HomeMy WebLinkAbout; ; 1996-1997 Technical Appendix; 1996-07-01CITY OF c AD
CAPITAL IMPROVEMENT PROGRAM
TECHNICAL APPENDIX
1996 - 1997 TO BUILDOUT
PREPARED BY:
ENGINEERING DEPARTMENT
BILL PLUMMER
CMWD
INTRODUCTION
The purpose of this Technical Appendix is to provide a detailed description of the project scope,
project location, and project need. All Capital Projects with any future or current funding are listed.
Where bonds or a loan are to be repaid, this has been included in the Technical Appendix to describe
the repayment. All cost estimates are preliminary, as in most cases, no design has been done to
accurately determine costs. All costs are in current dollars, therefore, projects in the future years
should be anticipated to escalate over time to account for inflation.
TABLE OF CONTENTS
CIVIC PROJECTS Page
ADA COMPLIANT PEDESTRIAN RAMPS AT STREET INTERSECTIONS - VARIOUS LOCATIONS 1
AFFORDABLE HOUSING LAND ACQUISITION 2
AMERICANS WITH DISABILITIES ACT (ADA) MODIFICATIONS - VARIOUS FACILITIES 3
AMERICANS WITH DISABILITIES ACT (ADA) PEDESTRIAN PUSH BUTTONS 4
BATIQUITOS LAGOON ENHANCEMENT 5
BUENA VISTA LAGOON ARTWORK 6
CADENCIA PARK-AMERICANS WITH DISABILITIES ACT (ADA) RETROFIT 7
CARLSBAD BOULEVARD SHORE PROTECTION WALL 8
CITY BOUNDARY SURVEY AND MONUMENTATION 9
CITY HALL/CITY COUNCIL CHAMBERS COMPLEX 10
COASTAL RAIL TRAIL 11
COMMUNITY SERVICES WAREHOUSE FACILITY 12
DESKTOP COMPUTING 13
EXPAND COLE LIBRARY 14
FINANCIAL INFORMATION SYSTEM 15
FIRE STATION NO. 3 RELOCATION 16
FIRE STATION NO. 6 (PERMANENT) 17
I-5 INTERCHANGES 18
LA COSTA CANYON PARK - AMERICANS WITH DISABILITIES ACT (ADA) RETROFIT 19
LAS PALMAS PURCHASE 20
LIBRARY - REMODEL COLE 21
MAXTON BROWN PARK ARTWORK 22
OPPORTUNISTIC SAND PROGRAM 23
PUBLIC ART-TEMPORARY ART EXHIBITION 24
REDEVELOPMENT PROJECT-LAND ACQUISITION 25
SOUTH CARLSBAD LIBRARY 26
SOUTH CARLSBAD LIBRARY ARTWORK 27
TELECOMMUNICATION INFRASTRUCTURE 28
TRANSIT STATION - SPECIALTY COMMERCIAL CENTER 29
FACILITIES MAINTENANCE
ASBESTOS SURVEY 30
CARRILLO RANCH PAINTING RESTORATION 31
CHASE PARK REST ROOM/SNACK BAR RE-ROOF 32
CITY HALL REFURBISHMENT 33
COMMUNITY DEVELOPMENT RE-ROOF 34
ENERGY LIGHTING RETROFIT 35
FIRE STATION NO. 3 RENOVATION 36
LIBRARY ROOF REHABILITATION 37
MISCELLANEOUS MAINTENANCE PROJECTS 38
REPLACE SEWER LINE 39
REPLACE VINYL FLOOR 40
PARK PROJECTS
CARLSBAD MUNICIPAL GOLF COURSE 41
ZONE 5 PARK FACILITY 42
PARKS IN THE NORTHWEST QUADRANT
AGUA HEDIONDA LAGOON LAND DEDICATION 43
BEACH ACCESSES REPAIR - UPGRADE 44
CANNON LAKE PARK 45
COMMUNITY CENTER - NORTHWEST QUADRANT 46
HOSP GROVE/BUENA VISTA LAGOON DEVELOPMENT (ALT II) 47
NORTHWEST QUADRANT PARKS - AMERICANS WITH DISABILITIES ACT RETROFIT 48
OCEAN STREET STAIRS 49
PARK SITE - NORTHWEST QUADRANT (ACQUISITION) 50
PARK SITE - NORTHWEST QUADRANT (DEVELOP) 51
SWIM COMPLEX PARKING LOT RECONSTRUCTION 52
SWIM COMPLEX SANITATION SYSTEM 53
VETERAN'S MEMORIAL PARK (NORTHWEST QUADRANT) 54
ii
E j t * i * *m IM im mm tt KLM tM mm mm im i i i i i i
PARK PROJECTS (Cont'd.)
Page
PARKS IN THE NORTHEAST QUADRANT
LARWIN COMMUNITY PARK-NORTHEAST QUADRANT 55
NORTHEAST QUADRANT PARK ACQUISITION 56
NORTHEAST QUADRANT PARK DEVELOPMENT 57
PARK RESTORATION AND ACQUISITION 58
VETERAN'S MEMORIAL PARK (NORTHEAST QUADRANT) 59
PARKS IN THE SOUTHWEST QUADRANT
PARK RESTORATION AND ACQUISITION 60
POINSETTIA COMMUNITY PARK (LOAN REPAY) 61
POINSETTIA COMMUNITY PARK (PHASE I) 62
POINSETTIA COMMUNITY PARK (PHASE II) 63
POINSETTIA COMMUNITY PARK (PHASE III) 64
VETERAN'S MEMORIAL PARK (SOUTHWEST QUADRANT) 65
ZONE 19 COMMUNITY PARK (LOAN REPAY) 66
ZONE 19 COMMUNITY PARK (PHASE I) 67
ZONE 19 COMMUNITY PARK (PHASE II) 68
ZONE 19 COMMUNITY CENTER (PHASE III) 69
PARKS IN SOUTHEAST QUADRANT
ALGA NORTE PARK (LOAN REPAY) 70
ALGA NORTE PARK (PHASE I) 71
ALGA NORTE PARK (PHASE II) 72
ALGA NORTE COMMUNITY CENTER (PHASE III) 73
LEO CARRILLO PARK (PHASE I) 74
LEO CARRILLO PARK (PHASE II) 75
PARK RESTORATION AND ACQUISITION 76
STAGECOACH PARK DRAIN 77
VETERAN'S MEMORIAL PARK (SOUTHEAST QUADRANT) 78
ill
DRAINAGE PROJECTS
MASTER DRAINAGE FACILITIES 79
PARK DRIVE SLOPE/DRAINAGE STUDY FOR REPAIR 80
SOUTH CARLSBAD VILLAGE STORM DRAIN 81
STATE STREET STORM DRAIN REPAIR 82
STORM DRAIN AND DESILTATION BASIN/CANNON ROAD 83
SEWER PROJECTS
ENCINA WATER POLLUTION CONTROL FACILITY
BUILDING IMPROVEMENTS 84
CAPITAL ACQUISITION 85
ENCINA CO-GENERATION PROJECT 86
ENCINA SEWER TREATMENT PLANT REHABILITATION 87
PARALLEL OCEAN OUTFALL 88
PHASE V EXPANSION 89
TREATMENT PLANT EXPANSION 90
INTERCEPTOR SYSTEM & LIFT STATIONS
AGUA HEDIONDA LIFT STATION 91
BUENA VISTA LIFT STATION 92
CHINQUAPIN SEWAGE LIFT STATION 93
FOREST SEWAGE GRAVITY LINE 94
NORTH AGUA HEDIONDA INTERCEPTOR SEWER ACCESS ROAD AND UPGRADE 95
NORTH BATIQUITOS INTERCEPTOR SEWER ACCESS ROAD AND UPGRADE 96
PALMER WAY SEWER EXTENSION 97
SEWAGE FLOW METERS 98
SEWAGE LIFT STATION ELIMINATION STUDY 99
SEWER LINE REFURBISH/REPLACEMENT 100
SEWER MANHOLE REFURBISHING/REPLACEMENT 101
SEWER MONITORING PROGRAM 102
VANCOUVER SEWAGE LIFT STATION 103
VISTA/CARLSBAD INTERCEPTOR 104
iv
r 1 n ra t a e^v t • i • LJ 11 M t a 11 I • tm mm i Ji i i mm i a
mm mm mm t i r i r i r^i r i rai IBI •
WATER PROJECTS
580 ZONE - SECONDARY SUPPLY 105
680 ZONE 106
CANNON ROAD 107
CARLSBAD BOULEVARD (MANZANO DRIVE TO AVENIDA ENCINAS) 108
CARLSBAD BOULEVARD (SOUTH OF PALOMAR AIRPORT ROAD) 109
CARLSBAD VILLAGE DRIVE 110
CARLSBAD VILLAGE DRIVE & "E" RESERVOIR RECOATING AND REPAIR 111
COLLEGE BOULEVARD (33" LINE TO CANNON ROAD) 112
COLLEGE BOULEVARD (CANNON TO TAP) 113
COLLEGE BOULEVARD EXTENSION AT EL CAMINO REAL 114
COLLEGE BOULEVARD (NORTH TO OCEANSIDE) 115
COLLEGE BOULEVARD (POINSETTIA LANE TO PALOMAR AIRPORT ROAD) 116
"D" RESERVOIR - PHASE II 117
"D" RESERVOIR TO PALOMAR OAKS WAY 118
DAVIS AVENUE PIPELINE REPLACEMENT 119
EL CAMINO REAL CROSSING AT KELLY DRIVE 120
EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH 121
EL CAMINO REAL TRANSMISSION MAIN & PRESSURE REDUCING STATION IMPROVEMENTS 122
EL FUERTE (ALGA ROAD TO POINSETTIA LANE) 123
EL FUERTE AVENUE (FARADAY TO MAERKLE RESERVOIR) 124
EL FUERTE AVENUE (NORTH OF LOKER) 125
EL FUERTE (POINSETTIA LANE TO PALOMAR AIRPORT ROAD) 126
ELLERY AND "C" RESERVOIR RECOATING & REPAIR 127
INTERSTATE 5 CROSSING 128
JEFFERSON STREET (PIO PICO TO MAY COMPANY) 129
MAERKLE DAM LINING AND COVERING) 130
MAERKLE RESERVOIR TO EL CAMINO REAL 131
MARRON ROAD (PRESSURE REGULATING STATION TO OCEANSIDE) 132
OCEANSIDE INTERTIE UPGRADE 133
PALOMAR AIRPORT (NORTH OF OWENS) 134
POINSETTIA LANE #18 135
POINSETTIA - EL CAMINO REAL TO "D" RESERVOIR 136
POINSETTIA LANE (EL FUERTE TO EL CAMINO REAL) 137
POINSETTIA LANE (PASEO DEL NORTE TO CARLSBAD BOULEVARD) 138
POINSETTIA LANE (TO THE 375 H.G. ZONE) 139
POINSETTIA LANE (TO THE 550 H.G. ZONE) 140
PRESSURE REGULATING STATION 141
WATER PROJECTS (Cont'd.)
PRESSURE REGULATING STATION PROJECT #19 142
TRI-AGENCY PIPELINE EROSION PROTECTION 143
WATER CERTIFICATE OF PARTICIPATION (COP) PAYMENTS 144
WATER RESOURCES MASTER PLAN 145
WATER SYSTEM INTERTIE CONNECTION 146
RECLAIMED WATER PROJECTS
INDUSTRIAL PARK SYSTEM - RECLAIMED WATER 147
RECLAIMED WATER MASTER PLAN 148
RECLAIMED WATER PUMP STATION UPGRADE 149
RECOATING RECLAIMED WATER TANKS 150
TRAFFIC SIGNAL PROJECTS
TRAFFIC SIGNAL - ALGA ROAD 151
TRAFFIC SIGNAL - ALGA ROAD/BATIQUITOS DRIVE 152
TRAFFIC SIGNAL - ALGA ROAD/MELROSE DRIVE 153
TRAFFIC SIGNAL - ALGA ROAD/POINSETTIA LANE 154
TRAFFIC SIGNAL - CAMINO DE LOS COCHES/LA COSTA AVENUE 155
TRAFFIC SIGNAL - CANNON ROAD/AVENIDA ENCINAS 156
TRAFFIC SIGNAL - CANNON ROAD/COLLEGE BOULEVARD 157
TRAFFIC SIGNAL-CANNON ROAD/FARADAY AVENUE 158
TRAFFIC SIGNAL-CANNON ROAD/l-5 159
TRAFFIC SIGNAL - CANNON ROAD/PASEO DEL NORTE 160
TRAFFIC SIGNAL - CARLSBAD BOULEVARD/AVENIDA ENCINAS 161
TRAFFIC SIGNAL-CARLSBAD VILLAGE DRIVE/TAMARACK AVENUE 162
TRAFFIC SIGNAL - COLLEGE BOULEVARD/ASTON AVENUE 163
TRAFFIC SIGNAL - COLLEGE BOULEVARD/CARLSBAD VILLAGE DRIVE 164
TRAFFIC SIGNAL-COLLEGE BOULEVARD/EL CAMINO REAL 165
TRAFFIC SIGNAL - COLLEGE BOULEVARD/LAKE CALAVERA 166
TRAFFIC SIGNAL - EL CAMINO REAL/CALLE BARCELONA 167
TRAFFIC SIGNAL - EL CAMINO REAL/CANNON ROAD 168
TRAFFIC SIGNAL-EL CAMINO REAL/OLIVENHAIN ROAD 169
TRAFFIC SIGNAL - EL CAMINO REAL/POINSETTIA LANE 170
TRAFFIC SIGNAL-FARADAY AVENUE/ORION STREET 171
vi
CJ KB mm n *-i * >
TRAFFIC SIGNAL PROJECTS (Cont'd.)
TRAFFIC SIGNAL - MELROSE DRIVE/LA COSTA AVENUE 172
TRAFFIC SIGNAL - RANCHO SANTA FE ROAD/MELROSE DRIVE (SOUTH) 173
TRAFFIC SIGNAL - PALOMAR AIRPORT ROAD/MELROSE DRIVE 174
TRAFFIC SIGNAL - PALOMAR AIRPORT ROAD/HIDDEN VALLEY ROAD 175
TRAFFIC SIGNAL - PASEO DEL NORTE/CAMINO DE LAS ONDAS 176
TRAFFIC SIGNAL - POINSETTIA LANE/EL FUERTE STREET 177
TRAFFIC SIGNAL - POINSETTIA LANE/MELROSE DRIVE 178
TRAFFIC SIGNAL - POINSETTIA LANE/BATIQUITOS DRIVE 179
TRAFFIC SIGNAL - POINSETTIA LANE/PASEO DEL NORTE 180
TRAFFIC SIGNAL - RANCHO SANTA FE ROAD/QUESTHAVEN ROAD 181
TRAFFIC SIGNAL-TAMARACK AVENUE/GARFIELD STREET 182
TRAFFIC SIGNAL-TAMARACK AVENUE/HIGHLAND DRIVE 183
TRAFFIC SIGNAL - CAMINO VIDA ROBLE/YARROW DRIVE 184
STREET PROJECTS
AVENIDA ENCINAS WIDENING 185
BICYCLE MASTER PLAN 186
CANNON ROAD 187
CANNON ROAD AND I-5 188
CANNON ROAD - KELLY RANCH TO EL CAMINO REAL 189
CANNON ROAD WIDENING 190
CARLSBAD BOULEVARD AND CANNON ROAD WIDENING 191
CARLSBAD BOULEVARD MEDIAN 192
CARLSBAD BOULEVARD SHORE PROTECTION 193
CARLSBAD VILLAGE DRIVE WIDENING 194
CHESTNUT AVENUE AND MONROE STREET UNDERGROUND UTILITY DISTRICT NO. 16 195
EL CAMINO REAL AND CANNON ROAD 196
EL CAMINO REAL MEDIANS 197
EL CAMINO REAL WIDENING (LA COSTA AVENUE TO ARENAL ROAD) 198
EL CAMINO REAL WIDENING (TAMARACK AVENUE TO CHESTNUT AVENUE) 199
EL CAMINO REAL AND CAMINO VIDA ROBLE 200
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE 201
EL CAMINO REAL AND FARADAY AVENUE 202
FARADAY AVENUE 203
HIDDEN VALLEY ROAD 204
LA COSTA AVENUE WIDENING 205
vii
STREET PROJECTS (Cont'd.)
LOCAL STREET/SIDEWALK UPGRADE PROGRAM 206
MELROSE DRIVE AND ALGA ROAD 207
MISCELLANEOUS - TRAFFIC MONITORING PROGRAM 208
PALOMAR AIRPORT ROAD 209
PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD 210
PALOMAR AIRPORT ROAD AND PASEO DEL NORTE 211
PALOMAR AIRPORT ROAD BRIDGE 212
PALOMAR AIRPORT ROAD MEDIANS 213
PALOMAR AIRPORT ROAD MITIGATION 214
POINSETTIA LANE BRIDGE 215
POINSETTIA LANE WIDENING 216
RANCHO SANTA FE ROAD AND OLIVENHAIN ROAD. 217
STREET LIGHTING ENHANCEMENT STUDY 218
UNDERGROUND UTILITY DISTRICT NO. 17 (ROOSEVELT STREET) 219
UNDERGROUND UTILITY DISTRICT NO. 18 (HARDING STREET) 220
UNDERGROUND UTILITY DISTRICT NO. 19 221
I-5 OVERPASS PROJECTS
I-5/LA COSTA AVENUE INTERCHANGE 222
UNFUNDED PROJECTS
ALGA ROAD MEDIANS 223
CARLSBAD BOULEVARD REALIGNMENT 224
HOLIDAY PARK IRRIGATION RENOVATION 225
LAKESHORE GARDENS SOUNDWALL 226
PAVE 8' SHOULDER ON EL FUERTE STREET NORTH OF CORINTIA STREET 227
SIDEWALKS - VILLAS TO DOVE LANE 228
50M SWIMMING POOL AT ALGA NORTE PARK 229
TRAFFIC SIGNAL-ALGA ROAD/CAZADERO DRIVE 230
TRAFFIC SIGNAL - CARLSBAD BOULEVARD/CHERRY AVENUE 231
TRAFFIC SIGNAL - CARLSBAD BOULEVARD/CHESTNUT AVENUE 232
TRAFFIC SIGNAL - CARLSBAD BOULEVARD/OAK DRIVE 233
TRAFFIC SIGNAL - CARLSBAD BOULEVARD/STATE STREET 234
TRAFFIC SIGNAL-CARLSBAD VILLAGE DRIVE/AVENITADE ANITA 235
TRAFFIC SIGNAL - CARLSBAD VILLAGE DRIVE/VALLEY STREET 236
viii
r~i r~i ri
UNFUNDED PROJECTS (Cont'.d)
TRAFFIC SIGNAL-CHESTNUT AVENUE/PIO PICO 237
TRAFFIC SIGNAL-LA COSTA AVENUE/CADENCIA STREET 238
TRAFFIC SIGNAL-LA COSTA AVENUE/PIREAUS STREET 239
TRAFFIC SIGNAL-LA COSTA AVENUE/ROMERIA STREET 240
TRAFFIC SIGNAL-LA COSTA AVENUE/SAXONY ROAD 241
TRAFFIC SIGNAL -LA COSTA AVENUE/VIEJA CASTILLA 242
ix
f i I I i i i i t j. i i i i f i ~ i f f i I i i t I
CIVIC PROJECTS
r i i n
CAPITAL PROJECT DESCRIPTION
AMERICANS WITH DISABILITIES ACT (ADA) MODIFICATIONS - VARIOUS FACILITIES
II II I
Proi
PROJECT LOCATION MAP
VARIOUS LOCATIONS THROUGHOUT THE CITY
ect Title
PROJECT LOCATION
Various locations throughout the City.
PROJECT DESCRIPTION
Removal of existing sidewalk at the curb returns of intersections without
pedestrian ramps and construction of pedestrian ramps. The installation of
pedestrian ramps is mandated by both State and Federal laws. This
project will provide for orderly compliance with those laws. A preliminary
study of the cost of installing pedestrian ramps at each intersection in the
City estimates a total cost of $1,000,000. This project is recommended to
be phased over ten years. The FY 1996-1997 appropriation of $25,000
provides funds to retain an engineering consultant at approximately
$10,000 to prepare plans and specifications. Remaining funds would be
utilized to prepare a priority project list and to prepare specifications and
administer the design project.
PROJECT NEED
The Americans with Disabilities Act requires the City to assure that all
public facilities be made accessible to disabled persons.
TOTAL PROJECT COST: $1.000.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
TIF
SttidV& Plans
$25.000
•0*
1997-4M
TIF
Const & Plans
$75.000
4*
PROJECT FUNDING
1998-99 1999-2000
TIF TIF
Const & Plans
$75.000
4*
Const & Plans
$75.000
-0-
2000-2001
TIF
Const & Plans
$100.000
-0-.
2001*2006
TIF
Const & Plans
$500.000
-0-
2006+
TIF
Construction
$150.000
**,
ADARAMPS.96 Pagel
CAPITAL PROJECT DESCRIPTION
AFFORDABLE HOUSING LAND ACQUISITION
Project Title
PROJECT LOCATION MAP
A SITE (OR SITES) TO BE SELECTED WITHIN THE
VILLAGE REDEVELOPMENT AREA
PROJECT NO. 3436
PROJECT LOCATION
Residential infill site to be selected within the Village Redevelopment
Area.
PROJECT DESCRIPTION - Project No. 3436
Scattered site acquisition for purposes of constructing or providing
affordable housing units within the Village Redevelopment Area.
Previous Appropriation - $400,000
PROJECT NEED
The project(s) will serve an affordable housing and blight elimination
need within the Village Redevelopment Area.
PROJECT FUNDING
TOTAL PROJECT COST: $400.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
AFFORDHS.96 Page 2
B3I II I~J
n we*mm mm i i
CAPITAL PROJECT DESCRIPTION
AMERICANS WITH DISABILITIES ACT (ADA) MODIFICATIONS - VARIOUS FACILITIES
Pro
PROJECT LOCATION MAP
VARIOUS CITY FACILITIES
ect Title
PROJECT LOCATION
Various City facilities.
PROJECT DESCRIPTION - Project No. 3441
Facilities modifications such as restroom alterations, new drinking
fountains, entry ramps, handrail modifications, new signage and parking lot
changes. A preliminary survey of City facilities in 1992 indicated the
estimated cost approached $600,000. Due to the complexity of the law
and the significant scope of work involved at all facilities, costs could be
much higher. Therefore, this project is recommended to be phased in over
several years. The FY 1994-1995 appropriation of $100,000 provides
funds to retain an architectural consultant at approximately $30,000 to
$50,000 to do a detailed facility survey, prepare plans and specifications,
and develop more accurate cost estimates of the modifications.
Remaining funds would be utilized for the highest priority projects.
PROJECT NEED
The Americans with Disabilities Act requires numerous facility modifications
be made to make them accessible to disabled persons.
PROJECT FUNDING
TOTAL PROJECT COST: $600.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1967-68 1998-99
GCC
1996-2000
GCC
$100.000 $150.000
2000-2001
GCC
2001-2006 2006*
$150.000
ADAMODIF.96 Page 3
CAPITAL PROJECT DESCRIPTION
AMERICANS WITH DISABILITIES ACT (ADA) PEDESTRIAN PUSH BUTTONS
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Various signalized intersections in the village and mall area.
PROJECT DESCRIPTION
Install 2" ADA pedestrian push button retrofit kit at each existing
pedestrian push button at signalized intersection.
%wx \ +f\x> v
PROJECT NEED
The ADA button will make it easier for a disabled pedestrian to use
the pedestrian signal at a signalized intersection.
PROJECT FUNDING
TOTAL PROJECT COST: $30.000
Fiscal Year 1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Fundina Source 6CC
Purpose For Disabled Peds
Amount $30.000
Operating Costs N/A
ADA PUSH.96
LI LJ IJ I J i i
Page 4
ii ii i a
in
CAPITAL PROJECT DESCRIPTION
BATIQUITOS LAGOON ENHANCEMENT
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
North of La Costa Avenue from the Pacific Ocean to El Camino Real.
PROJECT DESCRIPTION - Project No. 3429
The project will dredge about 4,000,000 cubic yards of silt and sand from
the lagoon, restoring the fish habitat; construct a channel the length of the
lagoon and construct off-shore jetties to restore tidal flushing to the lagoon
and replace a deteriorated bridge on the southbound lanes of Carlsbad
Boulevard over the lagoon.
All costs reimbursed by Port of Los Angeles.
Continuing Appropriation - $362,466
PROJECT NEED
The lagoon enhancement is a mitigation measure required by the Port of
Los Angeles to permit fill placement in the Los Angeles Harbor.
TOTAL PROJECT COST: $30.655.650
Fiscal Year 1996-97
Funding Source m_«m__^m»_
Purpose _^__^_™>
Amount . ..
Operating Costs
PROJECT FUNDING
'-98 1996*99 1999-2000 2000-2001 2001-2006 2006*
BLEP.96 Page 5
CAPITAL PROJECT DESCRIPTION
BUENA VISTA LAGOON ARTWORK
Project Title
PROJECT LOCATION MAP
PROJECT
SITE
PROJECT LOCATION
Adjacent to the Buena Vista Lagoon.
PROJECT DESCRIPTION - Project No. 3336
Design, construct, and install a public art piece to be placed in the Buena
Vista Lagoon area.
Previous Appropriation - $75,000
PROJECT NEED
The project is part of the City's Public Art Program.
PROJECT FUNDING
TOTAL PROJECT COST: $75.000
Fiscal Year 1996-87
Funding Source , ,
Purpose
Amount ,„ „ ,-,,....,
Operating Costs
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
BUENART.96
f J I J L J I 1 I J
Page 6
CAPITAL PROJECT DESCRIPTION
CADENCIA PARK - AMERICANS WITH DISABILITIES ACT (ADA) RETROFIT
Proi
PROJECT LOCATION MAP
ROJECT
SITE
ect Title
PROJECT LOCATION
In the southeast quadrant off of Cadencia, west of Rancho Santa Fe Road.
PROJECT DESCRIPTION
Retrofit existing playground and related park elements in order to bring into
conformance with the "Americans with Disabilities Act" (ADA-1992).
