMMENDATIONS 7.1 General CTE concludes that the proposed improvements on the site are feasible from a geotechnical standpoint, provided the preliminary recommendations in this report are incorporated into the design and construction of the project. Recommendations for the proposed earthwork and improvements are included in the following sections and Appendix D. However, recommendations in the text of this report supersede those presented in Appendix D should conflicts exist. These preliminary recommendations should either be confirmed as appropriate or updated following removal of existing improvements and observations during site preparation. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 21 7.2 Site Preparation If new foundations or slabs are proposed, areas to receive new footings and/or flatwork should be cleared of any existing construction debris and vegetation not suitable for structural backfill and be properly disposed of offsite. It is anticipated that new structure footings will be extended to the depth of competent native materials. Beneath other proposed improvements, such as slabs on grade, pavement, and hardscape areas, existing soils should be excavated to the depth of two feet below proposed grades, or to the depth of competent underlying materials, whichever is greater. If encountered, existing below-ground utilities should be redirected around proposed structures. Existing utilities at an elevation to extend through the proposed footings should generally be sleeved and caulked to minimize the potential for moisture migration below the building slabs. Abandoned pipes exposed by grading should be securely capped or filled with minimum two-sack cement/sand slurry to help prevent moisture from migrating beneath foundation and slab soils. Overexcavations adjacent to existing structures should generally not extend below a 1:1 plane extended down from the bottom of the existing footings or as recommended during grading based on the exposed conditions. Depending on the depth and proximity of the existing building footings to remain, alternating slot excavations could be required during earthwork. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 22 A CTE representative should observe the exposed ground surface prior to placement of compacted fill to document and verify the competency of the encountered subgrade materials. If unsuitable material is exposed at the base of excavations additional removals may be recommended. After approval by this office, the exposed subgrades to receive fill should be scarified a minimum of nine inches, moisture conditioned, and properly compacted prior to additional compacted fill placement. 7.3 Site Excavation Based on CTE’s observations, shallow excavations at the site should be feasible using well- maintained heavy-duty construction equipment run by experienced operators. However, excavations within the Old Paralic Deposits could encounter zones that are sensitive to caving and/or erosion, and may not effectively remain standing vertical or near-vertical, even at shallow or minor heights and for short periods of time. 7.4 Fill Placement and Compaction Following the recommended overexcavation of loose or disturbed soils, areas to receive fills should be scarified approximately nine inches, moisture conditioned, and properly compacted. Fill and backfill should be compacted to a minimum relative compaction of 90 percent at a moisture content of at least two percent above optimum, as evaluated by ASTM D 1557. The optimum lift thickness for fill soil depends on the type of compaction equipment used. Generally, backfill should be placed in uniform, horizontal lifts not exceeding eight inches in loose thickness. Fill placement and compaction should be conducted in conformance with local ordinances, and should be observed and tested by a CTE geotechnical representative. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 23 7.5 Fill Materials Properly moisture-conditioned very low to low expansion potential soils derived from the on-site excavations are considered suitable for reuse on the site as compacted fill. If used, these materials should be screened of organics and materials generally greater than three inches in maximum dimension. Irreducible materials greater than three inches in maximum dimension should generally not be used in shallow fills (within three feet of proposed grades). In utility trenches, adequate bedding should surround pipes. Imported fill beneath structures, flatwork, and pavements should have an Expansion Index of 20 or less (ASTM D 4829). Proposed import fill soils for use in structural or slope areas should be evaluated by the geotechnical engineer before being transported to the site. If retaining walls are proposed, backfill located within a 45-degree wedge extending up from the heel of the wall should consist of soil having an Expansion Index of 20 or less (ASTM D 4829) with less than 30 percent passing the No. 200 sieve. The upper 12 to 18 inches of wall backfill should consist of lower permeability soils, in order to reduce surface water infiltration behind walls. The project structural engineer and/or architect should detail proper wall backdrains, including gravel drain zones, fills, filter fabric, and perforated drain pipes. However, a conceptual wall backdrain detail, which may be suitable for use at the site, is provided as Figure 5. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 24 7.6 Temporary Construction Slopes The following recommended slopes should be relatively stable against deep-seated failure, but may experience localized sloughing. On-site soils are considered Type B and Type C soils with recommended slope ratios as set forth in Table 7.6. TABLE 7.6 RECOMMENDED TEMPORARY SLOPE RATIOS SOIL TYPE SLOPE RATIO (Horizontal: vertical) MAXIMUM HEIGHT B (Old Paralic Deposits) 1:1 (OR FLATTER) 10 Feet C (Undocumented Fill and Residual Soil) 1.5:1 (OR FLATTER) 10 Feet Actual field conditions and soil type designations must be verified by a "competent person" while excavations exist, according to Cal-OSHA regulations. In addition, the above sloping recommendations do not allow for surcharge loading at the top of slopes by vehicular traffic, equipment or materials. Appropriate surcharge setbacks must be maintained from the top of all unshored slopes. 7.7 Foundations and Slab Recommendations The following recommendations are for preliminary design purposes only. These foundation recommendations should be re-evaluated after review of the project grading and foundation plans, Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 25 and after completion of rough grading of the building pad areas. Upon completion of rough pad grading, Expansion Index of near surface soils should be verified, and these recommendations should be updated, if necessary. 7.7.1 Foundations Foundation recommendations presented herein are based on the anticipated very low expansion potential of site soils (Expansion Index of 20 or less). Following the recommended shallow preparatory grading (as necessary), continuous and isolated spread footings are anticipated to be suitable for use at this site. Foundation dimensions and reinforcement should be based on allowable bearing values of 2,500 pounds per square foot (psf) for minimum 15-inch wide footings embedded a minimum of 24-inches below lowest adjacent subgrade elevation. Isolated footings should be at least 24 inches in minimum dimension. The allowable bearing value may be increased by one-third for short- duration loading, which includes the effects of wind or seismic forces. Based on the recommendations provided, it is anticipated that all footings will be extended to bear in competent native materials. Footings should not span cut to fill interfaces. Minimum reinforcement for continuous footings should consist of four No. 5 reinforcing bars; two placed near the top and two placed near the bottom, or as per the project structural engineer. The structural engineer should design isolated footing reinforcement. An Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 26 uncorrected subgrade modulus of 140 pounds per cubic inch is considered suitable for elastic foundation design. The structural engineer should provide recommendations for reinforcement of any spread footings and footings with pipe penetrations. Footing excavations should generally be maintained above optimum moisture content until concrete placement. 7.7.2 Foundation Settlement The maximum total static settlement is expected to be on the order of one inch and the maximum differential settlement is expected to be on the order of 0.5 inch. Due to the generally dense nature of underlying materials, dynamic settlement is not expected to adversely affect the proposed buildings. 7.7.3 Foundation Setback Footings for structures should be designed such that the horizontal distance from the face of adjacent slopes to the outer edge of the footing is at least 12 feet. In addition, footings should bear beneath a 1:1 plane extended up from the nearest bottom edge of adjacent trenches and/or excavations. Deepening of affected footings may be a suitable means of attaining the prescribed setbacks. 