DRAINAGE STUDY
CT 14-04/PUD 14-06/CDP 14-20
MILES BUENA VISTA
1833 BUENA VISTA WAY
CITY OF CARLSBAD
Prepared for:
Robert Miles
Miles Pacific Limited Partnership
1833 Buena Vista Way
Carlsbad, CA 92008
Prepared by:
bf.tA, Inc
land planning, civil engineering, surveying
5115 Avenida Encinas, Suite L
,. : ..... ---.;; Carl~bad, CA 92008-4387
./' · , -c· 2::·.:·"~ · (760) 931-8700 / ·',--;:,~~:·!z.->, .' f :.5) L. no,/ '. · ..
I. i ,-. '~ .,..·, ... ~~
(f r· No,29271d~~\~'
,\-\nl~ ~--\,'-J~ , .. .:-.? • August 14, 2014
', · ·---~ ~-, Revised March 3, 2015 . . ,,. ' \'f0:0 .
' \ • ' < 1,... ; _.~-:P .
W.O. 901-1289-400 MM
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
I. DISCUSSION Vicinity Map ........................................................ 3
Purpose and Scope ................................................ 4
Project Description ............................................... 4
Study Method ...................................................... 5
Conclusions ........................................................ 9
Declaration of Responsible Charge ........................... 10
II. EXHIBITS Existing Hydrology Map & Proposed
Hydrology Map .............................. 11
III. CALCULATIONS A. Existing Condition Hydrology Calculations ............. 12
1. 100 Year Storm ....................................... 13
B. Proposed Hydrology Calculations ......................... 17
1. 100 Year Storm ....................................... 18
C. Hydraulic Calculations ....................................... 38
Detention Basin Outlet Detail. ............................. 38
Detention Basin Outlet Capacity Calculations ..... 39
Storage Basin Routing Model Calculations ......... 69
IV. REFERENCES ······································································· 105
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
bHA, Inc.
land planning, civil engineering, surveying
Drainage Study ') L_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I. DISCUSSION
VICINITY MAP:
\ \ \ \
-'Z-<' . •S• ' <;,:. 0 \ ;-.'' ~ \ .
, r, ,
----
> B!jt_N1----~~!_ST!:_ ::0L - -_/
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
\
NO SCA/ C
bhA, Inc.
land planning, civil engineering, surveying
-, _;
___ ___J
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PURPOSE AND SCOPE:
The purpose of this report is to publish the results of hydrology and hydraulic computer analysis
for the development of Miles Buena Vista at 1833 Buena Vista Way, City of Carlsbad. The
proposed project is a 3.13-acre site. The scope is to study the existing and proposed hydrology
and hydraulics as it influences the surrounding properties during a 100-year frequency storm
event, and make recommendations to intercept, contain and convey QlOO to the historic point
of discharge.
PROJECT DESCRIPTION:
The Miles Buena Vista project is located in the County of San Diego (APN 156-220-02). The
site is bounded by existing residential development and McCauley Lane to the southeast, by
steeply sloping open space and Monroe Street to the northeast, by Buena Vista Way to the
northwest, and by existing residential development and agricultural land to the southwest. The
3.13 acre property is currently an operating nursery. Existing onsite structures include one story
single-family residence and single story structures and shade canopies associated with the
nursery. Topographically, the site is generally flat-lying to very gently sloping in both
northwesterly and northeasterly directions. The overall gradient of the site is on the order of
12:1 or flatter. The site is surrounded by single family residential homes to the north, south, and
west. Near the northeasterly margin of the site, and approximately 41-foot high slope descends
toward Monroe Street. The on-site soil classification is Type-B from USDA Web Soil Survey
(see References). Existing land-use is 4.00 DU/Ac, proposed land-use is 3.51 DU/Ac.
The project proposes the development of 10 residential lots and grading of pads and driveways,
a 24' private access drive and the improvement of the Buena Vista public drive. The disturbed
area is 2.80 acres. The existing single family residence will be removed as part of the Miles Buena
Vista Project. Storm flows affecting the site are limited to the rainfall that lands directly on this
property. There is no flow on from upstream properties. Two (2) Points of Compliance (POC)
have been identified along the western boundary of the project site, as shown on the Existing
Hydrology Map. The existing drainage area is divided to two basins. Basin A sheet flows from
the top of the ridge north-easterly to the intersection of Buena Vista Way and Crest Drive, shown
as POC-1. Basin B sheet flows westerly off the ridge toward the westerly boundary of the subject
property and onto Buena Vista Way where it is carried downstream, shown as POC-2. The
project as proposed will endeavor to maintain the existing cross lot drainage condition for both
overall rate, and flow condition.
Detention basins proposed for the two main Drainage Basins A and B are proposed so that
increases in the drainage discharge rate and velocity will be mitigated up the 100-year runoff.
The proposed bioretention basins (Basins 1, 2 and 5) located in the west side of the property will
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
b~A, Inc.
land planning, civil engineering, suNeying
4 L __
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
outlet to a proposed storm drain under Buena Vista Way. Basins 3, 4, 6, 7 and 8 in the north
and east side of the property will outlet to a proposed storm drain under the proposed private
access drive. These storm drains will connect to an existing 48" storm drain under the
intersection of Buena Vista Way and Crest Drive which travels east and then north under
Monroe Street and discharges to the Buena Vista Lagoon. The existing storm drain system will
serve as the outlet for POC-1. Bioretention basins in the south side of the property (Basins 9
and 10) will outlet via proposed storm drain to McCauley Drive. The runoff will then travel
downstream and eventually to the same downstream location as POC-2. The proposed
bioretention basins will serve to detain the very minor calculated increase in runoff created by
the proposed development, and to mitigate any concentration of storm water discharge that
might cause erosion.
STUDY METHOD:
The method of analysis was based on the Rational Method according to the San Diego County
Hydrology Manual (SD HM). The Hydrology and Hydraulic Analysis were done on HydroSoft
by Advanced Engineering Software 2007.
Drainage basin areas were determined from the proposed grades shown on the Grading Plans
for Buena Vista TM and 200-scale existing topographic maps from the County of San Diego.
The Rational Method provided the following variable coefficients:
Rainfall Intensity = I = 7.44x(P6)x(Tc) "' -0.645
P6 for 100 year storm= 2.6"
Pdor 10 year storm= 1.7"
P 6 for 2 year storm = 1.2"
Soil group "B" will be used for a composite runoff coefficient for the existing and proposed
hydrology analyses. See the Appendix for the Web Soil Survey report and map. Due to soil quality
and proximity to the steep hillside slope, the bioretention basin design will include a perforated
pipe and impermeable liner. Runoff Coefficient values are taken from Table 3-1 of the SD HM,
and a Weighted Runoff Coefficient has been calculated for each drainage area containing multiple
surface types. For impervious surfaces C=0.87, and for pervious/ landscaping surfaces C=0.25.
See Hydraulic Calculations Section.
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bl-IA, Inc.
land planning, civil engineering, surveying
5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE 1.0-Weighted Runoff Coefficient "C" Value Calculations for Existing and Proposed
Condition Hydrology
Existing Hydrology-Buena Vista
Up Node Down Node Total Acreage C1 Al (acres) C2 A2 (acres) Ccomp
1 3 1.98 0.25 1.82 0.87 0.16 0.30
4 6 1.15 0.25 0.65 0.87 0.50 0.52
Proposed Hydrology-Buena Vista
Up Node Down Node Total Acreage C1 Al (acres) C2 A2 (acres) Ccomp
1 3 0.22 0.25 0.14 0.87 0.08 0.48
5 7 0.22 0.25 0.14 0.87 0.08 0.48
9 11 0.22 0.25 0.14 0.87 0.08 0.48
11.1 11 0.13 0.25 0.01 0.87 0.12 0.82
13 15 0.27 0.25 0.15 0.87 0.12 0.52
17 19 0.27 0.25 0.15 0.87 0.12 0.52
21 23 0.24 0.25 0.16 0.87 0.08 0.46
25 27 0.24 0.25 0.16 0.87 0.08 0.46
29 31 0.22 0.25 0.14 0.87 0.08 0.48
33 35 0.22 0.25 0.14 0.87 0.08 0.48
36 28 0.36 0.25 0.28 0.87 0.08 0.39
Note: C-values taken from Table 3-1 of San Diego County Hydrology Manual, consistent with on-site existing
soil types. See References.
Detention Basin Sizing:
The bioretention/detention basins act also as water quality treatment basins. The project is
Exempt from hydromodificaiton (refer to HMP exemption criteria in the project's Storm Water
Management Plan, SWMP).
The bioretention basins will use a "water quality only" sizing factor for area of 4% from Table 4-
6 of the County SUSMP. The minimum areas for the bioretention basins were found by summing
up the contributions of each tributary DMA and multiplying by the sizing factor (see DMA
Drainage and Surface Type Calculations). The LID IMP bioretention basins are responsible for
handling water quality requirements for each DMA. The bioretention basins have been designed
with a uniform surface depth of 1.4 feet. The IMP is comprised of an 18-inch layer of amended
soil ( a highly sandy, organic rich compost with an infiltration capacity of at least 5 inches/hr) and
a 12-inch layer of gravel for additional detention to accommodate the French drain system. Below
the gravel layer the basin is lined to prevent infiltration into the underlying soil. Flows will
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bliA, Inc.
land planning, civil engineering, surveying
6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
discharge from the basin via perforated underdrain pipe within the gravel layer to the receiving
storm drain system. A riser structure will be constructed within the IMP with and an emergency
overflow set 10-inches above the bottom of the basin, such that peak flows can be safely discharged
to the receiving storm drain system ( see dimensions in Bioretention Basin Detail on page 38).
For POC-1, the hydrology calculations in the developed condition shows that the runoff from
the pads and driveways in Lots 1-8, which have been treated in bioretention basins sized for
water quality treatment, can be discharged directly to the storm drains crossing Buena Vista Way
and the proposed private access drive, and discharging north to the existing storm drain system
at Node 50. The individual bioretention basins have been sized to treat the drainage generated
by that upstream tributary area. The required treatment area is based on the County of San
Diego SUSMP and the HMP dated March 2011. The storm water is allowed to pond to the
required 10" depth, then it can begin to discharge through the Brooks Catch Basin overflow.
Refer to the Calculations Section -Detention Basin Sizing and Basin Outlet Detail. This
separation of bioretention basin treated runoff on each lot provides an efficient means of
controlling exactly which tributary areas are treated on private property and discharged to the
existing storm drain system.
POC-1 drainage summary:
QlOO Existing condition
QlOO Developed Undetained condition (Node 50)
QlOO Developed Detained condition (Node 50)
= l.38cfs; Tc= 26.74 min
= 4. 76cfs; Tc= 10. 72 min
= 2.94cfs; Tc= 10.72 min
The 1.56 cfs increase in flowrate from Node 50 (Existing, 1.38 cfs from Node 3 to Proposed
Detained, 2.94 cfs) can be sufficiently conveyed by the existing storm drain system at that
location. This storm drain is a stabilized conveyance system that directly discharges to an
exempt system floodplain for the Buena Vista Lagoon. The floodplain has evolved over time
to convey a very large flowrate during a 100-year storm event, therefore the proposed 1.56 cfs
increase in flow can be considered minimal and will not adversely affect downstream habitat.
For POC-2, the hydrology calculations in the developed condition shows that the runoff from
the pads and driveways in Lots 9 and 10, which have been treated in bioretention basins sized
for water quality treatment, can be discharged directly via storm pipe to McCauley Lane at
Node 32 and 36. The individual bioretention basins have been sized to treat the drainage
generated by that upstream tributary area. The required treatment area is based on the
County of San Diego SUSMP and the HMP dated March 2011. The storm water is allowed to
pond to the required 10" depth, then it can begin to discharge through the Brooks Catch Basin
overflow. Refer to the Calculations Section -Detention Basin Sizing and Basin Outlet Detail.
This separation of bioretention basin treated runoff on each lot provides an efficient means of
controlling exactly which tributary areas are treated on private property and discharged to the
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
b~A, Inc.
land planning, civil engineering, surveying
7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
existing storm drain system.
POC-2 drainage summary:
QlOO Existing condition
QlOO Developed Undetained condition (Node 32)
QlOO Developed Undetained condition (Node 36)
QlOO Developed Detained condition (Node 32)
QlOO Developed Detained condition (Node 36)
= 2.23cfs; Tc= 12.85 min
= 0.37cfs; Tc= 14.62 min
= 0.37cfs; Tc= 14.37 min
= 0.12cfs; Tc= 14.62 min
= 0.26cfs; Tc= 14.37 min
Table 1.1 below summarizes the pre and post-condition drainage area and cumulative 100-year
peak flow rates.
TABLE 1.1-Summary of Existing and Proposed Storm Drain Flows
100Year:
Proposed Detained
POC Existing Condition Proposed Undetained Condition Condition
Node Acres Q (cfs) Tc Node Acres Q (cfs) Tc Acres Q(cfs) Tc
(min) (min) (min)
POC-1 3 1.98 1.38 26.74 50.00 2.30 4.76 10.72 2.30 2.94 10.72
32.00 0.22 0.37 14.26 0.22 0.12 14.26 POC-2 6 1.15 2.23 12.85 36.00 0.22 0.37 14.37 0.22 0.26 14.37
Total 3.13 3.61 26.74 2.74 5.50 14.37 2.74 3.32 14.37
While the actual developed drainage area and discharge points for Basin A and Basin B, or
POC-1 and POC-2, differ from the original undeveloped existing condition, any negative
impacts created by these area diversions are mitigated by the proposed detention-bioretention
basins. Overall detained runoff discharge rates are actually less than that of the undeveloped
existing condition.
Since cumulative OlOOex (3.6lcfs) is equal to or greater than cumulative OlOOdev (3.32cfs)
then this system achieves the goal of attenuating the storm flows from the proposed
development to predevelopment levels.
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
b~A, Inc.
land planning, civil engineering, surveying
8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CONCLUSION:
The development of Miles Buena Vista Way will decrease the cumulative runoff during the
100 year storm event. The bioretention basins as proposed have been sized with a sizing factor
of 0.04 for water quality treatment control requirements, see SWMP Report for this project.
The Hydraulic calculations show that the existing Storm Drain facilities can sufficiently convey
the anticipated QlOO flowrate without any adverse effects. Based on this conclusion, runoff
released from the proposed project site will be unlikely to cause any adverse impact to
downstream water bodies or existing habitat integrity. Sediment will likely be reduced upon
site development.
This project is particularly effective at mitigating the potential impacts that development can
have on stormwater runoff. By utilizing the proposed LID systems, this project mitigates both
the quantity of runoff generated during storm, and the quality of runoff that will ultimately
leave the property. It is our professional opinion that the recommendations provided in this
report, and the drainage system as proposed effectively intercept, contain, convey, detain and
treat the expected storm water runoff generated by this property to mimic pre-development
conditions.
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
b~A, Inc.
land planning, civil engineering, surveying
l __
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DECLARATION OF RESPONSIBLE CHARGE
I hereby declare that I am the Engineer of Work for this project, that I have exercised
responsible charge over the design of the project as defined in section 6703 of the business and
professions code, and that the design is consistent with current standards.
I understand that the check of project drawings and specifications by the City of Carlsbad is
confined to a review only and does not relieve me, as Engineer of Work, of my responsibilities
for project design.
Ronald ~oll~.C.E. 29271
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
Date
bhA, Inc.
land planning, civil engineering, surveying
10
1.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II. EXHIBITS
EXISTING HYDROLOGY MAP
&
PROPOSED HYDROLOGY MAP
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study I I
------1 --------:--· . ----""-"\ -··\--··a:-1 \ l--. i L ___ \ ___ _
i ·.1
' i _:_.,_r'"..J
I
I-
)) I -,., ___ ,,
~I
,I
I --,---,
I
. I ,!
·I
,·_-.. , ..
~'------
\
i \ ' ' I : : '\
: I
' I • I 'j i -I
: 1 l ______ _
• --·1,
'
i [ .•
"'
X
>< '""'-,...._
EXISTING HYDROLOGY MAP
MILES BUENA VISTA, CITY OF CARLSBAD
WEIGHTED RUNOFF COEFFICIENT CALCULATIONS:
---·-·-·-·-·-"····-·----~------·---.. ------------------·--·------------·---·---------· · · · · · ... ·--··r_ ... _ ---_--·-.. ----------~ ~----.. --------·------~~~-:--::._ ______ ::::-::":~~3-'3 ,1 7 ,:;---~-__ ·-···-, ...... _ _ · -· .. --·-·---------"------·---------~-----~-=-~=~~------------·· .. :.-.:~=.::--~--~--~:~~:_~ ---------Existing Hydrology· Buena Vista
--.,·--·--·----------------·----+------·----··---------·--------------------=:----/ · ·-----.... :-:::=·:~:::::-------.. ·-----.. ·--·-·-.. ------.. ------··-···---·-.,--·-··------·-·-·-····--· ..... ---:=~------------·-·-···-------------------__________________ ::_-:_-:::-~:··--Up Node Down Node Total Acreage C1 Al{acres) C2 A2{acres) Ccomp
___ ::-=--::i-__~==~ . · -,11 -=:.:_ =-c-_c~~~ · -:;~~ ,-==J"CCf J~[{1;ii~ '. := _c~:. __ ~;~. "c ~ -... =~ • ~ ~ -'_:~-·_ ;-==c,~•=-::_;:=~:---~~ ~=.:-_ ~,-:.;:;--___ -.: ___ ,:-:::"c·-::'.:~i _ ---------------~---~==-=--__ -_-__ -.-"'-'"'=--~ ;:; Not:, c-values t~ken from T;~;; 3-1 of Ja;: Dieg~:;~untJ::droll}~Manual~:!~
_____ ,, -----------....... , · -,-;··--···----"·--·.-. 1 .c-:, .c~-~-::·:=.:.-------· ····-_:----:=-:-.-=-~--=~~:-__:~~=-:~-:-~=-~-:..::.~~~~-:~~::=----·· --~-. -==::=·-=----------~-~-~-L·:·------·:.·.::... ·:~·:_: consistent with on-site existing soi I types. See References.
·, '
:,_-
' ' -----"'-.,
------
'
-------------------
-------~-~ .. -----------------------------·--·----------------------------·-----·-····-··-------~ ------------------
~
. "-.. ----' -
/ /
.. -,-----·· ·" "• C.) C\ ----~--------------' C=0.30
·--.. ---------·------··---·-----···--------\ J .,:
---·--..
/
/ / /
·---·---
---------------------·
---···-----.......
---
------· -
.--· _,._,
. . ,,./'"
_;-/',,,
20 10 0 20 40 60
~~~iiiiiiiiiiiiii~IIIIIIIIIIIIIII
SCALE: 1 " = 20'
• LEGEND:
SURFACE NODE
SURFACE FLOW. 100 YEAR
BASIN AREA
BASIN LIMIT
SUB-BASIN LIMIT ----FLOWPATH -···-····
:;.,_;;:;·_;,t::-·-·---··-··-·--·--r EXISTING HYDROLOGY MAP
I
MILES BUENA VISTA
CITY OF CARLSBAD
b~A,lnc.
land planning, civil englneel'inig, surveying
5115 AVENIDA ENCINAS
SUITE "L"
CARLSBAD, CA. 92008-4387
(760) 931-8700
K:\Land Projects 3\901-1289-400\dwg\EXHIBITS\2-2015\1289-EX HYDRO rev3.dwg, 3/4/201S 1:46:47 PM
. ,-,, ..
;r
;.)
: p d " \ I'
---,1-f-c-. !
1;
1/
/!
' -
I
·<.} ---
I
I
I
I ------/
<§)
C=0.48 2
194.1 F.P
'~--I ---
L ---------
·· r-~
I
I
I
(
)
i''
193:5(.~,
@D
C=0.48
-........
(@)
C=0.48
(9.:§_0
C=0.48
-.
I
I
I
I
I
/
.i·;
---\
I
I
/(), I
. ·--. ·1---,--~ /
I
I
' '--.::...-._ ___ _
~
C=0.39
194.0 F:P
___ ... ____ . . I ~ --, .
-i
j I
RISER WALL ---f-''
3/B"x/6" STAINLESS °. -
ANCHOR BOLTS WITH ..
WING TYPE NUTS (TYP.)
' 6" PVC PIPE : RESTRICTOR PLATE -.+-I
0.5" ORIFICE ~ :
BOTTOM OF BA:flN' i::"· -4 -·~111', 'm', 'm', 'm', ,,
I 1-1 n:::rrf:_ -1 I 1-11 1-ffi= =111=1 I l=I I l=I I 1=111=111
•
'
-· s
)k ' ,, ·-·-----···. -······--·-···-
6" PERFORATED
PVC PIPE
1/4" GALVANIZED STEEL
PLATE
-. 3/B"x/6" STAINLESS
• _ ANCHOR BOLTS WI TH
'• WING TYPE NUTS (TYP.)
• 6" PVC PERFORATED PIPE
0.5" ORIFICE-~~
4 -
' . ..:
, NOTE-ORIFICE PLATE
AND FLANGE CONNECJ10N
TO CONCRETE SHALL BE
• · FITTED WITH 30
DUROMETER NEOPRENE
RING.
RESTRICTOR PLATE DETAIL
NOT TO SCALE
K:\Land Projects 3\901-1289-400\dwg\EXHIBITS\2-2015\1289-PROP HYDRO rev3.dwg, 3/6/2015 9:57:15 AM
RESTRICTOR PLATE, SEE
DETAIL
--b_--------
*ENGINEERED SOIL MIX SHALL PROVIDE A MINIMUM SUSTAINED
INFILTRATION RA TE OF 5"/HR. MIX SHALL BE SANDY LOAM TOP
SOIL CONSISTING OF 50% SAND, 30% PLANJ1NG SOIL, 20%
SHREDDED HARDWOOD MULCH.
BIORETENTION BASIN OUTLET DETAIL
FROM HYDROLOGY REPORT
NOT TO SCALE
~
C=0.52 ,1
---~· .------··
~
'
C=0.39
~----~
·2
\\
--. '
----
--~-
/
9
200.1 F.P
@:?)
C=0.48
-!~ --·---
/
/
(@)
C=0.46
~
. ! ' \ I~
\). C=0.48
·-1 \. ,----.•. _
I .
B/ORETENDON
BASIN
PAD
2: 1
MAX
PROP. 6" _..,..
PCC CURB
.. ---------
/
/
--··-,_,
-... ~-->;-..
10
198:1/F.P
-
60'
If
@D
C=0.48
Ir
2' 1----~12~·---1---__:_1~2·_~-l----"19~·---1
2% 2% --
CPEN SPACE LOT
PROP. 6"
AC BERM
PROPOSED 4" AC PVMT
OVER 4" AB (MINIMUM)
TYPICAL SECTION
PRIVATE DRIVE
NOT TO SCALE
I
I
I
I
WEIGHTED RUNOFF COEFFICIENT CALCULATIONS:
.. _,;:' . ' '
.DETAINED;
t --\JPOC-2 " ' ' .. --
i j.
--------------. ----. -·----
J ·----------'-)•
SCALE: 1 " = 20'
LEGEND:
SURFACE NODE
SURFACE FLOW, 100 YEAR
BASIN AREA
BASIN LIMIT
SUB-BASIN LIMIT
FLOWPATH
PROPERTY LINE
-----
-···-····
PROJECT BOUNDARY --
PROPOSED HYDROLOGY MAP
MILES BUENA VISTA
CITY OF CARLSBAD
b~A,lnc.
land planning, civil englneeling, suiveytng
5115 A VEN I DA ENCINAS
SUITE "L"
CARLSBAD, CA. 92008-4387
(760) 931-8700
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
III. CALCULATIONS
A. EXISTING CONDITION HYDROLOGY
bHA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1. 100 YEAR STORM
****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
2003,1985,1981 HYDROLOGY MANUAL
(c) Copyright 1982-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-7780
************************** DESCRIPTION OF STUDY**************************
* 100 YEAR EXISTING HYDROLOGY ANALYSIS *
* 1833 BUENA VISTA WAY *
* SEE HYDROLOGY MAP FOR NODE LOCATIONS, AND BASIN INFORMATION *
**************************************************************************
FILE NAME: 1289E100.DAT
TIME/DATE OF STUDY: 15:06 06/26/2014
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
2003 SAN DIEGO MANUAL CRITERIA
USER SPECIFIED STORM EVENT(YEAR} = 100.00
6-HOUR DURATION PRECIPITATION (INCHES} = 2.600
SPECIFIED MINIMUM PIPE SIZE(INCH} = 3.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL} TO USE FOR FRICTION SLOPE= 0.95
SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD
NOTE: USE MODIFIED RATIONAL METHOD PROCEDURES FOR CONFLUENCE ANALYSIS
*USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL*
HALF-CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING
WIDTH CROSSFALL IN-/ OUT-/PARK-HEIGHT WIDTH LIP HIKE FACTOR
NO. (FT) (FT} SIDE / SIDE/ WAY (FT) (FT) (FT} (FT) (n)
1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0312 0.167 0.0150
GLOBAL STREET FLOW-DEPTH CONSTRAINTS:
1. Relative Flow-Depth= 0.00 FEET
as (Maximum Allowable Street Flow Depth} -(Top-of-Curb}
2. (Depth}*(Velocity) Constraint= 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
****************************************************************************
FLOW PROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .3000
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bl-tA, Inc.
land planning, civil engineering, surveying
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) =
UPSTREAM ELEVATION(FEET) = 196.00
DOWNSTREAM ELEVATION(FEET) = 194.00
ELEVATION DIFFERENCE(FEET) = 2.00
SUBAREA OVERLAND TIME OF FLOW(MIN.) =
100 YEAR RAINFALL INTENSITY(INCH/HOUR)
SUBAREA RUNOFF(CFS) 0.23
56.00
7.050
5.489
TOTAL AREA(ACRES) = 0.14 TOTAL RUNOFF(CFS) 0.23
****************************************************************************
FLOW PROCESS FROM NODE 2.00 TO NODE 3.00 IS CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 194.00 DOWNSTREAM(FEET) 186.00
CHANNEL LENGTH THRU SUBAREA(FEET) = 435.00 CHANNEL SLOPE 0.0184
CHANNEL BASE (FEET) 140. 00 "Z" FACTOR = 2. 000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.323
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .3000
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) 0.93
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) 0.37
AVERAGE FLOW DEPTH(FEET) 0.02 TRAVEL TIME(MIN.) 19.69
Tc(MIN.) = 26.74
SUBAREA AREA(ACRES) 1.84 SUBAREA RUNOFF(CFS) 1.28
AREA-AVERAGE RUNOFF COEFFICIENT 0.300
TOTAL AREA(ACRES) = 2.0 PEAK FLOW RATE(CFS) 1.38
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.03 FLOW VELOCITY(FEET/SEC.)
LONGEST FLOWPATH FROM NODE 1.00 TO NODE
0.38
3.00 = 4 91. 00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 4.00 TO NODE 5.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .5200
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) = 61. 00
UPSTREAM ELEVATION(FEET) = 196.00
DOWNSTREAM ELEVATION(FEET) = 195.50
ELEVATION DIFFERENCE(FEET) = 0.50
SUBAREA OVERLAND TIME OF FLOW(MIN.) =
100 YEAR RAINFALL INTENSITY(INCH/HOUR)
SUBAREA RUNOFF(CFS) 0.40
8. 713
4.788
TOTAL AREA(ACRES) = 0.16 TOTAL RUNOFF(CFS) 0.40
****************************************************************************
FLOW PROCESS FROM NODE 5.00 TO NODE
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
6.00 IS CODE= 51
bl-IA, Inc.
land planning, civil engineering, surveying
14
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
----------------------------------=--===========-=-----------===============
ELEVATION DATA: UPSTREAM(FEET) = 195.50 DOWNSTREAM(FEET)
CHANNEL LENGTH THRU SUBAREA(FEET) = 390.00 CHANNEL SLOPE
CHANNEL BASE(FEET) 18.00 "Z" FACTOR= 2.000
MANNING'S FACTOR= 0.015 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.726
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .5200
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) 1.38
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) 1.57
AVERAGE FLOW DEPTH(FEET) 0.05 TRAVEL TIME(MIN.) 4.14
Tc(MIN.) = 12.85
189.00
0.0167
SUBAREA AREA(ACRES) 0.99 SUBAREA RUNOFF(CFS) 1.92
AREA-AVERAGE RUNOFF COEFFICIENT 0.520
TOTAL AREA(ACRES) = 1.1 PEAK FLOW RATE(CFS) 2.23
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.06 FLOW VELOCITY(FEET/SEC.)
LONGEST FLOWPATH FROM NODE 4.00 TO NODE
1. 92
6.00 = 451. 00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 7.00 TO NODE 8.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .8700
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) = 78.00
UPSTREAM ELEVATION(FEET) = 196.40
DOWNSTREAM ELEVATION(FEET) = 195.80
ELEVATION DIFFERENCE(FEET) = 0.60
SUBAREA OVERLAND TIME OF FLOW(MIN.) = 3.363
WARNING: INITIAL SUBAREA FLOW PATH LENGTH IS GREATER THAN
THE MAXIMUM OVERLAND FLOW LENGTH= 55.38
(Reference: Table 3-lB of Hydrology Manual)
THE MAXIMUM OVERLAND FLOW LENGTH IS USED IN Tc CALCULATION!
100 YEAR RAINFALL INTENSITY(INCH/HOUR) 6.850
NOTE: RAINFALL INTENSITY rs BASED ON Tc= 5-MINUTE.
SUBAREA RUNOFF(CFS) 0.36
TOTAL AREA(ACRES) = 0.06 TOTAL RUNOFF(CFS) = 0.36
****************************************************************************
FLOW PROCESS FROM NODE 8.00 TO NODE 9.00 rs CODE= 62
>>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>(STREET TABLE SECTION# 1 USED)<<<<<
============================================================================
UPSTREAM ELEVATION(FEET)
STREET LENGTH(FEET) =
STREET HALFWIDTH(FEET)
195.80 DOWNSTREAM ELEVATION(FEET)
84.00 CURB HEIGHT(INCHES) = 8.0
30.00
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) 20.00
INSIDE STREET CROSSFALL(DECIMAL) 0.018
OUTSIDE STREET CROSSFALL(DECIMAL) 0.018
193.00
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 15
I
I
I
I
I
I
I
I
I.
I
I
I
I
I
I
I
I
I
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF= 1
STREET PARKWAY CROSSFALL(DECIMAL) 0.020
Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb)
Manning's FRICTION FACTOR for Back-of-Walk Flow Section 0.0200
**TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS)
STREETFLOW MODEL RESULTS USING ESTIMATED FLOW:
STREET FLOW DEPTH(FEET) = 0.20
HALFSTREET FLOOD WIDTH(FEET) = 2.00
AVERAGE FLOW VELOCITY(FEET/SEC.) 3.96
PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) 0.79
STREET FLOW TRAVEL TIME(MIN.) = 0.35 Tc(MIN.)
100 YEAR RAINFALL INTENSITY(INCH/HOUR) 6.850
NOTE: RAINFALL INTENSITY IS BASED ON Tc 5-MINUTE.
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .8700
0
0.870
3. 72
S.C.S. CURVE NUMBER
AREA-AVERAGE RUNOFF
SUBAREA AREA(ACRES)
TOTAL AREA(ACRES) =
(AMC II) =
COEFFICIENT
0.10
0.2
SUBAREA RUNOFF(CFS) =
PEAK FLOW RATE(CFS)
END OF SUBAREA STREET FLOW HYDRAULICS:
DEPTH(FEET) = 0.22 HALFSTREET FLOOD WIDTH(FEET) 3.03
0.66
0.60
0.0150
0.95
FLOW VELOCITY(FEET/SEC.) = 3.46 DEPTH*VELOCITY(FT*FT/SEC.) 0.75
LONGEST FLOWPATH FROM NODE 7.00 TO NODE 9.00 = 162.00 FEET.