Sidewalk from edge of park to playground area
• Access (across sand) to all play equipment
Play equipment modification/replacement
PROJECT NEED
Required by Federal law.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
$20.000
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 20064-
General Fund ,
Deslan/Const .......
$20.000
N/A , , ...
CADENCIA.96 Page 7
CAPITAL PROJECT DESCRIPTION
CARLSBAD BOULEVARD SHORE PROTECTION WALL
Project Title
PROJECT LOCATION MAP
PROJECT
AREA
PROJECT LOCATION
Carlsbad Boulevard by the jetties of Agua Hedionda Lagoon.
PROJECT DESCRIPTION - Project No. 3353
Concrete design in wall, plus benches and ramp designs on the three
access areas.
Previous Appropriation - $30,000
PROJECT NEED
Ordinance No. 1279 calls for 1 % public art.
TOTAL PROJECT COST: $30.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
SHOREPR0.96
t J I 1 I J t J t J 131 II
Page 8
r~i rn F-I r-i m in
CAPITAL PROJECT DESCRIPTION
CITY BOUNDARY SURVEY AND MONUMENTATION
Project Title
PROJECT LOCATION MAP
A
A A
PROJECT LOCATION
The project will cover the entire city.
PROJECT DESCRIPTION
The project will entail the creation of an accurate description of the
boundary of the city, to be monumented for accurate identification of city
limits. Phase 1 will consist of office research to identify the records
defining the city boundary as it currently exists. This research will provide
information for the scope and extent of Phase 2. Phase 2 will involve the
actual field work to relate existing survey control points (see map) to the
San Diego County survey control network and survey the city boundary
relative to these control monuments.
PROJECT NEED
At the present time, the actual boundaries of the city are not known in any
detail relative to their positions on the ground. A number of city
departments have indicated that a specific knowledge of city boundaries,
especially on roads leading into the city would be extremely helpful in their
work for resolving jurisdictional questions. These groups include Police,
Traffic, Risk Management and Code Enforcement. Additionally, the
geographic information system requires the use of survey monumentation
to accurately register land ownership parcels within the city, and all
subsequent layers in the GIS to absolute position on the ground.
PROJECT FUNDING
TOTAL PROJECT COST* $100.000
Fiscal Year 1996-97 1887-88 199&-99 1999-2000 2000-2001 2001-2006 2006+
Fundhtq Source , General Fund General Fund General Fund
Purpose
Amount ' IIIIIIMII
Operating Costs ,„„„,„„
Pha««1 Phase 2.1 Phase 2.2
$15.000 S4S.OOO $40.000
ri , -0* -0* -0* ... , , , ,....,...
BOUNDARY.96 Page 9
CAPITAL PROJECT DESCRIPTION
CITY HALL/CITY COUNCIL CHAMBERS COMPLEX
Project Title
PROJECT LOCATION MAP
LOCATION TO BE DETERMINED
PROJECT LOCATION
To be determined.
PROJECT DESCRIPTION
Design and construction of a City Hall and City Council Chambers
complex of approximately 96,000 square feet. Project will
consolidate all administrative operations and facilities in one location
for organizational and operational efficiency. Master Plan approved in
1986.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $23,100,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
CFD
Design/Const.
$23,100,000
CITYHALL.96
LJ
Page 10
n n n n r~i an ri .mi n
CAPITAL PROJECT DESCRIPTION
COASTAL RAIL TRAIL
Project Title
n n ri ri
PROJECT LOCATION MAP
OCEANSIDE
CARLSBAD
ENCINITAS
PACIFIC
OCEAN
SOLANA BEACH
DEL MAR
SAN DIEGO
PROJECT LOCATION
Within the existing Northern San Diego Railway corridor between the
Oceanside Transit Station and the Santa Fe Depot in San Diego.
PROJECT DESCRIPTION
The preparation of a Feasibility Study and preliminary design plans for
the future construction of a multi-use path in the existing railroad
right-of-way. The purpose is to provide a bicycle/pedestrian link
between the commuter stations within this corridor.
Previous Appropriations -$768,000 (ISTEA)
$192,000 (TSM)
PROJECT NEED
To encourage the use of alternative forms of transportation to reduce
traffic congestion and decrease pollution created by automobiles.
PROJECT FUNDING
TOTAL PROJECT COST: $960.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
1997-98 1999-2000 2000-2001 2001-2006 2006+
COASTRT.96 Page 11
CAPITAL PROJECT DESCRIPTION
COMMUNITY SERVICES WAREHOUSE FACILITY
Project Title
PROJECT LOCATION MAP
ROJECT
SITE
PROJECT LOCATION
Phase II of Safety & Service Center, Orion Way.
PROJECT DESCRIPTION
Construction of Phase II of the Public Safety and Service Center
project. Phase II includes construction of a purchasing warehouse,
general offices, and yard facilities for the Parks and Utilities and
Maintenance Departments. Extensive parking facilities and
landscaping are to be included.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $4,200.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
CFD/Sewer
Construction
$4.200,000
COMMSERV.96 Page 12
t J I J t Ji
CAPITAL PROJECT DESCRIPTION
DESKTOP COMPUTING
Proi
PROJECT LOCATION MAP
CITYWIDE
ect Title
PROJECT LOCATION
Various City facilities.
PROJECT DESCRIPTION
Ongoing replacement and upgrades of desktop computers and printers.
Desktop computers (PC's) need to be replaced every 3 to 5 years, printers
every 4 to 6 years. The City currently owns over 200 PC's, (120 Pentiums
and 80 486 class computers). Due to recent upgrades, the first anticipated
computer and printer replacements should begin in FY 97-98. In FY 97-98,
replacement costs for the 486's ($2,500 each) would be $200,000, 20
laser printers ($1,500 each) would be $30,000. Replacement costs are
reoccurring, but not necessarily the same amounts each year.
PROJECT NEED
It is essential to continually upgrade our desktop computing environment to
take advantage of emerging technologies and to enable staff to maintain
current level of productivity, with opportunity to increase productivity.
PROJECT FUNDING
TOTAL PROJECT COST: SOngoIno
Fiscal Year 1996-97 J997-38 199<t-99 1999-2000 2000-2001 2001-2006 2006*
Funding Source ,.. Info Systems Info Systems Info Systems Info Systems Info Systems Info Systems
Purpose , Equip. Purchase
Amount , $30.000
Operating Costs
Eauto. Purchase Eaulo. Purchase Egulo. Purchase Eaulo. Purchase Eauo. Purchase
$120.000 $120.000 $120.000 $600.000 $810.000
DESKTOP.96 Page 13
CAPITAL PROJECT DESCRIPTION
EXPAND COLE LIBRARY
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
At the site of the existing Cole Library, 1250 Carlsbad Village Drive,
adjacent to the existing City Hall.
PROJECT DESCRIPTION - Project No. 3384
The North Carlsbad Library will be remodeled and expanded from its
present 24,600 square feet to 44,600 square feet meeting the needs of the
City as the population reaches buildout.
PROJECT NEED
Required to meet Growth Management Standards at buildout population.
TOTAL PROJECT COST; $12.660.000
Fiscal Year 1996-67 1997-98
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006*
PFF/CFD
Deslan/ConsL
S12.660.000
EXP COLE.96 Page
LJ
r~i r~i E^
CAPITAL PROJECT DESCRIPTION
FINANCIAL INFORMATION SYSTEM
Proi
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
1200 Carlsbad Village Drive.
PROJECT DESCRIPTION - Project No. 3433
Financial Information System to replace existing computer hardware and
application software system. Initial system expected to include modules for
payroll, job costing, AP, purchasing, budget, G/L and report writing. Other
modules may be added as needed.
Estimated Cost:
Hardware
Software
Implementation
PC and Network Upgrades
Previous Appropriations:
$207,000
556,000
537,000
530.000$1,830,000
$1,370,000
PROJECT NEED
Critical—current system over ten years old. Hardware no longer
maintained by manufacturer. Many reports and analysis currently
performed manually. Annual cost savings in staff time estimated at
minimum of $100,000.
TOTAL PROJECT COST: $1.830.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
GF/Water/Scwer
Implementation
tt60.000/$40.000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006*
General Fund
software Purchase
$260.000
FIN INF0.96 Page 15
CAPITAL PROJECT DESCRIPTION
FIRE STATION NO. 3 RELOCATION
Project Title
PROJECT LOCATION MAP
PEOJECT,
SITE
CAUVERAHILLSCOMMUNITYPARK
PROJECT LOCATION
Southwest corner of Carlsbad Village Drive and Glascow Street
adjacent to Calavera Park.
PROJECT DESCRIPTION
This new station will be a 3,500 square foot suburban facility housing
one 3-person engine company. It will be the same design as Stations
4 and 6.
After relocation, the existing Fire Station No. 3 building and site will
be sold.
PROJECT NEED
Relocation of this fire station is required to ensure a five minute
response time within the northeast corner of the City as development
occurs.
TOTAL PROJECT COST: $450.000
Fiscal Year 1996-97
Fundinq Source
Purpose
Amount
Ooeratinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000
PFF
Design
$20,000
2000-2001 2001-2006 2006+
PFF
Construction
$430.000
FIRESTA3.96 Page 16
KIM
ri
PROJECT LOCATION MAP
CAPITAL PROJECT DESCRIPTION
FIRE STATION NO. 6 (PERMANENT)
Pro ect Title
PROJECT LOCATION
On the east side of the relocated Rancho Santa Fe Road. Precise location
to be determined.
PROJECT DESCRIPTION - Project No. 3302
This new station will be a 3,500 square foot suburban facility housing one
3-person engine company. It will be the same design as Stations 3 and 4.
After construction, the existing temporary Station No. 6 will be dismantled
and the land restored for use by the developer.
PROJECT NEED
This fire station is required to ensure a five minute response time within the
southeast corner of the City as development occurs.
TOTAL PROJECT COST: $450.000
Fiscal Year 1996-97
Fundlna Source
Purpose
Amount „„,„
Ooeratina Costs
1997-98
FteMstone/PFP
Deslan/Const.
$410.000
-
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006
PFF
Construction
$35.000
2006+
FIRESTA6.96 Page 17
CAPITAL PROJECT DESCRIPTION
1-5 INTERCHANGES
Pro
PROJECT LOCATION MAP
PROJECT
AREA
ect Title
PROJECT LOCATION
The 1-5 corridor adjacent or on overpasses.
PROJECT DESCRIPTION - Project No. 3352
A landscape architect and artist team will be selected to design artistic
elements to be incorporated into the construction of the projects. Costs
cover the development of an 1-5 Corridor Landscape Plan.
Previous Appropriation - $30,000
PROJECT NEED
Ordinance No. 1279 calls for public art.
TOTAL PROJECT COST;
Fiscal Year
Pudding Source
Purpose _
Amount
Operating Costs
PROJECT FUNDING
$155.000
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
6CC
Corridor Plan
$125.000
I-5INTER.96 Page 18
mm. n
CAPITAL PROJECT DESCRIPTION
LA COSTA CANYON PARK - AMERICANS WITH DISABILITIES ACT (ADA) RETROFIT
PROJECT LOCATION MAP
PROJECT
Pro ect Title
PROJECT LOCATION
In the southeast quadrant at the corner of Pueblo Street and Rana Court.
PROJECT DESCRIPTION
Retrofit existing playground and related park elements in order to bring into
conformance with the "Americans with Disabilities Act" (ADA-1992).
• Surfacing to access all play equipment (across sand)
• Play equipment modification/replacement
• Sidewalk to picnic facilities, drinking facility and play equipment
Previous Appropriation - $52,500
PROJECT NEED
Required by Federal law.
TOTAL PROJECT COST; $52.800
Fiscal Year 1996-97
Fundlno Source i:i:i...n ,
Purpose n
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
'
LACOSCAN.96 Page 19
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
LAS PALMAS PURCHASE
Project Title
PROJECT LOCATION
2075 Las Palmas Drive, south of Camino Vida Roble.
PROJECT DESCRIPTION - Project No. 3266
Lease-purchase payments for building and property for administrative
offices for Community Development.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$2.348,000
1996-97
PFF
Purchase
$235.000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Purchase
$117,000
LASPALM.96 Page 20
i j t j L.J t i i^a
CAPITAL PROJECT DESCRIPTION
LIBRARY - REMODEL COLE
Proj
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
At the site of the existing library, 1250 Carlsbad Village Drive.
PROJECT DESCRIPTION - Project No. 3384
An interim project to renovate and refurbish the existing library. Remodel
some existing administrative spaces into public and circulation areas.
Renovation includes recarpeting and repainting.
Previous appropriations:
(PFF) Design and ADA Modifications
Federal Grant
$275,000
$ 36,231
PROJECT NEED
Required to meet Growth Management Standards, restore quality library
service.
TOTAL PROJECT COST: St.S7S.000
Fiscal Year 1996-97 1997-98
Fundfna Source
Purpose
Amount ,,,.,...
Ooeratlna Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006
. PFF . . . . ....
Construction
11.57S.OOO
2006*
REMDCOLE.96 Page 21
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
MAXTON BROWN PARK ARTWORK
Project Title
PROJECT LOCATION
Maxton Brown Park.
PROJECT DESCRIPTION - Project No. 3354
Artist will design and construct artwork for the park.
Previous Appropriation - $25,000
PROJECT NEED
Public art as indicated by Ordinance No. 1279 enhances the park.
The amount is estimated at 1 %.
TOTAL PROJECT COST: $25.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
PROJECT FUNDING
1999-2000 2000-2001 2001-2006 2006+
MAXTON 1.96 Page 22
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
STORAGE &
DISPOSAL
SITE
DISPOSAL
SITE
OPPORTUNISTIC SAND PROGRAM
Project Title
PROJECT LOCATION
Along the Carlsbad coastline.
PROJECT DESCRIPTION
To obtain the necessary regulatory agency permits to allow the
periodic deposition of beach quality sand material on our local
beaches as an ongoing beach nourishment program.
Previous Appropriation - $20,000 (State Grant)
$19,542 (GCC)
PROJECT NEED
To allow for an ongoing beach nourishment activity on the Carlsbad
coastline.
PROJECT FUNDING
TOTAL PROJECT COST: $39.542
Fiscal Year 199
Funding Source
Purpose .
Amount
Operating Costs
1997-98 1999-2000 2000-2001 2001-2006 2006+
OPPORSND.96 Page 23
CAPITAL PROJECT DESCRIPTION
PUBLIC ART - TEMPORARY ART EXHIBITION
Project Title
PROJECT LOCATION MAP
VARIOUS LOCATIONS
PROJECT LOCATION
Temporary/rotating art exhibition.
PROJECT DESCRIPTION
Artwork to be placed throughout Carlsbad on a rotating basis. Each
artwork will be in place for a period of approximately six (6) months.
Ten (10) artworks at $500 each includes installation costs.
PROJECT NEED
• Arts Element/General Plan
• Educational components of the public art program.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
$5.000
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Public Art Fund
$5.000
Page
TEMP_ART.96
ft Jl ft I II i J I J I J I J Hi
CAPITAL PROJECT DESCRIPTION
REDEVELOPMENT PROJECT - LAND ACQUISITION
Proj
PROJECT LOCATION MAP
3-LJd
ect Title
PROJECT LOCATION
East side of Roosevelt Street between Grand Avenue and Carlsbad Village
Drive.
PROJECT DESCRIPTION - Project No. 3435
Development of a Commercial Project across from the Redevelopment
Agency. Project may include a public parking structure as well. Project
includes purchase of property and some pre-development costs (i.e.,
architectural/site plans, market analysis, etc.).
Previous Appropriation - $1,006,000
PROJECT NEED
The project serves an Economic Development and blight elimination need
within the Village Redevelopment Area.
TOTAL, PROJECT COST: 81,006.000
FI$MlY«r 1996*97
Funding source ,,,,„ „, , ,
Purpose »»>»»^__^^».
Amount ; ,
operating costs , ,
PROJECT FUNDING
1997-98 1998-99 1999.2000 2000-2001 2001-2006
LAND ACQ.96 Page 25
CAPITAL PROJECT DESCRIPTION
SOUTH CARLSBAD LIBRARY
Project Title
PROJECT LOCATION MAP
SITE
PROJECT LOCATION
Within a commercial development site at the northwest corner of the
intersection of El Camino Real and Alga Road.
PROJECT DESCRIPTION
Construct a 64,000 square foot library on a six-acre site. This library
will provide enough space to meet the City's needs up to a population
of 100,000 residents. Building will include all public service areas of
a full-service library as well as staff administrative offices.
Previous appropriations:
Library collection
Shelving and mechanical
EEE
$ 400,000
$ 650,000
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$12,000.000
1996-97
CFD
Plan Review
$100.000
PROJECT FUNDING
1997-98 1998-99 1999-2000
CFD
Construction
$11,100,000
$2.500.000 $2.500.000
2000-2001 2001-2006 2006+
$2.500.000 $2.500.000 $2.500.000
SCBADLIB.96 Page 26
t I i 1 11 I J I J I J IB
CAPITAL PROJECT DESCRIPTION
SOUTH CARLSBAD LIBRARY ARTWORK
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Plaza Paseo Real Shopping Center, corner of Dove and El Camino
Real.
PROJECT DESCRIPTION - Project No. 3335
Art work for the South Carlsbad Library. Includes artists' designs and
construction.
Previous Appropriation - $170,000
PROJECT NEED
Ordinance No. 1279 calls for 1% public art.
PROJECT FUNDING
TOTAL PROJECT COST: $170.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1997-98 1§99-2000 2000-2001 2001-2006 2006+
SOLIBRAR.96 Page 27
CAPITAL PROJECT DESCRIPTION
TELECOMMUNICATION INFRASTRUCTURE
Project Title
PROJECT LOCATION MAP
CITYWIDE
PROJECT LOCATION
Various City facilities.
PROJECT DESCRIPTION
Ongoing replacement and upgrades of telecommunication equipment.
This includes PBX's (phone switches), voice mail systems and inter-facility
communication lines and equipment. This type of telecommunications
equipment has a useful life of 4 to 6 years, at which time it needs to be
replaced or upgraded. Costs for City's type PBX equipment range from
$30,000 to $100,000 depending on capacity, voice mail systems
approximately $30,000 to $50,000 and telecommunications equipment
range from $1,000 to $5,000 per device. These are reoccurn'ng expenses,
but not necessarily the same amounts every year. Due to recent
upgrades, the first anticipated replacements should begin in FY 98-99.
PROJECT NEED
It is essential to continually upgrade our telecommunications equipment to
take advantage of emerging technologies, to enable staff to maintain levels
of efficiencies and to ensure maintenance support is available.
PROJECT FUNDING
TOTAL PROJECT COST: SOngoIng
Fiscal Year 1996-97 1997-98 1998-99 1999-2000 3000-2001, 2001-2006 2006+
Funding Source Info Systems Info Systems info Systems Info Systems Info Systems Info Systems
Purpose
Amount ,
Operating Costs
, Equip, Purchase Egulp. Purchase Equip. Purchase Equip. Purchase Equip. Purchase Eguo. Purchase
$150.000 $150.000 $150.000 $150.000 $750.000 $750.000
TELECOMM.96 Page 28
KB f 1 i r i ii i i t J
r"i in r "i
CAPITAL PROJECT DESCRIPTION
TRANSIT STATION - SPECIALTY COMMERCIAL CENTER
Project Title
PROJECT LOCATION MAP
153
i §:::
PROJECT
SITE
GRAND AVE.
I*
ta
I
eno
CARLSBAD VILLAGE DRIVE
PROJECT LOCATION
Northwest corner of State Street and Grand Avenue; Village
Redevelopment Area.
PROJECT DESCRIPTION - Project No. 3434
Development of a Specialty Commercial Center at new Transit
Station. Project includes purchase of property and some pre-
development costs (i.e., architectural/site plans, market analysis, etc.
Project No. 3434
Prior Appropriation - $425,000
PROJECT NEED
The project serves an Economic Development and blight elimination
need within the Village Redevelopment Area.
PROJECT FUNDING
TOTAL PROJECT COST: $425.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TRANSTAT.96 Page 29
FACILITIES MAINTENANCE
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT - ASBESTOS SURVEY
Proi
PROJECT LOCATION MAP
CITYWIDE
ect Title
PROJECT LOCATION
All City facilities.
PROJECT DESCRIPTION
Survey all City facilities to identify presence of asbestos and recommend
appropriate abatement method.
PROJECT NEED
OSHA requirement.
PROJECT FUNDING
TOTAL PROJECT COST; $40.000
Fiscal Year 1996-
Fundlng Source ^
Purpose ^
Amount _
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006*
$40.000
Operating Costs
ASBESTOS.96 Page 30
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT - CARRILLO RANCH PAINTING RESTORATION
PROJECT LOCATION MAP
\
Pro!ect Title
PROJECT LOCATION
Carrillo Ranch - Palomar Airport Road.
PROJECT DESCRIPTION
Paint/whitewash adobe structures.
Prior year appropriation carried forward to 1996-97.
PROJECT NEED
Required to preserve historical structures and prevent further deterioration.
:idfA'L^PR^jlct:;C^f^lilib^bl
i|||li;;^i;||;ii
Funding Source
;i|uf|p<6|l^|i|i::
*ipi|u'i|i:|||||i|I
Operating Costs
1996-97
GCC
PROJECT FUNDING
199748 1998-99 999-2000 2000-2001 2001-2006 2006+
CARRILL0.96
i j i m i J * J
Page 31
pa 11 i J
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT - CHASE PARK REST ROOM/SNACKBAR RE-ROOF
Proj
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
Chase Field Park, Harding and Chestnut.
PROJECT DESCRIPTION
Architectural study and design to replace roof on snackbar to provide
additional on-site storage of equipment and supplies.
PROJECT NEED
Storage space is inadequate considering use of facility and limitations of
site preclude additional structures.
TOTAL PROJECT COST: $33.000
Fiscal Year 1996-07
Funding Source
Purpose m; ,,,,,,,, „
Amount
Ooeratina Costs „...,...,„ ...„„,
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
GCC GCC
$3.000 $30.000
CHASEPRK.96 Page 32
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT - CITY HALL REFURBISHMENT
Proj
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
City Hall, 1200 Carlsbad Village Drive.
PROJECT DESCRIPTION
Replace carpeting, paint and minor office alterations in north wing.
Prior year appropriation of $30,000 carried forward to 1996-97.
PROJECT NEED
Carpet is worn, torn and has become a safety hazard. Paint and minor
office alterations can be accomplished most economically during carpet
replacement.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
$58.000
1996.07 1997-98 199S-99 1999-2000 2000-2001 2001-2006 2006+
GCC
$23.000
CITYREFUR.96 Page 33
mm mm ii ii i j ii
r i
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT - COMMUNITY DEVELOPMENT RE-ROOF
PROJECT LOCATION MAP
Proj ect Title
PROJECT LOCATION
Community Development, 2075 Las Palmas.
PROJECT DESCRIPTION
Replace roof and install roof insulation.
Prior year appropriation carried forward to 1996-97.
PROJECT NEED
The existing roof has deteriorated and is in need of replacement.
TOTAL PROJECT COST: $110.000
Fiscal Year I99g.97
Fundlna source GCC
Puroose
Amount m n rill^0»l. ,„ ,„
©Derating Costs , .. ., , „ M
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006»
CDREROOF.96 Page
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT - ENERGY LIGHTING RETROFIT
PROJECT LOCATION MAP
VARIOUS CITY FACILITIES
Project Title
PROJECT LOCATION
Various City facilities.
PROJECT DESCRIPTION
Install energy saving lamps and electronic ballasts.
PROJECT NEED
Reduce electrical consumption and heat load. Project incorporates
SDG&E incentives.
TOTAL PROJECT COST: $28.500
PROJECT FUNDING
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
GCC
1997-98 1998-99 1999-2000 2000-2001 2001-200$2006+
$28.500
LIGHTING.96 Page 35
fill I J I J I J I J f •
n
PROJECT LOCATION MAP
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT - FIRE STATION NO. 3 RENOVATION
Proiect Title
PROJECT LOCATION
Fire Station No. 3, 3701 Catalina Drive.
PROJECT DESCRIPTION
Replace carpet, vinyl flooring, paint and install air conditioning, new
lighting, cabinets and lockers.
PROJECT NEED
This station is more than twenty years old and is in need of refurbishment.
TOTAL PROJECT COST;
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs ._
$45.000
1996-97 1997-98
GCC
$48.000
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2008 2006+
FIRE#3.96 Page 36
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT - LIBRARY ROOF REHABILITATION
Proj
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
Cole Library, 1250 Carlsbad Village Drive.
PROJECT DESCRIPTION
Remove old roof and install new roof and insulation.
Prior year appropriation carried forward to 1996-97.
PROJECT NEED
The roof is thirty years old and is in need of replacement.
PROJECT FUNDING
TOTAL PROJECT COST: $85.000
Fiscal Year 1996-97
Funding Source GCC
Purpose
Amount «0-
Operating Costs
1997.88 1998-89 1999-2000 2000-2001 2001-2006 2006*
LIB_ROOF.96
El BiB m i j ii i J i M mm tm
Page 37
I J 11
•a ri
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT - MISCELLANEOUS MAINTENANCE PROJECTS
PROJECT LOCATION MAP
VARIOUS CITY FACILITIES
Project Title
PROJECT LOCATION
Various City facilities.
PROJECT DESCRIPTION
Exterior painting, termite mitigation, exterior door replacements and other
miscellaneous maintenance projects.
Prior year appropriation of $9,000 carried forward to 1996-97.
PROJECT NEED
These are minor maintenance projects that are necessary to preserve and
protect various facilities.
TOTAL PROJECT COST;
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$1.805.100
1996-87 1997-98
GCC
$29.100 $197.000
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
$170.000 $200.000 $200.000 $1.000,000
MISCMAIN.96 Page 38
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT - REPLACE SEWER LINE
Proi
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
Senior Center, 799 Pine Avenue.
PROJECT DESCRIPTION
Replace approximately thirty feet of sewer lateral.
