HomeMy WebLinkAboutCT 15-09; Quarry Creek PA R-4 East; WATER STUDY FOR QUARRY CREEK PLANNING AREA R-4A EAST; 2016-07-25BB&D~
PLANNING ENGINEERING SURVEYING
WATER STUDY
FOR
QUARRY CREEK PLANNING AREA R-4A EAST
City of Carlsbad, CA
PREPARED FOR:
PRESIDIO CORNERSTONE QC, LLC
4365 EXECUTIVE DRIVE, SUITE 600
SAN DIEGO, CA 92121
PREPARED BY:
SB&O, INC.
3990 RUFFIN ROAD, SUITE 120
SAN DIEGO, CA 92123
(858) 560-1141
SB&O JOB NO. 71630.60
Aaron Park
Exp: 9
JULY 25, 2016
Corporate Office: 3990 Ruffin Road, Suite 120 • San Diego, California 92123 • Phone 858.560.1141 Fax 858.560.8157
41689 Enterprise Circle North, Suite 126 • Temecula, CA 92590 • Phone 951.695.8900 Fax 951.695.8901
&D~
PLANNING ENGINEERING SURVEYING
TABLE OF CONTENTS
1. INTRODUCTION ..................................................................................................................... 1
2. DESCRIPTION OF WATER SYSTEMS ................................................................................. 1
2.1 Existing Condition ............................................................................................................... 1
2.2 Proposed Private Water System ........................................................................................... I
3. HYDRAULIC ANALYSIS ....................................................................................................... 2
3. I EP ANET .............................................................................................................................. 2
3.2 Residual Demand Analysis .................................................................................................. 2
3 .3 Results .................................................................................................................................. 2
4. WATER METER SIZING ......................................................................................................... 3
4.1 UPC Demands ...................................................................................................................... 3
4.2 Meter Sizes ........................................................................................................................... 3
5. RECOMMENDATIONS ........................................................................................................... 3
5. 1 Pipelines ............................................................................................................................... 3
5.2 Pressure Regulation ............................................................................................................. 3
5.3 Meters .................................................................................................................................. 3
EXHIBITS
Exhibit A: Vicinity Map
Exhibit B: EPANET Results/ Site Map
D: 7!6.12 QC PA 4'Reports-Walcr'Wl60725, QC-R4 EAST, WATER STUDY .. ,ls11.docx
&D~
PLANNING ENGINEERING SURVEYING
1. Introduction
The Quarry Creek project is located in the City of Carlsbad (City), but is bordered to the east by
the City of Oceanside. The project is situated west of College Boulevard, east of Interstate 5 and
south ofHayrnar Drive. TI1e property is divided north and south by the Buena Vista Creek which
runs east to west across the middle of the site.
Planning Area 4 (R-4) is located in the southwestern portion of the site, and consists of 150 two-
story townhomes. R-4 is bound by the Buena Vista Creek to the north, open space to the west
and Marron Road to the south.
This report summarizes our analysis of the proposed domestic water system within R-4 EAST,
for sizing of facilities and verifying adequate working pressures. This report is preliminary and
may be revised due to changes that occur in the final design stage of the project.
2. Description of Water Systems
2.1 Existing Condition
A water system analysis for the Quarry Creek Master Plan was prepared by Dexter Wilson
Engineering, dated March 2012. The Quarry Creek water system is connected to the 580
pressure zone near the intersection of Tamarack Avenue and Simsbury Court. A pressure
reducing station reduces all the Quarry Creek main lines to 330 pressure zone.
2.2 Proposed Private Water System
The R-4 EAST area contains private streets, private sewer, and a private water system. The
internal 6" PVC private main lines are looped through the site, and connected at two locations
with master public water meters and backflow devices. The layout of the domestic water system
and the Points of Connection (POCs) are illustrated in Exhibit A. Each building shall receive a
single water service and each unit shall be individually sub-metered. No irrigation, fire hydrants
or sprinkler systems shall be connected to the private potable water system.
A parallel private 8" PVC private fire system shall be provided in a joint trench to provide
service to fire hydrants and to building fire suppression systems. The private fire system shall
also be looped through the site and be connected to an 8" Double Check Detector Assembly
(DCDA) at the public right-of-way, at each of the two POCs.