END OF STUDY SUMMARY:
TOTAL AREA(ACRES)
PEAK FLOW RATE(CFS)
0. 2 TC (MIN. ) =
0.95
END OF RATIONAL METHOD ANALYSIS
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
3.72
bl-iA, Inc.
land planning, civil engineering, surveying
Drainage Study _______________________ ,____JJ6[__
I
I
I,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
B. PROPOSED CONDITION HYDROLOGY
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bf.tA, Inc.
land planning, civil engineering, surveying
_______ ___JJ-7 -L__
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1. lOOYEAR STORM
****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
2003,1985,1981 HYDROLOGY MANUAL
(c) Copyright 1982-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-7780
************************** DESCRIPTION OF STUDY**************************
* 100 YEAR PROPOSED HYDROLOGY ANALYSIS *
* 1833 BUENA VISTA WAY *
* SEE HYDROLOGY MAP FOR NODE LOCATIONS, AND BASIN INFORMATION * **************************************************************************
FILE NAME: 1289Ul00.DAT
TIME/DATE OF STUDY: 08:20 03/03/2015
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
2003 SAN DIEGO MANUAL CRITERIA
USER SPECIFIED STORM EVENT(YEAR) = 100.00
6-HOUR DURATION PRECIPITATION (INCHES) = 2.600
SPECIFIED MINIMUM PIPE SIZE(INCH) = 3.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE= 0.95
SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD
NOTE: USE MODIFIED RATIONAL METHOD PROCEDURES FOR CONFLUENCE ANALYSIS
*USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL*
HALF-CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES:
WIDTH CROSS FALL IN-I OUT-/PARK-HEIGHT WIDTH LIP
NO. (FT) (FT) SIDE I SIDE/ WAY (FT) (FT) (FT)
--------------------------
1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0312
GLOBAL STREET FLOW-DEPTH CONSTRAINTS:
1. Relative Flow-Depth= 0.00 FEET
as (Maximum Allowable Street Flow Depth) -(Top-of-Curb)
2. (Depth)*(Velocity) Constraint= 6.0 (FT*FT/S)
*SIZE PIPE WITH A FLOW CAPACITY GREATER THAN
OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.*
HIKE
(FT)
0.167
MANNING
FACTOR
(n)
0.0150
****************************************************************************
FLOW PROCESS FROM NODE 29, 00 TO NODE 30.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .4800
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bliA, Inc.
land planning, civil engineering, surveying
18
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) = 55.00
UPSTREAM ELEVATION(FEET) = 200.10
DOWNSTREAM ELEVATION(FEET) = 199.50
ELEVATION DIFFERENCE(FEET) = 0.60
SUBAREA OVERLAND TIME OF FLOW(MIN.) = 8.040
100 YEAR RAINFALL INTENSITY(INCH/HOUR) 5.043
SUBAREA RUNOFF(CFS) 0.12
TOTAL AREA(ACRES) = 0.05 TOTAL RUNOFF(CFS) 0.12
****************************************************************************
FLOW PROCESS FROM NODE 30.00 TO NODE 31.00 IS CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
-==----------=----====--===------====================================----===
ELEVATION DATA: UPSTREAM(FEET) = 199.50 DOWNSTREAM(FEET) 198.70
CHANNEL LENGTH THRO SUBAREA(FE~T) = 119.00 CHANNEL SLOPE 0.0067
CHANNEL BASE(FEET) 25.00 "Z" FACTOR= 2.000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.492
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .4800
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) 0.27
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) 0.32
AVERAGE FLOW DEPTH(FEET) 0.03 TRAVEL TIME(MIN.) 6.17
Tc(MIN.) = 14.21
SUBAREA AREA(ACRES) 0.17 SUBAREA RUNOFF(CFS) 0.28
AREA-AVERAGE RUNOFF COEFFICIENT 0.480
TOTAL AREA(ACRES) = 0.2 PEAK FLOW RATE(CFS) 0.37
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.04 FLOW VELOCITY(FEET/SEC.)
LONGEST FLOWPATH FROM NODE 29.00 TO NODE
0.36
31. 00 = 174.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 31.00 TO NODE 32.00 IS CODE= 31
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 196.03 DOWNSTREAM(FEET) 194.80
FLOW LENGTH(FEET) = 19.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 6.0 INCH PIPE IS 1.9 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) 6.80
ESTIMATED PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 0.37
PIPE TRAVEL TIME(MIN.) = 0.05 Tc(MIN.) = 14.26
LONGEST FLOWPATH FROM NODE 29.00 TO NODE 32.00 193.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 33.00 TO NODE 34.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================
*USER SPECIFIED(SUBAREA):
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bliA, Inc.
land planning, civil engineering, suNeying
19
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
USER-SPECIFIED RUNOFF COEFFICIENT= .4800
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) = 55.00
UPSTREAM ELEVATION(FEET) = 198.10
DOWNSTREAM ELEVATION(FEET) = 197.50
ELEVATION DIFFERENCE(FEET) = 0.60
SUBAREA OVERLAND TIME OF FLOW(MIN.) = 8.040
100 YEAR RAINFALL INTENSITY(INCH/HOUR) 5.043
SUBAREA RUNOFF(CFS) 0.15
TOTAL AREA(ACRES) = 0.06 TOTAL RUNOFF(CFS) 0.15
****************************************************************************
FLOW PROCESS FROM NODE 34.00 TO NODE 35.00 IS CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 197.50 DOWNSTREAM(FEET)
CHANNEL LENGTH THRU SUBAREA(FEET) = 119.00 CHANNEL SLOPE
CHANNEL BASE(FEET) 25.00 "Z" FACTOR= 2.000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.478
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .4800
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS)
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.)
AVERAGE FLOW DEPTH(FEET) 0.04 TRAVEL TIME(MIN.)
Tc(MIN.) = 14.30
0.28
0.32
6. 26
196.70
0.0067
0.16 SUBAREA AREA(ACRES)
AREA-AVERAGE RUNOFF COEFFICIENT
SUBAREA RUNOFF(CFS)
0.480
0.27
TOTAL AREA(ACRES) = 0.2 PEAK FLOW RATE(CFS) 0.37
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.04 FLOW VELOCITY(FEET/SEC.)
LONGEST FLOWPATH FROM NODE 33.00 TO NODE
0.36
35.00 = 174.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 35.00 TO NODE 36.00 IS CODE= 31
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 194.03 DOWNSTREAM(FEET) 193.60
FLOW LENGTH(FEET) = 19.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.6 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) 4.59
ESTIMATED PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 0.37
PIPE TRAVEL TIME(MIN.) = 0.07 Tc(MIN.) = 14.37
LONGEST FLOWPATH FROM NODE 33.00 TO NODE 36.00 193.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 37.00 TO NODE 38.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
========================-=-----=-===========================================
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
b~A, Inc.
land planning, civil engineering, suNeying
20
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT .3900
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) = 67.00
UPSTREAM ELEVATION(FEET) = 200.10
DOWNSTREAM ELEVATION(FEET) = 194.00
ELEVATION DIFFERENCE(FEET) = 6.10
SUBAREA OVERLAND TIME OF FLOW(MIN.) = 5.010
100 YEAR RAINFALL INTENSITY(INCH/HOUR) 6.841
SUBAREA RUNOFF(CFS) 0.16
TOTAL AREA(ACRES) = 0.06 TOTAL RUNOFF(CFS) 0.16
****************************************************************************
FLOW PROCESS FROM NODE 38.00 TO NODE 39.00 IS CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 194.00 DOWNSTREAM(FEET)
CHANNEL LENGTH THRU SUBAREA(FEET) = 116.00 CHANNEL SLOPE
CHANNEL BASE(FEET) 25.00 "Z" FACTOR= 2.000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.654
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .3900
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) 0.42
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) 0.47
AVERAGE FLOW DEPTH(FEET) 0.04 TRAVEL TIME(MIN.) 4.09
Tc(MIN.) = 9.10
192.60
0.0121
SUBAREA AREA(ACRES) 0.28 SUBAREA RUNOFF(CFS) 0.51
AREA-AVERAGE RUNOFF COEFFICIENT 0.390
TOTAL AREA(ACRES) = 0.3 PEAK FLOW RATE(CFS) 0.62
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.05 FLOW VELOCITY(FEET/SEC.)
LONGEST FLOWPATH FROM NODE 37.00 TO NODE
0.51
39.00 = 183.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 39.00 TO NODE 4.00 IS CODE= 31
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 189.93 DOWNSTREAM(FEET) 180.76
FLOW LENGTH(FEET) = 124.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) 8.16
ESTIMATED PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 0.62
PIPE TRAVEL TIME(MIN.) = 0.25 Tc(MIN.) = 9.36
LONGEST FLOWPATH FROM NODE 37.00 TO NODE 4.00 307.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 39.00 TO NODE 4.00 IS CODE= 10
>>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK# 2 <<<<<
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bliA, Inc.
land planning, civil engineering, surveying
21
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
****************************************************************************
FLOW PROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
*USER SPECIFIED(SUBAREA}:
USER-SPECIFIED RUNOFF COEFFICIENT= .4800
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH{FEET} = 53.00
UPSTREAM ELEVATION(FEET) = 194.00
DOWNSTREAM ELEVATION(FEET) = 193.40
ELEVATION DIFFERENCE{FEET) = 0.60
SUBAREA OVERLAND TIME OF FLOW(MIN.) = 7.796
100 YEAR RAINFALL INTENSITY{INCH/HOUR) 5.144
SUBAREA RUNOFF(CFS} 0.15
TOTAL AREA(ACRES) = 0.06 TOTAL RUNOFF(CFS} 0.15
****************************************************************************
FLOW PROCESS FROM NODE 2.00 TO NODE 3.00 IS CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 193.40 DOWNSTREAM(FEET) 192.10
CHANNEL LENGTH THRU SUBAREA(FEET) = 82.00 CHANNEL SLOPE 0.0159
CHANNEL BASE{FEET) 25.00 "Z" FACTOR= 2.000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH{FEET} = 1.00
100 YEAR RAINFALL INTENSITY{INCH/HOUR) = 4.158
*USER SPECIFIED(SUBAREA}:
USER-SPECIFIED RUNOFF COEFFICIENT= .4800
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS} 0.31
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY{FEET/SEC.) 0.45
AVERAGE FLOW DEPTH(FEET} 0.03 TRAVEL TIME(MIN.} 3.05
Tc(MIN.) = 10.84
SUBAREA AREA(ACRES} 0.16 SUBAREA RUNOFF(CFS) 0.32
AREA-AVERAGE RUNOFF COEFFICIENT 0.480
TOTAL AREA(ACRES} = 0.2 PEAK FLOW RATE{CFS) 0.44
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET} = 0.04 FLOW VELOCITY(FEET/SEC.}
LONGEST FLOWPATH FROM NODE 1.00 TO NODE
0.50
3.00 = 135. 00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 3.00 TO NODE 4.00 IS CODE= 31
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW}<<<<<
============================================================================
ELEVATION DATA: UPSTREAM(FEET} = 189.43 DOWNSTREAM(FEET} 180.76
FLOW LENGTH(FEET} = 16.50 MANNING'S N = 0.011
DEPTH OF FLOW IN 3.0 INCH PIPE IS 1.7 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.} 15.70
ESTIMATED PIPE DIAMETER(INCH} 3.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 0.44
bl-IA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study -~~~~--~~--~~~~~~·~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PIPE TRAVEL TIME(MIN.) = 0.02
LONGEST FLOWPATH FROM NODE
Tc (MIN.) =
1.00 TO NODE
10.86
4.00 151.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 3.00 TO NODE 4.00 IS CODE= 11
>>>>>CONFLUENCE MEMORY BANK# 2 WITH THE MAIN-STREAM MEMORY<<<<<
-------------------------------------------=================--=-=========--=
** MAIN
STREAM
NUMBER
1
STREAM CONFLUENCE DATA**
RUNOFF Tc INTENSITY
(CFS) (MIN.) (INCH/HOUR)
0.44 10.86 4.154
LONGEST FLOWPATH FROM NODE 1. 00 TO NODE
** MEMORY BANK# 2 CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN.) ( INCH/HOUR)
1 0. 62 9.36 4. 572
LONGEST FLOWPATH FROM NODE 37.00 TO NODE
** PEAK FLOW RATE TABLE**
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN.) (INCH/HOUR)
1 1. 00 9.36 4 .572
2 1.00 10.86 4.154
AREA
(ACRE)
0.22
AREA
(ACRE)
0.34
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
4.00
4.00
PEAK FLOW RATE(CFS) 1.00 Tc(MIN.) = 10.86
TOTAL AREA(ACRES) = 0.6
151. 50 FEET.
307.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 4.00 TO NODE 8.00 IS CODE= 41
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 180.76 DOWNSTREAM(FEET) 179.40
FLOW LENGTH(FEET) = 146.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 10.0 INCH PIPE IS 4.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 4.24
GIVEN PIPE DIAMETER(INCH) = 10.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 1.00
PIPE TRAVEL TIME(MIN.) = 0.57 Tc(MIN.) = 11.43
LONGEST FLOWPATH FROM NODE 37.00 TO NODE 8.00 453.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 4.00 TO NODE 8.00 IS CODE= 1
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================
TOTAL NUMBER OF STREAMS= 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN,) 11.43
RAINFALL INTENSITY(INCH/HR) = 4.02
TOTAL STREAM AREA(ACRES) = 0.56
PEAK FLOW RATE(CFS) AT CONFLUENCE= 1.00
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bHA, Inc.
land planning, civil engineering, surveying
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
****************************************************************************
FLOW PROCESS FROM NODE 5.00 TO NODE 6.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
*USER SPECIFIED(SUBAREA}:
USER-SPECIFIED RUNOFF COEFFICIENT= .4800
S.C.S. CURVE NUMBER (AMC II} = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) = 63.00
UPSTREAM ELEVATION(FEET} = 194.10
DOWNSTREAM ELEVATION(FEET) = 194.00
ELEVATION DIFFERENCE(FEET) = 0.10
SUBAREA OVERLAND TIME OF FLOW(MIN.) = 9.942
WARNING: INITIAL SUBAREA FLOW PATH LENGTH IS GREATER THAN
THE MAXIMUM OVERLAND FLOW LENGTH= 50.00
(Reference: Table 3-lB of Hydrology Manual)
THE MAXIMUM OVERLAND FLOW LENGTH IS USED IN Tc CALCULATION!
100 YEAR RAINFALL INTENSITY(INCH/HOUR} = 4.397
SUBAREA RUNOFF(CFS) 0.15
TOTAL AREA(ACRES) = 0.07 TOTAL RUNOFF(CFS} 0.15
****************************************************************************
FLOW PROCESS FROM NODE 6.00 TO NODE 7.00 IS CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 194.00 DOWNSTREAM(FEET) 192.70
CHANNEL LENGTH THRU SUBAREA(FEET} = 136.00 CHANNEL SLOPE 0.0096
CHANNEL BASE(FEET) 25.00 "Z" FACTOR= 2.000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH(FEET} = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.248
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .4800
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS} 0.26
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) 0.38
AVERAGE FLOW DEPTH(FEET) 0.03 TRAVEL TIME(MIN.) 5.96
Tc(MIN.) = 15.90
SUBAREA AREA(ACRES) 0.15 SUBAREA RUNOFF(CFS} 0.23
AREA-AVERAGE RUNOFF COEFFICIENT 0.480
TOTAL AREA(ACRES) = 0.2 PEAK FLOW RATE(CFS) 0.34
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET} = 0.04 FLOW VELOCITY(FEET/SEC.)
LONGEST FLOWPATH FROM NODE 5.00 TO NODE
0.39
7.00 = 199.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 7.00 TO NODE 8.00 IS CODE= 31
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW}<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 190.03 DOWNSTREAM(FEET) 179.40
FLOW LENGTH(FEET) 38.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 3.0 INCH PIPE IS 1.7 INCHES
bttA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
~ ·~~~~~~~~~~~~~~~~~~~~~~~-~~~~~~~~~--~~~~~~~~~~~~~~
Drainage Study
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PIPE-FLOW VELOCITY(FEET/SEC.)
ESTIMATED PIPE DIAMETER(INCH)
PIPE-FLOW(CFS) = 0.34
PIPE TRAVEL TIME(MIN.) = 0.05
LONGEST FLOWPATH FROM NODE
11. 59
3.00 NUMBER OF PIPES
Tc (MIN.) =
5.00 TO NODE
15.96
8.00
1
237.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 7.00 TO NODE 8.00 IS CODE=
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS= 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) 15.96
RAINFALL INTENSITY(INCH/HR) = 3.24
TOTAL STREAM AREA(ACRES) = 0.22
PEAK FLOW RATE(CFS) AT CONFLUENCE= 0.34
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE)
1 1. 00 11. 43 4.018 0.56
2 0.34 15.96 3.241 0.22
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN.) ( INCH/HOUR)
1 1.25 11. 43 4.018
2 1.15 15.96 3.241
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) 1.25 Tc (MIN.) = 11. 43
TOTAL AREA(ACRES) = 0.8
1
LONGEST FLOWPATH FROM NODE 37.00 TO NODE 8.00 453.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 8.00 TO NODE 49.00 IS CODE= 41
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 179.40 DOWNSTREAM(FEET) 177.93
FLOW LENGTH(FEET) = 112.50 MANNING'S N = 0.011
DEPTH OF FLOW IN 10.0 INCH PIPE IS 4.6 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 5.09
GIVEN PIPE DIAMETER{INCH) = 10.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 1.25
PIPE TRAVEL TIME{MIN.) = 0.37 Tc(MIN.) = 11.80
LONGEST FLOWPATH FROM NODE 37.00 TO NODE 49.00 565.50 FEET,
****************************************************************************
FLOW PROCESS FROM NODE 49.00 TO NODE
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
49.00 IS CODE= 10
bliA, Inc.
land planning, civil engineering, surveying
25
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
>>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK# 1 <<<<<
--=------------------------------------=========--=======-=-------------==--
****************************************************************************
FLOW PROCESS FROM NODE 25.00 TO NODE 26.00 rs CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .4600
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) = 54.00
UPSTREAM ELEVATION(FEET) = 200.10
DOWNSTREAM ELEVATION(FEET) = 192.50
ELEVATION DIFFERENCE(FEET) = 7.60
3.930 SUBAREA OVERLAND TIME OF FLOW(MIN.) =
WARNING: THE MAXIMUM OVERLAND FLOW SLOPE,
100 YEAR RAINFALL INTENSITY(INCH/HOUR)
NOTE: RAINFALL INTENSITY IS BASED ON Tc=
10.%, IS USED IN Tc CALCULATION!
6.850
5-MINUTE.
SUBAREA RUNOFF(CFS) 0.22
TOTAL AREA(ACRES) = 0.07 TOTAL RUNOFF(CFS) = 0.22
****************************************************************************
FLOW PROCESS FROM NODE 26.00 TO NODE 27.00 rs CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 192.50 DOWNSTREAM(FEET) 191.10
CHANNEL LENGTH THRU SUBAREA(FEET) = 137.00 CHANNEL SLOPE 0.0102
CHANNEL BASE (FEET) 25. 00 "Z" FACTOR = 2. 000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.714
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .4600
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) 0.40
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) 0.46
AVERAGE FLOW DEPTH(FEET) 0.04 TRAVEL TIME(MIN.) 4.99
Tc(MIN.) = 8.92
SUBAREA AREA(ACRES) 0.17 SUBAREA RUNOFF(CFS) 0.37
AREA-AVERAGE RUNOFF COEFFICIENT 0.460
TOTAL AREA(ACRES) = 0.2 PEAK FLOW RATE(CFS) 0.52
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.04 FLOW VELOCITY(FEET/SEC.)
LONGEST FLOWPATH FROM NODE 25.00 TO NODE
0.48
27.00 = 191. 00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 27.00 TO NODE 23.00 IS CODE= 31
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBA~EA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
============================================================================
ELEVATION DATA: UPSTREAM(FEET) = 189.83 DOWNSTREAM(FEET) 188.33
FLOW LENGTH(FEET) 41.50 MANNING'S N = 0.011
DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.7 INCHES
bl-iA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, suNeying
Drainage Study 26
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PIPE-FLOW VELOCITY(FEET/SEC.)
ESTIMATED PIPE DIAMETER(INCH)
PIPE-FLOW(CFS) = 0.52
6.02
6.00 NUMBER OF PIPES 1
PIPE TRAVEL TIME(MIN.) = 0.11
LONGEST FLOWPATH FROM NODE
Tc (MIN.) =
25.00 TO NODE
9.04
23.00 232.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 27.00 TO NODE 23.00 rs CODE= 1
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
TOTAL NUMBER OF STREAMS= 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) 9.04
RAINFALL INTENSITY(INCH/HR) = 4.68
TOTAL STREAM AREA(ACRES) = 0.24
PEAK FLOW RATE(CFS) AT CONFLUENCE= 0.52
****************************************************************************
FLOW PROCESS FROM NODE 21.00 TO NODE 22.00 rs CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .4600
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) = 65.00
UPSTREAM ELEVATION(FEET) = 200.10
DOWNSTREAM ELEVATION(FEET) = 191.00
ELEVATION DIFFERENCE(FEET) = 9.10
SUBAREA OVERLAND TIME OF FLOW(MIN.) = 4.311
WARNING: THE MAXIMUM OVERLAND FLOW SLOPE, 10.%, rs USED IN Tc CALCULATION!
100 YEAR RAINFALL INTENSITY(INCH/HOUR) 6.850
NOTE: RAINFALL INTENSITY rs BASED ON Tc= 5-MINUTE.
SUBAREA RUNOFF(CFS) 0.22
TOTAL AREA(ACRES) = 0.07 TOTAL RUNOFF(CFS) = 0.22
****************************************************************************
FLOW PROCESS FROM NODE 22.00 TO NODE 23.00 rs CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 191.00 DOWNSTREAM(FEET) 189.60
CHANNEL LENGTH THRU SUBAREA(FEET) = 115.00 CHANNEL SLOPE 0.0122
CHANNEL BASE(FEET) 25.00 "Z" FACTOR= 2.000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.846
*USER SPECIFIEQ(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .4600
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) 0.40
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) 0.45
AVERAGE FLOW DEPTH(FEET) 0.04 TRAVEL TIME(MIN.) 4.24
Tc(MIN.) = 8.55
SUBAREA AREA(ACRES) 0.16 SUBAREA RUNOFF(CFS) 0.36
AREA-AVERAGE RUNOFF COEFFICIENT 0.460
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista bHA, Inc.
1833 Buena Vista Way land planning, civil engineering, surveying
~~D~ra_in_a_g_e_S_tu_d_y~~~~~~~~~-~~~~~~~~~~~~~~~~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TOTAL AREA(ACRES) = 0.2 PEAK FLOW RATE(CFS) 0.51
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.04 FLOW VELOCITY(FEET/SEC.)
LONGEST FLOWPATH FROM NODE 21.00 TO NODE
0.50
23.00 = 180.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 22.00 TO NODE 23.00 IS CODE=
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS= 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) 8.55
RAINFALL INTENSITY{INCH/HR) = 4.85
TOTAL STREAM AREA(ACRES) = 0.23
PEAK FLOW RATE(CFS) AT CONFLUENCE= 0.51
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE)
1 0.52 9.04 4.676 0.24
2 0.51 8.55 4.846 0.23
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN.) {INCH/HOUR)
1 1.01 8.55 4.846
2 1. 02 9.04 4. 676
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) 1. 02 Tc (MIN.) = 9.04
TOTAL AREA{ACRES) = 0.5
1
LONGEST FLOWPATH FROM NODE 25. 00 TO NODE 23.00 232.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 23.00 TO NODE 24.00 IS CODE= 31
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM{FEET) = 186.93 DOWNSTREAM(FEET) 182.00
FLOW LENGTH(FEET) = 24.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.4 INCHES
PIPE-FLOW VELOCITY{FEET/SEC.) 13.61
ESTIMATED PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES 1
PIPE-FLOW{CFS) = 1.02
PIPE TRAVEL TIME(MIN.) = 0.03 Tc(MIN.) = 9.07
LONGEST FLOWPATH FROM NODE 25.00 TO NODE 24.00 256.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 2 4. 00 TO NODE
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
20.00 IS CODE= 41
bliA, Inc.
land planning, civil engineering, surveying
Drainage Study ·~~~~~~~~~~~~~~~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 182.00 DOWNSTREAM(FEET) 181.00
FLOW LENGTH(FEET) = 144.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 10.0 INCH PIPE IS 4.9 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 3.83
GIVEN PIPE DIAMETER(INCH) = 10.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 1.02
PIPE TRAVEL TIME(MIN.) = 0.63 Tc(MIN.) = 9.69
LONGEST FLOWPATH FROM NODE 25.00 TO NODE 20.00 400.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 24.00 TO NODE 20.00 IS CODE= 1
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
TOTAL NUMBER OF STREAMS= 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) 9.69
RAINFALL INTENSITY(INCH/HR) = 4.47
TOTAL STREAM AREA(ACRES) = 0.47
PEAK FLOW RATE(CFS) AT CONFLUENCE= 1.02
****************************************************************************
FLOW PROCESS FROM NODE 17.00 TO NODE 18.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .5200
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) = 59.00
UPSTREAM ELEVATION(FEET) = 194.00
DOWNSTREAM ELEVATION(FEET) = 190.00
ELEVATION DIFFERENCE(FEET) = 4.00
SUBAREA OVERLAND TIME OF FLOW(MIN.) = 4.237
100 YEAR RAINFALL INTENSITY(INCH/HOUR) 6.850
NOTE: RAINFALL INTENSITY IS BASED ON Tc= 5-MINUTE.
SUBAREA RUNOFF(CFS) 0.21
TOTAL AREA(ACRES) = 0.06 TOTAL RUNOFF(CFS) = 0.21
****************************************************************************
FLOW PROCESS FROM NODE 18. 00 TO NODE 19.00 IS CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 190.00 DOWNSTREAM(FEET)
CHANNEL LENGTH THRU SUBAREA(FEET) = 144.00 CHANNEL SLOPE
CHANNEL BASE (FEET) 25. 00 "Z" FACTOR = 2. 000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.443
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .5200
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) 0.47
188.60
0.0097
bf.tA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.)
AVERAGE FLOW DEPTH(FEET) 0.04 TRAVEL TIME(MIN.)
Tc(MIN.) = 9.78
SUBAREA AREA(ACRES) 0.21 SUBAREA RUNOFF(CFS)
AREA-AVERAGE RUNOFF COEFFICIENT 0.520
TOTAL AREA(ACRES) = 0.3 PEAK FLOW RATE(CFS)
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.05 FLOW VELOCITY(FEET/SEC.)
0.43
5.55
0.49
0.62
LONGEST FLOWPATH FROM NODE 17.00 TO NODE
0. 49
19.00 = 203.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 19.10 TO NODE 19.00 IS CODE= 81
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.443
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .8700
S.C.S. CURVE NUMBER (AMC II) = 0
AREA-AVERAGE RUNOFF COEFFICIENT= 0.5836
SUBAREA AREA(ACRES) 0.06 SUBAREA RUNOFF(CFS)
TOTAL AREA(ACRES) = 0.3 TOTAL RUNOFF(CFS) =
TC(MIN.) = 9.78
0.23
0.86
****************************************************************************
FLOW PROCESS FROM NODE 19.00 TO NODE 20.00 IS CODE= 31
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 185.93 DOWNSTREAM(FEET) 181.00
FLOW LENGTH(FEET) = 31.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.4 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) 11.81
ESTIMATED PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 0.86
PIPE TRAVEL TIME(MIN.) = 0.04 Tc(MIN.) = 9.83
LONGEST FLOWPATH FROM NODE 17.00 TO NODE 20.00 234.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 19.00 TO NODE 20.00 IS CODE=
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS= 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) 9.83
RAINFALL INTENSITY(INCH/HR) = 4.43
TOTAL STREAM AREA(ACRES) = 0.33
PEAK FLOW RATE(CFS) AT CONFLUENCE= 0.86
** CONFLUENCE DATA**
STREAM RUNOFF
NUMBER (CFS)
1 1. 02
Tc
(MIN.)
9.69
INTENSITY
(INCH/HOUR)
4.469
AREA
(ACRE)
0.47
1
bhA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 30
I
I·
1.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
2 0.86 9.83 4.430
RAINFALL INTENSITY AND TIME OF CONCENTRATION
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE
STREAM RUNOFF
NUMBER (CFS)
1 1. 86
2 1. 86
TABLE **
Tc INTENSITY
(MIN.) (INCH/HOUR)
9.69 4.469
9.83 4.430
ESTIMATES ARE AS FOLLOWS:
1.86 Tc(MIN.) =
0.8
0.33
RATIO
9.83
COMPUTED CONFLUENCE
PEAK FLOW RATE(CFS)
TOTAL AREA(ACRES) =
LONGEST FLOWPATH FROM NODE 25.00 TO NODE 20.00 400.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 20.00 TO NODE 16.00 IS CODE= 41
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
-----------------------------=--===============================-========----
ELEVATION DATA: UPSTREAM(FEET) = 181.00 DOWNSTREAM(FEET) 180.00
FLOW LENGTH(FEET) = 52.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 10.0 INCH PIPE IS 5.2 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 6.50
GIVEN PIPE DIAMETER(INCH) = 10.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 1.86
PIPE TRAVEL TIME(MIN.) = 0.13 Tc(MIN.) = 9.96
LONGEST FLOWPATH FROM NODE 25.00 TO NODE 16.00 452.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 20. 00 TO NODE 16.00 IS CODE= 1
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
TOTAL NUMBER OF STREAMS= 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) 9.96
RAINFALL INTENSITY(INCH/HR) = 4.39
TOTAL STREAM AREA(ACRES) = 0.80
PEAK FLOW RATE(CFS) AT CONFLUENCE= 1.86
****************************************************************************
FLOW PROCESS FROM NODE 13.00 TO NODE 14.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .5200
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) =
UPSTREAM ELEVATION(FEET) = 194.00
DOWNSTREAM ELEVATION(FEET) = 189.80
ELEVATION DIFFERENCE(FEET) = 4.20
SUBAREA OVERLAND TIME OF FLOW(MIN.) =
100 YEAR RAINFALL INTENSITY(INCH/HOUR)
50.00
3.632
6.850
bHA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 31
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
NOTE: RAINFALL INTENSITY IS BASED ON Tc= 5-MINUTE.
SUBAREA RUNOFF(CFS) 0.25
TOTAL AREA(ACRES) = 0.07 TOTAL RUNOFF(CFS) = 0.25
****************************************************************************
FLOW PROCESS FROM NODE 14.00 TO NODE 15.00 IS CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 189.80 DOWNSTREAM(FEET) 188.40
CHANNEL LENGTH THRU SUBAREA(FEET) = 144.00 CHANNEL SLOPE 0.0097
CHANNEL BASE(FEET) 25.00 "Z" FACTOR= 2.000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.809
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .5200
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) 0.51
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) 0.48
AVERAGE FLOW DEPTH(FEET) 0.04 TRAVEL TIME(MIN.) 5.02
Tc(MIN.) = 8.65
SUBAREA AREA(ACRES) 0.21 SUBAREA RUNOFF(CFS) 0.53
AREA-AVERAGE RUNOFF COEFFICIENT 0.520
TOTAL AREA(ACRES) = 0.3 PEAK FLOW RATE(CFS) 0.70
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.06 FLOW VELOCITY(FEET/SEC.)
LONGEST FLOWPATH FROM NODE 13.00 TO NODE
0.50
15.00 = 194.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 15.10 TO NODE 15.00 IS CODE= 81
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.809
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .8700
S.C.S. CURVE NUMBER (AMC II) = 0
AREA-AVERAGE RUNOFF COEFFICIENT= 0.5818
SUBAREA AREA(ACRES) 0.06 SUBAREA RUNOFF(CFS)
TOTAL AREA(ACRES) = 0.3 TOTAL RUNOFF(CFS) =
TC(MIN.) = 8.65
0.25
0.95
****************************************************************************
FLOW PROCESS FROM NODE 15.00 TO NODE 16.00 IS CODE= 31
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
============================================================================
ELEVATION DATA: UPSTREAM(FEET} = 185.73 DOWNSTREAM(FEET} 180.00
FLOW LENGTH(FEET) = 31.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.4 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) 12.84
ESTIMATED PIPE DIAMETER(INCH} = 6.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS} = 0.95
PIPE TRAVEL TIME(MIN.) = 0.04 Tc(MIN,) = 8.69
bliA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 32 L__
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LONGEST FLOWPATH FROM NODE 13. 00 TO NODE 16.00 = 225.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 15.00 TO NODE 16.00 rs CODE=
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
1
==========================------============================================
TOTAL NUMBER OF STREAMS= 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) 8.69
RAINFALL INTENSITY(INCH/HR) = 4.80
TOTAL STREAM AREA(ACRES) = 0.34
PEAK FLOW RATE(CFS) AT CONFLUENCE= 0.95
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN.) ( INCH/HOUR) (ACRE)
1 1. 86 9.96 4.392 0.80
2 0.95 8.69 4.795 0.34
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN.) ( INCH/HOUR)
1 2.66 8.69 4.795
2 2.73 9.96 4 .392
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) 2.73 Tc (MIN.) = 9.96
TOTAL AREA(ACRES) = 1.1
LONGEST FLOWPATH FROM NODE 25.00 TO NODE 16.00 452.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 16.00 TO NODE 12.00 IS CODE= 41
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) 180.00 DOWNSTREAM(FEET)
FLOW LENGTH(FEET) = 166.00 MANNING'S N = 0.011
ASSUME FULL-FLOWING PIPELINE
PIPE-FLOW VELOCITY(FEET/SEC.) 4.09
(PIPE FLOW VELOCITY CORRESPONDING TO NORMAL-DEPTH FLOW
AT DEPTH= 0.82 * DIAMETER)
GIVEN PIPE DIAMETER(INCH) = 10.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 2.73
PIPE TRAVEL TIME(MIN.) = 0.68 Tc(MIN.) = 10.64
LONGEST FLOWPATH FROM NODE 25.00 TO NODE 12.00
179. 00
618.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 16.00 TO NODE 12.00 IS CODE= 1
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
b~A, Inc.
land planning, civil engineering, surveying
.,., _,_,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TOTAL NUMBER OF STREAMS= 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) 10.64
RAINFALL INTENSITY(INCH/HR) = 4.21
TOTAL STREAM AREA(ACRES) = 1.14
PEAK FLOW RATE(CFS) AT CONFLUENCE= 2.73
****************************************************************************
FLOW PROCESS FROM NODE 9.00 TO NODE 10.00 IS CODE= 21
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .4800
S.C.S. CURVE NUMBER (AMC II) = 0
INITIAL SUBAREA FLOW-LENGTH(FEET) = 67.00
UPSTREAM ELEVATION(FEET) = 194.10
DOWNSTREAM ELEVATION(FEET) = 189.50
ELEVATION DIFFERENCE(FEET) = 4.60
SUBAREA OVERLAND TIME OF FLOW(MIN.) =
100 YEAR RAINFALL INTENSITY(INCH/HOUR)
4.807
6.850
NOTE: RAINFALL INTENSITY IS BASED ON Tc= 5-MINUTE.