PROJECT NEED
This section of sewer lateral has settled and created a trap in the line
causing frequent stoppages and sewer gases to back up into the facility.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$15.000
1996-97 1997-98
GCC
115.000
PROJECT FUNDING
1998-99 1989-2000 2000-2001 2001-2006 2006*
SEWRLINE.96 Page 39
• I I J II Hi ii 11 mm
CAPITAL PROJECT DESCRIPTION
FACILITIES MANAGEMENT SENIOR CENTER - REPLACE VINYL FLOOR
Proj
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
Senior Center, 799 Pine Avenue.
PROJECT DESCRIPTION
Replace vinyl floor in auditorium and waterproof concrete expansion joints.
PROJECT NEED
Moisture is penetrating through concrete expansion joints, causing floor to
spall and delaminate. This is a serious safety hazard.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating costs
PROJECT FUNDING
$30.000
1996-97 1997.98 1998-99 1999-2000 2000-2001 2001-2006 2006*
GCC
$30.000
VINYLFLR.96 Page
PARK PROJECTS
PROJECT LOCATION MAP
CAPITAL PROJECT DESCRIPTION
CARLSBAD MUNICIPAL GOLF COURSE
Pro act Title
PROJECT LOCATION
Palomar Airport Road and College Boulevard.
PROJECT DESCRIPTION - Project No. 3072
Design an 18-hole championship golf course. Work will include grading,
landscaping a clubhouse, access roads and utilities. The Golf Course
Steering Committee may consider additional features to be included.
Previous Appropriation - $2,298,190
PROJECT NEED
Because of strong citizen interest, the Parks and Recreation Commission
recommended building a golf course. Part of the Parks and Recreation
Element of the General Plan.
PROJECT FUNDING
TOTAL PROJECT COST: J2.598.19D
Fiscal Year 1996-97
Funding Source GCE
Purpose Design
Amount $300.000
Operating Costs
1998-99 1999-2000 2000-2001 2001-2008 2006+
-0-
GOLFDEV.96 Page
CAPITAL PROJECT DESCRIPTION
ZONE 5 PARK FACILITY
PROJECT LOCATION MAP
Pro set Title
PROJECT LOCATION
Somewhere within the Growth Management Zone 5 boundaries.
PROJECT DESCRIPTION
Exact acreage, location, and amenities of this park facility are still under
review. The recreation facilities may include a fitness center, swimming
pool, outdoor racquetball/handball courts, tennis courts, ball fields, and
basketball courts.
Previous Appropriation - $0
PROJECT NEED
Demand and need for recreational facilities within the industrial area
identified through a Parks and Recreation Commission subcommittee who
conducted two independent surveys and received input from Zone 5
developers.
TOTAL PROJECT COST; $7.030.000
Fiscal Year 1996-97 1997-98
Funding Source
Purpose , ^ HI1. ,.,
Amount „„„ ,„ ,
Operatina Costs .„.,„..,. , „ ,
PROJECT fUND|NG
1998-99 1999-2000 2000-2001 2001-2006
,...„...„„ , , ZoneS Zone8nmimmi
:,..., , , , Deslqn Construction
S700.0DO $3.000.000
2006+
, ,Zon«5
Construction
$3.330.000
ZONE5.96
II I Jl I J 11 IJ Page 42
I i f t • i f 4 i -i i -i i I 1 I i . I I - I ! f » f if f ? *
PARKS IN THE
NORTHWEST QUADRANT
CAPITAL PROJECT DESCRIPTION
AGUA HEDIONDA LAGOON LAND DEDICATION
Project Title
PROJECT LOCATION MAP
AGUA
HEDIONDA
LAGOON
FUTURE PARK
SITE
PROJECT LOCATION
South shore of the Agua Hedionda Lagoon off of Park Drive adjacent
to Neblina Drive.
PROJECT DESCRIPTION
Future 10 ± acre park land dedication parcel to be used for future
access to the south shore of Agua Hedionda Lagoon. Passive park
development concept.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management standards and is part of the
Northwest Quadrant Park Enhancement Program.
TOTAL PROJECT COST: $-0- (Dedication)
Fiscal Year 1996-97 1997-98
Fundinq Source
Purpose
Amount
Ooeratinq Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
Dedication
Acquisition
-0-
AGUADEDI.96 Page
CAPITAL PROJECT DESCRIPTION
n ^~ A /** ii A ^% x^ •«• j-fc .j-k ^B ^~ ^_. _ .BEACH ACCESSFS REPAIR -
PROJECT LOCATION MAP
Project Title
PROJECT LOCATION
Way' Beech street' Carlsbad
PROJECT DESCRIPTION
Provide major repairs to beach accesses, replace existing deteriorated
beach access steps, railing, and foundations. Upgrade base 3Iea
(re-engmeer) to withstand high surf conditions, use heavy aluminum for
handrails to replace existing eroded galvanized metal mmmum Tor
PROJECT NEED
e 'eft beaCh accesses in P°tential|y hazardous
cond on ThephhS ™ I6qulred l° keepthem in ^ long-term safecondition. These beach access points are heavily used by the public
TOTAL PROJECT COST: $50.000 PROJECT FUKiniMft
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
BEACHACC.96
1996-97
GCC
.Construction
$25.000
1997-98
GCC
1998-99 1999-2000 2000-2001 2001-2006 2006+
.Construction
ft:*LJ JLM K«JI RB BIB M:m »-!.-• B^^^•^^^w i^niiBii uBim ^^^^^^i
Page 44
tit a
CAPITAL PROJECT DESCRIPTION
CANNON LAKE PARK
Project Title
PROJECT LOCATION MAP
PROJECT
ITE
PROJECT LOCATION
In the Northwest Quadrant at Cannon Lake: South of Cannon Road
and west of the AT&SF Railway tracks.
PROJECT DESCRIPTION
Develop a 6.7 acre site. Development may include restrooms,
parking and passive areas for picknicking and leisure recreation
activities.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $900.000
Fiscal Year 1996-97
Fundinq Source
Puroose
Amount
Ooeratinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Design/Const.
$900.000
CANLAKE.96 Page 45
CAPITAL PROJECT DESCRIPTION
COMMUNITY CENTER - NORTHWEST QUADRANT
Project Title
PROJECT LOCATION MAP
SITE TO BE DETERMINED
PROJECT LOCATION
Within the northwest quadrant at a site to be determined.
PROJECT DESCRIPTION
Construct a ±20,000 square foot community center/gymnasium.
Facilities will include hardwood basketball, vollyball, gymnastics,
aerobic exercise areas; meeting rooms, kitchen facilities and office
space.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $3.000,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operatina Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$3,000,000
$1,500.000
CCENNW.96 Page 46
11 II I ] II I J I -1
CAPITAL PROJECT DESCRIPTION
HOSP GROVE/BUENA VISTA LAGOON DEVELOPMENT (ALT II)
Project Title
PROJECT LOCATION MAP
MAXTON
BROffNi
PARK
HOSP
GROVEf
PROJECT LOCATION
In the northwest quadrant from Hosp Grove along the south shore of
the Buena Vista Lagoon to the Pacific Ocean. Includes Maxton
Brown Park, Maxton Brown extension, and Maxton Brown expansion
area.
PROJECT DESCRIPTION
Develop a variety of recreational opportunities including passive
parks, boardwalks, view areas, trails, parking and staging areas in
Hosp Grove, the Buena Vista Lagoon, and out to the Pacific Ocean.
PROJECT NEED
Required to meet Growth Management standards and is part of the
Northwest Quadrant Park Enhancement Program.
TOTAL PROJECT COST: $3.225.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PIL
Design/Const.
$3.225.000
HOSPGRV2.96 Page 47
CAPITAL PROJECT DESCRIPTION
NORTHWEST QUADRANT PARKS - AMERICANS WITH DISABILITIES ACT RETROFIT
Proi
PROJECT LOCATION MAP
PACIFIC
OCEAN
ect Title
PROJECT LOCATION
All parks within the northwest quadrant of the City.
PROJECT DESCRIPTION
Modifications to existing park facilities. Modifications are required to
provide disabled persons adequate access to park facilities.
PROJECT NEED
Required to meet the Federal Americans with Disabilities Act.
TOTAL PROJECT COST: $80.000
Fiscal Year 1996-67
Funding Source ,
Purpose —-.
Amount
Operating Costs
PROJECT FUNDING
•f 997-9* 1998-99 1999-2000 2000-2001 2001-2006
GCC
Construction
JSO.OOO
-0-
2006*
NWQUADPK.96 Page 48
1 J I J I J I J I J
in r i j t i
CAPITAL PROJECT DESCRIPTION
OCEAN STREET STAIRS
Proj
PROJECT LOCATION MAP
set Title
PROJECT LOCATION
North end of Ocean Street.
PROJECT DESCRIPTION
Reconstruct cement stairs from street to beach.
PROJECT NEED
Rebar is rusty and has expanded in the concrete. Stairs have been
temporarily patched. Each step has a large crack and will continue to
break off.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
$40.000
199647 1997-98 199849 1999-2000 2000-2001 2001-2006 2006+
GCC
Construction
$40.000
•0-
OCEAN ST.96 Page 4
CAPITAL PROJECT DESCRIPTION
PARK SITE - NORTHWEST QUADRANT (ACQUISITION)
Project Title
PROJECT LOCATION MAP
SITE TO BE DETERMINED
PROJECT LOCATION
Within the northwest quadrant at a site to be determined, possibly
the site of Pine Elementary School.
PROJECT DESCRIPTION
Acquire seven (7) acres of land as a park. Development will include
two lighted baseball fields, lighted multi-use turfed area, roofed picnic
structure, parking lot, tot-lot and landscaping.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $2.380.000
Fiscal Year 1996-97
Fundi no Source
Purpose
Amount
Ooeratinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PIL
Acquire
$2,380,000
PARKS ITE.96
11 ft J I J II I J
Page 50
II I
in a MM
CAPITAL PROJECT DESCRIPTION
PARK SITE - NORTHWEST QUADRANT (DEVELOP)
Project Title
ri
PROJECT LOCATION MAP
SITE TO BE DETERMINED
PROJECT LOCATION
Within the northwest quadrant at a site to be determined, possibly
the site of Pine Elementary School.
PROJECT DESCRIPTION
Develop seven (7) acres of land as a park. Development will include
two lighted baseball fields, lighted multi-use turfed area, roofed picnic
structure, parking lot, tot-lot and landscaping.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $875.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 20001-2001 2001-2006 2006+
PFF
Design/Const.
$875,000
$280.000
PARKS IT2.96 Page 51
CAPITAL PROJECT DESCRIPTION
SWIM COMPLEX PARKING LOT RECONSTRUCTION
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Monroe Street
PROJECT DESCRIPTION
Remove and reconstruct curb and A.C. paving.
PROJECT NEED
Parking area is badly cracked and does not drain properly.
PROJECT FUNDING
TOTAL PROJECT COST: $36.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
GCC
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Maintenance
$36.000
SWIM LOT.96 Page 52
II I J l,J
r i
CAPITAL PROJECT DESCRIPTION
SWIM COMPLEX SANITATION SYSTEM
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Swim complex, Monroe Street.
PROJECT DESCRIPTION
Replace existing outdated gas chlorine and chemical control system
with new chlorinators.
PROJECT NEED
In response to potential safety hazards and updates in the California
Health and Safety Code, a new system is recommended.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
$70.000
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
GCF
Design/Construct
$70.000
$6.500 $13.000 $13.000 $13.000 $13.000 $65.000
SWIMCOMP.96 Page 53
CAPITAL PROJECT DESCRIPTION
VETERAN'S MEMORIAL PARK (NORTHWEST QUADRANT)
Proi
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
This property is located south and east of Agua Hedionda Lagoon, near
the geographic center of Carlsbad.
PROJECT DESCRIPTION
The Master Plan for development of Veteran's Memorial Park includes
the following improvements: streets, utilities, community leisure
recreation needs, sports complex, open space interpretive area, parking
and maintenance facility. In addition, private sector development of
recreation amenities will be considered. The suggested uses of this 288
acre + additional leased property are: amphitheatre complex, sports
complex, conference center, and numerous other active/passive
recreational amenities.
Previous Appropriation - $0
PROJECT NEED
The Macario Canyon property has been under City lease or ownership for
a number of years. The development of this property, since it is centrally
located, would provide the needed parkland for all quadrants at buildout.
Part of the Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST; $3.500.000
Fiscal Year 1996-97
Funding Source
Purpose ,,„. .., ,„„ ,
Amount
Ooeratinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006
CFD
Design/Const
,....,.,., S1.750.000
2006*
CFD
Design/Const
$1.750.000
VETERAN.96 Page 54
t 1 I J I J
I J.-.t i ... ,1.. . *.. . _i . . =*. -,fc . *..-*.
PARKS IN THE
NORTHEAST QUADRANT
m mm ri
CAPITAL PROJECT DESCRIPTION
LARWIN COMMUNITY PARK - NORTHEAST QUADRANT
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
This project is located in the northeast quadrant on the north side of
Carlsbad Village Drive, west of Concord Street.
PROJECT DESCRIPTION - Project No. 3344
This 22.3 acre site is constrained by steep slopes, sensitive habitat
and power lines. For that reason, grading and development will be
confined to a small area. Park development will consist of limited
grading and construction of two tennis courts, a tot-lot, restrooms, a
picnic area, a level turfed area, a parking lot and a trail system.
PROJECT NEED
Part of the Parks and Recreation Element of the General Plan and
required to meet Growth Management Standards. Currently there are
numerous apartments and attached housing projects in this area with
a large number of children requiring recreational area.
TOTAL PROJECT COST: $2,090.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT
1997-98 1998-99
PFF
Design
$200.000
FUNDING
1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$1,890,000
$550,000
LARWINPK.96 Page 55
CAPITAL PROJECT DESCRIPTION
NORTHEAST QUADRANT PARK ACQUISITION
Project Title
PROJECT LOCATION MAP
TO BE DETERMINED
PROJECT LOCATION
In the northeast quadrant, site to be determined.
PROJECT DESCRIPTION
Acquire ±15 acres for future development of ball fields.
PROJECT NEED
Because of development constraints, Larwin Park was unable to fulfill
the need for active ball fields. Therefore, ±15 acres will be acquired
somehwere in the northeast quadrant for ballfield development to
meet the City's guidelines for numbers of ball fields per quadrant.
TOTAL PROJECT COST: $2.625.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PIL
Acquisition
$2.625.000
N/A
NEQUAD 1.96
mm ri i i i i t j
Page 56
• I J
CAPITAL PROJECT DESCRIPTION
NORTHEAST QUADRANT PARK DEVELOPMENT
Project Title
EI r i
PROJECT LOCATION MAP
TO BE DETERMINED
PROJECT LOCATION
In the northeast quadrant, site to be determined.
PROJECT DESCRIPTION
Develop +15 acres for ball fields.
PROJECT NEED
Because of development constraints, Larwin Park was unable to fulfill
the need for active ball fields. Therefore, ±15 acres will be
developed somehwere in the northeast quadrant for ballfields to meet
the City's guidelines for numbers of ball fields per quadrant.
TOTAL PROJECT COST: $1.875,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PIL
Design/Const.
$1,875.000
N/A
NEQUAD 2.96 Page 57
CAPITAL PROJECT DESCRIPTION
PARK RESTORATION AND ACQUISITION
Project Title
PROJECT LOCATION MAP
TO BE DETERMINED
PROJECT LOCATION
To be determined at various locations in all four quadrants of the City.
PROJECT DESCRIPTION
Restore existing parks when and as required; acquire additional park land
required by Growth Management Standards; provide additional funds in the
future if budgeted amounts fall short.
Work on land acquisitions will be in all four quadrants of the City.
Northeast Quadrant
Northwest Quadrant
Southeast Quadrant
Southwest Quadrant
$2,150,000
$1,500,000
$4,300,000
$3,130,000
Previous Appropriation - $0
PROJECT NEED
To meet Growth Management Standards and the General Plan.
TOTAL PROJECT COST: $1-1,080.000
Fiscal Year 1996-9? 1997-88
Fundina Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006*
PIL
Construction
$11,080.000
PARKREST.96 Page 58
LJ
ri
CAPITAL PROJECT DESCRIPTION
VETERAN'S MEMORIAL PARK (NORTHEAST QUADRANT)
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
This property is located south and east of Agua Hedionda Lagoon, near
the geographic center of Carlsbad.
PROJECT DESCRIPTION
The Master Plan for development of Veteran's Memorial Park includes
the following improvements: streets, utilities, community leisure
recreation needs, sports complex, open space interpretive area, parking
and maintenance facility. In addition, private sector development of
recreation amenities will be considered. The suggested uses of this 288
acre + additional leased property are: amphitheatre complex, sports
complex, conference center, and numerous other active/passive
recreational amenities.
Previous Appropriation - $0
PROJECT NEED
The Macario Canyon property has been under City lease or ownership for
a number of years. The development of this property, since it is centrally
located, would provide the needed parkland for all quadrants at buildout.
Part of the Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST; $3.500.000
Fiscal Year 1996-97 1997-98
Fundlna Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006
CFD
Desian/Const.
$1.750.000
2006+
CFD
Design/Const
$1.750.000
VETERAN2.96 Page 59
PARKS IN THE
SOUTHWEST QUADRANT
]
CAPITAL PROJECT DESCRIPTION
PARK RESTORATION AND ACQUISITION
Proj
PROJECT LOCATION MAP
TO BE DETERMINED
ect Title
PROJECT LOCATION
To be determined at various locations in all four quadrants of the City.
PROJECT DESCRIPTION
Restore existing parks when and as required; acquire additional park land
required by Growth Management Standards; provide additional funds in the
future if budgeted amounts fall short.
Work on land acquisitions will be in all four quadrants of the City.
Northeast Quadrant
Northwest Quadrant
Southeast Quadrant
Southwest Quadrant
$2,150,000
$1,500,000
$4,300,000
$3,130,000
Previous Appropriation - $0
PROJECT NEED
To meet Growth Management Standards and the General Plan.
TOTAL PROJECT COST: $11,080,000
Fiscal Year 1996-97 1997-98
Fundina Source
Puroose
Amount
Operating Costs
PROJECT FUNDING
t99ft-ftS 1999-2000 2000-2001 2001-2006 2006+
PIL
Construction
$11.080.000
PARKREST.96 Page 60
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
POINSETTIA COMMUNITY PARK (LOAN REPAY)
Project Title
PROJECT
SITE
PROJECT LOCATION
In the southeast quadrant east of Paseo del Norte between Palomar
Airport Road and Poinsettia Lane.
PROJECT DESCRIPTION
In order to acquire land for this park, funds were advanced by the
Sammis Development Company to purchase 6.05 acres. The loan
will be repaid from Parks-in-Lieu fees as development occurs in the
southwest quadrant.
Previous Appropriation - $0
PROJECT NEED
Loan repayment.
TOTAL PROJECT COST: $281.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PIL-SW
Loan Repayment
$281.000
POINSLN.96
ii mm i 1 I J LJI
Page 61
I I I I I 1
i-i i i
CAPITAL PROJECT DESCRIPTION
pniMSFTTIA COMMUNITY PARK (PHASE I)
PROJECT LOCATION
In the Southeast Quadrant east of Paseo del Norte between Palomar
Airport Road and Poinsettia Lane.
PROJECT DESCRIPTION - Project No. 3348
The Master Plan for this 42 acre park includes the following facilities:
Ballfield soccer and tennis complex, tot-lots, hard courts, picnic•areas,
passive open space, restrooms, parking and maintenance storage and a
22,500 square foot community center.
Phase I (of 3 phases) includes grading the entire site, roads, parking and
inSation of a portion of the amenities listed above (i.e., ball fields,
soccer fields, tot-lot, restroom, picnic areas, etc.).
Previous Appropriation - $4.087,000
PROJECTNEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
0BQJECT FUNDING
Protect Complete
TOTAL PROJECT COST: t4.381.434
Fiscal Year 1996£Z
Funding Source
Purpose
Amount
Operating Costs
1997-98 1998-89 1999-2000 2000-2001 2001-2006 2006+
Page 62
POINSJ.96
CAPITAL PROJECT DESCRIPTION
POINSETTIA COMMUNITY PARK (PHASE II)
Proi
PROJECT LOCATION MAP
PROJECT
SITE
ect Title
PROJECT LOCATION
In the southeast quadrant east of Paseo del Norte between Palomar
Airport Road and Poinsettia Lane.
PROJECT DESCRIPTION
Phase II (of 3 phases) of this 42 acre park will include development of the
remainder of the amenities called out in the Master Plan and not
developed in Phase I (excluding the Community Center which is Phase III).
Amenities may include ball fields, enclosed soccer, tot-lots, picnic areas,
restrooms, tennis complex, and parking.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $2.680.000
FtepalYear 1996-07
Fundlna Source „,,„„„„„„„ ,-
Puroose ,,.„,,,, , ,
Amount ,•••,-,,,,•„,, ,,,,„, ,
Operating Costs , m , mii ., mm .
PROJECT FUNDING
1997-96 1998-99 1999-2000 2000-2001 2001-2006
.. . PFF ,,'
„.„„....„.„ „.,.,„ „., ,..„.... „ „ ,.., ..,.,, . peslan/Const
$2.680.000
$600.000
2000*
POINS II.96
mm wm ta 11 i J
Page 63
• II
CAPITAL PROJECT DESCRIPTION
POINSETTIA COMMUNITY PARK (PHASE
Proi
PROJECT LOCATION MAP
PROJECT
SITE
ect Title
PROJECT LOCATION
In the southeast quadrant east of Paseo del Norte between Palomar
Airport Road and Poinsettia Lane.
PROJECT DESCRIPTION
This project will be Phase III of the Alta Mira Park development and will
consist of the following:
Construct a 22,500 square foot community center/gymnasium. Facilities
will include hardwood basketball, vollyball, gymnastics, aerobic exercise
areas; meeting rooms, kitchen facilities and office space.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $3, OOP, 000
Fiscal Year 1996-97 1997-98
Funding Source
Purpose .„ , ,
Amount ,
Operating Cost* ,,,,,
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Desian/Const
$? f 000 r QOO
$1.500.000
POINS1II.96 Page 64
CAPITAL PROJECT DESCRIPTION
VETERAN'S MEMORIAL PARK (SOUTHWEST QUADRANT)
Proj
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
This property is located south and east of Agua Hedionda Lagoon, near
the geographic center of Carlsbad.
PROJECT DESCRIPTION
The Master Plan for development of Veteran's Memorial Park includes
the following improvements: streets, utilities, community leisure
recreation needs, sports complex, open space interpretive area, parking
and maintenance facility. In addition, private sector development of
recreation amenities will be considered. The suggested uses of this 288
acre + additional leased property are: amphitheatre complex, sports
complex, conference center, and numerous other active/passive
recreational amenities.
Previous Appropriation - $0
PROJECT NEED
The Macario Canyon property has been under City lease or ownership for
a number of years. The development of this property, since it is centrally
located, would provide the needed parkland for all quadrants at buildout.
Part of the Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST; $3.500.000
Fiscal Year 1996-97
Fundlna Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006
. CFD
Desian/Const.
$1.750.000
2006*
CFD
Deslqn/Consi
S1.750.000
VETERAN3.96
1 I J I J
Page 65
• I J II
r~i
CAPITAL PROJECT DESCRIPTION
ZONE 19 COMMUNITY PARK (LOAN REPAY)
Project Title
PROJECT LOCATION MAP
PROJECT
SITE
PROJECT LOCATION
In the southwest quadrant, at the northern tip of Zone 19, north of
Poinsettia Lane and west of El Camino Real.
PROJECT DESCRIPTION
LETTER OF CREDIT REPAYMENT
In order to construct the first phase (15 acres) of this park in a timely
manner, the developer, Hillman Properties, put up a Letter of Credit.
This will be repaid from Public Facilities Fees collected as development
occurs.
Previous Appropriation - $0
PROJECT NEED
Letter of Credit repayment.
TOTAL PROJECT COST: $1.725.000
Fiscal Year 1996-97
Fundlra Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1697-98 1998-99 1999-2000 2000-2001 2001-2006 2006*
PFF
Ltr. Credit Repay
41.725.000
ZONE19CP.96 Page 66
CAPITAL PROJECT DESCRIPTION
ZONE 19 COMMUNITY PARK (PHASE H
Pro.
PROJECT LOCATION MAP
'PROJECT
SITE
ect Title
PROJECT LOCATION
In the southwest quadrant, at the northern tip of Zone 19, north of
Poinsettia Lane and west of El Camino Real.
PROJECT DESCRIPTION
Phase I development of this 24+ acre park will be to develop 15 acres
with funds provided by the developer (Hillman Company) to be
reimbursed later.
The preliminary development plans may include ballfields,
soccer/football fields, basketball and tennis courts, tot-lots, restrooms,
maintenance facility, parking lots and picnic areas.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $1.687.500
Fiscal Year 1996-87
Fundlno Source M11 ,
Purpose .
Amount ,m
Ooeratina Costs , ,
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
,,,„ , , Ltr. Credit
, , , Deslan/Const
,,„ , , ,. , . $1.687.500
,,,,„,,„, • ,- „ $750.000
ZONE19-I.96 Page 67
I j LI
r™i
CAPITAL PROJECT DESCRIPTION
ZONE 19 COMMUNITY PARK (PHASE
Project Title
PROJECT LOCATION MAP
PROJECT
SITE
PROJECT LOCATION
In the southwest quadrant, at the northern tip of Zone 19, north of
Poinsettia Lane and west of El Camino Real.
PROJECT DESCRIPTION
Phase II development of this park will be for the City to develop the
remaining 9.25 acres.
The preliminary development plans may include lighted softball,
soccer/football fields, basketball and tennis courts, tot-lots,
restrooms, maintenance facility, parking lots and picnic areas.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $1.250.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Ooeratinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Design/Const.
$1.250.000
Page 68
ZONE19II.96
CAPITAL PROJECT DESCRIPTION
ZONE 19 COMMUNITY CENTER (PHASE
Project Title
PROJECT LOCATION MAP
PROJECT
SITE
PROJECT LOCATION
In the southwest quadrant, at the northern tip of Zone 19, north of
Poinsettia Lane and west of El Camino Real.
PROJECT DESCRIPTION
Construct a ±20,000 square foot community center/gymnasium.