7.7.4 Interior Concrete Slabs Lightly loaded concrete slabs should be a minimum of 5.0 inches thick. Minimum slab reinforcement should consist of #4 reinforcing bars placed on maximum 18-inch centers, each way, at or above mid-slab height, but with proper cover. More stringent Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 27 recommendations per the project structural engineer could be provided. In moisture-sensitive floor areas, a suitable vapor retarder of at least 15-mil thickness (with all laps or penetrations sealed or taped) overlying a four-inch layer of consolidated aggregate base or gravel (with SE of 30 or more) should be installed. An optional maximum two-inch layer of similar material may be placed above the vapor retarder to help protect the membrane during steel and concrete placement. This recommended protection is generally considered typical in the industry. If proposed floor areas or coverings are considered especially sensitive to moisture emissions, additional recommendations from a specialty consultant could be obtained. CTE is not an expert at preventing moisture penetration through slabs. A qualified architect or other experienced professional should be contacted if moisture penetration is a more significant concern. Slabs subjected to heavier loads may require thicker slab sections and/or increased reinforcement. A 110-pci subgrade modulus is considered suitable for elastic design of minimally embedded improvements such as slabs-on-grade. Subgrade materials should be maintained or brought to a minimum of two percent or greater above optimum moisture content until slab underlayment and concrete are placed. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 28 7.8 Seismic Design Criteria The seismic ground motion values listed in the table below were derived in accordance with the ASCE 7-10 Standard and 2016 CBC. This was accomplished by establishing the Site Class based on the soil properties at the site, and calculating the site coefficients and parameters using the United States Geological Survey Seismic Design Maps application and site coordinates of 33.13228° north latitude and -117.33654° longitude. These values are intended for the design of structures to resist the effects of earthquake ground motions. TABLE 7.8 SEISMIC GROUND MOTION VALUES PARAMETER VALUE CBC REFERENCE (2016) Site Class C ASCE 7, Chapter 20 Mapped Spectral Response Acceleration Parameter, SS 1.176 Figure 1613.3.1 (1) Mapped Spectral Response Acceleration Parameter, S1 0.452 Figure 1613.3.1 (2) Seismic Coefficient, Fa 1.000 Table 1613.3.3 (1) Seismic Coefficient, Fv 1.348 Table 1613.3.3 (2) MCE Spectral Response Acceleration Parameter, SMS 1.176 Section 1613.3.3 MCE Spectral Response Acceleration Parameter, SM1 0.609 Section 1613.3.3 Design Spectral Response Acceleration, Parameter SDS 0.784 Section 1613.3.4 Design Spectral Response Acceleration, Parameter SD1 0.406 Section 1613.3.4 PGAM 0.474 ASCE 7, Equation 11.8-1 Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 29 7.9 Lateral Resistance and Earth Pressures Lateral loads acting against structures may be resisted by friction between the footings and the supporting soil or passive pressure acting against structures. If frictional resistance is used, allowable coefficients of friction of 0.30 (total frictional resistance equals the coefficient of friction multiplied by the dead load) for concrete cast directly against compacted fill is recommended. A design passive resistance value of 250 pounds per square foot per foot of depth (with a maximum value of 1,500 pounds per square foot) may be used. The allowable lateral resistance can be taken as the sum of the frictional resistance and the passive resistance, provided the passive resistance does not exceed two-thirds of the total allowable resistance. If proposed, retaining walls backfilled using granular soils may be designed using the equivalent fluid unit weights given in Table 7.9 below. Lateral pressures on cantilever retaining walls (yielding walls) over six feet high due to earthquake motions may be calculated based on work by Seed and Whitman (1970). The total TABLE 7.9 EQUIVALENT FLUID UNIT WEIGHTS (Gh) (pounds per cubic foot) WALL TYPE LEVEL BACKFILL SLOPE BACKFILL 2:1 (HORIZONTAL: VERTICAL) CANTILEVER WALL (YIELDING) 35 55 RESTRAINED WALL 55 65 Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 30 lateral earth pressure against a properly drained and backfilled cantilever retaining wall above the groundwater level can be expressed as: PAE = PA + ΔPAE For non-yielding (or “restrained”) walls, the total lateral earth pressure may be similarly calculated based on work by Wood (1973): PKE = PK + ΔPKE Where PA/b = Static Active Earth Pressure = GhH2/2 PK/b = Static Restrained Wall Earth Pressure = GhH2/2 ΔPAE/b = Dynamic Active Earth Pressure Increment = (3/8) kh γH2/2 ΔPKE/b = Dynamic Restrained Earth Pressure Increment = kh γH2/2 b = unit length of wall (usually 1 foot) kh = 2/3 PGAm (PGAm given previously Table 5.8) Gh = Equivalent Fluid Unit Weight (given previously Table 5.9) H = Total Height of the retained soil γ = Total Unit Weight of Soil ≈ 135 pounds per cubic foot The static and increment of dynamic earth pressure in both cases may be applied with a line of action located at H/3 above the bottom of the wall (SEAOC, 2013). Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 31 These values assume non-expansive backfill and free-draining conditions. Measures should be taken to prevent moisture buildup behind all retaining walls. Drainage measures should include free- draining backfill materials and sloped, perforated drains. These drains should discharge to an appropriate off-site location. Figure 5 shows a conceptual wall backdrain detail that may be suitable for walls at the subject site. Any waterproofing should be as specified by the project architect. 7.10 Exterior Flatwork Flatwork should be installed with crack-control joints at appropriate spacing as designed by the project architect to reduce the potential for cracking in exterior flatwork caused by minor movement of subgrade soils and concrete shrinkage. Additionally, it is recommended that flatwork be installed with at least number 4 reinforcing bars at 18-inch centers, each way, at or above mid-height of slab, but with proper concrete cover, or with other reinforcement per the applicable project designer. Flatwork that should be installed with crack control joints, includes driveways, sidewalks, and architectural features. All subgrades should be prepared according to the earthwork recommendations previously given before placing concrete. Positive drainage should be established and maintained next to all flatwork. Subgrade materials should be maintained at a minimum of two percent above optimum moisture content before concrete placement. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 32 7.11 Vehicular Pavement If new pavements are proposed, Table 7.11 presents preliminary pavement sections utilizing estimated Resistance “R” Value and traffic index. Beneath pavement areas, the upper 12 inches of subgrade and all base materials should be compacted to 95% relative compaction in accordance with ASTM D1557, and at a minimum of two percent above optimum moisture content. TABLE 7.11 RECOMMENDED PAVEMENT THICKNESS Traffic Area Assumed Traffic Index Preliminary Subgrade “R”-Value Asphalt Pavements Portland Cement Concrete Pavements, on Subgrade Soils (inches) AC Thickness (inches) Class II Aggregate Base Thickness (inches) Automobile Parking Areas 5.0 30+ 3.0 8.0 6.5 * Caltrans class 2 aggregate base ** Concrete should have a modulus of rupture of at least 600 psi Following rough site grading, CTE recommends laboratory testing of at-grade soils for as-graded “R”-Value. Asphalt paved areas should be designed, constructed, and maintained in accordance with the recommendations of the Asphalt Institute, or other widely recognized authority. Concrete paved areas should be designed and constructed in accordance with the recommendations of the American Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 33 Concrete Institute or other widely recognized authority, particularly with regard to thickened edges, joints, and drainage. The Standard Specifications for Public Works construction (“Greenbook”) or Caltrans Standard Specifications may be referenced for pavement materials specifications. 7.12 Drainage Surface runoff should be collected and directed away from improvements and slope areas by means of appropriate erosion-reducing devices and positive drainage should be established around the proposed improvements. Positive drainage should be directed away from improvements at a gradient of at least two percent for a distance of at least five feet. However, the project civil engineers should evaluate the on-site drainage and make necessary provisions to keep surface water from affecting the site. Generally, CTE recommends against allowing water to infiltrate building pads or adjacent to slopes. CTE understands that some agencies are encouraging the use of storm-water cleansing devices. Use of such devices tends to increase the possibility of adverse effects associated with high groundwater including slope instability and liquefaction. 7.13 Slopes The proposed improvement portion of the site is generally flat and no significant slopes were observed other than the bluff, located approximately 30 feet west of the existing structure. Based on anticipated soil strength characteristics, fill slopes if proposed, should be constructed at slope ratios of 2:1 (horizontal: vertical) or flatter. These fill slope inclinations should exhibit factors of safety Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 34 greater than 1.5. Although properly constructed slopes on this site should be grossly stable, the soils will be somewhat erodible. Therefore, runoff water should not be permitted to drain over the edges of slopes unless that water is confined to properly designed and constructed drainage facilities. Erosion-resistant vegetation should be maintained on the face of all slopes. Typically, soils along the top portion of a fill slope face will creep laterally. CTE recommends against building distress-sensitive hardscape improvements within five feet of slope crests, and against using thickened edges in this area. 7.14 Controlled Low Strength Materials (CLSM) Controlled Low Strength Materials (CLSM) may be used in lieu of compacted soils below foundations, within building pads, and/or adjacent to retaining walls or other structures, provided the appropriate following recommendations are also incorporated. Minimum overexcavation depths recommended herein beneath bottom of footings, slabs, flatwork, and other areas may be applicable beneath CLSM if/where CLSM is to be used, and excavation bottoms should be observed by CTE prior to placement of CLSM. Prior to CLSM placement, the excavation should be free of debris, loose soil materials, and water. Once specific areas to utilize CLSM have been determined, CTE should review the locations to determine if additional recommendations are appropriate. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 35 CLSM should consist of a minimum three-sack cement/sand slurry with a minimum 28-day compressive strength of 100 psi (or equal to or greater than the maximum allowable short term soil bearing pressure provided herein, whichever is higher) as determined by ASTM D4832. If re- excavation is anticipated, the compressive strength of CLSM should generally be limited to a maximum of 150 psi per ACI 229R-99. Where re-excavation is required, two-sack cement/sand slurry may be used to help limit the compressive strength. The allowable soils bearing pressure and coefficient of friction provided herein should still govern foundation design. CLSM may not be used in lieu of structural concrete where required by the structural engineer. 7.15 Plan Review CTE should be authorized to review the project grading and foundation plans prior to commencement of earthwork in order to provide additional recommendations, if necessary. 7.16 Construction Observation The recommendations provided in this report are based on preliminary design information for the proposed construction and the subsurface conditions observed in the soil borings. The interpolated subsurface conditions should be checked by CTE during construction with respect to anticipated conditions. Upon completion of precise grading, if necessary, soil samples will be collected to evaluate as-built Expansion Index. Foundation recommendations may be revised upon completion of grading, and as-built laboratory test results. Additionally, soil samples should be taken in pavement subgrade areas upon rough grading to refine pavement recommendations as necessary. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 36 Recommendations provided in this report are based on the understanding and assumption that CTE will provide the observation and testing services for the project. All earthwork should be observed and tested in accordance with recommendations contained within this report. CTE should evaluate footing excavations before reinforcing steel placement. 8.0 LIMITATIONS OF INVESTIGATION The field evaluation, laboratory testing and geotechnical analysis presented in this report have been conducted according to current engineering practice and the standard of care exercised by reputable geotechnical consultants performing similar tasks in this area. No other warranty, expressed or implied, is made regarding the conclusions, recommendations and opinions expressed in this report. Variations may exist and conditions not observed or described in this report may be encountered during construction. This report is prepared for the project as described. It is not prepared for any other property or party. The existing structure was built in the 1970s, and the scope of this report did not include investigation of the as-built foundation conditions or characteristics of said structure, including determination of footing dimensions. The recommendations provided herein have been developed in order to reduce the post-construction movement of site improvements. However, even with the design and construction recommendations presented herein, some post-construction movement and associated distress may occur. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 37 The findings of this report are valid as of the present date. However, changes in the conditions of a property can occur with the passage of time, whether they are due to natural processes or the works of man on this or adjacent properties. In addition, changes in applicable or appropriate standards may occur, whether they result from legislation or the broadening of knowledge. Accordingly, the findings of this report may be invalidated wholly or partially by changes outside CTE’s involvement. Therefore, this report is subject to review and should not be relied upon after a period of three years. CTE’s conclusions and recommendations are based on an analysis of the observed conditions. If conditions different from those described in this report are encountered, CTE should be notified and additional recommendations, if required, will be provided subject to CTE remaining as authorized geotechnical consultant of record. This report is for use of the project as described. It should not be utilized for any other project. Geotechnical Investigation Proposed Buccola Residence Addition 5031 Tierra Del Oro, Carlsbad, California September 12, 2018 CTE Job No. 10-14444G \\ESC_SERVER\Projects\10-14444G\Rpt_Geotechnical.doc Page 38 CTE appreciates this opportunity to be of service on this project. If you have any questions regarding this report, please do not hesitate to contact the undersigned. Respectfully submitted, CONSTRUCTION TESTING & ENGINEERING, INC. Dan T. Math, GE #2665 Jay F. Lynch, CEG #1890 Principal Engineer Principal Engineering Geologist Aaron J. Beeby, CEG #2603 Colm J. Kenny, RCE #84406 Project Geologist Project Engineer SITE P-1B-1P-2B-2B-3B-2B-1B-1AAA'QopQswQmbTsaB-3Approximate Boring Location (Current Investigation)LEGENDQuaternary Slope WashQswApproximate Geologic ContactB-2Approximate Boring Location (CTE 2004)P-2Approximate Percolation Test LocationQuaternary Old Paralic Deposits overQopTsaTertiary Santiago FormationApproximate Geologic Cross SectionAA'Quaternary Marine Beach DepositsQmb 20ELEVATION (FEET)100DISTANCE (FEET)CROSS SECTION A-A'0500-10-20101502003040-30200-10-20103040-30AA'Proj.~5' NTD=5.7'TD=20.0'TD=19.9'B-1Proj.~15' SB-3B-2QopTsaResidual SoilRip RapQmbExisting ProfileLEGENDQuaternary Marine Beach DepositsQmbApproximate Geologic ContactQuaternary Old Paralic DepositsQopTertiary Santiago FormationTsa APPROXIMATE SITE LOCATION Tsa Qmb NOTE: Base Map by Kennedy and Tan, 2007, Geologic Map of the Oceanside 30' x 60' Quadrangle, California. LEGEND Young Alluvial Flood Plain DepositsQya Qmb Marine Beach Deposits Old Alluvial Flood Plain DepositsQoa Very Old Paralic DepositsQvop Santiago FormationTsa Qop Old Paralic Deposits Metasedimentary and MetavolcanicMzuRocks APPROXIMATESITE LOCATIONLEGENDHISTORIC FAULT DISPLACEMENT (LAST 200 YEARS)HOLOCENE FAULT DISPLACEMENT (DURING PAST 11,700 YEARS)LATE QUATERNARY FAULT DISPLACMENT (DURING PAST 700,000 YEARS) QUATERNARY FAULT DISPLACEMENT (AGE UNDIFFERENTIATED)PREQUATERNARY FAULT DISPLACEMENT (OLDER THAN 1.6 MILLION YEARS)>7.06.5-6.95.5-5.95.0-5.4PERIOD1800- 1869- 1932-1868 1931 2010LAST TWO DIGITS OF M > 6.5EARTHQUAKE YEARMAGNITUDE 1 1 SELECT GRANULAR WALL BACKFILL COMPACTED TO 90% RELATIVE COMPACTION 3/4" GRAVEL SURROUNDED BY FILTER FABRIC (MIRAFI 140 N. OR EQUIVALENT) -OR- PREFABRICATED DRAINAGE BOARD FINISH GRADE SPECIFIED BY ARCHITECT RETAINING WALL WATERPROOFING TO BE 12" TO 18" OF LOWER PERMEABILITY MATERIAL COMPACTED TO 90% RELATIVE COMPACTION 1' MIN 4" DIA. PERFORATED PVC PIPE (SCHEDULE 40 OR EQUIVALENT). MINIMUM 1% GRADIENT TO SUITABLE OUTLET WALL FOOTING *CONCEPTUAL DRAWING APPENDIX A REFERENCES REFERENCES 1. American Society for Civil Engineers, 2005, “Minimum Design Loads for Buildings and Other Structures,” ASCE/SEI 7-05. 2. ASTM, 2002, “Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort,” Volume 04.08. 3. Benumof, Benjamin T., and Griggs, Gary B., 1999, The Dependence of Seacliff Erosion Rates on Cliff Material Properties and Physical Processes: San Diego County, California. 4. Benumof, Benjamin T., Storlazzi, Curt D., Seymour, Richard J., and Griggs, Gary B., 2000, The Relationship Between Incident Wave Energy and Seacliff Erosion Rates: San Diego County, California. 5. Blake, T.F., 2000, “EQFAULT,” Version 3.00b, Thomas F. Blake Computer Services and Software. 6. California Building Code, 2016, “California Code of Regulations, Title 24, Part 2, Volume 2 of 2,” California Building Standards Commission, published by ICBO, June. 7. California Division of Mines and Geology, CD 2000-003 “Digital Images of Official Maps of Alquist-Priolo Earthquake Fault Zones of California, Southern Region,” compiled by Martin and Ross. 8. California Emergency Management Agency/California Geological Survey, “Tsunami Inundation Maps for Emergency Planning." 9. Construction Testing and Engineering, 2004, Preliminary Geotechnical Investigation, Proposed Improvements to McGuire Residence, 5035 Tierra Del Oro Street, Carlsbad, California, Job No. 10-6766, dated March 2. 10. Geotechnical Exploration, Inc., 2013, Report of Geotechnical Investigation and Costal Bluff Edge Evaluation, Tierra Del Oro, Carlsbad, California, Job No. 13-10316, dated November 12. 11. Hart, Earl W., Revised 1994, Revised 2007, “Fault-Rupture Hazard Zones in California, Alquist Priolo, Special Studies Zones Act of 1972,” California Division of Mines and Geology, Special Publication 42. 12. Jennings, Charles W., 1994, “Fault Activity Map of California and Adjacent Areas” with Locations and Ages of Recent Volcanic Eruptions. 13. Kennedy, M.P. and Tan, S.S., 2007, “Geologic Map of the Oceanside 30’ x 60’ Quadrangle, California”, California Geological Survey, Map No. 2. 14. Moore, Laura J., Benumof, Benjamin T., and Griggs, Gary B., 1999, Costal Erosion Hazards in Santa Cruz and San Diego Counties, California. 15. Reichle, M., Bodin, P., and Brune, J., 1985, The June 1985 San Diego Bay Earthquake swarm [abs.]: EOS, v. 66, no. 46, p.952. 16. Seed, H.B., and R.V. Whitman, 1970, “Design of Earth Retaining Structures for Dynamic Loads,” in Proceedings, ASCE Specialty Conference on Lateral Stresses in the Ground and Design of Earth-Retaining Structures, pp. 103-147, Ithaca, New York: Cornell University. 