SUBAREA RUNOFF(CFS) 0.23
TOTAL AREA(ACRES) = 0.07 TOTAL RUNOFF(CFS) = 0.23
****************************************************************************
FLOW PROCESS FROM NODE 10.00 TO NODE 11.00 IS CODE= 51
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 189.50 DOWNSTREAM(FEET) 188.10
CHANNEL LENGTH THRU SUBAREA(FEET) = 63.00 CHANNEL SLOPE 0.0222
CHANNEL BASE(FEET) 25.00 "Z" FACTOR= 2.000
MANNING'S FACTOR= 0.040 MAXIMUM DEPTH(FEET) = 1.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 5.605
*USER SPECIFIED{SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .4800
S.C.S. CURVE NUMBER (AMC II) = 0
TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) 0.44
TRAVEL TIME THRU SUBAREA BASED ON VELOCITY{FEET/SEC.) 0.52
AVERAGE FLOW DEPTH{FEET) 0.03 TRAVEL TIME(MIN.) 2.02
Tc(MIN.) = 6.82
SUBAREA AREA(ACRES) 0.15 SUBAREA RUNOFF(CFS) 0.40
AREA-AVERAGE RUNOFF COEFFICIENT 0.480
TOTAL AREA{ACRES) = 0.2 PEAK FLOW RATE(CFS) 0.59
END OF SUBAREA CHANNEL FLOW HYDRAULICS:
DEPTH(FEET) = 0.04 FLOW VELOCITY{FEET/SEC.)
LONGEST FLOWPATH FROM NODE 9.00 TO NODE
0.67
11. 00 = 130.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 11.10 TO NODE 11.00 IS CODE= 81
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
=--============------------============----------===========================
100 YEAR RAINFALL INTENSITY{INCH/HOUR) = 5.605
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bHA, Inc.
land planning, civil engineering, suNeying
34
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*USER SPECIFIED(SUBAREA):
USER-SPECIFIED RUNOFF COEFFICIENT= .8200
S.C.S. CURVE NUMBER (AMC II) = 0
AREA-AVERAGE RUNOFF COEFFICIENT= 0.6063
SUBAREA AREA(ACRES) 0.13 SUBAREA RUNOFF(CFS)
TOTAL AREA(ACRES) = 0.3 TOTAL RUNOFF(CFS) =
TC(MIN.) = 6.82
0.60
1.19
****************************************************************************
FLOW PROCESS FROM NODE 11. 00 TO NODE 12.00 IS CODE= 31
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 185.43 DOWNSTREAM(FEET) 179.00
FLOW LENGTH(FEET) = 26.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.5 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) 15.18
ESTIMATED PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 1.19
PIPE TRAVEL TIME(MIN.) = 0.03 Tc(MIN.) = 6.85
LONGEST FLOWPATH FROM NODE 9.00 TO NODE 12.00 156.00 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 11. 00 TO NODE 12.00 IS CODE=
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS= 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) 6.85
RAINFALL INTENSITY(INCH/HR) = 5.59
TOTAL STREAM AREA(ACRES) = 0.35
PEAK FLOW RATE(CFS) AT CONFLUENCE= 1.19
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE)
1 2.73 10.64 4.209 1.14
2 1.19 6.85 5.590 0.35
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN.) (INCH/HOUR)
1 3.25 6.85 5.590
2 3.63 10.64 4.209
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) 3.63 Tc(MIN.) = 10,64
TOTAL AREA(ACRES) = 1.5
LONGEST FLOWPATH FROM NODE 25.00 TO NODE 12.00
1
618.50 FEET,
****************************************************************************
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bHA, Inc.
land planning, civil engineering, surveying
_________________ ,_J 35 L __
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FLOW PROCESS FROM NODE 12.00 TO NODE 49.00 IS CODE= 41
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
ELEVATION DATA: UPSTREAM(FEET) = 179.00 DOWNSTREAM(FEET} 177.93
FLOW LENGTH(FEET) = 27.00 MANNING'S N = 0.011
DEPTH OF FLOW IN 10.0 INCH PIPE IS 6.3 INCHES
PIPE-FLOW VELOCITY(FEET/SEC.) = 10.03
GIVEN PIPE DIAMETER(INCH} = 10.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS} = 3.63
PIPE TRAVEL TIME(MIN.) = 0.04 Tc(MIN.) = 10.68
LONGEST FLOWPATH FROM NODE 25.00 TO NODE 49.00 645.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 49.00 TO NODE 49.00 IS CODE= 11
>>>>>CONFLUENCE MEMORY BANK# 1 WITH THE MAIN-STREAM MEMORY<<<<<
** MAIN STREAM CONFLUENCE DATA**
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS} (MIN.} ( INCH/HOUR)
1 3.63 10.68 4.198
LONGEST FLOW PATH FROM NODE 25.00 TO NODE
** MEMORY BANK# 1 CONFLUENCE DATA **
STREAM
NUMBER
1
LONGEST
** PEAK
STREAM
NUMBER
1
2
RUNOFF Tc
(CFS} (MIN.}
1.25 11. 80
FLOWPATH FROM NODE
FLOW RATE TABLE**
RUNOFF Tc
(CFS} (MIN.)
4.76 10.68
4.65 11. 80
INTENSITY
( INCH/HOUR}
3.937
37.00 TO NODE
INTENSITY
(INCH/HOUR)
4.198
3.937
AREA
(ACRE}
1. 49
49.00
AREA
(ACRE}
0.78
49.00
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS} 4.76 Tc(MIN.) = 10.68
TOTAL AREA(ACRES} = 2.3
645.50 FEET.
565.50 FEET.
****************************************************************************
FLOW PROCESS FROM NODE 49.00 TO NODE 50.00 IS CODE= 41
>>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRO SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE (EXISTING ELEMENT)<<<<<
177.93 DOWNSTREAM(FEET}
MANNING'S N = 0.011
ELEVATION DATA: UPSTREAM(FEET}
FLOW LENGTH(FEET} = 21.00
ASSUME FULL-FLOWING PIPELINE
PIPE-FLOW VELOCITY(FEET/SEC.}
(PIPE FLOW VELOCITY CORRESPONDING
AT DEPTH= 0.82 * DIAMETER}
8.76
TO NORMAL-DEPTH FLOW
GIVEN PIPE DIAMETER(INCH} = 10.00 NUMBER OF PIPES 1
PIPE-FLOW(CFS) = 4.76
PIPE TRAVEL TIME(MIN.} = 0.04 Tc (MIN,} = 10.72
177.35
bl-tA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LONGEST FLOWPATH FROM NODE
END OF STUDY SUMMARY:
TOTAL AREA(ACRES)
PEAK FLOW RATE(CFS)
25.00 TO NODE
2 . 3 TC (MIN. ) =
4.76
END OF RATIONAL METHOD ANALYSIS
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
50.00 = 666.50 FEET.
10. 72
b~A, Inc.
land planning, civil engineering, surveying
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
C. HYDRAULIC CALCULATIONS
BASIN OUTLET DETAIL:
12'\/2''\4' E,PC,Qv?
r-( C '~/ r,: ! I ~/, Si-'\1 ll/ -
C"~t T[[, /i,iLET
.. ' 1=-~ ' = b 14' -1~
;{cu::u,:cc=r:: ~.C,i"L 1_1:. :,:1:~ ... r:::c\·:c1L L 1.1,/1tl.('Jfi ::/J2TPi!JLD
!/\1/~T~:.7°;.:,I! i-L-;-[ :~,;-5·· ,·r ,i,,::, ~,,1;.LL D[ ~P'J[:; L6PM TOF ~CiL
(_ r;/ .. 1~/~ Tit Jr .,-,: ~r.c; (/..I(· 1'.1: ; ! Lf\1Tlf·JF C,(:1; J ')C,,7;. ~! IPJ[ifjf[J
Hl,l-'t;Y',/f;,_11.,. 1.~: n CL-
1 .:,J / f-ir'{lC, fi i., i ,j /'JS! 1 i)l,'C1tJ(J iJ I T(jf rp/,!JT ?i NnNG SUITI.R! I
rCJP WCLL [,f;:.L,JN[D SCIL
\ ' -\-/~[ t S'--'t =:·
,C VC OU Ti.ET ·,"f '·,w,·
PIP/:.
' J rn,•· ~,nt, ..
-...'..?:v.,,v.v.,wv·,.• ... ,v.-.... ,,,., .[~! I'_~J:.,-J'' MU/ Cf/
-----18" UVGINLLRLLi S0!L MIY.' \ ----------<' .. 01 fU GR~ VL~ ___1 ___ _:_,~_-c= · {JU ll"lY' UUlY-OU-lHl U(;l:H.F-U-U ·-u-ou~--T Ii O[t'T/·! or .5/4
-.::;.-ouTi1C'!!______ _1 _ _ ,., ---LCF<USHfD ROCK tOl? V'i ----j:--1-::r:U / STORAGf
RFS TRIC TOR Pl/.. Tf, Sff ~ // ' 6" PtRFORA 11:0 PVC PIP/:
OF I /.,II 81:.l C, N fLACE PIPE W(TH P~l1fQIJATIOJ!§
IMP/-RMI-AB//-I INF R Pl-R _,1 AT THE INVERT
SOILS RI-POR I
BIORETENTION BASIN OUTLET DETAIL
f l?OIA /-IYDROLCGY /(LPOR I
NOi TO SCI\! i
;9q~)ff'J --·cRA VU STORAGE LA YlR0
' '--' \.,__.I, '-' \.,__.I, '-' \.....-1 "-\?'~ /\t={\'f--. /\
. ),\,,2. _L=.' . /~ I
FRFNCH DRAIN _/ \()
RIStH WALL
RI S lRIC lOR Pl All
~~~~=~=6J ~~----0 5 "-DIA LID OR!rtet I 1=111-1 . -1-:, t. :.:Ji =1 =111= ·1=1 =' .1
-__ TT-· T
LID ORIFICE DETAIL
NOi ro S(A/ I
bl-IA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, suNeying
Drainage Study 38
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETENTION BASIN OUTLET CAPACITY CALCULATIONS:
Basin 1 (Node 3):
Table 2.0-Detention Flow Results Summary-100 Year
Total Site
(cfs)
OiN Oour tiQ QEXISTING 3.61
Basin 1 0.44 0.35 0.09 QpROPOSED 5.50
0oETAINED 3.32
Table 2.A-Basin 1, Overflow Capacity of 12"x12" Brooks Catch Basin Outlet
Using Broad Crested Weir Formula equation (6-10) Q=CLH1.s where Coefficient C is 3.3.
Basin Elev Coefficient Weir Length H (ft) Q (cfs) (ft)
0.833 3.3 4 0 0.00
0.9 3.3 4 0.067 0.23
1 3.3 4 0.167 0.90
1.1 3.3 4 0.267 1.82
1.2 3.3 4 0.367 2.93
1.3 3.3 4 0.467 4.21
1.4 3.3 4 0.567 5.64
Table 2.8-Flowrate Through 32" Engineered Soil Media to Native Soils, Q=KIA
AeAs1N= 173
Basin Depth K (in/hr)* I, Hydraulic
(ft) Gradient
0.00 5 1.000
0.10 5 1.038
0.20 5 1.075
0.30 5 1.113
0.40 5 1.150
0.50 5 1.188
0.60 5 1.225
0.70 5 1.263
0.80 5 1.300
0.833 5 1.312
0.90 5 1.338
1.00 5 1.375
1.10 5 1.413
1.20 5 1.450
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
Q(cfs)
0.020
0.021
0.022
0.022
0.023
0.024
0.025
0.025
0.026
0.026
0.027
0.028
0.028
0.029
bf.tA, Inc.
land planning, civil engineering, surveying
39 L_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1.30 5 1.488 0.030
1.40 5 1.525 0.031
*From GeoSoils Report for Feasibility Infiltration Testing, see
References.
Table 2.C-Basin 1, Capacity of 0.5"-dia Draindown Orifice Plate
Using standard submerged Orifice Flow equation (6-12) Q=CoA(2gH)0·5
Basin Depth Orifice Size (Diameter) Coefficient (ft) Dia.(ft) Area (sf)
0.0 0.04166 0.00136 0.603
0.1 0.04166 0.00136 0.603
0.2 0.04166 0.00136 0.603
0.3 0.04166 0.00136 0.603
0.4 0.04166 0.00136 0.603
0.5 0.04166 0.00136 0.603
0.6 0.04166 0.00136 0.603
0.7 0.04166 0.00136 0.603
0.8 0.04166 0.00136 0.603
0.833 0.04166 0.00136 0.603
0.9 0.04166 0.00136 0.603
1.0 0.04166 0.00136 0.603
1.1 0.04166 0.00136 0.603
1.2 0.04166 0.00136 0.603
1.3 0.04166 0.00136 0.603
1.4 0.04166 0.00136 0.603
Table 2.D-Main Basin Depth vs. Storage and Discharge Information
Bottom Basin Area (sf) = 173
Elev Volume CF Depth Vlume acre-ft
189.6 123.98 0 0.0028
189.7 141.98 0.1 0.0033
189.8 161.38 0.2 0.0037
189.9 182.18 0.3 0.0042
190.0 204.38 0.4 0.0047
190.1 227.98 0.5 0.0052
190.2 252.98 0.6 0.0058
190.3 279.38 0.7 0.0064
190.4 307.18 0.8 0.0071
190.433 316.66 0.833 0.0073
190.5 336.38 0.9 0.0077
190.6 366.98 1.0 0.0084
Head (ft) 0drain
(cfs)
2.667 0.011
2.767 0.011
2.867 0.011
2.967 0.011
3.067 0.012
3.167 0.012
3.267 0.012
3.367 0.012
3.467 0.012
3.500 0.012
3.567 0.012
3.667 0.013
3.767 0.013
3.867 0.013
3.967 0.013
4.067 0.013
Outflow
0.0200 Total Storage in Soil Media***
0.0208
0.0215
0.0223
0.0230
0.0238
0.0245
0.0253
0.0260
0.0263
0.2557
0.9284
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 40 [ __
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
190.7 398.98 1.1 0.0092 1.8494
190.8 432.38 1.2 0.0099 2.9638
190.9 467.18 1.3 0.0107 4.2424
191.0 503.38 1.4 0.0116 5.6662
***assuming 30% Void Ratio in Gravel Layer and 25% Void Ratio in Engineered
Soil Layer (typical value)
Drawdown calculator:
Using Darcy's Law to calculate time required to drain 10" of pond depth:
173 Basin Bottom Area (sf):
317 Basin Volume @ 10" Depth (d):
2.667 Depth of Engineered Soil above Outlet Point (ft):
5 Assumed Soil Hydraulic Conductivity in Engineered Soil (in/hr):
Q= KIA; where I= Hydraulic Gradient above outlet point
0.03
3.35
Q at outlet point ( cfs)
Drawdown Time (hrs) < 72 hrs ,/
bliA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 41 L_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 2 (Node 7):
Table 3.0-Detention Flow Results Summary-100 Vear
Total Site
(cfs)
QIN Oour 6Q Cli:xJSTJNG 3.61
Basin 2 0.34 0.15 0.19 QpROPOSED 5.50
0oETAINED 3.32
Table 3.A-Basin 2, Overflow Capacity of 12"x12" Brooks Catch Basin Outlet
Using Broad Crested Weir Formula equation (6-10} Q=CLH1·5 where Coefficient C is 3.3.
Basin Elev Coefficient Weir Length H (ft) Q (cfs) (ft)
0.833 3.3 4 0 0.00
0.9 3.3 4 0.067 0.23
1 3.3 4 0.167 0.90
1.1 3.3 4 0.267 1.82
1.2 3.3 4 0.367 2.93
1.3 3.3 4 0.467 4.21
1.4 3.3 4 0.567 5.64
Table 3.8-Flowrate Through 32" Engineered Soil Media to Native Soils, Q=KIA
A0AS1N= 170
Basin Depth K (in/hr)* I, Hydraulic
(ft) Gradient
0.00 5 1.000
0.10 5 1.038
0.20 5 1.075
0.30 5 1.113
0.40 5 1.150
a.so 5 1.188
0.60 5 1.225
0.70 5 1.263
0.80 5 1.300
0.833 5 1.312
0.90 5 1.338
1.00 5 1.375
1.10 5 1.413
1.20 5 1.450
1.30 5 1.488
1.40 5 1.525
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
Q (cfs)
0.020
0.020
0.021
0.022
0.023
0.023
0.024
0.025
0.026
0.026
0.026
0.027
0.028
0.029
0.029
0.030
b~A, Inc.
land planning, civil engineering, surveying
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~----'
I
42 L_
I
I
I
I
I
I
I
I
I
I
1·
I
I
I
I
I
I
*From GeoSoils Report for Feasibility Infiltration Testing, see
References.
Table 3.C-Basin 2, Capacity of 0.5"-dia Draindown Orifice Plate
Using standard submerged Orifice Flow equation (6-12) Q=C0A(2gH)0·5
Basin Depth Orifice Size (Diameter) Coefficient Head (ft) (ft) Dia.(ft) Area (sf)
0.0 0.04166 0.00136 0.603 2.667
0.1 0.04166 0.00136 0.603 2.767
0.2 0.04166 0.00136 0.603 2.867
0.3 0.04166 0.00136 0.603 2.967
0.4 0.04166 0.00136 0.603 3.067
0.5 0.04166 0.00136 0.603 3.167
0.6 0.04166 0.00136 0.603 3.267
0.7 0.04166 0.00136 0.603 3.367
0.8 0.04166 0.00136 0.603 3.467
0.833 0.04166 0.00136 0.603 3.500
0.9 0.04166 0.00136 0.603 3.567
1.0 0.04166 0.00136 0.603 3.667
1.1 0.04166 0.00136 0.603 3.767
1.2 0.04166 0.00136 0.603 3.867
1.3 0.04166 0.00136 0.603 3.967
1.4 0.04166 0.00136 0.603 4.067
Table 3.D-Main Basin Depth vs. Storage and Discharge Information
Bottom Basin Area (sf) = 170
Elev Volume CF Depth Vlume acre-ft Outflow
189.6 121.83 0 0.0028 0.0197
189.7 140.83 0.1 0.0032 0.0204
189.8 163.83 0.2 0.0038 0.0212
189.9 190.83 0.3 0.0044 0.0219
190.0 221.83 0.4 0.0051 0.0226
190.1 256.83 0.5 0.0059 0.0234
190.2 295.83 0.6 0.0068 0.0241
190.3 338.83 0.7 0.0078 0.0248
190.4 385.83 0.8 0.0089 0.0256
190.433 402.22 0.833 0.0092 0.0258
190.5 436.83 0.9 0.0100 0.2552
190.6 491.83 1.0 0.0113 0.9279
190.7 550.83 1.1 0.0126 1.8489
190.8 613.83 1.2 0.0141 2.9633
Udrain
(cfs)
0.011
0.011
0.011
0.011
0.012
0.012
0.012
0.012
0.012
0.012
0.012
0.013
0.013
0.013
0.013
0.013
Total Storage in Soil Media***
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista bhA, Inc. I 1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study ~ ~~~~~~-~~~~~~~~~~~~~~~-~~~~~~~~~~~·____J 43 L___
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
190.9 680.83 1.3 0.0156 4.2419
191.0 751.83 1.4 0.0173 5.6657
***assuming 30% Void Ratio in Gravel Layer and 25% Void Ratio in Engineered
Soil Layer (typical value)
Drawdown calculator:
Using Darcy's Law to calculate time required to drain 10" of pond depth:
170 Basin Bottom Area (sf): 1-------1
402 Basin Volume@ 10" Depth (d):. 1-------1
2.667 Depth of Engineered Soil above Outlet Point (ft): 1-------1
5 Assumed Soil Hydraulic Conductivity in Engineered Soil (in/hr): ..._ ___ ___.
Q= KIA; where I= Hydraulic Gradient above outlet point
0.03
4.33
Q at outlet point (cfs)
Drawdown Time (hrs)< 72 hrs
bttA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 44 L_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 3 (Node 11):
Table 4.0-Detention Flow Results Summary-100 Year
Total
Site {cfs}
QIN G.our tlQ ClEx,sTING 3.61
Basin 3 1.19 0.66 0.53 QpROPOSED 5.50
OoerAINED 3.32
Table 4.A-Basin 3, Overflow Capacity of 12"x12" Brooks Catch Basin Outlet
Using Broad Crested Weir Formula equation (6-10) Q=CLH1·5 where Coefficient C is 3.3 .
Basin Elev Coefficient . Weir Length H (ft) Q (cfs) (ft)
0.833 3.3 4 0 0.00
0.9 3.3 4 0.067 0.23
1 3.3 4 0.167 0.90
1.1 3.3 4 0.267 1.82
1.2 3.3 4 0.367 2.93
1.3 3.3 4 0.467 4.21
1.4 3.3 4 0.567 5.64
Table 4.8-Flowrate Through 32" Engineered Soil Media to Native Soils, Q=KIA
AsAS1N= 390
Basin Depth K {in/hr)* I, Hydraulic Q (cfs) (ft) Gradient
0.00 5 1.000 0.045
0.10 5 1.038 0.047
0.20 5 1.075 0.049
0.30 5 1.113 0.050
0.40 5 1.150 0.052
0.50 5 1.188 0.054
0.60 5 1.225 0.055
0.70 5 1.263 0.057
0.80 5 1.300 0.059
0.833 5 1.312 0.059
0.90 5 1.338 0.060
1.00 5 1.375 0.062
1.10 5 1.413 0.064
1.20 5 1.450 0.065
1.30 5 1.488 0.067
1.40 5 1.525 0.069
bHA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*From GeoSoils Report for Feasibility Infiltration Testing,
see References.
Table 4.C-Basin 3, Capacity of 0.5"-dia Draindown Orifice Plate
Using standard submerged Orifice Flow equation (6-12) Q=C0A(2gH)°-5
Basin Depth Orifice Size (Diameter) Coefficient Head (ft) (ft) Dia.(ft) Area (sf)
0.0 0.04166 0.00136 0.603 2.667
0.1 0.04166 0.00136 0.603 2.767
0.2 0.04166 0.00136 0.603 2.867
0.3 0.04166 0.00136 0.603 2.967
0.4 0.04166 0.00136 0.603 3.067
0.5 0.04166 0.00136 0.603 3.167
0.6 0.04166 0.00136 0.603 3.267
0.7 0.04166 0.00136 0.603 3.367
0.8 0.04166 0.00136 0.603 3.467
0.8 0.04166 0.00136 0.603 3.5
0.9 0.04166 0.00136 0.603 3.567
1.0 0.04166 0.00136 0.603 3.667
1.1 0.04166 0.00136 0.603 3.767
1.2 0.04166 0.00136 0.603 3.867
1.3 0.04166 0.00136 0.603 3.967
1.4 0.04166 0.00136 0.603 4.067
Table 4.D-Main Basin Depth vs. Storage and Discharge Information
Bottom Basin Area (sf) = 390
Elev Volume CF Depth Vlume acre-ft Outflow
189.6 279.50 0 0.006 0.045
189.7 319.92 0.1 0.007 0.047
189.8 363.18 0.2 0.008 0.049
189.9 409.28 0.3 0.009 0.050
190.0 458.22 0.4 0.011 0.052
190.1 510.00 0.5 0.012 0.054
190.2 564.62 0.6 0.013 0.055
190.3 622.08 0.7 0.014 0.057
190.4 682.38 0.8 0.016 0.059
190.433 702.90 0.833 0.016 0.059
190.5 745.52 0.9 0.017 0.289
190.6 811.50 1.0 0.019 0.963
190.7 880.32 1.1 0.020 1.885
190.8 951.98 1.2 0.022 3.000
Q drain
(cfs)
0.011
0.011
0.011
0.011
0.012
0.012
0.012
0.012
0.012
0.012
0.012
0.013
0.013
0.013
0.013
0.013
Total Storage in Soil Media***
bJ.iA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 46
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
190.9 1026.48 1.3 0.024
191.0 1103.82 1.4 0.025
***assuming 30% Void Ratio in Gravel Layer and 25% Void Ratio in
Engineered Soil Layer (typical value}
Drawdown calculator:
4.280
5.705
Using Darcy's Law to calculate time required to drain 10" of pond depth:
390 Basin Bottom Area (sf}:
703 Basin Volume @ 10" Depth (cf}:
2.667 Depth of Engineered Soil above Outlet Point (ft}:
5 Assumed Soil Hydraulic Conductivity in Engineered Soil (in/hr}:
Q= KIA; where I= Hydraulic Gradient above outlet point
0.06
3.30
Q at outlet point (cfs}
Drawdown Time (hrs} < 72 hrs ,/
bl-IA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 47
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 4 (Node 15):
Table 5.0-Detention Flow Results Summary-100 Year
Total
Site {cfs)
QiN Oour l:IQ QEXISTING 3.61
Basin 4 0.95 0.74 0.21 QpROPOSED 5.50
0oETAINED 3.32
Table S.A-Basin 4, Overflow Capacity of 12"xl2" Brooks Catch Basin Outlet
Using Broad Crested Weir Formula equation (6-10) Q=CLH1·5 where Coefficient C is 3.3.
Basin Elev Coefficient Weir Length H (ft) Q (cfs) (ft)
0.833 3.3 4 0 0.00
0.9 3.3 4 0.067 0.23
1 3.3 4 0.167 0.90
1.1 3.3 4 0.267 1.82
1.2 3.3 4 0.367 2.93
1.3 3.3 4 0.467 4.21
1.4 3.3 4 0.567 5.64
Table S.B-Flowrate Through 32" Engineered Soil Media to Native Soils, Q=KIA
A0AS1N= 381
Basin K (in/hr)* I, Hydraulic Q (cfs) Depth (ft) Gradient
0.00 5 1.000 0.044
0.10 5 1.038 0.046
0.20 5 1.075 0.047
0.30 5 1.113 0.049
0.40 5 1.150 0.051
a.so 5 1.188 0.052
0.60 5 1.225 0.054
0.70 5 1.263 0.056
0.80 5 1.300 0.057
0.833 5 1.312 0.058
0.90 5 1.338 0.059
1.00 5 1.375 0.061
1.10 5 1.413 0.062
1.20 5 1.450 0.064
1.30 5 1.488 0.066
1.40 5 1.525 0.067
bl-IA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, suNeying
Drainage Study
--·---------~~-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*From GeoSoils Report for Feasibility Infiltration Testing,
see References.
Table S.C-Basin 4, Capacity of 0.5"-dia Draindown Orifice Plate
Using standard submerged Orifice Flow equation {6-12) Q=C0A{2gH)0·5
Basin Orifice Size (Diameter) Coefficient Head {ft) Depth (ft) Dia.(ft) Area {sf)
0.0 0.04166 0.00136 0.603 2.667
0.1 0.04166 0.00136 0.603 2.767
0.2 0.04166 0.00136 0.603 2.867
0.3 0.04166 0.00136 0.603 2.967
0.4 0.04166 0.00136 0.603 3.067
0.5 0.04166 0.00136 0.603 3.167
0.6 0.04166 0.00136 0.603 3.267
0.7 0.04166 0.00136 0.603 3.367
0.8 0.04166 0.00136 0.603 3.467
0.833 0.04166 0.00136 0.603 3.500
0.9 0.04166 0.00136 0.603 3.567
1.0 0.04166 0.00136 0.603 3.667
1.1 0.04166 0.00136 0.603 3.767
1.2 0.04166 0.00136 0.603 3.867
1.3 0.04166 0.00136 0.603 3.967
1.4 0.04166 0.00136 0.603 4.067
Table S.D-Main Basin Depth vs. Storage and Discharge Information
Bottom Basin Area (sf) = 381
Elev Volume CF Depth Vlume acre-ft Outflow
189.6 273.05 0 0.006 0.044
189.7 312.02 0.1 0.007 0.046
189.8 352.73 0.2 0.008 0.047
189.9 395.18 0.3 0.009 0.049
190.0 439.37 0.4 0.010 0.051
190.1 485.30 0.5 0.011 0.052
190.2 532.97 0.6 0.012 0.054
190.3 582.38 0.7 0.013 0.056
190.4 633.53 0.8 0.015 0.057
190.433 650.79 0.833 0.015 0.058
190.5 686.42 0.9 0.016 0.288
190.6 741.05 1.0 0.017 0.961
190.7 797.42 1.1 0.018 1.883
190.8 855.53 1.2 0.020 2.999
0drain
{cfs)
0.011
0.011
0.011
0.011
0.012
0.012
0.012
0.012
0.012
0.012
0.012
0.013
0.013
0.013
0.013
0.013
Total Storage in Soil Media***
bHA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 49
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
190.9 915.38 1.3 0.021 4.278
191.0 976.97 1.4 0.022 5.703
***assuming 30% Void Ratio in Gravel Layer and 25% Void Ratio in
Engineered Soil Layer (typical value)
Drawdown calculator:
Using Darcy's Law to calculate time required to drain 10" of pond depth:
381 Basin Bottom Area (sf): ____ _,
651 Basin Volume@ 10" Depth (cf): 1-----t
2.667 Depth of Engineered Soil above Outlet Point (ft):
5 Assumed Soil Hydraulic Conductivity in Engineered Soil (in/hr):
Q= KIA; where I= Hydraulic Gradient above outlet point
0.06 Q at outlet point (cfs)
3.12 Drawdown Time (hrs)< 72 hrs
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 50
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 5 (Node 39):
Table 6.0-Detention Flow Results Summary-100 Year
Total
Site (cfs}
QIN Oour l\Q <lExtSTING 3.61
Basin 5 0.62 0.53 0.09 QPROPOSED 5.50
QDETAINED 3.32
Table 6.A-Basin 5, Overflow Capacity of 12"x12" Brooks Catch Basin Outlet
Using Broad Crested Weir Formula equation (6-10) Q=CLH1·5 where Coefficient C is 3.3.
Basin Elev Coefficient Weir Length H (ft) Q(cfs) (ft)
0.833 3.3 4 0 0.00
0.9 3.3 4 0.067 0.23
1 3.3 4 0.167 0.90
1.1 3.3 4 0.267 1.82
1.2 3.3 4 0.367 2.93
1.3 3.3 4 0.467 4.21
1.4 3.3 4 0.567 5.64
Table 6.8-Flowrate Throu2h 32" En2ineered Soil Media to Native Soils, Q=KIA
AsAstN= 200
Basin K (in/hr)* I, Hydraulic Q (cfs) Depth (ft) Gradient
0.00 5 1.000 0.023
0.10 5 1.038 0.024
0.20 5 1.075 0.025
0.30 5 1.113 0.026
0.40 5 1.150 0.027
0.50 5 1.188 0.027
0.60 5 1.225 0.028
0.70 5 1.263 0.029
0.80 5 1.300 0.030
0.833 5 1.312 0.030
0.90 5 1.338 0.031
1.00 5 1.375 0.032
1.10 5 1.413 0.033
1.20 5 1.450 0.034
1.30 5 1.488 0.034
1.40 5 1.525 0.035
bliA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 5 l
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*From GeoSoils Report for Feasibility Infiltration Testing,
see References.