Facilities include hardwood basketball, vollyball, gymnastics, aerobic
exercise areas; meeting rooms, kitchen facilities and office space.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $3,000.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Desiqn/Const
$3.000.000
Page 69
ZONE19CC.96
i J im KJI t_j ui i j t ji
i t i i • • i, i t i * h i • i i> t : ! ' f '. t : f ! t
PARKS IN THE
SOUTHEAST QUADRANT
n f i
CAPITAL PROJECT DESCRIPTION
ALGA NORTE PARK (LOAN REPAY)
Project Title
PROJECT LOCATION MAP
\
PROJECT
PROJECT LOCATION
In the Southeast Quadrant, tentatively anticipated to be east of
El Camino Real and north and adjacent to the future Poinsettia Lane.
PROJECT DESCRIPTION
In order to be permitted to develop in a timely manner, a developer,
Fieldstone Company, will construct the first phase (19.48 ac.) of this
park. This will be repaid from Public Facilities Fees collected as
development occurs.
Previous Appropriation - $0
PROJECT NEED
Loan Repayment.
TOTAL PROJECT COST: $2,241.265
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Loan Repayment
$2.241.265
ALGALOAN.96 Page 70
CAPITAL PROJECT DESCRIPTION
ALGA NORTE PARK (PHASE I)
Project Title
PROJECT LOCATION MAP
\
PROJECT
SITE
PROJECT LOCATION
In the Southeast Quadrant, tentatively anticipated to be east of
El Camino Real and north of and adjacent to the future Poinsettia
Lane.
PROJECT DESCRIPTION
The first phase (of 3 phases) of this +35 acre park will be for
developer (Fieldstone Company) to develop ±19 acres. Funds
advanced by the developer will be paid back at a later date.
The City development of the remaining +16 acres will be done at a
later date (refer to Phases II & III).
Anticipated facilities include ball fields, soccer fields, tennis courts,
restrooms, picnic areas and a tot-lot.
NOTE: Map shows general area. No site has been identified or
acquired.
Previous Appropriation - SO
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
PROJECT FUNDING
TOTAL PROJECT COST: $2.250.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006
LC/Fleldstone
Design
$250.000
-0-
2006+
LC/Fleldstone
Construction
$2.000,000
ALGANORT.96
I 1 I 1 11 II II I J II
Page 71
t I I J I J II 1 I II
ri ri n
CAPITAL PROJECT DESCRIPTION
ALGA NORTE PARK (PHASE II)
Project Title
PROJECT LOCATION MAP
\
PROJECT
SITE
PROJECT LOCATION
In the Southeast Quadrant, tentatively anticipated to be east of
El Camino Real and north of and adjacent to the future Poinsettia
Lane.
PROJECT DESCRIPTION
The second phase (of 3 phases) of this ±35 acre park will be the
development of the remaining ±16 acres.
Anticipated facilities include the remainder of the ammenities not
installed in Phase I and may include ball fields, soccer fields, tennis
courts, picnic areas, tot-lots and restrooms.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $2 . 100 . 000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$2.100,000
ALGANOR2.96 Page 72
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
ALGA NORTE COMMUNITY CENTER (PHASE
Project Title
PROJECT
SITE
PROJECT LOCATION
In the Southeast Quadrant, tentatively anticipated to be east of
El Camino Real and north and adjacent to the future Poinsettia Lane.
PROJECT DESCRIPTION
Construct a 20,500 square foot community center/gymnasium.
Facilities will include hardwood basketball, vollyball, gymnastics and
aerobic exercise areas; meeting rooms, kitchen facilities and office
space.
NOTE: Map shows general area. No site has been identified or
acquired.
NOTE: Phase IV consisting of a 3-4 million dollar swim complex
(currently unfunded) may be added as part of the project.
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $3,000,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Design/Const.
$3,000,000
ALGACNTR.96 Page 73
11 f I El i J I J I J IJI
II
CAPITAL PROJECT DESCRIPTION
LEO CARRILLO PARK (PHASE I)
Proj
PROJECT LOCATION MAP
act Title
PROJECT LOCATION
In the Southeast Quadrant, approximately one mile south of Palomar
Airport Road adjacent to the future extension of Melrose Drive and future
Poinsettia Lane.
PROJECT DESCRIPTION - Project No. 3456
This project involves the development and restoration of the existing
10.5 acres of the Carrillo Ranch parcel ($2,250,000). An additional 16.4
acres of park land is to be dedicated adjacent to the existing site and
developed as a second phase ($1,150,000).
The preliminary development plans for the 26.9 acre park may include
rehabilitation to existing structures, landscaping, parking lots, restrooms,
walkways, large group picnic facilities and tot-lots. The general theme
for this park will be passive in nature with the option for interpretive
programming.
Previous Appropriation - $250,000
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $2.250,000
Fiscal Year 1996-97
Punctilio Source
Puroose
Amount
Ooeratfna Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000
PFF
Design
$250.000
•0*
2000-2001 2001-2006 .
PFF
Design/Const
$1.750.000
$100.000
2006+
$500.000
LEOCARRI.96 Page 74
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
\
LEO CARRILLO PARK (PHASE II)
Project Title
PROJECT LOCATION
In the Southeast Quadrant, approximately one mile south of Palomar
Airport Road adjacent to the future extension of Melrose Drive and
future Poinsettia Lane.
PROJECT DESCRIPTION
This project involves development of the remaining ± 16.4 acres of
the 26.9 acre park.
Anticipated facilities include the remainder of ammenities not
completed in Phase I (refer to Phase I Project Description).
Previous Appropriation - $0
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
TOTAL PROJECT COST: $1.150,000
Fiscal Year 1996-97
Fundina Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$1.150,000
$800,000
LEOCARII.96 Page 75
f I II I J I J I J f 1 i J II I J II I i I I II I J II II II
BI m IB t i
CAPITAL PROJECT DESCRIPTION
PARK RESTORATION AND ACQUISITION
Project Title
PROJECT LOCATION MAP
TO BE DETERMINED
PROJECT LOCATION
To be determined at various locations in all four quadrants of the City.
PROJECT DESCRIPTION
Restore existing parks when and as required; acquire additional park land
required by Growth Management Standards; provide additional funds in the
future if budgeted amounts fall short.
Work on land acquisitions will be in all four quadrants of the City.
Northeast Quadrant
Northwest Quadrant
Southeast Quadrant
Southwest Quadrant
$2,150,000
$1,500,000
$4,300,000
$3,130,000
Previous Appropriation - $0
PROJECT NEED
To meet Growth Management Standards and the General Plan.
TOTAL PROJECT COST: (11,080,000
Fiscal Year 1996-97 1997-98
Fundina Source
Purpose
Amount
Ooeratina Costs
PROJECT FUNDING
1998-99 1996-2000 2000-2001 2001-2006 2006*
PIL
Construction
$11.080.000
PARKREST.96 Page 76
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
STAGECOACH PARK DRAIN
Project Title
PROJECT LOCATION
Entrance to Stagecoach Park gymnasium.
PROJECT DESCRIPTION
Relocate drain from the entrance to the Community
Center/Gymnasium to the north.
PROJECT NEED
The current drain floods during heavy rains and needs to be moved
away from the entrance to the Community Center/Gymnasium.
TOTAL PROJECT COST: $15.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
1997-98
GCF
Design
$5,000
-0-
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
GCF
Construction
$10,000
-0-
STAGEDRN.96 mm ii i 11 i i t i
Page 77
II II II II
r f
CAPITAL PROJECT DESCRIPTION
VETERAN'S MEMORIAL PARK (SOUTHEAST QUADRANT)
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
This property is located south and east of Agua Hedionda Lagoon, near
the geographic center of Carlsbad.
PROJECT DESCRIPTION
The Master Plan for development of Veteran's Memorial Park includes
the following improvements: streets, utilities, community leisure
recreation needs, sports complex, open space interpretive area, parking
and maintenance facility. In addition, private sector development of
recreation amenities will be considered. The suggested uses of this 288
acre + additional leased property are: amphitheatre complex, sports
complex, conference center, and numerous other active/passive
recreational amenities.
Previous Appropriation - $0
PROJECT NEED
The Macario Canyon property has been under City lease or ownership for
a number of years. The development of this property, since it is centrally
located, would provide the needed parkland for all quadrants at buildout.
Part of the Parks and Recreation Element of the General Plan.
TOTAL PROJECT COSTS i3.500.000
Fiscal Year 1996-97 1997-98
Fundlna Source m< , „
Purpose ,. ,., , , ,... ,, ,
Amount , ,„ , ....
Operating Costs , ,, , ,
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006
CFD
Design/Const
S1.750.000
CFD
Design/Const
$1,750.000
VETERAN4.96 Page 78
DRAINAGE PROJECTS
n n r~*i
CAPITAL PROJECT DESCRIPTION
MASTER DRAINAGE FACILITIES
Project Title
PROJECT LOCATION MAP
VARIOUS LOCATIONS THROUGHOUT THE CITY
PROJECT LOCATION
Various locations throughout the City.
PROJECT DESCRIPTION
Construction of various major storm drain facilities within the City. The
facilities funded through this program are outlined in the Master Drainage
and Storm Water Management Plan.
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Master Drainage and Storm Water Quality Management Plan.
TOTAL PROJECT COST: $19.425.000
Fiscal Year 1996-87 1997-98
Fundlna Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
PLDA PLDA
Construction Construction
$19.425.000
MASTRDRN.96 Page 79
CAPITAL PROJECT DESCRIPTION
PARK DRIVE SLOPE/DRAINAGE STUDY FOR REPAIR
Proj
PROJECT LOCATION MAP
AGUA
HEDIONDA
LAGOON
ect Title
PROJECT LOCATION
Northeast side of Park Drive between Cove Drive and Bayshore.
PROJECT DESCRIPTION
Contract with a consulting firm to prepare a soils report detailing the
following:
1) Ground water problems
2) Slope stability problems
3) Soils testing
4) Recommendations
Previous Appropriation - GCC $17,000
PROJECT NEED
Complaints by residents of bluff erosion blocking sidewalk, continuous
maintenance problems.
PROJECT FUNDING
TOTAL PROJECT COST: $17,000
Fiscal rear 1996-97
Funding Source
Purpose
Amount
Operating Costs
1997-9S 1996-99 3999-2006 2000-2001 2001-2006 2006*
PARK DR.96 Page 80
11 f 1 ILJ
ri r n in n
CAPITAL PROJECT DESCRIPTION
SOUTH CARLSBAD VILLAGE STORM DRAIN
Proj
PROJECT LOCATION MAP
DROJECT
J
set Title
PROJECT LOCATION
Oak Avenue to Agua Hedionda Lagoon along the easterly portion of the
Northern San Diego Railroad right-of-way.
PROJECT DESCRIPTION
Construct an underground storm drain system to carry storm water from
the area bounded by Carlsbad Village Drive, Highland Drive, Garfield
Street and Agua Hedionda Lagoon. The majority of the construction will
occur within the Northern San Diego Railroad right-of-way.
PROJECT NEED
The project will control flooding and standard water along its route.
PROJECT FUNDING
TOTAL PROJECT COST; $4.700.000
Fiscal Year .1996-07
Funding Source TransNet Local
Purpose Flood Control
Amount $940.000
operating Costs
1997-08
TransNet Local
Flood Control
$3.760.000
1998-99 1999-2000 2000*2001 2001*2006 2006*
SCBADVSD.96 Page 81
CAPITAL PROJECT DESCRIPTION
STATE STREET STORM DRAIN REPAIR
Project Title
PROJECT LOCATION MAP
,EXIST. 66" RCP
DR.
-EXIST. GRATED INLET
PROJECT LOCATION
State Street =200' north of Beech Avenue to Laguna.
PROJECT DESCRIPTION
Clean and line existing 24" CMP. Connect existing grated inlet to
existing 66" storm drain per Dwg. No. 266-8.
PROJECT NEED
Existing CMP is in poor condition. Heavy rains cause backup in inlets
and ponding of water on State Street.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$77,000
1996-97
Gas Tax
Design
$7.000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Gas Tax
Const & Insp
$70.000
STATE ST.96 Page 82
i J
r*i n n n n n r i
CAPITAL PROJECT DESCRIPTION
STORM DRAIN AND DESILTATION BASIN/CANNON ROAD
Proj
PROJECT LOCATION MAP
EXISTING
DRAINAGE
CHANNEL
(
RANCHO
CARLSBADLMOBILEHOME
PARK
ect Title
PROJECT LOCATION
East of El Camino Real along the north side of Rancho Carlsbad Mobile
Home Park.
PROJECT DESCRIPTION - Project No. 3338
Construct a desiltation basin at the northeast corner of the Rancho
Carlsbad Mobile Home Park and a drainage channel from the basin to El
Camino Real.
Previous Appropriation - $1,120,000
PROJECT NEED
Required by the Drainage Master Plan to handle runoff from future
development.
TOTAL PROJECT COST: $1,120,000
Fiscal Year 1996-97 1997-98
Funding Source ,
Purpose „„,,, M
Amount ,.,„,,. ,...„..., „
Ooeratina Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
STORMDR1.96 Page 83
t i t » k t i 4 t j *i .i . i t I : • f ' '
SEWER PROJECTS
CAPITAL PROJECT DESCRIPTION
BUILDING IMPROVEMENTS - ENCINA WATER POLLUTION CONTROL FACILITY
r~i r i r i
PROJECT LOCATION MAP
Proj
PALOMAR AfRPORT Rn
PROJECT
SITE
ect Title
PROJECT LOCATION
Encina Water Pollution Control Facility
6200 Avenida Encinas
Carlsbad, CA 92009
PROJECT DESCRIPTION
To construct and/or improve existing building facilities at the Encina Water
Pollution Control Facility.
Building improvements include:
• Additional Office
• Employee Locker Facilities
• Expanded Laboratory Facilities
Prior Appropriation - $25,000 _____
PROJECT NEED
Needed to provide office and laboratory facilities at the Encina Water
Pollution Control Facility.
TOTAL PROJECT COST: $50.000
Fiscal Year 1996-97
Funding Source ^^^^^,
Purpose m^^^^.
Amount ,__»«_^^__
Operating costs
PROJECT FUNDING
1997*98 1998-99 1999-2000 2000-2001 2001-2006
Construction
S25.000
ENCINA-1.96
CAPITAL PROJECT DESCRIPTION
CAPITAL ACQUISITION - ENCINA WATER POLLUTION CONTROL FACILITY
Proj
IlLfALQMAR AIRPORT Rn
PROJECT
SITE
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
Encina Water Pollution Control Facility
6200 Avenida Encinas
Carlsbad, CA 92009
PROJECT DESCRIPTION
Various Capital Improvements
Previous Appropriation - $132,110
PROJECT NEED
To upgrade the existing plant.
TOTAL PROJECT O
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
OST: $1.147.110
1996-87 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Sewer Sewer Sewer Sewer Sewer Sewer Sewer
To Be Determined To Be Determined To Be Determined To Be Determined To Be Determined To Be Determined To Be Determined
$65.000 $56,000 $50.000 $50.000 $50.000 $250.000 $500.000
ENCINA-2.96 Page 85
II i J I J t*JI
in
CAPITAL PROJECT DESCRIPTION
ENCINA CO-GENERATION PROJECT
Proj
PROJECT LOCATION MAP
PROJECT
SITE
ect Title
PROJECT LOCATION
Encina Water Pollution Control Facility.
PROJECT DESCRIPTION
In order to conform with mandated air quality regulations and to ensure the
lowest power price rates from San Diego Gas & Electric, Encina will be
upgrading and programming the electrical generators which power the
blowers within the sewer treatment facility.
Previous Appropriation - $315,908
PROJECT NEED
To meet air quality regulations.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose _„
Amount
Operating Costs
$380.908
1998.07 1997-98
Sewer
Construction
$65.000
fftO^EpT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 . 2006+
ENCCOGEN.96 Page 86
CAPITAL PROJECT DESCRIPTION
ENCINA SEWER TREATMENT PLANT REHABILITATION
Proj
PROJECT LOCATION MAP
PROJECT
SITE
ect Title
PROJECT LOCATION
Encina Water Pollution Control Facility.
PROJECT DESCRIPTION
A consultant will be hired to provide yearly recommendations for
machinery rehabilitation to ensure the efficient operating ability of the
Encina Sewer Treatment Facility.
Previous Appropriation - $127,000
PROJECT NEED
To ensure proper operating ability of Encina sewer treatment.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$2.680,000
1996-97
Sewer Red.
Construction
$140.000
1997-98
Sewer Real
u Construction
$130.000
PROJECT
1998-99
Sewer Reel.
,.. Construction (
$140.000
FUNDING
1999-2000
Sewer Real.
Construction
$130.000
2000-2001
Sewer Red.
Construction
$140.000
2001-2006
Sewer Repl.
Construction
$650.000
2006+
Sewer Reot.
Construction
$1,223.000
ENCINSEW.96 Page 87
i M i M 11 i j mm
fa m m
CAPITAL PROJECT DESCRIPTION
PARALLEL OCEAN OUTFALL
Pro
PROJECT LOCATION MAP
PROJECT
SITE
ect Title
PROJECT LOCATION
In the Pacific Ocean offshore from the Encina Water Pollution Control
Facility south of Palomar Airport Road.
PROJECT DESCRIPTION
Construction of a second ocean outfall line parallel to the existing one to
increase effluent dispersion capacity.
Previous Appropriation - $48,000
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Master Plan of Sewerage.
TOTAL PROJECT COST: $12.715.000
Fiscal Year 1996-07
Funding Source Sewer
Purpose
Amount $80.000
Ooeratina Costs ...,..,,.„,,.., „ ,„,,...
fROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001
,,,,, „..„ , Mll , „ , ,„ nS,eweT , ....
, ., , ,-„„„„„ , ,,,,, ,-„„•„•„„,•,••„•„•, ,, Destan ,.
$635.000
2001-2006 .
Sewer
Construction
$5.000.000
2006+
Sewer
Construction
S6.952.000
PAROCEAN.96 Page 88
CAPITAL PROJECT DESCRIPTION
PHASE V EXPANSION - ENCINA WATER POLLUTION CONTROL FACILITY
PROJECT LOCATION MAP
Pro
ROJECT
SITE
set Title
PROJECT LOCATION
Encina Water Pollution Control Facility
6200 Avenida Encinas
Carlsbad, CA 92009
PROJECT DESCRIPTION
Expand the Encina Water Pollution Control Facility to buildout for the
Treatment of 45-60 MOD of wastewater.
PROJECT NEED
To provide for ultimate wastewater treatment capacity of the Carlsbad
Sewer District.
TOTAL PROJECT COST: $2.840.000
Fiscal Year 1996-97
Fundlna Source , , ,
Purpose „„
Amount „„, „.,.,. ...,
Ooeratinq Costs .,,„,„. , ,...,
PROJECT FUNDING
1997^98 1998-99 1999-2000 2000-2001 2001-2006 2006*
, II]MII , , Deslan/Sewer .
, , „ ; ,,,,,,, , • Construction
$2.840.000
EWPCF-V.96 Page 89
•9 m n n r~i
CAPITAL PROJECT DESCRIPTION
TREATMENT PLANT EXPANSION
Proj
PROJECT LOCATION MAP
-^—J'LPALQMAR AIRPORT pn
PROJECT
SITE
ect Title
PROJECT LOCATION
South of Palomar Airport Road on the east side of Avenida Encinas.
PROJECT DESCRIPTION
Expansion of the Encina Water Pollution Control Facility to increase
treatment capacity from 22.5 million gallons per day to 36.0 million gallons
per day of raw sewage. Cost includes bond financing and interest costs.
Previous Appropriation - $5,016,800
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Master Plan of Sewage.
TOTAL PROJECTS
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
JST: $25.870.000
1996-97 1997-96 1998-99 1999-2000 2000-2001 2001-2006 2006*
Sewer Sewer Sewer Sewer Sewer Sewer Sewer
Debt Repayment Debt Repayment Debt Repayment Debt Repayment Debt Repayment Debt Repayment Debt Repayment
$1.107.500 i1.1oe.dOO S1.106.400 i1,106.200 $1.104.200 i5.504.6S6 $9.816.944
TREATPLT.96 Page 90
INTERCEPTOR SYSTEM AND
LIFT STATIONS
r i i i i
CAPITAL PROJECT DESCRIPTION
AGUA HEDIONDA LIFT STATION
Proj
PROJECT LOCATION MAP
set Title
PROJECT LOCATION
On the south shore of Agua Hedionda Lagoon adjacent to the east side of
the railroad tracks.
PROJECT DESCRIPTION
Relocate pump station to north side of Agua Hedionda Lagoon when
additional gravity line to station is constructed to avoid reconstruction of
railroad bridge across lagoon. Cost is Carlsbad's share which is 40.5% of
the total cost of project.
1995/1996 appropriation is for the reconstruction of the lift station
containment basin.
Previous Appropriation - $100,000
PROJECT NEED
Required to handle sewage flows for buildout population.
TOTAL PROJECT COST:
Fiscal Year
Fundtna Source _,
Purpose IM
Amount
Operating Costs
$2.325.000
199647 1997-98
MFC
Design/Const .,„„,„.., ,...,....„..„...
S100.000
PRQ,1ECTFVND|NG
1998-99 1999-2000 2000-2001 2001-2006 , 2006+
„„.„.„„„„.„..„„.„...„ .,„.„...,•.-, „ , ,„„,„,,--„ , DestqnAConst
. . .., , ,... . , „ ,,,„„., „ .. $2.125.000
AGUALIFT.96 Page 91
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
BUENA VISTA LIFT STATION
Pro ect Title
HtfY 78
PROJECT LOCATION
Adjacent to the east side of Jefferson Street just south of Buena Vista
Creek.
PROJECT DESCRIPTION
Add final pump and motor and make any needed improvements.
Previous Appropriation - $503,200
PROJECT NEED
TOTAL PROJECT COST: $736.200
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operatfna Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
15.5% MFC
Const/End.
$233.000
BUENASTA.96
mm im mm
Page 92i i i i
n r i i i is is
PROJECT LOCATION MAP
PROJECT
CAPITAL PROJECT DESCRIPTION
CHINQUAPIN SEWAGE LIFT STATION
Project Title
PROJECT LOCATION
Along Carlsbad Boulevard at Chinquapin Avenue.
PROJECT DESCRIPTION
Reconstruct wet well and relocate motor control center.
Previous Appropriation - $250,000
PROJECT NEED
Existing sewage lift station is safety hazard, does not meet current
codes for electrical and ventilation safety, wet well badly deteriorated,
pumps and controls need replacement.
TOTAL PROJECT COST: S250.000
Fiscal Year 199^7 jjy
Fundlna Source , , , , „, „„ „ „ „„„„
Purnose inniii „„„„„„„,„
Amount
ODeratlna Costs ,, , , ,,
PROJECT FUNDIKQ
IM 1WW* 1999-2000 2000-2001 2001-2008 . 2006*
CHNQPNST.96 Page 93
Pro
PROJECT LOCATION MAP
CAPITAL PROJECT DESCRIPTION
FOREST SEWAGE GRAVITY LINE
iect Title
PROJECT LOCATION
Along Forest Avenue at Highland Drive.
PROJECT DESCRIPTION
Abandon sewage lift station and construct gravity sewer.
Previous Appropriation - $250,000
Existing lift station does not meet electrical and ventilation safety
requirements, and wet well and mechanical equipment need
replacement. Sewer pipeline eliminates need for upgrade of facility.
PROJECTFUNDING
TOTAL PROJECT COST; $250.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
FORSTSTA.96
r i i i
BIB r i i i i i r i
CAPITAL PROJECT DESCRIPTION
NORTH AGUA HEDIONDA INTERCEPTOR SEWER ACCESS ROAD AND UPGRADE
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
North side of Agua Hedionda Lagoon from El Camino Real west to
Foxes Lift Station.
PROJECT DESCRIPTION
The water level of the creek tributary to the lagoon is above existing
manhole covers, and plant growth precludes access to the sewer for
maintenance. In other improved areas, obstructions have been
constructed precluding access to the sewer.
PROJECT NEED
To avoid accidental sewage spill, reduce inflow to the sewer, and
allow for maintenance vehicles to access the sewer.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$75.000
1996-97
Sewer/Repl .
Design
$25.000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Sewer /ReDl .
Construction
$50.000
NAGUAINT.96 Page 95
CAPITAL PROJECT DESCRIPTION
NORTH BATIQUITOS INTERCEPTOR SEWER ACCESS ROAD AND UPGRADE
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
North side of Batiquitos Lagoon from El Camino Real west to North
Batiquitos Lift Station.
PROJECT DESCRIPTION
During high rainfall periods, the Batiquitos Lagoon level rises to flood
above the existing access road and manhole covers. The project will
design a new access road to the sewer and raise manhole covers to a
higher elevation where required.
PROJECT NEED
To avoid accidental sewage spill, reduce inflow to the sewer, and
allow for maintenance vehicles to access the sewer.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1163.000
1996-97
Sewer/Reol .
Design
$25,000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Sewer/Repl .
Construction
$138.000
NBATINT.96 i j 11 ii
Page 96
ii t i r i
CAPITAL PROJECT DESCRIPTION
PALMER WAY SEWER EXTENSION
Project Title
r~i i J 11 11
PROJECT LOCATION MAP
'PROJECT
SITE
PROJECT LOCATION
From Cougar Drive north to proposed housing tract in the extension
of Palmer Way.
PROJECT DESCRIPTION
The existing sewer in Palmer Way terminates at Cougar Drive. Sewer
Service to the industrial park north of Faraday Avenue and east of
El Camino Real is provided by existing private lift stations for each
major building complex. These private lift stations are not well
maintained and fail to operate satisfactorily. District maintenance
personnel are often called to correct problems when they occur. By
extending the existing gravity sewer in Palmer Way, the private lift
stations can be eliminated. Construct 800 feet of 8-inch diameter
pipe.
PROJECT NEED
To eliminate sewage spills from failed private lift stations.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$125.000
1996-97
Sewer
Design
$25.000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Sewer
Construction
$100.000
PALMERWY.96 Page 97
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
SEWAGE FLOW METERS
PROJECT LOCATION
At eight separate locations (See Map.)
PROJECT DESCRIPTION
Install flow meters at various locations to measure flow rate tributary
to the City of Carlsbad for use at Encina Water Pollution Control
Facility and to verify remaining capacity of interceptor sewers.
To provide accurate data on the City's share for treatment cost at
Encina Water Pollution Control Facility and to determine remainingcapacity in interceptor sewers.