D:,71632 QC PA 4'Repons·Water-.20160725, QC-R~ EAST. WATER STUDY.~b~.d\\C.\
3. Hydraulic Analysis
3.1 EPANET
BB&D~
PLANNING ENGINEERING SURVEYING
EPANET (v2.00.12) is a computer program that performs extended period simulation of
hydraulic and water quality behavior within pressurized pipe networks. EP ANET can be used
for many different kinds of applications in distribution systems analyses. A network consists of
pipes, nodes (pipe junctions), pumps, valves, and storage tanks or reservoirs. EP ANET tracks the
flow of water in each pipe, the pressure at each node, and the height of water in each tank,
throughout the network during the simulation period comprised of multiple time steps.
3.2 Residual Demand Analysis
In accordance with the City's Design Requirements, Section 3.2.1, the following demand profiles
shall apply to the hydraulic analysis of the 150 residential multi-family units:
Average Daily Demand (ADD)= 37,500 gallons per day (gpd) = 26 gallons per minute (gpm)
Maximum Daily Demand (MDD) = 61,875 gpd = 43 gpm
Peak Hour Demand (PHD) = 108,750 gpd = 75.5 gpm
Per City's Design Requirements, Section 2.3, the minimum residual pressure shall meet the
following criteria:
A. 40 PSI at PHD
B. 20 PSI at design fire flow plus MDD
The private fire system is independent of the potable water system and therefore only scenario
"A" (PHD) is hydraulically modeled.
A second analysis was performed using the UPC residential profile based on fixture unit
conversion. Results are shown below.
3.3 Results
The results of the analyses are summarized in the table below and Exhibit A.
PHD UPC ALLOWABLE SIMULATION SIMULATION
Max. Velocitv /FPS\ 0.43 3.26 8
Hazen~Williams Roue:hness Coef. "C'' 150 150 -
Max. Residual Pressure /PSI) 94.65 94.38 -
Min. Pressure (PSD 87.67 85.04 40
D:··716n QC PA 4'Repo,wWater-20160725, QC'-R4 EAST, WATER STUDY.,dn.doc~ 2
BB&D~
PLANNING ENGINEERING SURVEYING
4. Water Meter Sizing
4.1 UPC Demands
The demands for each unit and building were calculated based upon the amount of fixture units
in each. Using chart A-2 (Appendix B) of the UPC, the fixture units are converted to flow
demand in gpm.
150 TOT AL NO. OF UNITS
30.3 ASSUMED FIXTURE UNITS PER DWELLING UNIT
4545 TOT AL FIXTURE UNITS
555 TOTAL DEMAND (GPM)
4.2 Meter Sizes
The private water system is looped to two points of connection with a demand of277 gpm at
each. Each 3" water meter has a capacity of 320 for a total capacity of 640 gmp.
5. Recommendations
5.1 Pipelines
The on-site main lines within the project should be constructed with 6" PVC (C900 CL. 150)
pipe or equivalent, and in accordance with the City's Water Design & Construction Manual.
5.2 Pressure Regulation
This water system does not require any pressure regulators or reducers for the on-site public
water system. The individual buildings will require pressure reducers, to be determined by the
building plumbing engineer.
5.3 Meters
The domestic water system shall be looped and connected at two POCs with a 3" public water
meter at each location. Each on-site unit shall be sub-metered to track individual water usage.