17. Tan, S. S., and Giffen, D. G., 1995, “Landslide Hazards in the Northern Part of the San Diego Metropolitan Area, San Diego County, California: Oceanside and San Luis Rey Quadrangles, Landslide Hazard Identification Map No. 35”, California Department of Conservation, Division of Mines and Geology, Open-File Report 95-04, State of California, Division of Mines and Geology, Sacramento, California. 18. Wood, J.H. 1973, Earthquake-Induced Soil Pressures on Structures, Report EERL 73-05. Pasadena: California Institute of Technology. APPENDIX B EXPLORATION LOGS DEFINITION OF TERMS PRIMARY DIVISIONS SYMBOLS SECONDARY DIVISIONS WELL GRADED GRAVELS, GRAVEL-SAND MIXTURES LITTLE OR NO FINES POORLY GRADED GRAVELS OR GRAVEL SAND MIXTURES, LITTLE OF NO FINES SILTY GRAVELS, GRAVEL-SAND-SILT MIXTURES, NON-PLASTIC FINES CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES, PLASTIC FINES WELL GRADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES POORLY GRADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES SILTY SANDS, SAND-SILT MIXTURES, NON-PLASTIC FINES CLAYEY SANDS, SAND-CLAY MIXTURES, PLASTIC FINES INORGANIC SILTS, VERY FINE SANDS, ROCK FLOUR, SILTY OR CLAYEY FINE SANDS, SLIGHTLY PLASTIC CLAYEY SILTS INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY, SANDY, SILTS OR LEAN CLAYS ORGANIC SILTS AND ORGANIC CLAYS OF LOW PLASTICITY INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS FINE SANDY OR SILTY SOILS, ELASTIC SILTS INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, ORGANIC SILTY CLAYS PEAT AND OTHER HIGHLY ORGANIC SOILS GRAIN SIZES GRAVEL SAND COARSE FINE COARSE MEDIUM FINE 12" 3" 3/4" 4 10 40 200 CLEAR SQUARE SIEVE OPENING U.S. STANDARD SIEVE SIZE ADDITIONAL TESTS (OTHER THAN TEST PIT AND BORING LOG COLUMN HEADINGS) MAX- Maximum Dry Density PM- Permeability PP- Pocket Penetrometer GS- Grain Size Distribution SG- Specific Gravity WA- Wash Analysis SE- Sand Equivalent HA- Hydrometer Analysis DS- Direct Shear EI- Expansion Index AL- Atterberg Limits UC- Unconfined Compression CHM- Sulfate and Chloride RV- R-Value MD- Moisture/Density Content , pH, Resistivity CN- Consolidation M- Moisture COR - Corrosivity CP- Collapse Potential SC- Swell Compression SD- Sample Disturbed HC- Hydrocollapse OI- Organic Impurities REM- Remolded FIGURE: BL1 GW SILTS AND CLAYS LIQUID LIMIT ISLESS THAN 50 SILTS AND CLAYS LIQUID LIMIT IS GREATER THAN 50 SANDS MORE THAN HALF OF COARSE FRACTION IS SMALLER THAN NO. 4 SIEVE GRAVELS MORE THAN HALF OF COARSE FRACTION IS LARGER THAN NO. 4 SIEVE CLEAN GRAVELS < 5% FINES GRAVELS WITH FINES CLEAN SANDS < 5% FINES SANDSWITH FINESCOARSE GRAINED SOILSMORE THAN HALF OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZEGP GM GC SW SP SM SC ML CL OL MH CH OH PTFINE GRAINED SOILSMORE THAN HALF OF MATERIAL IS SMALLER THAN NO. 200 SIEVE SIZEHIGHLY ORGANIC SOILS SILTS AND CLAYSCOBBLESCOBBLESBOULDERS PROJECT:DRILLER:SHEET:of CTE JOB NO:DRILL METHOD:DRILLING DATE: LOGGED BY:SAMPLE METHOD:ELEVATION:Depth (Feet)Bulk SampleDriven TypeBlows/FootDry Density (pcf)Moisture (%)U.S.C.S. SymbolGraphic LogBORING LEGEND Laboratory Tests DESCRIPTION Block or Chunk Sample Bulk Sample Standard Penetration Test Modified Split-Barrel Drive Sampler (Cal Sampler) Thin Walled Army Corp. of Engineers Sample Groundwater Table Soil Type or Classification Change ??????? Formation Change [(Approximate boundaries queried (?)] "SM"Quotes are placed around classifications where the soilsexist in situ as bedrock FIGURE: BL2 PROJECT:SHEET: of CTE JOB NO: DRILL METHOD: DRILLING DATE: LOGGED BY: SAMPLE METHOD: ELEVATION:Depth (Feet)Bulk SampleDriven TypeBlows/6"Dry Density (pcf)Moisture (%)U.S.C.S. SymbolGraphic LogDESCRIPTION SM SM Total Depth: 5.7' (Refusal on gravel)Seepage Encountered at Approximatly 5' 1 10-14444G HAND AUGER 8/7/2018 BUCCOLA RESIDENCE DRILLER: AJB 1 AJB BULK ~14 FEET BORING: B-1 Laboratory Tests QUATERNARY SLOPE WASH:Loose, moist to very moist, reddish brown, silty fine to mediumgrained SAND. QUATERNARY OLD PARALIC DEPOSITS:Medium dense, moist, reddish brown, silty fine to medium grainedSAND, oxidized, massive. Fine gravelSeepageTERTIARY SANTIAGO FORMATION:Dense to very dense, slightly moist, light gray, silty fine grainedSANDSTONE with trace gravel. B-1 0 5 10 15 20 25 PROJECT:SHEET: of CTE JOB NO: DRILL METHOD: DRILLING DATE: LOGGED BY: SAMPLE METHOD: ELEVATION:Depth (Feet)Bulk SampleDriven TypeBlows/6"Dry Density (pcf)Moisture (%)U.S.C.S. SymbolGraphic LogDESCRIPTION SM SM Total Depth: 5.1' (Refusal in dense formational material)No Groundwater Encountered B-1A Dense to very dense, slightly moist, light gray, silty fine grainedSANDSTONE with trace gravel. TERTIARY SANTIAGO FORMATION: Medium dense, moist, reddish brown, silty fine to medium grainedSAND, oxidized, massive. grained SAND. QUATERNARY OLD PARALIC DEPOSITS: QUATERNARY SLOPE WASH:Loose, moist, reddish brown, silty fine to medium AJB BULK ~14 FEET BORING: B-1A Laboratory Tests BUCCOLA RESIDENCE DRILLER:AJB 1 1 10-14444G HAND AUGER 8/7/2018 0 5 10 15 20 25 PROJECT:SHEET: of CTE JOB NO: DRILL METHOD: DRILLING DATE: LOGGED BY: SAMPLE METHOD: ELEVATION:Depth (Feet)Bulk SampleDriven TypeBlows/6"Dry Density (pcf)Moisture (%)U.S.C.S. SymbolGraphic LogDESCRIPTION SC/SM SM 6 7 12 14 SM/SP 4 12 20 16 51 Total Depth: 20'No Groundwater Encountered B-2 Dense to very dense, slightly moist, light gray, silty fine grainedSANDSTONE with trace gravel. MD, DS TERTIARY SANTIAGO FORMATION: Becomes light gray with abundant medium grained sand. GS MD, DS Medium dense, moist, light reddish brown, silty fine to mediumgrained SAND, oxidized, massive, friable.MD grained SAND, oxidized, massive. QUATERNARY OLD PARALIC DEPOSITS:Medium dense, moist, reddish brown, clayey to silty fine to medium AJB RING, SPT and BULK ~30 FEET BORING: B-2 Laboratory Tests BUCCOLA RESIDENCE DRILLER:MANSOFF DRILLING 1 1 10-14444G SOLID-STEM AUGER 8/7/2018 0 5 10 15 20 25 PROJECT:SHEET: of CTE JOB NO: DRILL METHOD: DRILLING DATE: LOGGED BY: SAMPLE METHOD: ELEVATION:Depth (Feet)Bulk SampleDriven TypeBlows/6"Dry Density (pcf)Moisture (%)U.S.C.S. SymbolGraphic LogDESCRIPTION SC/SM SC 7 7 8 SM 10 15 SM/SP 10 12 16 15 30 30/4" Total Depth: 19.9'No Groundwater Encountered B-3 GS, CHEM Becomes light gray with abundant medium grained sand. MD medium grained SAND, oxidized, massive, friable.Medium dense, slightly moist, light reddish brown, silty fine to grained SAND, oxidized, massive. QUATERNARY OLD PARALIC DEPOSITS:Medium dense, slighly moist, reddish brown, clayey fine to medium fine to medium graiend SAND. EI RESIDUAL SOIL:Loose to medium dense, slightly moist, dark brown, silty to clayey AJB RING, SPT and BULK ~37 FEET BORING: B-3 Laboratory Tests BUCCOLA RESIDENCE DRILLER:MANSOFF DRILLING 1 1 10-14444G SOLID-STEM AUGER 8/7/2018 0 5 10 15 20 25 APPENDIX C LABORATORY METHODS AND RESULTS LABORATORY METHODS AND RESULTS Laboratory Testing Program Laboratory tests were performed on representative soil samples to detect their relative engineering properties. Tests were performed following test methods of the American Society for Testing Materials or other accepted standards. The following presents a brief description of the various test methods used. Classification Soils were classified visually according to the Unified Soil Classification System. Visual classifications were supplemented by laboratory testing of selected samples according to ASTM D2487. The soil classifications are shown on the Exploration Logs in Appendix B. In-Place Moisture and Density To determine the moisture and density of in-place site soils, a representative sample was tested for the moisture and density at time of sampling. Modified Proctor Laboratory maximum dry density and optimum moisture content were evaluated according to ASTM D 1557, Method A. A mechanically operated rammer was used during the compaction process. Particle-Size Analysis Particle-size analyses were performed on selected representative samples according to ASTM D 422. Consolidation To assess their compressibility and volume change behavior when loaded and wetted, relatively undisturbed samples of representative samples from the investigation were subject to consolidation tests in accordance with ASTM D 2435. Chemical Analysis Soil materials were collected with sterile sampling equipment and tested for Sulfate and Chloride content, pH, Corrosivity, and Resistivity. LOCATION EXPANSION INDEX EXPANSION POTENTIAL B-3 3VERY LOW LOCATION % MOISTURE DRY DENSITY B-2 4.0 98.0 B-2 5.0 91.4 B-2 18.5 108.6 B-3 5.4 106.0 LOCATION RESULTS ppm B-2 501 LOCATION RESULTS ppm B-2 440.9 LOCATION RESULTS B-2 7.26 LOCATION RESULTS ohms-cm B-2 28870-15 RESISTIVITY CALIFORNIA TEST 643 DEPTH (feet) CALIFORNIA TEST 643 DEPTH (feet) 0-15 p.H. CHLORIDE CALIFORNIA TEST 422 DEPTH (feet) 0-15 SULFATE CALIFORNIA TEST 417 DEPTH (feet) 0-15 DEPTH (feet) 5 10 19 10.5 EXPANSION INDEX TEST ASTM D 4829 DEPTH (feet) 0-5 IN-PLACE MOISTURE AND DENSITY LABORATORY SUMMARY CTE JOB NO. 10-14444G PARTICLE SIZE ANALYSISSample Designation Sample Depth (feet) Symbol Liquid Limit (%) Plasticity Index ClassificationB-215-- SM/SPB-315-- SM/SPCTE JOB NUMBER: 10-14444GFIGURE: C-101020304050607080901000.0010.010.1110100PERCENT PASSING (%)PARTICLE SIZE (mm)U. S. STANDARD SIEVE SIZE2"1"3/4"1/2"3/8"481016203040501002001.5" SHEAR STRENGTH TEST - ASTM D3080 Job Name: Project Number:10-14444G Lab Number:28723 Sample Location:Tested by: Sample Description: RCV 8/15/2018 Angle Of Friction:38.0 Cohesion: Buccola Residence Addition 100 psf Initial Dry Density (pcf):91.4 Initial Moisture (%):5.0 Final Moisture (%):28.3 B-2 @ 10' Sample Date: Test Date: 8/7/2018 light brown SW 0.038 0.038 0.039 0.039 0.040 0.040 0.1 1 10 100STRAIN (inches) TIME (minutes) PRECONSOLIDATION 0 1000 2000 3000 4000 5000 0 2 4 6 8 10 12 14 16 18 20SHEAR STRESS (psf) STRAIN (%) SHEARING DATA 0 1000 2000 3000 4000 5000 0 1000 2000 3000 4000 5000SHEARING STRESS (psf) VERTICAL STRESS (psf) FAILURE ENVELOPE dr=0.1200 mm./min VERTICAL