PROJECT FUMniMft
TOTAL PROJECT COST: $30.000
FfscalYear
Funding Source
Purpose
Amount
Operating Costs
Sewer
Design/Const
FLOWMTRS.96
mm r* n •• mm mm mm rt r i i i
CAPITAL PROJECT DESCRIPTION
SEWAGE LIFT STATION ELIMINATION STUDY
I I I 1 I !
Project Title
PROJECT LOCATION MAP
VARIOUS LOCATIONS THROUGHOUT THE CITY
PROJECT LOCATION
At seven locations in the City.
PROJECT DESCRIPTION
Investigate the feasibility and cost to eliminate seven small
lift stations using gravity sewer pipelines.
Previous Appropriation
sewage
PROJECT NEED
The small sewage stations are unsafe, difficult to maintain, and could
have potential for accidental sewage spills, power failure or inflow
problems.
PROJECT FUNDING
TOTAL PROJECT COST; $50.000
Fiscal Year 1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006
Funding Source .. .,„. .. „ . , ,. ...... , . ., , . . . ., ,... , . „ , ... .,,
Purpose „,„,-,• , --T-- ••••!, - ,• , , -
Amount ,.,,., • •
Ooeratina Costs , , ... ,.., , ....„.,
2006+
STAELMST.96 Page 99
CAPITAL PROJECT DESCRIPTION
SEWER LINE REFURBISH/REPLACEMENT
Project Title
PROJECT LOCATION MAP
TO BE DETERMINED
PROJECT LOCATION
Various locations within the City sewer limits.
PROJECT DESCRIPTION
Clean and refurbish existing sewer lines older than 30 years or replace if
not able to refurbish. The sewer lines needing repair will be
determined by yearly TV inspection.
PROJECT NEED
Maintain system in good condition to avoid major problems.
TOTAL PROJECT COST; $9.000.000
Fiscal Year 1996-97
Fundlna Source
Purpose , ;
Amount , ., „ ..„
1997-98
SCR
Construction
$300.000
PROJECT
1998-99
SCR
Construction
$300.000
FUNDING
1999-2000
SCR
Construction
$300.000
gooojogi
SCR
Construction
$300,000
2001-2006
SCR
Construction
$1.500.000
2006*
SCR
Construction
$5.700.000
Operating Costs
SEWRLINE.96 mm u iJ t J
Page 100
f f r 1
n r i i i
CAPITAL PROJECT DESCRIPTION
SEWER MANHOLE REFURBISHING/REPLACEMENT
Project Title
PROJECT LOCATION MAP
TO BE DETERMINED
PROJECT LOCATION
Various locations within the City sewer line.
PROJECT DESCRIPTION
Clean and refurbish manholes older than 30 years, or replace if not
able to refurbish. The manholes needing repair will be determined
during yearly inspection.
PROJECT NEED
Maintain system in good condition to avoid major problems.
PROJECT FUNDING
TOTAL PROJECT COST: $3,000,000
Fiscal Year 1996-97
Fundlna Source
Purpose
Amount
Operatina Costs
1997-98
SCR
Construction
$100,000
1998-99
SCR
Construction
$100.000
1999-2000
SCR
Construction
$100.000
2000-2001
SCR
Construction
$100.000
2001-2006
SCR
Construction
$500.000
2006+
SCR
Construction
$1.900.000
SWRREFUR.96 Page 101
CAPITAL PROJECT DESCRIPTION
EWER MnMITOPING
Project TitlePROJECT LOCATION MAP
PROJECT LOCATION
Citywide within the City's sewer service area.
PROJECT DESCRIPTION
Monitor sewer flows and remaining capacities in lines and pump
stations within the Carlsbad sewer service area. Perform sewer flow
measurements when required. Update Sewer Master Plan and reviewadequacy of sewer fees as required.
Previous Appropriation - $69.075
To ensure that sewer flows do not exceed line capacity and to ensi
timely upgrades of sewer systems in conformance with the GrowthManagement Program.
ensure
TOTAL PROJECT COST; $549.075
Amount
Operating Costs
t i f • i • r Page 102rn f i i •
•Tl I"""! PS IT*! BSl- BHB IS •?"'•! K.,,1 LJI
CAPITAL PROJECT DESCRIPTION
VANCOUVER SEWAGE LIFT STATION
i i i
Proi
PROJECT LOCATION MAP
act Title
PROJECT LOCATION
Vancouver Street.
PROJECT DESCRIPTION
Incorporate standby power generator at facility.
Previous Appropriation - $200,000
PROJECT NEED
During power failures the sewage flowing to the facility can exceed
wet well capacity prior to maintenance restoring power.
TOTAL PROJECT COST: $200.000
Fiscal Year 1996-97
Fundina Source
Purpose
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Amount
Operating Costs
VNCVRSTA.96 Page
PROJECT LOCATION MAP
CAPITAL PROJECT DESCRIPTION
VISTA/CARLSBAD JNTERCEPTOR
PROJECT LOCATION
Along Jefferson Street from 1-5 to Grand Avenue; along Grand Avenue
from Jefferson Street to the railroad; along the railroad from Grand Avenue
to the Encina Water Pollution Control Facility.
PROJECT DESCRIPTION
Installation of new and upgraded sewer trunk line through the downtown
portion of Carlsbad to the Encina Water Pollution Control
Facility. The new pipe sizes will range from 36" pipe in Reach 5 to 60" pipe
in Reach 14. The various reaches will be upgraded in phases as demand
requires. This is a joint use line with the City of Vista and the cost of
upgrading will be shared between the agencies. The included estimate isCarlsbad's share.
Previous Appropriation - $919,939
PROJECT FtlMnm/s
TOTAL PROJECT COST; $&709.93fl
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
Sewer
INTERCEP.96
•'.* ii
WATER PROJECTS
ri t i t ] i i ii
CAPITAL PROJECT DESCRIPTION
580 ZONE - SECONDARY SUPPLY
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Along Oceanside/Carlsbad city limits between future Cannon Road and
existing T.A.P. 21-inch line.
PROJECT DESCRIPTION
Install 1,750 LF of 16-inch line.
(680-550 H.G. Zone)
PROJECT NEED
To meet the future demands of the area. Developer to pay 50% of
cost.
TOTAL PROJECT COST: $512.000
Fiscal Year 1996-97 1997-98
Fundina Source
Purpose
Amount ,,,,
Ooeratina Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 - 2006+
50% MFC
, ,, , , , Const/Ena .
$256.000
580ZONE.96 Page 105
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
FA
680 ZONE
Project Title
PROJECT LOCATION
Along Oceanside/Carlsbad city limits between Maerkle Dam and
future Cannon Road.
PROJECT DESCRIPTION
Construct 16" 680 line from Squires Reservoir along the Oceanside
boundary to Cannon Road with a pressure regulating station (1019
to 680) Squires. Install 1,750 LF of 16" line and a pressure
regulating station.
PROJECT NEED
To meet the future demands of the area.
TOTAL PROJECT COST: $1 . 100 , 000
Fiscal Year 1996-97
Fundi no Source
Purpose
Amount
Operating Costs
PROJECT FUNDINGS
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
50* MFC
Const/Enq
$550.000
680ZONE.96 Page 106
r i r
I 1 [ 1 I I I 1 I i i
CAPITAL PROJECT DESCRIPTION
CANNON ROAD
Proi
PROJECT LOCATION MAP
set Title
PROJECT LOCATION
Cannon Road (Car Country Drive to El Camino Real).
PROJECT DESCRIPTION
Install 13,900 LF of 14-inch line and three pressure regulating stations.
To be built at the time of construction of Cannon Road.
(In 375-318-255 H.G. Zone)
PROJECT NEED
To meet the future demands of the area and relocate line to Cannon
Road. Developer to pay 50% of cost.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$2,556,000
1996-97
50V. MFC
Deslon
$100.000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006*
50% MFC
Const/Ena
$1.178.000
CANNON.96 Page 107
CAPITAL PROJECT DESCRIPTION
CARLSBAD BOULEVARD (MANZANO DRIVE TO AVENIDA ENCINAS)
Project Title
PROJECT LOCATION MAP
PROJECT
SITE
PROJECT LOCATION
Carlsbad Boulevard, Manzano Drive to Avenida Encinas.
PROJECT DESCRIPTION
Install 2,500 LF of 10-inch line in Manzano Drive.
(In 255 H.G. Zone)
PROJECT NEED
To relocate and meet the future demands of the area.
TOTAL PROJECT COST: $275,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
MFC/Replace
Eng/Const
$275,000
CBADBLVD.96
j 1111 n
Page 108
r i r i
13 I J I J t 1 I
CAPITAL PROJECT DESCRIPTION
CARLSBAD BOULEVARD (SOUTH OF PALOMAR AIRPORT ROAD)
Project Title
PROJECT LOCATION MAP
PROJECT
SITE
PROJECT LOCATION
South of Palomar Airport Road in Carlsbad Boulevard and Ponto
Drive.
PROJECT DESCRIPTION
Install 2,500 of 10-inch line and a pressure regulating station.
(In 318-255 H.G. Zone)
PROJECT NEED
To meet the future demands of the area.
PROJECT FUNDING
TOTAL PROJECT COST: $525.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
1997-98 1998-99 1999-2000
MFC
2000-2001 2001-2006 2006+
Eng/Const
$525.000
CSBAD-1.96 Page 109
CAPITAL PROJECT DESCRIPTION
CARLSBAD VILLAGE DRIVE
PROJECT LOCATION MAP
Proiect Title
PROJECT LOCATION
Carlsbad Village Drive (Celinda Drive to Donna Drive).
PROJECT DESCRIPTION
Install 1,600 LF of 12" line.
PROJECT NEED
To meet the future demands of the area.
TOTAL PROJECT COST: $230.000
Fiscal Year 1996-87
Fundino Source
Purpose
Amount
Operatlnq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006
MFC
Design/Const
$230.000
2006*
CVD-1.96
i i
Page 110
r i r i i i
•n n C9 II 11 13 II f
CAPITAL PROJECT DESCRIPTION
CARLSBAD VILLAGE DRIVE & "E" RESERVOIR RECOATING AND REPAIR
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Carlsbad Village Drive tank is located on Carlsbad Village Drive west
of El Camino Real and "E" tank is located north of Palomar Airport
Road and west of Hidden Valley Road.
PROJECT DESCRIPTION
Remove existing coating and recoat each tank and make necessary
repairs. Carlsbad Village Drive tank is 1.5 MG and "E" tank is
1.5 MG.
PROJECT NEED
Existing coatings are beyond useful life causing tank deterioration.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
$340.000
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Water
Construction
$340.000
CVD E.96 Page 111
CAPITAL PROJECT DESCRIPTION
COLLEGE BOULEVARD (33" LINE TO CANNON ROAD)
Project Title
PROJECT LOCATION MAP
LAKE
CALAVERA
PROJECT LOCATION
College Boulevard from 400' north of El Camino Real northerly to future
Cannon Road.
PROJECT DESCRIPTION
Install 3,850 LF of 16-inch line.
(In 490 H.G. Zone)
PROJECT NEED
To meet the future demands of the area. Developer to pay 50% of
cost.
TOTAL PROJECT COST: $842.000
Fiscal Year 1996-97
Fundind Source
Purpose
Amount
Ooeratina Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
50% MFC
Const/Enq
$421.000
COLLEGE5.96
I J L J l_J|n r i
Page 112
n r i r
J i J i J
CAPITAL PROJECT DESCRIPTION
COLLEGE BOULEVARD (CANNON TO TAP)
Proi
PROJECT LOCATION MAP
set Title
PROJECT LOCATION
College Boulevard from future Cannon Road to Carlsbad Village Drive.
PROJECT DESCRIPTION
Install 3,560 linear feet of 16-inch line and a pressure regulating station.
Install 2,000 linear feet of 18-inch line.
(In 490-446 H.G. Zone)
PROJECT NEED
To meet the future demands of the area. Developer to pay 50% of the
cost.
llBtAi^ ' ; •> litliiilll
^iiiii^^^^^^^pip?:"- '.v': :^i^mmiii
IS 0:;:::-r ;: - ' ^-:::?;:is:;!:;s:s:;?s:Purpose safe I: : : ,:^mmm i
as* :#£:»^ P» K^^sAmcHinws m msm * mm :
;;
IW^^^^^^^^^^^^^^^
Iissi:js^998i99:::f;i is i in .a iiii m :r:::t mi iiit
sisSslsSsiiSsSSSHsSjIsis •:"^;:;:;:;;i:!.i;:;:;S;:;i;S;;;;;s^
;ii;;;;i;i;;i;:|;:ii;;;:l;;i;;s;siiii^^^
COLLEGE3.96 Page 113
CAPITAL PROJECT DESCRIPTION
COLLEGE BOULEVARD EXTENSION AT EL CAMINO REAL
Project Title
PROJECT LOCATION MAP
PROJECT
SITE
PROJECT LOCATION
College Boulevard from El Camino Real north 400 feet.
PROJECT DESCRIPTION
Install 400 linear feet of 36-inch D.I.P.
Previous Appropriation - $183,375
(In 490 H.G. Zone)
PROJECT NEED
The developer (Sycamore Creek) will be constructing full street
improvements and the waterlines should be installed.
TOTAL PROJECT COST: $183.375
Fiscal Year 1996-97
Fundina Source
Purpose
Amount , ,
Operatina Costs , , ,,
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006
MFC
Deslan/Const
$183,37$
2006+
COLLEGE1.96
I J L J mm i J i J i J IM
Page 114
r i i i
r™i 1 I 1 I I I
PROJECT LOCATION MAP
CAPITAL PROJECT DESCRIPTION
COLLEGE BOULEVARD (NORTH TO OCEANSIDE)
Pro
ROJECT
SITE
act Title
PROJECT LOCATION
College Boulevard (North to Oceanside).
PROJECT DESCRIPTION
Construct a 14-inch interconnect with the City of Oceanside from
the existing 446 and 580 lines in College Boulevard including metering
station and plug valve. Install 2,200 linear feet of 12" in College Boulevard
to north boundary of district limits.
PROJECT NEED
To meet the future demands of the area.
TOTAL PROJECT COST: $410,000
Fiscal Year 1996-97
Fundlno Source
purpose
Amount
Operating Costs
PROJECT FUNDING
1997-88 1998-99 1999-2000 2000-2001 2001-2006 20064-
General Fund
Const/End
$410.000
COLLEGE2.96 Page 115
CAPITAL PROJECT DESCRIPTION
COLLEGE BOULEVARD (POINSETTIA LANE TO PALOMAR AIRPORT ROAD)
Proj
PROJECT LOCATION MAP
set Title
PROJECT LOCATION
Future College Boulevard from Poinsettia Lane to Palomar Airport Road.
PROJECT DESCRIPTION
Install 4,400 LF of 12-inch line and 3,150 LF of 16-inch line. Each pipeline
is for a different pressure zone. (375 H.G. Zone and 550 H.G. Zone).
PROJECT NEED
To meet the future demands of the area. Developer to pay 50% of the
cost.
TOTAL PROJECT COST: $990.000
Fiscal Year 1996-97
Fundlnd Source
Purpose
Amount
Operatina Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
50% MFC
Const/Eng
$495.000
COLLEGE4.96 Page 116
r
f 1 II t I II I ] [
CAPITAL PROJECT DESCRIPTION
D" RESERVOIR - PHASE II
Proj
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
Adjacent to the existing "D" Reservoir.
PROJECT DESCRIPTION
Construction of second phase improvements to this site include an
8.5 million gallon reservoir.
Phase II Funding:$3,984,500
$1,328,000
Replacement
MFC
PROJECT NEED
Additional reservoir capacity is required to serve the entire
southwestern quadrant and adjacent areas.
TOTAL PROJECT COST: $5,312,500
Fiscal Year 1996-97 1997-98
Fundlna Source
Purpose
Amount
operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
MFC
Construction
S5.312.500
D-RESER.96 Page 117
CAPITAL PROJECT DESCRIPTION
"D" RESERVOIR TO PALOMAR OAKS WAY
Proi
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
In easement between "D" Reservoir and Palomar Oaks Drive.
PROJECT DESCRIPTION
Install 3,300 LF of 16-inch line and 400-feet of 18-inch line.
(In 375 H.G. Zone)
PROJECT NEED
To meet the future demands of the area.
D RES 2.96
TOTAL PROJECT COST; $250.000
Fiscal Year 199647
Fundlna Source
Puroose iiiiimi
Amount ,„ „„„-„-„,„
Ooeratina Costs ,„-„-,„-,„„„
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006
MFC
,„„,,,„„.,„„ ,, , „ miiiDe4ifln/c<Nt#, ,.,„.,...,.,...„, „„
$250.000
2006*
Page 118
EiB
r i i J i j i i ii i
CAPITAL PROJECT DESCRIPTION
DAVIS AVENUE PIPELINE REPLACEMENT
Project Title
PROJECT LOCATION MAP
\
PROJECT LOCATION
Davis Avenue from Knowles Avenue to Buena Vista Way.
PROJECT DESCRIPTION
Replace 1,000 feet of 6-inch diameter steel pipe with 8-inch PVC.
PROJECT NEED
Need to replace the existing pipeline which has severe corrosion and
requires high maintenance.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$100.000
1996-97
Water Reol .
Design
$25.000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Water Repl.
Construction
$75.000
DAVISAVE.96 Page 119
CAPITAL PROJECT DESCRIPTION
EL CAMINO REAL CROSSING AT KELLY DRIVE
Project Title
PROJECT LOCATION MAP
\
PROJECT LOCATION
El Camino Real at Kelly Drive
PROJECT DESCRIPTION
Install 300 LF of 12" line
(In 490 H.G. Zone)
PROJECT NEED
To meet the future demands of the area
ECRCROSS.96
TOTAL PROJECT COST: $94.000
Fiscal Year 1996-97
Fundina Source
Purpose
Amount
Ooeratina Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006*
MFC
..,„„ ,„ , Const/End
$94.000
Page 120
4L J
n •;•n n i. j ii ii i i
CAPITAL PROJECT DESCRIPTION
EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH
PROJECT LOCATION MAP
PALOMAR
AIRPORT
Proi
ROJECT
ect Title
PROJECT LOCATION
El Camino Real - Palomar Airport South 7,000 LF.
PROJECT DESCRIPTION
Replace 20" steel water line in El Camino Real South 7,000 LF with a
20-inch new water line.
Previous Appropriation - $50,000
PROJECT NEED
Replacing old steel water line to avoid high maintenance costs and
extend pipeline to new Poinsettia Lane road alignment.
TOTAL PROJECT COST: $750.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Replacement
Construction
$700.000
Operatina Costs
ECRPARS0.96 Page 121
CAPITAL PROJECT DESCRIPTION
EL CAMINO REAL TRANSMISSION MAIN & PRESSURE REDUCING STATION IMPROVEMENTS
Project Title
PROJECT LOCATION MAP
ROJECT
SITE
PROJECT LOCATION
El Camino Real from Faraday Avenue north to Cougar Drive and
pressure reducing station north side of Faraday Avenue.
PROJECT DESCRIPTION
Construction of 1,500 feet of 24-inch diameter transmission main and
pressure reducing station.
PROJECT NEED
To complete transmission main replacement from Palomar Airport
Road to Hosp Way.
TOTAL PROJECT COST: $300.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
1997-98
Water Repl.
Design
$50.000
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
Water Repl .
Construction
$250.000
ZRTRANWm mm mm Page 122
CAPITAL PROJECT DESCRIPTION
EL FUERTE (ALGA ROAD TO POINSETTIA LANE)
Pro
PROJECT LOCATION MAP
act Title
PROJECT LOCATION
Future El Fuerte, Alga Road to Poinsettia Lane.
PROJECT DESCRIPTION
Install 5,050 LF of 30-inch line and a pressure regulating station.
(In 700 H.G. Zone)
PROJECT NEED
To meet the future demands of the area.
PROJECT FUNDING
TOTAL PROJECT COST: $1,335,750
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1997-98 1999-2000 2000-2001 2001-2006
MFC
Const/End:
$1.335.750
ELFUERTE.96 Page 123
CAPITAL PROJECT DESCRIPTION
EL FUERTE AVENUE (FARADAY TO MAERKLE RESERVOIR)
Pro
PROJECT LOCATION MAP
PROJEC
ect Title
PROJECT LOCATION
In portion of El Fuerte and easement northwesterly to Maerkle.
PROJECT DESCRIPTION
Install 8,800 LF of 16-inch and a pressure regulating station
(In 700 H.G. Zone)
PROJECT NEED
To meet the future demands of the area. Developer to pay 75% of the
cost.
TOTAL PROJECT COST: $330.000
Fiscal Year ;f 996-97
Fundlna Source , „„,,„„„„ „,.. „,„„
Purpose , ,, ..,. . . , , . ..
Amount .„„ n , ,
Ooeratina Costs , ,
PROJEpT .FUNDING
?997-9q ,199g-99 1999-2000 2000-2001 2001-2006 2006+
„., ,,„ ..„„..„ ..,, , ,.„,.„„ „, ,„ , . . ,, . , .... , ..,„., , ,..,, ..., fHFC , ,
..., „..,,. ,...,,,.. ,„ ....,, ..„.„...„ .,,, ., „,- .„, „„,,.,„„...„, , , „ Construction, ,
S330.000
ELFUERT2.96 Page 124
• • i j i I i j ci ri ri r i PI
PROJECT LOCATION MAP
r i n n n i; i r J LJ i
CAPITAL PROJECT DESCRIPTION
EL FUERTE AVENUE (NORTH OF LOKER)
i j i
Proj
PROJECT
SITE
ect Title
PROJECT LOCATION
El Fuerte Avenue between Loker north to future Faraday Avenue.
PROJECT DESCRIPTION
Install 2,300 LF of 16-inch line.
(In 700-550 H.G. Zone)
PROJECT NEED
To meet the future demands of the area. Developer to pay 75% of the
cost.
TOTAU PROJECT COST: $595,000
Fiscal Year 1996-97
Fundino Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006*
25% MFC
Const/Ena
$148.750
ELFUERT5.96 Page 125
CAPITAL PROJECT DESCRIPTION
EL FUERTE (POINSETTIA LANE TO PALOMAR AIRPORT ROAD)
PROJECT LOCATION MAP
Project Title
PROJECT LOCATION
Future El Fuerte from future Carrillo Way to Palomar Airport Road.
PROJECT DESCRIPTION
Install 4,100 LF of 24-inch line.
PROJECT NEED
To meet the future demands of the area.
TOTAL PROJECT COST: $820.000
Fiscal Year 1996-97
Fundina Source
Puroose
Amount ,, ,
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000] 2000-2001 2001-2006 2006*
MFC
Const/Ena
$820.000
ELFUERT4.96
II I J i 1 I 1 I J 1 J t 1 II
Page 126
II 11 II
f i i i • i i i i i
CAPITAL PROJECT DESCRIPTION
ELLERY AND "C" RESERVOIR RECOATING & REPAIR
Proj
PROJECT LOCATION MAP
BCt Title
PROJECT LOCATION
Ellery Tank located on Janis Way and "C" Tank is located east of future
College Boulevard.
PROJECT DESCRIPTION
Remove existing coating and recoat each tank and make necessary
repairs. Ellery Tank is 5 MG and "C" Tank is 1.5 MG.
Previous Appropriation - $340,000
PROJECT NEED
Existing coating are beyond useful life causing tank deterioration.
TOTAL PROJECT COST: $340.000
Ftecal Year 1996-97
Fundina Source
Purpose
Amount
Operattna Costs
PROJECT FUNDING
1997-98 1998-99 1999>2000 2000-2001 2001-2006 2006*
EU.ERY&C.96 Page 127
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
PROJECT
SITE
INTERSTATE 5 CROSSING
Project Title
PROJECT LOCATION
Interstate 5 freeway between Batiquitos Drive and Navigator Circle.
PROJECT DESCRIPTION
Install 1,250 LF of 16-inch line and 400 LF of 12-inch line.
PROJECT NEED
To meet the future demands of the area based on a previous study.
TOTAL PROJECT COST: $307,500
Fiscal Year 1996-97
Fundinq Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
MFC
Const/Eng
J307.500
[-5CROSS.96
I § II I J I J
Page 128
mm
ti i i ii ii
CAPITAL PROJECT DESCRIPTION
JEFFERSON STREET (PIP PICO TO MAY COMPANY)
Project Title
PROJECT LOCATION MAP
PROJECT
SITE
PROJECT LOCATION
Jefferson Street from Pio Pico to Marron Road.
PROJECT DESCRIPTION
Install 1,860 LF of 12-inch line.
PROJECT NEED
The existing 18" failed and has been abandoned.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating costs
PROJECT FUNDING
$267.378
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Water Red.
Design/Const
$267.375
JEFFSNST.96 Page 129
CAPITAL PROJECT DESCRIPTION
MAERKLE DAM LINING AND COVERING
PROJECT LOCATION MAP
FARADAY
Projact Title
PROJECT LOCATION
The project would occur at the site of Maerkle Dam.
PROJECT DESCRIPTION
Install a lining and covering at a lump sum of $7,800,000.
Previously Appropriated - $4,874,000
PROJECT NEED
The State Health Department is requesting the District to line and cover the
dam to protect against the elements.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$7.800.000
1996-97 1997-98
Water
Construction
$2.926.000
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
MAERKLE.96
I 1 ft J I J
Page 130
t-J LJi
PROJECT LOCATION MAP
•• r*i n ra m KJI •• r i
CAPITAL PROJECT DESCRIPTION
MAERKLE RESERVOIR TO EL CAMINO REAL
Project Title
PROJECT LOCATION
College Boulevard and 400' north of El Camino Real, beginning at
north and northeast direction to Maerkle Dam.
PROJECT DESCRIPTION
Install 8,500 LF of 33-inch waterline.
(In 490 H.G. Zone)
PROJECT NEED
To meet immediate and future demands of the District.