D:·71632 QC PA 4·Reports·Water 20160725. QC-R4 EAST. WATER STUDY .\ls, don 3
BB&D~
PLANNING ENGINEERING SURVEYING
Exhibit A: Vicinity Map
EL CAMINO
COUNTRY CLUB
!;;t ~~ ~ 8 f MIRA ~
IJ COSTA COLLEGE ~
VICINITY MAP
NOT TO SCALE
THOMAS BROTHERS PG. 1107, GRID A-2
2006 £0/TION
D: 71632 QC PA 4 Repons·Wa1er·201607.25, QC-R4 EAST, WATER STUDY,.xlH.don
BB&D~
PLANNING ENGINEEAING SUAVEYING
Exhibit B: EPANET Results & Site Map
D:·71632 QC PA ,,1 Reports Water 20160725. QC·R4 EAST. WATER STUDY.xlsx.doc~
Page 1 7/24/2016 11:50:47 AM
**********************************************************************
* E p A N E T *
* Hydraulic and Water Quality *
* Analysis for Pipe Networks *
* Version 2.0 *
**********************************************************************
Input File: PHO R4 EAST.net
Link -Node Table:
----------------------------------------------------------------------
Link Start End Length Diameter
ID Node Node ft in
----------------------------------------------------------------------
Pl
P2
P3
P4
PS
P6
P7
PS
P9
PlO
Pll
Pl2
Pl3
Pl4
Pl5
Pl6
Pl7
Pl8
Pl9
P20
P21
1
2
3
4
Node
Node
ID
Jl
J2
J3
J4
JS
J6
Results:
J23
Jl
J2
J3
J4
JS
JS
J7
JS
J9
Jl8
JS
Jll
Jl3
Jl5
Jl7
Jl5
Jl3
Jll
J4
J3
POC2
Jl9
POCl
J24
Demand
GPM
7.00
4.50
4.50
3.00
0.00
3.00
Jl
J2
J3
J4
JS
J6
J7
JS
J9
JlO
J7
Jll
Jl3
Jl5
Jl7
Jl
Jl6
Jl4
Jl2
Jl2
Jl4
Jl9
Jl8
J24
J23
Head
ft
326.53
326.53
326.53
326.53
326.53
326.53
Pressure
psi
87. 67
88.97
89.94
91.31
91. 91
92.09
1
125 6
300 6
210 6
160 6
95 6
60 6
175 6
120 6
135 6
llO 6
215 6
215 6
160 6
160 6
210 6
160 6
120 6
160 6
170 6
100 6
llO 6
#N/A 3 Valve
#N/A 6 Valve
#N/A 3 Valve
#N/A 6 Valve
Quality
0.00
0.00
0.00
0.00
0.00
0.00
Page 2
Node Results: (continued)
Node Demand Head Pressure Quality
ID GPM ft psi
----------------------------------------------------------------------
J7 7.50 326.53 92. 96 0.00
J9 2.00 326.53 93.13 0.00
Jl0 5.00 326.53 92.56 0.00
Jll 3.00 326.53 92.17 0.00
J12 9.00 326.53 91.44 0.00
Jl3 2.00 326.53 91.22 0.00
J14 9.00 326.53 90.44 0.00
J15 4.00 326.53 90.14 0.00
Jl6 6.00 32 6. 53 89. 62 0.00
Jl7 6.00 326.53 88.49 0.00
J23 0.00 326.55 89.50 0.00
Jl8 0.00 326.56 93.84 0.00
Jl9 0.00 328.44 94.65 0.00
J24 0.00 328.44 90.32 0.00
JS 0.00 326.53 93.39 0.00
POCl -37.84 330.00 0.00 0.00 Reservoir
POC2 -37.66 330.00 0.00 0.00 Reservoir
Link Results:
Link Flow VelocityUnit Headless Status
ID GPM fps ft/Kft
----------------------------------------------------------------------
Pl 37.84 0.43 0.13 Open
P2 13.41 0.15 0.02 Open
P3 8. 91 0.10 0.01 Open
P4 -1.97 0.02 0.00 Open
PS -11.09 0.13 0.01 Open
P6 3.00 0.03 0.00 Open
P7 -14.09 0.16 0.02 Open
P8 16.07 0.18 0.03 Open
P9 7.00 0.08 0.01 Open
PIO 5.00 0.06 0.00 Open
Pll 37.66 0.43 0.13 Open
Pl2 9.07 0.10 0.01 Open
P13 3.19 0.04 0.00 Open
Pl4 -1.43 0.02 0.00 Open
Pl5 -11.43 0.13 0.01 Open
Pl6 -17.43 0.20 0.03 Open
Pl7 6.00 0.07 0.00 Open
Pl8 2.62 0.03 0.00 Open
Pl9 2.88 0.03 0.00 Open
P20 6.12 0.07 0.00 Open
P21 6.38 0.07 0.00 Open
1 37.66 1. 71 1.56 Open Valve
2 37.66 0.43 1. 88 Open Valve
3 37.84 1. 72 1.56 Open Valve