Table 6.C-Basin 5, Capacity of 0.5"-dia Draindown Orifice Plate
Using standard submerged Orifice Flow equation (6-12) Q=C0A(2gH)°-5
Basin Orifice
Size (Diameter) Coefficient Head (ft) Depth {ft) Dia.(ft) Area (sf)
0.0 0.04166 0.00136 0.603 2.667
0.1 0.04166 0.00136 0.603 2.767
0.2 0.04166 0.00136 0.603 2.867
0.3 0.04166 0.00136 0.603 2.967
0.4 0.04166 0.00136 0.603 3.067
0.5 0.04166 0.00136 0.603 3.167
0.6 0.04166 0.00136 0.603 3.267
0.7 0.04166 0.00136 0.603 3.367
0.8 0.04166 0.00136 0.603 3.467
0.833 0.04166 0.00136 0.603 3.500
0.9 0.04166 0.00136 0.603 3.567
1.0 0.04166 0.00136 0.603 3.667
1.1 0.04166 0.00136 0.603 3.767
1.2 0.04166 0.00136 0.603 3.867
1.3 0.04166 0.00136 0.603 3.967
1.4 0.04166 0.00136 0.603 4.067
Table 6.D-Main Basin Depth vs. Storage and Discharge Information
Bottom Basin Area (sf) = 200
Elev Volume CF Depth Vlume acre-ft Outflow
189.6 143.33 0 0.0033 0.023
189.7 164.23 0.1 0.0038 0.024
189.8 186.94 0.2 0.0043 0.025
189.9 211.45 0.3 0.0049 0.026
190.0 237.76 0.4 0.0055 0.027
190.1 265.87 0.5 0.0061 0.027
190.2 295.78 0.6 0.0068 0.028
190.3 327.50 0.7 0.0075 0.029
190.4 361.02 0.8 0.0083 0.030
190.433 372.48 0.833 0.0086 0.030
190.5 396.35 0.9 0.0091 0.260
190.6 433.47 1.0 0.0100 0.933
190.7 472.40 1.1 0.0108 1.854
0drain
(ds)
0.011
0.011
0.011
0.011
0.012
0.012
0.012
0.012
0.012
0.012
0.012
0.013
0.013
0.013
0.013
0.013
Total Storage in Soil Media***
M-tA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study _J 52 l __
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
190.8 513.13 1.2 0.0118 2.968
190.9 555.67 1.3 0.0128 4.247
191.0 600.01 1.4 0.0138 5.671
***assuming 30% Void Ratio in Gravel Layer and 25% Void Ratio in
Engineered Soil Layer (typical value)
Drawdown calculator:
Using Darcy's Law to calculate time required to drain 10" of pond depth:
200 Basin Bottom Area (sf):
372 Basin Volume@ 10" Depth (cf):
2.667 Depth of Engineered Soil above Outlet Point (ft):
5 Assumed Soil Hydraulic Conductivity in Engineered Soil (in/hr):
Q= KIA; where I= Hydraulic Gradient above outlet point
0.03 Q at outlet point (cfs)
3.41 Drawdown Time (hrs)< 72 hrs
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista b~A, Inc. I 1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study -~ ~~~~~~~~~~~·~~~~~~~--~~~-~~--~~~~~~~~~~~-' 53 L____
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 6 (Node 19):
Table 7.0-Detention Flow Results Summary-100 Year
Total
Site {cfs}
OJN ClouT ~Q Uex1STING 3.61
Basin 6 0.86 0.7 0.16 QpROPOSED 5.50
CloETAINED 3.32
Table 7 A-Basin 6, Overflow Capacity of 12"x12" Brooks Catch Basin Outlet
Using Broad Crested Weir Formula equation (6-10) Q=CLH1·5 where Coefficient C is 3.3.
Basin Elev Coefficient Weir Length H (ft) Q (cfs) (ft)
0.833 3.3 4 0 0.00
0.9 3.3 4 0.067 0.23
1 3.3 4 0.167 0.90
1.1 3.3 4 0.267 1.82
1.2 3.3 4 0.367 2.93
1.3 3.3 4 0.467 4.21
1.4 3.3 4 0.567 5.64
Table 7 .B-Flowrate Through 32" Engineered Soil Media to Native Soils, Q=KIA
AeAS1N= 381
Basin K (in/hr)* I, Hydraulic Q (cfs) Depth (ft) Gradient
0.00 5 1.000 0.044
0.10 5 1.038 0.046
0.20 5 1.075 0.047
0.30 5 1.113 0.049
0.40 5 1.150 0.051
0.50 5 1.188 0.052
0.60 5 1.225 0.054
0.70 5 1.263 0.056
0.80 5 1.300 0.057
0.833 5 1.312 0.058
0.90 5 1.338 0.059
1.00 5 1.375 0.061
1.10 5 1.413 0.062
1.20 5 1.450 0.064
1.30 5 1.488 0.066
1.40 5 1.525 0.067
M-1A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study ~~~~~~~~~~-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*From GeoSoils Report for Feasibility Infiltration Testing,
see References.
Table 7.C-Basin 61 Capacity of 0.5"-dia Draindown Orifice Plate
Using standard submerged Orifice Flow equation (6-12) Q=C0A(2gH)0·5
Basin Orifice Size (Diameter) Coefficient Head (ft) Depth (ft) Dia.(ft) Area (sf)
0.0 0.04166 0.00136 0.603 2.667
0.1 0.04166 0.00136 0.603 2.767
0.2 0.04166 0.00136 0.603 2.867
0.3 0.04166 0.00136 0.603 2.967
0.4 0.04166 0.00136 0.603 3.067
0.5 0.04166 0.00136 0.603 3.167
0.6 0.04166 0.00136 0.603 3.267
0.7 0.04166 0.00136 0.603 3.367
0.8 0.04166 0.00136 0.603 3.467
0.833 0.04166 0.00136 0.603 3.500
0.9 0.04166 0.00136 0.603 3.567
1.0 0.04166 0.00136 0.603 3.667
1.1 0.04166 0.00136 0.603 3.767
1.2 0.04166 0.00136 0.603 3.867
1.3 0.04166 0.00136 0.603 3.967
1.4 0.04166 0.00136 0.603 4.067
Table 7.D-Main Basin Depth vs. Storage and Discharge Information
Bottom Basin Area (sf) = 381
Elev Volume CF Depth Vlume acre-ft Outflow
189.6 273.05 0 0.006 0.044
189.7 312.02 0.1 0.007 0.046
189.8 352.73 0.2 0.008 0.047
189.9 395.18 0.3 0.009 0.049
190.0 439.37 0.4 0.010 0.051
190.1 485.30 0.5 0.011 0.052
190.2 532.97 0.6 0.012 0.054
190.3 582.38 0.7 0.013 0.056
190.4 633.53 0.8 0.015 0.057
190.433 650.79 0.833 0.015 0.058
190.5 686.42 0.9 0.016 0.288
190.6 741.05 1.0 0.017 0.961
190.7 797.42 1.1 0.018 1.883
190.8 855.53 1.2 0.020 2.999
0drain
(ds)
0.011
0.011
0.011
0.011
0.012
0.012
0.012
0.012
0.012
0.012
0.012
0.013
0.013
0.013
0.013
0.013
Total Storage in Soil Media***
bl-tA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 55
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
190.9 915.38 1.3 0.021 4.278
191.0 976.97 1.4 0.022 5.703
***assuming 30% Void Ratio in Gravel Layer and 25% Void Ratio in
Engineered Soil Layer (typical value)
Drawdown calculator:
Using Darcy's Law to calculate time required to drain 10" of pond depth:
381 Basin Bottom Area (sf):
1--------1 651 Basin Volume @ 10" Depth (d): -----I 2.667 Depth of Engineered Soil above Outlet Point (ft): t--------1 5 Assumed Soil Hydraulic Conductivity in Engineered Soil (in/hr): ......_ ___ ...,
Q= KIA; where I= Hydraulic Gradient above outlet point
0.06
3.12
Q at outlet point (ds)
Drawdown Time (hrs)< 72 hrs
bl-IA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 7 (Node 23):
Table 8.0-Detention Flow Results Summary-100 Year
Total Site
(cfs)
QN Clour ~Q Oi:x1STING 3.61
Basin 7 0.51 0.22 0.29 QpROPOSED 5.50
0orrAINED 3.32
Table 8.A-Basin 7, Overflow Capacity of 12"x12" Brooks Catch Basin Outlet
Using Broad Crested Weir Formula equation (6-10) Q=CLH 1·5 where Coefficient C is 3.3.
Basin Elev Coefficient Weir Length H (ft) Q (cfs) (ft)
0.833 3.3 4 0 0.00
0.9 3.3 4 0.067 0.23
1 3.3 4 0.167 0.90
1.1 3.3 4 0.267 1.82
1.2 3.3 4 0.367 2.93
1.3 3.3 4 0.467 4.21
1.4 3.3 4 0.567 5.64
Table 8.B-Flowrate Through 32" Engineered Soil Media to Native Soils, Q=KIA
AaAs1N= 172
Basin Depth K (in/hr)* I, Hydraulic Q {cfs) (ft) Gradient
0.00 5 1.000 0.020
0.10 5 1.038 0.021
0.20 5 1.075 0.021
0.30 5 1.113 0.022
0.40 5 1.150 0.023
0.50 5 1.188 0.024
0.60 5 1.225 0.024
0.70 5 1.263 0.025
0.80 5 1.300 0.026
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista bHA, Inc.
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study ~ .~~~~~~~~--~~~~~~~~~~~~~.-~ 57 L___
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
0.833 5 1.312 0.026
0.90 5 1.338 0.027
1.00 5 1.375 0.027
1.10 5 1.413 0.028
1.20 5 1.450 0.029
1.30 5 1.488 0.030
1.40 5 1.525 0.030
*From GeoSoils Report for Feasibility Infiltration Testing, see
References.
Table 8.C-Basin 7, Capacity of 0.5"-dia Draindown Orifice Plate
Using standard submerged Orifice Flow equation (6-12) Q=C0A(2gH)0·5
Basin Depth Orifice Size (Diameter) Coefficient (ft) Dia.(ft) Area (sf)
Head (ft)
0.0 0.04166 0.00136 0.603 2.667
0.1 0.04166 0.00136 0.603 2.767
0.2 0.04166 0.00136 0.603 2.867
0.3 0.04166 0.00136 0.603 2.967
0.4 0.04166 0.00136 0.603 3.067
0.5 0.04166 0.00136 0.603 3.167
0.6 0.04166 0.00136 0.603 3.267
0.7 0.04166 0.00136 0.603 3.367
0.8 0.04166 0.00136 0.603 3.467
0.833 0.04166 0.00136 0.603 3.500
0.9 0.04166 0.00136 0.603 3.567
1.0 0.04166 0.00136 0.603 3.667
1.1 0.04166 0.00136 0.603 3.767
1.2 0.04166 0.00136 0.603 3.867
1.3 0.04166 0.00136 0.603 3.967
1.4 0.04166 0.00136 0.603 4.067
Table 8.D-Main Basin Depth vs. Storage and Discharge Information
Bottom Basin Area (sf)= 172
Elev Volume CF Depth Vlume acre-ft Outflow
189.6 123.27 0 0.0028 0.0199
Q drain
(ds)
0.011
0.011
0.011
0.011
0.012
0.012
0.012
0.012
0.012
0.012
0.012
0.013
0.013
0.013
0.013
0.013
Total Storage in Soil Media***
bHA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study ____fssL_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
189.7 141.33 0.1 0.0032
189.8 161.11 0.2 0.0037
189.9 182.61 0.3 0.0042
190.0 205.83 0.4 0.0047
190.1 230.77 0.5 0.0053
190.2 257.43 0.6 0.0059
190.3 285.81 0.7 0.0066
190.4 315.91 0.8 0.0073
190.433 326.22 0.833 0.0075
190.5 347.73 0.9 0.0080
190.6 381.27 1.0 0.0088
190.7 416.53 1.1 0.0096
190.8 453.51 1.2 0.0104
190.9 492.21 1.3 0.0113
191.0 532.63 1.4 0.0122
***assuming 30% Void Ratio in Gravel Layer and 25% Void Ratio in
Engineered Soil Layer (typical value)
Drawdown calculator:
0.0207
0.0214
0.0221
0.0229
0.0236
0.0244
0.0251
0.0259
0.0261
0.2555
0.9282
1.8492
2.9636
4.2422
5.6661
Using Darcy's Law to calculate time required to drain 10" of pond depth:
172 Basin Bottom Area (sf):
326 Basin Volume @ 10" Depth (cf):
2.667 Depth of Engineered Soil above Outlet Point (ft):
5 Assumed Soil Hydraulic Conductivity in Engineered Soil (in/hr):
Q= KIA; where I= Hydraulic Gradient above outlet point
~ Q at outlet point (cfs)
~ Drawdown Time (hrs)< 72 hrs
bliA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 59L__
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 8 (Node 27):
Table 9.0-Detention Flow Results Summary-100 Year
Total Site
(cfs)
0JN Qour t.Q Clex1STING 3.61
Basin 8 0.52 0.26 0.26 QPROPOSED 5.50
QoETAINED 3.32
Table 9.A-Basin 81 Overflow Capacity of 12"x12" Brooks Catch Basin Outlet
Using Broad Crested Weir Formula equation (6-10) Q=CLH 1·5 where Coefficient C is 3.3.
Basin Elev Coefficient Weir Length H (ft) Q (cfs) (ft)
0.833 3.3 4 0 0.00
0.9 3.3 4 0.067 0.23
1 3.3 4 0.167 0.90
1.1 3.3 4 0.267 1.82
1.2 3.3 4 0.367 2.93
1.3 3.3 4 0.467 4.21
1.4 3.3 4 0.567 5.64
Table 9.8-Flowrate Through 32" Engineered Soil Media to Native Soils. Q=KIA
AaAS1N= 172
Basin Depth K (in/hr)* I, Hydraulic
(ft) Gradient
0.00 5 1.000
0.10 5 1.038
0.20 5 1.075
0.30 5 1.113
0.40 5 1.150
0.50 5 1.188
0.60 5 1.225
0.70 5 1.263
0.80 5 1.300
0.833 5 1.312
0.90 5 1.338
1.00 5 1.375
1.10 5 1.413
1.20 5 1.450
1.30 5 1.488
1.40 5 1.525
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
Q (cfs)
0.020
0.021
0.021
0.022
0.023
0.024
0.024
0.025
0.026
0.026
0.027
0.027
0.028
0.029
0.030
0.030
bHA, Inc.
land planning, civil engineering, surveying
60 L_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*From GeoSoils Report for Feasibility Infiltration Testing, see
References.
Table 9.C-Basin 8, Capacity of 0.5"-dia Draindown Orifice Plate
Using standard submerged Orifice Flow equation (6-12) Q=C0A(2gH)°-5
Basin Depth Orifice Size (Diameter) Coefficient Head (ft) (ft) Dia.(ft) Area (sf)
0.0 0.04166 0.00136 0.603 2.25
0.1 0.04166 0.00136 0.603 2.35
0.2 0.04166 0.00136 0.603 2.45
0.3 0.04166 0.00136 0.603 2.55
0.4 0.04166 0.00136 0.603 2.65
0.5 0.04166 0.00136 0.603 2.75
0.6 0.04166 0.00136 0.603 2.85
0.7 0.04166 0.00136 0.603 2.95
0.8 0.04166 0.00136 0.603 3.05
0.833 0.04166 0.00136 0.603 3.083
0.9 0.04166 0.00136 0.603 3.15
1.0 0.04166 0.00136 0.603 3.25
1.1 0.04166 0.00136 0.603 3.35
1.2 0.04166 0.00136 0.603 3.45
1.3 0.04166 0.00136 0.603 3.55
1.4 0.04166 0.00136 0.603 3.65
Table 9.D-Main Basin Depth vs. Storage and Discharge Information
Bottom Basin Area (sf)= 172
Elev Volume CF Depth Vlume acre-ft Outflow
189.6 123.27 0 0.0028 0.0199
189.7 141.25 0.1 0.0032 0.0207
189.8 160.79 0.2 0.0037 0.0214
189.9 181.89 0.3 0.0042 0.0221
190.0 204.55 0.4 0.0047 0.0229
190.1 228.77 0.5 0.0053 0.0236
190.2 254.55 0.6 0.0058 0.0244
190.3 281.89 0.7 0.0065 0.0251
190.4 310.79 0.8 0.0071 0.0259
190.433 320.67 0.833 0.0074 0.0261
190.5 341.25 0.9 0.0078 0.2555
190.6 373.27 1.0 0.0086 0.9282
190.7 406.85 1.1 0.0093 1.8492
190.8 441.99 1.2 0.0101 2.9636
0drain
(ds)
0.010
0.010
0.010
0.011
0.011
0.011
0.011
0.011
0.012
0.012
0.012
0.012
0.012
0.012
0.012
0.013
Total Storage in Soil Media***
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 61
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
190.9 478.69 1.3 0.0110 4.2422
191.0 516.95 1.4 0.0119 5.6661
***assuming 30% Void Ratio in Gravel Layer and 25% Void Ratio in Engineered
Soil Layer (typical value)
Drawdown calculator:
Using Darcy's Law to calculate time required to drain 10" of pond depth:
172 Basin Bottom Area (sf): 1-------1
321 Basin Volume @ 10" Depth (cf): 1-------1
2.25 Depth of Engineered Soil above Outlet Point (ft): 1-------1
5 Assumed Soil Hydraulic Conductivity in Engineered Soil (in/hr): .__ ___ __.
Q= KIA; where I= Hydraulic Gradient above outlet point
0.03
3.27
Q at outlet point (cfs)
Drawdown Time (hrs)< 72 hrs ,/
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista bf-tA, Inc. I 1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study ~
------------------------------------~____J 62 L____
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 9 (Node 31):
Table 10.0-Detention Flow Results Summary-100 Year
Total
Site {cfs)
ClJN Oour ~Q QEXISTING 3.61
Basin 9 0.37 0.12 0.25 QpROPOSED 5.50
CloETAINED 3.32
Table 10.A-Basin 9. Overflow Capacity of 12"x12" Brooks Catch Basin Outlet
Using Broad Crested Weir Formula equation (6-10) Q=CLH1·5 where Coefficient C is 3.3.
Basin Elev Coefficient Weir Length H (ft) Q (cfs) (ft)
0.833 3.3 4 0 0.00
0.9 3.3 4 0.067 0.23
1 3.3 4 0.167 0.90
1.1 3.3 4 0.267 1.82
1.2 3.3 4 0.367 2.93
1.3 3.3 4 0.467 4.21
1.4 3.3 4 0.567 5.64
Table 10.B-Flowrate Through 32" Engineered Soil Media to Native Soils, Q=KIA
AsAS1N= 261
Basin K (in/hr)* I, Hydraulic Q (cfs) Depth (ft) Gradient
0.00 5 1.000 0.030
0.10 5 1.038 0.031
0.20 5 1.075 0.032
0.30 5 1.113 0.034
0.40 5 1.150 0.035
0.50 5 1.188 0.036
0.60 5 1.225 0.037
0.70 5 1.263 0.038
0.80 5 1.300 0.039
bliA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 63 L_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
0.833 5 1.312 0.040
0.90 5 1.338 0.040
1.00 5 1.375 0.042
1.10 5 1.413 0.043
1.20 5 1.450 0.044
1.30 5 1.488 0.045
1.40 5 1.525 0.046
*From GeoSoils Report for Feasibility Infiltration Testing,
see References.
Table 10.C-Basin 9, Capacity of 0.5"-dia Draindown Orifice Plate
Using standard submerged Orifice Flow equation (6-12) Q=CoA(2gH)°·5
Orifice
Basin Size (Diameter) Coefficient Head (ft) Depth (ft) Dia.(ft) Area (sf)
0.0 0.04166 0.00136 0.603 2.25
0.1 0.04166 0.00136 0.603 2.35
0.2 0.04166 0.00136 0.603 2.45
0.3 0.04166 0.00136 0.603 2.55
0.4 0.04166 0.00136 0.603 2.65
0.5 0.04166 0.00136 0.603 2.75
0.6 0.04166 0.00136 0.603 2.85
0.7 0.04166 0.00136 0.603 2.95
0.8 0.04166 0.00136 0.603 3.05
0.833 0.04166 0.00136 0.603 3.083
0.9 0.04166 0.00136 0.603 3.15
1.0 0.04166 0.00136 0.603 3.25
1.1 0.04166 0.00136 0.603 3.35
1.2 0.04166 0.00136 0.603 3.45
1.3 0.04166 0.00136 0.603 3.55
1.4 0.04166 0.00136 0.603 3.65
Table 10.D-Main Basin Depth vs. Storage and Discharge Information
Bottom Basin Area (sf) = 261 I Elev I Volume CF I Depth I Vlume acre-ft I Outflow
Udrain
(cfs)
0.010
0.010
0.010
0.011
0.011
0.011
0.011
0.011
0.012
0.012
0.012
0.012
0.012
0.012
0.012
0.013
bl-tA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 64 L__
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
189.6 187.05 0 0.004 0.030 Total Storage in Soil Media***
189.7 213.94 0.1 0.005 0.031
189.8 242.39 0.2 0.006 0.032
189.9 272.42 0.3 0.006 0.034
190.0 304.02 ' 0.4 0.007 0.035
190.1 337.19 0.5 0.008 0.036
190.2 371.93 0.6 0.009 0.037
190.3 408.24 0.7 0.009 0.038
190.4 446.12 0.8 0.010 0.039
190.433 458.97 0.833 0.011 0.040
190.5 485.58 0.9 0.011 0.269
190.6 526.60 1.0 0.012 0.942
190.7 569.20 1.1 0.013 1.864
190.8 613.36 1.2 0.014 2.979
190.9 659.10 1.3 0.015 4.258
191.0 706.41 1.4 0.016 5.682
***assuming 30% Void Ratio in Gravel Layer and 25% Void Ratio in
Engineered Soil Layer (typical value)
Drawdown calculator:
Using Darcy's Law to calculate time required to drain 10" of pond depth:
261 Basin Bottom Area (sf): 1-------1
459 Basin Volume@ 10" Depth (cf): 1-------1
2.25 Depth of Engineered Soil above Outlet Point (ft):
5 Assumed Soil Hydraulic Conductivity in Engineered Soil (in/hr):
Q= KIA; where I= Hydraulic Gradient above outlet point
~ Q at outlet point (ds)
~ Drawdown Time (hrs)< 72 hrs
bl-tA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, suNeying
Drainage Study 65 l_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 10 (Node 35):
Table 10.0-Detention Flow Results Summary-100 Year
Total
Site {cfs)
QIN Oour ~Q QEXISTING 3.61
Basin 10 0.37 0.26 0.11 QPROPOSED 5.50
0oETAINED 3.32
Table 10.A-Basin 10, Overflow Capacity of 12"x12" Brooks Catch Basin Outlet
Using Broad Crested Weir Formula equation (6-10) Q=CLH1·5 where Coefficient C is 3.3.
Basin Elev Coefficient Weir Length H (ft) Q (cfs) (ft)
0.833 3.3 4 0 0.00
0.9 3.3 4 0.067 0.23
1 3.3 4 0.167 0.90
1.1 3.3 4 0.267 1.82
1.2 3.3 4 0.367 2.93
1.3 3.3 4 0.467 4.21
1.4 3.3 4 0.567 5.64
Table 10.B-Flowrate Through 32" Engineered Soil Media to Native Soils, Q=KIA
AsAs1N= 182
Basin Depth K (in/hr)* I, Hydraulic
(ft) Gradient
0.00 5 1.000
0.10 5 1.038
0.20 5 1.075
0.30 5 1.113
0.40 5 1.150
0.50 5 1.188
0.60 5 1.225
0.70 5 1.263
0.80 5 1.300
0.833 5 1.312
0.90 5 1.338
1.00 5 1.375
1.10 5 1.413
1.20 5 1.450
1.30 5 1.488
1.40 5 1.525
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
Q (cfs)
0.021
0.022
0.023
0.023
0.024
0.025
0.026
0.027
0.027
0.028
0.028
0.029
0.030
0.031
0.031
0.032
b~A, Inc.
land planning, civil engineering, surveying
66 L__
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*From GeoSoils Report for Feasibility Infiltration Testing, see
References.
Table 10.C-Basin 10, Capacity of 0.5"-dia Draindown Orifice Plate
Using standard submerged Orifice Flow equation (6-12) Q=C0A(2gH)0·5
Basin Depth Orifice Size (Diameter) Coefficient Head (ft) (ft) Dia.(ft) Area (sf)
0.0 0.04166 0.00136 0.603 2.25
0.1 0.04166 0.00136 0.603 2.35
0.2 0.04166 0.00136 0.603 2.45
0.3 0.04166 0.00136 0.603 2.55
0.4 0.04166 0.00136 0.603 2.65
0.5 0.04166 0.00136 0.603 2.75
0.6 0.04166 0.00136 0.603 2.85
0.7 0.04166 0.00136 0.603 2.95
0.8 0.04166 0.00136 0.603 3.05
0.833 0.04166 0.00136 0.603 3.083
0.9 0.04166 0.00136 0.603 3.15
1.0 0.04166 0.00136 0.603 3.25
1.1 0.04166 0.00136 0.603 3.35
1.2 0.04166 0.00136 0.603 3.45
1.3 0.04166 0.00136 0.603 3.55
1.4 0.04166 0.00136 0.603 3.65
Table 10.D-Main Basin Depth vs. Storage and Discharge Information
Bottom Basin Area (sf) = 182
Elev Volume CF Depth Vlume acre-ft Outflow
189.6 130.43 0 0.0030 0.0211
189.7 149.17 0.1 0.0034 0.0219
189.8 168.99 0.2 0.0039 0.0226
189.9 189.89 0.3 0.0044 0.0234
190.0 211.87 0.4 0.0049 0.0242
190.1 234.93 0.5 0.0054 0.0250
190.2 259.07 0.6 0.0059 0.0258
190.3 284.29 0.7 0.0065 0.0266
190.4 310.59 0.8 0.0071 0.0274
190.433 319.51 0.833 0.0073 0.0276
190.5 337.97 0.9 0.0078 0.2571
190.6 366.43 1.0 0.0084 0.9298
190.7 395.97 1.1 0.0091 1.8509
190.8 426.59 1.2 0.0098 2.9653
Qd,ain
(cfs)
0.010
0.010
0.010
0.011
0.011
0.011
0.011
0.011
0.012
0.012
0.012
0.012
0.012
0.012
0.012
0.013
Total Storage in Soil Media***
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study _J67L___
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
190.9 458.29 1.3 0.0105
191.0 491.07 1.4 0.0113
***assuming 30% Void Ratio in Gravel Layer and 25% Void Ratio in
Engineered Soil Layer (typical value)
Drawdown calculator:
4.2439
5.6678
Using Darcy's Law to calculate time required to drain 10" of pond depth:
182 Basin Bottom Area (sf): 1-----320 Basin Volume @ 10" Depth (cf): 1-----2.25 Depth of Engineered Soil above Outlet Point (ft): 1-----5 Assumed Soil Hydraulic Conductivity in Engineered Soil (in/hr): .__ ___ ___,
Q= KIA; where I= Hydraulic Gradient above outlet point
0.03
3.07
Q at outlet point (cfs)
Drawdown Time (hrs)< 72 hrs
bkA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 68
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
STORAGE BASIN HYDROGRAPH ROUTING MODEL:
Basin 1 (Node 3):
****************************************************************************
HYDRAULICS ELEMENTS -II PROGRAM PACKAGE
STORAGE BASIN HYDROGRAPH ROUTING MODEL
****************************************************************************
(c) Copyright 1983-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-8700
************************** DESCRIPTION OF STUDY**************************
* Basin 1-Detention Calculations *
* 100 Year Storm *
* Buena Vista, Carlsbad CA *
**************************************************************************
FILE NAME: 1289DT01.DAT
TIME/DATE OF STUDY: 08:26 03/03/2015
ENTERED INFORMATION:
TOTAL NUMBER OF INFLOW HYDROGRAPH INTERVALS= 35
CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 11.000
ASSUMED INITIAL DEPTH(FEET} IN STORAGE BASIN= 0.00
ENTERED INFLOW HYDROGRAPH ORDINATES(CFS):
*INTERVAL FLOW *INTERVAL FLOW *INTERVAL FLOW *
* NUMBER (CFS) * NUMBER (CFS) * NUMBER (CFS) *
* 1: 0.00* 2: 0.00* 3: 0.00*
* 4; 0.00* 5: 0.00* 6: 0.00*
* 7: 0.00* 8: 0.00* 9: 0.00*
* 10: 0.00* 11: 0.00* 12: 0.00*
* 13: 0.00* 14: 0.00* 15: 0.00*
* 16: 0.00* 17: 0.00* 18: 0.00*
* 19: 0.00* 20: 0.00* 21: 0.10*
* 22: 0.10* 23: 0.10* 24: 0.44*
* 25: 0.10* 26: 0.00* 27: 0.00*
* 28: 0.00* 29: 0.00* 30: 0.00*
* 31: 0.00* 32: 0.00* 33: 0.00*
* 34: 0.00* 35: 0.00*
DEPTH-VS.-STORAGE AND DEPTH-VS.-DISCHARGE INFORMATION:
TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES= 15
*BASIN-DEPTH STORAGE
* (FEET} (ACRE-FEET}
* 0.000 0.000
OUTFLOW **BASIN-DEPTH STORAGE
(CFS} ** (FEET} (ACRE-FEET}
0.000** 0.100 0.003
OUTFLOW *
(CFS} *
0.021*
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bl-IA, Inc.
land planning, civil engineering, surveying
69 L_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
* 0.200 0.004 0.022** 0.300 0.004 0.022*
* 0.400 0.005 0.023** 0.500 0.005 0.024*
* 0.600 0.006 0.024** 0.700 0.006 0.025*
* 0.800 0.007 0.026** 0.900 0.008 0.256*
* 1. 000 0.008 0.928** 1.100 0.009 1.849*
* 1. 200 0.010 2.964** 1. 300 0.011 4.242*
* 1. 400 0.012 5.662**
****************************************************************************
INITIAL BASIN DEPTH(FEET) = 0.00
INITIAL BASIN STORAGE(ACRE-FEET) = 0.00
INITIAL BASIN OUTFLOW(CFS) = 0.00
BASIN STORAGE, OUTFLOW
INTERVAL {S-O*DT/2)
NUMBER (ACRE-FEET)
1 0.00000
2 0.00284
3 0.00383
4 0.00403
5 0.00453
6 0.00502
7 0.00561
8 0.00621
9 0.00690
10 0.00576
11 0.00137
12 -0.00481
AND DEPTH ROUTING
{S+O*DT/2)
(ACRE-FEET)
0.00000
0.00316
0.00417
0.00437
0.00487
0.00538
0.00599
0.00659
0.00730
0.00964
0.01543
0.02321
13 -0.01255 0.03235
14 -0.02144 0.04284
15 -0.03129 0.05449
VALUES:
WHERE S=STORAGE(AF);O=OUTFLOW(AF/MIN.);DT=UNIT(MIN.)
*UNIT-HYDROGRAPH STORAGE-BASIN ROUTING*
NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES
OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE
AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL.
GRAPH NOTATION: "I"=MEAN UNIT INFLOW; "O"=OUTFLOW AT GIVEN TIME
TIME INFLOW OUTFLOW STORAGE
(HOURS) (CFS) (CFS) (ACRE-FT) 0. 0. 0. 0.
0.18 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.37 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.55 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.73 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0 .00]
0.92 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
1.10 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.28 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
o.
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 70
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1. 47 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0. 00]
1. 65 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 83 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.02 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.20 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.38 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
2.57 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.75 0.00 o.oo 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.93 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
3.12 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
3.30 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
3.48 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.67 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.85 0.10 0.01 0.001 0 I.
[BASIN DEPTH(FEET) = 0.05]
4.03 0.10 0.02 0.003 .0 I.
[BASIN DEPTH(FEET) = 0.09]
4.22 0.10 0.02 0.004 .o I.
[BASIN DEPTH(FEET) = 0.19] EJr;.,:;'t];,~~~~;;}fJ;;;r:1;~.:; :"&f;fs"0o:~· :-;-::-:·':'.:;~ !_~r-"·, :.· \JID·Jt· ·-
4 .58 0.10 0.03 0.006 .o I.