TOTAL PROJECT COST: $2.340.000
Fiscal Year 1996-97
Fundlna Source
Purpose
Amount
Ooeratina Costs
PROJECT
1997-98 1998-99
Replacement
Construction
$340.000
FUNDING
1999-2000 2000-2001 2001-2006 2006*
Replacement
Construction
$2.000.000
MAERKLE2.96 Page 131
CAPITAL PROJECT DESCRIPTION
MARRON ROAD (PRESSURE REGULATING STATION TO OCEANSIDE)
Proi
PROJECT LOCATION MAP
PROJECT
SITE
ect Title
PROJECT LOCATION
Matron Road from Avenida de Anita easterly 5,450 feet.
PROJECT DESCRIPTION
Install 5,450 LF of 14-inch line and two pressure regulating stations.
PROJECT NEED
TOTAL PROJECT COST: $600.000
Fiscal Year 1996-97 1997-98
Funding Source
Puroose
Amount
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
SO*/. MFC
Construction
$300.000
MARRONRD.96 Page 132
CAPITAL PROJECT DESCRIPTION
OCEANSIDE INTERTIE UPGRADE
Project Title
PROJECT LOCATION MAP
PROJECT
SITE
PROJECT LOCATION
El Camino Real near State Highway 78.
PROJECT DESCRIPTION
Make improvements to increase reliability of water system intertie
with City of Oceanside. System supplies 5 cfs of treated water to
Carlsbad. During emergencies and periods of water supply
curtailment, the Oceanside intertie provides backup.
PROJECT NEED
The system requires valve, pipe, and meter replacement.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
$75.000
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Water/Repl .
Design/Const.
$75.000
OS1DEINT.96
Page 133
PROJECT LOCATION MAP
CAPITAL PROJECT DESCRIPTION
PALOMAR AIRPORT (NORTH OF OWENS)
Project Title
PROJECT LOCATION
In Palomar Airport from Owens Place to Airport Road.
PROJECT DESCRIPTION
Install 625 LF of 12" line.
Previous Appropriation - $71,875
PROJECT NEED
To meet the future demands of the airport area and two-way feed.
TOTAL PROJECT COST: $71.825
Fiscal Year 1996-87
Funding Source
Purpose , - .
Amount
PROJECT FUNDING
1967-98 1998-99 1999-2000 2000-2001 2001-2006 2006*
Operating Costs
PALAIRPT.96
t J
Page 13«t
ii
n in ••n
PROJECT LOCATION MAP
CAPITAL PROJECT DESCRIPTION
POINSETTIALANE#18
Proi
'ROJECT
SITE
ect Title
PROJECT LOCATION
Poinsettia Lane from "D" Reservoir east 2,800 feet.
PROJECT DESCRIPTION
Install 2,800 LF of 12-inch line.
PROJECT NEED
To meet the future demands of the area. Developer to pay 75% of the
cost.
TOTAL PROJECT COST: $322.000
Fiscal Year 1996-07 1997-98
Funding Source
Puroose
Amount
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006
25% MFC
Const/Ena
$80.500
2006+
POINS418.96 Page 135
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
POINSETTIA - EL CAMINO REAL TO "D" RESERVOIR
Project Title
ROJECT
SITE
PROJECT LOCATION
Poinsettia Lane from El Camino Real to "D" Reservoir.
PROJECT DESCRIPTION
Install 5,550 LF of 30-inch line.
(In 550 H.G. Zone)
PROJECT NEED
To meet the future demands of the area. Developer to pay 50% of
the cost.
TOTAL PROJECT COST: $1,100.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
50* MFC
Construction
$555 , 000
POINSET2.96 Page 136
CAPITAL PROJECT DESCRIPTION
POINSETTIA LANE (EL FUERTE TO EL CAMINO REAL)
PROJECT LOCATION MAP
Pro ect Title
PROJECT LOCATION
Future Carrillo Way (from future El Fuerte to El Camino Real).
PROJECT DESCRIPTION
Install 7,250 LF of 30-inch line and a pressure regulating station.
(In 700-55- H.G. Zones)
PROJECT NEED
To meet the future demands of the area.
TOTAL PROJECT COST: $1.808.750
Fiscal Year 1996-37 1997-88
Fundlna Source .,. „,
Purpose „
Amount
Operating Costs , , M mlii Iin
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
MFC
Construction
$1.808.760
POINSET3.96 Page 137
CAPITAL PROJECT DESCRIPTION
POINSETTIA LANE (PASEO DEL NORTE TO CARLSBAD BOULEVARD)
PROJECT LOCATION MAP
PROJECT
SITE
Project Title
PROJECT LOCATION
Poinsettia Lane from Paseo del Norte to Carlsbad Boulevard.
PROJECT DESCRIPTION
Install 1,500 LF of 12-inch line.
(In 318 H.G. Zone)
Previously Appropriated $362,250
PROJECT NEED
To meet the future demands of the area. Locate pipeline in new bridge
crossing.
TOTAL PROJECT COST: $362.250
Fiscal Year 1996-97 1997-98
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2008 2006+
POINSLN2.96 Page 138
L J
CAPITAL PROJECT DESCRIPTION
PQINSETTIA LANE (TO THE 375 H.G. ZONE)
Project Title
t j i i
PROJECT LOCATION MAP
POINSETTU
IN.
PROJECT LOCATION
1. In future Poinsettia Lane between "D" Twin Tanks westerly to
Alga Road.
2. Between Poinsettia Lane and Camino De Los Ondas and Rose
Drive.
PROJECT DESCRIPTION
1.
2.
Install 1,760 LF of 24' water line.
Install 350 LF of 16" water line.
(In 375 H.G. Zone)
PROJECT NEED
To meet the demands to the area and to relocate existing water line
to Poinsettia Lane.
TOTAL PROJECT COST: $400.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
18* MFC/82* Reol
Const/Enq
$400.000
POINSET4.96 Page 139
CAPITAL PROJECT DESCRIPTION
POINSETTIA LANE (TO THE 550 H.G. ZONE)
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
In future Poinsettia Lane between D2 Twin Tanks westerly to Alga
Road at College Boulevard intersection. The second phase will be
between Poinsettia Lane and Camino De Los Ondas/Rose Drive.
PROJECT DESCRIPTION
Install 1,760 LF of 16-inch water line. The second phase will be
to install 350 LF of 12" water line.
(In 550 H.G. Zone)
PROJECT NEED
To meet the demands to the area and to relocate existing water line
to Poinsettia Lane.
TOTAL PROJECT COST: $326.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operatinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
18* MFC/82* ReDl .
Const/Enq
$326.000
POINSET5.?
I J
Page TfO
tm i J ii
n n r i t J ii 11 i
CAPITAL PROJECT DESCRIPTION
PRESSURE REGULATING STATION
Proj
PROJECT LOCATION MAP
LAKE
CALAVERA
ect Title
PROJECT LOCATION
Future intersection of Cannon Road and College Boulevard.
PROJECT DESCRIPTION
Install pressure regulating station.
SPECIAL NOTE:This project will take place when the existing
Cannon Reservoir is taken out of service.
(In 490-392 H.G. Zones)
PROJECT NEED
To meet the future demands of the area.
TOTAL PROJECT COST: $250.000
Fiscal Year 1996-97 1997>98
Fundlna Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006
MFC
Const/Ena
$250.000
2006*
PRESSREG.96 Page I«t1
CAPITAL PROJECT DESCRIPTION
PRESSURE REGULATING STATION PROJECT #19
PROJECT LOCATION MAP
Pro
ROJECT
SITE
ect Title
PROJECT LOCATION
In future Poinsettia Lane between "D" Reservoir and El Camino Real.
PROJECT DESCRIPTION
Install a pressure regulating station.
(In 550/384 Zones)
PROJECT NEED
To meet the future demands of the area.
TOTAL PROJECT COST: $250.000
PROJECT FUNDING
Fiscal Year
Funding Source
Purpose
Amount
Operating costs
1996-97 1997-98 1999-2000 2000-2001 2001-2006
MFC
Const/End
$250.000
2006*
PRSTAIK19.96
L J mm
Page 142
i
II ll 11 I J ii i
CAPITAL PROJECT DESCRIPTION
TRI-AGENCY PIPELINE EROSION PROTECTION
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
South of Calaveras Lake from city limits west to College Boulevard.
PROJECT DESCRIPTION
The tri-agency pipeline is the major transmission main to the north
portion of the City. At several locations, flood waters and stream
crossings have eroded the soil cover above the pipeline exposing the
pipeline to potential damage. The access road is also damaged
precluding access by maintenance personnel.
PROJECT NEED
To protect the pipeline from damage and provide access for
maintenance personnel.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
$150.000
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Water/Repl .
Design/Const.
$150.000
TRTAGNCY 96 Page H3
CAPITAL PROJECT DESCRIPTION
WATER CERTIFICATE OF PARTICIPATION (COP) PAYMENTS
Pro
PROJECT LOCATION MAP
N/A
ect Title
PROJECT LOCATION
Varies.
PROJECT DESCRIPTION
Past Water District improvements. Cost includes bond financing and
interest cost.
PROJECT NEED
Required to meet the Growth Management Standards and identified in
the Water Master Plan.
TOTAL PROJECT COST; $12.208.210
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
MFC/RepI
Debt/Repay
$1.524.823
1997-98
MFC/Reel
Debt/Repay
$1.524.982
PROJECT
1998-99
MFC/Real
Debt/Rebav
$1.525.123
FUNDING
1999-2000
MFC/ROD!
Debt/Repay
$1.524.772
2000-2001
MFC/RepI
Debt/Repay
$1,528.448
2001-2006
MFC/Reel
Debt/Repay
$4.580.062
2006*
WATERCOP.96 Page
Ill 1
r-i n •• ••••••
CAPITAL PROJECT DESCRIPTION
WATER RESOURCES MASTER PLAN
Proi
PROJECT LOCATION MAP
N/A
ect Title
PROJECT LOCATION
Not Applicable.
PROJECT DESCRIPTION
Prepare report to discuss developing alternative water resources including
groundwater development, acquifer storage and recovery,
stormwater harvesting, seawater desalination, etc.
Previously Appropriated - $200,000
PROJECT NEED
To develop supplemental water resources for water supply reliability
purposes.
TOTAL PROJECT COST; $200.000
Fiscal Year 1996-97 1997-98
Fundlna Source ..'...,., „ ,..„.,„.„.,,
Purpose ,„„ „„ mll , ,.„,„,„,.,
Amount ,,„ 1I1IMI „. ,.,„. , m ,... . Ml ,, , m
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
WTRREPT.96 Page 145
CAPITAL PROJECT DESCRIPTION
WATER SYSTEM INTERTIE CONNECTION
Proj
PROJECT LOCATION MAP
VARIOUS LOCATIONS THROUGHOUT THE CITY
act Title
PROJECT LOCATION
VID - Business Park Drive
Vallecitos Water District
OIK/enhain Water District
San Dieguito Water District
PROJECT DESCRIPTION
Construct pipeline system intertie with adjacent water agencies including
Vista Irrigation District, Vallecitos Water District,
Olivenhain Water District, and San Dieguito Water District.
PROJECT NEED
During emergencies these interties could supply water to the City and
also provide water back to the adjacent agencies.
TOTAL PROJECT COST; $400.000
Fiscal Year 1996-97
Fundlna Source m ,, ,
Purpose
Amount .,, ,,
Ooeratina Costs •„,,,,,,
1997-98
Water
Desian/Const
$200.000
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
Water
Desian/Const
$200.000
WTRINTER.96 Page H6
mm ii i i r J • i t M
.r '
RECLAIMED WATER PROJECTS
mm i i
CAPITAL PROJECT DESCRIPTION
INDUSTRIAL PARK SYSTEM - RECLAIMED WATER
Pro
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
Palomar Airport Road, Camino Vida Roble, El Camino Real.
PROJECT DESCRIPTION
Develop reclaimed water system to College Business Park, Carlsbad
Research Center, Carlsbad Airport Center and Olympic Resort.
PROJECT NEED
To supply reclaimed water for irrigation at existing industrial parks.
TOTAL. PROJECT COST: $1.000.000
Fiscal Year 1996-97
Fundlna Source
Puroose
Amount
Ooeratina Costs
1997-98
Water
Etesian
$100.000
PROJECT FUNDING
1998-99 1999*2000 2000-2001 2001-2006 2006+
Water
Desiart ,
$875.000
RCINDPRK.96 Page 147
CAPITAL PROJECT DESCRIPTION
RECLAIMED WATER MASTER PLAN
Project Title
PROJECT LOCATION MAP
(City Wide)
PROJECT LOCATION
City wide.
PROJECT DESCRIPTION
Update the City's Reclaimed Water Master Plan.
PROJECT NEED
To identify reclaimed water needs and ensure adequate funds will be
available for the construction of major water facilities.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
$50.000
;! 996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 20064-
Water
Planning
$50.000
RCLMSTPN.96
l_J
Page 148
• II II
ri r~i t ii ii ii
CAPITAL PROJECT DESCRIPTION
RECLAIMED WATER PUMP STATION UPGRADE
Proj
PROJECT LOCATION MAP
PROJECT
ect Title
PROJECT LOCATION
El Camino Real south of Palomar Airport Road.
PROJECT DESCRIPTION
Replace pumps with high efficiency vertical turbine pumps, install
variable speed control, construct permanent enclosure, and landscaping.
Previously Appropriated - $30,000
PROJECT NEED
Existing pumps are inefficient, pumps need to maintain level rather than
on/off control, permanent enclosure is needed to reduce vandalism and
maintenance, and landscaping will improve site aesthetics.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose „.„
Amount
Operating Costs
$250.000
1996-97 1997-98
Water
Construction
$220,000
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006*
RCSTNUPG.96 Page H9
CAPITAL PROJECT DESCRIPTION
RECOATING RECLAIMED WATER TANKS
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Intersection of Black Rail Road with future Poinsettia Lane.
PROJECT DESCRIPTION
Remove existing coal tar enamel and apply epoxy coating to two 1.25 MG
steel tank reservoirs.
PROJECT NEED
The existing coating is 20 years old. Recent inspection showed the coating
is delaminating from the steel.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$280.000
1996-97 1997-98
Water
Construction
$250.000
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
RECOATNK.96
mm L j i j
Page 150
mm 11 ii
r ^ • f '«- f i --f ».-•"•! i -I 4-1 a..--r ».-.. f T r t i
TRAFFIC SIGNAL PROJECTS
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNALS - ALGA ROAD
Project Title
r i in i i
PROJECT LOCATION MAP PROJECT LOCATION
On Alga Road at various intersections between Poinsettia Lane and
El Camino Real.
PROJECT DESCRIPTION
Construct traffic signals at the following intersections with Alga
Road:
1. Nightshade Road
2. Kestrol Drive
3. Tohee Lane
4. Black Rail Road
5. Blue Heron Road
6. Finch Lane
Previous Appropriation - $595,000
PROJECT NEED
Traffic signals will be installed when they are warranted.
TOTAL PROJECT COST: $595.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
ALGATSIG.96 Page 151
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - ALGA ROAD/BATIQUITOS DRIVE
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION^
PROJECT LOCATION
Alga Road and Batiquitos Drive.
PROJECT DESCRIPTION
Installation of a 5-phase, fully actuated traffic signal, including a Type
170 controller, 176 intersection control program, striping and signing,
and minor intersection improvements to construct the signal.
Previous Appropriation - $125,000 (Assessment District)
PROJECT NEED
Needed with the completion of Batiquitos Drive between Poinsettia
Lane and Alga Road. Alga Road is an arterial street expected to carry
large volumes of traffic.
PROJECT FUNDING
TOTAL PROJECT COST: $125,000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1998-99 1999-2000 2000-2001 2001-2006 2006+
ALGA BAT.96 Page 152
i j
r™i f i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNALS - ALGA ROAD/MELROSE DRIVE
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
Intersection of Alga Road and Melrose Drive.
PROJECT DESCRIPTION
Installation of an 8-phase, fully actuated traffic signal, including a
Type 170 controller, 176 intersection control program, signing and
striping.
PROJECT NEED
Needed in future when Melrose Drive is extended northerly of Alga
Road. Would be intersection of two high volume arterial streets.
TOTAL PROJECT COST: $110.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006ENDFIELD +
PFF
Construction
$110,000
ALGAMELR.96 Page 153
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - ALGA ROAD/POINSETTIA LANE
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
The intersection of College Boulevard/Alga Road and Poinsettia Lane.
PROJECT DESCRIPTION
Installation of an 8-phase, fully actuated traffic signal including a
Type 170 controller and a Type 176 intersection control program.
PROJECT NEED
Intersections of two arterial streets. Signal required when warrants
are met.
TOTAL PROJECT COST: $125,000
Fiscal Year 1996-97
Fundinq Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$125,000
ALGAPOIN.96 Page 154
L J
r i r i ft^i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CAMINO DE LOS COCHES/LA COSTA AVENUE
Project Title
t I I
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
Intersection of Camino de los Coches and La Costa Avenue.
PROJECT DESCRIPTION
Installation of a 4-phase, fully actuated traffic signal, including a Type
170 controller and 176 intersection control program.
PROJECT NEED
In the future, La Costa Avenue will be extended easterly to connect
with future Melrose Drive. This will be the intersection of two arterial
streets.
TOTAL PROJECT COST: $110.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$110.000
CAMI NODE.96 Page 155
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CANNON ROAD/AVENIDA ENCINAS
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
Intersection of Cannon Road and Avenida Encinas, immediately west
of Interstate 5.
PROJECT DESCRIPTION
Installation of a 5-phase, fully actuated traffic signal, including a Type
170 controller, 176 intersection control program and minor
intersection improvements.
PROJECT NEED
Needed in future when traffic signal warrants are met. Cannon Road
is a major arterial expected to carry large volumes of traffic.
TOTAL PROJECT COST: $110,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Ooeratinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$110,000
CANNON1.96 Page 156
EH F * r 1 I •
r i wm en m •» mm r i i a
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CANNON ROAD/COLLEGE BOULEVARD
Project Title
t i i i
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
Intersection of Cannon Road and College Boulevard.
PROJECT DESCRIPTION
Installation of an 8-phase, fully actuated traffic signal, including a
Type 170 controller and 176 intersection control program.
PROJECT NEED
Needed in future when both arterial streets are constructed.
TOTAL PROJECT COST: $125,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 • 2006+
PFF
Construction
$125,000
\ CANNON2.96 Page 157
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CANNON ROAD/FARADAY AVENUE
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
Intersection of Cannon Road and Faraday Avenue.
PROJECT DESCRIPTION
Installation of a 4-phase, fully actuated traffic signal, including a Type
170 controller and 176 intersection control program.
PROJECT NEED
Needed in future when both roads are constructed and warrants are
met. Cannon Road is an arterial street expected to carry large
volumes of traffic.
TOTAL PROJECT COST: $110.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 . 2006+
PFF
Construction
$110.000
CANNON3.96
Page 158
mm PI
i i r i 11 i J 11 i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CANNON ROAD/1-5
Project Title
PROJECT LOCATION MAP
IGNAL
LOCATION
PROJECT LOCATION
Intersection of Cannon Road with the on/off ramps of Interstate 5.
PROJECT DESCRIPTION
Installation of two (2) 4-phase, fully actuated signals including Type
170 controller and 176 intersection control program. Coordination
with CALTRANS will be required for the installation of these signals.
PROJECT NEED
As traffic volumes increase, signals will be needed to assign
right-of-way at the on/off ramps.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$200.000
1996-97
PFF
Design
$50,000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000^2001 2001-2006 2006+
PFF
Construction
$150,000
CANNON4.96 Page 159
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CANNON ROAD/PASEO DEL NORTE
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
Intersection of Cannon Road and Paseo Del Norte.
PROJECT DESCRIPTION
Installation of a 4-phase, fully actuated traffic signal, including Type
170 controller, 176 intersection control program and minor
intersection improvements.
PROJECT NEED
Traffic volumes on Cannon Road will increase when the road is
extended to El Camino Real. Signal will be needed in future when
warrants are met.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
$110.000
1996-97
PFF
Design/Const
$60.000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000 -2001 2001-2006 2006+
PFF
Construction
$50,000
CANNONS.96
f 1 II 1 1 f 1
Page 160
r i r i
E 1 I J L__J t I ft 1 t
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CARLSBAD BOULEVARD/AVENIDA ENCINAS
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION,
PROJECT LOCATION
Intersection of Carlsbad Boulevard and Avenida Encinas.
PROJECT DESCRIPTION
Installation of a 4-phase, fully actuated traffic signal, including a Type
170 controller and 176 intersection control program.
PROJECT NEED
Future intersection of two arterial streets.
TOTAL PROJECT COST: $110.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$110,000
CBADAVEN.96 Page 161
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CARLSBAD VILLAGE DRIVE/TAMARACK AVENUE
Pro
PROJECT LOCATION MAP
SIGNAL
LOCATION
ect Title
PROJECT LOCATION
Intersection of Carlsbad Village Drive and Tamarack Avenue.
PROJECT DESCRIPTION
Installation of an 8-phase, fully actuated traffic signal, including a Type 170
controller, 176 intersection control program, signing and striping.
Previously Appropriated - $110,000
PROJECT NEED
When signal warrants are met, the signal will replace the existing 4-way
stop control.
CVDTAMAR.96
t J I J Lai 1111 r~t * i
Page 162
i *
&M-;ffi^^^
::«^^MWW I*
CA ail « Hi
MffW «u' " -* " sf^MHKSfmfVSffmnm•lff:"W»«it'! auHC^aai- V;w;J
F 1 f 1 L J 1 I
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - COLLEGE BOULEVARD/ASTON AVENUE
Proj
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
Intersection of College Boulevard and Aston Avenue.
PROJECT DESCRIPTION
Installation of an 8-phase, fully actuated traffic signal, including a Type 170
controller, type 200SA intersection control program, striping and signing.
PROJECT NEED
Caltrans traffic signal warrants have been met.
TOTAL PROJECT COST; $5.000
Fiscal Year 1996-9TT
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006
GCC . , ...
Design • , ,„..., ...,.,,
$5.000
2006+
CB ASTON.96 Page 163
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - COLLEGE BOULEVARD/CARLSBAD VILLAGE DRIVE
Project Title
PROJECT LOCATION MAP
IGNAL
LOCATION
PROJECT LOCATION
Intersection of College Boulevard and Carlsbad Village Drive.
PROJECT DESCRIPTION
Installation of an 8-phase, fully actuated traffic signal, including a
Type 170 controller and 176 intersection control program.
PROJECT NEED
Future intersection of two arterial streets.
TOTAL PROJECT COST: $110,000
Fiscal Year 1996-97 1997-98
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$110,000
$23.750
COL CVD.96
L J mm ii ii r i
Page 16<t
i "
II II I J II II I
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - COLLEGE BOULEVARD AND EL CAMINO REAL
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
At the intersection of the above named streets.
PROJECT DESCRIPTION
Add an eastbound dual left-turn phase.
Widen intersection to include east leg.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $115.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$115.000
COLL ECR.96 Page 165
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - COLLEGE BOULEVARD/LAKE CALAVERA
Project Title
PROJECT LOCATION MAP
LAKE
t—-^ CALAVERA
PROJECT LOCATION
Intersection of College Boulevard and Lake Calavera.
PROJECT DESCRIPTION
Installation of a 4-phase, fully actuated traffic signal, including a Type
170 controller and 176 intersection control program.
PROJECT NEED
Future construction of a high volume arterial street and collector road.
TOTAL PROJECT COST: $100,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$100,000
COLLKCAL.96 Page 166
r i r
El 11 I J I I 11
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - EL CAMINO REAL/CALLE BARCELONA
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Intersection of El Camino Real and Calle Barcelona.
PROJECT DESCRIPTION
Installation of a 4-phase, fully actuated traffic signal, including a Type
170 controller and 176 intersection control program and minor
intersection improvements.
PROJECT NEED
Required when Calle Barcelona is constructed and signal warrants are
met.
TOTAL PROJECT COST: $110,000
Fiscal Year 1996-97
Fundinq Source
Purpose
Amount
Operatinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$110.000
ECR1.96 Page 167
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - EL CAMINO REAL/CANNON ROAD
PROJECT LOCATION MAP
SIGNAL
LOCATION
ECR2.96
Proiiset Title
PROJECT LOCATION
Intersection of El Camirto Real and Cannon Road.
PROJECT DESCRIPTION - Project No. 3184
Installation of an 8-phase, fully actuated traffic signal, including a Type 170
controller and 176 intersection control program.
PROJECT NEED
After completion of Cannon Road, this will be the intersection of two high
volume arterial streets.
im»**<m.k>li.m J «» :te^ss « i
;P^I*C<^Wi»i: i"l I1K ~'bi:J 5 rWil
1 ""' ' ""• •"-' ; " ' '='-:c.~'". »,:,:», ,-,»
iM : ». aae „ .«..., •> .
£S ^ 5
'• ••• -'•'•'-'•" 'ff "'••'• ••••••'•••-•• '••xxiimxrtm xmw ;^K^:K,Sfiifx^mtf^ -,»C:.:,,, •,.,,., ,.'.,r::.::
*" ^ !:^^^! ^ ^^^ ™ - -^
Page 168
ii ri r^-i
II II 11 I 1 I 1 i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - EL CAMINO REAL/OLIVENHAIN ROAD
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION!
PROJECT LOCATION
Intersection of El Camino Real and Olivenhain Road.
PROJECT DESCRIPTION
Upgrade existing traffic signal with new poles and mast arms, Type 170
controller, 176 intersection control program, minor intersection
improvements, signing and striping.
Previous Appropriation - $125,000
PROJECT NEED
Intersection of two arterial streets that needs new hardware to meet future
widened roadway configuration.
TOTAL PROJECT COST: $125.000
Fiscal Year 1996-97 1997«88
Fundlna Source
Puroos* ,„-,,-, , , , , - , ,- ,
Amount „ . , m
ODeratina Costs
PROJECT FUNDING
1998-99 1999.2000 2000-2001 2001-2006 2006+
ECR4.96 Page 169
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - EL CAMINO REAL/POINSETTIA LANE
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Intersection of El Camino Real and Poinsettia Lane.
PROJECT DESCRIPTION
Installation of an 8-phase, fully actuated traffic signal, including a
Type 170 controller and 176 intersection control program.
PROJECT NEED
Intersection of two high volume arterial streets once Poinsettia Lane
is constructed and signal warrants are met.
TOTAL PROJECT COST: $125.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$125,000
ECR3.96
I J t J I J U r"i
Page 170
n r i r
II II I 1
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - FARADAY AVENUE AND ORION STREET
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
At the intersection of the above named streets.