STRESS 1000 psf 3000 psf 5000 psf SHEAR STRENGTH TEST - ASTM D3080 Job Name: Project Number: 10-14444G Lab Number: 28723 Sample Location: Tested by: Sample Description: RCV 8/14/2018 Angle Of Friction: 43.3 Cohesion: Buccola Residence Addition 130 psf Initial Dry Density (pcf): 18.5 Initial Moisture (%): 108.6 Final Moisture (%): 19.5 B-2 @ 19' Sample Date: Test Date: 8/7/2018 Light brown SW-SM 0.034 0.034 0.035 0.035 0.036 0.036 0.037 0.1 1 10 100STRAIN (inches)TIME (minutes) PRECONSOLIDATION 0 1000 2000 3000 4000 5000 02468101214161820SHEAR STRESS (psf)STRAIN (%) SHEARING DATA 0 1000 2000 3000 4000 5000 0 1000 2000 3000 4000 5000SHEARING STRESS (psf)VERTICAL STRESS (psf) FAILURE ENVELOPE dr=0.1200 mm./min VERTICAL STRESS 1000 psf 3000 psf 5000 psf APPENDIX D STANDARD SPECIFICATIONS FOR GRADING Appendix D Standard Specifications for Grading STANDARD SPECIFICATIONS OF GRADING Page 1 of 26 Page D-1 Section 1 - General Construction Testing & Engineering, Inc. presents the following standard recommendations for grading and other associated operations on construction projects. These guidelines should be considered a portion of the project specifications. Recommendations contained in the body of the previously presented soils report shall supersede the recommendations and or requirements as specified herein. The project geotechnical consultant shall interpret disputes arising out of interpretation of the recommendations contained in the soils report or specifications contained herein. Section 2 - Responsibilities of Project Personnel The geotechnical consultant should provide observation and testing services sufficient to general conformance with project specifications and standard grading practices. The geotechnical consultant should report any deviations to the client or his authorized representative. The Client should be chiefly responsible for all aspects of the project. He or his authorized representative has the responsibility of reviewing the findings and recommendations of the geotechnical consultant. He shall authorize or cause to have authorized the Contractor and/or other consultants to perform work and/or provide services. During grading the Client or his authorized representative should remain on-site or should remain reasonably accessible to all concerned parties in order to make decisions necessary to maintain the flow of the project. The Contractor is responsible for the safety of the project and satisfactory completion of all grading and other associated operations on construction projects, including, but not limited to, earth work in accordance with the project plans, specifications and controlling agency requirements. Section 3 - Preconstruction Meeting A preconstruction site meeting should be arranged by the owner and/or client and should include the grading contractor, design engineer, geotechnical consultant, owner’s representative and representatives of the appropriate governing authorities. Section 4 - Site Preparation The client or contractor should obtain the required approvals from the controlling authorities for the project prior, during and/or after demolition, site preparation and removals, etc. The appropriate approvals should be obtained prior to proceeding with grading operations. Appendix D Standard Specifications for Grading STANDARD SPECIFICATIONS OF GRADING Page 2 of 26 Page D-2 Clearing and grubbing should consist of the removal of vegetation such as brush, grass, woods, stumps, trees, root of trees and otherwise deleterious natural materials from the areas to be graded. Clearing and grubbing should extend to the outside of all proposed excavation and fill areas. Demolition should include removal of buildings, structures, foundations, reservoirs, utilities (including underground pipelines, septic tanks, leach fields, seepage pits, cisterns, mining shafts, tunnels, etc.) and other man-made surface and subsurface improvements from the areas to be graded. Demolition of utilities should include proper capping and/or rerouting pipelines at the project perimeter and cutoff and capping of wells in accordance with the requirements of the governing authorities and the recommendations of the geotechnical consultant at the time of demolition. Trees, plants or man-made improvements not planned to be removed or demolished should be protected by the contractor from damage or injury. Debris generated during clearing, grubbing and/or demolition operations should be wasted from areas to be graded and disposed off-site. Clearing, grubbing and demolition operations should be performed under the observation of the geotechnical consultant. Section 5 - Site Protection Protection of the site during the period of grading should be the responsibility of the contractor. Unless other provisions are made in writing and agreed upon among the concerned parties, completion of a portion of the project should not be considered to preclude that portion or adjacent areas from the requirements for site protection until such time as the entire project is complete as identified by the geotechnical consultant, the client and the regulating agencies. Precautions should be taken during the performance of site clearing, excavations and grading to protect the work site from flooding, ponding or inundation by poor or improper surface drainage. Temporary provisions should be made during the rainy season to adequately direct surface drainage away from and off the work site. Where low areas cannot be avoided, pumps should be kept on hand to continually remove water during periods of rainfall. Rain related damage should be considered to include, but may not be limited to, erosion, silting, saturation, swelling, structural distress and other adverse conditions as determined by the geotechnical consultant. Soil adversely affected should be classified as unsuitable materials and should be subject to overexcavation and replacement with compacted fill or other remedial grading as recommended by the geotechnical consultant. Appendix D Standard Specifications for Grading STANDARD SPECIFICATIONS OF GRADING Page 3 of 26 Page D-3 The contractor should be responsible for the stability of all temporary excavations. Recommendations by the geotechnical consultant pertaining to temporary excavations (e.g., backcuts) are made in consideration of stability of the completed project and, therefore, should not be considered to preclude the responsibilities of the contractor. Recommendations by the geotechnical consultant should not be considered to preclude requirements that are more restrictive by the regulating agencies. The contractor should provide during periods of extensive rainfall plastic sheeting to prevent unprotected slopes from becoming saturated and unstable. When deemed appropriate by the geotechnical consultant or governing agencies the contractor shall install checkdams, desilting basins, sand bags or other drainage control measures. In relatively level areas and/or slope areas, where saturated soil and/or erosion gullies exist to depths of greater than 1.0 foot; they should be overexcavated and replaced as compacted fill in accordance with the applicable specifications. Where affected materials exist to depths of 1.0 foot or less below proposed finished grade, remedial grading by moisture conditioning in-place, followed by thorough recompaction in accordance with the applicable grading guidelines herein may be attempted. If the desired results are not achieved, all affected materials should be overexcavated and replaced as compacted fill in accordance with the slope repair recommendations herein. If field conditions dictate, the geotechnical consultant may recommend other slope repair procedures. Section 6 - Excavations 6.1 Unsuitable Materials Materials that are unsuitable should be excavated under observation and recommendations of the geotechnical consultant. Unsuitable materials include, but may not be limited to, dry, loose, soft, wet, organic compressible natural soils and fractured, weathered, soft bedrock and nonengineered or otherwise deleterious fill materials. Material identified by the geotechnical consultant as unsatisfactory due to its moisture conditions should be overexcavated; moisture conditioned as needed, to a uniform at or above optimum moisture condition before placement as compacted fill. If during the course of grading adverse geotechnical conditions are exposed which were not anticipated in the preliminary soil report as determined by the geotechnical consultant additional exploration, analysis, and treatment of these problems may be recommended. Appendix D Standard Specifications for Grading STANDARD SPECIFICATIONS OF GRADING Page 4 of 26 Page D-4 6.2 Cut Slopes Unless otherwise recommended by the geotechnical consultant and approved by the regulating agencies, permanent cut slopes should not be steeper than 2:1 (horizontal: vertical). The geotechnical consultant should observe cut slope excavation and if these excavations expose loose cohesionless, significantly fractured or otherwise unsuitable material, the materials should be overexcavated and replaced with a compacted stabilization fill. If encountered specific cross section details should be obtained from the Geotechnical Consultant. When extensive cut slopes are excavated or these cut slopes are made in the direction of the prevailing drainage, a non-erodible diversion swale (brow ditch) should be provided at the top of the slope. 6.3 Pad Areas All lot pad areas, including side yard terrace containing both cut and fill materials, transitions, located less than 3 feet deep should be overexcavated to a depth of 3 feet and replaced with a uniform compacted fill blanket of 3 feet. Actual depth of overexcavation may vary and should be delineated by the geotechnical consultant during grading, especially where deep or drastic transitions are present. For pad areas created above cut or natural slopes, positive drainage should be established away from the top-of-slope. This may be accomplished utilizing a berm drainage swale and/or an appropriate pad gradient. A gradient in soil areas away from the top-of-slopes of 2 percent or greater is recommended. Section 7 - Compacted Fill All fill materials should have fill quality, placement, conditioning and compaction as specified below or as approved by the geotechnical consultant. 