[BASIN DEPTH(FEET) = 0.71]
4.77 0.00 0.02 0.006 IO
[BASIN DEPTH(FEET) = 0.65]
4.95 0.00 0.02 0.006 IO
[BASIN DEPTH(FEET) = 0 .59]
5.13 0.00 0.02 0.005 IO
[BASIN DEPTH(FEET) = 0. 53]
5.32 0.00 0.02 0.005 IO
[BASIN DEPTH(FEET) = 0. 46]
5.50 0.00 0.02 0.005 IO
[BASIN DEPTH (FEET) = 0.39]
5.68 0.00 0.02 0.004 IO
[BASIN DEPTH(FEET) = 0.32]
5.87 0.00 0.02 0.004 IO
[BASIN DEPTH(FEET) = 0.20]
6.o5· 0.00 0.02 0.004 IO
[BASIN DEPTH (FEET) = 0 .16]
6.23 0.00 0.02 0.003 IO
[BASIN DEPTH(FEET) = 0.13]
6.42 0.00 0.02 0.003 IO
[BASIN DEPTH(FEET) = 0.10]
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 71
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 2 (Node 7):
****************************************************************************
HYDRAULICS ELEMENTS -II PROGRAM PACKAGE
STORAGE BASIN HYDROGRAPH ROUTING MODEL
****************************************************************************
(c) Copyright 1983-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-8700
************************** DESCRIPTION OF STUDY**************************
* Basin 2-Detention Calculations *
* 100 Year Storm *
* Buena Vista, Carlsbad CA *
**************************************************************************
FILE NAME: 1289DT02.DAT
TIME/DATE OF STUDY: 14:39 03/02/2015
ENTERED INFORMATION:
TOTAL NUMBER OF INFLOW HYDROGRAPH INTERVALS= 25
CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 16.000
ASSUMED INITIAL DEPTH(FEET) IN STORAGE BASIN= 0.00
ENTERED INFLOW HYDROGRAPH ORDINATES(CFS):
*INTERVAL FLOW *INTERVAL FLOW *INTERVAL FLOW *
* NUMBER (CFS) * NUMBER (CFS) * NUMBER (CFS) *
* 1: 0.00* 2: 0.00* 3: 0.00*
* 4: 0.00* 5: 0.00* 6: 0.00*
* 7: 0.00* 8: 0.00* 9: 0.00*
* 10: 0.00* 11: 0.00* 12: 0.00*
* 13: 0.00* 14: 0.00* 15: 0.10*
* 16: 0.10* 17: 0.34* 18: 0.00*
* 19: 0.00* 20: 0.00* 21: 0.00*
* 22: 0.00* 23: 0.00* 24: 0.00*
* 25: 0.00*
DEPTH-VS.-STORAGE AND DEPTH-VS.-DISCHARGE INFORMATION:
TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES= 15
*BASIN-DEPTH STORAGE OUTFLOW **BASIN-DEPTH STORAGE OUTFLOW *
* (FEET) (ACRE-FEET) (CFS) **
* 0.000 0.000 0.000**
* 0.200 0.004 0.021**
* 0.400 0.005 0.023**
* 0.600 0.007 0.024**
* 0.800 0.009 0.026**
* 1.000 0. 011 0.928**
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
(FEET) (ACRE-FEET) (CFS) *
0.100 0.003 0.020*
0.300 0.004 0.022*
0.500 0.006 0.023*
0.700 0.008 0.025*
0.900 0.010 0.255*
1.100 0. 013 1.849*
b~A, Inc.
land planning, civil engineering, surveying
71
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*
*
1.200
1. 400
0.014
0 .017
2.963**
5.666**
1. 300 0.016 4.242*
****************************************************************************
INITIAL BASIN DEPTH(FEET) = 0.00
INITIAL BASIN STORAGE(ACRE-FEET) =
INITIAL BASIN OUTFLOW(CFS) =
0.00
0.00
BASIN STORAGE, OUTFLOW AND DEPTH ROUTING VALUES:
INTERVAL {S-O*DT/2) {S+O*DT/2)
NUMBER (ACRE-FEET) (ACRE-FEET)
1 0.00000 0.00000
2 0.00298 0.00342
3
4
5
6
7
8
9
0.00357
0.00416
0.00485
0.00564
0.00653
0.00753
0.00862
0.00403
0.00464
0.00535
0.00616
0.00707
0.00807
0.00918
10 0.00719 0.01281
11 0.00108 0.02152
12 -0.00777 0.03297
13 -0.01855 0.04675
14 -0.03114 0.06234
15 -0.04513 0.07973
WHERE S=STORAGE(AF);O=OUTFLOW(AF/MIN.);DT=UNIT(MIN.)
*UNIT-HYDROGRAPH STORAGE-BASIN ROUTING*
NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES
OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE
AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL.
GRAPH NOTATION: "!"=MEAN UNIT INFLOW; "O"=OUTFLOW AT GIVEN TIME
TIME INFLOW OUTFLOW STORAGE
(HOURS) (CFS) (CFS) (ACRE-FT) 0. 0. 0. 0.
0.27 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
0.53 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.80 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
1. 07 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.33 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1. 60 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1. 87 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
2.13 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.40 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2. 67 0.00 0.00 0.000 0
0.
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 73
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
[BASIN DEPTH (FEET) = 0.00]
2.93 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.20 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00)
3.47 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
3.73 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
4.00 0.10 0.01 0.002 .o
[BASIN DEPTH(FEET) = 0. 06)
4.27 0.10 0.02 0.004 0
[BASIN DEPTH(FEET) = 0.21] 14. 5·3-~-... ·o ·3·,r· ... : ,ca-· 15 .. ··,o· .. 009 .. "··
r:., ·.··~·:.dt{~it?:1 o.ik'.t':a e-Ei:¢i> :. ~ ();85]
4.80 0.00 0.02 0.008
[BASIN DEPTH(FEET) = 0. 68)
5.07 0.00 0.02 0.007
[BASIN DEPTH(FEET) = 0.62)
5.33 0.00 0.02 0.007
[BASIN DEPTH(FEET) = 0.57]
5.60 0.00 0.02 0.006
[BASIN DEPTH(FEET) = 0 .51]
5.87 0.00 0.02 0.005
[BASIN DEPTH(FEET) = 0.45]
6.13 0.00 0.02 0.005
[BASIN DEPTH(FEET) = 0.38]
6.40 0.00 0.02 0.004
[BASIN DEPTH(FEET) = 0.31]
6.67 0.00 0.02 0.004
[BASIN DEPTH(FEET) = 0.23]
6.93 0.00 0.02 0.004
[BASIN DEPTH(FEET) = 0 .16)
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
I 0
I 0
I 0
I 0
I 0
I 0
I 0
I 0
IO
. I
. I
-. ' .·~o:\ ' ' ~!' ]~f-·::', :'.J;
bHA, Inc.
land planning, civil engineering, surveying
74
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 3 (Node 11):
****************************************************************************
HYDRAULICS ELEMENTS -II PROGRAM PACKAGE
STORAGE BASIN HYDROGRAPH ROUTING MODEL
****************************************************************************
{c) Copyright 1983-2013 Advanced Engineering Software {aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-8700
************************** DESCRIPTION OF STUDY**************************
* Basin 3-Detention Calculations *
* 100 Year Storm *
* Buena Vista, Carlsbad CA * **************************************************************************
FILE NAME: 1289DT03.DAT
TIME/DATE OF STUDY: 14:56 03/02/2015
ENTERED INFORMATION:
TOTAL NUMBER OF INFLOW HYDROGRAPH INTERVALS= 53
CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 7.000
ASSUMED INITIAL DEPTH{FEET) IN STORAGE BASIN= 0.00
ENTERED INFLOW HYDROGRAPH ORDINATES (CFS):
*INTERVAL FLOW *INTERVAL FLOW *INTERVAL FLOW *
* NUMBER (CFS) * NUMBER (CFS) * NUMBER (CFS) *
* 1: 0.00* 2: 0.00* 3: 0.00*
* 4: 0.00* 5: 0.00* 6: 0.00*
* 7: 0.00* 8: 0.00* 9: 0.00*
* 10: 0.00* 11: 0.00* 12: 0.00*
* 13: 0.00* 14: 0.00* 15: 0.00*
* 16: 0.00* 17: 0.00* 18: 0.00*
* 19: 0.00* 20: 0.00* 21: 0.00*
* 22: 0.10* 23: 0.10* 24: 0.10*
* 25: 0.10* 26: 0.10* 27: 0.10*
* 28: 0.10* 29: 0.10* 30: 0.10*
* 31: 0.10* 32: 0.10* 33: 0.10*
* 34: 0.20* 35: 0.10* 36: 1.19*
* 37: 0.20* 38: 0.10* 39: 0.10*
* 40: 0.10* 41: 0.10* 42: 0.10*
* 43: 0.00* 44: 0.00* 45: 0.00*
* 46: 0.00* 47: 0.00* 48: 0.00*
* 49: 0.00* 50: 0.00* 51: 0.00*
* 52: 0.00* 53: 0.00*
=======================================-----------------======-------==-=--=
DEPTH-VS.-STORAGE AND DEPTH-VS.-DISCHARGE INFORMATION:
TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES= 15
bl-IA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, suNeying
Drainage Study 75
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*BASIN-DEPTH STORAGE OUTFLOW **BASIN-DEPTH STORAGE OUTFLOW *
* (FEET} (ACRE-FEET} (CFS} ** (FEET} (ACRE-FEET} (CFS} *
* 0.000 0.000 0.000** 0.100 0.007 0.047*
* 0.200 0.008 0.049** 0.300 0.009 0.050*
* 0.400 0. 011 0.052** 0.500 0.012 0.054*
* 0.600 0.013 0.055** 0.700 0.014 0.057*
* 0.800 0.016 0.059** 0.900 0.017 0.289*
* 1. 000 0.019 0.963** 1.100 0.020 1.885*
* 1.200 0.022 3.000** 1. 300 0.024 4.280*
* 1. 400 0.025 5.705**
****************************************************************************
INITIAL BASIN DEPTH(FEET} = 0.00
INITIAL BASIN STORAGE(ACRE-FEET} = 0.00
INITIAL BASIN OUTFLOW(CFS} = 0.00
BASIN STORAGE, OUTFLOW
INTERVAL {S-O*DT/2)
NUMBER (ACRE-FEET}
1 0.00000
2 0.00677
3 0.00776
4 0.00876
5 0.01075
AND DEPTH ROUTING
{S+O*DT/2)
(ACRE-FEET}
0.00000
0.00723
0.00824
0.00924
0. 01125
6 0.01174 0.01226
7 0.01273 0.01327
8 0.01373 0.01427
9 0.01572 0.01628
10 0.01561 0.01839
11 0.01436 0.02364
12 0.01091 0.02909
13 0.00754 0.03646
14 0.00337 0.04463
15 -0.00250 0.05250
VALUES:
WHERE S=STORAGE(AF};O=OUTFLOW(AF/MIN.};DT=UNIT(MIN.}
*UNIT-HYDROGRAPH STORAGE-BASIN ROUTING*
NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES
OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE
AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL.
GRAPH NOTATION: "I"=MEAN UNIT INFLOW; "O"=OUTFLOW AT GIVEN TIME
TIME INFLOW OUTFLOW STORAGE
(HOURS) (CFS) (CFS} (ACRE-FT) 0. 0. 1. 1.
0.12 0.00 0.00 0.000 0
[BASIN DEPTH(FEET} = 0. 00]
0.23 0.00 0.00 0.000 0
[BASIN DEPTH(FEET} = 0.00]
0.35 0.00 0.00 0.000 0
[BASIN DEPTH(FEET} = 0.00]
0.47 0.00 0.00 0.000 0
[BASIN DEPTH(FEET} = 0.00]
0.58 0.00 0.00 0.000 0
[BASIN DEPTH (FEET} = 0. 00]
0.70 o.oo 0.00 0.000 0
1.
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 76
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
[BASIN DEPTH(FEET) = 0. 00]
0.82 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.93 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00]
1.05 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
1.17 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1.28 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 40 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.52 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0 .00]
1. 63 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 75 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.87 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 98 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.10 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.22 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.33 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.45 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.57 0.10 0.01 0.001 0 r
[BASIN DEPTH(FEET) = 0.01]
2.68 0.10 0.01 0.002 0 r
[BASIN DEPTH(FEET) = 0.03]
2.80 0.10 0.02 0.003 0 I
[BASIN DEPTH(FEET) = 0.04]
2.92 0.10 0.02 0.003 0 r
[BASIN DEPTH(FEET) = 0.05]
3.03 0.10 0.03 0.004 0 r
[BASIN DEPTH(FEET) = 0. 06]
3.15 0.10 0.03 0.005 0 I
[BASIN DEPTH(FEET) = 0.07]
3.27 0.10 0.04 0.005 0 I
[BASIN DEPTH(FEET) = 0.08]
3.38 0.10 0.04 0.006 .or
[BASIN DEPTH(FEET) = 0. 09]
3.50 0.10 0.04 0.007 .or
[BASIN DEPTH(FEET) = 0.09]
3.62 0.10 0.05 0.007 .or
[BASIN DEPTH(FEET) = 0.11]
3.73 0.10 0.05 0.008 .OI
[BASIN DEPTH(FEET) = 0 .16]
3.85 0.10 0.05 0.008 .or
[BASIN DEPTH(FEET) = 0.21]
3.97 0.20 0.05 0.010 .0
[BASIN DEPTH(FEET) = 0.33]
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
r
bHA, Inc.
land planning, civil engineering, surveying
77
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
4.08 0.10 0.05 0.010 .OI
[BASIN DEPTH(FEET) = 0.35)
4~20 1.19 0~66 0.018 . .. o I
[BASIN DE_PTH (FEET) = 0. 95]
4.32 0.20 0.12 0.016 0 I
[BASIN DEPTH(FEET) = 0.83)
4.43 0.10 0.10 0.016 0
[BASIN DEPTH(FEET) = 0.82)
4.55 0.10 0.10 0.016 0
[BASIN DEPTH(FEET) = 0. 82)
4.67 0.10 0.10 0.016 0
[BASIN DEPTH(FEET) = 0.82)
4.78 0.10 0.10 0.016 0
[BASIN DEPTH(FEET) = 0.82]
4.90 0.10 0.10 0.016 0
[BASIN DEPTH(FEET) = 0.82)
5.02 0.00 0.06 0.015 IO
[BASIN DEPTH(FEET) = 0.77]
5.13 0.00 0.06 0.015 IO
[BASIN DEPTH(FEET) = 0.74)
5.25 0.00 0.06 0.014 IO
[BASIN DEPTH (FEET) = 0.71)
5.37 0.00 0.06 0.014 IO
[BASIN DEPTH(FEET) = 0. 68)
5.48 0.00 0.06 0.013 IO
[BASIN DEPTH(FEET) = 0. 62]
5.60 0.00 0.05 0. 013 IO
[BASIN DEPTH(FEET) = 0.57)
5. 72 0.00 0.05 0.012 IO
[BASIN DEPTH(FEET) = 0.52)
5.83 0.00 0.05 0.012 IO
[BASIN DEPTH(FEET) = 0. 46)
5.95 0.00 0.05 o. 011 IO
[BASIN DEPTH (FEET) = 0.41)
6.07 0.00 0.05 0. 011 IO
[BASIN DEPTH(FEET) = 0.38]
6.18 0.00 0.05 0.010 IO
[BASIN DEPTH(FEET) = 0. 36)
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista b~A, Inc. I 1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study ~ ~~~~~~~~~~~~~~~~~--~~~~~~~-_J 78 L___
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 4 (Node 15):
****************************************************************************
HYDRAULICS ELEMENTS -II PROGRAM PACKAGE
STORAGE BASIN HYDROGRAPH ROUTING MODEL
****************************************************************************
(c) Copyright 1983-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-8700
************************** DESCRIPTION OF STUDY**************************
* Basin 4-Detention Calculations *
* 100 Year Storm *
* Buena Vista, Carlsbad CA *
**************************************************************************
FILE NAME: 1289DT04.DAT
TIME/DATE OF STUDY: 15:03 03/02/2015
ENTERED INFORMATION:
TOTAL NUMBER OF INFLOW HYDROGRAPH INTERVALS= 42
CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 9.000
ASSUMED INITIAL DEPTH(FEET) IN STORAGE BASIN= 0.00
ENTERED INFLOW HYDROGRAPH ORDINATES(CFS):
*INTERVAL FLOW *INTERVAL FLOW *INTERVAL FLOW *
* NUMBER (CFS) * NUMBER (CFS) * NUMBER (CFS) *
* 1: 0.00* 2: 0.00* 3: 0.00*
* 4: 0.00* 5: 0.00* 6: 0.00*
* 7: 0.00* 8: 0.00* 9: 0.00*
* 10: 0.00* 11: 0.00* 12: 0.00*
* 13: 0.00* 14: 0.00* 15: 0.00*
* 16: 0.00* 17: 0.00* 18: 0.00*
* 19: 0.10* 20: 0.10* 21: 0.10*
* 22: 0.10* 23: 0.10* 24: 0.10*
* 25: 0.10* 26: 0.10* 27: 0.20*
* 28: 0.10* 29: 0.95* 30: 0.10*
* 31: 0.10* 32: 0.10* 33: 0.10*
* 34: 0.00* 35: 0.00* 36: 0.00*
* 37: 0.00* 38: 0.00* 39: 0.00*
* 40: 0.00* 41: 0.00* 42: 0.00*
DEPTH-VS.-STORAGE AND DEPTH-VS.-DISCHARGE INFORMATION:
TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES= 15
*BASIN-DEPTH STORAGE
* (FEET) (ACRE-FEET)
* 0.000 0.000
OUTFLOW **BASIN-DEPTH STORAGE
(CFS) ** (FEET) (ACRE-FEET)
OUTFLOW
(CFS)
*
*
0.000** 0.100 0.007 0.046*
bl-tA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, suNeying
Drainage Study 79
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
* 0.200 0.008 0.047** 0.300 0.009 0.049*
* 0.400 0.010 0.051** 0.500 0. 011 0.052*
* 0.600 0.012 0.054** 0.700 0.013 0.056*
* 0.800 0.015 0.057** 0.900 0.016 0.288*
* 1. 000 0.017 0.961** 1.100 0.018 1.883*
* 1.200 0.020 2.999** 1. 300 0.021 4.278*
* 1. 400 0.022 5.703**
****************************************************************************
INITIAL BASIN DEPTH(FEET) = 0.00
INITIAL BASIN STORAGE(ACRE-FEET) =
INITIAL BASIN OUTFLOW(CFS) =
0.00
0.00
BASIN STORAGE, OUTFLOW AND DEPTH ROUTING VALUES:
INTERVAL {S-O*DT/2) {S+O*DT/2)
NUMBER (ACRE-FEET) (ACRE-FEET)
1 0.00000 0.00000
2 0.00671 0.00729
3 0.00771 0.00829
4
5
6
7
8
9
10
11
12
13
14
0.00870
0.00968
0.01068
0.01167
0.01265
0.01465
0.01421
0. 01104
0.00633
0.00141
-0.00552
0.00930
0.01032
0. 01132
0.01233
0. 01335
0.01535
0.01779
0.02296
0. 02967
0.03859
0.04752
15 -0.01335 0.05735
WHERE S=STORAGE(AF) ;O=OUTFLOW(AF/MIN.) ;DT=UNIT(MIN.)
*UNIT-HYDROGRAPH STORAGE-BASIN ROUTING*
NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES
OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE
AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL.
GRAPH NOTATION: "I"=MEAN UNIT INFLOW; "O"=OUTFLOW AT GIVEN TIME
TIME INFLOW OUTFLOW STORAGE
(HOURS) (CFS) (CFS) (ACRE-FT) 0. 0. 0. 1.
0.15 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.30 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00]
0.45 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00]
0.60 o.oo 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.75 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00]
0.90 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 05 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.
bliA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 80
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1.20 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
1. 35 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 50 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 65 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 80 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 95 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.10 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
2.25 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
2.40 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.55 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.70 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.85 0.10 0.01 0.001 0 I
[BASIN DEPTH(FEET) = 0.02]
3.00 0.10 0.02 0.002 0 I
[BASIN DEPTH(FEET) = 0.03]
3.15 0.10 0.02 0.003 0 I
[BASIN DEPTH(FEET) = 0.05]
3.30 0.10 0.03 0.004 0 I
[BASIN DEPTH(FEET) = 0.06]
3.45 0.10 0.03 0.005 .0 I
[BASIN DEPTH(FEET) = 0.07)
3.60 0.10 0.04 0.006 .0 I
[BASIN DEPTH(FEET) = 0.08]
3.75 0.10 0.04 0.007 .0 I
[BASIN DEPTH(FEET) = 0.09)
3.90 0.10 0.05 0.007 .0 I
[BASIN DEPTH(FEET) = 0.13)
4.05 0.20 0.05 0.009 .O I
[BASIN DEPTH(FEET) = 0.32)
4.20 0.10 0.05 0.010 .O I
[BASIN DEPTH(FEET) = 0.38) u~G~'.7~:t~~l~I~:};~c:~~~];]~J~:~·:;~;:'Q~:r:;; ·:~, · -~:::-:.,'.~~·~;:~~':'.z:.:·~~.:K~·:;:~,~::-r:?.::.·:~:,i
4.50 0.10 0.06 0.013 .O I
[BASIN DEPTH(FEET) = 0.70)
4.65 0.10 0.06 0.014 .0 I
[BASIN DEPTH(FEET) = 0.73)
4.80 0.10 0.06 0.014 .0 I
[BASIN DEPTH(FEET) = 0.75]
4.95 0.10 0.06 0.015 .O I
[BASIN DEPTH(FEET) = 0.78]
5.10 0.00 0.06 0.014 IO
[BASIN DEPTH(FEET) =
5.25 0.00 0.06
[BASIN DEPTH(FEET) =
5.40 0.00 0.06
0.74]
0.013 IO
0.71]
0.013 IO
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bl-tA, Inc.
land planning, civil engineering, surveying
sit._
I
I
I
I'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
[BASIN DEPTH(FEET) = 0. 65)
5.55 0.00 0.05 0.012
[BASIN DEPTH(FEET) = 0.58]
5.70 0.00 0.05 0. 011
[BASIN DEPTH(FEET) = 0.52]
5. 85 0.00 0.05 0. 011
[BASIN DEPTH(FEET) = 0.45]
6.00 0.00 0.05 0.010
[BASIN DEPTH(FEET) = 0. 39]
6.15 0.00 0.05 0.009
[BASIN DEPTH(FEET) = 0.33]
6.30 0.00 0.05 0.009
[BASIN DEPTH(FEET) = 0.27]
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
IO
IO
IO
IO
IO
IO
b~A, Inc.
land planning, civil engineering, surveying
~~~~--~~~~~.~~~~~~~~~~~~~~--~~~~~~~~~~~~~~~---'
I
82 L__
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 5 (Node 39):
****************************************************************************
HYDRAULICS ELEMENTS -II PROGRAM PACKAGE
STORAGE BASIN HYDROGRAPH ROUTING MODEL
****************************************************************************
(c) Copyright 1983-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-8700
************************** DESCRIPTION OF STUDY**************************
* Basin 5-Detention Calculations *
* 100 Year Storm *
* Buena Vista, Carlsbad CA
**************************************************************************
FILE NAME: 1289DT05.DAT
TIME/DATE OF STUDY: 15:11 03/02/2015
ENTERED INFORMATION:
TOTAL NUMBER OF INFLOW HYDROGRAPH INTERVALS= 42
CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 9.000
ASSUMED INITIAL DEPTH(FEET) IN STORAGE BASIN= 0.00
ENTERED INFLOW HYDROGRAPH ORDINATES(CFS):
*INTERVAL
* NUMBER
* 1:
* 4:
* 7:
* 10:
* 13:
* 16:
* 19:
* 22:
* 25:
* 28:
* 31:
* 34:
* 37:
* 40:
FLOW * INTERVAL
(CFS) * NUMBER
0.00* 2:
0.00* 5:
0.00* 8:
0.00* 11:
0.00* 14:
0.00* 17:
0.00* 20:
0.00* 23:
0.10* 26:
0.10* 29:
0.10* 32:
0.00* 35:
0.00* 38:
0.00* 41:
FLOW *INTERVAL
(CFS) * NUMBER
0.00* 3:
0.00* 6:
0.00* 9:
0.00* 12:
0.00* 15:
0.00* 18:
0.00* 21:
0.00* 24:
0.10* 27:
0.62* 30:
0.00* 33:
0.00* 36:
0.00* 39:
0.00* 42:
FLOW *
(CFS) *
0.00*
0.00*
0.00*
0.00*
0.00*
0.00*
0.00*
0.10*
0.10*
0.10*
0.00*
0.00*
0.00*
0.00*
============================================================================
DEPTH-VS.-STORAGE AND DEPTH-VS.-DISCHARGE INFORMATION:
TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES= 15
*BASIN-DEPTH STORAGE
* (FEET) (ACRE-FEET)
* 0.000 0.000
OUTFLOW **BASIN-DEPTH STORAGE
(CFS) ** (FEET) (ACRE-FEET)
0.000** 0.100 0.004
OUTFLOW *
(CFS) *
0.024*
b~A, Inc.
*
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 83
I
I
I
I
I
I-
I
I
I
I
I
I
I
I
I
I
I
I
* 0.200 0.004 0.025** 0.300 0.005 0. 026*
* 0.400 0.005 0.027** 0.500 0.006 0.027*
* 0.600 0.007 0.028** 0.700 0.007 0.029*
* 0.800 0.008 0.030** 0.900 0.009 0.260*
* 1.000 0.010 0.933** 1.100 0.011 1.854*
* 1.200 0.012 2.968** 1.300 0.013 4.247*
* 1.400 0.014 5.671**
****************************************************************************
INITIAL BASIN DEPTH(FEET) = 0.00
INITIAL BASIN STORAGE(ACRE-FEET) = 0.00
INITIAL BASIN OUTFLOW(CFS) = 0.00
BASIN STORAGE, OUTFLOW AND DEPTH ROUTING VALUES:
INTERVAL {S-O*DT/2) {S+O*DT/2)
NUMBER (ACRE-FEET) (ACRE-FEET)
1 0.00000 0.00000
2 0.00365 0.00395
3 0.00415 0.00445
4
5
6
7
8
9
10
11
12
0.00474
0.00533
0.00593
0.00663
0.00732
0 .00811
0.00749
0.00422
-0.00069
0.00506
0.00567
0.00627
0.00697
0.00768
0.00849
0.01071
0.01578
0.02229
13 -0.00660 0.03020
14 -0.01352 0.03912
15 -0.02135 0.04895
WHERE S=STORAGE(AF);O=OUTFLOW(AF/MIN.);DT=UNIT(MIN.)
*UNIT-HYDROGRAPH STORAGE-BASIN ROUTING*
NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES
OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE
AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL.
GRAPH NOTATION: "I"=MEAN UNIT INFLOW; "O"=OUTFLOW AT GIVEN TIME
TIME INFLOW OUTFLOW STORAGE
(HOURS) (CFS) (CFS) (ACRE-FT) o. 0. 0. 0.
0.15 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.30 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.45 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.60 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
0.75 0.00 o.oo 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
0.90 0. 00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 05 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
1.
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista bHA, Inc.
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study ~ ~~~~~~--~~~~~-~~~~~~~--~~~~ 84 t___
I
I-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1.20 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0. 00 l
1.35 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0. 00]
1. 50 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1. 65 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1.80 0.00 0.00 0.000 o
[BASIN DEPTH(FEET) = 0.00)
1.95 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
2.10 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
2.25 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
2.40 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.55 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.70 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.85 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00)
3.00 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
3.15 0.00 o.oo 0.000 O
[BASIN DEPTH(FEET) = 0.00]
3.30 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
3.45 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
3.60 0.10 0.01 0.001 0 I
[BASIN DEPTH(FEET) = 0.03]
3.75 0.10 0.01 0.002 0 I
[BASIN DEPTH(FEET) = 0.06]
3.90 0.10 0.02 0.003 .0 I
[BASIN DEPTH(FEET) = 0.09]
4.05 0.10 0.02 0.004 .0 I
[BASIN DEPTH(FEET) = 0.19]
4.20 0.10 0.03 0.005 .0 I
[BASIN DEPTH(FEET) = 0.35] !t:..,.3"'5,......,.,...,."'0-62--~.,..,.-53 .. ,,. ---,··o"' O'(i9'., >; .... ~.---, ., .. ' '~'""" ..... W-Vi·"··-,----~V-"<'•".:o'•C·N~ I r;:.;T::z:stt~i~ltii~iiC:~itibiD ::.!}{,,11 -., ) ;i,_;,c-_ :.~.--, ••. -~:.:;.,~;{,.-;.'.;,£~.:, ,-:. ··' ~j;:.::,;~
4.50 0.10 0.03 0.007 .0 I
[BASIN DEPTH(FEET) = 0.67]
4.65 0.10 0.03 0.008 .0 I
[BASIN DEPTH(FEET) = 0.78]
4.80 0.00 0.03 0.008 IO
[BASIN DEPTH(FEET) = 0.73]
4.95 0.00 0.03 0.007 IO
[BASIN DEPTH(FEET) = 0.69]
5.10 0.00 0.03 0.007 IO
[BASIN DEPTH(FEET) = 0.64]
5.25 0.00 0.03 0.007 IO
[BASIN DEPTH(FEET) = 0.59]
5.40 0.00 0.03 0.006 IO
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
b~A, Inc.
land planning, civil engineering, surveying
85
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
[BASIN DEPTH(FEET) = 0.54]
5.55 0.00 0.03 0.006
[BASIN DEPTH(FEET) = 0. 49]
5.70 0.00 0.03 0.006
[BASIN DEPTH(FEET) = 0.43]
5.85 0.00 0.03 0.005
[BASIN DEPTH(FEET) = 0.37]
6.00 o.oo 0.03 0.005
[BASIN DEPTH(FEET) = 0.32]
6.15 0.00 0.03 0.005
[BASIN DEPTH(FEET) = 0.27]
6.30 0.00 0.03 0.004
[BASIN DEPTH(FEET) = 0.21]
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
IO
IO
IO
IO
IO
IO
bHA, Inc.
land planning, civil engineering, surveying
86 L_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 6 (Node 19):
****************************************************************************
HYDRAULICS ELEMENTS -II PROGRAM PACKAGE
STORAGE BASIN HYDROGRAPH ROUTING MODEL
****************************************************************************
(c) Copyright 1983-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-8700
************************** DESCRIPTION OF STUDY**************************
* Basin 6-Detention Calculations *
* 100 Year Storm *
* Buena Vista, Carlsbad CA
**************************************************************************
FILE NAME: 1289DT06.DAT
TIME/DATE OF STUDY: 16:04 03/02/2015
ENTERED INFORMATION:
TOTAL NUMBER OF INFLOW HYDROGRAPH INTERVALS= 38
CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 10.000
ASSUMED INITIAL DEPTH(FEET) IN STORAGE BASIN= 0.00 ----------------------------------------------------------------------------
ENTERED INFLOW HYDROGRAPH ORDINATES(CFS):
*INTERVAL FLOW *INTERVAL FLOW *INTERVAL FLOW *
* NUMBER (CFS) * NUMBER (CFS) * NUMBER (CFS) *
* 1: 0.00* 2: 0.00* 3: 0.00*
* 4: 0.00* 5: 0.00* 6: 0.00*
* 7: 0.00* 8: 0.00* 9: 0.00*
* 10: 0.00* 11: 0.00* 12: 0.00*
* 13: 0.00* 14: 0.00* 15: 0.00*
* 16: 0.00* 17: 0.10* 18: 0.10*
* 19: 0.10* 20: 0.10* 21: 0.10*
* 22: 0.10* 23: 0.10* 24: 0.20*
* 25: 0.10* 26: 0.86* 27: 0.10*
* 28: 0.10* 29: 0.10* 30: 0.10*
* 31: 0.00* 32: 0.00* 33: 0.00*
* 34: 0.00* 35: 0.00* 36: 0.00*
* 37: 0.00* 38: 0.00*
===========================----======~=-----=======------=====-----=======--
DEPTH-VS.-STORAGE AND DEPTH-VS.-DISCHARGE INFORMATION:
TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES= 15 ----------------------------------------------------------------------------*BASIN-DEPTH STORAGE OUTFLOW **BASIN-DEPTH STORAGE OUTFLOW *
* (FEET) (ACRE-FEET) (CFS) ** (FEET) (ACRE-FEET) (CFS) *
* 0.000 0.000 0.000** 0.100 0.007 0.046*
* 0.200 0.008 0.047** 0.300 0.009 0.049*
bliA, Inc.