PROJECT DESCRIPTION
Install a 4-phase fully actuated traffic signal including a Type 170
controller and Type 176 intersection control program.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $100.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Construction
$100,000
FARAORI0.96 Page 171
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - MELROSE DRIVE/LA COSTA AVENUE
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
Intersection of Melrose Drive and La Costa Avenue.
PROJECT DESCRIPTION
Installation of a 4-phase, fully actuated traffic signal, including a Type
170 controller and 176 intersection control program.
PROJECT NEED
Intersection of two arterial streets expected to carry high traffic.
TOTAL PROJECT COST: $110,000
Fiscal Year 1996-97 1997-98
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
mo, ooo
MELROSE.96
Page 172
f j i i i j ii n f i f i ii ii r i - i
r i 11 ii i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - RANCHO SANTA FE ROAD/MELROSE DRIVE (SOUTH)
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Intersection of Rancho Santa Fe Road and future Melrose Drive
(South).
PROJECT DESCRIPTION
Installation of a 4-phase, fully actuated traffic signal, including a Type
170 controller and 176 intersection control program.
PROJECT NEED
Future intersection of two high volume arterial streets.
TOTAL PROJECT COST: $110,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$110,000
RSFMELR0.96 Page
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - PALOMAR AIRPORT ROAD/MELROSE DRIVE
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
Intersection of Palomar Airport Road and Melrose Drive.
PROJECT DESCRIPTION
Installation of an 8-phase, fully actuated traffic signal, including a
Type 170 controller and 176 intersection control program.
PROJECT NEED
Future intersection of two high volume arterial streets.
TOTAL PROJECT COST: $125,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$125,000
PARMELR0.96
i i i i i i mm i i r-t ri r
Page
I
I J 11 II 11 II I
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - PALQMAR AIRPORT ROAD/HIDDEN VALLEY ROAD
Project Title
PROJECT LOCATION MAP
AGUA
HEDIONDA
LAGOON
SIGNAL
LOCATION/
PROJECT LOCATION
Intersection of Palomar Airport Road and Hidden Valley Road.
PROJECT DESCRIPTION
Installation of a 4-phase, fully actuated traffic signal, including a Type
170 controller and 176 intersection control program.
PROJECT NEED
Future intersection of two arterial streets.
TOTAL PROJECT COST: $125.000
Fiscal Year 1996-97
Fundinq Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$125.000
PARHIDDE.96 Page 175
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - PASEO DEL NORTE/CAMINO DE LAS ONDAS
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
Intersection of Paseo Del Norte and Camino De Las Ondas.
PROJECT DESCRIPTION - Project No. 3427
Installation of an 8-phase, fully actuated traffic signal, including a
Type 170 controller and 176 intersection control program, minor
intersection improvements, signing and striping.
Previous Appropriation - $110,000
PROJECT NEED
Signal warrants may be met at this intersection in the future. Paseo
Del Norte is an arterial street and Camino De Las Ondas will serve as
a collector road.
PROJECT FUNDING
TOTAL PROJECT COST: $110,000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1997-98 1999-2000 2000-2001 2001-2006 2006+
PASEOCAM.96
i*
Page 176
t j i 1 ii i J i J i J i a i i r i r i r i ' i i
I 1 I J I 1 I 1 I I i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - POINSETTIA LANE/EL FUERTE STREET
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Intersection of Poinsettia Lane and El Fuerte Street.
PROJECT DESCRIPTION
Installation of an 8-phase, fully actuated traffic signal, including a
Type 170 controller and 176 intersection control program.
PROJECT NEED
Intersection of two arterial streets to be constructed in the future.
TOTAL PROJECT COST: $125.000
Fiscal Year 1996-97
Fundinq Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$125.000
POINSET1.96 Page 177
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - POINSETTIA LANE/MELROSE DRIVE
Project Title
PROJECT LOCATION MAP
IGNAL
.OCATION
PROJECT LOCATION
Intersection of Poinsettia Lane and Melrose Drive.
PROJECT DESCRIPTION
Installation of a 4-phase, fully actuated traffic signal, including a Type
170 controller and 176 intersection control program.
PROJECT NEED
Intersection of two arterial streets to be constructed in the future.
TOTAL PROJECT COST: $125.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$125,000
POINMELR.96
mm ii t i-...i t M i i r~i r~i
Page 178
§ i ii '
II I J I J I J I i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - POINSETTIA LANE/BATIQUITOS DRIVE
PROJECT LOCATION MAP
Pro
SIGNAL
LOCATION
ect Title
PROJECT LOCATION
Intersection of Poinsettia Lane and Batiquitos Drive.
PROJECT DESCRIPTION
Installation of a 5-phase, fully actuated traffic signal, including a Type 170
controller and 176 intersection control program.
Previously Appropriated - $110,000 (PFF)
PROJECT NEED
Traffic is expected to increase in this vicinity. When warrants are met, a
traffic signal will be necessary.
TOTAL PROJECT COST: S11 0.000
Fiscal Year 1996-OT
Fundlna Soured
Purpose
Amount
Operating Costs .,„.__,. ,
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 20064;
$4.750 U.750 $4.750 $4.750 (19.000
POINSBAT.96 Page 179
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - PQINSETTIA LANE/PASEO DEL NORTE
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
The intersection of Poinsettia Lane/Paseo del Norte.
PROJECT DESCRIPTION Project No. 3362
Installation of an 8-phase, fully actuated traffic signal including a
Type 170 controller and a Type 176 intersection control program.
Previous Appropriation - $125,000 (PFF)
PROJECT NEED
*
Intersections of two arterial streets. Signal required when warrants
are met.
PROJECT FUNDING
TOTAL PROJECT COST: $125.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1998-99 1999-2000 2000-2001 2001-2006 2006+
POINTSIG.96
t a t i
Page 180
r i r
mm ra ••E 3 t 1 II I J II
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - RANCHO SANTA FE ROAD/QUESTHAVEN ROAD
Proj
PROJECT LOCATION MAP
act Title
PROJECT LOCATION
Intersection of Rancho Santa Fe Road and Questhaven Road.
PROJECT DESCRIPTION - Project No. 3406
Installation of a 3-phase fully actuated traffic signal, including a type 170
controller, 200 SA intersection control program, striping and signing,
flashing beacons and intersection improvements to construct the signal.
The City of San Marcos is responsible for 1/3 share of this signal. Staff will
pursue a cost sharing agreement with the City of San Marcos.
Previous Appropriation - $125,000 (GCC)
PROJECT NEED
Intersection of two arterial roadways. Rancho Santa Fe Road is classified
as a prime arterial and Questhaven Road is classified as a major arterial.
TOTAL PROJECT COST: $125.000
Fiscal Year 1996-37
Fundlna Source ,
Purpose „,. ,
PROMOTE UNPINS
1*97-88 1998-99 1999-2000 2000-2001 2001-2006 2006*
Amount ....„„ ,,
Ooeratina Costs ,„ tf.QM $5.000 $5.000 $5.000 $5.000 $5.000 $5.000
RSFQUEST.96 Page 181
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - TAMARACK AVENUE/GARFIELD STREET
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATIO
PROJECT LOCATION
Intersection of Tamarack Avenue and Garfield Street.
PROJECT DESCRIPTION
Installation of a 2-phase, fully actuated traffic signal, including a Type
170 controller, 176 intersection control program, minor intersection
improvements, signing and striping.
PROJECT NEED
As traffic volumes increase in the beach area in the future, a signal
will be necessary at this location once signal warrants are met.
TAMGAR.96
II II II f 1
Page 182
i » i
TOTAL PROJECT COST: $110,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$110,000
mm mm m a ES t i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - TAMARACK AVENUE/HIGHLAND DRIVE
Project Title
I .1 i ! i I I
PROJECT LOCATION MAP
'SIGNAL
;ox LOCATION
PROJECT LOCATION
Intersection of Tamarack Avenue and Highland Drive.
PROJECT DESCRIPTION
Installation of a 2-phase, fully actuated traffic signal, including a Type
170 controller, 176 intersection control program, minor intersection
improvements, signing and striping.
PROJECT NEED
Existing 4-way stop controlled intersection on the route of two
schools. When warrants are met, a signal will be necessary.
TOTAL PROJECT COST: $110.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$110.000
$23.750
TAMAHIGH.96 Page 183
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CAMINO VIDA ROBLE/YARROW DRIVE
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION;
PROJECT LOCATION
Intersection of Camino Vida Roble and Yarrow Drive.
PROJECT DESCRIPTION
Installation of a 2-phase, fully actuated traffic signal, including a Type
170 controller, 176 intersection control program, minor intersection
improvements, signing and striping.
PROJECT NEED
Traffic volumes are increasing in this industrial area. When warrants
are met, a signal will be necessary to assign right-of-way.
TOTAL PROJECT COST: $100,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$100,000
CAMINOYA.96
L«J LJI I Ji
Page 184
r n •• ii
v r -* f * r "i ' f " i - f i V f ^ - f r i i . *
STREET PROJECTS
1..J L J L 1 I I I 1
CAPITAL PROJECT DESCRIPTION
AVENIDA ENCINAS WIDENING
Proi
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
South of Palomar Airport Road adjacent to the AT&SF Railway property.
PROJECT DESCRIPTION
Widen street on the west side to secondary arterial standards. Construct
curb and gutter, base and asphalt paving.
PROJECT NEED
Widen street to secondary arterial standards to provide adequate capacity
for future traffic.
TOTAL PROJECT COST: $870.000
Fiscal Year 1996-97 1997-98
Fundlna Source
Purpose
Amount ,, , „
Operating Costs ,,,„, „ , , ,,.,„.,
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
,.., , .„ „ . Construction m ri ,
$870.000
AVENIDA.96 Page 185
CAPITAL PROJECT DESCRIPTION
BICYCLE MASTER PLAN
PROJECT LOCATION MAP
N/A
BICYCLE.96
Project Title
PROJECT LOCATION
N/A
PROJECT DESCRIPTION - Project No. 3453
To study the City's bicycle needs and to develop a citywide bicycle network
which will tie into regional bicycle paths and also with the City's Trails
System. Construction of certain bicycle routes allows compliance with
requirements of the Federal Clean Air Act.
Previous Appropriation - $50,000 (TDA)
PROJECT NEED
In order to be eligible for certain funding sources, cities must have an
adopted Bicycle Plan.
Page 186
f J I J III J i J 11 ii it ii r i
TOTAL PROJECT COST: $50.000
Fiscal Year 1996-97 1997-98
Funding Source
Purpose . . „. . , .,„
Amount „„„,.„•„,..„ , ,
Ooeratlna Costs ..,.,.,„...,,,....„ , ,...,
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
c 3 i J titJ
CAPITAL PROJECT DESCRIPTION
CANNON ROAD
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
From Lego Drive to Faraday Avenue along the south side of Agua
Hedionda Lagoon.
PROJECT DESCRIPTION - Project No. 3184
Construct a four-lane major arterial including a 450-foot long bridge across
Macario Canyon. Work includes grading, drainage, curb ana gutter, paving,
raised landscaped median, sidewalks and streetlights as well as a 450-foot
long, five span, prestressed concrete bridge. The funding source is a
combination of TransNet Highway funds identified for the Highway 78 corridor,
a Bridge and Thoroughfare District as identified in an Engineering Department
report dated December 11,1995 and frontage improvements required as part
of the development of Kelly Ranch.
Developer contribution expected to be $1,332,000.
Previous Appropriation: $650,000 TransNet Highway
$412,137 Assessment District
$65,000 Bridge & Thoroughfare District
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Circulation Element of the General Plan.
PROJECT FUNDING
TOTAL PROJECT COST: $10.135.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
CFD/TransNet/BTDJPrlv CFtyrransNeUBTPffriv CFD/TransNet/BTD<Priv
Dcsian/Const Construction Construction
$1.509.000 $1.301.000 $6.675.000
CANNONRD.96 Page 187
CAPITAL PROJECT DESCRIPTION
CANNON ROAD AND 1-5
Project Title
PROJECT LOCATION MAP
w
Iccw c
PROJECT LOCATION
The intersection of the above named streets.
PROJECT DESCRIPTION - Project No. 3438
Widening of all four freeway ramps, restriping of Cannon Road under the
bridge and construction of traffic signals at freeway ramp intersections at
Cannon Road.
Previous Appropriation - $175,000
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $2.250.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
CFD#1
Design/Construct
$500.000
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIP
Construction
$1,575.000
CANNONI5.96 Page 188
II 1J 11 II II 11 II t J)i i mm im t i i i
L.J I 1 L J I J I
189
CAPITAL PROJECT DESCRIPTION
CANNON ROAD WIDENING
Project Title
PROJECT LOCATION MAP
CANNON ROAD
^V11
11 1\ ,\ 11 1
I-
oz
,-Jw
ous
PROJECT LOCATION
From Interstate 5 northbound ramps to Paseo del Norte.
PROJECT DESCRIPTION - Project No. 3437
Add one additional westbound lane.
Construct paving, base, median curb, curb & gutter, and sidewalk.
Reconstruct median and install dual northbound left-turn lanes.
Previously Appropriated - $100,000 (TIP)
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $435.000
Fiscal Year 1996-97
Funding Source
Purpose , , , mi „
Amount ,
Ooeratina Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 , 2006+
TIP
Construction
$335.000
CANNWIDE.96
I J 11
Page 190
I 1 I I
t 1 I J t I t 1
CAPITAL PROJECT DESCRIPTION
CARLSBAD BOULEVARD AND CANNON ROAD WIDENING
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Carlsbad Boulevard from Manzano Drive to Cannon Road. Cannon
Road from Carlsbad Boulevard to AT&SF railroad tracks.
PROJECT DESCRIPTION
Widen Carlsbad Boulevard from two lanes to four lanes with a center
raised median (major arterial). Construct pavement, curb and gutter,
stamped concrete and landscaping. Widen Cannon Road from two
lanes to four lanes with a center raised median. Construct pavement,
curb and gutter, stamped concrete and landscaping.
A planning study was initiated in 1992 to determine alignment
alternatives and investigate property access problems.
PROJECT NEED
Required to meet Growth Management Standards and the Circulation
Element of the General Plan.
TOTAL PROJECT COST: $2.000.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operatinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Construction
$2.000,000
CBADWIDE.96 Page 191
CAPITAL PROJECT DESCRIPTION
CARLSBAD BOULEVARD MEDIAN
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
From Tamarack Avenue to Pine Avenue.
PROJECT DESCRIPTION - Project No. 3444
Construct raised, landscaped median. Work includes concrete curb,
landscaping, irrigation and colored, stamped concrete.
Previous Appropriation - $125,000
PROJECT NEED
The median is needed to bring this section of Carlsbad Boulevard up
to City Standards for a major arterial.
TOTAL PROJECT COST: $1,250,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Construction
$1,125,000
CBMEDIAN.96
i j mm
Page 192
I J I i
ri • i t^i i^i •—i L J i
CAPITAL PROJECT DESCRIPTION
CARLSBAD BOULEVARD SHORE PROTECTION
Project Title
t i l
PROJECT LOCATION MAP
PROJECT
PROJECT LOCATION
On Carlsbad Boulevard at the Agua Hedionda Lagoon.
PROJECT DESCRIPTION - Project No. 3307
For the design and permitting of a seawall adjacent to Carlsbad Boulevard
to protect the roadway from impacts created by excessive storms or high
wave action on the Pacific Ocean.
Previous Appropriations $800,000 (GCC)
$280,000 (State Grant)
PROJECT NEED
To protect Carlsbad Boulevard from potential damage due to wave action
from storms or high waves on the Pacific Ocean.
TOTAL PROJECT C<
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
>ST: $4.409.000
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Fed/State
Construction
$3.335.000 ,
SHORPROT.96 Page 193
CAPITAL PROJECT DESCRIPTION
CARLSBAD VILLAGE DRIVE WIDENING
Proi
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
From 200 feet east of Pontiac Drive to 200 feet east of Victoria Street.
PROJECT DESCRIPTION
Widen street to full secondary arterial standards; street is currently
only half-width. Construct curb & gutter, sidewalk, streetlights, median
curb, base and asphalt pavement.
A special feature will be a split-level road with a median just north of
Victoria Street in order to save existing Eucalyptus trees which will
remain in the median.
PROJECT NEED
Required to meet Growth Management Standards and the Circulation
Element of the General Plan.
TOTAL PROJECT COST: $1,260,000
Fiscal Year 1996-97
Funding Source
Purpose ,„ ,„•-,„••„•„••,„
Amount
Ooeratina Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
„„..,„,..„,„„ ,...„,„ ,,...,,„....„,..,.„„....,, , „....„,...„,.,..„,..,„.,„ ,„..,, , „ .., , , ....,, ,, . Deslan/Cojist r
$1,260.000
CVDWIDEN.96
L J
Page 194
II 11
r i r^ ft^i
CAPITAL PROJECT DESCRIPTION
CHESTNUT AVENUE AND MONROE STREET UNDERGROUND UTILITY DISTRICT NO. 16
Pro
PROJECT LOCATION MAP
act Title
PROJECT LOCATION
Monroe Street from Chestnut Avenue to mid-block south of Carlsbad
Village Drive and Chestnut Avenue from Valley Street to Monroe Street.
PROJECT DESCRIPTION
Place all overhead utilities underground, including electric, telephone, and
cable television lines. Work includes trenching, placing conduit and cable,
restoring surface, and removal of existing poles and all overhead lines.
Work also includes installation of street lighting system and removal of
pole lights.
Funding Sources:
GCC
SDG&E Installation
$150,000 (for street luminaires)
$850,000 (for undergrounding)
PROJECT NEED
This project is identified on the City Council's adopted Underground Priority
List.
TOTAL PROJECT COST;
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT BUNDING
$1.000.000
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
SDGE/GCC
Desiqn/Const
$150.000
UUD 16.96 Page 195
CAPITAL PROJECT DESCRIPTION
EL CAMINO REAL AND CANNON ROAD
Project Title
PROJECT LOCATION MAP
CANNON RD.
PROJECT LOCATION
At the intersection of the above named streets.
PROJECT DESCRIPTION - Project No. 3184
Construct a southbound right-turn lane.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $130. OOP
Fiscal Year 1996-97
Fundinq Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Design/Const.
$130.000
ECRCANON.96
I J K3I
Page 196
11 I
J Li 11 II I i
CAPITAL PROJECT DESCRIPTION
EL CAMINO REAL MEDIANS
Pro
PROJECT LOCATION MAP
act Title
PROJECT LOCATION
At various locations along El Camino Real between the north and south
City boundaries.
PROJECT DESCRIPTION
Construct raised, landscaped medians at various places where no
developer will be obligated to do so as a condition of a private
development.
Work includes median curb, stamped concrete paving, irrigation and
landscaping.
PROJECT NEED
Raised landscaped medians are required on prime arterials for vehicular
safety and to meet City standards.
TOTAL PROJECT COST: $1,700,000
FISC«I YMr 1996-97
Fundlmi Source
Purpose
Amount
Operating costs
PROJECT FUNDING
1997-S8 1998-99 1999-2000 2000-2001
PFF
,-, , , „ , , u „, Destan .
$100.000
2001-2006
PFF
Construction
$1.600.000
2006*
ECRMDIAN.96 Page 197
CAPITAL PROJECT DESCRIPTION
EL CAMINO REAL WIDENING (LA COSTA AVENUE TO ARENAL ROAD)
Proj
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
From La Costa Avenue to Arena! Road.
PROJECT DESCRIPTION
Add the southbound lane for a length of approximately 600 ft. to widen the
street to full prime arterial standards. Construct curb & gutter, sidewalk,
base, and asphalt pavement and streetlights.
PROJECT NEED
To complete widening to prime arterial standards where no developers are
likely to develop and to improve the road capacity.
;$iinW;-:^^
fl«^^^^^^
•£:'! .' : " :•.''• :::v;:::':^^:::::'-:S;.?:::;:::i":;* .:.':'-:::K.,::•:, ; -•: v':tfK. x:x4::-:-:::::::::::i::.v::-;:-x::::;:iH:*}4:j:iS:S:::S:iJ;.:::::::'-:.:4::: :.>;:;
:-VW:--::::;«;?l;?: Iss&ssssss mmw*± i*^m^mmmwmmmmmms^xm
vVWS^•:-::.m^mtMfm:;Mw^!MSf&
ill "~ "'^ii^i;ii:i;:ii^iiiiiiiilliiii
S;S*ss
ECRLACOS.96
KM K.JI KJ ta II r i
Page 198
r i r i
ri r i n K? r i c j E~i 1 3 i
CAPITAL PROJECT DESCRIPTION
EL CAMINO REAL WIDENING (TAMARACK AVENUE TO CHESTNUT AVENUE)
Project Title
PROJECT LOCATION MAP
PROJECT
PROJECT
PROJECT LOCATION
Portions of El Camino Real from Tamarack Avenue to Chestnut
Avenue.
PROJECT DESCRIPTION - Project No. 3327
Add the outside lane to widen street to full prime arterial standards.
Widen west side approximately 1200 ft. in length and east side
approximately 600 ft. in length. Construct curb & gutter, sidewalk,
base, and asphalt pavement and streetlights.
Previous Appropriation - $192,000
PROJECT NEED
To complete widening to prime arterial standards where no
developers are likely to develop and to improve the road capacity.
TOTAL PROJECT COST: $1,502,000
Fiscal Year 1996-97
Funding Source
Pur-Dose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Construction
$1.310.000
ECRWIDE2.96 Page 199
CAPITAL PROJECT DESCRIPTION
EL CAMINO REAL AND CAMINO VIDA ROBLE
Project Title
PROJECT LOCATION MAP
CAMINO VIDA ROBLE
y^ _ *
-^T^ ~±
S
\
\
\}
^ m
o m5 M^i3 VF
W 'clV
PROJECT LOCATION
At the intersection of the above named streets.
PROJECT DESCRIPTION
Construct dual left-turn lanes and modify traffic signal.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $320,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Construction
$320,000
ECRCAMIN.96
II
Page 200
J i 1 II
mm i i t j
CAPITAL PROJECT DESCRIPTION
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE
Project Title
1 I 1
PROJECT LOCATION MAP
CARLSBAD VILLAGE DR.
TT
PROJECT LOCATION
At the intersection of the above named streets.
PROJECT DESCRIPTION
Construct northbound and southbound dual left-turn lanes on El
Camino Real.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $320.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Construction
$320,000
ECRCVDR.96 Page 201
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
EL CAMINO REAL AND FARADAY AVENUE
Project Title
FARADAY AVE.
PROJECT LOCATION
The intersection of El Camino Real & Faraday Avenue.
PROJECT DESCRIPTION
Intersection improvements which include adding three exclusive right
turns (southbound, eastbound and westbound).
Construct curb and gutter, asphalt pavement, sidewalk and traffic
islands.
Additional right-of-way will be required.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $710.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Construction
$710.000
ECRFARAD.96 Page 202
I 1 I J f 1 I J [ J • i i j i J i J ii r i r
t J t 1 I J I J l i I
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
FARADAY AVENUE
Project Title
PROJECT LOCATION
From future Cannon Road through the future Veteran's Memorial Park
to the boundary of the Carlsbad Research Center development.
PROJECT DESCRIPTION
Construct full improvements to controlled collector standards. Work
includes grading, curb and gutter, pavement, sidewalks and
streetlights.
This project will also provide access to Veteran's Memorial Park.
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Circulation Element of the General Plan.
TOTAL PROJECT COST: $3.500,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
CFD
Design/Const.
$3,500,000
FARADAY.96 Page 203
CAPITAL PROJECT DESCRIPTION
HIDDEN VALLEY ROAD
Project Title
PROJECT LOCATION MAP
PROJECT
PROJECT LOCATION
East of Paseo del Norte from Camino de las Ondas to the north end of
the Alta Mira Park property.
PROJECT DESCRIPTION - Project No. 3409
Construct full street improvements to collector standards. Work
includes grading, curb and gutter, base and pavement, sidewalks and
streetlights.
City will advance funds for road construction concurrent with park
development and will be reimbursed later by developers.
Previous Appropriations - $630,000
$120,000
GCC
TransNet Local
PROJECT NEED
Required for access to Alta Mira Park.
TOTAL PROJECT COST: $750,000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
HIDNVALL.96
IJI I J I J [ J t J i J l_J L J
Page 204
tm i
E"l C~l B!9 El •• •• Ell L J L J I J I I
CAPITAL PROJECT DESCRIPTION
LA COSTA AVENUE WIDENING
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
From Interstate 5 northbound ramps along the south side of
Batiquitos Lagoon to El Camino Real.
PROJECT DESCRIPTION - Project No. 321 5
Widen La Costa Avenue to a four-lane major arterial for a distance of
approximately 7,500 feet. Construct new asphalt pavement, curb &
gutter, sidewalks, median and street lighting.
Previous Appropriation - $1,314,000 (CFD)
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $7,314,000
Fiscal Year 1996-97
Fundina Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
CFO
Construction
$6.000.000
LACOST1.96 Page 205
CAPITAL PROJECT DESCRIPTION
LOCAL STREET/SIDEWALK UPGRADE PROGRAM
Proi
PROJECT LOCATION MAP
VARIOUS LOCATIONS THROUGHOUT THE CITY BASED ON
THE SIDEWALK INVENTORY REPORT
ect Title
PROJECT LOCATION
Various existing local and arterial streets throughout the City as shown in
the Sidewalk Inventory Report. Generally, all areas with existing streets but
no sidewalks.
PROJECT DESCRIPTION - Project No. 3391
Analyze all projects in priority order to determine feasibility of a
construction project. Design and construct feasible projects in priority
order up to budgeted annual amount. List of projects and priority come
from the Sidewalk Inventory Report, dated February 1991. Projects will
come from segments of the streets in the report by priority and will work
down list as feasibility and funding permit.
Funded $300,000 per year from the Traffic Impact Fee (TIF) and TransNet
(local sales tax) funds for the next 25 years.
Prior Appropriation - $1,146,588
PROJECT NEED
Primarily to improve pedestrian circulation and safety. Will also improve
on-street parking, drainage, and traffic circulation.
TOTAL PROJECT COST: $8.046,588
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
TransNet/TIF
Deslan/Const.