2
Page 3
Link Results: (continued)
Link
ID
4
Flow
GPM
37.84
VelocityUnit Headless Status
fps ft/Kft
0.43 1.89 Open Valve
3
Page 1 7/24/2016 11:54:16 AM
**********************************************************************
* E p A N E T *
* Hydraulic and Water Quality *
* Analysis for Pipe Networks *
* Version 2.0 *
**********************************************************************
Input File: UPC R4 EAST.net
Link -Node Table:
Link
ID
Pl
P2
P3
P4
PS
P6
P7
PS
P9
Pl0
Pll
Pl2
Pl3
P14
PlS
P16
P17
Pl8
Pl9
P20
P21
1
2
3
4
Node
Node
ID
Jl
J2
J3
J4
JS
J6
Results:
Start
Node
J23
Jl
J2
J3
J4
JS
JS
J7
JS
J9
J18
JS
Jll
Jl3
JlS
J17
Jl5
J13
Jll
J4
J3
POC2
Jl9
POCl
J24
Demand
GPM
51.80
33.30
33.30
22.20
0.00
22.20
End
Node
Jl
J2
J3
J4
JS
J6
J7
JS
J9
Jl0
J7
Jll
Jl3
Jl5
J17
Jl
J16
Jl4
J12
Jl2
J14
Jl9
J18
J24
J23
Head
ft
320.47
320.22
320. 13
320.13
320.18
320.18
Pressure
psi
85.04
86.23
87.17
88.54
89.16
89.34
1
Length Diameter
ft in
125 6
300 6
210 6
160 6
95 6
60 6
175 6
120 6
135 6
ll0 6
215 6
215 6
160 6
160 6
210 6
160 6
120 6
160 6
170 6
100 6
ll0 6
#N/A 3 Valve
#N/A 6 Valve
#N/A 3 Valve
#N/A 6 Valve
Quality
0.00
0.00
0.00
0.00
0.00
0.00
Page 2
Node Results: (continued)
Node Demand Head Pressure Quality
ID GPM ft psi
----------------------------------------------------------------------
J7 55.50 320.32 90.27 0.00
J9 14.80 32 0. 16 90.37 0.00
Jl0 37.00 320.15 89.80 0.00
Jll 22.20 320.12 89.40 0.00
Jl2 66.60 320.11 88.66 0.00
Jl3 14.80 320.11 88.44 0.00
Jl4 66.60 320.11 87.66 0.00
Jl5 29.60 320.12 87.36 0.00
Jl6 44.40 320.10 86.83 0.00
Jl7 44.40 320.25 85.77 0.00
J23 0.00 321.17 87 .17 0.00
Jl8 0.00 321.42 91.61 0.00
Jl9 0.00 327.81 94.38 0.00
J24 0.00 327.76 90.02 0.00
JS 0.00 320.20 90.64 0.00
POCl -287.11 330.00 0.00 0.00 Reservoir
POC2 -271.59 330.00 0.00 0.00 Reservoir
Link Results:
----------------------------------------------------------------------
Link Flow VelocityUnit Headless Status
ID GPM fps ft/Kft
----------------------------------------------------------------------
Pl 287 .11 3.26 5.64 Open
P2 102.67 1. 1 7 0.84 Open
P3 69.37 0.79 0.41 Open
P4 -10.80 0.12 0.01 Open
PS -78.31 0.89 0.51 Open
P6 22.20 0.25 0.05 Open
P7 -100.51 1.14 0.81 Open
PS 115.59 1. 31 1. 05 Open
P9 51.80 0.59 0.24 Open
Pl0 37.00 0.42 0 .13 Open
Pll 271.59 3.08 5.09 Open
Pl2 63.79 0.72 0.35 Open
Pl3 20.29 0.23 0.04 Open
Pl4 -14.23 0.16 0.02 Open
Pl5 -88.23 1. 00 0.63 Open
Pl6 -132.63 1. 51 1. 35 Open
Pl7 44.40 0.50 0.18 Open
Pl8 19.72 0.22 0.04 Open
Pl9 21.30 0.24 0.05 Open
P20 45.30 0.51 0.18 Open
P21 46.88 0.53 0.20 Open
1 271.59 12.33 2.19 Open Valve
2 271.59 3.08 6.39 Open Valve
3 287 .11 13.03 2.24 Open Valve
2
Page 3
Link Results: (continued)
Link
ID
4
Flow
GPM
287 .11
VelocityUnit Headloss Status
fps ft/Kft
3.26 6.59 Open Valve
3
LEGEND
PRIVATE DOMEST1C WATER (6• P. V.C.)
PUBLIC MAIN (f 2• P. V.C.}
P.O.C. INDICATES POINT OF CONNECTION
@ INDICATES JUNCTION
w _,,
'
!PRESSURE ZONE = 3.JO I WATER EXH/Bff FOR
QUARRY CREEK PLANNING AREA R-4A {EAST} SB&D~
PLANNING ENGINEERING SURVEYING
71630.60