7.1 Fill Material Quality Excavated on-site or import materials which are acceptable to the geotechnical consultant may be utilized as compacted fill, provided trash, vegetation and other deleterious materials are removed prior to placement. All import materials anticipated for use on-site should be sampled tested and approved prior to and placement is in conformance with the requirements outlined. Appendix D Standard Specifications for Grading STANDARD SPECIFICATIONS OF GRADING Page 5 of 26 Page D-5 Rocks 12 inches in maximum and smaller may be utilized within compacted fill provided sufficient fill material is placed and thoroughly compacted over and around all rock to effectively fill rock voids. The amount of rock should not exceed 40 percent by dry weight passing the 3/4-inch sieve. The geotechnical consultant may vary those requirements as field conditions dictate. Where rocks greater than 12 inches but less than four feet of maximum dimension are generated during grading, or otherwise desired to be placed within an engineered fill, special handling in accordance with the recommendations below. Rocks greater than four feet should be broken down or disposed off-site. 7.2 Placement of Fill Prior to placement of fill material, the geotechnical consultant should observe and approve the area to receive fill. After observation and approval, the exposed ground surface should be scarified to a depth of 6 to 8 inches. The scarified material should be conditioned (i.e. moisture added or air dried by continued discing) to achieve a moisture content at or slightly above optimum moisture conditions and compacted to a minimum of 90 percent of the maximum density or as otherwise recommended in the soils report or by appropriate government agencies. Compacted fill should then be placed in thin horizontal lifts not exceeding eight inches in loose thickness prior to compaction. Each lift should be moisture conditioned as needed, thoroughly blended to achieve a consistent moisture content at or slightly above optimum and thoroughly compacted by mechanical methods to a minimum of 90 percent of laboratory maximum dry density. Each lift should be treated in a like manner until the desired finished grades are achieved. The contractor should have suitable and sufficient mechanical compaction equipment and watering apparatus on the job site to handle the amount of fill being placed in consideration of moisture retention properties of the materials and weather conditions. When placing fill in horizontal lifts adjacent to areas sloping steeper than 5:1 (horizontal: vertical), horizontal keys and vertical benches should be excavated into the adjacent slope area. Keying and benching should be sufficient to provide at least six-foot wide benches and a minimum of four feet of vertical bench height within the firm natural ground, firm bedrock or engineered compacted fill. No compacted fill should be placed in an area after keying and benching until the geotechnical consultant has reviewed the area. Material generated by the benching operation should be moved sufficiently away from Appendix D Standard Specifications for Grading STANDARD SPECIFICATIONS OF GRADING Page 6 of 26 Page D-6 the bench area to allow for the recommended review of the horizontal bench prior to placement of fill. Within a single fill area where grading procedures dictate two or more separate fills, temporary slopes (false slopes) may be created. When placing fill adjacent to a false slope, benching should be conducted in the same manner as above described. At least a 3-foot vertical bench should be established within the firm core of adjacent approved compacted fill prior to placement of additional fill. Benching should proceed in at least 3-foot vertical increments until the desired finished grades are achieved. Prior to placement of additional compacted fill following an overnight or other grading delay, the exposed surface or previously compacted fill should be processed by scarification, moisture conditioning as needed to at or slightly above optimum moisture content, thoroughly blended and recompacted to a minimum of 90 percent of laboratory maximum dry density. Where unsuitable materials exist to depths of greater than one foot, the unsuitable materials should be over-excavated. Following a period of flooding, rainfall or overwatering by other means, no additional fill should be placed until damage assessments have been made and remedial grading performed as described herein. Rocks 12 inch in maximum dimension and smaller may be utilized in the compacted fill provided the fill is placed and thoroughly compacted over and around all rock. No oversize material should be used within 3 feet of finished pad grade and within 1 foot of other compacted fill areas. Rocks 12 inches up to four feet maximum dimension should be placed below the upper 10 feet of any fill and should not be closer than 15 feet to any slope face. These recommendations could vary as locations of improvements dictate. Where practical, oversized material should not be placed below areas where structures or deep utilities are proposed. Oversized material should be placed in windrows on a clean, overexcavated or unyielding compacted fill or firm natural ground surface. Select native or imported granular soil (S.E. 30 or higher) should be placed and thoroughly flooded over and around all windrowed rock, such that voids are filled. Windrows of oversized material should be staggered so those successive strata of oversized material are not in the same vertical plane. It may be possible to dispose of individual larger rock as field conditions dictate and as recommended by the geotechnical consultant at the time of placement. Appendix D Standard Specifications for Grading STANDARD SPECIFICATIONS OF GRADING Page 7 of 26 Page D-7 The contractor should assist the geotechnical consultant and/or his representative by digging test pits for removal determinations and/or for testing compacted fill. The contractor should provide this work at no additional cost to the owner or contractor's client. Fill should be tested by the geotechnical consultant for compliance with the recommended relative compaction and moisture conditions. Field density testing should conform to ASTM Method of Test D 1556-00, D 2922-04. Tests should be conducted at a minimum of approximately two vertical feet or approximately 1,000 to 2,000 cubic yards of fill placed. Actual test intervals may vary as field conditions dictate. Fill found not to be in conformance with the grading recommendations should be removed or otherwise handled as recommended by the geotechnical consultant. 7.3 Fill Slopes Unless otherwise recommended by the geotechnical consultant and approved by the regulating agencies, permanent fill slopes should not be steeper than 2:1 (horizontal: vertical). Except as specifically recommended in these grading guidelines compacted fill slopes should be over-built two to five feet and cut back to grade, exposing the firm, compacted fill inner core. The actual amount of overbuilding may vary as field conditions dictate. If the desired results are not achieved, the existing slopes should be overexcavated and reconstructed under the guidelines of the geotechnical consultant. The degree of overbuilding shall be increased until the desired compacted slope surface condition is achieved. Care should be taken by the contractor to provide thorough mechanical compaction to the outer edge of the overbuilt slope surface. At the discretion of the geotechnical consultant, slope face compaction may be attempted by conventional construction procedures including backrolling. The procedure must create a firmly compacted material throughout the entire depth of the slope face to the surface of the previously compacted firm fill intercore. During grading operations, care should be taken to extend compactive effort to the outer edge of the slope. Each lift should extend horizontally to the desired finished slope surface or more as needed to ultimately established desired grades. Grade during construction should not be allowed to roll off at the edge of the slope. It may be helpful to elevate slightly the outer edge of the slope. Slough resulting from the placement of individual lifts should not be allowed to drift down over previous lifts. At intervals not Appendix D Standard Specifications for Grading STANDARD SPECIFICATIONS OF GRADING Page 8 of 26 Page D-8 exceeding four feet in vertical slope height or the capability of available equipment, whichever is less, fill slopes should be thoroughly dozer trackrolled. For pad areas above fill slopes, positive drainage should be established away from the top-of-slope. This may be accomplished using a berm and pad gradient of at least two percent. Section 8 - Trench Backfill Utility and/or other excavation of trench backfill should, unless otherwise recommended, be compacted by mechanical means. Unless otherwise recommended, the degree of compaction should be a minimum of 90 percent of the laboratory maximum density. Within slab areas, but outside the influence of foundations, trenches up to one foot wide and two feet deep may be backfilled with sand and consolidated by jetting, flooding or by mechanical means. If on-site materials are utilized, they should be wheel-rolled, tamped or otherwise compacted to a firm condition. For minor interior trenches, density testing may be deleted or spot testing may be elected if deemed necessary, based on review of backfill operations during construction. If utility