*
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 87
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
* 0.400 0.010 0.051** 0.500 0. 011 0.052*
* 0.600 0.012 0.054** 0.700 0.013 0.056*
* 0.800 0.015 0.057** 0.900 0.016 0.288*
* 1. 000 0 .017 0.961** 1.100 0.018 1. 883*
* 1.200 0.020 2.999** 1.300 0.021 4.278*
* 1.400 0.022 5.703**
****************************************************************************
INITIAL BASIN DEPTH(FEET) = 0.00
INITIAL BASIN STORAGE(ACRE-FEET) = 0.00
INITIAL BASIN OUTFLOW(CFS) = 0.00
BASIN STORAGE, OUTFLOW AND DEPTH ROUTING VALUES:
INTERVAL {S-O*DT/2) {S+O*DT/2)
NUMBER (ACRE-FEET) (ACRE-FEET)
1 0.00000 0.00000
2 0.00668 0.00732
3 0.00768 0.00832
4 0.00866 0.00934
5 0.00965 0.01035
6 0.01064 0.01136
7 0.01163 0.01237
8 0.01261 0.01339
9 0.01461 0.01539
10 0.01402 0. 01798
11 0.01038 0.02362
12 0.00503 0.03097
13 -0.00065 0.04065
14 -0.00846 0.05046
15 -0.01728 0.06128
WHERE S=STORAGE(AF);O=OUTFLOW(AF/MIN.);DT=UNIT(MIN.)
*UNIT-HYDROGRAPH STORAGE-BASIN ROUTING*
NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES
OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE
AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL.
GRAPH NOTATION: "I"=MEAN UNIT INFLOW; "O"=OUTFLOW AT GIVEN TIME ----------------------------------------------------------------------------
TIME INFLOW OUTFLOW STORAGE
(HOURS) (CFS) (CFS) (ACRE-FT)
0.17 0.00 0.00 0.000
[BASIN DEPTH(FEET) = 0. 00)
0.33 0.00 0.00 0.000
[BASIN DEPTH(FEET) = 0.00)
0.50 0.00 0.00 0.000
[BASIN DEPTH(FEET) = 0.00]
0.67 0.00 0.00 0.000
[BASIN DEPTH(FEET) = 0. 00]
0.83 0.00 0.00 0.000
[BASIN DEPTH (FEET) = 0.00)
1.00 0.00 0.00 0.000
[BASIN DEPTH(FEET) = 0. 00)
1.17 o.oo 0.00 0.000
[BASIN DEPTH(FEET) = 0.00]
1.33 0.00 o.oo 0.000
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
0. 0. 0. 1. 1.
0
0
0
0
0
0
0
0
bliA, Inc.
land planning, civil engineering, surveying
88
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
[BASIN DEPTH(FEET) = 0.00]
1.50 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 67 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00]
1.83 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.00 0.00 o.oo 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.17 0.00 o.oo 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.33 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.50 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.67 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.83 0.10 0.01 0.001 0 I
[BASIN DEPTH(FEET) = 0.02]
3.00 0.10 0.02 0.003 0 I
[BASIN DEPTH(FEET) = 0.04]
3.17 0.10 0.02 0.004 0 I
[BASIN DEPTH(FEET) = 0.05]
3.33 0.10 0.03 0.005 .o I
[BASIN DEPTH(FEET) = 0.07]
3.50 0.10 0.04 0.006 .o I
[BASIN DEPTH(FEET) = 0.08]
3.67 0.10 0.04 0.006 .0 I
[BASIN DEPTH(FEET) = 0. 09]
3.83 0.10 0.05 0.007 .0 I
[BASIN DEPTH(FEET) = 0.12]
4.00 0.20 0.05 0.009 .o
[BASIN DEPTH(FEET) = 0.32)
4.17 0.10 0.05 0.010 .0 I
[BASIN DEPTH(FEET) = 0. 39) rr~'~f.,.,,~~P¥~~;~:~~;~~~6r;~~:~7~1~~7~·o··rm~::':;:
, • .:. ~-,; ~ ... ·.~h~I!i.lt:J.DEE:J.'H,,(f~E'.1:;,),~;;., .,:. ... ,~j-~
4.50 0.10 0.06 0.013 OI
[BASIN DEPTH(FEET) = 0. 68]
4.67 0.10 0.06 0.013 OI
[BASIN DEPTH(FEET) = 0. 72]
4.83 0.10 0.06 0.014 OI
[BASIN DEPTH(FEET) = 0. 75]
5.00 0.10 0.06 0.015 OI
[BASIN DEPTH(FEET) = 0.78)
5.17 0.00 0.06 0.014 I 0
[BASIN DEPTH(FEET) = 0.74]
5.33 0.00 0.06 0.013 I 0
[BASIN DEPTH(FEET) = 0. 70)
5.50 0.00 0.05 0.012
[BASIN DEPTH(FEET) = 0. 63]
5. 67 0.00 0.05 0.012
[BASIN DEPTH(FEET) = 0.55]
5.83 0.00 0.05 0. 011
[BASIN DEPTH(FEET) = 0.48]
6.00 0.00 0.05 0.010
[BASIN DEPTH(FEET) = 0.41]
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
I 0
IO
IO
IO
I.
b~A, Inc.
land planning, civil engineering, surveying
89
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
6.17 0.00 0.05 0.009
[BASIN DEPTH (FEET) = 0.34]
6.33 0.00 0.05 0.009
[BASIN DEPTH(FEET) = 0.27]
6.50 0.00 0.05 0.008
[BASIN DEPTH(FEET) = 0.21]
6.67 0.00 0.05 0.007
[BASIN DEPTH(FEET) = 0.14]
6.83 0.00 0.04 0.007
[BASIN DEPTH(FEET) = 0.10]
7.00 0.00 0.04 0.006
[BASIN DEPTH(FEET) = 0. 09]
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
IO
IO
IO
IO
IO
IO
bliA, Inc.
land planning, civil engineering, suNeying
90
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 7 (Node 23):
****************************************************************************
HYDRAULICS ELEMENTS -II PROGRAM PACKAGE
STORAGE BASIN HYDROGRAPH ROUTING MODEL
****************************************************************************
(c) Copyright 1983-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-8700
************************** DESCRIPTION OF STUDY**************************
* Basin 7-Detention Calculations *
* 100 Year Storm *
* Buena Vista, Carlsbad CA
**************************************************************************
FILE NAME: 1289DT07.DAT
TIME/DATE OF STUDY: 08:25 03/03/2015
ENTERED INFORMATION:
TOTAL NUMBER OF INFLOW HYDROGRAPH INTERVALS= 42
CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 9.000
ASSUMED INITIAL DEPTH(FEET) IN STORAGE BASIN= 0.00
ENTERED INFLOW HYDROGRAPH ORDINATES (CFS):
*INTERVAL FLOW *INTERVAL FLOW *INTERVAL FLOW *
* NUMBER (CFS) * NUMBER (CFS) * NUMBER (CFS) *
* 1: 0.00* 2: 0.00* 3: 0.00*
* 4: 0.00* 5: 0.00* 6: 0.00*
* 7: 0.00* 8: 0.00* 9: 0.00*
* 10: 0.00* 11: 0.00* 12: 0.00*
* 13: 0.00* 14: 0.00* 15: 0.00*
* 16: 0.00* 17: 0.00* 18: 0.00*
* 19: 0.00* 20: 0.00* 21: 0.00*
* 22: 0.00* 23: 0.00* 24: 0.00*
* 25: 0.10* 26: 0.10* 27: 0.10*
* 28: 0.00* 29: 0.51* 30: 0.10*
* 31: 0.00* 32: 0.00* 33: 0.00*
* 34: 0.00* 35: 0.00* 36: 0.00*
* 37: 0.00* 38: 0.00* 39: 0.00*
* 40: 0.00* 41: 0.00* 42: 0.00*
=========-------=======================-------------------------------------
DEPTH-VS.-STORAGE AND DEPTH-VS.-DISCHARGE INFORMATION:
TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES= 15
*BASIN-DEPTH STORAGE
* (FEET) (ACRE-FEET)
* 0.000 0.000
OUTFLOW **BASIN-DEPTH STORAGE
(CFS) ** (FEET) (ACRE-FEET)
0.000** 0.100 0.003
OUTFLOW *
(CFS) *
0.021*
b~A, Inc.
*
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 91
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
* 0.200 0.004 0.021** 0.300 0.004 0.022*
* 0.400 0.005 0.023** 0.500 0.005 0.024*
* 0.600 0.006 0.024** 0.700 0.007 0.025*
* 0.800 0.007 0.026** 0.900 0.008 0.255*
* 1.000 0.009 0.928** 1.100 0.010 1.849*
* 1.200 0.010 2.964** 1.300 O.Oll 4.242*
* 1.400 0.012 5.666**
****************************************************************************
INITIAL BASIN DEPTH(FEET) = 0.00
INITIAL BASIN STORAGE(ACRE-FEET) = 0.00
INITIAL BASIN OUTFLOW(CFS) = 0.00
BASIN STORAGE, OUTFLOW AND DEPTH ROUTING VALUES:
INTERVAL {S-O*DT/2) {S+O*DT/2)
NUMBER (ACRE-FEET) (ACRE-FEET)
1 0.00000 0.00000
2 0.00307 0.00333
3 0.00357 0.00383
4 0.00406 0.00434
5 0.00456 0.00484
6 0.00515 0.00545
7 0.00575 0.00605
8 0.00644 0.00676
9 0.00714 0.00746
10 0.00642 0.00958
ll 0.00305 0.01455
12 -0.00186 0.02106
13 -0.00797 0.02877
14 -0.01499 0.03759
15 -0.02292 0.04732
WHERE S=STORAGE(AF);O=OUTFLOW(AF/MIN.);DT=UNIT(MIN.)
*UNIT-HYDROGRAPH STORAGE-BASIN ROUTING*
NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES
OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE
AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL.
GRAPH NOTATION: "I"=MEAN UNIT INFLOW; "O"=OUTFLOW AT GIVEN TIME
TIME INFLOW OUTFLOW STORAGE
(HOURS) (CFS) (CFS) {ACRE-FT) 0. 0. 0. 0.
0.15 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.30 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
0.45 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.60 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.75 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
0.90 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00]
1. 05 0.00 o.oo 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista bHA, Inc.
1833 Buena Vista Way land planning, civil engineering, surveying
.~~~D_r_a_in_a_g_e_S_tu_d_y~~~.~~~~~~~~~~~~~~~~~~~~~~~~-~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1.20 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1. 35 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1. 50 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1.65 0.00 0.00 0.000 o
[BASIN DEPTH(FEET) = 0.00]
1.80 0.00 o.oo 0.000 O
[BASIN DEPTH(FEET) = 0.00]
1.95 0.00 o.oo 0.000 O
[BASIN DEPTH(FEET) = 0.00]
2.10 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.25 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.40 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.55 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.70 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.85 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.00 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
3.15 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00]
3.30 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.45 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.60 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
3.75 0.10 0.01 0.001 0 I
[BASIN DEPTH(FEET) = 0.04)
3.90 0.10 0.01 0.002 0 I
[BASIN DEPTH(FEET) = 0.07]
4.05 0.10 0.02 0.003 .0 I
[BASIN DEPTH(FEET) = 0.12]
4.20 0.00 0.02 0.003 IO
[BASIN DEPTH(FEET) = 0.10] ra~s.....,......,.·~·7!~5::t:"""""'."1'1'()~'2"-'''')"'•='"'i'"''0'-·01re·l"f'!_._,., .·.· .;-.· :::2,'o;;;;:~'.:.'<':r;_C -~:~".,;{'; ·:.n-:-;;:1'.?!t rc,-.v.--·~ .. ~·4',. .... _..!';'1'!'t---_,.,.{._,l"f!· 7H-:•:-. ~:, ~·~-~,:;~,.;~· .. -:J·1;I/;.,:::,~(.':...3•· ..... ;~-~---... __ ... _,.. .,_ -··
t· \. ~ :'.,. ~.,;.c, ..;..'..;,,'tfil\,S;m, :PJltlill!J!!:.(,f.EE:.'fL::.i;:i;. ·:: 10-..88.·
4.50 0.10 0.06 0.007 0 I
[BASIN DEPTH(FEET) = 0.81]
4.65 0.00 0.03 0.007 IO
[BASIN DEPTH(FEET) = 0.74]
4.80 0.00 0.03 0.007
[BASIN DEPTH(FEET) = 0.69]
4.95 0.00 0.02 0.006
[BASIN DEPTH(FEET) = 0. 65]
5.10 0.00 0.02 0.006
[BASIN DEPTH(FEET) = 0. 61]
5.25 0.00 0.02 0.006
[BASIN DEPTH(FEET) = 0. 56]
5. 40 0.00 0.02 0.005
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
IO
IO
IO
IO
IO
bl-tA, Inc.
land planning, civil engineering, surveying
93
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
[BASIN DEPTH(FEET) = 0. 51)
5.55 0.00 0.02 0.005 IO
[BASIN DEPTH(FEET) = 0. 46)
5.70 0.00 0.02 0.005 IO
[BASIN DEPTH(FEET) = 0.41)
5.85 0.00 0.02 0.004 IO
[BASIN DEPTH(FEET) = 0. 36)
6.00 0.00 0.02 0.004 IO
[BASIN DEPTH(FEET) = 0.30)
6.15 0.00 0.02 0.004 IO
[BASIN DEPTH(FEET) = 0.25)
6.30 0.00 0.02 0.004 IO
[BASIN DEPTH(FEET) = 0.20)
6.45 0.00 0.02 0.003 IO
[BASIN DEPTH(FEET) = 0.14)
6.60 0.00 0.02 0.003 IO
[BASIN DEPTH(FEET) = 0.10)
6.75 0.00 0.02 0.003 IO
[BASIN DEPTH(FEET) = 0. 09)
6.90 0.00 0.02 0.003 IO
[BASIN DEPTH(FEET) = 0.08)
7.05 0.00 0.02 0.002 IO
[BASIN DEPTH(FEET) = 0. 08)
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista bf..tA, Inc. I 1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study ~ ~~~~-~~~~~~~~~~~~~~~~~~~~~_____J 94 L__
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 8 (Node 27):
****************************************************************************
HYDRAULICS ELEMENTS -II PROGRAM PACKAGE
STORAGE BASIN HYDROGRAPH ROUTING MODEL
****************************************************************************
(c) Copyright 1983-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-8700
************************** DESCRIPTION OF STUDY**************************
* Basin 8-Detention Calculations *
* 100 Year Storm *
* Buena Vista, Carlsbad CA
**************************************************************************
FILE NAME: 1289DT08.DAT
TIME/DATE OF STUDY: 16:31 03/02/2015
ENTERED INFORMATION:
TOTAL NUMBER OF INFLOW HYDROGRAPH INTERVALS= 42
CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 9.000
ASSUMED INITIAL DEPTH(FEET) IN STORAGE BASIN= 0.00
ENTERED INFLOW HYDROGRAPH ORDINATES(CFS):
*INTERVAL FLOW *INTERVAL FLOW *INTERVAL FLOW *
* NUMBER (CFS) * NUMBER (CFS) * NUMBER (CFS) *
* 1: 0.00* 2: 0.00* 3: 0.00*
* 4: 0.00* 5: 0.00* 6: 0.00*
* 7: 0.00* 8: 0.00* 9: 0.00*
* 10: 0.00* 11: 0.00* 12: 0.00*
* 13: 0.00* 14: 0.00* 15: 0.00*
* 16: 0.00* 17: 0.00* 18: 0.00*
* 19: 0.00* 20: 0.00* 21: 0.00*
* 22: 0.00* 23: 0.00* 24: 0.00*
* 25: 0.10* 26: 0.10* 27: 0.10*
* 28: 0.00* 29: 0.52* 30: 0.10*
* 31: 0.00* 32: 0.00* 33: 0.00*
* 34: 0.00* 35: 0.00* 36: 0.00*
* 37: 0.00* 38: 0.00* 39: 0.00*
* 40: 0.00* 41: 0.00* 42: 0.00*
---------------========--------==-=====-------------------------------------
DEPTH-VS.-STORAGE AND DEPTH-VS.-DISCHARGE INFORMATION:
TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES= 15
*BASIN-DEPTH STORAGE
* (FEET) (ACRE-FEET)
* 0.000 0.000
OUTFLOW **BASIN-DEPTH STORAGE
(CFS) ** (FEET) (ACRE-FEET)
0.000** 0.100 0.003
OUTFLOW *
(CFS) *
0.021*
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista b~A, Inc.
*
I 1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-_J 95 L___
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
* 0.200 0.004 0.021** 0.300 0.004 0.022*
* 0.400 0.005 0.023** 0.500 0.005 0.024*
* 0.600 0.006 0.024** 0.700 0.007 0.025*
* 0.800 0.007 0.026** 0.900 0.008 0.255*
* 1.000 0.009 0.928** 1.100 0.009 1.849*
* 1.200 0.010 2.964** 1.300 0. 011 4.242*
* 1. 400 0.012 5.661**
****************************************************************************
INITIAL BASIN DEPTH(FEET) = 0.00
INITIAL BASIN STORAGE(ACRE-FEET) = 0.00
INITIAL BASIN OUTFLOW(CFS) = 0.00
BASIN STORAGE, OUTFLOW
INTERVAL {S-O*DT/2)
NUMBER (ACRE-FEET)
1 0.00000
2 0.00307
3 0.00357
4 0.00406
5 0.00456
6 0.00515
7 0.00565
8 0.00634
9 0.00694
AND DEPTH ROUTING
{S+O*DT/2)
(ACRE-FEET)
0.00000
0.00333
0.00383
0.00434
0.00484
0.00545
0.00595
0.00666
0. 00726
10 0.00622 0.00938
11 0.00285 0.01435
12 -0.00216 0.02076
13 -0.00827 0.02847
14 -0.01529 0.03729
15 -0.02319 0.04699
VALUES:
WHERE S=STORAGE(AF);O=OUTFLOW(AF/MIN.);DT=UNIT(MIN.)
*UNIT-HYDROGRAPH STORAGE-BASIN ROUTING*
NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES
OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE
AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL.
GRAPH NOTATION: "I"=MEAN UNIT INFLOW; "O"=OUTFLOW AT GIVEN TIME
TIME INFLOW OUTFLOW STORAGE
(HOURS) (CFS) (CFS) (ACRE-FT) 0. 0. 0. 0.
0.15 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
0.30 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
0.45 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0 .00)
0.60 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.75 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
0.90 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.05 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study
I
I
I
I
I
I
I·
I
I
I
I
I
I
I
I
I
I
1. 20 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00]
1. 35 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0 .00]
1. 50 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 65 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
1. 80 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
1. 95 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00]
2.10 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.25 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
2.40 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.55 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0 .00]
2.70 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
2.85 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.00 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.15 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.30 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.45 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0 .00]
3.60 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.75 0.10 0.01 0.001 0 I
[BASIN DEPTH(FEET) = 0.04]
3.90 0.10 0.01 0.002 0 I
[BASIN DEPTH(FEET) = 0.07]
4.05 0.10 0.02 0.003 .o I
[BASIN DEPTH(FEET) = 0.12]
4.20 0.00 0.02 0.003 IO
[BASIN DEPTH(FEET) = 0.10]
[''.:5{z~j~~w~~~~::;~;:[4~[~:0~01.::~~;:7; f::;}:~~:.~:;~·~}-::~(ff~}J:1::::~·?J:;;:2~::·D·.;t:,;
4.50 0.10 0.05 0.007 . 0 I
[BASIN DEPTH(FEET) = 0.81]
4.65 0.00 0.03 0.007 IO
[BASIN DEPTH(FEET) = 0.74]
4.80 0.00 0.03 0.006 IO
[BASIN DEPTH(FEET) = 0.69]
4.95 0.00 0.02 0.006 IO
[BASIN DEPTH(FEET) = 0.64)
5.10 0.00 0.02 0.006 IO
[BASIN DEPTH(FEET) = 0.60)
5.25 0.00 0.02 0.005 IO
[BASIN DEPTH(FEET) = 0.54]
5.40 0.00 0.02 0.005 IO
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
bliA, Inc.
land planning, civil engineering, surveying
Drainage Study ·~~~~~~~~-~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
[BASIN DEPTH(FEET) = 0.48]
5.55 0.00 0.02 0.005
[BASIN DEPTH (FEET) = 0.43]
5.70 0.00 0.02 0.005
[BASIN DEPTH (FEET) = 0.38]
5.85 0.00 0.02 0.004
[BASIN DEPTH(FEET) = 0.33]
6.00 0.00 0.02 0.004
[BASIN DEPTH (FEET) = 0.27]
6.15 0.00 0.02 0.004
[BASIN DEPTH(FEET) = 0.22)
6.30 0.00 0.02 0.004
[BASIN DEPTH(FEET) = 0.17)
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
IO
IO
IO
IO
IO
IO
bHA, Inc.
land planning, civil engineering, surveying
98
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 9 (Node 31):
****************************************************************************
HYDRAULICS ELEMENTS -II PROGRAM PACKAGE
STORAGE BASIN HYDROGRAPH ROUTING MODEL
****************************************************************************
(c) Copyright 1983-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-8700
************************** DESCRIPTION OF STUDY**************************
* Basin 9-Detention Calculations *
* 100 Year Storm *
* Buena Vista, Carlsbad CA
**************************************************************************
FILE NAME: 1289DT09.DAT
TIME/DATE OF STUDY: 16:44 03/02/2015
ENTERED INFORMATION:
TOTAL NUMBER OF INFLOW HYDROGRAPH INTERVALS= 28
CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 14.000
ASSUMED INITIAL DEPTH(FEET) IN STORAGE BASIN= 0.00
ENTERED INFLOW HYDROGRAPH ORDINATES (CFS) :
*INTERVAL FLOW *INTERVAL FLOW *INTERVAL FLOW *
* NUMBER (CFS) * NUMBER (CFS) * NUMBER (CFS) *
* 1: 0.00* 2: 0.00* 3: 0.00*
* 4: 0.00* 5: 0.00* 6: 0.00*
* 7: 0.00* 8: 0.00* 9: 0.00*
* 10: 0.00* 11: 0.00* 12: 0.00*
* 13: 0.00* 14: 0.00* 15: 0.00*
* 16: 0.00* 17: 0.10* 18: 0.10*
* 19: 0.37* 20: 0.10* 21: 0.00*
* 22: 0.00* 23: 0.00* 24: 0.00*
* 25: 0.00* 26: 0.00* 27: 0.00*
* 28: 0.00*
DEPTH-VS.-STORAGE AND DEPTH-VS.-DISCHARGE INFORMATION:
TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES= 15
----------------------------------------------------------------------------
*BASIN-DEPTH STORAGE OUTFLOW **BASIN-DEPTH STORAGE OUTFLOW *
* (FEET) (ACRE-FEET) (CFS) ** (FEET) (ACRE-FEET) (CFS) *
* 0.000 0.000 0.000** 0.100 0.005 0.031*
* 0.200 0.006 0.032** 0.300 0.006 0.034*
* 0.400 0.007 0.035** 0.500 0.008 0.036*
* 0.600 0.009 0.037** 0.700 0.009 0.038*
* 0.800 0.010 0.039** 0.900 o. 011 0.269*
bl-tA, Inc.
*
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 99
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*
*
*
1. 000
1.200
1. 400
0.012
0.014
0.016
0.942**
2.979**
5.682**
1.100
1.300
0.013
0.015
1.864*
4.258*
****************************************************************************
INITIAL BASIN DEPTH(FEET) = 0.00
INITIAL BASIN STORAGE(ACRE-FEET) = 0.00
INITIAL BASIN OUTFLOW(CFS) = 0.00
BASIN STORAGE, OUTFLOW AND DEPTH ROUTING VALUES:
INTERVAL {S-O*DT/2) {S+O*DT/2)
NUMBER (ACRE-FEET) (ACRE-FEET)
1 0.00000 0.00000
2 0.00470 0.00530
3 0.00569 0.00631
4 0.00607 0.00673
5 0.00666 0.00734
6 0.00765 0.00835
7 0.00864 0.00936
8 0.00903 0.00977
9 0.00962 0.01038
10 0.00841 0.01359
11 0.00292 0.02108
12 -0.00497 0.03097
13 -0.01472 0. 04272
14 -0.02606 0.05606
15 -0.03879 0.07079
WHERE S=STORAGE(AF);O=OUTFLOW(AF/MIN.);DT=UNIT(MIN.)
*UNIT-HYDROGRAPH STORAGE-BASIN ROUTING*
NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES
OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE
AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL.
GRAPH NOTATION: "I"=MEAN UNIT INFLOW; "O"=OUTFLOW AT GIVEN TIME
TIME INFLOW OUTFLOW STORAGE
(HOURS) (CFS) (CFS) (ACRE-FT) 0. o. 0. 0.
0.23 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
0.47 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00]
0.70 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
0.93 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.17 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0. 00]
1. 40 o.oo 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1. 63 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.87 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
2.10 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0 .00]
o.
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 100 l_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
2.33 0.00 0.00 0.000 0
0.00]
0.000 0
[BASIN DEPTH(FEET) =
2.57 0.00 0.00
[BASIN DEPTH(FEET) = 0.00]
2.80 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
3.03 0.00 0.00 0.000 o
[BASIN DEPTH(FEET) = 0.00]
3.27 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00)
3.50 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00)
3.73 0.00 0.00 0.000 O
[BASIN DEPTH(FEET) = 0.00)
3.97 0.10 0.01 0.002 0
[BASIN DEPTH(FEET) = 0.04]
4.20 0.10 0.02 0.003 .o
[BASIN DEPTH(FEET) = 0.07]
r.-;(:f :J, ~-' [Q: ... ~J O • 0 4 0 . 0 10 0
[BASIN DEPTH(FEET) = 0.80]
4 67 0 10 lf.12:.':c '·".·?c ... ~ij''bla ; ,.,, -
11'' ,,,, • ...:'." "'·'~:..,;:;-;.,-;.;,.,,.,,,,,.E: .. P,,"'·H.1"""'E. ,T •• ).•:-, .,:,'. :o,:.a, 4']• . ·•",, •. r-_ :.' ._·5". -.:,u,_; .~1/~~1'4..~~ .-i-'!'_,·\'.C~ .• :: ;_~'.~-r • :.-..!.~;--~-
4. 90 0.00 0.04 0.009 I 0
[BASIN DEPTH(FEET) = 0.58)
5.13 0.00 0.04 0.008 I 0
[BASIN DEPTH(FEET) = 0.51)
5.37 0.00 0.04 0.007 I 0
[BASIN DEPTH(FEET) = 0.44)
5.60 0.00 0.03 0.007 I 0
[BASIN DEPTH(FEET) = 0.36]
5.83 0.00 0.03 0.006 I 0
[BASIN DEPTH(FEET) = 0.23]
6.07 0.00 0.03 0.005 I 0
[BASIN DEPTH(FEET) = 0.15]
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
I
I
I
bf.IA, Inc.
land planning, civil engineering, surveying
101
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin 10 (Node 35):
****************************************************************************
HYDRAULICS ELEMENTS -II PROGRAM PACKAGE
STORAGE BASIN HYDROGRAPH ROUTING MODEL
****************************************************************************
(c) Copyright 1983-2013 Advanced Engineering Software (aes)
Ver. 20.0 Release Date: 06/01/2013 License ID 1459
Analysis prepared by:
BHA, Inc
5115 Avenida Encinas, Suite L
Carlsbad, CA 92008-4387
(760) 931-8700
************************** DESCRIPTION OF STUDY**************************
* Basin 10-Detention Calculations *
* 100 Year Storm *
* Buena Vista, Carlsbad CA
**************************************************************************
FILE NAME: 1289DT10.DAT
TIME/DATE OF STUDY: 08:05 03/03/2015
ENTERED INFORMATION:
TOTAL NUMBER OF INFLOW HYDROGRAPH INTERVALS= 28
CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 14.000
ASSUMED INITIAL DEPTH(FEET) IN STORAGE BASIN= 0.00
ENTERED INFLOW HYDROGRAPH ORDINATES(CFS):
*INTERVAL FLOW *INTERVAL FLOW *INTERVAL FLOW *
* NUMBER (CFS) * NUMBER (CFS) * NUMBER (CFS) *
* 1: 0.00* 2: 0.00* 3: 0.00*
* 4: 0.00* 5: 0.00* 6: 0.00*
* 7: 0.00* 8: 0.00* 9: 0.00*
* 10: 0.00* 11: 0.00* 12: 0.00*
* 13: 0.00* 14: 0.00* 15: 0.00*
* 16: 0.00* 17: 0.10* 18: 0.10*
* 19: 0.37* 20: 0.10* 21: 0.00*
* 22: 0.00* 23: 0.00* 24: 0.00*
* 25: 0.00* 26: 0.00* 27: 0.00*
* 28: 0.00*
DEPTH-VS.-STORAGE AND DEPTH-VS.-DISCHARGE INFORMATION:
TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES= 15 ----------------------------------------------------------------------------*BASIN-DEPTH STORAGE OUTFLOW **BASIN-DEPTH STORAGE OUTFLOW *
* (FEET) (ACRE-FEET) (CFS) ** (FEET) (ACRE-FEET) (CFS) *
* 0.000 0.000 0.000** 0.100 0.003 0.022*
* 0.200 0.004 0.023** 0.300 0.004 0.023*
* 0.400 0.005 0.024** 0.500 0.005 0.025*
* 0.600 0.006 0.026** 0.700 0.007 0.027*
* 0.800 0.007 0.027** 0.900 0.008 0.257*
bliA, Inc.
*
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 102
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*
*
*
1.000
1.200
1. 400
0.008
0.010
O.Oll
0.930**
2.965**
5.668**
1.100
1.300
0.009
0.010
1.851*
4.244*
****************************************************************************
INITIAL BASIN DEPTH(FEET) = 0.00
INITIAL BASIN STORAGE(ACRE-FEET) = 0.00
INITIAL BASIN OUTFLOW(CFS) = 0.00
BASIN STORAGE, OUTFLOW AND DEPTH ROUTING VALUES:
INTERVAL (S-O*DT/2} {S+O*DT/2}
NUMBER (ACRE-FEET) (ACRE-FEET)
1 0.00000 0.00000
2 0.00319 0.00361
3 0.00368 0.00412
4 0.00417 0.00463
5 0.00467 0.00513
6 0.00516 0.00564
7 0.00565 0.00615
8 0.00624 0.00676
9 0.00684 0.00736
10 0.00532 0.01028
11 -0.00057 0.01737
12 -0.00875 0.02695
13 -0.01879 0.03839
14 -0.03042 0.05142
15 -0.04335 0.06595
WHERE S=STORAGE(AF);O=OUTFLOW(AF/MIN,);DT=UNIT(MIN.)
*UNIT-HYDROGRAPH STORAGE-BASIN ROUTING*
NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES
OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE
AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL.
GRAPH NOTATION: "!"=MEAN UNIT INFLOW; "O"=OUTFLOW AT GIVEN TIME
TIME INFLOW OUTFLOW STORAGE
(HOURS) (CFS) (CFS) (ACRE-FT) 0. 0. 0. 0.
0.23 o.oo 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.47 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
0.70 0.00 o.oo 0.000 0
[BASIN DEPTH(FEET) = 0.00]
0.93 o.oo 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1.17 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1. 40 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
1. 63 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
1.87 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
2.10 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00)
0.
bHA, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 103 L_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
2.33 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0.00]
2.57 0.00 0.00 0.000 0
[BASIN DEPTH (FEET) = 0.00]
2.80 0.00 0.00 0.000 0
[BASIN DEPTH(FEET) = 0. 00]
3.03 0.00 o.oo 0.000 0
[BASIN DEPTH{FEET) = 0.00)
3.27 0.00 0.00 0.000 0
[BASIN DEPTH{FEET) = 0.00)
3.50 0.00 0.00 0.000 0
[BASIN DEPTH{FEET) = 0. 00)
3.73 0.00 o.oo 0.000 0
[BASIN DEPTH{FEET) = 0.00]
3.97 0.10 0.01 0.002 .o I
[BASIN DEPTH(FEET) = 0.05]
4.20 0.10 0.02 0.003 .o I
[BASIN DEPTH(FEET) = 0.10] , ... ,,.~f(~~~:r:,:'."'·, ~<r~.3~"t·:.-::-:t~:~'6\ .. )' :·tr~QOlL.:.· ':, :,: . . ' ' . , ~-;--:.,i:.~ :,:::<-,-: .0 ·-,4 ~ ); .,
F' · : , " ..• ·;).EID\".$.l!'JH,)l-Jf.~ff (~m.'.!Jl ·. 5' "·., i,O i. .. 9.0:l
4. 67 0.10 0.03 0.007 0 I
[BASIN DEPTH {FEET) = 0.77]
4.90 0.00 0.03 0.006 I 0
[BASIN DEPTH{FEET) = 0. 69)
5.13 o.oo 0.03 0.006 I 0
[BASIN DEPTH{FEET) = 0. 60)
5.37 0.00 0.03 0.005 I 0
[BASIN DEPTH(FEET) = 0. 50)
5.60 0.00 0.02 0.005 I 0
[BASIN DEPTH{FEET) = 0. 41]
5.83 0.00 0.02 0.004 I 0
[BASIN DEPTH{FEET) = 0.32]
6.07 0.00 0.02 0.004 IO
[BASIN DEPTH (FEET) = 0 .23]
6.30 0.00 0.02 0.004 IO
[BASIN DEPTH(FEET) = 0 .14]
6.53 0.00 0.02 0.003 IO
[BASIN DEPTH{FEET) = 0.09)
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista bHA, Inc. I 1833 Buena Vista Way land planning, civil engineering, surveying
~~~~~D_ra_i_na_g_e_S_tu_d_y~~~~~~~~~~~~~~~~~~~~~~~~·~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
IV. REFERENCES
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bl-IA, Inc.
land planning, civil engineering, suNeying
105
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
N
A
Hyctologlc Sdl Groop-San o,ego Co,;nryArea. c amorna
(Buena Vista)
-----======-----------==========d"·~~ 15 30 60 90 o~---~~====!100~--------200~=========?~
Mop 1711j,dx,o; Wet,--., Orne-coordna."' WGS84 Ed,etics,un,, a,,ollNWGSM
Natunl Rno1Xcn
cons.rvxlon s.,.,-i.,..