$300.000
1997-98
TransNet
Deslan/Const
$300.000
PROJECT
1998-99
TransNet
Deslan/Const
$300.000
FUNDING
1999-2000
TransNet
Deslan/ConsL
$300.000
2000-2001
TransNet
Deslan/Const
$400,000
2001-2006
TransNet
Deslan/Const
$2.000.000
2006*
TIF/TransNet
Deslan/Const
$3.300.000
LOCALST.96
i :m i f •r i ru r:i i i
Page 206
r~i tu i i c.i
I ] 11 I J 1 i .
CAPITAL PROJECT DESCRIPTION
MELROSE DRIVE AND ALGA ROAD
Project Title
PROJECT LOCATION MAP
1 1
II
1 1
\1I
bJ
K
oa:
ALGA ROAD
PROJECT LOCATION
At the intersection of the above named streets.
PROJECT DESCRIPTION
Construct dual left-turns on all legs-northbound, southbound,
eastbound and westbound.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $480.000
Fiscal Year 1996-97
Fundinq Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Construction
$480.000
MELROALG.96 Page 207
CAPITAL PROJECT DESCRIPTION
MISCELLANEOUS -TRAFFIC MONITORING PROGRAM
Proj
PROJECT LOCATION MAP
N/A
act Title
PROJECT LOCATION
City-wide.
PROJECT DESCRIPTION - Project No. 3316
Perform traffic vehicle counts, analyze and report annually on adequacy of
circulation system and identify any intersections or links that fail to meet
Growth Management Standards.
Previous Appropriation = $372,764
PROJECT NEED
To ensure that the circulation system meets Growth Management
Standards.
PROJECT FUNDING
TOTAL PROJECT COST: $1.032.764
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
TIF
Monitoring
$44.000
1997J8
TIF
Monitoring
$44.000
1998-99
TIF
Monitoring ,
$44.000
1999-2000
TIF
Monitoring
$44,000
2000-20W
TIF
Monitoring
$44.000
2001-2006
TIF
Monitoring
$220.000
2006+
TIF
Monitoring
$220.000
TRAFFMON.96
II € I LI i i 19 i J i cai rai
Page 208
• I JI I
mm r~i rai ta tj mm i j i i L
CAPITAL PROJECT DESCRIPTION
PALOMAR AIRPORT ROAD
Project Title
LI i j ».
PROJECT LOCATION MAP PROJECT LOCATION
Between Yarrow Drive and El Camino Real.
PROJECT DESCRIPTION - Project No. 3286
Widen to six lanes plus construct eastbound dual left-turn lanes.
Construct paving, base, curb & gutter, sidewalk and street lights.
Previous Appropriation - $117,500 (GCC and County)
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $2,597.500
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Oberating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
Countv/TransNct
Construction
$2.480.500
PAR2.96 Page 209
CAPITAL PROJECT DESCRIPTION
PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD
Project Title
PROJECT LOCATION MAP
PALOMAR AIRPORT ROAD
PROJECT LOCATION
At the intersection of the above named streets.
PROJECT DESCRIPTION
Construct dual left-turn lane southbound on College Boulevard.
Additional right-of-way will be required.
PROJECT NEED
Required to meet Growth Management Standards.
PARCOLLE.96
TOTAL PROJECT COST: $160.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Construction
$160,000
Page 210
II II I 1 II I 1 i
CAPITAL PROJECT DESCRIPTION
PALOMAR AIRPORT ROAD AND PASEO DEL NORTE
Project Title
PROJECT LOCATION MAP
PALOMAE AIRPORT ROAD
PROJECT LOCATION
At the intersection of the above named streets.
PROJECT DESCRIPTION
Construct dual left-turns on all legs-northbound, southbound,
eastbound, and westbound.
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST: $525,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Construction
$525,000
PARPASE0.96 Page 211
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
PROJECT
PALOMAR AIRPORT ROAD BRIDGE
Project Title
PROJECT LOCATION
Between Carlsbad Boulevard and 1-5 over the AT&SF Railway.
PROJECT DESCRIPTION
Reconstruct old interchange and connect Palomar Airport Road to
Carlsbad Boulevard with a tee intersection. Construct four lanes of
asphalt pavement on Palomar Airport Road (600 ft.) and Carlsbad
Boulevard (1000 ft.) including curb and gutter, medians, sidewalk,
streetlights, traffic signal and new bridge over railroad.
PROJECT NEED
Project will improve the capacity of the intersection and free two
parcels of land which the City can lease or develop.
TOTAL PROJECT COST: $7.200.000
Fiscal Year 1996-97
Fundinq Source
Purpose
Amount
Operatinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006
PFF
Desiqn
$750.000
2006+
PFF
Construction
$6.450.000
PARBRIDG.96
ra i j cai
Page 212
• II 1 I
r i * i K*JI t~J i~i L J t
CAPITAL PROJECT DESCRIPTION
PALOMAR AIRPORT ROAD MEDIANS
Project Title
t J I i i
PROJECT LOCATION MAP PROJECT LOCATION
Between Yarrow Drive and El Camino Real.
PROJECT DESCRIPTION
Construct raised, landscaped median where no developers are
required to do so. Work includes median curb, stamped concrete,
irrigation and landscaping.
PROJECT NEED
Required for vehicular safety and to meet standards for a prime
arterial.
TOTAL PROJECT COST: $500.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Design/Const
$500,000
PARMDIAN.96 Page 213
CAPITAL PROJECT DESCRIPTION
PALOMAR AIRPORT ROAD MITIGATION
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
South of Palomar Airport Road and east of College Boulevard.
PROJECT DESCRIPTION - Project No. 3401
Repair plants, shrubs and the irrigation system to original
specifications. Maintain and make periodic replacements as required
for a period of five years.
Previous Appropriation - $280,000 Assessment District
PROJECT NEED
The mitigation establishment was a Coastal Commission requirement
for the widening of Palomar Airport Road.
PROJECT FUNDING
TOTAL PROJECT COST: $280.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PARMITIG.96
IJi i J •••
Page 2U
E 1 II
r™i r i i i i i
CAPITAL PROJECT DESCRIPTION
POINSETTIA LANE BRIDGE
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Between Carlsbad Boulevard and Avenida Encinas over the AT&SF
Railway.
PROJECT DESCRIPTION
Only one-half width bridge currently exists over the railroad. This
project will complete the other half of the prestressed concrete bridge
so that four lanes of this major arterial can continue across the
railroad.
PROJECT NEED
Required to meet Growth Management Standards and identified in the
Circulation Element of the General Plan.
TOTAL PROJECT COST: $2.000.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Ooerating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
PFF
Design/Const
$2.000,000
POINBRDG.96 Page 215
CAPITAL PROJECT DESCRIPTION
POINSETTIA LANE WIDENING
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
From Paseo Del Norte to Batiquitos Lane,
PROJECT DESCRIPTION - Project No. 3390
Widen this segment of the street to six lanes by adding one lane in
each direction.
Construct curb and gutter, base, asphalt pavement and sidewalk.
Right-of-way is required.
PROJECT NEED
Required to meet Growth Management Standards and to have
sufficient capacity for projected future traffic volumes.
TOTAL PROJECT COST: $1,870,000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operatinq Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
TIF
Construction
$1.870,000
POINWIDE.96
I J 1 J L J I « E J 1 9 E Ji
Page 216
• I...J I 1
BB Ki ri ei BH •• n r i r
CAPITAL PROJECT DESCRIPTION
RANCHO SANTA FE ROAD AND OLIVENHAIN ROAD
K3 I 1
Pro
PROJECT LOCATION MAP
set Title
PROJECT LOCATION
From El Camino Real to Melrose Drive.
PROJECT DESCRIPTION - Project Nos. 3190 & 3466
Widen street to full 6-lane prime arterial standards at several locations.
Amount is a contribution for areas where no developer is obligated to
widen. Construct curb and gutter, sidewalk, base, asphalt pavement and
streetlights.
NOTE: Widening required on the south side of Olivenhain Road is outside
the City limits of Carlsbad.
Right-of-way is required.
Previous Appropriation - $3,074,000
PROJECT NEED
Required by Growth Management Standards and to conform to the
Circulation Element of the General Plan.
PROJECT FUNDING
TOTAL PROJECT COST: $36.057.000
Fiscal Year 1996-97 1997-96 1996-99 1999-2000 2000-2001 2001-2006 2006*
Funding Source CFD#2/Enclnltas CFD#1/CFD#2 CFD#1/CFD#2
Purpose Construction
Amount $2,612.000
Operating Costs
Construction Construction
$15.032.000 $17,339.000
RSFOLIVE.96 Page 217
CAPITAL PROJECT DESCRIPTION
STREET LIGHTING ENHANCEMENT STUDY
PROJECT LOCATION MAP
CITYOFOCEANSIDE
PROJECT,
AREA
Project Title
PROJECT LOCATION
Bounded by the northerly city limits, Pacific Ocean, 1-5 and Agua Hedionda.
PROJECT DESCRIPTION
Hire consultant to study street lighting levels. Identify deficiencies and
recommend cost effective measures to rectify deficiencies.
PROJECT NEED
Planning study within the project boundary has identified deficiencies.
Substandard lighting may cause unsafe conditions.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
$50.000
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
GCF
Studv
$65.000
-0-
STRLIGHT.96
mm i M i M im u mm
Page 218
• II II
n r~i ri 11
CAPITAL PROJECT DESCRIPTION
UNDERGROUND UTILITY DISTRICT NO. 17 (ROOSEVELT STREET)
Proi
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
Roosevelt Street from Carlsbad Village Drive to Magnolia Avenue.
PROJECT DESCRIPTION
Place all overhead utilities underground, including electric, telephone, and
cable television lines. Work includes trenching, placing conduit and cable,
restoring surface, and removal of existing poles and all overhead lines.
PROJECT NEED
This project is identified on the City Council's adopted Underground Priority
List.
TOTAL PROJECT COST; $700.000
Fiscal Year 1996-97 1997-98
Fundlna Source ,,, ..
Purpose
Amount _„
Operating Costs ,
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006
SDG&E
Construction
$700.000
2006+
UUD17.96 Page 219
CAPITAL PROJECT DESCRIPTION
UNDERGROUND UTILITY DISTRICT NO. 18 (HARDING STREET)
PROJECT LOCATION MAP
Proiect Title
PROJECT LOCATION
Harding Street between Carlsbad Village Drive and Maple Street.
PROJECT DESCRIPTION
Place all overhead utilities underground, including electric, telephone, and
cable television lines. Work includes trenching, placing conduit and cable,
restoring surface, and removal of existing poles and all overhead lines.
PROJECT NEED
This project is identified on the City Council's adopted Underground Priority
List.
TOTAL PROJECT COST: $550.000
Fiscal Year 1996-97
Funding Source
Puroose
Amount
Ooeratina Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006*
SDG&E
.,„.,,. , Construction
$550.000
UUD18.96
t J t-JI LJI KJi
Page 220
mm i j i i
ri i i i i
CAPITAL PROJECT DESCRIPTION
UNDERGROUND UTILITY DISTRICT NO. 19
Pro
PROJECT LOCATION MAP
;ct Title
PROJECT LOCATION
Valley Street between Chestnut Avenue and Tamarack Avenue.
PROJECT DESCRIPTION
Place all overhead utilities underground, including electric, telephone, and
cable television lines. Work includes trenching, placing conduit and cable,
restoring surface, and removal of existing poles and all overhead lines.
PROJECT NEED
This project is identified on the City Council's adopted Underground Priority
List.
TOTAL PROJECT COST: $350,000
Fiscal Year 1996-97 ,199^8
Fundlna Source
Ptiroos* MI m ,,,,.. ,,.,,..,
Amount ,
OMratina Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-200? 2006+
SDG&E
Construction
$350.000
UUD19.96 Page 221
f 1- "f *"•---»
1-5 OVERPASS PROJECTS
r"i r~i r~i «a r^ ri
CAPITAL PROJECT DESCRIPTION
1-5/LA COSTA AVENUE INTERCHANGE
J LJ i i i i i i
Proj
PROJECT LOCATION MAP
ect Title
PROJECT LOCATION
Interchange of Interstate 5 with La Costa Avenue.
PROJECT DESCRIPTION - Project No. 3219
Widen freeway overpass to four lanes plus left-turn lanes and include
raised median. Widen all on and off ramps and install traffic signals at the
two ramp/La Costa Avenue intersections.
Previous Appropriation - $4,000,000 (CFD)
PROJECT NEED
Required to meet Growth Management Standards.
TOTAL PROJECT COST:
Fiscal Year
Funding Source
Purpose
Amount ,....
Operating Costs
$9.750.000
1996-97 1997-98
CFD«H
Construction
$4.250.000
PROJECT FUNDING
1998-99 1999-200Q 2000-2001 2001-2006 20064
CFD#i
Construction
S1.500.000
I-5LACOS.96 Page 222
» i. p f P < f i - r » i i i i
UNFUNDED PROJECTS
r i LJ • J 11 i i ii
PROJECT LOCATION MAP
CAPITAL PROJECT DESCRIPTION
ALGA ROAD MEDIANS
Project Title
PROJECT LOCATION
Alga Road between El Camino Real and El Fuerte.
PROJECT DESCRIPTION
The installation of an irrigation system and landscaping within the existing
median in Alga Road.
PROJECT NEED
To provide landscaping treatment in the existing median.
TOTAL PROJECT COST; $485.000
Fiscal Year
Funding Source
Purpose ,__
Amount
Operating Costs
PROJECT FUNDING
1998-2000 2000-2001 2001-2006
ALGAMEDI.96 Page 223
CAPITAL PROJECT DESCRIPTION
CARLSBAD BOULEVARD REALIGNMENT
Project Title
PROJECT LOCATION MAP
PROJECT
PROJECT LOCATION
Carlsbad Boulevard south of Palomar Airport Road.
PROJECT DESCRIPTION
Currently there exists a wide vegetated corridor between the northbound
and southbound Carlsbad Boulevard between Palomar Airport Road and
the Carlsbad State Campground. The realignment of the southbound lane
to traverse directly adjacent to the northbound lane providing excess right-
of-way on the west.
This excess property could be converted to a park and public access to the
local beach area. The City will seek ISTEA funding for design and
construction.
PROJECT NEED
Would provide excess right-of-way which could be converted to park usage
along the Pacific Ocean bluff.
TOTAL PROJECT COST: 1900.000
Fiscal Y0ar 1996-87
Fundlna Source
Purpose
Amount
Operatinfl Cost*
PROJECT FUNDING
1«974i 1998-99 1999-2000 2000-2001 2001-2006 2006+
CB REAL.96 Page 224
t a i * i m mm
iJ 11 ii ii i
CAPITAL PROJECT DESCRIPTION
HOLIDAY PARK IRRIGATION RENOVATION
Proi
PROJECT LOCATION MAP
I )J t
\\\\\\
ect Title
PROJECT LOCATION
Holiday Park.
PROJECT DESCRIPTION
To revise and upgrade existing irrigation system at Holiday Park.
PROJECT NEED
Will provide for more efficient watering of grass area in park.
tOTAL PROJECT COST: $95.000
Fiscal Year 1996-87
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
199?.98 1998-99 1999-2000 2000-2001 2001-2006 2006*
HOLIDYPK.96
Page 22f.
CAPITAL PROJECT DESCRIPTION
LAKESHORE GARDENS SOUNDWALL
PROJECT LOCATION MAP
Project Title
PROJECT LOCATION
Lake Shore Gardens Mobile Home Park at Poinsettia Lane and Avenida
Encinas.
PROJECT DESCRIPTION
Extend and modify an existing block wall around the Lake Shore Gardens
Mobilehome Park. The location of this particular improvement is limited to
the area adjacent to the intersection of Poinsettia Lane and Avenida
Encinas.
PROJECT NEED
To reduce the sound impacts from adjacent traffic.
TOTAL PROJECT COST: $25.000
Fiscal Year 1996-87 1997-98
Fundlna Source
Purpose
Amount
Ooeratina Costs
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006*
LAKESHOR.96
ii ii r i ii ii 11
Page 226
i I i j i j i j i i i J i i f i i i 11 i a
t 1 L J II II II
CAPITAL PROJECT DESCRIPTION
PAVE 8' SHOULDER ON EL FUERTE STREET NORTH OF CORINTIA STREET
PROJECT LOCATION MAP
Proj ect Title
PROJECT LOCATION
East side of El Fuerte Street between Corintia Street and
Luciernaga Street.
PROJECT DESCRIPTION
Pave 8' shoulder (approximately 16,000 square feet) on east side of El
Fuerte Street. Should to be used for parking and bike lane. Existing
alignment and profile Dwg. #191-5.
PROJECT NEED
Children and bicycle traffic adjacent to public school. Substandard width of
secondary arterial.
TOTAL PROJECT COST: tSO.OOO
Fiscal Year 1996-97
Fundlra Source
Purnose
Amount
Operating Costs
PROJECT FUNDING
1997-88 1998-09 1999-2000 2000-2001 2001-2008 2006*
GCC
SHOULDER.96 Page 227
CAPITAL PROJECT DESCRIPTION
SIDEWALKS - VILLAS TO DOVE LANE
PROJECT LOCATION MAP
Proj
11
ect Title
PROJECT LOCATION
Along the southbound lane of El Camino Real between the Villas project
and Dove Lane.
PROJECT DESCRIPTION
Construction of a pedestrian walkway adjacent to the southbound lanes of
El Camino Real.
PROJECT NEED
To provide a safe pedestrian route from the Villas project to the
commercial center at Alga Road and El Camino Real.
TOTAL PROJECT COST: $60.000
Fiscal Year 1996-97 1997-98
Funding Source „
Purpose , ... ,„.,, „ , , ,.. ir
Amount mil m ,. , ,,
Operating Costs H. .,, ,
PROJECT FUNDING
1998-99 1999-2000 2000-200^ 2001-2006 2006+
SIDEWALK. 96 Page 228
r i i i
PROJECT LOCATION MAP
\
CAPITAL PROJECT DESCRIPTION
50M SWIMMING POOL AT ALGA NORTE PARK
Project Title
PROJECT
PROJECT LOCATION
Alga Norte Park.
PROJECT DESCRIPTION
Construction of a BOM swimming pool complex at Alga Norte Park.
PROJECT NEED
To accommodate future recreational and competitive swimming
activities.
TOTAL PROJECT COST: $3.000.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-3006 2006+
50M SWIM.96 Page 229
CAPITAL PROJECT DESCRIPTION
PROJECT LOCATION MAP
SIGNAL
LOCATION
TRAFFIC SIGNAL - ALGA ROAD/CAZADERQ DRIVE
Project Title
PROJECT LOCATION
Alga Road and Cazadero Drive.
PROJECT DESCRIPTION
Installation of a fully actuated traffic signal.
PROJECT NEED
Needed in future when traffic warrants are met. Alga Road is a major
arterial expected to accommodate large volumes of traffic.
TOTAL PROJECT COST: $125.000
PROJECT FUNDING
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1998-99 1999-2000 2000-2001 2001-2006 2006+
ALGACAZA.96 Page 230
i J I J LJI
n f i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CARLSBAD BOULEVARD/CHERRY AVENUE
Pro
PROJECT LOCATION MAP
PACIFIC
OCEAN
ect Title
PROJECT LOCATION
Intersection of Carlsbad Boulevard and Cherry Avenue.
PROJECT DESCRIPTION
Installation of a 3-phase, fully actuated traffic signal, including a Type 170
controller, type 200SA intersection control program, striping and signing.
PROJECT NEED
Caltrans traffic signal warrants have been met.
TOTAL PROJECT COST: $110.000
Fiscal Year 1996-97
Fundina Source , „ , , n
Purpose , .,., r ,
Amount ,,,,,,, „,„., ,
Operatina Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
CBCHERRY.96 Page 231
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CARLSBAD BOULEVARD/CHESTNUT AVENUE
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
Carlsbad Boulevard and Chestnut Avenue.
PROJECT DESCRIPTION
Installation of a fully actuated traffic signal.
PROJECT NEED
Needed in future when traffic volumes are met. Carlsbad Boulevard is
a major arterial expected to accommodate large volumes of traffic.
TOTAL PROJECT COST: $110.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
CBADCHES.96 Page 232
i j
• KB n mm mm mm mm r~i r i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CARLSBAD BOULEVARD/OAK DRIVE
Project Title
r i r i
PROJECT LOCATION MAP PROJECT LOCATION
Carlsbad Boulevard and Oak Drive.
PROJECT DESCRIPTION
Installation of a fully actuated traffic signal.
PROJECT NEED
Needed in future when traffic warrants are met. Carlsbad Boulevard
is a major arterial expected to accommodate large volumes of traffic.
PROJECT FUNDING
TOTAL PROJECT COST: $110.000
Fiscal Year 1996-97
Funding Source •
Purpose
Amount
Operating Costs
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
CBAD OAK.96 Page 233
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CARLSBAD BOULEVARD/STATE STREET
Proi
PROJECT LOCATION MAP
PACIFIC
OCEAN
set Title
PROJECT LOCATION
Intersection of Carlsbad Boulevard and State Street.
PROJECT DESCRIPTION
Installation of a 3-phase, fully actuated traffic signal, including a Type 170
controller, type 200SA intersection control program, striping and signing.
PROJECT NEED
Caltrans traffic signal warrants have been met.
PROJECT FUNDING
TOTAL PROJECT COSt: $110.000
Fiscal Year 1996-97
Funding Source ,
Purpose _^
Amount
Operating Costs
1997.98 1998-99 1999-2000 2000-2001 2001-2006 2006*
CB_STATE.96 Page 234
i J t J I J
r~i n r^i r i r i t J i i i i i i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CARLSBAD VILLAGE DRIVE/AVENITA DE ANITA
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Carlsbad Village Drive and Avenita de Anita.
PROJECT DESCRIPTION
Installation of a fully actuated traffic signal.
PROJECT NEED
Needed in future when traffic warrants are met. Carlsbad Village
Drive is a major arterial expected to accommodate large volumes of
traffic.
PROJECT FUNDING
TOTAL PROJECT COST: $100.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
CVD AVEN.96 Page 235
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CARLSBAD VILLAGE DRIVE/VALLEY STREET
Pro!
PROJECT LOCATION MAP
IGNAL
LOCATION
ect Title
PROJECT LOCATION
Carlsbad Village Drive and Valley Street.
PROJECT DESCRIPTION
Installation of a fully actuated traffic signal.
PROJECT NEED
Needed when traffic warrants are met. Carlsbad Village Drive is a major
arterial expected to accommodate large volumes of traffic.
TOTAL PROJECT COST: $125.000
Fiscal Year ^996-97
Fundlna Source
Purpose B.
Amount _. , ,, , ..„.„,
Ooeratina Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2008+
CVD_VALL96 Page 236
I J I J
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - CHESTNUT AVENUE/PIQ PICO
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Chestnut Avenue and Pio Pico.
PROJECT DESCRIPTION
Installation of a fully actuated traffic signal.
PROJECT NEED
Needed when traffic warrants are met.
TOTAL PROJECT COST: $125.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
CHESTPI0.96 Page 237
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - LA COSTA AVENUE/CADENCIA STREET
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
Intersection of La Costa Avenue and Cadencia Street.
PROJECT DESCRIPTION
Installation of a 5-phase, fully actuated traffic signal, including a
Type 170 controller, type 200 SA intersection control program,
striping and signing.
PROJECT NEED
Caltrans traffic signal warrants have been met.
PROJECT FUNDING
TOTAL PROJECT COST: $125.000
Fiscal Year 1996
Funding Source
Purpose
Amount
Operating Costs
1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
LC CADEN.96 Page 238
f 1 I ] I J II I 1 I i
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - LA COSTA AVENUE/PIREAUS STREET
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
La Costa Avenue and Pireaus Street.
PROJECT DESCRIPTION
Installation at a fully actuated traffic signal.
PROJECT NEED
Needed when traffic warrants are met. La Costa Avenue is a major
arterial expected to accommodate large volumes of traffic.
PROJECT FUNDING
TOTAL PROJECT COST: $110.000
Fiscal Year
Funding Source
Purpose
Amount
Operating Costs
1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2006 2006+
LACOSPIR.96 Page 239
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - LA COSTA AVENUE/ROMERIA STREET
PROJECT LOCATION MAP
Proj ect Title
PROJECT LOCATION
Intersection of La Costa Avenue and Romeria Street.
PROJECT DESCRIPTION
Installation of a 5-phase, fully actuated traffic signal, including a Type 170
controller, type 200SA intersection control program, striping and signing.
PROJECT NEED
Caltrans traffic signal warrants have been met.
TOTAL PROJECT COST: $125.000
Fiscal Year 199647
Funding Source
Purpose
Amount
Operating Costs
PROJECT FUNDING
1997-98 1998-99 1999-2000 2000-2001 2001.2006 2006*
LCROMERI.96
Page 2<tO
IJI 1 J L.J
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - LA COSTA AVENUE/SAXONY ROAD
Project Title
PROJECT LOCATION MAP
SIGNAL
LOCATION
PROJECT LOCATION
La Costa Avenue and Saxony Road.
PROJECT DESCRIPTION
Installation at a fully actuated traffic signal.
PROJECT NEED
Needed when traffic warrants are met. La Costa Avenue is a major
arterial expected to accommodate large volumes of traffic.
TOTAL PROJECT COST: $110.000
Fiscal Year 1996-97
Funding Source
Purpose
Amount
Operating Costs
1997-98
PROJECT FUNDING
1998-99 1999-2000 2000-2001 2001-2006 2006+
LACOSSAX.96 Page 241
CAPITAL PROJECT DESCRIPTION
TRAFFIC SIGNAL - LA COSTA AVENUE/VIEJA CASTILLA
Project Title
PROJECT LOCATION MAP PROJECT LOCATION
La Costa Avenue and Vieja Castilla.
PROJECT DESCRIPTION
Installation of a fully actuated traffic signal.
PROJECT NEED
Needed in future when traffic warrants are met.
PROJECT FUNDING
TOTAL PROJECT COST: $125.000
Fiscal Year 1996-97
Funding Source _
Purpose _
Amount _
1997-98 1998-99 1999-2000 2000-2001 2001-2006
Operating Costs
2006+
LC VIEJA.96 Page 242