contractors indicate that it is undesirable to use compaction equipment in close proximity to a buried conduit, the contractor may elect the utilization of light weight mechanical compaction equipment and/or shading of the conduit with clean, granular material, which should be thoroughly jetted in-place above the conduit, prior to initiating mechanical compaction procedures. Other methods of utility trench compaction may also be appropriate, upon review of the geotechnical consultant at the time of construction. In cases where clean granular materials are proposed for use in lieu of native materials or where flooding or jetting is proposed, the procedures should be considered subject to review by the geotechnical consultant. Clean granular backfill and/or bedding are not recommended in slope areas. Section 9 - Drainage Where deemed appropriate by the geotechnical consultant, canyon subdrain systems should be installed in accordance with CTE’s recommendations during grading. Typical subdrains for compacted fill buttresses, slope stabilization or sidehill masses, should be installed in accordance with the specifications. Appendix D Standard Specifications for Grading STANDARD SPECIFICATIONS OF GRADING Page 9 of 26 Page D-9 Roof, pad and slope drainage should be directed away from slopes and areas of structures to suitable disposal areas via non-erodible devices (i.e., gutters, downspouts, and concrete swales). For drainage in extensively landscaped areas near structures, (i.e., within four feet) a minimum of 5 percent gradient away from the structure should be maintained. Pad drainage of at least 2 percent should be maintained over the remainder of the site. Drainage patterns established at the time of fine grading should be maintained throughout the life of the project. Property owners should be made aware that altering drainage patterns could be detrimental to slope stability and foundation performance. Section 10 - Slope Maintenance 10.1 - Landscape Plants To enhance surficial slope stability, slope planting should be accomplished at the completion of grading. Slope planting should consist of deep-rooting vegetation requiring little watering. Plants native to the southern California area and plants relative to native plants are generally desirable. Plants native to other semi-arid and arid areas may also be appropriate. A Landscape Architect should be the best party to consult regarding actual types of plants and planting configuration. 10.2 - Irrigation Irrigation pipes should be anchored to slope faces, not placed in trenches excavated into slope faces. Slope irrigation should be minimized. If automatic timing devices are utilized on irrigation systems, provisions should be made for interrupting normal irrigation during periods of rainfall. 10.3 - Repair As a precautionary measure, plastic sheeting should be readily available, or kept on hand, to protect all slope areas from saturation by periods of heavy or prolonged rainfall. This measure is strongly recommended, beginning with the period prior to landscape planting. If slope failures occur, the geotechnical consultant should be contacted for a field review of site conditions and development of recommendations for evaluation and repair. If slope failures occur as a result of exposure to period of heavy rainfall, the failure areas and currently unaffected areas should be covered with plastic sheeting to protect against additional saturation. Appendix D Standard Specifications for Grading STANDARD SPECIFICATIONS OF GRADING Page 10 of 26 Page D-10 In the accompanying Standard Details, appropriate repair procedures are illustrated for superficial slope failures (i.e., occurring typically within the outer one foot to three feet of a slope face). APPENDIX E SLOPE/W OUTPUT 20ELEVATION (FEET)100DISTANCE (FEET)CROSS SECTION A-A'0500-10-20101502003040-30200-10-20103040-30AA'Proj.~5' NTD=5.7'TD=20.0'TD=19.9'B-1Proj.~15' SB-3B-2QopTsaResidual SoilRip RapQmbExisting Profile123456123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354552.11112345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455Description: QmbModel: MohrCoulombWt: 120Cohesion: 0Phi: 37Piezometric Line: 1Description: Rip RapModel: MohrCoulombWt: 140Cohesion: 100Phi: 45Piezometric Line: 1Description: Residual SoilModel: MohrCoulombWt: 120Cohesion: 400Phi: 35Piezometric Line: 1Description: QswModel: MohrCoulombWt: 120Cohesion: 250Phi: 37Piezometric Line: 1Description: QopModel: MohrCoulombWt: 120Cohesion: 100Phi: 38Piezometric Line: 1Description: TsaModel: MohrCoulombWt: 120Cohesion: 500Phi: 38Piezometric Line: 1Name: Entry Exit.gszMethod: SpencerDirection of movement: RightToLeftSlip Surface Option: EntryAndExitHorz Seismic Load: 0Vert Seismic Load: 0Factor of Safety: 2.111 APPENDIX F PERCOLATION TO INFILTRATION CALCULATIONS AND FIELD DATA CHANGE YELLOW ONLYAsk RJ QuestionsJob Name:Buccola ResidenceJob No.:10‐14444GTest Hole Name:P‐1Time Test Interval TimeTest RefillWater Level Initial/StartWater Level End/FinalIncremental Water Level ChangePercolation RatePercolation Rate(minutes) Feet InchesInches Depth /Inches Feet InchesDepth /Inches (inches) inches/minute inches/hourStart Time:12:20 12:20 PM Initial 3 10 7 / 8 46.875 46.875 3 10 7 / 8 initial‐Reading Increment (min): 0:10 12:30 PM10 3 10 7 / 8 46.875 46.875 4 1 1 / 4 49.250 2.3750 0.238 14.250Total Depth:63 12:40 PM10 3 10 0 / 16 46.000 46.875 4 1 5 / 8 49.625 2.7500 0.275 16.500Test Hole Radius (in):3 12:50 PM10 3 9 1 / 2 45.500 46.000 4 1 1 / 4 49.250 3.2500 0.325 19.500Test Hole Diameter (in):6 1:00 PM10 3 9 1 / 2 45.500 45.500 4 0 1 / 4 48.250 2.7500 0.275 16.5001:10 PM10 3 9 1 / 2 45.500 45.500 4 0 0 / 16 48.000 2.5000 0.250 15.0001:20 PM10 0 0 0 / 16 NO 45.500 4 0 0 / 16 48.000 2.5000 0.250 15.000P‐2Time Test Interval TimeTest RefillWater Level Initial/StartWater Level End/FinalIncremental Water Level ChangePercolation RatePercolation Rate(minutes) Feet InchesInches Depth /Inches Feet InchesDepth /Inches (inches) inches/minute inches/hourStart Time:12:22 12:22 PM Initial 2 5 0 / 16 29.000 29.000 2 5 0 / 16 initial‐Reading Increment (min): 0:10 12:32 PM10 2 5 0 / 16 29.000 29.000 2 8 5 / 8 32.625 3.625 0.363 21.750Total Depth:37 12:42 PM10 2 5 0 / 16 29.000 29.000 2 8 3 / 8 32.375 3.375 0.338 20.250Test Hole Radius (in):3 12:52 PM10 2 5 0 / 16 29.000 29.000 2 8 1 / 2 32.500 3.500 0.350 21.000Test Hole Diameter (in):6 1:02 PM10 2 4 3 / 4 28.750 29.000 2 9 1 / 4 33.250 4.250 0.425 25.5001:12 PM10 2 4 5 / 8 28.625 28.750 2 8 0 / 16 32.000 3.250 0.325 19.5001:22 PM10 0 0 0 / 16 NO 28.625 2 8 0 / 16 32.000 3.375 0.338 20.250FractionFractionFractionTest Refill InputFractionWater Level Final DepthWater Level Final DepthTest Refill Input APPENDIX G I-8 WORKSHEET I-8 I-8 X The NRCS soil mapped at the soil consists of a Type B soil with medium surface runoff. The site soils are consistent with the NRCS mapped soil types based on site explorations and percolation testing. Three soil types were present in the area of the proposed improvements, Residual Soil, Quaternary Old Paralic Deposits and Tertiary Santiago Formation. Two percolation tests were completed within the Old Paralic Deposits. The calculated infiltration rates (with an applied factor of safety of 2) ranged from approximately 0.63 to 1.85 inches per hour. X Any water infiltrating on the western portion of the site would likely migrate to and discharge from the existing slope face and could result in piping, oversteepening and destabilizing the slope. I-8 I-8 X According to Geotracker, the nearest known "Open" LUST cleanup site is over 2,000 feet away from the site. X The nearest down gradient surface waters are the Pacific Ocean which is located at the base of the existing site slope. Due to the close proximity of the Pacific Ocean infiltrating water could potentially have a impact. No Full I-8 X Based on the working draft version of Appendix C, it is CTE's understanding that the lower limit of partial infiltration is 0.05 inches/hour. Which is less than the rate that was determined by testing therefore partial infiltration is possible. X Any water infiltrating on the western portion of the site would likely migrate to and discharge from the existing slope face and could result in piping, oversteepening and destabilizing the slope. I-8 X According to Geotracker, the nearest known "Open" LUST cleanup site is over 2,000 feet away from the site. X The nearest down gradient surface waters are the Pacific Ocean which is located at the base of the existing site slope. Due to the close proximity of the Pacific Ocean infiltrating water could potentially have a impact. No Inf. APPENDIX H HISTORIC TOPOGRAPHIC MAPS EDR Historical Topo Map Report Inquiry Number: 6 Armstrong Road, 4th floor Shelton, CT 06484 Toll Free: 800.352.0050 www.edrnet.com with QuadMatch™ Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 August 24, 2018 5404232.1 EDR Historical Topo Map Report EDR Inquiry # Search Results: P.O.# Project: Maps Provided: Disclaimer - Copyright and Trademark Notice EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, Inc. or its affiliates. All other trademarks used herein are the property of their respective owners. page- Coordinates: Latitude: Longitude: UTM Zone: UTM X Meters: UTM Y Meters: Elevation: Contact: Site Name: Client Name: 2012 1997 1975 1968 1949 1948 1947 1901 1898 1893 08/24/18 Buccola Residence Addition Construction Testing & Eng. 5031 Tierra Del Oro 1441 Montiel Rd Carlsbad, CA 92008 Escondido, CA 92026 5404232.1 Brandon Alderson EDR Topographic Map Library has been searched by EDR and maps covering the target property location as provided by Construction Testing & Eng. were identified for the years listed below. EDR’s Historical Topo Map Report is designed to assist professionals in evaluating potential liability on a target property resulting from past activities. EDRs Historical Topo Map Report includes a search of a collection of public and private color historical topographic maps, dating back to the late 1800s. 10-14444G 33.132212 33° 7' 56" North Buccola Residence Addition -117.336702 -117° 20' 12" West Zone 11 North 468593.62 3665994.57 23.80' above sea level This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, Inc. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. NO WARRANTY EXPRESSED OR IMPLIED, IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT. ENVIRONMENTAL DATA RESOURCES, INC. SPECIFICALLY DISCLAIMS THE MAKING OF ANY SUCH WARRANTIES, INCLUDING WITHOUT LIMITATION, MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE OR PURPOSE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, INC. BE LIABLE TO ANYONE, WHETHER ARISING OUT OF ERRORS OR OMISSIONS, NEGLIGENCE, ACCIDENT OR ANY OTHER CAUSE, FOR ANY LOSS OF DAMAGE, INCLUDING, WITHOUT LIMITATION, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR EXEMPLARY DAMAGES. ANY LIABILITY ON THE PART OF ENVIRONMENTAL DATA RESOURCES, INC. IS STRICTLY LIMITED TO A REFUND OF THE AMOUNT PAID FOR THIS REPORT. Purchaser accepts this Report "AS IS". Any analyses, estimates, ratings, environmental risk levels or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only a Phase I Environmental Site Assessment performed by an environmental professional can provide information regarding the environmental risk for any property. Additionally, the information provided in this Report is not to be construed as legal advice. Copyright 2018 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc., or its affiliates, is prohibited without prior written permission. 5404232 1 2 page Topo Sheet Key This EDR Topo Map Report is based upon the following USGS topographic map sheets. - 2012 Source Sheets 2012 San Luis Rey 7.5-minute, 24000 2012 Encinitas 7.5-minute, 24000 1997 Source Sheets 1997 Encinitas 7.5-minute, 24000 Aerial Photo Revised 1997 1997 San Luis Rey 7.5-minute, 24000 Aerial Photo Revised 1997 1975 Source Sheets 1975 Encinitas 7.5-minute, 24000 Aerial Photo Revised 1975 1975 San Luis Rey 7.5-minute, 24000 Aerial Photo Revised 1975 1968 Source Sheets 1968 Encinitas 7.5-minute, 24000 Aerial Photo Revised 1967 1968 San Luis Rey 7.5-minute, 24000 Aerial Photo Revised 1967 5404232 1 3 page Topo Sheet Key This EDR Topo Map Report is based upon the following USGS topographic map sheets. - 1949 Source Sheets 1949 San Luis Rey 7.5-minute, 24000 Aerial Photo Revised 1946 1949 Encinitas 7.5-minute, 24000 Aerial Photo Revised 1947 1948 Source Sheets 1948 San Luis Rey 7.5-minute, 24000 Aerial Photo Revised 1946 1948 Encinitas 7.5-minute, 24000 Aerial Photo Revised 1947 1947 Source Sheets 1947 OCEANSIDE 15-minute, 50000 1901 Source Sheets 1901 Oceanside 15-minute, 62500 5404232 1 4 page Topo Sheet Key This EDR Topo Map Report is based upon the following USGS topographic map sheets. - 1898 Source Sheets 1898 Oceanside 15-minute, 62500 1893 Source Sheets 1893 Oceanside 15-minute, 62500 5404232 1 5 Historical Topo Map page SITE NAME: ADDRESS: CLIENT: This report includes information from the following map sheet(s). - EW SW S SE NW N NE 2012 0 Miles 0.25 0.5 1 1.5 Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Construction Testing & Eng. TP, San Luis Rey, 2012, 7.5-minute S, Encinitas, 2012, 7.5-minute 5404232 1 6 Historical Topo Map page SITE NAME: ADDRESS: CLIENT: This report includes information from the following map sheet(s). - EW SW S SE NW N NE 1997 0 Miles 0.25 0.5 1 1.5 Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Construction Testing & Eng. TP, San Luis Rey, 1997, 7.5-minute S, Encinitas, 1997, 7.5-minute 5404232 1 7 Historical Topo Map page SITE NAME: ADDRESS: CLIENT: This report includes information from the following map sheet(s). - EW SW S SE NW N NE 1975 0 Miles 0.25 0.5 1 1.5 Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Construction Testing & Eng. TP, San Luis Rey, 1975, 7.5-minute S, Encinitas, 1975, 7.5-minute 5404232 1 8 Historical Topo Map page SITE NAME: ADDRESS: CLIENT: This report includes information from the following map sheet(s). - EW SW S SE NW N NE 1968 0 Miles 0.25 0.5 1 1.5 Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Construction Testing & Eng. TP, San Luis Rey, 1968, 7.5-minute S, Encinitas, 1968, 7.5-minute 5404232 1 9 Historical Topo Map page SITE NAME: ADDRESS: CLIENT: This report includes information from the following map sheet(s). - EW SW S SE NW N NE 1949 0 Miles 0.25 0.5 1 1.5 Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Construction Testing & Eng. TP, San Luis Rey, 1949, 7.5-minute S, Encinitas, 1949, 7.5-minute 5404232 1 10 Historical Topo Map page SITE NAME: ADDRESS: CLIENT: This report includes information from the following map sheet(s). - EW SW S SE NW N NE 1948 0 Miles 0.25 0.5 1 1.5 Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Construction Testing & Eng. TP, San Luis Rey, 1948, 7.5-minute S, Encinitas, 1948, 7.5-minute 5404232 1 11 Historical Topo Map page SITE NAME: ADDRESS: CLIENT: This report includes information from the following map sheet(s). - EW SW S SE NW N NE 1947 0 Miles 0.25 0.5 1 1.5 Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Construction Testing & Eng. TP, OCEANSIDE, 1947, 15-minute 5404232 1 12 Historical Topo Map page SITE NAME: ADDRESS: CLIENT: This report includes information from the following map sheet(s). - EW SW S SE NW N NE 1901 0 Miles 0.25 0.5 1 1.5 Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Construction Testing & Eng. TP, Oceanside, 1901, 15-minute 5404232 1 13 Historical Topo Map page SITE NAME: ADDRESS: CLIENT: This report includes information from the following map sheet(s). - EW SW S SE NW N NE 1898 0 Miles 0.25 0.5 1 1.5 Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Construction Testing & Eng. TP, Oceanside, 1898, 15-minute 5404232 1 14 Historical Topo Map page SITE NAME: ADDRESS: CLIENT: This report includes information from the following map sheet(s). - EW SW S SE NW N NE 1893 0 Miles 0.25 0.5 1 1.5 Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Construction Testing & Eng. TP, Oceanside, 1893, 15-minute 5404232 1 15 APPENDIX I HISTORIC OBLIQUE AERIAL PHOTOGRAPHS FROM CALIFORNIA COASTAL PROJECT APPENDIX J HISTORIC AERIAL PHOTOGRAPHS The EDR Aerial Photo Decade Package Buccola Residence Addition 5031 Tierra Del Oro Carlsbad, CA 92008 Inquiry Number: August 24, 2018 5404232.2 6 Armstrong Road, 4th floor Shelton, CT 06484 Toll Free: 800.352.0050 www.edrnet.com 2016 1"=500'Flight Year: 2016 USDA/NAIP 2012 1"=500'Flight Year: 2012 USDA/NAIP 2009 1"=500'Flight Year: 2009 USDA/NAIP 2005 1"=500'Flight Year: 2005 USDA/NAIP 1994 1"=500'Acquisition Date: June 01, 1994 USGS/DOQQ 1990 1"=500'Flight Date: September 06, 1990 USDA 1985 1"=500'Flight Date: September 13, 1985 USDA 1979 1"=500'Flight Date: January 27, 1979 EDR Proprietary Landiscor 1970 1"=500'Flight Date: March 06, 1970 EDR Proprietary Landiscor 1967 1"=500'Flight Date: May 07, 1967 USGS 1964 1"=500'Flight Date: April 09, 1964 USDA 1953 1"=500'Flight Date: April 14, 1953 USDA 1946 1"=500'Flight Date: December 30, 1946 USGS 1939 1"=500'Flight Date: April 16, 1939 USDA 1928 1"=500'Flight Date: November 01, 1928 USGS EDR Aerial Photo Decade Package 08/24/18 Buccola Residence Addition Site Name:Client Name: Construction Testing & Eng. 5031 Tierra Del Oro 1441 Montiel Rd Carlsbad, CA 92008 Escondido, CA 92026 EDR Inquiry #5404232.2 Contact:Brandon Alderson Environmental Data Resources, Inc. (EDR) Aerial Photo Decade Package is a screening tool designed to assist environmental professionals in evaluating potential liability on a target property resulting from past activities. EDR’s professional researchers provide digitally reproduced historical aerial photographs, and when available, provide one photo per decade. Search Results: Year Scale Details Source When delivered electronically by EDR, the aerial photo images included with this report are for ONE TIME USE ONLY. Further reproduction of these aerial photo images is prohibited without permission from EDR. For more information contact your EDR Account Executive. Disclaimer - Copyright and Trademark Notice This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, Inc. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. NO WARRANTY EXPRESSED OR IMPLIED, IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT. ENVIRONMENTAL DATA RESOURCES, INC. SPECIFICALLY DISCLAIMS THE MAKING OF ANY SUCH WARRANTIES, INCLUDING WITHOUT LIMITATION, MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE OR PURPOSE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, INC. BE LIABLE TO ANYONE, WHETHER ARISING OUT OF ERRORS OR OMISSIONS, NEGLIGENCE, ACCIDENT OR ANY OTHER CAUSE, FOR ANY LOSS OF DAMAGE, INCLUDING, WITHOUT LIMITATION, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR EXEMPLARY DAMAGES. ANY LIABILITY ON THE PART OF ENVIRONMENTAL DATA RESOURCES, INC. IS STRICTLY LIMITED TO A REFUND OF THE AMOUNT PAID FOR THIS REPORT. Purchaser accepts this Report "AS IS". Any analyses, estimates, ratings, environmental risk levels or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only a Phase I Environmental Site Assessment performed by an environmental professional can provide information regarding the environmental risk for any property. Additionally, the information provided in this Report is not to be construed as legal advice. Copyright 2018 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc., or its affiliates, is prohibited without prior written permission. EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, Inc. or its affiliates. All other trademarks used herein are the property of their respective owners. 5404232 2-page 2 5404232.2 2016 = 500' 5404232.2 2012 = 500' 5404232.2 2009 = 500' 5404232.2 2005 = 500' 5404232.2 1994 = 500' 5404232.2 1990 = 500' 5404232.2 1985 = 500' 5404232.2 1979 = 500' 5404232.2 1928 = 500' 5404232.2 1964 = 500' 5404232.2 1953 = 500' 5404232.2 1946 = 500' 5404232.2 1939 = 500' 5404232.2 1970 = 500' 5404232.2 1967 = 500'