Web Soll Survey
N i:Cionai Coopera!Ne Soll Survey
7/112014
Page 1 d 4
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 106 L_
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Hyaol09< Soil Gro.ip--San Oiego Counly Am C.ifomia
(Bu<na \llslo)
MAP LEGEND
-oflnlwtsl{AOIJ D r--· meorr<...,.<AOI! • C,!) ... ,.
loO RIiiing l'olygons •
[il " [] Nolrtt.dornotavd1b&t
ID Ml W1ttrf1•urn
Sh,,m1N~ ~e
It!! Ml oc
El ct)
IE D
D ,...,_ ... .,_,,.,
lolRllllngU>n -"
-Ml
"" B
"" BIO
...., C
-ct)
,.., D
9o1Rllllng-
8 A
• Ml •
• BIO
llllurol IIHWfcts
ConHMlllon kVlct
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
Web Sal &lrvey
NIIIOIIII CcoperatM, Soll Su1vey
MAP INFORMATION
I W1meng SO<l t.llp m1y na bt 111lll ti lhlS sctle , !
I E111arpemenl of mops beyond Ille setle d ""'l'l*'!I can cau,. ' !
""'""dfflhnllng clllledelttl clm1ppmgond1ecuraeyo!sal l11e: '
placement The maps do not "'""lhesml! aretsd catlrlSbng 1• i
I SO<IS 11111 C<>Uld hlM been.,,_ II I mere Clelllied 1Cale , ! --~ I
Pleose rely on '1e bar scale a, etd:I mop 511eel tor map r
=:me;: Ne!UOII Resources ConserVl!lon s.r..:. Ii
Web SQII SuM)' URL· hl!p:/,wc,b,ol,ur;oy.m;und,.p
Coordintlt Syolem Web Me,Cltor (EPSG 3857)
Maps tom lhe Wtb Soil Survey Wt based on '1t Wrb Mtrcattr
prqecbon, wt11ch J)feserves cired!m andohape but ostorts
a.s1once and are• A p<oteca> 1h11 fl'.,.,....• "''"· such II the Albfflequ11-free conlcl)<ljtetien, Sll<luldbe U5'dKmoro tCOJtlle
ca1<:u1111ons d dosl111ce et 1111 we re<J!nd.
TIil, pn,dud Is gen en led tom Ille USO,t..NRCS co<lllled dlfl .. cl
tile version dlle(S) Isled below
Sol &uvoy /Veo · Sin ()ego C<lul'lly 1'111. Clll1orna
Survey i'IN Otta Version 7, NOY 15, 2013
Sol map unHsare labeled 11upocelllCM'S)tormapsctles 1:50,000
or huger
llltl!sl11!f!al1111goswe,epllotqµphed Moy3.201()..Jun 1B
2010
The athq>holo or other Ill,. m11> on wtich the sal lines were
COl'1)lled end llglbled plti>abty clffer, trun the bedli,aind
lmogery 1151>11yed on 111151 1111111' ~ 1 resul, scmt mrior slltlr!g
of m11> unit boundaries moy be tYident
711/2014
Page2d4
bl-IA, Inc.
land planning, civil engineering, surveying
107
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Hydrolog1c Soil Groop-San Otego Coonty Nee. Cal1fomia Buena 'Vlsta
Hydrologic Soil Group
Hydrologlc Soll Group-Summary by Map Unit -San Diego County Area, California (CA638)
Map unit symbol Map unit name Rating Acres In AOI Percent of AOI --------------------------------------
CbC Carlsbad gravelly loemy B 22
sand. 5 to 9 pe<cent
slopes
MC Marina loamy coars,, B 0.1
sand. 2 to 9 pe<cent
slcpes
ME Marina loamy coarse B 0.9
sand, 9 lo 30 percent
slopes
Totals for Area of Interest 3.3
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected l:7y vegetation, are thoroughly wet, and receive precipitation
from long-duration storms.
The soils in the United states are assigned to four groups (A, B, C, and D) and
three dual classes (AID, BID, and CID). The groups are defined as follows:
Group A Soils having a high Infiltration rate (low runoff potential) when thoroughly
wet. These consist mainly of deep, well drained to excessively drained sands or
gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet These
consist chiefly of moderately deep or deep, moderately well drained or well drained
soils that have moderately fine texture to moderately coarse texture. These soils
have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture orf1ne texture. These soils have a slow rate of water
transmission.
Group D. Soils having a very slow inf11trat1on rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay layer
at or near the surface, and soils that are shallow over nearty impervious material.
These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologio group (ND, SID, or CID), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in their
natural condition are In group D are assigned to dual classes.
Natural itesources
Conservation Service
Web Sol Survey
Nellonel CooperatlVC Soll survey
68.4%
3.7%
27.9%
100.0%
711/2014
Pege3 d4
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 108
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Hydrologic Soll Group-San Diego County Ma. California
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff. None Specified
Tie-break Rule: Higher
Nalurlll Resources
Conservation Service
Web Sod Survey
National Cooperative Soll Survey
Buena vlsta
711/2014
Page4 of4
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, suNeying
Drainage Study 109 L_
--
OJ ::::,
Q.
"O OJ ::::, ::::, 5· co
0 ~
CD ::::, co 5· co co -, 5· cp
en C j
5· co
0
......
.i,,. I "' C)
~ ro en
OJ C: CD ::,
Q)
-
< f!I Q)
C"' :r > ...
S" ~
-
10.0
,.o
8.0
7.0
8.0
5.0
•.o
3.0
2.0
"S' I c1.0 i0.9
iD.B
]iD.7
O.B
0.5
o.•
0.3
o.z
0.1
- -
..... ........ .... ... ' ' .... ....... ...
~ ' ~ ' ... '
~ I'..._ .... ' ' ' ... ,,
..... .... I'-, .... .... "' ... ' ', ", ', ' .... ,.._
~ .... ', 'i,., ·, i,..,
.... "', ....
..... , ~ .... 'i,. .... ,
'i,..
""i,.
'i,.
I
I
!
I
i ;
I
I
II 8 7 II t 10 15
---
~~~
~~~
~
~~ ~~ ~
~
~~
~ ~
~~~ I
20 30 •o !O
MfnulN Duration
--
!11111111111 I Jilli 1111
111111111111 11 I 11111 1111
!11111111111 I 11111 1111
EQUATION
I " 7.44 P5 o-0.845
I :r Intensity (lnJIY)
P5 • 6-Hour Preclpllalion (In}
D = Duta8on (min)
' I
-~ ~ ,,,
' ... , ......
... ' ', ' ' ' ' I ',
I ;,
I ...
I'"" ,,
'~ I• 'i,.
1, 'i,. '~ ,, '~
' ~
' ',
1,
3
HIMS
-
m
I
I
I
""'m
'""'' I II
f
uJ
5.5 ...
5.D :5 C.51
c.o !
3.5-
3.D
2.5
2.D
1.5
1.D
--- --
Direction• for Appllcatlon:
(1) From preclpltalion maps detennlne 6 hr and 24 Iv amounls
for the selected frequency. These maps are induded in lhe
County Hydrolc>g'J Manual (10, 50, and 100 yr maps included
In lhe Design and Procedure Manual).
(2) Adjust 6 hr preclpllalion (If necessary) so t-,at ii is within
the range or 45% lo 65% of the 24 hr predpilallon (not
appllcaple 10 Desert}.
(3) Plot 6 hr precipitation on the light side of the chart.
(4) Draw a nne through the point parallel to the plotted nnes.
(5) This line Is the lntenslty-<lurallon curve for the location
being analyzed.
Appllcatlon Form:
(a) Selected frequency __ year
p
(b) Pe= __ In., P24 = ---~ = %(21
24
(c) Adjusted p5<21. __ In.
(d) 1x = __ min.
(e) t = __ in./hr.
Note: This chart replaces the lntenslty-Ouration-Frequency
curves used since f 965.
lntenslly-1:Juratlon Design Chari • Template
--
---
u _.. ()
'"1 co ---l ,:I) w ...... ~.w ::I CD ""'" ,:I) C: 6 (JQ CD ""'" (D ::, --""U (/'J D) C .... < 0 t:: -· 0. !!?. ...... '< D) ""'" ' ~ C,
D) O>
'< 0 0 ""U ......
""'" "' C,
~
CD U>
CD C: CD ::,
ti)
< !a ti)
- --
tii w I.L 0 ~ w u ~ en 5
w en a: :::,
0 u a: w ... i
----
EXAMPLE:
Given: Watercourse Distance (D) = 70 Feet
Slope (s) = 1.3%
Runoff Coefficient {C) = 0.41
Overland Flow Time {T) = 9.5 Minutes
SOURCE: Airport Drainage, Federal Aviation AdmlnlstraUon, 1965
- --- -
T= 1.8(1.1-C)\/o
llfs
-
20
10
-
en w I-::, z ~
~ w ~ .:=
~ 0 -l LL
0 z
::S et: w > 0
FIGURE
Rational Formula • Overland Time of Flow Nomograph 13-3 I
- -
I
I
I
I
I
I
I
I
I:
I
I
I
I
I
I
I
I
llE
Feet
EQUATION
Tc • (1;;tt385
Tc • Time ol concotntr•lion (hou"')
L • Waten:oul"M! Distance fmllea)
LI.E • Cha119a In elev•llon •long
en.ctiva slope line (See Fogure 3-5)(1eet)
2t
,,
5
LI.E
SOURCE: Callornlt Dlvltlon of Highw;ya (1941) end Kltplch (1940)
L
MIi• Fwt
3000 '
2000
1800
1800
1ol00
1200
1000 --
500 -
300
200
L
'
Homograph for Det.nnlnatlon o,
' ' ' '
Tc
'
7
'
5
•
,
Tc
Time of Concenllotlon (Tc) or Travel Time (llJ for Natural watenhedl
FIGURE
EJ
b~A, Inc. CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way land planning, civil engineering, surveying
Drainage Study 112
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
W.tushed
Divide
1·
AE
j
Effective Slope Line
.jl---L----1
Area NA" •Araa "B11
SOURCE! C811fomia Division or Highways (19"1) and KJ,pjch (1940)
FIGURE
Computation of Effective Slope for Natural Watersheds ~
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bl-IA, Inc.
land planning, civil engineering, surveying
113
-- -
0 ..... (") 00 -I '"I c..> ..... e. w ~ ::s m •
II) C: ~
OQ CD --(1) ::, -0 m C :!> :s:; CJ S:: en __,. o. or f"' '-<! :a:: C)
O> ~ '< (")
CJ -0 ..... ~ "' C)
~ (D en
m C: CD ::,
O> :s:;
!'a. O>
iD :::,
Q.
-a
!l) :::, :::, s·
~
0 <" =
CD :::, co s·
CD CD 0-s· :r-
(fJ ~
en :, C ~ ~
'< s· co
=I ~
------/ -- ----
11 ill,+ µ. , ,----!---1++1-:. .L ... L--1-1-tm·LI.I-J-L ... Lf.l-!u--! -!j-l. .I I I ... ± I I I I . -1·t· T. --l-.! .. -+!-.. J.1.1.µ.J.f-].L!. : : ! ! I ! I ! I I I I I I !.. _j _l I I I .t, . _ -I • -..: If ...j... •• • ... -1-l-~-L-1-,--l ! .:... ...!..
Tl .L. 1-J.L I i ... ·H-I+ .J.E. .. I .!! -!-.. l.:... ·•·H· + ..!.. .. :~ -T _ .. -1-_J .. ~L • 1 1 , T' , 1 1 1 ,-: , 1 • , , , _·ry'1" .. -r-t-i,-;--,c-t-t-HT l-.. .. .. '-H-_ .l-!-.L .LI .J. _1 , 11 11 , , ,
I I I I I I I ti l ! I •II 11! ~'lwJ.
-··,-~,·-~,;..! + : I • $ itt=!· + I I + + * t-+ .. + .. J±-~ + I -+tl~ .. +ci l l! HB: 13f I l ,+t+~-:-' .,..,,·· .. --!,--·:i~iy,-stl-c'"' I I LT' ···;··=···+..i:. +,. +..2,.1, .. :._ [-,+ -i-L • 1 ., •. /:r:::... ; ..L 1 , _ , ct=~-__ --r-.J-L'" I .J:!. )' ,· ..!..l ' ... .... • . . • • ~ ,!_ • . ~---I I
.!..I ;r.. • • • ·c · i;~? : . ' l+ . ltt"t T :::r -,-I'-'..~ : : ~~, :i' (!'-·6. • :\.j\:t~ . ili-f , . -~. ~"it ·, , . , , •·L .;., _: 1 j. , Ill . , · -:l , l .. T 1 ·1· • • ., • ,r -,._ ·t! • , • , 1 , L ,...,, 1.: .j .. " L I l · 1 l
rt-·1-l-t-H-.'-i.l.l II I
. -~ ................ ...,,..r,-
-~tr • . cl,
• I !_j
- - -
Cmmty of San C
Hydrology Mai
• "" fills.· '~--·:la 1.r '!'~·: __ * ....l::J __ .,. '. ~;-, ·-rn-;~,r~~-' .. i:.1.1 .. p.i~~~:-{t::J:,(:'I ~-;-1·(
;.\, e"o-• .-._ ~-~"r • •. •. • •~ -/:!· ,. I I ~ • ~ 'tlj\ I ..J-jJ; •h.1-•m•·' l',i'~-,..! •I J ill' I .. i ,;!. i::J .... I ' i __ ~ • ---l•·Jt_,_. i , ,: i .. ~ .tt.u -LJ. .. -·' 4-.~,..l.£:."'JI __ :i. -4---:: : , :1 .,, .... , ..... , •• •• -~; ;~ t,:!.:!'lµ-!.J. ~-s.'lT1r;r •i.:1 :, r!, •I!-~· ,
ra ,_;:. : -~~ j W, f2/}: J ~i\ ;_ : ~.:._ -.-+,:·1~.r:)f+t>:~~ti.(~)~1¥.::'!H: . ~~;} :~ ~~!~~ =~ ~i '..!JI Rai,!fall lsopl111-ial.
ttkt-rt--i'-L '-..;-~ L.1. I ,-I •i.r ~~ ... ·1 .. L ..l ·'"l ...... ·.,, ,,.., !• r-1 .. l'i;,\. 1,.rJ; •, =1-utli .. l :>-..l-1~::1.;' ..l.L,..,.l I I l . .!.1.r ti L4 I .f • .,,._ .-, t I I• I ·~ ,-..... t •,j I t • .,. 1. ·1 · 1. 1• 1 \ I I• I t I I ! l I J tr J • -!-~: _.. .J_J..!.. • •• • ., • LL _j_ _ _ _ , ••. • ,... • •••• !_ -~! ~,-, \: • .1·w.:r4-1-...: \ 1r, ·'.J .... :......
-· f' ll, -. .l ·"-II T\. -J--· --LU ........ _. "~:!: ... ··.-•1 -~-'",.;.' --1£.:!:~.·t-O:J•• ,-!.... !-l--t--L • -• r. i,; 1:::. , ~ • , , u... _ -1-f-l, . tf.-.!. . .. ......... . • ,--~, , 1 , 1 , . , , , .!..!..
I .. -4~ • I I \ J.' -l-,_ - - - · .. ~ ~t-1 . -LH· I ·.1 I •• 1• I I I t I LL~~. m'm-,.. , _ 1 _ ~ ~ , , , , ".rr . ~ . -~, ·t . 1_ , ~ .. J: .1. ll.~..J ,_~1a1. !. 1 : 1. -r. u, ~ ,..., L ·.~ 1 1 1 ,· "1 1-, ... c . ,. 1 , 1 , , -, r ~ 1~. , · 1 't ... , , I
",;L . r.1 '..;.,. ~~ I T -· -•·,--...... ., --1-t:;,, ~-··r--:--"""-::l.· •. ' ;-, r,.1 • I I I "1 • j t• I l I I I • ·-~-l!J..l, --~ ~I t ! ... --•11J1J ~ -_ -•• , ··: • .J: .(,. ~ _ 1..., 1 1 •. '-! or. .,_1 r; 11 · •. .:& 1 :4,--~. ,·Li...4-i" ..Il.Ll.~+i
I 1 • N w :,,~-ji :t'. .. ·!· .. VJ_ I ~ ,I', •• '.l. 1 1-. 1 1 i"!= , I IT.-l..!.J.E,J-;w~1 r.+ t-_ -1 :i.: _ ,_1 _ _r.r •. .1._ 1.. .•• 1~ 11111"'.'"____L'·, ••• , 11-.i,", ,,._,r ;, 1 .. µ· 1.. ·r ., .. , 'L 1 ,· ~ rT. l--flr:-o •. -.,., ,_... , ., " ,·,i, , , , ,'-; __ ;_1
' H,b, Jo ! ~ "" -f.tr •):·± .L , , '' , . ·;f1-1'11,\j-P:. '.7-:r: ,p ... L .. , ..i:,\-·1-: i : ; J I _1 rrl' ~ 1 I I f-f:' . __ !. I I .,f •1.,, •, -~ -... =-·rd·{'· .,; ·j-1 ---l---t-+-:i·t-J-J· ! ~ ~ !
I ~*.I.-~. f,.: •• -1--1-?----.~--t,. 't ~: ~--~·~. ~\ :0 1 : !.-;t1fr--f--!-·;±
ILt-' I -' -1-! L...J.. •. I. !L';,t t' ..... . ., .. ,.,,. :. ........ ,,, ,r,e;c I ~i: • : -.. ..l: I I I .. .. .l, i~. . .. ·1 r -. ,{:._ • ... !,l-~,-t·l-~-Lt~ +' le-•·•-, T1 I I I I :2· !. rtl tr-·-·•· I j 1""'• :,:-"lfr· • I I :., +;l..J~ ... +µ~r,+ ·-~ -2,;.m· '"'.:!:-ru· .. ! .. lfi"I ',-, -. . .. !.!.. ill! i,.. . . -• . ,.. .:J ' • ,, c{.\.~i ·t= ... ·--•·i,.;•. -~.... . -).... :J'}j ·l L 1' ! l_!jJI . , H ·· ..-----J • •• 11 1 ,.r ••. -.. 1 1 t-~--·t t; , , 1 _ L I ·.!. I , -I I '--· __ i; __ ~ ,.,, •• T~,.-'!.....!.'.~: .... ~·21;·1·.· ~·.w. r·Fr··"-· LI I ' 1 1 • , .. 1 '. ?" j'' . .,L.. .l• •, 1 ·'~ ~-• • ,. , r LL f..._,;;~1-1--!+ _;_ , • ..L ~ I I t J, -· • , ~: • •· ~r ,!-/-, ..L ·, l,.['lJ:. I ._ .• ,._ ., ,• TT i'll ~-\ • I , , I ,. _ ± ..J.. I , • .( .,. - 1 -·t .). :·,-::C J: ~ ~ I -t-i:• •.:, • .\.' .. Lµ+ r, l ~ .! J .: t:.Ll. T ·t --· -.~ -t ..L l · ., ... ,-1-t· l":.li!·; -t :r:t-Y·; .11, 't 4-+-+rf -i 1~
--:,-r-r-r-N ·, -I .. j ·= '1,.-;,r --'-iii~-,-~·-•-~-µ!. ct .f::,.~ : -L-
_L ,-_ I ' i, -~ _ 'I ... I -W-i: f,f-• 1i •J.-'_J_:. -!.. --_j_~ ...!--ti. .. L I I t ~t'~ -1:,-1, I •• , ... , ,., ·~~ I :h ~I I ! I I , j 1
I ' I f • :p ,. • [l{i 4 \ .,. I -' I• ~ 1 I t
l \'ur lhinC.I t:-.n! -6 lluur1
[----... ,.,,wn·,;-.<i I
N 33° {D' 10"
W 111"'2-0' Ow''
Pt1~,. 2"
--H--t-' + 11-" :t· , .... · , ,:!' .1 .• 1:r: -W-N, , ... :.:!:L.J.. .y 1-4~!..tl\.: t..lt'. r~ .L ... -.l' TI -.. -. + -~-' ... . . -y ~ I I • ':' I -: • -l:t) -f'. .•. • ~!-J..L'i' + -l-r,J ; :
11 -• -l ·:--1.1~ ···t-t~.1-t-.. I I .• , -• ·t:l,, -! lJ:i.~·i-t ·:· :•r-li ~--. ~; DP\V ~--
_L • ..L ' , . , t '": - . ~.lrn -~:-J r'-. . L f..i • i , ··,· ' ' :-r-• .J • ·f,(' 'T' ,-l.. G IS S -.-,;-::l. • ::r,•, • .. 1 "'-'-~ .j:~ -l-'1. -~t-i-Jo~ :f"• f" 1 I# :J.,.LJ..::: ~ '. • ·; .,J -;~2.;_ ~ '.. a 11'
.. J, ... I . II :, -~ ..J.. ~ .... ~·• ~ . I .,.r: .. l. 4-!! .. f.£ .. ; µ -i".ultt_ -~-I 1 • I ... , • I ' ' _j_J[-~j .. ' .. ';':'_:-:_:•:::::_ ., ,!, . ., --_ • , • L ..-., 1 1 1 • -T ·-.1 •• ~}:J .. _ -L _ J ""'I:' ;r.· H--1.f-1 I~ •• ,__,,,, _j_ _ _
.J.. ·'· j.l-I I ,.., I ,·::!' -r~ l. -'.I,? ,.., ., :·t .. ' _, . -1-;·.1. I I ~ •:-;. l l i 11 : I I ~ :.~.::::·.H~...:";~;·:.,~:;.·,
.:., I • •. 1• l ~' ; :: ~ ;, ·1i•n· -~:, '. •• !", '.".'" I : I ·1 :j" ·t ... !·. ; ·; 1 l+ 1-4 + * '(.:;::,--:;::::=,:;:.:::_:~•"••~
.I ···r J'_"T' F"! I ,,...;··-·r---"t" L~-_j ,l.Jl"" ,.. I I I -!-Rf' -=hT~ 1,1, E~-::::1:::::::_::::;e-... :.::.'::! -I~-,-I-I -,· ---F\ ··!--1. ~Ll!. -1::t I I I I + : I : I ~ I I ::-,..::-_::::__... __ _
-,-I I I I I •r I I I I ·, -.( · ,-f--l·f-,-1-t-t-I I I +{· -t"-1-j" 1l-t-!-7·{·j~d± ·i· S -•------
i_l I _t • l j· : ·! ..L I : .1 .. •··iw.· II' I 1 ±±i.:t+H-++1-+·i± -l·-11-:1:rfT+ 3 0 3 JiiAel
u•.1 ·~-,-• ..i_ __ , _ 4::J:t±.Lt-.. ~l ,-~1:1_:, .::1:L,_Hw.. .I I II If 1_;: I II T I r,!··7r-j"rt1,,· e I .l.,!,J.1 I T I ! LL J I I -1 U~· --u. LL..1. l ,_l I ! --'...L • . • • ' .• ' • . -..
-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ll-..e
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bliA, Inc.
land planning, civil engineering, surveying
115
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
w ~
§~ • Uj 6'n 4-0 0 oe
§~ 8 ::r:
l+:t: :j'::j::~~ . " H-+-1---e ~~-
[_!_LI-,-"', !.,W, -1--l+t' LLL 1
..:: .;,
~ ~ ~ =:: ""-i:::· ~
---i' --j : '
"" :, ~
"' ;; .. ~
'i '.ii ~
= ;,.
~
~
~ ~ 0 0--o -~ eo
0 r-~= 23,
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
't=·; ;;! jt j
11 jct.· m JI,, ···11 11 'Jj-~ ·~, fi 1
~ l~il lj J ,t, II 1 r-,,.,.:, ,, ~
~V)jl •ill ~I I -.: =•!-,: .
~ ;:;,--,: 1111 I I I ,!
c..<.;H b. !I ! :a
.& o,1! ·+·=~ Q..
::,. "
bl-IA, Inc.
land planning, civil engineering, surveying
116
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
..
• .. l
t:· ~
=-
; .
I I'' '++-l...l..!...' I I --i,--·:;,.,,+,-·-,----H-+ si-t-t-+, ·'·--'--4-_i-_
,rr-~-t·-H-H-+-1-l
-i '
• l't1 ... ---t-
:,f-'-t:.. -11"1 f~---H-i ..,. · ' · ...J...L... -t-H-+----1· ...... =··i-i--1,1 i-+-++-1: -. -f...! ' : ~-H·-t-r-t-,'-H'H--t-+ I - I : --f1 -t-t+-+,-+,-!ld11;;;;-·H-.-i-w<,-+,.,;.,"',!l..;.4_,+I-,! ... -ri+f. -.-'---,-...J i i ... -1..J.....:...;-1-1-1--'-l,--~-1-'~.J....l.-''-''C-i-.l..l-.J..J..+-I . . . , -1~ -; .:rr .... _ 7 , --:-•-+---·-..... :-.t· +:--:-t :t.lJ ·I+~ 1", -:1=1=,= . n, + -I+ 1 • ... ~-1-H-+--....... :-l-f-, j_~:i~: --,+H
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bl-IA, Inc.
land planning, civil engineering, surveying
117
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
u ... -., :; itt> f ii j ro .~ -
•
.. ~~ ;;. ~i 'i !1 ~ ~ • ~ Cir;t;-,·o I !J t .I! C/): 'i! l• 1 C/J ~ 5 y ~ .r: ,,_ r:: I-;, 11~ J ....: a ~ .t;S u: 1 f..., -,. 3 a 0 0 ::§. :.l ! -'fi~' J 1 • -ii -~ N t J!I JI ~:o .s· ~ ,, 0 ~V)tl ' ~ C ;;..-'"-;; .d I, t i t:-6 Ci: ~ -.. II c...C.;h 0 [-" o~Ji ·+-:1 := ;>-. E ~ ~ o:r: -~ ;,. -u ,n ------~ 3 ...
:.
-f-1tt--..,. 11 --:=-l:, ,. : ~ ~ ,..,. 11'&.l --t-\: '-fL• • ... _1~, . 1 j
r, '.,.-,,-x; -• : ':I • -- • .• 4>f • ---....
-H-. : · .. .:: \ --h+ IIU l,,l • -' ,H, - • . I . -:..!.. 1 .... , ..
' • ' .•. , , •• I '. • -.. !";I' p . ... Jr-, • --ti'" . ~ ll ...i.. I I ....
~-.-4 ... i-;I -"-..1.lr,, I 1,l-1.....!._ ' ~l+J, ,,I' -/~i 1--' ,... .... ·.:,...;· I r-r-
~
-L _ _t++--l-~-• '~ -"' -· ._ • -1... I ••• ~ ~1-I I 4-1'--f--t-+.l -........... ~-;-::-. ~. -~ -~ :1 i -;.J-. . ,., J I'..; -•• ,ll'-t+f-..w. --~
I I : --J • -:i_ t I f :=• . • j ' '
l. . ..a. I • :-t -'-~.: ,--ri-' -r>"it~·. .... _; • ~: -" -1--1-·, ·, • ~ +·H-.;=-r-'i-'
H-··;t:: : . , . ..:; , :-• , -r '" >:!t-i-i : · .... !~ ~-f ;_ --1~-f~--t -+-H---l-' -+:-....
1 , --r'.:~.~. __ ,...,--; --~ · ---l: ~ --, I '-!E3·i· E·u33ig~ •,__·+: --f-...j,.-,' --~-.j.,~-hJ'-,::-i'-' I 1 I ::d-t----1--:t: • -f
;. : .!j-!4,-.: -~~:"i?t. . * .,. ,., ~ ~ l:l :-+, : _J ,~ ........ ~U,..J-1-+,-.............
·f-l·++-'-*..!111 +~ : ·-._ -+.t-1. i, -1-/-' ' ' ++ · :.-rl H-r-.. "" . , • ·~,. • t • :1+ --I+ --1-•, ' ,.-, , ''i-,·~--~-;-'-HII-, .. • ., -l : ' ~-,
I I ,-......,·l-1-l--~-i,-i1 ...L 1 -~~l-ij~~~~-~ii:~f:§~~~~-~~-~f-~ -I~' ·H '-'-4-;....i....i..~-11...J...J-+-_'. -,j..+ ..... -1-f-4-I. t:-4 I --f+ : --f=t r I -. --J-.l--r 1-t-t-t-• ;:-. .. ·i-~1-. . -·-' ' ,-,-- , ' , ' ---, ·!-I ' , ..!.. -l-
~,H-++_-r~ ... .,1....-i:._u..H-:: =.:.:r:++·--;-' 1 1, 1 ll Jl+,=i+t---r+I+~.:·::' J-1-l-fill= :,..:...~-1-1-: :-1+H::i
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bl-IA, Inc.
land planning, civil engineering, surveying
120
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
bJ.tA, Inc.
land planning, civil engineering, surveying
12 J
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
:....; ~ ] .. ::,
•
• ~~ ~ :: • ... I ZJ ;>.. ~ ] 4-bl) ~
CJ2 i-i ~ c•E ER ti,
3= J ,.
::.
~ .c-a 0 -~ -0 -• • ~!;
~~
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
·tc:·: }:j ,i I r 1· l.·. te· : •I 11 ~-= ·;J• )· jl I: t:].J b l
(('\ r.~f if! 1;
~ ~Jl !fl jll rl J ~J II JI u ~f • c! -~· ·*··:i ~~J:
. ... :!'-
bl-tA, Inc.
land planning, civil engineering, surveying
122
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
b~A, Inc.
land planning, civil engineering, surveying
123
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
" ..2 -
; ...
T
+ -~ --e;.._ ·lo ~1/·r~1T ~; . ., --... -t t I I • f: -~ ~ --! !-_, • l.,,11
~--· j -~ ' ':; • -1 ~ ~ ),
I '
-j .
I I!
14-.-.-1-1-.XJ~~-\., ,.
r ' a ... -vr. ....
h-
~ ~l~f:t:t -t·: I -tf+
T+:Q:l:::t:J:~-z· :r:r:· :r:t:t--t --'f'Jr +·--e,--;-,-,-+-t-1-1-', -+-++..J...;.'i...:...,--1-1 +++-l·~l-1--1-4..µ''-,1-00" 4---1
-j ..... ,tj • H-'
.-+ +H-I I ·-=r= i:t -1· t-'
I + ' I
H--H' H-...:
I :::;:l~ 1 • I I --1--
;+. ~ -'8 !.,,. .. ._ f"" -t~" --I J. f' -I ; ..J-lt•Ff-f-f$.$~tt~$$:~t~a.~11±tt~
t:, :~ ---·---. :-·-!=,--, ·. : __ -! ': ,J:-''·-' -'-··-+-1-I-~ ..:.-1-1 :r .. -L. ::c-....... -1.I -_J __ "I. :1 l I ' I I ,-, ' I
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
......
bl-tA, Inc.
land planning, civil engineering, surveying
124
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
Drainage Study
b~A, Inc.
land planning, civil engineering, surveying
125
-
t:l _. 0
'"1 00 -l Pl w _. -· w = CD """' I Pl C: C> (JO CD """' (1) ::, --"'U VJ Q) C ..... < 0 C: u;· o..-_.
""<: Q) """' I ~ C>
Q) 0) --'< 0 0 "'U _.
"""' I "' C>
~
CD en
CD C: CD ::,
Q)
< ~ Q)
i5.> ::,
Q.
-0 i5.> ::, ::, 5· cp
0 ~
CD ::,
(Cl 5·
CD 0-CD ::!. ::r-::, :I> cp ' cn 5" C: 1 9
::,
(Cl
l'.J
0\
----
San Diego County Hydrology Manual
Date; June 2003
-- -- - - -
Section:
Page:
Table3-1
RUNOFF COEFFICIENTS FOR URBAN AREAS
Land Use Runoff Coefficient "C"
Soil Type
NRCS Elements Coun Elements %IMPER. A B
Undisturbed Natural Terrain (Natural) Permanent Open Space o• 0.20 0.2S
Low DCll5ity Residential (LOR) Resldenlial, 1.0 DU/ A or less 10 0.27 0.32
Low D=ity Residential (LOR) Residential. 2.0 DU/ A or less 20 0.34 0.38
Low Density Residential (LOR) Residential, 2.9 DU/ A or less 25 0.38 0.41
Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45
Medium Density Residential (MDR) Residential, 7.3 DU/ A or less 40 0.48 0.51
Medium Density Residential (MDR) Residential, 10.9 DU/A or less 4S 0.52 0.54
Medium Density Residential (MDR) Residential, 14.S DU/A or less 50 o.ss 0.58
High Density Residential (HOR) Residential, 24.0 DU/A or less 65 0.66 0.67
High Density Residential (HOR) Residential, 43.0 DU/A or less 80 0.76 0.77
Commercial/Industrial (N. Com) Nei11hbomood Commercial 80 0.76 0.77
Commerclalllndustrial (G. Com) General Commercl•l 85 0.80 0.80
Commercial/Industrial (O.P. Com) Office ProfessionaUCommercial 90 0.83 0.84
Commercialllndustrlal (Limited I.) Limited Industrial 90 0.83 0.84
Commercial/Industrial General I. Gcneml Industrial 95 0.87 O.B7
C
0.30
0.36
0.42
0.45
0.48
0.54
0.57
0.60
0.69
0.78
0.78
0.81
0.84
0.84
0.87
--
3
6 of26
D
0.35
0.41
0.46
0.49
0.52
0.57
0.60
0.63
0.71
0.79
0.79
0.82
0.85
0.85
0.&7
0The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3 .1.2 (representing the pervious runoff
coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justincatlon must be given that the urea will remain natural forever (e.g .. the area
is located in Cleveland National Forest).
DU/A = dwelling units per acre
NRCS = National Resources Conservlllion Service
---
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
San Diego Couniy Hydrology Manual
Date: June 2003
Section:
Page:
3
12 of26
Note that the Initial Time of Concentration should be reflective of the general land-use at the
upstream end of a drainage basin. /1. single lot with an area of two or less acres docs not have
a significant effect where the drainage basin area is 20 to 600 acres.
Table 3-2 provides limits of the length {Maximum Length (LM)) of sheet flow to be used in
hydrology studies. Initial T; values based on average C values for the Land Use Element are
also included. These values can be used in planning and design applications as described
below. Exceptions may be approved by the "Regulating Agency·· when submitted with o
detailed study.
Table3-2
MAXIMUM OVERLAND FLOW LENGTH (LM)
& INITIAL TIME OF CONCENTRATION (T1)
Element• DUI .5% 1% 2% 3% 5% 10%
Acre LM T, LM T; LM Ti LM T; LM T; LM T;
Natural 50 13.2 70 12.5 85 I0.9 100 I0.3 100 8.7 100 6.9
LOR I 50 12.2 70 11.5 85 10.0 JOO 9.5 JOO 8.0 JOO 6.4
LDR 2 50 11.3 70 10.5 85 9.2 100 8.8 100 7.4 100 5.8
LDR 2.9 50 10.7 70 10.0 85 8.8 95 8.1 100 7.0 100 5.6
MDR 4.3 50 10.2 70 9.6 80 8.1 95 7.8 100 6.7 IOO 5.3
MOR 7.3 50 9.2 65 8.4 80 7.4 95 7.0 100 6.0 IOO 4.8
MOR 10.9 50 8.7 65 7.9 80 6.9 90 6.4 100 5.7 100 4.5
MDR 14.5 50 8.2 65 7.4 80 6.5 90 6.0 100 5.4 JOO 4.3
HOR 24 50 6.7 65 6.1 75 5.1 90 4.9 95 4.3 100 3.S
HOR 43 50 5.3 65 4.7 75 4.0 85 3.8 95 3.4 100 2.7
N.Com 50 5.3 60 4.5 75 4.0 85 3.8 95 3.4 100 2.7
G.Com 50 4.7 60 4.1 75 3.6 85 3.4 90 2.9 100 2.4
O.P./Com 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2
Limited I. 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2
General I. 50 3.7 60 3.2 70 2.7 80 2.6 90 2.3 100 1.9
•see Table 3-1 for more detailed description
3-12
CT 14-04/PUD 14-06/CDP 14-20 Miles Buena Vista
1833 Buena Vista Way
bHA, Inc.
land planning, civil engineering, surveying
Drainage Study 127 L_
RATIONAL METHOD HYDROGRAPH PROGRAM
.OPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
.UN DATE 3/2/2015
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 11 MIN. I HOUR RAINFALL 2.6 INCHES
ASIN AREA 0.2 ACRES
UNOFF COEFFICIENT 0.48
PEAK DISCHARGE 0.44 CFS
I IME (MIN) = 0 DISCHARGE (CFS) = 0
IME (MIN) = 11 DISCHARGE (CFS) = 0
TIME (MIN) = 22 DISCHARGE (CFS) = 0
TIME (MIN) = 33 DISCHARGE (CFS) = 0 I IME (MIN) = 44 DISCHARGE (CFS) = 0
IME (MIN) = 55 DISCHARGE (CFS)= 0
IME (MIN) = 66 DISCHARGE (CFS) = 0
TIME (MIN) = 77 DISCHARGE (CFS) = 0 IIME (MIN) = 88 DISCHARGE (CFS) = 0
IME (MIN) = 99 DISCHARGE (CFS) = 0
IME (MIN)= 110 DISCHARGE (CFS)= 0
TIME (MIN)= 121 DISCHARGE (CFS)= 0
TIME (MIN)= 132 DISCHARGE (CFS)= 0 I IME (MIN) = 143 DISCHARGE (CFS) = 0
IME (MIN)= 154 DISCHARGE (CFS)= 0
IME (MIN) = 165 DISCHARGE (CFS) = 0
TIME (MIN)= 176 DISCHARGE (CFS)= 0
•
IME (MIN)= 187 DISCHARGE (CFS)= 0
IME (MIN)= 198 DISCHARGE (CFS)= 0
IME (MIN) = 209 DISCHARGE (CFS) = 0
IME (MIN) = 220 DISCHARGE (CFS) = 0.1
TIME (MIN) = 231 DISCHARGE (CFS)= 0.1 I IME (MIN) = 242 DISCHARGE (CFS) = 0.1
IME (MIN)= 253 DISCHARGE (CFS) = 0.44
IME (MIN) = 264 DISCHARGE (CFS) = 0.1
TIME (MIN) = 275 DISCHARGE (CFS) = 0
•
IME (MIN) = 286 DISCHARGE (CFS)= 0
IME (MIN) = 297 DISCHARGE (CFS) = 0
IME (MIN)= 308 DISCHARGE (CFS)= 0
IME (MIN)= 319 DISCHARGE (CFS)= 0
TIME (MIN) = 330 DISCHARGE (CFS) = 0 I IME (MIN)= 341 DISCHARGE (CFS)= 0
IME (MIN) = 352 DISCHARGE (CFS) = 0
IME (MIN) = 363 DISCHARGE (CFS)= 0
TIME (MIN)= 374 DISCHARGE (CFS)= 0
I
I
I
I
I
I
I
I
I
INFLOW HYDROGRAPH-100-YEAR
BASIN 1
RATIONAL METHOD HYDROGRAPH PROGRAM I COPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
RUN DATE 3/2/2015
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 16 MIN. I HOUR RAINFALL 2.6 INCHES
ASIN AREA 0.2 ACRES
UNOFF COEFFICIENT 0.48
PEAK DISCHARGE 0.34 CFS
-
!ME (MIN) = 0
!ME (MIN)= 16
IME (MIN)= 32
TIME (MIN) = 48 I IME (MIN) = 64
IME (MIN) = 80
IME (MIN) = 96
TIME (MIN)= 112
-
:rlME (MIN)= 128
IME (MIN)= 144
IME (MIN) = 160
IME (MIN)= 176
TIME (MIN)= 192 I IME (MIN) = 208
IME (MIN)= 224
IME (MIN) = 240
TIME (MIN) = 256
•
IME (MIN) = 272
IME (MIN) = 288
IME (MIN) = 304
IME (MIN)= 320
TIME (MIN) = 336 I IME (MIN) = 352
IME (MIN) = 368
IME (MIN) = 384
I
I
I
I
I
I
I
I
I
I
I
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS)= 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS)= 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.34
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
INFLOW HYDRGRAPH-100-YEAR
BASIN 2
RATIONAL METHOD HYDROGRAPH PROGRAM
111fOPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
.UN DATE 3/2/2015
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 7 MIN.
I HOUR RAINFALL 2.6 INCHES
ASIN AREA 0.3 ACRES
UNOFF COEFFICIENT 0.6063
PEAK DISCHARGE 1.19 CFS
I IME (MIN) = 0 DISCHARGE (CFS) = 0
!ME (MIN)= 7 DISCHARGE (CFS)= 0
TIME (MIN)= 14 DISCHARGE (CFS)= 0
TIME (MIN) = 21 DISCHARGE (CFS) = 0
I IME (MIN) = 28 DISCHARGE (CFS) = 0
!ME (MIN) = 35 DISCHARGE (CFS) = 0
!ME (MIN) = 42 DISCHARGE (CFS)= 0
TIME (MIN) = 49 DISCHARGE (CFS)= 0
I IME (MIN) = 56 DISCHARGE (CFS) = 0
!ME (MIN) = 63 DISCHARGE (CFS) = 0
!ME (MIN) = 70 DISCHARGE (CFS) = 0
TIME (MIN) = 77 DISCHARGE (CFS) = 0
TIME (MIN) = 84 DISCHARGE (CFS) = 0
I IME (MIN) = 91 DISCHARGE (CFS)= 0
IME (MIN)= 98 DISCHARGE (CFS) = 0
IME (MIN)= 105 DISCHARGE (CFS)= 0
TIME (MIN)= 112 DISCHARGE (CFS)= 0
I IME (MIN)= 119 DISCHARGE (CFS)= 0
IME (MIN)= 126 DISCHARGE (CFS)= 0
IME (MIN)= 133 DISCHARGE (CFS)= 0
TIME (MIN) = 140 DISCHARGE (CFS)= 0
TIME (MIN)= 147 DISCHARGE (CFS)= 0.1
I IME (MIN)= 154 DISCHARGE (CFS)= 0.1
IME (MIN)= 161 DISCHARGE (CFS)= 0.1
IME (MIN)= 168 DISCHARGE (CFS)= 0.1
TIME (MIN)= 175 DISCHARGE (CFS)= 0.1
-
!ME (MIN)= 182 DISCHARGE (CFS)= 0.1
IME (MIN)= 189 DISCHARGE (CFS)= 0.1
IME (MIN)= 196 DISCHARGE (CFS)= 0.1
!ME (MIN) = 203 DISCHARGE (CFS)= 0.1
TIME (MIN)= 210 DISCHARGE (CFS)= 0.1
I IME (MIN)= 217 DISCHARGE (CFS)= 0.1
IME (MIN) = 224 DISCHARGE (CFS) = 0.1
!ME (MIN)= 231 DISCHARGE (CFS)= 0.2
TIME (MIN)= 238 DISCHARGE (CFS)= 0.1
•
IME (MIN)= 245 DISCHARGE (CFS)= 1.19
!ME (MIN) = 252 DISCHARGE (CFS)= 0.2
IME (MIN) = 259 DISCHARGE (CFS)= 0.1
IME (MIN)= 266 DISCHARGE (CFS)= 0.1
TIME (MIN)= 273 DISCHARGE (CFS)= 0.1
I IME (MIN) = 280 DISCHARGE (CFS)= 0.1
!ME (MIN)= 287 DISCHARGE (CFS) = 0.1
IME (MIN) = 294 DISCHARGE (CFS) = 0
TIME (MIN) = 301 DISCHARGE (CFS)= 0
TIME (MIN)= 308 DISCHARGE (CFS)= 0
-
IME (MIN)= 315 DISCHARGE (CFS)= 0
!ME (MIN) = 322 DISCHARGE (CFS) = 0
IME (MIN) = 329 DISCHARGE (CFS)= 0
TIME (MIN) = 336 DISCHARGE (CFS)= 0
IIME (MIN) = 343 DISCHARGE (CFS) = 0
IME (MIN) = 350 DISCHARGE (CFS) = 0
IME (MIN) = 357 DISCHARGE (CFS)= 0
TIME (MIN)= 364 DISCHARGE (CFS)= 0
I
I
I
I
I
INFLOW HYDROGRAPH-100-YEAR
BASIN 3
RATIONAL METHOD HYDROGRAPH PROGRAM
rOPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
.UN DATE 3/2/2015
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 9 MIN.
I HOUR RAINFALL 2.6 INCHES
ASIN AREA 0.3 ACRES
UNOFF COEFFICIENT 0.5818
PEAK DISCHARGE 0.95 CFS
I IME (MIN) = 0 DISCHARGE (CFS) = 0
IME (MIN) = 9 DISCHARGE (CFS)= 0
TIME (MIN)= 18 DISCHARGE (CFS)= 0
TIME (MIN) = 27 DISCHARGE (CFS) = 0
I IME (MIN)= 36 DISCHARGE (CFS)= 0
IME (MIN) = 45 DISCHARGE (CFS)= 0
IME (MIN) = 54 DISCHARGE (CFS) = 0
TIME (MIN) = 63 DISCHARGE (CFS)= 0
I IME (MIN) = 72 DISCHARGE (CFS) = 0
IME (MIN) = 81 DISCHARGE (CFS) = 0
IME (MIN) = 90 DISCHARGE (CFS) = 0
TIME (MIN) = 99 DISCHARGE (CFS) = 0
TIME (MIN)= 108 DISCHARGE (CFS)= 0
I IME (MIN)= 117 DISCHARGE (CFS)= 0
IME (MIN)= 126 DISCHARGE (CFS)= 0
!ME (MIN)= 135 DISCHARGE (CFS)= 0
TIME (MIN) = 144 DISCHARGE (CFS)= 0
I IME (MIN)= 153 DISCHARGE (CFS)= 0
IME (MIN)= 162 DISCHARGE (CFS)= 0.1
!ME (MIN)= 171 DISCHARGE (CFS)= 0.1
TIME (MIN) = 180 DISCHARGE (CFS) = 0.1
TIME (MIN)= 189 DISCHARGE (CFS)= 0.1
I IME (MIN)= 198 DISCHARGE (CFS)= 0.1
!ME (MIN)= 207 DISCHARGE (CFS)= 0.1
IME (MIN)= 216 DISCHARGE (CFS)= 0.1
TIME (MIN) = 225 DISCHARGE (CFS)= 0.1
•
IME (MIN) = 234 DISCHARGE (CFS) = 0.2
!ME (MIN) = 243 DISCHARGE (CFS)= 0.1
IME (MIN) = 252 DISCHARGE (CFS)= 0.95
IME (MIN) = 261 DISCHARGE (CFS) = 0.1
TIME (MIN) = 270 DISCHARGE (CFS) = 0.1
I IME (MIN) = 279 DISCHARGE (CFS) = 0.1
!ME (MIN) = 288 DISCHARGE (CFS) = 0.1
IME (MIN)= 297 DISCHARGE (CFS) = 0
TIME (MIN) = 306 DISCHARGE (CFS) = 0
IME (MIN) = 324 DISCHARGE (CFS) = 0
•
IME (MIN)= 315 DISCHARGE (CFS)= 0
IME (MIN) = 333 DISCHARGE (CFS) = 0
IME (MIN) = 342 DISCHARGE (CFS)= 0
TIME (MIN) = 351 DISCHARGE (CFS) = 0
I IME (MIN) = 360 DISCHARGE (CFS) = 0
IME (MIN) = 369 DISCHARGE (CFS) = 0
I
I
I
I
I
I
I
INFLOW HYDROGRAPH-100-YEAR
BASIN 4
RATIONAL METHOD HYDROGRAPH PROGRAM I OPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
UN DATE 3/2/2015
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 9 MIN.
'
HOUR RAINFALL 2.6 INCHES
ASIN AREA 0.3 ACRES
UNOFF COEFFICIENT 0.39
PEAK DISCHARGE 0.62 CFS I IME (MIN) = 0 DISCHARGE (CFS) = 0
IME (MIN) = 9 DISCHARGE (CFS) = 0
TIME (MIN)= 18 DISCHARGE (CFS)= 0
TIME (MIN) = 27 DISCHARGE (CFS) = 0
-
IME (MIN) = 36 DISCHARGE (CFS) = 0
IME (MIN) = 45 DISCHARGE (CFS) = 0
IME (MIN) = 54 DISCHARGE (CFS) = 0
TIME (MIN) = 63 DISCHARGE (CFS) = 0 IIME (MIN) = 72 DISCHARGE (CFS) = 0
IME (MIN)= 81 DISCHARGE (CFS)= 0
IME (MIN) = 90 DISCHARGE (CFS) = 0
TIME (MIN) = 99 DISCHARGE (CFS) = 0
TIME (MIN)= 108 DISCHARGE (CFS)= 0
-
IME (MIN)= 117 DISCHARGE (CFS)= 0
IME (MIN)= 126 DISCHARGE (CFS)= 0
IME (MIN)= 135 DISCHARGE (CFS)= 0
TIME (MIN) = 144 DISCHARGE (CFS) = 0 I ME (MIN)= 153 DISCHARGE (CFS)= 0
ME (MIN)= 162 DISCHARGE (CFS)= 0
ME (MIN)= 171 DISCHARGE (CFS)= 0
TIME (MIN)= 180 DISCHARGE (CFS)= 0
TIME (MIN)= 189 DISCHARGE (CFS)= 0 I ME (MIN) = 198 DISCHARGE (CFS) = 0
ME (MIN) = 207 DISCHARGE (CFS) = 0.1
ME (MIN)= 216 DISCHARGE (CFS)= 0.1
TIME (MIN)= 225 DISCHARGE (CFS)= 0.1 I ME (MIN)= 234 DISCHARGE (CFS)= 0.1
ME (MIN) = 243 DISCHARGE (CFS) = 0.1
ME (MIN) = 252 DISCHARGE (CFS) = 0.62
TIME (MIN) = 261 DISCHARGE (CFS)= 0.1
TIME (MIN)= 270 DISCHARGE (CFS)= 0.1 I ME (MIN)= 279 DISCHARGE (CFS) = 0
ME (MIN) = 288 DISCHARGE (CFS)= 0
ME (MIN)= 297 DISCHARGE (CFS)= 0
TIME (MIN) = 306 DISCHARGE (CFS) = 0
-
ME (MIN)= 315 DISCHARGE (CFS)= 0
ME (MIN) = 324 DISCHARGE (CFS) = 0
ME (MIN)= 333 DISCHARGE (CFS) = 0
ME (MIN) = 342 DISCHARGE (CFS) = 0
TIME (MIN) = 351 DISCHARGE (CFS) = 0 I ME (MIN) = 360 DISCHARGE (CFS) = 0
I
I
I
ME (MIN) = 369 DISCHARGE (CFS) = 0
I
I
I
I
INFLOW HYDROGRAPH-100-YEAR
BASIN 5
RATIONAL METHOD HYDROGRAPH PROGRAM
I OPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
UN DATE 3/2/2015
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 10 MIN.
I HOUR RAINFALL 2.6 INCHES
ASIN AREA 0.3 ACRES
UNOFF COEFFICIENT 0.5836
PEAK DISCHARGE 0.86 CFS
I IME (MIN) = 0 DISCHARGE (CFS) = 0
IME (MIN)= 10 DISCHARGE (CFS)= 0
TIME (MIN) = 20 DISCHARGE (CFS) = 0
TIME (MIN) = 30 DISCHARGE (CFS) = 0
I IME (MIN)= 40 DISCHARGE (CFS)= 0
IME (MIN) = 50 DISCHARGE (CFS) = 0
IME (MIN) = 60 DISCHARGE (CFS) = 0
TIME (MIN) = 70 DISCHARGE (CFS) = 0
I IME (MIN) = 80 DISCHARGE (CFS) = 0
IME (MIN)= 90 DISCHARGE (CFS) = 0
IME (MIN)= 100 DISCHARGE (CFS)= 0
TIME (MIN)= 110 DISCHARGE (CFS)= 0
TIME (MIN)= 120 DISCHARGE (CFS)= 0
I IME (MIN)= 130 DISCHARGE (CFS)= 0
IME (MIN)= 140 DISCHARGE (CFS)= 0
IME (MIN)= 150 DISCHARGE (CFS)= 0
TIME (MIN)= 160 DISCHARGE (CFS)= 0.1
IIME (MIN)= 170 DISCHARGE (CFS)= 0.1
IME (MIN)= 180 DISCHARGE (CFS)= 0.1
IME (MIN)= 190 DISCHARGE (CFS)= 0.1
TIME (MIN)= 200 DISCHARGE (CFS) = 0.1
TIME (MIN)= 210 DISCHARGE (CFS)= 0.1
I IME (MIN) = 220 DISCHARGE (CFS) = 0.1
IME (MIN) = 230 DISCHARGE (CFS) = 0.2
IME (MIN) = 240 DISCHARGE (CFS) = 0.1
TIME (MIN) = 250 DISCHARGE (CFS) = 0.86
-
IME (MIN) = 260 DISCHARGE (CFS)= 0.1
!ME (MIN) = 270 DISCHARGE (CFS) = 0.1
IME (MIN)= 280 DISCHARGE (CFS)= 0.1
IME (MIN) = 290 DISCHARGE (CFS) = 0.1
TIME (MIN) = 300 DISCHARGE (CFS) = 0
I IME (MIN)= 310 DISCHARGE (CFS)= 0
IME (MIN) = 320 DISCHARGE (CFS) = 0
IME (MIN) = 330 DISCHARGE (CFS) = 0
TIME (MIN) = 340 DISCHARGE (CFS) = 0
IIME (MIN)= 350 DISCHARGE (CFS) = 0
IME (MIN) = 360 DISCHARGE (CFS) = 0
IME (MIN) = 370 DISCHARGE (CFS) = 0
I
I
I
I
I
I
I
I
INFLOW HYDROGRAPH-100-YEAR
BASIN 6
RATIONAL METHOD HYDROGRAPH PROGRAM
I OPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
UN DATE 3/3/2015
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 9 MIN.
-
HOUR RAINFALL 2.6 INCHES
ASIN AREA 0.2 ACRES
UNOFF COEFFICIENT 0.46
PEAK DISCHARGE 0.51 CFS
I IME (MIN) = 0 DISCHARGE (CFS) = 0
IME (MIN) = 9 DISCHARGE (CFS) = 0
TIME (MIN)= 18 DISCHARGE (CFS)= 0
TIME (MIN) = 27 DISCHARGE (CFS) = 0
-
IME (MIN) = 36 DISCHARGE (CFS) = 0
IME (MIN) = 45 DISCHARGE (CFS) = 0
IME (MIN) = 54 DISCHARGE (CFS)= 0
TIME (MIN) = 63 DISCHARGE (CFS) = 0
I IME (MIN) = 72 DISCHARGE (CFS) = 0
IME (MIN)= 81 DISCHARGE (CFS) = 0
IME (MIN) = 90 DISCHARGE (CFS) = 0
TIME (MIN)= 99 DISCHARGE (CFS)= 0
TIME (MIN)= 108 DISCHARGE (CFS)= 0
-
IME (MIN)= 117 DISCHARGE (CFS)= 0
IME (MIN)= 126 DISCHARGE (CFS)= 0
IME (MIN)= 135 DISCHARGE (CFS)= 0
TIME (MIN) = 144 DISCHARGE (CFS) = 0
I IME (MIN)= 153 DISCHARGE (CFS)= 0
IME (MIN)= 162 DISCHARGE (CFS)= 0
IME (MIN)= 171 DISCHARGE (CFS)= 0
TIME (MIN)= 180 DISCHARGE (CFS)= 0
TIME (MIN)= 189 DISCHARGE (CFS)= 0
I IME (MIN)= 198 DISCHARGE (CFS)= 0
IME (MIN) = 207 DISCHARGE (CFS) = 0
IME (MIN)= 216 DISCHARGE (CFS)= 0.1
TIME (MIN) = 225 DISCHARGE (CFS) = 0.1
IME (MIN) = 243 DISCHARGE (CFS) = 0 I IME (MIN) = 234 DISCHARGE (CFS) = 0.1
IME (MIN) = 252 DISCHARGE (CFS) = 0.51
TIME (MIN)= 261 DISCHARGE (CFS)= 0.1
TIME (MIN) = 270 DISCHARGE (CFS)= 0
IIME (MIN) = 279 DISCHARGE (CFS)= 0
IME (MIN) = 288 DISCHARGE (CFS) = 0
IME (MIN) = 297 DISCHARGE (CFS)= 0
TIME (MIN)= 306 DISCHARGE (CFS) = 0
•
IME (MIN)= 315 DISCHARGE (CFS)= 0
IME (MIN) = 324 DISCHARGE (CFS) = 0
IME (MIN) = 333 DISCHARGE (CFS) = 0
IME (MIN)= 342 DISCHARGE (CFS)= 0
TIME (MIN) = 351 DISCHARGE (CFS)= 0
I IME (MIN) = 360 DISCHARGE (CFS) = 0
IME (MIN) = 369 DISCHARGE (CFS) = 0
I
I
I
I
I
I
I
INFLOW HYDROGRAPH-100-YEAR
BASIN 7
RATIONAL METHOD HYDROGRAPH PROGRAM
.COPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
.UN DATE 3/2/2015
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 9 MIN. I HOUR RAINFALL 2.6 INCHES
ASIN AREA 0.2 ACRES
UNOFF COEFFICIENT 0.46
PEAK DISCHARGE 0.52 CFS
I IME (MIN) = 0 DISCHARGE (CFS) = 0
IME (MIN) = 9 DISCHARGE (CFS) = 0
TIME (MIN)= 18 DISCHARGE (CFS)= 0
TIME (MIN)= 27 DISCHARGE (CFS) = 0 I IME (MIN) = 36 DISCHARGE (CFS) = 0
IME (MIN) = 45 DISCHARGE (CFS) = 0
IME (MIN)= 54 DISCHARGE (CFS)= 0
TIME (MIN) = 63 DISCHARGE (CFS)= 0 IJIME (MIN) = 72 DISCHARGE (CFS) = 0
IME (MIN)= 81 DISCHARGE (CFS)= 0
IME (MIN) = 90 DISCHARGE (CFS) = 0
TIME (MIN) = 99 DISCHARGE (CFS) = 0
TIME (MIN)= 108 DISCHARGE (CFS)= 0 I IME (MIN)= 117 DISCHARGE (CFS)= 0
IME (MIN)= 126 DISCHARGE (CFS)= 0
!ME (MIN)= 135 DISCHARGE (CFS)= 0
TIME (MIN) = 144 DISCHARGE (CFS)= 0
•
IME (MIN)= 153 DISCHARGE (CFS)= 0
IME (MIN)= 162 DISCHARGE (CFS)= 0
IME (MIN)= 171 DISCHARGE (CFS)= 0
IME (MIN)= 180 DISCHARGE (CFS)= 0
TIME (MIN)= 189 DISCHARGE (CFS)= 0 I IME (MIN)= 198 DISCHARGE (CFS)= 0
IME (MIN) = 207 DISCHARGE (CFS) = 0
IME (MIN)= 216 DISCHARGE (CFS)= 0.1
TIME (MIN) = 225 DISCHARGE (CFS) = 0.1
•
IME (MIN)= 234 DISCHARGE (CFS)= 0.1
IME (MIN) = 243 DISCHARGE (CFS) = 0
IME (MIN) = 252 DISCHARGE (CFS) = 0.52
IME (MIN)= 261 DISCHARGE (CFS)= 0.1
TIME (MIN)= 270 DISCHARGE (CFS)= 0 I IME (MIN) = 279 DISCHARGE (CFS) = 0
!ME (MIN) = 288 DISCHARGE (CFS)= 0
IME (MIN) = 297 DISCHARGE (CFS) = 0
TIME (MIN)= 306 DISCHARGE (CFS) = 0
TIME (MIN)= 315 DISCHARGE (CFS)= 0 l lME (MIN) = 324 DISCHARGE (CFS) = 0
IME (MIN)= 333 DISCHARGE (CFS)= 0
IME (MIN) = 342 DISCHARGE (CFS) = 0
TIME (MIN)= 351 DISCHARGE (CFS) = 0 I IME (MIN)= 360 DISCHARGE (CFS)= 0
I
I
I
I
I
I
I
IME (MIN) = 369 DISCHARGE (CFS) = 0
INLFOW HYDROGRAPH-100-YEAR
BASIN 8
RATIONAL METHOD HYDROGRAPH PROGRAM I OPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
UN DATE 3/2/2015
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 14 MIN.
'
HOUR RAINFALL 2.6 INCHES
ASIN AREA 0.2 ACRES
UNOFF COEFFICIENT 0.48
PEAK DISCHARGE 0.37 CFS I IME (MIN) = 0 DISCHARGE (CFS) = 0
IME (MIN)= 14 DISCHARGE (CFS)= 0
TIME (MIN) = 28 DISCHARGE (CFS) = 0
TIME (MIN) = 42 DISCHARGE (CFS) = 0
-
IME (MIN) = 56 DISCHARGE (CFS) = 0
IME (MIN) = 70 DISCHARGE (CFS) = 0
IME (MIN) = 84 DISCHARGE (CFS) = 0
TIME (MIN) = 98 DISCHARGE (CFS)= 0 I IME (MIN)= 112 DISCHARGE (CFS)= 0
IME (MIN)= 126 DISCHARGE (CFS) = 0
IME (MIN)= 140 DISCHARGE (CFS)= 0
TIME (MIN)= 154 DISCHARGE (CFS)= 0
TIME (MIN)= 168 DISCHARGE (CFS)= 0 IIME (MIN)= 182 DISCHARGE (CFS)= 0
IME (MIN)= 196 DISCHARGE (CFS)= 0
IME (MIN)= 210 DISCHARGE (CFS)= 0
TIME (MIN)= 224 DISCHARGE (CFS)= 0.1 IIME (MIN) = 238 DISCHARGE (CFS)= 0.1
IME (MIN) = 252 DISCHARGE (CFS) = 0.37
IME (MIN) = 266 DISCHARGE (CFS) = 0.1
TIME (MIN)= 280 DISCHARGE (CFS) = 0
TIME (MIN) = 294 DISCHARGE (CFS) = 0 I IME (MIN) = 308 DISCHARGE (CFS) = 0
IME (MIN) = 322 DISCHARGE (CFS) = 0
IME (MIN) = 336 DISCHARGE (CFS) = 0
TIME (MIN) = 350 DISCHARGE (CFS) = 0
IME (MIN) = 378 DISCHARGE (CFS) = 0 IIME (MIN) = 364 DISCHARGE (CFS) = 0
I
I
I
I
I
I
I
I
I
I
INFLOW HYDROGRAPH-100-YEAR
BASIN 9
RATIONAL METHOD HYDROGRAPH PROGRAM
.COPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY
It.UN DATE 3/2/2015
HYDROGRAPH FILE NAME Text1
TIME OF CONCENTRATION 14 MIN.
EHOUR RAINFALL 2.6 INCHES
ASIN AREA 0.2 ACRES
UNOFF COEFFICIENT 0.48
PEAK DISCHARGE 0.37 CFS
-
IME (MIN) = 0
IME (MIN)= 14
IME (MIN) = 28
TIME (MIN)= 42
I IME (MIN) = 56
IME (MIN) = 70
IME (MIN) = 84
TIME (MIN) = 98
~
JIME (MIN)= 112
IME (MIN)= 126
IME (MIN) = 140
IME (MIN)= 154
TIME (MIN)= 168
I IME (MIN)= 182
IME (MIN)= 196
IME (MIN)= 210
TIME (MIN) = 224
•
IME (MIN) = 238
IME (MIN) = 252
IME (MIN) = 266
IME (MIN) = 280
TIME (MIN) = 294
I IME (MIN) = 308
IME (MIN) = 322
IME (MIN) = 336
TIME (MIN) = 350
IJIME (MIN) = 364 I IME (MIN) = 378
I
I
I
I
I
I
I
I
I
I
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0.37
DISCHARGE (CFS) = 0.1
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
DISCHARGE (CFS) = 0
INFLOW HYDROGRAPH-100-YEAR
BASIN 10